EP0381995A2 - Procédé et dispositif de rattache pour un métier à filer à bout libre - Google Patents
Procédé et dispositif de rattache pour un métier à filer à bout libre Download PDFInfo
- Publication number
- EP0381995A2 EP0381995A2 EP90101375A EP90101375A EP0381995A2 EP 0381995 A2 EP0381995 A2 EP 0381995A2 EP 90101375 A EP90101375 A EP 90101375A EP 90101375 A EP90101375 A EP 90101375A EP 0381995 A2 EP0381995 A2 EP 0381995A2
- Authority
- EP
- European Patent Office
- Prior art keywords
- fiber
- thread
- collecting surface
- stream
- spinning
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 46
- 238000007383 open-end spinning Methods 0.000 title claims abstract description 19
- 239000000835 fiber Substances 0.000 claims abstract description 194
- 238000009987 spinning Methods 0.000 claims description 64
- 230000006735 deficit Effects 0.000 claims description 11
- 230000001133 acceleration Effects 0.000 claims description 6
- 238000012423 maintenance Methods 0.000 description 18
- 238000004804 winding Methods 0.000 description 8
- 230000006870 function Effects 0.000 description 6
- 238000004519 manufacturing process Methods 0.000 description 5
- 238000010586 diagram Methods 0.000 description 4
- 230000001771 impaired effect Effects 0.000 description 3
- 230000006978 adaptation Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 239000002657 fibrous material Substances 0.000 description 2
- 238000003801 milling Methods 0.000 description 2
- 238000004140 cleaning Methods 0.000 description 1
- 239000000470 constituent Substances 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 238000010040 friction spinning Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
- 238000009827 uniform distribution Methods 0.000 description 1
Images
Classifications
-
- D—TEXTILES; PAPER
- D01—NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
- D01H—SPINNING OR TWISTING
- D01H4/00—Open-end spinning machines or arrangements for imparting twist to independently moving fibres separated from slivers; Piecing arrangements therefor; Covering endless core threads with fibres by open-end spinning techniques
- D01H4/48—Piecing arrangements; Control therefor
- D01H4/50—Piecing arrangements; Control therefor for rotor spinning
Definitions
- the present invention relates to a method for piecing an open-end spinning device, in which a fiber feeding device is switched on and the fiber stream generated thereby is deflected on its way to a fiber collecting surface and is discharged until the actual attachment process is initiated by returning the thread, whereupon in coordination with this return of the thread, the fiber stream is redirected again and fed to the fiber collecting surface, as well as a device for carrying out the method.
- This object is achieved in a generic method in that the redirection of the fiber stream is carried out again to the collecting surface before the fiber stream starting by switching on the fiber feeding device has reached its full strength. In this way, the first fibers that could have suffered from interweaving or milling are first removed.
- the fiber beard located in the fiber feeding device has more or less been combed out, depending on this downtime it always takes a certain time until the fiber stream reaches its full strength again as during production.
- This fact is exploited according to the invention in that the removal of the fiber stream is stopped and its feed to the fiber collecting surface is started before the fiber stream has reached its full strength again.
- the fiber stream now entering the spinning device is therefore still much weaker than during production and only gradually rises again. It is thus much easier to pull the thread draw off the spinning device at a speed adapted to this increase in the fiber flow. The consequence of this is an inconspicuous piecing.
- the suction is already switched off after the fiber feeding device is switched on before it is switched on when the fiber feeding device is switched on reinstating fiber stream has reached its full strength, and the speed of the thread take-off adapted to the increase in the fiber stream.
- the thread draw-off is controlled as a function of the combed state of the fiber beard. It is expediently provided that the acceleration of the thread take-off is controlled as a function of the combed state of the fiber beard so that the thread take-off speed is increased more slowly than with less impairment if the fiber beard is severely impaired.
- An adaptation to the downtime of the fiber feeding device and thus to the impairment of the fiber beard can additionally or in place of the control of the thread take-off according to the invention also take place in that the thread drawdown begins later when the fiber beard is severely impaired than when there is little impairment.
- the combing-out state of the fiber beard can be determined in various ways, but it has proven to be particularly advantageous to derive the combing-out state of the fiber beard from the idle time of the sliver with the dissolving device running before switching on the fiber feed onto the fiber collecting surface. In this way, a simple time measuring element is sufficient for determining the combing-out state.
