JPS5968432A - Laying of anchor bolt - Google Patents

Laying of anchor bolt

Info

Publication number
JPS5968432A
JPS5968432A JP17712582A JP17712582A JPS5968432A JP S5968432 A JPS5968432 A JP S5968432A JP 17712582 A JP17712582 A JP 17712582A JP 17712582 A JP17712582 A JP 17712582A JP S5968432 A JPS5968432 A JP S5968432A
Authority
JP
Japan
Prior art keywords
bolt
anchor bolt
anchor
plate
support plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP17712582A
Other languages
Japanese (ja)
Other versions
JPS611573B2 (en
Inventor
Hitoshi Mori
仁 森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP17712582A priority Critical patent/JPS5968432A/en
Publication of JPS5968432A publication Critical patent/JPS5968432A/en
Publication of JPS611573B2 publication Critical patent/JPS611573B2/ja
Granted legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures

Abstract

PURPOSE:To exactly lay anchor bolts in the foundation concrete by a method in which a scale plate showing the installation interval of the anchor bolts is screwed through a nut with the upper end threaded portion of the anchor bolts projected on the supporting plate. CONSTITUTION:An anchor bolt 1 is inserted into the through hole 7 of a supporting plate 6, the upper end threaded portion 3 of the bolt 1 is thrust through the supporting plate 6 and connected with a nut 8 lightly, and the anchor bolt 1 is hung down through the supporting plate 6 between beam formworks 11 and the lower end of the bolt 1 is fixed to a stopper 2 set at a right angle to the formwork direction between the lower ends of the beam formworks 11. The through hole 13 of a scale plate 12 showing the installation interval of the bolt 1 is thrust with the tip end threaded portion 3, and the verticality of the bolt 1 is corrected while matching the position of the bolt 1 with the through hole 13. The nut 8 is clamped on the supporting plate 6, and then the scale plate 12 is removed out of the threaded portion 13. Concrete 14 is placed into the space between the beam formworks 11 to bury the anchor bolt 1 in the foundation concrete.

Description

【発明の詳細な説明】 本発明は、布基礎コンクリートにアンカーボルトを正確
な位置に埋設する、主として鉄鋼系構造物のアンカーボ
ルトの埋設方法に関する。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method for embedding anchor bolts, mainly for steel-based structures, in which anchor bolts are buried in concrete at accurate positions.

従来、アンカーボルトは、ボルト孔を設けたプレートラ
左、右の型枠上端間に固定し、そのボルト孔にアンカー
ボルトにナツトをかけ釣り下ケ、コンクリートを充填埋
設していたものである。したがって、アンカーボルトを
釣り下げた個々の位置では左右型枠間の中心にアンカー
ボルトが釣り下げられであるものとしても、型枠の通り
が曲っている場合、基礎方向の複数のアンカーボルトの
埋設位置の中心は一致できない。又、基礎方向のアンカ
ーボルトの間隔は隣接するアンカーボルト間で個々に測
って埋設するために例えば基準点から一本の土台に3本
及至4本のアンカーボルトの入る土台を納める場合、基
準点から2本目、3本目・・・・・・と離れるアンカー
ボルト程、設計寸法と誤差を生じやすく、土台を基礎上
に納めろことが不可能になる欠点と共に間隔を一本づつ
測る手数を要する欠点もあった。
Conventionally, anchor bolts have been fixed between the upper ends of the left and right formworks of plate plates with bolt holes, nuts are placed on the anchor bolts through the bolt holes, and the anchor bolts are filled with concrete and buried. Therefore, even if the anchor bolt is hung at the center between the left and right formwork at each location, if the formwork is curved, multiple anchor bolts may be buried in the direction of the foundation. The centers of positions cannot coincide. In addition, the spacing between anchor bolts in the direction of the foundation is determined by measuring each anchor bolt between adjacent anchor bolts before burying them. For example, if a foundation containing three or four anchor bolts is installed in one foundation from a reference point, The farther apart the anchor bolt is from the second, third, etc., the more likely it is that errors will occur with the design dimensions, and the disadvantage is that it will be impossible to fit the foundation onto the foundation, and it will take time to measure the distance one by one. There were also drawbacks.

