CN111727270A - 形成具有细化形状和微结构的铜合金溅射靶的方法 - Google Patents

形成具有细化形状和微结构的铜合金溅射靶的方法 Download PDF

Info

Publication number
CN111727270A
CN111727270A CN201980013285.3A CN201980013285A CN111727270A CN 111727270 A CN111727270 A CN 111727270A CN 201980013285 A CN201980013285 A CN 201980013285A CN 111727270 A CN111727270 A CN 111727270A
Authority
CN
China
Prior art keywords
copper
forging
blank
heat treatment
manganese
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201980013285.3A
Other languages
English (en)
Inventor
斯蒂芬·费拉泽
弗兰克·C·奥尔福德
艾拉·G·诺兰德
埃里克·L·特纳
帕特里克·安德伍德
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Honeywell International Inc
Original Assignee
Honeywell International Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Honeywell International Inc filed Critical Honeywell International Inc
Publication of CN111727270A publication Critical patent/CN111727270A/zh
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21JFORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
    • B21J1/00Preparing metal stock or similar ancillary operations prior, during or post forging, e.g. heating or cooling
    • B21J1/003Selecting material
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C14/00Coating by vacuum evaporation, by sputtering or by ion implantation of the coating forming material
    • C23C14/22Coating by vacuum evaporation, by sputtering or by ion implantation of the coating forming material characterised by the process of coating
    • C23C14/34Sputtering
    • C23C14/3407Cathode assembly for sputtering apparatus, e.g. Target
    • C23C14/3414Metallurgical or chemical aspects of target preparation, e.g. casting, powder metallurgy
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C23/00Extruding metal; Impact extrusion
    • B21C23/001Extruding metal; Impact extrusion to improve the material properties, e.g. lateral extrusion
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21JFORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
    • B21J1/00Preparing metal stock or similar ancillary operations prior, during or post forging, e.g. heating or cooling
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21JFORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
    • B21J1/00Preparing metal stock or similar ancillary operations prior, during or post forging, e.g. heating or cooling
    • B21J1/02Preliminary treatment of metal stock without particular shaping, e.g. salvaging segregated zones, forging or pressing in the rough
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21JFORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
    • B21J1/00Preparing metal stock or similar ancillary operations prior, during or post forging, e.g. heating or cooling
    • B21J1/04Shaping in the rough solely by forging or pressing
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21JFORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
    • B21J1/00Preparing metal stock or similar ancillary operations prior, during or post forging, e.g. heating or cooling
    • B21J1/06Heating or cooling methods or arrangements specially adapted for performing forging or pressing operations
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C9/00Alloys based on copper
    • C22C9/05Alloys based on copper with manganese as the next major constituent
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22FCHANGING THE PHYSICAL STRUCTURE OF NON-FERROUS METALS AND NON-FERROUS ALLOYS
    • C22F1/00Changing the physical structure of non-ferrous metals or alloys by heat treatment or by hot or cold working
    • C22F1/08Changing the physical structure of non-ferrous metals or alloys by heat treatment or by hot or cold working of copper or alloys based thereon

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Crystallography & Structural Chemistry (AREA)
  • Forging (AREA)
  • Physical Vapour Deposition (AREA)

Abstract

本发明公开了一种形成铜锰溅射靶的方法,该方法包括:使铜锰坯料经受第一单向锻造步骤;将铜锰坯料加热至约650℃至约750℃的温度;使铜锰坯料经受第二单向锻造步骤;以及将铜锰坯料加热至约500℃至约650℃的温度,以形成铜合金。

