WO2017121315A1 - 一种建筑桁架及楼板的施工方法 - Google Patents

一种建筑桁架及楼板的施工方法 Download PDF

Info

Publication number
WO2017121315A1
WO2017121315A1 PCT/CN2017/070783 CN2017070783W WO2017121315A1 WO 2017121315 A1 WO2017121315 A1 WO 2017121315A1 CN 2017070783 W CN2017070783 W CN 2017070783W WO 2017121315 A1 WO2017121315 A1 WO 2017121315A1
Authority
WO
WIPO (PCT)
Prior art keywords
truss
welding
chord
lower chord
building
Prior art date
Application number
PCT/CN2017/070783
Other languages
English (en)
French (fr)
Inventor
丁昌银
何炳泉
谢永超
邓恺坚
肖焕詹
冯少鹏
杨翔
李泽
黄华
陈智富
蒋明曦
李世蕃
古嘉昌
Original Assignee
广州机施建设集团有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from CN201610022575.2A external-priority patent/CN105678001B/zh
Priority claimed from CN201610022505.7A external-priority patent/CN105604183B/zh
Priority claimed from CN201610022588.XA external-priority patent/CN105649332B/zh
Application filed by 广州机施建设集团有限公司 filed Critical 广州机施建设集团有限公司
Publication of WO2017121315A1 publication Critical patent/WO2017121315A1/zh

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/19Three-dimensional framework structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]