- control means are provided which act on the device for deflecting the fiber stream in such a way that the fiber stream, depending on the thread return, reaches the fiber collecting surface before it reaches its full operational strength after switching on the fiber feeding device has reached.
- the control device for the suction device contains an adjustable time control element which defines the time interval between switching on the fiber feeding device and switching off the suction device. This time control element is started at the moment when the fiber feeding device is switched on and is set to the time which should elapse before the suction device is switched off.
- the time control element is connected to a device which determines the state of combing out the fiber beard at the time of piecing and determines the time interval as a function of this state of combing.
- the method according to the invention is very simple and can also be implemented in a simple manner subsequently by a slight change in the conventional control device for piecing. No complicated control devices operating with narrow tolerances are required either in order to adapt the thread take-off acceleration to the increase in the fiber stream acting in the spinning device.
- the method according to the invention and also the device according to the invention can be used in a wide variety of generic methods and devices (for example according to GB-PS 1.170.869, DE-OS 1.901.442, DE-OS 1.932.009, DE-OS 3.104.444 and DE -OS 3.118.382) apply.
- FIG 4 shows in its left half a schematic representation of a spinning station 10 of an open-end spinning machine 1.
- This spinning station 10 has an open-end spinning device 11 and a winding device 12.
- Each open-end spinning device 11 has a fiber feeding device 110 for feeding a sliver 2 to a dissolving device 116.
- the fiber feeding device 110 consists of a delivery roller 111 and a feed trough 112 that cooperates with it elastically.
- the feed trough 112 is pivotably mounted on an axis 113 and is pressed elastically against the delivery roller 111 by means of a spring 114.
- the delivery roller 111 is driven by a controllable clutch 115 from a central drive, not shown.
- the opening device 116 is essentially designed as a opening roller arranged in a housing 117. From it, a fiber feed channel 118 extends to a spinning element 13, which in the exemplary embodiment shown is designed as a spinning rotor.
- the spinning element 13 is driven or braked in the usual way.
- the spinning element 13 designed as a spinning rotor has a shaft 130 against which a tangential belt 131 can be brought into contact with or lifted off from it.
- the spinning element 13 shown is located in a housing 132 which has a suction opening 133 which is connected via a controllable valve 134 and a suction line 135 to a vacuum source, not shown.
- a thread take-off tube 119 is provided for guiding the thread 20 to be drawn off from the spinning element 13.
- the take-off takes place with the aid of a pair of draw-off rollers 14 which has a driven draw-off roller 140 and a draw-off roller 141 which rests elastically on it and is driven by it.
- the take-off roller 141 is mounted on a swivel arm 142.
- the thread 20 is monitored by a thread monitor 15.
- the thread 20 is wound up in the winding device 12, which has a driven winding roller 120 for this purpose.
- the spooler 12 also has a pair of pivotable spool arms 121 which rotatably hold a spool 122 therebetween.
- the bobbin 122 lies on the winding roller 120 during the undisturbed spinning process and is consequently driven by it.
- the thread 20 to be wound onto the bobbin 122 is inserted into a traversing thread guide 123 which is moved back and forth along the bobbin 122 and thereby ensures a uniform distribution of the thread 20 on the bobbin 122.
- the thread monitor 15, the coupling 115 and the valve 134 are connected to a computer unit or control device 3 for control purposes via lines 30, 31 and 32.
- This control device 3 contains a time measuring element 33, which measures the time from the stopping of the fiber feeding device 110 to the start of the piecing process. More details will be described later.
- a maintenance device 4 can be moved along the open-end spinning machine, which has a multiplicity of similar spinning stations 10, which also has a control device 40, which is connected via a line 407 for control purposes to the computer unit or control device 3 of the open-end spinning machine 1 for controlling the piecing process stands.
- the control device 40 is also connected to the swivel via a line 400 Drive 410 of a swivel arm 41 in connection, which carries an auxiliary drive roller 411 at its free end.
- the auxiliary drive roller 411 is driven by a drive motor 412, which is also connected to the control device 40 for control purposes via a line 401.
- the spool arms 121 of the spooling device 12 can be supplied with swivel arms 42 which are pivotably mounted on the maintenance device 4 and whose swivel drive 420 is connected to the control device 40 in a tax-related manner via a line 402.
