EP0335088A2 - Procédé pour la fixation en position précise de pièces d'équipement - Google Patents

Procédé pour la fixation en position précise de pièces d'équipement Download PDF

Info

Publication number
EP0335088A2
EP0335088A2 EP89102401A EP89102401A EP0335088A2 EP 0335088 A2 EP0335088 A2 EP 0335088A2 EP 89102401 A EP89102401 A EP 89102401A EP 89102401 A EP89102401 A EP 89102401A EP 0335088 A2 EP0335088 A2 EP 0335088A2
Authority
EP
European Patent Office
Prior art keywords
spacers
connection
guideway
bodies
cover plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP89102401A
Other languages
German (de)
English (en)
Other versions
EP0335088B1 (fr
EP0335088A3 (en
Inventor
Rolf Dr.Ing. Kindmann
Hans Joachim Dipl.-Ing. Niebuhr
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ThyssenKrupp Technologies AG
Original Assignee
Thyssen Industrie AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Thyssen Industrie AG filed Critical Thyssen Industrie AG
Publication of EP0335088A2 publication Critical patent/EP0335088A2/fr
Publication of EP0335088A3 publication Critical patent/EP0335088A3/de
Application granted granted Critical
Publication of EP0335088B1 publication Critical patent/EP0335088B1/fr
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B25/00Tracks for special kinds of railways
    • E01B25/30Tracks for magnetic suspension or levitation vehicles
    • E01B25/32Stators, guide rails or slide rails
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10TTECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
    • Y10T29/00Metal working
    • Y10T29/49Method of mechanical manufacture
    • Y10T29/49826Assembling or joining
    • Y10T29/49945Assembling or joining by driven force fit
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10TTECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
    • Y10T29/00Metal working
    • Y10T29/49Method of mechanical manufacture
    • Y10T29/49826Assembling or joining
    • Y10T29/49947Assembling or joining by applying separate fastener
    • Y10T29/49948Multipart cooperating fastener [e.g., bolt and nut]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10TTECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
    • Y10T29/00Metal working
    • Y10T29/49Method of mechanical manufacture
    • Y10T29/49826Assembling or joining
    • Y10T29/49947Assembling or joining by applying separate fastener
    • Y10T29/49963Threaded fastener

