- building structural
- data
- cad
- structural member
- processing
- Prior art date
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2111/00—Details relating to CAD techniques
- G06F2111/02—CAD in a network environment, e.g. collaborative CAD or distributed simulation
Definitions
- the present invention relates to a structural design of a building, in particular, to design a building structure using a CAD (co-immediate computer aided design) device and to use a communication network such as a LAN (Local Area Network) to execute a CAD device analysis on a CAM. (Computer aided manufacturing)
- the present invention relates to an apparatus for processing building structural members output to an apparatus.
- the frame, shed and floor in the conventional construction method are assembled by building structural members that have been pre-processed (pre-cut) in the factory based on the designed dimensions and connections.
- pre-cut building structural members that have been pre-processed
- the procedure for pre-cutting building structural members is as follows. First, input the data such as columns and beams that are built on the foundation by the design CAD equipment, as well as various data and materials such as huts, floors, and openings, and then enter the CAD program in advance. Save as CAD data together with the prepared auxiliary data (drawing method, color, etc.). Then, from the CAD data stored in this way, the shape data and material data of each building structural member are printed out, and these data are newly input to the pre-cut CAD device. In addition, at this stage, additional data such as port holes and slits for joints and fittings are also input to the pre-cut CAD device. Among them, the shape data, material data and additional data are regarded as pre-cut data.
- the pre-cut data is output from the pre-cut CAD device to the pre-cut CAM device in the factory via a communication line, and the actual material is processed according to the shape data of each building structural member.
- the present invention has been made to solve the above problems.
- the purpose is to provide a processing equipment for building structural members that can perform integrated processing from building structural design to design reexamination and further processing of building structural members using CAD data created by design CAD equipment. To provide. Disclosure of the invention
- an input means for inputting at least shape data and relative position data of a plurality of types of building structural members forming a building structure, and various data input by the input means and CAD.
- a two-dimensional diagram creating means for creating a two-dimensional diagram drawn on a plane for a selected building structural member from a virtual three-dimensional model constructed based on the auxiliary data in the program;
- Display means for displaying a two-dimensional diagram obtained by the two-dimensional diagram creation means on a display screen, and storage for storing CAD data for constructing the virtual three-dimensional model obtained by the two-dimensional diagram creation means
- a first station having means for calculating the strength of the building structural member selected based on the CAD data read from the storage means;
- a second station that is connected via a communication line and has processing means for processing each building structural member based on the CAD data read from the storage means. I do.
- At least a plurality of types of building structural members forming the structure of a building Input means for inputting the shape data and relative position data, and a virtual 3D model constructed based on the data input by the input means and the auxiliary data in the CAD program.
- 2D diagram creation means for creating a 2D diagram drawn on a plane for the building structural members that have been set, and display means for displaying the 2D diagram obtained by the 2D diagram creation device on a display screen
- Storage means for storing CAD data for constructing the virtual three-dimensional model obtained by the two-dimensional diagram creation means; and price of building structural members based on the CAD data read from the storage means.
- a first station having estimation means for estimating the building structure, and connecting each building structural member to the first station via a communication line based on the CAD data read from the storage means.
- Processing means to process That it has to have a second stearyl one Deployment of the gist.
- FIG. 1 is a block diagram illustrating an electrical configuration according to an embodiment of the present invention.
- FIG. 2 is a block diagram outlining steps in the same embodiment.
- FIG. 5 is an explanatory diagram illustrating an intensity distribution diagram displayed on a display screen.
- FIG. 6 is a table showing the relationship between intensity and actual color.
- FIG. 7 is a table illustrating attributes of members of an intensity distribution diagram displayed on a display screen. BEST MODE FOR CARRYING OUT THE INVENTION
- the processing unit has a CPU (Central Processing Unit) 11, which has ROM (Read Only Memory) 12, RAM (Random Access Memory) 13, and magnetic disk unit. 14. Input device 15, mouse 16, display device 17, and printer 18 are connected.
- the first station A is composed of the CPU 11 and these peripheral devices.
- the CPU 11 communicates with the communication line 20 via the communication line 20.
- CAM device 21 as station B of 2 is connected.
- the ROM 12 has programs for controlling the operation of the entire processing device, a database management program for organizing and integrating databases, a network processing program for controlling a communication network, and a common program for multiple programs.
