US20150089898A1 - Method for erecting a tower - Google Patents
Method for erecting a tower Download PDFInfo
- Publication number
- US20150089898A1 US20150089898A1 US14/566,433 US201414566433A US2015089898A1 US 20150089898 A1 US20150089898 A1 US 20150089898A1 US 201414566433 A US201414566433 A US 201414566433A US 2015089898 A1 US2015089898 A1 US 2015089898A1
- Authority
- US
- United States
- Prior art keywords
- foundation
- ring
- pylon
- pairs
- segment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 238000000034 method Methods 0.000 title claims abstract description 25
- 239000000463 material Substances 0.000 claims abstract description 23
- 238000009434 installation Methods 0.000 claims abstract description 17
- 239000004567 concrete Substances 0.000 claims description 11
- 230000008878 coupling Effects 0.000 claims 5
- 238000010168 coupling process Methods 0.000 claims 5
- 238000005859 coupling reaction Methods 0.000 claims 5
- 229910000831 Steel Inorganic materials 0.000 description 4
- 239000010959 steel Substances 0.000 description 4
- 239000011395 ready-mix concrete Substances 0.000 description 3
- 230000001419 dependent effect Effects 0.000 description 1
- 239000011440 grout Substances 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 238000012432 intermediate storage Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/22—Sockets or holders for poles or posts
- E04H12/2253—Mounting poles or posts to the holder
- E04H12/2269—Mounting poles or posts to the holder in a socket
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/42—Foundations for poles, masts or chimneys
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/388—Separate connecting elements
-
- E04B1/40—
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/02—Structures made of specified materials
- E04H12/08—Structures made of specified materials of metal
- E04H12/085—Details of flanges for tubular masts
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/22—Sockets or holders for poles or posts
- E04H12/2284—Means for adjusting the orientation of the post or pole
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D13/00—Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
- F03D13/20—Arrangements for mounting or supporting wind motors; Masts or towers for wind motors
- F03D13/22—Foundations specially adapted for wind motors
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F05—INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
- F05B—INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
- F05B2240/00—Components
- F05B2240/90—Mounting on supporting structures or systems
- F05B2240/91—Mounting on supporting structures or systems on a stationary structure
- F05B2240/912—Mounting on supporting structures or systems on a stationary structure on a tower
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/728—Onshore wind turbines
Definitions
- the present invention concerns a method of erecting a tower or pylon and a wind power installation with such a pylon.
- U.S. Pat. No. 5,826,387 discloses a foundation and a method of producing a foundation which can be used for example for wind power installations.
- U.S. Pat. No. 6,050,038 discloses a foundation system.
- DE 100 45 735 A1 discloses a means of fixing a column on a concrete foundation.
- DE 102 26 996 A1 discloses a method of producing a foundation, in particular for a pylon of a wind power installation.
- a large crane is required for handling the lower pylon segment. That crane however is only further used for constructing the pylon after the grouting material has set. Shifting the crane for the period during which the gap grouting is setting is however too complicated and expensive and therefore does not happen. Accordingly the costly crane is stopped and inactive for 24 hours.
- the object of the invention is to efficiently carry out the structure of a pylon, in particular a pylon of a wind power installation.
- That object is attained by a method of erecting a pylon as set forth in claim 1 , a wind power installation with a pylon as set forth in claim 3 , and a method of using a leveling ring for erecting a pylon as set forth in claim 4 .
- a method of erecting a pylon, in particular a pylon of a wind power installation which has a foundation with segment anchors, wherein the connecting elements project beyond the top side of the foundation by a predetermined amount.
- a ring is leveled, aligned and fixed at the top side of the foundation.
- a gap which has been formed by leveling, aligning and fixing of the ring is underlaid with a grouting material. After the grouting material has set a lower pylon segment is placed on the leveled, aligned and fixed ring and connected thereto.
- the ring may also be formed from a plurality of segments.
- the invention is based on the realization that it is not leveling of the lower pylon section that is important, but the fact that it is exactly aligned in situ. That however can also be achieved using a leveling ring.
- a leveling ring is comparable to a flange ring which can be handled with a markedly lower level of effort and expenditure than the lower pylon section, for example with a vehicle-mounted crane.
- precise alignment (leveling) of the leveling ring is simpler than the corresponding procedure in relation to a pylon section.
- the leveling ring when of greater width and/or thickness, can be made from a less high-grade material than the pylon flange.
- the pylon flange can also be reduced in its width. In that way it is possible to make better use of the transport width.
- the leveling ring After alignment and fixing the leveling ring can be underlaid with grouting material in known manner and the material can set. During that time however the (vehicle-mounted) crane can already be used for other tasks while the crane required for handling the pylon sections is not yet needed.
- a particularly rational structure for the pylon can be implemented if prefabricated finished parts, in particular concrete finished parts, are used for the foundation. They are delivered ready for installation on the building site and connected to produce a foundation which can then be further used immediately and thus in such a way as to save time.
- FIG. 1 is a diagrammatic view in section of a portion of a pylon base
- FIG. 2A shows a plan view of a pylon base
- FIG. 2B shows a view in section taken along line A-A of the pylon base of FIG. 2A ,
- FIG. 2C shows a view on an enlarged scale of the portion X in FIG. 2B .
- FIG. 3 shows a perspective view of a pylon base.
- a foundation 10 can be in the form of a prefabricated finished part foundation but also in the form of an on-site mixed concrete foundation or a foundation made from supplied ready-mix concrete.
- One or more segment anchors 12 are provided in the foundation 10 .
- Those segment anchors 12 can be adapted in shape and number to the particular demands of the foundation.
- a segment anchor which for example is in one piece in relation to on-site mixed concrete foundations or foundations produced from ready-mix concrete, that segment anchor being woven into the reinforcement.
- prefabricated finished part foundations in contrast a plurality of segment anchors are used, which are adapted in respect of their shape to the finished part. It will be appreciated that a plurality of segment anchors can also be used in relation to an on-site mixed concrete structure or a structure produced from supplied ready-mix concrete.
- Connecting elements 14 are connected to the segment anchor 12 .
- the connecting elements 14 can be in the form of screwthreaded rods which are fixed with nuts 15 in a predetermined position to the segment anchor 12 .
- the fixing elements 14 extend a predetermined distance outside the foundation 10 above the top side 11 of the foundation. Instead of a screw connection it is also possible to use a welded connection.
- a leveling ring 18 which is formed in one piece or a plurality of pieces is then arranged on the top side 11 of the foundation.
- the leveling ring 18 is exactly leveled so that it forms a perfectly aligned base for the pylon.
- a gap 16 inevitably occurs between the top side 11 of the foundation and the leveling ring 18 .