Definitions

  • the invention relates to a method for the precise location of equipment parts at predetermined connection locations on the support structure of guideways for magnetic levitation trains.
  • Connection bodies in guideway girders are arranged at connection locations and dimensioned such that they can transmit the forces and moments acting on the equipment parts through the vehicle to the supporting structure.
  • the target positions of the equipment parts are determined by measuring the girder based on the route.
  • the object of the invention is seen in developing a guideway for magnetic levitation vehicles which enables a computer-aided, adjustment-free assembly of the equipment parts with little material and labor.
  • connection bodies are screwed to the guideway girder and are not firmly connected to it before machining, it is not necessary to provide a correspondingly complex processing machine designed for machining a complete guideway girder, which has the correct coordinates in all coordinates on the long guideway girder Drill holes.
  • connection bodies and spacers can be edited with the individual connection bodies and spacers and measure them at the connection points of the guideway girder after measuring the route and correspondingly determining the desired positions of the equipment parts.
  • the equipment parts can easily be screwed onto the connection body without adjustment work.
  • the route is created on site by assembling the fully equipped route sections.
  • the fact that the individual connection bodies are provided with the spacers at the locations drilled with the correct coordinates enables exact compliance with the desired positions with little effort.
  • the connection bodies or the spacers can be processed with a stationary machine.
  • the attachment of the connector body with spacers also allows great flexibility with regard to the distances to be selected between the connector body and the carriageway girder and constructional simplifications in the load-bearing fixation of the connector body and thus also the equipment parts at the intended locations.
  • the invention can be advantageously configured as follows.
  • connection locations for the installation of the connection body are prepared before measuring the guideway girder, based on the route, the guideway girder e.g. Received round bolts with threaded holes during the manufacture of the girder, the exact position of the connection locations including the surface position during the measurement are available for determining the target position of the connection body.
  • the connection points in the Track carrier advantageously attached to the underside of the cover plate.
  • this simple manufacturing process fulfills all the requirements to be made. It has been shown that the welded-on, longitudinally running special supports for the connecting bodies for the stator packs used in accordance with the prior art, the supports being additionally stiffened with cross members, are not necessary. This type of construction is complex in terms of production technology, also with regard to the dimensional accuracy to be maintained and is unfriendly to assembly.
  • connection bodies are advantageously processed in a computer-controlled manner in accordance with the desired values, the processing being carried out by a stationary machine to which the connection bodies or their spacers are automatically fed.
  • connection bodies are drilled corrosponding to the connection locations already provided ensures that the position of the connection bodies with respect to the horizontal is correct, without further processing on the finished carrier being necessary.
  • connection bodies are first screwed to the connection bodies and only then the connection bodies are attached together with the equipment parts to the corresponding connection locations of the guideway girder can make installation considerably easier. This applies in particular to the assembly of the relatively difficult-to-handle stator packages, the screwing locations of which are freely accessible with the connecting bodies before being attached to the guideway girder.
  • connection bodies If, however, a processing machine is available that is suitable for drilling holes and countersinks that are true to size in all coordinates, it is also possible to machine the connection locations for the connection bodies on the guideway girder and to make the connection bodies uniform. With this out Type of management of the invention is made use of the advantages of the easier possibility of mounting the equipment parts on the connection body and the simplified suspension of the connection body.
  • the setting of the desired lengths of the spacers is simple in that the spacers are screwed tight as pipes surrounding the connecting screws between the connection points and the connection bodies.
  • the pipes can be machined to length according to their planned location.
  • tubes are selected and assembled according to their nominal dimensions from a magazine with different lengths of prefabricated tubes. This can also be automated.
  • connection points can be designed in various ways.
  • disk-shaped bodies which can have any shape, are welded onto the underside of the cover plate of the guideway girder, the supporting force is reliably introduced into the girder and a simple possibility for the screw-type fastening of the connecting body is created.
  • the machining of the connection point, drilling, tapping and the preparation of the support surface for the spacer can be done both before welding the disks and afterwards, especially if a processing machine is available.
  • connection bodies A particularly stable, low-deformation type of connection is obtained by attaching bolts, round steel or steel blocks with a thread to the underside of the cover plate and screwing the connection bodies with correspondingly short spacers with threads in the support tubes.
  • An advantageous method is the shooting open of threaded bolts. With a high current surge, which is caused by the bolt, an aluminum ball and the cover plate is passed, a welding in a matter of seconds. It is of course also possible to fasten the bolts, round steels or blocks using any welding method.
  • cover plate of the guideway girder is made sufficiently thick, it is also possible to cut bores and threads into the guideway girder itself and to screw on the connection body with the welded-on spacers. The stability is improved by welding the connection bodies to the spacers. No special connection elements are required in the guideway girder itself.
  • connection body and spacer together to facilitate assembly and screw it as a U-shaped component through holes through the cover plate of the guideway girder from above.
  • Fig. 1 shows the positionally accurate attachment of a piece of equipment 1, here a long stator package of a magnetic levitation train on a guideway girder.
  • the connector body 2 are arranged at the connection locations 3 and are dimensioned such that they can transmit the forces and moments acting on the equipment parts 1 through the vehicle to the supporting structure. After the production of a guideway girder, it was measured in relation to the alignment and the target positions of the equipment parts 1 have been determined.
  • the connecting bodies 2 have been drilled and provided with spacers 4 in such a way that the desired positions of the connecting bodies 2 with respect to the connecting locations 3 and the routing have been maintained and have been screwed to the guideway girders at the connecting locations 3.
  • the length of the spacers 4 has been determined on the basis of the data from the carrier measurement, in which its actual shape is determined, and the spacers have been processed accordingly.
  • washers which are sufficiently strong to accommodate the threaded bore for screwing the connection body 2 are welded on. These have already been provided with the threaded bores 5 before the measurement.
  • the long stator package 1 was first screwed onto the connector body 2, the screws being freely accessible and then the connector body 2 together with the stator package 1 has been screwed to the route at junction 3.
  • the winding on the long stator package 1, indicated by dashed lines, is only introduced after the roadway has been raised in the terrain.
  • the tubular spacers 4 have been machined to length according to their intended location and then welded to the cover plate 8.
  • the connection bodies 2 have been screwed on in the correct position through the bores 6, which are designed with coordinate coordinates.
  • the screws 10 pass through the cover plate 8 from above.
  • connection points 3 for the connection body 2 are mounted directly in the cover plate 8.
  • the cover plate is appropriately reinforced and has threaded holes for screwing on the connector body 2.
  • the spacers 4 are welded to the connecting bodies 2 and machined to length before assembly on the cover plate 8.
  • sheets 11 extending in the transverse direction to the guideway are welded between the side guide rail 12 and the web sheet 13.
  • the sheets 11 are provided with a reinforced area 14, which has the threads for screwing the connection body 2.
  • the connecting bodies 2 are screwed to the reinforced areas 14 with the short, machined spacers 4 in this case.
  • a longitudinally running plate 15 is welded to the side guide rail 12 and to the web plate 13 as a console.
  • the sheets 15 have a threaded bore 15, with which the connection body 2 is screwed to the intermediate, machined spacers 4.
  • sheet metal disks 17 are welded under a longitudinally running sheet 16, with the threaded bores 5 of which the connecting body 2 is screwed on with the spacers 4 machined to length being interposed.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Railway Tracks (AREA)
  • Connection Of Plates (AREA)
EP89102401A 1988-03-26 1989-02-11 Procédé pour la fixation en position précise de pièces d'équipement Expired - Lifetime EP0335088B1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE3810326 1988-03-26
DE3810326A DE3810326A1 (de) 1988-03-26 1988-03-26 Verfahren zur lagegenauen befestigung von ausruestungsteilen