更に、アンカーボルトは釣り下げられた状態で、コンク
リートを充填するため、コンクリートの流動圧力によっ
てアンカーボルトの下端部が流され、したがってアンカ
ーボルトは基礎天端に対し、垂直性を失うためアンカー
ボルトに作用する引キ抜を応力を即時、基礎に伝達され
ない構造上の欠点もあった。
Furthermore, because the anchor bolt is suspended and filled with concrete, the lower end of the anchor bolt is washed away by the flow pressure of the concrete, and the anchor bolt loses its perpendicularity to the top of the foundation. There were also structural shortcomings in that the stress caused by the pull-out action was not immediately transferred to the foundation.

特に、鉄鋼系構造住宅の土台或は枠等では、アンカーボ
ルトの通孔が予め、工場で穿孔されて現場に搬入される
ため、基礎コンクリートに埋設されたアンカーボルトの
位置が、土台のボルト孔と一致しガければ、建築するこ
とかでギない結果となり、これを修正するに大舘い無駄
な経費を必要とする欠点があった。
In particular, in the foundations or frames of steel-based houses, holes for anchor bolts are pre-drilled at the factory and delivered to the site, so the position of the anchor bolts buried in the foundation concrete is not the same as the bolt hole in the foundation. If this did not match, the result would be that it would not be possible to construct a new building, which had the drawback of requiring a large amount of wasted expense to correct it.

本発明は上記した欠点を排除するために研究されたもの
で、その要旨は、予め据付けられた梁型枠のと端間にア
ンカーボルトを支持板の通孔にアンカーボルトヲ挿入し
、かつ先端ネジ部を一定の高さに支持板上に突出させア
ットをかけ左右型枠間に支持板を介し釣り下げると共に
、アンカーボルトの下端部にアンカーボルトに対し直角
に止め体を固定したものを梁型枠下端間に渡しかけ、更
にアンカーボルトの据付は間隔を示した尺板(尺板はボ
ルト孔の位置が必要に応じ穿孔され、アンカーボルトの
間隔を示す一定長さの物差してなっている。)のボルト
通孔をそれぞれのアンカーボルトの支持板上に突出した
先端ネジ部に嵌入し、これを間隔の基準としてアンカー
ボルトの位it尺板のボルト孔に合わせながら、又、垂
直性に修正し、該、アットを支持板上で個々に締め固め
不動にし2、次に尺板を個々のアンカーボルトの先端ネ
ジ部から除去し、左右梁型枠間にコンクリートを充填し
、基礎コンクリートにアンカーボルトを埋設するもので
ある。
The present invention was researched to eliminate the above-mentioned drawbacks, and its gist is to insert an anchor bolt into a hole in a support plate between the ends of a beam formwork that has been installed in advance, and to The threaded part is made to protrude above the support plate at a certain height and is suspended between the left and right formwork through the support plate, and a stopper is fixed to the lower end of the anchor bolt at right angles to the anchor bolt. The anchor bolts are passed between the lower ends of the formwork, and the anchor bolts are installed using a shaku plate that indicates the spacing (the shaku plate has bolt holes drilled as necessary and serves as a ruler of a certain length to indicate the spacing between the anchor bolts). ) into the tip threaded part protruding on the support plate of each anchor bolt, and using this as a reference for spacing, align the anchor bolts with the bolt holes on the length plate, and make sure they are vertical. After fixing the bolts, compact them individually on the support plate to immobilize them. 2. Next, remove the shaku plate from the threaded end of each anchor bolt, fill the space between the left and right beam formwork with concrete, and add it to the foundation concrete. This is to bury the anchor bolt.

したがって本発明は、仮えは梁型枠の据付後、精度(特
に梁型枠の通り。)が不正確な場合でも、支持板上に設
けられる尺板の位置(通り)を正確にすることにより、
アンカーボルトの位置、間隔を個々に測る必要がなく、
又、仮えは基礎コンクリートの通りが曲っている場合で
も、アンカーボルトの基礎方向の通り及び間隔を設計ど
おシ埋設できる効果がある。
Therefore, the present invention aims to make the position (orientation) of the shaku plate provided on the support plate accurate even if the accuracy (especially the alignment of the beam formwork) is inaccurate after the beam formwork is temporarily installed. According to
There is no need to measure the position and spacing of anchor bolts individually.
In addition, even if the foundation concrete path is curved, temporary anchorage has the effect of allowing anchor bolts to be buried according to the design of the path and spacing in the direction of the foundation.

