WO2014041640A1 - 生産順序最適化方法および生産順序最適化システム - Google Patents

生産順序最適化方法および生産順序最適化システム Download PDF

Info

Publication number
WO2014041640A1
WO2014041640A1 PCT/JP2012/073353 JP2012073353W WO2014041640A1 WO 2014041640 A1 WO2014041640 A1 WO 2014041640A1 JP 2012073353 W JP2012073353 W JP 2012073353W WO 2014041640 A1 WO2014041640 A1 WO 2014041640A1
Authority
WO
WIPO (PCT)
Prior art keywords
production
group
feeders
electronic component
resources
Prior art date
Application number
PCT/JP2012/073353
Other languages
English (en)
French (fr)
Inventor
幸寿 森田
Original Assignee
富士機械製造株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 富士機械製造株式会社 filed Critical 富士機械製造株式会社
Priority to CN201280075745.3A priority Critical patent/CN104620187B/zh
Priority to EP12884735.7A priority patent/EP2897009B1/en
Priority to US14/427,410 priority patent/US10139813B2/en
Priority to PCT/JP2012/073353 priority patent/WO2014041640A1/ja
Priority to JP2014535287A priority patent/JP5955971B2/ja
Publication of WO2014041640A1 publication Critical patent/WO2014041640A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
    • G05B19/41865Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/46Multiprogramming arrangements
    • G06F9/48Program initiating; Program switching, e.g. by interrupt
    • G06F9/4806Task transfer initiation or dispatching
    • G06F9/4843Task transfer initiation or dispatching by program, e.g. task dispatcher, supervisor, operating system
    • G06F9/4881Scheduling strategies for dispatcher, e.g. round robin, multi-level priority queues
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/46Multiprogramming arrangements
    • G06F9/50Allocation of resources, e.g. of the central processing unit [CPU]
    • G06F9/5005Allocation of resources, e.g. of the central processing unit [CPU] to service a request
    • G06F9/5027Allocation of resources, e.g. of the central processing unit [CPU] to service a request the resource being a machine, e.g. CPUs, Servers, Terminals
    • G06F9/5044Allocation of resources, e.g. of the central processing unit [CPU] to service a request the resource being a machine, e.g. CPUs, Servers, Terminals considering hardware capabilities
    • HELECTRICITY
    • H05ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
    • H05KPRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
    • H05K13/00Apparatus or processes specially adapted for manufacturing or adjusting assemblages of electric components
    • H05K13/08Monitoring manufacture of assemblages
    • HELECTRICITY
    • H05ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
    • H05KPRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
    • H05K13/00Apparatus or processes specially adapted for manufacturing or adjusting assemblages of electric components
    • H05K13/08Monitoring manufacture of assemblages
    • H05K13/085Production planning, e.g. of allocation of products to machines, of mounting sequences at machine or facility level
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/32Operator till task planning
    • G05B2219/32264Setup time
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/32Operator till task planning
    • G05B2219/32283Machine scheduling, several machines, several jobs
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/32Operator till task planning
    • G05B2219/32291Task sequence optimization
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/32Operator till task planning
    • G05B2219/32298Designate at least two group of articles, first with priority, reschedule second
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/45Nc applications
    • G05B2219/45026Circuit board, pcb
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Definitions