Definitions

  • the invention relates to a truss construction method, in particular to a construction method of a building truss and a floor slab.
  • the truss structure was mainly applied to wooden bridges and trusses in the early days, and the earliest metal truss structures appeared in England in 1845.
  • the biggest feature of the truss structure is that when the nodes are articulated, the rods on the joints only bear axial forces and do not bear bending moments and shear forces.
  • reinforced concrete trusses, steel truss structures and steel reinforced concrete combined trusses have also been applied in engineering practice.
  • steel Due to its high strength, light weight, strong deformation ability, uniform material and good isotropic properties, steel is especially suitable for the construction of large span and super high-rise buildings.
  • the box-type conversion steel truss is mostly used for the conversion of large-span space and ordinary floor structure, and has beautiful appearance and large structural bearing capacity. It can be processed into a giant cast steel joint by means of rolling steel plate welding and forming large-scale processing equipment. Solve the problem that the welding on the construction site is complicated and the quality is not easy to guarantee. However, since the pressure resistance of the truss members must be ensured, the thickness of the steel members of the frame members is often large, and the height of the frame body is large.
  • the span of the podium conversion truss is 32m, and the upper part of the truss member must support the upper 5-7 floor cover.
  • the construction of the reinforced concrete beam as the conversion structure is more difficult and the material wears more.
  • the technical problem to be solved by the present invention is to provide a construction method for a building truss and a floor slab, which can solve the above prior art. Since the elasticity of the steel truss is larger than that of the ordinary concrete structure, it is easy to cause the upper concrete structure to crack due to excessive deflection, and the settlement deformation after the truss load has a series of technical quality problems such as large bad side pressure on the column.
  • the present invention provides a construction method for a building truss and a floor slab, comprising the following steps:
  • S1 collecting building construction requirements, designing a truss structure, the truss comprising a chord composed of an upper chord and a lower chord, and a web connected between the upper chord and the lower chord;
  • step S3 using the finite element software to perform mechanical check on the model, calculate the pressure value of the chord or the web, and the pressure value exceeds the preset value to proceed to step S4, and the pressure value does not exceed the preset value, then proceeds to step S5;
  • the preset value is the pressure value within the safe range of the truss deformation allowed by the construction requirements;
  • step S4 performing simulated injection tempering on the upper chord of the truss, and selecting a portion of the lower chord or the abdominal rod whose pressure value exceeds the preset value as the high pressure section to perform the simulated partial injection tempering, and proceeding to step S3;
  • the truss and floor construction of the step S8 includes:
  • S8.8 laying a plurality of parallelly arranged superposed plates between two adjacent trusses, laying structural ribs on the laminated plates, and tying the structural ribs respectively with the prestressing tendons of the laminated plates and the studs arranged on the top of the upper chord Fixed; wherein a spacing is left between two adjacent laminated plates, and a template is arranged on the bottom surface of the spacing;
  • the top of the support frame is provided with a temporary support pier, and the temporary support pier includes a steel mesh plate laid on the top of the support frame and two side-by-side type on each side of the truss joint position.
  • Steel, the I-beam is placed on a steel mesh, and the jack is placed on the I-beam.
  • the bottom of the support frame is provided with a pad, and the support frame is provided with scissors support.
  • a process hole is reserved at the splicing portion of the segment truss, and the inner weld of the truss is welded through the process hole.
  • a vertical plate is disposed on both sides of the high force section in the truss, and the vertical plate is enclosed in the truss to form a partial cavity for injection .
  • a riser is disposed in the lower chord at the rear weld node, and the vertical plate and the lower chord are enclosed to form a partial cavity for injection .
  • the specific step of the step S8.2 is: using a two-point lashing method, the two lifting points are symmetrically arranged with the center of gravity of the segment truss as a center point and higher than the center of gravity of the segment truss; After a certain distance from the ground, the truss is suspended for a short time. According to the installation angle of the segment truss, the reverse chain on the rope is adjusted, and the hoisting length of each rope is changed to adjust the inclination angle of the segment truss to ensure the rope and the hoist.
  • the center line of the machine hook passes through the center of gravity of the segmented truss; the segment truss is hung to the jack at the predetermined position, and then the manual hoist and the wire rope are used to adjust the left and right direction, and then the jack is used for vertical adjustment, and the position adjustment is completed.
  • a temporary supporting steel plate is welded on both sides of the upper chord and the lower chord to be welded and fixed to the installed segment truss, and a temporary supporting steel plate and a sub-framed truss are welded at the bottom edge of the lower chord. Steel welded and fixed.
  • the specific step of the step S8.5 is to guide the release of the unified operation of the operator by setting up the deputy commander of the general command and the release point.
  • the operator should Report to the deputy commander in time, and convey it to the commander by the deputy commander.
  • the data of the internal force and deformation of the truss structure will be suspended for 5-10 minutes, and the jack condition will be tested to make the jacks evenly stressed and the truss structure
  • Monitoring of changes, monitoring of truss structural changes includes axial horizontal displacement monitoring, lateral displacement monitoring, truss representative sections and stress monitoring of important nodes.
  • the stud in the step S8.8 is designed according to a complete shear connection design, and the design method is:
  • S8.8.2 Determine the longitudinal shear force of the interface between the upper chord and the concrete in each shear span section step by step;
  • a st is the cross-sectional area of the longitudinal tensile reinforcement in the effective width of the concrete flange plate in the negative bending zone;
  • f st is the tensile strength design value of the tensile reinforcement;
  • N v c is the design value of the shear capacity of a single stud
  • the invention uses the finite element software to analyze the truss stress, and performs the injection strengthening of the upper chord of the truss, and selects the part of the lower chord or the abdominal rod whose pressure value exceeds the preset value as the high pressure section for local injection strengthening.
  • the strength and rigidity of the truss are enhanced, the bearing capacity of the conversion truss is improved, and the problem that the upper concrete structure is cracked due to excessive deflection due to the elastic deformation of the truss in the prior art is effectively solved;
  • the invention uses the finite element software to analyze the truss load deflection, set the position of the post-welding node and the reserved post-welding port.
  • the welded joint after the repair welding effectively solves the large deformation of the truss due to the deformation of the truss. Side pressure problem;
  • FIG. 1 is a schematic structural view of a truss constructed on a column according to the present invention
  • FIG. 2 is a schematic structural view of a segmented truss segment assembly
  • Figure 3 is a schematic view showing the structure of the segmented steel beam in the left and right direction after precise adjustment
  • Figure 4 is a schematic view showing the structure of the segmented steel beam in the vertical direction after precise adjustment
  • Figure 5 is a schematic diagram of the force simulation of the symmetry of the symmetry of the model by the finite element software
  • Figure 6 is a schematic diagram of the finite element software simulation of the force of the model
  • Figure 7 is a schematic diagram of the simulation of the force applied by the finite element software to simulate the partial chord of the upper chord
  • Figure 8 is a schematic diagram of the simulation of the force of the finite element software on the simulation of the lower chord and the web;
  • Figure 9 is a schematic diagram of finite element software simulation of load deflection of truss model
  • Fig. 10 is a schematic view showing the connection structure at the joint between the laminated plates.
  • a preferred embodiment of the present invention a construction method for a building truss and a floor, comprising the following steps:
  • the truss 1 is a two-way truss, including an upper chord 11, a lower chord 12, and a web connected between the upper chord 11 and the lower chord 12. 13.
  • the preferred truss 1 is a steel box truss.
  • S2 The finite element software is used to establish the substructure and superstructure model of the truss 1 and truss 1 connections.
  • step S3 Perform mechanical check on the model with finite element software, calculate the pressure value of the compressed chord or web 13 of the truss 1, and the pressure value of the chord 11, 12 or the web 13 exceeds the preset value.
  • step S4 if the pressure value does not exceed the preset value, the process proceeds to step S5; the preset value is a pressure value within the safe range of the truss 1 deformation allowed by the building construction requirement.
  • the mechanical simulation of the truss 1 model is carried out by the finite element software, and the force simulation of the upper chord 11, the lower chord 12 and the web 13 is performed.
  • the A part represents the maximum pulling point and the B part represents the maximum pressure point.
  • the color in the figure indicates the magnitude of the force from shallow to deep, that is, the color depth indicates that the force of the truss 1 is in a dangerous range, and the light color indicates that the force of the truss 1 is in a safe range.
  • the chord is mainly the pressure of some parts of the lower chord 12, and some parts of the tensile force value is too high, and mainly the tensile force of the A part exceeds the preset value; in Fig. 6, the web 13 has Many parts of the B part are subjected to pressure exceeding the preset value and another part of the A part is subjected to high tensile force.
  • step S4 performing simulated injection strengthening on the upper chord 11 of the truss 1, and selecting a portion of the lower chord 12 or the abdominal rod 13 whose pressure value exceeds a preset value as a high-force segment to perform simulated local injection enhancement, and proceeds to step S3.
  • the mechanics check is re-executed.
  • the upper chord 11 simulates the chord force simulation result after the injection, and it is found that the upper chord 11 is evenly loaded and in a safe range.
  • the high-strength segment calculated by the step S3 of the lower chord 12 and the web 13 is simulated and strengthened, and the truss 1 is uniformly stressed and in a safe range, and the partial injection can be achieved.
  • the on-site construction of the truss and the floor of the step S8 includes:
  • the support frame in order to ensure the stability and safety of the structure during truss hoisting, superimposed slab installation and concrete pouring, it is necessary to set up temporary support frame according to the actual situation of the site and the length and width of the truss 10, and the support frame should have the upper load and meet the requirements.
  • the function of personnel operation can be used to lay the scaffolding board as a pedestrian passage and web welding work platform along the edge of the steel girder to the edge of the protective railing.
  • the scaffolding board is made of iron wire. Set on the steel pipe of the scaffolding.
  • the truss-mounted temporary support frame 2 is erected by fastener-type scaffolding.
  • the frame of the support frame 2 is erected with a 3.2m wide support frame 2 along the direction of the steel box beam.
  • the horizontal and vertical spacing of the support frame 2 are 0.8m, the crossbar step is 1.5m;
  • the support frame 2 is provided with a back plate at the lower end of the pole.
  • the backing plate is preferably a wooden backing plate, and the top of the support frame 2 is covered with a steel mesh sheet 22.
  • the transverse bridge of 800mm position on both sides of the joint of the steel beam is placed as two temporary support piers, and the I-beam 23 is placed on the steel mesh 22 in the I-beam. There is a jack 3 on the 23rd.
  • the scissors support 21 is provided in the longitudinal and lateral direction and the horizontal direction, and a scissors support is arranged on the outer periphery of the support frame 2, and then a scissors support is arranged in each of the five rows in the longitudinal direction.
  • a scissor support is arranged for every five rows, and the longitudinal and lateral shear support is at an angle of 45° to 60° to the ground.
  • a scissor support is set up 3m from the height of the bracket.
  • the horizontal scissors support is used to lock the frame body and the column to increase the stability of the frame structure.
  • the support frame 2 for temporary support needs to meet the relevant regulations in the relevant specifications of the fastener-type steel pipe scaffolding, and the force check is carried out.
  • the operation platform of the support frame 2 is provided with a 1.2 m high safety protection rail 24, and the periphery of the railing 24 is closed by a green security dense mesh.
  • the segmented truss 10 is placed on the jack 3, and is adjusted in the left-right direction and the vertical direction. After the position adjustment is completed, a temporary support steel plate 14 and the installed points are welded on both sides of the upper chord 11 and the lower chord 12 The segment truss 10 is welded and fixed, and a temporary supporting steel plate 15 is welded and fixed to the I-beam 23 carrying the segment truss 10 at the bottom edge of the lower chord.
  • tower cranes, mast cranes and self-propelled cranes can be selected according to the structural form, the weight of the sections, the level of the section and the construction conditions on site.
  • the three main parameters of the crane are lifting capacity, lifting height and lifting radius: the lifting weight must be greater than the weight of the heaviest component plus the lifting block; the lifting height must meet the lifting requirements of the highest component to be installed.
  • the lifting radius should meet the requirement that the component can be hoisted at a certain distance when the lifting weight and the lifting height are constant. If there are fewer trusses 1 hoisted on site, they can be directly hoisted by tower cranes.
  • the hoisting sequence of the structure segment is determined based on the principle of facilitating structural installation measurement and control, reducing the cumulative error of structural installation and speeding up the progress of the project.
  • the setting of the lifting point should be selected according to the length, shape and weight of the component (segment truss 10). Generally, the length of the component of the segmented hoisting is short, and the two-point lashing method can meet the requirements; the lifting point and the center of gravity of the component should be Symmetrical and higher than the center of gravity of the component, to ensure the stability of the hoisting of the component; if the wire rope is used to bundle the beam member for hoisting, the edge of the beam should be lined with a sack piece, a half-side steel pipe or a short square wood corner.
  • the lifting position of the lifting lug is the main structural surface. If the unstructured surface of the lifting lug is temporarily strengthened, the strength of the lifting lug should be ensured; the two closed lifting lugs should be evenly distributed on the segmented truss 10, and the center of gravity of the segment should be ensured. Near the center point where the two lifting ears are formed.
  • the traction lanyard should be controlled on both sides of the segmented truss 10.
  • the lifting process should be slow and constant. It must not be “fast-paced” to speed up the lifting process, preventing the components from colliding with other components or buildings in the air due to excessive swinging. Things.
  • the crane is slowed down, and the truss 10 is assisted by the manpower.
  • the center line of the beam is placed in advance under the coordination of the crane and the manual.
  • the center line of the bearing surface is aligned, and then slowly placed in position. If there is a deviation, it can be lifted slightly with a tool such as a crowbar.
  • a plurality of jacks 3 are used as temporary support for the beam.
  • the support points cannot simultaneously interact with the segment truss 10
  • a sleeper or other solid cushion is placed beside the jack 3 at the top of the support frame 2, so that it can participate in the force, strengthen the support of the structure, and facilitate the segmentation of the truss 10 Adjust the jack 3 during calibration.
  • the steel beam lifting position needs to be precisely adjusted in detail, and the adjustment is performed according to the order of the first plane position and the elevation, including the center axis, the span spacing, Elevation, verticality, etc., verticality test can be used to hang the hammer ball, other inspection content can be carried out with theodolite, total station and so on. If there is a deviation after the test, it should be corrected by tools.
  • the calibration tools mainly include jacks, crowbars, steel wedges, reverse chains, flange bolts, etc.
  • the calibration process should avoid local deformation of the components, and the truss can be fixed after correction. If the height and width of the beam are relatively large, to ensure stability, the segmented truss is fixed by a cable or a fixed steel frame.
  • the specific method is as follows:
  • a temporary supporting steel plate 14 is welded on both sides of the upper chord 11 and the lower chord 12. It is welded and fixed to the installed segmented truss 10.