次に本発明に図示する一実施例について詳細に説明する
Next, one embodiment illustrated in the present invention will be described in detail.

本発明に用いるアンカーボルト(1)は第3図(4)に
示すように一定の長さを有する丸鋼(異形でもよい、)
の下端にアンカーボルト(1)に対し直角に止め体(2
)(丸鋼、角鋼等断面形状に関係しない。)が固定され
、他方、上端には一定長さのネジ部(3)ヲ有するもの
である。
The anchor bolt (1) used in the present invention is a round steel having a certain length as shown in Fig. 3 (4) (it may be of a different shape).
At the bottom end of the stopper (2) perpendicular to the anchor bolt (1).
) (irrespective of the cross-sectional shape, such as round steel or square steel) is fixed, and on the other hand, the upper end has a threaded portion (3) of a certain length.

又、第3図(B)のように上端ネジ部(3)ヲ有し下端
に頭部(4)のついた丸鋼でもよく(仮えば六角ボルト
或は四角ボルト)或は第3図C)のように下端にフック
(5)のついたものでも使用で般る。
Alternatively, it may be a round steel with a threaded portion (3) at the upper end and a head (4) at the lower end as shown in Fig. 3 (B) (for example, a hexagonal bolt or a square bolt) or Fig. 3C. ) with a hook (5) at the bottom end can also be used.

次に、第3図(5)のアンカーボルト(1) ?使用す
るには、第4図に示す支持板(6)の通孔(7)にアン
カーボルト(1)の上端ネジ部(3)を挿入し、支持板
(6)上にアット(8)を軽くかけ、空間(9)を有す
るフーチング型枠αω上に予め、据付けられた梁型枠1
9間のアンカーボルト(1)の埋設される大体の位置に
アンカーボルト(1)の下端から支持板(6)ヲ介し釣
り下げ、更に止め体(2)を梁型枠aυ力方向対し直角
にし、支持板(6)北のアント[F])を軽く締め固め
る。
Next, anchor bolt (1) in Figure 3 (5)? To use, insert the upper threaded part (3) of the anchor bolt (1) into the through hole (7) of the support plate (6) shown in Fig. 4, and insert the at (8) onto the support plate (6). Beam formwork 1 installed in advance on a footing formwork αω that is lightly laid and has a space (9)
Suspend the anchor bolt (1) from the lower end of the anchor bolt (1) through the support plate (6) at the approximate location where the anchor bolt (1) will be buried between the holes 9 and 9, and place the stopper (2) at right angles to the direction of the force of the beam formwork aυ. , and lightly compact the support plate (6) north ant [F]).

次に第3図(B)に示すアンカーボルト(1)を用いる
場合には、第4図に示す支持板(6)二枚の通孔(7)
にアンカーボルトα)を挿通し1、下方の一枚を止め体
(2)とし、又、上方の一枚を支持板(6)とし、支持
板(6)上でナツト(8)を軽くかけ、第3図囚と同様
に梁型枠09間に釣り下げ、支持板(6)と止め体(2
)の方向を梁型枠αυの方向に対し1、直角に1゜て軽
く固定しておく。
Next, when using the anchor bolt (1) shown in FIG. 3(B), the support plate (6) and the two through holes (7) shown in FIG.
Insert the anchor bolt α) into 1, use the lower piece as a stopper (2), use the upper piece as a support plate (6), and lightly tighten the nut (8) on the support plate (6). , hang between the beam formwork 09 as in Figure 3, support plate (6) and stopper (2).
) is 1 degree perpendicular to the direction of the beam formwork αυ and fixed lightly.

