ES2369669T5 - Procedimiento para erigir una torre así como instalación de energía eólica - Google Patents
Procedimiento para erigir una torre así como instalación de energía eólica Download PDFInfo
- Publication number
- ES2369669T5 ES2369669T5 ES05716518T ES05716518T ES2369669T5 ES 2369669 T5 ES2369669 T5 ES 2369669T5 ES 05716518 T ES05716518 T ES 05716518T ES 05716518 T ES05716518 T ES 05716518T ES 2369669 T5 ES2369669 T5 ES 2369669T5
- Authority
- ES
- Spain
- Prior art keywords
- tower
- foundation
- leveling
- segment
- ring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009434 installation Methods 0.000 title claims description 15
- 238000000034 method Methods 0.000 title claims description 13
- 239000011178 precast concrete Substances 0.000 claims description 2
- 239000004567 concrete Substances 0.000 description 9
- 239000000463 material Substances 0.000 description 9
- 229910000831 Steel Inorganic materials 0.000 description 4
- 238000010276 construction Methods 0.000 description 4
- 239000010959 steel Substances 0.000 description 4
- 238000011065 in-situ storage Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 1
- 239000000945 filler Substances 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 238000012432 intermediate storage Methods 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/22—Sockets or holders for poles or posts
- E04H12/2253—Mounting poles or posts to the holder
- E04H12/2269—Mounting poles or posts to the holder in a socket
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/42—Foundations for poles, masts or chimneys
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/388—Separate connecting elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/02—Structures made of specified materials
- E04H12/08—Structures made of specified materials of metal
- E04H12/085—Details of flanges for tubular masts
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/22—Sockets or holders for poles or posts
- E04H12/2284—Means for adjusting the orientation of the post or pole
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D13/00—Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
- F03D13/20—Arrangements for mounting or supporting wind motors; Masts or towers for wind motors
- F03D13/22—Foundations specially adapted for wind motors
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F05—INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
- F05B—INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
- F05B2240/00—Components
- F05B2240/90—Mounting on supporting structures or systems
- F05B2240/91—Mounting on supporting structures or systems on a stationary structure
- F05B2240/912—Mounting on supporting structures or systems on a stationary structure on a tower
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/728—Onshore wind turbines
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Engineering & Computer Science (AREA)
- Paleontology (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Chemical & Material Sciences (AREA)
- Wood Science & Technology (AREA)
- Materials Engineering (AREA)
- Sustainable Energy (AREA)
- Sustainable Development (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Wind Motors (AREA)
- Foundations (AREA)
Description
DESCRIPCIÓN
Procedimiento para erigir una torre así como instalación de energía eólica
La presente invención se refiere a un procedimiento para erigir una torre de una instalación de energía eólica.
El documento US 6.050.038 muestra un sistema de cimentación. El documento DE 10045735 A1 muestra una fijación de una columna en una cimentación de hormigón. El documento DE 10226996 A1 muestra un procedimiento para realizar una cimentación, en particular para una torre de una instalación de energía eólica.
En el estado de la técnica es conocido al erigir una torre, en particular para una instalación de energía eólica, colocar un segmento de torre inferior en los elementos de unión que sobresalen de una cimentación con una brida de pie. Este segmento de torre inferior se alinea (nivela) y se fija en la posición alineada. Durante este proceso se forma una junta entre la brida de pie del segmento de torre inferior y el lado superior de la cimentación. Esta junta se llena con masa de relleno que debe fraguar posteriormente antes de poder ser cargada y poderse seguir con la construcción de la torre. El fraguado puede durar perfectamente hasta 24 horas.
Para la manipulación del segmento de torre inferior se necesita una grúa grande. No obstante, ésta no se usa hasta después del fraguado de la masa de relleno para seguir con la construcción de la torre. Sin embargo, es demasiado costoso un traslado de la grúa durante el tiempo de fraguado de la junta, por lo que no se hace. Por lo tanto, la grúa costosa queda parada durante 24 horas.
El objetivo de la invención es, por lo tanto, racionalizar la construcción de una torre de una instalación de energía eólica.
Este objetivo se consigue mediante un procedimiento para erigir una torre de una instalación de energía eólica de acuerdo con la reivindicación 1.
Por lo tanto, se prevé un procedimiento para erigir una torre de una instalación de energía eólica, que presente una cimentación con anclajes de segmento, sobresaliendo los elementos de unión una medida predeterminada del lado superior de la cimentación. En el lado superior de la cimentación se nivela, alinea y fija un anillo. Una junta formada por la nivelación, la alineación y la fijación del anillo se rellena con una masa de relleno. Después de haber fraguado la masa de relleno, un segmento de torre inferior se coloca en el anillo nivelado, alineado y fijado y se une al mismo. El anillo también puede estar formado por varios segmentos.
La invención está basada en el conocimiento de que no tiene importancia la nivelación de la sección inferior de la torre sino que ésta quede alineada exactamente in situ. No obstante, esto también puede conseguirse mediante un anillo de nivelación. Un anillo de nivelación de este tipo es comparable con una brida anular, que puede ser manipulada con un esfuerzo claramente menor que la sección inferior de la torre, p.ej. con una grúa montada en un vehículo. También la alineación precisa (la nivelación) del anillo de nivelación es más sencilla que el proceso correspondiente en caso de una sección de torre. Además, el anillo de nivelación puede ser fabricado de un material de menor calidad que la brida de la torre ofreciendo una mayor anchura y/o un mayor espesor. Además, puede reducirse la anchura de la brida de la torre. De este modo se puede aprovechar mejor la anchura de transporte.
Después de la alineación y la fijación, el anillo de nivelación puede rellenarse por debajo de forma conocida con material de relleno y el material puede fraguar. No obstante, durante este tiempo, la grúa (montada en un vehículo) ya puede usarse para otras tareas, mientras aún no se necesite la grúa requerida para la manipulación de las secciones de la torre.
