CN110147589A - Pc异形梁与现浇梁bim组合建模算量方法 - Google Patents

Pc异形梁与现浇梁bim组合建模算量方法 Download PDF

Info

Publication number
CN110147589A
CN110147589A CN201910359317.7A CN201910359317A CN110147589A CN 110147589 A CN110147589 A CN 110147589A CN 201910359317 A CN201910359317 A CN 201910359317A CN 110147589 A CN110147589 A CN 110147589A
Authority
CN
China
Prior art keywords
cast
situ
modeling
bim
software
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910359317.7A
Other languages
English (en)
Inventor
王军凯
袁德星
安吉福
赵建立
谢非
谭旭林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201910359317.7A priority Critical patent/CN110147589A/zh
Publication of CN110147589A publication Critical patent/CN110147589A/zh
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Geometry (AREA)
  • Theoretical Computer Science (AREA)
  • Computer Hardware Design (AREA)
  • General Physics & Mathematics (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Computational Mathematics (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Foundations (AREA)

Abstract

本发明具体是一种PC异形梁与现浇梁BIM组合建模算量方法;其特征是:包括步骤1、叠合梁PC梁建模;步骤2、PC叠合梁异形区域建模;步骤3、PC叠合梁现浇梁部分建模;步骤4、通过组合建模,汇总计算,得出PC异形梁及现浇梁的工程量并进行分类汇总整理。本方法通过BIM技术奖PC与现浇叠合梁有序规范建模,使钢筋模板混凝土在一个模型里快速建模电算完成,给施工预算结算提供了精确的依据。

Description

PC异形梁与现浇梁BIM组合建模算量方法
技术领域
本发明涉及建筑施工的成本核算领域,具体是一种PC异形梁与现浇梁BIM组合建模算量方法。
背景技术
随着科学水平的发展,建筑的造型越来越复杂、建筑群的规模越来越大,而相应地,建筑成本也是呈几何级增长,尤其是复杂的建筑造型和庞大的规模,对于建筑施工中结构件和现浇构件的用量核算越来越复杂,如果采用手工核算的方式应对当前极为繁复的工程规模,容易出现用量核算出错的情况,如此,对于业主、总包方和分包方来说,都极为不便。也即是说,当前传统的手工核算方式已经无法跟上现代建造业的发展需求。
发明内容
本发明的目的在于克服上述缺陷,提供一种通过BIM技术对PC异形梁与现浇梁组合进行估量的方法。
为了达到上述目的,本发明是这样实现的:
一种PC异形梁与现浇梁BIM组合建模算量方法,包括
步骤1、叠合梁PC梁建模:PC叠合梁箍筋外漏至叠合梁现浇梁顶部为了保证梁箍筋的整体性完整性使箍筋达到设计及规范要求,在BIM软件里新建PC梁构件根据图纸标注实际尺寸,含现浇部分,在属性里编辑矩形尺寸,在软件原位标注里按PC优化图纸钢筋信息编辑底部受力纵筋及箍筋腰筋根据规范及图纸要求调整节点计算设置,进行软件计算、锁定构件在原位标注里调整PC梁截面高度调整PC梁上标高,完成底筋箍筋腰筋绘制编辑跟规范及图纸达到一致;
步骤2、PC叠合梁异形区域建模:在软件里新建构件PC异形构件编辑标高进行填空建模;
步骤3、PC叠合梁现浇梁部分建模:在BIM软件里新建异形叠合梁现浇构件,进行建模在原位标注里编辑上部通长受力纵筋及支座受力钢筋进行软件计算上部钢筋及现浇叠合梁建模编辑完成,使钢筋达到图纸规范设计要求。
步骤4、通过组合建模,汇总计算,得出PC异形梁及现浇梁的工程量并进行分类汇总整理。
本方法通过BIM技术奖PC与现浇叠合梁有序规范建模,使钢筋模板混凝土在一个模型里快速建模电算完成,给施工预算结算提供了精确的依据。
具体实施方式
以下通过具体实施例进一步说明本发明。
一种PC异形梁与现浇梁BIM组合建模算量方法,包括
步骤1、叠合梁PC梁建模:PC叠合梁箍筋外漏至叠合梁现浇梁顶部为了保证梁箍筋的整体性完整性使箍筋达到设计及规范要求,在BIM软件里新建PC梁构件根据图纸标注实际尺寸,含现浇部分,在属性里编辑矩形尺寸,在软件原位标注里按PC优化图纸钢筋信息编辑底部受力纵筋及箍筋腰筋根据规范及图纸要求调整节点计算设置,进行软件计算、锁定构件在原位标注里调整PC梁截面高度调整PC梁上标高,完成底筋箍筋腰筋绘制编辑跟规范及图纸达到一致;
步骤2、PC叠合梁异形区域建模:在软件里新建构件PC异形构件编辑标高进行填空建模;
步骤3、PC叠合梁现浇梁部分建模:在BIM软件里新建异形叠合梁现浇构件,进行建模在原位标注里编辑上部通长受力纵筋及支座受力钢筋进行软件计算上部钢筋及现浇叠合梁建模编辑完成,使钢筋达到图纸规范设计要求。
步骤4、通过组合建模,汇总计算,得出PC异形梁及现浇梁的工程量并进行分类汇总整理。
本方法通过BIM技术奖PC与现浇叠合梁有序规范建模,使钢筋模板混凝土在一个模型里快速建模电算完成,给施工预算结算提供了精确的依据。

Claims (1)

1.一种PC异形梁与现浇梁BIM组合建模算量方法,其特征是:包括
步骤1、叠合梁PC梁建模:PC叠合梁箍筋外漏至叠合梁现浇梁顶部为了保证梁箍筋的整体性完整性使箍筋达到设计及规范要求,在BIM软件里新建PC梁构件根据图纸标注实际尺寸,含现浇部分,在属性里编辑矩形尺寸,在软件原位标注里按PC优化图纸钢筋信息编辑底部受力纵筋及箍筋腰筋根据规范及图纸要求调整节点计算设置,进行软件计算、锁定构件在原位标注里调整PC梁截面高度调整PC梁上标高,完成底筋箍筋腰筋绘制编辑跟规范及图纸达到一致;
步骤2、PC叠合梁异形区域建模:在软件里新建构件PC异形构件编辑标高进行填空建模;
步骤3、PC叠合梁现浇梁部分建模:在BIM软件里新建异形叠合梁现浇构件,进行建模在原位标注里编辑上部通长受力纵筋及支座受力钢筋进行软件计算上部钢筋及现浇叠合梁建模编辑完成,使钢筋达到图纸规范设计要求;
步骤4、通过组合建模,汇总计算,得出PC异形梁及现浇梁的工程量并进行分类汇总整理。
CN201910359317.7A 2019-04-30 2019-04-30 Pc异形梁与现浇梁bim组合建模算量方法 Pending CN110147589A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910359317.7A CN110147589A (zh) 2019-04-30 2019-04-30 Pc异形梁与现浇梁bim组合建模算量方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910359317.7A CN110147589A (zh) 2019-04-30 2019-04-30 Pc异形梁与现浇梁bim组合建模算量方法

Publications (1)

Publication Number Publication Date
CN110147589A true CN110147589A (zh) 2019-08-20

Family

ID=67594627

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910359317.7A Pending CN110147589A (zh) 2019-04-30 2019-04-30 Pc异形梁与现浇梁bim组合建模算量方法

Country Status (1)

Country Link
CN (1) CN110147589A (zh)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111552998A (zh) * 2020-03-20 2020-08-18 广联达科技股份有限公司 装配式预制梁建模及钢筋测算方法、系统和介质
CN112035911A (zh) * 2020-07-16 2020-12-04 中国二十冶集团有限公司 墙预留插筋建模方法
CN112035906A (zh) * 2020-07-17 2020-12-04 中国二十冶集团有限公司 一种多元化冲渣沟入口电算组合建模精细化调整方法
CN112052491A (zh) * 2020-07-20 2020-12-08 中国二十冶集团有限公司 一种电缆沟电算组合建模方法
CN112084552A (zh) * 2020-07-20 2020-12-15 中国二十冶集团有限公司 一种连铸循环水泵房设备基础系列化电算组合建模方法
CN112115532A (zh) * 2020-08-31 2020-12-22 中国二十冶集团有限公司 基于电算组合建模的旋流池的工程量计算方法
CN112257150A (zh) * 2020-10-19 2021-01-22 中国二十冶集团有限公司 基于bim建模的筏形基础板带加强筋精细化算量的方法
CN112417575A (zh) * 2020-12-18 2021-02-26 中国二十冶集团有限公司 一种异形墙和异形顶板bim组合建模方法及系统
CN112560147A (zh) * 2020-12-18 2021-03-26 中国二十冶集团有限公司 一种异形顶板下柱结构的bim建模算量方法及系统
CN113468636A (zh) * 2021-06-09 2021-10-01 中国二十冶集团有限公司 基于bim的地下室双扇门门槛钢筋精细化电算方法及系统

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017121315A1 (zh) * 2016-01-12 2017-07-20 广州机施建设集团有限公司 一种建筑桁架及楼板的施工方法
CN107341290A (zh) * 2017-06-07 2017-11-10 中国建筑第八工程局有限公司 基于bim的梁板预制与现浇结构工程量提取系统及方法
CN107977487A (zh) * 2017-11-07 2018-05-01 山东住工装配建筑有限公司 一种基于bim技术的装配式混凝土建筑设计方法
CN108664697A (zh) * 2018-04-03 2018-10-16 山东住工装配建筑有限公司 一种基于bim的装配式构件参数化设计方法
CN109543209A (zh) * 2018-09-19 2019-03-29 中建科技有限公司深圳分公司 一种构件数据库的管理方法及装置

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017121315A1 (zh) * 2016-01-12 2017-07-20 广州机施建设集团有限公司 一种建筑桁架及楼板的施工方法
CN107341290A (zh) * 2017-06-07 2017-11-10 中国建筑第八工程局有限公司 基于bim的梁板预制与现浇结构工程量提取系统及方法
CN107977487A (zh) * 2017-11-07 2018-05-01 山东住工装配建筑有限公司 一种基于bim技术的装配式混凝土建筑设计方法
CN108664697A (zh) * 2018-04-03 2018-10-16 山东住工装配建筑有限公司 一种基于bim的装配式构件参数化设计方法
CN109543209A (zh) * 2018-09-19 2019-03-29 中建科技有限公司深圳分公司 一种构件数据库的管理方法及装置

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111552998A (zh) * 2020-03-20 2020-08-18 广联达科技股份有限公司 装配式预制梁建模及钢筋测算方法、系统和介质
CN112035911A (zh) * 2020-07-16 2020-12-04 中国二十冶集团有限公司 墙预留插筋建模方法
CN112035911B (zh) * 2020-07-16 2023-04-25 中国二十冶集团有限公司 墙预留插筋建模方法
CN112035906A (zh) * 2020-07-17 2020-12-04 中国二十冶集团有限公司 一种多元化冲渣沟入口电算组合建模精细化调整方法
CN112035906B (zh) * 2020-07-17 2023-12-22 中国二十冶集团有限公司 一种多元化冲渣沟入口电算组合建模精细化调整方法
CN112084552B (zh) * 2020-07-20 2022-12-09 中国二十冶集团有限公司 一种连铸循环水泵房设备基础系列化电算组合建模方法
CN112084552A (zh) * 2020-07-20 2020-12-15 中国二十冶集团有限公司 一种连铸循环水泵房设备基础系列化电算组合建模方法
CN112052491A (zh) * 2020-07-20 2020-12-08 中国二十冶集团有限公司 一种电缆沟电算组合建模方法
CN112115532A (zh) * 2020-08-31 2020-12-22 中国二十冶集团有限公司 基于电算组合建模的旋流池的工程量计算方法
CN112115532B (zh) * 2020-08-31 2023-03-24 中国二十冶集团有限公司 基于电算组合建模的旋流池的工程量计算方法
CN112257150A (zh) * 2020-10-19 2021-01-22 中国二十冶集团有限公司 基于bim建模的筏形基础板带加强筋精细化算量的方法
CN112257150B (zh) * 2020-10-19 2024-01-19 中国二十冶集团有限公司 基于bim建模的筏形基础板带加强筋精细化算量的方法
CN112417575A (zh) * 2020-12-18 2021-02-26 中国二十冶集团有限公司 一种异形墙和异形顶板bim组合建模方法及系统
CN112560147A (zh) * 2020-12-18 2021-03-26 中国二十冶集团有限公司 一种异形顶板下柱结构的bim建模算量方法及系统
CN112560147B (zh) * 2020-12-18 2022-07-26 中国二十冶集团有限公司 一种异形顶板下柱结构的bim建模算量方法及系统
CN113468636A (zh) * 2021-06-09 2021-10-01 中国二十冶集团有限公司 基于bim的地下室双扇门门槛钢筋精细化电算方法及系统
CN113468636B (zh) * 2021-06-09 2022-04-22 中国二十冶集团有限公司 基于bim的地下室双扇门门槛钢筋精细化电算方法及系统

Similar Documents

Publication Publication Date Title
CN110147589A (zh) Pc异形梁与现浇梁bim组合建模算量方法
CN110096800A (zh) Pc矩形梁与现浇梁通过bim实现用料估量的方法
CN109538237B (zh) 一种基于obm的公路隧道设计方法
US11015367B2 (en) Post sleeve positioning apparatus and related methods
CN112257137B (zh) 一种基于Revit的建筑结构BIM正向自动设计方法
Hills et al. Willis's elements of quantity surveying
CN110083948A (zh) Pc板与现浇叠合板通过bim组合建模进行估量的方法
US5745751A (en) Civil site information system
CN105302914B (zh) 一种基于增量和联动的地形图制图数据库快速更新方法
CN112948920B (zh) 一种基于Revit平台的路基路面BIM模型快速建模方法及系统
CN114925425B (zh) 一种参数化创建公路桥梁模型的方法
CN108416162A (zh) 一种基于bim的螺旋上升式钢筋混凝土结构的施工方法
CN106408683B (zh) 一种agv导航轨迹设置方法
CN110263451A (zh) 基于bim的拱肋加工施工方法
CN110110431A (zh) Pc楼梯与现浇构件组合bim建模算量方法
CN105756187A (zh) 一种3d打印工艺与混凝土结合的建筑构造、施工方法
CN114329740B (zh) 基于bim的大跨度上承式梁拱组合刚构桥三维正向设计方法
CN103791886A (zh) 平原地区谷歌地球辅助短距离输电线路平断面测量方法
US20210019454A1 (en) Design and construction of fence panels and fence panel components
CN112560147A (zh) 一种异形顶板下柱结构的bim建模算量方法及系统
CN109680961B (zh) 基于装配式建筑的楼梯预埋件自动生成方法及装置
CN116186856A (zh) 一种基于revit软件轮廓族创建三维隧道洞身模型的方法
CN110263437A (zh) 铁路联络线自动设计方法
Wang et al. The application of BIM technology in the construction of Hangzhou Zizhi tunnel
CN114705204A (zh) 一种基于道路基础设计资料的高精度地图生成方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190820