  • the present invention relates to a production order optimization method and a production order optimization system for optimizing the execution order of a plurality of production programs used for board production.
  • the production sequence of the boards that is, the execution sequence of the production program is determined by the editing application at the stage of production planning.
  • an editing application determines the execution order of production programs without considering the number of resources owned. For this reason, the time required for the setup change work may become long.
  • ⁇ Electronic parts are contained in tape.
  • the tape is attached to the feeder in a replaceable manner.
  • seven feeders are required.
  • the second type of substrate in other words, when executing the second production program, eight feeders are required.
  • the two feeders can be shared. For this reason, in the setup change work, it is necessary to newly arrange six feeders out of the eight feeders used in the second production program, except for the two feeders that can be shared.
  • the tape (electronic component) for the second production program is preliminarily placed on the six feeders outside the production line during the execution of the first production program. It is preferable to wear.
  • the editing application determines the execution order of the production program without considering the number of owned resources, the downtime associated with the setup change work may become long.
  • paragraph [0097] and paragraph [0098] of Patent Document 1 disclose a method of adjusting the number of cassettes used in accordance with the number of cassettes owned within a single production program.
  • the method disclosed in Patent Document 1 does not assume a plurality of production programs. For this reason, Patent Document 1 does not describe or suggest a problem related to resource shortage between successive production programs.
  • an object of the present invention is to provide a production order optimization method and a production order optimization system that can reduce downtime associated with setup change work.
  • the production order optimization method of the present invention divides a plurality of production programs continuously executed using a production line into a plurality of groups having common resources used for production.
  • a production order optimization method for optimizing the execution order of a plurality of production programs the resource number counting step for counting the number of all the owned resources, the number of all the resources, and N ( N is a natural number) resource allocation step of allocating the resource to each group based on the number of resources required in the group and the number of resources required in the (N + 1) th group It is characterized by that.
  • the number of production programs included in any one group may be singular or plural.
  • the execution order of a plurality of production programs can be optimized in consideration of the number of owned resources. That is, when production shifts from the Nth group to the (N + 1) th group, resources are allocated to each group so that the setup can be changed outside the production line as much as possible. For this reason, according to the production order optimization method of the present invention, the downtime associated with the setup change work can be shortened.
  • the resource is a feeder in which a tape on which an electronic component is arranged is detachable, and is detachable from an electronic component mounting machine.
  • the number of all the feeders is set to X0, N (N is a natural number) in the resource allocation step.
  • the following equation (1) is obtained, where X1 is the number, X2 is the number of feeders required for the N + 1th group, and X3 is the number of feeders shared by the Nth group and the (N + 1) th group. It is better to use a configuration in which the feeder is distributed to each group.
  • X0 ⁇ X1 + X3 ⁇ X2 Formula (1)
  • the resource is a feeder in which the tape on which the electronic component is arranged is detachable and detachable from the electronic component mounting machine.
  • N is a natural number
  • the number of feeders is X1
  • the number of feeders required in the (N + 1) th group is X2
  • the feeders are allocated to the groups using the following equation (2). X1 + X2 ⁇ X0 (2)
  • the resource is a nozzle for transporting an electronic component that is detachable from an electronic component mounting machine, and the resource allocation
  • Y0 is the number of all the nozzles
  • Y1 is the number of nozzles required in the Nth (N is a natural number) group
  • Y2 is the number of nozzles required in the N + 1th group
  • a cycle is performed for the production program having the highest priority among the plurality of production programs. It is better to have a reference optimization process for allocating the resources so that the time is shortened.
  • resources can be allocated to the highest priority production program.
  • the resource becomes a reference for allocating resources to each group in a resource allocation process which is a subsequent process.
  • the production order optimization system of the present invention has a common resource for production using a production line and a plurality of production programs that are continuously executed using the production line.
  • a production order optimization system comprising: a control device that optimizes the execution order of a plurality of the production programs by dividing into a plurality of groups, wherein the control device counts the number of all the resources owned Based on the resource number counting step, the number of all the resources, the number of resources required in the Nth (N is a natural number) group, and the number of resources required in the N + 1th group. And a resource distribution step of allocating the resource to each of the groups.
  • the number of production programs included in any one group may be singular or plural.
  • the execution order of a plurality of production programs can be optimized in consideration of the number of owned resources. That is, when production shifts from the Nth group to the (N + 1) th group, resources are allocated to each group so that the setup can be changed outside the production line as much as possible. For this reason, according to the production order optimization method of the present invention, the downtime associated with the setup change work can be shortened.
  • the production line includes an electronic component mounting machine for mounting electronic components on a board, and the resource is capable of detaching a tape on which the electronic components are arranged.
  • the feeder is a detachable feeder for the electronic component mounting machine, and when the feeder is individually replaced for the electronic component mounting machine in the setup change operation, the control device performs the resource allocation step.
  • the number of all the feeders is X0, the number of feeders required in the Nth (N is a natural number) group is X1, the number of feeders required in the (N + 1) th group is X2, the Nth number of the feeders The number of feeders shared by the group and the (N + 1) th group is X3, and it is better to use the following formula (1) to allocate the feeders to the groups.
  • X0 ⁇ X1 + X3 ⁇ X2 Formula (1)
  • the production line includes an electronic component mounting machine for mounting electronic components on a board, and the resource is capable of detaching a tape on which the electronic components are arranged.
  • the feeder is a detachable feeder for the electronic component mounting machine, and the control device allocates the resource when replacing the feeder in batch with respect to the electronic component mounting machine in a setup change operation.
  • X0 is the number of all the feeders
  • X1 is the number of feeders required in the Nth (N is a natural number) group
  • X2 is the number of feeders required in the N + 1th group
  • the downtime associated with the setup change work can be shortened when the feeders are collectively replaced for the electronic component mounting machine.
  • the production line includes an electronic component mounting machine for mounting an electronic component on a board
  • the resource is the electronic component mounting machine
  • the control device is configured such that, in the resource allocation step, the number of all the nozzles is Y0, N (N is a natural number) in the group. It is preferable that the number of the necessary nozzles is Y1, the number of the necessary nozzles in the (N + 1) th group is Y2, and the nozzles are allocated to the groups using the following equation (3). Y1 + Y2 ⁇ Y0 Formula (3)
  • the downtime associated with the setup change operation can be shortened.
  • control device has the highest priority among the plurality of production programs before the resource distribution step.
  • resources can be allocated to the production program with the highest priority.
  • the resource becomes a reference for allocating resources to each group in a resource allocation process which is a subsequent process.
  • FIG. 1 is a schematic diagram of an embodiment of a production line management system of the present invention.
  • FIG. 2 is a perspective view of the electronic component mounting machine of the production order optimization system.
  • FIG. 3 is a perspective view of the device pallet.
  • FIG. 4 is a perspective view of the PCU.
  • FIG. 5 is a flowchart of an embodiment of the production order optimization method of the present invention.
  • FIG. 6 is a schematic diagram of feeder distribution work when a method of individually replacing feeders is selected.
  • FIG. 7 is a schematic diagram of feeder distribution work when a method of exchanging all feeders at once is selected.
  • FIG. 8 is a schematic diagram of the nozzle sorting operation.
  • FIG. 9 is a flowchart of another embodiment of the production order optimization method of the present invention.
  • 1a to 1d Electronic component mounting machines.
  • 2 Base. 3: module, 30: substrate transport unit, 300: wall, 301: conveyor belt, 31: XY robot, 310: Y direction slider, 311: X direction slider, 312: Y direction guide rail, 313: X direction guide rail 32: mounting head, 320: nozzle, 33: nozzle stocker, 36: housing.
  • 5 Device palette, 50: Slot. 6: PCU, 60: unit main body, 61: caster, 62: handle.
  • 9 Production order optimization system, 90: Substrate.
  • F Floor
  • L Production line
  • N Network.
  • FIG. 1 the schematic diagram of the production line management system of this embodiment is shown.
  • the production order optimization system 9 of this embodiment includes a production line L and a host computer 8.
  • the host computer 8 is included in the concept of the “control device” of the present invention.
  • the production line L includes four electronic component mounting machines 1a to 1d arranged in a line.
  • the configuration of the electronic component mounting machine 1a will be described on behalf of the four electronic component mounting machines 1a to 1d.
  • FIG. 2 shows a perspective view of the electronic component mounting machine of the production order optimization system of this embodiment.
  • the housing 36 is shown in a transparent manner.
  • the electronic component mounting machine 1 a includes a base 2, a module 3, a large number of component supply apparatuses 4, and a device pallet 5.
  • the base 2 is located on the floor F of the factory.
  • the module 3 is detachably disposed on the upper surface of the base 2.
  • the module 3 includes a substrate transport unit 30, an XY robot 31, a mounting head 32, a nozzle stocker 33, and a housing 36.
  • the housing 36 forms the outer shell of the module 3.
  • the substrate transport unit 30 includes a pair of front and rear wall portions 300. Conveyor belts 301 are disposed on the rear surface of the front wall portion 300 and on the front surface of the rear wall portion 300, respectively. A substrate 90 is installed on the pair of front and rear conveyor belts 301.
  • the XY robot 31 includes a Y-direction slider 310, an X-direction slider 311, a pair of left and right Y-direction guide rails 312, and a pair of upper and lower X-direction guide rails 313.
  • the pair of left and right Y-direction guide rails 312 are disposed on the lower surface of the upper wall of the housing 36.
