WO2017085782A1 - 実装処理方法、実装システム、交換制御装置および部品実装機 - Google Patents
実装処理方法、実装システム、交換制御装置および部品実装機 Download PDFInfo
- Publication number
- WO2017085782A1 WO2017085782A1 PCT/JP2015/082233 JP2015082233W WO2017085782A1 WO 2017085782 A1 WO2017085782 A1 WO 2017085782A1 JP 2015082233 W JP2015082233 W JP 2015082233W WO 2017085782 A1 WO2017085782 A1 WO 2017085782A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- component
- mounting
- unit
- mounting process
- component supply
- Prior art date
Links
Images
Classifications
-
- H—ELECTRICITY
- H05—ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
- H05K—PRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
- H05K13/00—Apparatus or processes specially adapted for manufacturing or adjusting assemblages of electric components
- H05K13/08—Monitoring manufacture of assemblages
- H05K13/086—Supply management, e.g. supply of components or of substrates
-
- H—ELECTRICITY
- H05—ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
- H05K—PRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
- H05K13/00—Apparatus or processes specially adapted for manufacturing or adjusting assemblages of electric components
- H05K13/04—Mounting of components, e.g. of leadless components
- H05K13/0417—Feeding with belts or tapes
-
- H—ELECTRICITY
- H05—ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
- H05K—PRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
- H05K13/00—Apparatus or processes specially adapted for manufacturing or adjusting assemblages of electric components
- H05K13/04—Mounting of components, e.g. of leadless components
- H05K13/0417—Feeding with belts or tapes
- H05K13/0419—Feeding with belts or tapes tape feeders
-
- H—ELECTRICITY
- H05—ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
- H05K—PRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
- H05K13/00—Apparatus or processes specially adapted for manufacturing or adjusting assemblages of electric components
- H05K13/04—Mounting of components, e.g. of leadless components
- H05K13/0452—Mounting machines or lines comprising a plurality of tools for guiding different components to the same mounting place
-
- H—ELECTRICITY
- H05—ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
- H05K—PRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
- H05K13/00—Apparatus or processes specially adapted for manufacturing or adjusting assemblages of electric components
- H05K13/04—Mounting of components, e.g. of leadless components
- H05K13/0495—Mounting of components, e.g. of leadless components having a plurality of work-stations
-
- H—ELECTRICITY
- H05—ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
- H05K—PRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
- H05K13/00—Apparatus or processes specially adapted for manufacturing or adjusting assemblages of electric components
- H05K13/08—Monitoring manufacture of assemblages
- H05K13/085—Production planning, e.g. of allocation of products to machines, of mounting sequences at machine or facility level
-
- H—ELECTRICITY
- H05—ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
- H05K—PRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
- H05K13/00—Apparatus or processes specially adapted for manufacturing or adjusting assemblages of electric components
- H05K13/08—Monitoring manufacture of assemblages
- H05K13/085—Production planning, e.g. of allocation of products to machines, of mounting sequences at machine or facility level
- H05K13/0853—Determination of transport trajectories inside mounting machines
-
- H—ELECTRICITY
- H05—ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
- H05K—PRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
- H05K13/00—Apparatus or processes specially adapted for manufacturing or adjusting assemblages of electric components
- H05K13/08—Monitoring manufacture of assemblages
- H05K13/087—Equipment tracking or labelling, e.g. tracking of nozzles, feeders or mounting heads
-
- H—ELECTRICITY
- H05—ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
- H05K—PRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
- H05K13/00—Apparatus or processes specially adapted for manufacturing or adjusting assemblages of electric components
- H05K13/08—Monitoring manufacture of assemblages
- H05K13/0882—Control systems for mounting machines or assembly lines, e.g. centralized control, remote links, programming of apparatus and processes as such
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01R—ELECTRICALLY-CONDUCTIVE CONNECTIONS; STRUCTURAL ASSOCIATIONS OF A PLURALITY OF MUTUALLY-INSULATED ELECTRICAL CONNECTING ELEMENTS; COUPLING DEVICES; CURRENT COLLECTORS
- H01R33/00—Coupling devices specially adapted for supporting apparatus and having one part acting as a holder providing support and electrical connection via a counterpart which is structurally associated with the apparatus, e.g. lamp holders; Separate parts thereof
- H01R33/88—Coupling devices specially adapted for supporting apparatus and having one part acting as a holder providing support and electrical connection via a counterpart which is structurally associated with the apparatus, e.g. lamp holders; Separate parts thereof adapted for simultaneous co-operation with two or more identical counterparts
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01R—ELECTRICALLY-CONDUCTIVE CONNECTIONS; STRUCTURAL ASSOCIATIONS OF A PLURALITY OF MUTUALLY-INSULATED ELECTRICAL CONNECTING ELEMENTS; COUPLING DEVICES; CURRENT COLLECTORS
- H01R43/00—Apparatus or processes specially adapted for manufacturing, assembling, maintaining, or repairing of line connectors or current collectors or for joining electric conductors
- H01R43/26—Apparatus or processes specially adapted for manufacturing, assembling, maintaining, or repairing of line connectors or current collectors or for joining electric conductors for engaging or disengaging the two parts of a coupling device
-
- H—ELECTRICITY
- H05—ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
- H05K—PRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
- H05K13/00—Apparatus or processes specially adapted for manufacturing or adjusting assemblages of electric components
- H05K13/04—Mounting of components, e.g. of leadless components
- H05K13/0404—Pick-and-place heads or apparatus, e.g. with jaws
- H05K13/0408—Incorporating a pick-up tool
- H05K13/0409—Sucking devices
Definitions
- the present invention relates to a mounting processing method, a mounting system, an exchange control device, and a component mounting machine.
- a component mounter that mounts a component supplied by a component supply unit containing a plurality of components on a substrate.
- a component supply unit containing a plurality of components on a substrate.
- the component supply unit may be replaced by an operator depending on the component type necessary for mounting. In this case, depending on the number of component supply units to be replaced, it may take time for the replacement work, and the start of production of the next board type may be delayed.
- the component mounting system described in this document includes a replacement robot that can automatically replace a component supply unit. Then, the replacement robot replaces the component supply unit that has finished supplying the component with the component supply unit that is necessary for the next mounting process during production before the substrate type is switched, thereby quickly switching the substrate type. It is supposed to be. Thus, in order to improve the productivity of the mounting process, it is required to efficiently replace the component supply unit.
- the replacement of the component supply unit is not limited to when the board type is switched.
- a unit exchanging device such as an exchanging robot
- the main object of the present invention is to improve productivity by exchanging the component supply unit more efficiently during the mounting process using the unit exchanging device.
- the present invention adopts the following means in order to achieve the main object described above.
- a plurality of component supply units that accommodate a plurality of components are set so as to be replaceable by a unit replacement device, and a plurality of types of the components supplied by the plurality of component supply units are mounted on a board.
- setting in the component mounter means that the component supply unit is attached so as to be able to supply components.
- the mounting processing may be performed while replacing the remaining component supply unit.
- a component supply unit that has finished supplying components in the mounting process can be a component supply unit that does not need to supply any more components to one substrate in the mounting process.
- the head is moved onto the substrate via a predetermined position to perform the mounting process, and the mounting process is performed.
- the component supply unit in which the supply of the component is completed the component supply unit is set at a position where the movement distance from when the head collects the component to the predetermined position is shorter.
- the mounting process may be performed while replacing the remaining component supply unit with the unit replacement device. In this way, by exchanging the component supply unit during the mounting process, it is possible to shorten the moving time of the head to a predetermined position and improve the productivity.
- the time required for the head to move to a predetermined position is shorter than the time required to replace the component supply unit, based on the number of components (number of supply points) of the component type that is mounted on one board.
- the remaining component supply unit may be set so that the For example, among the plurality of component supply units necessary for the mounting process, a component supply unit with a large number of supply points may be used as the remaining component supply unit. In this case, the effect of improving the productivity of the mounting process can be enhanced by setting the remaining component supply unit at a position where the moving distance until the head moves to the predetermined position is shorter.
- the component supply for which the supply of the components has been completed in the mounting processing may be performed while changing the arrangement of the unit and the component supply unit for which the supply of the component has not been completed by the unit replacement device. In this way, it is possible to perform mounting processing while setting the component supply unit at a position where supply efficiency is better.
- the head is moved onto the substrate via a predetermined position to perform a mounting process.
- the moving distance from the time when the head collects the component to the predetermined position is shorter.
- the mounting process may be performed while changing the arrangement with the component supply unit for which the component supply has not been completed in the mounting process.
- the component supply unit that is the target of the arrangement change may be a component supply unit that is set at a position where the movement distance from when the head collects the component to when the head moves to a predetermined position is shortest. In this way, the effect of shortening the moving time of the head can be enhanced and the productivity can be further improved.
- the moving time is compared by comparing the changing time required to change the arrangement of the parts supply unit with the moving time to reduce the movement time of the head when changing the arrangement of the parts supply unit. When the shortening time exceeds the arrangement change time, the arrangement of the component supply units can be changed.
- the component supply unit to be changed may be set so that the arrangement change of the component supply unit is completed before the timing at which the component supply from the component supply unit to be changed is to be started.
- a plurality of component supply units that house a plurality of components are set so as to be replaceable by a unit replacement device, and a plurality of types of the components supplied by the component supply unit are converted into a plurality of types.
- a mounting processing method in a component mounting machine that performs mounting processing to be mounted on a board, wherein the mounting process is sequentially performed by the component mounting machine on the board that is transported to a plurality of lanes provided in parallel. If the type of the board that is mounted in one lane is different from the type of the board that is mounted next in another lane, the mounting process of the same type of board is continued in the one lane.
- the component supply unit for which the supply of the component has been completed in the mounting process of the board of one of the board types is connected to the component supply unit necessary for the next mounting process of the other lane. And summarized in that the mounting process while replaced with.
- the mounting process while replaced with.
- it is determined whether or not a component supply unit that has finished supplying components during the mounting process is used in the next mounting process in another lane, and is determined not to be used in the next mounting process in another lane.
- the component supply unit may be replaced with a component supply unit necessary for the next mounting process in another lane.
- a plurality of component supply units that accommodate a plurality of components are set so as to be replaceable by a unit replacement device, and a plurality of types of the components supplied by the component supply unit are converted into a plurality of types.
- a mounting processing method in a component mounting machine that performs mounting processing to be mounted on a board, wherein a plurality of mounting processes are performed in the component mounting machine arranged side by side along the transport direction of the board, and the mounting process of the same type of the board
- the component supply unit set in any of the plurality of component mounters is mounted while being transferred between the component mounters by the unit replacement device. In this way, the component supply unit can be reused in each component mounter, so that the mounting process can be performed efficiently even when the number of component supply units is not as many as the number of component mounters.
- the mounting process of the same type of the substrate is completed until the component mounting process is completed. If the total number of remaining parts in the parts contained in another component supply unit of the component type set in the plurality of component mounters is larger than the required number of components, the component type will run out of components.
- the component supply unit which is not formed may be mounted while being transferred between the component mounters by the unit replacement device. In this way, when a component supply unit that is out of components occurs, the mounting process can be continued without using a new component supply unit. For this reason, generation
- the one component of the component type The supply unit may be mounted while being transferred between the component mounting machines by the unit replacement device.
- the component supply unit can be delivered and efficiently mounted.
- the component supply unit to be transferred between each component mounter is set at the start of the mounting process of one board, the component supplied by the component supply unit to be transferred is not a target to be transferred. It is also possible to change the mounting order so that mounting is performed with priority over other component supply units.
- the component supply unit to be transferred between the component mounters is not set at the start of the mounting process of one board, the component supply to be transferred to another component supply unit that is not to be transferred
- the mounting order may be changed to change the mounting order so that the mounting is prioritized over the unit.
- a first mounting system of the present invention is set in a component mounter that performs a mounting process for mounting the component supplied by a plurality of component supply units that accommodate a plurality of components on a substrate, and the component mounter.
- a mounting system comprising a unit exchanging device for exchanging the component supply unit and an exchanging control device for controlling the unit exchanging device, wherein the exchanging control device includes a plurality of the board necessary for the mounting process of the substrate.
- the mounting process When the mounting process is started in a state where some of the component supply units are set, during the mounting process of one of the boards, the mounting order of the plurality of types of components in the mounting process and the Based on the information of the component supply unit for which the supply of the component has been completed in the mounting process, the component supply unit for which the supply of the component has been completed is And summarized in that to control the unit replacement device to replace the rest of the component feeding unit excluding a portion of the component supply unit and the out of the component supply units required.
- the mounting process can be performed while exchanging with a necessary part supply unit within a limited number of sets of the component supply units, so that the productivity of the mounting process can be improved. Further, it is possible to suppress the expansion of the component mounter in order to increase the number of sets of component supply units.
- the second mounting system of the present invention is set in a component mounter that performs a mounting process for mounting the component supplied by a plurality of component supply units that accommodate a plurality of components on a substrate, and the component mounter.
- a mounting system comprising a unit exchanging device for exchanging the component supply unit and an exchanging control device for controlling the unit exchanging device, wherein the exchanging control device performs the mounting process during the mounting process of the one board.
- the gist of the present invention is to control the unit exchanging device so as to change the arrangement with the component supply unit that has not been completed. As a result, mounting processing can be performed while setting the component supply unit at a position where supply efficiency is better.
- a third mounting system of the present invention includes a component mounter that performs a mounting process for mounting the component supplied by a plurality of component supply units that accommodate a plurality of components on a plurality of types of substrates, and is set in the component mounter.
- a mounting system comprising a unit exchanging device for exchanging the component supply unit, and an exchanging control device for controlling the unit exchanging device, wherein the component mounter is transported to a plurality of lanes provided in parallel.
- the board is sequentially mounted on the board, and the exchange control device is mounted next on the type of the board that is mounted on one lane and the other lane among the plurality of lanes.
- the component supply unit for which the component supply has been completed is necessary for the next mounting process in the other lane.
- the gist is to control the unit exchanging device so as to be replaced with a component supply unit. In this way, when boards of different board types are transported to multiple lanes, even if the number of component supply units necessary for the mounting process of each board type exceeds the number that can be set in the component mounting machine, It can be performed.
- a fourth mounting system includes a component mounter that performs a mounting process for mounting the component supplied by a plurality of component supply units that store a plurality of components on a plurality of types of substrates, and is set in the component mounter.
- a mounting system comprising a unit exchanging device for exchanging the component supply unit, and an exchanging control device for controlling the unit exchanging device.
- the replacement control apparatus supplies the component in the mounting process of the board of one of the board types in the plurality of component mounters while the mounting process of the board of the same type is continued.
- the component supply units set in the plurality of component mounters are transferred between the component mounters based on the information of the component supply units that have been completed. And summarized in that controlling the knit changer. In this way, the component supply unit can be reused in each component mounter, so that the mounting process can be performed efficiently even when the number of component supply units is not as many as the number of component mounters.
- the replacement control apparatus of the present invention replaces the component supply unit with respect to a component mounter that performs a mounting process for mounting a plurality of types of the components supplied by a plurality of component supply units that accommodate a plurality of components on a substrate.
- An exchange control device that controls a unit exchange device, and obtains various types of information including the order of mounting a plurality of types of components in the mounting process and the information of the component supply units that have finished supplying the components in the mounting process.
- An instruction output unit that is summarized in that comprises a.
- the information acquisition unit acquires information on the number of necessary units of the plurality of component supply units necessary for the mounting processing of the one board, and the required number of units is the component mounter.
- a unit number determination unit that determines whether or not the maximum number of units that can be set is exceeded, and the unit number determination unit determines that the required number of units exceeds the maximum number of units.
- a set content determination unit that determines the set content of the component supply unit to be set, and the set content determination unit supplies a plurality of the components necessary for a mounting process of the one board based on the mounting order Of the units, a part of component supply units to be set at the start of the mounting process is determined, and the remaining component supply units excluding the part of the component supply units
- the instruction output unit instructs the unit exchanging apparatus to set the part supply unit to the component mounter until one board mounting process is started. And outputs an instruction to the unit exchanging device during the mounting process so that the component supply unit that has finished supplying the components in the mounting process is replaced with a component supply unit to be set next based on the set order. It may be a thing. In this way, mounting processing can be performed while exchanging with necessary component supply units within a limited number of sets of component supply units, so that productivity of the mounting processing can be improved.
- the unit replacement device replaces the component supply unit with respect to the component mounter that performs a mounting process on the board that is transported to a plurality of lanes provided in parallel.
- the information acquisition unit acquires information on the type of the board to be mounted in each of the plurality of lanes, and switches from mounting in one lane to mounting in another lane among the plurality of lanes.
- a board type determination unit that determines whether the type of the board in the one lane is different from the type of the board in the other lane, and the instruction output unit determines the board type determination The board determines that the type of the board in the one lane is different from the type of the board in the other lane.
- the unit replacement device is configured to replace the component supply unit that has completed the supply of the component in the mounting processing of the board of one of the board types with a component supplying unit required in the next mounting processing of the other lane.
- An instruction may be output. In this way, when boards of different board types are transported to multiple lanes, even if the number of component supply units necessary for the mounting process of each board type exceeds the number that can be set in the component mounting machine, It can be performed.
- the unit replacement device replaces the component supply unit with respect to the component mounter arranged in a plurality along the transport direction of the substrate, and the information acquisition unit Is the required number of components required for the component type before the mounting processing of the same type of board is completed when the component supply unit of any component type occurs during the mounting process, and To obtain the number of remaining components in the component supply unit of another component supply unit of the component type set in a plurality of component mounters, and determine whether the number of remaining components is greater than the required number of components And the instruction output unit determines that the component supply unit is out of components when the component number determination unit determines that the number of remaining components is greater than the required number of components.
- Preparative may output an instruction to the unit replacement device to replace with another component supply unit not a component depletion in the component type.
- the mounting process can be continued without using a new component supply unit. For this reason, generation
- a supply source determination unit that determines whether there is a component type that should be the same component supply unit as a component supply source
- the instruction output unit when the supply source determination unit determines that there is a component type whose component supply source should be the same component supply unit, is one component supply unit of the component type in the component mounter
- an instruction may be output to the unit replacement device so that the one component supply unit is removed from the component mounter and set in another component mounter.
- the unit replacement device performs mounting processing by moving the head onto the substrate via a predetermined position after collecting the component supplied by the component supply unit with a head.
- the component supply unit is replaced with respect to the component mounting machine, and the information acquisition unit is configured to have a first set position where the determination target component supply unit is set and the first set position.
- the moving time Based on the second set position close to the predetermined position, the moving time until the head moves from the component supply position in the component supply unit at the first set position to the predetermined position and the second set position A movement shortening time which is a difference between a movement time from the component supply position to the predetermined position in the component supply unit, and the component supply unit.
- An arrangement change determination unit and when the instruction output unit determines that the arrangement change is to be performed by the arrangement change determination unit, the component supply unit set at the second set position supplies the component.
- an instruction may be output to the unit replacement device so as to change the arrangement of the component supply unit that has completed the supply of the component and the component supply unit that is set at the first set position. In this way, if the head movement reduction time exceeds the component supply unit layout change time, the component supply unit can be changed, thereby reducing the occurrence of loss due to the change in location and improving productivity. Can do.
- a plurality of component supply units that accommodate a plurality of components are set so as to be replaceable by a unit replacement device, and a plurality of types of the components supplied by the plurality of component supply units are mounted on a board
- a component mounter that performs a mounting process to be mounted on the component based on the mounting order of a plurality of types of components in the mounting process, and information on the component supply unit that has finished supplying the component in the mounting process
- the gist of the present invention is that a request for replacement between the component supply unit that has been completed and the component supply unit that has not been supplied is transmitted to the unit replacement device. Thereby, during the mounting process of one substrate, replacement of the component supply unit for improving the productivity of the mounting process can be easily realized by using the unit replacement device.
- a plurality of component supply units that accommodate a plurality of components are set so as to be replaceable by a unit replacement device, and a plurality of types of the components supplied by the plurality of component supply units are mounted on a board.
- a component mounting machine that performs a mounting process to be mounted on the plurality of lanes, the type of the board to be mounted in the plurality of lanes, the mounting order of the plurality of types of components in the mounting process of each board type, and the plurality of lanes Based on the information of the component supply unit for which the supply of the component has been completed in the mounting process for one lane, The gist is to send a request for replacement with a necessary component supply unit to the unit replacement device. As a result, it is possible to improve the productivity of the mounting process by suppressing occurrence of a replacement loss of the component supply unit when the board type of each lane is switched.
- FIG. 1 is a configuration diagram showing an outline of the configuration of a component mounting system 10.
- FIG. 2 is a configuration diagram showing an outline of the configuration of a component mounter 20.
- the block diagram which shows the outline of a structure of the feeder 30.
- FIG. The block diagram which shows the outline of a structure of the exchange robot 50.
- FIG. FIG. 3 is a configuration diagram relating to control of the component mounting system 10. Explanatory drawing which shows an example of supply area information and stock area information.
- the flowchart which shows an example of a feeder exchange instruction
- the flowchart which shows an example of an initial set corresponding
- the flowchart which shows an example of a board
- the flowchart which shows an example of a component mounting process.
- the flowchart which shows an example of a feeder exchange request transmission process The flowchart which shows an example of the replacement
- Explanatory drawing which shows a mode that the feeder 30 is replaced
- the flowchart which shows the initial set corresponding
- the flowchart which shows the feeder exchange request transmission process of 2nd Embodiment.
- the flowchart which shows the initial set corresponding
- FIG. 1 is a configuration diagram showing an outline of the configuration of the component mounting system 10
- FIG. 2 is a configuration diagram showing an overview of the configuration of the component mounting machine 20
- FIG. 3 is a configuration diagram showing an overview of the configuration of the feeder 30. is there.
- FIG. 4 is a configuration diagram showing an outline of the configuration of the replacement robot 50
- FIG. 5 is a configuration diagram relating to control of the component mounting system 10.
- the left-right direction of FIG. 1 is an X direction
- the front-back direction is a Y direction
- the up-down direction is a Z direction.
- the component mounting system 10 includes a printing machine 12 that prints solder on a substrate, a printing inspection machine 14 that inspects the state of the printed solder, and a component supplied from a feeder 30 on the substrate.
- a plurality of component mounting machines 20 to be mounted, a mounting inspection machine (not shown) for inspecting the mounting state of the parts, a management device 80 for managing the entire line, and the like are provided.
- the printing machine 12, the printing inspection machine 14, and the plurality of component mounting machines 20 are arranged in this order in the board conveyance direction (X direction).
- the component mounting system 10 includes an exchange robot 50 that automatically exchanges the feeder 30 with each component mounter 20.
- the replacement robot 50 is movable along the X-axis rail 18 provided in front of the plurality of component mounting machines 20 in parallel with the substrate transport direction (X direction). In FIG. 2, the illustration of the X-axis rail 18 is omitted.
- the component mounter 20 moves the head 22 in the XY directions, a substrate transport device 21 that can transport the substrate S, a head 22 that has a suction nozzle that sucks components supplied by the feeder 30, and the head 22.
- a head moving mechanism 23 and a mounting control device 28 for controlling the entire apparatus are provided.
- the component mounter 20 includes a mark camera 24 that captures an image of the mark provided on the substrate S from above, and a parts camera 25 that captures an image of the component sucked by the suction nozzle from below.
- the component mounter 20 has two lanes (for example, a first lane on the front side in the Y direction and a second lane on the rear side in the Y direction).
- the substrate transport device 21 can transport the substrates S in each lane.
- the mounting control device 28 includes a CPU 28a, a ROM 28b, an HDD 28c, a RAM 28d, and the like.
- the mounting control device 28 outputs a drive signal to the substrate transfer device 21, the head 22, the head moving mechanism 23, the feeder 30, etc., outputs an imaging instruction to the mark camera 24 and the parts camera 25, and the mark camera 24 and the parts.
- a captured image is input from the camera 25.
- the feeder 30 is configured as a tape feeder that sends out a tape that accommodates components at a predetermined pitch.
- the feeder 30 includes a tape reel 32 around which a tape is wound, a tape feed mechanism 33 that pulls out the tape from the tape reel 32, and a connector 35 that has two protruding positioning pins 34.
- a rail member 37 provided at the lower end and a feeder control device 39 (see FIG. 5) for controlling the entire feeder are provided.
- the feeder control device 39 includes a CPU, a ROM, a RAM, and the like, and outputs a drive signal to the tape feeding mechanism 33.
- the feeder control device 39 can communicate with the mounting control device 28 of the component mounter 20 to which the feeder 30 is attached via the connector 35.
- the component mounter 20 has two upper and lower areas to which the feeder 30 can be attached.
- the upper area is a supply area (part supply area) 20A in which the feeder 30 can supply parts
- the lower area is a stock area 20B in which the feeder 30 can be stocked.
- a feeder base 40 on which a plurality of feeders 30 are mounted (set) is provided in the supply area 20A and the stock area 20B.
- the feeder base 40 is an L-shaped base in a side view, and a plurality of slots 42 arranged in the X direction at intervals where the rail members 37 of the feeder 30 can be inserted, and the two positioning pins 34 of the feeder 30 are inserted.
- Two possible positioning holes 44 and a connector 45 provided between the two positioning holes 44 to which the connector 35 is connected are provided.
- Each feeder base 40 can mount feeders 30 up to the upper limit number N.
- FIG. 6 is an explanatory diagram showing an example of supply area information and stock area information stored in the HDD 28c.
- Supply area information is information of the feeder 30 set in the supply area 20A.
- the stock area information is information on the feeder 30 set in the stock area 20B.
- the supply area information is associated with the position information of the attachment position of the feeder 30 in the supply area 20A, and stores ID information of the feeder 30, information on the type of parts accommodated in the feeder 30, information on the number of remaining parts, and the like.
- the position information is determined in order with the reference slot (for example, the leftmost slot 42) among the plurality of slots 42 of the feeder base 40 as the head position “001”.
- the ID information, the part type information, and the remaining part number information of the feeder 30 are stored from the feeder control device 39 of the feeder 30 through the connection of the connectors 35 and 45.
- the stock area information is stored in association with the position information of the attachment position of the feeder 30 in the stock area 20 ⁇ / b> B, such as ID information of the feeder 30, information on the part type, and information on the number of remaining parts. For this reason, the supply area information and the stock area information are appropriately updated when the feeder 30 is attached or detached or when a component is supplied during the component mounting process. In addition, it shows that the feeder 30 is not attached to the position where the position information of the stock area information is “003”.
- the replacement robot 50 includes a robot moving mechanism 51 that moves the replacement robot 50 along the X-axis rail 18, a feeder transfer mechanism 53 that transfers the feeder 30 to the component mounting machine 20, and an exchange And a robot controller 59 (see FIG. 5) for controlling the entire robot.
- the robot moving mechanism 51 includes an X-axis motor 52a such as a servo motor that drives a driving belt for moving the exchange robot 50, a guide roller 52b that guides the movement of the exchange robot 50 along the X-axis rail 18, and the like. Prepare.
- the feeder transfer mechanism 53 includes a Y-axis slider 55 that mounts a clamp unit 54 that clamps the feeder 30 and a Y-axis motor 55a that moves the clamp unit 54 along the Y-axis guide rail 55b. And a Z-axis motor 56a that moves along the shaft guide rail 56b.
- the exchange robot 50 includes an encoder 57 (see FIG. 5) that detects a movement position in the X direction, and a monitoring sensor 58 such as an infrared sensor that monitors the presence or absence of obstacles (operators) on the left and right of the exchange robot 50. (See FIG. 5).
- the Y-axis slider 55 of the feeder transfer mechanism 53 is driven by a Z-axis motor 56a so that an upper transfer area 50A that faces the supply area 20A of the component mounter 20 and a lower transfer that faces the stock area 20B of the component mounter 20 are provided. Move to the loading area 50B.
- the robot control device 59 moves the Y-axis slider 55 that clamps the feeder 30 by the clamp unit 54 from the upper transfer area 50A to the supply area 20A by driving the Y-axis motor 55a, thereby moving the rail member 37 of the feeder 30. It is inserted into the slot 42 of the feeder base 40.
- the robot control device 59 attaches the feeder 30 to the feeder base 40 in the supply area 20 ⁇ / b> A by releasing the clamp of the clamp unit 54.
- the robot controller 59 also clamps the feeder 30 attached to the feeder base 40 in the supply area 20A by the clamp portion 54, and moves the Y-axis slider 55 from the supply area 20A to the upper part by driving the Y-axis motor 55a.
- the feeder 30 is removed from the feeder base 40 in the supply area 20A (drawn into the upper transfer area 50A).
- the robot controller 59 moves the Y-axis slider 55 to the lower part by driving the Z-axis motor 56a when attaching the feeder 30 to the feeder base 40 in the stock area 20B or removing the feeder 30 from the feeder base 40 in the stock area 20B. Since the same process is performed except that it is moved to the area 50B and performed in the lower transfer area 50B instead of the upper transfer area 50A, the description is omitted.
- the management device 80 includes a CPU 80a, a ROM 80b, an HDD 80c, a RAM 80d, and the like, and includes a display 82 such as an LCD and an input device 84 such as a keyboard and a mouse.
- the management device 80 stores a production program (job data) for the substrate S and the like.
- the production program for the board S includes, for each type of board S (board type), how many parts of which part type are to be mounted, from which part type of parts to be mounted (in order of mounting of the part type), in each lane.
- the management device 80 is communicably connected to the mounting control device 28 by wire and connected to the robot control device 59 so as to be wirelessly communicable, and each control device of the printing machine 12, the print inspection machine 14, and the mounting inspection machine. Communicatively connected.
- the management device 80 transmits a production program for the substrate S to the mounting control device 28, receives information about the mounting status of the component mounting machine 20 and information about the mounting status of the feeder 30 from the mounting control device 28, and the robot control device.
- 59 receives information on the drive status of the exchange robot 50 from 59.
- the management device 80 acquires supply area information and stock area information of each component mounter 20 from the mounting control device 28 of each component mounter 20 as necessary.
- processing performed by the management device 80 will be described.
- processing for setting the feeder 30 necessary for component mounting processing in the supply area 20A will be mainly described.
- the feeder 30 necessary for the component mounting process is set in either the supply area 20A or the stock area 20B. If the feeder 30 necessary for the component mounting process is not set in either the supply area 20A or the stock area 20B, the management device 80 informs the operator of the fact that the feeder 30 is necessary.
- the setting may be instructed, or the replacement robot 50 may be moved to a storage location of the feeder 30 (not shown) to take out the necessary feeder 30 and carry it.
- FIG. 7 is a flowchart showing an example of feeder replacement instruction transmission processing. This process is executed every predetermined time.
- the CPU 80a of the management device 80 first determines whether there is a component mounter 20 at the feeder initial set timing (S100), and whether a feeder replacement request has been received from any of the component mounters 20. (S105) is determined. Further, when determining that the feeder replacement request has been received, the CPU 80a further determines whether or not it is a feeder replacement request based on the out of parts (S110).
- the feeder initial setting timing starts the mounting process after the operator has performed a setup change operation to replace various production members (for example, the suction nozzle and the head 22) of the component mounting machine 20 according to the board type.
- the feeder replacement request is transmitted when the remaining parts of the feeder 30 set in the supply area 20A run out during the mounting process and the parts are out of stock.