  • the vertical direction is adjusted, and the adjustment is adjusted by four 15t jacks.
  • the jack 3 is placed above the I-beam 21, and the jack 3 cannot directly contact the segment truss bottom plate. Place one steel block on the rod, and make precise measurement when adjusting. After the requirements are met, the steel gasket and the steel wedge are added. It is required to provide a gasket at each web. After the adjustment is completed, a temporary support steel plate 15 is welded and fixed to the I-beam 23 carrying the segment truss 10 at the bottom edge of the lower chord.
  • the project surveyor performs the whole process test.
  • the surveyor releases the side truss 10 side line and the center line at the top of the support frame 2 in advance to facilitate the hoisting and positioning of the truss 10; and whether the top elevation of the support frame 2 (ie, the height of the truss 10 floor slab) is reviewed. Accurate, if the error exceeds the specification requirements, adjust it in time to avoid delaying the lifting of the steel beam.
  • the surveyor After each stage of the segmented truss 10 is assembled, the surveyor performs cross-measurement on the top plate of the installed segmented truss 10, and performs elevation measurement at the same time, and checks whether the plane direction and vertical direction of the segment truss 10 are correctly installed, if the error exceeds the specification. Request, timely adjustments.
  • the welded portion includes the butt welding of the upper chord and the upper chord, the butt welding of the lower chord and the lower chord, and the butt welding of the web and the web
  • the welding process should be strictly formulated to control the welding deformation.
  • the process hole is reserved at the splicing portion of the segment truss 10, and the inner weld of the steel beam is welded through the process hole; after the welding is completed, the temporary support steel plate in step S8.2 is cut and the post weld welding process is performed.
  • the truss 1 belongs to the thin-walled sealing member, which must be separately welded outside the box and welded inside the box.
  • the working environment inside the box is narrow, which is not conducive to the construction operation and easily affects the welding quality. Therefore, the welding difficulty of the truss 1 is the treatment of the weld seam during the segmentation splicing.
  • the truss with a large cross section has a long butt weld, and the welding easily causes the wavy deformation of the web, so that it is difficult to maintain the geometric cross-sectional dimension of the box.
  • the flatness of the butt joint is completely difficult to meet the strict requirements of the joint misalignment ( ⁇ 1/10t, ⁇ 3mm), and there must be a shape, diagonal difference, and long seam slope of the interface.
  • the edge of the mouth is undulating and other errors. Therefore, it is necessary to adopt special process measures such as increasing the density of the spot welding, the length of the segmented weld, and the card code.
  • the first step of the intervention is in-slot cleaning, followed by pre-weld heating. Because the cross section of the truss is large and the steel plate is thin, the heat storage function of the thin plate is low, the heat dissipation function is high, the heating is fast, the temperature is also fast, the expansion is fast, the shrinkage is also fast, and it is easy to cause the joint that has just been heated and put into formal welding to enter first. Shrinkage, which makes it difficult to control the total shrinkage of the joint and maintain the geometry of the section.
  • the stability of the truss as a whole is ensured, and the weak links are eliminated.
  • the square splicing process is reserved at the truss segment splicing during the production of the truss truss members. Holes, so that the welds inside the steel beam are welded through the process hole, so that the components are assembled in the dark to ensure complete welding in the dark.
  • the process hole is set as a square hole, which can greatly improve the quality of the internal welding connection between the segmented trusses 10, and the reloading side It is quick and easy to control the quality of the refill soldering without affecting the integrity of the steel box girder.
  • the reloading is carried out by single-sided welding with a reverse-faced iron pad.
  • the width of the strip should be between 30-40mm.
  • the thickness, strength and material of the reloaded steel plate must be consistent with the material of the web.
  • the four sides of the reloaded steel plate must be 45° oblique, and ensure full soldering and welding inspection.
  • the welding is temporarily suspended; the welding joint is completed in advance, including the removal of the raised portion at the beginning and the end of the seam, and the sanding into a gentle slope must be carried out in advance; the length of the welded joint of the segmented welding is identified in advance, and the welding is performed. Meat thickness, welding direction, etc.; clearly complete the physical cross to avoid confusion.
  • welding parameters For the butt welding of the box section, the main welding methods that can be used are manual arc welding and CO 2 gas shielded welding. The appropriate method should be selected according to the actual welding position. Because of the small heat input of CO 2 gas shielded welding, The welding quality is easy to ensure, and this method can be preferred.
  • Preheating When the working environment temperature is low and the segment truss 10 is thick and rigid, it should be preheated, that is, it is heated by flame, power frequency induction, infrared, etc. near the welding line before the formal welding. Reduce the welding cooling speed, reduce the stress, prevent the occurrence of cracks, and immediately apply welding after preheating.
  • the preheating temperature is mainly determined by the carbon content of the steel, and the content of other elements is also affected by different degrees. Under normal circumstances, the preheating temperature of the low alloy steel is 100 to 150 °C.
  • Positioning welding is a short-weld welding. As part of the formal welding, the quality should be strictly guaranteed as the formal welding. The position of the weld seam of the tack welding should be symmetrically and evenly distributed to prevent the local constraint from being too large; the length and height of the tack weld should be suitable, mainly determined according to the actual weld length and the groove shape. The general length is 30-60 mm and the height is 5 ⁇ . 8mm; the welding consumables used for tack welding should be of the same type as the actual welding, or the welding rod or welding wire with a lower strength grade can be selected; the welding current of the tack welding should be slightly larger than the current during welding (10% to 15% increase) to reduce the discontinuity. Disadvantages of slag inclusion in welding.
  • Welding sequence In order to control the welding deformation, symmetrical and layered multi-pass reflow should be used for welding.
  • the welding sequence of the following chords 12 is as follows: the bottom plate of the lower chord 12 is first welded, and two welders are sequentially welded, and one welder firstly welds from the middle of the weld in the box to the one side of the process hole of the web. The arc is welded from the other side of the side plate to the joint, and the other welder is outside the box. After the welder finishes the first stage of welding, the joint is welded from the side plate to the 30mm of the weld beyond the weld.
  • each layer of welding is completed to the entire weld seam; then the side plates are welded on both sides, and the sections are divided into layers from top to bottom and separated by sub-way; the last is the upper flange plate welding, segmentation The layer is back welded.
  • the liner plate and the lead-in plate shall be cut off as required to clean the dregs and splashes; post-heat treatment at a suitable temperature to eliminate the welding stress, and the post-heating temperature varies with the material and the plate thickness. Also, the post-heating temperature of a general low carbon steel is 600 to 650 °C.
  • Welding quality inspection Through the visual inspection, it is checked whether the welding wave on the surface of the weld metal is uniform, whether there are cracks, unfused, slag inclusions, welds, undercuts, burn through, craters and needle-shaped pores. Inspect the internal defects of the weld, such as cracks, incomplete penetration, and gas, through non-destructive testing Holes, slag inclusions, etc.
  • the weld repair method shall be formulated.
  • the repair welding process shall be the same as the original welding process.
  • the original plan such as preheating and post-heating shall be strictly implemented.
  • the weld after repair welding shall be re-repaired. flaw detection.
  • S8.4 Repeat the steps S8.1 to S8.3, perform the splicing of the next section of the truss, complete the hoisting and welding of the entire truss, and leave the rear welding node of the lower chord without welding.
  • Synchronous adjustment refers to the method of unloading the support points of the structure at the same time by a certain method, and stopping at the same time to maintain the uniformity of the front and rear operations.
  • the use of computer for synchronization control has better accuracy, which is conducive to the gradual stress of the structure; manual control can also be used, but the synchronization accuracy of the manual control process is relatively poor, but the method is simple, and the engineering cost can be saved.
  • the manual synchronization adjustment is mainly through the establishment of the chief commander and the deputy commander of the release point (generally setting up a deputy commander on each of the tire frames) to guide the release of the unified operation of the operators, and always maintain the command of the chief commander ⁇ the response of the deputy commander Uniformity and fluency of the entire process with the start command ⁇ operator specific operations.
  • the operator In order to do the synchronous operation, the operator must locate the fixed post, familiarize and master the operation essentials and requirements before releasing, clear the position of the operating point, the release control value of the jack 3, the operating speed and the number of the plunger, the scale reading, etc. Perform an actual demonstration on the ground. When releasing, the operator should obey the command and unify the action, and the unified slogan can be specified in advance to maintain a stable rhythm and speed. After each level is released, the operator should report it to the deputy commander in time and communicate it to the commander by the deputy commander. After each stage is released, the data of the internal force and deformation of the structure is suspended for 5 to 10 minutes, and the condition of the jack 3 is checked. If there is a tilt, the adjustment should be carried out one by one.
  • each jack 3 is evenly stressed.
  • the tilt adjustment of the jacks should be carried out one by one, and cannot be moved casually to avoid a single jack. The effect is too large to cause damage.
  • the release monitoring content should be comprehensive and comprehensive, and can directly reflect structural changes.
  • the monitoring content includes the axial horizontal displacement of the truss, the lateral displacement, the representative section of the steel beam and the important nodes. Stress, etc.
  • the above monitoring contents should be monitored before the release of the structure, during the release of the structure, and within three days after the release of the structure, and the monitoring results should be recorded in time.
  • the release monitoring adopts a stable, intuitive and reliable traditional testing method, including wire drawing method, inclinometer, intuitive measuring method, level, total station and resistance strain.
  • monitoring points are arranged at reasonable positions to obtain more accurate and reliable monitoring results.
  • a vernier caliper is arranged at the end of the truss 1, which can accurately monitor the horizontal displacement of the steel beam; the strain flower is arranged on the inner surface of each segment truss 10, and the stress variation of the steel box beam can be accurately monitored.
  • a vertical plate is disposed on both sides of the high-force segment in the truss 1, and the vertical plate is enclosed in the truss to form a partial cavity for injection, thereby blocking
  • the lateral flow of the fluid helium is more solid and stable during the pouring process, and is guaranteed in the local injection effect.
  • S8.8 a plurality of parallelly arranged laminated plates 7 are laid between two adjacent trusses.
  • the laminated plates 7 adopt unidirectional prestressed laminated plates, and the laminated plates are used due to the cost problem of the laminated plates.
  • a certain distance between the laminated plates is left, about 30 mm, and a template 71 is placed on the bottom surface of the spacing, as shown in FIG.
  • the prestressed laminated board has the characteristics of light large span, prefabrication, rapid construction, good fireproof performance and low cost. It can replace the formwork, cancel the scaffolding, greatly accelerate the construction speed, and save manpower, material resources and financial resources.
  • the combination of the laminated plate and the steel beam can improve the bending rigidity of the steel beam, reduce the height of the section, and increase the stability of the structure.
  • the structural ribs 8 are laid on the laminated plates, and the structural ribs 8 are respectively fixed with the prestressing ribs 72 of the laminated plates and the studs at the top of the truss; the template 71 is suspended by the steel wires on the structural ribs 8;
  • the slab can meet the overall stress requirements and crack control.
  • the design of the stud is designed according to the complete shear connection, and the design method is:
  • S8.8.2 Determine the longitudinal shear force of the interface between the upper chord and the concrete in each shear span section step by step;
  • a st is the cross-sectional area of the longitudinal tensile reinforcement in the effective width of the concrete flange plate in the negative bending zone;
  • f st is the tensile strength design value of the tensile reinforcement;
  • N v c is the design value of the shear capacity of a single stud
  • the lower surface of the nail head should be 30mm above the top surface of the steel plate at the bottom of the wing.
  • the longitudinal maximum spacing of the studs should not be greater than 4 times the thickness of the concrete slab and not more than 400 mm.
  • the distance between the outer edge of the stud and the edge of the steel beam flange should not be less than 20mm; the thickness of the concrete protective layer on the top surface of the stud should not be less than 15mm.
  • the diameter of the stud rod should not be greater than 1.5 times the thickness of the upper flange of the steel beam; if the upper flange of the steel beam is not subjected to tensile force, the diameter of the stud rod It should not be greater than 2.5 times the thickness of the upper flange of the steel beam.
  • the length of the stud should not be less than 4 times the diameter of its rod.
  • the spacing of the studs along the axis of the beam shall not be less than 6 times the diameter of the rod, and the spacing perpendicular to the direction of the beam axis shall not be less than 4 times the diameter of the rod.
  • a vertical plate is arranged in the lower chord at the rear welding node 5, and the vertical plate and the lower chord are enclosed to form a partial cavity for injection, thereby blocking
  • the lateral flow of the fluid helium is more solid and stable during the pouring process, and is guaranteed in the local injection effect.
  • the injection strengthening in the upper chord 11 can significantly reduce the force of the truss 1, and the effect of reducing the truss 1 on the upper chord 11 is significant, as shown in Fig. 5. It is shown that after the upper chord 11 is injected, the partial chord 12 and the web 13 are partially injected, that is, the truss is maximally strengthened without changing the truss structure, which is highly economical and practical.
  • the construction method of a building truss and a floor slab according to the present invention has the following beneficial effects as compared with the prior art:
  • the invention uses the finite element software to analyze the truss stress, and performs the injection strengthening of the upper chord of the truss, and selects the part of the lower chord or the abdominal rod whose pressure value exceeds the preset value as the high pressure section for local injection strengthening.
  • the strength and rigidity of the truss are enhanced, the bearing capacity of the conversion truss is improved, and the problem that the upper concrete structure is cracked due to excessive deflection due to the elastic deformation of the truss in the prior art is effectively solved.
  • the invention uses the finite element software to analyze the truss load deflection, set the position of the post-welding node and the reserved post-welding port.
  • the welded joint after the repair welding effectively solves the large deformation of the truss due to the deformation of the truss. Side pressure problem.
  • the invention realizes the high-altitude installation of the large-scale conversion truss, improves the use efficiency of the construction machine, shortens the construction period and saves the construction cost.
  • the invention adopts a structural system combining truss and laminated plates to realize the installation of the large-span slab without the support, and the slab span is increased to 4.5-5.5 m, which simplifies the structure without the secondary beam, reduces the material loss, and improves the construction. Efficiency and saving construction costs.
  • the invention adopts the installation process of segmented high-altitude assembly, independent support frame support and jack synchronous coordination to realize accurate installation of large-span large-scale conversion truss.
  • the present invention makes the truss and the floor slab tightly connected by reasonably arranging the studs and structural ribs connected to the truss by the laminated plates, thereby realizing the overall force of the truss and the slab.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Electromagnetism (AREA)
  • Computer Hardware Design (AREA)
  • Evolutionary Computation (AREA)
  • Geometry (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Mechanical Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