Description

形成具有细化形状和微结构的铜合金溅射靶的方法
技术领域
本公开整体涉及铜锰合金以及形成铜锰合金的方法。更具体地讲,本公开涉及具有细化形状和微结构的铜锰合金。在一些实施方案中,铜锰合金可形成为溅射靶并在各种溅射应用中使用。
背景技术
物理气相沉积(“PVD”)方法广泛用于在各种基材上形成薄膜材料。在称为溅射的一种PVD工艺中,通过用诸如等离子体的气体离子轰击从溅射靶的表面喷射原子。因此,溅射靶是沉积在基材上的材料源。
在图1中示出示例性溅射组件的一部分的示意图。溅射组件10包括背板12,该背板具有结合到其上的溅射靶14。半导体晶圆18定位在组件内并且与溅射靶14的溅射表面16间隔开。在操作中,颗粒或溅射材料22从溅射靶14的表面16移位并沉积在半导体晶圆18的表面上以在晶圆上形成涂层(或薄膜)20。应当理解,图1中描绘的溅射组件10是示例性配置,因为例如靶14和背板12两者可以是任何合适的尺寸或形状。在一些实施方案中,物理气相沉积装置10可包括溅射靶14而没有背板12。该配置称为单片配置。
可使用PVD技术沉积各种金属和合金,包括例如Al、Ti、Cu、Ta、Ni、Mo、Au、Ag、Pt以及这些元素的合金。一种此类合金为铜锰(“CuMn”),其已用于溅射靶以形成例如半导体工业中使用的各种金属互连件。
溅射靶可以由金属或金属合金坯料形成或锻造。使用以较慢冷却速率为特征的各种铸造技术可有利于降低坯料的总杂质并获得具有较高纯度的铸坯,从而获得溅射靶。然而,铸造期间较慢冷却可导致在进一步加工期间可能不利的大的微结构。因此,行业内需要越来越细化的金属和金属合金以及用于形成此类细化金属和金属合金(例如作为坯料)的方法。
发明内容
本公开的各个方面涉及形成铜锰溅射靶的方法。该方法包括使铜锰坯料经受第一单向锻造步骤,使得铜锰坯料的晶粒的数量增加至少10倍。该方法还包括在第一热处理步骤中在约650℃至约750℃的温度下加热铜锰坯料持续约1小时至约3小时。该方法还包括使铜锰坯料经受第二单向锻造步骤,使得坯料的高度降低约40%至95%。该方法还包括在第二热处理步骤中在约500℃至约650℃的温度下加热铜锰坯料持续约4小时至约8小时,以形成铜合金。
本公开的各个方面涉及形成铜合金溅射靶的方法。该方法包括使铜合金坯料经受第一锻造步骤,使得铜合金坯料的晶粒的数量增加至少10倍。该方法还包括在第一锻造步骤之后,在第一热处理步骤中,在足以实现铜合金的100%重结晶的温度和时间下加热铜合金坯料。该方法还包括使铜合金坯料经受第二锻造步骤,使得铜合金坯料的高度降低约40%至95%。该方法还包括在第二锻造步骤之后,在第二热处理步骤中,在足以实现基本上细化的晶粒结构的温度和时间下加热铜合金坯料。该方法还包括将铜合金坯料形成为铜合金溅射靶。
虽然公开了多个实施方案,但是本领域技术人员从以下示出并描述了本发明的例示性实施方案的具体实施方式中将理解本发明的其它实施方案。因此,附图和具体实施方式本质上被认为是例示性的而非限制性的。
附图说明
图1是根据一些实施方案的示例性溅射组件的一部分的示意图。
图2是示例性坯料的透视图。
图3是根据一些实施方案的形成铜锰合金的方法的方框流程图。
图4A至图4C是示出常规加工方法对铜锰合金的效果的照片。
图5是示出根据一些实施方案的两步锻造工艺的效果的照片。
图6A至图6C是示出根据一些实施方案的在25%锻造工艺之后的附加热处理步骤的效果的照片。
图7A至图7C是示出根据一些实施方案的在17%锻造工艺之后的附加热处理步骤的效果的照片。
图8A至图8C是示出根据一些实施方案的在12%锻造工艺之后的附加热处理步骤的效果的照片。
图9是示出根据一些实施方案的热处理温度与第一锻造步骤中的锻造压缩%之间的关系的图。
图10A至图10B是根据一些实施方案的各种大型铜锰合金坯料的晶粒结构的显微照片。
图10C至图10D分别是示出根据一些实施方案的图10A至图10B的铜锰合金的R比率和晶粒尺寸的图。
图11A至图11B是根据一些实施方案的在附加ECAE加工之后的图10A至图10B的铜锰合金的显微照片。
图12A是根据一些实施方案的铜锰合金坯料的R比率的图。
图12B是根据一些实施方案的铜锰合金坯料的晶粒尺寸的图。
具体实施方式
本文公开了一种用于例如溅射靶的铜锰合金。本文还公开了形成铜锰合金的方法。更具体地,本文公开了形成具有细化形状和细化均匀微结构的铜锰合金的方法。
已发现,当经受特定加工技术(诸如例如,与缓慢冷却结合使用的各种铸造技术)时,铜锰合金可以形成大晶粒和/或非均匀晶粒结构。如本文所用,缓慢冷却是指铸造铜锰材料从其熔融温度到环境温度的受控或自然冷却。在缓慢冷却期间,铸造材料保持在与加热阶段和熔融阶段期间使用的相同的坩埚中,并且使其在坩埚内冷却。该技术与其它更快冷却技术相反,诸如将熔融材料从第一坩埚淬火或浇注到第二坩埚,该第二坩埚具有显著低于熔融材料的温度的温度。使铜锰材料经受缓慢冷却可有助于在进一步塑性变形期间(例如在坯料被加工以形成溅射靶时)的坯料变形、坯料裂纹增加以及各种其它缺陷。这种缓慢冷却可降低坯料的总杂质,从而使得能够获得具有较高纯度的铸坯。然而,缓慢冷却可导致在进一步加工期间可能不利的大的微结构。本文所公开的合金和方法在进一步塑性变形期间产生具有改善的形状、减少的裂纹和/或减少的缺陷的铜锰合金。
铜锰合金包含作为主要组分的铜和作为次要组分的锰。相比是次要组分的锰,作为主要组分的铜以更高的重量百分比存在。例如,铜锰合金可包括大于90重量%、大于98重量%、或大于99重量%的铜,以及小于10重量%、小于2.0重量%、小于1.0重量%的锰、小于0.1重量%的锰或小于0.01重量%的锰。在一些实施方案中,铜锰合金可包含铜、锰和一种或多种附加次要组分。在其它实施方案中,铜锰合金可由铜、锰和不可避免的杂质(诸如氧、碳和其它痕量元素)组成。
在一些实施方案中,铜锰合金可具有细化微结构。在各种示例中,微结构的细化量的特征可在于坯料的横截面积与该给定横截面中的晶粒的平均面积的比率R。换句话讲,R可被定义为每坯料横截面的晶粒总数。参考图2,坯料的横截面积是当坯料沿其高度H在直径D处被切成两半时坯料的面F的面积(即,垂直于圆柱形坯料的基部截取的横截面积)。在一些实施方案中,铜锰合金的微结构的特征在于使得其具有大于或等于约500的比率R。铜锰合金可具有大于500的比率R,该比率例如等同于每坯料横截面大于500个晶粒。在一个示例中,具有10英寸高度和10英寸直径的圆柱形坯料具有100in2或64,500mm2的横截面积。如果该坯料中的晶粒的平均直径为约12.82mm或0.5in,则晶粒的平均面积将为约130mm2或0.2in2。因此,比率R将为约500(即,在给定横截面积中将存在约500个晶粒)。在其它示例中,铜锰合金可具有大于1,000、大于10,000、大于100,000、大于1,000,000、或大于10,000,000的比率R。一般来讲,坯料具有给定坯料尺寸所需的特定最小数量的晶粒,以有利于在锻造期间在所有方向上各向同性且均匀的变形。在一些实施方案中,铜锰合金可具有直径小于约150μm、直径小于约100μm、直径小于约80μm、直径小于约50μm、直径小于约25μm、或直径小于约1μm的平均晶粒尺寸。一般来讲,给定坯料的平均晶粒尺寸将根据坯料的尺寸和/或横截面积而变化。
在一些实施方案中,铜锰合金坯料可具有细化形状。坯料可具有基本上等轴、圆形或倒圆形状的顶面和/或底面。例如,坯料的顶面和/或底面可在所有方向上具有大致相等的尺寸。换句话讲,顶面和/或底面在一个方向上的直径大致等于顶面和/或底面在相反/垂直方向上的直径。在一些实施方案中,坯料的顶面和底面的纹理是均匀的和/或平滑的。坯料还可被形成为使得在坯料的边缘处可不存在可检测到的显著突起。