- the take-off roller 141 of the pair of draw-off rollers 14 can be fed a lifting device 43.
- This lifting device has a swivel arm 430 which can cooperate with the swivel arm 142 of the take-off roller 141.
- the swivel arm 430 is connected to a swivel drive 431 and a lifting drive 432, which in turn are controllably connected to the control device 40 via lines 403 and 404.
- the maintenance device 4 also has a thread ejection device 44 with a drive device 440 which can be controlled by the control device 40 via a line 405.
- the opening 50 of a suction channel 5 opens, the end of which facing away from the opening device 116 can be closed by a flap 51.
- a suction channel 450 of a suction device 45 of the maintenance device 4 can be delivered to the suction channel 5 of the open-end spinning device 1.
- This suction channel 450 is connected to a vacuum source 452 via a valve 451.
- the valve 451 in turn is connected for control purposes via a line 406 to the control device 40, which contains a time control element 46.
- the fiber sliver 2 is fed with the aid of the fiber feeding device 110 to the dissolving device 116, which dissolves the fiber sliver 2 into fibers which are fed to the fiber collecting surface 136 of the spinning element 13 and are deposited there.
- the end of the thread 20 in the take-off is connected and, due to the rotation imparted to it by the rotation of the spinning rotor, binds the fibers into its end, while the thread 20 through the take-off device 14 is withdrawn from the spinning device 11.
- the bobbin 122 lies on the winding roller 120 in a known manner and winds up the thread 20, the traversing thread guide 123 alternately laying the thread on the bobbin 122.
- the fiber flow F F effective in the spinning element 13 has been shown with a solid line upwards.
- the thread take-off A G is also shown upwards, but with a dashed line.
- the fiber flow F F which is fed to the suction channel 5 and thus does not get into the spinning element 13, has been shown at the bottom with a solid line.
- Time t is plotted on the horizontal time axis.
- the piecing program is started at time t0.
- the fiber feeding device 110 now begins to run, so that the fiber flow F F starts again. Since the previous standstill has combed the fiber sliver forming, the continuing dissolving device 116 front sliver end more or less so that the fiber sliver is now much weaker than during normal production, the fiber sliver must first be advanced a certain distance until the disintegrating device 116 can again be presented with a fiber beard which is similar to that during production. In addition, it is necessary that the fibers presented to the dissolving device 116 fill the clothing of the dissolving device 116 and are conveyed by it. A certain time is required for this, which is why the run-up curve of the fiber flow F F turns out to be more or less steep in accordance with the downtime.
- FIG. 2 Another method is provided according to FIG. 2. 1, from the time t 1, the fiber flow F F first enters the suction channel 5 and is discharged via the suction channel 45, so that no fibers reach the fiber collecting surface 136 of the spinning element 13. In contrast to the previously known method according to FIG. 1, however, the redirection of the fiber flow F F and its supply to the fiber collecting surface 136 of the spinning element 13 takes place a long time before the time t 2 is reached, so that from the time t 2 before the time t 2 lies, all fibers reach the spinning element 13.
- the switching of the fiber flow F F and its supply to the spinning element 13 thus takes place during the run-up of the fiber flow F F , ie before the fiber flow or fiber flow F F which starts by switching on the fiber feeding device 110 has reached its full operating strength.
- the end of the thread 20 prepared in the usual way is returned to the fiber collecting surface 136 of the spinning element 13 in the period t5.
- the thread take-off A G then begins. Because the ramp-up curve of the fiber flow F F in the new method according to FIG. 2 is considerably flatter than in the known method according to FIG.
- the run-up can be controlled very well by the speed of the thread take-off A G and the run-up curve of the fiber flow F F can be adjusted so that the run-up of the thread take-off A G deviates only slightly from the run-up curve of the fiber flow F F.
- the piecing tool only deviates slightly from the normal thread size and thus from the target size.
- FIGS. 1 and 2 While the fiber excess is quite large according to FIG. 1 (see triangle A), so that a relatively strong and thus conspicuous thick spot arises in the piecing area of the newly spun thread 20, the method according to FIG. 2 initially results in an inconspicuous thick spot (triangle B) and then a likewise inconspicuous thin spot (triangle C) in the thread 20.