- the feeder replacement request is sent between the supply area 20A and the stock area 20B. This is a request transmitted from each component mounter 20 when it is necessary to replace the feeder 30 between them. If the CPU 80a determines in S100 that there is no component mounter 20 at the feeder initial set timing, and determines in S105 that no feeder replacement request has been received from each component mounter 20, the CPU 80a terminates the process.
- the CPU 80a of the management device 80 determines in S100 that there is a component mounter 20 at the feeder initial set timing, the CPU 80a executes an initial set handling process for the component mounter 20 (S115). If the CPU 80a receives the feeder replacement request from the component mounter 20 in S105 and S110 and determines that it is a feeder replacement request based on a component shortage, the CPU 80a executes a replacement handling process when the component is short (S120). If it is determined in S105 and S110 that a feeder replacement request is received from the component mounter 20 and it is not a feeder replacement request based on a component shortage, a replacement handling process when a component is out of stock is executed (S125).
- the CPU 80a determines whether or not the feeder 30 to be exchanged has been set in the corresponding processes of S115, S120, and S125 (S130). If the replacement target feeder 30 has not been set, for example, the CPU 80a determines that replacement is not required or waiting for replacement in each corresponding process, the process ends. On the other hand, if the replacement target feeder 30 has been set, the CPU 80a generates a replacement instruction based on the position information of the replacement target feeder 30 (S135), designates the target component mounter 20 and specifies the feeder 30. Is sent to the robot controller 59 of the exchange robot 50 (S140), and this process is terminated.
- the CPU 80a acquires the position information of the feeder 30 to be replaced from the supply area information and stock area information stored in the HDD 28c by the target component mounter 20.
- the robot control device 59 that has received the replacement instruction controls the robot moving mechanism 51 so that the replacement robot 50 moves in front of the designated component mounter 20. Further, the robot control device 59 controls the robot moving mechanism 51 and the feeder transfer mechanism 53 so as to perform the replacement process of the feeder 30 in the designated component mounter 20. Thereby, the exchange robot 50 takes out the unnecessary feeder 30 from the supply area 20A and attaches it to the stock area 20B, or takes out the necessary feeder 30 from the stock area 20B and attaches it to the supply area 20A.
- the CPU 28a of the mounting control device 28 acquires information on the set feeder 30 from the feeder control device 39 through the connection of the connectors 35 and 45, and updates the supply area information and stock area information of the HDD 28c.
- the following is a detailed description of the initial set handling process of S115.
- the initial set handling process for one component mounter 20 will be described, but the same process is performed for each component mounter 20 determined to be at the feeder initial set timing.
- compatible process of S120 and S125 is demonstrated after demonstrating the process of the component mounting machine 20.
- FIG. 8 is a flowchart showing an example of the initial set handling process.
- the CPU 80a of the management device 80 first mounts the component type to be mounted and the mounting order of the component types based on the production program of the board S on which the component mounter 20 to be processed starts the mounting process.
- Information necessary for the initial setting of the feeder 30 such as the number of feeders 30 required for the mounting process (number of parts, number of necessary feeders) is acquired (S200).
- the CPU 80a determines whether or not the required number of feeders is equal to or less than the upper limit number N of supply areas 20A (S205). 30 is set as an initial set target (S210).
- the CPU 80a sets the initial set target feeder 30 in the stock area 20B as the replacement target from the stock area information stored in the HDD 28c by the processing target component mounter 20 (S230). Further, the CPU 80a uses the same number of feeders 30 as the replacement targets in S230 among the feeders 30 other than the initial setting target in the supply area 20A based on the supply area information stored in the HDD 28c by the component mounter 20 to be processed.
- the feeder 30 is set as an exchange target (S235), and this process is terminated. As described above, when the necessary number of feeders is equal to or less than the upper limit number N, the CPU 80a determines that all the feeders 30 can be set and sets them as initial setting targets.
- the CPU 80a sets all the feeders 30 necessary for the mounting process in the supply area 20A and supplies the feeders 30 to be replaced set in S230 and S235.
- An exchange instruction is generated so that an unnecessary feeder 30 set in the area 20A is set in the stock area 20B.
- the feeder 30 of the first to Nth component types in the mounting order is set as the initial setting target (S215). That is, when all the feeders 30 necessary for the mounting process cannot be mounted in the supply area 20A, the CPU 80a sets some of the feeders 30 as initial setting targets. Subsequently, the CPU 80a sets the remaining feeder 30, that is, the feeder 30 of the component type whose mounting order is the (N + 1) th and subsequent ones, as the replacement target during mounting (S220), and the order of setting the feeder 30 as the replacement target during mounting. Are set in the same order as the (N + 1) th and subsequent mounting orders (S225).
- the CPU 80a sets the initial setting target feeder 30 in the stock area 20B as the replacement target from the stock area information of the processing target component mounter 20 (S230). Further, the CPU 80a sets all the feeders 30 (including the replacement target being mounted) in the supply area 20A other than the initial set target from the supply area information of the processing target component mounting machine 20 as replacement targets (S235). Exit. As described above, when all of the feeders 30 necessary for the mounting process cannot be mounted in the supply area 20A, the CPU 80a initially sets the first to Nth feeders 30 (the upper limit mounting number N) in the mounting order. In addition to setting the target, the remaining feeders 30 in the mounting order after the (N + 1) th are set as replacement targets during mounting.
- the CPU 80a sets a part of the feeders 30 necessary for the mounting process in the supply area 20A for each feeder 30 to be replaced set in S230 and S235.
- An exchange instruction is generated so that an unnecessary feeder 30 (including an exchange target during mounting) set in the supply area 20A is set in the stock area 20B.
- the mounting order of the component types in the mounting process of one substrate S is determined in advance based on the mounting efficiency of the components.
- the CPU 80a of the management device 80 or the CPU 28a of the mounting control device 28 may change the mounting order.
- the CPU 80a may change the mounting order based on the number of components (the number of mounting points and the number of supply points) of each component type mounted in the mounting process of one substrate S.
- the CPU 80a may change the mounting order in descending order of the number of mounting points.
- the initial setting target is the feeder 30 of the component type from the order of the mounting number to the Nth component, and the replacement target during mounting is the number of mounting points (the number of supply points). ) Is a relatively small feeder 30.
- the CPU 80a may change the mounting order in ascending order of the number of mounting points.
- the initial set target is the feeder 30 from the order of decreasing mounting number to the Nth feeder 30, and the replacement target during mounting is the number of mounting points (the number of supply points).
- the feeder 30 becomes relatively large.
- FIG. 9 is a flowchart showing an example of the substrate transfer process. This process is executed at predetermined time intervals by the CPU 28a of the mounting control device 28 of each component mounting machine 20.
- the CPU 28a of the mounting control device 28 first determines whether there is a carry-in waiting substrate associated with either the first lane or the second lane (S300). When determining that there is no board waiting for loading, the CPU 28a determines whether a board carry-out enable signal has been received from the component mounting machine 20 adjacent on the upstream side (S305).
- the board unloadable signal is a signal transmitted to the management device 80 when the component mounting machine 20 adjacent to the upstream side finishes mounting the component on one board S and can unload the board S. .
- the board unloadable signal includes information on the board type of the board S, designation information on the lane to which the board S is transported, and the like, and is downstream from the component mounting machine 20 adjacent to the upstream side via the management device 80. Is transmitted (transferred) to the component mounting machine 20 on the side. If the CPU 28a determines that it has not received the substrate carry-out enable signal, the process proceeds to S340.
- the CPU 28a determines that the board unloadable signal has been received, the CPU 28a acquires the board type information to be mounted next and the lane designation information from the board unloadable signal (S310). In step S315, it is determined whether the substrate S can be received (can be loaded). Note that the CPU 28a determines that the substrate S cannot be received in the designated lane when the mounting process of the substrate S is in progress or when a setup change operation by an operator is required before the substrate is carried in. Further, the CPU 28a determines that the substrate S can be received when the substrate S has already been carried out in the designated lane and there is no substrate S.
- the CPU 28a determines that the substrate S cannot be received in S315, the CPU 28a sets the substrate S as a loading waiting substrate in association with the lane designated by the substrate carry-out enable signal (S320), and proceeds to S340.
- the CPU 28a sets the board waiting for loading in S320, the CPU 28a determines that there is a board waiting for loading in S300, skips S305 and S310, and proceeds to S315.
- the CPU 28a transmits a substrate acceptance signal including designation information of acceptable lanes to the management device 80 (S325).
- the management device 80 that has received this board acceptable information transmits (transfers) a board acceptable signal to the component mounting machine 20 adjacent on the upstream side.
- the upstream component mounter 20 When the upstream component mounter 20 receives the board acceptable signal, it controls the board transfer device 21 to carry out the board S in the designated lane. For this reason, the CPU 28a performs a board carry-in process for controlling the board carrying device 21 so as to carry in the board S carried out from the upstream component mounter 20 (S330), and the board loaded with the lane loaded with the board S.
- the identification information of S and the substrate type are associated with each other and registered in the in-production substrate information (not shown) stored in the RAM 28d (S335), and the process proceeds to S340.
- the CPU 28a controls the mark camera 24 so as to capture the mark attached to the substrate S that has been carried in, and registers the identification information of the substrate S obtained by the imaging in the substrate information being produced.
- the CPU 28a determines whether or not there is a carry-out waiting substrate associated with either the first lane or the second lane (S340). If the CPU 28a determines that there is no board waiting to be carried out, the CPU 28a determines whether there is a board S for which the mounting process has been completed in either the first lane or the second lane (S345). If it is determined that there is no, this process is terminated. On the other hand, if the CPU 28a determines that there is a substrate S for which the mounting process has been completed, the CPU 28a transmits a substrate unloadable signal including information on the substrate type of the substrate S and designation information on the lane to which the substrate S is transported to the management device 80. (S350).
- the management device 80 that has received the board unloadable signal transmits (transfers) the board unloadable signal to the component mounting machine 20 adjacent on the downstream side. Then, the CPU 28a determines whether or not a board acceptable signal has been received from the downstream component mounting machine 20 (S355), and if it is determined that the board acceptable signal has not been received, the board S that has completed the mounting process. Is set as a carry-out waiting substrate (S360), and this process is terminated. On the other hand, if the CPU 28a determines that the substrate acceptance signal has been received in S355, the CPU 28a controls the substrate transport device 21 to carry out the substrate S in the lane designated by the substrate acceptance signal (S365). The information is deleted from the in-production board information in the RAM 28d (S370), and this process ends.
- FIG. 10 is a flowchart showing an example of component mounting processing. This process is executed at predetermined time intervals by the CPU 28a of the mounting control device 28 of each component mounting machine 20.
- the CPU 28a of the mounting control device 28 is first required for mounting processing such as the mounting target component type and the mounting order of the component type, the mounting position of each component, and the number of mounting points based on the production program of the board S. Information is acquired (S400). Then, the CPU 28a waits for the board S of the board type to be mounted to be loaded into the mounting process target lane (either the first lane or the second lane) (S405).
- the CPU 28a determines whether or not the mounting order of the component types needs to be changed (S410). (S415), and if there is no need to change, S415 is skipped. In addition, the case where the necessity for a change arises later.
- the CPU 28a supplies a component of a component type based on the mounting order from any one of the plurality of feeders 30 set in the supply area 20A (S420), and sucks the supplied component with a suction nozzle.
- the head 22 is controlled to collect parts (S425).
- the CPU 28a controls the head moving mechanism 23 so that the head 22 moves on the substrate S via the parts camera 25 (predetermined position) (S430), and the component sucked by the suction nozzle is changed to the parts camera.
- the part camera 25 is controlled so as to take an image of a part when the image is on the part 25 (S435).
- the CPU 28a controls the head 22 and the head moving mechanism 23 so as to mount the component at the corrected position obtained by correcting the mounting position based on the component suction posture in the captured image (S440).
- the CPU 28a executes a feeder exchange request transmission process for sending a feeder exchange request to the management device 80 if the feeder 30 needs to be exchanged (S445). It is determined whether or not all the components have been mounted (S450). If the CPU 28a determines that all components are not mounted, the process returns to S420 and repeats the process. If the CPU 28a determines that all components are mounted, the process ends.
- the feeder exchange request transmission process of S445 is performed based on the flowchart of FIG.
- the CPU 28a of the mounting control device 28 determines whether or not it is the timing when the mounting of the component of one component type is completed (S500), and the timing of completing the mounting of the component of one component type. If it is determined that there is an unset feeder 30 (feeder 30 to be replaced during mounting) that is not set in the supply area 20A among the feeders 30 of other component types necessary for the current mounting process. Determination is made (S505). Here, if all types of feeders 30 necessary for the mounting process in the initial set handling process described above are set and set as initial setting targets, the CPU 28a determines that there is no unset feeder 30.
- the CPU 28a sets the unset feeder. It is determined that there are 30. If the CPU 28a determines that there is no feeder 30 that has not been set in S505, the CPU 28a directly ends this processing. On the other hand, if the CPU 28a determines that there is an unset feeder 30 in S505, the CPU 28a acquires the position information of the feeder 30 of the component type that has been mounted from the supply area information stored in the HDD 28c (S510), and enters the supply area 20A.
- a feeder replacement request for requesting replacement with an unset feeder 30 (unset feeder) is transmitted to the management apparatus 80 (S515), and this processing is terminated.
- the CPU 28a transmits the position information of the feeder 30 acquired in S510 in a feeder replacement request.
- the CPU 28a determines whether the remaining number of components accommodated is 0, that is, whether the feeder 30 has run out of components. (S520). If the CPU 28a determines that the component-out feeder 30 has not occurred, the CPU 28a ends the process. On the other hand, when the CPU 28a determines that the component-out feeder 30 has occurred, the CPU 28a acquires the position information of the component type feeder 30 in which the component is out of the supply area information stored in the HDD 28c (S525). The feeder replacement request is transmitted to the management device 80 (S530), and this process is terminated. The CPU 28a transmits the position information acquired in S525 and the component type information included in the feeder replacement request.
- the CPU 80a of the management device 80 determines that the feeder replacement request has been received in S105 of the feeder replacement instruction transmission process of FIG. Further, the CPU 80a executes the replacement handling process when the parts are out of S120 when the feeder replacement request is received when the parts are out, and if the feeder replacement request with the unset feeder is received, the CPU 80a does not execute S125. Execute replacement handling processing when parts are out of stock. In the replacement handling process at the time of component failure in S120, the CPU 80a performs processing such as setting the feeder 30 that is out of components and the feeder 30 of the same component type in the stock area 20B as replacement targets. The detailed description is omitted because it does not form the gist of the embodiment.
- the CPU 80a notifies the operator of that fact and instructs the operator to set the required feeder 30, or moves the replacement robot 50 to the storage location of the feeder 30. Then, processing such as transporting necessary feeders 30 is performed.
- the replacement handling process at the time of non-component cut in S125 is performed based on the flowchart of FIG.
- the CPU 80a of the management device 80 first acquires position information of the feeder 30 that has finished supplying components in the mounting process of one substrate S from the received feeder replacement request (S600). It is determined whether or not the position 30 is a vicinity position (camera vicinity position) including the front position of the parts camera 25 (S605).
- the CPU 28a includes, for example, a total of three feeders 30 including a feeder 30 facing the center in the X direction (left and right direction) of the parts camera 25 (at the front position in front) and a feeder 30 adjacent to the left and right of the feeder 30. It is determined that the feeder 30 is in the vicinity of the camera. If the CPU 80a determines that the position of the feeder 30 for which the feeder replacement request has been made in S605 is not located in the vicinity of the camera, the CPU 80a directly ends this process.
- the CPU 80a determines that the position of the feeder 30 to which the feeder replacement request has been made is in the vicinity of the camera, the CPU 80a sets based on the set order of the feeder 30 to be replaced that is set in S225 of the feeder initial content setting process in FIG.
- the next feeder 30 is set as the replacement target feeder 30 (S610).
- the CPU 80a sets the next feeder 30 to be set based on the set order among the feeders 30 to be exchanged during mounting. Then, the CPU 80a excludes the feeder 30 set as the replacement target from the set order of the feeders 30 to be replaced during mounting (S615), and ends this processing.
- the CPU 80a sets the feeder 30 for which the supply of components has been completed in the stock area 20B and the feeder 30 to be replaced during mounting (the feeder 30 set as the replacement target in S610). Is generated to be set in the supply area 20A. For this reason, even if there is a remaining accommodation component, the feeder 30 is replaced with the feeder 30 to be replaced during mounting by the replacement robot 50. For this reason, the component mounter 20 sets the first to Nth feeders 30 in the mounting order as initial setting targets when all of the feeders 30 necessary for the mounting process cannot be mounted in the supply area 20A.
- the remaining feeders 30 (the feeder 30 to be replaced during mounting) after the (N + 1) th mounting order may be sequentially set in the supply area 20A. it can. Further, since the feeder 30 to be exchanged during mounting is set in the vicinity of the parts camera 25 during the mounting process, the head 22 that sucks the supplied components with the suction nozzles passes through the parts camera 25 to the substrate. The moving time when moving on S can be shortened. Accordingly, since the feeder 30 to be exchanged during mounting can be set at a position where the movement efficiency of the head 22 is better, the mounting process can be performed efficiently.
- the replacement target during mounting is the feeder 30 having a relatively large number of mounting points (the number of supply points). Therefore, the effect of improving the movement efficiency of the head 22 can be further enhanced by setting the feeder 30 to be exchanged during mounting at a position near the parts camera 25 during the mounting process.
- FIG. 13 is an explanatory diagram showing how the feeder 30 is replaced during the mounting process in the first embodiment.
- the feeders 30 of the component types A to * are set as the initial setting target feeders in the supply area 20A and the remaining component types O , P, Q are set in the stock area 20B as feeders to be exchanged during mounting.
- the other feeder 30 is also set in the stock area 20B, illustration was abbreviate
- the feeder 30 of the component type G located at the position facing the center of the left and right direction of the parts camera 25 and the two feeders 30 of the component types F and H adjacent to the feeder 30 on the left and right are in the vicinity of the camera.
- the CPU 80a determines that the position is not near the camera and does not replace the feeder 30.
- the CPU 80a receives a replacement request when one of the component types F, G, and H is out of component during the mounting process, the CPU 80a determines that the position is in the vicinity of the camera and Exchange.
- the three feeders 30 of the component types O, P, and Q of the feeder to be replaced during mounting are sequentially set in the supply area 20A (see FIG. 13B).
- the worker must perform the work at the timing when the supply of the components of each component type is finished, leading to an increase in the work load.
- the replacement target feeder 30 in the stock area 20B is replaced with the feeder 30 in the supply area 20A during the mounting process by the replacement robot 50, the feeder is fed at an appropriate timing without increasing the work load. 30 can be replaced.
- the CPU 80a of the management device 80 and the CPU 28a of the mounting control device 28 may change the mounting order.
- the CPU 28a of the mounting control device 28 sets the board S to be mounted first as the original mounting order, and sets the board S to be mounted next as the same type in the mounting order opposite to the original mounting order (original Then, the original mounting order and the reverse mounting order are alternately changed.
- the CPU 28a when the setting state of the feeder 30 when the mounting process of one substrate S is completed is FIG. 13B, the CPU 28a does not return to the state of FIG.
- the mounting process of the substrate S may be started. Further, when starting the mounting process in the state of FIG. 13B, the CPU 28a determines that the mounting order needs to be changed in S410 of the component mounting process of FIG.
- the CPU 80a of the management device 80 may return the feeder 30 to the initial set state (for example, the state shown in FIG. 13A) during the mounting process of one substrate S or whenever the mounting process ends.
- the feeder 30 corresponds to a component supply unit
- the replacement robot 50 corresponds to a unit replacement device
- the component mounter 20 corresponds to a component mounter.
- the robot control device 59 and the management device 80 that transmits an exchange instruction to the robot control device 59 correspond to the exchange control device.
- the above correspondence is the same in the second to fourth embodiments.
- the CPU 80a of the management device 80 that executes S200 of the initial set handling process of FIG. 8 corresponds to the information acquisition unit
- the CPU 80a that executes S205 of the initial set handling process corresponds to the unit number determination unit.
- the CPU 80a that executes S215 to S225 corresponds to the set content determination unit.
- step S515 of the feeder replacement request transmission process in FIG. 11 the feeder replacement request for the unset feeder transmitted from the component mounter 20 is received, and in step S125 of the feeder replacement instruction transmission process in FIG.
- the CPU 80a that executes the corresponding processing), S135, and S140 corresponds to the instruction output unit.
- the component mounting system 10 includes a plurality of component mounters 20 that mount components supplied by the plurality of feeders 30 on the substrate S, and feeders 30 set in the component mounters 20.
- An exchange robot 50 to be exchanged, and a management device 80 that generates and transmits an exchange instruction for the feeder 30 for controlling the exchange robot 50 are provided.
- the management apparatus 80 of the component mounting system 10 has started the mounting process in a state where some of the plurality of feeders 30 necessary for the mounting process of one substrate S are set in the supply area 20A. In this case, a replacement instruction is transmitted to the robot controller 59 so that the feeder 30 that has finished supplying components during the mounting process of the substrate S is replaced with the feeder 30 to be replaced during mounting even if there are remaining components.
- the component mounting system 10 among the plurality of feeders 30 necessary for the mounting process, some of the initial set target feeders 30 are set in the component mounting machine 20 (supply area 20A) and the remaining feeders 30 (during mounting) The mounting process is started in a state where the feeder 30) to be replaced is not set in the component mounting machine 20 (supply area 20A). Further, the component mounting system 10 performs the mounting process while replacing the feeder 30 whose components have been supplied during the mounting process of one substrate S with the remaining feeder 30 by the replacement robot 50. As a result, the mounting process can be performed while exchanging the necessary feeders 30 within the range of the upper limit mounting number N of the component mounting machine 20, so that the efficiency of the mounting process can be improved. Further, it is possible to suppress the component mounter 20 from expanding in order to increase the upper limit number N of feeders 30 mounted.
- the management device 80 replaces the feeder 30 that is the component to be replaced with the feeder 30 that is to be replaced when the feeder 30 that has finished supplying components is in the vicinity of the camera, but is not limited thereto. is not.
- the management device 80 may replace the feeder 30 that is to be replaced during mounting when the feeder 30 that has finished supplying components is in the front position of the camera. By so doing, the effect of shortening the movement time of the head 22 can be further enhanced.
- the management device 80 sequentially replaces the feeder 30 with the feeder 30 to be replaced during mounting when the feeder 30 that has finished supplying components is generated without specifying the position of the feeder 30 in this way. It is good.
- the management device 80 sequentially sets each of the feeders 30 to be exchanged during mounting in the supply area 20A until the supply of the parts by the feeder 30 to be exchanged during mounting is started.
- the mounting process (part supply) can be prevented from being interrupted by the replacement.
- the management device 80 takes into consideration the time required for the mounting process of each component by the head 22 and the replacement time required for replacing the feeder 30 until starting the supply of the component from the feeder 30 to be replaced during mounting. In order to determine the mounting order of each component type and the replacement timing of the feeder 30 so that the feeder 30 to be replaced during mounting is set as close to the camera as possible and the front position of the camera as much as possible (while preventing the supply of parts from being interrupted) Also good.
- each configuration of the component mounting system 10 (component mounting machine 20 and replacement robot 50) of the second embodiment and the third and fourth embodiments to be described later is the same as that of the first embodiment, and the description thereof is omitted.
- the initial set handling process of FIG. 14 is executed instead of FIG.
- the CPU 80a of the management device 80 first acquires each information of the current board type to be mounted from now on and each information of the next board type scheduled to be mounted next (S200a). .
- each piece of information is information such as the component types to be mounted, the mounting order of the component types, and the number of feeders 30 required for the mounting process (the number of component types and the number of necessary feeders).
- the CPU 80a sets all types of feeders 30 as initial setting targets (S210).
- the required number of feeders does not exceed the upper limit number N, but the required number of feeders may exceed the upper limit number N.
- the same processing as in the first embodiment may be performed, such as the processing of S215 to S225 in FIG.
- the CPU 80a subtracts the required number of feeders from the upper limit number of installations N, thereby calculating the remaining number M of available installations when the required number of feeders is set in the supply area 20A (S240). It is determined whether or not the mounting number M exceeds the value 0 (S245). If the CPU 80a determines that the surplus mounting number M exceeds the value 0, the CPU 80a adds the component type feeder 30 up to the Mth mounting order to the initial setting target based on the information on the board type to be mounted next time. (S250), S230, and S235 are executed, and this process ends.
- the CPU 80a determines that there is no empty slot in the supply area 20A when the margin mounting number M does not exceed the value 0, that is, when the feeder 30 necessary for the current board type mounting process is set in the supply area 20A, S250 Is skipped, the processing of S230 and S235 is executed, and this processing is terminated.
- the feeders 30 corresponding to the surplus number M are feeders 30 that are unnecessary for the mounting process of the board type this time. For this reason, it is good also as what starts the mounting process of this board
- the feeder exchange request transmission process of FIG. 15 is executed instead of FIG.
- the CPU 28a of the mounting control device 28 first determines whether or not it is the timing when the supply of one component type in the current board type (the board type during the mounting process) has ended (S500). If it is determined that it is not the timing when the supply is completed, the processing of S520 to S530 is executed as in FIG. That is, the CPU 28a transmits a feeder replacement request to the management device 80 when the parts are out of order if the parts 30 are out of feeders.
- the feeder 30 that has finished supplying the current component based on the component type to be mounted on the next substrate type is the next substrate. It is determined whether or not it is used in the type of mounting process (S503) and whether or not the number of unset feeders Q of the next board type exceeds the value 0 (S505a).
- the number of unset feeders Q indicates the number of feeders 30 (unset feeders) that are not set in the supply area 20A among the feeders 30 necessary for the next board type mounting process, and the setting thereof will be described later. To do.
- the CPU 28a determines that the feeder 30 that has finished supplying components this time is used in the next board type mounting process, or determines that the number of unset feeders Q does not exceed the value 0, the CPU 28a ends the process. To do. On the other hand, if the CPU 28a determines that the feeder 30 that has finished supplying components at this time is not used in the next board type mounting process in S503, and determines that the number Q of unset feeders exceeds 0 in S505a, The position information of the feeder 30 of the component type that has been mounted is acquired from the supply area information of the HDD 28c (S510).
- the CPU 28a transmits a feeder replacement request for requesting replacement of the next substrate type with an unset feeder (S515a), and decrements the number Q of unset feeders by 1 (S535).
- the process ends.
- the CPU 28a transmits the position information of the feeder 30 acquired in S510 in a feeder replacement request.
- the CPU 80a of the management device 80 that has received this feeder replacement request performs a replacement handling process when the non-part is out.
- the CPU 80a omits the determination process of S605 in the replacement handling process at the time of non-component runout in FIG.
- the management device 80 receives a feeder replacement request with an unset feeder of the next board type
- the feeder 30 that has finished supplying components in the current board type mounting process is used as the next board type mounting process.
- the feeder 30 is replaced with a necessary one.
- FIG. 16 is a flowchart illustrating an example of an unset feeder number setting process. This process is performed when the CPU 28a of the mounting control device 28 acquires the next production program for the board S during the mounting process for the current board type, or during the mounting process for the current board type, as shown in FIG. This process is executed when information on the substrate type of the next mounting process is acquired in S310.
- the CPU 28a first determines whether or not the next mounting process is performed in a different lane from the current mounting process (S700), and the next mounting process targets a board type different from the current mounting process. Whether or not (S705).
- the CPU 28a makes these determinations by using the in-production board information updated in S335 and S370 of the board transfer process of FIG. If the CPU 28a determines that the next mounting process is not performed in another lane or determines that the board type is not a different board type, the CPU 28a ends the process. On the other hand, if the CPU 28a determines that the next mounting process is performed in another lane and the board type is different, the CPU 28a acquires information on the component type (feeder type) necessary for the next board type mounting process (S710). ). Then, the CPU 28a determines from the supply area information of the HDD 28c whether there is an unset feeder that is not set in the supply area 20A among the feeders 30 necessary for the next board type mounting process (S715).
- the CPU 28a determines that there is an unset feeder, it sets the number of unset feeders 30 to the number Q of unset feeders (S720), ends this processing, and determines that there is no unset feeder. This process ends. In this way, during the mounting process, the CPU 28a determines that a board type of a type different from the board type currently being mounted (currently being mounted) will be mounted next time in a lane different from the current mounting process. Then, when all of the feeders 30 necessary for the next board type mounting process are not set in the supply area 20A, the unset feeder number Q is set. Note that the initial value of the number of unset feeders Q is 0.
- FIG. 17 is an explanatory diagram showing how the feeder 30 is replaced during the mounting process in the second embodiment.
- the feeder 30 up to the parts type A to * for the mounting process of this time (board type 1) and the next board
- the feeders 30 of the component types a and b for mounting processing of the type are set in the supply area 20A as the initial setting target feeder.
- five feeders 30 of the component types c to g are illustrated as unset feeders for mounting processing of the next board type that is set in the stock area 20B (not set in the supply area 20A).
- the CPU 28a of the mounting control device 28 determines that the next mounting process is performed in the second lane during the mounting process of the board S of the current board type 1 in the first lane and the board type 2 is different from the current type. Then, the number of unset feeders Q is set to a value of 5. Then, every time the supply of the component types A, B, C, D, and E is completed during the mounting process of the substrate S of the substrate type 1 this time, the feeder exchange request with the unset feeder is managed. Output to 80. Each time the CPU 80a of the management device 80 receives a feeder replacement request, the CPU 30a sequentially replaces the feeder 30 that has finished supplying components in the mounting process of the current board type 1 and the unset feeder for the next mounting process.
- the supply area 20A includes the substrate type 2 in the second lane. All the feeders 30 for mounting processing are set. Thereby, when a board
- the time for replacing the feeder 30 at the time of lane switching is reduced or the time for replacement is shortened, so that it is different in the next lane.
- the board type mounting process can be started quickly. If the operator replaces the feeder 30 as described above, the worker must perform the work in accordance with the lane switching timing, leading to an increase in the work load. In the present embodiment, since the feeder 30 is replaced by the replacement robot 50 during the mounting process before the lane switching, the mounting process of different board types in the next lane can be started quickly without increasing the work load. Can do.
- the CPU 80a of the management device 80 that executes S310, S335, and S370 of the substrate transfer process of FIG. 9 corresponds to the information acquisition unit, and the CPU 80a that executes S700 and S705 of the unset feeder number setting process of FIG.
- the feeder replacement request transmission process of S515a in FIG. 15 the feeder replacement request for the unset feeder transmitted from the component mounter 20 is received, and the feeder replacement instruction transmission processes of S125, S135, and S140 in FIG. 7 are executed.
- the component mounting system 10 of the second embodiment described above is configured such that each component mounter 20 performs a mounting process on the board S that is transported to two lanes (first lane and second lane) provided in parallel. Has been. Further, in the component mounting system 10, the board type that is mounted in one of the two lanes (current board type) is different from the board type that is next mounted in the other lane (next board type). In this case, during the mounting process of the current board type, the replacement robot 50 replaces the feeder 30 that has finished supplying components in the mounting process of the board S of the current board type with the feeder 30 necessary for the mounting process of the next board type. To do.
- the component mounting system 10 performs the mounting process of the current board type when a board type of a type different from the board type of the current mounting process (during mounting process) is mounted in a lane different from the current mounting process.
- the feeder 30 that has finished supplying components in the mounting process of one board S is mounted and replaced with the feeder 30 necessary for the next board type mounting process.