又、第3図(Qに示すアンカーボルト(1)を用いろ場
合には支持板(6)、通孔(7)にアンカーボルト(1
)を挿通し梁型枠測量に釣り下げ梁型枠U下端間に仮え
ば丸鋼のようなアンカ(5)にか\る止め体(2)をか
け渡し、支持板(6)上でアット(8)を軽く固め、次
にアンカーボルト(1)の形状にかkわらず支持板(6
)上に突出したアンカーボルト(1)の先端ネジ部(3
) K予め、アンカーボルト(1)の埋設間隔に穿孔さ
れた尺板α2のボルト孔住3を嵌入し、尺板任りのボル
ト孔q簿に合わせて、アンカーボルト(1)の位置を垂
−直に修正し1、又、尺板t1りの通りを予め設けられ
た基準水系(図示しない。)等に合わせてから支持板(
6)上のナンド(8)を梁型枠Uを媒体とし7てその上
下から挾み固く締めつけアンカーボルト(1)を不動に
し、尺板(Iりを個々のアンカーボルト(1)を先端ネ
ジ部(3)から除去し、コンクリートIを充填すればア
ンカーボルト(1)の間隔金側々に測らずして、その間
隔、位置を基礎コンクリートaりの通りに関係なく、正
確に埋設することができる効果がある。
In addition, when using the anchor bolt (1) shown in Fig. 3 (Q), insert the anchor bolt (1) into the support plate (6) and through hole (7).
) is inserted into the beam formwork survey, and suspended between the lower ends of the beam formwork U. Pass the stopper body (2), which is temporarily made of round steel, on an anchor (5), and place it on the support plate (6). (8) is lightly hardened, and then the support plate (6) is fixed regardless of the shape of the anchor bolt (1).
) The tip threaded part (3) of the anchor bolt (1) that protrudes above
) Insert the bolt holes 3 of the shaku plate α2, which have been drilled in advance at the burial intervals of the anchor bolts (1), and vertically align the bolt holes q on the shaku plate. - Directly correct 1, or align the path of the length plate t1 with a pre-set reference water system (not shown), etc., and then adjust the support plate (
6) Using the beam formwork U as a medium, firmly tighten the upper nand (8) from above and below to keep the anchor bolts (1) immovable. If it is removed from part (3) and filled with concrete I, the spacing and position of the anchor bolt (1) can be accurately buried regardless of the direction of the foundation concrete A without measuring on both sides of the spacing metal. It has the effect of

又、支持板(6)は中央にアンカーポル) (1) ’
e挿入する通孔(7)ヲ有する板であるから梁型枠aD
上で基礎幅方向及び基礎方向に自由自在にその位置を修
正することがでキる。又、支持板(6)の材質構造は通
孔(7)を有するものであれば自由である。又、アンカ
ーボルト(1)の埋設位置の精度は尺板C1邊のボルト
孔fIlとのクリヤランスによって決められろ。
Also, the support plate (6) has an anchor pole in the center) (1) '
e Since it is a board with a through hole (7) for insertion, it is a beam formwork aD.
At the top, the position can be freely adjusted in the foundation width direction and foundation direction. Further, the material structure of the support plate (6) is free as long as it has through holes (7). Also, the accuracy of the buried position of the anchor bolt (1) is determined by the clearance with the bolt hole fIl on the side of the length plate C1.

又、アンカーボルト(1)の垂直性は尺板(L′IJの
ボルト孔(13にアンカーボルトα)の先端ネジ部(3
)が軽く嵌合で般る範囲で確認することがで牙る。
Also, the verticality of the anchor bolt (1) is determined by the tip threaded portion (3) of the bolt hole (anchor bolt α in 13) of the shaku plate (L'
) can be confirmed within the range of a light fit.

又、尺板aSは第5図(A) (B) (C) Q))
 VC示すように必要に応じ用いればよい。更に尺板鰺
の断面形状及び材質は自由である。
Also, the shaku plate aS is shown in Figure 5 (A) (B) (C) Q))
It may be used as necessary, as shown in VC. Furthermore, the cross-sectional shape and material of the shakuban mackerel are free.

又、止め体(2)はアンカーボルト(1)の下端部に固
定し、梁型枠αυ下端間にかけ渡され、アンカーボルト
(1)を支持板(6)間で締めつける応力に対し変形し
ない強度があれば、その形状は上記したように自由に選
択で練る。
In addition, the stopper (2) is fixed to the lower end of the anchor bolt (1) and spans between the lower ends of the beam formwork αυ, and has a strength that does not deform under the stress of tightening the anchor bolt (1) between the support plates (6). If there is, the shape can be freely selected as described above.