在图3中示出形成铜锰合金的方法100。方法100包括在初始加工步骤110中形成起始材料。例如,可使用各种铸造技术结合缓慢冷却将铜材料铸成坯料形式,如上所述。铜材料可包含添加剂,诸如与铜进行合金以形成铜合金的其它元素。例如,铜材料可包含作为主要组分的铜和作为次要组分的一种或多种元素。在一个示例中,铜材料可包含作为次要组分的锰。在一些实施方案中,铜锰材料可使用包含铜和锰两者的铜合金的标准铸造实践来形成。
在初始加工之后,使铜锰合金经受第一加工步骤102。在一些实施方案中,第一加工步骤102包括第一锻造步骤112和第一热处理步骤114。在各种实施方案中,第一锻造步骤112可包括将铜锰坯料的高度降低约10%至约33%。例如,第一锻造步骤112可包括使铜锰坯料的高度的降低为10%降低至25%降低、12%降低至25%降低、约15%降低至25%降低、或17%降低至25%降低。在一些实施方案中,第一锻造步骤112为单向锻造或单轴锻造,使得沿一个平面或轴线锻造坯料。在一些实施方案中,在第一锻造步骤112期间,晶粒结构可被细化至少约10倍,使得作为第一锻造步骤112的结果,铜锰坯料中的晶粒现有总数增加至少约10倍。例如,与锻造之前的铜锰坯料中的晶粒总数相比,在锻造之后,铜锰坯料中的晶粒总数增加至少10倍。在另一个示例中,在第一锻造步骤112之前具有总共约10个晶粒的材料将在第一锻造步骤112之后具有总共至少约100个晶粒。
在第一锻造步骤112之后,使铜锰合金经受第一热处理步骤114。第一热处理步骤114可包括在约650℃至约750℃、约675℃至约750℃、或约675℃至约700℃的温度下加热铜锰坯料持续约0.5小时至约3小时的时段或持续约1.5小时至约2小时的时段。例如,在一个实施方案中,可在约700℃的温度下加热铜锰坯料持续约2小时的时段。在一些实施方案中,第一热处理步骤114可进行持续足以在坯料内达到温度均匀性和平衡的时间。在其它实施方案中,第一热处理步骤114可在足以使得晶粒不再生的温度和时间下进行。在又其它实施方案中,第一热处理步骤114可在足以获得现有晶粒结构的约80%至100%重结晶、现有晶粒结构的约90%至100%重结晶或现有晶粒结构的完全重结晶的温度和时间下进行。在一些示例中,如上所述,晶粒结构可被细化至少约10倍,使得作为第一热处理步骤114的结果,铜锰坯料中的晶粒现有总数增加至少约10倍。例如,在第一热处理步骤114之前在给定横截面中具有总共约100个晶粒的铜锰坯料将在第一热处理步骤之后具有总共至少约1,000个晶粒。在其它实施方案中,晶粒结构可被细化至少约50倍、至少约100倍、至少约1,000倍、至少约10,000倍、至少约100,000倍或大于100,000倍。
在第一热处理步骤114之后,可使铜锰合金经受包括第二锻造步骤116和第二热处理步骤118的第二加工步骤104。在一些实施方案中,第二锻造步骤116可包括将坯料的高度降低至最终所需高度。坯料的最终所需高度将根据多种因素而变化。在一些实施方案中,第二锻造步骤116可根据需要将坯料的高度从约40%降低至约80%或从约50%降低至约70%。在一些实施方案中,在第二锻造步骤116之后,铜锰坯料的形状是基本上等轴的。例如,坯料的形状在第二锻造步骤116之后可比在第一锻造步骤112之后更等轴。在一些实施方案中,第二锻造步骤116为单向锻造或单轴锻造,使得沿一个平面或轴线锻造坯料。
在第二锻造步骤116之后,可使铜锰坯料经受第二热处理步骤118。在一些实施方案中,可将铜锰坯料加热至低于第一热处理步骤114的温度的温度。例如,可将铜锰坯料加热至约500℃至约650℃、约550℃至约650℃、或约600℃至约650℃的温度持续约4小时至约8小时的时段,以形成铜锰合金。在一些实施方案中,铜锰合金可在第二热处理步骤118之后具有基本上细化的晶粒结构。例如,在第二热处理步骤118之后,铜合金可具有直径小于约150μm、小于约100μm、小于约80μm、小于约50μm、小于约25μm、或小于约1μm的平均晶粒尺寸。
在第二热处理步骤118之后,铜合金可根据需要在最终加工步骤120中进行进一步加工。在一些实施方案中,可使铜锰坯料经受附加加工步骤,如上所述。在其它实施方案中,可使铜锰坯料经受多种常规加工技术,诸如任选的附加锻造、轧制和/或剧烈塑性变形诸如等通道转角挤压(ECAE),以根据需要进一步细化微结构。在又其它实施方案中,铜合金可形成为溅射靶以在各种溅射应用中使用。
本公开的各种实施方案和示例描述了用于形成具有细化形状和/或细化均匀微结构的铜锰合金的方法。一般来讲,合金坯料必须具有与合金坯料的尺寸有关的特定最小数量的晶粒(即,基本上细化的微结构),以在进行锻造、轧制、ECAE和/或其它加工技术时以均匀方式变形。因此,本发明所公开的合金的优点包括例如合金坯料在加工期间的均匀变形。在其中需要进一步加工诸如附加锻造、轧制和/或ECAE的特定示例中,本方法可有利于所得合金产品中的更少的裂纹和/或其它表面缺陷。
实施例
以下非限制性实施例说明了本发明的各种特征和特性,本发明不应解释为限制于此。
进行以下实验以评估各种锻造压缩量和热处理温度对铜锰合金坯料的形状和晶粒结构的效果。在所有以下实验中使用的材料为6N铜锰(CuMn)合金,该铜锰合金具有作为主要组分的铜和浓度为0.69重量%的作为次要组分的锰。初始铸态晶粒尺寸的平均直径为数厘米,并且晶粒始终是非均匀的。
第一锻造工艺包括单向两步热锻工艺,该单向两步热锻工艺包括在烘箱中加热铜锰坯料持续足以达到温度均匀性和平衡的时间。在大多数实施例中,这包括约550℃的平均温度持续约1.5小时至2小时的时段。在加热后,将铜锰坯料锻造至所需压缩率,如以下实施例中所述。
第一热处理工艺包括将铜锰坯料加热至足以诱导重结晶的温度。在大多数实施例中,这包括将坯料加热至约700℃的平均温度持续约2小时的时段。然而,这些参数并非旨在为限制的。
实施例1:常规加工方法对铜锰坯料的效果
观察到了常规加工方法(例如,单步锻造)对铜锰坯料的形状和晶粒结构的效果。在第一热处理中,将坯料加热至约550℃的温度持续约2小时的时段。然后使坯料经受单个锻造步骤,其中高度总共降低约70%。在第二热处理中,然后将坯料加热至各种选定温度持续约1.5小时的时段,如下所述。
在图4A至图4C中示出单步锻造的结果。图4A示出了在第二热处理步骤期间被加热至约550℃的温度的铜锰坯料。图4B示出了在第二热处理步骤期间被加热至约650℃的温度的铜锰坯料。图4C示出了在第二热处理步骤期间被加热至约800℃的温度的铜锰坯料。如图所示,在所有三个示例中,坯料的形状为基本上长方形且非均匀的。因此,已确定,单步锻造不足以产生基本上等轴的坯料,并且提高第二热处理的温度不会解决该缺陷。
实施例2:具有25%降低的两步锻造的效果
观察到了两步锻造的效果,其中第一锻造步骤对铜锰坯料的形状和晶粒结构造成了25%的降低。在第一锻造步骤之后进行第一热处理步骤,在该第一热处理步骤中,将坯料加热至700℃的温度持续两个小时的时段。然后在第二锻造步骤中将坯料锻造成最终所需厚度(70%降低)。不应用第二热处理步骤。
如图5所示,与利用单步锻造加工的实施例1的坯料相比,实施例2的坯料的形状是基本上等轴的。实施例2的坯料在第二锻造步骤之后也具有细小的重结晶微结构。
实施例3:附加热处理的效果
观察到了第二锻造步骤之后的附加热处理步骤对铜锰坯料的形状和晶粒结构的效果。使铜锰坯料经受实施例2的工艺。第一锻造步骤包括25%降低,并且在该第一锻造步骤之后进行第一热处理步骤,在该第一热处理步骤中,将坯料加热至700℃的温度持续两个小时的时段。然后使坯料经受第二锻造步骤,在该第二锻造步骤中,将坯料降低至最终所需厚度(70%降低)。在第二锻造步骤之后,然后使坯料经受如下表1所示的第二加热步骤。
表1
实验 第二热处理温度(℃) 第二热处理持续时间(小时)
A 550 2
B 600 2
