CN111125817A - 一种基于bim的装配式建筑设计方法及设备 - Google Patents

一种基于bim的装配式建筑设计方法及设备 Download PDF

Info

Publication number
CN111125817A
CN111125817A CN201911246880.XA CN201911246880A CN111125817A CN 111125817 A CN111125817 A CN 111125817A CN 201911246880 A CN201911246880 A CN 201911246880A CN 111125817 A CN111125817 A CN 111125817A
Authority
CN
China
Prior art keywords
unit
bim
bim model
building
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911246880.XA
Other languages
English (en)
Inventor
彭婧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201911246880.XA priority Critical patent/CN111125817A/zh
Publication of CN111125817A publication Critical patent/CN111125817A/zh
Pending legal-status Critical Current

Links

Images

Abstract

本发明公开了一种基于BIM的装配式建筑设计方法,包括以下步骤:S1、根据图纸和客户需求创建BIM模型;S2、对创建的BIM模型进行结构分析;S3、根据模型选取相应的建筑材料;S4、对各个结构进行应力分析和碰撞检测;S5、统计各项试验数据,对各项试验数据进行分析排查;本发明还提出一种基于BIM的装配式建筑设计设备,包括BIM模型制作单元、BIM模型结构分析单元、建材选购单元、应力分析和碰撞检测单元、实验数据统计单元和数据储存单元。本发明将设计方案、制造需求、安装需求集成在BIM模型中,实现了装配式建筑设计的一体化,能够将实际制造、安装过程中可能产生的问题提前消除,提高了制造、安装的整体效率、缩短了工期。

Description

一种基于BIM的装配式建筑设计方法及设备
技术领域
本发明涉及建筑设计技术领域,尤其涉及一种基于BIM的装配式建筑设计方法及设备。
背景技术
装配式建筑项目传统的全过程模式是装配式深化设计→工厂加工生产→现场安装,相较于设计→现场施工模式来说,已经节约了时间,但这种模式推广起来仍有困难。从技术和管理上来看,一是因为设计、工厂制造、现场施工三个阶段相分离,设计结果错误率较高,在安装过程才发现预制构件孔位对不上或者不经济,造成变更和浪费,甚至影响质量;另一方面,工厂统一加工的产品不是标准化产品,不能满足不同客户的需求。
BIM技术的引入可以有效解决以上问题,它将设计方案、制造需求、安装需求集成在BIM模型中,在实际建造前统筹考虑各专业设计、工厂生产、现场安装的各种要求,把实际制造、安装过程中可能产生的问题提前消除。
发明内容
本发明的目的是为了解决现有技术中存在的缺点,而提出的一种基于BIM的装配式建筑设计方法及设备,其将设计方案、制造需求、安装需求集成在BIM模型中,实现了装配式建筑设计的一体化,能够将实际制造、安装过程中可能产生的问题提前消除,提高了制造、安装的整体效率、缩短了工期。
为了实现上述目的,本发明采用了如下技术方案:
一种基于BIM的装配式建筑设计方法及设备,包括以下步骤:
S1、根据图纸和客户需求创建BIM模型;
S2、对创建的BIM模型进行结构分析;
S3、根据模型选取相应的建筑材料;
S4、对各个结构进行应力分析和碰撞检测;
S5、统计各项试验数据,对各项试验数据进行分析排查;
S6、将各项试验数据进行储存入库。
优选地,所述步骤S1中,图纸和客户需求需要与产品设计师进行协同设计,对用户个性化定制建筑模型进行各专业协调优化获得最终设计方案。
优选地,所述步骤S2中,所述BIM模型中包括建筑、结构、机电各构件。
本发明还提出一种基于BIM的装配式建筑设计设备,包括BIM模型制作单元、BIM模型结构分析单元、建材选购单元、应力分析和碰撞检测单元、实验数据统计单元和数据储存单元,其中;
a、所述BIM模型制作单元用于将CAD图纸等结构和客户所需设计数据导入BIM模型创建单元,自动创建BIM模型;
b、所述BIM模型结构分析单元用于分析CAD图纸等结构和客户所需设计数据是否合理;
c、所述建材选购单元用于根据BIM模型选取建造产品的建材;
d、所述应力分析和碰撞检测单元用于分析BIM模型建造后的产品应力和各零部件之间的碰撞检查;
e、所述实验数据统计单元用于对产品应力和各零部件之间的碰撞检查的数据进行统计;
f、所述数据储存单元用于对各项数据进行储存,以便下次调取。
本发明具有以下有益效果:
1、本发明将设计方案、制造需求、安装需求集成在BIM模型中,实现了装配式建筑设计的一体化,能够将实际制造、安装过程中可能产生的问题提前消除,提高了制造、安装的整体效率、缩短了工期;
2、降低了建筑设计、制造、施工组织难度,信息自动生成,工程全过程信息共享;
3、设计前期的各专业协调与深化设计,避免生产以及施工过程中的碰撞产生;
4、智能生成生产计划、施工计划以及原料采购计划,提供过程预警,方便过程管控;
5、管道组件全寿命周期信息一扫便知,提高施工效率以及后期运维效率。
附图说明
图1为本发明提出的一种基于BIM的装配式建筑设计方法的流程图;
图2为本发明提出的一种基于BIM的装配式建筑设计设备的结构图。
具体实施方式
为使本发明的上述目的、特征和优点能够更加明显易懂,下面结合附图对本发明的具体实施方式做详细的说明。在下面的描述中阐述了很多具体细节以便于充分理解本发明。但是本发明能够以很多不同于在此描述的其它方式来实施,本领域技术人员可以在不违背本发明内涵的情况下做类似改进,因此本发明不受下面公开的具体实施的限制。
需要说明的是,当元件被称为“固定于”另一个元件,它可以直接在另一个元件上或者也可以存在居中的元件。当一个元件被认为是“连接”另一个元件,它可以是直接连接到另一个元件或者可能同时存在居中元件。本文所使用的术语“垂直的”、“水平的”、“左”、“右”以及类似的表述只是为了说明的目的,并不表示是唯一的实施方式。
除非另有定义,本文所使用的所有的技术和科学术语与属于本发明的技术领域的技术人员通常理解的含义相同。本文中在本发明的说明书中所使用的术语只是为了描述具体的实施例的目的,不是旨在于限制本发明。本文所使用的术语“及/或”包括一个或多个相关的所列项目的任意的和所有的组合。
参照图1-2,一种基于BIM的装配式建筑设计方法,包括以下步骤:
S1、根据图纸和客户需求创建BIM模型;
S2、对创建的BIM模型进行结构分析;
S3、根据模型选取相应的建筑材料;
S4、对各个结构进行应力分析和碰撞检测;
S5、统计各项试验数据,对各项试验数据进行分析排查;
S6、将各项试验数据进行储存入库。
本发明还提出一种基于BIM的装配式建筑设计设备,包括BIM模型制作单元、BIM模型结构分析单元、建材选购单元、应力分析和碰撞检测单元、实验数据统计单元和数据储存单元,其中;
a、所述BIM模型制作单元用于将CAD图纸等结构和客户所需设计数据导入BIM模型创建单元,自动创建BIM模型;
b、所述BIM模型结构分析单元用于分析CAD图纸等结构和客户所需设计数据是否合理;
c、所述建材选购单元用于根据BIM模型选取建造产品的建材;
d、所述应力分析和碰撞检测单元用于分析BIM模型建造后的产品应力和各零部件之间的碰撞检查;
e、所述实验数据统计单元用于对产品应力和各零部件之间的碰撞检查的数据进行统计;
f、所述数据储存单元用于对各项数据进行储存,以便下次调取。
本发明将设计方案、制造需求、安装需求集成在BIM模型中,实现了装配式建筑设计的一体化,能够将实际制造、安装过程中可能产生的问题提前消除,提高了制造、安装的整体效率、缩短了工期;降低了建筑设计、制造、施工组织难度,信息自动生成,工程全过程信息共享;设计前期的各专业协调与深化设计,避免生产以及施工过程中的碰撞产生;智能生成生产计划、施工计划以及原料采购计划,提供过程预警,方便过程管控;管道组件全寿命周期信息一扫便知,提高施工效率以及后期运维效率。
以上所述,仅为本发明较佳的具体实施方式,但本发明的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本发明揭露的技术范围内,根据本发明的技术方案及其发明构思加以等同替换或改变,都应涵盖在本发明的保护范围之内。

