BRPI0509286B1 - Processo para erguer uma torre, instalação de energia eólica, e, uso de um anel de nivelamento - Google Patents
Processo para erguer uma torre, instalação de energia eólica, e, uso de um anel de nivelamento Download PDFInfo
- Publication number
- BRPI0509286B1 BRPI0509286B1 BRPI0509286-8A BRPI0509286A BRPI0509286B1 BR PI0509286 B1 BRPI0509286 B1 BR PI0509286B1 BR PI0509286 A BRPI0509286 A BR PI0509286A BR PI0509286 B1 BRPI0509286 B1 BR PI0509286B1
- Authority
- BR
- Brazil
- Prior art keywords
- ring
- tower
- foundation
- leveling
- wind power
- Prior art date
Links
- 238000009434 installation Methods 0.000 title claims abstract description 20
- 238000000034 method Methods 0.000 title claims abstract description 14
- 239000000463 material Substances 0.000 claims description 23
- 239000004570 mortar (masonry) Substances 0.000 claims description 16
- 239000004567 concrete Substances 0.000 claims description 12
- 150000001875 compounds Chemical class 0.000 abstract 2
- 238000007789 sealing Methods 0.000 abstract 2
- 229910000831 Steel Inorganic materials 0.000 description 4
- 239000010959 steel Substances 0.000 description 4
- 238000010276 construction Methods 0.000 description 2
- 239000004677 Nylon Substances 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 238000012432 intermediate storage Methods 0.000 description 1
- 229920001778 nylon Polymers 0.000 description 1
- 239000011395 ready-mix concrete Substances 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/22—Sockets or holders for poles or posts
- E04H12/2253—Mounting poles or posts to the holder
- E04H12/2269—Mounting poles or posts to the holder in a socket
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/42—Foundations for poles, masts or chimneys
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/388—Separate connecting elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/02—Structures made of specified materials
- E04H12/08—Structures made of specified materials of metal
- E04H12/085—Details of flanges for tubular masts
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/22—Sockets or holders for poles or posts
- E04H12/2284—Means for adjusting the orientation of the post or pole
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D13/00—Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
- F03D13/20—Arrangements for mounting or supporting wind motors; Masts or towers for wind motors
- F03D13/22—Foundations specially adapted for wind motors
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F05—INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
- F05B—INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
- F05B2240/00—Components
- F05B2240/90—Mounting on supporting structures or systems
- F05B2240/91—Mounting on supporting structures or systems on a stationary structure
- F05B2240/912—Mounting on supporting structures or systems on a stationary structure on a tower
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/728—Onshore wind turbines
Abstract
"processo para erguer uma torre, instalação de energia eólica, e, uso de um anel de nivelamento" a invenção refere-se a um processo para erguer uma torre, especialmente uma torre pertencente a uma instalação de energia eólica compreendendo uma fundação provida com âncoras segmentadas, elementos de conexão salientes do topo da fundação por uma medida predeterminada.um anel é nivelado, alinhado e fixado no topo da fundação.uma junta criada pelo nivelamento, alinhamento e fixação do anel é alinhada com um composto de vedação. dito composto de vedação é endurecido e um segmento de torre inferior é colocado sobre o anel nivelado, alinhado e fixado, e conectado nele.
Description
A presente invenção refere-se a um processo para erguer uma torre bem como uma instalação de energia eólica com tal torre.
A US 6 050 038 descreve um sistema de fundação. A DE 100 45 735 Al descreve um meio de fixar uma coluna em uma fundação de concreto. A DE 102 26 996 Al descreve um processo de produzir uma fundação, em particular para uma torre de uma instalação de energia eólica.
É conhecido no estado da técnica, quando erguendo-se uma torre, em particular para uma instalação de energia eólica, que um segmento de torre inferior seja colocado sobre os elementos conectantes, que se projetam para fora da fundação, com um flange de base. Esse segmento de torre inferior é apropriadamente alinhado (nivelado) e fixado na posição alinhada. Nesse caso, há um vão entre o flange de base do segmento de torre inferior e o lado de topo da fundação. Esse vão é enchido com um material de argamassa, que então tem que endurecer antes de poder ser carregado e a torre construído ainda sobre ele. O endurecimento pode certamente levar até 24 h.
Um grande guindaste é necessário para manusear o segmento de torre inferior. Esse guindaste, entretanto, é somente ainda usado para construir a torre após o material de argamassa ter endurecido. A mudança do guindaste para o período durante o qual a argamassa do vão está endurecendo é entretanto demasiado complicada e dispendiosa e, portanto, não acontece.
Por conseguinte, o guindaste dispendioso fica parado e inativo por 24 horas.
Portanto, o objetivo da invenção é racionalizar a estrutura de uma torre, em particular uma torre de uma instalação de energia eólica.
Esse objetivo é alcançado por um processo para erguer uma torre como exposto na reivindicação 1, uma instalação de energia eólica com uma torre, como exposto na reivindicação 3 e uso de um anel de nivelamento para erguer uma torre como exposto na reivindicação 5.
·* · · ·<
Portanto, é fornecido um método para:erêu’ef*uma*t©íTe,**em· particular uma torre de uma instalação de energia eólica, que tem uma fundação com âncoras de segmento, em que os elementos conectantes projetam-se além do lado de topo da fundação em uma extensão predeterminada. Um anel é nivelado, alinhado e fixado no lado de topo da fundação. Um intervalo que foi formado por nivelamento, alinhamento e fixação do anel é sobrejazido com um material de argamassa. Após o material de argamassa ter endurecido um segmento de torre inferior é colocado no anel nivelado, alinhado e fixado e conectado nele. Nesse caso, o anel pode também ser formado de uma pluralidade de segmentos.