在图6A至图6C中示出实施例3的结果。图6A示出了在第二锻造步骤之后且在第二热处理步骤之前可直接使用的铜锰坯料的晶粒结构。图6B示出了在第二热处理步骤之后实验A的铜锰坯料的晶粒结构。如图所示,晶粒结构比图6A的可直接使用的坯料的晶粒结构更细化。图6C示出了在第二热处理步骤之后实验B的铜锰坯料的晶粒结构。如图所示,晶粒结构比可直接使用的坯料和图6B的坯料两者的晶粒结构更细化。因此,已确定,在第二锻造步骤之后的附加热处理步骤产生越来越细化的微结构。
实施例4:具有17%降低的两步锻造的效果
观察到了两步锻造的效果,其中第一锻造步骤对铜锰坯料的形状和晶粒结构造成了17%的降低。在第一锻造步骤之后进行热处理步骤,在该热处理步骤中,将坯料加热至700℃的温度持续两个小时的时段。然后在第二锻造步骤中将坯料锻造成最终所需厚度(70%降低)。
与利用单步锻造加工的实施例1的坯料相比,实施例4的坯料的形状是基本上等轴的。实施例4的坯料在第二锻造步骤之后也具有细小的重结晶微结构。
实施例5:附加热处理的效果
观察到了第二锻造步骤之后的附加热处理步骤对铜锰坯料的形状和晶粒结构的效果。使铜锰坯料经受实施例4的工艺。使坯料经受第一锻造步骤,在该第一锻造步骤中,使用具有17%降低的两步锻造。在第一锻造步骤之后进行第一热处理步骤,在该第一热处理步骤中,将坯料加热至700℃的温度持续两个小时的时段。然后使坯料经受第二最终锻造步骤,在该第二最终锻造步骤中,将坯料降低至最终所需厚度(70%降低)。在第二锻造步骤之后,将坯料加热至如下表2所示的各种选定温度。
表2
实验 第二热处理温度(℃) 第二热处理持续时间(小时)
A 550 2
B 600 2
在图7A至图7C中示出实施例5的结果。图7A示出了在第二锻造步骤之后且在第二热处理步骤之前可直接使用的铜锰坯料的晶粒结构。图7B示出了在第二热处理步骤之后实验A的铜锰坯料的晶粒结构。如图所示,晶粒结构比图7A的可直接使用的坯料的晶粒结构更细化。图7C示出了在第二热处理步骤之后实验B的铜锰坯料的晶粒结构。如图所示,晶粒结构比图7A的可直接使用的坯料的晶粒结构更细化。因此,已确定,在第二锻造步骤之后的附加热处理步骤产生越来越细化的微结构。
实施例6:具有12%降低的两步锻造的效果
观察到了两步锻造的效果,其中第一锻造步骤对铜锰坯料的形状和晶粒结构造成了12%的降低。在第一锻造步骤之后进行热处理步骤,在该热处理步骤中,将坯料加热至700℃的温度持续两个小时的时段。然后在第二锻造步骤中将坯料锻造成最终所需厚度(70%降低)。
与利用单步锻造加工的实施例1的坯料相比,实施例6的坯料的形状是基本上等轴的。实施例6的坯料在第二锻造步骤之后也具有细小的重结晶微结构。
实施例7:附加热处理的效果
观察到了第二锻造步骤之后的附加热处理步骤对铜锰坯料的形状和晶粒结构的效果。使铜锰坯料经受实施例6的工艺。使坯料经受第一锻造步骤,在该第一锻造步骤中,使用具有12%降低的两步锻造。在第一锻造步骤之后进行第一热处理步骤,在该第一热处理步骤中,将坯料加热至700℃的温度持续两个小时的时段。然后使坯料经受第二最终锻造步骤,在该第二最终锻造步骤中,将坯料降低至最终所需厚度(70%降低)。在第二锻造步骤之后,然后将坯料加热至如下表3所示的各种选定温度。
表3
实验 第二热处理温度(℃) 第二热处理持续时间(小时)
A 550 2
B 600 2
C 650 2
在图8A至图8C中示出实施例7的结果。图8A示出了在第二热处理步骤之后实验A的铜锰坯料的晶粒结构。如图所示,还细化了除了在坯料的顶部中心和底部中心处的部分之外的晶粒结构。图8B示出了在第二热处理步骤之后实验B的铜锰坯料的晶粒结构。如图所示,晶粒结构比图8A的坯料的晶粒结构更细化。坯料在坯料的顶部中心和底部中心处确实包含未细化部分(例如,大晶粒)。图8C示出了在第二热处理步骤之后实验C的铜锰坯料的晶粒结构。晶粒结构比实验A和实验B的两个坯料的晶粒结构更细化。
该实施例示出了热处理温度与第一锻造步骤中的锻造压缩%之间的明显相互效果。即,在第一锻造步骤期间经受较小压缩率的坯料需要较高热处理温度,以便实现类似的晶粒结构。在图9中示出这种关系。例如,在第一锻造步骤期间经历仅17%降低的坯料需要在第二热处理步骤期间重结晶(即,热处理温度)为约700℃,而经历较高压缩率的坯料需要较低热处理温度,以便实现类似的晶粒结构。
实施例8:两步锻造对大型坯料的效果
使两个大型(10英寸乘10英寸)坯料经受以下工艺。称为样品1的一个坯料为具有0.69重量%锰的6N铜锰合金,而称为样品2的另一个坯料为具有0.43重量%锰的铜锰合金。首先使两个铸态坯料经受具有25%降低的第一锻造步骤。然后将坯料加热至约700℃的温度持续约两小时的时段。然后使坯料经受具有70%降低的第二锻造步骤。然后将坯料加热至约600℃的温度持续约四小时的时段。
表4
Figure BDA0002631325450000111
样品1和样品2两者具有基本上等轴的形状和细小的重结晶微结构。如表4和图10A、图10B和图10D所示,在具有25%降低的第一两步锻造和后续热处理步骤之后,样品1的平均晶粒结构小于150μm(约121μm)。在第二两步锻造和后续热处理步骤之后,平均晶粒结构小于80μm(约61μm)。如表4和图10D所示,获得样品2的类似数据。
图10C示出了第一两步锻造和后续热处理步骤以及第二两步锻造和后续热处理步骤之后的比率R和晶粒尺寸。例如,样品1的比率R从约35增加至第一两步锻造和后续热处理步骤之后的大于4百万,并且增加至第二两步锻造和后续热处理步骤之后的大于1400万。获得样品2的类似数据,如表4和图10C所示。
实施例9:大型坯料的附加变形的效果
在实施例8所述的第二两步锻造和后续热处理步骤之后,利用ECAE进一步加工实施例8的两个大型坯料。使坯料经受四次ECAE(例如,当量压缩率超过99.9%的总变形),以便实现晶粒尺寸和纹理的微结构细化。样品1的平均晶粒尺寸在下表5中示出。
表5
Figure BDA0002631325450000121
在ECAE工艺期间未观察到坯料的不利裂纹,并且获得细小且均匀的微结构。如图11A和图11B所示,ECAE工艺后样品1的平均晶粒结构小于1微米。图11A示出了在坯料的顶面的中心处的晶粒结构。图11B示出了在坯料的顶面的边缘处的晶粒结构。样品2具有与上表5中所示类似的微结构。
实施例10:两步锻造对小型坯料的效果
使称为样品1和样品2的具有约1英寸高度和约1.5英寸直径的两个小型坯料经受以下工艺。两个坯料均为具有0.69重量%锰的6N铜锰合金。样品1和样品2分别具有约18,500μm和16,000μm的初始铸态晶粒尺寸。
使样品1经受具有12%降低的第一锻造步骤。使样品2经受具有25%降低的第一锻造步骤。然后将两个坯料加热至约700℃的温度持续约两小时的时段。然后使两个坯料经受具有70%降低的第二锻造步骤,并加热至约600℃的温度持续约四小时的时段。在下表6中示出结果。
表6
Figure BDA0002631325450000122
两个坯料具有基本上等轴的形状和细小的重结晶微结构。如表6和图12B所示,在第一25%锻造步骤和后续热处理步骤之后,样品2的平均晶粒结构小于150μm(约101μm)。在第二锻造步骤和后续热处理步骤之后,样品2的平均晶粒结构小于80μm(约60μm)。如图所示,获得样品1的类似数据。
表6和图12A示出了两个样品在第一锻造步骤和第一热处理步骤以及第二锻造步骤和第二热处理步骤之后R比率的增大。例如,在第一锻造步骤和后续热处理步骤之后,样品2的R比率从4增加至约100,660。在第二锻造步骤和后续热处理步骤之后,然后样品2的R比率增加至约285,232。如图所示,获得样品1的类似数据。
在不脱离本发明的范围的情况下,可以对所讨论的示例性实施方案进行各种修改和添加。例如,虽然上述实施方案涉及特定特征结构,但是本发明的范围还包括具有不同特征结构组合的实施方案和不包括所有上述特征结构的实施方案。