- the mounting process of the board type is completed this time, the mounting process of the next board type can be started immediately.
- the component type and the lane are switched. It can be smooth.
- the present invention is not limited to this, and may be applied to a plurality of lanes, for example, three lanes. It is good also as what applies to.
- the initial set target feeder in the supply area 20A includes the feeder 30 for the next board type with the margin mounting number M, but is not limited thereto, and the feeder 30 for the margin mounting number M is provided. It may not be included. That is, each feeder 30 necessary for the next board type may be set during the mounting process of the board S of the current board type.
- the CPU 80a of the management device 80 first acquires information on the component types to be mounted, the mounting order of the component types, and whether or not each component type can be mixed (S200b), and confirms whether or not each component type can be mixed. (S260), it is determined whether there is a component type that cannot be mixed (S262).
- the CPU 80a is not allowed to mix components that are determined not to be mixed with components of different production lots (components supplied from different feeders 30) in one substrate. judge.
- Each component mounter 20 needs to mount a component supplied from the same feeder 30 while sharing the same feeder 30 for a specific component type that is determined to be unmixable. If the CPU 80a determines that there is no specific component type that cannot be mixed in S262, it sets all types of feeders 30 as initial setting targets (S210), sets the replacement target feeder 30 in S230 and S235, and performs this processing. finish. In FIG. 18, the required number of feeders does not exceed the upper limit number N, but the required number of feeders may exceed the upper limit number N. In that case, the same processing as in the first embodiment may be performed, such as the processing of S215 to S225 in FIG.
- the CPU 80a determines whether or not a shared mounter that is the component mounter 20 that shares the feeder 30 (specific feeder) of the specific component type has been set. Determination is made (S264). If the CPU 80a determines that the common mounting machine has not been set, the CPU 80a sets the component mounting machine 20 that shares the specific feeder to mount the component of the specific component type based on the production program of the board S and the like (S266). If it is determined that the shared mounting machine has been set, S266 is skipped.
- the CPU 80a determines whether or not the processing target of the current initial set handling process is a shared mounting machine (S268). If the processing target is not the shared mounting machine, all types of feeders 30 are set as initial setting targets. (S210), S230, and S235 are performed, and this process is terminated. On the other hand, when the CPU 80a determines that the processing target is a shared mounting machine, the processing target is one of the shared mounting machines (the two adjacent component mounting machines 20) (here, the upstream side) component mounting machine 20. It is determined whether or not (S270).
- the CPU 80a sets some specific feeders among the specific feeders as initial setting targets (S272), and sets the remaining specific feeders as initial sets. It is excluded from the target (S274), and the mounting order of the component types in the upstream component mounter 20 is changed so as to be mounted from the specific component types of some specific feeders (S276).
- the CPU 80a determines that the processing target is the downstream (the other) component mounting machine 20
- the remaining specific feeders are set as initial setting targets.
- some specific feeders are excluded from the initial setting target (S280).
- the CPU 80a changes the mounting order of the component types in the component mounting machine 20 on the downstream side so as to be mounted from the specific component types of the remaining specific feeders (S282). That is, the CPU 80a sets the specific feeder as an initial setting target of one shared mounting machine and excludes it from the initial setting target of the other shared mounting machine.
- the CPU 80a changes the mounting order so that mounting is performed from the specific component type of the specific feeder set as the initial setting target in each shared mounting machine. If there is only one specific feeder, the CPU 80a may set the specific feeder as an initial set target of one shared mounting machine and exclude it from the initial setting target of the other shared mounting machine. When the initial setting target is set and the mounting order is changed in this way, the CPU 80a sets the necessary feeder 30 other than the specific component type (other than the specific feeder) as the initial setting target (S284), and the feeder to be replaced in S230 and S235. 30 is set and the process is terminated.
- the feeder exchange request transmission process of FIG. 19 is executed instead of FIG.
- the CPU 28a of the mounting control device 28 first determines whether or not it is the timing when the supply of one component type is completed (S500). In the same manner as described above, the processing of S520 to S530 is executed and this processing is terminated. On the other hand, if the CPU 28a determines that it is the timing when the mounting of the component of one component type is completed, the CPU 28a determines whether or not the component type is a specific component type (S505b). If the CPU 28a determines that the type is not a specific component type, the process is terminated.
- the CPU 28a determines that it is a specific component type, it acquires the position information of the feeder 30 (specific feeder) of the specific component type that has been mounted from the supply area information of the HDD 28c (S510), and requests replacement of the specific feeder.
- a feeder exchange request is transmitted to the management apparatus 80 (S515b), and this process is terminated.
- the CPU 28a transmits the position information of the feeder 30 acquired in S510 in a feeder replacement request.
- the management device 80 that has received this feeder replacement request performs the replacement handling process when the non-part is out as shown in FIG.
- the CPU 80a of the management device 80 first acquires position information of the specific feeder that has finished supplying parts from the received feeder replacement request (S600a). Further, the CPU 80a determines the usage status of each feeder 30 in the supply area 20A and the feeder in the supply area 20A from the supply area information stored in the HDD 28c in the other shared mounting machine different from the transmission source of the current feeder replacement request. The set status of 30 is acquired (S630). In S630, the CPU 80a acquires information on a specific feeder that is waiting for replacement and information on an empty slot 42 in the supply area 20A.
- the CPU 80a determines whether there is a specific feeder waiting for replacement in the other shared mounting machine (S635), and whether there is an empty slot 42 in the supply area 20A of the other shared mounting machine. (S640), respectively. If the CPU 80a determines in S635 that there is a specific feeder waiting for replacement in the other shared mounting machine, the specific feeder in the shared mounting machine that is the transmission source of the received feeder replacement request and the specific feeder waiting for replacement of the other shared mounting machine Are set as exchange targets (S645), and this process is terminated.
- the CPU 80a specifies that the supply of the component has already been completed in the other shared mounting machine (component mounting machine 20). If there is a feeder, an exchange instruction is created to exchange (replace) those specific feeders with each other and transmitted to the exchange robot 50.
- the CPU 80a determines in S635 that there is no specific feeder waiting for replacement in the other shared mounting machine, and determines that there is an empty slot 42 in the supply area 20A of the other shared mounting machine in S640, the received feeder Only the specific feeder of the exchange request is set as the exchange target (S650), and this process is terminated. For this reason, when the supply of the component from the specific feeder is finished in one shared mounting machine (component mounting machine 20), the CPU 80a has an empty slot 42 in the supply area 20A of the other shared mounting machine (component mounting machine 20). If there is, an exchange instruction is generated so as to deliver the specific feeder for which the supply of parts has been completed to the other shared mounting machine, and is transmitted to the exchange robot 50.
- the CPU 80a determines in S640 that there is no empty slot in the supply area 20A of the other shared mounting machine, the CPU 80a issues an instruction to wait for the exchange of the specific feeder of the received feeder exchange request. It transmits to a common mounting machine (component mounting machine 20) (S655), and this process is complete
- the CPU 80a determines that there is a specific feeder waiting for replacement in S635, and replaces the specific feeder with each other. Will do.
- the CPU 80a has finished supplying the components during the mounting process of one substrate S to the feeder 30 of the component type other than the specific component type in the other shared mounting machine (during the mounting process of the one substrate S). If there is something that is not used), the feeder 30 for which the supply of the component has been completed and the specific feeder in the shared mounting machine that is the transmission source of the received feeder exchange request may be set as exchange targets. That is, the specific feeder replacement (replacement) target is not limited to another specific feeder, and may be a normal feeder 30 other than the specific feeder. In this way, the specific feeder for which a feeder replacement request has been made can be quickly transferred to the other shared mounting machine.
- FIG. 21 is an explanatory diagram showing how the feeder 30 is replaced during the mounting process in the third embodiment.
- each component mounter 20 (1), (2) shows what performs the mounting process in each mountable range.
- component types X, Y, Z, and W are illustrated as component types that cannot be mixed. That is, for these component types X, Y, Z, and W, components supplied from the same feeder 30 (specific feeder) need to be mounted on one substrate S.
- the CPU 80a of the management apparatus 80 has finished supplying the parts to the specific feeders of the component types X and Y of the component mounter 20 (1) and the specific feeders of the component types Z and W of the component mounter 20 (2).
- the objects are exchanged with each other by the exchange robot 50.
- the specific feeder of the component type X and the specific feeder of the component type Z are exchanged, and the specific feeder of the component type Y and the specific feeder of the component type W are exchanged.
- the parts of the specific part type (part types X, Y, Z, W) are transferred while the specific feeder is delivered by the two component mounting machines 20 (1), (2). It can be supplied and mounted. Assuming that the operator delivers such a specific feeder, the worker must perform the work in accordance with the delivery timing, leading to an increase in work load.
- the specific feeder is delivered between the component mounting machines 20 by the replacement robot 50, smooth delivery can be performed without increasing the work load.
- the CPU 80a of the management device 80 or the CPU 28a of the mounting control device 28 may change the mounting order.
- the CPU 28a of the mounting control device 28 determines that the mounting order needs to be changed in S410 of the component mounting process in FIG. May be changed.
- the CPU 28a changes the mounting order so that mounting is performed from a specific component type of a specific feeder that has been replaced and set.
- the CPU 80a of the management device 80 may return the specific feeder to the initial set state during the mounting process of one substrate S or at the end of the mounting process.
- the CPU 80a of the management device 80 that executes S200b of the initial set handling process of FIG. 18 corresponds to the information acquisition unit
- the CPU 80a that executes S260 and S262 of FIG. 18 corresponds to the supply source determination unit
- the feeder replacement request of FIG. The feeder replacement request for the specific feeder transmitted from the component mounter 20 in S515b of the transmission process is received, and S125 of the feeder replacement instruction transmission process of FIG.
- the CPU 80a that executes the process corresponds to the instruction output unit.
- the component mounting system 10 performs mounting processing with the component mounting machines 20 arranged in a plurality along the transport direction of the substrate S, and continues mounting processing of the same type of substrate S.
- the feeder 30 set in any of the plurality of component mounters 20 can be mounted while being transferred between the component mounters 20 by the replacement robot 50.
- the component mounting system 10 has a specific component type (component type that cannot be mixed) that should be the same feeder 30 as the component supply source.
- One feeder of the product type is mounted while being transferred between the component mounting machines 20 by the replacement robot 50. For this reason, the component mounting system 10 can deliver the feeder 30 and perform the mounting process efficiently when there is a specific component type for which the component supply source is the same feeder 30.
- the components supplied from different feeders 30 in one substrate S must not be mixedly mounted, but this is not a limitation.
- the same feeder 30 is similarly transferred between the component mounting machines 20.
- the mounting process while delivering the same feeder 30 between the component mounting machines 20 is not limited to the mounting process of components having such characteristics (specific component types). If the feeders 30 can be reused in each component mounting machine 20, even when the feeders 30 are not prepared in the number corresponding to the number of the component mounting machines 20, the mounting process can be performed efficiently.
- the component-out feeder 30 is generated, the mounting process may be performed while the same type of feeder 30 as the component-out is delivered between the component mounters 20.
- this modification will be described.
- the replacement handling process at the time of the part shortage in S120 in the feeder replacement instruction transmission process of FIG. 7 is performed based on the flowchart of FIG.
- the CPU 80a of the management device 80 first acquires the position information and the component type of the feeder 30 that is out of components from the feeder replacement request (S800).
- the CPU 80a confirms the information of the feeder 30 in use based on the supply area information and stock area information of the other component mounting machines 20 (S805), and is in the process of using the same component type as the feeder 30 that is out of components. It is determined whether there is a feeder 30 (S810).
- the CPU 80a determines that there is no feeder 30 in use of the same component type as that of the component-out feeder 30, the CPU 80a sets a new feeder 30 of the same component type as the component-out feeder 30 as a replacement target (S815). The process ends. In S815, the CPU 80a sets the feeder 30 that is out of components and the new (not used) feeder 30 of the same component type in the stock area 20B as replacement targets. If there is no feeder 30 of the same component type in the stock area 20B, the CPU 80a notifies the operator of that fact and instructs the operator to set the necessary feeder 30, or replaces the replacement robot 50 with another component mounting machine 20. Processing such as moving to the stock area 20B and transporting a new feeder 30 of the same component type is performed.
- the CPU 80a determines in S810 that the other component mounter 20 has a feeder 30 in use that has the same component type as the feeder 30 that has run out of components, the CPU 80a acquires the number of remaining components in the feeder 30 that is in use. (S820), the total number of remaining parts is calculated (S825). If there is one feeder 30 in use of the same component type, the CPU 80a acquires the number of components of that feeder 30 as a total number in S825, and if there are multiple feeders 30 in use of the same component type, the CPU 80a The total number of remaining parts of the feeder 30 is calculated.
- the CPU 80a obtains the number of remaining boards (production number) in the board type being mounted and the number of mounting points (number of supply points) per board of the part type that is out of components (S830), and the remaining boards. Based on the number and the number of mounting points per board, the necessary number of parts until the end of mounting of the board type being mounted is calculated (S835). Then, the CPU 80a determines whether or not the total number of remaining parts calculated in S825 is equal to or greater than the required number of parts calculated in S835 (S840), and determines that the total remaining number of parts is not equal to or greater than the required number of parts.
- the feeder 30 that has run out of parts and a new feeder 30 of the same part type are set as replacement targets (S815), and this processing is terminated.
- the CPU 80a determines to continue the mounting process while using the feeder 30 that is being used (S845). Then, the CPU 80a terminates the supply of the component during the mounting process of one substrate S among the feeders 30 in use (the feeder 30 of the same component type as the component cut) set in any of the component mounting machines 20.
- the feeder 30 that has been replaced is set as a replacement target (S850), and this processing is terminated.
- the CPU 80a When there is no feeder 30 that has finished supplying components, the CPU 80a generates a feeder 30 that has finished supplying components from among the feeders 30 of the same component type as when the components are out of operation. Wait and set it for replacement.
- FIG. 23 is an explanatory diagram showing a state in which the feeder 30 is replaced when a component runs out during the mounting process in a modification of the third embodiment.
- the adjacent two component mounting machines 20 (1) and (2) are mounting the same type of board S, they are set in the supply area 20A of the component mounting machine 20 (1).
- the case where the feeder 30 of the part type X being used is out of parts is shown.
- the CPU 80a of the management apparatus 80 determines that the number of remaining components of the component type X in the component mounter 20 (2) is the component mounter 20 (1) until the mounting processing of the board type being mounted is completed. ) And (2), it is assumed that it is determined that there are more mounting points than the number of parts of the part type X required.
- the CPU 80a replaces the feeder of the component type X of the component mounting machine 20 (1) with the component mounting after the completion of the mounting (supply) of the component type X of the component mounting machine 20 (2).
- the component mounter 20 (1) continues the component type X component mounting process.
- the replacement robot 50 causes the component mounter 20 ( Remove from 1) and set again on component mounter 20 (2).
- the replacement robot 50 causes the component mounting machine 20 ( Remove from 2) and set again on the component mounting machine 20 (1).
- the mounting process can be continued using the feeder 30 in use efficiently without using a new feeder 30.
- the component-out feeder 30 when a component-out feeder 30 is generated in any of the component mounting machines 20 during the mounting process, the component is out before the mounting process of the same type of board S is completed.
- the total number of remaining parts in another feeder 30 set in each component mounting machine 20 is larger than the required number of parts required for that part type, the part type is not out of parts.
- the feeder 30 is mounted and processed by the replacement robot 50 while being transferred between the component mounting machines 20. For this reason, when the feeder 30 out of components is generated, the mounting process can be continued without using a new feeder 30. For this reason, it is possible to prevent an increase in the number of feeders 30 that are in use.
- the initial set handling process of FIG. 24 is executed instead of FIG.
- the CPU 80a of the management device 80 first acquires the component type to be mounted, the mounting order of the component types, and the number of component types (the number of feeders) (S200), and sets all types of feeders 30 as an initial set.
- the target is set (S210).
- FIG. 24 it is assumed that the required number of feeders does not exceed the upper limit number N, but the required number of feeders may exceed the upper limit number N. In that case, the same processing as in the first embodiment may be performed, such as the processing of S215 to S225 in FIG.
- the CPU 80a sets the set position (set position to be set in the component supply area 20A) of the feeder 30 of the first component type among the initial setting targets as the camera front position (S290).
- the camera front position is a position where the camera is inserted into the slot 42 facing the center of the part camera 25 in the X direction (left-right direction). For this reason, when the feeder 30 is set at the front position of the camera, the moving distance that the head 22 moves from the parts supply position of the feeder 30 onto the parts camera 25 is the shortest.
- the CPU 80a sets the set positions of the remaining feeders 30 to alternate left and right positions with respect to the camera front position based on the mounting order (S295).
- the feeder 30 is arrange
- the CPU 80a sets the initial setting target feeder 30 in the stock area as the replacement target from the stock area information of the component mounter 20 (S230). Further, the CPU 80a sets the feeder 30 in the supply area 20A as a replacement target based on the supply area information of the component mounter 20 and the set position that has been set (S235a), and ends this process.
- the CPU 28a of the mounting control device 28 of the component mounter 20 transmits a feeder replacement request to the management device 80 every time the mounting process for one component type is completed.
- the illustration of the feeder exchange request transmission process of the fourth embodiment is omitted, for example, the process of S505 may be omitted in the feeder exchange request process of FIG.
- what is necessary is just to set it as the process which transmits the exchange request
- the replacement handling process at the time of non-component cutout in FIG. 25 is executed.
- the CPU 80a of the management device 80 first acquires position information of the feeder 30 that has finished supplying components (S600), and determines whether or not the acquired position of the feeder 30 is the camera front position. (S605a). If the CPU 80a determines that the position of the feeder 30 is not the front position of the camera, the CPU 80a ends the process. On the other hand, if the CPU 80a determines that the position of the feeder 30 is the front position of the camera, the CPU 80a acquires the current position information for the feeder 30 of the next component type in the mounting order from the supply area information of the component mounter 20 (S660).
- the CPU 80a acquires the movement time of the head 22 from the current position (component supply position) of the feeder 30 to the position on the parts camera 25 (imaging position when the component is imaged) (S665), and the acquired head
- the difference between the movement time of 22 and the shortest movement time of the head 22 from the camera front position (part supply position) to the position on the parts camera 25 is calculated (S670). This difference becomes an effect of shortening the movement time in one movement when the head 22 collects parts and moves them onto the parts camera 25.
- the movement time from each component supply position to the position on the parts camera 25 is previously stored in the HDD 80c for each slot 42, and the movement time corresponding to the slot 42 in which the feeder 30 is set or the camera front position is stored.
- the movement distance from each component supply position to the position on the parts camera 25 is previously stored in the HDD 80c for each slot 42, and corresponds to the movement distance corresponding to the slot 42 in which the feeder 30 is set or the camera front position.
- the movement distance may be read by the CPU 80a from the HDD 80c, and the movement distance may be obtained by dividing the movement distance by the average movement speed of the head 22.
- the CPU 80a acquires the number of parts (the number of supply points and the number of mounting points) supplied by the feeder 30 of the next component type in the mounting order during the mounting process of one substrate S (S675), and the difference in moving time And the movement shortening time of the head 22 when the position of the feeder 30 is changed to the front position of the camera is calculated based on the number of parts supplied and the number of parts supplied (S680).
- the CPU 80a calculates the movement shortening time by multiplying the difference in movement time by the number of supply points. In the case where the head 22 includes a plurality of nozzles and moves onto the parts camera 25 after sucking a plurality of components, the number of suction points of the components is plural in one movement.
- the CPU 80a may calculate the movement shortening time by multiplying the difference between the movement times by the value obtained by dividing the number of supply points by the number of suction points.
- the CPU 80a acquires an arrangement change time necessary for changing the position of the feeder 30 from the current position to the camera front position (S685).
- the CPU 80a acquires, as the arrangement change time, the total time of the time when the exchange robot 50 moves in the X direction and the time when the exchange robot 50 takes the feeder 30 in and out at the current position of the feeder 30 or the front position of the camera. Note that if the replacement robot 50 is performing a replacement operation with another component mounting machine 20, the CPU 80a may acquire the total time in consideration of the scheduled time required for the replacement.
- the CPU 80a may acquire a predetermined time as the arrangement change time. Next, the CPU 80a determines whether or not the movement shortening time calculated in S680 exceeds the arrangement change time acquired in S685 (S690). That is, when the position of the feeder 30 is changed from the current position to the front position of the camera, the CPU 80a determines whether or not the time effect of reducing the moving time of the head 22 exceeds the time required for changing the arrangement of the feeder 30. Determine. If the CPU 80a determines in S690 that the movement shortening time exceeds the arrangement change time, the CPU 30a sets the next component type feeder 30 and the feeder 30 at the front position of the camera as replacement targets (S695), and ends this processing. . On the other hand, when determining that the movement shortening time does not exceed the arrangement change time, the CPU 80a sets the next feeder 30 of the next component type and the feeder 30 at the front position of the camera as replacement targets (S697). The process ends.
- FIG. 26 is an explanatory diagram showing how the feeder 30 is replaced during the mounting process in the fourth embodiment.
- the component mounter 20 mounts components in the order of component types A, B, C, D, E,...
- the feeder 30 of the part type A is set in the supply area 20A at the start of the mounting process (at the time of initial setting) at the front position of the camera in front of the parts camera 25.
- the feeders 30 of the component types B and C are set on the left and right sides, and the feeders 30 of the component types D and E are set on the outer side.
- a large number for example, several hundred to a thousand or more
- the CPU 80a determines that the movement shortening time by changing the arrangement of the feeders 30 of the component types B to E from the initial position to the camera front position is longer than the arrangement changing time of each feeder 30.
- the position of each feeder 30 of the component type A and the component type B is changed (replaced) by the replacement robot 50, as shown in FIG.
- the component type B component is supplied (mounted) in a state where the component type B feeder 30 is set at the front position of the camera.
- the component mounting machine 20 supplies the components by setting the feeder 30 that supplies the components of the next component type at the front position of the camera every time the supply of the components of the one component type is completed.
- the feeder 30 of the component type with the last mounting order is set at the front position of the camera. For this reason, the component mounter 20 changes the position of the feeder 30 whose mounting order is the last in the camera front position and the feeder 30 whose mounting order is the first (first), and then mounts the next board S. What should be started.
- the CPU 28a determines that the mounting order needs to be changed in S410 of the component mounting process in FIG. 10, and changes the mounting order in the subsequent S415. And it is sufficient.
- the CPU 28a may change the mounting order to the reverse order so that the original mounting order is mounted from the last component type at the camera front position. If the operator replaces the feeder 30 as described above, the worker must perform the work at the timing when the supply of the components of each component type ends, leading to an increase in the work load. Become. In this embodiment, since each feeder 30 in the supply area 20A is replaced during the mounting process by the replacement robot 50, the feeder 30 is changed to an optimal arrangement at an appropriate timing without increasing the work load. Can do.
- the CPU 80a of the management device 80 that executes S600 and S660 to S685 of the replacement handling process at the time of non-component cutout in FIG. 25 corresponds to an information acquisition unit
- the CPU 80a that executes S690 in FIG. 25 corresponds to an arrangement change determination unit.
- the feeder replacement request transmitted from the component mounter 20 in S515 of the feeder replacement request transmission process is received, and S125 of the feeder replacement instruction transmission process of FIG. 7 (S695 of the replacement corresponding process when the non-component is out of FIG. 25), S135 , S140 that executes S140 corresponds to the instruction output unit.
- the head 22 is mounted on the parts camera 25 (predetermined position) via the board. Move to S and perform the mounting process.
- the component mounting system 10 has the longest moving distance from the time when the head 22 collects the component to the time when the component mounting system 10 moves to the part camera 25 among the feeders 30 whose components have been supplied during the mounting process of one substrate S.
- the mounting process is performed while changing the arrangement with the feeder 30 whose parts have not been supplied by the replacement robot 50. For this reason, since the component mounting system 10 can perform the mounting process while sequentially setting the feeder 30 with the replacement robot 50 at the position where the movement time of the head 22 is the shortest, the mounting process can be performed efficiently.
- the CPU 80a of the management device 80 moves the moving time from the current position (first set position) where the feeder 30 of the next component type is set to the position on the parts camera 25 from the current position where the feeder 30 is set. And the movement shortening time which is a difference with the movement time until the head 22 moves to the position on the parts camera 25 from a camera front position (2nd set position) is acquired. Then, the CPU 80a acquires the arrangement change time required to change the arrangement of the feeder 30 of the next component type, and changes the arrangement of the feeder 30 of the next component type when the movement shortening time exceeds the arrangement change time. An exchange instruction is transmitted to the exchange robot 50.
- the feeder 30 can be changed. Therefore, the time loss accompanying the change of the arrangement of the feeder 30 is suppressed, and the efficiency of the mounting process is appropriately set. Can be improved. If the CPU 80a determines that the movement shortening time exceeds the arrangement change time, and the time (difference time) exceeding the movement shortening time exceeds the predetermined time is a predetermined time or more, the next component type feeder 30 may be changed.
- the front position of the camera (the position in front of the parts camera 25), which is the position where the moving distance from when the head 22 collects the part to when it moves onto the parts camera 25 is the shortest, is the change destination position.
- the camera vicinity position here, three positions
- the camera front position and the positions adjacent to the left and right of the position may be set as the change destination position. In this case, it is only necessary to determine whether the position of the feeder 30 that has finished the supply of the component is at any position in the vicinity of the camera in S605a of the replacement handling process at the time of non-component cut in FIG.
- the position of the feeder 30 at the timing when the supply of the components is completed among the positions near the camera may be used.
- the timing at which the CPU 80a of the management device 80 determines whether or not the placement can be changed is limited to the timing at which the feeder 30 that has finished supplying the components is generated. is not. For example, the CPU 80a moves the feeder 30 in the next mounting order to another position (current position) while the parts are being supplied from the feeder 30 at any position (current supply position).
- the position of the feeder 30 can be changed to a position different from the supply position, and to change the position of the feeder 30 of the next component type. Further, in this case, the time during which the feeder 30 in the current supply position supplies the part is compared with the time during which the feeder 30 of the next part type is rearranged to supply the part. However, when the time of the placement change is exceeded, the placement of the feeder 30 of the next component type may be changed. In this way, it is possible to prevent a waiting time for changing the arrangement of the feeders 30 and further improve the efficiency of the mounting process.
- the movement time of the head 22 is based on the supply position of the component (the position at which the head 22 collects the component) and the position on the parts camera 25 (the predetermined position through which the head 22 that has collected the component passes).
- the present invention is not limited to this.
- the feeder 30 may be rearranged to a position where the moving time of the head 22 becomes shorter based on the component supply position, the position on the parts camera 25, and the component mounting position.
- a feeder 30 on one side for example, the left side in the left-right direction (X direction) on the basis of the position on the parts camera 25 (a predetermined position through which the head 22 that picks up the component passes), and is mounted on the other side (for example, the right side) When there is a position, the head 22 can move to the mounting position while passing through the parts camera 25 (predetermined position) without stopping once after collecting the parts at the supply position.
- the head 22 picks up the component at the supply position, moves to the parts camera 25, temporarily stops on the parts camera 25, and then changes the left and right moving directions to the mounting position. Will move.
- the head 22 needs to be temporarily stopped on the part camera 25. There is no need to stop. If the head 22 does not need to stop once, the mounting position can be reached quickly, so that the mounting efficiency can be improved.
- the CPU 80a of the management device 80 acquires the mounting position of each component for each component type, and is mounted on either the right region or the left region on the substrate S with the parts camera 25 as a reference. It is determined for each part type whether there are many. If the CPU 80a determines that there are many types of components to be mounted in the right region on the board S, the CPU 80a sets the feeder 30 at a position on the left side of the parts camera 25 (camera front position). Good. Further, when the CPU 80a determines that there are many components to be mounted in the left region on the substrate S, the CPU 80a sets the feeder 30 at a position on the right side with respect to the parts camera 25 (camera front position). Good.
- the CPU 80a may set the feeder 30 at a position on the opposite side of the area determined as having many components to be mounted. Furthermore, the movement efficiency is better when the head 22 can move in a straight line from the component supply position to the component mounting position via the position (predetermined position) on the parts camera 25. For this reason, the CPU 80a can bring the movement path of the head 22 close to a straight line based on the position (predetermined position) on the parts camera 25 and the mounting position (area) where more parts are mounted. It is also possible to set the feeder 30 at the same time.
- the arrangement of the feeders 30 in the supply area 20A is changed during the mounting process.
- the present invention is not limited to this, and the arrangement of the feeders 30 taken out from the stock area 20B may be changed.
- the arrangement may be changed with the feeder 30 carried by the exchange robot 50 from the outside.
- components are supplied from a tray feeder that supplies components from a flat tray containing components, a bulk feeder that supplies components directly on the head, or the like.
- the component mounter 20 may be configured as possible (a component may be supplied from a component supply unit different from the component supply unit).
- the management device 80 transmits a mounting order change instruction to the component mounting machine 20 to supply components from a tray feeder, a bulk feeder, or the like,
- the arrangement of 30 may be changed.
- positioning change time For example, in the case of a feeder 30 of a component type that should be repositioned due to a large number of component supply points, a position that shortens the repositioning time can be set as the initial set position in advance.
- the processing of the fourth embodiment can be executed by each component mounter 20, but if the replacement timing occurs at a plurality of component mounters 20 at the same time, the work time (movement time) of the replacement robot 50 increases. It becomes easy to determine that the movement shortening time of the head 22 does not exceed the arrangement change time of the feeder 30. For this reason, the management device 80 may perform the process of the fourth embodiment with the selected component mounter 20 among the plurality of component mounters 20. For example, the management device 80 may preferentially select the component mounter 20 having a large number of components of each component type to be mounted on one substrate S.
- the replacement robot 50 replaces the feeder 30 having the remaining accommodated components among the plurality of feeders 30 set in the component mounter 20. Therefore, the mounting process can be performed while efficiently replacing the feeder 30 during the mounting process of one substrate S.
- a feeder replacement request is transmitted from the component mounter 20 to the management device 80, and how the CPU 80a of the management device 80 replaces the feeder 30 based on the feeder replacement request (exchange target) And an exchange instruction including designation of the feeder 30 to be exchanged is transmitted to the exchange robot 50. Further, the exchange control device 59 that has received the exchange instruction controls the exchange robot 50 to exchange the feeder 30.
- the exchange control device 59 controls the exchange robot 50 to exchange the feeder 30.
- the component mounter 20 transmits a feeder replacement request
- the component mounter 20 acquires necessary information such as the mounting order of the component types, the board type to be mounted in each lane, and the mounting order of the component types, in advance.
- the mounting control device 28 (CPU 28a) of the component mounter 20 may acquire necessary information such as the status of the feeder 30 set in another component mounter 20 via the management device 80. However, it may be obtained directly from another component mounter 20. Alternatively, the CPU of the robot control device 59 that controls the replacement robot 50 may determine how to replace the feeder 30 (replacement target).
- the mounting control device 28 performs part or all of the initial set handling processing, the replacement handling processing at the time of a component shortage, and the replacement handling processing at the time of a non-component running out, which are executed by the CPU 80a of the management device 80 Or may be performed by the exchange control device 59.
- the mounting control device 28 and the robot control device 59 may be configured to exchange information directly.
- the component mounting system 10 includes a plurality of component mounters 20 having two lanes, but in any of the embodiments, the configuration is not limited thereto.