- a processing program for managing applicable functions (for example, Japanese input function and print function) is stored in advance.
- the RAM 13 is a writable and rewritable storage unit for temporarily storing various information required for the operation of the CPU 11.
- the magnetic disk drive 14 has a CAD program for the design of building structural members, an estimation program for estimating prices based on the data of the designed building structural members, and calculating the strength of building structural members.
- a strength calculation program for performing the calculation is stored.
- the magnetic disk device 14 stores CAD data created by a CAD program.
- the CPU 11 transfers the CAD data from the magnetic disk device 14 to the RAM 13 when executing the estimation program and the strength calculation program.
- the input device 15 gives various commands to the CPU 11 and inputs data.
- the input device 15 includes a selection key 15a, a numeric keypad 15b, and an input key 15c.
- the selection key 15a is used to select a desired program to be executed or a desired process from a CAD program, an estimation program, and a strength calculation program.
- Numeric keys 15b input new data.
- the input keys 15c execute the selected processing or confirm the contents.
- the mouse 16 is an auxiliary device of the input device 15 .Move the mouse cursor over the instruction box displayed on the display screen of the display device 17, and enter the switch to select the above selection keys 15 a and Performs the same function as the input key 15c.
- the display device 17 displays a CAD drawing such as a virtual three-dimensional model on a display screen based on the CAD data of the CAD program read from the RAM I3.
- the estimation table created by the estimation program is displayed, and the intensity distribution diagram 23 created by the intensity calculation program is displayed.
- the printer 18 prints a virtual three-dimensional model, an estimation table, and the like displayed on the display screen of the display device 17 on recording paper.
- the CAM device 21 processes a material based on processing data, and is controlled by a CAM-side CPU (not shown). First, the process I, in which the structural design of the building shown in Fig. 2 is performed on a CAD program and stored as CAD data, will be described.
- the CPU 11 reads the CAD program from the magnetic disk device 14 and transfers it to the RAM 13.
- the program in the RAM 13 is called up on the display screen of the display device 11, and the shape data, relative position data, load data, and joints, connections, and connection fittings are used.
- Input the connection processing data such as the port hole and slit.
- the specifications of the interior materials such as roofing materials, wall materials, flooring materials, stairs, windows, doors, etc. are not directly related to the structure, but are used for the estimation calculation in the estimation program described later.
- auxiliary data material (tree type), drawing method, color, etc. of building structural members) prepared in advance in the CAD program, CAD data that can construct a virtual 3D model by each data is selected. obtain.
- the CPU 11 temporarily stores the CAD data in the RAM 13 and then in the magnetic disk device 14.
- the CPU 11 reads the estimation program from the magnetic disk drive 14 and transfers it to the RAM 13, and also reads out the shape data and material (tree type) data related to the structure from the CAD data from the magnetic disk drive 14, and similarly reads the data into the RAM 13. Forward.
- the specification data of the interior materials such as roofing materials, wall materials, flooring materials, stairs, windows and doors, which are not directly related to the structure, are simultaneously read and transferred to the RAM 13 in the same manner.
- the estimation program has a table T1 indicating the relationship between the member dimensions of building structural members and numerical values for estimating calculations.
- roof materials, wall materials, floor materials, stairs, windows, doors, and other interior specifications are selected based on the unified standard products selected in Process I.
- the prices of wall materials and floor materials are determined according to the selected standard products and construction area. For stairs, windows and doors, etc., select the standard product and size. The price is determined based on the price.
- Fig. 4 shows a part of the estimation table 24 as an example.
- a unit price of 1 cubic meter is set according to the material (tree species).
- column B is displayed in actual size, but the volume is actually calculated using the corrected numerical value. And the price is calculated.
- the actual volume is 1.09714 cubic mZ, but since it is modified as described above, the modified volume is 1.1956 cubic mZ and is displayed at a higher price than it actually is.
- the attribute for each group such as columns and beams
- the CPU 11 reads the strength calculation program from the magnetic disk device 14 and transfers it to the RAM 13.
- the CPU 11 reads the shape data, relative position data, and load data of the building structural members from the CAD data from the magnetic disk device 14 and transfers the data to the RAM 13.
- the CPU 11 constructs a virtual 3D model of the building structure based on the shape data and the relative position data.
- a plane sectional view obtained by cutting the virtual three-dimensional model obtained in this manner horizontally is displayed on the display screen of the display device 17 as a two-dimensional diagram.
- intensity calculation is performed by operating the input device 15 or the mouse 16. That is, the stress values were calculated for the columns 25a to 25m, the beams 26a to 26m, and the ridges 27a to 27f involved in the strength calculation, and the display device 17 as shown in FIG.
- the intensity distribution diagram 23 is displayed on the display screen.
- the columns 25a to 25m, the beams 26a to 26m, and the braces 27a to 27f, which are calculated by the color corresponding to the stress value, are represented.
- the displayed color differs depending on the stress value.
- the strength is expressed by the difference.
- six colors are prepared according to the stress value, with blue having the highest intensity (smallest stress value), followed by light blue, yellow-green, yellow, and pink in order, and red having the highest intensity. Is small (the stress value is large).
- the relationship between the color and the stress value can be changed. For example, it is possible to change the stress value from 0 to 0.24 as blue as the initial value to the stress value from 0 to 0.49. This change can be made on the table in FIG. 7 by operating the mouse 16.
- the types of stress values calculated are: bending stress (M), shear stress (Q), compressive stress (N;), tensile stress (T), bending stress + compressive stress ( ⁇ + ⁇ ), degree of deformation ( ⁇ ), bending stress (jM), shear stress (jQ), compressive stress (jN), tensile stress (jT), bending stress of joint fittings of each building structural member Stress + compressive stress (jM + N).
- the load data for calculating the stress values are fixed load (self weight + 180 kg for three people: 180 kg: L), fixed load + snow load (L + S), fixed load + seismic force in X direction (L + soil EX) , Fixed load + seismic force in Y direction (L + EY), fixed load + wind pressure in X direction (L + soil WX), fixed load + wind pressure in Y direction (L + soil WY), fire load (fire) No.
- a stress value (all 12 1 types) combining all these types of stresses and loads is calculated for each building structural member subject to strength calculation.
- the attributes of the building structural members constituting the intensity distribution FIG. 23 are displayed.
- the calculated stress values for various load data of the beam 28a (G4) are shown.
- the load data and the stress value at the initial setting values are the worst values for each building structural member at the initial setting value (“Worst case” in the figure). ) are displayed in color. In other words, if at least one large stress value is calculated for a building structural member, the member will be displayed in a color corresponding to the large stress value even if the other stress values are small.
- the intensity distribution diagram 23 obtained in this way is printed by the pudding device 18. You.
- the estimation table 24 is created by the estimation program using the CAD data created by the CAD program in this way, and the intensity distribution chart 23 is created by the intensity calculation program.
- the estimation table 24 and the strength distribution diagram 23 are indicators for designers and customers to judge the design.For example, if it is determined from the strength distribution diagram 23 that the safety of a building structural member is not very large, Rewrite the CAD data from the CAD program again to change the dimensions to increase the size. Further, in order to confirm the price change after rewriting, the estimation program is read again and the new estimation table 24 is printed.
- Hinoki was used as the base from the estimation Table 24. If the price would be high, rewrite the CAD data from the CAD program again to lower the rank and make it Hiba. Then, in order to confirm the price change after rewriting, the estimation program is read again and a new estimation table 24 is printed out.
- CAD data When the CAD data is determined on the first station A side in this way, of the CAD data, tree species data, shape data, and connection processing data are output to the CAM device 21 via the communication line 20. Then, in the process VI in FIG. 2, a not-shown CPU in the CAM device 21 processes the material wood based on the processing data.
- the configuration as in the present embodiment has the following effects.
- the CAD data can be corrected based on the estimation table 24 and the intensity distribution diagram 23, and the estimation table 24 and the intensity distribution diagram 23 can be easily created again based on the corrected data.
- the data can be transferred to the CAM device 21 as it is, which contributes to speeding up the processing.
- the shape data related to the structure and the material (tree species) data are read out by the estimation program, and the roofing material, wall material, flooring material, stairs, windows, doors, etc. that are not directly related to the structure are read out.