- Fig. 3 shows the new piecing process after a long standstill of the spinning station. Due to the dissolving device 116, which continues to run even after the fiber feeding device 110 has been stopped, the fiber beard is removed further, depending on the design of the fiber feeding device 110, this can be done solely by combing out or also by partially milling the fibers of the fiber beard. Due to the longer exposure time of the opening roller corresponding to this longer standstill time, the fiber beard is also more severely affected, so that it takes longer until the fiber sliver 2 can be released in a normal manner by the opening device 116 after the fiber feeding device 110 is switched on again. The distance between the times t0 and t1 is thus larger according to FIG. 3 than in the case according to FIG. 2nd
- the thread take-off A G can also receive a varying acceleration in order to adapt to the run-up curve of the fiber flow F F.
- the thread take-off is accelerated in a maximum manner between times t4 and t6 (phase A G ′ ) until the thread take-off speed as a percentage of its operating speed has reached the same value as the fiber flow F F. Then the thread take-off speed is accelerated less (phase A G ⁇ ), so that the fiber flow F F and thread take-off A G reach the full value (100%) essentially simultaneously.
- the maintenance device 4 After a certain time, the maintenance device 4 arrives at this spinning station 10, at which the thread 20 is broken.
- the maintenance device 4 can be called to this spinning station by a call device 4, which is not shown and is known per se; however, the maintenance device 4 can also patrol continuously along a defined number of spinning positions and can also reach the spinning position 10 affected by a thread break.
- the control device 40 queries the control device 3 via a line 407 and in this way finds out whether maintenance is required at the relevant spinning station 10 or not.
- the control device 3 is designed so that each the maintenance device 4 only transmits the information relating to the spinning station 10 at which the maintenance device 4 is currently located.
- the maintenance device 4 stops.
- the spool arms 121 are supported in the manner already described by the swivel arms 42 from the machine-side spool lifting device.
- the auxiliary drive roller 411 is delivered to the spool 122.
- the suction channel 450 of the maintenance device 4 is also delivered to the machine-side suction channel 5.
- the take-off roller 141 is lifted off the driven take-off roller 140, and the thread 20 is drawn off in the usual way from the bobbin 122 lifted off the winding roller 120 and returned to the thread take-off tube 119.
- the thread is placed over the thread dropping device 44 and held there.
- the spinning element 13 is cleaned in a known manner.
- the fibers and dirt constituents detached from the spinning element 13 are discharged through the suction channel 5 with the aid of the spinning vacuum which is still effective in the housing 132.
- the valve 134 is closed for the negative vacuum and the valve 451 for the suction channel 450 is opened.
- the previously shut down spinning element 13 is released again, which now runs up to its operating speed or only to a predetermined piecing speed.
- the piecing program can be set so that piecing is carried out either at a stationary speed of the spinning element 13 or during its run-up curve. If the piecing takes place at a reduced but stationary rotor speed, the spinning rotor is preferably brought to its production speed in such a way that its run-up curve is essentially synchronized with that of the fiber flow F F and the thread take-off A G or is largely adapted.
- the control device 3 sends a pulse to the time measuring element 33, which thus indicates the downtime of the Fiber feeding device 110 from the occurrence of the thread break until the beginning of the piecing process - with an uninterrupted opening device 116 - held.
- the fiber feeding device 110 is then switched on again by actuating the clutch 115.
- the sliver 2 is fed back to the opening device 116, but is sucked out of the housing 117 again by the effective vacuum source 452.
- the valves 134 and 451 are now actuated, so that there is no longer a vacuum on the suction channel 5 and instead in the housing 132 via the suction line 135 in turn the spinning vacuum is present.
- the fibers entering the housing 117 of the opening device 116 are thus sucked via the fiber feed channel 118 to the spinning element 13, where they are deposited on the fiber collecting surface 136 in a known manner.
- the time t3 which is determined by the control device 3 and at which the vacuum on the suction line 135 is switched on, is chosen so that the fiber flow F F has not yet reached its full strength.
- the aforementioned control means (control device 3, valves 134, 451) act on the device (suction opening 133, suction channel 5) for deflecting the fiber flow or fiber flow F F in such a way that the fiber flow F F reaches the fiber collecting surface 136 as a function of the return of the thread .
- this switchover takes place in such a way that the fiber flow F F or fiber flow has not yet reached its full operating strength after the fiber feed device 110 has been switched on.