  • the Y-direction slider 310 is attached to a pair of left and right Y-direction guide rails 312 so as to be slidable in the front-rear direction.
  • the pair of upper and lower X-direction guide rails 313 is disposed on the front surface of the Y-direction slider 310.
  • the X-direction slider 311 is attached to a pair of upper and lower X-direction guide rails 313 so as to be slidable in the left-right direction.
  • the mounting head 32 is attached to the X-direction slider 311. For this reason, the mounting head 32 can be moved in the front-rear and left-right directions by the XY robot 31. Below the mounting head 32, a nozzle 320 is attached in a replaceable manner.
  • the nozzle stocker 33 is detachably disposed in front of the substrate transport unit 30. A large number of nozzles 320 are arranged in the nozzle stocker 33.
  • the mounting head 32 can replace the nozzle 320 to be used in the nozzle stocker 33.
  • the device pallet 5 is detachably attached to the front opening of the module 3.
  • FIG. 3 shows a perspective view of the device pallet. As shown in FIG. 3, the device pallet 5 includes a number of slots 50.
  • the component supply device 4 includes a tape 40, a reel 41, and a feeder 42.
  • a large number of electronic components are arranged on the tape 40 at predetermined intervals in the longitudinal direction.
  • the same type of electronic component is arranged on the single tape 40.
  • the tape 40 is wound around the reel 41.
  • the reel 41 is accommodated in the feeder 42 so as to be detachable.
  • the leading end of the tape 40 is drawn backward from the reel 41.
  • the electronic component is taken out from the tip of the tape 40 by the nozzle 320 shown in FIG.
  • the extracted electronic component is transported to the substrate 90 by the mounting head 32 and the XY robot 31 and mounted at a predetermined mounting position.
  • the host computer 8 is electrically connected to all the electronic component mounting machines 1a to 1d via the network N.
  • the host computer 8 includes a calculation unit 80, a storage unit 81, an input unit 82, and a monitor 83.
  • the calculation unit 80 is a CPU (Central Processing Unit).
  • the storage unit 81 includes a ROM (Read Only Memory) and a RAM (Random Access Memory).
  • the input unit 82 is used when an operator issues an instruction to each work machine arranged on the production line L or when data is input.
  • the monitor 83 displays the status of each work machine arranged in the host computer 8 or the production line L.
  • ⁇ Feeder replacement method> As shown in FIG. 2, as a method of exchanging the feeders 42 (that is, electronic components) with respect to the electronic component mounting machine 1a, a method of individually exchanging the feeders 42 and a method of exchanging all the feeders 42 at once. There is.
  • the feeders 42 are mounted one by one in the slots 50 of the device pallet 5 attached to the electronic component mounting machine 1a.
  • FIG. 4 shows a perspective view of the PCU.
  • the PCU 6 includes a unit main body 60, four casters 61, and two handles 62.
  • a large number of feeders 42 are mounted on the unit main body 60 together with the device pallet 5.
  • a large number of feeders 42 are mounted on the electronic component mounting machine 1 a together with the device pallet 5.
  • the same type of production line L is used to continuously produce the first type substrate 90 and the second type substrate 90.
  • a reel 41 around which a tape 40 having components is wound can be arranged in advance.
  • the feeder 42 not used for the production of the first type substrate 90 is replaced with the second type substrate 90 as shown in FIG.
  • a reel 41 around which a tape 40 having necessary electronic components is wound can be arranged in advance, and the feeder 42 can be mounted in advance on the PCU 6 together with the device pallet 5.
  • ⁇ Nozzle replacement method> As shown in FIG. 2, as a method of exchanging the nozzles 320 for the electronic component mounting machine 1a, there is a method of exchanging all the nozzles 320 at once. As described above, a case where the first type substrate 90 and the second type substrate 90 are continuously produced using the same production line L is assumed. As the production preparation of the second type substrate 90 that can be executed during the production of the first type substrate 90, the nozzle 320 that is not used for the production of the first type substrate 90 and the production of the second type substrate 90 is produced. The nozzle 320 used in the above can be mounted in advance on the nozzle stocker 33 that is not used for the production of the first type substrate 90.
  • the production order optimization method of the present embodiment includes a production program selection step, a priority setting step, a resource count step, a setup change method selection step, a reference optimization step, and a resource distribution step.
  • FIG. 5 shows a flowchart of the production order optimization method of this embodiment.
  • the calculation unit 80 sets priorities for the selected plurality of production programs. That is, the calculation unit 80 sets the priority according to the number of substrates 90 produced, the importance of the substrates 90, and the like.
  • the calculation unit 80 performs optimization on the production program having the highest priority set in the priority setting step (S2). That is, the arithmetic unit 80 first sets the number of feeders 42 for each type of feeder 42 and the type of nozzle 320 so that the cycle time during production of the substrate 90 is the shortest for the production program with the highest priority. The number of nozzles 320 is assigned to.
  • the calculation unit 80 selects another production program that can share the feeder 42 and the nozzle 320 with the production program that has been optimized, among the production programs selected in the production program selection step (S1). Extract from Then, the calculation unit 80 sets one group (hereinafter referred to as a reference group) from the optimized production program and the extracted production program.
  • the calculation unit 80 uses the number of feeders 42 and the number of nozzles 320 assigned to the highest priority production program (that is, the reference group) in the reference optimization step (S5) as a reference for other production programs. 42 numbers and 320 nozzle numbers are assigned.
  • the number of feeders 42 for each type of feeder 42 and the number of nozzles 320 for each type of nozzle 320 are assigned to all the production programs selected in the production program selection step (S1).
  • the calculation unit 80 sets the number of all feeders 42 of any type to X0, N (N is a natural number) )
  • the number of feeders 42 required in the first group is X1
  • the number of feeders 42 required in the (N + 1) th group is X2
  • the number of feeders 42 shared by the Nth group and the (N + 1) th group is X3.
  • the feeders 42 are allocated to each group (S11).
  • Fig. 6 shows a schematic diagram of feeder distribution work when the method of individually replacing feeders is selected.
  • group 1 is the reference group.
  • the number of feeders 42 is set so that the formula (1) is established in all of the groups 1 to 2, the groups 2 to 3, and the groups 3 to 4. If it carries out like this, the down time accompanying the feeder 42 replacement
  • the reels 41 that is, the tapes 40
  • the setup change can be performed in a short time. That is, downtime can be reduced.
  • the reference group is not necessarily the first group 1.
  • the calculation unit 80 distributes the feeders 42 to the groups 1 to 4 as well as the feeders 42 of the type # 1 to the other types # 2 of the feeders 42.
  • the setup change method selection step (S4) when the method of replacing all the feeders 42 at a time is selected (S6), the calculation unit 80 sets the number of all feeders 42 of any type to X0, the Nth group
  • the number of the necessary feeders 42 is X1
  • the number of the necessary feeders 42 in the (N + 1) th group is X2
  • the feeders 42 are allocated to each group using the following equation (2) (S7). X1 + X2 ⁇ X0 (2)
  • Fig. 7 shows a schematic diagram of feeder distribution work when the method of replacing all feeders at once is selected.
  • group 1 is the reference group.
  • the number of feeders 42 is set so that the formula (2) is established in all of the groups 1 to 2, the groups 2 to 3, and the groups 3 to 4. If it carries out like this, the down time accompanying the feeder 42 replacement
  • group 1 when group 1 is in production, 50 feeders 42 are used for production. However, of the 100 feeders 42 owned, 50 feeders 42 are left unused. For this reason, as shown in FIG. 4, outside of the production line L, 50 feeders 42 (the tape 40 for the group 2 is arranged) used in the group 2 are mounted on the PCU 6 in advance. Can do. Therefore, when the production is switched from the group 1 to the group 2, the setup change can be performed in a short time. That is, downtime can be reduced.
  • the reference group is not necessarily the first group 1.
  • the calculation unit 80 distributes the feeders 42 to the groups 1 to 4 as well as the feeders 42 of the type # 1 to the other types # 2 of the feeders 42.
  • the calculation unit 80 sets the number of all types of nozzles 320 as Y0, the number of nozzles 320 required in the Nth group as Y1, and the number of nozzles 320 required in the N + 1th group as Y2, as follows: Using (3), the nozzles 320 are assigned to each group (S8). Y1 + Y2 ⁇ Y0 Formula (3)
  • Fig. 8 shows a schematic diagram of the nozzle sorting operation.
  • the number of nozzles 320 owned is 50 (S3).
  • Y0 50 in the equation (3).
  • group 1 is the reference group.
  • the number of nozzles 320 is set so that the formula (3) is established in all of the groups 1 to 2, the groups 2 to 3, and the groups 3 to 4. In this way, it is possible to reduce the downtime associated with the replacement of the nozzle 320 during the setup change.
  • 25 nozzles 320 are used for production.
  • 25 nozzles 320 remain unused.
  • 25 nozzles 320 used in the group 2 can be mounted in the nozzle stocker 33 in advance. Therefore, when the production is switched from the group 1 to the group 2, the setup change can be performed in a short time. That is, downtime can be reduced.
  • the reference group is not necessarily the first group 1.
  • the calculation unit 80 distributes the nozzles 320 to the groups 1 to 4 as well as the nozzles 320 of the type # 1 with respect to the nozzles 320 of the other type # 2.
  • the calculation unit 80 performs optimization on all the production programs to be executed (S9). If the optimization result is appropriate, the process is terminated (S10).
  • the number of feeders 42 and nozzles 320 arranged in the group having the highest priority production program is reduced (S12).
  • the number of the feeders 42 and the nozzles 320 arranged is reduced. Thereafter, the standard optimization step (S5) is executed again.
  • the execution order of a plurality of production programs is optimized in consideration of the number of feeders 42 and nozzles 320 owned. be able to. That is, when production shifts from the Nth group to the (N + 1) th group, the feeder 42 and the nozzle 320 are allocated to each group so that the setup can be changed outside the production line as much as possible. For this reason, according to the production order optimization method and the production order optimization system 9 of this embodiment, it is possible to reduce the downtime associated with the setup change work.
  • the feeders 42 and the nozzles 320 can be first assigned to the production program with the highest priority. Then, the feeders 42 and the nozzles 320 can be assigned to each group based on the production program.
  • the type of resource is not particularly limited. It may be a tray on which electronic components are mounted. Also, the resource distribution method is not particularly limited.
  • FIG. 9 shows a flowchart of another embodiment of the production order optimization method of the present invention.
  • the number of feeders 42 and nozzles 320 in the highest priority group is reduced (S12).
  • the production program in one group may be reduced (S13).
  • the number of feeders 42 and the number of nozzles 320 necessary for one group increase. Therefore, if the optimization result is inappropriate, the number of production programs in one group may be reduced and the standard optimization step (S5) may be executed again.

