CN110083989B - 一种基于bim技术在管廊暗挖工程中安全数据监测方法 - Google Patents
一种基于bim技术在管廊暗挖工程中安全数据监测方法 Download PDFInfo
- Publication number
- CN110083989B CN110083989B CN201910450154.3A CN201910450154A CN110083989B CN 110083989 B CN110083989 B CN 110083989B CN 201910450154 A CN201910450154 A CN 201910450154A CN 110083989 B CN110083989 B CN 110083989B
- Authority
- CN
- China
- Prior art keywords
- model
- bim
- pipe gallery
- data
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T17/00—Three dimensional [3D] modelling, e.g. data description of 3D objects
Abstract
本发明公开了一种基于BIM技术在管廊暗挖工程中安全数据监测方法,属于地下管廊施工技术领域。本发明的步骤为:步骤一:根据图纸建立暗挖断面模型;步骤二:利用建立好的模型导入BIM模型结构分析软件分析暗挖面受力点;步骤三:暗挖施工过程中对结构不利点进行监测布控;步骤四:运用BIM技术进行道路虚拟导改及便桥模拟安装;步骤五:将每天采集的数据通过WEB与BIM模型进行关联;步骤六:使用3D扫描仪器对开挖断面定期扫描。本发明利用安全监测的数据导入BIM模型进行电脑智能分析,减少出错概率,分析更加准确,在保证施工安全,进度保障的情况下,进行动态监测,实时管理,通过实时的数据反馈保障管廊下穿河流工程安全顺利。
Description
技术领域
本发明涉及地下管廊施工技术领域,更具体地说,涉及一种基于BIM技术在管廊暗挖工程中安全数据监测方法。
背景技术
我国地下综合管廊在近几年取得了迅猛发展,地下综合管廊的重要性已逐渐得到越来越多城市的认可,地下综合管廊已成为城市的不可缺少的配套市政设施,在管廊工程是地下施工的过程,不免会碰到复杂的地质情况,最为复杂的为在施工过程中碰到地下暗河,碰到暗河如果采用明挖截流的方法,成本极大,还存在一定安全风险,故而采用下穿的方法施工,在下穿施工中要时刻监测开挖断面的位和受力移情况,传统的监测方法不直观,人为出错率高,存在一定的滞后性。
发明内容
1.发明要解决的技术问题
针对现有技术存在的缺陷与不足,本发明提供了一种基于BIM技术在管廊暗挖工程中安全数据监测方法,本发明有效减少出错概率,分析更加准确,其分析数据也可以作为后期资料数据,数据准确可靠,步骤简易,操作简单,通过实时的数据反馈保障管廊下穿河流工程安全顺利。
2.技术方案
为达到上述目的,本发明提供的技术方案为:
本发明的一种基于BIM技术在管廊暗挖工程中安全数据监测方法,其步骤为:
步骤一:根据图纸建立暗挖断面模型;
步骤二:利用建立好的模型导入BIM模型结构分析软件分析暗挖面受力点,找出结构受力最不利点;
步骤三:暗挖施工过程中对结构不利点进行监测布控;
步骤四:运用BIM技术进行道路虚拟导改及便桥模拟安装;
步骤五:将每天采集的数据通过WEB与BIM模型进行关联,通过每天的数据采集观察模型受力分布变化情况;
步骤六:使用3D扫描仪器对开挖断面定期扫描;
步骤七:将得到的3D扫描模型通过CSV格式导入到BIM软件中,在将根据图纸建立的标准模型进行整合,观察整合情况,针对实际施工进行数据动态管理。
进一步地,所述的步骤七:通过三维扫描将现场施工进度实景通过CSV点云导入电脑生成三维实景模型。
进一步地,所述的步骤七:将三维扫描仪形成的点云模型,与根据设计建立的标准模型进行整合,通过对模型的分析,发现设计与施工存在的偏差,对实际施工存在的偏差在模型中找到位置并进行整改。
3.有益效果
采用本发明提供的技术方案,与现有技术相比,具有如下有益效果:
本发明利用BIM技术将现场与模型进行关联通过对模型和数据的分析动态进行安全管控,利用安全监测的数据导入BIM模型进行电脑智能分析,减少出错概率,分析更加准确,其分析数据也可以作为后期资料数据,数据准确可靠,步骤简易,操作简单,在保证施工安全,进度保障的情况下,利用新技术BIM技术在管廊暗挖工程中安全数据监测方法,使数据与模型相关联,更直观更超前的将监测情况反映到项目部,进行动态监测,实时管理,通过实时的数据反馈保障管廊下穿河流工程安全顺利。
具体实施方式
下面结合实施例对本发明作进一步的描述:
实施例1
本实施例的一种基于BIM技术在管廊暗挖工程中安全数据监测方法,其步骤为:
步骤一:根据图纸建立暗挖断面模型;
步骤二:利用建立好的模型导入BIM模型结构分析软件分析暗挖面受力点,找出结构受力最不利点;
步骤三:暗挖施工过程中对结构不利点进行监测布控;
步骤四:运用BIM技术进行道路虚拟导改及便桥模拟安装;
步骤五:将每天采集的数据通过WEB与BIM模型进行关联,通过每天的数据采集观察模型受力分布变化情况;
步骤六:使用3D扫描仪器对开挖断面定期扫描;