A esse respeito, a invenção é baseada no entendimento de que não é o nivelamento da seção de torre inferior que é importante, mas o fato de que seja exatamente alinhada in situ. Isso, entretanto, pode também ser conseguido utilizando-se um anel de nivelamento. Tal anel de nivelamento é comparável a um anel de flange, que pode ser manipulado com um nível de esforço e dispêndio significativamente inferior ao da seção de tone inferior, por exemplo, com um guindaste montado em um veículo. Também alinhamento preciso (nivelamento) do anel de nivelamento é mais simples do que o correspondente procedimento em relação a uma seção de torre. Além do anel de nivelamento, quando de maior largura e/ou espessura, pode ser produzido de um material de menor alta qualidade do que o flange de torre. O flange de torre pode também ser reduzido em largura. Dessa maneira, é possível fazer melhor uso da largura de transporte.
Após alinhamento e fixação do anel de nivelamento pode ser sobrejazido com material de argamassa em maneira conhecida e o material pode endurecer. Durante esse tempo, entretanto, o guindaste (montado em veículo) já pode ser usado para outras tarefas, enquanto o guindaste requerido para manipular as seções de torre não é ainda necessário.
É somente quando o material no intervalo endureceu que o :·· : · · ··. ί : ·.: y .
grande guindaste deve estar pronto para erguer a Oorre,tpôr’exemplb,*de uma' instalação de energia eólica, e pode então relativamente rápido erguer o segmento de torre segmento por segmento.
Uma estrutura particularmente racional para a torre pode ser implementada, se partes acabadas pré-fabricadas, em particular partes acabadas de concreto, forem usadas para a fundação. Elas são supridas prontas para instalação no sítio de construção e conectadas para produzir uma fundação que pode ser então ainda usada imediatamente e de tal maneira a economizar tempo.
A invenção é descrita a seguir com referência às Figuras.
A Figura 1 é uma vista diagramática em seção de uma parte de uma base de torre,
A Figura 2a mostra uma vista em planta de uma base de torre,
A Figura 2b mostra uma vista em seção tomada ao longo da linha A-A da base de torre da Figura 2a,
A Figura 2c mostra uma vista em uma escala ampliada da parte X da Figura 2b e
A Figura 3 mostra uma vista em perspectiva de uma base de torre.
Uma fundação 10 pode ser na forma de uma fundação de partes acabadas pré-fabricadas, mas também na forma de uma fundação de concreto misturado no local ou uma fundação feita de concreto misturado pronto suprido. Uma ou mais âncoras de segmento 12 são providas na fundação 10. Aquelas âncoras de segmento 12 podem ser adaptadas em formato e número às demandas particulares da fundação. Assim, é possível utilizar-se uma âncora de segmentos que, por exemplo, seja de uma peça em relação às fundações de concreto misturado no local ou fundações produzidas de concreto misturado-pronto, essa âncora de segmento sendo tecida dentro do reforço. No caso de fundações parcialmente acabadas pré-fabricadas, ao /β • · · · · · t · · · contrário uma pluralidade de âncoras de segmento é lisa*dã, ’qúe‘ *e adaptada com respeito a seu formato na parte acabada. Observamos que uma pluralidade de âncoras de segmento pode também ser usada em relação a uma estrutura de concreto misturado no local ou uma estrutura produzida por concreto de mistura pronta suprido.
Os elementos conectantes 14 são conectados à âncora segmentada 12. Os elementos conectantes 14 podem ser na forma de tirantes atarraxados, que são fixados com porcas 15 em uma predeterminada posição à âncora de segmento 12. Os elementos de fixação 14 estendem-se por uma predeterminada distância para fora da fundação 10 acima do lado de topo 11 da fundação. Em vez de uma conexão de parafuso, é também possível utilizarse uma conexão soldada.
Um anel de nivelação 18, que é formado em uma peça ou uma pluralidade de peças, é então disposto sobre o lado de topo 11 da fundação. O anel de nivelamento 18 é exatamente nivelado, de modo que forme uma base perfeitamente alinhada para a torre.
Quando um anel de nivelamento 18 é alinhado um intervalo 16 ocorre inevitavelmente entre o lado de topo 11 da fundação e o anel de nivelamento 18. Quando o anel de nivelamento 18 é fixado na sua posição predeterminada o intervalo 16 é preenchido com um material de argamassa 16. Após o endurecimento desse material de argamassa 17 o anel de nivelamento 18 pode ser carregado na sua posição desejada e um segmento de torre inferior com um anel de flange inferior 20 e uma placa de torre 22 ilustrada pode ser colocada sobre o anel de nivelamento 18. Os tirantes presos por parafuso 14 encaixam através de furos adequadamente posicionados no anel de nivelamento 18 e no anel de flange inferior 20 da seção de torre inferior e porcas 15 são encaixadas sobre eles, a fim de conectar a seção de torre inferior fixamente na fundação 10 por meio do anel de nivelamento 18.
A Figura 2a mostra uma vista em planta de uma base de torre.
A Figura 2b mostra uma seção transversal, tomadi ao iorígô da*línAa*Á-Â*tlã* Figura 2a. Como na Figura 1, é mostrada aqui uma fundação 10 com uma superfície de fundação 11. Em particular, duas âncoras segmentadas 12 e quatro tirantes presos por parafuso 14 são mostrados. A parte X é mostrada em uma escala ampliada na Figura 2c. Essa vista corresponde substancialmente à vista da Figura 1.
A Fig. 3 mostra uma vista em perspectiva da base de torre, com uma sua parte cortada aberta. O nivelamento da base de torre é realizada como descrito com referência à Figura 1.
Como a torre, por exemplo, de uma instalação de energia eólica pode agora ser construído de uma única vez, um guindaste somente tem que ser provido uma vez para acelerar a ereção da torre, porém até então o guindaste pode realizar outras tarefas.
Tarefas logísticas são também simplificadas. Até agora, a seção de torre inferior tinha que estar no local pelo menos 24 horas antes das outras partes da torre, a fim de ser-se capaz de instalá-lo satisfatoriamente. Observamos que as outras partes da torre poderíam também ser supridas ao mesmo tempo. Elas, entretanto, não poderíam ser construídas ao mesmo tempo e, portanto, tomariam espaço adicional no local de construção durante o tempo de espera.
