BR112018003752A2 - torre de equipamento, parque de torre de equipamento e método para construir uma torre de equipamento - Google Patents

torre de equipamento, parque de torre de equipamento e método para construir uma torre de equipamento

Info

Publication number
BR112018003752A2
BR112018003752A2 BR112018003752A BR112018003752A BR112018003752A2 BR 112018003752 A2 BR112018003752 A2 BR 112018003752A2 BR 112018003752 A BR112018003752 A BR 112018003752A BR 112018003752 A BR112018003752 A BR 112018003752A BR 112018003752 A2 BR112018003752 A2 BR 112018003752A2
Authority
BR
Brazil
Prior art keywords
tower
plinth
equipment
equipment tower
foundation
Prior art date
Application number
BR112018003752A
Other languages
English (en)
Inventor
D Lockwood James
E Carbonell Luis
J Chase Matthew
Original Assignee
Siemens Gamesa Renewable Energy Inc
Wind Tower Tech Llc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Siemens Gamesa Renewable Energy Inc, Wind Tower Tech Llc filed Critical Siemens Gamesa Renewable Energy Inc
Publication of BR112018003752A2 publication Critical patent/BR112018003752A2/pt

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • E02D27/425Foundations for poles, masts or chimneys specially adapted for wind motors masts
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D13/00Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
    • F03D13/20Arrangements for mounting or supporting wind motors; Masts or towers for wind motors
    • F03D13/22Foundations specially adapted for wind motors
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/728Onshore wind turbines

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Sustainable Development (AREA)
  • Sustainable Energy (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Wind Motors (AREA)
  • Foundations (AREA)

Abstract

a presente invenção refere-se a uma torre de equipamento (100) incluindo uma fundação (102), um plinto (120) de concreto localmente fundido estendendo-se verticalmente da fundação e uma porção da torre (104, 106, 108) estendendo-se verticalmente do plinto. a torre de equipamento é construída em um local tendo um conjunto de parâmetros específicos de torre, e pelo menos uma dimensão do plinto é selecionada com base em um parâmetro específico da torre. por exemplo, uma altura (134) do plinto pode ser selecionada para alcançar uma elevação desejada da superfície (138) mais superior do plinto, de modo que duas torres (170, 172) tendo segmentos de torre idênticos (105, 107, 109) terão uma altura comum do equipamento (a) em vez de variações em suas respectivas elevações da fundação devido a variações no nível do solo local (128). além disso, o plinto localmente fundido pode ser projetado para incluir uma abertura de porta (140) maior o suficiente para acomodar o equipamento a ser instalado dentro da torre.
BR112018003752A 2015-08-31 2016-08-03 torre de equipamento, parque de torre de equipamento e método para construir uma torre de equipamento BR112018003752A2 (pt)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
US201562211991P 2015-08-31 2015-08-31
US201562211998P 2015-08-31 2015-08-31
PCT/US2016/045223 WO2017039923A2 (en) 2015-08-31 2016-08-03 Equipment tower having a concrete plinth

Publications (1)

Publication Number Publication Date
BR112018003752A2 true BR112018003752A2 (pt) 2018-09-25

Family

ID=56618289

Family Applications (1)

Application Number Title Priority Date Filing Date
BR112018003752A BR112018003752A2 (pt) 2015-08-31 2016-08-03 torre de equipamento, parque de torre de equipamento e método para construir uma torre de equipamento

Country Status (9)

Country Link
US (1) US11072903B2 (pt)
EP (1) EP3329119A2 (pt)
CN (2) CN113738586A (pt)
BR (1) BR112018003752A2 (pt)
CA (1) CA2997924A1 (pt)
CL (1) CL2018000552A1 (pt)
MX (1) MX2018002408A (pt)
WO (1) WO2017039923A2 (pt)
ZA (1) ZA201801335B (pt)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020027777A1 (en) * 2018-07-30 2020-02-06 Siemens Gamesa Renewable Energy A/S Safe access wind turbine arrangement
CN111339625A (zh) * 2018-12-19 2020-06-26 北京天润新能投资有限公司 构建风力发电机组基础模型的方法、装置及其系统
EP3795823A1 (en) * 2019-06-28 2021-03-24 Ørsted Wind Power A/S Monopile and wind turbine structure
CN113494425A (zh) * 2020-04-07 2021-10-12 上海夏凯建筑科技有限公司 塔架及塔架构件
WO2022032403A1 (es) * 2020-08-13 2022-02-17 Mecal Intellectual Property And Standards B.V. Metodo para llevar a cabo una union de trabado (shear key) entre elementos prefabricados para la construcción de una torre de turbina eólica de concreto o similar
USD1015312S1 (en) * 2021-04-23 2024-02-20 Taoglas Group Holdings Limited Integrated antenna with connector
CN113047332B (zh) * 2021-04-27 2022-05-31 中国华能集团清洁能源技术研究院有限公司 一种海上风电单桩基础的塔架及其构型设计方法
CN115306196B (zh) * 2022-08-18 2023-08-15 浙江八方电信有限公司 一种城市道路多杆合一的智能通信塔