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Software Systems (AREA)
  • Microelectronics & Electronic Packaging (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Automation & Control Theory (AREA)
  • Supply And Installment Of Electrical Components (AREA)
  • General Factory Administration (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

 段取り替え作業に伴うダウンタイムを短縮化可能な生産順序最適化方法および生産順序最適化システムを提供することを課題とする。 生産順序最適化方法は、生産ライン(L)を用いて連続して実行される複数の生産プログラムを、生産に使用するリソース(42、320)が共通する複数のグループに分けることにより、複数の生産プログラムの実行順序を最適化する生産順序最適化方法であって、所有する全てのリソース(42、320)の数を数えるリソース数カウント工程と、全てのリソース(42、320)の数と、N(Nは自然数)番目のグループで必要なリソース(42、320)の数と、N+1番目のグループで必要なリソース(42、320)の数と、を基に、各グループにリソース(42、320)を振り分けるリソース振り分け工程と、を有する。

Description

生産順序最適化方法および生産順序最適化システム
 本発明は、基板の生産に用いられる複数の生産プログラムの実行順序を最適化する生産順序最適化方法および生産順序最適化システムに関する。
 生産ラインにおいては、複数の種類の基板が連続的に生産される。基板の生産順序、つまり生産プログラムの実行順序は、生産計画の段階で、編集アプリケーションにより決定される。
 生産対象となる基板の種類を変更する場合は、段取り替え作業が行われる。すなわち、基板の種類に応じて、フィーダやノズルなどのリソースの種類、数は異なる。このため、段取り替え作業においては、リソースの交換が行われる。
特開2003-46296号公報
 しかしながら、従来は、編集アプリケーションが、リソースの所有数を考慮しないで、生産プログラムの実行順序を決定していた。このため、段取り替え作業に要する時間が長くなってしまう場合があった。
 以下、まず第一の種類の基板に7種類の電子部品を装着し、次に第二の種類の基板に8種類の電子部品を装着する場合を想定する。並びに、双方の基板において2種類の電子部品が共通している場合を想定する。並びに、フィーダの所有数が10個の場合を想定する。
 電子部品はテープに収容されている。テープはフィーダに交換可能に装着されている。第一の種類の基板を生産する場合、言い換えると第一の生産プログラムを実行する場合、7個のフィーダが必要になる。また、第二の種類の基板を生産する場合、言い換えると第二の生産プログラムを実行する場合、8個のフィーダが必要になる。ここで、2個のフィーダは共用可能である。このため、段取り替え作業においては、第二の生産プログラムで用いられる8個のフィーダのうち、共用可能な2個のフィーダを除いて、6個のフィーダを新たに配置する必要がある。
 ここで、段取り替え作業に要する時間を短縮化するためには、第一の生産プログラムの実行中に、生産ライン外で、6個のフィーダに予め第二の生産プログラム用のテープ(電子部品)を装着しておいた方が好ましい。
 しかしながら、第一の生産プログラムの実行中に余っているフィーダは、3個(=10個-7個)だけである。すなわち、生産ライン外で予めテープを装着できるフィーダは、3個だけである。残りの3個のフィーダに関しては、第一の生産プログラムの終了後に、第一の生産プログラムで使用していた3個のフィーダを利用する必要がある。すなわち、3個のフィーダを電子部品実装機から取り外し、各々のフィーダに対してテープ(電子部品)を交換し、各々のフィーダを再度電子部品実装機に取り付ける必要がある。このため、段取り替え作業に伴うダウンタイムが長くなってしまう。
 このように、編集アプリケーションがリソースの所有数を考慮しないで生産プログラムの実行順序を決定すると、段取り替え作業に伴うダウンタイムが長くなってしまう場合がある。
 この点、特許文献1の段落[0097]、段落[0098]には、単一の生産プログラム内で、カセットの所有数に合わせて、カセット使用数を調整する方法が開示されている。ところが、特許文献1に開示されている方法は、複数の生産プログラムを想定していない。このため、特許文献1には、前後に連続する生産プログラム間におけるリソース不足に関する課題は、記載、示唆されていない。
 そこで、本発明は、段取り替え作業に伴うダウンタイムを短縮化可能な生産順序最適化方法および生産順序最適化システムを提供することを目的とする。
 (1)上記課題を解決するため、本発明の生産順序最適化方法は、生産ラインを用いて連続して実行される複数の生産プログラムを、生産に使用するリソースが共通する複数のグループに分けることにより、複数の該生産プログラムの実行順序を最適化する生産順序最適化方法であって、所有する全ての前記リソースの数を数えるリソース数カウント工程と、全ての該リソースの数と、N(Nは自然数)番目の前記グループで必要な該リソースの数と、N+1番目の該グループで必要な該リソースの数と、を基に、各該グループに該リソースを振り分けるリソース振り分け工程と、を有することを特徴とする。ここで、任意の一つのグループに含まれる生産プログラムの数は、単数でも複数でもよい。
 本発明の生産順序最適化方法によると、リソースの所有数を考慮して、複数の生産プログラムの実行順序を最適化することができる。すなわち、N番目のグループからN+1番目のグループに生産が移行する際に、できるだけ生産ライン外で段取り替えを行えるように、リソースを各グループに振り分けている。このため、本発明の生産順序最適化方法によると、段取り替え作業に伴うダウンタイムを短縮化することができる。
 (2)好ましくは、上記(1)の構成において、前記リソースは、電子部品が配置されたテープが脱着可能であると共に、電子部品実装機に対して脱着可能なフィーダであり、段取り替え作業において、該電子部品実装機に対して、個別に該フィーダを交換する場合、前記リソース振り分け工程において、全ての該フィーダの数をX0、N(Nは自然数)番目の前記グループで必要な該フィーダの数をX1、N+1番目の該グループで必要な該フィーダの数をX2、N番目の該グループとN+1番目の該グループとで共用される該フィーダの数をX3として、以下の式(1)を用いて、各前記グループに該フィーダを振り分ける構成とする方がよい。
X0-X1+X3≧X2 ・・・式(1)
 本構成によると、電子部品実装機に対して、個別にフィーダを交換する場合に、段取り替え作業に伴うダウンタイムを短縮化することができる。
 (3)好ましくは、上記(1)の構成において、前記リソースは、電子部品が配置されたテープが脱着可能であると共に、電子部品実装機に対して脱着可能なフィーダであり、段取り替え作業において、該電子部品実装機に対して、一括して該フィーダを交換する場合、前記リソース振り分け工程において、全ての該フィーダの数をX0、N(Nは自然数)番目の前記グループで必要な該フィーダの数をX1、N+1番目の該グループで必要な該フィーダの数をX2として、以下の式(2)を用いて、各前記グループに該フィーダを振り分ける構成とする方がよい。
X1+X2≦X0 ・・・式(2)
 本構成によると、電子部品実装機に対して、一括してフィーダを交換する場合に、段取り替え作業に伴うダウンタイムを短縮化することができる。
 (4)好ましくは、上記(1)ないし(3)のいずれかの構成において、前記リソースは、電子部品実装機に対して脱着可能な、電子部品を搬送するためのノズルであり、前記リソース振り分け工程において、全ての該ノズルの数をY0、N(Nは自然数)番目の前記グループで必要な該ノズルの数をY1、N+1番目の該グループで必要な該ノズルの数をY2として、以下の式(3)を用いて、各前記グループに該ノズルを振り分ける構成とする方がよい。
Y1+Y2≦Y0 ・・・式(3)
 本構成によると、電子部品実装機に対してノズルを交換する場合に、段取り替え作業に伴うダウンタイムを短縮化することができる。
 (5)好ましくは、上記(1)ないし(4)のいずれかの構成において、前記リソース振り分け工程の前に、複数の前記生産プログラムのうち、最も優先度の高い該生産プログラムに対して、サイクルタイムが短くなるように、該リソースを振り分ける基準最適化工程を有する構成とする方がよい。
 本構成によると、最も優先度の高い生産プログラムに、リソースを振り分けることができる。当該リソースは、後工程であるリソース振り分け工程において、各グループにリソースを振り分ける際の基準になる。
 (6)上記課題を解決するため、本発明の生産順序最適化システムは、生産ラインと、該生産ラインを用いて連続して実行される複数の生産プログラムを、生産に使用するリソースが共通する複数のグループに分けることにより、複数の該生産プログラムの実行順序を最適化する制御装置と、を備える生産順序最適化システムであって、前記制御装置は、所有する全ての前記リソースの数を数えるリソース数カウント工程と、全ての該リソースの数と、N(Nは自然数)番目の前記グループで必要な該リソースの数と、N+1番目の該グループで必要な該リソースの数と、を基に、各該グループに該リソースを振り分けるリソース振り分け工程と、を実行することを特徴とする。ここで、任意の一つのグループに含まれる生産プログラムの数は、単数でも複数でもよい。
 上記(1)の構成と同様に、本発明の生産順序最適化システムによると、リソースの所有数を考慮して、複数の生産プログラムの実行順序を最適化することができる。すなわち、N番目のグループからN+1番目のグループに生産が移行する際に、できるだけ生産ライン外で段取り替えを行えるように、リソースを各グループに振り分けている。このため、本発明の生産順序最適化方法によると、段取り替え作業に伴うダウンタイムを短縮化することができる。
 (7)好ましくは、上記(6)の構成において、前記生産ラインは、基板に電子部品を装着する電子部品実装機を有し、前記リソースは、該電子部品が配置されたテープが脱着可能であると共に、該電子部品実装機に対して脱着可能なフィーダであり、段取り替え作業において、該電子部品実装機に対して、個別に該フィーダを交換する場合、前記制御装置は、前記リソース振り分け工程において、全ての該フィーダの数をX0、N(Nは自然数)番目の前記グループで必要な該フィーダの数をX1、N+1番目の該グループで必要な該フィーダの数をX2、N番目の該グループとN+1番目の該グループとで共用される該フィーダの数をX3として、以下の式(1)を用いて、各前記グループに該フィーダを振り分ける構成とする方がよい。
X0-X1+X3≧X2 ・・・式(1)
 上記(2)の構成と同様に、本構成によると、電子部品実装機に対して、個別にフィーダを交換する場合に、段取り替え作業に伴うダウンタイムを短縮化することができる。
 (8)好ましくは、上記(6)の構成において、前記生産ラインは、基板に電子部品を装着する電子部品実装機を有し、前記リソースは、該電子部品が配置されたテープが脱着可能であると共に、該電子部品実装機に対して脱着可能なフィーダであり、前記制御装置は、段取り替え作業において、該電子部品実装機に対して、一括して該フィーダを交換する場合、前記リソース振り分け工程において、全ての該フィーダの数をX0、N(Nは自然数)番目の前記グループで必要な該フィーダの数をX1、N+1番目の該グループで必要な該フィーダの数をX2として、以下の式(2)を用いて、各前記グループに該フィーダを振り分ける構成とする方がよい。
X1+X2≦X0 ・・・式(2)
 上記(3)の構成と同様に、本構成によると、電子部品実装機に対して、一括してフィーダを交換する場合に、段取り替え作業に伴うダウンタイムを短縮化することができる。
 (9)好ましくは、上記(6)ないし(8)のいずれかの構成において、前記生産ラインは、基板に電子部品を装着する電子部品実装機を有し、前記リソースは、該電子部品実装機に対して脱着可能な、該電子部品を搬送するためのノズルであり、前記制御装置は、前記リソース振り分け工程において、全ての該ノズルの数をY0、N(Nは自然数)番目の前記グループで必要な該ノズルの数をY1、N+1番目の該グループで必要な該ノズルの数をY2として、以下の式(3)を用いて、各前記グループに該ノズルを振り分ける構成とする方がよい。
Y1+Y2≦Y0 ・・・式(3)
 上記(4)の構成と同様に、本構成によると、電子部品実装機に対してノズルを交換する場合に、段取り替え作業に伴うダウンタイムを短縮化することができる。
 (10)好ましくは、上記(6)ないし(9)のいずれかの構成において、前記制御装置は、前記リソース振り分け工程の前に、複数の前記生産プログラムのうち、最も優先度の高い該生産プログラムに対して、サイクルタイムが短くなるように、該リソースを振り分ける基準最適化工程を実行する構成とする方がよい。
 上記(5)の構成と同様に、本構成によると、最も優先度の高い生産プログラムに、リソースを振り分けることができる。当該リソースは、後工程であるリソース振り分け工程において、各グループにリソースを振り分ける際の基準になる。
 本発明によると、段取り替え作業に伴うダウンタイムを短縮化可能な生産順序最適化方法および生産順序最適化システムを提供することができる。
図1は、本発明の生産ライン管理システムの一実施形態の模式図である。 図2は、同生産順序最適化システムの電子部品実装機の斜視図である。 図3は、デバイスパレットの斜視図である。 図4は、PCUの斜視図である。 図5は、本発明の生産順序最適化方法の一実施形態のフローチャートである。 図6は、個別にフィーダを交換する方法を選択した場合のフィーダ振り分け作業の模式図である。 図7は、全フィーダを一括で交換する方法を選択した場合のフィーダ振り分け作業の模式図である。 図8は、ノズル振り分け作業の模式図である。 図9は、本発明の生産順序最適化方法のその他の実施形態のフローチャートである。
 1a~1d:電子部品実装機。
 2:ベース。
 3:モジュール、30:基板搬送部、300:壁部、301:コンベアベルト、31:XYロボット、310:Y方向スライダ、311:X方向スライダ、312:Y方向ガイドレール、313:X方向ガイドレール、32:装着ヘッド、320:ノズル、33:ノズルストッカ、36:ハウジング。
 4:部品供給装置、40:テープ、41:リール、42:フィーダ。
 5:デバイスパレット、50:スロット。
 6:PCU、60:ユニット本体、61:キャスタ、62:ハンドル。
 8:ホストコンピュータ(制御装置)、80:演算部、81:記憶部、82:入力部、83:モニタ。
 9:生産順序最適化システム、90:基板。
 F:フロア、L:生産ライン、N:ネットワーク。
 以下、本発明の生産順序最適化方法および生産順序最適化システムの実施の形態について説明する。
 <生産順序最適化システム>
 まず、本実施形態の生産順序最適化システムの構成について説明する。図1に、本実施形態の生産ライン管理システムの模式図を示す。図1に示すように、本実施形態の生産順序最適化システム9は、生産ラインLと、ホストコンピュータ8と、を備えている。ホストコンピュータ8は、本発明の「制御装置」の概念に含まれる。
 [生産ラインL]
 生産ラインLは、四台の電子部品実装機1a~1dが一列に連なって構成されている。以下、四台の電子部品実装機1a~1dを代表して、電子部品実装機1aの構成について説明する。
 図2に、本実施形態の生産順序最適化システムの電子部品実装機の斜視図を示す。なお、ハウジング36は透過して示す。図2に示すように、電子部品実装機1aは、ベース2と、モジュール3と、多数の部品供給装置4と、デバイスパレット5と、を備えている。
 ベース2は、工場のフロアFに配置されている。モジュール3は、ベース2の上面に脱着可能に配置されている。モジュール3は、基板搬送部30と、XYロボット31と、装着ヘッド32と、ノズルストッカ33と、ハウジング36と、を備えている。
 ハウジング36は、モジュール3の外殻を形成している。基板搬送部30は、前後一対の壁部300を備えている。前方の壁部300の後面、後方の壁部300の前面には、各々、コンベアベルト301が配置されている。前後一対のコンベアベルト301には、基板90が架設されている。
 XYロボット31は、Y方向スライダ310と、X方向スライダ311と、左右一対のY方向ガイドレール312と、上下一対のX方向ガイドレール313と、を備えている。
 左右一対のY方向ガイドレール312は、ハウジング36の上壁下面に配置されている。Y方向スライダ310は、左右一対のY方向ガイドレール312に、前後方向に摺動可能に取り付けられている。上下一対のX方向ガイドレール313は、Y方向スライダ310の前面に配置されている。X方向スライダ311は、上下一対のX方向ガイドレール313に、左右方向に摺動可能に取り付けられている。
 装着ヘッド32は、X方向スライダ311に取り付けられている。このため、装着ヘッド32は、XYロボット31により、前後左右方向に移動可能である。装着ヘッド32の下方には、ノズル320が交換可能に取り付けられている。
 ノズルストッカ33は、基板搬送部30の前方に、脱着可能に配置されている。ノズルストッカ33には、多数のノズル320が配置されている。装着ヘッド32は、ノズルストッカ33において、使用するノズル320を交換可能である。
 デバイスパレット5は、モジュール3の前部開口に脱着可能に装着されている。図3に、デバイスパレットの斜視図を示す。図3に示すように、デバイスパレット5は、多数のスロット50を備えている。
 多数の部品供給装置4は、各々、スロット50に脱着可能に取り付けられている。部品供給装置4は、テープ40と、リール41と、フィーダ42と、を備えている。テープ40には、長手方向に所定間隔ずつ離間して、多数の電子部品が配置されている。単一のテープ40には、同じ種類の電子部品が配置されている。テープ40は、リール41に巻装されている。リール41は、フィーダ42に脱着可能に収容されている。テープ40の先端は、リール41から後方に引き出されている。電子部品は、図2に示すノズル320により、テープ40の先端から取り出される。取り出された電子部品は、装着ヘッド32およびXYロボット31により基板90まで搬送され、所定の装着位置に装着される。
 [ホストコンピュータ8]
 図1に示すように、ホストコンピュータ8は、ネットワークNを介して、全ての電子部品実装機1a~1dに電気的に接続されている。ホストコンピュータ8は、演算部80と、記憶部81と、入力部82と、モニタ83と、を備えている。演算部80は、CPU(Central Processing Unit)である。記憶部81は、ROM(Read Only Memory)、RAM(Random Access Memory)を有している。入力部82は、作業者が、生産ラインLに配置された各作業機に指示を出す際や、データを入力する際に用いられる。モニタ83には、ホストコンピュータ8や生産ラインLに配置された各作業機の状態が表示される。
 <フィーダ交換方法>
 図2に示すように、電子部品実装機1aに対して、フィーダ42(つまり電子部品)を交換する方法としては、個別にフィーダ42を交換する方法と、全フィーダ42を一括で交換する方法と、がある。
 図3に示すように、個別にフィーダ42を交換する場合は、電子部品実装機1aに取り付けられたデバイスパレット5のスロット50に、一つずつフィーダ42を装着する。
 一方、全フィーダ42を一括で交換する場合は、PCU(パレットチェンジユニット)が使用される。図4に、PCUの斜視図を示す。図4に示すように、PCU6は、ユニット本体60と、四つのキャスタ61と、二つのハンドル62と、を備えている。多数のフィーダ42は、デバイスパレット5ごと、ユニット本体60に搭載されている。多数のフィーダ42は、デバイスパレット5ごと、電子部品実装機1aに装着される。
 同じ生産ラインLを用いて、第一種類の基板90と、第二種類の基板90と、を連続して生産する場合を想定する。段取り替え作業に伴うダウンタイムを削減するためには、第一種類の基板90を生産している間に、第二種類の基板90の生産準備をしたい。
 当該生産準備として、個別にフィーダ42を交換する方法の場合、図3に示すように、第一種類の基板90の生産に使用していないフィーダ42に、第二種類の基板90に必要な電子部品を有するテープ40が巻装されたリール41を、予め配置しておくことができる。
 また、当該生産準備として、全フィーダ42を一括で交換する方法の場合、図4に示すように、第一種類の基板90の生産に使用していないフィーダ42に、第二種類の基板90に必要な電子部品を有するテープ40が巻装されたリール41を、予め配置し、かつ当該フィーダ42を、デバイスパレット5ごと、PCU6に、予め搭載しておくことができる。
 <ノズル交換方法>
 図2に示すように、電子部品実装機1aに対して、ノズル320を交換する方法としては、全ノズル320を一括で交換する方法がある。上述したように、同じ生産ラインLを用いて、第一種類の基板90と、第二種類の基板90と、を連続して生産する場合を想定する。第一種類の基板90の生産中に実行可能な第二種類の基板90の生産準備として、第一種類の基板90の生産に使用していないノズル320であって第二種類の基板90の生産に使用するノズル320を、第一種類の基板90の生産に使用していないノズルストッカ33に、予め搭載しておくことができる。
 <生産順序最適化方法>
 次に、本実施形態の生産順序最適化方法について説明する。本実施形態の生産順序最適化方法は、生産プログラム選択工程と、優先度設定工程と、リソースカウント工程と、段取り替え方式選択工程と、基準最適化工程と、リソース振り分け工程と、を有する。図5に、本実施形態の生産順序最適化方法のフローチャートを示す。
 [生産プログラム選択工程](図5のS1)
 本工程においては、図1に示すホストコンピュータ8の演算部80が、記憶部81に格納されている複数の生産プログラム(基板90の種類に対応)の中から、生産ラインLを用いて連続して実行する複数の生産プログラムを選択する。
 [優先度設定工程](図5のS2)
 本工程においては、演算部80が、選択した複数の生産プログラムに対して、優先度を設定する。すなわち、演算部80は、基板90の生産枚数や、基板90の重要度などに応じて、優先度を設定する。
 [リソースカウント工程](図5のS3)
 本工程においては、作業者が、図1に示すホストコンピュータ8の入力部82に、所有する全てのフィーダ42の数を、フィーダ42の種類ごとに入力する。また、作業者が、入力部82に、所有する全てのノズル320の数を、ノズル320の種類ごとに入力する。入力されたフィーダ42の数、ノズル320の数は、記憶部81に格納される。
 なお、本例では、種類♯1のフィーダ42を100個、種類♯1のノズルを50個所有していると仮定する。
 [段取り替え方式選択工程](図5のS4)
 本工程においては、作業者が、入力部82に、段取り替えの際の、フィーダ42の交換方法を入力する。すなわち、前述したように、フィーダ42の交換方法には、個別にフィーダ42を交換する方法と、全フィーダ42を一括で交換する方法と、がある。本工程においては、段取り替えの際に、どちらの交換方法を実行するか、作業者が選択する。
 [基準最適化工程](図5のS5)
 本工程においては、演算部80が、優先度設定工程(S2)において設定した優先度が最も高い生産プログラムに対して、最適化を実行する。すなわち、演算部80は、まず、優先度が最も高い生産プログラムに対して、基板90生産時のサイクルタイムが最も短くなるように、フィーダ42の種類ごとにフィーダ42の数、ノズル320の種類ごとにノズル320の数を割り当てる。
 なお、本例では、優先度が最も高い生産プログラムに対して、種類♯1のフィーダ42を50個、種類♯1のノズル320を25個、各々割り当てたと仮定する。
 次に、演算部80は、最適化実行済みの生産プログラムとの間で、フィーダ42、ノズル320を共用化可能な他の生産プログラムを、生産プログラム選択工程(S1)において選択した生産プログラムの中から、抽出する。そして、演算部80は、最適化実行済みの生産プログラムと、抽出した生産プログラムと、から一つのグループ(以下、基準グループと称す。)を設定する。
 [リソース振り分け工程](図5のS6~S12)
 本工程においては、演算部80が、基準最適化工程(S5)において最優先の生産プログラム(つまり、基準グループ)に割り当てたフィーダ42数、ノズル320数を基準に、他の生産プログラムに、フィーダ42数、ノズル320数を割り当てる。
 つまり、生産プログラム選択工程(S1)において選択した全ての生産プログラムに対して、フィーダ42の種類ごとにフィーダ42の数、ノズル320の種類ごとにノズル320の数を振り分ける。
 (個別にフィーダ42を交換する方法を選択した場合の、フィーダ42の振り分け処理(S6、S11))
 段取り替え方式選択工程(S4)において、個別にフィーダ42を交換する方法を選択した場合は(S6)、演算部80は、任意の種類の全てのフィーダ42の数をX0、N(Nは自然数)番目のグループで必要なフィーダ42の数をX1、N+1番目のグループで必要なフィーダ42の数をX2、N番目のグループとN+1番目のグループとで共用されるフィーダ42の数をX3として、以下の式(1)を用いて、各グループにフィーダ42を振り分ける(S11)。
X0-X1+X3≧X2 ・・・式(1)
 図6に、個別にフィーダを交換する方法を選択した場合のフィーダ振り分け作業の模式図を示す。例えば、種類♯1のフィーダ42の場合、フィーダ42の所有数は100個である(S3)。このため、式(1)のX0=100となる。
 本例では、グループ1が基準グループと仮定する。この場合、必要なフィーダ42の数は、基準最適化工程(S5)で、既に50個と決まっている。このため、式(1)のX1=50となる。共用されるフィーダ42の数(X3)を30個に設定すると、式(1)から、X0(=100)-X1(=50)+X3(=30)≧X2となり、80≧X2となる。つまり、グループ1の後に連続するグループ2のフィーダ42の数は、80個以下になる。
 同様に、グループ3のフィーダ42の数(X2)は、フィーダ42の所有数(X0=100)、グループ2のフィーダ42の数(X1)、共有されるフィーダ42の数(X3)から、式(1)を用いて算出される。同様に、グループ4のフィーダ42の数(X2)は、フィーダ42の所有数(X0=100)、グループ3のフィーダ42の数(X1)、共有されるフィーダ42の数(X3)から、式(1)を用いて算出される。
 このように、グループ1-グループ2間、グループ2-グループ3間、グループ3-グループ4間の全てにおいて、式(1)が成立するように、フィーダ42の数を設定する。こうすると、段取り替え時のフィーダ42交換に伴うダウンタイムを削減することができる。例えば、図6において、グループ1の生産中の場合、50個のフィーダ42は生産に使用されている。しかしながら、所有している100個のフィーダ42のうち、50個のフィーダ42は使用されずに余っている。このため、図3に示すように、生産ラインLの外において、グループ2で使用する50個のフィーダ42に、予めグループ2用のリール41(つまりテープ40)を配置しておくことができる。また、使用中の50個のフィーダ42のうち30個は、そのままグループ2の生産で転用することができる。したがって、グループ1からグループ2に生産を切り替える際、短時間で段取り替えを行うことができる。すなわち、ダウンタイムを削減することができる。
 なお、基準グループは、先頭のグループ1とは限らない。例えば、基準グループがグループ2の場合、グループ3のフィーダ42の数(X2)は、フィーダ42の所有数(X0=100)、グループ2のフィーダ42の数(X1)、共有されるフィーダ42の数(X3)から、式(1)を用いて算出される。一方、グループ1のフィーダ42の数(この場合はX1)は、フィーダ42の所有数(X0=100)、グループ2のフィーダ42の数(この場合はX2)、共有されるフィーダ42の数(X3)から、式(1)を用いて算出される。
 演算部80は、他の種類♯2のフィーダ42に対しても、種類♯1のフィーダ42と同様に、各グループ1~4にフィーダ42を振り分ける。
 (全フィーダ42を一括で交換する方法を選択した場合の、フィーダ42の振り分け処理(S6、S7))
 段取り替え方式選択工程(S4)において、全フィーダ42を一括で交換する方法を選択した場合は(S6)、演算部80は、任意の種類の全てのフィーダ42の数をX0、N番目のグループで必要なフィーダ42の数をX1、N+1番目のグループで必要なフィーダ42の数をX2として、以下の式(2)を用いて、各グループにフィーダ42を振り分ける(S7)。
X1+X2≦X0 ・・・式(2)
 図7に、全フィーダを一括で交換する方法を選択した場合のフィーダ振り分け作業の模式図を示す。例えば、種類♯1のフィーダ42の場合、フィーダ42の所有数は100個である(S3)。このため、式(2)のX0=100となる。
 本例では、グループ1が基準グループと仮定する。この場合、必要なフィーダ42の数は、基準最適化工程(S5)で、既に50個と決まっている。このため、式(2)のX1=50となる。よって、式(2)から、X2≦X0(=100)-X1(=50)となり、X2≦50となる。つまり、グループ1の後に連続するグループ2のフィーダ42の数は、50個以下になる。
 同様に、グループ3のフィーダ42の数(X2)は、フィーダ42の所有数(X0=100)、グループ2のフィーダ42の数(X1)から、式(2)を用いて算出される。同様に、グループ4のフィーダ42の数(X2)は、フィーダ42の所有数(X0=100)、グループ3のフィーダ42の数(X1)から、式(2)を用いて算出される。
 このように、グループ1-グループ2間、グループ2-グループ3間、グループ3-グループ4間の全てにおいて、式(2)が成立するように、フィーダ42の数を設定する。こうすると、段取り替え時のフィーダ42交換に伴うダウンタイムを削減することができる。例えば、図7において、グループ1の生産中の場合、50個のフィーダ42は生産に使用されている。しかしながら、所有している100個のフィーダ42のうち、50個のフィーダ42は使用されずに余っている。このため、図4に示すように、生産ラインLの外において、グループ2で使用する50個のフィーダ42(グループ2用のテープ40が配置されている)を、予めPCU6に搭載しておくことができる。したがって、グループ1からグループ2に生産を切り替える際、短時間で段取り替えを行うことができる。すなわち、ダウンタイムを削減することができる。
 なお、基準グループは、先頭のグループ1とは限らない。例えば、基準グループがグループ2の場合、グループ3のフィーダ42の数(X2)は、フィーダ42の所有数(X0=100)、グループ2のフィーダ42の数(X1)から、式(2)を用いて算出される。一方、グループ1のフィーダ42の数(この場合はX1)は、フィーダ42の所有数(X0=100)、グループ2のフィーダ42の数(この場合はX2)から、式(2)を用いて算出される。
 演算部80は、他の種類♯2のフィーダ42に対しても、種類♯1のフィーダ42と同様に、各グループ1~4にフィーダ42を振り分ける。
 (ノズル320の振り分け処理(S8))
 演算部80は、任意の種類の全てのノズル320の数をY0、N番目のグループで必要なノズル320の数をY1、N+1番目のグループで必要なノズル320の数をY2として、以下の式(3)を用いて、各グループにノズル320を振り分ける(S8)。
Y1+Y2≦Y0 ・・・式(3)
 図8に、ノズル振り分け作業の模式図を示す。例えば、種類♯1のノズル320の場合、ノズル320の所有数は50個である(S3)。このため、式(3)のY0=50となる。
 本例では、グループ1が基準グループと仮定する。この場合、必要なノズル320の数は、基準最適化工程(S5)で、既に25個と決まっている。このため、式(3)のY1=25となる。よって、式(3)から、Y2≦Y0(=50)-Y1(=25)となり、Y2≦25となる。つまり、グループ1の後に連続するグループ2のノズル320の数は、25個以下になる。
 同様に、グループ3のノズル320の数(Y2)は、ノズル320の所有数(Y0=50)、グループ2のノズル320の数(Y1)から、式(3)を用いて算出される。同様に、グループ4のノズル320の数(Y2)は、ノズル320の所有数(Y0=50)、グループ3のノズル320の数(Y1)から、式(3)を用いて算出される。
 このように、グループ1-グループ2間、グループ2-グループ3間、グループ3-グループ4間の全てにおいて、式(3)が成立するように、ノズル320の数を設定する。こうすると、段取り替え時のノズル320交換に伴うダウンタイムを削減することができる。例えば、図8において、グループ1の生産中の場合、25個のノズル320は生産に使用されている。しかしながら、所有している50個のノズル320のうち、25個のノズル320は使用されずに余っている。このため、図2に示すように、生産ラインLの外において、グループ2で使用する25個のノズル320を、予めノズルストッカ33に搭載しておくことができる。したがって、グループ1からグループ2に生産を切り替える際、短時間で段取り替えを行うことができる。すなわち、ダウンタイムを削減することができる。
 なお、基準グループは、先頭のグループ1とは限らない。例えば、基準グループがグループ2の場合、グループ3のノズル320の数(Y2)は、ノズル320の所有数(Y0=50)、グループ2のノズル320の数(Y1)から、式(3)を用いて算出される。一方、グループ1のノズル320の数(この場合はY1)は、ノズル320の所有数(Y0=50)、グループ2のノズル320の数(この場合はY2)から、式(3)を用いて算出される。
 演算部80は、他の種類♯2のノズル320に対しても、種類♯1のノズル320と同様に、各グループ1~4にノズル320を振り分ける。
 それから、演算部80は、実行する全ての生産プログラムに対して、最適化を実行する(S9)。最適化の結果が適当な場合は、処理を終了する(S10)。
 一方、最適化の結果が不適当な場合は、最も優先度の高い生産プログラムを有するグループにおける、フィーダ42、ノズル320の配置数を削減する(S12)。このとき、同一の電子部品を保持したフィーダ42が複数配置されている場合や、同一のノズル320が複数配置されている場合は、当該フィーダ42、当該ノズル320の配置数を削減する。その後、再度、基準最適化工程(S5)を実行する。
 <作用効果>
 次に、本実施形態の生産順序最適化方法および生産順序最適化システムの作用効果について説明する。本実施形態の生産順序最適化方法および生産順序最適化システム9によると、図5に示すように、フィーダ42およびノズル320の所有数を考慮して、複数の生産プログラムの実行順序を最適化することができる。すなわち、N番目のグループからN+1番目のグループに生産が移行する際に、できるだけ生産ライン外で段取り替えを行えるように、フィーダ42およびノズル320を各グループに振り分けている。このため、本実施形態の生産順序最適化方法および生産順序最適化システム9によると、段取り替え作業に伴うダウンタイムを短縮化することができる。
 また、本実施形態の生産順序最適化方法および生産順序最適化システム9によると、図5に示すように、電子部品実装機1a~1dに対して、個別にフィーダ42を交換する場合に、段取り替え作業に伴うダウンタイムを短縮化することができる。
 また、本実施形態の生産順序最適化方法および生産順序最適化システム9によると、図5に示すように、電子部品実装機1a~1dに対して、一括してフィーダ42を交換する場合に、段取り替え作業に伴うダウンタイムを短縮化することができる。
 また、本実施形態の生産順序最適化方法および生産順序最適化システム9によると、図5に示すように、電子部品実装機1a~1dに対してノズル320を交換する場合に、段取り替え作業に伴うダウンタイムを短縮化することができる。
 また、本実施形態の生産順序最適化方法および生産順序最適化システム9によると、図5に示すように、最も優先度の高い生産プログラムに、最初にフィーダ42およびノズル320を振り分けることができる。そして、当該生産プログラムを基準に、各グループにフィーダ42およびノズル320を振り分けることができる。
 <その他>
 以上、本発明の生産順序最適化方法および生産順序最適化システムの実施の形態について説明した。しかしながら、実施の形態は上記形態に特に限定されるものではない。当業者が行いうる種々の変形的形態、改良的形態で実施することも可能である。
 例えば、リソースの種類は特に限定しない。電子部品が搭載されるトレイなどであってもよい。また、リソースの振り分け方法は特に限定しない。
 図9に、本発明の生産順序最適化方法のその他の実施形態のフローチャートを示す。なお、図5と対応する部位については、同じ符号で示す。図5に示すように、上記実施形態においては、最適化の結果が不適当な場合、最も優先度の高いグループにおけるフィーダ42、ノズル320の配置数を削減した(S12)。しかしながら、図9に示すように、一つのグループ内の生産プログラムを削減してもよい(S13)。すなわち、段取り替え作業の効率化の観点からは、できるだけ多くの生産プログラムを同一のグループに包括する方が好ましい。しかしながら、この場合、一つのグループで必要なフィーダ42数、ノズル320数が増加してしまう。そこで、最適化の結果が不適当な場合は、一つのグループ内の生産プログラム数を削減し、再度、基準最適化工程(S5)を実行してもよい。

Claims (10)

  1.  生産ラインを用いて連続して実行される複数の生産プログラムを、生産に使用するリソースが共通する複数のグループに分けることにより、複数の該生産プログラムの実行順序を最適化する生産順序最適化方法であって、
     所有する全ての前記リソースの数を数えるリソース数カウント工程と、
     全ての該リソースの数と、N(Nは自然数)番目の前記グループで必要な該リソースの数と、N+1番目の該グループで必要な該リソースの数と、を基に、各該グループに該リソースを振り分けるリソース振り分け工程と、
    を有することを特徴とする生産順序最適化方法。
  2.  前記リソースは、電子部品が配置されたテープが脱着可能であると共に、電子部品実装機に対して脱着可能なフィーダであり、
     段取り替え作業において、該電子部品実装機に対して、個別に該フィーダを交換する場合、
     前記リソース振り分け工程において、全ての該フィーダの数をX0、N(Nは自然数)番目の前記グループで必要な該フィーダの数をX1、N+1番目の該グループで必要な該フィーダの数をX2、N番目の該グループとN+1番目の該グループとで共用される該フィーダの数をX3として、以下の式(1)を用いて、各前記グループに該フィーダを振り分ける請求項1に記載の生産順序最適化方法。
    X0-X1+X3≧X2 ・・・式(1)
  3.  前記リソースは、電子部品が配置されたテープが脱着可能であると共に、電子部品実装機に対して脱着可能なフィーダであり、
     段取り替え作業において、該電子部品実装機に対して、一括して該フィーダを交換する場合、
     前記リソース振り分け工程において、全ての該フィーダの数をX0、N(Nは自然数)番目の前記グループで必要な該フィーダの数をX1、N+1番目の該グループで必要な該フィーダの数をX2として、以下の式(2)を用いて、各前記グループに該フィーダを振り分ける請求項1に記載の生産順序最適化方法。
    X1+X2≦X0 ・・・式(2)
  4.  前記リソースは、電子部品実装機に対して脱着可能な、電子部品を搬送するためのノズルであり、
     前記リソース振り分け工程において、全ての該ノズルの数をY0、N(Nは自然数)番目の前記グループで必要な該ノズルの数をY1、N+1番目の該グループで必要な該ノズルの数をY2として、以下の式(3)を用いて、各前記グループに該ノズルを振り分ける請求項1ないし請求項3のいずれかに記載の生産順序最適化方法。
    Y1+Y2≦Y0 ・・・式(3)
  5.  前記リソース振り分け工程の前に、
     複数の前記生産プログラムのうち、最も優先度の高い該生産プログラムに対して、サイクルタイムが短くなるように、該リソースを振り分ける基準最適化工程を有する請求項1ないし請求項4のいずれかに記載の生産順序最適化方法。
  6.  生産ラインと、該生産ラインを用いて連続して実行される複数の生産プログラムを、生産に使用するリソースが共通する複数のグループに分けることにより、複数の該生産プログラムの実行順序を最適化する制御装置と、を備える生産順序最適化システムであって、
     前記制御装置は、
     所有する全ての前記リソースの数を数えるリソース数カウント工程と、
     全ての該リソースの数と、N(Nは自然数)番目の前記グループで必要な該リソースの数と、N+1番目の該グループで必要な該リソースの数と、を基に、各該グループに該リソースを振り分けるリソース振り分け工程と、
    を実行することを特徴とする生産順序最適化システム。
  7.  前記生産ラインは、基板に電子部品を装着する電子部品実装機を有し、
     前記リソースは、該電子部品が配置されたテープが脱着可能であると共に、該電子部品実装機に対して脱着可能なフィーダであり、
     段取り替え作業において、該電子部品実装機に対して、個別に該フィーダを交換する場合、
     前記制御装置は、
     前記リソース振り分け工程において、全ての該フィーダの数をX0、N(Nは自然数)番目の前記グループで必要な該フィーダの数をX1、N+1番目の該グループで必要な該フィーダの数をX2、N番目の該グループとN+1番目の該グループとで共用される該フィーダの数をX3として、以下の式(1)を用いて、各前記グループに該フィーダを振り分ける請求項6に記載の生産順序最適化システム。
    X0-X1+X3≧X2 ・・・式(1)
  8.  前記生産ラインは、基板に電子部品を装着する電子部品実装機を有し、
     前記リソースは、該電子部品が配置されたテープが脱着可能であると共に、該電子部品実装機に対して脱着可能なフィーダであり、
     前記制御装置は、
     段取り替え作業において、該電子部品実装機に対して、一括して該フィーダを交換する場合、
     前記リソース振り分け工程において、全ての該フィーダの数をX0、N(Nは自然数)番目の前記グループで必要な該フィーダの数をX1、N+1番目の該グループで必要な該フィーダの数をX2として、以下の式(2)を用いて、各前記グループに該フィーダを振り分ける請求項6に記載の生産順序最適化システム。
    X1+X2≦X0 ・・・式(2)
  9.  前記生産ラインは、基板に電子部品を装着する電子部品実装機を有し、
     前記リソースは、該電子部品実装機に対して脱着可能な、該電子部品を搬送するためのノズルであり、
     前記制御装置は、
     前記リソース振り分け工程において、全ての該ノズルの数をY0、N(Nは自然数)番目の前記グループで必要な該ノズルの数をY1、N+1番目の該グループで必要な該ノズルの数をY2として、以下の式(3)を用いて、各前記グループに該ノズルを振り分ける請求項6ないし請求項8のいずれかに記載の生産順序最適化システム。
    Y1+Y2≦Y0 ・・・式(3)
  10.  前記制御装置は、
     前記リソース振り分け工程の前に、
     複数の前記生産プログラムのうち、最も優先度の高い該生産プログラムに対して、サイクルタイムが短くなるように、該リソースを振り分ける基準最適化工程を実行する請求項6ないし請求項9のいずれかに記載の生産順序最適化システム。
PCT/JP2012/073353 2012-09-12 2012-09-12 生産順序最適化方法および生産順序最適化システム WO2014041640A1 (ja)

Priority Applications (5)

Application Number Priority Date Filing Date Title
CN201280075745.3A CN104620187B (zh) 2012-09-12 2012-09-12 生产顺序最佳化方法及生产顺序最佳化系统
EP12884735.7A EP2897009B1 (en) 2012-09-12 2012-09-12 Production-sequence-optimizing method and production-sequence-optimizing system
US14/427,410 US10139813B2 (en) 2012-09-12 2012-09-12 Production sequence optimizing method and production sequence optimizing system
PCT/JP2012/073353 WO2014041640A1 (ja) 2012-09-12 2012-09-12 生産順序最適化方法および生産順序最適化システム
JP2014535287A JP5955971B2 (ja) 2012-09-12 2012-09-12 生産順序最適化方法および生産順序最適化システム

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2012/073353 WO2014041640A1 (ja) 2012-09-12 2012-09-12 生産順序最適化方法および生産順序最適化システム

Publications (1)

Publication Number Publication Date
WO2014041640A1 true WO2014041640A1 (ja) 2014-03-20

Family

ID=50277795

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2012/073353 WO2014041640A1 (ja) 2012-09-12 2012-09-12 生産順序最適化方法および生産順序最適化システム

Country Status (5)

Country Link
US (1) US10139813B2 (ja)
EP (1) EP2897009B1 (ja)
JP (1) JP5955971B2 (ja)
CN (1) CN104620187B (ja)
WO (1) WO2014041640A1 (ja)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107409491A (zh) * 2015-03-05 2017-11-28 富士机械制造株式会社 安装管理装置
WO2021010033A1 (ja) * 2019-07-18 2021-01-21 パナソニックIpマネジメント株式会社 段取り替え作業支援方法および段取り替え作業支援装置
JP2022090072A (ja) * 2019-02-15 2022-06-16 株式会社Fuji 部品実装システム

Families Citing this family (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3541162B1 (en) * 2016-11-09 2021-08-11 Fuji Corporation Component mounting line production management system and production management method
CN109964551B (zh) * 2016-11-17 2020-11-03 株式会社富士 调整支援装置
CN106774196B (zh) * 2016-11-30 2019-02-15 京东方科技集团股份有限公司 在制品管控方法和在制品管控系统
JP6825014B2 (ja) * 2017-02-09 2021-02-03 株式会社Fuji 生産ラインの最適化装置
JP6965603B2 (ja) * 2017-07-06 2021-11-10 富士通株式会社 設計支援装置、設計支援方法および設計支援プログラム
EP3474650B1 (de) 2017-10-19 2020-12-09 Sick Ag Verfahren zur erstellung eines rüstsatzes für eine bestückungsmaschine
WO2019229786A1 (ja) * 2018-05-28 2019-12-05 株式会社Fuji ユニット交換装置
CN115209720A (zh) * 2018-06-12 2022-10-18 株式会社富士 元件安装系统
JP6947931B2 (ja) * 2018-06-26 2021-10-13 株式会社Fuji 部品供給ユニットの配置決定方法および部品実装システム
WO2020039495A1 (ja) * 2018-08-21 2020-02-27 株式会社Fuji 部品実装システム
EP3843520A4 (en) * 2018-08-23 2021-09-29 Fuji Corporation MOBILE WORK MANAGEMENT DEVICE, MOBILE WORK DEVICE, MOUNTING SYSTEM AND ADMINISTRATIVE PROCEDURE
WO2020039544A1 (ja) * 2018-08-23 2020-02-27 株式会社Fuji 移動作業管理装置、移動型作業装置、実装システム及び移動作業管理方法
WO2020039541A1 (ja) * 2018-08-23 2020-02-27 株式会社Fuji 移動作業管理装置、実装システム及び移動作業管理方法
WO2020161827A1 (ja) * 2019-02-06 2020-08-13 株式会社Fuji 管理装置、移動型作業装置、実装システム及び管理方法
JP7195403B2 (ja) 2019-02-18 2022-12-23 株式会社Fuji 段取り替え作業設定装置
CN111479404B (zh) * 2020-05-09 2021-06-01 宁波智能装备研究院有限公司 一种基于混合遗传算法的led贴片机拾贴路径优化方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05257918A (ja) * 1992-03-11 1993-10-08 Nec Corp 部品割付決定装置
JP2003046296A (ja) 2001-05-17 2003-02-14 Matsushita Electric Ind Co Ltd 部品実装順序最適化方法、その装置及び部品実装機
JP2004287540A (ja) * 2003-03-19 2004-10-14 Kawasaki Heavy Ind Ltd 設備のグルーピング方法およびグルーピング装置

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5155679A (en) * 1989-12-18 1992-10-13 Hewlett-Packard Company Set-up optimization for flexible manufacturing systems
JP2966082B2 (ja) * 1990-11-06 1999-10-25 株式会社日立製作所 実装順序決定方法及びその実装方法
JP2003101294A (ja) * 2001-09-20 2003-04-04 Fuji Mach Mfg Co Ltd 電気部品供給方法および電気部品装着システム
JP3589658B2 (ja) * 2001-09-28 2004-11-17 松下電器産業株式会社 最適化装置、装着装置及び電子部品装着システム
JP4162930B2 (ja) * 2002-06-25 2008-10-08 富士機械製造株式会社 電子部品実装装置における基板搬送装置
US6829514B2 (en) * 2003-01-17 2004-12-07 Motorola, Inc. Balancing workloads in an electronics assembly factory
JP4545115B2 (ja) 2005-07-05 2010-09-15 パナソニック株式会社 生産条件決定方法、生産条件決定装置、部品実装機およびプログラム
JP4943299B2 (ja) * 2007-02-09 2012-05-30 Juki株式会社 部品実装装置のフィーダ配置方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05257918A (ja) * 1992-03-11 1993-10-08 Nec Corp 部品割付決定装置
JP2003046296A (ja) 2001-05-17 2003-02-14 Matsushita Electric Ind Co Ltd 部品実装順序最適化方法、その装置及び部品実装機
JP2004287540A (ja) * 2003-03-19 2004-10-14 Kawasaki Heavy Ind Ltd 設備のグルーピング方法およびグルーピング装置

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP2897009A4

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107409491A (zh) * 2015-03-05 2017-11-28 富士机械制造株式会社 安装管理装置
JPWO2016139793A1 (ja) * 2015-03-05 2017-12-21 富士機械製造株式会社 実装管理装置
EP3267782A4 (en) * 2015-03-05 2018-03-21 Fuji Machine Mfg. Co., Ltd. Mounting management device
CN107409491B (zh) * 2015-03-05 2020-04-24 株式会社富士 安装管理装置
US11006558B2 (en) 2015-03-05 2021-05-11 Fuji Corporation Mounting management device
JP2022090072A (ja) * 2019-02-15 2022-06-16 株式会社Fuji 部品実装システム
JP7351964B2 (ja) 2019-02-15 2023-09-27 株式会社Fuji 部品実装システム
WO2021010033A1 (ja) * 2019-07-18 2021-01-21 パナソニックIpマネジメント株式会社 段取り替え作業支援方法および段取り替え作業支援装置
JPWO2021010033A1 (ja) * 2019-07-18 2021-01-21

Also Published As

Publication number Publication date
EP2897009B1 (en) 2023-03-01
US10139813B2 (en) 2018-11-27
US20150248314A1 (en) 2015-09-03
EP2897009A4 (en) 2015-08-26
EP2897009A1 (en) 2015-07-22
JP5955971B2 (ja) 2016-07-20
JPWO2014041640A1 (ja) 2016-08-12
CN104620187B (zh) 2017-08-29
CN104620187A (zh) 2015-05-13

Similar Documents

Publication Publication Date Title
JP5955971B2 (ja) 生産順序最適化方法および生産順序最適化システム
JP4996634B2 (ja) 実装条件決定方法および実装条件決定装置
JP6270286B2 (ja) 部品実装ラインの生産最適化装置
JP6016541B2 (ja) 部品実装システム
CN1846223B (zh) 元件装配顺序的优化方法和元件装配顺序的优化设备
JP2014197594A (ja) 電子部品管理システム
CN106413374A (zh) 分配装置、生产系统及分配方法
JP2022090072A (ja) 部品実装システム
WO2016147390A1 (ja) 部品実装ライン、および部品実装ラインの段取り方法
JP2013038335A (ja) 部品実装ライン
JP6947930B2 (ja) 部品供給ユニットの配置決定方法および部品実装システム
JP2005216945A (ja) フィーダ配置設定方法および同装置
JP2008004761A (ja) 段取データ群作成方法
JP2009224766A (ja) 実装条件決定方法、実装条件決定装置、部品実装方法、部品実装機及びプログラム
JP4242355B2 (ja) 部品実装順序決定方法、装置、プログラム及び部品実装機
KR101690725B1 (ko) 실장기의 부품 실장 최적화 방법 및 장치
JP2013084862A (ja) 電子部品実装装置
JP5792586B2 (ja) 電子部品実装システム、電子部品実装方法及び電子部品実装用コンピュータプログラム
JP2006171916A (ja) 生産計画方法
WO2020157845A1 (ja) 部品実装システム
JP6475245B2 (ja) 基板生産方法及び基板生産の条件決定方法
JP4891201B2 (ja) 部品振り分け方法
JP2006157063A (ja) 部品供給カセットの配列決定方法
JP2008130849A (ja) 実装条件決定方法
WO2019035196A1 (ja) 段取り支援装置、段取り支援方法、段取り支援プログラム、記録媒体

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 12884735

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2014535287

Country of ref document: JP

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 14427410

Country of ref document: US

NENP Non-entry into the national phase

Ref country code: DE