- the component mounter 20 may have only one lane.
- the present invention can be used in the component mounter manufacturing industry.
Landscapes
- Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Microelectronics & Electronic Packaging (AREA)
- Operations Research (AREA)
- Automation & Control Theory (AREA)
- Supply And Installment Of Electrical Components (AREA)
Abstract
部品実装システムは、実装処理に必要な複数のフィーダ(30)のうち一部の初期セット対象のフィーダ(30)が部品実装機(20)の供給エリア(20A)にセットされると共に残りのフィーダ(30)(実装中交換対象のO,P,Qのフィーダ30)が供給エリア(20A)にセットされない状態で実装処理を開始する。また、一の基板(S)の実装処理中に部品の供給が終了したフィーダ(30)を、交換ロボットにより残りのフィーダ(30)と入れ替えながら実装処理する。これにより、部品実装機(20)の上限搭載数の範囲内で必要なフィーダ(30)に交換しながら実装処理することができるから、実装処理の効率を向上させることができる。
Description
本発明は、実装処理方法、実装システム、交換制御装置および部品実装機に関する。
従来より、複数の部品が収容された部品供給ユニットにより供給された部品を基板に実装する部品実装機が知られている。例えば、特許文献1の部品実装機では、基板の搬送方向に沿って多数の部品供給ユニットが並列に配置されている。このような部品実装機では、基板種の切り替わり時などにおいて、実装に必要な部品種に応じて作業者により部品供給ユニットの交換作業が行われる場合がある。その場合、交換対象の部品供給ユニットの数によっては交換作業に時間が掛かり次の基板種の生産開始が遅れることがある。
そのような交換時間の問題を解決するため、部品供給ユニットの交換を自動で行うものも提案されている(例えば、国際出願番号PCT/JP2014/73093)。この文献に記載の部品実装システムでは、部品供給ユニットを自動で交換可能な交換ロボットを備えている。そして、交換ロボットが、基板種が切り替わる前の生産中から、部品を供給し終えた部品供給ユニットを次の実装処理に必要な部品供給ユニットに交換することで、基板種の切り替えを速やかに行うものとしている。このように、実装処理の生産性を向上させるために、部品供給ユニットの交換を効率よく行うことが要求されている。
ここで、部品供給ユニットの交換は、基板種の切り替わり時に限られるものではない。特に、交換ロボットなどのユニット交換装置を用いるものでは、作業者が部品供給ユニットを交換するものに比べて、様々な場面で部品供給ユニットの交換が可能であるから、前述した要求が高まるものとなる。
本発明は、ユニット交換装置を用いて実装処理中に部品供給ユニットをより効率よく交換することで、生産性を向上させることを主目的とする。
本発明は、上述の主目的を達成するために以下の手段を採った。
本発明の第1の実装処理方法は、複数の部品を収容する複数の部品供給ユニットがユニット交換装置により交換可能にセットされ、前記複数の部品供給ユニットにより供給される複数種の前記部品を基板に実装する実装処理を行う部品実装機における実装処理方法であって、一の前記基板の実装処理中に、前記部品実装機にセットされている複数の前記部品供給ユニットのうち収容部品の残りがある部品供給ユニットを前記ユニット交換装置により別の部品供給ユニットと交換しながら実装処理することを要旨とする。これにより、一の基板の実装処理中に、実装処理の生産性を向上させるための部品供給ユニットの交換を、ユニット交換装置を用いて容易に実現することができる。なお、部品実装機にセットされるとは、部品供給ユニットが部品を供給可能に取り付けられることを意味する。
本発明の第1の実装処理方法において、実装処理に必要な複数の前記部品供給ユニットのうち、一部の部品供給ユニットが前記部品実装機にセットされると共に残りの部品供給ユニットが前記部品実装機にセットされない状態で実装処理を開始し、一の前記基板の実装処理中に、前記一部の部品供給ユニットのうち当該実装処理において前記部品の供給が終了した部品供給ユニットを前記ユニット交換装置により前記残りの部品供給ユニットと入れ替えながら実装処理するものとしてもよい。こうすれば、部品供給ユニットの限られたセット数の範囲内で必要な部品供給ユニットに交換しながら実装処理することができるから、実装処理の生産性を向上させることができる。なお、「実装処理において部品の供給が終了した部品供給ユニット」とは、実装処理において一の基板に対し、これ以上部品を供給する必要がない部品供給ユニットなどということもできる。
本発明の第1の実装処理方法において、前記部品供給ユニットにより供給される前記部品をヘッドで採取した後に前記ヘッドを所定位置を経由して前記基板上に移動させて実装処理を行い、実装処理において前記部品の供給が終了した部品供給ユニットのうち、前記ヘッドが前記部品を採取してから前記所定位置に移動するまでの移動距離がより短い位置にセットされている部品供給ユニットを対象として、前記ユニット交換装置により前記残りの部品供給ユニットと入れ替えながら実装処理するものとしてもよい。こうすれば、実装処理中に部品供給ユニットを交換することで、所定位置までのヘッドの移動時間を短縮して生産性をより向上させることができる。なお、一の基板に実装処理される部品種の部品数(供給点数)に基づいて、部品供給ユニットを交換するのに要する時間よりも、ヘッドが所定位置に移動するのに要する時間の短縮効果が大きくなるように、残りの部品供給ユニットを設定するものとしてもよい。例えば、実装処理に必要な複数の前記部品供給ユニットのうち、供給点数の多い部品供給ユニットを残りの部品供給ユニットとするものとしてもよい。こうすれば、ヘッドが所定位置に移動するまでの移動距離がより短い位置に残りの部品供給ユニットをセットすることにより、実装処理の生産性を向上させる効果を高めることができる。
本発明の第1の実装処理方法において、一の前記基板の実装処理中に、前記部品実装機にセットされている前記部品供給ユニットのうち、当該実装処理において前記部品の供給が終了した部品供給ユニットと前記部品の供給が終了していない部品供給ユニットとの配置を前記ユニット交換装置により変更しながら実装処理するものとしてもよい。こうすれば、部品供給ユニットを供給効率のよりよい位置にセットしながら、実装処理することが可能となる。
本発明の第1の実装処理方法において、前記部品供給ユニットにより供給される前記部品をヘッドで採取した後に前記ヘッドを所定位置を経由して前記基板上に移動させて実装処理を行い、一の前記基板の実装処理中に、当該実装処理において前記部品の供給が終了した部品供給ユニットのうち、前記ヘッドが前記部品を採取してから前記所定位置に移動するまでの移動距離がより短い位置にセットされている部品供給ユニットを対象として、当該実装処理において前記部品の供給が終了していない部品供給ユニットと配置を変更しながら実装処理するものとしてもよい。こうすれば、ヘッドの移動時間を短縮して、生産性をより向上させることができる。なお、配置変更の対象とする部品供給ユニットは、ヘッドが部品を採取してから所定位置に移動するまでの移動距離が最も短い位置にセットされている部品供給ユニットとしてもよい。こうすれば、ヘッドの移動時間を短縮する効果を高めて、生産性をさらに向上させることができる。また、部品供給ユニットの配置を変更するのに必要となる配置変更時間と、部品供給ユニットの配置を変更した際のヘッドの移動時間を短縮することになる移動短縮時間とを比較して、移動短縮時間が配置変更時間を超える場合に、部品供給ユニットの配置を変更するものとすることもできる。さらに、配置変更対象の部品供給ユニットから部品の供給を開始すべきタイミングとなるまでに、部品供給ユニットの配置変更が完了するよう変更の対象の部品供給ユニットを設定するものとすることもできる。
本発明の第2の実装処理方法は、複数の部品を収容する複数の部品供給ユニットがユニット交換装置により交換可能にセットされ、前記部品供給ユニットにより供給される複数種の前記部品を複数種の基板に実装する実装処理を行う部品実装機における実装処理方法であって、並列に設けられた複数のレーンに搬送される前記基板に前記部品実装機で順次実装処理を行い、前記複数のレーンのうち一のレーンで実装処理されている前記基板の種類と他のレーンで次に実装処理される前記基板の種類とが異なる場合、前記一のレーンにおいて同一種の前記基板の実装処理を継続している間に、当該基板種の一の前記基板の実装処理において前記部品の供給が終了した部品供給ユニットを前記他のレーンの次の実装処理に必要な部品供給ユニットと入れ替えながら実装処理することを要旨とする。こうすれば、複数のレーンに異なる基板種の基板が搬送される際に、各基板種の実装処理に必要な部品供給ユニットの数が部品実装機にセット可能な数を超える場合でも、実装処理を行うことができる。なお、実装処理中に部品の供給が終了した部品供給ユニットが、他のレーンの次の実装処理で用いられるか否かを判定し、他のレーンの次の実装処理で用いられないと判定した場合に、その部品供給ユニットを他のレーンの次の実装処理に必要な部品供給ユニットと入れ替えるものとすることもできる。
本発明の第3の実装処理方法は、複数の部品を収容する複数の部品供給ユニットがユニット交換装置により交換可能にセットされ、前記部品供給ユニットにより供給される複数種の前記部品を複数種の基板に実装する実装処理を行う部品実装機における実装処理方法であって、前記基板の搬送方向に沿って複数並べて配置された前記部品実装機で実装処理を行い、同一種の前記基板の実装処理を継続している間に、前記複数の部品実装機のいずれかにセットされている前記部品供給ユニットを前記ユニット交換装置により各部品実装機間で受け渡しながら実装処理することを要旨とする。こうすれば、部品供給ユニットを各部品実装機で使い回すことができるから、部品供給ユニットを部品実装機の数だけ準備できていない場合などでも効率よく実装処理を行うことができる。
本発明の第3の実装処理方法において、実装処理中にいずれかの部品種の前記部品供給ユニットに部品切れが発生した際、同一種の前記基板の実装処理が終了するまでに当該部品種において必要となる必要部品数よりも前記複数の部品実装機にセットされている当該部品種の別の部品供給ユニットにおける収容部品の残り部品数の合計の方が多い場合に、当該部品種において部品切れとなっていない部品供給ユニットを前記ユニット交換装置により各部品実装機間で受け渡しながら実装処理するものとしてもよい。こうすれば、部品切れの部品供給ユニットが発生した場合に、新たな部品供給ユニットを使用しなくても実装処理を継続することができる。このため、使いかけの部品供給ユニットの発生を抑制することができる。
本発明の第3の実装処理方法において、同一種の前記基板の実装処理において、部品の供給元を同一の前記部品供給ユニットとすべき部品種がある場合に、当該部品種の一の前記部品供給ユニットを前記ユニット交換装置により各部品実装機間で受け渡しながら実装処理するものとしてもよい。こうすれば、部品の供給元を同一の部品供給ユニットとすべき部品種がある場合に、部品供給ユニットを受け渡して効率よく実装処理することができる。なお、一の基板の実装処理の開始時に、各部品実装機間で受け渡す対象の部品供給ユニットがセットされている場合には、受け渡す対象の部品供給ユニットが供給する部品を受け渡す対象でない他の部品供給ユニットよりも優先的に実装するよう実装順を変更して実装処理するものとしてもよい。また、一の基板の実装処理の開始時に、各部品実装機間で受け渡す対象の部品供給ユニットがセットされていない場合には、受け渡す対象でない他の部品供給ユニットを受け渡す対象の部品供給ユニットよりも優先的に実装するよう実装順を変更して実装処理するものとしてもよい。
本発明の第1の実装システムは、複数の部品を収容する複数の部品供給ユニットにより供給される前記部品を基板に実装する実装処理を行う部品実装機と、前記部品実装機にセットされている前記部品供給ユニットを交換するユニット交換装置と、前記ユニット交換装置を制御する交換制御装置とを備える実装システムであって、前記交換制御装置は、一の前記基板の実装処理に必要な複数の前記部品供給ユニットのうち一部の部品供給ユニットがセットされている状態で当該実装処理が開始された場合、一の前記基板の実装処理中に、当該実装処理における複数種の部品の実装順と当該実装処理において前記部品の供給が終了した前記部品供給ユニットの情報とに基づいて、前記部品の供給を終了した前記部品供給ユニットを当該実装処理に必要な部品供給ユニットのうち前記一部の部品供給ユニットを除いた残りの部品供給ユニットと入れ替えるよう前記ユニット交換装置を制御することを要旨とする。これにより、部品供給ユニットの限られたセット数の範囲内で必要な部品供給ユニットに交換しながら実装処理することができるから、実装処理の生産性を向上させることができる。また、部品供給ユニットのセット数を増やすために部品実装機が拡大するのを抑制することができる。
本発明の第2の実装システムは、複数の部品を収容する複数の部品供給ユニットにより供給される前記部品を基板に実装する実装処理を行う部品実装機と、前記部品実装機にセットされている前記部品供給ユニットを交換するユニット交換装置と、前記ユニット交換装置を制御する交換制御装置とを備える実装システムであって、前記交換制御装置は、一の前記基板の実装処理中に、当該実装処理における複数種の部品の実装順と当該実装処理において前記部品の供給が終了した前記部品供給ユニットの情報とに基づいて、当該実装処理において前記部品の供給が終了した部品供給ユニットと前記部品の供給が終了していない部品供給ユニットとの配置を変更するよう前記ユニット交換装置を制御することを要旨とする。これにより、部品供給ユニットを供給効率のよりよい位置にセットしながら、実装処理することが可能となる。
本発明の第3の実装システムは、複数の部品を収容する複数の部品供給ユニットにより供給される前記部品を複数種の基板に実装する実装処理を行う部品実装機と、前記部品実装機にセットされている前記部品供給ユニットを交換するユニット交換装置と、前記ユニット交換装置を制御する交換制御装置とを備える実装システムであって、前記部品実装機は、並列に設けられた複数のレーンに搬送される前記基板に順次実装処理を行うものであり、前記交換制御装置は、前記複数のレーンのうち一のレーンで実装処理されている前記基板の種類と他のレーンで次に実装処理される前記基板の種類とが異なる場合、前記一のレーンにおいて同一種の前記基板の実装処理を継続している間に、前記一のレーンと前記他のレーンとにおける複数種の部品の実装順と当該実装処理において前記部品の供給が終了した前記部品供給ユニットの情報とに基づいて、前記部品の供給が終了した部品供給ユニットを前記他のレーンの次の実装処理で必要な部品供給ユニットと入れ替えるよう前記ユニット交換装置を制御することを要旨とする。こうすれば、複数のレーンに異なる基板種の基板が搬送される際に、各基板種の実装処理に必要な部品供給ユニットの数が部品実装機にセット可能な数を超える場合でも、実装処理を行うことができる。
本発明の第4の実装システムは、複数の部品を収容する複数の部品供給ユニットにより供給される前記部品を複数種の基板に実装する実装処理を行う部品実装機と、前記部品実装機にセットされている前記部品供給ユニットを交換するユニット交換装置と、前記ユニット交換装置を制御する交換制御装置とを備える実装システムであって、前記部品実装機は、前記基板の搬送方向に沿って複数並べて配置されており、前記交換制御装置は、同一種の前記基板の実装処理を継続している間に、前記複数の部品実装機において当該基板種の一の前記基板の実装処理において前記部品の供給が終了した前記部品供給ユニットの情報に基づいて、前記複数の部品実装機にセットされている前記部品供給ユニットを各部品実装機間で受け渡すよう前記ユニット交換装置を制御することを要旨とする。こうすれば、部品供給ユニットを各部品実装機で使い回すことができるから、部品供給ユニットを部品実装機の数だけ準備できていない場合などでも効率よく実装処理を行うことができる。
本発明の交換制御装置は、複数の部品を収容する複数の部品供給ユニットにより供給される複数種の前記部品を基板に実装する実装処理を行う部品実装機に対し、前記部品供給ユニットを交換するユニット交換装置を制御する交換制御装置であって、実装処理における複数種の部品の実装順と、実装処理において前記部品の供給が終了した部品供給ユニットの情報とを含む各種情報を取得する情報取得部と、前記複数種の部品の実装順と前記部品の供給が終了した部品供給ユニットの情報とに基づいて、前記部品実装機にセットされている前記複数の部品供給ユニットのうち、前記部品の供給が終了した部品供給ユニットを当該部品供給ユニットよりも実装順が後の別の部品供給ユニットと交換するよう前記ユニット交換装置に指示を出力する指示出力部と、を備えることを要旨とする。これにより、部品の供給が終了した部品供給ユニットをユニット交換装置を用いて別の部品供給ユニットと交換することができるから、実装処理の生産性を向上させるための部品供給ユニットの交換を、ユニット交換装置を用いて容易に実現することができる。
本発明の交換制御装置において、前記情報取得部は、一の前記基板の実装処理に必要な複数の前記部品供給ユニットの必要ユニット数の情報を取得し、前記必要ユニット数が、前記部品実装機にセット可能な最大ユニット数を超えるか否かを判定するユニット数判定部と、前記ユニット数判定部により前記必要ユニット数が前記最大ユニット数を超えると判定される場合に、前記部品実装機にセットされる前記部品供給ユニットのセット内容を決定するセット内容決定部と、を備え、前記セット内容決定部は、前記実装順に基づいて、一の前記基板の実装処理に必要な複数の前記部品供給ユニットのうち当該実装処理の開始時にセットすべき一部の部品供給ユニットを決定し、前記一部の部品供給ユニットを除いた残りの部品供給ユニットにおけるセット順を決定し、前記指示出力部は、一の前記基板の実装処理が開始されるまでに、前記一部の部品供給ユニットを前記部品実装機にセットするよう前記ユニット交換装置に指示を出力し、当該実装処理中に、実装処理において前記部品の供給を終了した前記部品供給ユニットを、前記セット順に基づいて次にセットすべき部品供給ユニットと入れ替えるよう前記ユニット交換装置に指示を出力するものとしてもよい。こうすれば、部品供給ユニットの限られたセット数の範囲内で必要な部品供給ユニットに交換しながら実装処理することができるから、実装処理の生産性を向上させることができる。
本発明の交換制御装置において、前記ユニット交換装置は、並列に設けられた複数のレーンに搬送される前記基板に実装処理を行う前記部品実装機に対して、前記部品供給ユニットを交換するものであり、前記情報取得部は、前記複数のレーンでそれぞれ実装処理される前記基板の種類の情報を取得し、前記複数のレーンのうち一のレーンの実装処理から他のレーンの実装処理に切り替わることになる場合、前記一のレーンにおける前記基板の種類と、前記他のレーンにおける前記基板の種類とが異なるか否かを判定する基板種判定部を備え、前記指示出力部は、前記基板種判定部により前記一のレーンにおける前記基板の種類と前記他のレーンにおける前記基板の種類とが異なると判定された場合、前記一のレーンにおける前記基板の実装処理中に、当該基板種の一の前記基板の実装処理において前記部品の供給が終了した部品供給ユニットを前記他のレーンの次の実装処理で必要な部品供給ユニットと入れ替えるよう前記ユニット交換装置に指示を出力するものとしてもよい。こうすれば、複数のレーンに異なる基板種の基板が搬送される際に、各基板種の実装処理に必要な部品供給ユニットの数が部品実装機にセット可能な数を超える場合でも、実装処理を行うことができる。
本発明の交換制御装置において、前記ユニット交換装置は、前記基板の搬送方向に沿って複数並べて配置された前記部品実装機に対して、前記部品供給ユニットを交換するものであり、前記情報取得部は、実装処理中にいずれかの部品種の前記部品供給ユニットに部品切れが発生した場合、同一種の前記基板の実装処理が終了するまでに当該部品種において必要となる必要部品数と、前記複数の部品実装機にセットされている当該部品種の別の部品供給ユニットにおける収容部品の残り部品数とを取得し、前記必要部品数よりも前記残り部品数の方が多いか否かを判定する部品数判定部を備え、前記指示出力部は、前記部品数判定部により前記必要部品数よりも前記残り部品数の方が多いと判定される場合に、前記部品切れの部品供給ユニットを、当該部品種において部品切れとなっていない別の部品供給ユニットと入れ替えるよう前記ユニット交換装置に指示を出力するものとしてもよい。こうすれば、部品切れの部品供給ユニットが発生した場合に、新たな部品供給ユニットを使用しなくても実装処理を継続することができる。このため、使いかけの部品供給ユニットの発生を抑制することができる。
本発明の交換制御装置において、同一種の前記基板の実装処理において、部品の供給元を同一の前記部品供給ユニットとすべき部品種があるか否かを判定する供給元判定部を備え、前記指示出力部は、前記供給元判定部により部品の供給元を同一の前記部品供給ユニットとすべき部品種があると判定される場合に、前記部品実装機において当該部品種の一の部品供給ユニットによる前記部品の供給が終了すると、当該部品実装機から前記一の部品供給ユニットを取り外して別の部品実装機にセットするよう前記ユニット交換装置に指示を出力するものとしてもよい。こうすれば、部品の供給元を同一の部品供給ユニットとすべき部品種がある場合に、部品供給ユニットを受け渡して効率よく実装処理することができる。
本発明の交換制御装置において、前記ユニット交換装置は、前記部品供給ユニットにより供給される前記部品をヘッドで採取した後に前記ヘッドを所定位置を経由して前記基板上に移動させて実装処理を行う前記部品実装機に対し、前記部品供給ユニットを交換するものであり、前記情報取得部は、判定対象の前記部品供給ユニットがセットされている第1のセット位置と当該第1のセット位置よりも前記所定位置に近い第2のセット位置とに基づいて、前記ヘッドが前記第1のセット位置の部品供給ユニットにおける部品供給位置から前記所定位置に移動するまでの移動時間と前記第2のセット位置の部品供給ユニットにおける部品供給位置から前記所定位置に移動するまでの移動時間との差分である移動短縮時間と、前記部品供給ユニットを配置変更するのに要する配置変更時間とを取得し、前記実装順と前記短縮時間と前記配置変更時間とに基づいて、前記判定対象の部品供給ユニットを配置変更するか否かを判定する配置変更判定部と、を備え、前記指示出力部は、前記配置変更判定部より配置変更すると判定される場合、前記第2のセット位置にセットされている前記部品供給ユニットによる前記部品の供給が終了すると、前記部品の供給が終了した部品供給ユニットと前記第1のセット位置にセットされている前記部品供給ユニットとの配置を変更するよう前記ユニット交換装置に指示を出力するものとしてもよい。こうすれば、ヘッドの移動短縮時間が部品供給ユニットの配置変更時間を上回る場合に、部品供給ユニットを配置変更することができるから、配置変更によるロスの発生を抑えて生産性をより向上させることができる。
本発明の第1の部品実装機は、複数の部品を収容する複数の部品供給ユニットがユニット交換装置により交換可能にセットされ、前記複数の部品供給ユニットにより供給される複数種の前記部品を基板に実装する実装処理を行う部品実装機であって、実装処理における複数種の部品の実装順と、実装処理において前記部品の供給が終了した部品供給ユニットの情報とに基づいて、前記部品の供給が終了した前記部品供給ユニットと前記部品の供給が終了していない前記部品供給ユニットとの交換要求を前記ユニット交換装置に送信することを要旨とする。これにより、一の基板の実装処理中に、実装処理の生産性を向上させるための部品供給ユニットの交換を、ユニット交換装置を用いて容易に実現することができる。
本発明の第2の部品実装機は、複数の部品を収容する複数の部品供給ユニットがユニット交換装置により交換可能にセットされ、前記複数の部品供給ユニットにより供給される複数種の前記部品を基板に実装する実装処理を行う部品実装機であって、前記複数のレーンで実装処理される前記基板の種類と、各基板種の実装処理における複数種の部品の実装順と、前記複数のレーンのうち一のレーンの実装処理において前記部品の供給が終了した部品供給ユニットの情報とに基づいて、当該実装処理で前記部品の供給が終了した前記部品供給ユニットと他のレーンの次の実装処理で必要な部品供給ユニットとの交換要求を前記ユニット交換装置に送信することを要旨とする。これにより、各レーンの基板種の切り替わり時において部品供給ユニットの交換ロスが生じるのを抑制して、実装処理の生産性を向上させることができる。
[第1実施形態]
次に、本発明の第1実施形態について、図面を用いて説明する。図1は部品実装システム10の構成の概略を示す構成図であり、図2は部品実装機20の構成の概略を示す構成図であり、図3はフィーダ30の構成の概略を示す構成図である。また、図4は交換ロボット50の構成の概略を示す構成図であり、図5は部品実装システム10の制御に関する構成図である。なお、図1の左右方向がX方向であり、前後方向がY方向であり、上下方向がZ方向である。
次に、本発明の第1実施形態について、図面を用いて説明する。図1は部品実装システム10の構成の概略を示す構成図であり、図2は部品実装機20の構成の概略を示す構成図であり、図3はフィーダ30の構成の概略を示す構成図である。また、図4は交換ロボット50の構成の概略を示す構成図であり、図5は部品実装システム10の制御に関する構成図である。なお、図1の左右方向がX方向であり、前後方向がY方向であり、上下方向がZ方向である。
部品実装システム10は、図1に示すように、基板上にはんだを印刷する印刷機12と、印刷されたはんだの状態を検査する印刷検査機14と、フィーダ30から供給された部品を基板に実装する複数の部品実装機20と、部品の実装状態を検査する実装検査機(図示省略)と、ライン全体を管理する管理装置80などを備える。部品実装システム10では、印刷機12と印刷検査機14と複数の部品実装機20とが、この順番で基板の搬送方向(X方向)に並べて設置されている。
また、部品実装システム10は、各部品実装機20との間でフィーダ30の自動交換を行う交換ロボット50を備える。交換ロボット50は、複数の部品実装機20の前面に基板の搬送方向(X方向)に対して平行に設けられたX軸レール18に沿って移動可能となっている。なお、図2では、X軸レール18の図示を省略した。
部品実装機20は、図2に示すように、基板Sを搬送可能な基板搬送装置21と、フィーダ30が供給した部品を吸着する吸着ノズルを有するヘッド22と、ヘッド22をXY方向に移動させるヘッド移動機構23と、装置全体を制御する実装制御装置28(図5参照)とを備える。また、部品実装機20は、基板Sに設けられたマークを上方から撮像するマークカメラ24と、吸着ノズルに吸着された部品を下方から撮像するパーツカメラ25とを備える。部品実装機20は、2つのレーン(例えば、Y方向前方側の第1レーンとY方向後方側の第2レーン)を有する。基板搬送装置21は、各レーンの基板Sをそれぞれ搬送可能である。実装制御装置28は、CPU28aとROM28bとHDD28cとRAM28dなどで構成されている。実装制御装置28は、基板搬送装置21とヘッド22とヘッド移動機構23とフィーダ30などに駆動信号を出力したり、マークカメラ24とパーツカメラ25に撮像指示を出力したり、マークカメラ24とパーツカメラ25から撮像画像を入力したりする。
フィーダ30は、部品を所定ピッチで収容するテープを送り出すテープフィーダとして構成されている。フィーダ30は、図3に示すように、テープが巻回されたテープリール32と、テープリール32からテープを引き出して送り出すテープ送り機構33と、突出する2本の位置決めピン34を有するコネクタ35と、下端に設けられたレール部材37と、フィーダ全体の制御を行うフィーダ制御装置39(図5参照)とを備える。フィーダ制御装置39は、CPUとROMとRAMなどで構成され、テープ送り機構33に駆動信号を出力する。また、フィーダ制御装置39は、フィーダ30が取り付けられている部品実装機20の実装制御装置28とコネクタ35を介して通信可能である。
部品実装機20は、図2に示すように、前方にフィーダ30を取り付け可能な上下2つのエリアを有する。上のエリアはフィーダ30が部品を供給可能な供給エリア(部品供給エリア)20Aであり、下のエリアはフィーダ30をストック可能なストックエリア20Bである。供給エリア20Aとストックエリア20Bには、それぞれ複数のフィーダ30が搭載される(セットされる)フィーダ台40が設けられる。フィーダ台40は、側面視がL字状の台であり、フィーダ30のレール部材37が挿入可能な間隔でX方向に複数配列されたスロット42と、フィーダ30の2本の位置決めピン34が挿入可能な2つの位置決め穴44と、2つの位置決め穴44の間に設けられコネクタ35が接続されるコネクタ45とを備える。なお、各フィーダ台40は、上限搭載数Nまでフィーダ30を搭載可能である。
ここで、図6はHDD28cに記憶された供給エリア情報とストックエリア情報の一例を示す説明図である。供給エリア情報は、供給エリア20Aにセットされているフィーダ30の情報である。ストックエリア情報は、ストックエリア20Bにセットされているフィーダ30の情報である。供給エリア情報は、供給エリア20Aにおけるフィーダ30の取付位置の位置情報に対応付けて、フィーダ30のID情報やフィーダ30に収容されている部品種の情報、残り部品数の情報などが記憶される。なお、位置情報は、フィーダ台40の複数のスロット42のうち基準スロット(例えば左端のスロット42)を先頭位置「001」として順に定められている。また、フィーダ30のID情報や部品種の情報,残り部品数の情報は、コネクタ35,45の接続を介して、フィーダ30のフィーダ制御装置39から取得したものを記憶する。同様に、ストックエリア情報は、ストックエリア20Bにおけるフィーダ30の取付位置の位置情報に対応付けて、フィーダ30のID情報や部品種の情報、残り部品数の情報などが記憶される。このため、供給エリア情報とストックエリア情報は、フィーダ30が着脱された場合や部品実装処理中に部品が供給された場合に適宜更新されるものとなる。なお、ストックエリア情報の位置情報が「003」の位置には、フィーダ30が取り付けられていないことを示す。
交換ロボット50は、図4に示すように、X軸レール18に沿って交換ロボット50を移動させるロボット移動機構51と、フィーダ30を部品実装機20に移載するフィーダ移載機構53と、交換ロボット全体を制御するロボット制御装置59(図5参照)とを備える。ロボット移動機構51は、交換ロボット50を移動させるための駆動用ベルトを駆動するサーボモータなどのX軸モータ52aと、X軸レール18に沿った交換ロボット50の移動をガイドするガイドローラ52bなどを備える。フィーダ移載機構53は、フィーダ30をクランプするクランプ部54およびクランプ部54をY軸ガイドレール55bに沿って移動させるY軸モータ55aとを搭載するY軸スライダ55と、Y軸スライダ55をZ軸ガイドレール56bに沿って移動させるZ軸モータ56aとを備える。交換ロボット50は、この他に、X方向の移動位置を検出するエンコーダ57(図5参照)と、交換ロボット50の左右の障害物(作業者)の有無を監視する赤外線センサなどの監視センサ58(図5参照)などを備える。
フィーダ移載機構53のY軸スライダ55は、Z軸モータ56aの駆動により部品実装機20の供給エリア20Aに対向する上部移載エリア50Aと、部品実装機20のストックエリア20Bに対向する下部移載エリア50Bとに移動する。ロボット制御装置59は、クランプ部54によりフィーダ30をクランプしているY軸スライダ55を、Y軸モータ55aの駆動により上部移載エリア50Aから供給エリア20Aに移動させてフィーダ30のレール部材37をフィーダ台40のスロット42に挿入させる。続いて、ロボット制御装置59は、クランプ部54のクランプを解除することにより、フィーダ30を供給エリア20Aのフィーダ台40に取り付ける。また、ロボット制御装置59は、供給エリア20Aのフィーダ台40に取り付けられているフィーダ30をクランプ部54によりクランプして、Y軸モータ55aの駆動によりY軸スライダ55を供給エリア20Aから上部移載エリア50Aに移動させることにより、フィーダ30を供給エリア20Aのフィーダ台40から取り外す(上部移載エリア50Aに引き込む)。ロボット制御装置59は、ストックエリア20Bのフィーダ台40へのフィーダ30の取り付けやストックエリア20Bのフィーダ台40からのフィーダ30の取り外しは、Z軸モータ56aの駆動によりY軸スライダ55を下部移載エリア50Bに移動させて、上部移載エリア50Aに代えて下部移載エリア50Bで行う以外は同様の処理を行うため、説明は省略する。
管理装置80は、図5に示すように、CPU80aとROM80bとHDD80cとRAM80dなどで構成され、LCDなどのディスプレイ82と、キーボードやマウスなどの入力デバイス84とを備える。管理装置80は、基板Sの生産プログラム(ジョブデータ)などを記憶している。基板Sの生産プログラムは、基板Sの種類(基板種)毎に、どの部品種の部品を何個実装するか、どの部品種の部品から実装するか(部品種の実装順)、各レーンにどの基板種の基板Sを何枚搬送するか、各基板種の基板Sを何枚生産(実装)するかなどを定めたプログラムをいう。管理装置80は、実装制御装置28と有線により通信可能に接続されると共にロボット制御装置59と無線により通信可能に接続される他、印刷機12や印刷検査機14、実装検査機の各制御装置と通信可能に接続される。管理装置80は、実装制御装置28に基板Sの生産プログラムを送信したり、実装制御装置28から部品実装機20の実装状況に関する情報やフィーダ30の搭載状況に関する情報を受信したり、ロボット制御装置59から交換ロボット50の駆動状況に関する情報を受信したりする。例えば、管理装置80は、各部品実装機20の供給エリア情報およびストックエリア情報を、必要に応じて各部品実装機20の実装制御装置28から通信により取得する。