- the control device 3 stores (corresponding to the fiber material, the staple fiber length, the configuration of the fiber feed device 110, etc.) how the fiber flow F F increases with corresponding downtimes. Depending on this curve, the thread draw A G can also be controlled and the increase in the fiber flow F F can be adapted.
- the thread take-off A G is switched on by the control device 3 via the control device 40 of the maintenance device 4 at the time t 3 of the fiber flow F F taking effect in the spinning element 13 - or shortly before or after this time t 3 - and accelerated in accordance with the curve predetermined by the control device 3 .
- This acceleration can vary depending on the in the Control device 3 input run-up curve of the fiber flow F F can be controlled linearly or along any curve.
- the control takes place with the help of the auxiliary drive roller 411.
- the thread take-off A G is controlled by the thread take-up speed being increased more slowly than with less impairment if the fiber beard is severely impaired (long downtime of the open-end spinning device 11).
- the thread draw-off A G can also start earlier (minor impairment) or later (major impairment) depending on the impairment of the fiber beard.
- the fiber flow F F has reached its full strength at the time t2.
- the pressure roller 141 can be brought back into contact with the driven draw-off roller 140 and the thread 20 can be drawn off from the spinning device 11 with the help of the draw-off device 14.
- the spool 122 can now be lowered onto the winding roller 120, after which the auxiliary drive roller 411 is lifted off the spool 122.
- the acceleration of the spinning element 13 can also be controlled in accordance with the run-up of the fiber flow F F.
- the described method and also the device discussed can be modified in a variety of ways, for example by replacing individual features with equivalents or with other combinations thereof.
- the spinning element 13 it is not necessary to design the spinning element 13 as a spinning rotor, but other open-end spinning elements, for example friction spinning rollers, etc., can also be used.
- an adjustment button 460 for the time control element 46 can also be provided on the maintenance device in order to fix the time t 1. This can take place depending on various factors (fiber condition, fiber material, staple fiber length, distance of the clamping line between delivery roller 111 and feed trough 112 - or other counter element working together with delivery roller 111 - from the working area of opening device 117 etc.).
- condition of the fiber beard does not have to be derived from the downtime of the fiber sliver 2 - taking into account other factors - but can also be determined in a different way, e.g. optically, by measuring air resistance etc., if this should be desirable.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Textile Engineering (AREA)
- Spinning Or Twisting Of Yarns (AREA)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE3903782 | 1989-02-09 | ||
DE3903782A DE3903782C2 (de) | 1989-02-09 | 1989-02-09 | Verfahren zum Anspinnen einer Offenend-Spinnvorrichtung und Offenend-Spinnmaschine mit einer Einrichtung zum Anspinnen einzelner oder mehrerer Spinnvorrichtungen |
Publications (3)
Publication Number | Publication Date |
---|---|
EP0381995A2 true EP0381995A2 (fr) | 1990-08-16 |
EP0381995A3 EP0381995A3 (fr) | 1991-01-09 |
EP0381995B1 EP0381995B1 (fr) | 1994-10-19 |
Family
ID=6373683
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP90101375A Expired - Lifetime EP0381995B1 (fr) | 1989-02-09 | 1990-01-24 | Procédé et dispositif de rattache pour un métier à filer à bout libre |
Country Status (6)
Country | Link |
---|---|
EP (1) | EP0381995B1 (fr) |
JP (1) | JP2888897B2 (fr) |