O processo de acordo com a presente invenção significa que os segmentos de torre podem ser supridos em um processo de transporte para o ponto de ereção exatamente em tempo. Isso também elimina procedimentos de deslocamento de carga adicionais, mais especificamente primeiro do veículo de transporte para armazenagem intermediária no solo e então mais tarde dali para o local de instalação. Sem dúvida, segmentos de torre, que são supridos exatamente a tempo, podem ser descarregados do veículo de transporte e encaixados em posição imediatamente.
Com a solução acima descrita, deve ser tomado cuidado para rb assegurar que o material de argamassa seja sfempife *aplicadô**c©m *ιΐΓηα' espessura mínima (dependente do material), visto que aquele material de argamassa é necessário para transmitir a força da torre na fundação. Se o material de argamassa for aplicado demasiado fino, essa camada pode fraturar e dar origem a considerável avaria.
A solução acima descrita foi constatada ser vantajosa em termos de racionalização da ereção de uma torre, em particular uma torre de uma instalação de energia eólica. Por outro lado, os custos e propriedades do material também representam uma parte não significativa. Deve ser salientado que o flange mais inferior de um segmento de náilon deve ser produzido de um material de qualidade muito elevada, a fim de ser capaz de transmitir as cargas originando-se da torre. Se uma torre dessa espécie for erguido em uma fundação de concreto, então o concreto é o mais fraco dos dois aspectos da conexão. Por conseguinte, o flange de torre deve ser mais largo, de modo que o concreto da fundação não seja sobrecarregado. Conseqüentemente, o flange do segmento de tone inferior deve ser de uma largura que seja superdimensionada em relação ao aço que é usado. Isso deve ser considerado como uma desvantagem em particular, em termos de custos do aço usado.
Em conseqüência da inserção do anel de nivelamento, é agora possível, de acordo com a invenção, inserir uma espécie de etapa de transição entre o aço altamente carregável, mas de alto custo, do segmento de torre inferior e o concreto de carregamento inferior da fundação. Assim, o anel de nivelamento pode ser de suficiente largura para transmitir as cargas da instalação de energia eólica para a fundação sem risco. Por outro lado, é possível utilizar aço melhor ou mais barato naquele local e, assim, o flange do segmento de torre inferior pode ser produzido correspondentemente mais estreito e, assim, menos dispendioso em termos de material e custo.
Tem-se uma outra vantagem quando o anel de nivelamento é feito na forma de segmentos e pode, assim, ser empilhado e transportado em
maneira segmentada. Se o anel de nivelamento fêr dõ um’grahde*diâmfctfo, isso não é um problema de acordo com a presente invenção, do ponto de vista de transporte, porque ele pode ser empilhado de maneira segmentada. O segmento de torre inferior tem um flange de base mais estreito de uma largura menor, visto que agora o flange de base pode ser material especificamente dimensionado. A largura de transporte pode assim também ser correspondentemente reduzida.
A ereção, por exemplo, de uma torre de uma instalação de energia eólica em terra foi descrita no exemplo aqui antes exposto. A ereção de uma torre de uma instalação de energia eólica ao largo, isto é, na água ou no mar, pode também ser realizada por meio do anel de nivelamento acima descrito e um correspondente procedimento de nivelamento, antes de um segmento de torre inferior ser fixado em posição.
Claims (4)
- reivindicações Γ : :: ?: : : *·: / :• · · · «*···*1. Processo para erguer uma torre, em particular uma torre de uma instalação de energia eólica, que tem uma fundação com âncoras segmentadas, em que elementos de conexão projetam-se além do lado de topo da fundação em uma quantidade predeterminada, caracterizado pelo fato de compreender as etapas de:nivelar, alinhar e fixar um anel no lado de topo da fundação, sobrejazer um intervalo produzido por nivelamento, alinhamento e fixação do anel com um material de argamassa, endurecer o material de argamassa, colocar um segmento de torre inferior com um anel de flange inferior (20) no anel nivelado, alinhado e fixado, e conectar o anel de flange inferior ao anel por meio de elementos de conexão.
- 2. Processo de acordo com a reivindicação 1, caracterizado pelo fato de as partes acabadas de concreto serem usadas para a fundação (10).