以下は、こうして構成された部品実装システム10の処理の説明である。まず、管理装置80が行う処理を説明する。なお、以下では、主に部品の実装処理に必要なフィーダ30を供給エリア20Aにセットするための処理について説明する。説明の便宜上、部品の実装処理に必要なフィーダ30は、供給エリア20Aおよびストックエリア20Bのいずれかにセットされているものとする。なお、管理装置80は、部品の実装処理に必要なフィーダ30が供給エリア20Aおよびストックエリア20Bのいずれにもセットされてない場合には、作業者にその旨を報知して必要なフィーダ30のセットを指示したり、交換ロボット50を図示しないフィーダ30の保管場所に移動させて必要なフィーダ30を取り出して運搬させたりすればよい。
図7はフィーダ交換指示送信処理の一例を示すフローチャートである。この処理は、所定時間毎に実行される。図7の処理では、管理装置80のCPU80aは、まず、フィーダ初期セットタイミングの部品実装機20があるか否か(S100)、いずれかの部品実装機20からフィーダ交換要求を受信したか否か(S105)、をそれぞれ判定する。また、CPU80aは、フィーダ交換要求を受信したと判定すると、さらに、部品切れに基づくフィーダ交換要求であるか否かを判定する(S110)。フィーダ初期セットタイミングは、基板種に応じて部品実装機20の各種生産部材(例えば、吸着ノズルやヘッド22など)を取り替える段取り替え作業などが作業者により行われた後などにおいて、実装処理を開始するのに必要なフィーダ30を交換ロボット50により供給エリア20Aにセットさせるタイミングである。また、フィーダ交換要求は、実装処理中に、供給エリア20Aにセットされているフィーダ30の残り部品がなくなって部品切れが生じた場合に送信される他、供給エリア20Aとストックエリア20Bなどとの間でフィーダ30を交換する必要が生じた場合に、各部品実装機20から送信される要求である。CPU80aは、S100でフィーダ初期セットタイミングの部品実装機20がないと判定し、且つ、S105で各部品実装機20からフィーダ交換要求を受信してないと判定すると、そのまま本処理を終了する。
一方、管理装置80のCPU80aは、S100でフィーダ初期セットタイミングの部品実装機20があると判定すると、その部品実装機20に対する初期セット対応処理を実行する(S115)。CPU80aは、S105,S110で部品実装機20からフィーダ交換要求を受信し且つ部品切れに基づくフィーダ交換要求であると判定すると、部品切れ時の交換対応処理を実行する(S120)。また、S105,S110で部品実装機20からフィーダ交換要求を受信し且つ部品切れに基づくフィーダ交換要求でないと判定すると、非部品切れ時の交換対応処理を実行する(S125)。そして、CPU80aは、S115,S120,S125の各対応処理で交換対象のフィーダ30が設定済みとなったか否かを判定する(S130)。CPU80aは、各対応処理で交換不要あるいは交換待ちなどと判定するなど、交換対象のフィーダ30を設定済みとなっていない場合には、そのまま本処理を終了する。一方、CPU80aは、交換対象のフィーダ30が設定済みであれば、その交換対象のフィーダ30の位置情報に基づく交換指示を生成し(S135)、対象となる部品実装機20を指定してフィーダ30の交換指示を交換ロボット50のロボット制御装置59に送信して(S140)、本処理を終了する。なお、CPU80aは、交換対象のフィーダ30の位置情報を、対象となる部品実装機20がHDD28cに記憶している供給エリア情報やストックエリア情報から取得する。交換指示を受信したロボット制御装置59は、指定された部品実装機20の前に交換ロボット50が移動するようロボット移動機構51を制御する。また、ロボット制御装置59は、指定された部品実装機20において、フィーダ30の交換処理を行うようロボット移動機構51とフィーダ移載機構53とを制御する。これにより、交換ロボット50は、供給エリア20Aから不要なフィーダ30を取り出してストックエリア20Bに取り付けたり、ストックエリア20Bから必要なフィーダ30を取り出して供給エリア20Aに取り付けたりする。なお、実装制御装置28のCPU28aは、セットされたフィーダ30の情報をコネクタ35,45の接続を介してフィーダ制御装置39から取得して、HDD28cの供給エリア情報やストックエリア情報を更新する。以下は、S115の初期セット対応処理の詳細の説明である。以下の説明は、1つの部品実装機20に対する初期セット対応処理を説明するが、フィーダ初期セットタイミングにあると判定された各部品実装機20に対して同様な処理が行われる。なお、S120,S125の各交換対応処理は、部品実装機20の処理を説明した後に説明する。
図8は初期セット対応処理の一例を示すフローチャートである。図8の処理では、管理装置80のCPU80aは、まず、処理対象の部品実装機20が実装処理を開始する基板Sの生産プログラムなどに基づいて、実装対象の部品種と部品種の実装順,実装処理に必要なフィーダ30の数(部品種数,必要フィーダ数)など、フィーダ30の初期セットに必要な情報を取得する(S200)。次に、CPU80aは、必要フィーダ数が供給エリア20Aの上限搭載数N以下であるか否かを判定し(S205)、必要フィーダ数が上限搭載数N以下であると判定すると、全部品種のフィーダ30を初期セット対象に設定する(S210)。そして、CPU80aは、処理対象の部品実装機20がHDD28cに記憶しているストックエリア情報から、ストックエリア20Bにある初期セット対象のフィーダ30を交換対象に設定する(S230)。また、CPU80aは、処理対象の部品実装機20がHDD28cに記憶している供給エリア情報から、供給エリア20Aにある初期セット対象以外のフィーダ30のうち、S230で交換対象としたフィーダ30と同数のフィーダ30を交換対象として(S235)、本処理を終了する。このように、CPU80aは、必要フィーダ数が上限搭載数N以下の場合には、全てのフィーダ30をセット可能であると判定して初期セット対象に設定するのである。そして、CPU80aは、図7のフィーダ交換指示送信処理のS135において、S230,S235で設定した交換対象の各フィーダ30について、実装処理に必要な全てのフィーダ30が供給エリア20Aにセットされると共に供給エリア20Aにセットされている不要なフィーダ30がストックエリア20Bにセットされるよう交換指示を生成する。
一方、CPU80aは、S205で必要フィーダ数が上限搭載数Nを超えると判定すると、実装順が1~N番目の部品種のフィーダ30を初期セット対象に設定する(S215)。即ち、CPU80aは、実装処理に必要な全てのフィーダ30を供給エリア20Aに搭載できない場合には、そのうち一部のフィーダ30を初期セット対象に設定する。続いて、CPU80aは、残りのフィーダ30、即ち、実装順が(N+1)番目以降となる部品種のフィーダ30を実装中交換対象に設定し(S220)、実装中交換対象のフィーダ30のセット順を(N+1)番目以降の実装順と同じ順序に設定する(S225)。そして、CPU80aは、処理対象の部品実装機20のストックエリア情報から、ストックエリア20Bにある初期セット対象のフィーダ30を交換対象とする(S230)。また、CPU80aは、処理対象の部品実装機20の供給エリア情報から、供給エリア20Aにある初期セット対象以外のフィーダ30の全て(実装中交換対象を含む)を交換対象として(S235)、本処理を終了する。このように、CPU80aは、実装処理に必要なフィーダ30の全てを供給エリア20Aに搭載できない場合には、実装順が1番目~N番目のN個(上限搭載数N)のフィーダ30を初期セット対象に設定すると共に、実装順が(N+1)番目以降の残りのフィーダ30を実装中交換対象に設定するのである。そして、CPU80aは、図7のフィーダ交換指示送信処理のS135において、S230,S235で設定した交換対象の各フィーダ30について、実装処理に必要な一部のフィーダ30が供給エリア20Aにセットされると共に供給エリア20Aにセットされている不要なフィーダ30(実装中交換対象を含む)がストックエリア20Bにセットされるよう交換指示を生成する。
ここで、一の基板S(1枚の基板S)の実装処理における部品種の実装順は、部品の実装効率などに基づいた順序に予め定められている。しかし、第1実施形態において、必要フィーダ数が上限搭載数Nを超える場合、管理装置80のCPU80aや実装制御装置28のCPU28aが実装順を変更してもよい。例えば、CPU80aは、一の基板Sの実装処理において実装される各部品種の部品数(実装点数,供給点数)に基づいて実装順を変更してもよい。CPU80aは実装点数の多い順に実装順を変更してもよく、その場合、初期セット対象は実装点数の多い順からN番目までの部品種のフィーダ30となり、実装中交換対象は実装点数(供給点数)が比較的少ないフィーダ30となる。あるいは、CPU80aは実装点数の少ない順に実装順を変更してもよく、その場合、初期セット対象は実装点数の少ない順からN番目までのフィーダ30となり、実装中交換対象は実装点数(供給点数)が比較的多いフィーダ30となる。
次に、部品実装機20が行う処理を説明する。図9は基板搬送処理の一例を示すフローチャートである。この処理は、各部品実装機20の実装制御装置28のCPU28aにより所定時間毎に実行される。図9の処理では、実装制御装置28のCPU28aは、まず、第1レーンまたは第2レーンのいずれかに対応付けられた搬入待ち基板があるか否かを判定する(S300)。CPU28aは、搬入待ち基板がないと判定すると、上流側に隣接する部品実装機20からの基板搬出可能信号を受信したか否かを判定する(S305)。基板搬出可能信号は、上流側に隣接する部品実装機20において、一の基板Sへの部品の実装が終了しその基板Sを搬出可能となったときに管理装置80に送信される信号である。この基板搬出可能信号は、基板Sの基板種の情報と、基板Sが搬送されるレーンの指定情報などを含んでおり、上流側に隣接する部品実装機20から管理装置80を経由して下流側の部品実装機20に送信(転送)される。CPU28aは、基板搬出可能信号を受信してないと判定すると、S340に進む。また、CPU28aは、基板搬出可能信号を受信したと判定すると、次に実装処理の対象となる基板種の情報とレーンの指定情報とを基板搬出可能信号から取得し(S310)、指定されたレーンで基板Sを受入可能(搬入可能)であるか否かを判定する(S315)。なお、CPU28aは、指定されたレーンにおいて、基板Sの実装処理中である場合や基板搬入前に作業者による段取り替え作業が必要となる場合などに、基板Sを受入可能でないと判定する。また、CPU28aは、指定されたレーンにおいて、既に基板Sを搬出しており基板Sがない場合に、基板Sを受入可能であると判定する。
CPU28aは、S315で基板Sを受入可能でないと判定すると、基板搬出可能信号で指定されたレーンに対応付けてその基板Sを搬入待ち基板に設定して(S320)、S340に進む。CPU28aは、S320で搬入待ち基板に設定すると、S300で搬入待ち基板があると判定しS305,S310をスキップして、S315に進む。一方、CPU28aは、S315で基板Sを受入可能であると判定すると、受入可能なレーンの指定情報を含む基板受入可能信号を管理装置80に送信する(S325)。この基板受入可能情報を受信した管理装置80は、上流側に隣接する部品実装機20に基板受入可能信号を送信(転送)する。上流側の部品実装機20は、基板受入可能信号を受信すると、基板搬送装置21を制御して指定されたレーンにある基板Sを搬出する。このため、CPU28aは、上流側の部品実装機20から搬出された基板Sを搬入するよう基板搬送装置21を制御する基板搬入処理を行うと共に(S330)、基板Sを搬入したレーンと搬入した基板Sの識別情報や基板種とを対応付けてRAM28dに記憶されている生産中基板情報(図示省略)に登録して(S335)、S340に進む。なお、CPU28aは、搬入した基板Sに付されたマークを撮像するようマークカメラ24を制御し、撮像により得られた基板Sの識別情報を生産中基板情報に登録する。
次に、CPU28aは、第1レーンまたは第2レーンのいずれかに対応付けられた搬出待ち基板があるか否かを判定する(S340)。CPU28aは、搬出待ち基板がないと判定すると、第1レーンまたは第2レーンのいずれかに実装処理が終了した基板Sがあるか否かを判定し(S345)、実装処理が終了した基板Sがないと判定すると、本処理を終了する。一方、CPU28aは、実装処理が終了した基板Sがあると判定すると、その基板Sの基板種の情報と基板Sが搬送されるレーンの指定情報などを含む基板搬出可能信号を管理装置80に送信する(S350)。基板搬出可能信号を受信した管理装置80は、下流側に隣接する部品実装機20にその基板搬出可能信号を送信(転送)する。そして、CPU28aは、下流側の部品実装機20から基板受入可能信号を受信したか否かを判定し(S355)、基板受入可能信号を受信してないと判定すると、実装処理が終了した基板Sを搬出待ち基板に設定して(S360)、本処理を終了する。一方、CPU28aは、S355で基板受入可能信号を受信したと判定すると、基板受入可能信号で指定されたレーンの基板Sを搬出するよう基板搬送装置21を制御し(S365)、搬出した基板Sに関する情報をRAM28dの生産中基板情報から削除して(S370)、本処理を終了する。
図10は部品実装処理の一例を示すフローチャートである。この処理は、各部品実装機20の実装制御装置28のCPU28aにより所定時間毎に実行される。図10の処理では、実装制御装置28のCPU28aは、まず、基板Sの生産プログラムに基づいて、実装対象の部品種と部品種の実装順,各部品の実装位置,実装点数など実装処理に必要な情報を取得する(S400)。そして、CPU28aは、実装処理対象の基板種の基板Sが実装処理の対象レーン(第1レーンまたは第2レーンのいずれか)に搬入済みになるのを待つ(S405)。CPU28aは、実装処理対象の基板種の基板Sが対象レーンに搬入済みになると、部品種の実装順を変更する必要があるか否かを判定し(S410)、変更の必要があれば実装順を変更し(S415)、変更の必要がなければS415をスキップする。なお、変更の必要が生じる場合については、後述する。
次に、CPU28aは、実装順に基づく部品種の部品を供給エリア20Aにセットされている複数のフィーダ30のうちいずれかのフィーダ30から供給させ(S420)、供給された部品を吸着ノズルで吸着する(部品を採取する)ようヘッド22を制御する(S425)。続いて、CPU28aは、ヘッド22がパーツカメラ25上(所定位置)を経由して基板S上に移動するようヘッド移動機構23を制御すると共に(S430)、吸着ノズルに吸着された部品がパーツカメラ25上にあるときに部品の画像を撮像するようパーツカメラ25を制御する(S435)。そして、CPU28aは、撮像した画像における部品吸着姿勢に基づいて実装位置を補正した補正後位置に部品を実装するようヘッド22とヘッド移動機構23とを制御して(S440)、基板Sに部品を実装する。CPU28aは、こうして部品を基板Sに実装すると、フィーダ30の交換の必要があればフィーダ交換要求を管理装置80に送信するフィーダ交換要求送信処理を実行し(S445)、実装対象の一の基板Sに全ての部品を実装したか否かを判定する(S450)。CPU28aは、全ての部品を実装してないと判定すると、S420に戻り処理を繰り返し、全ての部品を実装したと判定すると、本処理を終了する。
S445のフィーダ交換要求送信処理は、図11のフローチャートに基づいて行われる。図11の処理では、実装制御装置28のCPU28aは、一の部品種の部品の実装を終了したタイミングであるか否かを判定し(S500)、一の部品種の部品の実装を終了したタイミングであると判定すると、現在の実装処理に必要な他の部品種のフィーダ30のうち供給エリア20Aにセットされていない未セットのフィーダ30(実装中交換対象のフィーダ30)があるか否かを判定する(S505)。ここで、前述した初期セット対応処理で実装処理に必要な全部品種のフィーダ30が初期セット対象に設定されてセットされていれば、CPU28aは未セットのフィーダ30がないと判定する。一方、初期セット対応処理で一部の部品種のフィーダ30が初期セット対象に設定され、実装中交換対象のフィーダ30の全てがまだ供給エリア20Aにセットされてなければ、CPU28aは未セットのフィーダ30があると判定する。CPU28aは、S505で未セットのフィーダ30がないと判定すると、そのまま本処理を終了する。一方、CPU28aは、S505で未セットのフィーダ30があると判定すると、HDD28cに記憶している供給エリア情報から実装終了した部品種のフィーダ30の位置情報を取得し(S510)、供給エリア20Aに未セットのフィーダ30(未セットフィーダ)との交換を要求するフィーダ交換要求を管理装置80に送信して(S515)、本処理を終了する。なお、CPU28aは、S510で取得したフィーダ30の位置情報をフィーダ交換要求に含めて送信する。
また、CPU28aは、S500で一の部品種の実装(供給)を終了したタイミングでないと判定すると、収容している部品の残数が値0即ち部品切れのフィーダ30が発生したか否かを判定する(S520)。CPU28aは、部品切れのフィーダ30が発生してないと判定すると、そのまま本処理を終了する。一方、CPU28aは、部品切れのフィーダ30が発生したと判定すると、HDD28cに記憶している供給エリア情報から部品切れとなった部品種のフィーダ30の位置情報を取得し(S525)、部品切れ時のフィーダ交換要求を管理装置80に送信して(S530)、本処理を終了する。なお、CPU28aは、S525で取得した位置情報と部品種の情報とをフィーダ交換要求に含めて送信する。
このようなフィーダ交換要求が実装制御装置28から送信されると、管理装置80のCPU80aは、図7のフィーダ交換指示送信処理のS105でフィーダ交換要求を受信したと判定する。また、CPU80aは、部品切れ時のフィーダ交換要求を受信した場合には、S120の部品切れ時の交換対応処理を実行し、未セットフィーダとのフィーダ交換要求を受信した場合には、S125の非部品切れ時の交換対応処理を実行する。S120の部品切れ時の交換対応処理では、CPU80aは、部品切れとなったフィーダ30と、ストックエリア20Bにある同じ部品種のフィーダ30とを交換対象に設定するなどの処理を行うが、第1実施形態の要旨をなさないため詳細な説明は省略する。なお、CPU80aは、同じ部品種のフィーダ30がストックエリア20Bになければ、作業者にその旨を報知して必要なフィーダ30のセットを指示したり、交換ロボット50をフィーダ30の保管場所に移動させて必要なフィーダ30を運搬させたりするなどの処理を行う。
また、S125の非部品切れ時の交換対応処理は、図12のフローチャートに基づいて行われる。図12の処理では、管理装置80のCPU80aは、まず、受信したフィーダ交換要求から、一の基板Sの実装処理において部品の供給を終了したフィーダ30の位置情報を取得し(S600)、そのフィーダ30の位置がパーツカメラ25の正面位置を含む近傍位置(カメラ近傍位置)であるか否かを判定する(S605)。CPU28aは、例えば、パーツカメラ25のX方向(左右方向)の中心に対向する(前方の正面位置にある)フィーダ30と、そのフィーダ30の左右に隣接するフィーダ30との計3つのフィーダ30を、カメラ近傍位置にあるフィーダ30と判定する。CPU80aは、S605でフィーダ交換要求がなされたフィーダ30の位置がカメラ近傍位置にないと判定すると、そのまま本処理を終了する。
CPU80aは、フィーダ交換要求がなされたフィーダ30の位置がカメラ近傍位置にあると判定すると、図8のフィーダ初期内容セット処理のS225で設定した実装中交換対象のフィーダ30のセット順に基づいて、セット順が次となるフィーダ30を交換対象のフィーダ30に設定する(S610)。このように、CPU80aは、部品の供給が終了したフィーダ30が発生すると、実装中交換対象のフィーダ30のうちセット順に基づいて次にセットするフィーダ30を設定する。そして、CPU80aは、交換対象に設定したフィーダ30を実装中交換対象のフィーダ30のセット順から除外して(S615)、本処理を終了する。CPU80aは、図7のフィーダ交換指示送信処理のS135において、部品の供給が終了したフィーダ30がストックエリア20Bにセットされると共に実装中交換対象のフィーダ30(S610で交換対象に設定したフィーダ30)が供給エリア20Aにセットされるよう交換指示を生成する。このため、収容部品の残りがあっても、フィーダ30が、交換ロボット50によって実装中交換対象のフィーダ30と交換されることになる。このため、部品実装機20は、実装処理に必要なフィーダ30の全てを供給エリア20Aに搭載できない場合に、実装順が1番目~N番目のN個のフィーダ30を初期セット対象に設定して実装処理を開始した場合でも、一の基板Sの実装処理中に、実装順が(N+1)番目以降の残りのフィーダ30(実装中交換対象のフィーダ30)を順次供給エリア20Aにセットすることができる。また、実装中交換対象のフィーダ30は、実装処理中にパーツカメラ25の近傍位置にセットされるから、供給された部品を吸着ノズルで吸着したヘッド22が、パーツカメラ25上を経由して基板S上に移動する際の移動時間を短縮することができる。したがって、実装中交換対象のフィーダ30を、ヘッド22の移動効率のよりよい位置にセットして実装処理を行うことができるから、実装処理を効率のよいものとすることができる。なお、前述したように、CPU80aが実装点数の少ない順に実装順を変更した場合、実装中交換対象は実装点数(供給点数)が比較的多いフィーダ30となる。このため、実装中交換対象のフィーダ30が実装処理中にパーツカメラ25の近傍位置にセットされることにより、ヘッド22の移動効率をよくする効果を一層高めることができる。
図13は、第1実施形態で実装処理中にフィーダ30を交換する様子を示す説明図である。図13(a)に示すように、実装処理開始時(初期セット時)には、部品種A~*までのフィーダ30が初期セット対象フィーダとして供給エリア20Aにセットされると共に残りの部品種O,P,Qの3つのフィーダ30が実装中交換対象フィーダとしてストックエリア20Bにセットされている。なお、ストックエリア20Bには、他のフィーダ30もセットされているが、図示を省略した。また、パーツカメラ25の左右方向の中心に対向する位置にある部品種Gのフィーダ30とそのフィーダ30に左右に隣接する部品種F,Hの2つのフィーダ30とが、カメラ近傍位置にあるものとする。CPU80aは、実装処理中に部品種A,Bのフィーダ30の非部品切れ時の交換要求を受信しても、カメラ近傍位置にないと判定して、フィーダ30の交換は行わない。また、CPU80aは、実装処理中に部品種F,G,Hのいずれかのフィーダ30の非部品切れ時の交換要求を受信すると、カメラ近傍位置にあると判定して、実装中交換対象フィーダとの交換を行う。これにより、実装中交換対象フィーダの部品種O,P,Qの3つのフィーダ30が順次供給エリア20Aにセットされることになる(図13(b)参照)。このようなフィーダ30の交換を作業者が行うものとすると、作業者は各部品種の部品の供給が終了するタイミングを見計らって作業を行わなければならず、作業負担の増加に繋がるものとなる。本実施形態では、交換ロボット50により、実装処理中に、ストックエリア20Bの実装中交換対象フィーダ30を供給エリア20Aのフィーダ30と交換するから、作業負担を増加させることなく、適切なタイミングでフィーダ30を入れ替えることができる。
また、前述したように、管理装置80のCPU80aや実装制御装置28のCPU28aが実装順を変更してもよい。例えば、実装制御装置28のCPU28aは、先に実装処理される基板Sを本来の実装順とし、同じ種類の次に実装処理される基板Sを本来の実装順とは逆の実装順(本来の実装順で末尾となる部品種を先頭とする順)とし、以後、本来の実装順と逆の実装順とを交互に変更する。その場合、一の基板Sの実装処理を終了したときのフィーダ30のセット状態が図13(b)の場合、図13(a)の状態に戻すことなくそのままのセット状態で、CPU28aが次の基板Sの実装処理を開始すればよい。また、図13(b)の状態で実装処理を開始する場合、CPU28aは、図10の部品実装処理のS410で実装順の変更が必要と判定し、続くS415で逆の実装順に変更するものなどとすればよい。勿論、管理装置80のCPU80aは、一の基板Sの実装処理中や実装処理を終了する度に、フィーダ30を初期セット状態(例えば図13(a)の状態)に戻してもよい。
ここで、第1実施形態の構成要素と本発明の構成要素との対応関係を明らかにする。フィーダ30が部品供給ユニットに相当し、交換ロボット50がユニット交換装置に相当し、部品実装機20が部品実装機に相当する。ロボット制御装置59とロボット制御装置59に交換指示を送信する管理装置80とが交換制御装置に相当する。なお、以上の対応関係は、第2~第4実施形態においても同様である。また、図8の初期セット対応処理のS200を実行する管理装置80のCPU80aが情報取得部に相当し、初期セット対応処理のS205を実行するCPU80aがユニット数判定部に相当し、初期セット対応処理のS215~S225を実行するCPU80aがセット内容決定部に相当する。図11のフィーダ交換要求送信処理のS515で部品実装機20から送信される未セットフィーダのフィーダ交換要求を受信して図7のフィーダ交換指示送信処理のS125(図12の非部品切れ時の交換対応処理),S135,S140を実行するCPU80aが指示出力部に相当する。
以上説明した第1実施形態の部品実装システム10は、複数のフィーダ30により供給される部品を基板Sに実装する複数の部品実装機20と、各部品実装機20にセットされているフィーダ30を交換する交換ロボット50と、交換ロボット50を制御するためのフィーダ30の交換指示を生成して送信する管理装置80とを備える。また、部品実装システム10の管理装置80は、一の基板Sの実装処理に必要な複数のフィーダ30のうち一部のフィーダ30が供給エリア20Aにセットされている状態で実装処理が開始された場合、その基板Sの実装処理中に部品の供給を終了したフィーダ30を、部品の残りがあっても実装中交換対象のフィーダ30と交換するようロボット制御装置59に交換指示を送信する。即ち、部品実装システム10は、実装処理に必要な複数のフィーダ30のうち一部の初期セット対象のフィーダ30が部品実装機20(供給エリア20A)にセットされると共に残りのフィーダ30(実装中交換対象のフィーダ30)が部品実装機20(供給エリア20A)にセットされない状態で実装処理を開始する。また、部品実装システム10は、一の基板Sの実装処理中に部品の供給が終了したフィーダ30を、交換ロボット50により残りのフィーダ30と入れ替えながら実装処理する。これにより、部品実装機20の上限搭載数Nの範囲内で必要なフィーダ30に交換しながら実装処理することができるから、実装処理の効率を向上させることができる。また、フィーダ30の上限搭載数Nを増やすために部品実装機20が拡大するのを抑制することができる。
なお、第1実施形態では、管理装置80は、部品の供給を終了したフィーダ30がカメラ近傍位置にある場合に、実装中交換対象のフィーダ30と交換するものとしたが、これに限られるものではない。例えば、管理装置80は、部品の供給を終了したフィーダ30がカメラ正面位置にある場合に、実装中交換対象のフィーダ30と交換するものとしてもよい。こうすれば、ヘッド22の移動時間を短縮する効果をより一層高めることができる。あるいは、管理装置80は、このようにフィーダ30の位置を特定することなく、部品の供給を終了したフィーダ30が発生した場合に、そのフィーダ30を実装中交換対象のフィーダ30と順次交換するものとしてもよい。このようにすれば、管理装置80は、実装中交換対象のフィーダ30による部品の供給が開始されるまでに、実装中交換対象の各フィーダ30を供給エリア20Aに順次セットして、フィーダ30の交換により実装処理(部品の供給)が中断しないようにすることができる。また、管理装置80は、ヘッド22による各部品の実装処理に要する時間と、フィーダ30の交換に要する交換時間などとを考慮して、実装中交換対象のフィーダ30から部品の供給を開始するまでに(部品の供給が中断しないようにしつつ)、実装中交換対象のフィーダ30をできるだけカメラ近傍位置やカメラ正面位置にセットするよう、各部品種の実装順やフィーダ30の交換タイミングを定めるものなどとしてもよい。
[第2実施形態]
次に、本発明の第2実施形態について説明する。この第2実施形態および後述する第3,第4実施形態の部品実装システム10(部品実装機20,交換ロボット50)の各構成は、第1実施形態と同じであるため説明を省略する。第2実施形態では、図8に代えて図14の初期セット対応処理が実行される。図14の処理では、管理装置80のCPU80aは、まず、これから実装処理される今回の基板種の各情報と次に実装処理される予定の次回の基板種の各情報とを取得する(S200a)。なお、各情報は、前述したように、実装対象の部品種と部品種の実装順,実装処理に必要なフィーダ30の数(部品種数,必要フィーダ数)などの情報である。次に、CPU80aは、全部品種のフィーダ30を初期セット対象に設定する(S210)。なお、図14では、必要フィーダ数が上限搭載数Nを超えないものとするが、必要フィーダ数が上限搭載数Nを超える場合があってもよい。その場合、図8のS215~S225の処理を行うなど、第1実施形態と同様な処理を行うものとすればよい。
次に、本発明の第2実施形態について説明する。この第2実施形態および後述する第3,第4実施形態の部品実装システム10(部品実装機20,交換ロボット50)の各構成は、第1実施形態と同じであるため説明を省略する。第2実施形態では、図8に代えて図14の初期セット対応処理が実行される。図14の処理では、管理装置80のCPU80aは、まず、これから実装処理される今回の基板種の各情報と次に実装処理される予定の次回の基板種の各情報とを取得する(S200a)。なお、各情報は、前述したように、実装対象の部品種と部品種の実装順,実装処理に必要なフィーダ30の数(部品種数,必要フィーダ数)などの情報である。次に、CPU80aは、全部品種のフィーダ30を初期セット対象に設定する(S210)。なお、図14では、必要フィーダ数が上限搭載数Nを超えないものとするが、必要フィーダ数が上限搭載数Nを超える場合があってもよい。その場合、図8のS215~S225の処理を行うなど、第1実施形態と同様な処理を行うものとすればよい。
続いて、CPU80aは、上限搭載数Nから必要フィーダ数を減じることにより、供給エリア20Aに必要フィーダ数をセットした際の残りのセット可能数である余裕搭載数Mを算出し(S240)、余裕搭載数Mが値0を超えるか否かを判定する(S245)。CPU80aは、余裕搭載数Mが値0を超えると判定すると、次回に実装処理される基板種の各情報に基づいて、実装順がM番目までの部品種のフィーダ30を初期セット対象に追加し(S250)、S230,S235の処理を実行して本処理を終了する。なお、CPU80aは、余裕搭載数Mが値0を超えない、即ち今回の基板種の実装処理に必要なフィーダ30を供給エリア20Aにセットすると、供給エリア20Aに空きスロットはないと判定すると、S250をスキップし、S230,S235の処理を実行して本処理を終了する。これにより、今回の基板種の実装処理の開始時に、今回の基板種に必要なフィーダ30に加えて、次回の基板種に必要なフィーダ30の少なくとも一部を予め搭載しておくことができる。なお、余裕搭載数M分のフィーダ30は、今回の基板種の実装処理に不要なフィーダ30である。このため、余裕搭載数M分のフィーダ30を全てセットする前に、今回の基板種の実装処理を開始するものなどとしてもよい。
また、第2実施形態では、図11に代えて図15のフィーダ交換要求送信処理が実行される。図15の処理では、実装制御装置28のCPU28aは、まず、今回の基板種(実装処理中の基板種)における一の部品種の供給を終了したタイミングであるか否かを判定し(S500)、供給を終了したタイミングでないと判定すると、図11と同様にS520~S530の処理を実行して本処理を終了する。即ち、CPU28aは、部品切れのフィーダ30が発生していれば、部品切れ時のフィーダ交換要求を管理装置80に送信する。一方、CPU28aは、一の部品種の部品の供給を終了したタイミングであると判定すると、次回の基板種で実装処理される部品種に基づいて今回部品の供給を終了したフィーダ30が次回の基板種の実装処理で用いられるものであるか否か(S503)、次回の基板種の未セットフィーダ数Qが値0を超えるか否か(S505a)、をそれぞれ判定する。この未セットフィーダ数Qは、次回の基板種の実装処理に必要なフィーダ30のうち、供給エリア20Aにセットされていないフィーダ30(未セットフィーダ)の数を示すものであり、その設定は後述する。CPU28aは、今回部品の供給を終了したフィーダ30が次回の基板種の実装処理で用いられると判定したり、未セットフィーダ数Qが値0を超えないと判定したりすると、そのまま本処理を終了する。一方、CPU28aは、S503で今回部品の供給を終了したフィーダ30が次回の基板種の実装処理で用いられないと判定し、且つ、S505aで未セットフィーダ数Qが値0を超えると判定すると、HDD28cの供給エリア情報から実装終了した部品種のフィーダ30の位置情報を取得する(S510)。続いて、CPU28aは、次回の基板種の未セットフィーダとの交換を要求するフィーダ交換要求を管理装置80に送信し(S515a)、未セットフィーダ数Qを値1デクリメントして(S535)、本処理を終了する。なお、CPU28aは、S510で取得したフィーダ30の位置情報をフィーダ交換要求に含めて送信する。このフィーダ交換要求を受信した管理装置80のCPU80aは、非部品切れ時の交換対応処理を行う。ただし、第2実施形態では、CPU80aは、図12の非部品切れ時の交換対応処理におけるS605の判定処理を省略する。このため、管理装置80は、次回の基板種の未セットフィーダとのフィーダ交換要求を受信すると、今回の基板種の実装処理で部品の供給を終了したフィーダ30を、次回の基板種の実装処理に必要なフィーダ30に交換することになる。これにより、次回の基板種の実装処理が開始される際に、フィーダ30を交換する必要をなくしたり、あるいは、交換に必要な時間を短縮したりして、次回の基板種の実装処理を速やかに開始することができる。