Claims (10)

1.一种形成铜合金溅射靶的方法,所述方法包括:
使铜合金坯料经受第一锻造步骤,使得与锻造之前的所述铜合金坯料中的晶粒总数相比,在锻造之后,所述铜合金坯料中的晶粒总数增加至少10倍;
在所述第一锻造步骤之后,在第一热处理步骤中,在足以实现铜合金的100%重结晶的温度和时间下加热所述铜合金坯料;
使所述铜合金坯料经受第二锻造步骤,使得所述铜合金坯料的高度降低约40%至95%;
在所述第二锻造步骤之后,在第二热处理步骤中,在足以实现基本上细化的晶粒结构的温度和时间下加热所述铜合金坯料;以及
将所述铜合金坯料形成为铜合金溅射靶。
2.根据权利要求1所述的方法,其中所述铜合金包含作为主要组分的铜和作为次要组分的锰。
3.根据权利要求1所述的方法,其中所述第一热处理步骤在使得所述晶粒不再生的温度和时间下进行。
4.根据权利要求1所述的方法,其中所述第一热处理步骤在约650℃至约750℃的温度下进行约1小时至约3小时。
5.根据权利要求1所述的方法,其中所述铜合金在所述第二热处理步骤之后具有至少500的R比率。
6.根据权利要求5所述的方法,其中所述R比率为约100,000至100,000,000。
7.根据权利要求1所述的方法,还包括在所述第二热处理步骤之后利用ECAE等通道转角挤压(ECAE)加工所述铜合金坯料。
8.根据权利要求1所述的方法,其中在所述第二锻造步骤之后,所述坯料的形状是基本上等轴的。
9.根据权利要求1所述的方法,其中所述第一锻造步骤和所述第二锻造步骤包括单向锻造。
10.根据权利要求1所述的方法,其中所述铜合金在所述第二热处理步骤之后具有小于约80μm的平均晶粒尺寸。
CN201980013285.3A 2018-02-01 2019-01-31 形成具有细化形状和微结构的铜合金溅射靶的方法 Pending CN111727270A (zh)

Applications Claiming Priority (5)

Application Number Priority Date Filing Date Title
US201862625122P 2018-02-01 2018-02-01
US62/625,122 2018-02-01
US16/247,232 US11035036B2 (en) 2018-02-01 2019-01-14 Method of forming copper alloy sputtering targets with refined shape and microstructure
US16/247,232 2019-01-14
PCT/US2019/016044 WO2019152646A1 (en) 2018-02-01 2019-01-31 Method of forming copper alloy sputtering targets with refined shape and microstructure

Publications (1)

Publication Number Publication Date
CN111727270A true CN111727270A (zh) 2020-09-29

Family

ID=67391914

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201980013285.3A Pending CN111727270A (zh) 2018-02-01 2019-01-31 形成具有细化形状和微结构的铜合金溅射靶的方法

Country Status (7)

Country Link
US (1) US11035036B2 (zh)
EP (1) EP3746579A4 (zh)
JP (1) JP7426936B2 (zh)
KR (1) KR20200106084A (zh)
CN (1) CN111727270A (zh)
TW (1) TWI802646B (zh)
WO (1) WO2019152646A1 (zh)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10760156B2 (en) * 2017-10-13 2020-09-01 Honeywell International Inc. Copper manganese sputtering target
CN113305172B (zh) * 2021-05-21 2022-09-27 中国矿业大学 一种gh4169合金棒材的制备方法
CN114032480A (zh) * 2021-11-10 2022-02-11 中国航发北京航空材料研究院 一种提高镍基难变形高温合金组织均匀性的方法
CN115341161B (zh) * 2022-08-22 2023-06-23 宁波江丰电子材料股份有限公司 一种铜铝合金靶材及其制备方法与应用

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2004011691A1 (en) * 2002-07-16 2004-02-05 Honeywell International Inc. Copper sputtering targets and methods of forming copper sputtering targets
US20090045051A1 (en) * 2007-08-13 2009-02-19 Stephane Ferrasse Target designs and related methods for coupled target assemblies, methods of production and uses thereof
CN102791905A (zh) * 2010-03-11 2012-11-21 株式会社东芝 溅射靶及其制造方法、以及半导体元件的制造方法
CN104746020A (zh) * 2013-12-27 2015-07-01 有研亿金新材料股份有限公司 一种铜合金靶材的加工方法
JP6202131B1 (ja) * 2016-04-12 2017-09-27 三菱マテリアル株式会社 銅合金製バッキングチューブ及び銅合金製バッキングチューブの製造方法