- 3. Instalação de energia eólica, caracterizada pelo fato de compreender uma torre que tem pelo menos um segmento de torre, uma fundação (10) com âncoras segmentadas (12), elementos de conexão (14) que se proj etam por uma predeterminada distância acima do lado de topo da fundação (10), um anel de nivelamento (18), que é alinhado e fixado no lado de topo da fundação, um material de argamassa (17) que sobrejaze um intervalo produzido por alinhamento e fixação do anel de nivelamento (18), em que um segmento de torre inferior com um anel de flange inferior (20) é colocado sobre o anel de nivelamento (18) e o anel de flange inferior (20) é conectado aos elementos de conexão (14).W · * · »k» « · · « »«
- 4. Uso de um anel de nivelamento (J*8), &it€> üspsaracteçizfldo;*: ♦*· • * · <r ··»···· · pelo fato de ser para erguer uma tone, em particular uma torre de uma instalação de energia eólica, em que o anel de nivelamento após alinhamento e fixação é sobrejazido com um material de argamassa (17) em que o material de argamassa é primeiro endurecido antes de um segmento de torre inferior com um anel de flange inferior ser colocado no anel de nivelamento (18) e o anel de flange inferior (20) ser conectado ao anel de nivelamento (18).1/2 » * ·2θFIG.2B41.FIG.3
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102004017006.1 | 2004-04-02 | ||
DE102004017006A DE102004017006B4 (de) | 2004-04-02 | 2004-04-02 | Verfahren zum Errichten eines Turmes |
PCT/EP2005/003499 WO2005095792A1 (de) | 2004-04-02 | 2005-04-04 | Verfahren zum errichten eines turmes |
Publications (2)
Publication Number | Publication Date |
---|---|
BRPI0509286A BRPI0509286A (pt) | 2007-09-18 |
BRPI0509286B1 true BRPI0509286B1 (pt) | 2018-06-05 |
Family
ID=34962709
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
BRPI0509286-8A BRPI0509286B1 (pt) | 2004-04-02 | 2005-04-04 | Processo para erguer uma torre, instalação de energia eólica, e, uso de um anel de nivelamento |
Country Status (19)
Country | Link |
---|---|
US (2) | US9206617B2 (pt) |
EP (1) | EP1735533B2 (pt) |
JP (2) | JP4726891B2 (pt) |
KR (1) | KR20060130755A (pt) |
CN (1) | CN1965165B (pt) |
AR (1) | AR048458A1 (pt) |
AT (1) | ATE521804T1 (pt) |
AU (1) | AU2005229135B2 (pt) |
BR (1) | BRPI0509286B1 (pt) |
CA (1) | CA2561431C (pt) |
CY (1) | CY1111928T1 (pt) |
DE (1) | DE102004017006B4 (pt) |
DK (1) | DK1735533T4 (pt) |
ES (1) | ES2369669T5 (pt) |
NZ (1) | NZ550073A (pt) |
PL (1) | PL1735533T3 (pt) |
PT (1) | PT1735533E (pt) |
SI (1) | SI1735533T1 (pt) |
WO (1) | WO2005095792A1 (pt) |
Families Citing this family (64)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102004017008B4 (de) | 2004-04-02 | 2009-10-22 | Aloys Wobben | Verfahren zum Errichten eines Turmes |
DE102004017006B4 (de) | 2004-04-02 | 2012-03-29 | Aloys Wobben | Verfahren zum Errichten eines Turmes |
EP2390421A3 (en) | 2005-03-16 | 2012-07-25 | Illinois Tool Works Inc. | Tower foundation system and method for providing such system |
US8051627B2 (en) * | 2006-04-30 | 2011-11-08 | General Electric Company | Tower adapter, method of producing a tower foundation and tower foundation |
ES2326010B2 (es) * | 2006-08-16 | 2011-02-18 | Inneo21, S.L. | Estructura y procedimiento de montaje de torres de hormigon para turbinas eolicas. |
US8661752B2 (en) | 2006-09-21 | 2014-03-04 | Ahmed Phuly | Foundation with slab, pedestal and ribs for columns and towers |
DE102006058668A1 (de) * | 2006-12-13 | 2008-06-19 | Kleinsorge Verbindungstechnik Gmbh | Ankerstange, Verfahren zur Herstellung einer Ankerstange und Windkraftanlage |
WO2009056898A1 (es) | 2007-11-02 | 2009-05-07 | Alejandro Cortina-Cordero | Torre de concreto postensado para generadores eolicos |
JP5198011B2 (ja) * | 2007-08-10 | 2013-05-15 | 前田建設工業株式会社 | タワー基礎 |
DE102007060379C5 (de) * | 2007-12-12 | 2018-11-15 | Senvion Gmbh | Verankerung eines Turms einer Windenergieanlage |
US8555600B2 (en) | 2008-12-10 | 2013-10-15 | Cortina Innovations, S.A. De C.V. | Method for mounting in sections an annular tower for wind power generator, heliostatic power generator or chimney composed from three concrete segments or more |
EP2199469B1 (en) * | 2008-12-16 | 2012-06-06 | Vestas Wind Systems A/S | Foundation for enabling anchoring of a wind turbine tower thereto by means of replaceable through-bolts |
US8220214B1 (en) * | 2009-05-02 | 2012-07-17 | Purdy Charles L | Prefabricated weight distribution element |
DE102009019709A1 (de) | 2009-05-05 | 2010-11-11 | Wobben, Aloys | Verfahren zum Errichten eines Turmes und Turm |
US20110027100A1 (en) * | 2009-07-30 | 2011-02-03 | Daniel Francis Cummane | Mobile wind power station |
DE102009049435A1 (de) * | 2009-10-14 | 2011-04-28 | Wobben, Aloys | Verfahren zum Herstellen von Betonfertigteilen und Schalungseinheit zum Herste llen von Betonfertigteilen |
EP2375057B1 (en) * | 2010-03-31 | 2016-05-04 | Siemens Aktiengesellschaft | Wind turbine installation |
US20110131899A1 (en) * | 2010-04-30 | 2011-06-09 | Stefan Voss | Apparatus and method for producing a concrete foundation |
CN102713277A (zh) * | 2010-08-24 | 2012-10-03 | 三菱重工业株式会社 | 风力发电装置及风车用塔架施工方法 |
FI125153B (fi) * | 2010-09-16 | 2015-06-15 | Peikko Group Oy | Menetelmä ja sovitelma tornimaisen rakenteen kiinnittämiseksi perustukseen |
CN102095052B (zh) * | 2010-11-25 | 2013-06-12 | 华锐风电科技(集团)股份有限公司 | 地脚螺栓锚固系统的安装方法及安装工业设备的方法 |
DE102011001250A1 (de) | 2011-03-14 | 2012-09-20 | Strabag Offshore Wind Gmbh | Vorrichtung und Verfahren für den Übergang zwischen einem Stahlturmabschnitt und einem vorgespannten Betonturmabschnitt |
ES2400902B1 (es) * | 2011-05-25 | 2014-02-18 | Esteyco Energía S.L. | Procedimiento de asentamiento de una torre. |
EP2541059A2 (en) * | 2011-06-28 | 2013-01-02 | Gamesa Innovation & Technology, S.L. | Footing for wind turbine towers |
GB2494674B (en) * | 2011-09-15 | 2018-09-05 | Ronald Chambers Peter | A connection formed under water between a wind turbine tower and a wind turbine foundation |
DE102011085947A1 (de) | 2011-11-08 | 2013-05-08 | Wobben Properties Gmbh | Turmfußsektion einer Windenergieanlage |
ES2405034B1 (es) * | 2011-11-17 | 2014-04-15 | Acciona Windpower, S.A. | Procedimiento y unidad para la fijación de una torre de un aerogenerador a una cimentación y aerogenerador que incorpora dicha unidad |
EP2821565A1 (en) | 2012-02-28 | 2015-01-07 | MS Enertech S.L. | Connection between a wind turbine tower and its foundation |
CN103114604B (zh) * | 2012-03-09 | 2015-04-22 | 中国电建集团西北勘测设计研究院有限公司 | 预应力混凝土圆筒型风力发电机组基础 |
KR101358213B1 (ko) * | 2012-07-05 | 2014-02-05 | 삼성중공업 주식회사 | 타워 지지 구조물 및 타워 지지 구조물 건조방법 |
CN102777334A (zh) * | 2012-07-21 | 2012-11-14 | 广东明阳风电产业集团有限公司 | 风力发电机组调平装置 |
US10100548B2 (en) * | 2012-10-01 | 2018-10-16 | Valmont Industries, Inc. | Base angle attachment assemblies |
CN102979109B (zh) * | 2012-12-17 | 2015-06-17 | 中国电建集团西北勘测设计研究院有限公司 | 一种装配式预应力混凝土圆筒型柱体基础的设计方法 |
EP2746578B1 (en) * | 2012-12-21 | 2016-11-30 | Siemens Aktiengesellschaft | Segmented tower bottom flange and method of assembly |
CN103046575B (zh) * | 2013-01-28 | 2015-07-29 | 中国电建集团西北勘测设计研究院有限公司 | 一种陆上四叶梅型的风机扩展基础结构 |
EP2981654B1 (en) * | 2013-03-29 | 2020-07-01 | Tindall Corporation | Tower assembly for a tower structure |
DE102013211750A1 (de) * | 2013-06-21 | 2014-12-24 | Wobben Properties Gmbh | Windenergieanlage und Windenergieanlagen-Fundament |
DE102013213976A1 (de) * | 2013-07-17 | 2015-01-22 | Wobben Properties Gmbh | Verfahren zum Herstellen eines Fertigbetonteil-Segmentes eines Windenergieanlagen-Turmes |
US9003721B1 (en) | 2013-11-08 | 2015-04-14 | Siemens Aktiengesellschaft | Leveling arrangement for a tower |
US9869300B2 (en) * | 2014-01-16 | 2018-01-16 | Pacadar S.A.U. | Foundation for wind turbine tower and pre-assembly method of wind turbine tower |
KR101687972B1 (ko) * | 2014-11-20 | 2017-01-02 | 대우조선해양 주식회사 | 풍력발전기용 기초구조물 및 그 시공방법 |
DE102015203574A1 (de) * | 2015-02-27 | 2016-09-01 | Wobben Properties Gmbh | Windenergieanlagen-Fundament und Windenergieanlage |
CN104895101B (zh) * | 2015-06-10 | 2016-08-24 | 杭州江润科技有限公司 | 筏板基础高精度整体预埋大直径螺栓群结构的施工方法 |
DE102015216444A1 (de) * | 2015-08-27 | 2017-03-02 | Wobben Properties Gmbh | Windenergieanlage |
WO2017039923A2 (en) * | 2015-08-31 | 2017-03-09 | Siemens Energy, Inc. | Equipment tower having a concrete plinth |
US9518402B1 (en) * | 2015-09-04 | 2016-12-13 | Kundel Industries, Inc. | Anchoring system |
DE102015014070A1 (de) | 2015-10-30 | 2017-05-04 | Senvion Gmbh | Windenergieanlage, Lastenverteilungssystem einer Windenergieanlage und Verfahren zum Errichten eines Turms einer Windenergieanlage |
CN105350565B (zh) * | 2015-12-07 | 2017-04-05 | 湖南皓诺工程有限公司 | 一种风电场风机塔架基础修补加固方法 |
US11236727B2 (en) | 2015-12-21 | 2022-02-01 | Vestas Wind Systems A/S | Method for forming a wind turbine foundation and related system for forming such a foundation |
KR101888231B1 (ko) * | 2015-12-21 | 2018-09-06 | 고려대학교 산학협력단 | 수직도 오차 보정이 가능한 콘크리트 기초-타워 연결구조 |
US11268648B2 (en) * | 2016-09-14 | 2022-03-08 | Mitsubishi Heavy Industries Compressor Corporation | Supporting platform, rotating machine unit, and method for manufacturing rotating machine unit |
CN106626048A (zh) * | 2016-10-08 | 2017-05-10 | 霍尔果斯新国金新能源科技有限公司 | 风力发电机的塔筒与基础的灌浆模具及灌浆方法 |
US10544559B2 (en) * | 2016-11-02 | 2020-01-28 | Inventus Holdings, Llc | Pier and mat foundation fortification and monitoring system |