次に、未セットフィーダ数Qの設定処理について説明する。図16は、未セットフィーダ数設定処理の一例を示すフローチャートである。この処理は、実装制御装置28のCPU28aが、今回の基板種の実装処理中に次回の基板Sの生産プログラムを取得した場合、あるいは、今回の基板種の実装処理中に図9の基板搬送処理のS310で次回の実装処理の基板種の情報を取得した場合に実行される。図16の処理では、CPU28aは、まず、次回の実装処理が今回の実装処理と別レーンで行われるか否か(S700)、次回の実装処理が今回の実装処理と異なる基板種を対象とするか否か(S705)、をそれぞれ判定する。CPU28aは、図9の基板搬送処理のS335,S370で更新される生産中基板情報や基板Sの生産プログラムなどを用いて、これらの判定を行う。CPU28aは、次回の実装処理が、別レーンで行われないと判定したり、異なる基板種でないと判定したりすると、そのまま本処理を終了する。一方、CPU28aは、次回の実装処理が別レーンで行われ、且つ、異なる基板種であると判定すると、次回の基板種の実装処理に必要な部品種(フィーダ種)の情報を取得する(S710)。そして、CPU28aは、HDD28cの供給エリア情報から、次回の基板種の実装処理に必要なフィーダ30のうち供給エリア20Aにセットされていない未セットフィーダがあるか否かを判定する(S715)。CPU28aは、未セットフィーダがあると判定すると、その未セットのフィーダ30の数を未セットフィーダ数Qに設定して(S720)、本処理を終了し、未セットフィーダがないと判定すると、そのまま本処理を終了する。このように、CPU28aは、実装処理中に、現在実装処理中(今回の実装処理中)の基板種と異なる種類の基板種が、現在の実装処理と異なるレーンで次回に実装処理されると判定すると、次回の基板種の実装処理に必要なフィーダ30の全てが供給エリア20Aにセットされてない場合に、未セットフィーダ数Qを設定するのである。なお、未セットフィーダ数Qの初期値は、値0とする。
図17は、第2実施形態で実装処理中にフィーダ30を交換する様子を示す説明図である。図17(a)に示すように、基板種1の実装処理開始時(初期セット時)には、今回(基板種1)の実装処理用の部品種A~*までのフィーダ30と次回の基板種(基板種2)の実装処理用の部品種a,bのフィーダ30とが初期セット対象フィーダとして供給エリア20Aにセットされている。また、ストックエリア20Bにセットされている(供給エリア20Aにセットされていない)、次回の基板種の実装処理用の未セットフィーダとして、部品種c~gの5つのフィーダ30を例示する。実装制御装置28のCPU28aは、第1レーンにおいて今回の基板種1の基板Sの実装処理中に、次回の実装処理が第2レーンで行われ且つ現在と種類が異なる基板種2であると判定すると、未セットフィーダ数Qを値5に設定する。そして、今回の基板種1の基板Sの実装処理中に部品種A,B,C,D,Eの各部品種の部品の供給を終了する度に、未セットフィーダとのフィーダ交換要求を管理装置80に出力する。管理装置80のCPU80aは、フィーダ交換要求を受信する度に、今回の基板種1の実装処理において部品の供給を終了したフィーダ30と、次回の実装処理用の未セットフィーダとを順次交換する。このため、図17(b)に示すように、第1レーンで基板種1の実装処理を終了して基板Sを搬出する際には、供給エリア20Aには、第2レーンの基板種2の実装処理用のフィーダ30が全てセットされることになる。これにより、基板種が変更する場合において、実装処理をスムーズに切り替えることができる。また、次に第1レーンに基板種1の基板Sが搬送される場合には、CPU80aは、第2レーンで基板種2の基板Sの実装処理中に、部品種a,b,c,d,e,f,gの各部品種の部品の供給を終了する度に、基板種1の未セットフィーダである部品種A,B,C,D,Eの各フィーダ30と順次交換することになる。このため、各レーンにおいて実装処理される基板種が毎回異なる場合などにおいても、レーン切り替わり時のフィーダ30の交換時間をなくしたり、あるいは、交換時間を短縮したりして、次のレーンでの異なる基板種の実装処理を速やかに開始することができる。このようなフィーダ30の交換を作業者が行うものとすると、作業者はレーンの切り替わりタイミングを見計らって作業を行わなければならず、作業負担の増加に繋がるものとなる。本実施形態では、交換ロボット50により、レーン切り替わり前の実装処理中にフィーダ30を交換するから、作業負担を増加させることなく、次のレーンでの異なる基板種の実装処理を速やかに開始することができる。
ここで、第2実施形態の構成要素と本発明の構成要素との対応関係を明らかにする。図9の基板搬送処理のS310,S335,S370を実行する管理装置80のCPU80aが情報取得部に相当し、図16の未セットフィーダ数設定処理のS700,S705を実行するCPU80aが基板種判定部に相当し、図15のフィーダ交換要求送信処理のS515aで部品実装機20から送信される未セットフィーダのフィーダ交換要求を受信して図7のフィーダ交換指示送信処理のS125,S135,S140を実行するCPU80aが指示出力部に相当する。
以上説明した第2実施形態の部品実装システム10は、並列に設けられた2つのレーン(第1レーンと第2レーン)に搬送される基板Sに各部品実装機20が実装処理を行うよう構成されている。また、部品実装システム10は、2つのレーンのうち一方のレーンで実装処理されている基板種(今回基板種)と他方のレーンで次回に実装処理される基板種(次回基板種)とが異なる場合、今回基板種の実装処理中に、交換ロボット50により、今回基板種の一の基板Sの実装処理において部品の供給を終了したフィーダ30を次回基板種の実装処理に必要なフィーダ30と交換する。即ち、部品実装システム10は、今回の実装処理(実装処理中)の基板種と異なる種類の基板種が、今回の実装処理と異なるレーンで実装処理される際に、今回の基板種の実装処理中に、一の基板Sの実装処理で部品の供給を終了したフィーダ30を、次回の基板種の実装処理に必要なフィーダ30に順次交換しながら実装処理する。これにより、今回基板種の実装処理が終了すると、速やかに次回基板種の実装処理を開始することができる。また、2つのレーンで異なる基板種の基板Sが搬送される際に、各基板種の実装処理に必要なフィーダ30の合計数が上限搭載数Nを超える場合でも、部品種およびレーンの切り替えをスムーズなものとすることができる。
第2実施形態では、本発明を第1レーンおよび第2レーンの2つのレーンに適用した場合を説明したが、これに限られず、複数のレーンに適用するものであればよく、例えば3つのレーンに適用するものなどとしてもよい。
第2実施形態では、供給エリア20Aにおける初期セット対象フィーダに、次回の基板種の余裕搭載数M分のフィーダ30を含むものとしたが、これに限られず、余裕搭載数M分のフィーダ30を含まないものとしてもよい。即ち、次回の基板種に必要な各フィーダ30は、今回の基板種の基板Sの実装処理中にセットし始めるものとしてもよい。
[第3実施形態]
次に、本発明の第3実施形態について説明する。第3実施形態では、図8に代えて図18の初期セット対応処理が実行される。図18の処理では、管理装置80のCPU80aは、まず、実装対象の部品種と部品種の実装順,各部品種の混載可否に関する情報を取得して(S200b)、各部品種の混載可否を確認して(S260)、混載不可の部品種があるか否かを判定する(S262)。ここで、CPU80aは、部品の特性上、一の基板内に製造ロットが異なる部品(異なるフィーダ30から供給される部品)を混載してはいけないことが定められている部品種について、混載不可と判定する。各部品実装機20は、混載不可と判定される特定部品種について、同じフィーダ30を共用して同じフィーダ30から供給された部品を実装する必要がある。CPU80aは、S262で混載不可の特定部品種がないと判定すると、全部品種のフィーダ30を初期セット対象に設定し(S210)、S230,S235で交換対象のフィーダ30を設定して、本処理を終了する。なお、図18では、必要フィーダ数が上限搭載数Nを超えないものとするが、必要フィーダ数が上限搭載数Nを超える場合があってもよい。その場合、図8のS215~S225の処理を行うなど、第1実施形態と同様な処理を行うものとすればよい。
次に、本発明の第3実施形態について説明する。第3実施形態では、図8に代えて図18の初期セット対応処理が実行される。図18の処理では、管理装置80のCPU80aは、まず、実装対象の部品種と部品種の実装順,各部品種の混載可否に関する情報を取得して(S200b)、各部品種の混載可否を確認して(S260)、混載不可の部品種があるか否かを判定する(S262)。ここで、CPU80aは、部品の特性上、一の基板内に製造ロットが異なる部品(異なるフィーダ30から供給される部品)を混載してはいけないことが定められている部品種について、混載不可と判定する。各部品実装機20は、混載不可と判定される特定部品種について、同じフィーダ30を共用して同じフィーダ30から供給された部品を実装する必要がある。CPU80aは、S262で混載不可の特定部品種がないと判定すると、全部品種のフィーダ30を初期セット対象に設定し(S210)、S230,S235で交換対象のフィーダ30を設定して、本処理を終了する。なお、図18では、必要フィーダ数が上限搭載数Nを超えないものとするが、必要フィーダ数が上限搭載数Nを超える場合があってもよい。その場合、図8のS215~S225の処理を行うなど、第1実施形態と同様な処理を行うものとすればよい。
また、CPU80aは、S262で混載不可の特定部品種があると判定すると、特定部品種のフィーダ30(特定フィーダ)を共用する部品実装機20である共用実装機を設定済みであるか否かを判定する(S264)。CPU80aは、共用実装機を設定済みでないと判定すると、基板Sの生産プログラムなどに基づいて、特定部品種の部品を実装するために特定フィーダを共用する部品実装機20を設定し(S266)、共用実装機を設定済みであると判定すると、S266をスキップする。ここで、混載不可の特定部品種を実装する一例として、隣接する2つの部品実装機20に跨がって一の基板Sが配置されている状態で、2つの部品実装機20でその一の基板Sの実装可能範囲(各ヘッド22の移動可能範囲)で実装処理を行うものを考える。このため、CPU80aは、S266で、隣接する2つの部品実装機20を共用実装機に設定する。
続いて、CPU80aは、今回の初期セット対応処理の処理対象が共用実装機であるか否かを判定し(S268)、共用実装機でなければ、全部品種のフィーダ30を初期セット対象に設定し(S210)、S230,S235の処理を行って本処理を終了する。一方、CPU80aは、処理対象が共用実装機であると判定すると、さらに処理対象が共用実装機(隣接する2つの部品実装機20)のうち一方(ここでは上流側とする)の部品実装機20であるか否かを判定する(S270)。CPU80aは、処理対象が上流側(一方)の部品実装機20であると判定すると、特定フィーダのうち一部の特定フィーダを初期セット対象に設定すると共に(S272)、残りの特定フィーダを初期セット対象から除外し(S274)、上流側の部品実装機20における部品種の実装順を、一部の特定フィーダの特定部品種から実装するよう変更する(S276)。
一方、CPU80aは、処理対象が下流側(他方)の部品実装機20であると判定すると、特定フィーダのうち残りの特定フィーダ(S274で初期セット対象から除外されたもの)を初期セット対象に設定すると共に(S278)、一部の特定フィーダ(S272で初期セット対象に設定されたもの)を初期セット対象から除外する(S280)。また、CPU80aは、下流側の部品実装機20における部品種の実装順を、残りの特定フィーダの特定部品種から実装するよう変更する(S282)。即ち、CPU80aは、特定フィーダを、一方の共用実装機の初期セット対象に設定すると共に、他方の共用実装機の初期セット対象から除外する。また、CPU80aは、各共用実装機において、初期セット対象に設定された特定フィーダの特定部品種から実装するよう実装順を変更する。なお、CPU80aは、特定フィーダが1つだけの場合には、その特定フィーダを一方の共用実装機の初期セット対象に設定すると共に他方の共用実装機の初期セット対象から除外すればよい。CPU80aは、こうして初期セット対象を設定して実装順を変更すると、特定部品種以外(特定フィーダ以外)の必要なフィーダ30を初期セット対象に設定し(S284)、S230,S235で交換対象のフィーダ30を設定して本処理を終了する。
また、第3実施形態では、図11に代えて図19のフィーダ交換要求送信処理が実行される。図19の処理では、実装制御装置28のCPU28aは、まず、一の部品種の供給を終了したタイミングであるか否かを判定し(S500)、実装を終了したタイミングでないと判定すると、図11と同様にS520~S530の処理を実行して本処理を終了する。一方、CPU28aは、一の部品種の部品の実装を終了したタイミングであると判定すると、その部品種が特定部品種であるか否かを判定する(S505b)。CPU28aは、特定部品種でないと判定すると、そのまま本処理を終了する。一方、CPU28aは、特定部品種であると判定すると、実装終了した特定部品種のフィーダ30(特定フィーダ)の位置情報をHDD28cの供給エリア情報から取得し(S510)、特定フィーダの交換を要求するフィーダ交換要求を管理装置80に送信して(S515b)、本処理を終了する。なお、CPU28aは、S510で取得したフィーダ30の位置情報をフィーダ交換要求に含めて送信する。このフィーダ交換要求を受信した管理装置80は、図20に示す非部品切れ時の交換対応処理を行う。
図20の処理では、管理装置80のCPU80aは、まず、受信したフィーダ交換要求から部品の供給を終了した特定フィーダの位置情報を取得する(S600a)。また、CPU80aは、今回のフィーダ交換要求の送信元と異なる他方の共用実装機において、HDD28cに記憶されている供給エリア情報から、供給エリア20Aにある各フィーダ30の使用状況や供給エリア20Aにおけるフィーダ30のセット状況を取得する(S630)。CPU80aは、S630で、交換待ちとなっている特定フィーダの情報と供給エリア20Aの空きスロット42の情報とを取得する。そして、CPU80aは、取得した情報に基づいて、他方の共用実装機に交換待ちの特定フィーダがあるか否か(S635)、他方の共用実装機の供給エリア20Aに空きスロット42があるか否か(S640)、をそれぞれ判定する。CPU80aは、S635で他方の共用実装機に交換待ちの特定フィーダがあると判定すると、受信したフィーダ交換要求の送信元の共用実装機にある特定フィーダと他方の共用実装機の交換待ちの特定フィーダとを交換対象に設定して(S645)、本処理を終了する。このため、一方の共用実装機(部品実装機20)で特定フィーダからの部品の供給が終了した場合、CPU80aは、他方の共用実装機(部品実装機20)で既に部品の供給が終了した特定フィーダがあれば、それらの特定フィーダを互いに交換する(入れ替える)よう交換指示を作成して交換ロボット50に送信する。
また、CPU80aは、S635で他方の共用実装機に交換待ちの特定フィーダがないと判定し、且つ、S640で他方の共用実装機の供給エリア20Aに空きスロット42があると判定すると、受信したフィーダ交換要求の特定フィーダのみを交換対象に設定して(S650)、本処理を終了する。このため、一方の共用実装機(部品実装機20)で特定フィーダからの部品の供給が終了した場合、CPU80aは、他方の共用実装機(部品実装機20)の供給エリア20Aに空きスロット42があれば、部品の供給が終了した特定フィーダを他方の共用実装機に受け渡すよう交換指示を作成して交換ロボット50に送信することになる。一方、CPU80aは、S640で他方の共用実装機の供給エリア20Aに空きスロットがないと判定すると、受信したフィーダ交換要求の特定フィーダを交換待ちとする旨の指示を、フィーダ交換要求の要求元の共用実装機(部品実装機20)に送信して(S655)、本処理を終了する。この場合、CPU80aは、次に、他方の共用実装機から特定フィーダの交換要求を受信した場合に、S635で交換待ちの特定フィーダがあると判定して、それらの特定フィーダを互いに交換するよう処理を行うことになる。なお、CPU80aは、他方の共用実装機における特定部品種以外の部品種のフィーダ30について、一の基板Sの実装処理中に部品の供給が終了している(一の基板Sの実装処理中に使用されない)ものがあれば、その部品の供給が終了したフィーダ30と、受信したフィーダ交換要求の送信元の共用実装機にある特定フィーダとを交換対象に設定するものとしてもよい。即ち、特定フィーダの交換(入れ替え)対象は、別の特定フィーダに限られず、特定フィーダ以外の通常のフィーダ30としてもよい。こうすれば、フィーダ交換要求がなされた特定フィーダを速やかに他方の共用実装機に受け渡すことが可能となる。
図21は、第3実施形態で実装処理中にフィーダ30を交換する様子を示す説明図である。図21では、隣接する2つの部品実装機20(1),(2)に跨がって一の基板Sが配置されている状態で、その基板Sに対し各部品実装機20(1),(2)がそれぞれの実装可能範囲で実装処理を行うものを示す。また、混載不可の部品種として、部品種X,Y,Z,Wを例示する。即ち、これらの部品種X,Y,Z,Wは、それぞれ同じフィーダ30(特定フィーダ)から供給された部品が一の基板Sに実装される必要がある。管理装置80のCPU80aは、部品実装機20(1)の部品種X,Yの特定フィーダと、部品実装機20(2)の部品種Z,Wの特定フィーダとを、部品の供給が終了したものから交換ロボット50により互いに交換させる。図21では、一例として、部品種Xの特定フィーダと部品種Zの特定フィーダとが交換され、部品種Yの特定フィーダと部品種Wの特定フィーダとが交換される。これにより、一の基板Sの実装処理中に、特定フィーダを2つの部品実装機20(1),(2)で受け渡しながら、特定部品種(部品種X,Y,Z,W)の部品を供給して実装処理することができる。このような特定フィーダの受け渡しを作業者が行うものとすると、作業者は受け渡しタイミングを見計らって作業を行わなければならず、作業負担の増加に繋がるものとなる。本実施形態では、交換ロボット50により、各部品実装機20間で特定フィーダの受け渡しを行うから、作業負担を増加させることなく、スムーズな受け渡しを可能とすることができる。なお、一の基板Sの実装処理が終了したときには、各共用実装機において、セットされている特定フィーダが入れ替わることになる。このため、管理装置80のCPU80aや実装制御装置28のCPU28aが実装順を変更してもよい。例えば、実装制御装置28のCPU28aは、セットされている特定フィーダが初期セット対象から入れ替わっている場合、図10の部品実装処理のS410で実装順の変更が必要と判定し、続くS415で実装順を変更するものとすればよい。この場合、CPU28aは、入れ替わってセットされている特定フィーダの特定部品種から実装するよう実装順を変更するものとする。勿論、管理装置80のCPU80aは、一の基板Sの実装処理中や実装処理終了時に、特定フィーダを初期セット状態に戻してもよい。
ここで、第3実施形態の構成要素と本発明の構成要素との対応関係を明らかにする。図18の初期セット対応処理のS200bを実行する管理装置80のCPU80aが情報取得部に相当し、図18のS260,S262を実行するCPU80aが供給元判定部に相当し、図19のフィーダ交換要求送信処理のS515bで部品実装機20から送信される特定フィーダのフィーダ交換要求を受信して図7のフィーダ交換指示送信処理のS125(図20の非部品切れ時の交換対応処理),S135,S140を実行するCPU80aが指示出力部に相当する。
以上説明した第3実施形態の部品実装システム10は、基板Sの搬送方向に沿って複数並べて配置された部品実装機20で実装処理を行うものであり、同一種の基板Sの実装処理を継続している間に、複数の部品実装機20のいずれかにセットされているフィーダ30を交換ロボット50により各部品実装機20間で受け渡しながら実装処理することができる。また、部品実装システム10は、同一種の基板Sの実装処理において、部品の供給元を同一のフィーダ30とすべき特定の部品種(混載不可の部品種)がある場合に、その特定の部品種の1つのフィーダを交換ロボット50により各部品実装機20間で受け渡しながら実装処理する。このため、部品実装システム10は、部品の供給元を同一のフィーダ30とすべき特定の部品種がある場合に、フィーダ30を受け渡して効率よく実装処理することができる。
第3実施形態では、2つの部品実装機20に跨がって配置される一の基板Sに対して、同一のフィーダ30(特定フィーダ)から供給される部品を実装処理する場合を例示したが、これに限られるものではない。1つの部品実装機20内に収まるサイズの基板Sに対して、同一のフィーダ30(特定フィーダ)から供給される部品を実装処理するものなどとしてもよい。また、同一のフィーダ30(特定フィーダ)を共用する共用実装機として隣接する2つの部品実装機20を例示したが、これに限られず、隣接しない2つの部品実装機20としてもよいし、隣接するか否かを問わず3つ以上の部品実装機20を共用実装機としてもよい。なお、共用実装機を複数台とする場合、全ての特定フィーダを最も上流側の共用実装機の初期セット対象に設定するものとしてもよいし、特定フィーダを各共用実装機の初期セット対象に均等に割り振って設定するものなどとしてもよい。
第3実施形態では、混載不可の特定部品種として、一の基板S内に異なるフィーダ30から供給される部品を混載してはいけないをものを例示したが、これに限られるものではない。例えば、部品の特性上、異なる部品種の部品同士をセットにして一の基板S内に実装することが定められている場合にも、同様に同じフィーダ30を各部品実装機20間で受け渡しながら実装処理することができる。また、同じフィーダ30を各部品実装機20間で受け渡しながら実装処理するのは、そのような特性の部品(特定部品種)を実装処理する場合に限られるものではない。フィーダ30を各部品実装機20で使い回すことができれば、フィーダ30を部品実装機20の数だけ準備できていない場合などでも、効率よく実装処理を行うことができる。あるいは、部品切れのフィーダ30が発生した場合に、その部品切れと同じ種類のフィーダ30を各部品実装機20間で受け渡しながら、実装処理を行うものとしてもよい。以下、この変形例について説明する。
この場合、図7のフィーダ交換指示送信処理におけるS120の部品切れ時の交換対応処理は、図22のフローチャートに基づいて行われる。この処理では、管理装置80のCPU80aは、まず、フィーダ交換要求から部品切れのフィーダ30の位置情報と部品種とを取得する(S800)。次に、CPU80aは、他の部品実装機20の供給エリア情報およびストックエリア情報に基づいて使用途中のフィーダ30の情報を確認し(S805)、部品切れのフィーダ30と同じ部品種の使用途中のフィーダ30があるか否かを判定する(S810)。CPU80aは、部品切れのフィーダ30と同じ部品種の使用途中のフィーダ30がないと判定すると、部品切れのフィーダ30と同じ部品種の新たなフィーダ30を交換対象に設定して(S815)、本処理を終了する。CPU80aは、S815では、部品切れのフィーダ30と、ストックエリア20Bにある同じ部品種の新たな(使いかけでない)フィーダ30とを交換対象に設定する。なお、同じ部品種のフィーダ30がストックエリア20Bになければ、CPU80aは、作業者にその旨を報知して必要なフィーダ30のセットを指示したり、交換ロボット50を他の部品実装機20のストックエリア20Bに移動させて同じ部品種の新たなフィーダ30を運搬させたりするなどの処理を行う。
また、CPU80aは、S810で他の部品実装機20に、部品切れのフィーダ30と同じ部品種の使用途中のフィーダ30があると判定すると、その使用途中のフィーダ30の残り部品数を取得して(S820)、残り部品数の合計を算出する(S825)。CPU80aは、同じ部品種の使用途中のフィーダ30が1つであれば、そのフィーダ30の部品数をS825で合計数として取得し、同じ部品種の使用途中のフィーダ30が複数であれば、複数のフィーダ30の残り部品数の合計数を算出する。続いて、CPU80aは、実装処理中の基板種における残りの基板数(生産枚数)と、部品切れの部品種の一基板当りの実装点数(供給点数)とを取得し(S830)、残りの基板数と一基板当りの実装点数とに基づいて実装処理中の基板種の実装終了までの必要部品数を算出する(S835)。そして、CPU80aは、S825で算出した残り部品数の合計が、S835で算出した必要部品数以上であるか否かを判定し(S840)、残り部品数の合計が必要部品数以上でないと判定すると、部品切れとなったフィーダ30と、同じ部品種の新たなフィーダ30とを交換対象に設定して(S815)、本処理を終了する。一方、CPU80aは、残り部品数の合計が必要部品数以上であると判定すると、使用途中のフィーダ30を使い回しながら実装処理を継続すると判断する(S845)。そして、CPU80aは、いずれかの部品実装機20にセットされている使用途中のフィーダ30(部品切れと同じ部品種のフィーダ30)のうち、一の基板Sの実装処理中に部品の供給を終了したフィーダ30を交換対象に設定して(S850)、本処理を終了する。なお、CPU80aは、部品の供給を終了したフィーダ30がないときには、いずれかの部品実装機20において、部品切れと同じ部品種のフィーダ30のうち部品の供給を終了したフィーダ30が発生するのを待って交換対象に設定する。
図23は、第3実施形態の変形例で実装処理中の部品切れ時にフィーダ30を交換する様子を示す説明図である。図23では、隣接する2つの部品実装機20(1),(2)で同じ基板種の基板Sをそれぞれ実装処理しているときに、部品実装機20(1)の供給エリア20Aにセットされている部品種Xのフィーダ30が部品切れとなった場合を示す。この場合において、管理装置80のCPU80aは、部品実装機20(2)にある部品種Xの残り部品数が、実装処理中の基板種の実装処理が終了するまでに、部品実装機20(1),(2)で必要となる部品種Xの部品の実装点数よりも多いと判定したと仮定する。そのように判定すると、CPU80aは、部品実装機20(2)での部品種Xの部品の実装(供給)終了後に、部品実装機20(1)の部品種Xのフィーダに代えて、部品実装機20(2)の部品種Xのフィーダを用いて、部品実装機20(1)で部品種Xの部品の実装処理を継続する。また、部品実装機20(1)で一の基板Sの実装処理中に、部品種Xの部品の実装(供給)を終了すると、交換ロボット50により部品種Xのフィーダ30を部品実装機20(1)から取り外して部品実装機20(2)に再度セットさせる。そして、部品実装機20(2)で一の基板Sの実装処理中に、部品種Xの部品の実装(供給)を終了すると、交換ロボット50により部品種Xのフィーダ30を部品実装機20(2)から取り外して部品実装機20(1)に再度セットさせる。これにより、部品切れのフィーダ30が発生した場合でも、新たなフィーダ30を用いることなく、使用途中のフィーダ30を効率よく用いて実装処理を継続することができる。
このように、第3実施形態の変形例では、実装処理中にいずれかの部品実装機20で部品切れのフィーダ30が発生した際、同一種の基板Sの実装処理が終了するまでに部品切れの部品種で必要となる必要部品数よりも、各部品実装機20にセットされている別のフィーダ30における残り部品数の合計の方が多い場合に、その部品種で部品切れとなっていないフィーダ30を交換ロボット50により各部品実装機20間で受け渡しながら実装処理する。このため、部品切れのフィーダ30が発生した場合に、新たなフィーダ30を用いなくても実装処理を継続することができる。このため、使いかけのフィーダ30が増えるのを防止することができる。
[第4実施形態]
次に、本発明の第4実施形態について説明する。第4実施形態では、図8に代えて図24の初期セット対応処理が実行される。図24の処理では、管理装置80のCPU80aは、まず、実装対象の部品種と部品種の実装順,部品種数(フィーダ数)を取得して(S200)、全部品種のフィーダ30を初期セット対象に設定する(S210)。なお、図24では、必要フィーダ数が上限搭載数Nを超えないものとするが、必要フィーダ数が上限搭載数Nを超える場合があってもよい。その場合、図8のS215~S225の処理を行うなど、第1実施形態と同様な処理を行うものとすればよい。
次に、本発明の第4実施形態について説明する。第4実施形態では、図8に代えて図24の初期セット対応処理が実行される。図24の処理では、管理装置80のCPU80aは、まず、実装対象の部品種と部品種の実装順,部品種数(フィーダ数)を取得して(S200)、全部品種のフィーダ30を初期セット対象に設定する(S210)。なお、図24では、必要フィーダ数が上限搭載数Nを超えないものとするが、必要フィーダ数が上限搭載数Nを超える場合があってもよい。その場合、図8のS215~S225の処理を行うなど、第1実施形態と同様な処理を行うものとすればよい。
次に、CPU80aは、初期セット対象のうち実装順が1番目の部品種のフィーダ30のセット位置(部品供給エリア20Aにセットするセット位置)をカメラ正面位置に設定する(S290)。カメラ正面位置は、前述したように、パーツカメラ25のX方向(左右方向)の中心に対向するスロット42に挿入される位置である。このため、フィーダ30がカメラ正面位置にセットされた場合、そのフィーダ30の部品供給位置からパーツカメラ25上にヘッド22が移動する移動距離が最も短いものとなる。続いて、CPU80aは、残りのフィーダ30のセット位置を実装順に基づいて、カメラ正面位置を挟んで左右交互となる位置に設定する(S295)。このため、フィーダ30は、実装順が後になるほど、カメラ正面位置から遠ざかる位置に配置される。CPU80aは、こうして全部品種のフィーダ30のセット位置を設定すると、部品実装機20のストックエリア情報からストックエリアにある初期セット対象のフィーダ30を交換対象に設定する(S230)。また、CPU80aは、部品実装機20の供給エリア情報と設定したセット位置とに基づいて供給エリア20Aにあるフィーダ30を交換対象に設定して(S235a)、本処理を終了する。
この第4実施形態では、部品実装機20の実装制御装置28のCPU28aは、一の部品種の実装処理が終了する度に、管理装置80にフィーダ交換要求を送信する。第4実施形態のフィーダ交換要求送信処理の図示は省略するが、例えば、図11のフィーダ交換要求処理においてS505を省略するものなどとすればよい。また、図11のS515では、実装前の他のフィーダ30との交換要求を送信する処理などとすればよい。
第4実施形態では、図12に代えて図25の非部品切れ時の交換対応処理が実行される。図25の処理では、管理装置80のCPU80aは、まず、部品の供給を終了したフィーダ30の位置情報を取得し(S600)、取得したフィーダ30の位置がカメラ正面位置であるか否かを判定する(S605a)。CPU80aは、フィーダ30の位置がカメラ正面位置でないと判定すると、そのまま本処理を終了する。一方、CPU80aは、フィーダ30の位置がカメラ正面位置であると判定すると、部品実装機20の供給エリア情報から実装順が次の部品種のフィーダ30について現在の位置情報を取得する(S660)。そして、CPU80aは、フィーダ30の現在位置(部品供給位置)からパーツカメラ25上の位置(部品が撮像される際の撮像位置)までのヘッド22の移動時間を取得し(S665)、取得したヘッド22の移動時間とカメラ正面位置(部品供給位置)からパーツカメラ25上の位置までのヘッド22の最短移動時間との差分を算出する(S670)。この差分は,ヘッド22が部品を採取してパーツカメラ25上に移動する際の、一回当りの移動における移動時間の短縮効果分となる。ここで、スロット42毎に各部品供給位置からパーツカメラ25上の位置までの移動時間を予めHDD80cに記憶しておき、フィーダ30がセットされているスロット42に対応する移動時間やカメラ正面位置に対応する最短移動時間を、CPU80aがHDD80cから読み出して取得するものなどとすればよい。あるいは、スロット42毎に各部品供給位置からパーツカメラ25上の位置までの移動距離を予めHDD80cに記憶しておき、フィーダ30がセットされているスロット42に対応する移動距離やカメラ正面位置に対応する移動距離を、CPU80aがHDD80cから読み出し、その移動距離をヘッド22の平均移動速度で除して移動時間を取得するものなどとしてもよい。
続いて、CPU80aは、一の基板Sの実装処理中において、実装順が次の部品種のフィーダ30が供給する部品の点数(供給点数,実装点数)を取得し(S675)、移動時間の差分と部品の供給点数とに基づいてフィーダ30の位置をカメラ正面位置に変更した場合のヘッド22の移動短縮時間を算出する(S680)。CPU80aは、移動時間の差分に供給点数を乗じることにより移動短縮時間を算出する。なお、ヘッド22が複数のノズルを備えており、複数の部品を吸着してからパーツカメラ25上に移動するものにおいては、一回当りの移動において部品の吸着点数が複数となる。このため、CPU80aは、移動時間の差分に、供給点数を吸着点数で除した値を乗じることにより移動短縮時間を算出するものなどとすればよい。また、CPU80aは、フィーダ30の位置を現在位置からカメラ正面位置に配置変更するのに必要な配置変更時間を取得する(S685)。CPU80aは、配置変更時間として、交換ロボット50がX方向に移動する時間と、交換ロボット50がフィーダ30の現在位置やカメラ正面位置などでフィーダ30を出し入れする時間などとの合計時間を取得する。なお、CPU80aは、交換ロボット50が他の部品実装機20で交換作業中であれば、その交換に要する予定時間を加味して合計時間を取得するものとしてもよい。あるいは、CPU80aは、配置変更時間として予め定められた一定の時間を取得するものとしてもよい。次に、CPU80aは、S680で算出した移動短縮時間が、S685で取得した配置変更時間を超えるか否かを判定する(S690)。即ち、CPU80aは、フィーダ30を現在の位置からカメラ正面位置に位置を変更した場合において、ヘッド22の移動時間が短縮される時間的効果が、フィーダ30の配置変更に要する時間を上回るか否かを判定する。CPU80aは、S690で移動短縮時間が配置変更時間を超えると判定すると、次の部品種のフィーダ30とカメラ正面位置にあるフィーダ30とを交換対象に設定して(S695)、本処理を終了する。一方、CPU80aは、移動短縮時間が配置変更時間を超えないと判定すると、次の部品種のさらに次のフィーダ30とカメラ正面位置にあるフィーダ30とを交換対象に設定して(S697)、本処理を終了する。