步骤七:将得到的3D扫描模型通过CSV格式导入到BIM软件中,在将根据图纸建立的标准模型进行整合,观察整合情况,针对实际施工进行数据动态管理,通过三维扫描将现场施工进度实景通过CSV点云导入电脑生成三维实景模型,其生成的实景数据准确比传统的测量数据要更加精准,通过机器减少人为犯错的机会,使工程能够更加顺利安全进行,将三维扫描仪形成的点云模型,与根据设计建立的标准模型进行整合,通过对模型的分析,发现设计与施工存在的偏差,对实际施工存在的偏差在模型中找到位置并进行整改。
本发明利用BIM技术将现场与模型进行关联通过对模型和数据的分析动态进行安全管控,利用安全监测的数据导入BIM模型进行电脑智能分析,减少出错概率,分析更加准确,其分析数据也可以作为后期资料数据,数据准确可靠,步骤简易,操作简单。
本发明在保证施工安全,进度保障的情况下,利用新技术BIM技术在管廊暗挖工程中安全数据监测方法,使数据与模型相关联,更直观更超前的将监测情况反映到项目部,进行动态监测,实时管理,通过实时的数据反馈保障管廊下穿河流工程安全顺利。
以上示意性的对本发明及其实施方式进行了描述,该描述没有限制性,实际的方法并不局限于此。所以,如果本领域的普通技术人员受其启示,在不脱离本发明创造宗旨的情况下,不经创造性的设计出与该技术方案相似的结构方式及实施例,均应属于本发明的保护范围。
Claims (3)
1.一种基于BIM技术在管廊暗挖工程中安全数据监测方法,其特征在于:其步骤为:
步骤一:根据图纸建立暗挖断面模型;
步骤二:利用建立好的模型导入BIM模型结构分析软件分析暗挖面受力点,找出结构受力最不利点;
步骤三:暗挖施工过程中对结构不利点进行监测布控;
步骤四:运用BIM技术进行道路虚拟导改及便桥模拟安装;
步骤五:将每天采集的数据通过WEB与BIM模型进行关联,通过每天的数据采集观察模型受力分布变化情况;
步骤六:使用3D扫描仪器对开挖断面定期扫描;
步骤七:将得到的3D扫描模型通过CSV格式导入到BIM软件中,在将根据图纸建立的标准模型进行整合,观察整合情况,针对实际施工进行数据动态管理。
2.根据权利要求1所述的一种基于BIM技术在管廊暗挖工程中安全数据监测方法,其特征在于:所述的步骤七:通过三维扫描将现场施工进度实景通过CSV点云导入电脑生成三维实景模型。
3.根据权利要求1所述的一种基于BIM技术在管廊暗挖工程中安全数据监测方法,其特征在于:所述的步骤七:将三维扫描仪形成的点云模型,与根据设计建立的标准模型进行整合,通过对模型的分析,发现设计与施工存在的偏差,对实际施工存在的偏差在模型中找到位置并进行整改。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910450154.3A CN110083989B (zh) | 2019-05-28 | 2019-05-28 | 一种基于bim技术在管廊暗挖工程中安全数据监测方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910450154.3A CN110083989B (zh) | 2019-05-28 | 2019-05-28 | 一种基于bim技术在管廊暗挖工程中安全数据监测方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110083989A CN110083989A (zh) | 2019-08-02 |
CN110083989B true CN110083989B (zh) | 2023-01-10 |
Family
ID=67422232
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910450154.3A Active CN110083989B (zh) | 2019-05-28 | 2019-05-28 | 一种基于bim技术在管廊暗挖工程中安全数据监测方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110083989B (zh) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110847963B (zh) * | 2019-10-08 | 2021-11-30 | 中国铁建重工集团股份有限公司 | 一种针对铁路隧道施工的数据交互系统 |
CN112132964A (zh) * | 2020-08-18 | 2020-12-25 | 浙江华阳数智信息科技有限公司 | 基于介导现实技术的数字乡村建设管控系统及方法 |
CN112446083A (zh) * | 2020-11-30 | 2021-03-05 | 中建八局轨道交通建设有限公司 | 基于bim技术的监控模拟方法 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2017121315A1 (zh) * | 2016-01-12 | 2017-07-20 | 广州机施建设集团有限公司 | 一种建筑桁架及楼板的施工方法 |
CN108951328A (zh) * | 2018-07-25 | 2018-12-07 | 中国十七冶集团有限公司 | 一种基于bim技术的城市地下综合管廊交通疏导方法 |
-
2019