Family Cites Families (35)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2803198B1 (fr) * 1999-12-30 2003-09-26 Oreal Composition pour la teinture d'oxydation des fibres keratiniques comprenant deux polyammonium quaternaires particuliers
DE10033845A1 (de) * 2000-07-12 2002-01-24 Aloys Wobben Turm aus Spannbeton-Fertigteilen
CA2424334C (en) * 2000-09-27 2008-07-22 Allan P. Henderson Perimeter weighted foundation for wind turbines and the like
DK1654460T3 (da) * 2003-08-09 2007-05-21 Gen Electric Tårnfundament, især til en vindmölle
DE102004017006B4 (de) * 2004-04-02 2012-03-29 Aloys Wobben Verfahren zum Errichten eines Turmes
DE102004017008B4 (de) * 2004-04-02 2009-10-22 Aloys Wobben Verfahren zum Errichten eines Turmes
WO2006097108A1 (en) * 2005-03-16 2006-09-21 Densit A/S Tower foundation system and method for providing such system
WO2007025555A1 (de) * 2005-08-30 2007-03-08 Icec Holding Ag Verfahren zum vertikalen extrudieren eines betonelements, vorrichtung zum herstellen eines betonelements und mit diesem verfahren hergestellte vorrichtungen
US8051627B2 (en) * 2006-04-30 2011-11-08 General Electric Company Tower adapter, method of producing a tower foundation and tower foundation
US20080313927A1 (en) 2006-08-24 2008-12-25 Body Tech Laboratories, Llc Arch support with a patterned surface
US9096985B1 (en) * 2006-09-21 2015-08-04 Ahmed Phuly Foundation with slab, pedestal and ribs for columns and towers
CN101548098B (zh) * 2006-11-03 2012-07-04 维斯塔斯风力系统有限公司 风能转换器、风轮机基础、风轮机基础的方法及应用
CA2667625A1 (en) * 2006-11-03 2008-05-08 Vestas Wind Systems A/S A wind energy converter, a method and use hereof
ES2330482T3 (es) * 2007-06-20 2009-12-10 Siemens Aktiengesellschaft Torre de turbina eolica y metodo para construir una torre de turbina eolica.
DE102008012664A1 (de) * 2008-01-30 2009-08-06 Repower Systems Ag Windenergieanlage und ein Turm oder Turmsegment und eine Türzarge dafür
WO2010006659A1 (en) * 2008-07-15 2010-01-21 Siemens Aktiengesellschaft Method for the assembly of a tower and tower
US20100095617A1 (en) * 2008-10-16 2010-04-22 General Electric Wind Energy Gmbh Wind turbine tower foundation containing power and control equipment
DK2182201T3 (en) * 2008-11-03 2016-03-21 Siemens Ag Foundation, especially for a windmill, and windmill
ES2378199B1 (es) * 2009-06-24 2013-06-05 Acciona Windpower S.A. Sistema de unión de una góndola con la torre de hormigón de un aerogenerador.
CN102482892B (zh) * 2009-07-13 2014-10-08 Vsl国际股份公司 伸缩塔组件和方法
US8511013B2 (en) * 2009-09-03 2013-08-20 General Electric Company Wind turbine tower and system and method for fabricating the same
DE102009051425A1 (de) * 2009-10-30 2011-05-05 Voith Patent Gmbh Strömungskraftwerk und Verfahren für dessen Erstellung
AU2009284717A1 (en) * 2009-12-25 2011-07-21 Mitsubishi Heavy Industries, Ltd. Monopole tower and wind turbine generator having monopole tower
US7993107B2 (en) * 2010-10-25 2011-08-09 General Electric Company Onshore wind turbine with tower support system
DE102011085947A1 (de) 2011-11-08 2013-05-08 Wobben Properties Gmbh Turmfußsektion einer Windenergieanlage
CN102720207A (zh) * 2012-06-08 2012-10-10 北京金风科创风电设备有限公司 一种塔架基础及风力发电机的塔架
WO2014021927A2 (en) 2012-08-03 2014-02-06 Lockwood James D Precast concrete post tensioned segmented wind turbine tower
EP2728179A1 (en) * 2012-10-30 2014-05-07 Alstom Wind, S.L.U. Wind farm and method for installing a wind farm
DE102013216343A1 (de) * 2013-08-19 2015-02-19 Wobben Properties Gmbh Windenergieanlagen-Fundament und Windenergieanlage
US20160265514A1 (en) * 2013-10-11 2016-09-15 Tower Dynamics Llc Support device and methods for improving and constructing a support device
ES2673006T3 (es) * 2014-01-16 2018-06-19 Pacadar S.A.U. Cimentación para torre de aerogenerador y método de premontaje de torre de aerogenerador
CN103821677B (zh) 2014-03-20 2016-07-20 哈尔滨工业大学(威海) 装配式预应力活性粉末混凝土风电塔架
ES2863051T3 (es) * 2014-10-30 2021-10-08 Byo Towers S L Método de instalación de una torre hueca de hormigón formada por más de un segmento
DK178587B1 (en) * 2015-02-02 2016-07-25 Vestas Wind Sys As Access panel for a wind turbine tower and method for securing same
DK178586B1 (en) * 2015-02-02 2016-07-25 Vestas Wind Sys As Wind turbine access panel and method for securing same