- the leveling ring 18 is fixed in its predetermined position the gap 16 is filled with a grouting material 17 .
- the leveling ring 18 can be loaded in its desired position and a lower pylon segment with a lower flange ring 20 and an illustrated pylon wall plate 22 can be placed on the leveling ring 18 .
- the screwthreaded rods 14 engage through suitably positioned holes in the leveling ring 18 and in the lower flange ring 20 of the lower pylon section and nuts 15 are fitted thereon in order to connect the lower pylon section fixedly to the foundation 10 by way of the leveling ring 18 .
- FIG. 2A shows a plan view of a pylon base.
- FIG. 2B shows a cross-section taken along line A-A in FIG. 2A .
- a foundation 10 with a foundation surface 11 .
- two segment anchors 12 and four screwthreaded rods 14 are shown.
- the portion X is shown on an enlarged scale in FIG. 2C . That view substantially corresponds to the view in FIG. 1 .
- FIG. 3 shows a perspective view of the pylon base with a portion thereof cut open. Leveling of the pylon base is effected as described with reference to FIG. 1 .
- the method according to the invention means that the pylon segments can be delivered in a transport process to the erection point just in time. That also eliminates additional transloading procedures, more specifically firstly from the transport vehicle to intermediate storage on the ground and then later from there to the location of installation. Rather pylon segments which are delivered just in time can be unloaded from the transport vehicle and fitted in place immediately.
- the above-described solution has been found to be advantageous in terms of efficiently carrying out rationalizing the erection of a pylon, in particular a pylon of a wind power installation.
- the costs and material properties also play a not insignificant part.
- the lowermost flange of a pylon segment must be made from a very high-grade material in order to be able to carry the loads originating from the pylon. If a pylon of that kind is set up on a concrete foundation then the concrete is the weaker one of the two aspects of the connection. Accordingly the pylon flange must be broader in width so that the concrete of the foundation is not overloaded. Consequently the flange in the lower pylon segment must be of a width which is oversized in relation to the steel which is used in that respect. That is to be considered as a disadvantage in particular in terms of the costs of the steel used in that respect.
- the leveling ring can be of a sufficient width to transmit the loads of the wind power installation to the foundation without risk.
- the flange on the lower pylon segment can be made correspondingly narrower and thus less expensively in terms of material and cost.
- a further advantage is enjoyed when the leveling ring is made in the form of segments and can thus be stacked and transported in segment-wise manner.
- the leveling ring is of a large diameter, that is not a problem in accordance with the invention from the point of view of transportation because it can be stacked in segment-wise manner.
- the lower pylon segment has a narrower base flange of a smaller width as now the base flange can be material-specifically sized. The transport width can thus also be correspondingly reduced.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Engineering & Computer Science (AREA)
- Paleontology (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Chemical & Material Sciences (AREA)
- Wood Science & Technology (AREA)
- Materials Engineering (AREA)
- Sustainable Energy (AREA)
- Sustainable Development (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Wind Motors (AREA)
- Foundations (AREA)
Abstract
A method of erecting a pylon, in particular a pylon of a wind power installation, which has a foundation with segment anchors, wherein connecting elements project beyond the top side of the foundation by a predetermined amount. A ring is leveled, aligned and fixed at the top side of the foundation. A gap produced by leveling, aligning and fixing of the ring is underlaid with a grouting material. The grouting material is set and a lower pylon segment is placed on the leveled, aligned and fixed ring and connected thereto.
Description
- 1. Technical Field
- The present invention concerns a method of erecting a tower or pylon and a wind power installation with such a pylon.
- 2. Description of the Related Art
- U.S. Pat. No. 5,826,387 discloses a foundation and a method of producing a foundation which can be used for example for wind power installations. U.S. Pat. No. 6,050,038 discloses a foundation system. DE 100 45 735 A1 discloses a means of fixing a column on a concrete foundation. DE 102 26 996 A1 discloses a method of producing a foundation, in particular for a pylon of a wind power installation.
- It is known in the state of the art, when erecting a pylon in particular for a wind power installation, for a lower pylon segment to be placed on the connecting elements which project out of a foundation, with a base flange. That lower pylon segment is properly aligned (leveled) and fixed in the aligned position. In that case there is a gap between the base flange of the lower pylon segment and the top side of the foundation. That gap is filled with a grouting material which then has to set before it can be loaded and the pylon further constructed thereon. Setting can certainly take up to 24 hours.
- A large crane is required for handling the lower pylon segment. That crane however is only further used for constructing the pylon after the grouting material has set. Shifting the crane for the period during which the gap grouting is setting is however too complicated and expensive and therefore does not happen. Accordingly the costly crane is stopped and inactive for 24 hours.
- Therefore the object of the invention is to efficiently carry out the structure of a pylon, in particular a pylon of a wind power installation.
- That object is attained by a method of erecting a pylon as set forth in claim 1, a wind power installation with a pylon as set forth in claim 3, and a method of using a leveling ring for erecting a pylon as set forth in claim 4.
- Therefore there is provided a method of erecting a pylon, in particular a pylon of a wind power installation, which has a foundation with segment anchors, wherein the connecting elements project beyond the top side of the foundation by a predetermined amount. A ring is leveled, aligned and fixed at the top side of the foundation. A gap which has been formed by leveling, aligning and fixing of the ring is underlaid with a grouting material. After the grouting material has set a lower pylon segment is placed on the leveled, aligned and fixed ring and connected thereto. In that case the ring may also be formed from a plurality of segments.
- In that respect the invention is based on the realization that it is not leveling of the lower pylon section that is important, but the fact that it is exactly aligned in situ. That however can also be achieved using a leveling ring. Such a leveling ring is comparable to a flange ring which can be handled with a markedly lower level of effort and expenditure than the lower pylon section, for example with a vehicle-mounted crane. Also precise alignment (leveling) of the leveling ring is simpler than the corresponding procedure in relation to a pylon section. In addition the leveling ring, when of greater width and/or thickness, can be made from a less high-grade material than the pylon flange. The pylon flange can also be reduced in its width. In that way it is possible to make better use of the transport width.
- After alignment and fixing the leveling ring can be underlaid with grouting material in known manner and the material can set. During that time however the (vehicle-mounted) crane can already be used for other tasks while the crane required for handling the pylon sections is not yet needed.
- It is only when the material in the gap has hardened that the large crane must be ready to erect the pylon, for example of a wind power installation, and can then relatively quickly erect the pylon segment by segment.
- A particularly rational structure for the pylon can be implemented if prefabricated finished parts, in particular concrete finished parts, are used for the foundation. They are delivered ready for installation on the building site and connected to produce a foundation which can then be further used immediately and thus in such a way as to save time.
- The invention is described hereinafter with reference to the Figures.