本発明は北記したように、従来のアンカーボルトの形状
と異なりその下端部t−7字形にし、梁型枠の下端間に
かけ渡し、他方、梁型枠と端間とかけ渡される支持板通
孔にアンカーボルトの先端ネジ部を突出させ、かつ支持
板上に突出した先端ネジ部に予め定められた尺板のボル
ト孔を嵌入しアンカーボルトの間隔を規正し、梁型枠を
媒体として支持板とでアントラ締め固め、アンカーボル
トの位置を不動にし、尺板を除去し、基礎コンクリート
を充填するものであるから、従来の欠点を排除し、アン
カーボルトを基礎コンクリートの正常な位置に埋設で炒
る利点がある。
As mentioned above, the present invention differs from the shape of conventional anchor bolts in that its lower end is shaped like a T-7, and extends between the lower ends of the beam formwork, and on the other hand, the support plate extends between the beam formwork and the ends. The threaded end of the anchor bolt is made to protrude into the hole, and the bolt hole of a predetermined shaku plate is inserted into the threaded end that protrudes onto the support plate to regulate the spacing between the anchor bolts and supported using the beam formwork as a medium. This method eliminates the drawbacks of the conventional method and allows the anchor bolts to be buried in the correct position in the foundation concrete, as it is antral compacted with a plate, the position of the anchor bolt is fixed, the shingle plate is removed, and the foundation concrete is filled. There are advantages to roasting.

【図面の簡単な説明】[Brief explanation of the drawing]