CN106702907B (zh) * | 2016-12-19 | 2018-05-01 | 中交路桥建设有限公司 | 一种桥梁护栏底座可调节法兰盘施工方法 |
CN106592660A (zh) * | 2016-12-21 | 2017-04-26 | 神华集团有限责任公司 | 风机基础的修复方法 |
CN107130628A (zh) * | 2017-05-31 | 2017-09-05 | 中国二十冶集团有限公司 | 地脚螺栓预埋用法兰及地脚螺栓预埋的施工方法 |
DE102017125716A1 (de) * | 2017-11-03 | 2019-05-09 | Eno Energy Systems Gmbh | Verfahren zum Errichten eines Turms mit einer mehrteiligen Turmsektion und Teilsektion einer mehrteiligen Turmsektion eines Turms |
US20190257075A1 (en) * | 2018-02-22 | 2019-08-22 | Joseph W. Ball | Anchor bolt assembly and arrangement for concrete foundation designs |
EP3810863A4 (en) * | 2018-05-18 | 2021-06-30 | Cetres Holdings LLC. | CONCRETE BOSS ANCHOR |
DE102019109904A1 (de) | 2019-04-15 | 2020-10-15 | Wobben Properties Gmbh | Turmsegment und Verfahren zum Aufbau eines Turms |
HUE063667T2 (hu) * | 2019-06-14 | 2024-01-28 | Peikko Group Oy | Eljárás elõregyártott építõelem másik építõelemhez történõ szerelésére és kötési elrendezés |
RU197237U1 (ru) * | 2020-02-03 | 2020-04-14 | Николай Валентинович МЕДВЕДЕВ | Фундаментное анкерное крепление башенного крана |
CN113187305A (zh) * | 2021-05-26 | 2021-07-30 | 新余学院 | 一种电子信息工程通信塔连接装置 |
US11905924B2 (en) * | 2022-03-03 | 2024-02-20 | Barr Engineering Co. | Spreader box |
Family Cites Families (78)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US962699A (en) | 1909-01-09 | 1910-06-28 | Unit Construction Co | Concrete construction. |
US1506173A (en) | 1919-11-17 | 1924-08-26 | Hagen Hans Engelhart | Method of producing concrete poles |
GB606545A (en) | 1946-02-26 | 1948-08-16 | William Hubert James Miller | Improved shuttering for adjustable location of anchor bolts and anchor plates in concrete foundations, walls, floors and like supports |
US2724261A (en) † | 1951-05-24 | 1955-11-22 | Egil M Rensaa | Precast column attaching means |
DE1045735B (de) | 1957-09-27 | 1958-12-04 | Knorr Bremse Gmbh | Gleitachslager mit durch Tiefstkanten gefuehrtem OElkreislauf |
US3503165A (en) * | 1967-06-12 | 1970-03-31 | Arrowall Corp | Prefabricated light weight panels of cementitious material |
US3645057A (en) | 1970-10-13 | 1972-02-29 | Seymour M Kaplan | Base for mounting a traffic light pole in rotatable and vertically adjustable relation |
US3829540A (en) * | 1970-12-07 | 1974-08-13 | J Cox | Technique for aligning anchor bolts |
US3713262A (en) | 1970-12-10 | 1973-01-30 | J Jatcko | Taper lock break-away pole structure |
JPS5312672B2 (pt) * | 1972-11-15 | 1978-05-02 | ||
US3834094A (en) | 1973-09-12 | 1974-09-10 | B Ferguson | Track system wall assembly for houses or the like |
AT347189B (de) * | 1977-04-06 | 1978-12-11 | Voest Ag | Fundamentverankerung fuer schwermaschinen |
JPS6043925B2 (ja) | 1977-07-15 | 1985-10-01 | 日特建設株式会社 | 法面緑化のための施肥方法 |
JPS5578722A (en) | 1978-12-11 | 1980-06-13 | Mitsubishi Heavy Ind Ltd | Groundwork construction of steel smoke stuck |
US4228627A (en) * | 1979-04-16 | 1980-10-21 | Neill Joseph C O | Reinforced foundation structure |
US4327703A (en) | 1979-10-09 | 1982-05-04 | Destree Allen L | Method of preparing concrete column for attachment to beam |
US4331314A (en) * | 1980-05-22 | 1982-05-25 | Allis-Chalmers Corporation | Hydraulic pump/turbine discharge ring support anchorage |
US4365929A (en) | 1981-01-16 | 1982-12-28 | Philip Retz | Vertical wind turbine power generating tower |
US4438607A (en) * | 1982-03-29 | 1984-03-27 | A. O. Smith Harvestore Products, Inc. | Method and apparatus for leveling a storage structure |
JPS5968432A (ja) * | 1982-10-08 | 1984-04-18 | Hitoshi Mori | アンカ−ボルトの埋設方法 |
US4785593A (en) | 1986-10-27 | 1988-11-22 | Munoz Jr Jose C | Structural building system |
DE3809113A1 (de) | 1988-03-18 | 1989-09-28 | Mehne Fa Erwin | Verfahren zum aufstellen der stahl-hochbaukonstruktion eines hochregallagers und stahlkonstruktion dafuer |
US5110082A (en) * | 1988-09-21 | 1992-05-05 | Rowan Jr Robert L | Adjustable apparatus for supporting machinery or other load |
US4910930A (en) * | 1988-10-28 | 1990-03-27 | Base Isolation Consultants, Inc. | Seismic isolation structure |
US4887691A (en) | 1988-11-04 | 1989-12-19 | Rotondo/Penn-Cast | Modular wall construction using posts and panels |
US5505033A (en) * | 1988-12-06 | 1996-04-09 | 501 Hitachi Metals Ltd. | Column base structure and connection arrangement |
DE8910744U1 (pt) | 1989-09-08 | 1991-01-17 | Schmidt, Rene P., Oberweningen, Ch | |
FR2659685A1 (fr) | 1990-03-16 | 1991-09-20 | Puglia Emilio | Dispositif pour ameliorer la fixation d'un support et le reglage de sa verticalite sur un massif d'ancrage. |
