CN111339601A - 一种bim+vr的施工现场布置方法 - Google Patents

一种bim+vr的施工现场布置方法 Download PDF

Info

Publication number
CN111339601A
CN111339601A CN202010217301.5A CN202010217301A CN111339601A CN 111339601 A CN111339601 A CN 111339601A CN 202010217301 A CN202010217301 A CN 202010217301A CN 111339601 A CN111339601 A CN 111339601A
Authority
CN
China
Prior art keywords
construction site
construction
bim
model
format
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010217301.5A
Other languages
English (en)
Inventor
路希鑫
张首锋
杨圆圆
钱浩
王申杰
刘文峰
孙亚辉
刘子祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN202010217301.5A priority Critical patent/CN111339601A/zh
Publication of CN111339601A publication Critical patent/CN111339601A/zh
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T19/00Manipulating 3D models or images for computer graphics
    • G06T19/006Mixed reality

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Health & Medical Sciences (AREA)
  • Computer Graphics (AREA)
  • Computer Hardware Design (AREA)
  • General Engineering & Computer Science (AREA)
  • Software Systems (AREA)
  • Floor Finish (AREA)

Abstract

本发明公开了一种BIM+VR的施工现场布置方法,属于建筑施工技术领域。本发明的步骤为:步骤1.创建各个施工阶段的三维可视化施工现场BIM模型;步骤2.BIM模型通过格式转换为3Dmax或lumion等真实效果更好的模型;步骤3.基于施工现场模型及VR特定设备软件制作施工现场VR格式图片和视频;步骤4.施工现场VR格式图片和视频传输到VR设备;步骤5.在VR设备中查看施工现场布置、技术交底,进行动态调整。本发明基于BIM技术创建不同阶段施工现场布置三维可视化模型,可以解决施工现场布置静态化、随意化的问题,操作简便,取得了较好的社会效益和经济效益。

Description

一种BIM+VR的施工现场布置方法
技术领域
本发明涉及建筑施工技术领域,更具体地说,涉及一种BIM+VR的施工现场布置方法。
背景技术
施工现场非常重要,合理的布置可以节约用地,提升施工效率。当前,大部分施工现场布置较为随意,且是静态布置,随着施工进度的推进,其调整也非常随意。
发明内容
1、要解决的问题
针对现有技术存在的缺陷与不足,本发明提供了一种BIM+VR的施工现场布置方法,可以解决施工现场布置静态化、随意化的问题,操作简便,取得了较好的社会效益和经济效益。
2、技术方案
为达到上述目的,本发明提供的技术方案为:
一种BIM+VR的施工现场布置方法,其步骤为:
步骤1.基于BIM施工现场布置软件,创建各个施工阶段的三维可视化施工现场BIM模型;
步骤2.BIM模型通过格式转换为3Dmax或lumion等真实效果更好的模型,并进行材质选择和贴图;
步骤3.基于施工现场模型及VR特定设备软件制作施工现场VR格式图片和视频;
步骤4.施工现场VR格式图片和视频传输到VR设备;
步骤5.在VR设备中查看施工现场布置、技术交底,进行动态调整。
进一步的,步骤1所述BIM模型,包含建筑物、起重机械、安全通道、外脚手架防护、卸料平台防护、建筑物临边防护、企业文化标牌、钢筋加工场、木工加工场、周转材料堆场、配电房及配电箱、硬化道路、绿化场地、堆土区、排水沟、废弃材料池、消防材料区、质量样板区、安全体育馆等。
进一步的,步骤1所述施工阶段,包含施工前、地基与基础施工阶段、主体结构施工阶段、装饰装修施工阶段、室外工程施工阶段等。
3、有益效果
相比于现有技术,本发明的有益效果为:
本发明的一种BIM+VR的施工现场布置方法,基于BIM技术创建不同阶段施工现场布置三维可视化模型,制作相关VR格式图片和视频,在VR设备中查看施工现场布置、技术交底,并进行动态调整,具有沉浸式、交互式体验,可最大化合理利用现场土地和施工空间,强化施工管理和技术作业的前瞻性,取得较好的社会效益和经济效益。
附图说明
图1是本发明的操作流程图。
具体实施方式
下面结合具体实施例和附图对本发明进一步进行描述:
实施例1
本实施例的一种BIM+VR的施工现场布置方法,其步骤为:
步骤1.基于BIM施工现场布置软件,创建各个施工阶段的三维可视化施工现场BIM模型;
步骤2.BIM模型通过格式转换为3Dmax或lumion等真实效果更好的模型,并进行材质选择和贴图;
步骤3.基于施工现场模型及VR特定设备软件制作施工现场VR格式图片和视频;
步骤4.施工现场VR格式图片和视频传输到VR设备;
步骤5.在VR设备中查看施工现场布置、技术交底,进行动态调整。
步骤1所述BIM模型,包含建筑物、起重机械、安全通道、外脚手架防护、卸料平台防护、建筑物临边防护、企业文化标牌、钢筋加工场、木工加工场、周转材料堆场、配电房及配电箱、硬化道路、绿化场地、堆土区、排水沟、废弃材料池、消防材料区、质量样板区、安全体育馆等。
步骤1所述施工阶段,包含施工前、地基与基础施工阶段、主体结构施工阶段、装饰装修施工阶段、室外工程施工阶段等。
以上示意性的对本发明及其实施方式进行了描述,该描述没有限制性,附图中所示的也只是本发明的实施方式之一,实际的方法并不局限于此。所以,如果本领域的普通技术人员受其启示,在不脱离本发明创造宗旨的情况下,不经创造性的设计出与该技术方案相似的结构方式及实施例,均应属于本发明的保护范围。