-
FIG. 1 is a diagrammatic view in section of a portion of a pylon base, -
FIG. 2A shows a plan view of a pylon base, -
FIG. 2B shows a view in section taken along line A-A of the pylon base ofFIG. 2A , -
FIG. 2C shows a view on an enlarged scale of the portion X inFIG. 2B , and -
FIG. 3 shows a perspective view of a pylon base. - A
foundation 10 can be in the form of a prefabricated finished part foundation but also in the form of an on-site mixed concrete foundation or a foundation made from supplied ready-mix concrete. One ormore segment anchors 12 are provided in thefoundation 10. Thosesegment anchors 12 can be adapted in shape and number to the particular demands of the foundation. Thus it is possible to use a segment anchor which for example is in one piece in relation to on-site mixed concrete foundations or foundations produced from ready-mix concrete, that segment anchor being woven into the reinforcement. In the case of prefabricated finished part foundations in contrast a plurality of segment anchors are used, which are adapted in respect of their shape to the finished part. It will be appreciated that a plurality of segment anchors can also be used in relation to an on-site mixed concrete structure or a structure produced from supplied ready-mix concrete. - Connecting
elements 14 are connected to thesegment anchor 12. The connectingelements 14 can be in the form of screwthreaded rods which are fixed withnuts 15 in a predetermined position to thesegment anchor 12. Thefixing elements 14 extend a predetermined distance outside thefoundation 10 above thetop side 11 of the foundation. Instead of a screw connection it is also possible to use a welded connection. - A
leveling ring 18 which is formed in one piece or a plurality of pieces is then arranged on thetop side 11 of the foundation. The levelingring 18 is exactly leveled so that it forms a perfectly aligned base for the pylon. When the levelingring 18 is aligned agap 16 inevitably occurs between thetop side 11 of the foundation and the levelingring 18. As soon as the levelingring 18 is fixed in its predetermined position thegap 16 is filled with agrouting material 17. After setting or hardening of thatgrouting material 17 the levelingring 18 can be loaded in its desired position and a lower pylon segment with alower flange ring 20 and an illustratedpylon wall plate 22 can be placed on the levelingring 18. Thescrewthreaded rods 14 engage through suitably positioned holes in the levelingring 18 and in thelower flange ring 20 of the lower pylon section andnuts 15 are fitted thereon in order to connect the lower pylon section fixedly to thefoundation 10 by way of the levelingring 18. -
FIG. 2A shows a plan view of a pylon base.FIG. 2B shows a cross-section taken along line A-A inFIG. 2A . As inFIG. 1 , shown here is afoundation 10 with afoundation surface 11. In particular two segment anchors 12 and fourscrewthreaded rods 14 are shown. The portion X is shown on an enlarged scale inFIG. 2C . That view substantially corresponds to the view inFIG. 1 . -
FIG. 3 shows a perspective view of the pylon base with a portion thereof cut open. Leveling of the pylon base is effected as described with reference toFIG. 1 . - As the pylon for example of a wind power installation can now be constructed in one go a crane only has to be provided once for speedy pylon erection, but until then the crane can perform other tasks.
- Logistical tasks are also simplified. Hitherto the lower pylon section had to be on site at least 24 hours before the other parts of the pylon in order to be able to satisfactorily install it. It will be appreciated that the other parts of the pylon could also be supplied at the same time. They however could not be constructed at the same time and therefore took up additional space on the building site, for the waiting time.
- The method according to the invention means that the pylon segments can be delivered in a transport process to the erection point just in time. That also eliminates additional transloading procedures, more specifically firstly from the transport vehicle to intermediate storage on the ground and then later from there to the location of installation. Rather pylon segments which are delivered just in time can be unloaded from the transport vehicle and fitted in place immediately.
- With the above-described solution care is to be taken to ensure that the grouting material must always be applied with at least a minimum thickness, which is dependent on the material used for the grout, because that grouting material is required to transmit the forces from the pylon to the foundation. If the grouting material is applied too thinly, that layer can fracture and give rise to considerable damage.
- The above-described solution has been found to be advantageous in terms of efficiently carrying out rationalizing the erection of a pylon, in particular a pylon of a wind power installation. On the other hand the costs and material properties also play a not insignificant part. It should be pointed out that the lowermost flange of a pylon segment must be made from a very high-grade material in order to be able to carry the loads originating from the pylon. If a pylon of that kind is set up on a concrete foundation then the concrete is the weaker one of the two aspects of the connection. Accordingly the pylon flange must be broader in width so that the concrete of the foundation is not overloaded. Consequently the flange in the lower pylon segment must be of a width which is oversized in relation to the steel which is used in that respect. That is to be considered as a disadvantage in particular in terms of the costs of the steel used in that respect.
- By virtue of the insertion of the leveling ring it is now possible in accordance with the invention to insert a kind of transitional step between the highly loadable but cost-intensive steel of the lower pylon segment and the lower-loadable concrete of the foundation. Thus the leveling ring can be of a sufficient width to transmit the loads of the wind power installation to the foundation without risk. On the other hand it is possible to use better or cheaper steel at that location and thus the flange on the lower pylon segment can be made correspondingly narrower and thus less expensively in terms of material and cost. A further advantage is enjoyed when the leveling ring is made in the form of segments and can thus be stacked and transported in segment-wise manner. If the leveling ring is of a large diameter, that is not a problem in accordance with the invention from the point of view of transportation because it can be stacked in segment-wise manner. The lower pylon segment has a narrower base flange of a smaller width as now the base flange can be material-specifically sized. The transport width can thus also be correspondingly reduced.
- Erection for example of a pylon of a wind power installation on land was described in the example set forth hereinbefore. Erecting a pylon of a wind power installation off-shore, that is to say in the water or in the sea, can also be effected by means of the above-described leveling ring and a corresponding leveling procedure before a lower pylon segment is mounted in place.
- All of the above U.S. patents, U.S. patent application publications, U.S. patent applications, foreign patents, foreign patent applications and non-patent publications referred to in this specification and/or listed in the Application Data Sheet, are incorporated herein by reference, in their entirety.
- From the foregoing it will be appreciated that, although specific embodiments of the invention have been described herein for purposes of illustration, various modifications may be made without deviating from the spirit and scope of the invention. Accordingly, the invention is not limited except as by the appended claims.