図26は、第4実施形態で実装処理中にフィーダ30を交換する様子を示す説明図である。図26では、部品実装機20は、一の基板Sの実装処理において部品種A,B,C,D,E,・・・の順に部品を実装する。図26(a)に示すように、実装処理開始時(初期セット時)の供給エリア20Aには、パーツカメラ25の前のカメラ正面位置に部品種Aのフィーダ30がセットされ、部品種Aを挟んで左右に部品種B,Cのフィーダ30がセットされ、さらに外側に部品種D,Eのフィーダ30がセットされている。また、各部品種の部品は、多数(例えば、数百点から千点以上)実装されるものとする。このため、CPU80aは、部品種B~Eの各フィーダ30を初期位置からカメラ正面位置に配置変更することによる移動短縮時間が、各フィーダ30の配置変更時間よりも大きいと判定する。部品実装機20は、部品種Aの部品の供給を終了すると、交換ロボット50により部品種Aと部品種Bの各フィーダ30の位置が変更され(入れ替えされ)、図26(b)に示すように、カメラ正面位置に部品種Bのフィーダ30がセットされた状態で部品種Bの部品の供給(実装)を行う。以下、同様に、部品実装機20は、一の部品種の部品の供給が終了する度に、次の部品種の部品を供給するフィーダ30をカメラ正面位置にセットして、部品の供給を行う(図26(c),(d))。このため、いずれの部品種の部品を実装する場合でも、ヘッド22が部品供給位置でノズルに部品を吸着してからパーツカメラ25上の位置に移動するまでの移動時間を短縮することができる。しかも、ヘッド22の移動時間の短縮効果が生じる場合にのみ次の部品種のフィーダ30の位置を変更するから、フィーダ30の交換に伴う時間ロスを抑えて、実装効率を向上させることができる。なお、CPU80aは、例えば、部品種Dのフィーダ30をカメラ正面位置に移動することによる移動短縮時間が、配置変更時間を超えないと判定した場合、部品種Dはそのままの位置で実装処理を行い、部品種Dに代えてさらに次の部品種Eのフィーダ30をカメラ正面位置に配置変更する。
このようにして実装処理を行うと、一の基板Sの実装処理を終了した際に、実装順が最後の部品種のフィーダ30がカメラ正面位置にセットされていることになる。このため、部品実装機20は、カメラ正面位置にある実装順が最後のフィーダ30と、実装順が最初(先頭)のフィーダ30との位置を変更してから、次の基板Sの実装処理を開始するものなどとすればよい。あるいは、実装順が最後のフィーダ30がカメラ正面位置にある場合には、CPU28aは、図10の部品実装処理のS410で実装順の変更が必要と判定し、続くS415で実装順を変更するものとすればよい。その場合、CPU28aは、カメラ正面位置にある、本来の実装順が最後の部品種から実装するよう、実装順を逆の順序に変更するものなどとすればよい。なお、このようなフィーダ30の交換を作業者が行うものとすると、作業者は各部品種の部品の供給が終了するタイミングを見計らって作業を行わなければならず、作業負担の増加に繋がるものとなる。本実施形態では、交換ロボット50により、実装処理中に、供給エリア20A内の各フィーダ30を入れ替えるからから、作業負担を増加させることなく、適切なタイミングでフィーダ30を最適な配置に変更することができる。
第4実施形態の構成要素と本発明の構成要素との対応関係を明らかにする。図25の非部品切れ時の交換対応処理のS600,S660~S685を実行する管理装置80のCPU80aが情報取得部に相当し、図25のS690を実行するCPU80aが配置変更判定部に相当し、フィーダ交換要求送信処理のS515で部品実装機20から送信されるフィーダ交換要求を受信して図7のフィーダ交換指示送信処理のS125(図25の非部品切れ時の交換対応処理のS695),S135,S140を実行するCPU80aが指示出力部に相当する。
以上説明した第4実施形態の部品実装システム10は、部品実装機20がフィーダ30により供給される部品をヘッド22で採取した後に、ヘッド22をパーツカメラ25上(所定位置)を経由して基板S上に移動させて実装処理を行う。そして、部品実装システム10は、一の基板Sの実装処理中に部品の供給が終了したフィーダ30のうち、ヘッド22が部品を採取してからパーツカメラ25上に移動するまでの移動距離が最も短い位置にセットされているフィーダ30を対象として、一の基板Sの実装処理中に、交換ロボット50により部品の供給が終了していないフィーダ30と配置変更しながら実装処理する。このため、部品実装システム10は、ヘッド22の移動時間が最短となる位置に交換ロボット50によりフィーダ30を順次セットしながら実装処理を行うことができるから、実装処理を効率よく行うことができる。
また、管理装置80のCPU80aは、実装順が次の部品種のフィーダ30がセットされている現在位置(第1のセット位置)からパーツカメラ25上の位置にヘッド22が移動するまでの移動時間と、カメラ正面位置(第2のセット位置)からパーツカメラ25上の位置にヘッド22が移動するまでの移動時間との差分である移動短縮時間を取得する。そして、CPU80aは、次の部品種のフィーダ30を配置変更するのに要する配置変更時間を取得し、移動短縮時間が配置変更時間を超える場合に、次の部品種のフィーダ30を配置変更するよう交換ロボット50に交換指示を送信する。このため、ヘッド22の移動短縮時間がフィーダ30の配置変更時間を上回る場合に、フィーダ30を配置変更することができるから、フィーダ30の配置変更に伴う時間ロスを抑えて実装処理の効率を適切に向上させることができる。なお、CPU80aは、移動短縮時間が配置変更時間を超えると判定した場合において、移動短縮時間が配置変更時間を超える時間(差分の時間)が所定時間以上である場合に、次の部品種のフィーダ30を配置変更するものなどとしてもよい。
第4実施形態では、ヘッド22が部品を採取してからパーツカメラ25上に移動するまでの移動距離が最も短くなる位置であるカメラ正面位置(パーツカメラ25の正面の位置)を変更先の位置としたが、この位置に限られるものではない。例えば、カメラ正面位置と、その位置の左右に隣接する位置とを含むカメラ近傍位置(ここでは3つの位置)を変更先の位置としてもよい。この場合、図25の非部品切れ時の交換対応処理のS605aでは、部品の供給を終了したフィーダ30の位置がカメラ近傍位置のいずれかの位置にあるか否かを判定すればよい。また、S670,S685,S695,S697では、カメラ正面位置に代えて、カメラ近傍位置のうち部品の供給を終了したタイミングにあるフィーダ30の位置を用いるものとすればよい。また、フィーダ30の配置変更先として、そのような複数位置を有する場合、管理装置80のCPU80aが配置変更可否を判定するタイミングは、部品の供給を終了したフィーダ30が発生したタイミングに限られるものではない。例えば、CPU80aは、複数位置のいずれかの位置(現在の供給位置)にあるフィーダ30から部品の供給が行われている間に、実装順が次のフィーダ30を複数位置の別の位置(現在の供給位置とは異なる位置)に配置変更することができるか否かを判定して、次の部品種のフィーダ30を配置変更するものなどとしてもよい。また、この場合、現在の供給位置にあるフィーダ30が部品の供給を行っている時間と、次の部品種のフィーダ30を配置変更する時間とを比較して、部品の供給を行っている時間が配置変更の時間を超える場合に、次の部品種のフィーダ30の配置変更を行うものとしてもよい。こうすれば、フィーダ30を配置変更するための待ち時間が生じるのを防止して、実装処理の効率をさらに向上させることができる。
第4実施形態では、部品の供給位置(ヘッド22が部品を採取する位置)とパーツカメラ25上の位置(部品を採取したヘッド22が経由する所定位置)とに基づいて、ヘッド22の移動時間がより短くなる位置にフィーダ30を配置変更するものとしたが、これに限られるものではない。例えば、部品の供給位置とパーツカメラ25上の位置と部品の実装位置とに基づいて、ヘッド22の移動時間がより短くなる位置にフィーダ30を配置変更するものとしてもよい。
例えば、パーツカメラ25上の位置(部品を採取したヘッド22が経由する所定位置)を基準として左右方向(X方向)の一方側(例えば左側)にフィーダ30があり他方側(例えば右側)に実装位置がある場合、ヘッド22は、供給位置で部品を採取した後、パーツカメラ25上(所定位置)で一旦停止することなく通り抜けながら、実装位置まで移動することができる。これに対し、パーツカメラ25上の位置(部品を採取したヘッド22が経由する所定位置)を基準として左右方向(X方向)の一方側(例えば左側)にフィーダ30があり同じく一方側(例えば左側)に実装位置がある場合、ヘッド22は、供給位置で部品を採取した後、パーツカメラ25上に移動し、パーツカメラ25上で一旦停止してから、左右の移動方向を変えて実装位置まで移動することになる。このように、部品の供給位置とヘッド22が経由する所定位置(パーツカメラ25上の位置)と部品の実装位置との位置関係によって、ヘッド22がパーツカメラ25上で一旦停止する必要が生じたり、一旦停止する必要が生じなかったりする。ヘッド22が一旦停止する必要がなければ、速やかに実装位置に到達することができるから、実装効率を向上させることができる。このため、管理装置80のCPU80aは、例えば、部品種毎に各部品の実装位置を取得して、パーツカメラ25を基準として基板S上の右側の領域または左側の領域のいずれに実装される部品が多いかを部品種毎に判定する。そして、CPU80aは、実装される部品が基板S上の右側の領域に多い部品種と判定した場合には、パーツカメラ25(カメラ正面位置)に対して左側となる位置にフィーダ30をセットすればよい。また、CPU80aは、実装される部品が基板S上の左側の領域に多い部品種と判定した場合には、パーツカメラ25(カメラ正面位置)に対して右側となる位置にフィーダ30をセットすればよい。即ち、CPU80aは、実装される部品が多いと判定した領域と反対側となる位置にフィーダ30をセットするものとすればよい。さらにいえば、ヘッド22が部品の供給位置からパーツカメラ25上の位置(所定位置)を経由して部品の実装位置まで、一直線状に移動できる方が移動効率がよいものとなる。このため、CPU80aは、パーツカメラ25上の位置(所定位置)と部品がより多く実装される実装位置(領域)とに基づいて、ヘッド22の移動経路を一直線状に近付けることができるような位置にフィーダ30をセットするものとすることもできる。
第4実施形態では、実装処理中に供給エリア20A内にあるフィーダ30の配置を変更するものとしたが、これに限られず、ストックエリア20Bから取り出したフィーダ30と配置を変更してもよいし、交換ロボット50が外部から運搬してきたフィーダ30と配置を変更してもよい。
第4実施形態では、供給エリア20Aにセットされるフィーダ30とは別に、部品を収容した平板状のトレイから部品を供給するトレイフィーダやヘッド上で部品を直接供給するバルクフィーダなどから部品を供給可能に部品実装機20を構成しておくものとしてもよい(部品供給ユニットとは異なる部品供給部から部品を供給可能に構成してもよい)。そして、管理装置80は、移動短縮時間が配置変更時間を超えない場合には、部品実装機20に実装順変更指示を送信して、トレイフィーダやバルクフィーダなどから部品を供給させ、その間にフィーダ30の配置を変更するものなどとしてもよい。また、移動短縮時間が配置変更時間を超え易くなるように、部品種の実装順を設定したり、フィーダ30の初期セット対象位置を設定するものなどとしてもよい。例えば、部品の供給点数が多いなど配置変更した方がよい部品種のフィーダ30であれば、予め配置変更時間が短くなるような位置を初期セット位置として設定するものなどとすることができる。
この第4実施形態の処理は、各部品実装機20で実行可能であるが、同時に複数台の部品実装機20で交換タイミングが生じると、交換ロボット50の作業時間(移動時間)が増えるため、ヘッド22の移動短縮時間がフィーダ30の配置変更時間を超えないと判定し易いものとなる。このため、管理装置80は、複数台の部品実装機20のうち選択した部品実装機20で、第4実施形態の処理を行うものとしてもよい。例えば、管理装置80は、一の基板Sに実装する各部品種の部品点数が多い部品実装機20を優先的に選択するものなどとしてもよい。
このように、第1~第4実施形態では、一の基板Sの実装処理中に、部品実装機20にセットされている複数のフィーダ30のうち収容部品の残りがあるフィーダ30を交換ロボット50により別のフィーダ30と交換しながら実装処理するから、一の基板Sの実装処理中にフィーダ30を効率よく交換しながら実装処理することが可能となる。
第1~第4実施形態では、部品実装機20からフィーダ交換要求を管理装置80に送信し、管理装置80のCPU80aがフィーダ交換要求に基づいてフィーダ30をどのように交換するか(交換対象)を決定し、交換対象のフィーダ30の指定を含む交換指示を交換ロボット50に送信するものとした。また、その交換指示を受信した交換制御装置59が、交換ロボット50を制御して、フィーダ30の交換を行うものとした。しかしながら、このような形態に限られるものではない。例えば、部品実装機20は、フィーダ交換要求を送信する際に、部品種の実装順や各レーンで実装処理される基板種,部品種の実装順などの必要な情報を取得して、予めフィーダ30をどのように交換するか(交換対象)を判定し、交換対象のフィーダ30の指定を含むフィーダ交換要求を管理装置80に送信するものとしてもよい。この場合、部品実装機20の実装制御装置28(CPU28a)は、他の部品実装機20にセットされているフィーダ30の状況などの必要な情報を、管理装置80を介して取得してもよいし、他の部品実装機20から直接取得してもよい。あるいは、交換ロボット50を制御するロボット制御装置59のCPUが、フィーダ30をどのように交換するか(交換対象)を決定するものとしてもよい。即ち、管理装置80のCPU80aにより実行されるものとした、初期セット対応処理や部品切れ時の交換対応処理,非部品切れ時の交換対応処理の一部または全てを、実装制御装置28が行うものとしてもよいし、交換制御装置59が行うものとしてもよい。また、このようにする場合、実装制御装置28とロボット制御装置59とが直接情報をやり取り可能に構成してもよい。
第1~第4実施形態では、部品実装システム10が2つのレーンを有する部品実装機20を複数備えるものとしたが、いずれの実施形態においても、このような構成とするものに限られない。例えば、第1,第3,第4実施形態では、部品実装機20が1つのレーンのみを有するものとしてもよい。また、第1,第2,第4実施形態では、部品実装システム10が部品実装機20を複数備えることは必須ではなく、1台の部品実装機20であっても適用可能である。
なお、本発明は上述した実施形態に何ら限定されることはなく、本発明の技術的範囲に属する限り種々の態様で実施し得ることはいうまでもない。
本発明は、部品実装機の製造産業などに利用可能である。
10 部品実装システム、12 印刷機、14 印刷検査機、18 X軸レール、20 部品実装機、20A 供給エリア、20B ストックエリア、21 基板搬送装置、22 ヘッド、23 ヘッド移動機構、24 マークカメラ、25 パーツカメラ、28 実装制御装置、28a CPU、28b ROM、28c HDD、28d RAM、30 フィーダ、32 テープリール、33 テープ送り機構、34 位置決めピン、35 コネクタ、37 レール部材、39 フィーダ制御装置、40 フィーダ台、42 スロット、44 位置決め穴、45 コネクタ、50 交換ロボット、50A 上部移載エリア、50B 下部移載エリア、51 ロボット移動機構、52a X軸モータ、52b ガイドローラ、53 フィーダ移載機構、54 クランプ部、55 Y軸スライダ、55a Y軸モータ、55b Y軸ガイドレール、56a Z軸モータ、56b Z軸ガイドレール、57 エンコーダ、58 監視センサ、59 ロボット制御装置、80 管理装置、80a CPU、80b ROM、80c HDD、80d RAM、82 ディスプレイ、84 入力デバイス、S 基板。
Claims (21)
- 複数の部品を収容する複数の部品供給ユニットがユニット交換装置により交換可能にセットされ、前記複数の部品供給ユニットにより供給される複数種の前記部品を基板に実装する実装処理を行う部品実装機における実装処理方法であって、
一の前記基板の実装処理中に、前記部品実装機にセットされている複数の前記部品供給ユニットのうち収容部品の残りがある部品供給ユニットを前記ユニット交換装置により別の部品供給ユニットと交換しながら実装処理する
実装処理方法。 - 請求項1に記載の実装処理方法であって、
実装処理に必要な複数の前記部品供給ユニットのうち、一部の部品供給ユニットが前記部品実装機にセットされると共に残りの部品供給ユニットが前記部品実装機にセットされない状態で実装処理を開始し、
一の前記基板の実装処理中に、前記一部の部品供給ユニットのうち当該実装処理において前記部品の供給が終了した部品供給ユニットを前記ユニット交換装置により前記残りの部品供給ユニットと入れ替えながら実装処理する
実装処理方法。 - 請求項2に記載の実装処理方法であって、
前記部品供給ユニットにより供給される前記部品をヘッドで採取した後に前記ヘッドを所定位置を経由して前記基板上に移動させて実装処理を行い、
実装処理において前記部品の供給が終了した部品供給ユニットのうち、前記ヘッドが前記部品を採取してから前記所定位置に移動するまでの移動距離がより短い位置にセットされている部品供給ユニットを対象として、前記ユニット交換装置により前記残りの部品供給ユニットと入れ替えながら実装処理する
実装処理方法。 - 請求項1に記載の実装処理方法であって、
一の前記基板の実装処理中に、前記部品実装機にセットされている前記部品供給ユニットのうち、当該実装処理において前記部品の供給が終了した部品供給ユニットと前記部品の供給が終了していない部品供給ユニットとの配置を前記ユニット交換装置により変更しながら実装処理する
実装処理方法。 - 請求項4に記載の実装処理方法であって、
前記部品供給ユニットにより供給される前記部品をヘッドで採取した後に前記ヘッドを所定位置を経由して前記基板上に移動させて実装処理を行い、
一の前記基板の実装処理中に、当該実装処理において前記部品の供給が終了した部品供給ユニットのうち、前記ヘッドが前記部品を採取してから前記所定位置に移動するまでの移動距離がより短い位置にセットされている部品供給ユニットを対象として、当該実装処理において前記部品の供給が終了していない部品供給ユニットと配置を変更しながら実装処理する
実装処理方法。 - 複数の部品を収容する複数の部品供給ユニットがユニット交換装置により交換可能にセットされ、前記部品供給ユニットにより供給される複数種の前記部品を複数種の基板に実装する実装処理を行う部品実装機における実装処理方法であって、
並列に設けられた複数のレーンに搬送される前記基板に前記部品実装機で順次実装処理を行い、
前記複数のレーンのうち一のレーンで実装処理されている前記基板の種類と他のレーンで次に実装処理される前記基板の種類とが異なる場合、前記一のレーンにおいて同一種の前記基板の実装処理を継続している間に、当該基板種の一の前記基板の実装処理において前記部品の供給が終了した部品供給ユニットを前記他のレーンの次の実装処理に必要な部品供給ユニットと入れ替えながら実装処理する
実装処理方法。 - 複数の部品を収容する複数の部品供給ユニットがユニット交換装置により交換可能にセットされ、前記部品供給ユニットにより供給される複数種の前記部品を複数種の基板に実装する実装処理を行う部品実装機における実装処理方法であって、
前記基板の搬送方向に沿って複数並べて配置された前記部品実装機で実装処理を行い、
同一種の前記基板の実装処理を継続している間に、前記複数の部品実装機のいずれかにセットされている前記部品供給ユニットを前記ユニット交換装置により各部品実装機間で受け渡しながら実装処理する
実装処理方法。 - 請求項7に記載の実装処理方法であって、
実装処理中にいずれかの部品種の前記部品供給ユニットに部品切れが発生した際、同一種の前記基板の実装処理が終了するまでに当該部品種において必要となる必要部品数よりも前記複数の部品実装機にセットされている当該部品種の別の部品供給ユニットにおける収容部品の残り部品数の合計の方が多い場合に、当該部品種において部品切れとなっていない部品供給ユニットを前記ユニット交換装置により各部品実装機間で受け渡しながら実装処理する
実装処理方法。 - 請求項7に記載の実装処理方法であって、
同一種の前記基板の実装処理において、部品の供給元を同一の前記部品供給ユニットとすべき部品種がある場合に、当該部品種の一の前記部品供給ユニットを前記ユニット交換装置により各部品実装機間で受け渡しながら実装処理する
実装処理方法。 - 複数の部品を収容する複数の部品供給ユニットにより供給される前記部品を基板に実装する実装処理を行う部品実装機と、前記部品実装機にセットされている前記部品供給ユニットを交換するユニット交換装置と、前記ユニット交換装置を制御する交換制御装置とを備える実装システムであって、
前記交換制御装置は、一の前記基板の実装処理に必要な複数の前記部品供給ユニットのうち一部の部品供給ユニットがセットされている状態で当該実装処理が開始された場合、一の前記基板の実装処理中に、当該実装処理における複数種の部品の実装順と当該実装処理において前記部品の供給が終了した前記部品供給ユニットの情報とに基づいて、前記部品の供給を終了した前記部品供給ユニットを当該実装処理に必要な部品供給ユニットのうち前記一部の部品供給ユニットを除いた残りの部品供給ユニットと入れ替えるよう前記ユニット交換装置を制御する
実装システム。 - 複数の部品を収容する複数の部品供給ユニットにより供給される前記部品を基板に実装する実装処理を行う部品実装機と、前記部品実装機にセットされている前記部品供給ユニットを交換するユニット交換装置と、前記ユニット交換装置を制御する交換制御装置とを備える実装システムであって、
前記交換制御装置は、一の前記基板の実装処理中に、当該実装処理における複数種の部品の実装順と当該実装処理において前記部品の供給が終了した前記部品供給ユニットの情報とに基づいて、当該実装処理において前記部品の供給が終了した部品供給ユニットと前記部品の供給が終了していない部品供給ユニットとの配置を変更するよう前記ユニット交換装置を制御する
実装システム。 - 複数の部品を収容する複数の部品供給ユニットにより供給される前記部品を複数種の基板に実装する実装処理を行う部品実装機と、前記部品実装機にセットされている前記部品供給ユニットを交換するユニット交換装置と、前記ユニット交換装置を制御する交換制御装置とを備える実装システムであって、
前記部品実装機は、並列に設けられた複数のレーンに搬送される前記基板に順次実装処理を行うものであり、
前記交換制御装置は、前記複数のレーンのうち一のレーンで実装処理されている前記基板の種類と他のレーンで次に実装処理される前記基板の種類とが異なる場合、前記一のレーンにおいて同一種の前記基板の実装処理を継続している間に、前記一のレーンと前記他のレーンとにおける複数種の部品の実装順と当該実装処理において前記部品の供給が終了した前記部品供給ユニットの情報とに基づいて、前記部品の供給が終了した部品供給ユニットを前記他のレーンの次の実装処理で必要な部品供給ユニットと入れ替えるよう前記ユニット交換装置を制御する
実装システム。 - 複数の部品を収容する複数の部品供給ユニットにより供給される前記部品を複数種の基板に実装する実装処理を行う部品実装機と、前記部品実装機にセットされている前記部品供給ユニットを交換するユニット交換装置と、前記ユニット交換装置を制御する交換制御装置とを備える実装システムであって、
前記部品実装機は、前記基板の搬送方向に沿って複数並べて配置されており、
前記交換制御装置は、同一種の前記基板の実装処理を継続している間に、前記複数の部品実装機において当該基板種の一の前記基板の実装処理において前記部品の供給が終了した前記部品供給ユニットの情報に基づいて、前記複数の部品実装機にセットされている前記部品供給ユニットを各部品実装機間で受け渡すよう前記ユニット交換装置を制御する
実装システム。 - 複数の部品を収容する複数の部品供給ユニットにより供給される複数種の前記部品を基板に実装する実装処理を行う部品実装機に対し、前記部品供給ユニットを交換するユニット交換装置を制御する交換制御装置であって、
実装処理における複数種の部品の実装順と、実装処理において前記部品の供給が終了した部品供給ユニットの情報とを含む各種情報を取得する情報取得部と、
前記複数種の部品の実装順と前記部品の供給が終了した部品供給ユニットの情報とに基づいて、前記部品実装機にセットされている前記複数の部品供給ユニットのうち、前記部品の供給が終了した部品供給ユニットを当該部品供給ユニットよりも実装順が後の別の部品供給ユニットと交換するよう前記ユニット交換装置に指示を出力する指示出力部と、
を備える交換制御装置。 - 請求項14に記載の交換制御装置であって、
前記情報取得部は、一の前記基板の実装処理に必要な複数の前記部品供給ユニットの必要ユニット数の情報を取得し、
前記必要ユニット数が、前記部品実装機にセット可能な最大ユニット数を超えるか否かを判定するユニット数判定部と、
前記ユニット数判定部により前記必要ユニット数が前記最大ユニット数を超えると判定される場合に、前記部品実装機にセットされる前記部品供給ユニットのセット内容を決定するセット内容決定部と、
を備え、
前記セット内容決定部は、前記実装順に基づいて、一の前記基板の実装処理に必要な複数の前記部品供給ユニットのうち当該実装処理の開始時にセットすべき一部の部品供給ユニットを決定し、前記一部の部品供給ユニットを除いた残りの部品供給ユニットにおけるセット順を決定し、
前記指示出力部は、一の前記基板の実装処理が開始されるまでに、前記一部の部品供給ユニットを前記部品実装機にセットするよう前記ユニット交換装置に指示を出力し、当該実装処理中に、実装処理において前記部品の供給を終了した前記部品供給ユニットを、前記セット順に基づいて次にセットすべき部品供給ユニットと入れ替えるよう前記ユニット交換装置に指示を出力する
交換制御装置。 - 請求項14または15に記載の交換制御装置であって、
前記ユニット交換装置は、並列に設けられた複数のレーンに搬送される前記基板に実装処理を行う前記部品実装機に対して、前記部品供給ユニットを交換するものであり、
前記情報取得部は、前記複数のレーンでそれぞれ実装処理される前記基板の種類の情報を取得し、
前記複数のレーンのうち一のレーンの実装処理から他のレーンの実装処理に切り替わることになる場合、前記一のレーンにおける前記基板の種類と、前記他のレーンにおける前記基板の種類とが異なるか否かを判定する基板種判定部を備え、
前記指示出力部は、前記基板種判定部により前記一のレーンにおける前記基板の種類と前記他のレーンにおける前記基板の種類とが異なると判定された場合、前記一のレーンにおける前記基板の実装処理中に、当該基板種の一の前記基板の実装処理において前記部品の供給が終了した部品供給ユニットを前記他のレーンの次の実装処理で必要な部品供給ユニットと入れ替えるよう前記ユニット交換装置に指示を出力する
交換制御装置。 - 請求項14ないし16のいずれか1項に記載の交換制御装置であって、
前記ユニット交換装置は、前記基板の搬送方向に沿って複数並べて配置された前記部品実装機に対して、前記部品供給ユニットを交換するものであり、
前記情報取得部は、実装処理中にいずれかの部品種の前記部品供給ユニットに部品切れが発生した場合、同一種の前記基板の実装処理が終了するまでに当該部品種において必要となる必要部品数と、前記複数の部品実装機にセットされている当該部品種の別の部品供給ユニットにおける収容部品の残り部品数とを取得し、
前記必要部品数よりも前記残り部品数の方が多いか否かを判定する部品数判定部を備え、
前記指示出力部は、前記部品数判定部により前記必要部品数よりも前記残り部品数の方が多いと判定される場合に、前記部品切れの部品供給ユニットを、当該部品種において部品切れとなっていない別の部品供給ユニットと入れ替えるよう前記ユニット交換装置に指示を出力する
交換制御装置。 - 請求項14ないし17のいずれか1項に記載の交換制御装置であって、
同一種の前記基板の実装処理において、部品の供給元を同一の前記部品供給ユニットとすべき部品種があるか否かを判定する供給元判定部を備え、
前記指示出力部は、前記供給元判定部により部品の供給元を同一の前記部品供給ユニットとすべき部品種があると判定される場合に、前記部品実装機において当該部品種の一の部品供給ユニットによる前記部品の供給が終了すると、当該部品実装機から前記一の部品供給ユニットを取り外して別の部品実装機にセットするよう前記ユニット交換装置に指示を出力する
交換制御装置。 - 請求項14ないし18のいずれか1項に記載の交換制御装置であって、
前記ユニット交換装置は、前記部品供給ユニットにより供給される前記部品をヘッドで採取した後に前記ヘッドを所定位置を経由して前記基板上に移動させて実装処理を行う前記部品実装機に対し、前記部品供給ユニットを交換するものであり、
前記情報取得部は、判定対象の前記部品供給ユニットがセットされている第1のセット位置と当該第1のセット位置よりも前記所定位置に近い第2のセット位置とに基づいて、前記ヘッドが前記第1のセット位置の部品供給ユニットにおける部品供給位置から前記所定位置に移動するまでの移動時間と前記第2のセット位置の部品供給ユニットにおける部品供給位置から前記所定位置に移動するまでの移動時間との差分である移動短縮時間と、前記部品供給ユニットを配置変更するのに要する配置変更時間とを取得し、
前記実装順と前記短縮時間と前記配置変更時間とに基づいて、前記判定対象の部品供給ユニットを配置変更するか否かを判定する配置変更判定部と、
を備え、
前記指示出力部は、前記配置変更判定部より配置変更すると判定される場合、前記第2のセット位置にセットされている前記部品供給ユニットによる前記部品の供給が終了すると、前記部品の供給が終了した部品供給ユニットと前記第1のセット位置にセットされている前記部品供給ユニットとの配置を変更するよう前記ユニット交換装置に指示を出力する
交換制御装置。 - 複数の部品を収容する複数の部品供給ユニットがユニット交換装置により交換可能にセットされ、前記複数の部品供給ユニットにより供給される複数種の前記部品を基板に実装する実装処理を行う部品実装機であって、
実装処理における複数種の部品の実装順と、実装処理において前記部品の供給が終了した部品供給ユニットの情報とに基づいて、前記部品の供給が終了した前記部品供給ユニットと前記部品の供給が終了していない前記部品供給ユニットとの交換要求を前記ユニット交換装置に送信する
部品実装機。 - 複数の部品を収容する複数の部品供給ユニットがユニット交換装置により交換可能にセットされ、前記複数の部品供給ユニットにより供給される複数種の前記部品を基板に実装する実装処理を行う部品実装機であって、
前記複数のレーンで実装処理される前記基板の種類と、各基板種の実装処理における複数種の部品の実装順と、前記複数のレーンのうち一のレーンの実装処理において前記部品の供給が終了した部品供給ユニットの情報とに基づいて、当該実装処理で前記部品の供給が終了した前記部品供給ユニットと他のレーンの次の実装処理で必要な部品供給ユニットとの交換要求を前記ユニット交換装置に送信する
部品実装機。
Priority Applications (9)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/JP2015/082233 WO2017085782A1 (ja) | 2015-11-17 | 2015-11-17 | 実装処理方法、実装システム、交換制御装置および部品実装機 |
JP2017551419A JP6788606B2 (ja) | 2015-11-17 | 2015-11-17 | 実装処理方法 |
CN201580084615.XA CN108353527B (zh) | 2015-11-17 | 2015-11-17 | 安装处理方法及安装系统 |
CN202010254007.1A CN111447822B (zh) | 2015-11-17 | 2015-11-17 | 安装处理方法、安装系统及元件安装机 |
CN202010254012.2A CN111465311B (zh) | 2015-11-17 | 2015-11-17 | 安装处理方法、安装系统及元件安装机 |
EP15908722.0A EP3379910B1 (en) | 2015-11-17 | 2015-11-17 | Mounting process method and mounting system |
US15/775,413 US10925200B2 (en) | 2015-11-17 | 2015-11-17 | Mounting processing method, mounting system, exchange control device, and component mounter |
CN202010254016.0A CN111432621B (zh) | 2015-11-17 | 2015-11-17 | 安装处理方法及安装系统 |
CN202010254149.8A CN111447823B (zh) | 2015-11-17 | 2015-11-17 | 更换控制装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/JP2015/082233 WO2017085782A1 (ja) | 2015-11-17 | 2015-11-17 | 実装処理方法、実装システム、交換制御装置および部品実装機 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2017085782A1 true WO2017085782A1 (ja) | 2017-05-26 |
Family
ID=58718536
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2015/082233 WO2017085782A1 (ja) | 2015-11-17 | 2015-11-17 | 実装処理方法、実装システム、交換制御装置および部品実装機 |
Country Status (5)
Country | Link |
---|---|
US (1) | US10925200B2 (ja) |
EP (1) | EP3379910B1 (ja) |
JP (1) | JP6788606B2 (ja) |
CN (5) | CN111465311B (ja) |
WO (1) | WO2017085782A1 (ja) |
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2019058416A1 (ja) * | 2017-09-19 | 2019-03-28 | 株式会社Fuji | 部品実装システム |
WO2019225009A1 (ja) * | 2018-05-25 | 2019-11-28 | 株式会社Fuji | 部品実装システム |
WO2019229924A1 (ja) | 2018-05-31 | 2019-12-05 | 株式会社Fuji | 部品実装システムおよび部品供給ユニットの配置指示方法 |
WO2020012573A1 (ja) * | 2018-07-11 | 2020-01-16 | 株式会社Fuji | ジョブ処理方法および部品実装システム |
WO2020039544A1 (ja) * | 2018-08-23 | 2020-02-27 | 株式会社Fuji | 移動作業管理装置、移動型作業装置、実装システム及び移動作業管理方法 |
WO2020157856A1 (ja) * | 2019-01-30 | 2020-08-06 | 株式会社Fuji | 管理装置、実装装置、実装システム及び管理方法 |
WO2020161830A1 (ja) | 2019-02-06 | 2020-08-13 | 株式会社Fuji | 管理装置、移動型作業装置、実装装置、実装システム及び管理方法 |
WO2020161827A1 (ja) * | 2019-02-06 | 2020-08-13 | 株式会社Fuji | 管理装置、移動型作業装置、実装システム及び管理方法 |
WO2020165955A1 (ja) * | 2019-02-12 | 2020-08-20 | 株式会社Fuji | 部品種類管理装置 |
WO2020183599A1 (ja) * | 2019-03-12 | 2020-09-17 | 株式会社Fuji | 管理装置、移動型作業装置、実装システム及び管理方法 |
JPWO2021014545A1 (ja) * | 2019-07-22 | 2021-01-28 | ||
CN112586105A (zh) * | 2018-08-23 | 2021-03-30 | 株式会社富士 | 移动作业管理装置、安装系统及移动作业管理方法 |
EP3843514A4 (en) * | 2018-08-23 | 2021-08-18 | Fuji Corporation | MOBILE WORKING DEVICE, MOBILE WORK MANAGEMENT SYSTEM, MOUNTING SYSTEM AND MANAGEMENT PROCEDURE |
JP2022037190A (ja) * | 2018-08-01 | 2022-03-08 | 株式会社Fuji | 部品実装システムおよび部品交換方法 |
WO2022079858A1 (ja) * | 2020-10-15 | 2022-04-21 | 株式会社Fuji | 部品実装システム |
US12133333B2 (en) | 2018-08-23 | 2024-10-29 | Fuji Corporation | Moving work management device |
Families Citing this family (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107950085B (zh) * | 2015-09-09 | 2020-05-26 | 株式会社富士 | 另置式带盘保持装置 |
JP6561317B2 (ja) * | 2016-06-01 | 2019-08-21 | パナソニックIpマネジメント株式会社 | 部品実装システム |
WO2018216101A1 (ja) * | 2017-05-23 | 2018-11-29 | 株式会社Fuji | 装着順序決定装置、装着順序検査装置、装着順序決定方法、および装着順序検査方法 |
WO2019229953A1 (ja) * | 2018-05-31 | 2019-12-05 | 株式会社Fuji | 決定装置およびこれを有する部品実装装置 |
EP3826445B1 (en) * | 2018-07-19 | 2023-08-23 | Fuji Corporation | Component mounting system |
WO2020039495A1 (ja) * | 2018-08-21 | 2020-02-27 | 株式会社Fuji | 部品実装システム |
EP3843520A4 (en) * | 2018-08-23 | 2021-09-29 | Fuji Corporation | MOBILE WORK MANAGEMENT DEVICE, MOBILE WORK DEVICE, MOUNTING SYSTEM AND ADMINISTRATIVE PROCEDURE |
JP7308390B2 (ja) * | 2018-09-20 | 2023-07-14 | パナソニックIpマネジメント株式会社 | 作業装置 |
US11369974B2 (en) * | 2019-02-05 | 2022-06-28 | Michael Faro | Apparatus and method for automatic plant trimming tumbler |
JP7249403B2 (ja) * | 2019-03-28 | 2023-03-30 | 株式会社Fuji | 管理装置および実装システム |
EP4007472B1 (en) * | 2019-07-22 | 2024-05-01 | Fuji Corporation | Image display device and image display method |
WO2021144866A1 (ja) * | 2020-01-14 | 2021-07-22 | 株式会社Fuji | 物品搬送システム |
WO2021241389A1 (ja) * | 2020-05-29 | 2021-12-02 | パナソニックIpマネジメント株式会社 | 部品装着装置および部品装着方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09214191A (ja) * | 1996-01-30 | 1997-08-15 | Yamaha Motor Co Ltd | 表面実装機 |
JPH10242689A (ja) * | 1997-02-28 | 1998-09-11 | Sanyo Electric Co Ltd | 電子部品装着装置における部品供給装置 |
JP2013038282A (ja) * | 2011-08-09 | 2013-02-21 | Hitachi High-Tech Instruments Co Ltd | 電子部品装着装置及び電子部品装着方法 |
Family Cites Families (46)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS60171799A (ja) * | 1984-02-17 | 1985-09-05 | 松下電器産業株式会社 | 電子部品自動装着装置 |
JPH081982B2 (ja) * | 1985-04-17 | 1996-01-10 | 株式会社日立製作所 | 電子部品搭載方法及び装置 |
US4914808A (en) * | 1987-10-16 | 1990-04-10 | Sanyo Electric Co., Ltd | Automatic electronic parts mounting apparatus for repeatedly mounting in forward and reverse sequences |
JPH07100265B2 (ja) * | 1989-04-27 | 1995-11-01 | 松下電器産業株式会社 | 部品装着装置 |
GB2262516B (en) * | 1991-12-21 | 1995-03-22 | Tdk Corp | Electronic component feed system |
JPH066084A (ja) | 1992-06-19 | 1994-01-14 | Olympus Optical Co Ltd | 電子部品自動実装機 |
JP3301880B2 (ja) * | 1995-01-17 | 2002-07-15 | 松下電器産業株式会社 | 部品装着方法及び装置 |
JPH09161220A (ja) * | 1995-12-01 | 1997-06-20 | Sony Corp | 磁気ヘッド及びその製造方法 |
JP3402968B2 (ja) * | 1996-11-18 | 2003-05-06 | ヤマハ発動機株式会社 | 実装装置 |
DE69825365T2 (de) * | 1997-06-05 | 2005-07-21 | Hitachi High-Tech Instruments Co., Ltd. | Einrichtung zur Montage von elektronischen Bauteilen und Speisevorrichtung dafür |
EP1114575B1 (en) * | 1998-09-17 | 2002-05-08 | Matsushita Electric Industrial Co., Ltd. | Method and apparatus for feeding component, and method and apparatus for mounting component |
US6629007B1 (en) * | 1998-12-25 | 2003-09-30 | Matsushita Electric Industrial Co., Ltd. | Apparatus and method for notifying lack of component in advance, component mounting apparatus, and article of manufacture comprising computer usable medium |
CN2456445Y (zh) * | 2000-12-06 | 2001-10-24 | 英业达股份有限公司 | 供料器待料架结构 |
JP4744689B2 (ja) * | 2000-12-11 | 2011-08-10 | パナソニック株式会社 | 粘性流体転写装置及び電子部品実装装置 |
JP2004172497A (ja) * | 2002-11-21 | 2004-06-17 | Fuji Mach Mfg Co Ltd | 電子回路組立方法および部品装着プログラム作成プログラム |
JP4255267B2 (ja) * | 2002-11-22 | 2009-04-15 | 富士機械製造株式会社 | 作業プログラム適否判定装置を含む対基板作業システムおよび作業プログラム適否判定プログラム |
TW200604060A (en) * | 2004-06-11 | 2006-02-01 | Assembleon Nv | Component placement apparatus, component feeding apparatus and method |
JP4566768B2 (ja) * | 2005-02-02 | 2010-10-20 | Juki株式会社 | 搭載部品管理方法 |
JP2006245483A (ja) * | 2005-03-07 | 2006-09-14 | Yamagata Casio Co Ltd | 部品搭載方法及びそれを用いた部品搭載装置 |
JP2007115982A (ja) | 2005-10-21 | 2007-05-10 | I-Pulse Co Ltd | 電子部品移載装置 |
JP2007220715A (ja) * | 2006-02-14 | 2007-08-30 | Matsushita Electric Ind Co Ltd | チップ搭載装置 |
JP2007287932A (ja) * | 2006-04-17 | 2007-11-01 | Yamaha Motor Co Ltd | 部品実装方法および同装置 |
JP4380756B2 (ja) * | 2007-10-10 | 2009-12-09 | 株式会社デンソー | 製造装置 |
JP4883070B2 (ja) * | 2008-10-03 | 2012-02-22 | パナソニック株式会社 | 電子部品実装システムおよび電子部品実装方法 |
EP2182790A3 (en) * | 2008-11-04 | 2011-01-05 | Hitachi High-Tech Instruments Co., Ltd. | Method of mounting electronic component and electronic component mounting apparatus |
JP5679399B2 (ja) * | 2008-11-25 | 2015-03-04 | 富士機械製造株式会社 | スクリーン印刷機および印刷ユニット |
US8528196B2 (en) * | 2009-01-08 | 2013-09-10 | Panasonic Corporation | Component mounting apparatus and method |
JP4893789B2 (ja) * | 2009-08-10 | 2012-03-07 | ヤマハ株式会社 | 音場制御装置 |
JP5419641B2 (ja) * | 2009-11-06 | 2014-02-19 | Juki株式会社 | 電子部品実装装置及び電子部品実装方法 |
JP5438525B2 (ja) * | 2010-01-14 | 2014-03-12 | Juki株式会社 | 電子部品実装装置 |
CN201910995U (zh) * | 2010-12-21 | 2011-07-27 | 北京中科同志科技有限公司 | 自动喂料器托架 |
JP5737989B2 (ja) * | 2011-02-14 | 2015-06-17 | 富士機械製造株式会社 | 部品実装機 |
WO2013037511A1 (en) * | 2011-04-08 | 2013-03-21 | Micronic Mydata AB | Tape feeder and method for moving a carrier tape towards a picking position in a component mounting machine |
JP5755935B2 (ja) * | 2011-05-13 | 2015-07-29 | 富士機械製造株式会社 | 部品ピッチ計測装置及び部品ピッチ計測方法 |
JP5721585B2 (ja) * | 2011-08-10 | 2015-05-20 | 富士機械製造株式会社 | 部品実装ライン |
JP5767918B2 (ja) * | 2011-09-08 | 2015-08-26 | 富士機械製造株式会社 | 電子部品実装機および電子部品実装方法 |
JP5925524B2 (ja) * | 2012-02-28 | 2016-05-25 | Juki株式会社 | 電子部品供給装置及び電子部品実装装置 |
JP5877314B2 (ja) * | 2012-05-08 | 2016-03-08 | パナソニックIpマネジメント株式会社 | 電子部品実装システムおよび電子部品実装方法 |
JP6074425B2 (ja) * | 2012-07-13 | 2017-02-01 | 富士機械製造株式会社 | 部品実装システム |
JP6049037B2 (ja) * | 2013-02-04 | 2016-12-21 | 富士機械製造株式会社 | 部品実装機のカセット式フィーダ入替システム |
JP5982649B2 (ja) * | 2013-08-05 | 2016-08-31 | パナソニックIpマネジメント株式会社 | 部品実装方法および部品実装装置 |
JP6300808B2 (ja) * | 2013-09-12 | 2018-03-28 | 富士機械製造株式会社 | 対基板作業システム、およびフィーダ移し替え方法 |
CN106031325B (zh) * | 2014-02-14 | 2019-04-02 | 株式会社富士 | 供料器更换装置 |
JP6367929B2 (ja) * | 2014-04-28 | 2018-08-01 | 株式会社Fuji | 管理装置 |
WO2016035145A1 (ja) | 2014-09-02 | 2016-03-10 | 富士機械製造株式会社 | 部品実装システム及び部品実装方法 |
JP6561317B2 (ja) * | 2016-06-01 | 2019-08-21 | パナソニックIpマネジメント株式会社 | 部品実装システム |
-
2015
- 2015-11-17 WO PCT/JP2015/082233 patent/WO2017085782A1/ja active Application Filing
- 2015-11-17 CN CN202010254012.2A patent/CN111465311B/zh active Active
- 2015-11-17 JP JP2017551419A patent/JP6788606B2/ja active Active
- 2015-11-17 CN CN202010254007.1A patent/CN111447822B/zh active Active
- 2015-11-17 CN CN202010254149.8A patent/CN111447823B/zh active Active
- 2015-11-17 EP EP15908722.0A patent/EP3379910B1/en active Active
- 2015-11-17 CN CN201580084615.XA patent/CN108353527B/zh active Active
- 2015-11-17 US US15/775,413 patent/US10925200B2/en active Active
- 2015-11-17 CN CN202010254016.0A patent/CN111432621B/zh active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09214191A (ja) * | 1996-01-30 | 1997-08-15 | Yamaha Motor Co Ltd | 表面実装機 |
JPH10242689A (ja) * | 1997-02-28 | 1998-09-11 | Sanyo Electric Co Ltd | 電子部品装着装置における部品供給装置 |
JP2013038282A (ja) * | 2011-08-09 | 2013-02-21 | Hitachi High-Tech Instruments Co Ltd | 電子部品装着装置及び電子部品装着方法 |
Non-Patent Citations (1)
Title |
---|
See also references of EP3379910A4 * |
Cited By (53)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2021180339A (ja) * | 2017-09-19 | 2021-11-18 | 株式会社Fuji | 部品実装システム |
JP7407151B2 (ja) | 2017-09-19 | 2023-12-28 | 株式会社Fuji | 部品実装システム |
US11291147B2 (en) | 2017-09-19 | 2022-03-29 | Fuji Corporation | Component mounting system |
WO2019058416A1 (ja) * | 2017-09-19 | 2019-03-28 | 株式会社Fuji | 部品実装システム |
CN111096096B (zh) * | 2017-09-19 | 2021-11-26 | 株式会社富士 | 元件安装系统 |
JPWO2019058416A1 (ja) * | 2017-09-19 | 2020-03-26 | 株式会社Fuji | 部品実装システム |
CN111096096A (zh) * | 2017-09-19 | 2020-05-01 | 株式会社富士 | 元件安装系统 |
JPWO2019225009A1 (ja) * | 2018-05-25 | 2021-05-13 | 株式会社Fuji | 部品実装システム |
WO2019225009A1 (ja) * | 2018-05-25 | 2019-11-28 | 株式会社Fuji | 部品実装システム |
EP3806607A4 (en) * | 2018-05-31 | 2021-06-23 | Fuji Corporation | COMPONENT ASSEMBLY SYSTEM AND PROCEDURE FOR GUIDING THE ARRANGEMENT OF A COMPONENT FEEDING UNIT |
WO2019229924A1 (ja) | 2018-05-31 | 2019-12-05 | 株式会社Fuji | 部品実装システムおよび部品供給ユニットの配置指示方法 |
JPWO2019229924A1 (ja) * | 2018-05-31 | 2021-04-30 | 株式会社Fuji | 部品実装システムおよび部品供給ユニットの配置指示方法 |
JP7001824B2 (ja) | 2018-05-31 | 2022-01-20 | 株式会社Fuji | 部品実装システムおよび部品供給ユニットの配置指示方法 |
CN112166660B (zh) * | 2018-05-31 | 2022-02-15 | 株式会社富士 | 元件安装系统以及元件供给单元的配置指示方法 |
CN112166660A (zh) * | 2018-05-31 | 2021-01-01 | 株式会社富士 | 元件安装系统以及元件供给单元的配置指示方法 |
JP7071502B2 (ja) | 2018-07-11 | 2022-05-19 | 株式会社Fuji | ジョブ処理方法および部品実装システム |
WO2020012573A1 (ja) * | 2018-07-11 | 2020-01-16 | 株式会社Fuji | ジョブ処理方法および部品実装システム |
JPWO2020012573A1 (ja) * | 2018-07-11 | 2021-06-03 | 株式会社Fuji | ジョブ処理方法および部品実装システム |
JP2022037190A (ja) * | 2018-08-01 | 2022-03-08 | 株式会社Fuji | 部品実装システムおよび部品交換方法 |
JP7216799B2 (ja) | 2018-08-01 | 2023-02-01 | 株式会社Fuji | 部品実装システムおよび部品交換方法 |
US12133333B2 (en) | 2018-08-23 | 2024-10-29 | Fuji Corporation | Moving work management device |
WO2020039544A1 (ja) * | 2018-08-23 | 2020-02-27 | 株式会社Fuji | 移動作業管理装置、移動型作業装置、実装システム及び移動作業管理方法 |
JPWO2020039544A1 (ja) * | 2018-08-23 | 2021-08-12 | 株式会社Fuji | 移動作業管理装置、移動型作業装置、実装システム及び移動作業管理方法 |
EP3843514A4 (en) * | 2018-08-23 | 2021-08-18 | Fuji Corporation | MOBILE WORKING DEVICE, MOBILE WORK MANAGEMENT SYSTEM, MOUNTING SYSTEM AND MANAGEMENT PROCEDURE |
EP3843516A4 (en) * | 2018-08-23 | 2021-08-25 | Fuji Corporation | MOBILE WORK MANAGEMENT DEVICE, MOUNTING SYSTEM AND MOBILE WORK MANAGEMENT METHOD |
CN112586105B (zh) * | 2018-08-23 | 2022-03-08 | 株式会社富士 | 移动作业管理装置、安装系统及移动作业管理方法 |
CN112586105A (zh) * | 2018-08-23 | 2021-03-30 | 株式会社富士 | 移动作业管理装置、安装系统及移动作业管理方法 |
JP7249350B2 (ja) | 2018-08-23 | 2023-03-30 | 株式会社Fuji | 移動作業管理装置、移動型作業装置、実装システム及び移動作業管理方法 |
CN112567901A (zh) * | 2018-08-23 | 2021-03-26 | 株式会社富士 | 移动作业管理装置、移动型作业装置、安装系统及移动作业管理方法 |
JPWO2020157856A1 (ja) * | 2019-01-30 | 2021-11-25 | 株式会社Fuji | 管理装置、実装装置、実装システム及び管理方法 |
WO2020157856A1 (ja) * | 2019-01-30 | 2020-08-06 | 株式会社Fuji | 管理装置、実装装置、実装システム及び管理方法 |
CN113170606A (zh) * | 2019-01-30 | 2021-07-23 | 株式会社富士 | 管理装置、安装装置、安装系统以及管理方法 |
CN113170606B (zh) * | 2019-01-30 | 2022-08-02 | 株式会社富士 | 管理装置、安装装置、安装系统以及管理方法 |
JP7220237B2 (ja) | 2019-01-30 | 2023-02-09 | 株式会社Fuji | 管理装置、実装装置、実装システム及び管理方法 |
JP7220238B2 (ja) | 2019-02-06 | 2023-02-09 | 株式会社Fuji | 管理装置、移動型作業装置、実装装置、実装システム及び管理方法 |
US12041726B2 (en) | 2019-02-06 | 2024-07-16 | Fuji Corporation | Management device, moving work device, mounting device, mounting system, and management method |
WO2020161827A1 (ja) * | 2019-02-06 | 2020-08-13 | 株式会社Fuji | 管理装置、移動型作業装置、実装システム及び管理方法 |
US20220087087A1 (en) * | 2019-02-06 | 2022-03-17 | Fuji Corporation | Management device, moving work device, mounting device, mounting system, and management method |
WO2020161830A1 (ja) | 2019-02-06 | 2020-08-13 | 株式会社Fuji | 管理装置、移動型作業装置、実装装置、実装システム及び管理方法 |
JPWO2020161830A1 (ja) * | 2019-02-06 | 2021-11-25 | 株式会社Fuji | 管理装置、移動型作業装置、実装装置、実装システム及び管理方法 |
JPWO2020161827A1 (ja) * | 2019-02-06 | 2021-11-11 | 株式会社Fuji | 管理装置、移動型作業装置、実装システム及び管理方法 |
JP7203866B2 (ja) | 2019-02-06 | 2023-01-13 | 株式会社Fuji | 管理装置、移動型作業装置、実装システム及び管理方法 |
JPWO2020165955A1 (ja) * | 2019-02-12 | 2021-10-28 | 株式会社Fuji | 部品種類管理装置 |
JP7096377B2 (ja) | 2019-02-12 | 2022-07-05 | 株式会社Fuji | 部品種類管理装置 |
WO2020165955A1 (ja) * | 2019-02-12 | 2020-08-20 | 株式会社Fuji | 部品種類管理装置 |
JP7084545B2 (ja) | 2019-03-12 | 2022-06-14 | 株式会社Fuji | 管理装置、移動型作業装置、実装システム及び管理方法 |
JPWO2020183599A1 (ja) * | 2019-03-12 | 2021-11-25 | 株式会社Fuji | 管理装置、移動型作業装置、実装システム及び管理方法 |
CN113519207A (zh) * | 2019-03-12 | 2021-10-19 | 株式会社富士 | 管理装置、移动型作业装置、安装系统以及管理方法 |
WO2020183599A1 (ja) * | 2019-03-12 | 2020-09-17 | 株式会社Fuji | 管理装置、移動型作業装置、実装システム及び管理方法 |
JP7210741B2 (ja) | 2019-07-22 | 2023-01-23 | 株式会社Fuji | トレイ式部品供給装置 |
WO2021014545A1 (ja) * | 2019-07-22 | 2021-01-28 | 株式会社Fuji | トレイ式部品供給装置 |
JPWO2021014545A1 (ja) * | 2019-07-22 | 2021-01-28 | ||
WO2022079858A1 (ja) * | 2020-10-15 | 2022-04-21 | 株式会社Fuji | 部品実装システム |
Also Published As
Publication number | Publication date |
---|---|
CN111447823B (zh) | 2021-05-07 |
CN111432621B (zh) | 2021-05-11 |
CN111447822B (zh) | 2021-05-07 |
JPWO2017085782A1 (ja) | 2018-09-06 |
CN111465311A (zh) | 2020-07-28 |
CN108353527B (zh) | 2020-06-02 |
EP3379910A4 (en) | 2019-10-09 |
JP6788606B2 (ja) | 2020-11-25 |
US10925200B2 (en) | 2021-02-16 |
CN111447822A (zh) | 2020-07-24 |
EP3379910A1 (en) | 2018-09-26 |
CN111432621A (zh) | 2020-07-17 |
CN111465311B (zh) | 2021-02-26 |
EP3379910B1 (en) | 2022-11-23 |
CN108353527A (zh) | 2018-07-31 |
CN111447823A (zh) | 2020-07-24 |
US20180376635A1 (en) | 2018-12-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2017085782A1 (ja) | 実装処理方法、実装システム、交換制御装置および部品実装機 | |
JP7113075B2 (ja) | ユニット着脱装置 | |
JP2024114884A (ja) | 部品回収方法 | |
CN112166660B (zh) | 元件安装系统以及元件供给单元的配置指示方法 | |
US11582891B2 (en) | Component mounting system | |
JP6986148B2 (ja) | 部品実装システム | |
JP6892535B2 (ja) | 実装処理方法、交換制御装置および部品実装機 | |
WO2022097288A1 (ja) | 部品実装システム | |
WO2023144910A1 (ja) | 実装システムおよび部材補給案内方法 | |
JP7071502B2 (ja) | ジョブ処理方法および部品実装システム | |
WO2022101992A1 (ja) | 管理装置および管理方法並びに作業装置 | |
WO2022101991A1 (ja) | 管理装置および管理方法並びに作業装置 | |
US20230371222A1 (en) | Automatic feeder arrangement support system and automatic feeder arrangement support program | |
WO2023139730A1 (ja) | 払出管理装置 | |
WO2023139761A1 (ja) | 払出管理装置 | |
EP3373717B1 (en) | Component mounting system and component mounting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 15908722 Country of ref document: EP Kind code of ref document: A1 |
|
ENP | Entry into the national phase |
Ref document number: 2017551419 Country of ref document: JP Kind code of ref document: A |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2015908722 Country of ref document: EP |