CN (1) | CN1045610A (fr) |
BR (1) | BR9000575A (fr) |
CZ (1) | CZ284503B6 (fr) |
DE (2) | DE3903782C2 (fr) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3441677A1 (de) * | 1984-08-08 | 1986-02-20 | Schubert & Salzer Maschinenfabrik Ag, 8070 Ingolstadt | Verfahren und vorrichtung zum anspinnen eines fadens an einer offenend-spinnvorrichtung |
EP0392482A2 (fr) | 1989-04-13 | 1990-10-17 | Maschinenfabrik Rieter Ag | Système de transport pour des bobines de mèche |
WO2007065506A1 (fr) * | 2005-12-10 | 2007-06-14 | Oerlikon Textile Gmbh & Co. Kg | Procede pour rattacher un fil ainsi que machine de filature a rotor pour la mise en œuvre du procede |
Families Citing this family (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE4126552C2 (de) * | 1991-08-10 | 1995-06-08 | Rieter Ingolstadt Spinnerei | Verfahren und Vorrichtung zum pneumatischen Einführen von Faserband in eine OE-Spinnmaschine |
DE4321440C2 (de) * | 1993-06-28 | 2003-10-02 | Rieter Ingolstadt Spinnerei | Verfahren und Vorrichtung zum Anspinnen einer Offenend-Spinnvorrichtung |
DE4404538C1 (de) * | 1994-02-12 | 1995-04-27 | Rieter Ingolstadt Spinnerei | Verfahren und Vorrichtung zum Anspinnen einer Offenend-Spinnvorrichtung |
CZ299541B6 (cs) * | 2001-10-11 | 2008-08-27 | Oerlikon Czech S.R.O. | Zpusob zaprádání na bezvretenových doprádacích strojích a zarízení k jeho provádení |
DE102004002503B4 (de) * | 2004-01-17 | 2012-11-15 | Oerlikon Textile Gmbh & Co. Kg | Serviceaggregat für eine Kreuzspulen herstellende Textilmaschine |
DE102005033562A1 (de) * | 2005-07-19 | 2007-01-25 | Saurer Gmbh & Co. Kg | Verfahren zum Betreiben einer Offenend-Spinnvorrichtung |
DE102005045814A1 (de) * | 2005-09-24 | 2007-04-05 | Saurer Gmbh & Co. Kg | Serviceaggregat für eine Kreuzspulen herstellende Textilmaschine |
CZ301752B6 (cs) * | 2005-12-20 | 2010-06-16 | Rieter Cz S.R.O. | Zpusob obnovování predení složkové príze, zejména na rotorovém doprádacím stroji pomocí spliceru a zarízení k provádení zpusobu |
CZ304396B6 (cs) * | 2006-05-26 | 2014-04-16 | Rieter Cz S.R.O. | Způsob a zařízení k individuálnímu zapřádání příze na pracovním místě rotorového dopřádacího stroje |
DE102009030802A1 (de) * | 2009-06-27 | 2009-11-05 | Oerlikon Textile Gmbh & Co. Kg | Offenend-Rotorspinnmaschine |
DE102009050582A1 (de) | 2009-10-24 | 2010-05-20 | Oerlikon Textile Gmbh & Co. Kg | Verfahren zum Anspinnen einer Offenend-Rotorspinnvorrichtung |
DE102016109682A1 (de) | 2016-05-25 | 2017-11-30 | Rieter Ingolstadt Gmbh | Verfahren zum Anspinnen eines Fadens in einer Offenend-Spinnvorrichtung |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3516120A1 (de) * | 1985-05-04 | 1986-11-06 | Fritz 7347 Bad Überkingen Stahlecker | Verfahren zum automatischen anspinnen und automatische anspinnvorrichtung |
WO1989010990A1 (fr) * | 1988-05-03 | 1989-11-16 | Schubert & Salzer Maschinenfabrik Aktiengesellscha | Procede et dispositif permettant de commencer une nouvelle filee dans un dispositif de filage open-end |
Family Cites Families (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR1584247A (fr) * | 1968-02-07 | 1969-12-19 | ||
DE1932009A1 (de) * | 1968-07-10 | 1970-01-15 | Vnii Tekstilnogo I Legkogo Mas | Zwirn- und Formierungseinrichtung zum pneumatisch-mechanischen Spinnen |
DE1901442A1 (de) * | 1969-01-13 | 1970-08-13 | Schurr Stahlecker & Grill | Spinneinrichtung |
DE2725105C2 (de) * | 1977-06-03 | 1994-07-07 | Fritz 7347 Bad Überkingen Stahlecker | Verfahren zum Durchführen eines Anspinnvorganges und Vorrichtung zum Durchführen des Verfahrens |
DE2818794C2 (de) * | 1978-04-28 | 1987-01-02 | Stahlecker, Fritz, 7347 Bad Überkingen | Verfahren und Vorrichtung zum Betreiben und Anspinnen einer OE-Spinnvorrichtung |
CS227602B1 (en) * | 1980-02-13 | 1984-04-16 | Jiri Ing Elias | Method of and apparatus for yarn spinning-in in open-end spinning unit |