Claims (10)
1. A method of erecting a pylon of a wind power installation, the method comprising:
forming a foundation that includes a plurality of segment anchors, the plurality of segment anchors including pairs of connecting elements having first and second ends, the first ends of the pairs of connecting elements coupled to the segment anchors, respectively, the second ends of the pairs of connecting elements extending from the foundation;
leveling, aligning, and fixing a ring structure relative to an upper surface of the foundation, wherein leveling, aligning, and fixing includes producing a gap between a surface of the ring structure and an upper surface of the foundation, the ring structure having openings, the second ends of the pairs of connecting elements extending through the openings of the ring structure;
placing a grouting material in the gap;
setting of the grouting material;
placing a lower flange ring of a pylon segment on an upper surface of the ring, the lower flange ring having openings, the second ends of the pairs of connecting elements extending through the openings of the lower flange ring; and
coupling the lower flange ring to the ring structure.
2. The method according to claim 1 , wherein coupling the lower flange ring to the ring structure comprises fixing nuts to the second ends of the pairs of connecting elements above the lower flange ring of the pylon segment.
3. The method according to claim 1 , wherein forming the foundation comprises using concrete finished parts for at least part of the foundation.
4. The method according to claim 1 , wherein the openings of the lower flange ring are pairs of openings, the lower flange ring include a wall plate that extends between each opening in each pair of openings.
5. The method according to claim 1 , wherein the pairs of segment anchors are spaced apart from each other in the foundation.
6. The method according to claim 1 , wherein forming the foundation comprises placing the pairs of segment anchors radially about a central axis of the foundation.
7. A method of erecting a pylon, the method comprising:
forming a foundation that includes a plurality of segment anchors that are spaced apart from each other and radially arranged about a central axis of the foundation, wherein forming the foundation includes coupling first ends of pairs of connecting elements to the plurality of segment anchors, respectively, so that second ends of the pairs of connecting elements extend from the foundation;
leveling, aligning, and fixing a leveling ring over an upper surface of the foundation and thereby forming one or more gaps between a surface of the leveling ring and an upper surface of the foundation;
filling the one or more gaps with a grouting material;
setting the grouting material;
placing a lower pylon segment with a lower flange ring on the leveling ring; and
coupling the lower flange ring to the leveling ring.
8. The method according to claim 7 , wherein coupling the lower flange ring to the leveling ring comprises placing the second ends of the pairs of the connecting elements through first openings in the leveling ring and through second openings of the lower pylon segment and securing connection devices to the second ends of the pairs of the connecting elements above the lower pylon segment.
9. The method according to claim 7 , wherein the connection devices are nuts.
10. The method according to claim 7 , wherein forming the foundation comprises using concrete finished parts for at least part of the foundation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US14/566,433 US20150089898A1 (en) | 2004-04-02 | 2014-12-10 | Method for erecting a tower |
Applications Claiming Priority (5)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102004017006A DE102004017006B4 (en) | 2004-04-02 | 2004-04-02 | Method of erecting a tower |
DE102004017006.1 | 2004-04-02 | ||
PCT/EP2005/003499 WO2005095792A1 (en) | 2004-04-02 | 2005-04-04 | Method for erecting a tower |
US54738708A | 2008-08-19 | 2008-08-19 | |
US14/566,433 US20150089898A1 (en) | 2004-04-02 | 2014-12-10 | Method for erecting a tower |
Related Parent Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/EP2005/003499 Division WO2005095792A1 (en) | 2004-04-02 | 2005-04-04 | Method for erecting a tower |
US11/547,387 Division US9206617B2 (en) | 2004-04-02 | 2005-04-04 | Tower and foundation |
Publications (1)
Publication Number | Publication Date |
---|---|
US20150089898A1 true US20150089898A1 (en) | 2015-04-02 |
Family
ID=34962709
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US11/547,387 Active 2028-08-20 US9206617B2 (en) | 2004-04-02 | 2005-04-04 | Tower and foundation |
US14/566,433 Abandoned US20150089898A1 (en) | 2004-04-02 | 2014-12-10 | Method for erecting a tower |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US11/547,387 Active 2028-08-20 US9206617B2 (en) | 2004-04-02 | 2005-04-04 | Tower and foundation |
Country Status (19)
Country | Link |
---|---|
US (2) | US9206617B2 (en) |
EP (1) | EP1735533B2 (en) |
JP (2) | JP4726891B2 (en) |
KR (1) | KR20060130755A (en) |
CN (1) | CN1965165B (en) |
AR (1) | AR048458A1 (en) |
AT (1) | ATE521804T1 (en) |
AU (1) | AU2005229135B2 (en) |
BR (1) | BRPI0509286B1 (en) |
CA (1) | CA2561431C (en) |
CY (1) | CY1111928T1 (en) |
DE (1) | DE102004017006B4 (en) |
DK (1) | DK1735533T4 (en) |
ES (1) | ES2369669T5 (en) |
NZ (1) | NZ550073A (en) |
PL (1) | PL1735533T3 (en) |
PT (1) | PT1735533E (en) |
SI (1) | SI1735533T1 (en) |
WO (1) | WO2005095792A1 (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20150143765A1 (en) * | 2012-02-28 | 2015-05-28 | Ms Enertech, S.L. | Connection between a wind turbine tower and its foundation |
CN105350565A (en) * | 2015-12-07 | 2016-02-24 | 湖南皓诺工程有限公司 | Wind power plant fan tower foundation repairing and reinforcing method |