Es ya después de haber endurecido el material en la junta cuando la grúa grande debe estar preparada para erigir la torre, p.ej. de una instalación de energía eólica, pudiendo erigir la misma a continuación de forma relativamente rápida la torre, segmento por segmento.
Una estructura especialmente racional de una torre puede realizarse si se usan piezas prefabricadas para la cimentación, en particular piezas prefabricadas de hormigón. Estas se suministran a pie de obra listas para ser instaladas y se unen para formar una cimentación, que a continuación puede seguir usándose inmediatamente, por lo que se ahorra tiempo.
A continuación, la invención se explicará haciéndose referencia a las figuras.
La Figura 1 muestra una vista en corte esquemática de un tramo de un pie de torre;
la Figura 2a muestra una vista en planta desde arriba de un pie de torre;
la Figura 2b muestra una vista en corte a lo largo de la línea de corte A-A del pie de torre de la Figura 2a;
la Figura 2c muestra una vista a escala ampliada del detalle X de la Figura 2b y
la Figura 3 muestra una vista en perspectiva de un pie de torre.
Una cimentación 10 puede estar realizada como cimentación de piezas prefabricadas, pero también como cimentación de hormigón preparado in situ o como cimentación de hormigón de transporte. En la cimentación 10 están previstos varios anclajes de segmento 12. La forma y el número de estos anclajes de segmento 12 pueden adaptarse a los requisitos especiales de la cimentación. En el caso de fundaciones de piezas prefabricadas se usan, en cambio, varios anclajes de segmento, cuya forma está adaptada a la pieza prefabricada. Naturalmente también pueden usarse varios anclajes de segmento en el modo de construcción con hormigón preparado in situ u hormigón de transporte.
Al ancla de segmento 12 están unidos elementos de unión 14. Los elementos de unión 14 pueden estar realizados como vástagos roscados, que están fijados con tuercas 15 en una posición predeterminada en el ancla de segmento 12. Los elementos de fijación 14 se extienden a lo largo de una medida predeterminada en el exterior de la cimentación 10 más allá del lado superior de la cimentación 11. En lugar de una unión roscada también puede usarse una unión por soldadura.
En el lado superior de la cimentación 11 se coloca a continuación un anillo de nivelación 18 realizado en una pieza o en varias piezas. Este anillo de nivelación 18 se nivela exactamente, de modo que forma una base perfectamente alineada para la torre.
Durante la alineación del anillo de nivelación 18 se forma forzosamente una junta 16 entre el lado superior de la cimentación 11 y el anillo de nivelación 18. En cuanto esté fijado el anillo de nivelación 18 en su posición predeterminada, la junta 16 se llena con una masa de relleno 17. Después del fraguado o endurecimiento de esta masa de relleno 17, el anillo de nivelación 18 puede ser cargado en su posición deseada y un segmento de torre inferior con una brida anular 20 inferior y una chapa de pared de torre 22 representada puede colocarse en el anillo de nivelación 18. Los vástagos roscados 14 pasan por agujeros correspondientemente posicionados en el anillo de nivelación 18 y en la brida anular 20 inferior de la sección de torre inferior y se colocan tuercas 15 para unir la sección de torre inferior mediante el anillo de nivelación 18 fijamente a la cimentación 10.
En la Figura 2a se muestra una vista en planta desde arriba de un pie de torre. En la Figura 2b se muestra una vista en corte transversal a lo largo de la línea de corte A-A de la Figura 2a. Al igual que en la Figura 1 se muestra una cimentación 10 con una superficie de cimentación 11. En particular se muestran dos anclajes de segmento 12, así como cuatro vástagos roscados 14. En la Figura 2c se muestra una vista a escala ampliada del detalle X. Esta representación corresponde sustancialmente a la representación de la Figura 1.
En la Figura 3 se muestra una representación en perspectiva del pie de torre con un tramo parcial visto en corte. La nivelación del pie de torre se realiza de la forma descrita en la Figura 1.
Puesto que la torre de una instalación de energía eólica, puede construirse ahora de una vez, para erigir la torre rápidamente sólo debe prepararse una sola vez una grúa, que hasta este momento puede cumplir con otras tareas.
También se simplifican las tareas logísticas. Hasta ahora, la sección inferior de la torre tenía que estar en la obra al menos 24 horas antes que las demás partes de la torre, para poder ser instalada de forma impecable. Naturalmente también era posible suministrar al mismo tiempo también las demás partes de la torre. No obstante, no era posible montarlas al mismo tiempo, por lo que ocupaban espacio adicional en la obra durante el tiempo de espera.
Gracias al procedimiento según la invención, los segmentos de torre pueden suministrarse en un transporte en un momento cercano al momento en el que se erige la torre. De este modo se suprimen también procesos de transbordo adicionales, es decir, del vehículo de transporte al almacenamiento intermedio en el suelo y posteriormente desde allí al lugar de instalación. Por lo contrario, los segmentos de torre suministrados pueden descargarse en un momento cercano (just in time) del vehículo de transporte e instalarse inmediatamente.
En la solución arriba descrita hay que tener en cuenta que la masa de relleno debe aplicarse siempre con un espesor mínimo (en función del material, puesto que esta masa de relleno debe transmitir las fuerzas de la torre a la cimentación. Si la masa de relleno se aplica con un espesor demasiado fino, esta capa puede romperse y conducir a daños considerables.