図面は本発明の一実施例を示すもので、第1図は梁型枠
にアンカーボルトを装着した横垂直断面図。 第2図は第1図(5)−因における断面図。第3図(4
)は止め体を固定したアンカーボルトの斜面図。第3図
(B)は頭部つ般アンカーボルトの斜面図。第3図(Q
はフックつ薯アンカーポル111の斜面図。第4図は支
持板の斜面図。第5図(5)は尺板の斜面図。第5図(
B)はL字形尺板の平面図。 第5図(Qは丁字形尺板の平面図。第5図0は十字形尺
板の平面図。第6図は梁を枠1に尺板とアンカーボルト
を装着した状態を示す平面図。 1・・・・・・・・アンカーボルト、2・・・・・・・
・・止め体、3・°・・・・・ネジ部、4・・・・・・
・・・頭部、5・・・・・・・・フン−り、6・・・・
・・・・・支持板、7・・・・・・・・・通孔、8・・
・・・・・ナツト、9・・・・・・・・・空間、10・
・・・・・ツー牛ング型枠、11・・・・・・梁型枠、
12・・・・・・尺板、13・・・・・・ボルト孔、1
4・・・・・・コンクリート14 手続補正書く軸ね 昭和眸ワ年11月13日 特許庁長官       殿 +芋←序寺→千ト         殿)1、事件の表
示 昭和−F1年  l鮪店腎 願第円flint;  号
2、発明÷纏Hの名称 −7:、、台−ギ−,+1.−
1−めヤ′1幹力]狐3、補正をする者 事件との関係    清新  出願人 シ:・i!(i、へi リ、c Q゛’L H& l=
 −r %l a \)二=(5\’D(+ヨシ)にN
′・−玉;%; ・’J? ゝF)(C)E、歇3鴨(
v)1つ蓬ヤ1つ 1、 明細書1頁特許請求の範囲を下記のように訂正す
る。 記 左、右の梁型枠(11)間に渡したる支持板(6)、通
孔(7)にアンカーボルト(1)の頭部ネジ部(3)を
一定長さ突出させ、ナツト(8)をかけ、基礎梁型枠(
11)間に、該、支持板(6)を介し釣り下げると共に
、該、アンカーボルト(1)の下端部(2)を梁型枠(
11)下端にかけ、更に、尺板(12)の適合するボル
ト孔(13)をそれぞれのアンカーボルト(1)の頭部
ネジ部(3)に嵌入し、アンカーボルト(1)の位置を
定めたる後、該、ナツト(8)を支持板(6)上で締め
固め、次に尺板(12)を除去しコンクリート(14)
を充填する構成を特徴とする、アンカーボルトの埋設方
法。 2、 同3頁8行目「アンカーボルトの位置」の次に「
(間隔)」を加入する。 3、 同3頁18行目「下端部に」の「に」を「を」に
訂正する。 4、 同3頁19行目「直角」の次に[或は丁字形端に
か\るようにすることもできる。次に」を 27゜加入
する。                   下20
  同8頁5行目「止め体(2)け」を抹消する。 又「下端部」の次にr (2) jを加入し「に」を「
け」に訂正する。 21、  同8頁6行目「固定し」を抹消し、[梁型枠
(11) Jの次に「下端或は」を加入する。 22  同8頁9行目「選択できる。」の次に[又、第
3図(B)に示すアンカーボルト(1)のフック(5)
は第3図(4)に示す下端部(2)と同じ機能を有する
ものである。」を加入する。 23  同8頁11行目「1字形」の次に1或はL字形
」を加入する。 24、  同8頁12行目「梁型枠の」の次に「下端或
は」を加入する。 25、  同9百8行目「止め体を固定した」を抹消し
「下端部を1字形にした」を加入する。 26、  同9頁、図面の簡単な説明の内、第3図の)
の項を図面とも削除し、「第3図(C)」を「第3図(
B)」に図面とも変更する。 同9頁16行目「2・・・・・・止め体」を「2・・・
・・・端部」に訂正する。 以  上
The drawings show one embodiment of the present invention, and FIG. 1 is a horizontal and vertical cross-sectional view of an anchor bolt attached to a beam formwork. FIG. 2 is a sectional view taken from FIG. 1 (5). Figure 3 (4
) is a perspective view of the anchor bolt with the stopper secured. FIG. 3(B) is a perspective view of the general head anchor bolt. Figure 3 (Q
This is a slope view of Hook Tube Anchor Port 111. FIG. 4 is a perspective view of the support plate. Figure 5 (5) is a slope view of the shaku plate. Figure 5 (
B) is a plan view of the L-shaped scale plate. FIG. 5 (Q is a plan view of a T-shaped shaku plate. FIG. 5 0 is a plan view of a cross-shaped shaku board. FIG. 6 is a plan view showing a state in which a beam is attached to a frame 1 with shaku boards and anchor bolts. 1...Anchor bolt, 2...
・・Stopping body, 3・°・・・・Screw part, 4・・・・
...Head, 5...Fun, 6...
...Support plate, 7...Through hole, 8...
・・・・・・Natsuto, 9・・・・・・・・・Space, 10・
...Two-column formwork, 11...Beam formwork,
12...Shaku plate, 13...Bolt hole, 1
4...Concrete 14 Procedural amendment writing axis November 13, 1999 Director General of the Japan Patent Office (Mr. + Imo←Joji → Chito (Mr.)) 1. Indication of the case Showa - F1 year l Tuna store kidney request No. 2, Invention ÷ Name of H -7:,,,Gi-,+1. −
1-Meya'1 trunk power] Fox 3, relationship with the amended person case Freshness Applicant shi:・i! (i, hei ri, c Q゛'L H&l=
-r %l a \)2=(5\'D(+Yoshi) to N
′・-ball;%; ・'J?ゝF) (C)E, 3 ducks (
v) The scope of claims on page 1 of the specification is amended as follows. The head screw part (3) of the anchor bolt (1) protrudes a certain length into the support plate (6) passed between the left and right beam forms (11) and the through hole (7), and the nut (8) ) and the foundation beam formwork (
11) While suspending the anchor bolt (1) through the support plate (6), the lower end (2) of the anchor bolt (1) is attached to the beam formwork (
11) Hang the lower end, and then fit the matching bolt holes (13) of the length plate (12) into the head threads (3) of each anchor bolt (1) to determine the position of the anchor bolt (1). After that, the nut (8) is compacted on the support plate (6), then the length plate (12) is removed and the concrete (14) is compacted.
A method for burying an anchor bolt, characterized by a configuration in which it is filled with. 2. On page 3, line 8, next to “Anchor bolt position” is “
(interval)” is added. 3. On page 3, line 18, ``ni'' in ``bottom edge'' is corrected to ``wo''. 4. On page 3, line 19, after "Right angle", it can also be placed at the end of the T-shape. Next, add 27°. Lower 20
On page 8, line 5, "stop body (2) ke" is deleted. Also, add r (2) j next to "lower end" and change "ni" to "
Correct it to ``ke''. 21. On the 6th line of page 8, delete ``fixed'' and add ``lower end or'' next to [beam formwork (11) J]. 22 On page 8, line 9, next to “Selectable.” [Also, the hook (5) of the anchor bolt (1) shown in Figure 3 (B)
has the same function as the lower end portion (2) shown in FIG. 3(4). ” to join. 23 On page 8, line 11, add “1 or L-shape” after “1-shape”. 24. On page 8, line 12, add ``bottom end or'' after ``of the beam formwork''. 25. In line 908, the phrase ``The stop body was fixed'' was deleted and the phrase ``The lower end was shaped like a single character'' was added. 26, same page 9, brief explanation of the drawings, Figure 3)
``Figure 3 (C)'' was changed to ``Figure 3 (Figure 3 (C)'').
B)” and the drawing. On page 9, line 16, “2...stop body” was changed to “2...
...Corrected to ``edge.''that's all