CN106592660A (en) * | 2016-12-21 | 2017-04-26 | 神华集团有限责任公司 | Draught fan foundation restoration method |
US11236727B2 (en) | 2015-12-21 | 2022-02-01 | Vestas Wind Systems A/S | Method for forming a wind turbine foundation and related system for forming such a foundation |
US20230279841A1 (en) * | 2022-03-03 | 2023-09-07 | Barr Engineering Co. | Spreader box |
Families Citing this family (59)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102004017006B4 (en) | 2004-04-02 | 2012-03-29 | Aloys Wobben | Method of erecting a tower |
DE102004017008B4 (en) | 2004-04-02 | 2009-10-22 | Aloys Wobben | Method for erecting a tower |
EP1866484A1 (en) * | 2005-03-16 | 2007-12-19 | Densit A/S | Tower foundation system and method for providing such system |
US8051627B2 (en) * | 2006-04-30 | 2011-11-08 | General Electric Company | Tower adapter, method of producing a tower foundation and tower foundation |
ES2326010B2 (en) * | 2006-08-16 | 2011-02-18 | Inneo21, S.L. | STRUCTURE AND PROCEDURE FOR ASSEMBLING CONCRETE TOWERS FOR WIND TURBINES. |
WO2010138978A2 (en) | 2009-05-05 | 2010-12-02 | Ahmed Phuly Engineering & Consulting, Inc. | Fatigue resistant foundation |
DE102006058668A1 (en) * | 2006-12-13 | 2008-06-19 | Kleinsorge Verbindungstechnik Gmbh | Anchoring rod for a wind power installation comprises a shaft with threads provided with a cathodic corrosion protection in sections |
WO2009056898A1 (en) | 2007-11-02 | 2009-05-07 | Alejandro Cortina-Cordero | Post-tensioned concrete tower for wind turbines |
JP5198011B2 (en) * | 2007-08-10 | 2013-05-15 | 前田建設工業株式会社 | Tower foundation |
DE102007060379C5 (en) * | 2007-12-12 | 2018-11-15 | Senvion Gmbh | Anchoring a tower of a wind turbine |
US8555600B2 (en) | 2008-12-10 | 2013-10-15 | Cortina Innovations, S.A. De C.V. | Method for mounting in sections an annular tower for wind power generator, heliostatic power generator or chimney composed from three concrete segments or more |
EP2199469B1 (en) * | 2008-12-16 | 2012-06-06 | Vestas Wind Systems A/S | Foundation for enabling anchoring of a wind turbine tower thereto by means of replaceable through-bolts |
US8220214B1 (en) * | 2009-05-02 | 2012-07-17 | Purdy Charles L | Prefabricated weight distribution element |
DE102009019709A1 (en) | 2009-05-05 | 2010-11-11 | Wobben, Aloys | Process for building a tower and tower |
US20110027100A1 (en) * | 2009-07-30 | 2011-02-03 | Daniel Francis Cummane | Mobile wind power station |
DE102009049435A1 (en) * | 2009-10-14 | 2011-04-28 | Wobben, Aloys | Process for the manufacture of precast concrete elements and formwork unit for the production of precast concrete parts |
DK2375057T3 (en) * | 2010-03-31 | 2016-08-15 | Siemens Ag | wind farms |
US20110131899A1 (en) * | 2010-04-30 | 2011-06-09 | Stefan Voss | Apparatus and method for producing a concrete foundation |
CA2722226A1 (en) * | 2010-08-24 | 2012-02-24 | Mitsubishi Heavy Industries, Ltd. | Wind turbine generator and construction method for wind turbine tower |
FI125153B (en) | 2010-09-16 | 2015-06-15 | Peikko Group Oy | Method and apparatus for attaching a tower structure to a foundation |
CN102095052B (en) * | 2010-11-25 | 2013-06-12 | 华锐风电科技(集团)股份有限公司 | Installing method of foundation bolt anchoring system and method for installing industrial equipment |
DE102011001250A1 (en) | 2011-03-14 | 2012-09-20 | Strabag Offshore Wind Gmbh | Apparatus and method for the transition between a steel tower section and a prestressed concrete tower section |
ES2400902B1 (en) * | 2011-05-25 | 2014-02-18 | Esteyco Energía S.L. | SETTLEMENT PROCEDURE OF A TOWER. |
EP2541059A2 (en) * | 2011-06-28 | 2013-01-02 | Gamesa Innovation & Technology, S.L. | Footing for wind turbine towers |
GB2494674B (en) * | 2011-09-15 | 2018-09-05 | Ronald Chambers Peter | A connection formed under water between a wind turbine tower and a wind turbine foundation |
DE102011085947A1 (en) | 2011-11-08 | 2013-05-08 | Wobben Properties Gmbh | Tower foot section of a wind turbine |
ES2405034B1 (en) | 2011-11-17 | 2014-04-15 | Acciona Windpower, S.A. | PROCEDURE AND UNIT FOR THE SETTING OF A TOWER FROM AN AIRCRAFT TO A FOUNDATION AND AEROGENERATOR THAT INCLUDES SUCH UNIT |
CN103114604B (en) * | 2012-03-09 | 2015-04-22 | 中国电建集团西北勘测设计研究院有限公司 | Prestressed concrete tubular type wind generating set foundation |
KR101358213B1 (en) * | 2012-07-05 | 2014-02-05 | 삼성중공업 주식회사 | Tower support structure and method for constructing the structure |
CN102777334A (en) * | 2012-07-21 | 2012-11-14 | 广东明阳风电产业集团有限公司 | Wind generating set leveling device |
US10100548B2 (en) * | 2012-10-01 | 2018-10-16 | Valmont Industries, Inc. | Base angle attachment assemblies |
CN102979109B (en) * | 2012-12-17 | 2015-06-17 | 中国电建集团西北勘测设计研究院有限公司 | Design method of assembled-type prestressed concrete cylindrical column base |
EP2746578B1 (en) * | 2012-12-21 | 2016-11-30 | Siemens Aktiengesellschaft | Segmented tower bottom flange and method of assembly |
CN103046575B (en) * | 2013-01-28 | 2015-07-29 | 中国电建集团西北勘测设计研究院有限公司 | A kind of blower fan spread footing structure of land four leaf plum types |
EP2981654B1 (en) * | 2013-03-29 | 2020-07-01 | Tindall Corporation | Tower assembly for a tower structure |
DE102013211750A1 (en) | 2013-06-21 | 2014-12-24 | Wobben Properties Gmbh | Wind turbine and wind turbine foundation |
DE102013213976A1 (en) * | 2013-07-17 | 2015-01-22 | Wobben Properties Gmbh | A method of manufacturing a precast concrete segment of a wind turbine tower |
US9003721B1 (en) | 2013-11-08 | 2015-04-14 | Siemens Aktiengesellschaft | Leveling arrangement for a tower |
US9869300B2 (en) * | 2014-01-16 | 2018-01-16 | Pacadar S.A.U. | Foundation for wind turbine tower and pre-assembly method of wind turbine tower |
KR101687972B1 (en) * | 2014-11-20 | 2017-01-02 | 대우조선해양 주식회사 | Foundation for Wind Generator and Construction Method Thereof |