Also Published As

Publication number Publication date
MX2018002408A (es) 2018-08-24
CN113738586A (zh) 2021-12-03
WO2017039923A3 (en) 2017-05-04
CA2997924A1 (en) 2017-03-09
CL2018000552A1 (es) 2018-11-05
WO2017039923A2 (en) 2017-03-09
ZA201801335B (en) 2018-11-28
CN108350863A (zh) 2018-07-31
US11072903B2 (en) 2021-07-27
EP3329119A2 (en) 2018-06-06
US20190010673A1 (en) 2019-01-10

Similar Documents

Publication Publication Date Title
BR112018003752A2 (pt) torre de equipamento, parque de torre de equipamento e método para construir uma torre de equipamento
BR112016027775A8 (pt) estrutura flutuante, procedimento de instalação de uma estrutura flutuante e turbina eólica
WO2019201714A3 (de) Fundament für eine windkraftanlage
WO2013039645A3 (en) Integrated building based air handler for server farm cooling system
BR102016009146A2 (pt) métodos para remover e para instalar um mancal de passo e sistema de polia
BR112018077442A2 (pt) andaime de serviço, módulo de andaime, torre, instalação de energia eólica, e, métodos para erigir e/ou operar um andaime de serviço e para erigir uma torre
Favvata et al. Limit states of RC structures with first floor irregularities
ES2394809B1 (es) Plataforma de mantenimiento
PL427071A1 (pl) Kotwa gruntowa
MX2018002413A (es) Instalacion de escalera para torre de equipo.
NZ749621A (en) Method for modifying concrete slab on subsided ground
NZ593244A (en) A foundation and a method for forming a foundation for a wind turbine tower with angled anchoe hole through a rock flange
BR102017003456A8 (pt) Processo de fabricação de torres de concreto para turbinas eólicas e torre de concreto para turbinas eólicas
WO2010117289A3 (en) Truss tower
CN204163398U (zh) 一种水平爬模系统装置
CN204299259U (zh) 高压线防攀爬线塔
GB2601507B (en) Installing equipment in offshore monopile foundations
CN209217546U (zh) 变电站防火隔板固定装置
Srikanth et al. Dynamic analysis of transmission line towers
PL126334U1 (pl) Podpora pionowa do mocowania w gruncie
DK3880958T3 (da) Indretning til vedligeholdelse af vindmøllevinge og- tårn og et system til at løfte og sænke indretningen
AU2019101512A4 (en) A method of constructing a column, a subterranean structure, and a structure made from the method.
CN203883378U (zh) 落地式架线杆
CN203834912U (zh) 一种电梯安装用平台
NZ715789A (en) Access support for offshore installations

Legal Events

Date Code Title Description
B06U Preliminary requirement: requests with searches performed by other patent offices: procedure suspended [chapter 6.21 patent gazette]
B08F Application dismissed because of non-payment of annual fees [chapter 8.6 patent gazette]

Free format text: REFERENTE A 7A ANUIDADE.

B08K Patent lapsed as no evidence of payment of the annual fee has been furnished to inpi [chapter 8.11 patent gazette]

Free format text: EM VIRTUDE DO ARQUIVAMENTO PUBLICADO NA RPI 2734 DE 30-05-2023 E CONSIDERANDO AUSENCIA DE MANIFESTACAO DENTRO DOS PRAZOS LEGAIS, INFORMO QUE CABE SER MANTIDO O ARQUIVAMENTO DO PEDIDO DE PATENTE, CONFORME O DISPOSTO NO ARTIGO 12, DA RESOLUCAO 113/2013.