Publications (3)

Publication Number Publication Date
EP0335088A2 true EP0335088A2 (fr) 1989-10-04
EP0335088A3 EP0335088A3 (en) 1990-03-21
EP0335088B1 EP0335088B1 (fr) 1992-05-20

Family

ID=6350783

Family Applications (1)

Application Number Title Priority Date Filing Date
EP89102401A Expired - Lifetime EP0335088B1 (fr) 1988-03-26 1989-02-11 Procédé pour la fixation en position précise de pièces d'équipement

Country Status (8)

Country Link
US (1) US5131132A (fr)
EP (1) EP0335088B1 (fr)
JP (1) JPH01285457A (fr)
CN (1) CN1037112A (fr)
AU (1) AU628805B2 (fr)
DD (1) DD287443A5 (fr)
DE (2) DE3810326A1 (fr)
RU (1) RU1808037C (fr)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2677083A1 (fr) * 1991-05-28 1992-12-04 Magnetbahn Gmbh Procede pour la pose exacte de composants fonctionnels sans usinage mecanique, avec assemblage de pieces de differentes tolerances.
FR2679395A1 (fr) * 1991-07-20 1993-01-22 Magnetbahn Gmbh Procede de fabrication de stators longs pour systemes de voie a sustentation magnetique.
WO2001004420A1 (fr) * 1999-07-07 2001-01-18 Stahlbau Plauen Gmbh Support de voie

Families Citing this family (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3931794A1 (de) * 1989-09-23 1991-04-04 Quaas Hans Rainer Dipl Ing Multifunktionsschiene
JP2512240Y2 (ja) * 1991-11-13 1996-09-25 パロマ工業株式会社 パルス燃焼器の点火プラグ取付構造
DE4219200C2 (de) * 1992-06-12 1997-01-23 Thyssen Industrie Fahrweg für Magnetbahnen
DE4219199A1 (de) * 1992-06-12 1993-12-16 Thyssen Industrie Fahrweg für Magnetbahnen
US6951433B2 (en) 2000-08-04 2005-10-04 Dieter Reichel Device for nonpositively fixing a bracket to a supporting base body
DE10038851A1 (de) 2000-08-04 2002-02-14 Boegl Max Bauunternehmung Gmbh Verfahren zum Herstellen einer Verbindungsstelle an einem Fahrweg
PL360854A1 (en) 2000-09-12 2004-09-20 Max Bögl Bauunternehmung Gmbh & Co.Kg Travel way support
CN100489194C (zh) * 2002-05-28 2009-05-20 埃菲尔德国钢铁技术有限公司 用于磁悬浮列车的行车路轨
DE10257329A1 (de) * 2002-12-06 2004-06-24 Max Bögl Bauunternehmung GmbH & Co. KG Fahrweg für ein spurgebundenes Fahrzeug sowie ein Verfahren zum Herstellen eines solchen Fahrweges und Statorpaket eines Fahrweges
DE10332253A1 (de) * 2003-03-20 2004-09-30 Hirschfeld, Inc., San Angelo Verfahren zur Errichtung eines Fahrweges für eine Magnetschwebebahn
CN105926382B (zh) * 2016-04-20 2018-05-15 中铁上海工程局集团华海工程有限公司 一种地铁车辆段一般整体道床预留凹槽轨道施工方法
CN107041092A (zh) * 2017-06-09 2017-08-11 株洲联诚集团有限责任公司 一种安装座可万向调节的电器柜以及电器柜的安装方法
CN109914165B (zh) * 2019-04-22 2023-11-07 中铁十七局集团第一工程有限公司 二次衬砌台车导轨快速前移精确定位装置
CN112941988A (zh) * 2021-04-15 2021-06-11 中铁十一局集团第三工程有限公司 一种轨道精调架
CN114134765B (zh) * 2021-11-26 2024-06-07 中铁第四勘察设计院集团有限公司 一种轨道梁支撑体系及安装工法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2053827A5 (fr) * 1969-07-18 1971-04-16 Barthalon Maurice
DE2235036A1 (de) * 1972-07-17 1974-02-07 Krauss Maffei Ag Anordnung der fahrbahnseitigen komponenten der betriebssysteme eines schwebefahrzeugs
DE3111385A1 (de) * 1981-03-23 1983-01-20 Peter Dr.-Ing. 6054 Rodgau Wagner Fahrweg fuer hochleistungs-magnetbahnen
DE3404061C1 (de) * 1984-02-06 1985-09-05 Thyssen Industrie Ag, 4300 Essen Verfahren zur Iagegenauen Befestigung von Ausruestungsteilen an vorgegebenen Anschlussorten an der Tragkonstruktion von Fahrwegen

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3034611A (en) * 1958-05-07 1962-05-15 Zenzic John Tapered locking device
US3039401A (en) * 1959-06-15 1962-06-19 Mechanical Handling Sys Inc Conveyor track structure
US3118217A (en) * 1961-06-20 1964-01-21 Harsco Corp Die set bushing and method of assembling a bushing in a die set
ES360313A1 (es) * 1968-11-15 1970-07-01 Cortes Cherto Perfeccionamientos en la fabricacion de ferrocarriles.
US4087896A (en) * 1976-09-17 1978-05-09 Paul R. Briles Sleeve bolt installation nut
JPS585321B2 (ja) * 1977-03-08 1983-01-31 日本航空株式会社 吸引式磁気浮上走行体に用いる接極子レ−ル支持構造
SU966127A1 (ru) * 1980-07-18 1982-10-15 Всесоюзный Научно-Исследовательский И Проектно-Конструкторский Институт По Трубопроводным Контейнерным Системам Подвеска монорельса
DE3412401C1 (de) * 1984-04-03 1985-06-27 Stahlbau Michael Lavis Söhne, 6050 Offenbach Stahlfahrweg fuer Magnetbahnen

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2053827A5 (fr) * 1969-07-18 1971-04-16 Barthalon Maurice
DE2235036A1 (de) * 1972-07-17 1974-02-07 Krauss Maffei Ag Anordnung der fahrbahnseitigen komponenten der betriebssysteme eines schwebefahrzeugs
DE3111385A1 (de) * 1981-03-23 1983-01-20 Peter Dr.-Ing. 6054 Rodgau Wagner Fahrweg fuer hochleistungs-magnetbahnen
DE3404061C1 (de) * 1984-02-06 1985-09-05 Thyssen Industrie Ag, 4300 Essen Verfahren zur Iagegenauen Befestigung von Ausruestungsteilen an vorgegebenen Anschlussorten an der Tragkonstruktion von Fahrwegen

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2677083A1 (fr) * 1991-05-28 1992-12-04 Magnetbahn Gmbh Procede pour la pose exacte de composants fonctionnels sans usinage mecanique, avec assemblage de pieces de differentes tolerances.
FR2679395A1 (fr) * 1991-07-20 1993-01-22 Magnetbahn Gmbh Procede de fabrication de stators longs pour systemes de voie a sustentation magnetique.
WO2001004420A1 (fr) * 1999-07-07 2001-01-18 Stahlbau Plauen Gmbh Support de voie
AU759646B2 (en) * 1999-07-07 2003-04-17 Stahlbau Plauen Gmbh Support for a travel way
US6889616B1 (en) 1999-07-07 2005-05-10 Stahlbau Plauen Gmbh Track support

Also Published As

Publication number Publication date
RU1808037C (ru) 1993-04-07
EP0335088B1 (fr) 1992-05-20
DE3810326A1 (de) 1989-10-05
EP0335088A3 (en) 1990-03-21
AU3160989A (en) 1989-09-28
JPH01285457A (ja) 1989-11-16
DD287443A5 (de) 1991-02-28
US5131132A (en) 1992-07-21
AU628805B2 (en) 1992-09-24
DE58901447D1 (de) 1992-06-25
CN1037112A (zh) 1989-11-15

Similar Documents

Publication Publication Date Title
EP0335088B1 (fr) Procédé pour la fixation en position précise de pièces d'équipement
EP0410153B1 (fr) Cadre de support pour voie pour véhicule déplaçable sur rails, notamment pour train à lévitation magnétique
EP0987370B1 (fr) Méthode précise de positionnement et de connection des stators d'une voie pour véhicule à lévitation magnétique et sa structure de support
EP0381136B1 (fr) Voie porteuse pour véhicules magnétiques
DE3404061C1 (de) Verfahren zur Iagegenauen Befestigung von Ausruestungsteilen an vorgegebenen Anschlussorten an der Tragkonstruktion von Fahrwegen
EP0411314B1 (fr) Cadre de support pour voie pour véhicule déplaçable sur rails, notamment pour train à lévitation magnétique
DE19619866C2 (de) Fahrweg für Magnetbahnzüge
DE3924486C1 (en) Side-rail fixing system - is for electromagnetic railway and uses recesses in sides of concrete beam folded with poured concrete
DE3618075C2 (fr)
EP1203123B1 (fr) Voie pour vehicule guide, en particulier pour train a sustentation magnetique
DE3111385C2 (de) Stahlfahrweg für Magnetbahnen
EP1305474A1 (fr) Procede pour la production d'un point de jonction sur une voie de circulation
DE10303177A1 (de) Verfahren zum Einrichten eines Fertigteiles und Vorrichtung zur Aufnahme von Messprismen
EP0445259B1 (fr) Rail pour vehicules a levitation magnetique
WO2005052259A1 (fr) Support pour une voiture guidee et console
EP4229239B1 (fr) Dispositif et procédé d'alignement des plaques de support de voie ainsi que procédé de fabrication d'une voie fixe
DE19704019A1 (de) Trägerelement für den Stahlhochbau
DE10224148A1 (de) Fahrweg, Fahrwegmodul und Verfahren zu dessen Herstellung
DE29924949U1 (de) Fahrweg
DE10138623A1 (de) Verfahren, Konsolrahmen und Schalung zur Herstellung eines Trägers
EP1262599A2 (fr) Dispositif pour aligner une partie d' ouvrage
DD295688A5 (de) Tragkonstruktion fuer den fahrweg eines spurgebundenen fahrzeugs, insbesondere einer magnetschwebebahn
DE10242744A1 (de) Konsole und Fahrweg für ein spurgebundenes Fahrzeug
DE10226802A1 (de) Verfahren zum Herstellen einer lagegenauen Verbindung an einem Fahrweg und Fahrweg für ein spurgebundenes Fahrzeug
DE20023877U1 (de) Fahrweg für ein spurgebundenes Fahrzeug

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 19890303

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): CH DE FR GB IT LI

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): CH DE FR GB IT LI

17Q First examination report despatched

Effective date: 19910314

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): CH DE FR GB IT LI

REF Corresponds to:

Ref document number: 58901447

Country of ref document: DE

Date of ref document: 19920625

GBT Gb: translation of ep patent filed (gb section 77(6)(a)/1977)
ITF It: translation for a ep patent filed

Owner name: MODIANO & ASSOCIATI S.R.L.

ET Fr: translation filed
PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed
PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 19940622

Year of fee payment: 6

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: CH

Payment date: 19940624

Year of fee payment: 6

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 19940627

Year of fee payment: 6

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 19940708

Year of fee payment: 6

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Effective date: 19950211

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Effective date: 19950228

Ref country code: CH

Effective date: 19950228

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 19950211

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Effective date: 19951031

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Effective date: 19951101

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED.

Effective date: 20050211