DE102015203574A1 (en) | 2015-02-27 | 2016-09-01 | Wobben Properties Gmbh | Wind turbine foundation and wind turbine |
CN104895101B (en) * | 2015-06-10 | 2016-08-24 | 杭州江润科技有限公司 | The construction method of raft foundation high accuracy integral built-in large diameter bolt group structure |
DE102015216444A1 (en) * | 2015-08-27 | 2017-03-02 | Wobben Properties Gmbh | Wind turbine |
EP3329119A2 (en) * | 2015-08-31 | 2018-06-06 | Siemens Gamesa Renewable Energy, Inc. | Equipment tower having a concrete plinth |
US9518402B1 (en) * | 2015-09-04 | 2016-12-13 | Kundel Industries, Inc. | Anchoring system |
DE102015014070A1 (en) | 2015-10-30 | 2017-05-04 | Senvion Gmbh | Wind energy plant, load distribution system of a wind turbine and method for erecting a tower of a wind turbine |
KR101888231B1 (en) * | 2015-12-21 | 2018-09-06 | 고려대학교 산학협력단 | A tower-substructure connecting structure for reinforced concrete substructure capable of correcting vertical misalignment |
WO2018051427A1 (en) * | 2016-09-14 | 2018-03-22 | 三菱重工コンプレッサ株式会社 | Supporting table, rotating machine unit, and method for manufacturing rotating machine unit |
CN106626048A (en) * | 2016-10-08 | 2017-05-10 | 霍尔果斯新国金新能源科技有限公司 | Grouting mold and method for wind driven generator tower drum and foundation |
US10544559B2 (en) * | 2016-11-02 | 2020-01-28 | Inventus Holdings, Llc | Pier and mat foundation fortification and monitoring system |
CN106702907B (en) * | 2016-12-19 | 2018-05-01 | 中交路桥建设有限公司 | A kind of Bridge guardrail base adjustable flange disk construction method |
CN107130628A (en) * | 2017-05-31 | 2017-09-05 | 中国二十冶集团有限公司 | The construction method of embedding anchor bolts flange and embedding anchor bolts |
DE102017125716A1 (en) * | 2017-11-03 | 2019-05-09 | Eno Energy Systems Gmbh | Method for erecting a tower with a multi-part tower section and sub-section of a multi-part tower section of a tower |
US20190257075A1 (en) * | 2018-02-22 | 2019-08-22 | Joseph W. Ball | Anchor bolt assembly and arrangement for concrete foundation designs |
EP3810863A4 (en) * | 2018-05-18 | 2021-06-30 | Cetres Holdings LLC. | Concrete boss anchor |
DE102019109904A1 (en) | 2019-04-15 | 2020-10-15 | Wobben Properties Gmbh | Tower segment and method of building a tower |
WO2020249852A1 (en) * | 2019-06-14 | 2020-12-17 | Peikko Group Oy | Method for mounting a prefabricated construction element to another construction element and connection arrangement |
RU197237U1 (en) * | 2020-02-03 | 2020-04-14 | Николай Валентинович МЕДВЕДЕВ | FOUNDATION ANCHOR FASTENING OF THE TOWER CRANE |
CN113187305A (en) * | 2021-05-26 | 2021-07-30 | 新余学院 | Electronic information engineering communication tower connecting device |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3503165A (en) * | 1967-06-12 | 1970-03-31 | Arrowall Corp | Prefabricated light weight panels of cementitious material |
US4228627A (en) * | 1979-04-16 | 1980-10-21 | Neill Joseph C O | Reinforced foundation structure |
US4910930A (en) * | 1988-10-28 | 1990-03-27 | Base Isolation Consultants, Inc. | Seismic isolation structure |
US5953864A (en) * | 1997-04-23 | 1999-09-21 | Rapid Wall Systems | Prefabricated modular concrete foundation wall systems and methods of constructing prefabricated modular concrete foundation wall systems |
US20040035073A1 (en) * | 2002-08-26 | 2004-02-26 | Bravinski Leonid G | 3-D construction modules |
Family Cites Families (73)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US962699A (en) | 1909-01-09 | 1910-06-28 | Unit Construction Co | Concrete construction. |
US1506173A (en) | 1919-11-17 | 1924-08-26 | Hagen Hans Engelhart | Method of producing concrete poles |
GB606545A (en) | 1946-02-26 | 1948-08-16 | William Hubert James Miller | Improved shuttering for adjustable location of anchor bolts and anchor plates in concrete foundations, walls, floors and like supports |
US2724261A (en) † | 1951-05-24 | 1955-11-22 | Egil M Rensaa | Precast column attaching means |
DE1045735B (en) * | 1957-09-27 | 1958-12-04 | Knorr Bremse Gmbh | Sliding axle bearing with oil circuit guided through the lowest edges |
US3645057A (en) | 1970-10-13 | 1972-02-29 | Seymour M Kaplan | Base for mounting a traffic light pole in rotatable and vertically adjustable relation |
US3829540A (en) * | 1970-12-07 | 1974-08-13 | J Cox | Technique for aligning anchor bolts |
US3713262A (en) | 1970-12-10 | 1973-01-30 | J Jatcko | Taper lock break-away pole structure |
JPS5312672B2 (en) * | 1972-11-15 | 1978-05-02 | ||
US3834094A (en) | 1973-09-12 | 1974-09-10 | B Ferguson | Track system wall assembly for houses or the like |
AT347189B (en) * | 1977-04-06 | 1978-12-11 | Voest Ag | FOUNDATION ANCHORING FOR HEAVY MACHINERY |
JPS6043925B2 (en) † | 1977-07-15 | 1985-10-01 | 日特建設株式会社 | Fertilization method for slope greening |
JPS5578722A (en) | 1978-12-11 | 1980-06-13 | Mitsubishi Heavy Ind Ltd | Groundwork construction of steel smoke stuck |
US4327703A (en) | 1979-10-09 | 1982-05-04 | Destree Allen L | Method of preparing concrete column for attachment to beam |
US4331314A (en) * | 1980-05-22 | 1982-05-25 | Allis-Chalmers Corporation | Hydraulic pump/turbine discharge ring support anchorage |
US4365929A (en) | 1981-01-16 | 1982-12-28 | Philip Retz | Vertical wind turbine power generating tower |
US4438607A (en) * | 1982-03-29 | 1984-03-27 | A. O. Smith Harvestore Products, Inc. | Method and apparatus for leveling a storage structure |
JPS5968432A (en) * | 1982-10-08 | 1984-04-18 | Hitoshi Mori | Laying of anchor bolt |
US4785593A (en) | 1986-10-27 | 1988-11-22 | Munoz Jr Jose C | Structural building system |
DE3809113A1 (en) † | 1988-03-18 | 1989-09-28 | Mehne Fa Erwin | Method of erecting the steel-framed superstructure of storage racking and steel structure for it |