DE3118382C2 (de) * | 1981-05-09 | 1983-06-16 | Schubert & Salzer Maschinenfabrik Ag, 8070 Ingolstadt | Verfahren und Vorrichtung zum Unterbrechen und Beginnen des Spinnvorganges an einer Offenend-Spinnstelle |
DE3441677C3 (de) * | 1984-08-08 | 1994-02-24 | Rieter Ingolstadt Spinnerei | Verfahren und Vorrichtung zum Anspinnen einer Offenend-Spinnvorrichtung |
CS255810B1 (en) * | 1985-01-25 | 1988-03-15 | Jiri Sloupensky | Device for starting up an open-end spinning machine with a spinning rotor |
-
1989
- 1989-02-09 DE DE3903782A patent/DE3903782C2/de not_active Expired - Fee Related
-
1990
- 1990-01-24 EP EP90101375A patent/EP0381995B1/fr not_active Expired - Lifetime
- 1990-01-24 DE DE59007471T patent/DE59007471D1/de not_active Expired - Fee Related
- 1990-02-08 BR BR909000575A patent/BR9000575A/pt not_active Application Discontinuation
- 1990-02-09 CN CN90101464A patent/CN1045610A/zh active Pending
- 1990-02-09 CZ CS90652A patent/CZ284503B6/cs not_active IP Right Cessation
- 1990-02-09 JP JP2028589A patent/JP2888897B2/ja not_active Expired - Lifetime
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3516120A1 (de) * | 1985-05-04 | 1986-11-06 | Fritz 7347 Bad Überkingen Stahlecker | Verfahren zum automatischen anspinnen und automatische anspinnvorrichtung |
WO1989010990A1 (fr) * | 1988-05-03 | 1989-11-16 | Schubert & Salzer Maschinenfabrik Aktiengesellscha | Procede et dispositif permettant de commencer une nouvelle filee dans un dispositif de filage open-end |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3441677A1 (de) * | 1984-08-08 | 1986-02-20 | Schubert & Salzer Maschinenfabrik Ag, 8070 Ingolstadt | Verfahren und vorrichtung zum anspinnen eines fadens an einer offenend-spinnvorrichtung |
EP0392482A2 (fr) | 1989-04-13 | 1990-10-17 | Maschinenfabrik Rieter Ag | Système de transport pour des bobines de mèche |
WO2007065506A1 (fr) * | 2005-12-10 | 2007-06-14 | Oerlikon Textile Gmbh & Co. Kg | Procede pour rattacher un fil ainsi que machine de filature a rotor pour la mise en œuvre du procede |
CN101321901B (zh) * | 2005-12-10 | 2011-04-13 | 欧瑞康纺织有限及两合公司 | 纱线接头的方法和实施该方法的转杯纺纱机 |
US8061116B2 (en) | 2005-12-10 | 2011-11-22 | Oerlikon Textile Gmbh & Co Kg | Method for piecing a yarn and rotor spinning machine for carrying out the method |
Also Published As
Publication number | Publication date |
---|---|
JPH038819A (ja) | 1991-01-16 |
EP0381995B1 (fr) | 1994-10-19 |
CZ284503B6 (cs) | 1998-12-16 |
DE59007471D1 (de) | 1994-11-24 |
CS9000652A2 (en) | 1991-07-16 |
JP2888897B2 (ja) | 1999-05-10 |
DE3903782A1 (de) | 1990-08-23 |
CN1045610A (zh) | 1990-09-26 |
EP0381995A3 (fr) | 1991-01-09 |
DE3903782C2 (de) | 1994-02-24 |
BR9000575A (pt) | 1991-01-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE2725105C3 (de) | Verfahren zum Durchführen eines Anspinnvorganges und Vorrichtung zum Durchführen des Verfahrens | |
DE3734565C2 (fr) | ||
DE10133125B9 (de) | Verfahren zum Anspinnen des Garnes auf einer Arbeitsstelle einer Rotorspinnmaschine und Vorrichtung zur Durchführung des Verfahrens | |
DE4404538C1 (de) | Verfahren und Vorrichtung zum Anspinnen einer Offenend-Spinnvorrichtung | |
EP0381995B1 (fr) | Procédé et dispositif de rattache pour un métier à filer à bout libre | |
EP0274016B2 (fr) | Procédé et dispositif de rattache pour machine de filature à bout libre | |
DE3123494C2 (de) | Verfahren und Vorrichtung zum Aufwinden eines neu angesponnenen Fadens auf eine in eine Spulvorrichtung eingelegte Leerhülse | |
DE3441677A1 (de) | Verfahren und vorrichtung zum anspinnen eines fadens an einer offenend-spinnvorrichtung | |
DE69803275T2 (de) | Verfahren zum individuellen fadenanspinnen an einer arbeitseinheit einer rotorspinnmaschine und vorrichtung zur durchführung des verfahrens | |