La solución arriba descrita resulta ser ventajosa respecto a la racionalización al erigir una torre de una instalación de energía eólica. Por otro lado, también desempeñan un papel importante los costes y las propiedades del material: Se indica que la brida inferior de un segmento de torre debe estar hecho de un material de muy buena calidad para poder desviar las cargas de la torre. Cuando se coloca una torre de este tipo en una cimentación de hormigón, el hormigón es el más débil de los dos elementos de la unión. Por lo tanto, la anchura de la brida de la torre debe concebirse de tal modo que no se sobrecargue el hormigón de la cimentación. Por consiguiente, la brida en el segmento de torre inferior debe tener una anchura sobredimensionada para el acero usado para la misma. Esto debe considerarse un inconveniente, en particular en cuanto a los costes del acero usado para ello.
Gracias a la inserción del anillo de nivelación, según la invención ahora es posible insertar una especie de escalón de transición entre el acero altamente resistente, pero de costes elevados, del segmento de torre inferior y el hormigón menos resistente de la cimentación. Por lo tanto, el anillo de nivelación puede presentar una anchura suficiente para transmitir las cargas de la instalación de energía eólica sin peligro a la cimentación. Por otro lado, en este lugar puede usarse un acero más económico o más barato, por lo que la brida en el segmento de torre inferior puede realizarse correspondientemente más estrecha y, por lo tanto, ahorrándose material y costes.
Otra ventaja puede cobrar importancia si el anillo de nivelación está realizado en segmentos, pudiendo apilarse y transportarse por lo tanto por segmentos. Si el anillo de nivelación presenta un gran diámetro, según la invención esto no es problemático desde el punto de vista de la técnica de transporte, porque el mismo puede apilarse por segmentos. El segmento de torre inferior presenta una brida de pie más estrecha con una anchura reducida, puesto que ahora la brida de pie puede ser dimensionada de forma específica según el material. Además, de este modo también puede reducirse correspondientemente la anchura de transporte.
En el ejemplo anteriormente indicado se ha descrito como se erige por ejemplo una torre de una instalación de energía eólica en tierra. El proceso de erigir una torre de una instalación de energía eólica offshore, es decir, en el agua o en el mar, también puede realizarse con ayuda del anillo de nivelación arriba descrito, así como con una nivelación correspondiente, antes de colocarse un segmento de torre inferior.
Claims (2)
1. Procedimiento para erigir una torre de una instalación de energía eólica, con una cimentación con anclajes de segmento, estando unida una pluralidad de elementos de unión a los anclajes de segmento y sobresaliendo una medida predeterminada del lado superior de la cimentación, con las etapas:
colocación del anillo de nivelación con una pluralidad de primeros agujeros pasantes en el lado superior de la cimentación, haciéndose pasar la pluralidad de elementos de unión por la pluralidad de los primeros agujeros pasantes, nivelación, alineación y fijación de un anillo de nivelación en el lado superior de la cimentación,
relleno de una junta formada por la nivelación, alineación y fijación del anillo con una masa de relleno,
fraguado de la masa de relleno,
colocación de un segmento de torre inferior con una brida anular (20) inferior con una pluralidad de segundos agujeros pasantes directamente en el anillo nivelado, alineado y fijado, y
unión de la brida anular inferior mediante la pluralidad de elementos de unión por los segundos agujeros pasantes al anillo de nivelación y los anclajes de segmento.
2. Procedimiento según la reivindicación 1, usándose piezas prefabricadas de hormigón para la cimentación (10).
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102004017006 | 2004-04-02 | ||
DE102004017006A DE102004017006B4 (de) | 2004-04-02 | 2004-04-02 | Verfahren zum Errichten eines Turmes |
PCT/EP2005/003499 WO2005095792A1 (de) | 2004-04-02 | 2005-04-04 | Verfahren zum errichten eines turmes |
Publications (2)
Publication Number | Publication Date |
---|---|
ES2369669T3 ES2369669T3 (es) | 2011-12-02 |
ES2369669T5 true ES2369669T5 (es) | 2020-11-16 |
Family
ID=34962709
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
ES05716518T Active ES2369669T5 (es) | 2004-04-02 | 2005-04-04 | Procedimiento para erigir una torre así como instalación de energía eólica |
Country Status (19)
Country | Link |
---|---|
US (2) | US9206617B2 (es) |
EP (1) | EP1735533B2 (es) |
JP (2) | JP4726891B2 (es) |
KR (1) | KR20060130755A (es) |
CN (1) | CN1965165B (es) |
AR (1) | AR048458A1 (es) |
AT (1) | ATE521804T1 (es) |
AU (1) | AU2005229135B2 (es) |
BR (1) | BRPI0509286B1 (es) |
CA (1) | CA2561431C (es) |
CY (1) | CY1111928T1 (es) |
DE (1) | DE102004017006B4 (es) |
DK (1) | DK1735533T4 (es) |
ES (1) | ES2369669T5 (es) |
NZ (1) | NZ550073A (es) |
PL (1) | PL1735533T3 (es) |
PT (1) | PT1735533E (es) |
SI (1) | SI1735533T1 (es) |
WO (1) | WO2005095792A1 (es) |
Families Citing this family (64)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102004017006B4 (de) | 2004-04-02 | 2012-03-29 | Aloys Wobben | Verfahren zum Errichten eines Turmes |
DE102004017008B4 (de) | 2004-04-02 | 2009-10-22 | Aloys Wobben | Verfahren zum Errichten eines Turmes |
EP1866484A1 (en) | 2005-03-16 | 2007-12-19 | Densit A/S | Tower foundation system and method for providing such system |
US8051627B2 (en) * | 2006-04-30 | 2011-11-08 | General Electric Company | Tower adapter, method of producing a tower foundation and tower foundation |
ES2326010B2 (es) * | 2006-08-16 | 2011-02-18 | Inneo21, S.L. | Estructura y procedimiento de montaje de torres de hormigon para turbinas eolicas. |
WO2010138978A2 (en) | 2009-05-05 | 2010-12-02 | Ahmed Phuly Engineering & Consulting, Inc. | Fatigue resistant foundation |
DE102006058668A1 (de) * | 2006-12-13 | 2008-06-19 | Kleinsorge Verbindungstechnik Gmbh | Ankerstange, Verfahren zur Herstellung einer Ankerstange und Windkraftanlage |
WO2009056898A1 (es) | 2007-11-02 | 2009-05-07 | Alejandro Cortina-Cordero | Torre de concreto postensado para generadores eolicos |
JP5198011B2 (ja) * | 2007-08-10 | 2013-05-15 | 前田建設工業株式会社 | タワー基礎 |
DE102007060379C5 (de) * | 2007-12-12 | 2018-11-15 | Senvion Gmbh | Verankerung eines Turms einer Windenergieanlage |
US8555600B2 (en) | 2008-12-10 | 2013-10-15 | Cortina Innovations, S.A. De C.V. | Method for mounting in sections an annular tower for wind power generator, heliostatic power generator or chimney composed from three concrete segments or more |
ES2388807T3 (es) * | 2008-12-16 | 2012-10-18 | Vestas Wind Systems A/S | Cimentación para permitir el anclaje de una torre de turbina eólica a la misma por medio de pernos pasantes reemplazables |
US8220214B1 (en) * | 2009-05-02 | 2012-07-17 | Purdy Charles L | Prefabricated weight distribution element |
DE102009019709A1 (de) * | 2009-05-05 | 2010-11-11 | Wobben, Aloys | Verfahren zum Errichten eines Turmes und Turm |
US20110027100A1 (en) * | 2009-07-30 | 2011-02-03 | Daniel Francis Cummane | Mobile wind power station |
DE102009049435A1 (de) * | 2009-10-14 | 2011-04-28 | Wobben, Aloys | Verfahren zum Herstellen von Betonfertigteilen und Schalungseinheit zum Herste llen von Betonfertigteilen |
EP2375057B1 (en) * | 2010-03-31 | 2016-05-04 | Siemens Aktiengesellschaft | Wind turbine installation |
US20110131899A1 (en) * | 2010-04-30 | 2011-06-09 | Stefan Voss | Apparatus and method for producing a concrete foundation |
BRPI1004557A2 (pt) * | 2010-08-24 | 2016-03-22 | Mitsubishi Heavy Ind Ltd | gerador de turbina eólica e método de construção para torre de turbina eólica |
FI125153B (fi) * | 2010-09-16 | 2015-06-15 | Peikko Group Oy | Menetelmä ja sovitelma tornimaisen rakenteen kiinnittämiseksi perustukseen |
CN102095052B (zh) * | 2010-11-25 | 2013-06-12 | 华锐风电科技(集团)股份有限公司 | 地脚螺栓锚固系统的安装方法及安装工业设备的方法 |
DE102011001250A1 (de) | 2011-03-14 | 2012-09-20 | Strabag Offshore Wind Gmbh | Vorrichtung und Verfahren für den Übergang zwischen einem Stahlturmabschnitt und einem vorgespannten Betonturmabschnitt |
ES2400902B1 (es) * | 2011-05-25 | 2014-02-18 | Esteyco Energía S.L. | Procedimiento de asentamiento de una torre. |
EP2541059A2 (en) * | 2011-06-28 | 2013-01-02 | Gamesa Innovation & Technology, S.L. | Footing for wind turbine towers |
GB2494674B (en) * | 2011-09-15 | 2018-09-05 | Ronald Chambers Peter | A connection formed under water between a wind turbine tower and a wind turbine foundation |
DE102011085947A1 (de) | 2011-11-08 | 2013-05-08 | Wobben Properties Gmbh | Turmfußsektion einer Windenergieanlage |
ES2405034B1 (es) | 2011-11-17 | 2014-04-15 | Acciona Windpower, S.A. | Procedimiento y unidad para la fijación de una torre de un aerogenerador a una cimentación y aerogenerador que incorpora dicha unidad |
EP2821565A1 (en) | 2012-02-28 | 2015-01-07 | MS Enertech S.L. | Connection between a wind turbine tower and its foundation |
CN103114604B (zh) * | 2012-03-09 | 2015-04-22 | 中国电建集团西北勘测设计研究院有限公司 | 预应力混凝土圆筒型风力发电机组基础 |
KR101358213B1 (ko) * | 2012-07-05 | 2014-02-05 | 삼성중공업 주식회사 | 타워 지지 구조물 및 타워 지지 구조물 건조방법 |
CN102777334A (zh) * | 2012-07-21 | 2012-11-14 | 广东明阳风电产业集团有限公司 | 风力发电机组调平装置 |
WO2014055534A1 (en) * | 2012-10-01 | 2014-04-10 | Valmont Industries, Inc. | Base angle attachment assemblies |
CN102979109B (zh) * | 2012-12-17 | 2015-06-17 | 中国电建集团西北勘测设计研究院有限公司 | 一种装配式预应力混凝土圆筒型柱体基础的设计方法 |
DK2746578T3 (en) * | 2012-12-21 | 2017-02-27 | Siemens Ag | Segmented tower bottom flange and method of mounting |
CN103046575B (zh) * | 2013-01-28 | 2015-07-29 | 中国电建集团西北勘测设计研究院有限公司 | 一种陆上四叶梅型的风机扩展基础结构 |
CA2908510A1 (en) * | 2013-03-29 | 2014-10-02 | Tindall Corporation | Core component and tower assembly for a tower structure |
DE102013211750A1 (de) * | 2013-06-21 | 2014-12-24 | Wobben Properties Gmbh | Windenergieanlage und Windenergieanlagen-Fundament |
DE102013213976A1 (de) * | 2013-07-17 | 2015-01-22 | Wobben Properties Gmbh | Verfahren zum Herstellen eines Fertigbetonteil-Segmentes eines Windenergieanlagen-Turmes |
US9003721B1 (en) | 2013-11-08 | 2015-04-14 | Siemens Aktiengesellschaft | Leveling arrangement for a tower |
CN106029987A (zh) * | 2014-01-16 | 2016-10-12 | 帕卡达尔有限公司 | 风力涡轮机塔架的基座和风力涡轮机塔架的预组装方法 |
KR101687972B1 (ko) * | 2014-11-20 | 2017-01-02 | 대우조선해양 주식회사 | 풍력발전기용 기초구조물 및 그 시공방법 |
DE102015203574A1 (de) | 2015-02-27 | 2016-09-01 | Wobben Properties Gmbh | Windenergieanlagen-Fundament und Windenergieanlage |
CN104895101B (zh) * | 2015-06-10 | 2016-08-24 | 杭州江润科技有限公司 | 筏板基础高精度整体预埋大直径螺栓群结构的施工方法 |
DE102015216444A1 (de) * | 2015-08-27 | 2017-03-02 | Wobben Properties Gmbh | Windenergieanlage |
BR112018003752A2 (pt) * | 2015-08-31 | 2018-09-25 | Siemens Gamesa Renewable Energy Inc | torre de equipamento, parque de torre de equipamento e método para construir uma torre de equipamento |
US9518402B1 (en) * | 2015-09-04 | 2016-12-13 | Kundel Industries, Inc. | Anchoring system |
DE102015014070A1 (de) | 2015-10-30 | 2017-05-04 | Senvion Gmbh | Windenergieanlage, Lastenverteilungssystem einer Windenergieanlage und Verfahren zum Errichten eines Turms einer Windenergieanlage |
CN105350565B (zh) * | 2015-12-07 | 2017-04-05 | 湖南皓诺工程有限公司 | 一种风电场风机塔架基础修补加固方法 |
ES2833505T3 (es) | 2015-12-21 | 2021-06-15 | Vestas Wind Sys As | Método para formar una cimentación de turbina eólica y sistema relacionado para formar una cimentación de este tipo |
KR101888231B1 (ko) * | 2015-12-21 | 2018-09-06 | 고려대학교 산학협력단 | 수직도 오차 보정이 가능한 콘크리트 기초-타워 연결구조 |
WO2018051427A1 (ja) * | 2016-09-14 | 2018-03-22 | 三菱重工コンプレッサ株式会社 | 支持台、回転機械ユニット、及び回転機械ユニットの製造方法 |
CN106626048A (zh) * | 2016-10-08 | 2017-05-10 | 霍尔果斯新国金新能源科技有限公司 | 风力发电机的塔筒与基础的灌浆模具及灌浆方法 |
US10544559B2 (en) * | 2016-11-02 | 2020-01-28 | Inventus Holdings, Llc | Pier and mat foundation fortification and monitoring system |
CN106702907B (zh) * | 2016-12-19 | 2018-05-01 | 中交路桥建设有限公司 | 一种桥梁护栏底座可调节法兰盘施工方法 |
CN106592660A (zh) * | 2016-12-21 | 2017-04-26 | 神华集团有限责任公司 | 风机基础的修复方法 |
CN107130628A (zh) * | 2017-05-31 | 2017-09-05 | 中国二十冶集团有限公司 | 地脚螺栓预埋用法兰及地脚螺栓预埋的施工方法 |
DE102017125716A1 (de) * | 2017-11-03 | 2019-05-09 | Eno Energy Systems Gmbh | Verfahren zum Errichten eines Turms mit einer mehrteiligen Turmsektion und Teilsektion einer mehrteiligen Turmsektion eines Turms |
US20190257075A1 (en) * | 2018-02-22 | 2019-08-22 | Joseph W. Ball | Anchor bolt assembly and arrangement for concrete foundation designs |
WO2019222727A1 (en) * | 2018-05-18 | 2019-11-21 | Cetres Holdings, Llc | Concrete boss anchor |
DE102019109904A1 (de) | 2019-04-15 | 2020-10-15 | Wobben Properties Gmbh | Turmsegment und Verfahren zum Aufbau eines Turms |
PL3983618T3 (pl) * | 2019-06-14 | 2023-10-09 | Peikko Group Oy | Sposób mocowania prefabrykowanego elementu konstrukcyjnego do innego elementu konstrukcyjnego i układ połączenia |
RU197237U1 (ru) * | 2020-02-03 | 2020-04-14 | Николай Валентинович МЕДВЕДЕВ | Фундаментное анкерное крепление башенного крана |
CN113187305A (zh) * | 2021-05-26 | 2021-07-30 | 新余学院 | 一种电子信息工程通信塔连接装置 |
US11905924B2 (en) * | 2022-03-03 | 2024-02-20 | Barr Engineering Co. | Spreader box |
Family Cites Families (78)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US962699A (en) * | 1909-01-09 | 1910-06-28 | Unit Construction Co | Concrete construction. |
US1506173A (en) * | 1919-11-17 | 1924-08-26 | Hagen Hans Engelhart | Method of producing concrete poles |
GB606545A (en) | 1946-02-26 | 1948-08-16 | William Hubert James Miller | Improved shuttering for adjustable location of anchor bolts and anchor plates in concrete foundations, walls, floors and like supports |