- the specification data of the interior was read out at the same time and an estimate was calculated based on these data.
- Estimation Table 24 is set higher than the actual price of building structural members, but may be set lower. It may be created according to the actual price.
- various programs are transferred from the magnetic disk device 14 to the RAM I 3.
- the data may be transferred from another external storage device, for example, a flexible disk, a CD-ROM, a magneto-optical disk, or the like.
- data may be transferred by LAN (Loca1AReaNeWork), WAN (WideAReaNeWork), or data communication such as an Internet connection network.
- the intensity display mode for displaying the intensity may be performed in a pattern other than the above colors, and the number of colors used can be freely set. Also, the display may be made based on a difference in line type or a difference in brightness from white to black, and a mark corresponding to the strength may be arranged so as to overlap with a member in display.
- pudding is not mandatory.
- any preservation method is not required.
- a magnetic disk device a RAM, a flexible disk, a CD-ROM, a magneto-optical disk, and the like are given as examples.
- the present invention can be freely modified and implemented without departing from the spirit thereof.
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Geometry (AREA)
- General Physics & Mathematics (AREA)
- Computer Hardware Design (AREA)
- Theoretical Computer Science (AREA)
- Mathematical Optimization (AREA)
- Computational Mathematics (AREA)
- Architecture (AREA)
- Mathematical Analysis (AREA)
- Structural Engineering (AREA)
- Pure & Applied Mathematics (AREA)
- Evolutionary Computation (AREA)
- General Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Instructional Devices (AREA)
Description
Claims
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US09/529,765 US6826516B1 (en) | 1998-08-26 | 1999-08-26 | Apparatus for working building material |
EP99940512A EP1026606A4 (en) | 1998-08-26 | 1999-08-26 | APPARATUS FOR FORMING CONSTRUCTION MATERIAL |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP10/257501 | 1998-08-26 | ||
JP25750198A JP3171830B2 (ja) | 1998-08-26 | 1998-08-26 | 建築構造部材の処理装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2000013114A1 true WO2000013114A1 (fr) | 2000-03-09 |
Family
ID=17307179
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP1999/004626 WO2000013114A1 (fr) | 1998-08-26 | 1999-08-26 | Appareil pour façonner un materiau de construction |
Country Status (4)
Country | Link |
---|---|
US (1) | US6826516B1 (ja) |
EP (1) | EP1026606A4 (ja) |
JP (1) | JP3171830B2 (ja) |
WO (1) | WO2000013114A1 (ja) |
Families Citing this family (23)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100373496B1 (ko) * | 2000-04-04 | 2003-02-26 | 이강준 | 건축 또는 토목 공학에 필요한 솔루션을 제공하는 인터넷시스템 |
JP2001357079A (ja) * | 2000-06-16 | 2001-12-26 | Ncn:Kk | 建築構造情報供給方法 |
WO2002037341A1 (fr) * | 2000-10-27 | 2002-05-10 | Mitsubishi Denki Kabushiki Kaisha | Procede de support de plan d'installation, ordinateur serveur de systeme de support de plan d'installation, et ordinateur client de systeme de plan d'installation |
JP4711533B2 (ja) * | 2001-03-29 | 2011-06-29 | 日本鋳造株式会社 | 柱脚設計支援方法、柱脚設計支援システム及び柱脚設計支援プログラムを記録したコンピュータ読み取り可能な記録媒体 |
JP2002332689A (ja) * | 2001-05-10 | 2002-11-22 | Taisei Corp | 最適断面設定プログラム |
KR20070072634A (ko) * | 2001-07-27 | 2007-07-04 | 신닛뽄세이테쯔 카부시키카이샤 | 건축 재료 제조용 정보 처리 시스템, 건축 재료 제조 방법및 제조 설비 그리고 건축 정보 유통 시스템 |
US20030014223A1 (en) * | 2002-07-31 | 2003-01-16 | Mr. Calvin Edward Phillips | Building design analyzer |
US7353144B1 (en) * | 2002-10-25 | 2008-04-01 | Michael Shane Rinks | Method for determining a set of materials |
JP2004164328A (ja) * | 2002-11-13 | 2004-06-10 | Fujitsu Ltd | 一人camシステムおよび一人camプログラム |
US8266005B2 (en) | 2003-01-17 | 2012-09-11 | Uniloc Luxembourg | Automated pricing system |
US7783523B2 (en) * | 2003-01-17 | 2010-08-24 | California Distribution Center, Inc. | Automated pricing system |
US7769595B2 (en) * | 2003-01-17 | 2010-08-03 | California Distribution Center, Inc. | Automated pricing and/or “Green” indicating method and system |
US7337151B2 (en) * | 2003-01-17 | 2008-02-26 | California Distribution Center, Inc. | Automated pricing system |
US8260628B2 (en) | 2003-01-17 | 2012-09-04 | Uniloc Luxembourg S. A. | Automated pricing and/or “green” indicating method and system |
FR2853104B1 (fr) * | 2003-03-24 | 2007-05-25 | 3 A Btp Analyses D Avaries Et | Procede pour la rehabilitation d'un ouvrage souterrain |
JPWO2005052819A1 (ja) * | 2003-11-28 | 2007-12-06 | 富士通株式会社 | 材料名設定支援装置、材料名設定支援プログラムおよび材料名設定支援方法 |
US7292908B2 (en) * | 2004-10-13 | 2007-11-06 | Robotic Built Structures, Inc. | Systems and methods for manufacturing customized prefabricated buildings including arbitrarily modularizing a building specification without using any pre-defined modules |
US7970605B2 (en) | 2005-01-12 | 2011-06-28 | Nippon Telegraph And Telephone Corporation | Method, apparatus, program and recording medium for long-term prediction coding and long-term prediction decoding |
GR1005481B (el) * | 2005-07-28 | 2007-04-02 | Συστημα και μεθοδος για την εκπονηση και διαχειριση μελετων εφαρμογης για την οπλιση κτιριακων εργων. | |
JP4629594B2 (ja) * | 2006-02-20 | 2011-02-09 | 株式会社日立製作所 | モジュール評価方法及び装置 |
US10635841B2 (en) | 2017-02-23 | 2020-04-28 | OPTO Interactive, LLC | Method of managing proxy objects |
CN112182727A (zh) * | 2020-10-23 | 2021-01-05 | 筑友智造科技投资有限公司 | 建筑工程的支撑件自动布设方法、装置及可读存储介质 |
WO2023049176A1 (en) * | 2021-09-21 | 2023-03-30 | Protea Intelligence, Inc. | Parametric cost-modeling system and method |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0756970A (ja) * | 1993-08-17 | 1995-03-03 | Pfu Ltd | 混構造建築物の積算方式 |
JPH0836591A (ja) * | 1994-07-22 | 1996-02-06 | Takenaka Komuten Co Ltd | 建築設備図面作成装置 |
JPH08123837A (ja) * | 1994-10-21 | 1996-05-17 | Misawa Homes Co Ltd | ユニット建物の設計方法 |
Family Cites Families (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS59163665A (ja) | 1983-03-08 | 1984-09-14 | Asahi Chem Ind Co Ltd | 鉄骨建築物構造設計システム |
JPH0810455B2 (ja) | 1989-04-18 | 1996-01-31 | 富士通株式会社 | オフィス内の床荷重分布表示処理方式 |
JP2731041B2 (ja) | 1991-03-20 | 1998-03-25 | 株式会社クボタ | 水理解析装置 |
JPH04326173A (ja) | 1991-04-25 | 1992-11-16 | Haabesuto Syst:Kk | 建築支援装置 |
JP3207971B2 (ja) * | 1993-06-25 | 2001-09-10 | 富士通株式会社 | 最適骨組及び板組構造の設計方法 |
JP3585532B2 (ja) * | 1994-07-05 | 2004-11-04 | ミサワホーム株式会社 | 建築物の設計支援装置 |
JPH08166979A (ja) | 1994-12-14 | 1996-06-25 | Sharp Corp | 設計システム |
JPH09319773A (ja) | 1996-05-30 | 1997-12-12 | Toshiba Corp | コンピュータシステム及びその解析結果表示方法 |
JP3308869B2 (ja) * | 1996-07-31 | 2002-07-29 | 株式会社アマダ | 部品表示画像操作システムおよび方法 |
-
1998
- 1998-08-26 JP JP25750198A patent/JP3171830B2/ja not_active Expired - Lifetime
-
1999
- 1999-08-26 WO PCT/JP1999/004626 patent/WO2000013114A1/ja not_active Application Discontinuation
- 1999-08-26 US US09/529,765 patent/US6826516B1/en not_active Expired - Lifetime
- 1999-08-26 EP EP99940512A patent/EP1026606A4/en not_active Withdrawn
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0756970A (ja) * | 1993-08-17 | 1995-03-03 | Pfu Ltd | 混構造建築物の積算方式 |
JPH0836591A (ja) * | 1994-07-22 | 1996-02-06 | Takenaka Komuten Co Ltd | 建築設備図面作成装置 |
JPH08123837A (ja) * | 1994-10-21 | 1996-05-17 | Misawa Homes Co Ltd | ユニット建物の設計方法 |
Non-Patent Citations (1)
Title |
---|
See also references of EP1026606A4 * |
Also Published As
Publication number | Publication date |
---|---|
US6826516B1 (en) | 2004-11-30 |
JP3171830B2 (ja) | 2001-06-04 |
EP1026606A1 (en) | 2000-08-09 |
JP2000076323A (ja) | 2000-03-14 |
EP1026606A4 (en) | 2002-10-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2000013114A1 (fr) | Appareil pour façonner un materiau de construction | |
Hyun et al. | Automated optimization of formwork design through spatial analysis in building information modeling | |
US6996503B2 (en) | System and method for take-off of materials using two-dimensional CAD interface | |
JP2617552B2 (ja) | パラメトリック設計図作成方法およびシステム | |
US20080249756A1 (en) | Method and system for integrating computer aided design and energy simulation | |
US20060074609A1 (en) | System and method for determining variance in building structures | |
KR100309582B1 (ko) | 2차원 캐드인터페이스를 이용한 물량산출 시스템과 그 방법 | |
WO2021027310A1 (zh) | 一种基于参数化的2d铺贴设计方法、电子设备及存储介质 | |
KR20220064061A (ko) | 대안 복수 건축물 모델 도출 가능한 bim 기반의 모듈러 건축용 통합 운영 시스템 및 그 방법 | |
JP3171829B2 (ja) | 建築構造の強度表示装置及び建築構造の強度表示プログラムを記録した記録媒体 | |
JP2001188812A (ja) | 工業化注文住宅設計方法およびシステム | |
CN114065349A (zh) | 一种基于Revit的外墙外保温及装饰计量的方法及系统 | |
JP3164950B2 (ja) | 部材決定装置 | |
JP2003150665A (ja) | 既築建物の構造計算方法及び構造計算装置 | |
JP4653344B2 (ja) | プレハブ式建物用cadシステム | |
JP5702618B2 (ja) | 建築物の構造表示装置 | |
KR101573435B1 (ko) | 도면의 자동 편집 방법 | |
JP2002348950A (ja) | 建築構造の強度判定装置及び建築構造の強度修正方法 | |
JP2002342387A (ja) | 施工図用cadシステムおよびcad支援データが記憶された記憶媒体 | |
JP4590059B2 (ja) | 建物の設計方法 | |
JPH08185426A (ja) | ユニット建物の設計方法およびユニット建物用cadシステム | |
JPH03259292A (ja) | 住宅用モデル作製装置 | |
JP2002259462A (ja) | 建築構造の強度表示装置及び強度表示方法 | |
JP4312505B2 (ja) | 建築積算装置 | |
JP2002063228A (ja) | 住宅設計システム |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AK | Designated states |
Kind code of ref document: A1 Designated state(s): US |
|
AL | Designated countries for regional patents |
Kind code of ref document: A1 Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LU MC NL PT SE |
|
WWE | Wipo information: entry into national phase |
Ref document number: 1999940512 Country of ref document: EP |
|
121 | Ep: the epo has been informed by wipo that ep was designated in this application | ||
WWE | Wipo information: entry into national phase |
Ref document number: 09529765 Country of ref document: US |
|
WWP | Wipo information: published in national office |
Ref document number: 1999940512 Country of ref document: EP |
|
WWW | Wipo information: withdrawn in national office |
Ref document number: 1999940512 Country of ref document: EP |