DE3338833A1 (de) | Verfahren und vorrichtung zum anspinnen eines garnes an einem spinnaggregat einer oe-friktions-spinnmaschine | |
DE3118382A1 (de) | Verfahren und vorrichtung zum unterbrechen und beginnen des spinnvorganges an einer offenend-spinnstelle | |
DE2753349A1 (de) | Verfahren und vorrichtung zum anspinnen eines umwindegarnes | |
DE3337120A1 (de) | Verfahren zum garnandrehen in einer offen-end-spinnmaschine | |
DE2818794C2 (de) | Verfahren und Vorrichtung zum Betreiben und Anspinnen einer OE-Spinnvorrichtung | |
DE2758064B2 (de) | Verfahren und Vorrichtung zum Beseitigen einer Unregelmäßigkeit im Faden an einer Spinnstelle einer Offen-End-Spinnvorrichtung | |
EP0042906B1 (fr) | Procédé et dispositif pour la rattache d'un fil dans un rotor à filer d'un dispositif de filature à fibres libérées | |
DE4418358C2 (de) | Verfahren zum Stillsetzen einer Offenend-Rotorspinnvorrichtung und Vorrichtung zur Durchführung | |
DE2708936C2 (de) | Verfahren und Vorrichtung zum Anspinnen eines Fadens an Spinnaggregaten einer Offenend-Spinnmaschine | |
DE4321440C2 (de) | Verfahren und Vorrichtung zum Anspinnen einer Offenend-Spinnvorrichtung | |
DE3410471A1 (de) | Oe-friktionsspinnmaschine mit einer vielzahl von spinnaggregaten und einem verfahrbaren wartungsgeraet | |
DE2558419A1 (de) | Offen-end-spinnvorrichtung | |
DE4106556C2 (de) | Verfahren und Vorrichtung zum kurzzeitigen Ändern der Faserzufuhr bei einer Offenend-Spinnvorrichtung | |
EP0276208B1 (fr) | Dispositif pour la reprise du filage sur un dispositif de filage open-end a friction | |
EP1445360A2 (fr) | Procédé et dispositif pour rattacher un fil dans un métier à filer à bout libre | |
DE102004002741B4 (de) | Verfahren zum Anspinnen eines Fadens in einer eine Fasersammelfläche aufweisenden Offenend-Spinnmaschine sowie eine Vorrichtung zur Durchführung des Verfahrens |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): CH DE FR GB IT LI |
|
ITCL | It: translation for ep claims filed |
Representative=s name: ZINI MARANESI |
|
PUAL | Search report despatched |
Free format text: ORIGINAL CODE: 0009013 |
|
GBC | Gb: translation of claims filed (gb section 78(7)/1977) | ||
EL | Fr: translation of claims filed | ||
AK | Designated contracting states |
Kind code of ref document: A3 Designated state(s): CH DE FR GB IT LI |
|
17P | Request for examination filed |
Effective date: 19910410 |
|
17Q | First examination report despatched |
Effective date: 19921007 |
|
RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: RIETER INGOLSTADT SPINNEREIMASCHINENBAU AKTIENGESE |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): CH DE FR GB IT LI |
|
REF | Corresponds to: |
Ref document number: 59007471 Country of ref document: DE Date of ref document: 19941124 |
|
ET | Fr: translation filed | ||
ITF | It: translation for a ep patent filed | ||
GBT | Gb: translation of ep patent filed (gb section 77(6)(a)/1977) |
Effective date: 19950106 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 19950220 Year of fee payment: 6 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed | ||
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 19960116 Year of fee payment: 7 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Effective date: 19960124 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: CH Payment date: 19960403 Year of fee payment: 7 |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 19960124 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Effective date: 19970131 Ref country code: CH Effective date: 19970131 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Effective date: 19970930 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20020212 Year of fee payment: 13 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20030801 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED. Effective date: 20050124 |