US5110082A (en) * | 1988-09-21 | 1992-05-05 | Rowan Jr Robert L | Adjustable apparatus for supporting machinery or other load |
US4887691A (en) | 1988-11-04 | 1989-12-19 | Rotondo/Penn-Cast | Modular wall construction using posts and panels |
US5505033A (en) * | 1988-12-06 | 1996-04-09 | 501 Hitachi Metals Ltd. | Column base structure and connection arrangement |
DE8910744U1 (en) | 1989-09-08 | 1991-01-17 | Schmidt, René P., Oberweningen | Sealing device for concrete joints |
FR2659685A1 (en) † | 1990-03-16 | 1991-09-20 | Puglia Emilio | DEVICE FOR IMPROVING THE ATTACHMENT OF A SUPPORT AND THE ADJUSTMENT OF ITS VERTICALITY ON AN ANCHORING MASSIVE. |
GB9024500D0 (en) * | 1990-11-10 | 1991-01-02 | Peace Steven J | A vertical axis wind turbine unit capable of being mounted on or to an existing chimney,tower or similar structure |
JPH0739665B2 (en) * | 1992-04-24 | 1995-05-01 | 茂樹 林 | Basic structure of retaining wall block |
FR2692611B1 (en) | 1992-06-17 | 1999-03-05 | Prefatlantique | FIXING PLATE FOR PYLON. |
US5437519A (en) * | 1992-08-26 | 1995-08-01 | Roger Bullivant Of Texas, Inc. | Piles and pile forming methods |
GB2273310A (en) * | 1992-12-10 | 1994-06-15 | Thomas Steel Craik | Improvements relating to buildings |
US5308195A (en) | 1993-02-12 | 1994-05-03 | The Reinforced Earth Company | Coping construction for a retaining wall |
US5379563A (en) * | 1993-09-13 | 1995-01-10 | Eastman Chemical Company | Anchoring assembly |
JP3362809B2 (en) * | 1994-05-13 | 2003-01-07 | 積水ハウス株式会社 | Pillar support device |
US5586417A (en) * | 1994-11-23 | 1996-12-24 | Henderson; Allan P. | Tensionless pier foundation |
JP3002107B2 (en) * | 1994-12-19 | 2000-01-24 | 勤伍 内藤 | Column base structure and column base construction method |
JP3622119B2 (en) * | 1995-01-09 | 2005-02-23 | 日本鋳造株式会社 | Basic bar arrangement method |
JP3458179B2 (en) | 1995-02-03 | 2003-10-20 | 日本鋳造株式会社 | Column base fixing structure |
JPH09158215A (en) * | 1995-12-07 | 1997-06-17 | Toshiba Eng & Constr Co Ltd | Construction method for installing large-sized machine |
US5707180A (en) | 1995-12-26 | 1998-01-13 | Vickars Developments Co. Ltd. | Method and apparatus for forming piles in-situ |
US6264402B1 (en) | 1995-12-26 | 2001-07-24 | Vickars Developments Co. Ltd. | Method and apparatus for forming piles in place |
JPH09302675A (en) * | 1996-05-20 | 1997-11-25 | Sumitomo Forestry Co Ltd | Anchor bolt installation method and metal fitting |
JP3752310B2 (en) * | 1996-05-20 | 2006-03-08 | 住友林業株式会社 | Anchor bolt positioning tool and method |
JPH10121576A (en) | 1996-10-16 | 1998-05-12 | Tomoe Corp | Fixing structure of pedestal |
US6050038A (en) * | 1998-09-11 | 2000-04-18 | Fey; James M. | Foundation system for supporting a superstructure |
AU2093200A (en) | 1999-01-22 | 2000-08-07 | Neg Micon A/S | A method and an assembly for casting a tower foundation |
US6705058B1 (en) | 1999-02-12 | 2004-03-16 | Newmark International Inc. | Multiple-part pole |
JP3381031B2 (en) * | 1999-03-31 | 2003-02-24 | 日本鋳造株式会社 | Method of designing base plate for steel pipe column and base plate for steel pipe column |
JP2000034733A (en) * | 1999-06-25 | 2000-02-02 | Okabe Co Ltd | Footing structure |
IL134724A0 (en) | 2000-02-24 | 2001-04-30 | Giltek Telecomm Ltd | Foundation for a tower and a method for its deployment on site |
DE10009072A1 (en) * | 2000-02-25 | 2001-08-30 | Sms Demag Ag | Method for anchoring machine to floor uses casing pipes) and anchor plates and bolts with sealing rings made from polymer, especially polyurethane |
US6503024B2 (en) * | 2000-03-06 | 2003-01-07 | Stan Rupiper | Concrete foundation pierhead and method of lifting a foundation using a jack assembly |
US6318034B1 (en) | 2000-03-08 | 2001-11-20 | Tindall Corporation | Elevated storage tank |
DK174190B1 (en) * | 2000-04-12 | 2002-09-09 | Spaencom As | Foundation for a windmill and procedure for installation hereof |
DE10045735B4 (en) * | 2000-09-15 | 2008-04-03 | Vetter Fördertechnik GmbH | Fixing the column of a column slewing crane on a concrete foundation |
WO2002027105A1 (en) * | 2000-09-27 | 2002-04-04 | Allan P Henderson | Perimeter weighted foundation for wind turbines and the like |
US6470645B1 (en) | 2000-11-09 | 2002-10-29 | Beaird Industries, Inc. | Method for making and erecting a wind tower |
US6443656B1 (en) | 2001-03-30 | 2002-09-03 | Abt, Inc. | Trench forming assembly having removable pin anchoring mechanism |
DE10226996B4 (en) * | 2001-10-09 | 2014-07-03 | Aloys Wobben | Method for creating a foundation, in particular for a tower of a wind energy plant |
JP2003293938A (en) | 2002-04-02 | 2003-10-15 | Tetra Co Ltd | Construction method of wind power generating device |
US20030196393A1 (en) * | 2002-04-22 | 2003-10-23 | Bowman Joseph M. | Weldless pole mounting structure and method of providing same |
DE10238033A1 (en) | 2002-08-20 | 2004-03-04 | Alpine Project Technology Gmbh | Concrete foundation for road sign support has flat foundation block with concrete shuttering elements of different height, filled with poured concrete with anchors for carrier fittings |
US7222464B2 (en) * | 2002-12-18 | 2007-05-29 | Suehiro-System Co., Ltd. | Anchor bolt and installing method thereof |
FI20022235A (en) * | 2002-12-19 | 2002-12-19 | Rautaruukki Oyj | Foundation of a transversely loaded tower |
US7533505B2 (en) * | 2003-01-06 | 2009-05-19 | Henderson Allan P | Pile anchor foundation |
US6808350B1 (en) * | 2003-01-27 | 2004-10-26 | Norman L. Tooman | Anchor bolt cap and method of use |
US7025176B1 (en) * | 2003-06-09 | 2006-04-11 | Tooman Norman L | Bolt greaser unit |
DE502004009257D1 (en) * | 2003-06-27 | 2009-05-14 | Alstom Technology Ltd | Fastening device of a machine base of a machine and method for fixing the same |
WO2005015013A1 (en) | 2003-08-09 | 2005-02-17 | General Electric Company | Tower foundation, in particular for a wind energy turbine |