Family Cites Families (129)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2637777B2 (ja) 1988-07-29 1997-08-06 株式会社日立製作所 光磁気記録媒体およびその製造方法
TW289900B (zh) 1994-04-22 1996-11-01 Gould Electronics Inc
JP3769761B2 (ja) 1994-04-28 2006-04-26 住友化学株式会社 アルミニウム合金単結晶ターゲットおよびその製造方法
EP0855451A4 (en) 1995-10-12 1999-10-06 Toshiba Kk WIRING FILM, ION BOMBING SPRAYING TARGET FOR FORMING THIS FILM AND ELECTRONIC COMPONENT COMPRISING THIS FILM
DE69738612T2 (de) 1996-11-20 2009-07-09 Kabushiki Kaisha Toshiba Sputtertarget
JPH10330929A (ja) 1997-05-28 1998-12-15 Japan Energy Corp スパッタリングタ−ゲット用バッキングプレ−ト及びスパッタリングタ−ゲット/バッキングプレ−ト組立体
US6569270B2 (en) 1997-07-11 2003-05-27 Honeywell International Inc. Process for producing a metal article
US6736947B1 (en) 1997-12-24 2004-05-18 Kabushiki Kaisha Toshiba Sputtering target, A1 interconnection film, and electronic component
AU4410499A (en) 1998-05-28 1999-12-13 Sputtering Materials, Inc. Target for pvd and similar processes
JP2000034562A (ja) * 1998-07-14 2000-02-02 Japan Energy Corp スパッタリングターゲット及び薄膜形成装置部品
JP2000348383A (ja) 1999-06-07 2000-12-15 Mitsubishi Chemicals Corp 光学的情報記録用媒体及びその製造方法
TWI278525B (en) * 1999-12-16 2007-04-11 Honeywell Int Inc Copper sputtering targets and methods of forming copper sputtering targets
US6878250B1 (en) 1999-12-16 2005-04-12 Honeywell International Inc. Sputtering targets formed from cast materials
JP4718664B2 (ja) 2000-05-22 2011-07-06 株式会社東芝 スパッタリングターゲットの製造方法
JP4900992B2 (ja) 2000-07-21 2012-03-21 株式会社東芝 スパッタリングターゲットとそれを用いたGe層、Ge化合物層、Ge合金層および光ディスク、電気・電子部品、磁気部品
JP4900993B2 (ja) 2000-08-30 2012-03-21 株式会社東芝 スパッタリングターゲットとそれを用いたGe系薄膜の製造方法
JP2002141201A (ja) 2000-11-02 2002-05-17 Koa Corp 薄膜抵抗器及びその製造方法
JP4936613B2 (ja) 2001-08-24 2012-05-23 株式会社東芝 スパッタリングターゲット
WO2006025347A1 (ja) 2004-08-31 2006-03-09 National University Corporation Tohoku University 銅合金及び液晶表示装置
US20040104110A1 (en) 2002-02-20 2004-06-03 Lee Eal H. Topologically tailored sputtering targets
US7260053B2 (en) 2002-04-02 2007-08-21 Ricoh Company, Ltd. Optical recording medium, process for manufacturing the same, sputtering target for manufacturing the same, and optical recording process using the same
JP4305809B2 (ja) 2002-07-10 2009-07-29 日立金属株式会社 Ag合金系スパッタリングターゲット材
JP2004076080A (ja) 2002-08-14 2004-03-11 Tosoh Corp 配線用薄膜およびスパッタリングターゲット
JP4794802B2 (ja) 2002-11-21 2011-10-19 Jx日鉱日石金属株式会社 銅合金スパッタリングターゲット及び半導体素子配線
JP4534417B2 (ja) 2002-12-13 2010-09-01 ソニー株式会社 スパッタターゲットの製造方法
JP3994386B2 (ja) 2002-12-24 2007-10-17 日立金属株式会社 Ag合金膜、平面表示装置およびAg合金膜形成用スパッタリングターゲット材
JP4237479B2 (ja) 2002-12-25 2009-03-11 株式会社東芝 スパッタリングターゲット、Al合金膜および電子部品
JP4223511B2 (ja) 2003-03-17 2009-02-12 日鉱金属株式会社 銅合金スパッタリングターゲット及びその製造方法並びに半導体素子配線
JPWO2004092440A1 (ja) 2003-04-16 2006-07-06 株式会社ブリヂストン 多孔質薄膜の形成方法
JP4379602B2 (ja) 2003-08-20 2009-12-09 三菱マテリアル株式会社 半透明反射膜または反射膜を構成層とする光記録媒体および前記反射膜の形成に用いられるAg合金スパッタリングターゲット
US20050040030A1 (en) 2003-08-20 2005-02-24 Mcdonald Peter H. Method of treating sputtering target to reduce burn-in time and sputtering target thereof and apparatus thereof
JP2006044215A (ja) 2003-11-10 2006-02-16 Ricoh Co Ltd 光記録媒体及びその製造方法、スパッタリングターゲット、並びに光記録媒体の使用方法及び光記録装置
WO2005051671A1 (ja) 2003-11-28 2005-06-09 Ricoh Company, Ltd. 光記録媒体及びその製造方法、スパッタリングターゲット、並びに光記録媒体の使用方法及び光記録再生装置
JP4351036B2 (ja) 2003-12-15 2009-10-28 日鉱金属株式会社 スパッタリングターゲット
US7256980B2 (en) 2003-12-30 2007-08-14 Du Pont Thin film capacitors on ceramic
JP2005313230A (ja) 2004-03-29 2005-11-10 Kiyohito Ishida 高温実装用接合材料
US8252126B2 (en) 2004-05-06 2012-08-28 Global Advanced Metals, Usa, Inc. Sputter targets and methods of forming same by rotary axial forging
JP2006005104A (ja) 2004-06-16 2006-01-05 Sumitomo Metal Mining Co Ltd 薄膜抵抗体、薄膜抵抗体の製造方法および薄膜抵抗体製造用スパッタリングターゲット
US20050279630A1 (en) 2004-06-16 2005-12-22 Dynamic Machine Works, Inc. Tubular sputtering targets and methods of flowforming the same
JP5068925B2 (ja) 2004-09-03 2012-11-07 Jx日鉱日石金属株式会社 スパッタリングターゲット
US20060071338A1 (en) 2004-09-30 2006-04-06 International Business Machines Corporation Homogeneous Copper Interconnects for BEOL
JP4953615B2 (ja) 2004-11-02 2012-06-13 株式会社ブリヂストン 色素増感型太陽電池用半導体電極の製造方法及び色素増感型太陽電池の製造方法
JP4117001B2 (ja) 2005-02-17 2008-07-09 株式会社神戸製鋼所 薄膜トランジスタ基板、表示デバイス、および表示デバイス用のスパッタリングターゲット
WO2006110667A2 (en) 2005-04-11 2006-10-19 Intematix Corporation Biased target ion beam deposition (btibd) for the production of combinatorial materials libraries
JP4589835B2 (ja) 2005-07-13 2010-12-01 富士通セミコンダクター株式会社 半導体装置の製造方法及び半導体装置
JP4756458B2 (ja) 2005-08-19 2011-08-24 三菱マテリアル株式会社 パーティクル発生の少ないMn含有銅合金スパッタリングターゲット
JP4236201B2 (ja) 2005-08-30 2009-03-11 富士通マイクロエレクトロニクス株式会社 半導体装置の製造方法
TWI296286B (en) 2005-12-20 2008-05-01 Chung Shan Inst Of Science Method of manufacturing al and al alloy sputtering target
EP1972014A1 (de) 2006-01-03 2008-09-24 Basf Se Photovoltaisch aktives halbleitermaterial und photovoltaische zelle
ATE553223T1 (de) 2006-02-28 2012-04-15 Advanced Interconnect Materials Llc Halbleitervorrichtung, herstellungsverfahren dafür und sputtern von zielmaterial zur verwendung für das verfahren
WO2007102988A2 (en) 2006-03-06 2007-09-13 Tosoh Smd, Inc. Electronic device, method of manufacture of same and sputtering target
EP1845554A3 (en) 2006-04-10 2011-07-13 Imec A method to create super secondary grain growth in narrow trenches
US20070251818A1 (en) * 2006-05-01 2007-11-01 Wuwen Yi Copper physical vapor deposition targets and methods of making copper physical vapor deposition targets
JP2008013848A (ja) 2006-06-08 2008-01-24 Tokyo Electron Ltd 成膜装置及び成膜方法
CN101501820B (zh) 2006-08-10 2012-11-28 株式会社爱发科 导电膜形成方法、薄膜晶体管、带薄膜晶体管的面板、及薄膜晶体管的制造方法
JP2008091645A (ja) 2006-10-02 2008-04-17 Tokyo Electron Ltd 半導体製造装置、半導体装置の製造方法及び記憶媒体
WO2008041535A1 (en) * 2006-10-03 2008-04-10 Nippon Mining & Metals Co., Ltd. Cu-Mn ALLOY SPUTTERING TARGET AND SEMICONDUCTOR WIRING
KR101067364B1 (ko) 2006-10-12 2011-09-23 울박, 인크 도전막 형성 방법, 박막 트랜지스터, 박막 트랜지스터를 갖는 패널 및 박막 트랜지스터의 제조 방법
TW200822232A (en) 2006-11-06 2008-05-16 Chunghwa Picture Tubes Ltd Thin film transistor and fabrication method thereof
JP5076452B2 (ja) 2006-11-13 2012-11-21 富士通セミコンダクター株式会社 半導体装置の製造方法
US20080121516A1 (en) 2006-11-29 2008-05-29 Jaydeep Sarkar Method and apparatus for treating sputtering target to reduce burn-in time and sputtering targets made thereby
US20080131735A1 (en) 2006-12-05 2008-06-05 Heraeus Incorporated Ni-X, Ni-Y, and Ni-X-Y alloys with or without oxides as sputter targets for perpendicular magnetic recording
WO2008084867A1 (ja) 2007-01-10 2008-07-17 Nec Corporation 半導体装置及びその製造方法
JP5103914B2 (ja) 2007-01-31 2012-12-19 富士通セミコンダクター株式会社 半導体装置の製造方法及び半導体装置
JP4324617B2 (ja) 2007-02-26 2009-09-02 東京エレクトロン株式会社 スパッタ成膜方法及びスパッタ成膜装置
JP5141683B2 (ja) 2007-03-27 2013-02-13 富士通セミコンダクター株式会社 半導体装置の製造方法
JP4496237B2 (ja) 2007-05-14 2010-07-07 株式会社 日立ディスプレイズ 液晶表示装置
JP2009016782A (ja) 2007-06-04 2009-01-22 Tokyo Electron Ltd 成膜方法及び成膜装置
JP2008306043A (ja) 2007-06-08 2008-12-18 Ulvac Japan Ltd 配線膜の形成方法、トランジスタ、及び電子装置
US20090065354A1 (en) 2007-09-12 2009-03-12 Kardokus Janine K Sputtering targets comprising a novel manufacturing design, methods of production and uses thereof
US20090117731A1 (en) 2007-11-01 2009-05-07 Taiwan Semiconductor Manufacturing Co., Ltd. Semiconductor interconnection structure and method for making the same
US8168532B2 (en) 2007-11-14 2012-05-01 Fujitsu Limited Method of manufacturing a multilayer interconnection structure in a semiconductor device
US8304909B2 (en) 2007-12-19 2012-11-06 Intel Corporation IC solder reflow method and materials
JP5366235B2 (ja) 2008-01-28 2013-12-11 東京エレクトロン株式会社 半導体装置の製造方法、半導体製造装置及び記憶媒体
US8143093B2 (en) 2008-03-20 2012-03-27 Applied Materials, Inc. Process to make metal oxide thin film transistor array with etch stopping layer
US7932176B2 (en) 2008-03-21 2011-04-26 President And Fellows Of Harvard College Self-aligned barrier layers for interconnects
US20090242385A1 (en) 2008-03-28 2009-10-01 Tokyo Electron Limited Method of depositing metal-containing films by inductively coupled physical vapor deposition
JP2009266985A (ja) 2008-04-24 2009-11-12 Philtech Inc 半導体装置の製造装置
US20090321934A1 (en) 2008-06-30 2009-12-31 Lavoie Adrien R Self-aligned cap and barrier
US20090321935A1 (en) 2008-06-30 2009-12-31 O'brien Kevin Methods of forming improved electromigration resistant copper films and structures formed thereby
JP5420328B2 (ja) 2008-08-01 2014-02-19 三菱マテリアル株式会社 フラットパネルディスプレイ用配線膜形成用スパッタリングターゲット
US8039390B2 (en) 2008-08-05 2011-10-18 Rohm Co., Ltd. Method of manufacturing semiconductor device
US8110504B2 (en) 2008-08-05 2012-02-07 Rohm Co., Ltd. Method of manufacturing semiconductor device
JP5277808B2 (ja) 2008-09-09 2013-08-28 三菱マテリアル株式会社 微細結晶粒銅材料の製造方法
US8258626B2 (en) 2008-09-16 2012-09-04 Advanced Interconnect Materials, Llc Copper interconnection, method for forming copper interconnection structure, and semiconductor device
JP5100846B2 (ja) 2008-11-07 2012-12-19 パナソニック株式会社 情報記録媒体とその製造方法、およびスパッタリングターゲット
JP5530118B2 (ja) 2009-04-08 2014-06-25 東京エレクトロン株式会社 酸化マンガン膜の形成方法、半導体装置の製造方法および半導体装置
JP5550848B2 (ja) 2009-04-17 2014-07-16 株式会社Shカッパープロダクツ 配線構造の製造方法、及び配線構造
JP5548396B2 (ja) 2009-06-12 2014-07-16 三菱マテリアル株式会社 薄膜トランジスタ用配線層構造及びその製造方法
JP5481989B2 (ja) 2009-07-22 2014-04-23 富士通セミコンダクター株式会社 半導体装置の製造方法
DE112010003274T5 (de) 2009-08-12 2012-12-27 Ulvac, Inc. Verfahren zur Herstellung eines Sputtertargets sowie Sputtertarget
US8324738B2 (en) 2009-09-01 2012-12-04 Taiwan Semiconductor Manufacturing Company, Ltd. Self-aligned protection layer for copper post structure
KR20120082943A (ko) * 2009-11-17 2012-07-24 도시바 마테리알 가부시키가이샤 탄탈 스퍼터링 타겟 및 탄탈 스퍼터링 타겟의 제조 방법 및 반도체 소자의 제조 방법
JP5467641B2 (ja) 2010-03-31 2014-04-09 山陽特殊製鋼株式会社 スパッタリングターゲット材の製造方法
US20110266676A1 (en) 2010-05-03 2011-11-03 Toshiba America Electronic Components, Inc. Method for forming interconnection line and semiconductor structure
US20110281136A1 (en) 2010-05-14 2011-11-17 Jenq-Gong Duh Copper-manganese bonding structure for electronic packages
JP2011256457A (ja) 2010-06-11 2011-12-22 Toshiba Corp スパッタリング方法、スパッタターゲット、スパッタリング装置およびターゲット作製方法
KR20120001121A (ko) 2010-06-29 2012-01-04 한국전기연구원 물리적 기상 증착법을 이용한 그래핀 박막의 형성방법
JP5638369B2 (ja) 2010-07-07 2014-12-10 株式会社Shカッパープロダクツ シリコンデバイス構造、及びその形成に用いるスパッタリングターゲット材
US9926639B2 (en) 2010-07-16 2018-03-27 Applied Materials, Inc. Methods for forming barrier/seed layers for copper interconnect structures
MY165512A (en) 2010-07-29 2018-03-28 Jx Nippon Mining & Metals Corp Sputtering target for magnetic recording film, and process for producing same
JP2012149294A (ja) 2011-01-18 2012-08-09 Hitachi Cable Ltd スパッタリングターゲット、半導体装置および半導体装置の製造方法
JP5722427B2 (ja) 2011-03-01 2015-05-20 Jx日鉱日石金属株式会社 銅チタン合金製スパッタリングターゲット、同スパッタリングターゲットを用いて形成した半導体配線並びに同半導体配線を備えた半導体素子及びデバイス
KR101323151B1 (ko) 2011-09-09 2013-10-30 가부시키가이샤 에스에이치 카퍼프로덕츠 구리-망간합금 스퍼터링 타겟재, 그것을 사용한 박막 트랜지스터 배선 및 박막 트랜지스터
US8492897B2 (en) 2011-09-14 2013-07-23 International Business Machines Corporation Microstructure modification in copper interconnect structures
US9090970B2 (en) 2011-09-14 2015-07-28 Jx Nippon Mining & Metals Corporation High-purity copper-manganese-alloy sputtering target
EP2837710B1 (en) 2011-09-14 2019-05-15 JX Nippon Mining & Metals Corporation Production method for a high-purity copper-manganese-alloy sputtering target
US9224643B2 (en) 2011-09-19 2015-12-29 Taiwan Semiconductor Manufacturing Company, Ltd. Structure and method for tunable interconnect scheme
EP2733235B1 (en) 2011-09-30 2017-05-03 JX Nippon Mining & Metals Corporation Sputtering target and manufacturing method therefor
CN102517621B (zh) 2011-12-31 2014-10-22 宁波江丰电子材料股份有限公司 铜-磷合金阳极的制备方法
KR101620762B1 (ko) 2012-01-23 2016-05-12 제이엑스 킨조쿠 가부시키가이샤 고순도 구리 망간 합금 스퍼터링 타깃
JP5554364B2 (ja) 2012-04-12 2014-07-23 Jx日鉱日石金属株式会社 半導体用銅合金配線及びスパッタリングターゲット並びに半導体用銅合金配線の形成方法
JP5952653B2 (ja) 2012-06-26 2016-07-13 株式会社コベルコ科研 ターゲット接合体
KR101946592B1 (ko) 2012-08-02 2019-02-11 삼성전자주식회사 측정 장치 및 측정 방법
US9050647B2 (en) 2013-03-15 2015-06-09 Ati Properties, Inc. Split-pass open-die forging for hard-to-forge, strain-path sensitive titanium-base and nickel-base alloys
KR20170092706A (ko) 2013-03-04 2017-08-11 제이엑스금속주식회사 탄탈 스퍼터링 타깃 및 그 제조 방법
WO2014136702A1 (ja) 2013-03-06 2014-09-12 Jx日鉱日石金属株式会社 スパッタリング用チタンターゲット及びその製造方法
KR20150053805A (ko) * 2013-03-07 2015-05-18 제이엑스 닛코 닛세키 킨조쿠 가부시키가이샤 구리 합금 스퍼터링 타깃
JP6239767B2 (ja) 2013-09-04 2017-11-29 フナン、テリー、ニュー、マテリアルズ、カンパニー、リミテッドHunan Terry New Materials Company Ltd. 無鉛、高硫黄、かつ易切削性の銅マンガン合金、およびその調製方法
WO2015037533A1 (ja) 2013-09-12 2015-03-19 Jx日鉱日石金属株式会社 バッキングプレート一体型の金属製スパッタリングターゲット及びその製造方法
WO2015099119A1 (ja) 2013-12-27 2015-07-02 Jx日鉱日石金属株式会社 高純度銅又は銅合金スパッタリングターゲット及びその製造方法
CN105525149B (zh) 2014-09-29 2018-01-12 有研亿金新材料有限公司 一种铝合金溅射靶材的制备方法
JP6398594B2 (ja) 2014-10-20 2018-10-03 三菱マテリアル株式会社 スパッタリングターゲット
CN106282938B (zh) 2015-05-13 2018-11-27 宁波创润新材料有限公司 回收靶材的方法
JP2018529019A (ja) 2015-07-17 2018-10-04 ハネウェル・インターナショナル・インコーポレーテッドHoneywell International Inc. 金属及び金属合金の作製のための熱処理方法
EP3390679B1 (en) * 2015-12-14 2022-07-13 Swagelok Company Highly alloyed stainless steel forgings made without solution anneal
CN106399954A (zh) 2016-08-30 2017-02-15 有研亿金新材料有限公司 一种长寿命铜锰合金靶材的加工方法
CN106435261B (zh) 2016-11-28 2018-01-12 河北宏靶科技有限公司 一种有超细晶组织的长寿命铜锰基合金靶材及其加工方法
US10760156B2 (en) 2017-10-13 2020-09-01 Honeywell International Inc. Copper manganese sputtering target