GB9024500D0 (en) * | 1990-11-10 | 1991-01-02 | Peace Steven J | A vertical axis wind turbine unit capable of being mounted on or to an existing chimney,tower or similar structure |
JPH0739665B2 (ja) * | 1992-04-24 | 1995-05-01 | 茂樹 林 | 擁壁ブロックの基礎構造 |
FR2692611B1 (fr) | 1992-06-17 | 1999-03-05 | Prefatlantique | Platine de fixation pour pylone. |
US5437519A (en) * | 1992-08-26 | 1995-08-01 | Roger Bullivant Of Texas, Inc. | Piles and pile forming methods |
GB2273310A (en) | 1992-12-10 | 1994-06-15 | Thomas Steel Craik | Improvements relating to buildings |
US5308195A (en) | 1993-02-12 | 1994-05-03 | The Reinforced Earth Company | Coping construction for a retaining wall |
US5379563A (en) * | 1993-09-13 | 1995-01-10 | Eastman Chemical Company | Anchoring assembly |
JP3362809B2 (ja) * | 1994-05-13 | 2003-01-07 | 積水ハウス株式会社 | 柱脚の支持装置 |
US5586417A (en) † | 1994-11-23 | 1996-12-24 | Henderson; Allan P. | Tensionless pier foundation |
JP3002107B2 (ja) * | 1994-12-19 | 2000-01-24 | 勤伍 内藤 | 柱脚構造及び柱脚工法 |
JP3622119B2 (ja) * | 1995-01-09 | 2005-02-23 | 日本鋳造株式会社 | 基礎の配筋方法 |
JP3458179B2 (ja) | 1995-02-03 | 2003-10-20 | 日本鋳造株式会社 | 柱脚部の固定構造 |
JPH09158215A (ja) | 1995-12-07 | 1997-06-17 | Toshiba Eng & Constr Co Ltd | 大型機械の据付工法 |
US5707180A (en) | 1995-12-26 | 1998-01-13 | Vickars Developments Co. Ltd. | Method and apparatus for forming piles in-situ |
US6264402B1 (en) | 1995-12-26 | 2001-07-24 | Vickars Developments Co. Ltd. | Method and apparatus for forming piles in place |
JPH09302675A (ja) * | 1996-05-20 | 1997-11-25 | Sumitomo Forestry Co Ltd | アンカーボルトの据え付け方法及び金具 |
JP3752310B2 (ja) * | 1996-05-20 | 2006-03-08 | 住友林業株式会社 | アンカーボルトの位置決め具及び方法 |
JPH10121576A (ja) | 1996-10-16 | 1998-05-12 | Tomoe Corp | 柱脚固定構造 |
US5953864A (en) * | 1997-04-23 | 1999-09-21 | Rapid Wall Systems | Prefabricated modular concrete foundation wall systems and methods of constructing prefabricated modular concrete foundation wall systems |
US6050038A (en) * | 1998-09-11 | 2000-04-18 | Fey; James M. | Foundation system for supporting a superstructure |
WO2000043599A1 (en) | 1999-01-22 | 2000-07-27 | Neg Micon A/S | A method and an assembly for casting a tower foundation |
US6705058B1 (en) | 1999-02-12 | 2004-03-16 | Newmark International Inc. | Multiple-part pole |
JP3381031B2 (ja) * | 1999-03-31 | 2003-02-24 | 日本鋳造株式会社 | 鋼管柱用ベースプレートの設計方法及び鋼管柱用ベースプレート |
JP2000034733A (ja) * | 1999-06-25 | 2000-02-02 | Okabe Co Ltd | 基礎の構造 |
IL134724A0 (en) | 2000-02-24 | 2001-04-30 | Giltek Telecomm Ltd | Foundation for a tower and a method for its deployment on site |
DE10009072A1 (de) | 2000-02-25 | 2001-08-30 | Sms Demag Ag | Montageverfahren zum Verankern einer Arbeitsmaschine auf einem Fundament |
US6503024B2 (en) * | 2000-03-06 | 2003-01-07 | Stan Rupiper | Concrete foundation pierhead and method of lifting a foundation using a jack assembly |
US6318034B1 (en) | 2000-03-08 | 2001-11-20 | Tindall Corporation | Elevated storage tank |
DK174190B1 (da) * | 2000-04-12 | 2002-09-09 | Spaencom As | Fundament til vindmølle samt fremgangsmåde til montering heraf |
DE10045735B4 (de) * | 2000-09-15 | 2008-04-03 | Vetter Fördertechnik GmbH | Befestigung der Säule eines Säulenschwenkkranes auf einem Betonfundament |
AU2001296896A1 (en) * | 2000-09-27 | 2002-04-08 | Allan P. Henderson | Perimeter weighted foundation for wind turbines and the like |
US6470645B1 (en) | 2000-11-09 | 2002-10-29 | Beaird Industries, Inc. | Method for making and erecting a wind tower |
US6443656B1 (en) | 2001-03-30 | 2002-09-03 | Abt, Inc. | Trench forming assembly having removable pin anchoring mechanism |
DE10226996B4 (de) * | 2001-10-09 | 2014-07-03 | Aloys Wobben | Verfahren zur Erstellung eines Fundaments, insbesondere für einen Turm einer Windenergieanlage |
JP2003293938A (ja) | 2002-04-02 | 2003-10-15 | Tetra Co Ltd | 風力発電装置の施工方法 |
US20030196393A1 (en) * | 2002-04-22 | 2003-10-23 | Bowman Joseph M. | Weldless pole mounting structure and method of providing same |
DE10238033A1 (de) | 2002-08-20 | 2004-03-04 | Alpine Project Technology Gmbh | Betonfundament für einen Träger |
US7124547B2 (en) * | 2002-08-26 | 2006-10-24 | Bravinski Leonid G | 3-D construction modules |
US7222464B2 (en) * | 2002-12-18 | 2007-05-29 | Suehiro-System Co., Ltd. | Anchor bolt and installing method thereof |
FI20022235A (fi) | 2002-12-19 | 2002-12-19 | Rautaruukki Oyj | Poikittaiskuormitetun tornin perustus |
US7533505B2 (en) * | 2003-01-06 | 2009-05-19 | Henderson Allan P | Pile anchor foundation |
US6808350B1 (en) * | 2003-01-27 | 2004-10-26 | Norman L. Tooman | Anchor bolt cap and method of use |
US7025176B1 (en) * | 2003-06-09 | 2006-04-11 | Tooman Norman L | Bolt greaser unit |