一种建筑桁架及楼板的施工方法,包含如下步骤:收集建筑施工要求,设计桁架(1)结构;运用有限元软件建立桁架(1)及桁架(1)连接的下层建筑与上层建筑结构模型;对模型进行力学验算,计算出桁架(1)的高受力节段进行局部注砼强化;用有限元软件对模型进行挠度分析,计算桁架(1)荷载后下弦杆(12)向下位移量,向下位移后的下弦杆(12)两端在与立柱连接位置处设有缺口,该缺口为后焊节点(5);制作桁架(1),在立柱(4)对应后焊节点(5)的位置设置后焊接口;桁架(1)及楼板现场施工。所述方法能够解决现有技术中由于钢桁架弹性比普通混凝土结构大,容易使上部混凝土结构因挠度过大而开裂,桁架荷载后沉降变形对立柱产生较大的不良侧压力等一系列技术质量问题。

Description

一种建筑桁架及楼板的施工方法 技术领域
本发明涉及一种桁架施工方法,尤其涉及一种建筑桁架及楼板的施工方法。
背景技术
桁架结构在早期主要是应用于木桥和屋架,而最早的金属桁架结构出现1845年的英国。桁架结构的最大特点就是当各节点均为铰接时,节点上杆件只承受轴力,而不承受弯矩和剪力。随着近代科学技术的发展,建筑材料性能得到极大的提升,钢筋混凝土桁架、钢桁架结构及型钢混凝土组合式桁架也随之应用于工程实践之中。
由于钢材具有强度高、自重轻、变形能力强、材质均匀及各向同性好等特点特别适合建造大跨度及超高层建筑。
2015年军事医学科学院院务部徐福宾教授采用有限元计算软件,建立三维模型,对建筑和施工过程中的临时支撑体系进行了数值模拟分析,得到了支撑架的应力和应力分布规律,其只是在简单的支撑架受力上进行了分析。
而随着钢桁架研究的不断深入,在最近几年,桁架的使用功能不断增加,其中比较新型的是箱型转换钢桁架的诞生。箱型转换钢桁架多用于大跨度空间与普通楼层结构的转换,造型美观,具有较大的结构承载力。采用轧制钢板焊接成型,借助于工厂大型加工设备,可加工成巨型铸钢节点。解决施工现场焊接复杂、质量不易保证的问题。但是,由于必须保证桁架杆件的抗压能力,往往架体杆件钢材厚高度较大,架体截面高度大。
方案 拟增加用钢量 不足之处
提高截面面积 120t 结构净空减少
加大钢板厚度 约50t 需要采取特殊措施保证厚钢板焊接质量
现有的调整方式均不能达到预期效果。
此外,由于钢桁架弹性比普通混凝土结构大,容易使上部混凝土结构因挠度过大而开裂,桁架荷载后沉降变形对立柱产生较大的不良侧压力等一系列技术质量问题急切需要解决。
本工程项目需要,裙楼转换桁架跨度为32m,桁架构件上部须支承上部5-7层楼盖,采用钢筋混凝土梁作为转换结构的施工难度较大,材料的耗损较多。
发明内容
本发明所要解决的技术问题在于,提供一种建筑桁架及楼板的施工方法,能够解决上述现有技术中 由于钢桁架弹性比普通混凝土结构大,容易使上部混凝土结构因挠度过大而开裂,桁架荷载后沉降变形对立柱产生较大的不良侧压力等一系列技术质量问题。
为了解决上述技术问题,本发明提供了一种建筑桁架及楼板的施工方法,,包含如下步骤:
S1:收集建筑施工要求,设计桁架结构,所述桁架包括由上弦杆和下弦杆构成的弦杆、以及连接在上弦杆和下弦杆之间的腹杆;
S2:运用有限元软件建立桁架及桁架连接的下层建筑与上层建筑结构模型;
S3:用有限元软件对模型进行力学验算,计算出弦杆或腹杆的受压力值,受压力值超过预设值进入步骤S4,受压力值不超过预设值则进入步骤S5;所述预设值为建筑施工要求允许桁架形变安全范围内的受压力值;
S4:对桁架的上弦杆进行模拟注砼强化,选取下弦杆或腹杆的受压力值超过预设值的部位作为高受压节段进行模拟局部注砼强化,进入步骤S3;
S5:用有限元软件对模型进行挠度分析,计算桁架荷载后下弦杆向下位移量,向下位移后的下弦杆在与下层建筑的立柱连接位置处设有缺口,所述缺口为后焊节点,所述立柱对应后焊节点位置设置后焊接口;
S6:用有限元软件对模型进行应力分布分析,在受力较小的部位设置分段点,将桁架分割为若干的分段桁架;
S7:根据模型制作分段桁架;
S8:桁架及楼板现场施工。
作为本发明优选的方案,所述步骤S8的桁架及楼板现场施工包括:
S8.1:搭建支撑架,在支撑架上表面设置有千斤顶;
S8.2:吊装分段桁架,将分段桁架放置在千斤顶上,并进行左右方向及垂直方向调整,待位置调整完毕后在上弦杆和下弦杆的两侧上各焊接一块临时支撑钢板与已安装完毕的分段桁架焊接固定,在下弦杆的底板边缘处各焊接一块临时支撑钢板与其底下承载分段桁架的工字钢焊接固定;
S8.3:焊接分段桁架,分段桁架安装就位后,进行分段桁架间的对接焊,焊接部位包括上弦杆与上弦杆的对接焊,下弦杆与下弦杆的对接焊,腹杆与腹杆的对接焊,焊接完成后,割除步骤S8.2中的临时支撑钢板并进行焊后焊缝处理;
S8.4:重复所述步骤S8.1~步骤S8.3,进行下一段分段桁架拼接,完成整条桁架的吊装及焊接,并留置下弦杆的后焊节点不焊接;
S8.5:释放千斤顶,进行桁架整体同步调整;
S8.6:重复步骤S8.1~步骤S8.5,完成多条平行布置的桁架施工;
S8.7:在上弦杆内全部注砼,在下弦杆和腹杆经步骤S4模拟的高受压节段局部注砼;
S8.8:在相邻的两条桁架之间铺设多条平行布置的叠合板,在叠合板上铺设构造筋,构造筋分别与叠合板的预应力筋和设置在上弦杆顶部的栓钉绑扎固定;其中,相邻的两块叠合板之间留有一定间距,并在该间距的底面设置模板;
S8.9:在叠合板上进行砼浇筑形成楼板;
S8.10:将下弦杆的后焊节点与立柱的后焊接口进行焊接;
S8.11:在后焊节点处的下弦杆内灌注砼。
作为本发明优选的方案,所述支撑架的顶部设有临时支墩,所述临时支墩包括铺设在支撑架顶部的钢网片以及在桁架接缝位置两侧各放置两根并排的工字钢,所述工字钢放置在钢网片上,所述千斤顶放置在工字钢上。
作为本发明优选的方案,所述支撑架底部设置垫板,所述支撑架设置有剪刀支撑。
作为本发明优选的方案,所述步骤S8.3中,在分段桁架的拼接处预留工艺孔,通过该工艺孔对桁架内部焊缝进行焊接。
作为本发明优选的方案,所述步骤S8.7中,在桁架内的高受力节段两侧设置竖板,所述竖板在所述桁架内围合形成用于注砼的局部空腔。
作为本发明优选的方案,所述步骤S8.11中,在所述后焊节点处的下弦杆内设置竖板,所述竖版与所述下弦杆围合形成用于注砼的局部空腔。
作为本发明优选的方案,所述步骤S8.2的具体步骤:采用两点绑扎法,两个吊点以分段桁架的重心为中心点呈对称设置并高于分段桁架的重心;待分段桁架吊离地面一定距离后作短暂停留,根据分段桁架的安装就位角度,调节绳索上的倒链,改变各条绳索的起吊长度来调节分段桁架的倾斜角度,以保证绳索与吊机吊钩的中心线通过分段桁架的重心;将分段桁架吊至既定位置的千斤顶上,然后利用手动葫芦及钢丝绳进行左右方向的调整,再利用千斤顶进行垂直方向的调整,待位置调整完毕后在上弦杆和下弦杆的两侧上各焊接一块临时支撑钢板与已安装完毕的分段桁架焊接固定,在下弦杆的底板边缘处各焊接一块临时支撑钢板与其底下承载分段桁架的工字钢焊接固定。
作为本发明优选的方案,所述步骤S8.5的具体步骤:通过设立总指挥和释放点的副指挥,指导释放操作人员的统一操作,在调整过程中,每级释放到位后,操作人员应及时报告给副指挥,并由副指挥传达给总指挥,每级释放后,暂停5~10min进行桁架结构内力与变形的数据实测,并检验千斤顶情况,使各个千斤顶受力均匀,同时进行桁架结构变化的监测,桁架结构变化的监测包括轴向水平位移监测、侧向位移监测、桁架代表截面与重要节点的应力监测。
作为本发明优选的方案,所述步骤S8.8中的栓钉设计时按完全抗剪连接设计,设计方法为:
S8.8.1:以弯距绝对值最大点及零弯距为界限,划分若干剪跨区段;
S8.8.2:逐段确定各剪跨区段内的上弦杆与混凝土交界面的纵向剪力;
S8.8.3:位于正弯距区段的剪跨Vs=Astfst
式中,Ast为负弯距区混凝土翼缘板内有效宽度内纵向受拉钢筋的截面积;fst为受拉钢筋的抗拉强度设计值;
S8.8.4:确定每个剪跨内所需栓钉的数量nf=Vs/Nv c
式中,Nv c为单个栓钉的抗剪承载力设计值;
S8.8.5:将算得的栓钉数目在相应的剪跨内均匀布置。
实施本发明的一种建筑桁架及楼板的施工方法,与现有技术相比较,具有如下有益效果:
1、本发明运用有限元软件分析桁架应力,对桁架的上弦杆进行注砼强化,选取下弦杆或腹杆的受压力值超过预设值的部位作为高受压节段进行局部注砼强化,从而增强桁架的强度和刚度,提高转换桁架承载能力,有效解决现有技术中由于桁架弹性变形使上部混凝土结构因挠度过大而开裂的问题;
2、本发明运用有限元软件分析桁架荷载挠度,设定后焊节点位置和预留后焊接口,在后期施工中通过补焊后焊接口有效解决了桁架受力变形对立柱产生较大的不良侧压力问题;
3、在制作桁架时可以减少后焊接口数量,直接体现在施工环节降低焊接工作量,提高施工效率。
附图说明
为了更清楚地说明本发明实施例的技术方案,下面将对实施例的附图作简单地介绍。
图1是本发明在立柱上搭建桁架的结构示意图;
图2是分段桁架分段拼装时的结构示意图;
图3是分段钢梁左右方向的精确调整后固定的结构示意图;
图4是分段钢梁垂直方向的精确调整后固定的结构示意图;
图5是有限元软件对模型进行力学验算弦杆受力仿真示意图;
图6是有限元软件对模型进行力学验算腹杆受力仿真示意图;
图7是有限元软件对上弦杆模拟局部注砼后受力仿真示意图;
图8是有限元软件对下弦杆和腹杆模拟局部注砼后受力仿真示意图;
图9是有限元软件对桁架模型荷载挠度仿真示意图;
图10是叠合板间拼缝处的连接结构示意图。
具体实施方式
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
本发明的优选实施例,一种建筑桁架及楼板的施工方法,包含如下步骤:
S1:收集建筑施工要求,设计桁架1结构,如图1所示,所述桁架1为双向桁架,包括上弦杆11、下弦杆12、以及连接在上弦杆11和下弦杆12之间的腹杆13,优选的桁架1为钢箱桁架。
S2:运用有限元软件建立桁架1及桁架1连接的下层建筑与上层建筑结构模型。
S3:用有限元软件对模型进行力学验算,计算出桁架1的受压的弦杆或腹杆13的受压力值,弦杆11、12或腹杆13的受压力值超过预设值则进入步骤S4,受压力值不超过预设值则进入步骤S5;所述预设值为建筑施工要求允许桁架1形变安全范围内的受压力值。
参见图5和图6,为有限元软件对桁架1模型进行力学验算,上弦杆11、下弦杆12和腹杆13的受力仿真示意图,A部位代表最大拉力点,B部位代表最大压力点,而且图中颜色由浅到深表示受力大小,也即颜色深表示桁架1受力处于危险范围,浅色表示桁架1受力处于安全范围。根据仿真结果,图5中,弦杆主要为下弦杆12一些部位的压力,也有一些部位的拉力值过高,且主要为A部位的拉力超过预设值;图6中,腹杆13同时有多处的B部位承受压力超过预设值以及另有个别A部位承受拉力偏高。
S4:对桁架1的上弦杆11进行模拟注砼强化,选取下弦杆12或腹杆13的的受压力值超过预设值的部位作为高受力节段进行模拟局部注砼强化,进入步骤S3重新进行力学验算,如图7所示为上弦杆11模拟注砼后弦杆受力仿真结果,发现上弦杆11受力均匀且处于安全范围。
如图8所示,继续在下弦杆12和腹杆13的经步骤S3验算出的高受力节段进行模拟注砼强化,桁架1整体受力均匀且处于安全范围,局部注砼即可达到桁架1整体的强化。
S5:在桁架上增加所述上层建筑结构的荷载,用有限元软件对模型进行挠度分析,计算桁架1荷载后下弦杆12向下位移量,向下位移后的下弦杆12两端在与立柱4连接位置处设有缺口,所述缺口为后焊节点5,所述立柱4对应后焊节点5位置设置后焊接口;如图9所示,图中A部位代表最大拉力点,B部位代表最大压力点,颜色由浅到深表示受力大小,也即颜色越深表示桁架1受力处于危险范围,浅色表示桁架1受力处于安全范围。根据仿真结果,桁架1在荷载后在局部受力严重,中间部位扰度明显,产生较大向下位移,在本工程项目中,测得最大竖向扰度41mm。
S6:用有限元软件对模型进行应力分布分析,在受力较小的部位设置分段点,将桁架1分割为若干的分段桁架10;其中,桁架结构的应力分布由BIM三维建模模拟施工找出,桁架分为四段。
S7:根据模型制作分段桁架10。
S8:桁架及楼板现场施工。
其中,所述步骤S8的桁架及楼板现场施工包括:
S8.1:搭建支撑架2,
具体实施时,为保证桁架吊装、叠合板安装及混凝土浇筑时结构的稳定和安全,需结合现场实际情况及分段桁架10长宽的情况搭设临时支撑架,支撑架应具有承受上部荷载及满足人员作业通行的功能,可沿钢梁腹板边至防护栏杆边缘顺桥向铺设脚手板作为人行通道及腹板焊接工作平台,脚手板采用铁丝固 定在脚手架的钢管上。
8.1.1支撑架2的架体设计
结合现场实际情况及分段桁架10长宽的情况,桁架安装临时支撑架2采用扣件式脚手架进行搭设。
支撑架2的架体沿着钢箱梁方向搭设一个3.2m宽支撑架2,支撑架2立杆横纵间距均为0.8m,横杆步距1.5m;支撑架2立杆下端设垫板,该垫板优选为木垫板,支撑架2顶部满铺钢网片22。为了便于钢梁安装焊接,钢梁接缝位置两侧800mm位置横桥向各放置两根并排工字钢23做为临时支墩,工字钢23放置在钢网片22上,在工字钢23上设置有千斤顶3。
支撑架2搭设后,为使支架稳定,纵横向、水平向均用扣件式钢管设置剪刀支撑21,在支撑架2的外四周设置一道剪刀撑,之后纵向每五排设置一道剪刀支撑,横向每五排设置一道剪刀支撑,纵横向剪力支撑与地面夹角45°~60°。水平向随支架高度每升起3m搭设一道剪刀支撑。在柱位置,采用水平剪刀支撑将架体与柱锁住,增加架体结构稳定性。
用于临时支撑用的支撑架2搭设需满足有关扣件式钢管脚手架规范中的相关规定,进行受力验算。
8.1.2工作平台设置
钢梁腹板焊接平台及钢梁两侧人行通道:沿钢箱梁腹板边至防护栏杆边缘顺桥向铺设脚手板作为人行通道及腹板焊接工作平台,脚手板采用铁丝固定在支撑架2的钢管上。
8.1.3支撑架2的安全防护设计
临时支撑架2搭设时,在架体和钢梁周边进行安全防护,防高空坠物、坠落,确保施工安全。支撑架2的操作平台处设1.2m高安全防护栏杆24,栏杆24周边采用绿色安全密目网进行封闭。
S8.2:吊装分段桁架10
将分段桁架10放置在千斤顶3上,并进行左右方向及垂直方向调整,待位置调整完毕后在上弦杆11和下弦杆12的两侧上各焊接一块临时支撑钢板14与已安装完毕的分段桁架10焊接固定,在下弦杆的底板边缘处各焊接一块临时支撑钢板15与其底下承载分段桁架10的工字钢23焊接固定。
8.2.1吊机的选择
大跨度桁架1采用分段吊装法进行施工时,根据结构形式、分段的重量、分段的就位标高以及现场的施工条件,可选用塔式起重机、桅杆式起重机和自行杆式起重机。起重机的三个主要参数为起重量、起重高度和起重半径:起重量必须大于所吊最重构件加起重滑车组的重量;起吊高度必须满足所需要安装的最高的构件的吊装要求;起重半径应满足在起重量与起重高度一定时,能保持一定距离吊装该构件的要求。若现场吊装的桁架1较少,可直接采用塔吊进行吊装。
8.2.2吊装顺序
结构分段的吊装顺序是以有利于结构安装测控,减小结构安装累积误差,加快工程进度的原则进行确定的。
8.2.3吊装工艺
1)吊点的设置。吊点的数量应视构件(分段桁架10)的长度、形状、重量等进行选择,一般分段吊装的构件长度较短,采用两点绑扎法即能满足要求;吊点与构件重心应相对称并高于构件重心,保证构件吊装的稳定性;若采用钢丝绳捆绑梁构件进行吊装,则梁棱角边缘应衬以麻袋片、半边钢管或短方木护角。
吊点的设置原则:
保证吊耳焊接位置为主结构面,如果吊耳位置无结构面采用临时加强的形式来保证吊耳强度;两个合拢吊耳应该均匀的分布在分段桁架10上,应该保证分段的重心在两个吊耳形成的中心点附近。
2)起吊和就位。采用合适的吊索具规格。起吊前应检验绳索、卡具等是否完好,待构件吊离地面约0.2m后应作短暂停留,检验设备、工具是否工作正常,并根据结构分段的安装就位角度,调节绳索上的倒链,改变各条绳索的起吊长度,来调节吊装分段的倾斜角度,以满足其就位要求。此工序要保证绳索与吊机吊钩的中心线应通过分段桁架10的重心。如果分段桁架10属于水平放置,就不需调整分段的倾斜角度,可直接进行吊运。
吊装过程中,应在分段桁架10两边用牵引溜绳进行控制,起吊过程应匀速缓慢,切不可为加快吊装进度而“心急手快”,防止构件在空中因过大摆动而碰撞其它构件或建筑物。当分段桁架10吊至设计位置离支座近20cm时,令吊机减慢速度,辅助以人力扶正分段桁架10,在吊机和人工的协调配合下使梁中心线与事先放好的支承面中心线对准,然后缓慢就位,如有偏差,可稍吊起用撬杠等工具拨正。
一般用多个千斤顶3作为梁的临时支承,桁架落位时,由于各支承点不能同时与分段桁架10发生作用,往往是部分千斤顶先行受力,经过调整并落架后,所有支承千斤顶才会全部受力。为避免因千斤顶的受力不均而引起破坏,在支撑架2顶部的千斤顶3旁边另设枕木或其他坚实垫物,使之能参与受力,加强结构的支承作用,也方便分段桁架10校正时的千斤顶3调整。
3)分段桁架10的精确校正。分段桁架10吊装至既定位置后,若位置与设计位置存在误差,需对钢梁吊装位置进行细部精确调整,调整按照先平面位置再高程的顺序进行精校内容包括中心轴线、分跨间距、标高、垂直度等,垂直度检验可用挂线锤球,其他检验内容可用经纬仪、全站仪等进行。检验后如果存在偏差,应采用工具进行校正,校正工具主要有千斤顶、撬杠、钢楔、倒链、法兰螺栓等。校正过程应避免构件发生局部变形,桁架校正完后,便可进行固定。如果梁的高宽比较大,为保证稳定性,应用拉索或固定钢架将分段桁架固定。具体方法如下:
a.左右方向的精确调整方法,如图2和图3所示:
在待调整的桁架1顶板处焊接四个耳板,然后用手动葫芦6及钢丝绳5进行左右位置微调,待调整完毕后在上弦杆11和下弦杆12的两侧上各焊接一块临时支撑钢板14与已安装完毕的分段桁架10焊接固定。
b.垂直方向的精确调整方法,如图3和图4所示:
在分段桁架经过左右方向的调整以后,进行垂直方向的调整,调整通过4台15t千斤顶来调节,千斤顶3要放置在工字钢21上方,千斤顶3不能直接接触分段桁架底板,要在液压杆上放置1块钢板块,调整时要进行精密测量,达到要求后加入钢垫片及钢楔,要求在每个腹板处均设置垫片。待调整完毕后,在下弦杆的底板边缘处各焊接一块临时支撑钢板15与其底下承载分段桁架10的工字钢23焊接固定。
分段桁架10安装过程中,项目测量人员进行全过程检测。
分段桁架10吊装前,测量人员提前在支撑架2顶部放出分段桁架10边线及中心线,便于分段桁架10吊装定位;同时复核支撑架2顶部高程(即分段桁架10底板高程)是否准确,如误差超过规范要求,及时进行调整,以免耽误钢梁吊装。
分段桁架10每拼装完毕一段后,测量人员对安装完毕的分段桁架10顶板进行十字测量放线,同时进行高程测量,复核分段桁架10平面方向和垂直方向是否安装正确,如误差超过规范要求,及时进行调整。
S8.3:焊接分段桁架10
分段桁架10安装就位后,便可进行分段桁架10间的对接焊,焊接部位包括上弦杆与上弦杆的对接焊,下弦杆与下弦杆的对接焊,腹杆与腹杆的对接焊,但由于焊缝较多且较集中,应严密制定焊接工艺,控制焊接变形。
其中,在分段桁架10的拼接处预留工艺孔,通过该工艺孔对钢梁内部焊缝进行焊接;焊接完成后,割除步骤S8.2中的临时支撑钢板并进行焊后焊缝处理。
8.3.1焊接难点
桁架1属于薄壁封闭构件,须分别进行箱外、箱内焊接,箱内工作环境狭小,不利于施工操作,易影响焊接质量。因此桁架1的焊接难点是分段拼接时焊缝的处理。
截面较大的桁架,对接焊缝较长,焊接容易引起腹板的波浪状变形,从而不易保持箱体的几何截面尺寸。现场安装组对时,对接接头平整度完全要达到接头错边允许值(≤1/10t,≯3mm)的严格要求相当难,必然存在对接口的走形、对角线差异、长缝区坡口部板缘起伏等误差。因此,采取增加定位焊分段密度、分段焊缝长度、卡码等特殊工艺措施进行约束是必要的,但这些措施易造成焊缝内定位焊起弧收弧处增多,根部焊接连贯性差等焊接缺陷。接头在准予焊接后,最先介入的作业工序为缝内清理,之后即为焊前加热。因桁架的截面较大而钢板较薄,薄板储热功能低、散热功能却高,升温快、降温也快,膨胀快、收缩演变也快,极易导致刚加热投入正式焊接的接头局部先行进入缩变,给控制接头总缩变和保持截面的几何尺寸带来困难。
为了保证大跨度桁架内部焊缝的焊接质量,确保桁架整体的稳定性,杜绝薄弱环节,经专家论证及受力验算后,在分段桁架构件制作加工时在桁架分段拼接处预留方形工艺孔,从而通过该工艺孔对钢梁内部焊缝进行焊接,以便构件拼装时确保暗处每条边焊接完整。
经施工实践验证,工艺孔设置为方形孔可大大提高分段桁架10之间内部焊接连接质量,而且回装方 便快捷,易于控制回装焊接质量,不影响钢箱梁的整体性。当桁架焊接完,需要进行工艺孔的回装。回装是采用反面贴铁衬垫的方式来单面焊成型,贴条宽度宜在30-40mm之间,回装钢板厚度、强度及材料必须与腹板材质一致。回装钢板四边必须是45°的斜口,并确保满焊焊接和焊接检测合格。
8.3.2主要焊接工艺
1)做好焊前准备
事先完备焊接作业所需的机具、焊材、剔凿工机具、计量器具、防护器材、器材机具屯放台的配备与周边安全防护设置,确保进入焊接施工后焊工不因施工手段不完备而导致焊接暂时中止;事先完成焊接接头包括缝内定位焊起始处与终了处凸起部位的清除工作,需要砂磨成缓坡状的均须事先进行;事先标识出分段焊的焊缝长度、焊肉厚度、焊接方向等;清楚地完成实物交底,避免混淆。
2)正式施焊
a.焊接参数:对于箱形截面的对接焊,可采用的主要焊接方法有手工电弧焊和CO2气体保护焊,应根据实际焊接位置选择合适的方法,因CO2气体保护焊热输入小,焊接质量易于保证,可优选此方法。
b.预热:当工作环境温度较低、分段桁架10板厚和刚性较大时,应进行预热,即在正式焊接前靠近焊接线处用火焰、工频感应、红外线等加热,达到降低焊接冷却速度,减少应力,防止产生裂纹的目的,预热后应立即进行施焊。预热温度主要由钢材的含碳量决定,其他元素含量也由不同程度的影响,一般情况下,低合金钢的预热温度为100~150℃。
c.定位焊:定位焊属于短焊缝焊接,作为正式焊缝的一部分,其质量应与正式焊缝一样得到严格保证。定位焊的焊缝位置应对称均匀分布,防止局部约束过大;定位焊缝长度和高度应适宜,主要根据实际焊缝长度和坡口形式进行确定,一般长度为30~60mm,高度为5~8mm;定位焊采用的焊材应与实际焊接同型,也可选用强度等级稍低的焊条或焊丝;定位焊的焊接电流应稍大于焊接时的电流(提高10%~15%),以减少间断焊接中夹渣等的缺点。
d.焊接顺序:为控制焊接变形,应采用对称、分层多道退焊进行焊接。以下弦杆12的焊接顺序为:先进行下弦杆12底板焊接,由两名焊工按序施焊,一名焊工先从箱内焊缝中部向一方向起焊至一侧腹板工艺孔处收弧,再从另一侧侧板工艺孔处起焊至接头,另一名焊工在箱外待箱内焊工完成第一段焊接后,从侧板工艺孔处接头焊至超出焊缝30mm引弧板处停弧,再到分段桁架10另一侧焊缝引弧板超出焊缝30mm处起弧焊至工艺孔处接头。按此焊接顺序完成每一层焊接至整条焊缝完成;然后焊接两侧侧板,分若干段由上至下分层、分道退焊完成;最后是上翼缘板焊接,分段分层退焊完成。
3)焊后焊缝处理
a.焊接完成后,衬垫板、引出引入板应按要求割除,将药渣、飞溅清理干净;按适合的温度进行后热处理,消除焊接应力,随着材质与板厚的不同,后热温度也不同,一般低碳钢的后热温度为600~650℃。
b.焊接质量检查:通过外观检查,检验焊缝金属表面焊波是否均匀,是否有裂纹、未熔合、夹渣、焊瘤、咬边、烧穿、弧坑和针状气孔等缺陷。通过无损探伤,检验焊缝的内部缺陷,如裂纹、未焊透、气 孔、夹渣等。
c.焊缝检查出缺陷后,要制订焊缝返修方法,返修焊接工艺应与原订焊接工艺相同,也应严格执行预热、后热等原定方案,补焊后的焊缝应进行重新探伤。
S8.4:重复所述步骤S8.1~步骤S8.3,进行下一段分段桁架拼接,完成整条桁架的吊装及焊接,并留置下弦杆的后焊节点不焊接。
S8.5:释放千斤顶3,进行桁架1整体同步调整;
同步调整是指采用一定的方法使结构各支承点的卸荷过程同时进行,同时停止,保持前后操作的统一性。一般采用计算机进行同步性控制具有较好的精确性,有利于结构的逐渐受力;也可采用人工控制,只是人工控制过程同步性精度相对较差,但方法简单,可节约工程成本。
进行人工同步调整,主要是通过设立总指挥和释放点的副指挥(一般在每个胎架上设立一个副指挥),指导释放操作人员的统一操作,始终保持总指挥的发号施令→副指挥的回应与开始命令→操作人员的具体操作整个过程的统一性和流畅性。
为做好同步操作,操作人员必须定位定岗,释放前熟悉和掌握操作要领和要求,清楚自己的操作点位置、该点千斤顶3释放控制值、压杆操作速度与次数、标尺读数等,并在地面进行一次实际演示。释放时,操作人员应听从指挥、统一动作,可以事先规定统一的口号,使压杆操作保持稳定的节奏和速度。每级释放到位后,操作人员应及时报告给副指挥,并由副指挥传达给总指挥。每级释放后,暂停5~10min进行结构内力与变形的数据实测,并检验千斤顶3情况,若存在倾斜者应进行逐个调整扶正,若千斤顶3与桁架10底部之间不得有悬空现象,应立即顶紧,使各个千斤顶3受力均匀。在每个释放点处预备若干个千斤顶3,当万一释放千斤顶出现破坏时,及时在相应点位补设千斤顶;释放过程中,千斤顶的倾斜调整应逐个进行,而不能随便移动,以免单个千斤顶作用过大额发生破坏。
最后,桁架的释放监测是释放过程中重要环节,其结果不仅能体现结构安装质量,又能为结构分析提供参考依据。
监测内容:为详细了解释放过程中结构的变化情况,释放监测内容应详尽全面,并能直接反映结构变化,监测内容包括桁架的轴向水平位移、侧向位移、钢梁代表截面与重要节点的应力等。以上监测内容在结构释放前、结构释放过程中、结构释放后三天内均应进行监测,并及时记录监测结果。
监测方法:释放监测采用稳定、直观、可靠的传统测试方法,包括拉线法、倾角仪、直观量测方法、水准仪、全站仪和电阻应变等。
监测点的布置:根据结构特点,在合理位置布设监测点,以求得更为准确可靠的监测结果。例如在桁架1的端部设置游标卡尺,可较准确监测出钢梁的轴线水平位移;在各分段桁架10的内表面布置应变花,可准确监测出钢箱梁截面应力变化等。
S8.4:重复所述步骤S8.1~步骤S8.3,进行下一段分段桁架10拼接,完成整条桁架的吊装及焊接,并留置下弦杆的后焊节点不焊接;
S8.5:释放千斤顶,进行桁架整体同步调整;
S8.6:重复步骤S8.1~步骤S8.5,完成多条平行布置的桁架施工。
S8.7:在上弦杆内全部注砼,在下弦杆和腹杆经步骤S4模拟的高受压节段局部注砼;
优选的,所述步骤S8.7中,在桁架1内的高受力节段两侧设置竖板,所述竖板在所述桁架内围合形成用于注砼的局部空腔,从而阻挡流体砼的横向流动,在浇筑过程中更凝实稳固,在局部注砼效果上得到保障。
S8.8:在相邻的两条桁架之间铺设多条平行布置的叠合板7,具体实施时,由于考虑到叠合板的造价问题,叠合板7采用单向预应力叠合板,叠合板与叠合板之间留有一定间距,约为30mm,并在该间距的底面设置模板71,如图10所示。需要说明的是,预应力叠合板具有轻型大跨,预制装配,快速施工、防火性能好、造价低等特点,可代替模板,取消脚手架,大大加快施工速度,节约人力、物力、财力。叠合板与钢梁组合,可以提高钢梁的抗弯刚度,减少截面高度,增加结构的稳定。
在叠合板上铺设构造筋8,构造筋8分别与叠合板的预应力筋72和桁架顶部的栓钉绑扎固定;模板71被钢丝吊挂在构造筋8上;之后浇筑混凝土层9成整浇楼板,能够满足整体的受力要求及裂缝控制。
其中,栓钉设计时按完全抗剪连接设计,设计方法为:
S8.8.1:以弯距绝对值最大点及零弯距为界限,划分若干剪跨区段;
S8.8.2:逐段确定各剪跨区段内的上弦杆与混凝土交界面的纵向剪力;
S8.8.3:位于正弯距区段的剪跨Vs=Astfst
式中,Ast为负弯距区混凝土翼缘板内有效宽度内纵向受拉钢筋的截面积;fst为受拉钢筋的抗拉强度设计值;
S8.8.4:确定每个剪跨内所需栓钉的数量nf=Vs/Nv c
式中,Nv c为单个栓钉的抗剪承载力设计值;
S8.8.5:将算得的栓钉数目在相应的剪跨内均匀布置。
栓钉设计的构造要求:
1)钉头下表面宜高出翼板底部钢筋顶面30mm。
2)栓钉的纵向最大间距不应大于混凝土翼板厚度的4倍,且不大于400mm。
3)栓钉的外侧边缘与钢梁翼缘边缘之间的距离不应小于20mm;栓钉顶面的混凝土保护层厚度不应小于15mm。
4)当栓钉位置不正对钢梁腹板时,如钢梁上翼缘承受拉力,则栓钉杆直径不应大于钢梁上翼缘厚度的1.5倍;如钢梁上翼缘不承受拉力,则栓钉杆直径不应大于钢梁上翼缘厚度的2.5倍。
5)栓钉长度不应小于其杆径的4倍。
6)栓钉沿梁轴线方向的间距不应小于杆径的6倍,垂直于梁轴线方向的间距不应小于杆径的4倍。
S8.9:在叠合板上进行砼浇筑形成楼板。
S8.10:将向下位移后的下弦杆12上的后焊节点5与立柱的后焊接口进行焊接。
S8.11:在后焊节点5处的下弦杆12内灌注砼。
优选的,所述步骤S8.11中,在所述后焊节点5处的下弦杆内设置竖板,所述竖版与所述下弦杆围合形成用于注砼的局部空腔,从而阻挡流体砼的横向流动,在浇筑过程中更凝实稳固,在局部注砼效果上得到保障。
如图4所示,对比图2和图3仿真结果,在上弦杆11内注砼强化能明显减小桁架1受力,且在上弦杆11注砼降低桁架1扰度效果显著,如图5所示,在上弦杆11注砼后,在下弦杆12和腹杆13中局部注砼,即在不改变桁架结构的同时最大程度强化桁架,具有很高的经济性和实用性。
综上所述,实施本发明的一种建筑桁架及楼板的施工方法,与现有技术相比较,具有如下有益效果:
1、本发明运用有限元软件分析桁架应力,对桁架的上弦杆进行注砼强化,选取下弦杆或腹杆的受压力值超过预设值的部位作为高受压节段进行局部注砼强化,从而增强桁架的强度和刚度,提高转换桁架承载能力,有效解决现有技术中由于桁架弹性变形使上部混凝土结构因挠度过大而开裂的问题。
2、本发明运用有限元软件分析桁架荷载挠度,设定后焊节点位置和预留后焊接口,在后期施工中通过补焊后焊接口有效解决了桁架受力变形对立柱产生较大的不良侧压力问题。
3、在制作桁架时可以减少后焊接口数量,直接体现在施工环节降低焊接工作量,提高施工效率。
4、本发明实现大型转换桁架的高空安装,提高了施工机械的使用效率,缩短了施工工期,节约了施工成本。
5、本发明采用桁架与叠合板结合的结构体系,实现大跨度楼板免支模安装,将楼板跨度提高至4.5~5.5m,达到不设次梁条件下的结构简化,减少材料损耗,提高施工效率,节省施工成本。
6、本发明采用分段高空拼装、独立支撑架支撑、千斤顶同步协调下的安装工艺,实现大跨度大型转换桁架的精确安装。
7、本发明通过合理布置叠合板与桁架连接的栓钉和构造筋,使桁架与楼板连接紧密,实现桁架与楼板的整体受力。
以上所述是本发明的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本发明原理的前提下,还可以做出若干改进和润饰,这些改进和润饰也视为本发明的保护范围。

Claims (10)

  1. 一种建筑桁架及楼板的施工方法,其特征在于,包含如下步骤:
    S1:收集建筑施工要求,设计桁架结构,所述桁架包括由上弦杆和下弦杆构成的弦杆、以及连接在上弦杆和下弦杆之间的腹杆;
    S2:运用有限元软件建立桁架及桁架连接的下层建筑与上层建筑结构模型;
    S3:用有限元软件对模型进行力学验算,计算出弦杆或腹杆的受压力值,受压力值超过预设值进入步骤S4,受压力值不超过预设值则进入步骤S5;所述预设值为建筑施工要求允许桁架形变安全范围内的受压力值;
    S4:对桁架的上弦杆进行模拟注砼强化,选取下弦杆或腹杆的受压力值超过预设值的部位作为高受压节段进行模拟局部注砼强化,进入步骤S3;
    S5:用有限元软件对模型进行挠度分析,计算桁架荷载后下弦杆向下位移量,向下位移后的下弦杆在与下层建筑的立柱连接位置处设有缺口,所述缺口为后焊节点,所述立柱对应后焊节点位置设置后焊接口;
    S6:用有限元软件对模型进行应力分布分析,在受力较小的部位设置分段点,将桁架分割为若干的分段桁架;
    S7:根据模型制作分段桁架;
    S8:桁架及楼板现场施工。
  2. 根据权利要求1所述的建筑桁架及楼板的施工方法,其特征在于,所述步骤S8的桁架及楼板现场施工包括:
    S8.1:搭建支撑架,在支撑架上表面设置有千斤顶;
    S8.2:吊装分段桁架,将分段桁架放置在千斤顶上,并进行左右方向及垂直方向调整,待位置调整完毕后在上弦杆和下弦杆的两侧上各焊接一块临时支撑钢板与已安装完毕的分段桁架焊接固定,在下弦杆的底板边缘处各焊接一块临时支撑钢板与其底下承载分段桁架的工字钢焊接固定;
    S8.3:焊接分段桁架,分段桁架安装就位后,进行分段桁架间的对接焊,焊接部位包括上弦杆与上弦杆的对接焊,下弦杆与下弦杆的对接焊,腹杆与腹杆的对接焊,焊接完成后,割除步骤S8.2中的临时支撑钢板并进行焊后焊缝处理;
    S8.4:重复所述步骤S8.1~步骤S8.3,进行下一段分段桁架拼接,完成整条桁架的吊装及焊接,并留置下弦杆的后焊节点不焊接;
    S8.5:释放千斤顶,进行桁架整体同步调整;
    S8.6:重复步骤S8.1~步骤S8.5,完成多条平行布置的桁架施工;
    S8.7:在上弦杆内全部注砼,在下弦杆和腹杆经步骤S4模拟的高受压节段局部注砼;
    S8.8:在相邻的两条桁架之间铺设多条平行布置的叠合板,在叠合板上铺设构造筋,构造筋分别与叠合板的预应力筋和设置在上弦杆顶部的栓钉绑扎固定;其中,相邻的两块叠合板之间留有一定间距,并在该间距的底面设置模板;
    S8.9:在叠合板上进行砼浇筑形成楼板;
    S8.10:将下弦杆的后焊节点与立柱的后焊接口进行焊接;
    S8.11:在后焊节点处的下弦杆内灌注砼。
  3. 根据权利要求2所述的建筑桁架及楼板的施工方法,其特征在于,所述支撑架的顶部设有临时支墩,所述临时支墩包括铺设在支撑架顶部的钢网片以及在桁架接缝位置两侧各放置两根并排的工字钢,所述工字钢放置在钢网片上,所述千斤顶放置在工字钢上。
  4. 根据权利要求2所述的建筑桁架及楼板的施工方法,其特征在于,所述支撑架底部设置垫板,所述支撑架设置有剪刀支撑。
  5. 根据权利要求2所述的建筑桁架及楼板的施工方法,其特征在于,所述步骤S8.3中,在分段桁架的拼接处预留工艺孔,通过该工艺孔对桁架内部焊缝进行焊接。
  6. 根据权利要求2所述的建筑桁架及楼板的施工方法,其特征在于,所述步骤S8.7中,在桁架内的高受力节段两侧设置竖板,所述竖板在所述桁架内围合形成用于注砼的局部空腔。
  7. 根据权利要求2所述的建筑桁架及楼板的施工方法,其特征在于,所述步骤S8.11中,在所述后焊节点处的下弦杆内设置竖板,所述竖版与所述下弦杆围合形成用于注砼的局部空腔。
  8. 根据权利要求2所述的建筑桁架及楼板的施工方法,其特征在于,所述步骤S8.2的具体步骤:采用两点绑扎法,两个吊点以分段桁架的重心为中心点呈对称设置并高于分段桁架的重心;待分段桁架吊离地面一定距离后作短暂停留,根据分段桁架的安装就位角度,调节绳索上的倒链,改变各条绳索的起吊长度来调节分段桁架的倾斜角度,以保证绳索与吊机吊钩的中心线通过分段桁架的重心;将分段桁架吊至既定位置的千斤顶上,然后利用手动葫芦及钢丝绳进行左右方向的调整,再利用千斤顶进行垂直方向的调整,待位置调整完毕后在上弦杆和下弦杆的两侧上各焊接一块临时支撑钢板与已安装完毕的分段桁架焊接固定,在下弦杆的底板边缘处各焊接一块临时支撑钢板与其底下承载分段桁架的工字钢焊接固定。
  9. 根据权利要求2所述的建筑桁架及楼板的施工方法,其特征在于,所述步骤S8.5的具体步骤:通过设立总指挥和释放点的副指挥,指导释放操作人员的统一操作,在调整过程中,每级释放到位后,操作人员应及时报告给副指挥,并由副指挥传达给总指挥,每级释放后,暂停5~10min进行桁架结构内力与变形的数据实测,并检验千斤顶情况,使各个千斤顶受力均匀,同时进行桁架结构变化的监测,桁架结构变化的监测包括轴向水平位移监测、侧向位移监测、桁架代表截面与重要节点的应力监测。
  10. 如权利要求2所述的建筑桁架及楼板的施工方法,其特征在于,所述步骤S8.8中的栓钉设计时 按完全抗剪连接设计,设计方法为:
    S8.8.1:以弯距绝对值最大点及零弯距为界限,划分若干剪跨区段;
    S8.8.2:逐段确定各剪跨区段内的上弦杆与混凝土交界面的纵向剪力;
    S8.8.3:位于正弯距区段的剪跨Vs=Astfst
    式中,Ast为负弯距区混凝土翼缘板内有效宽度内纵向受拉钢筋的截面积;fst为受拉钢筋的抗拉强度设计值;
    S8.8.4:确定每个剪跨内所需栓钉的数量nf=Vs/Nv c
    式中,Nv c为单个栓钉的抗剪承载力设计值;
    S8.8.5:将算得的栓钉数目在相应的剪跨内均匀布置。
PCT/CN2017/070783 2016-01-12 2017-01-10 一种建筑桁架及楼板的施工方法 WO2017121315A1 (zh)

Applications Claiming Priority (6)

Application Number Priority Date Filing Date Title
CN201610022588.X 2016-01-12
CN201610022575.2A CN105678001B (zh) 2016-01-12 2016-01-12 一种桁架注砼的施工方法
CN201610022505.7 2016-01-12
CN201610022505.7A CN105604183B (zh) 2016-01-12 2016-01-12 一种桁架后焊节点的施工方法
CN201610022575.2 2016-01-12
CN201610022588.XA CN105649332B (zh) 2016-01-12 2016-01-12 一种建筑梁板的施工方法

Publications (1)

Publication Number Publication Date
WO2017121315A1 true WO2017121315A1 (zh) 2017-07-20

Family

ID=59310914

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2017/070783 WO2017121315A1 (zh) 2016-01-12 2017-01-10 一种建筑桁架及楼板的施工方法

Country Status (1)

Country Link
WO (1) WO2017121315A1 (zh)

Cited By (110)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107989351A (zh) * 2017-11-28 2018-05-04 江苏速捷模架科技有限公司 盘扣式快速组装桁架平台结构
CN108360686A (zh) * 2018-03-19 2018-08-03 浙江中南建设集团钢结构有限公司 一种网架整体安装装置及其施工方法
CN108568707A (zh) * 2018-06-08 2018-09-25 浙江亿洲机械科技有限公司 桁架楼承板总成生产线
CN108959775A (zh) * 2018-07-05 2018-12-07 华北水利水电大学 一种栈桥用方钢管桁架次应力影响因素显著性分析方法
CN109060280A (zh) * 2018-08-24 2018-12-21 重庆建工第八建设有限责任公司 一种结构加载墙用加载定位模具及其施工方法
CN109101763A (zh) * 2018-09-17 2018-12-28 重庆建工住宅建设有限公司 一种高边坡工程力学性能分析及信息化施工方法
CN109505378A (zh) * 2018-09-27 2019-03-22 上海市建筑装饰工程集团有限公司 大面积屋面桁架受力转换层
CN109590580A (zh) * 2018-12-24 2019-04-09 深圳能源资源综合开发有限公司 一种厌氧罐底板焊接变形控制方法
CN109707172A (zh) * 2018-12-12 2019-05-03 中国建筑第四工程局有限公司 一种用于提升大跨度高空连廊桁架的提升平台
CN109826312A (zh) * 2019-02-21 2019-05-31 深圳市建筑设计研究总院有限公司 一种高层连体结构的分段拼装方法及高层连体结构
CN110069882A (zh) * 2019-04-30 2019-07-30 中国十七冶集团有限公司 一种多机抬吊吊装优化方法
CN110083989A (zh) * 2019-05-28 2019-08-02 中国十七冶集团有限公司 一种基于bim技术在管廊暗挖工程中安全数据监测方法
CN110147589A (zh) * 2019-04-30 2019-08-20 中国二十冶集团有限公司 Pc异形梁与现浇梁bim组合建模算量方法
CN110258878A (zh) * 2019-07-08 2019-09-20 江苏广兴集团有限公司 隐形梁装配式免拆保温楼板结构
CN110348142A (zh) * 2019-07-16 2019-10-18 龙元建设集团股份有限公司 基于bim用组合模板支架工艺成型曲线桥的方法
CN110390179A (zh) * 2019-08-22 2019-10-29 惠州市新一代工业互联网创新研究院 一种钢构矫正力数学模型构建方法
CN110455255A (zh) * 2019-04-28 2019-11-15 中铁四局集团第五工程有限公司 一种满堂支架预压沉降监测装置及监测方法
CN110468957A (zh) * 2019-07-09 2019-11-19 深圳市建筑设计研究总院有限公司 一种空间双向空腹桁架结构体系及其施工方法
CN110565968A (zh) * 2019-09-06 2019-12-13 青岛理工大学 一种大跨桁架施工滑移支撑自散辅助装置
CN110569545A (zh) * 2019-08-06 2019-12-13 湖北大成空间科技股份有限公司 一种预制组合式空腔楼盖挠度和内力的确定方法
CN110670803A (zh) * 2019-11-01 2020-01-10 江苏沪宁钢机股份有限公司 一种半箱体半桁架结构
CN110781543A (zh) * 2019-10-15 2020-02-11 北京城建集团有限责任公司 一种大跨度钢梁安装精度控制施工方法
CN110929324A (zh) * 2019-11-21 2020-03-27 浙江百厦建设有限公司 基于bim技术的空心砌块免支模构造柱同步填充墙工法
CN110987504A (zh) * 2019-12-20 2020-04-10 哈尔滨工业大学(威海) 光辐射下钢结构温度梯度及其影响的测试装置及测试方法
CN111016032A (zh) * 2019-11-27 2020-04-17 航天海鹰(镇江)特种材料有限公司 一种长桁零件压损实验制件的成型装置及其应用
CN111125817A (zh) * 2019-12-09 2020-05-08 彭婧 一种基于bim的装配式建筑设计方法及设备
CN111159797A (zh) * 2019-12-06 2020-05-15 上海建工集团股份有限公司 一种基于bim的力学模型通用建模方法
CN111222194A (zh) * 2020-03-03 2020-06-02 中国建筑第八工程局有限公司 大跨度幕墙施工中的屋面钢结构预压及等比例卸载方法
CN111339601A (zh) * 2020-03-25 2020-06-26 中国十七冶集团有限公司 一种bim+vr的施工现场布置方法
CN111353191A (zh) * 2020-02-28 2020-06-30 中国十七冶集团有限公司 一种多曲率异形曲面屋盖钢结构施工方法
CN111382532A (zh) * 2020-03-04 2020-07-07 广联达科技股份有限公司 支架体系智能构建方法、系统和介质
CN111398065A (zh) * 2020-04-24 2020-07-10 华侨大学 一种高温下叠合面抗剪性能测试装置
CN111485489A (zh) * 2020-06-03 2020-08-04 中铁宝桥集团有限公司 一种大型桥梁支座垫板及其连接方法
CN111524225A (zh) * 2020-04-15 2020-08-11 中国十七冶集团有限公司 一种基于bim技术的人工挖孔灌注桩施工方法
CN111561127A (zh) * 2020-06-22 2020-08-21 中铁宝桥集团有限公司 一种钢箱拱节段及其组拼方法
CN111597623A (zh) * 2020-05-26 2020-08-28 中建安装集团有限公司 一种石化装置模块化设计方法
CN111797508A (zh) * 2020-06-12 2020-10-20 中冶建筑研究总院有限公司 一种基于监测技术的钢屋架安全性实时评定方法
CN112035935A (zh) * 2020-09-07 2020-12-04 中国十七冶集团有限公司 一种基于bim的大跨度钢桁架可视化施工方法
CN112069583A (zh) * 2020-09-08 2020-12-11 中国十七冶集团有限公司 有限元同步分析的斜悬挑安全智能施工系统及方法
CN112127544A (zh) * 2020-09-29 2020-12-25 中建七局第一建筑有限公司 悬空梁的施工方法及用于悬空梁的建造结构
CN112197844A (zh) * 2020-09-22 2021-01-08 浙江东鼎电子股份有限公司 一种平板式动态称重装置吊放安装方法
CN112270025A (zh) * 2020-09-30 2021-01-26 晟通科技集团有限公司 模板组合设计方法
CN112360146A (zh) * 2020-12-04 2021-02-12 湖南中天杭萧钢构科技股份有限公司 一种可拆式钢筋桁架楼承板件支撑系统
CN112372172A (zh) * 2020-11-27 2021-02-19 中铁宝桥集团有限公司 全焊钢桁梁弦杆嵌补段的设置方法
CN112391949A (zh) * 2020-11-25 2021-02-23 中交第二航务工程局有限公司 一种大跨钢混廊桥结构混凝土裂缝控制施工方法
CN112434362A (zh) * 2020-11-23 2021-03-02 上海燃气工程设计研究有限公司 一种基于bim技术的地上燃气管道可视化施工交底方法
CN112482578A (zh) * 2020-12-14 2021-03-12 北京市机械施工集团有限公司 采用临时支撑的大跨度转换桁架及其施工方法
CN112482579A (zh) * 2020-12-14 2021-03-12 北京市机械施工集团有限公司 一种双向大刚度大跨度转换桁架体系及其卸载方法
CN112507537A (zh) * 2020-11-26 2021-03-16 筑友智造科技投资有限公司 一种塔吊布置方法、装置及系统
CN112502046A (zh) * 2020-11-30 2021-03-16 四川路航建设工程有限责任公司 一种y型支撑架现浇连续梁0-1#节段施工方法
CN112541218A (zh) * 2020-12-11 2021-03-23 中铁大桥科学研究院有限公司 一种大跨全焊钢桁架桥悬臂施工线形控制方法
CN112580135A (zh) * 2020-12-15 2021-03-30 昆山经济技术开发区建筑安装工程有限公司 一种基于bim应用的钢柱分节吊装方法
CN112668151A (zh) * 2020-12-10 2021-04-16 上海宝冶集团有限公司 一种在设计软件中贝雷架建模的替代方法
CN112699448A (zh) * 2021-01-13 2021-04-23 中铁大桥勘测设计院集团有限公司 一种全焊钢桁梁整体节点撕破计算方法
CN112699462A (zh) * 2020-12-29 2021-04-23 中国航空工业集团公司西安飞机设计研究所 一种大跨度开剖面舱体空间桁架结构设计方法
CN112726415A (zh) * 2021-01-05 2021-04-30 中交路桥建设有限公司 一种钢箱梁上下交叉施工支架结构及施工方法
CN112749436A (zh) * 2021-01-15 2021-05-04 广联达科技股份有限公司 楼板间的板缝模型的构建方法、装置、设备和存储介质
CN112875542A (zh) * 2021-03-17 2021-06-01 中国五冶集团有限公司 一种捣固焦炉煤塔捣固机主桁架的快速吊装装置及方法
CN112878699A (zh) * 2019-11-29 2021-06-01 中冶(上海)钢结构科技有限公司 一种管桁架吊装时与铸钢件企口支管对接的施工方法
CN112878698A (zh) * 2019-11-29 2021-06-01 中冶(上海)钢结构科技有限公司 一种管桁架与铸钢件分开安装并滑动对口的施工方法
CN112900868A (zh) * 2021-01-20 2021-06-04 山东华海塑胶建材有限公司 一种高层钢结构工程的施工方法
CN113009593A (zh) * 2021-02-23 2021-06-22 中国人民解放军海军工程大学 一种桁架式岛礁海洋气象环境数据采集装置的构建方法
CN113111464A (zh) * 2021-04-21 2021-07-13 中交第三公路工程局有限公司工程总承包分公司 一种基于数字模型的钢拱桥虚拟预拼装方法
CN113136974A (zh) * 2021-04-26 2021-07-20 中国建筑第八工程局有限公司 超厚底板内群组竖向作动器埋件安装方法
CN113463929A (zh) * 2021-07-29 2021-10-01 中冶建工集团重庆钢结构有限公司 一种提高钢柱安装精度的施工方法
CN113484053A (zh) * 2021-06-22 2021-10-08 成兰铁路有限责任公司 一种模拟桥梁承台上覆土体荷载的等效施加装置及安装方法
CN113494148A (zh) * 2021-09-08 2021-10-12 中国船舶重工集团国际工程有限公司 一种大跨度转换桁架-剪力墙结构及施工工艺
CN113670714A (zh) * 2021-07-01 2021-11-19 珠海十字门中央商务区建设控股有限公司 验证大跨度钢结构整体提升可实施性及安全性的试验方式
CN113738024A (zh) * 2021-06-28 2021-12-03 三一筑工科技股份有限公司 一种预制墙钢筋设计形式确定方法及装置
CN113761677A (zh) * 2021-08-12 2021-12-07 广州五羊建设机械有限公司 一种实现利润最大化的塔吊结构设计方法
CN113833107A (zh) * 2021-10-17 2021-12-24 山西潇河建筑产业有限公司 一种转换桁架及其桁架节点的焊接方法
CN113898176A (zh) * 2021-09-29 2022-01-07 中冶南方武汉建筑设计有限公司 一种地下室顶板的施工方法
CN113916146A (zh) * 2021-11-11 2022-01-11 深圳高速公路股份有限公司 一种桥梁拼接缝车致振动变形监测及控制系统和方法
CN113957990A (zh) * 2021-11-05 2022-01-21 中建一局集团建设发展有限公司 一种空旷场地超高结构防雷系统与节点装置
CN113979299A (zh) * 2021-11-24 2022-01-28 北京市第三建筑工程有限公司 一种吊装系统的安装方法和吊装方法
CN114104939A (zh) * 2021-11-16 2022-03-01 中铁一局集团建筑安装工程有限公司 一种钢构架吊装工艺、吊装设备及辅助装置
CN114178760A (zh) * 2021-11-23 2022-03-15 中国一冶集团有限公司 可调节式大跨度钢梁焊接操作平台
CN114235028A (zh) * 2022-01-24 2022-03-25 上海市建筑科学研究院有限公司 一种同层即时灌浆构件受后续施工扰动的检测方法
CN114351590A (zh) * 2021-12-14 2022-04-15 上海市基础工程集团有限公司 用于钢箱梁制作节段现场安装精确定位装置及方法
CN114352033A (zh) * 2022-01-29 2022-04-15 北京城建集团有限责任公司 钢结构梁、柱支架安装新型施工方法
CN114457919A (zh) * 2022-01-29 2022-05-10 中建钢构工程有限公司 一种能够提高桁架安装精度的施工方法
CN114636500A (zh) * 2022-03-22 2022-06-17 哈尔滨工业大学(深圳) 超高层结构伸臂桁架施工监控方法和装置
CN114689087A (zh) * 2022-04-02 2022-07-01 中国科学院西安光学精密机械研究所 一种高热稳定性大视场星图模拟器的支撑架
CN114722446A (zh) * 2022-06-09 2022-07-08 山东高速德建集团有限公司 一种基于dynamo的模板系统竖向支撑建模方法
CN114809300A (zh) * 2022-05-20 2022-07-29 中建八局第二建设有限公司 一种高空多层大悬挑型钢混凝土组合结构施工方法
CN114841040A (zh) * 2022-05-20 2022-08-02 上交(徐州)新材料研究院有限公司 一种适用于大型桁架焊接工艺的制定方法
CN114941433A (zh) * 2022-05-19 2022-08-26 上海宝冶集团有限公司 一种大重量船型采光顶钢结构的施工方法
CN114969942A (zh) * 2022-06-15 2022-08-30 中南建筑设计院股份有限公司 一种张弦立体拱架的参数化建模方法
CN115030520A (zh) * 2022-06-01 2022-09-09 中冶(上海)钢结构科技有限公司 一种悬挑钢桁架组对过程中的卸载及端部下扰值控制方法
CN115045450A (zh) * 2022-04-22 2022-09-13 中铁二十局集团第二工程有限公司 建筑结构屋面面板的安装方法及其建筑结构
CN115075562A (zh) * 2022-06-29 2022-09-20 浙江精工钢结构集团有限公司 一种释放大跨度桁架结构分区分阶段施工附加应力的方法
CN115070242A (zh) * 2022-06-20 2022-09-20 中铁宝桥(扬州)有限公司 内嵌弦杆的钢箱梁制造方法
CN115142558A (zh) * 2022-07-15 2022-10-04 江苏昊钢建筑科技有限公司 一种分体式桁架楼承板连接件
CN115162752A (zh) * 2022-06-13 2022-10-11 江苏万斯达建筑科技有限公司 上承式索拉施工承重装置及施工方法
CN115236186A (zh) * 2022-07-22 2022-10-25 浙大城市学院 空间k型斜柱网格内部侧向浇灌试验装置及检测方法
CN115233807A (zh) * 2022-07-26 2022-10-25 中国建筑第七工程局有限公司 局部悬挑超大型钢结构连廊及其施工方法
CN115404994A (zh) * 2022-10-21 2022-11-29 中建八局第二建设有限公司 一种超大跨度建筑不规则曲线空间立体桁架体系施工方法
CN115419750A (zh) * 2022-10-13 2022-12-02 中安华力建设集团有限公司 一种地下室管线复杂节点整体预制装配施工方法
CN115492418A (zh) * 2022-10-12 2022-12-20 上海建为历保科技股份有限公司 一种打牮拨正工艺
CN115538815A (zh) * 2022-12-01 2022-12-30 北京市第三建筑工程有限公司 一种在已有建筑内快速安装水平钢结构的施工方法
CN115839172A (zh) * 2022-11-29 2023-03-24 中建八局第四建设有限公司 一种型钢混凝土组合结构逆作施工方法
CN116044176A (zh) * 2022-12-22 2023-05-02 中国水利水电第九工程局有限公司 一种钢结构屋面网架安装方法
CN116415341A (zh) * 2023-06-09 2023-07-11 山东高速德建集团有限公司 基于Revit的组装式水平桁架及竖向支撑建模方法
CN116497946A (zh) * 2023-05-05 2023-07-28 中建三局集团(深圳)有限公司 塔楼分离式同步生长施工方法
CN116604699A (zh) * 2023-07-19 2023-08-18 成都建工雅安建设有限责任公司 一种智能化叠合板预制系统
CN116933429A (zh) * 2023-07-28 2023-10-24 招商局重工(江苏)有限公司 一种fpso下滑环吊装转运与变形控制方法
CN117290914A (zh) * 2023-10-27 2023-12-26 湘潭大学 一种考虑界面摩擦作用的栓钉连接钢-uhpc界面抗剪承载力计算方法
CN117489130A (zh) * 2024-01-02 2024-02-02 北京城建集团有限责任公司 一种环形钢桁架地面散件拼装高空胎架组装施工工艺
CN117585591A (zh) * 2024-01-17 2024-02-23 辽宁城建集团有限公司 一种用于建筑施工的狭小空间吊运装置及其吊运方法
CN117627376A (zh) * 2024-01-25 2024-03-01 北京建工集团有限责任公司 一种模块化钢梁和檩条整体安装施工方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1261638A (zh) * 1999-12-30 2000-08-02 王康强 高层建筑钢结构安装工法
CN102704606A (zh) * 2012-04-04 2012-10-03 中国航空规划建设发展有限公司 一种调整悬挑钢-砼组合楼盖中楼板拉力的方法
CN104631838A (zh) * 2014-12-08 2015-05-20 永升建设集团有限公司 过程监控施工下的异形超大悬挑钢桁架安装方法
US20150145156A1 (en) * 2012-05-08 2015-05-28 Kunshan Ecological Building Technology Co., Ltd. Method of casting in-situ ferrocement ribbed slab with spliced rack and suspended formwork
CN105604183A (zh) * 2016-01-12 2016-05-25 广州机施建设集团有限公司 一种桁架后焊节点的施工方法
CN105649332A (zh) * 2016-01-12 2016-06-08 广州机施建设集团有限公司 一种建筑梁板的施工方法
CN105678001A (zh) * 2016-01-12 2016-06-15 广州机施建设集团有限公司 一种桁架注砼的施工方法

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1261638A (zh) * 1999-12-30 2000-08-02 王康强 高层建筑钢结构安装工法
CN102704606A (zh) * 2012-04-04 2012-10-03 中国航空规划建设发展有限公司 一种调整悬挑钢-砼组合楼盖中楼板拉力的方法
US20150145156A1 (en) * 2012-05-08 2015-05-28 Kunshan Ecological Building Technology Co., Ltd. Method of casting in-situ ferrocement ribbed slab with spliced rack and suspended formwork
CN104631838A (zh) * 2014-12-08 2015-05-20 永升建设集团有限公司 过程监控施工下的异形超大悬挑钢桁架安装方法
CN105604183A (zh) * 2016-01-12 2016-05-25 广州机施建设集团有限公司 一种桁架后焊节点的施工方法
CN105649332A (zh) * 2016-01-12 2016-06-08 广州机施建设集团有限公司 一种建筑梁板的施工方法
CN105678001A (zh) * 2016-01-12 2016-06-15 广州机施建设集团有限公司 一种桁架注砼的施工方法

Cited By (156)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107989351A (zh) * 2017-11-28 2018-05-04 江苏速捷模架科技有限公司 盘扣式快速组装桁架平台结构
CN108360686A (zh) * 2018-03-19 2018-08-03 浙江中南建设集团钢结构有限公司 一种网架整体安装装置及其施工方法
CN108360686B (zh) * 2018-03-19 2023-05-23 浙江中南绿建科技集团有限公司 一种网架整体安装装置及其施工方法
CN108568707A (zh) * 2018-06-08 2018-09-25 浙江亿洲机械科技有限公司 桁架楼承板总成生产线
CN108959775A (zh) * 2018-07-05 2018-12-07 华北水利水电大学 一种栈桥用方钢管桁架次应力影响因素显著性分析方法
CN109060280A (zh) * 2018-08-24 2018-12-21 重庆建工第八建设有限责任公司 一种结构加载墙用加载定位模具及其施工方法
CN109101763A (zh) * 2018-09-17 2018-12-28 重庆建工住宅建设有限公司 一种高边坡工程力学性能分析及信息化施工方法
CN109505378A (zh) * 2018-09-27 2019-03-22 上海市建筑装饰工程集团有限公司 大面积屋面桁架受力转换层
CN109707172A (zh) * 2018-12-12 2019-05-03 中国建筑第四工程局有限公司 一种用于提升大跨度高空连廊桁架的提升平台
CN109590580A (zh) * 2018-12-24 2019-04-09 深圳能源资源综合开发有限公司 一种厌氧罐底板焊接变形控制方法
CN109826312A (zh) * 2019-02-21 2019-05-31 深圳市建筑设计研究总院有限公司 一种高层连体结构的分段拼装方法及高层连体结构
CN109826312B (zh) * 2019-02-21 2024-03-15 深圳市建筑设计研究总院有限公司 一种高层连体结构的分段拼装方法及高层连体结构
CN110455255B (zh) * 2019-04-28 2024-02-02 中铁四局集团第五工程有限公司 一种满堂支架预压沉降监测装置及监测方法
CN110455255A (zh) * 2019-04-28 2019-11-15 中铁四局集团第五工程有限公司 一种满堂支架预压沉降监测装置及监测方法
CN110069882A (zh) * 2019-04-30 2019-07-30 中国十七冶集团有限公司 一种多机抬吊吊装优化方法
CN110147589A (zh) * 2019-04-30 2019-08-20 中国二十冶集团有限公司 Pc异形梁与现浇梁bim组合建模算量方法
CN110083989A (zh) * 2019-05-28 2019-08-02 中国十七冶集团有限公司 一种基于bim技术在管廊暗挖工程中安全数据监测方法
CN110083989B (zh) * 2019-05-28 2023-01-10 中国十七冶集团有限公司 一种基于bim技术在管廊暗挖工程中安全数据监测方法
CN110258878B (zh) * 2019-07-08 2024-04-05 江苏广兴集团有限公司 隐形梁装配式免拆保温楼板结构
CN110258878A (zh) * 2019-07-08 2019-09-20 江苏广兴集团有限公司 隐形梁装配式免拆保温楼板结构
CN110468957A (zh) * 2019-07-09 2019-11-19 深圳市建筑设计研究总院有限公司 一种空间双向空腹桁架结构体系及其施工方法
CN110348142A (zh) * 2019-07-16 2019-10-18 龙元建设集团股份有限公司 基于bim用组合模板支架工艺成型曲线桥的方法
CN110348142B (zh) * 2019-07-16 2023-01-17 龙元建设集团股份有限公司 基于bim用组合模板支架工艺成型曲线桥的方法
CN110569545A (zh) * 2019-08-06 2019-12-13 湖北大成空间科技股份有限公司 一种预制组合式空腔楼盖挠度和内力的确定方法
CN110390179A (zh) * 2019-08-22 2019-10-29 惠州市新一代工业互联网创新研究院 一种钢构矫正力数学模型构建方法
CN110565968A (zh) * 2019-09-06 2019-12-13 青岛理工大学 一种大跨桁架施工滑移支撑自散辅助装置
CN110781543A (zh) * 2019-10-15 2020-02-11 北京城建集团有限责任公司 一种大跨度钢梁安装精度控制施工方法
CN110670803A (zh) * 2019-11-01 2020-01-10 江苏沪宁钢机股份有限公司 一种半箱体半桁架结构
CN110929324A (zh) * 2019-11-21 2020-03-27 浙江百厦建设有限公司 基于bim技术的空心砌块免支模构造柱同步填充墙工法
CN111016032A (zh) * 2019-11-27 2020-04-17 航天海鹰(镇江)特种材料有限公司 一种长桁零件压损实验制件的成型装置及其应用
CN112878699A (zh) * 2019-11-29 2021-06-01 中冶(上海)钢结构科技有限公司 一种管桁架吊装时与铸钢件企口支管对接的施工方法
CN112878698A (zh) * 2019-11-29 2021-06-01 中冶(上海)钢结构科技有限公司 一种管桁架与铸钢件分开安装并滑动对口的施工方法
CN111159797A (zh) * 2019-12-06 2020-05-15 上海建工集团股份有限公司 一种基于bim的力学模型通用建模方法
CN111125817A (zh) * 2019-12-09 2020-05-08 彭婧 一种基于bim的装配式建筑设计方法及设备
CN110987504B (zh) * 2019-12-20 2024-05-14 哈尔滨工业大学(威海) 光辐射下钢结构温度梯度及其影响的测试装置及测试方法
CN110987504A (zh) * 2019-12-20 2020-04-10 哈尔滨工业大学(威海) 光辐射下钢结构温度梯度及其影响的测试装置及测试方法
CN111353191A (zh) * 2020-02-28 2020-06-30 中国十七冶集团有限公司 一种多曲率异形曲面屋盖钢结构施工方法
CN111222194A (zh) * 2020-03-03 2020-06-02 中国建筑第八工程局有限公司 大跨度幕墙施工中的屋面钢结构预压及等比例卸载方法
CN111222194B (zh) * 2020-03-03 2024-03-12 中国建筑第八工程局有限公司 大跨度幕墙施工中的屋面钢结构预压及等比例卸载方法
CN111382532A (zh) * 2020-03-04 2020-07-07 广联达科技股份有限公司 支架体系智能构建方法、系统和介质
CN111339601A (zh) * 2020-03-25 2020-06-26 中国十七冶集团有限公司 一种bim+vr的施工现场布置方法
CN111524225A (zh) * 2020-04-15 2020-08-11 中国十七冶集团有限公司 一种基于bim技术的人工挖孔灌注桩施工方法
CN111524225B (zh) * 2020-04-15 2023-11-10 中国十七冶集团有限公司 一种基于bim技术的人工挖孔灌注桩施工方法
CN111398065A (zh) * 2020-04-24 2020-07-10 华侨大学 一种高温下叠合面抗剪性能测试装置
CN111597623A (zh) * 2020-05-26 2020-08-28 中建安装集团有限公司 一种石化装置模块化设计方法
CN111485489A (zh) * 2020-06-03 2020-08-04 中铁宝桥集团有限公司 一种大型桥梁支座垫板及其连接方法
CN111797508A (zh) * 2020-06-12 2020-10-20 中冶建筑研究总院有限公司 一种基于监测技术的钢屋架安全性实时评定方法
CN111797508B (zh) * 2020-06-12 2024-03-01 中冶建筑研究总院有限公司 一种基于监测技术的钢屋架安全性实时评定方法
CN111561127A (zh) * 2020-06-22 2020-08-21 中铁宝桥集团有限公司 一种钢箱拱节段及其组拼方法
CN112035935A (zh) * 2020-09-07 2020-12-04 中国十七冶集团有限公司 一种基于bim的大跨度钢桁架可视化施工方法
CN112069583B (zh) * 2020-09-08 2023-10-20 中国十七冶集团有限公司 有限元同步分析的斜悬挑安全智能施工系统及方法
CN112069583A (zh) * 2020-09-08 2020-12-11 中国十七冶集团有限公司 有限元同步分析的斜悬挑安全智能施工系统及方法
CN112197844A (zh) * 2020-09-22 2021-01-08 浙江东鼎电子股份有限公司 一种平板式动态称重装置吊放安装方法
CN112127544A (zh) * 2020-09-29 2020-12-25 中建七局第一建筑有限公司 悬空梁的施工方法及用于悬空梁的建造结构
CN112270025A (zh) * 2020-09-30 2021-01-26 晟通科技集团有限公司 模板组合设计方法
CN112434362A (zh) * 2020-11-23 2021-03-02 上海燃气工程设计研究有限公司 一种基于bim技术的地上燃气管道可视化施工交底方法
CN112391949A (zh) * 2020-11-25 2021-02-23 中交第二航务工程局有限公司 一种大跨钢混廊桥结构混凝土裂缝控制施工方法
CN112507537A (zh) * 2020-11-26 2021-03-16 筑友智造科技投资有限公司 一种塔吊布置方法、装置及系统
CN112372172A (zh) * 2020-11-27 2021-02-19 中铁宝桥集团有限公司 全焊钢桁梁弦杆嵌补段的设置方法
CN112372172B (zh) * 2020-11-27 2024-04-26 中铁宝桥集团有限公司 全焊钢桁梁弦杆嵌补段的设置方法
CN112502046A (zh) * 2020-11-30 2021-03-16 四川路航建设工程有限责任公司 一种y型支撑架现浇连续梁0-1#节段施工方法
CN112360146A (zh) * 2020-12-04 2021-02-12 湖南中天杭萧钢构科技股份有限公司 一种可拆式钢筋桁架楼承板件支撑系统
CN112360146B (zh) * 2020-12-04 2022-04-26 湖南中天杭萧钢构科技股份有限公司 一种可拆式钢筋桁架楼承板件支撑系统
CN112668151B (zh) * 2020-12-10 2022-07-01 上海宝冶集团有限公司 一种在设计软件中贝雷架建模的替代方法
CN112668151A (zh) * 2020-12-10 2021-04-16 上海宝冶集团有限公司 一种在设计软件中贝雷架建模的替代方法
CN112541218A (zh) * 2020-12-11 2021-03-23 中铁大桥科学研究院有限公司 一种大跨全焊钢桁架桥悬臂施工线形控制方法
CN112541218B (zh) * 2020-12-11 2023-07-21 中铁大桥科学研究院有限公司 一种大跨全焊钢桁架桥悬臂施工线形控制方法
CN112482579A (zh) * 2020-12-14 2021-03-12 北京市机械施工集团有限公司 一种双向大刚度大跨度转换桁架体系及其卸载方法
CN112482578A (zh) * 2020-12-14 2021-03-12 北京市机械施工集团有限公司 采用临时支撑的大跨度转换桁架及其施工方法
CN112482578B (zh) * 2020-12-14 2024-05-31 北京市机械施工集团有限公司 采用临时支撑的大跨度转换桁架及其施工方法
CN112580135A (zh) * 2020-12-15 2021-03-30 昆山经济技术开发区建筑安装工程有限公司 一种基于bim应用的钢柱分节吊装方法
CN112580135B (zh) * 2020-12-15 2023-11-28 昆山经济技术开发区建筑安装工程有限公司 一种基于bim应用的钢柱分节吊装方法
CN112699462A (zh) * 2020-12-29 2021-04-23 中国航空工业集团公司西安飞机设计研究所 一种大跨度开剖面舱体空间桁架结构设计方法
CN112699462B (zh) * 2020-12-29 2024-04-09 中国航空工业集团公司西安飞机设计研究所 一种大跨度开剖面舱体空间桁架结构设计方法
CN112726415A (zh) * 2021-01-05 2021-04-30 中交路桥建设有限公司 一种钢箱梁上下交叉施工支架结构及施工方法
CN112699448A (zh) * 2021-01-13 2021-04-23 中铁大桥勘测设计院集团有限公司 一种全焊钢桁梁整体节点撕破计算方法
CN112749436A (zh) * 2021-01-15 2021-05-04 广联达科技股份有限公司 楼板间的板缝模型的构建方法、装置、设备和存储介质
CN112749436B (zh) * 2021-01-15 2024-04-12 广联达科技股份有限公司 楼板间的板缝模型的构建方法、装置、设备和存储介质
CN112900868A (zh) * 2021-01-20 2021-06-04 山东华海塑胶建材有限公司 一种高层钢结构工程的施工方法
CN113009593A (zh) * 2021-02-23 2021-06-22 中国人民解放军海军工程大学 一种桁架式岛礁海洋气象环境数据采集装置的构建方法
CN112875542B (zh) * 2021-03-17 2024-06-11 中国五冶集团有限公司 一种捣固焦炉煤塔捣固机主桁架的快速吊装装置及方法
CN112875542A (zh) * 2021-03-17 2021-06-01 中国五冶集团有限公司 一种捣固焦炉煤塔捣固机主桁架的快速吊装装置及方法
CN113111464A (zh) * 2021-04-21 2021-07-13 中交第三公路工程局有限公司工程总承包分公司 一种基于数字模型的钢拱桥虚拟预拼装方法
CN113136974B (zh) * 2021-04-26 2022-09-23 中国建筑第八工程局有限公司 超厚底板内群组竖向作动器埋件安装方法
CN113136974A (zh) * 2021-04-26 2021-07-20 中国建筑第八工程局有限公司 超厚底板内群组竖向作动器埋件安装方法
CN113484053A (zh) * 2021-06-22 2021-10-08 成兰铁路有限责任公司 一种模拟桥梁承台上覆土体荷载的等效施加装置及安装方法
CN113738024A (zh) * 2021-06-28 2021-12-03 三一筑工科技股份有限公司 一种预制墙钢筋设计形式确定方法及装置
CN113738024B (zh) * 2021-06-28 2023-01-24 三一筑工科技股份有限公司 一种预制墙钢筋设计形式确定方法及装置
CN113670714A (zh) * 2021-07-01 2021-11-19 珠海十字门中央商务区建设控股有限公司 验证大跨度钢结构整体提升可实施性及安全性的试验方式
CN113670714B (zh) * 2021-07-01 2023-07-07 珠海十字门中央商务区建设控股有限公司 验证大跨度钢结构整体提升可实施性及安全性的试验方法
CN113463929A (zh) * 2021-07-29 2021-10-01 中冶建工集团重庆钢结构有限公司 一种提高钢柱安装精度的施工方法
CN113761677A (zh) * 2021-08-12 2021-12-07 广州五羊建设机械有限公司 一种实现利润最大化的塔吊结构设计方法
CN113494148A (zh) * 2021-09-08 2021-10-12 中国船舶重工集团国际工程有限公司 一种大跨度转换桁架-剪力墙结构及施工工艺
CN113494148B (zh) * 2021-09-08 2021-12-07 中国船舶重工集团国际工程有限公司 一种大跨度转换桁架-剪力墙结构及施工工艺
CN113898176A (zh) * 2021-09-29 2022-01-07 中冶南方武汉建筑设计有限公司 一种地下室顶板的施工方法
CN113833107A (zh) * 2021-10-17 2021-12-24 山西潇河建筑产业有限公司 一种转换桁架及其桁架节点的焊接方法
CN113957990A (zh) * 2021-11-05 2022-01-21 中建一局集团建设发展有限公司 一种空旷场地超高结构防雷系统与节点装置
CN113957990B (zh) * 2021-11-05 2023-03-14 中建一局集团建设发展有限公司 一种空旷场地超高结构防雷系统与节点装置
CN113916146B (zh) * 2021-11-11 2024-01-23 深圳高速公路股份有限公司 一种桥梁拼接缝车致振动变形监测及控制系统和方法
CN113916146A (zh) * 2021-11-11 2022-01-11 深圳高速公路股份有限公司 一种桥梁拼接缝车致振动变形监测及控制系统和方法
CN114104939B (zh) * 2021-11-16 2023-12-08 中铁一局集团建筑安装工程有限公司 一种钢构架吊装工艺、吊装设备及辅助装置
CN114104939A (zh) * 2021-11-16 2022-03-01 中铁一局集团建筑安装工程有限公司 一种钢构架吊装工艺、吊装设备及辅助装置
CN114178760A (zh) * 2021-11-23 2022-03-15 中国一冶集团有限公司 可调节式大跨度钢梁焊接操作平台
CN113979299A (zh) * 2021-11-24 2022-01-28 北京市第三建筑工程有限公司 一种吊装系统的安装方法和吊装方法
CN113979299B (zh) * 2021-11-24 2022-07-29 北京市第三建筑工程有限公司 一种吊装系统的安装方法和吊装方法
CN114351590A (zh) * 2021-12-14 2022-04-15 上海市基础工程集团有限公司 用于钢箱梁制作节段现场安装精确定位装置及方法
CN114351590B (zh) * 2021-12-14 2024-05-31 上海市基础工程集团有限公司 用于钢箱梁制作节段现场安装精确定位装置及方法
CN114235028A (zh) * 2022-01-24 2022-03-25 上海市建筑科学研究院有限公司 一种同层即时灌浆构件受后续施工扰动的检测方法
CN114352033A (zh) * 2022-01-29 2022-04-15 北京城建集团有限责任公司 钢结构梁、柱支架安装新型施工方法
CN114457919A (zh) * 2022-01-29 2022-05-10 中建钢构工程有限公司 一种能够提高桁架安装精度的施工方法
CN114636500A (zh) * 2022-03-22 2022-06-17 哈尔滨工业大学(深圳) 超高层结构伸臂桁架施工监控方法和装置
CN114689087B (zh) * 2022-04-02 2024-04-12 中国科学院西安光学精密机械研究所 一种高热稳定性大视场星图模拟器的支撑架
CN114689087A (zh) * 2022-04-02 2022-07-01 中国科学院西安光学精密机械研究所 一种高热稳定性大视场星图模拟器的支撑架
CN115045450A (zh) * 2022-04-22 2022-09-13 中铁二十局集团第二工程有限公司 建筑结构屋面面板的安装方法及其建筑结构
CN114941433B (zh) * 2022-05-19 2024-05-03 上海宝冶集团有限公司 一种大重量船型采光顶钢结构的施工方法
CN114941433A (zh) * 2022-05-19 2022-08-26 上海宝冶集团有限公司 一种大重量船型采光顶钢结构的施工方法
CN114841040B (zh) * 2022-05-20 2024-05-07 上交(徐州)新材料研究院有限公司 一种适用于大型桁架焊接工艺的制定方法
CN114809300A (zh) * 2022-05-20 2022-07-29 中建八局第二建设有限公司 一种高空多层大悬挑型钢混凝土组合结构施工方法
CN114841040A (zh) * 2022-05-20 2022-08-02 上交(徐州)新材料研究院有限公司 一种适用于大型桁架焊接工艺的制定方法
CN115030520B (zh) * 2022-06-01 2023-08-08 中冶(上海)钢结构科技有限公司 一种悬挑钢桁架组对过程中的卸载及端部下挠值控制方法
CN115030520A (zh) * 2022-06-01 2022-09-09 中冶(上海)钢结构科技有限公司 一种悬挑钢桁架组对过程中的卸载及端部下扰值控制方法
CN114722446A (zh) * 2022-06-09 2022-07-08 山东高速德建集团有限公司 一种基于dynamo的模板系统竖向支撑建模方法
CN114722446B (zh) * 2022-06-09 2022-08-16 山东高速德建集团有限公司 一种基于dynamo的模板系统竖向支撑建模方法
CN115162752A (zh) * 2022-06-13 2022-10-11 江苏万斯达建筑科技有限公司 上承式索拉施工承重装置及施工方法
CN114969942A (zh) * 2022-06-15 2022-08-30 中南建筑设计院股份有限公司 一种张弦立体拱架的参数化建模方法
CN114969942B (zh) * 2022-06-15 2024-03-29 中南建筑设计院股份有限公司 一种张弦立体拱架的参数化建模方法
CN115070242B (zh) * 2022-06-20 2024-02-09 中铁宝桥(扬州)有限公司 内嵌弦杆的钢箱梁制造方法
CN115070242A (zh) * 2022-06-20 2022-09-20 中铁宝桥(扬州)有限公司 内嵌弦杆的钢箱梁制造方法
CN115075562B (zh) * 2022-06-29 2024-06-11 浙江精工钢结构集团有限公司 一种释放大跨度桁架结构分区分阶段施工附加应力的方法
CN115075562A (zh) * 2022-06-29 2022-09-20 浙江精工钢结构集团有限公司 一种释放大跨度桁架结构分区分阶段施工附加应力的方法
CN115142558A (zh) * 2022-07-15 2022-10-04 江苏昊钢建筑科技有限公司 一种分体式桁架楼承板连接件
CN115236186A (zh) * 2022-07-22 2022-10-25 浙大城市学院 空间k型斜柱网格内部侧向浇灌试验装置及检测方法
CN115236186B (zh) * 2022-07-22 2024-05-17 浙大城市学院 空间k型斜柱网格内部侧向浇灌试验装置及检测方法
CN115233807A (zh) * 2022-07-26 2022-10-25 中国建筑第七工程局有限公司 局部悬挑超大型钢结构连廊及其施工方法
CN115233807B (zh) * 2022-07-26 2023-10-24 中国建筑第七工程局有限公司 局部悬挑超大型钢结构连廊及其施工方法
CN115492418A (zh) * 2022-10-12 2022-12-20 上海建为历保科技股份有限公司 一种打牮拨正工艺
CN115419750A (zh) * 2022-10-13 2022-12-02 中安华力建设集团有限公司 一种地下室管线复杂节点整体预制装配施工方法
CN115404994A (zh) * 2022-10-21 2022-11-29 中建八局第二建设有限公司 一种超大跨度建筑不规则曲线空间立体桁架体系施工方法
CN115839172A (zh) * 2022-11-29 2023-03-24 中建八局第四建设有限公司 一种型钢混凝土组合结构逆作施工方法
CN115538815B (zh) * 2022-12-01 2023-03-24 北京市第三建筑工程有限公司 一种在已有建筑内快速安装水平钢结构的施工方法
CN115538815A (zh) * 2022-12-01 2022-12-30 北京市第三建筑工程有限公司 一种在已有建筑内快速安装水平钢结构的施工方法
CN116044176A (zh) * 2022-12-22 2023-05-02 中国水利水电第九工程局有限公司 一种钢结构屋面网架安装方法
CN116497946A (zh) * 2023-05-05 2023-07-28 中建三局集团(深圳)有限公司 塔楼分离式同步生长施工方法
CN116415341A (zh) * 2023-06-09 2023-07-11 山东高速德建集团有限公司 基于Revit的组装式水平桁架及竖向支撑建模方法
CN116415341B (zh) * 2023-06-09 2023-08-04 山东高速德建集团有限公司 基于Revit的组装式水平桁架及竖向支撑建模方法
CN116604699A (zh) * 2023-07-19 2023-08-18 成都建工雅安建设有限责任公司 一种智能化叠合板预制系统
CN116604699B (zh) * 2023-07-19 2023-10-13 成都建工雅安建设有限责任公司 一种智能化叠合板预制系统
CN116933429A (zh) * 2023-07-28 2023-10-24 招商局重工(江苏)有限公司 一种fpso下滑环吊装转运与变形控制方法
CN117290914A (zh) * 2023-10-27 2023-12-26 湘潭大学 一种考虑界面摩擦作用的栓钉连接钢-uhpc界面抗剪承载力计算方法
CN117290914B (zh) * 2023-10-27 2024-03-29 湘潭大学 一种考虑界面摩擦作用的栓钉连接钢-uhpc界面抗剪承载力计算方法
CN117489130A (zh) * 2024-01-02 2024-02-02 北京城建集团有限责任公司 一种环形钢桁架地面散件拼装高空胎架组装施工工艺
CN117489130B (zh) * 2024-01-02 2024-04-02 北京城建集团有限责任公司 一种环形钢桁架施工工艺
CN117585591B (zh) * 2024-01-17 2024-04-16 辽宁城建集团有限公司 一种用于建筑施工的狭小空间吊运装置及其吊运方法
CN117585591A (zh) * 2024-01-17 2024-02-23 辽宁城建集团有限公司 一种用于建筑施工的狭小空间吊运装置及其吊运方法
CN117627376B (zh) * 2024-01-25 2024-05-17 北京建工集团有限责任公司 一种模块化钢梁和檩条整体安装施工方法
CN117627376A (zh) * 2024-01-25 2024-03-01 北京建工集团有限责任公司 一种模块化钢梁和檩条整体安装施工方法

Similar Documents

Publication Publication Date Title
WO2017121315A1 (zh) 一种建筑桁架及楼板的施工方法
CN105649332B (zh) 一种建筑梁板的施工方法
CN106836498B (zh) 一种超大跨度体育场看台屋盖钢桁架吊装施工工法
WO2022062294A1 (zh) 一种用于大跨度悬挑钢桁架悬挂连接节点及其施工方法
CN102493360B (zh) 钢筋混凝土拱桥施工方法
CN101956457B (zh) 一种矩形钢管混凝土柱施工工法
CN105133841A (zh) 空间曲面钢结构管桁架屋盖安装施工工法
CN106087752B (zh) 多跨提篮拱桥施工方法
CN103410094B (zh) 桥梁刚性铰的安装施工方法
CN104775564B (zh) 一种双向倾斜大截面箱型格构柱无支撑安装方法
CN114439249B (zh) 一种大跨三角桁架空中转体提升施工方法
CN101372865A (zh) 斜拉式吊杆多跨连续梁结构高镂空支模体系及施工方法
CN105952133A (zh) 悬空大跨度钢筋砼结构施工钢平台及施工方法
CN113047447B (zh) 一种错层钢结构建筑半逆作施工方法
CN107060070A (zh) 荷载转移装置及用该装置吊装钢连廊的施工方法
CN108643572B (zh) 砼大梁支撑、贝雷平台施工和钢绞线的组合安装方法
CN107271157A (zh) 一种大吨位空间多向多点结构试验加载反力装置及其制作方法
CN103495793A (zh) 改进的大吨位铸钢构件复杂节点吊装焊接施工方法
CN114673096A (zh) 一种转体梁结构施工工艺
CN208219384U (zh) 一种叠合梁节段
CN113982281A (zh) 一种超大吨位空间桁架提升加固结构及其施工方法
CN112096090B (zh) 大跨度空间管桁架单点支撑对接逐级卸载装置及施工工法
CN113090036A (zh) 一种钢结构网架整体吊装施工方法
CN107130521B (zh) 一种深坑崖壁段大截面梁贝雷支架吊模施工方法
CN212294735U (zh) 龙门吊轨道基础梁

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 17738129

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 17738129

Country of ref document: EP

Kind code of ref document: A1