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2004011691A1 (en) * 2002-07-16 2004-02-05 Honeywell International Inc. Copper sputtering targets and methods of forming copper sputtering targets
US20090045051A1 (en) * 2007-08-13 2009-02-19 Stephane Ferrasse Target designs and related methods for coupled target assemblies, methods of production and uses thereof
CN102791905A (zh) * 2010-03-11 2012-11-21 株式会社东芝 溅射靶及其制造方法、以及半导体元件的制造方法
CN104746020A (zh) * 2013-12-27 2015-07-01 有研亿金新材料股份有限公司 一种铜合金靶材的加工方法
JP6202131B1 (ja) * 2016-04-12 2017-09-27 三菱マテリアル株式会社 銅合金製バッキングチューブ及び銅合金製バッキングチューブの製造方法

Also Published As

Publication number Publication date
EP3746579A1 (en) 2020-12-09
KR20200106084A (ko) 2020-09-10
JP2021512221A (ja) 2021-05-13
US20190233935A1 (en) 2019-08-01
JP7426936B2 (ja) 2024-02-02
WO2019152646A1 (en) 2019-08-08
US11035036B2 (en) 2021-06-15
TW201936947A (zh) 2019-09-16
EP3746579A4 (en) 2021-11-10
TWI802646B (zh) 2023-05-21

Similar Documents

Publication Publication Date Title
JP4976013B2 (ja) 銅スパッタリングターゲット及び銅スパッタリングターゲットの形成方法
CN111727270A (zh) 形成具有细化形状和微结构的铜合金溅射靶的方法
US7767043B2 (en) Copper sputtering targets and methods of forming copper sputtering targets
US6645427B1 (en) Copper sputtering target assembly and method of making same
US6849139B2 (en) Methods of forming copper-containing sputtering targets
US20180202039A1 (en) Heat treatment methods for metal and metal alloy preparation
JP2002518593A (ja) 微細で一様な構造とテキスチュアを有する金属製品及びその製造方法
WO2005094280A2 (en) High-strength backing plates, target assemblies, and methods of forming high-strength backing plates and target assemblies
JPWO2005045090A1 (ja) タンタルスパッタリングターゲット
WO1998020183A1 (en) Method for fabricating sputtering targets
JP5325096B2 (ja) 銅ターゲット
JPH11269621A (ja) 高純度チタン材の加工方法
EP3695024B1 (en) Method of manufacturing copper manganese sputtering target
CN106795624A (zh) 铝溅镀靶材
JP2002069626A (ja) スパッタリングターゲットおよびその製造方法
JP2022542292A (ja) 大粒子スズスパッタリングターゲット

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination