CN111339601A - 一种bim+vr的施工现场布置方法 - Google Patents
一种bim+vr的施工现场布置方法 Download PDFInfo
- Publication number
- CN111339601A CN111339601A CN202010217301.5A CN202010217301A CN111339601A CN 111339601 A CN111339601 A CN 111339601A CN 202010217301 A CN202010217301 A CN 202010217301A CN 111339601 A CN111339601 A CN 111339601A
- Authority
- CN
- China
- Prior art keywords
- construction site
- construction
- bim
- model
- format
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 66
- 238000000034 method Methods 0.000 title claims abstract description 15
- 230000000007 visual effect Effects 0.000 claims abstract description 6
- 230000000694 effects Effects 0.000 claims abstract description 5
- 238000004519 manufacturing process Methods 0.000 claims abstract description 4
- 239000000463 material Substances 0.000 claims description 9
- 238000009826 distribution Methods 0.000 claims description 6
- 238000005034 decoration Methods 0.000 claims description 3
- 239000002689 soil Substances 0.000 claims description 3
- 238000003860 storage Methods 0.000 claims description 3
- 230000007306 turnover Effects 0.000 claims description 3
- 239000002699 waste material Substances 0.000 claims description 3
- 229910001294 Reinforcing steel Inorganic materials 0.000 claims description 2
- 238000005516 engineering process Methods 0.000 abstract description 3
- 238000009435 building construction Methods 0.000 abstract description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009430 construction management Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000002452 interceptive effect Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T19/00—Manipulating 3D models or images for computer graphics
- G06T19/006—Mixed reality
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- Marketing (AREA)
- General Business, Economics & Management (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Health & Medical Sciences (AREA)
- Computer Graphics (AREA)
- Computer Hardware Design (AREA)
- General Engineering & Computer Science (AREA)
- Software Systems (AREA)
- Floor Finish (AREA)
Abstract
本发明公开了一种BIM+VR的施工现场布置方法,属于建筑施工技术领域。本发明的步骤为:步骤1.创建各个施工阶段的三维可视化施工现场BIM模型;步骤2.BIM模型通过格式转换为3Dmax或lumion等真实效果更好的模型;步骤3.基于施工现场模型及VR特定设备软件制作施工现场VR格式图片和视频;步骤4.施工现场VR格式图片和视频传输到VR设备;步骤5.在VR设备中查看施工现场布置、技术交底,进行动态调整。本发明基于BIM技术创建不同阶段施工现场布置三维可视化模型,可以解决施工现场布置静态化、随意化的问题,操作简便,取得了较好的社会效益和经济效益。
Description
技术领域
本发明涉及建筑施工技术领域,更具体地说,涉及一种BIM+VR的施工现场布置方法。
背景技术
施工现场非常重要,合理的布置可以节约用地,提升施工效率。当前,大部分施工现场布置较为随意,且是静态布置,随着施工进度的推进,其调整也非常随意。
发明内容
1、要解决的问题
针对现有技术存在的缺陷与不足,本发明提供了一种BIM+VR的施工现场布置方法,可以解决施工现场布置静态化、随意化的问题,操作简便,取得了较好的社会效益和经济效益。
2、技术方案
为达到上述目的,本发明提供的技术方案为:
一种BIM+VR的施工现场布置方法,其步骤为:
步骤1.基于BIM施工现场布置软件,创建各个施工阶段的三维可视化施工现场BIM模型;
步骤2.BIM模型通过格式转换为3Dmax或lumion等真实效果更好的模型,并进行材质选择和贴图;
步骤3.基于施工现场模型及VR特定设备软件制作施工现场VR格式图片和视频;
步骤4.施工现场VR格式图片和视频传输到VR设备;
步骤5.在VR设备中查看施工现场布置、技术交底,进行动态调整。
进一步的,步骤1所述BIM模型,包含建筑物、起重机械、安全通道、外脚手架防护、卸料平台防护、建筑物临边防护、企业文化标牌、钢筋加工场、木工加工场、周转材料堆场、配电房及配电箱、硬化道路、绿化场地、堆土区、排水沟、废弃材料池、消防材料区、质量样板区、安全体育馆等。
进一步的,步骤1所述施工阶段,包含施工前、地基与基础施工阶段、主体结构施工阶段、装饰装修施工阶段、室外工程施工阶段等。
3、有益效果
相比于现有技术,本发明的有益效果为:
本发明的一种BIM+VR的施工现场布置方法,基于BIM技术创建不同阶段施工现场布置三维可视化模型,制作相关VR格式图片和视频,在VR设备中查看施工现场布置、技术交底,并进行动态调整,具有沉浸式、交互式体验,可最大化合理利用现场土地和施工空间,强化施工管理和技术作业的前瞻性,取得较好的社会效益和经济效益。
附图说明
图1是本发明的操作流程图。
具体实施方式
下面结合具体实施例和附图对本发明进一步进行描述:
实施例1
本实施例的一种BIM+VR的施工现场布置方法,其步骤为:
步骤1.基于BIM施工现场布置软件,创建各个施工阶段的三维可视化施工现场BIM模型;
步骤2.BIM模型通过格式转换为3Dmax或lumion等真实效果更好的模型,并进行材质选择和贴图;
步骤3.基于施工现场模型及VR特定设备软件制作施工现场VR格式图片和视频;
步骤4.施工现场VR格式图片和视频传输到VR设备;
步骤5.在VR设备中查看施工现场布置、技术交底,进行动态调整。
步骤1所述BIM模型,包含建筑物、起重机械、安全通道、外脚手架防护、卸料平台防护、建筑物临边防护、企业文化标牌、钢筋加工场、木工加工场、周转材料堆场、配电房及配电箱、硬化道路、绿化场地、堆土区、排水沟、废弃材料池、消防材料区、质量样板区、安全体育馆等。
步骤1所述施工阶段,包含施工前、地基与基础施工阶段、主体结构施工阶段、装饰装修施工阶段、室外工程施工阶段等。
以上示意性的对本发明及其实施方式进行了描述,该描述没有限制性,附图中所示的也只是本发明的实施方式之一,实际的方法并不局限于此。所以,如果本领域的普通技术人员受其启示,在不脱离本发明创造宗旨的情况下,不经创造性的设计出与该技术方案相似的结构方式及实施例,均应属于本发明的保护范围。
Claims (3)
1.一种BIM+VR的施工现场布置方法,其特征在于:其步骤为:
步骤1.基于BIM施工现场布置软件,创建各个施工阶段的三维可视化施工现场BIM模型;
步骤2.BIM模型通过格式转换为3Dmax或lumion等真实效果更好的模型,并进行材质选择和贴图;
步骤3.基于施工现场模型及VR特定设备软件制作施工现场VR格式图片和视频;
步骤4.施工现场VR格式图片和视频传输到VR设备;
步骤5.在VR设备中查看施工现场布置、技术交底,进行动态调整。
2.根据权利要求1所述的一种BIM+VR的施工现场布置方法,其特征在于:步骤1所述BIM模型,包含建筑物、起重机械、安全通道、外脚手架防护、卸料平台防护、建筑物临边防护、企业文化标牌、钢筋加工场、木工加工场、周转材料堆场、配电房及配电箱、硬化道路、绿化场地、堆土区、排水沟、废弃材料池、消防材料区、质量样板区、安全体育馆等。
3.根据权利要求1所述的一种BIM+VR的施工现场布置方法,其特征在于:步骤1所述施工阶段,包含施工前、地基与基础施工阶段、主体结构施工阶段、装饰装修施工阶段、室外工程施工阶段等。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010217301.5A CN111339601A (zh) | 2020-03-25 | 2020-03-25 | 一种bim+vr的施工现场布置方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010217301.5A CN111339601A (zh) | 2020-03-25 | 2020-03-25 | 一种bim+vr的施工现场布置方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111339601A true CN111339601A (zh) | 2020-06-26 |
Family
ID=71182810
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010217301.5A Pending CN111339601A (zh) | 2020-03-25 | 2020-03-25 | 一种bim+vr的施工现场布置方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111339601A (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111932211A (zh) * | 2020-08-13 | 2020-11-13 | 福建荣冠环境建设集团有限公司 | 一种基于bim技术的市政工程施工控制系统 |
CN112069694A (zh) * | 2020-09-15 | 2020-12-11 | 深圳市华壹装饰科技设计工程有限公司 | 基于bim技术的精装修xr交互体验方法和系统 |
CN112364414A (zh) * | 2020-10-26 | 2021-02-12 | 中国能源建设集团安徽电力建设第一工程有限公司 | 一种基于bim技术的三维施工场地布置方法 |
CN112989099A (zh) * | 2021-05-14 | 2021-06-18 | 赣通通信股份有限公司 | 基于图像通信的智慧施工管理系统和方法 |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2017121315A1 (zh) * | 2016-01-12 | 2017-07-20 | 广州机施建设集团有限公司 | 一种建筑桁架及楼板的施工方法 |
JP2019021190A (ja) * | 2017-07-20 | 2019-02-07 | 前田建設工業株式会社 | 施工支援方法、および、施工支援システム |
CN109388902A (zh) * | 2018-10-26 | 2019-02-26 | 中铁八局集团第四工程有限公司 | 一种应用bim技术的场地布置施工方法 |
CN109933900A (zh) * | 2019-03-13 | 2019-06-25 | 上海理工大学 | 一种基于bim技术的施工三维场布建模方法 |
US20190325089A1 (en) * | 2018-04-18 | 2019-10-24 | Reconstruct Inc. | Computation of point clouds and joint display of point clouds and building information models with project schedules for monitoring construction progress, productivity, and risk for delays |
CN110428223A (zh) * | 2019-07-23 | 2019-11-08 | 中国建筑第八工程局有限公司 | 建筑施工安全交底的方法、系统及bim+vr管理平台 |
CN110489897A (zh) * | 2019-08-25 | 2019-11-22 | 中铁二局第一工程有限公司 | 一种基于bim和gis的三维施工场布vr全景沙盘制作方法 |
CN110569621A (zh) * | 2019-09-18 | 2019-12-13 | 中国十七冶集团有限公司 | 一种基于bim技术的多维曲面玻璃幕墙设计加工及安装方法 |
-
2020
- 2020-03-25 CN CN202010217301.5A patent/CN111339601A/zh active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2017121315A1 (zh) * | 2016-01-12 | 2017-07-20 | 广州机施建设集团有限公司 | 一种建筑桁架及楼板的施工方法 |
JP2019021190A (ja) * | 2017-07-20 | 2019-02-07 | 前田建設工業株式会社 | 施工支援方法、および、施工支援システム |
US20190325089A1 (en) * | 2018-04-18 | 2019-10-24 | Reconstruct Inc. | Computation of point clouds and joint display of point clouds and building information models with project schedules for monitoring construction progress, productivity, and risk for delays |
CN109388902A (zh) * | 2018-10-26 | 2019-02-26 | 中铁八局集团第四工程有限公司 | 一种应用bim技术的场地布置施工方法 |
CN109933900A (zh) * | 2019-03-13 | 2019-06-25 | 上海理工大学 | 一种基于bim技术的施工三维场布建模方法 |
CN110428223A (zh) * | 2019-07-23 | 2019-11-08 | 中国建筑第八工程局有限公司 | 建筑施工安全交底的方法、系统及bim+vr管理平台 |
CN110489897A (zh) * | 2019-08-25 | 2019-11-22 | 中铁二局第一工程有限公司 | 一种基于bim和gis的三维施工场布vr全景沙盘制作方法 |
CN110569621A (zh) * | 2019-09-18 | 2019-12-13 | 中国十七冶集团有限公司 | 一种基于bim技术的多维曲面玻璃幕墙设计加工及安装方法 |
Non-Patent Citations (2)
Title |
---|
侯春明等: "可视化技术在建筑施工企业中的应用", 《施工技术》 * |
刘松等: "闹市区综合体项目施工平面动态管理BIM模拟", 《台州学院学报》 * |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111932211A (zh) * | 2020-08-13 | 2020-11-13 | 福建荣冠环境建设集团有限公司 | 一种基于bim技术的市政工程施工控制系统 |
CN112069694A (zh) * | 2020-09-15 | 2020-12-11 | 深圳市华壹装饰科技设计工程有限公司 | 基于bim技术的精装修xr交互体验方法和系统 |
CN112364414A (zh) * | 2020-10-26 | 2021-02-12 | 中国能源建设集团安徽电力建设第一工程有限公司 | 一种基于bim技术的三维施工场地布置方法 |
CN112364414B (zh) * | 2020-10-26 | 2023-12-22 | 中能建建筑集团有限公司 | 一种基于bim技术的三维施工场地布置方法 |
CN112989099A (zh) * | 2021-05-14 | 2021-06-18 | 赣通通信股份有限公司 | 基于图像通信的智慧施工管理系统和方法 |
CN112989099B (zh) * | 2021-05-14 | 2021-08-17 | 赣通通信股份有限公司 | 基于图像通信的智慧施工管理系统和方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111339601A (zh) | 一种bim+vr的施工现场布置方法 | |
CN110117994A (zh) | 一种基于bim技术的建筑砌体施工方法 | |
CN106639317A (zh) | 一种预制装配式建筑成套建造技术 | |
CN109583046A (zh) | 一种桥梁高陡边坡桥墩虚拟施工现场的构建方法 | |
CN207348087U (zh) | 一种装配式砌块挡土墙 | |
CN109933900A (zh) | 一种基于bim技术的施工三维场布建模方法 | |
CN112329105B (zh) | 一种基于bim技术的铝模和模块化附着式脚手架的优化施工方法 | |
CN111597625A (zh) | 一种基于bim的基坑支护开挖质量控制方法 | |
CN108005099B (zh) | 一种杆塔预制装配式混凝土阶梯形基础及其拼装方法 | |
Zhanglin et al. | Application of BIM technology in prefabricated buildings | |
CN207934054U (zh) | 一种预制装配式筏板基础 | |
CN106869387A (zh) | 密肋板楼盖结构体系hz砼膜施工方法 | |
CN202247924U (zh) | 顶管施工拼装式钢结构沉井 | |
CN115203511A (zh) | 一种基于虚拟现实的施工数据处理系统及方法 | |
CN207110586U (zh) | 一种低层立体车库的分力板 | |
CN207776228U (zh) | 一种适用于夯土墙阳角的空心砌块结构 | |
CN207331726U (zh) | 一种旋挖钻成孔施工的复合地基 | |
CN103485555B (zh) | 一种防雨、防渗的户内式固废填埋场的建造方法 | |
CN112381675A (zh) | 一种基于bim的房地产建设工程的施工方法 | |
CN207037657U (zh) | 一种bim异形幕墙板块优化中央控制板 | |
CN111985040A (zh) | 基于bim和gis技术的桥梁设计施工一体化应用方法 | |
CN111581818A (zh) | 一种基于bim技术的施工现场布置优化方法 | |
Yan et al. | Application of the BIM Technique in Modern Project Management | |
Feng et al. | Intelligent engineering management of prefabricated building based on BIM Technology | |
Lv et al. | Summary of BIM technology application in a dormitory building project |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20200626 |