DE502004009257D1 (de) * | 2003-06-27 | 2009-05-14 | Alstom Technology Ltd | Befestigungsvorrichtung eines Maschinenfusses einer Maschine und Verfahren zur Befestigung desselben |
DK1654460T3 (da) | 2003-08-09 | 2007-05-21 | Gen Electric | Tårnfundament, især til en vindmölle |
NL1024581C2 (nl) * | 2003-10-21 | 2005-04-22 | Gmb Beton En Ind Noord West B | Windmolenfundatie. |
DE102004017006B4 (de) | 2004-04-02 | 2012-03-29 | Aloys Wobben | Verfahren zum Errichten eines Turmes |
DE102004017008B4 (de) | 2004-04-02 | 2009-10-22 | Aloys Wobben | Verfahren zum Errichten eines Turmes |
US8801370B2 (en) | 2006-10-12 | 2014-08-12 | General Electric Company | Turbine case impingement cooling for heavy duty gas turbines |
DE102007060379C5 (de) | 2007-12-12 | 2018-11-15 | Senvion Gmbh | Verankerung eines Turms einer Windenergieanlage |
-
2004
- 2004-04-02 DE DE102004017006A patent/DE102004017006B4/de not_active Revoked
-
2005
- 2005-04-01 AR ARP050101291A patent/AR048458A1/es not_active Application Discontinuation
- 2005-04-04 JP JP2007503310A patent/JP4726891B2/ja not_active Expired - Fee Related
- 2005-04-04 US US11/547,387 patent/US9206617B2/en active Active
- 2005-04-04 WO PCT/EP2005/003499 patent/WO2005095792A1/de active Application Filing
- 2005-04-04 PL PL05716518T patent/PL1735533T3/pl unknown
- 2005-04-04 CN CN2005800106378A patent/CN1965165B/zh active Active
- 2005-04-04 NZ NZ550073A patent/NZ550073A/en not_active IP Right Cessation
- 2005-04-04 AT AT05716518T patent/ATE521804T1/de active
- 2005-04-04 DK DK05716518.5T patent/DK1735533T4/da active
- 2005-04-04 PT PT05716518T patent/PT1735533E/pt unknown
- 2005-04-04 CA CA2561431A patent/CA2561431C/en not_active Expired - Fee Related
- 2005-04-04 EP EP05716518.5A patent/EP1735533B2/de active Active
- 2005-04-04 BR BRPI0509286-8A patent/BRPI0509286B1/pt active IP Right Grant
- 2005-04-04 KR KR1020067021572A patent/KR20060130755A/ko active Search and Examination
- 2005-04-04 AU AU2005229135A patent/AU2005229135B2/en not_active Ceased
- 2005-04-04 SI SI200531359T patent/SI1735533T1/sl unknown
- 2005-04-04 ES ES05716518T patent/ES2369669T5/es active Active
-
2010
- 2010-02-09 JP JP2010026377A patent/JP2010159625A/ja active Pending
-
2011
- 2011-10-11 CY CY20111100971T patent/CY1111928T1/el unknown
-
2014
- 2014-12-10 US US14/566,433 patent/US20150089898A1/en not_active Abandoned
Also Published As
Publication number | Publication date |
---|---|
US20150089898A1 (en) | 2015-04-02 |
JP4726891B2 (ja) | 2011-07-20 |
CA2561431C (en) | 2010-11-30 |
DE102004017006A1 (de) | 2005-10-27 |
EP1735533A1 (de) | 2006-12-27 |
PL1735533T3 (pl) | 2012-04-30 |
WO2005095792A1 (de) | 2005-10-13 |
AR048458A1 (es) | 2006-04-26 |
AU2005229135B2 (en) | 2010-12-16 |
NZ550073A (en) | 2011-07-29 |
JP2010159625A (ja) | 2010-07-22 |
KR20060130755A (ko) | 2006-12-19 |
PT1735533E (pt) | 2011-10-18 |
US20080302038A1 (en) | 2008-12-11 |
ES2369669T5 (es) | 2020-11-16 |
BRPI0509286A (pt) | 2007-09-18 |
CN1965165A (zh) | 2007-05-16 |
JP2007535634A (ja) | 2007-12-06 |
CN1965165B (zh) | 2011-08-10 |
ATE521804T1 (de) | 2011-09-15 |
DK1735533T4 (da) | 2020-06-02 |
SI1735533T1 (sl) | 2011-10-28 |
ES2369669T3 (es) | 2011-12-02 |
DE102004017006B4 (de) | 2012-03-29 |
EP1735533B1 (de) | 2011-08-24 |
DK1735533T3 (da) | 2011-11-21 |
EP1735533B2 (de) | 2020-03-25 |
CA2561431A1 (en) | 2005-10-13 |
CY1111928T1 (el) | 2015-11-04 |
AU2005229135A1 (en) | 2005-10-13 |
US9206617B2 (en) | 2015-12-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
BRPI0509286B1 (pt) | Processo para erguer uma torre, instalação de energia eólica, e, uso de um anel de nivelamento | |
BRPI0509291B1 (pt) | instalação de energia eólica | |
AU2006224942B2 (en) | Tower foundation system and method for providing such system | |
US20070181767A1 (en) | Foundation for a wind energy plant | |
US10138648B2 (en) | Tower and method for assembling tower | |
US8555518B2 (en) | Grout template for wind turbine foundations | |
CN101813069A (zh) | 用于能够通过可替换的贯穿螺栓将风轮机塔锚固到其处的基座 | |
KR20130143096A (ko) | 설치 기초 | |
US10060087B2 (en) | Fully adjustable suspended post and panel modules and installation methods | |
US9238921B2 (en) | Method and arrangements relating to foundation for antenna mast of wireless communication system | |
JP2006188862A (ja) | 構造物の施工方法とこれに使用される基礎構造 | |
JPH0967823A (ja) | 斜面安定化工法およびこれに用いるアンカー定着用台座 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
B15K | Others concerning applications: alteration of classification |
Ipc: F03D 13/10 (2016.01) |
|
B09A | Decision: intention to grant [chapter 9.1 patent gazette] | ||
B16A | Patent or certificate of addition of invention granted [chapter 16.1 patent gazette] |