Claims (3)

1.一种BIM+VR的施工现场布置方法,其特征在于:其步骤为:
步骤1.基于BIM施工现场布置软件,创建各个施工阶段的三维可视化施工现场BIM模型;
步骤2.BIM模型通过格式转换为3Dmax或lumion等真实效果更好的模型,并进行材质选择和贴图;
步骤3.基于施工现场模型及VR特定设备软件制作施工现场VR格式图片和视频;
步骤4.施工现场VR格式图片和视频传输到VR设备;
步骤5.在VR设备中查看施工现场布置、技术交底,进行动态调整。
2.根据权利要求1所述的一种BIM+VR的施工现场布置方法,其特征在于:步骤1所述BIM模型,包含建筑物、起重机械、安全通道、外脚手架防护、卸料平台防护、建筑物临边防护、企业文化标牌、钢筋加工场、木工加工场、周转材料堆场、配电房及配电箱、硬化道路、绿化场地、堆土区、排水沟、废弃材料池、消防材料区、质量样板区、安全体育馆等。
3.根据权利要求1所述的一种BIM+VR的施工现场布置方法,其特征在于:步骤1所述施工阶段,包含施工前、地基与基础施工阶段、主体结构施工阶段、装饰装修施工阶段、室外工程施工阶段等。
CN202010217301.5A 2020-03-25 2020-03-25 一种bim+vr的施工现场布置方法 Pending CN111339601A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010217301.5A CN111339601A (zh) 2020-03-25 2020-03-25 一种bim+vr的施工现场布置方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010217301.5A CN111339601A (zh) 2020-03-25 2020-03-25 一种bim+vr的施工现场布置方法

Publications (1)

Publication Number Publication Date
CN111339601A true CN111339601A (zh) 2020-06-26

Family

ID=71182810

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010217301.5A Pending CN111339601A (zh) 2020-03-25 2020-03-25 一种bim+vr的施工现场布置方法

Country Status (1)

Country Link
CN (1) CN111339601A (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111932211A (zh) * 2020-08-13 2020-11-13 福建荣冠环境建设集团有限公司 一种基于bim技术的市政工程施工控制系统
CN112069694A (zh) * 2020-09-15 2020-12-11 深圳市华壹装饰科技设计工程有限公司 基于bim技术的精装修xr交互体验方法和系统
CN112364414A (zh) * 2020-10-26 2021-02-12 中国能源建设集团安徽电力建设第一工程有限公司 一种基于bim技术的三维施工场地布置方法
CN112989099A (zh) * 2021-05-14 2021-06-18 赣通通信股份有限公司 基于图像通信的智慧施工管理系统和方法

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017121315A1 (zh) * 2016-01-12 2017-07-20 广州机施建设集团有限公司 一种建筑桁架及楼板的施工方法
JP2019021190A (ja) * 2017-07-20 2019-02-07 前田建設工業株式会社 施工支援方法、および、施工支援システム
CN109388902A (zh) * 2018-10-26 2019-02-26 中铁八局集团第四工程有限公司 一种应用bim技术的场地布置施工方法
CN109933900A (zh) * 2019-03-13 2019-06-25 上海理工大学 一种基于bim技术的施工三维场布建模方法
US20190325089A1 (en) * 2018-04-18 2019-10-24 Reconstruct Inc. Computation of point clouds and joint display of point clouds and building information models with project schedules for monitoring construction progress, productivity, and risk for delays
CN110428223A (zh) * 2019-07-23 2019-11-08 中国建筑第八工程局有限公司 建筑施工安全交底的方法、系统及bim+vr管理平台
CN110489897A (zh) * 2019-08-25 2019-11-22 中铁二局第一工程有限公司 一种基于bim和gis的三维施工场布vr全景沙盘制作方法
CN110569621A (zh) * 2019-09-18 2019-12-13 中国十七冶集团有限公司 一种基于bim技术的多维曲面玻璃幕墙设计加工及安装方法

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017121315A1 (zh) * 2016-01-12 2017-07-20 广州机施建设集团有限公司 一种建筑桁架及楼板的施工方法
JP2019021190A (ja) * 2017-07-20 2019-02-07 前田建設工業株式会社 施工支援方法、および、施工支援システム
US20190325089A1 (en) * 2018-04-18 2019-10-24 Reconstruct Inc. Computation of point clouds and joint display of point clouds and building information models with project schedules for monitoring construction progress, productivity, and risk for delays
CN109388902A (zh) * 2018-10-26 2019-02-26 中铁八局集团第四工程有限公司 一种应用bim技术的场地布置施工方法
CN109933900A (zh) * 2019-03-13 2019-06-25 上海理工大学 一种基于bim技术的施工三维场布建模方法
CN110428223A (zh) * 2019-07-23 2019-11-08 中国建筑第八工程局有限公司 建筑施工安全交底的方法、系统及bim+vr管理平台
CN110489897A (zh) * 2019-08-25 2019-11-22 中铁二局第一工程有限公司 一种基于bim和gis的三维施工场布vr全景沙盘制作方法
CN110569621A (zh) * 2019-09-18 2019-12-13 中国十七冶集团有限公司 一种基于bim技术的多维曲面玻璃幕墙设计加工及安装方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
侯春明等: "可视化技术在建筑施工企业中的应用", 《施工技术》 *
刘松等: "闹市区综合体项目施工平面动态管理BIM模拟", 《台州学院学报》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111932211A (zh) * 2020-08-13 2020-11-13 福建荣冠环境建设集团有限公司 一种基于bim技术的市政工程施工控制系统
CN112069694A (zh) * 2020-09-15 2020-12-11 深圳市华壹装饰科技设计工程有限公司 基于bim技术的精装修xr交互体验方法和系统
CN112364414A (zh) * 2020-10-26 2021-02-12 中国能源建设集团安徽电力建设第一工程有限公司 一种基于bim技术的三维施工场地布置方法
CN112364414B (zh) * 2020-10-26 2023-12-22 中能建建筑集团有限公司 一种基于bim技术的三维施工场地布置方法
CN112989099A (zh) * 2021-05-14 2021-06-18 赣通通信股份有限公司 基于图像通信的智慧施工管理系统和方法
CN112989099B (zh) * 2021-05-14 2021-08-17 赣通通信股份有限公司 基于图像通信的智慧施工管理系统和方法

Similar Documents

Publication Publication Date Title
CN111339601A (zh) 一种bim+vr的施工现场布置方法
CN110117994A (zh) 一种基于bim技术的建筑砌体施工方法
CN106639317A (zh) 一种预制装配式建筑成套建造技术
CN109583046A (zh) 一种桥梁高陡边坡桥墩虚拟施工现场的构建方法
CN207348087U (zh) 一种装配式砌块挡土墙
CN109933900A (zh) 一种基于bim技术的施工三维场布建模方法
CN112329105B (zh) 一种基于bim技术的铝模和模块化附着式脚手架的优化施工方法
CN111597625A (zh) 一种基于bim的基坑支护开挖质量控制方法
CN108005099B (zh) 一种杆塔预制装配式混凝土阶梯形基础及其拼装方法
Zhanglin et al. Application of BIM technology in prefabricated buildings
CN207934054U (zh) 一种预制装配式筏板基础
CN106869387A (zh) 密肋板楼盖结构体系hz砼膜施工方法
CN202247924U (zh) 顶管施工拼装式钢结构沉井
CN115203511A (zh) 一种基于虚拟现实的施工数据处理系统及方法
CN207110586U (zh) 一种低层立体车库的分力板
CN207776228U (zh) 一种适用于夯土墙阳角的空心砌块结构
CN207331726U (zh) 一种旋挖钻成孔施工的复合地基
CN103485555B (zh) 一种防雨、防渗的户内式固废填埋场的建造方法
CN112381675A (zh) 一种基于bim的房地产建设工程的施工方法
CN207037657U (zh) 一种bim异形幕墙板块优化中央控制板
CN111985040A (zh) 基于bim和gis技术的桥梁设计施工一体化应用方法
CN111581818A (zh) 一种基于bim技术的施工现场布置优化方法
Yan et al. Application of the BIM Technique in Modern Project Management
Feng et al. Intelligent engineering management of prefabricated building based on BIM Technology
Lv et al. Summary of BIM technology application in a dormitory building project

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20200626