Claims (1)

【特許請求の範囲】 支持板(6)、通孔(7)にアンカーボルト(1)の頭
部ネジ部(3)を一定長さ突出させ、ナラI−(8) 
’t−かけ、基礎梁型枠09間に、該支持板(6)を介
し釣り下げると共に、該アンカーボルト(1)の下端部
の止め体(2)を梁型枠aυ下端間にかけ渡し、更に、
尺板任りの適合するボルト孔Ht ’−れぞれのアンカ
ーボルト・(1)の頭部ネジ部(3)に嵌入し、アンカ
ーボルト(1)の位置を定めたる後、該ナツト(8)を
支持板(6)、hで締め固め、次に尺板←カを除去し、
コンクリートα4を充填する構成を特徴とする。 アンカーボルトの埋設方法。
[Claims] The head screw portion (3) of the anchor bolt (1) is made to protrude a certain length into the support plate (6) and the through hole (7).
't-hung between the foundation beam forms 09 via the support plate (6), and passing the stopper (2) at the lower end of the anchor bolt (1) between the lower ends of the beam forms aυ; Furthermore,
After fitting the head screw part (3) of each anchor bolt (1) into the corresponding bolt hole Ht' of the shaku plate and determining the position of the anchor bolt (1), tighten the nut (8). ) with the support plate (6) and h, then remove the shaku plate ←,
It is characterized by a structure filled with concrete α4. How to bury anchor bolts.
JP17712582A 1982-10-08 1982-10-08 Laying of anchor bolt Granted JPS5968432A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP17712582A JPS5968432A (en) 1982-10-08 1982-10-08 Laying of anchor bolt

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP17712582A JPS5968432A (en) 1982-10-08 1982-10-08 Laying of anchor bolt

Publications (2)

Publication Number Publication Date
JPS5968432A true JPS5968432A (en) 1984-04-18
JPS611573B2 JPS611573B2 (en) 1986-01-18

Family

ID=16025601

Family Applications (1)

Application Number Title Priority Date Filing Date
JP17712582A Granted JPS5968432A (en) 1982-10-08 1982-10-08 Laying of anchor bolt

Country Status (1)

Country Link
JP (1) JPS5968432A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080302038A1 (en) * 2004-04-02 2008-12-11 Aloys Wobben Method for Erecting a Tower

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080302038A1 (en) * 2004-04-02 2008-12-11 Aloys Wobben Method for Erecting a Tower
US9206617B2 (en) * 2004-04-02 2015-12-08 Aloys Wobben Tower and foundation

Also Published As

Publication number Publication date
JPS611573B2 (en) 1986-01-18

Similar Documents

Publication Publication Date Title
US4412407A (en) Mounting arrangement for guard rail post
US3207465A (en) Foundation form apparatus
US5253460A (en) Column assembly
US4736554A (en) Bolt system
US4614070A (en) Support shoe
US4099360A (en) Method and device for joining concrete bodies and method of constructing a multi-story building
US3219308A (en) Form locator
US1729935A (en) Wall anchor
US3810339A (en) Method and apparatus for forming construction element locating and mounting voids in a poured concrete structure
US4924579A (en) Layout system for construction foundation placement
US7596877B2 (en) Mason's adjustable alignment tool
US3600863A (en) Concrete slab with improved fastening means
US3039196A (en) Masonry corner and wall lay-up guide
US5001839A (en) Building profiling tools
JPS5968432A (en) Laying of anchor bolt
US3017701A (en) Mason's multipurpose implement and anchoring means
US2348314A (en) Suspension for refractory walls
US4380329A (en) Footing jig for positioning fasteners
US20190010715A1 (en) Formwork apparatus for forming a building support
US2534154A (en) Anchor lock form aligner
US4656753A (en) Post support unit for a building profile
JPS59179937A (en) Placement of anchor bolt
CN210148396U (en) Fixing structure of pre-buried sleeve
JPH0288818A (en) Method and apparatus for leveling surface of column for foundation
US2769240A (en) Mason's corner gauge