- 2019-05-28 CN CN201910450154.3A patent/CN110083989B/zh active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2017121315A1 (zh) * | 2016-01-12 | 2017-07-20 | 广州机施建设集团有限公司 | 一种建筑桁架及楼板的施工方法 |
CN108951328A (zh) * | 2018-07-25 | 2018-12-07 | 中国十七冶集团有限公司 | 一种基于bim技术的城市地下综合管廊交通疏导方法 |
Non-Patent Citations (1)
Title |
---|
BIM技术在市政综合管廊建设运营中的应用探究;王能林等;《建筑施工》;20161031(第10期);全文 * |
Also Published As
Publication number | Publication date |
---|---|
CN110083989A (zh) | 2019-08-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110083989B (zh) | 一种基于bim技术在管廊暗挖工程中安全数据监测方法 | |
CN112945139B (zh) | 一种三维扫描结合bim技术的盾构工程辅助系统 | |
CN103866769B (zh) | 基于3d地质模型及实时监控大坝灌浆工程分析控制方法 | |
WO2021128675A1 (zh) | 一种基于bim技术的地下连续墙施工方法 | |
CN103425054B (zh) | 一种基于数字化的电力隧道施工控制方法 | |
CN1873674B (zh) | 专用铁路道岔群下开采沉陷预计与治理专家系统 | |
CN110030972A (zh) | 基于ExcelVBA的隧道超欠挖检测方法 | |
CN102325177A (zh) | 基于物联网的煤矿生产三维可视化信息系统 | |
CN114580752B (zh) | 一种基于bim技术的工程施工进度智能管理系统 | |
CN111778996A (zh) | 一种基于bim技术的基坑桩锚支护结构快速构建方法 | |
CN102880918B (zh) | 基于数据融合分析的深基坑风险评估方法 | |
CN108230183A (zh) | 一种基于时标量测的电网设备多维度综合告警的处理方法 | |
Zhou et al. | A BIM-based identification and classification method of environmental risks in the design of Beijing subway | |
CN111597625A (zh) | 一种基于bim的基坑支护开挖质量控制方法 | |
CN106049558B (zh) | 一种综合管廊信息预警系统及方法 | |
CN116383950A (zh) | 一种多平台协同的室外雨水管网参数化设计方法及系统 | |
Liu et al. | Application Research of BIM Technology in Ancient Architecture Restoration | |
Li et al. | Application of point cloud data in the construction and management of interior design | |
Fu et al. | Risk comprehensive assessment of shield tunnel construction based on cloud theory | |
Yoon et al. | Method of deriving activity relationship and location information from BIM model for construction schedule management | |
CN105259783A (zh) | 一种水电工程施工过程可视化预演系统 | |
Koroteev et al. | Cost analysis of the combined application of 3D-printing and BIM technologies in the construction industry | |
CN104143126A (zh) | 一种基于五要素体系的信息系统运维管理方法 | |
Ma et al. | The method of integrated pipeline intelligent conversion of bim design model into fine bim construction model | |
Wuchen et al. | Some Thoughts on the Application of Three-dimensional Technology in the Construction of Transmission and Transformation Engineering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |