JP2008526524A5 - - Google Patents

Download PDF

Info

Publication number
JP2008526524A5
JP2008526524A5 JP2007552250A JP2007552250A JP2008526524A5 JP 2008526524 A5 JP2008526524 A5 JP 2008526524A5 JP 2007552250 A JP2007552250 A JP 2007552250A JP 2007552250 A JP2007552250 A JP 2007552250A JP 2008526524 A5 JP2008526524 A5 JP 2008526524A5
Authority
JP
Japan
Prior art keywords
tubing
wall thickness
manufacturing
rolling mill
hot rolling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2007552250A
Other languages
English (en)
Other versions
JP2008526524A (ja
Filing date
Publication date
Priority claimed from US11/038,611 external-priority patent/US20060157539A1/en
Application filed filed Critical
Publication of JP2008526524A publication Critical patent/JP2008526524A/ja
Publication of JP2008526524A5 publication Critical patent/JP2008526524A5/ja
Pending legal-status Critical Current

Links

Claims (10)

  1. 反復する巻き伸ばし圧力に耐える手段を具備する連続コイルドチュービングを製造するための方法であり、前記方法は、
    第一先端部と第一後ろ端部と第一中央部を備えさらに第一の幅と第一の厚さを有する第一フラットストリップ材の後ろ端部をトリミングし、第二先端部と第二後ろ端部と第二中央部を備えさらに前記第一フラットストリップ材の第一の幅と第一の厚さと実質的に同一の第二の幅と第二の厚さを有する第二フラットストリップ材の先端部をトリミングし、
    前記第一フラットストリップ材の第一先端部および第一中央部をチュービング形成工程において第一の供給速度で進行させる一方で、前記第一フラットストリップ材の第一後ろ端部を停止させ、
    前記第二フラットストリップ材の第二先端部を前記第一フラットストリップ材の停止する第一後ろ端部に横溶接して合成ストリップを形成し、
    前記第一フラットストリップ材の第一先端部および第一中央部をチュービング形成工程において第一の供給速度で進行させる一方で、第一および第二フラットストリップ材の幅および厚さに横溶接部を合わせることにより合成ストリップを表面仕上げ加工し、
    合成ストリップの対向両端縁部を溶接することによって仕上げ加工済み合成ストリップを第一外部直径および第一壁厚を具備する製造中のチュービングへと形成して縦溶接部を形成し、
    製造中のチュービングを熱間圧延ミルに第一供給速度で導入し、当該熱間圧延ミルは複数のスタンドを含み、各スタンドは複数のチューブ係合ローラーを含んで隣接する後スタンドおよび/または前スタンドから間隙により分離され、各スタンドはチュービングの一つ以上の特性を1%ないし10%変化させ、当該特性は外部直径と、内部直径と、壁厚とからなり、各スタンドの各ローラーはそれぞれ固有の回転方向を有し、いかなる2つのローラースタンドも同一の回転方向を有することなく、それによって、その周囲で実質的に均一な壁厚を有するチュービングを製造するよう構成され、
    製造中のチュービングの外部直径を第一外部直径よりも小さい第二外部直径に縮小し、
    製造中のチュービングを熱間鍛造し、縦溶接部および端部溶接部の粒子構造が第二外部直径を有する製造中のチュービングの粒子構造と同一となるように、製造中のチュービング粒子構造を横溶接部および縦溶接部の位置で改良し、均質化し、
    チュービングを熱間圧延ミルから第一供給速度より速い第二供給速度で引っ張り出す工程を含むことを特徴とする方法。
  2. 熱間圧延ミルから引っ張り出されるチュービングの壁厚は、前記第一壁厚よりも薄いことを特徴とする請求項1に記載のコイルドチュービングを製造するための方法。
  3. 熱間圧延ミルから引っ張り出されるチュービングの壁厚は、前記第一壁厚と同一であることを特徴とする請求項1に記載のコイルドチュービングを製造するための方法。
  4. 熱間圧延ミルから引っ張り出されるチュービングの壁厚は、前記第一壁厚よりも厚いことを特徴とする請求項1に記載のコイルドチュービングを製造するための方法。
  5. 横溶接は、鍛造溶接を含むことを特徴とする請求項1に記載のコイルドチュービングを製造するための方法。
  6. 横溶接は、高周波溶接を含むことを特徴とする請求項1に記載のコイルドチュービングを製造するための方法。
  7. 横溶接は、90度オフセット溶接であることを特徴とする請求項1に記載のコイルドチュービングを製造するための方法。
  8. 横溶接は、90度傾斜溶接であることを特徴とする請求項1に記載のコイルドチュービングを製造するための方法。
  9. 熱間圧延ミルから引っ張り出されたチュービングの少なくともいくつかは、調質されることを特徴とする請求項1に記載のコイルドチュービングを製造するための方法。
  10. 熱間圧延ミルからチュービングを引っ張り出す第二の供給速度は、一定であることを特徴とする請求項1に記載のコイルドチュービングを製造するための方法。
JP2007552250A 2005-01-19 2006-01-19 高温縮小コイルドチュービングとその形成方法 Pending JP2008526524A (ja)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US11/038,611 US20060157539A1 (en) 2005-01-19 2005-01-19 Hot reduced coil tubing
PCT/US2006/001823 WO2006078768A1 (en) 2005-01-19 2006-01-19 Hot reduced coil tubing and a method for forming same

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2011222525A Division JP5689776B2 (ja) 2005-01-19 2011-10-07 連続チュービングを製造する方法及び熱間圧延ミル

Publications (2)

Publication Number Publication Date
JP2008526524A JP2008526524A (ja) 2008-07-24
JP2008526524A5 true JP2008526524A5 (ja) 2011-12-15

Family

ID=36263968

Family Applications (2)

Application Number Title Priority Date Filing Date
JP2007552250A Pending JP2008526524A (ja) 2005-01-19 2006-01-19 高温縮小コイルドチュービングとその形成方法
JP2011222525A Expired - Fee Related JP5689776B2 (ja) 2005-01-19 2011-10-07 連続チュービングを製造する方法及び熱間圧延ミル

Family Applications After (1)

Application Number Title Priority Date Filing Date
JP2011222525A Expired - Fee Related JP5689776B2 (ja) 2005-01-19 2011-10-07 連続チュービングを製造する方法及び熱間圧延ミル

Country Status (8)

Country Link
US (1) US20060157539A1 (ja)
EP (1) EP1850981A1 (ja)
JP (2) JP2008526524A (ja)
AU (1) AU2006206472A1 (ja)
CA (2) CA2731337C (ja)
EA (1) EA200701488A1 (ja)
MX (1) MX2007008760A (ja)
WO (1) WO2006078768A1 (ja)

Families Citing this family (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5203186B2 (ja) * 2006-03-30 2013-06-05 ライオン株式会社 アルキレンオキサイド付加物及びその製造方法、並びに界面活性剤組成物
US9541224B2 (en) * 2009-08-17 2017-01-10 Global Tubing, Llc Method of manufacturing coiled tubing using multi-pass friction stir welding
EP2325435B2 (en) 2009-11-24 2020-09-30 Tenaris Connections B.V. Threaded joint sealed to [ultra high] internal and external pressures
EP2627460A1 (en) 2010-10-12 2013-08-21 National Oilwell Varco, L.P. Coiled tubing with improved fatigue resistance and method of manufacture
US9163296B2 (en) 2011-01-25 2015-10-20 Tenaris Coiled Tubes, Llc Coiled tube with varying mechanical properties for superior performance and methods to produce the same by a continuous heat treatment
IT1403689B1 (it) 2011-02-07 2013-10-31 Dalmine Spa Tubi in acciaio ad alta resistenza con eccellente durezza a bassa temperatura e resistenza alla corrosione sotto tensioni da solfuri.
JP6204496B2 (ja) 2013-01-11 2017-09-27 テナリス・コネクシヨンズ・ベー・ブイ 耐ゴーリング性ドリルパイプツールジョイントおよび対応するドリルパイプ
US9803256B2 (en) * 2013-03-14 2017-10-31 Tenaris Coiled Tubes, Llc High performance material for coiled tubing applications and the method of producing the same
US9200730B2 (en) * 2013-03-14 2015-12-01 Tenaris Coiled Tubes, Llc Fatigue resistant coiled tubing
CN104070241A (zh) * 2013-03-26 2014-10-01 江苏承中和高精度钢管制造有限公司 一种焊管焊缝在线削平机构
EP2789700A1 (en) 2013-04-08 2014-10-15 DALMINE S.p.A. Heavy wall quenched and tempered seamless steel pipes and related method for manufacturing said steel pipes
EP2789701A1 (en) 2013-04-08 2014-10-15 DALMINE S.p.A. High strength medium wall quenched and tempered seamless steel pipes and related method for manufacturing said steel pipes
KR102197204B1 (ko) 2013-06-25 2021-01-04 테나리스 커넥션즈 비.브이. 고크롬 내열철강
JP6505431B2 (ja) * 2013-12-18 2019-04-24 株式会社アスター コイルおよびその製造方法
US11124852B2 (en) 2016-08-12 2021-09-21 Tenaris Coiled Tubes, Llc Method and system for manufacturing coiled tubing
US10434554B2 (en) * 2017-01-17 2019-10-08 Forum Us, Inc. Method of manufacturing a coiled tubing string
CN110125574A (zh) * 2018-02-09 2019-08-16 兰州兰石重型装备股份有限公司 大直径多层盘管组焊和转运的防变形装置及使用方法
WO2019198733A1 (ja) * 2018-04-13 2019-10-17 日本製鉄株式会社 長尺管の継手接続方法、及び継手付きコイルドチュービングの製造方法
CN109807195B (zh) * 2019-03-21 2020-08-11 浙江鼎强电气科技有限公司 一种漆包线用拉丝机收线工艺
CN113584288A (zh) * 2021-07-19 2021-11-02 山东宏丰海洋石油装备有限公司 一种连续油管离线淬火回火制造工艺

Family Cites Families (45)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US379663A (en) * 1888-03-20 Hannah m
DE1059865B (de) * 1956-11-22 1959-06-25 Kocks Gmbh Friedrich Rohrreduzierwalzwerk
GB1188374A (en) * 1966-05-05 1970-04-15 Rotary Profile Anstalt Improvements in or relating to apparatus for Manufacturing Tubular Articles
US3570297A (en) * 1968-09-19 1971-03-16 Raymond A Matthews Die and method for drawing metal tubes
US3605476A (en) * 1969-02-17 1971-09-20 Battelle Development Corp Metal drawing method and apparatus
DE2030802A1 (de) * 1970-06-23 1971-12-30 Fa. Friedrich Kocks, 4000 Düsseldorf Verfahren zum Streckreduzieren von Rohren
US3857269A (en) * 1972-01-21 1974-12-31 Aluminum Co Of America Non-rotatable tube pay-off apparatus
FR2218156B2 (ja) * 1973-02-21 1976-09-10 Naphtachimie Sa
DE2605486C2 (de) * 1976-02-12 1982-11-11 Kocks Technik Gmbh & Co, 4010 Hilden Verfahren zum Herstellen längsnahtgeschweißter Rohre
FR2385486A1 (fr) * 1977-03-31 1978-10-27 Petroles Cie Francaise Methode et machine de soudage automatique de tubes chanfreines
US4190186A (en) * 1978-09-15 1980-02-26 Aluminum Company Of America Preparation of tube for welding
US4365136A (en) * 1981-02-23 1982-12-21 Hydril Company Zone refinement of inertia welded tubulars to impart improved corrosion resistance
JP2528808B2 (ja) * 1983-08-12 1996-08-28 株式会社日立製作所 鋼片の連続熱間圧延方法
JPS62130703A (ja) * 1985-12-03 1987-06-13 Ishikawajima Harima Heavy Ind Co Ltd ストレツチレジユ−シングミル
JPS6349323A (ja) * 1986-08-18 1988-03-02 Sumitomo Metal Ind Ltd 溶接チタン管の製造方法
US4863091A (en) * 1987-03-18 1989-09-05 Quality Tubing, Inc. Method and apparatus for producing continuous lengths of coilable tubing
US5191911A (en) * 1987-03-18 1993-03-09 Quality Tubing, Inc. Continuous length of coilable tubing
JPH02187214A (ja) * 1989-01-17 1990-07-23 Kusakabe Denki Kk タレット式ハイフレックス鋼管製造装置
GB8924036D0 (en) * 1989-10-25 1989-12-13 Rollsec Ltd Reducing mill
GB2243097B (en) * 1990-04-18 1994-01-26 Pirelli General Plc Manufacture of metal tubes
JPH0413402A (ja) * 1990-05-08 1992-01-17 Sumitomo Metal Ind Ltd 継目無管の製造方法
JP2514527B2 (ja) * 1992-03-31 1996-07-10 新日本製鐵株式会社 マンドレルミルの管端テ―パ圧延時のロ―ル焼付き防止方法
JPH05305321A (ja) * 1992-05-06 1993-11-19 Nippon Steel Corp 鋼管圧延機の管端テーパ圧延方法
JPH06254608A (ja) * 1993-03-05 1994-09-13 Ishikawajima Harima Heavy Ind Co Ltd 3ロールパイピングミル
US5346116A (en) * 1993-06-24 1994-09-13 Hall Jr Bertie F Machine for forming a metal strip into a tubular form having a stop-restart displacement mechanism
JP2716652B2 (ja) * 1993-10-20 1998-02-18 日下部電機株式会社 電縫管の管形状仕上げ装置
US5456405A (en) * 1993-12-03 1995-10-10 Quality Tubing Inc. Dual bias weld for continuous coiled tubing
US5515707A (en) * 1994-07-15 1996-05-14 Precision Tube Technology, Inc. Method of increasing the fatigue life and/or reducing stress concentration cracking of coiled metal tubing
JPH08197111A (ja) * 1995-01-24 1996-08-06 Sumitomo Metal Ind Ltd レデューサのロール回転数制御方法
JP3853428B2 (ja) * 1995-08-25 2006-12-06 Jfeスチール株式会社 鋼管の絞り圧延方法および設備
US5615826A (en) * 1995-08-29 1997-04-01 The United States Of America As Represented By The United States Department Of Energy Method for welding beryllium
JPH09182906A (ja) * 1995-12-28 1997-07-15 Nkk Corp 円管の絞り圧延機のロールスタンドおよび円管の圧延方 法
JPH09327703A (ja) * 1996-06-13 1997-12-22 Nkk Corp 連続熱間圧延方法
JPH11169913A (ja) * 1997-12-11 1999-06-29 Kawasaki Steel Corp 溶接鋼管の製造方法および鋼管製造ライン
JP2000094007A (ja) * 1998-09-21 2000-04-04 Kawasaki Steel Corp 金属管の絞り圧延方法
JP4306079B2 (ja) * 2000-02-28 2009-07-29 Jfeスチール株式会社 電縫鋼管の製造方法および設備列
US6276181B1 (en) * 2000-06-27 2001-08-21 Kusakabe Electric & Machinery Co., Ltd. Three-roll-type reducing mill for electro-resistance-welded tube
US6688513B2 (en) * 2000-10-20 2004-02-10 Nexans Process for producing longitudinally welded tubes
US6527056B2 (en) * 2001-04-02 2003-03-04 Ctes, L.C. Variable OD coiled tubing strings
JP4736240B2 (ja) * 2001-05-29 2011-07-27 Jfeスチール株式会社 鋼管の製造方法
DE10151827A1 (de) * 2001-10-20 2003-04-30 Nexans Verfahren zur kontinuierlichen Herstellung eines längsnahtgeschweissten Metallrohres
JP2004009126A (ja) * 2002-06-11 2004-01-15 Nippon Steel Corp 中空スタビライザー用電縫溶接鋼管
US7192551B2 (en) * 2002-07-25 2007-03-20 Philip Morris Usa Inc. Inductive heating process control of continuous cast metallic sheets
US7282663B2 (en) * 2002-07-29 2007-10-16 Shell Oil Company Forge welding process
US7169239B2 (en) * 2003-05-16 2007-01-30 Lone Star Steel Company, L.P. Solid expandable tubular members formed from very low carbon steel and method

Similar Documents

Publication Publication Date Title
JP2008526524A5 (ja)
CA2731337A1 (en) Hot reduced coil tubing and a method for forming same
CN107695102B (zh) 一种预防厚壁管斜轧穿孔后卡的方法
BRPI0915529A2 (pt) processo para a fabricação de um tubo de aço grande dimensão
WO2009072194A1 (ja) 冷間圧延法による超薄肉金属管の製造方法
JP2008539083A5 (ja)
WO2008111200A1 (ja) シームレス鋼管、シームレス鋼管を用いた中空ばねおよびその製造方法
JPWO2010073863A1 (ja) 冷間圧延による継目無金属管の製造方法
CN210878385U (zh) 一种用于钢管焊缝口压合处理装置
JPWO2002024366A1 (ja) 金属管の冷間縮径ロール成形法及びこれにより成形された金属管
US20090014082A1 (en) Exhaust apparatus and method
CN204620715U (zh) 一种适用于大批量生产多种截面形状金属线材的系统
CN202052792U (zh) 辊式成型机
JP5615938B2 (ja) 管圧延プラント
US20100000073A1 (en) Method of producing at least two plane functional surfaces extending parallel to each other on a pipe
CN202153483U (zh) 防膜面皱折和变形的镀膜机
JP5572958B2 (ja) T形鋼の製造設備及び製造方法
JPS6035206B2 (ja) 継目無鋼管製造法
JP6221512B2 (ja) 段付き鋼管の凹部成形用ロールスタンド、これを搭載したロール絞り圧延機、および段付き鋼管の製造方法
CN112439789A (zh) 一种易脱模的芯棒和金属复合管的成形方法
CN203750990U (zh) 一种三辊穿孔机轧辊
JP2006305770A5 (ja)
CN205255483U (zh) 聚乙烯管材壁厚调整辅助装置
JPS6087907A (ja) 鋼管の連続圧延機
CN107597847A (zh) 三辊连续螺旋式轧制镁合金无缝管的工艺方法