US2724261A (en) * | 1951-05-24 | 1955-11-22 | Egil M Rensaa | Precast column attaching means |
DE1045735B (de) | 1957-09-27 | 1958-12-04 | Knorr Bremse Gmbh | Gleitachslager mit durch Tiefstkanten gefuehrtem OElkreislauf |
US3503165A (en) * | 1967-06-12 | 1970-03-31 | Arrowall Corp | Prefabricated light weight panels of cementitious material |
US3645057A (en) * | 1970-10-13 | 1972-02-29 | Seymour M Kaplan | Base for mounting a traffic light pole in rotatable and vertically adjustable relation |
US3829540A (en) * | 1970-12-07 | 1974-08-13 | J Cox | Technique for aligning anchor bolts |
US3713262A (en) * | 1970-12-10 | 1973-01-30 | J Jatcko | Taper lock break-away pole structure |
JPS5312672B2 (es) * | 1972-11-15 | 1978-05-02 | ||
US3834094A (en) * | 1973-09-12 | 1974-09-10 | B Ferguson | Track system wall assembly for houses or the like |
AT347189B (de) * | 1977-04-06 | 1978-12-11 | Voest Ag | Fundamentverankerung fuer schwermaschinen |
JPS6043925B2 (ja) | 1977-07-15 | 1985-10-01 | 日特建設株式会社 | 法面緑化のための施肥方法 |
JPS5578722A (en) | 1978-12-11 | 1980-06-13 | Mitsubishi Heavy Ind Ltd | Groundwork construction of steel smoke stuck |
US4228627A (en) * | 1979-04-16 | 1980-10-21 | Neill Joseph C O | Reinforced foundation structure |
US4327703A (en) * | 1979-10-09 | 1982-05-04 | Destree Allen L | Method of preparing concrete column for attachment to beam |
US4331314A (en) * | 1980-05-22 | 1982-05-25 | Allis-Chalmers Corporation | Hydraulic pump/turbine discharge ring support anchorage |
US4365929A (en) * | 1981-01-16 | 1982-12-28 | Philip Retz | Vertical wind turbine power generating tower |
US4438607A (en) * | 1982-03-29 | 1984-03-27 | A. O. Smith Harvestore Products, Inc. | Method and apparatus for leveling a storage structure |
JPS5968432A (ja) * | 1982-10-08 | 1984-04-18 | Hitoshi Mori | アンカ−ボルトの埋設方法 |
US4785593A (en) * | 1986-10-27 | 1988-11-22 | Munoz Jr Jose C | Structural building system |
DE3809113A1 (de) | 1988-03-18 | 1989-09-28 | Mehne Fa Erwin | Verfahren zum aufstellen der stahl-hochbaukonstruktion eines hochregallagers und stahlkonstruktion dafuer |
US5110082A (en) * | 1988-09-21 | 1992-05-05 | Rowan Jr Robert L | Adjustable apparatus for supporting machinery or other load |
US4910930A (en) * | 1988-10-28 | 1990-03-27 | Base Isolation Consultants, Inc. | Seismic isolation structure |
US4887691A (en) * | 1988-11-04 | 1989-12-19 | Rotondo/Penn-Cast | Modular wall construction using posts and panels |
US5505033A (en) * | 1988-12-06 | 1996-04-09 | 501 Hitachi Metals Ltd. | Column base structure and connection arrangement |
DE8910744U1 (de) * | 1989-09-08 | 1991-01-17 | Schmidt, René P., Oberweningen | Dichtungsvorrichtung für Betonfugen |
FR2659685A1 (fr) | 1990-03-16 | 1991-09-20 | Puglia Emilio | Dispositif pour ameliorer la fixation d'un support et le reglage de sa verticalite sur un massif d'ancrage. |
GB9024500D0 (en) * | 1990-11-10 | 1991-01-02 | Peace Steven J | A vertical axis wind turbine unit capable of being mounted on or to an existing chimney,tower or similar structure |
JPH0739665B2 (ja) * | 1992-04-24 | 1995-05-01 | 茂樹 林 | 擁壁ブロックの基礎構造 |
FR2692611B1 (fr) | 1992-06-17 | 1999-03-05 | Prefatlantique | Platine de fixation pour pylone. |
US5437519A (en) * | 1992-08-26 | 1995-08-01 | Roger Bullivant Of Texas, Inc. | Piles and pile forming methods |
GB2273310A (en) | 1992-12-10 | 1994-06-15 | Thomas Steel Craik | Improvements relating to buildings |
US5308195A (en) * | 1993-02-12 | 1994-05-03 | The Reinforced Earth Company | Coping construction for a retaining wall |
US5379563A (en) * | 1993-09-13 | 1995-01-10 | Eastman Chemical Company | Anchoring assembly |
JP3362809B2 (ja) * | 1994-05-13 | 2003-01-07 | 積水ハウス株式会社 | 柱脚の支持装置 |
US5586417A (en) * | 1994-11-23 | 1996-12-24 | Henderson; Allan P. | Tensionless pier foundation |
JP3002107B2 (ja) * | 1994-12-19 | 2000-01-24 | 勤伍 内藤 | 柱脚構造及び柱脚工法 |
JP3622119B2 (ja) * | 1995-01-09 | 2005-02-23 | 日本鋳造株式会社 | 基礎の配筋方法 |
JP3458179B2 (ja) | 1995-02-03 | 2003-10-20 | 日本鋳造株式会社 | 柱脚部の固定構造 |
JPH09158215A (ja) | 1995-12-07 | 1997-06-17 | Toshiba Eng & Constr Co Ltd | 大型機械の据付工法 |
US5707180A (en) * | 1995-12-26 | 1998-01-13 | Vickars Developments Co. Ltd. | Method and apparatus for forming piles in-situ |
US6264402B1 (en) * | 1995-12-26 | 2001-07-24 | Vickars Developments Co. Ltd. | Method and apparatus for forming piles in place |
JPH09302675A (ja) * | 1996-05-20 | 1997-11-25 | Sumitomo Forestry Co Ltd | アンカーボルトの据え付け方法及び金具 |
JP3752310B2 (ja) * | 1996-05-20 | 2006-03-08 | 住友林業株式会社 | アンカーボルトの位置決め具及び方法 |
JPH10121576A (ja) | 1996-10-16 | 1998-05-12 | Tomoe Corp | 柱脚固定構造 |
US5953864A (en) * | 1997-04-23 | 1999-09-21 | Rapid Wall Systems | Prefabricated modular concrete foundation wall systems and methods of constructing prefabricated modular concrete foundation wall systems |
US6050038A (en) * | 1998-09-11 | 2000-04-18 | Fey; James M. | Foundation system for supporting a superstructure |
AU2093200A (en) | 1999-01-22 | 2000-08-07 | Neg Micon A/S | A method and an assembly for casting a tower foundation |
US6705058B1 (en) * | 1999-02-12 | 2004-03-16 | Newmark International Inc. | Multiple-part pole |
JP3381031B2 (ja) * | 1999-03-31 | 2003-02-24 | 日本鋳造株式会社 | 鋼管柱用ベースプレートの設計方法及び鋼管柱用ベースプレート |
JP2000034733A (ja) * | 1999-06-25 | 2000-02-02 | Okabe Co Ltd | 基礎の構造 |
IL134724A0 (en) * | 2000-02-24 | 2001-04-30 | Giltek Telecomm Ltd | Foundation for a tower and a method for its deployment on site |
DE10009072A1 (de) | 2000-02-25 | 2001-08-30 | Sms Demag Ag | Montageverfahren zum Verankern einer Arbeitsmaschine auf einem Fundament |
US6503024B2 (en) * | 2000-03-06 | 2003-01-07 | Stan Rupiper | Concrete foundation pierhead and method of lifting a foundation using a jack assembly |
US6318034B1 (en) * | 2000-03-08 | 2001-11-20 | Tindall Corporation | Elevated storage tank |
DK174190B1 (da) * | 2000-04-12 | 2002-09-09 | Spaencom As | Fundament til vindmølle samt fremgangsmåde til montering heraf |
DE10045735B4 (de) * | 2000-09-15 | 2008-04-03 | Vetter Fördertechnik GmbH | Befestigung der Säule eines Säulenschwenkkranes auf einem Betonfundament |
AU2001296896A1 (en) * | 2000-09-27 | 2002-04-08 | Allan P. Henderson | Perimeter weighted foundation for wind turbines and the like |
US6470645B1 (en) * | 2000-11-09 | 2002-10-29 | Beaird Industries, Inc. | Method for making and erecting a wind tower |
US6443656B1 (en) * | 2001-03-30 | 2002-09-03 | Abt, Inc. | Trench forming assembly having removable pin anchoring mechanism |
DE10226996B4 (de) * | 2001-10-09 | 2014-07-03 | Aloys Wobben | Verfahren zur Erstellung eines Fundaments, insbesondere für einen Turm einer Windenergieanlage |
JP2003293938A (ja) | 2002-04-02 | 2003-10-15 | Tetra Co Ltd | 風力発電装置の施工方法 |
US20030196393A1 (en) * | 2002-04-22 | 2003-10-23 | Bowman Joseph M. | Weldless pole mounting structure and method of providing same |
DE10238033A1 (de) | 2002-08-20 | 2004-03-04 | Alpine Project Technology Gmbh | Betonfundament für einen Träger |
US7124547B2 (en) * | 2002-08-26 | 2006-10-24 | Bravinski Leonid G | 3-D construction modules |
US7222464B2 (en) * | 2002-12-18 | 2007-05-29 | Suehiro-System Co., Ltd. | Anchor bolt and installing method thereof |
FI20022235A (fi) | 2002-12-19 | 2002-12-19 | Rautaruukki Oyj | Poikittaiskuormitetun tornin perustus |
US7533505B2 (en) * | 2003-01-06 | 2009-05-19 | Henderson Allan P | Pile anchor foundation |
US6808350B1 (en) * | 2003-01-27 | 2004-10-26 | Norman L. Tooman | Anchor bolt cap and method of use |
US7025176B1 (en) * | 2003-06-09 | 2006-04-11 | Tooman Norman L | Bolt greaser unit |
ATE427450T1 (de) * | 2003-06-27 | 2009-04-15 | Alstom Technology Ltd | Befestigungsvorrichtung eines maschinenfusses einer maschine und verfahren zur befestigung desselben |
US7877944B2 (en) * | 2003-08-09 | 2011-02-01 | General Electric Company | Tower foundation, in particular for a wind energy turbine |
NL1024581C2 (nl) | 2003-10-21 | 2005-04-22 | Gmb Beton En Ind Noord West B | Windmolenfundatie. |
DE102004017006B4 (de) | 2004-04-02 | 2012-03-29 | Aloys Wobben | Verfahren zum Errichten eines Turmes |
DE102004017008B4 (de) * | 2004-04-02 | 2009-10-22 | Aloys Wobben | Verfahren zum Errichten eines Turmes |
US8801370B2 (en) * | 2006-10-12 | 2014-08-12 | General Electric Company | Turbine case impingement cooling for heavy duty gas turbines |
DE102007060379C5 (de) | 2007-12-12 | 2018-11-15 | Senvion Gmbh | Verankerung eines Turms einer Windenergieanlage |
-
2004
- 2004-04-02 DE DE102004017006A patent/DE102004017006B4/de not_active Revoked
-
2005
- 2005-04-01 AR ARP050101291A patent/AR048458A1/es not_active Application Discontinuation
- 2005-04-04 WO PCT/EP2005/003499 patent/WO2005095792A1/de active Application Filing
- 2005-04-04 JP JP2007503310A patent/JP4726891B2/ja not_active Expired - Fee Related
- 2005-04-04 PT PT05716518T patent/PT1735533E/pt unknown
- 2005-04-04 CA CA2561431A patent/CA2561431C/en not_active Expired - Fee Related
- 2005-04-04 AU AU2005229135A patent/AU2005229135B2/en not_active Ceased
- 2005-04-04 SI SI200531359T patent/SI1735533T1/sl unknown
- 2005-04-04 CN CN2005800106378A patent/CN1965165B/zh active Active
- 2005-04-04 ES ES05716518T patent/ES2369669T5/es active Active
- 2005-04-04 BR BRPI0509286-8A patent/BRPI0509286B1/pt active IP Right Grant
- 2005-04-04 KR KR1020067021572A patent/KR20060130755A/ko active Search and Examination
- 2005-04-04 NZ NZ550073A patent/NZ550073A/en not_active IP Right Cessation
- 2005-04-04 AT AT05716518T patent/ATE521804T1/de active
- 2005-04-04 EP EP05716518.5A patent/EP1735533B2/de active Active
- 2005-04-04 PL PL05716518T patent/PL1735533T3/pl unknown
- 2005-04-04 DK DK05716518.5T patent/DK1735533T4/da active
- 2005-04-04 US US11/547,387 patent/US9206617B2/en active Active
-
2010
- 2010-02-09 JP JP2010026377A patent/JP2010159625A/ja active Pending
-
2011
- 2011-10-11 CY CY20111100971T patent/CY1111928T1/el unknown
-
2014
- 2014-12-10 US US14/566,433 patent/US20150089898A1/en not_active Abandoned
Also Published As
Publication number | Publication date |
---|---|
AR048458A1 (es) | 2006-04-26 |
ATE521804T1 (de) | 2011-09-15 |
CN1965165B (zh) | 2011-08-10 |
DK1735533T3 (da) | 2011-11-21 |
WO2005095792A1 (de) | 2005-10-13 |
JP2010159625A (ja) | 2010-07-22 |
DE102004017006A1 (de) | 2005-10-27 |
EP1735533B2 (de) | 2020-03-25 |
EP1735533A1 (de) | 2006-12-27 |
BRPI0509286B1 (pt) | 2018-06-05 |
US20080302038A1 (en) | 2008-12-11 |
ES2369669T3 (es) | 2011-12-02 |
NZ550073A (en) | 2011-07-29 |
AU2005229135A1 (en) | 2005-10-13 |
AU2005229135B2 (en) | 2010-12-16 |
KR20060130755A (ko) | 2006-12-19 |
PL1735533T3 (pl) | 2012-04-30 |
JP2007535634A (ja) | 2007-12-06 |
CA2561431A1 (en) | 2005-10-13 |
US9206617B2 (en) | 2015-12-08 |
DE102004017006B4 (de) | 2012-03-29 |
US20150089898A1 (en) | 2015-04-02 |
BRPI0509286A (pt) | 2007-09-18 |
EP1735533B1 (de) | 2011-08-24 |
PT1735533E (pt) | 2011-10-18 |
JP4726891B2 (ja) | 2011-07-20 |
CY1111928T1 (el) | 2015-11-04 |
CA2561431C (en) | 2010-11-30 |
DK1735533T4 (da) | 2020-06-02 |
CN1965165A (zh) | 2007-05-16 |
SI1735533T1 (sl) | 2011-10-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
ES2369669T5 (es) | Procedimiento para erigir una torre así como instalación de energía eólica | |
ES2636437T3 (es) | Procedimiento para la erección de una torre | |
ES2217289T3 (es) | Cimentacion con pilotes sin tension. | |
ES2796475T3 (es) | Cimentación para un molino de viento | |
ES2935839T3 (es) | Fundamentos para una instalación de energía eólica | |
ES2301656T3 (es) | Procedimiento de montaje de una turbina eolica, cimentacion de turbina eolica y conjunto de turbina eolica. | |
ES2343451T3 (es) | Estructura y procedimiento de montaje de torres de hormigón para aerogeneradores | |
ES2565411T3 (es) | Losa o solera de hormigón armado con casetones | |
ES2764468B2 (es) | Cimentacion para torres eolicas | |
ES2386735T3 (es) | Adaptador de torre, procedimiento para producir una cimentación de torre y cimentación de torre | |
ES2525405T3 (es) | Procedimiento para montar elementos de torre para formar secciones de una torre híbrida de un aerogenerador | |
ES2386149T3 (es) | Pies para una instalación de energía eólica en alta mar | |
ES2471071T3 (es) | Dispositivo de soporte de un aerogenerador de producción de energía eléctrica en el mar, instalación de producción de energía eléctrica en el mar correspondiente | |
US20070181767A1 (en) | Foundation for a wind energy plant | |
ES2371893A1 (es) | Método y dispositivo de manipulación o transporte de palas de aerogeneradores. | |
BR102012008751B1 (pt) | guia de montagem de revestimento para a montagem de uma estrutura de revestimento e método de montagem de uma estrutura de revestimento | |
ES2673105A1 (es) | Método de construcción de la cimentación de una torre | |
ES2761655B2 (es) | Cimentación para torre de un aerogenerador y método de realización de dicha cimentación | |
WO2011029965A1 (es) | Procedimiento de montaje de torre prefabricada de hormigón de un aerogenerador, y estructura de premontaje de los segmentos de la torre | |
WO2022144471A1 (es) | Torre offshore y metodo de montaje | |
ES2770657T3 (es) | Método y estructura de unión para unir una estructura de cimentación a una estructura de soporte de una planta de energía eólica y planta de energía eólica | |
ES2824448T3 (es) | Procedimiento para colocar una torre de instalación de energía eólica, así como instalación de energía eólica correspondiente | |
ES2811826T3 (es) | Taco de anclaje | |
ES2959280T3 (es) | Procedimiento para erigir una torre con una sección de torre de varias partes | |
WO2016203066A1 (es) | Cimentación de hormigón prefabricado y procedimiento de ejecución de la misma |