NL1024581C2 (en) † | 2003-10-21 | 2005-04-22 | Gmb Beton En Ind Noord West B | Windmill foundation. |
DE102004017006B4 (en) | 2004-04-02 | 2012-03-29 | Aloys Wobben | Method of erecting a tower |
DE102004017008B4 (en) | 2004-04-02 | 2009-10-22 | Aloys Wobben | Method for erecting a tower |
US8801370B2 (en) | 2006-10-12 | 2014-08-12 | General Electric Company | Turbine case impingement cooling for heavy duty gas turbines |
DE102007060379C5 (en) | 2007-12-12 | 2018-11-15 | Senvion Gmbh | Anchoring a tower of a wind turbine |
-
2004
- 2004-04-02 DE DE102004017006A patent/DE102004017006B4/en not_active Revoked
-
2005
- 2005-04-01 AR ARP050101291A patent/AR048458A1/en not_active Application Discontinuation
- 2005-04-04 KR KR1020067021572A patent/KR20060130755A/en active Search and Examination
- 2005-04-04 JP JP2007503310A patent/JP4726891B2/en not_active Expired - Fee Related
- 2005-04-04 BR BRPI0509286-8A patent/BRPI0509286B1/en active IP Right Grant
- 2005-04-04 US US11/547,387 patent/US9206617B2/en active Active
- 2005-04-04 PL PL05716518T patent/PL1735533T3/en unknown
- 2005-04-04 WO PCT/EP2005/003499 patent/WO2005095792A1/en active Application Filing
- 2005-04-04 ES ES05716518T patent/ES2369669T5/en active Active
- 2005-04-04 EP EP05716518.5A patent/EP1735533B2/en active Active
- 2005-04-04 NZ NZ550073A patent/NZ550073A/en not_active IP Right Cessation
- 2005-04-04 SI SI200531359T patent/SI1735533T1/en unknown
- 2005-04-04 AU AU2005229135A patent/AU2005229135B2/en not_active Ceased
- 2005-04-04 CN CN2005800106378A patent/CN1965165B/en active Active
- 2005-04-04 DK DK05716518.5T patent/DK1735533T4/en active
- 2005-04-04 CA CA2561431A patent/CA2561431C/en not_active Expired - Fee Related
- 2005-04-04 PT PT05716518T patent/PT1735533E/en unknown
- 2005-04-04 AT AT05716518T patent/ATE521804T1/en active
-
2010
- 2010-02-09 JP JP2010026377A patent/JP2010159625A/en active Pending
-
2011
- 2011-10-11 CY CY20111100971T patent/CY1111928T1/en unknown
-
2014
- 2014-12-10 US US14/566,433 patent/US20150089898A1/en not_active Abandoned
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3503165A (en) * | 1967-06-12 | 1970-03-31 | Arrowall Corp | Prefabricated light weight panels of cementitious material |
US4228627A (en) * | 1979-04-16 | 1980-10-21 | Neill Joseph C O | Reinforced foundation structure |
US4910930A (en) * | 1988-10-28 | 1990-03-27 | Base Isolation Consultants, Inc. | Seismic isolation structure |
US5953864A (en) * | 1997-04-23 | 1999-09-21 | Rapid Wall Systems | Prefabricated modular concrete foundation wall systems and methods of constructing prefabricated modular concrete foundation wall systems |
US20040035073A1 (en) * | 2002-08-26 | 2004-02-26 | Bravinski Leonid G | 3-D construction modules |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20150143765A1 (en) * | 2012-02-28 | 2015-05-28 | Ms Enertech, S.L. | Connection between a wind turbine tower and its foundation |
CN105350565A (en) * | 2015-12-07 | 2016-02-24 | 湖南皓诺工程有限公司 | Wind power plant fan tower foundation repairing and reinforcing method |
US11236727B2 (en) | 2015-12-21 | 2022-02-01 | Vestas Wind Systems A/S | Method for forming a wind turbine foundation and related system for forming such a foundation |
US12000378B2 (en) | 2015-12-21 | 2024-06-04 | Vestas Wind Systems A/S | System for forming a wind turbine foundation |
CN106592660A (en) * | 2016-12-21 | 2017-04-26 | 神华集团有限责任公司 | Draught fan foundation restoration method |
US20230279841A1 (en) * | 2022-03-03 | 2023-09-07 | Barr Engineering Co. | Spreader box |
US11905924B2 (en) * | 2022-03-03 | 2024-02-20 | Barr Engineering Co. | Spreader box |
Also Published As
Publication number | Publication date |
---|---|
WO2005095792A1 (en) | 2005-10-13 |
DE102004017006B4 (en) | 2012-03-29 |
EP1735533A1 (en) | 2006-12-27 |
CN1965165A (en) | 2007-05-16 |
SI1735533T1 (en) | 2011-10-28 |
ES2369669T5 (en) | 2020-11-16 |
AU2005229135A1 (en) | 2005-10-13 |
JP4726891B2 (en) | 2011-07-20 |
DE102004017006A1 (en) | 2005-10-27 |
PT1735533E (en) | 2011-10-18 |
AR048458A1 (en) | 2006-04-26 |
JP2007535634A (en) | 2007-12-06 |
CN1965165B (en) | 2011-08-10 |
AU2005229135B2 (en) | 2010-12-16 |
EP1735533B2 (en) | 2020-03-25 |
CA2561431C (en) | 2010-11-30 |
DK1735533T4 (en) | 2020-06-02 |
CA2561431A1 (en) | 2005-10-13 |
DK1735533T3 (en) | 2011-11-21 |
JP2010159625A (en) | 2010-07-22 |
US9206617B2 (en) | 2015-12-08 |
EP1735533B1 (en) | 2011-08-24 |
US20080302038A1 (en) | 2008-12-11 |
CY1111928T1 (en) | 2015-11-04 |
BRPI0509286B1 (en) | 2018-06-05 |
KR20060130755A (en) | 2006-12-19 |
ES2369669T3 (en) | 2011-12-02 |
PL1735533T3 (en) | 2012-04-30 |
NZ550073A (en) | 2011-07-29 |
BRPI0509286A (en) | 2007-09-18 |
ATE521804T1 (en) | 2011-09-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20150089898A1 (en) | Method for erecting a tower | |
US8037646B2 (en) | Method for erecting a tower | |
US7416367B2 (en) | Lateral force resistance device | |
US20070181767A1 (en) | Foundation for a wind energy plant | |
EP2981654B1 (en) | Tower assembly for a tower structure | |
WO2001040585A1 (en) | Foundation structure and erection of towers | |
US10060087B2 (en) | Fully adjustable suspended post and panel modules and installation methods | |
US9238921B2 (en) | Method and arrangements relating to foundation for antenna mast of wireless communication system | |
CN111197318B (en) | Foundation for a tower of a wind turbine | |
US9828739B2 (en) | In-line battered composite foundations | |
CN212052262U (en) | Prefabricated pier body and bridge | |
EP4294987A1 (en) | Mold part set for wind turbine ground foundation and wind turbine ground foundation | |
WO1995026444A1 (en) | Multiple pier foundation and method of constructing same |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |