EP3325394A1 - Automatisierte montagevorrichtung zur durchführung von installationen in einem aufzugschacht einer aufzuganlage - Google Patents
Automatisierte montagevorrichtung zur durchführung von installationen in einem aufzugschacht einer aufzuganlageInfo
- Publication number
- EP3325394A1 EP3325394A1 EP16733545.4A EP16733545A EP3325394A1 EP 3325394 A1 EP3325394 A1 EP 3325394A1 EP 16733545 A EP16733545 A EP 16733545A EP 3325394 A1 EP3325394 A1 EP 3325394A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- component
- mounting device
- installation
- elevator shaft
- hoistway
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 claims abstract description 26
- 238000009434 installation Methods 0.000 claims description 151
- 238000005553 drilling Methods 0.000 claims description 54
- 238000006073 displacement reaction Methods 0.000 claims description 38
- 238000011900 installation process Methods 0.000 claims description 25
- 230000008569 process Effects 0.000 abstract description 6
- 230000000717 retained effect Effects 0.000 abstract 1
- 230000002787 reinforcement Effects 0.000 description 39
- 239000004567 concrete Substances 0.000 description 17
- 238000013016 damping Methods 0.000 description 17
- 238000004891 communication Methods 0.000 description 10
- 238000001514 detection method Methods 0.000 description 10
- 230000008859 change Effects 0.000 description 5
- 239000012636 effector Substances 0.000 description 5
- 230000003993 interaction Effects 0.000 description 5
- 239000000725 suspension Substances 0.000 description 5
- 230000006378 damage Effects 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 4
- 230000003287 optical effect Effects 0.000 description 4
- 238000013461 design Methods 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 2
- 208000027418 Wounds and injury Diseases 0.000 description 2
- 239000000872 buffer Substances 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 230000007246 mechanism Effects 0.000 description 2
- 230000003252 repetitive effect Effects 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 238000004804 winding Methods 0.000 description 2
- 206010024453 Ligament sprain Diseases 0.000 description 1
- 208000010040 Sprains and Strains Diseases 0.000 description 1
- 230000001133 acceleration Effects 0.000 description 1
- 230000004913 activation Effects 0.000 description 1
- 230000006978 adaptation Effects 0.000 description 1
- 230000001174 ascending effect Effects 0.000 description 1
- 230000002238 attenuated effect Effects 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 230000002950 deficient Effects 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000009776 industrial production Methods 0.000 description 1
- 208000014674 injury Diseases 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 238000003754 machining Methods 0.000 description 1
- 238000000691 measurement method Methods 0.000 description 1
- 238000003801 milling Methods 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
- 238000012549 training Methods 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B19/00—Mining-hoist operation
- B66B19/002—Mining-hoist operation installing or exchanging guide rails
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B11/00—Main component parts of lifts in, or associated with, buildings or other structures
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B11/00—Main component parts of lifts in, or associated with, buildings or other structures
- B66B11/0005—Constructional features of hoistways
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B19/00—Mining-hoist operation
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B7/00—Other common features of elevators
- B66B7/02—Guideways; Guides
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B7/00—Other common features of elevators
- B66B7/02—Guideways; Guides
- B66B7/023—Mounting means therefor
- B66B7/024—Lateral supports
Definitions
- the present invention relates to a mounting device by means of which
- Installation operations in an elevator shaft of an elevator system can be performed. Furthermore, the invention relates to a method for performing a
- a production of an elevator installation and in particular a thereby to be carried out installation of components of the elevator system within a hoistway in a building can cause a lot of effort and / or high costs, as a
- a person goes to a position within the hoistway to which the component is to be installed and installed there at a desired location the component, for example by holes are drilled in a shaft wall and the component with screws screwed into these holes or inserted Bolt is attached to the shaft wall.
- the person can use tools and / or machines for this purpose.
- JP 3 214801 B2 a mounting device for alignment of
- the mounting device can be aligned by installation personnel in the hoistway pre-mounted guide rails and attached to installation staff in the elevator shaft holding profiles in the form of bracket elements become.
- the mounting device has a screwing device which is an integral part of the mounting device.
- the mounting device also has a fixing device, by means of which the mounting device can be supported laterally on one of the above, by installation personnel mounted bracket elements.
- a mounting device for carrying out an installation process in an elevator shaft of an elevator installation has a carrier component and a mechatronic installation component.
- the carrier component is adapted to move relative to the hoistway, i. for example, within the hoistway, to be relocated and positioned at different heights within the hoistway.
- Installation component is held on the carrier component and adapted to perform an assembly step in the context of the installation process at least partially automatically, preferably fully automatically.
- the carrier component further comprises a fixing component, which is adapted to the carrier component and / or the installation component within the
- fixing in the lateral direction can be understood to mean that the
- Carrier component can be brought together with the installation component attached to her not only vertically, for example by means of the displacement component to a position at a desired height within the elevator shaft, but that the carrier component can then be fixed there in the horizontal direction by means of the fixing component.
- the fixing component is designed to be supported laterally on walls of the elevator shaft, so that the carrier component can no longer move in a horizontal direction relative to the walls.
- the carrier component can no longer move in a horizontal direction relative to the walls.
- the support can be done in different ways.
- the fixing component according to the invention it is advantageously possible for the mounting device to be used in an elevator shaft of an elevator installation without installation components having to be previously mounted on walls of the elevator shaft by installation personnel. This allows the installation of components in the elevator shaft with very little effort and thus particularly cost-effective.
- the fixing component is designed to at least one of the carrier component and the installation component within the
- the installation component can be securely fixed in the elevator shaft and in the execution of an assembly step, neither in the vertical direction, nor dodge across it and thus jeopardize the correct implementation of the assembly step.
- the fixing component is in particular designed to caulk laterally on or between walls of the elevator shaft. Such caulking may also be considered as supporting on walls of the hoistway.
- the fixing may for example have suitable supports, stamp, lever or the like.
- the supports, punches or levers can in particular be designed so that they can be displaced outwards in the direction of the wall of the hoistway and thus pressed against the wall. It is possible that on opposite sides the support component or the installation component supports, stamp or lever are arranged, which are all displaced outwards.
- the support element in particular has an elongated shape in the vertical direction and in particular extends at least over the entire vertical extent of the carrier component. It has, for example, a mainly bar-shaped basic shape.
- the mounting device is in particular so inserted into the elevator shaft, that the support element on one side with
- elongated shape allows the support even then sufficient support when the mounting device is to be fixed in the region of a door opening.
- the support element may in particular be designed so that its distance from the carrier component is manually adjustable, in particular adjustable in different stages. The distance is adjustable only by hand and takes place only before the introduction of the mounting device in the elevator shaft.
- the fixing device can be adapted to dimensions of the elevator shaft.
- Installation component can lead. Such problems can be avoided, for example, if the carrier component is designed so stiff that it does not deform when supporting or caulking, or the magazine components are arranged opposite the installation component such that their relative positions to each other do not change even during a deformation of the carrier component. It is also possible that the fixation device has suction cups over which one
- Holding force against a wall of the elevator shaft and thus a fixation of the carrier component relative to walls of the elevator shaft can be done.
- the carrier component is supported on the walls of the elevator shaft.
- the fixation by means of suction cups also works in the vertical direction.
- the carrier component is temporarily fixed by means of fastening means, for example in the form of screws, bolts or nails on one or more walls of the elevator shaft and thus supported on the walls. This support also works in the vertical direction. This temporary fixation is achieved when the carrier component is to be brought to a different position within the elevator shaft.
- a frame, against which the tool is movably guided are fixed for example via suction cups on a wall of the elevator shaft.
- said frame may also be temporarily fixed to a wall of the hoistway by means of fasteners, for example in the form of screws, bolts or nails.
- fasteners for example in the form of screws, bolts or nails.
- Carrier component during an assembly step in which the installation component works and exerts lateral forces on the carrier component can move horizontally within the elevator shaft.
- the fixing component can be used as an abutment for the attached to the carrier component
- lateral support can, for example, in particular during a
- Drilling be necessary to absorb the occurring horizontally acting forces and to avoid or damp vibrations.
- the number of components to be assembled can often involve a mounting of all components required for the elevator installation within the elevator shaft over several days or even several weeks.
- Embodiments of the invention are based inter alia on the idea
- Installation steps that must be performed many times during the installation of the elevator system, be made automated.
- a plurality of support profiles must be attached to walls of the hoistway, for this purpose, for example, first holes must be drilled at many points along the hoistway and then a retaining profile must be screwed.
- the automation is proposed to provide a mounting device, on the one hand has a carrier component and on the other hand held on this carrier component mechatronic installation component.
- the carrier component can be configured in different ways.
- the carrier component can be designed as a simple platform, frame, scaffold, cabin or the like. Dimensions of the carrier component should be chosen such that the carrier component easily in the elevator shaft
- a mechanical design of the carrier component should be chosen so that it can reliably support the mechatronic installation component held thereon and, if appropriate, can withstand static and dynamic forces exerted by the installation component upon performing an assembly step.
- the installation component should be mechatronic, that is, have cooperating mechanical, electronic and information technology elements or modules.
- the installation component should have a suitable mechanism in order, for example, to be able to handle tools within an assembly step.
- the tools can be brought by the mechanics, for example, suitably to a mounting position and / or be performed suitably during an assembly step.
- the Tools can be powered by the installation component with energy, for example in the form of electrical energy. It is also possible that the tools have their own power supply, for example batteries, accumulators or a separate power supply via cable.
- the installation component itself may have a suitable mechanism that forms a tool.
- Electronic elements or modules of the mechatronic installation component can serve, for example, mechanical elements or modules of the mechatronic installation component
- electronic elements or modules can thus serve, for example, as a control for the installation component.
- the installation component may have information technology elements or modules with which, for example, it can be deduced to which position a tool is brought and / or how the tool is to be operated and / or guided there during an assembly step.
- Information technology elements or modules should take place in such a way that, as part of the installation process, at least one assembly step can be performed semi-automatically or fully automatically by the mounting device.
- Guide components can also be provided on the carrier component, by means of which the carrier component can be guided during vertical displacement within the elevator shaft along one or more of the walls of the elevator shaft.
- the guide components may for example be designed as support rollers, which roll on the walls of the elevator shaft. Depending on the arrangement of the support rollers on the carrier component, it may be one to four in particular
- Support rollers may be provided.
- the mechatronic installation component comprises an industrial robot. Under an industrial robot can be a universal, mostly programmable machine for
- Such robots are designed for use in an industrial environment and have previously been used, for example, in the industrial production of complex goods in large numbers, for example in automobile production.
- an industrial robot has a so-called manipulator, a so-called effector and a controller.
- the manipulator may, for example, be a robot arm pivotable about one or more axes and / or displaceable along one or more directions.
- the effector may, for example, be
- the controller can serve the
- Manipulator and / or the effector suitable to control that is, for example, suitable to relocate and / or lead.
- the industrial robot is in particular designed to be coupled at its cantilever end with various assembly tools.
- the control of the industrial robot has in particular a so-called power unit and a control PC.
- the control PC carries out the actual calculations for the desired movements of the industrial robot and sends control commands for controlling the individual electric motors of the industrial robot to the power unit, which then converts them into concrete controls of the electric motors.
- the power unit is arranged in particular on the carrier component, whereas the control PC is not arranged on the carrier component, but in or next to the elevator shaft. If the power unit were not arranged on the carrier component, a multiplicity of cable connections would have to be led via the elevator shaft to the industrial robot. Due to the arrangement of the power unit on the carrier component must for the industrial robot mainly only a power supply and a
- Communication connection for example in the form of an Ethernet connection between the control PC and power unit are provided in particular via a so-called hanging cable.
- This allows a particularly simple cable connection, the In addition, because of the small number of cables is very robust and less prone to failure. It can be implemented other functions, such as a security monitoring in the control of the industrial robot, for the other cable connections between the control PC and power unit may be required.
- the industrial robot can also have a so-called passive auxiliary arm, which can only be moved together with the robot arm, and in particular has a device for holding a component, for example a retaining clip.
- a component for example a retaining clip.
- the robot arm can be moved, for example, so that the headband is received by the passive auxiliary arm and is held in the proper position, for example by means of a screw on the wall in the correct position.
- industrial robots are also equipped with various sensors that enable them to identify information, for example, about their environment, working conditions, components to be processed or the like. For example, sensors, forces, pressures, accelerations, temperatures, positions, distances, etc. can be detected in order to subsequently evaluate them appropriately. After initial programming, an industrial robot is typically in the
- An execution of the workflow can be varied, for example, depending on sensor information within certain limits.
- a controller of an industrial robot may optionally be self-learning.
- An industrial robot may thus be capable of performing various assembly steps as part of an installation operation in a single installation due to a way in which its components are mechanically and / or electrically configured, and a way in which these components can be controlled by the control of the industrial robot
- Industrial robot and optionally other installation components can be moved to a desired position within the hoistway.
- Installation component also be configured in other ways. Conceivable, inter alia, especially for the stated application in a (semi) automated elevator installation constructed mechatronic machines in which, for example, special drills, screwdrivers, feeding components, etc. are used. For example, linearly displaceable drilling tools, screwdriving tools and the like could be used here.
- the mounting device may further comprise a
- Positioning component which is designed to determine at least one of a position and an orientation of the mounting device within the elevator shaft.
- the mounting device using their
- Positioning component to be able to determine their position or pose with respect to the current spatial position and / or orientation within the hoistway.
- the positioning component may be arranged to detect a precise position of the mounting device within the hoistway with a desired accuracy, for example, an accuracy of less than 10 cm, preferably less than 1 cm or less than 1 mm.
- Orientation of the mounting device can also be performed with high accuracy, i. For example, an accuracy of less than 10 °, preferably less than 5 ° or 1 °, are found.
- the positioning component may in this case be designed to measure the elevator shaft from its current position.
- the positioning component can, for example, recognize where it is currently located in the hoistway, how large, for example, distances to walls, a ceiling and / or a floor of the hoistway, etc.
- the positioning component can detect how far they are from a Target position is located so that based on this information, the mounting device can be moved in the desired manner to reach the desired position.