Claims (4)

1.一种基于BIM的装配式建筑设计方法,其特征在于,包括以下步骤:
S1、根据图纸和客户需求创建BIM模型;
S2、对创建的BIM模型进行结构分析;
S3、根据模型选取相应的建筑材料;
S4、对各个结构进行应力分析和碰撞检测;
S5、统计各项试验数据,对各项试验数据进行分析排查;
S6、将各项试验数据进行储存入库。
2.根据权利要求1所述的一种基于BIM的装配式建筑设计方法,其特征在于,所述步骤S1中,图纸和客户需求需要与产品设计师进行协同设计,对用户个性化定制建筑模型进行各专业协调优化获得最终设计方案。
3.根据权利要求1所述的一种基于BIM的装配式建筑设计方法,其特征在于,所述步骤S2中,所述BIM模型中包括建筑、结构、机电各构件。
4.一种基于BIM的装配式建筑设计设备,其特征在于,包括BIM模型制作单元、BIM模型结构分析单元、建材选购单元、应力分析和碰撞检测单元、实验数据统计单元和数据储存单元,其中;
a、所述BIM模型制作单元用于将CAD图纸等结构和客户所需设计数据导入BIM模型创建单元,自动创建BIM模型;
b、所述BIM模型结构分析单元用于分析CAD图纸等结构和客户所需设计数据是否合理;
c、所述建材选购单元用于根据BIM模型选取建造产品的建材;
d、所述应力分析和碰撞检测单元用于分析BIM模型建造后的产品应力和各零部件之间的碰撞检查;
e、所述实验数据统计单元用于对产品应力和各零部件之间的碰撞检查的数据进行统计;
f、所述数据储存单元用于对各项数据进行储存,以便下次调取。
CN201911246880.XA 2019-12-09 2019-12-09 一种基于bim的装配式建筑设计方法及设备 Pending CN111125817A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911246880.XA CN111125817A (zh) 2019-12-09 2019-12-09 一种基于bim的装配式建筑设计方法及设备

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911246880.XA CN111125817A (zh) 2019-12-09 2019-12-09 一种基于bim的装配式建筑设计方法及设备

Publications (1)

Publication Number Publication Date
CN111125817A true CN111125817A (zh) 2020-05-08

Family

ID=70497768

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911246880.XA Pending CN111125817A (zh) 2019-12-09 2019-12-09 一种基于bim的装配式建筑设计方法及设备

Country Status (1)

Country Link
CN (1) CN111125817A (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112347551A (zh) * 2021-01-05 2021-02-09 中铁六局集团北京铁路建设有限公司 一种基于bim技术的连续梁施工预留孔道精确定位施工方法
CN112784339A (zh) * 2021-01-22 2021-05-11 深圳国研建筑科技有限公司 一种基于bim的装配式方舱医院设计方法、系统、智能终端以及存储介质
CN112883469A (zh) * 2021-02-04 2021-06-01 鑫源建设科技有限责任公司 一种基于bim技术的异形构件的数字化加工方法及系统
CN114564772A (zh) * 2022-04-28 2022-05-31 广东世纪达建设集团有限公司 一种基于bim的室内装饰墙安装设计方法及系统
CN114781027A (zh) * 2022-04-14 2022-07-22 浙江大东吴杭萧绿建科技有限公司 基于bim的数字化钢结构建筑建造方法及系统

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017121315A1 (zh) * 2016-01-12 2017-07-20 广州机施建设集团有限公司 一种建筑桁架及楼板的施工方法
CN109408903A (zh) * 2018-09-29 2019-03-01 鼎宸建设管理有限公司 基于bim技术的装配式建筑设计方法
CN109801038A (zh) * 2019-01-25 2019-05-24 中铁三局集团广东建设工程有限公司 一种基于bim技术应用的通用性工程施工方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017121315A1 (zh) * 2016-01-12 2017-07-20 广州机施建设集团有限公司 一种建筑桁架及楼板的施工方法
CN109408903A (zh) * 2018-09-29 2019-03-01 鼎宸建设管理有限公司 基于bim技术的装配式建筑设计方法
CN109801038A (zh) * 2019-01-25 2019-05-24 中铁三局集团广东建设工程有限公司 一种基于bim技术应用的通用性工程施工方法

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112347551A (zh) * 2021-01-05 2021-02-09 中铁六局集团北京铁路建设有限公司 一种基于bim技术的连续梁施工预留孔道精确定位施工方法
CN112784339A (zh) * 2021-01-22 2021-05-11 深圳国研建筑科技有限公司 一种基于bim的装配式方舱医院设计方法、系统、智能终端以及存储介质
CN112784339B (zh) * 2021-01-22 2024-03-29 深圳国研建筑科技有限公司 一种基于bim的装配式方舱医院设计方法、系统、智能终端以及存储介质
CN112883469A (zh) * 2021-02-04 2021-06-01 鑫源建设科技有限责任公司 一种基于bim技术的异形构件的数字化加工方法及系统
CN114781027A (zh) * 2022-04-14 2022-07-22 浙江大东吴杭萧绿建科技有限公司 基于bim的数字化钢结构建筑建造方法及系统
CN114564772A (zh) * 2022-04-28 2022-05-31 广东世纪达建设集团有限公司 一种基于bim的室内装饰墙安装设计方法及系统
CN114564772B (zh) * 2022-04-28 2022-08-09 广东世纪达建设集团有限公司 一种基于bim的室内装饰墙安装设计方法及系统

Similar Documents

Publication Publication Date Title
CN111125817A (zh) 一种基于bim的装配式建筑设计方法及设备
CN110889238B (zh) 一种数字孪生驱动的热压罐管控系统
CN103838202B (zh) 参数控制方法和参数控制系统
CN109544084B (zh) 一种装配式建筑系统的应用方法、系统及终端设备
CN107341290B (zh) 基于bim的梁板预制与现浇结构工程量提取系统及方法
CN110109425B (zh) 一种基于专家知识库以工艺数字模型驱动的智能管控平台
CN111561182A (zh) 一种基于bim和大数据的装配式建筑深化设计及施工方法
WO2007078371A3 (en) Spare parts inventory management
CN102999528B (zh) 一种数据仓库中etl任务离线和数据清理的方法及装置
CN110674548A (zh) 基于bim的装配式建筑设计方法及系统
CN114118673A (zh) 一种基于数字孪生技术的车间智能化故障诊断预警方法
CN110531722A (zh) 基于数据采集的工艺参数推荐系统及方法
CN110750931A (zh) 一种高效的型材挤压模具设计方法
WO2020044110A2 (en) A method for building a model of a physical system
CN108491991A (zh) 基于工业大数据产品工期的约束条件分析系统与方法
KR20200061194A (ko) 모듈러 건축물의 공장제작 관리 시스템 및 그 방법
Stefaniak et al. Computerised decision-making support system based on data fusion for machinery system’s management and maintenance
CN105739476B (zh) 一种车间工序工艺可配置化的产品控制方法及装置
CN102896224A (zh) 基于kbe系统的汽车覆盖件拉深模具装配方法
CN107220713A (zh) 基于健康状态的机器人手臂实时保养方法
Kim et al. Die-casting defect prediction and diagnosis system using process condition data
CN107292967B (zh) 基于几何特征映射搭建含有骨架的三维可配置bom的方法
Ning et al. Statistical process control techniques for service processes: a review
CN104503982A (zh) 一种cmdb配置项调和的方法
US11514344B2 (en) Systems and methods for modeling a manufacturing assembly line

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20200508

WD01 Invention patent application deemed withdrawn after publication