- the positioning component can determine the position of the mounting device in different ways. For example, a position determination is under Use of optical measuring principles conceivable. For example, laser distance meters may measure distances between the positioning component and walls of the hoistway. Other optical measuring methods such as stereoscopic measuring methods or triangulation-based measuring methods are also conceivable. Besides optical measuring methods are also very different others
- Positioning method conceivable, for example, based on
- the installation component is designed to execute several different assembly steps at least partially automatically, preferably fully automatically.
- the installation component may in this case be designed to carry out various assembly tools, such as e.g. a drill, a screwdriver and / or a gripper to use.
- various assembly tools such as e.g. a drill, a screwdriver and / or a gripper to use.
- the ability to use different assembly tools enables the mechatronic installation component during one
- Installation process to perform various assembly steps simultaneously or sequentially, for example, to finally attach a component within the hoistway at a suitable position, for example.
- the installation component is designed to provide the assembly tool used in each of the various types of assembly steps
- the installation component can thus store a not required for the next assembly step assembly tool and record the required mounting tool, so change assembly tools.
- the installation component can thus always be coupled only with the currently required assembly tool.
- the installation component thus manages with a small space and can perform assembly steps in many places. It is therefore very flexible. If the installation component were always coupled with all the assembly tools required for the various assembly steps, it would require significantly more space. The respective assembly tools could thus be used in significantly fewer places.
- the mounting device further comprises a tool magazine component, which is designed to store mounting tools required for different assembly steps and to provide the installation component. This allows unneeded assembly tools can be stored safely and can be secured against falling during the execution of operations and during the displacement of the mounting device in the elevator shaft.
- the installation component is designed to drill holes in a wall of the hoistway at least partially controlled as an assembly step.
- the installation component can use a suitable drilling tool for this purpose. Both the tool and the installation component itself should be designed to be suitable to meet the conditions occurring during the assembly step within the hoistway.
- walls of a hoistway to which components are to be mounted are often made of concrete, in particular reinforced concrete.
- reinforced concrete When drilling holes in concrete very strong vibrations and high forces can occur.
- Drilling tool as well as the installation component itself should be designed to withstand such vibrations and forces.
- a damping element may for example be integrated in the assembly tool or arranged in a connecting element between installation component and assembly tool.
- the mounting tool and the connecting element as part of
- a damping element is designed for example as one or more parallel rubber buffers, which in large
- Rubber buffer can be considered as a damping element. It is also possible that a damping element is designed as a telescopic damper.
- the drills used are subject to wear and can also be damaged, for example, when hitting a reinforcement.
- a feed during drilling and / or a period of time for introducing a hole with a desired depth be monitored. When falling below a feed limit value and / or when exceeding a time duration limit, the drill used is detected as no longer in order and generates a corresponding message.
- the installation component may be designed as
- Assembly step at least partially automatic screws in holes of a wall of the
- the installation component can be designed to screw concrete screws in prefabricated holes in a concrete wall of the elevator shaft.
- high-load points can be created, where, for example, components can be attached.
- Concrete screws can be screwed directly into concrete, that is, without necessarily using dowels, and thus enable quick and easy installation.
- high forces or torques may be required, which the installation component or an assembly tool handled by it should be able to provide.
- the installation component can be designed to mount components on the wall of the hoistway at least partially automatically as an assembly step.
- Components may in this context include a wide variety of shaft material, such as e.g. Holding profiles, parts of guide rails, screws, bolts, clamps or the like.
- the mounting device further comprises a
- a magazine component adapted to store components to be installed and to provide the installation component.
- the magazine component may have a plurality of screws, in particular
- the magazine component can either actively supply the stored components to the installation component or passively provide the components in such a way that the installation component can actively remove these components and then mount them, for example.
- the magazine component may optionally be configured to store various components and these simultaneously or sequentially to the installation component provide. Alternatively, several different magazine components can be provided in the mounting device.
- the mounting device may further comprise a
- Displacement component which is adapted to displace the carrier component vertically within the elevator shaft.
- the mounting device itself may be configured to shift its carrier component within the hoistway suitably by means of its displacement component.
- the displacement component will generally have a drive by which the carrier component within the
- Elevator shaft can be moved, i. For example, between different floors of a building can be moved. Furthermore, the
- Displacement component having a control by means of which the drive can be operated controlled such that the carrier component can be brought to a desired position within the elevator shaft.
- a displacement component can also be provided externally.
- a drive pre-assembled in the elevator shaft can be provided as the displacement component. If necessary, this drive can be a later for the
- Elevator drive serving machine which is to be moved in the fully installed state of an elevator car and can be used during the previous installation process for moving the carrier component.
- it can be provided to establish a data communication possibility between the mounting device and the external displacement component, so that the mounting device can cause the displacement component to move the carrier component within the elevator shaft to a desired position.
- the carrier component can be connected to a counterweight by means of a resilient load-bearing, such as a rope, a chain or a belt, and the drive can act between the carrier component and the counterweight.
- a resilient load-bearing such as a rope, a chain or a belt
- the drive can act between the carrier component and the counterweight.
- the same drive configurations as for the transfer of elevator cars are possible for the displacement of the carrier component.
- the displacement component may be implemented in different ways so as to be able to support the carrier component together with the one held on it
- the displacement component can either be fixed to the carrier component of the mounting device or at a stop at the top inside the elevator shaft and have a trainable, flexible suspension means such as a rope, a chain or a belt, one end of which is held on the displacement component is and whose other end is fixed to the respective other element, that is at the stop above the elevator shaft or on the carrier component.
- a trainable, flexible suspension means such as a rope, a chain or a belt
- Relocating component to be mounted on the support component of the mounting device and a support member held on the displacement component support means may be attached at its other end to the top of a breakpoint within the hoistway. Or conversely, the displacement component at the top of the breakpoint in the
- Lift shaft be fixed and the free end of its suspension means can then be fixed to the support component of the mounting device.
- the displacement component can then displace the carrier component within the elevator shaft by displacing the suspension element.
- such a displacement component can be provided as a kind of winch, in which a flexible rope on an example of a
- Electric motor driven winch can be wound up.
- the winch can either be fixed to the carrier component of the mounting device or, alternatively, for example, in the top of the elevator shaft, for example on an elevator shaft ceiling.
- the free end of the rope can then be placed opposite either at the top of the breakpoint in the elevator shaft or at the bottom of the carrier component.
- the mounting device By targeted winding and unwinding of the rope on the winch then the mounting device can be moved within the hoistway.
- the displacement component may be attached to the carrier component and configured to exert a force on a wall of the hoistway by moving a movement component to displace the carrier component within the hoistway by moving the movement component along the wall.
- the displacement component may be directly attached to the carrier component and actively move along the wall of the elevator shaft by means of its component of motion.
- the displacement component for this purpose have a drive which moves one or more components of movement in the form of wheels or rollers, wherein the wheels or rollers are pressed against the wall of the hoistway, so that the offset from the drive in rotation wheels or rollers as slippery as possible along can roll the wall and thereby be able to relocate the displacement component together with the attached to it carrier component within the elevator shaft.
- Displacement component transmits forces to the wall of the hoistway in a different way.
- gears could serve as a component of motion and engage with a rack mounted on the wall to displace the displacement component vertically in the hoistway.
- the carrier component can be designed in two parts.
- the installation component is attached to a first part.
- On a second part of the fixing component is attached.
- Carrier component may then further comprise an alignment component which is adapted to align the first part of the carrier component relative to the second part of the carrier component, for example by rotating about a spatial axis.
- the fixing component may be the second part of the
- Fix carrier component within the elevator shaft for example by being supported laterally on walls of the elevator shaft.
- Particularly preferred is the
- Fixing component designed to support the second part of the carrier component on a shaft access side and a wall opposite thereto.
- the alignment component of the carrier component may then be the other, first part of the
- the installed on the first part installation component is mitverlagert.
- the mounting device further comprises a
- the Arm istsdetektionskomponente is thus able to detect a mostly non-visually recognizable, deepened inside a wall reinforcement such as a steel profile. An information about the existence of such
- Reinforcement may be advantageous, for example, when holes are to be drilled in a wall of the hoistway as an assembly step, since then a drilling of the reinforcement and thus both damage to the reinforcement as well as possibly damage to a drilling tool can be avoided.
- the mounting device may comprise a scanning component, by means of which a distance to an object, such as a wall of the
- Lift shaft can be measured.
- the scanning component can be guided, for example, by means of the installation component in a defined movement along the wall of the elevator shaft and the distance to the wall can be measured continuously. This allows conclusions to be drawn on an angular position of the wall and on the condition of the wall with regard to unevenness, steps or existing holes.
- the information obtained can be used, for example, to adapt the activation of the installation component, such as, for example, a change in a planned drilling position.
- the scanning component in a region in which a
- Bracket elements should be mounted, guided in a zigzag pattern along the wall, and from the measured distances a height profile of the wall can be created. This height profile can be used as described for an adaptation of the control of the installation component.
- a further aspect of the invention relates to a method for carrying out an installation process in an elevator shaft of an elevator installation.
- the method comprises inserting a mounting device according to an embodiment as described herein into a hoistway, controlled displacement of
- the mounting device described above can be used to partially or completely automated assembly steps of an installation process in an elevator shaft, and thus partially or completely autonomously perform.
- the mounting device is introduced into the elevator shaft in such a way that it is elongated in the vertical direction
- Supporting element is arranged opposite a wall of the elevator shaft with door openings.
- a secure fixation of the carrier component can also be made possible in the area of door openings.
- FIG. 1 shows a perspective view of a hoistway of an elevator installation with a mounting device accommodated therein in accordance with an embodiment of the present invention.
- Fig. 2 shows a perspective view of a mounting device according to an embodiment of the present invention.
- 3 shows a view from above into an elevator shaft of an elevator installation with a mounting device accommodated therein according to an alternative embodiment of the present invention.
- Fig. 4 shows a side view of an elevator shaft of an elevator system with a received therein mounting device and its energy
- FIG. 5 shows a part of an installation component designed as an industrial robot with a damping element and an assembly tool coupled thereto in the form of a drill.
- Fig. 6 shows a part of an industrial robot executed as an installation component with a damping element in a connecting element to a mounting tool in the form of a drill.
- Figures 7a and 7b show reinforcements in a wall of a hoistway in two areas in which associated holes are to be drilled, and one
- 8a and 8b show reinforcements in a wall of a hoistway shaft in two areas in which associated holes are to be drilled, and a
- Fig. 1 shows an elevator shaft 103 of an elevator installation 101, in which a
- Mounting device 1 is arranged according to an embodiment of the present invention.
- the mounting device 1 has a carrier component 3 and a mechatronic installation component 5.
- the carrier component 3 is designed as a frame on which the mechatronic installation component 5 is mounted. This frame has dimensions which make it possible to displace the carrier component 3 vertically within the elevator shaft 103, that is to say along the vertical 104, that is to say, for example, to move to different vertical positions on different floors within a building.
- the mechatronic installation component 5 is executed in the example shown as an industrial robot 7, the hanging down the frame of the carrier component 3 is mounted. An arm of the industrial robot 7 can be moved relative to the carrier component 3 and, for example, be shifted towards a wall 105 of the elevator shaft 3.
- the carrier component 3 is connected via a serving as a support means 17 steel cable with a
- Displacement component 15 connected in the form of a motor-driven winch, which is mounted at the top of the elevator shaft 103 at a stop 107 on the ceiling of the elevator shaft 103.
- the mounting device 1 can be displaced vertically within the elevator shaft 103 over an entire length of the elevator shaft 103.
- the mounting device 1 further comprises a fixing component 19, by means of which the carrier component 3 within the elevator shaft 103 in the lateral direction, that is, in the horizontal direction, can be fixed.
- Rear side of the carrier component 3 can be displaced to the front or rear to the outside and in this way caulk the carrier component 3 between walls 105 of the elevator shaft 103.
- the fixing component 19 and / or the punches can be spread outwards, for example by means of a hydraulic system or the like, in order to fix the carrier component 3 in the elevator shaft 103 in the horizontal direction.
- Fig. 2 shows an enlarged view of a mounting device 1 according to a
- the carrier component 3 is designed as a cage-like frame in which a plurality of horizontally and vertically extending spars form a mechanically loadable structure. A dimensioning of the spars and any braces provided is designed such that the carrier component 3 can withstand forces that may occur during various installation steps carried out by the installation component 5 during an installation process in the elevator shaft 103.
- tethers 27 are attached, which can be connected to a support means 17.
- the displacement component 15 could also be provided directly on the carrier component 3 and, for example by means of a winch, pull up or lower the carrier component 3 on a suspension element 17 fixed rigidly in the elevator shaft 3.
- Displacement component 15 also be mounted directly to the support component 3 and drive, for example via a drive rollers that are pressed firmly against walls 105 of the elevator shaft 103.
- the mounting device 1 could be vertically moved automatically within the hoistway 103 without installations in advance within the hoistway 103 would have to be made, in particular without, for example, a support means 17 within the
- Elevator shaft 103 would have to be provided.
- Guide components for example in the form of support rollers 25, can also be provided on the carrier component 3, with the aid of which the carrier component 3 can be guided during vertical displacement within the elevator shaft 103 along one or more of the walls 105 of the elevator shaft 103.
- the fixing component 19 is provided laterally on the support component 3.
- the fixing component 19 is formed with an elongated spar extending in the vertical direction, which can be displaced in the horizontal direction with respect to the frame of the carrier component 3.
- the spar can be attached to the carrier component 3 via a blockable hydraulic cylinder or a self-locking motor spindle, for example. If the spar of the
- Fixing component 19 is moved away from the frame of the carrier component 3, it moves laterally toward one of the walls 105 of the elevator shaft 103.
- Fixing component 19 could be displaced at the back of the carrier component 3 punch back to the support component 3 in the elevator shaft 103rd to sprain. In this way, the carrier component 3 can be caulked within the elevator shaft 103 and so, for example, during a performance of a
- Elevator shaft 103 can shift or get into vibration.
- Carrier component 3 be carried out in two parts. At a first part can thereby the
- Installation component 5 may be attached and on a second part the
- Fixing component 19 may be attached.
- an alignment component can also be provided on the carrier component 3, which enables a controlled alignment of the first part of the carrier component 3 carrying the installation component 5 with respect to the second part of the carrier component 3 that can be fixed within the elevator shaft 103.
- the carrier component 3 carrying the installation component 5 with respect to the second part of the carrier component 3 that can be fixed within the elevator shaft 103.
- the mechatronic installation component 5 is implemented by means of an industrial robot 7. It should be noted, however, that the mechatronic installation component 5 can also be realized in other ways, for example with differently designed actuators, manipulators, effectors, etc. In particular, the installation component could be a specially designed for use in an installation process within a hoistway 103 of a
- Elevator installation 1 adapted mechatronics or robotics have.
- the industrial robot 7 is equipped with a plurality of robot arms pivotable about pivot axes.
- the industrial robot may have at least six degrees of freedom, that is, an assembly tool 9 guided by the industrial robot 7 may be moved in six degrees of freedom, that is, for example, with three rotational degrees of freedom and three translational degrees of freedom.
- the industrial robot can be used as a vertical articulated robot, as a horizontal articulated robot or as a SCARA robot or as a Cartesian robot or
- the robot can at its cantilever end 8 with different
- Mounting tools 9 are coupled.
- the assembly tools 9 may differ in terms of their design and their intended use.
- Mounting tools 9 can be attached to the carrier component 3 in a tool
- Magazine component 14 are held such that the cantilevered end of the industrial robot 7 are approached and can be coupled to one of them.
- the industrial robot 7 can do this for example via a Have tool change system, which is designed so that it allows at least the handling of several such assembly tools 9.
- One of the assembly tools 9 may be designed as a drilling tool, similar to a drill.
- the installation component 5 can be configured to allow at least partially automated controlled drilling holes in one of the shaft walls 105 of the elevator shaft 103, for example.
- the drilling tool can in this case for example be moved and handled by the industrial robot 7 such that the drilling tool drills holes with a drill at a designated position, for example in concrete of the wall 105 of the hoistway 103 into which, for example, fastening screws for fastening fasteners can later be screwed.
- the drilling tool as well as the industrial robot 7 can be designed to be suitable, for example, that they can withstand the considerable forces and vibrations occurring during drilling in concrete.
- Another assembly tool 9 may be configured as a screwing device to at least partially screw screws in previously drilled holes in a wall 105 of the elevator shaft 103.
- the screwing can be designed in particular such that with their help concrete screws in concrete a shaft wall 105 can be screwed.
- a magazine component 11 can be provided on the carrier component 3.
- the magazine component 11 may serve to store components 13 to be installed and to provide the installation component 5.
- the magazine component 11 is arranged in a lower region of the frame of the carrier component 3 and accommodates various components 13, for example in the form of different profiles, which are to be mounted within the elevator shaft 103 on walls 105 in order, for example, to fix guide rails for the elevator installation 101 thereto to be able to.
- screws can be stored and provided, which can be screwed by means of the installation component 5 in prefabricated holes in the wall 105.
- the industrial robot 7 can, for example, automatically grasp a fastening screw from the magazine component 11 and, for example, screw it incompletely into previously drilled mounting holes in the wall 105 with a mounting tool 9 designed as a screwing device. Subsequently, an assembly tool 9 can be changed on the industrial robot 7 and, for example, a to be mounted component 13 are gripped from the magazine component 11.
- the component 13 may have attachment slots. If the component 13 is brought into an intended position with the aid of the installation component 5, the fastening screws, which have been partially screwed in beforehand, can engage in or extend through these fastening slots. Below can turn on the as
- Screwing trained training tool 9 are reconfigured and the mounting screws are tightened.
- an installation process in which components 13 are mounted on a wall 105 can be performed completely or at least partially automated by the installation component 5 first drilling holes in the wall 105 and then components 13 fastened in these holes with fixing screws.
- Such an automated installation process can be carried out relatively quickly and can, in particular, help with installation work to be carried out repeatedly repetitively within a hoistway
- a positioning component 21 can furthermore be provided.
- Positioning component 21 may for example be permanently mounted on the carrier component 3 and thus be moved during the process of the mounting device 1 within the elevator shaft 3.
- the positioning component 21 could also be arranged independently of the mounting device 1 at another position within the elevator shaft 103 and determine a current position of the mounting device 1 from there.
- the positioning component 21 can use different measuring principles in order to be able to precisely determine the current position of the mounting device 1.
- optical measurement methods seem suitable to a desired
- a Control of the mounting device 1 can evaluate signals from the positioning component 21 and determine an actual positioning relative to a desired positioning within the elevator shaft 103 on the basis of these signals. Based on this, the controller can then, for example, first the carrier component 3 within the
- Installation component 5 suitably control, for example, 3 holes to drill at desired locations within the hoistway, screwing screws and / or ultimately to assemble components 13.
- the mounting device 1 can in this case also a
- Arm istösdetektionskomponente have 23.
- the reinforcement detection component 23 is accommodated in the magazine component 11 in a manner similar to one of the assembly tools 9 and can be handled by the industrial robot 7.
- the armor detection component 23 can thus be brought by the industrial robot 7 to a desired position at which, for example, subsequently a hole is to be drilled in the wall 105.
- the armor detection component 23 could also be otherwise connected to the
- Mounting device 1 are provided.
- the reinforcement detection component 23 is configured to detect a reinforcement within the wall 105 of the hoistway 103.
- the reinforcement detection component 23 is configured to detect a reinforcement within the wall 105 of the hoistway 103.
- Arm istsdetektionskomponente for example, use physical measuring methods in which electrical and / or magnetic properties of the typically metallic reinforcement are used within a concrete wall to accurately detect this reinforcement.
- control of the assembly apparatus 1 may correct, for example, previously assumed positions of bolt holes to be drilled such that no intersection occurs between the bolt holes and the reinforcement.
- a mounting device 1 is described, with the example robot assisted an installation process partially or fully automated within a
- Elevator shaft 103 can be performed.
- the mounting device 1 can at least support installation personnel during the installation of components of the elevator installation 101 within the elevator shaft 103, that is, for example Do preliminary work.
- multiple occurring, that is repetitive, steps can be automated and thus performed quickly, accurately, low risk and / or cost.
- the installation process steps performed in an assembly process may vary with respect to individual ones
- Assembly tools 9 can be changed by hand and / or components, for example, by hand refilled in the magazine component. Also
- a functional scope of a mechatronic installation component 5 provided in the mounting device 1 may comprise all or part of the work steps listed below:
- the elevator shaft 103 can be measured. In this case, for example, door openings 106 can be detected, a precise orientation of the elevator shaft 103 can be detected, and / or a shaft layout can be optimized. If appropriate, real surveying data of the elevator shaft 103 obtained by a surveying operation can be compared with planning data, as indicated, for example, in a CAD model of the elevator shaft 103.
- Orientation and / or location of the mounting device 1 within the hoistway 103 can be determined.
- Reinforcing iron or reinforcements in walls 105 of the elevator shaft 103 can be detected.
- preliminary work such as drilling, milling, cutting work, etc.
- these preliminary work can be carried out preferably partially or fully automatically by the installation component 5 of the mounting device 1.
- components 13 such as fasteners, interface elements and / or bracket elements can be installed.
- components 13 such as fasteners, interface elements and / or bracket elements can be installed.
- concrete screws can be screwed into previously drilled holes, bolts are hammered, parts are welded together, nailed and / or glued or the like.
- Components and / or shaft material such as brackets, rails, landing door elements, screws and the like can be handled assisted by the mounting device 1 or completely automated.
- Required material and / or components can be automated and / or staffed by staff in the mounting device 1 refilled.
- work steps 103 work steps and a workflow can be matched to each other in an installation process within a hoistway and, for example, machine-human interactions are minimized, that is to be created as autonomous system working.
- the displacement component for displacing the mounting device in the elevator shaft can also be arranged on the carrier component of the mounting device and act on walls of the elevator shaft.
- Such a mounting device 1 in an elevator shaft 103 is shown in Fig. 3 in a view from above.
- Displacement component 115 has two electric motors 151, which are arranged on the carrier component 3 of the mounting device 1. At opposite
- Pages of the carrier component 3 is attached via two guides 152 each have a rotatable shaft 153.
- two wheels 154 are secured against rotation relative to the axles 153.
- the wheels 154 can roll on walls 105 of the elevator shaft 103 and are pressed against the respective wall 105 via pressing devices, not shown.
- the electric motors 151 are via a drive connection 155, for example in the form of gears and a chain with the axes 153rd
- Displacement component 115 is disposed, a fixing component consisting of a support member 119 and a telescopic cylinder 120.
- the support element 119 is arranged such that it is located on one side with door openings 106 (not shown in FIG. 3) in the walls 105 of the elevator shaft 103 (analogous to FIG. 1).
- the mounting device 1 is thus introduced into the elevator shaft 103, that the support member 119 is arranged accordingly.
- the elongated support member 119 has a mainly cuboid or bar-shaped basic shape and is aligned in the vertical direction. Analogous to the illustration in FIGS. 1 and 2, it extends over the complete vertical extent of
- Carrier component 3 and also still protrudes in both directions over the
- the support element 119 is connected via two cylindrical connecting elements 123 with the carrier component 3.
- the Connecting elements 123 consist of two parts not shown separately, which can be manually pushed into each other and pulled apart, where they can be fixed in several positions. Thus, a distance 122 between the support member 119 and the carrier component 3 can be adjusted.
- a telescopic cylinder 120 On the side opposite the support member 119 side of the carrier component 3, a telescopic cylinder 120 is arranged centrally.
- the telescopic cylinder 120 has an extendable punch 121, which is connected to a U-shaped extension element 124.
- the punch 121 can be extended so far in the direction of the wall 105 of the elevator shaft 103, that the support element 119 and the extension member 124 connected to the punch 121 abut against walls 105 of the elevator shaft 103 and the carrier component 3 is thus caulked to the walls 105.
- Carrier component 3 is thus fixed in the vertical direction and in the horizontal direction, ie transversely to the vertical direction.
- the telescopic cylinder 120 is electromotive off and retracted.
- drive for example, pneumatically or hydraulically conceivable.
- the telescopic cylinder 120 shown in FIG. 3 is arranged on or in the region of an upper side of the carrier component 3.
- the carrier component 3 also has a telescopic cylinder on or in the region of its underside.
- Fixation component is also possible in combination with a mounting device, which by means of a support means as shown in FIGS. 1 and 2, within the
- Elevator shaft can be relocated.
- FIG. 4 shows energy and communication connections to a mounting device 1 in an elevator shaft 103.
- the mounting device 1 has a carrier component 3 and a mechatronic installation component 5 in the form of an industrial robot 7.
- the industrial robot 7 is controlled by a controller which consists of a on the
- Carrier component 3 arranged power section 156 and one on a floor outside the elevator shaft 103 arranged control PC 157 consists.
- the control PC 157 and the power unit 156 are connected to one another via a communication line 158, for example in the form of an Ethernet line.
- Communication line 158 is part of a so-called hanging cable 159, which also includes power lines 160, via which the mounting device 1 of a
- Voltage source 161 is supplied with electrical energy. Out
- the power section 156 of the industrial robot 7 is thus supplied with electrical energy via the power lines 160 and is in communication communication with the control PC 157 via the communication line 158.
- the control PC 157 can therefore send control signals to the power unit 156 via the communication line 158, which then converts these into concrete controls of the individual electric motors of the industrial robot 7, not shown, and thus for example moves the industrial robot 7 as specified by the control PC 157.
- FIG. 5 shows part of an installation component 5 designed as an industrial robot 7 with a damping element 130 and an assembly tool coupled thereto in the form of a drill 131.
- a drill bit 132 is used, which can be driven by the drill 131.
- the damping element 130 consists of a plurality of parallel rubber bumpers 136, each as a
- Damping element can be considered.
- the damping element 130 is inserted into an arm 133 of the industrial robot 7 and divides it into a first, drill-side part 134 and a second part 135.
- the damping element 130 connects the two parts 134, 135 of the arm 133 of the industrial robot 7 and gives attenuated shocks and vibrations introduced to the second part 135 via the drilling insert 132.
- a damping element 130 can also be arranged in a connecting element 137 from an industrial robot 7 to an assembly tool in the form of a drill 131.
- the damping element is basically the same as the
- Damping element 130 constructed in Fig. 5.
- the connecting element 137 is firmly connected to the drill 131, so that the industrial robot 7 for drilling a hole in a wall of the elevator shaft, the combination of connecting element 137 and
- Drill 131 receives. It is also possible that a damping element is designed as an integral part of a drill.
- a feed rate during drilling and / or a time to drill a hole of a desired depth is monitored.
- the drill bit used is detected as no longer in order and generates a corresponding message.
- a portion 140 of a wall of a hoistway is shown in which a bore is to be performed at a first drilling position.
- the area 140 is divided into grid squares identified to the right with successive letters A to J and downwardly with ascending numbers 1 to 10. This division was carried out analogously in FIG. 7b.
- first and second reinforcements 141, 142 run from top to bottom, whereby they run straight and parallel to one another, at least in the illustrated region 140.
- the first reinforcement 141 extends from Bl to BIO and the second reinforcement 142 from II to 110.
- third and fourth reinforcements 143, 144 extend from left to right, whereby they run straight and parallel to each other at least in the area shown.
- the third reinforcement 143 runs from A4 to J4 and the fourth reinforcement 144 from A10 to J10.
- the reinforcement detection component 23 is guided by the installation component 5 several times along the wall 105 of the elevator shaft.
- Arm istsdetektionskomponente 23 is first performed several times from top to bottom (and vice versa) and then from left to right (and vice versa).
- the armor detection component 23 continuously provides the distance 145 to the armoring 143 closest to the direction of movement during the movement, so that from the known position of the armor detection component 23 and the said distance 145 the illustrated illustration of the position of the armaments 141, 142, 143, 144 can be created.
- a first possible range 146 for the first drilling position may be determined. In Fig. 7a, this first possible area 146 is a rectangle with the corners C5, H5, C9 and H9.
- the area 147 of a wall of a hoistway shown in FIG. 7b is
- first and second drilling positions are in the illustrated example in Figs. 7a and 7b in
- Grid square B2 in the region 140 of Fig, 7a is performed, the second hole in the area 147 of Fig. 7b must also be performed in the grid square B2. This ensures that the second hole is positioned correctly relative to the first hole.
- the courses of the reinforcements 141, 142, 143, 144 in FIG. 7b are not identical as in FIG. 7a.
- the first reinforcement 141 extends from D1 to D10 in FIG. 7b and the second reinforcement 142 from J1 to J10.
- the third reinforcement 143 extends in FIG. 7b from A5 to J5 and the fourth reinforcement 144 as in FIG. 7a from A10 to J10.
- this second possible region 148 for the second drilling position can be determined.
- this second possible area 148 is a rectangle with the corners E6, 16, E9 and 19.
- the possible areas for the first and second drilling positions are shown in FIG.
- Reinforcements 141, 142, 143, 144 in Fig. 8a corresponds to the arrangement in Fig. 7a and the arrangement in Fig. 8b of the arrangement in Fig. 7b. Also identical is the division into grid squares.
- possible positions for the first drilling position are determined. For this purpose, it is checked with the aid of the reinforcement detection component 23 whether a hole is possible here at a desired drilling position, here D5. This is the case here. Subsequently, further possible positions for the first drilling position are searched. For this purpose, starting from the desired drilling position D5 spiral in the
- a possible second drilling position is searched. Due to the described assignment of the two drilling positions, the second drilling position must lie in the same grid square as the first drilling position. It is first checked whether the desired drilling position, ie here D5 is also possible for the second drilling position. In the example shown, this is not possible because of a collision with the reinforcement 141, so that spiraling is continued analogously to the procedure for the first drilling position. The second possible position E5 is not possible because of a collision with the reinforcement 143.
- the third possible position E6 is possible, so that in the example illustrated in FIGS. 8a and 8b, the first drilling position 172 in FIG. 8a and the second drilling position 173 in FIG. 8b are defined in the grid square E6.
Landscapes
- Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Mechanical Engineering (AREA)
- Structural Engineering (AREA)
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
- Automatic Assembly (AREA)
- Manipulator (AREA)
- Cage And Drive Apparatuses For Elevators (AREA)
Abstract
Description
Claims
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP15178287 | 2015-07-24 | ||
PCT/EP2016/065240 WO2017016780A1 (de) | 2015-07-24 | 2016-06-30 | Automatisierte montagevorrichtung zur durchführung von installationen in einem aufzugschacht einer aufzuganlage |
Publications (2)
Publication Number | Publication Date |
---|---|
EP3325394A1 true EP3325394A1 (de) | 2018-05-30 |
EP3325394B1 EP3325394B1 (de) | 2019-11-20 |
Family
ID=53724070
Family Applications (3)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP16733547.0A Active EP3325395B1 (de) | 2015-07-24 | 2016-06-30 | Automatisierte montagevorrichtung zur durchführung von installationen in einem aufzugschacht einer aufzuganlage |
EP16733545.4A Active EP3325394B1 (de) | 2015-07-24 | 2016-06-30 | Automatisierte montagevorrichtung zur durchführung von installationen in einem aufzugschacht einer aufzuganlage |
EP16733548.8A Active EP3325396B1 (de) | 2015-07-24 | 2016-06-30 | Automatisierte montagevorrichtung zur durchführung von installationen in einem aufzugschacht einer aufzuganlage |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP16733547.0A Active EP3325395B1 (de) | 2015-07-24 | 2016-06-30 | Automatisierte montagevorrichtung zur durchführung von installationen in einem aufzugschacht einer aufzuganlage |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP16733548.8A Active EP3325396B1 (de) | 2015-07-24 | 2016-06-30 | Automatisierte montagevorrichtung zur durchführung von installationen in einem aufzugschacht einer aufzuganlage |
Country Status (19)
Country | Link |
---|---|
US (3) | US10850946B2 (de) |
EP (3) | EP3325395B1 (de) |
KR (2) | KR102585413B1 (de) |
CN (3) | CN107922166B (de) |
AU (3) | AU2016299144B2 (de) |
BR (3) | BR112017026363B1 (de) |
CA (3) | CA2988505C (de) |
ES (2) | ES2769749T3 (de) |
HK (3) | HK1247175A1 (de) |
IL (1) | IL256596B (de) |
MX (3) | MX2018000986A (de) |
MY (3) | MY189102A (de) |
NZ (1) | NZ737713A (de) |
PH (1) | PH12018500001A1 (de) |
PL (2) | PL3325395T3 (de) |
RU (2) | RU2715066C2 (de) |
SG (3) | SG11201800575SA (de) |
WO (3) | WO2017016780A1 (de) |
ZA (2) | ZA201801168B (de) |
Families Citing this family (50)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3107856B1 (de) * | 2014-02-21 | 2020-04-22 | Wurtec Elevator Products & Services | Falsche fahrkorbvorrichtung |
EP3436390B1 (de) * | 2016-03-31 | 2020-04-29 | Inventio AG | Verfahren und montagevorrichtung zum durchführen eines installationsvorgangs in einem aufzugschacht einer aufzuganlage |
US11242227B2 (en) * | 2016-04-20 | 2022-02-08 | Inventio Ag | Method and assembly device for carrying out an installation process in an elevator shaft of an elevator system |
MX2019006015A (es) | 2016-11-24 | 2019-08-01 | Inventio Ag | Metodo para montaje y dispositivo de alineacion para alineacion de riel guia de sistema de elevador. |
US11186464B2 (en) | 2017-02-08 | 2021-11-30 | Inventio Ag | Method for fixing a rail bracket of an elevator system, and elevator system |
WO2018153522A1 (en) * | 2017-02-23 | 2018-08-30 | Siemens Wind Power A/S | Assembly assisting device for assisting of the assembling of two wind turbine components of a wind turbine and method for assembling of the two wind turbine components |
BR112019016943A2 (pt) * | 2017-03-06 | 2020-04-14 | Inventio Ag | sistema de montagem para realização de um processo de instalação em um poço de elevador de uma instalação de elevador |
PL3601137T3 (pl) * | 2017-03-27 | 2021-11-02 | Inventio Ag | Sposób i urządzenie montażowe do prowadzenia procesu instalacji w szybie dźwigu instalacji dźwigowej |
WO2019052970A1 (de) | 2017-09-13 | 2019-03-21 | Inventio Ag | Installationseinrichtung und verfahren zum bringen einer installationseinrichtung in eine installationsposition in einem aufzugschacht |
WO2019052971A1 (de) | 2017-09-15 | 2019-03-21 | Inventio Ag | Vorrichtung und verfahren zum automatisierten durchführen eines montageschritts in einem aufzugschacht |
WO2019063356A1 (de) * | 2017-09-27 | 2019-04-04 | Inventio Ag | Ausrichtvorrichtung und verfahren zur montage einer führungsschiene in einem aufzugschacht einer aufzuganlage |
DE102017223644A1 (de) * | 2017-12-22 | 2018-12-06 | Thyssenkrupp Ag | Verfahren zum Anbringen einer Antriebeinheit eines Linearantriebs in einem Aufzugsschacht |
EP3546127A1 (de) | 2018-03-28 | 2019-10-02 | Inventio AG | Setzwerkzeug und verfahren zum schlagenden eintreiben einer ankerstange in ein bohrloch |
JP2020007095A (ja) * | 2018-07-06 | 2020-01-16 | 株式会社日立ビルシステム | エレベーター据付装置 |
EP3829803B1 (de) | 2018-07-31 | 2022-08-31 | Inventio AG | Vorrichtung und ein verfahren zum entfernen eines werkzeugs aus einem werkzeughalter |
WO2020048727A1 (de) * | 2018-09-03 | 2020-03-12 | Inventio Ag | Montagesystem zur durchführung eines installationsvorgangs in einem aufzugschacht einer aufzuganlage |
US11708244B2 (en) | 2018-09-26 | 2023-07-25 | Inventio Ag | Method for planning and at least partially installing an elevator system in an elevator shaft |
SG11202103837RA (en) * | 2018-11-20 | 2021-05-28 | Inventio Ag | Method and mounting device for automated determination of a drilling position of a drill hole |
CN109205445B (zh) * | 2018-11-23 | 2019-08-02 | 燕山大学 | 一种用于安装电梯导轨的自爬升机器人 |
CN113015687B (zh) * | 2018-11-27 | 2023-07-14 | 因温特奥股份公司 | 用于在建筑物墙壁上自动钻出钻孔的装配装置和方法 |
CN109356390A (zh) * | 2018-11-29 | 2019-02-19 | 上海大界机器人科技有限公司 | 一种建筑施工设备、系统及其控制方法 |
US11059701B2 (en) * | 2018-12-06 | 2021-07-13 | Tk Elevator Innovation And Operations Gmbh | Methods and apparatuses for lifting elevator cars during installation |
EP3894348B1 (de) * | 2018-12-13 | 2022-08-17 | Inventio AG | Verfahren zur zumindest teilweise automatisierten planung einer installation von aufzugkomponenten einer aufzuganlage |
US11807495B2 (en) * | 2019-03-05 | 2023-11-07 | Inventio Ag | Measuring device for measuring an elevator shaft and use of the measuring device to measure an elevator shaft |
CN113544077B (zh) * | 2019-03-27 | 2023-04-18 | 因温特奥股份公司 | 用于在电梯系统的电梯井道中执行安装过程的安装设备和方法 |
WO2020212143A1 (de) | 2019-04-15 | 2020-10-22 | Inventio Ag | Setzwerkzeug und verfahren zum schlagenden eintreiben einer ankerstange in ein bohrloch |
CN109987478A (zh) * | 2019-04-18 | 2019-07-09 | 湖南电气职业技术学院 | 一种用于电梯导轨支架安装的辅助定位系统及方法 |
US11724917B2 (en) * | 2019-05-21 | 2023-08-15 | Inventio Ag | Aligning device and method for aligning a guide rail of an elevator system by means of force pulses |
DE102019207842A1 (de) * | 2019-05-28 | 2020-12-03 | Thyssenkrupp Ag | Haltevorrichtung für eine Bohreinrichtung zu Montagezwecken in einer Aufzuganlage |
EP3766818B1 (de) * | 2019-07-16 | 2023-06-07 | KONE Corporation | Verfahren und anordnung zum installieren von aufzugsführungsschienen in einem aufzugsschacht |
EP3766820B1 (de) * | 2019-07-16 | 2023-05-31 | KONE Corporation | Verfahren und anordnung zur aufzugsführungsschieneninstallation |
JP7086906B2 (ja) | 2019-09-13 | 2022-06-20 | 株式会社東芝 | 作業支援装置、作業支援方法、および作業支援プログラム |
EP4054967B1 (de) | 2019-11-08 | 2023-10-25 | Inventio Ag | Installationseinrichtung für eine verwendung in einem aufzugschacht |
US11772934B2 (en) | 2019-11-12 | 2023-10-03 | Inventio Ag | Mounting frame for displacing and fixing in a shaft |
MX2022005731A (es) * | 2019-11-12 | 2022-06-09 | Inventio Ag | Marco de montaje para desplazamiento y fijacion en un pozo. |
CN114981196B (zh) * | 2020-01-16 | 2024-08-06 | 因温特奥股份公司 | 对人员运送设备进行数字化归档和模拟的方法 |
KR20220129552A (ko) * | 2020-01-17 | 2022-09-23 | 인벤티오 아게 | 모바일 운송 장치 및 설치 프레임을 샤프트에 도입하는 방법 |
US20230094665A1 (en) | 2020-02-07 | 2023-03-30 | Inventio Ag | Installation device for carrying out installation steps on a wall and method for exchanging a tool of an installation apparatus |
AU2021220916B2 (en) | 2020-02-11 | 2024-08-08 | Inventio Ag | Assembly apparatus for implementing assembly steps on a wall and method for arranging a magazine component on an assembly apparatus |
BR112022017766A2 (pt) | 2020-03-12 | 2022-10-18 | Inventio Ag | Método para formar estrutura de guia para guiar cabine de elevador em poço de elevador |
US12000689B2 (en) | 2020-08-17 | 2024-06-04 | Faro Technologies, Inc. | Environmental scanning and image reconstruction thereof |
CN112520533B (zh) * | 2020-12-10 | 2022-04-12 | 漳州市高林电梯有限公司 | 一种电梯自动化施工设备 |
CN112520534B (zh) * | 2020-12-10 | 2022-04-12 | 漳州市高林电梯有限公司 | 一种电梯智能安装系统 |
CN112917140B (zh) * | 2021-02-25 | 2022-05-27 | 联想新视界(江苏)设备服务有限公司 | 一种电梯l板安装装置 |
CN113579712B (zh) * | 2021-08-06 | 2022-05-17 | 联想新视界(江苏)设备服务有限公司 | 一种电梯l板搬运锁紧夹具机构 |
CN113460830B (zh) * | 2021-08-06 | 2022-09-23 | 联想新视界(江苏)设备服务有限公司 | 一种电梯铺轨l板安装装置 |
CN113800358B (zh) * | 2021-09-16 | 2023-03-24 | 无锡瑞吉德机械有限公司 | 一种电梯井道刚柔并济撑墙机构 |
CN113977173B (zh) * | 2021-11-22 | 2024-02-06 | 联想新视界(江苏)设备服务有限公司 | 一种电梯井l型支架的自动焊接机 |
WO2024149926A1 (en) * | 2023-01-09 | 2024-07-18 | Kone Corporation | Installation carriage, use of installation carriage and method of installing components |
CN118306875A (zh) * | 2024-06-07 | 2024-07-09 | 联想新视界(江苏)设备服务有限公司 | 一种轻型自动安装导轨系统 |
Family Cites Families (36)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1431059A1 (de) | 1964-11-02 | 1968-10-17 | Loedige Alois Dipl Ing | Aufzugsanlage |
JPS585436B2 (ja) | 1975-08-29 | 1983-01-31 | 松下電器産業株式会社 | ランニングヒヨウジセイギヨソウチ |
SU988733A1 (ru) * | 1981-08-28 | 1983-01-15 | Опытно-Механический Завод "Главленстройматериалов" Ленгорисполкома | Устройство дл креплени направл ющей кабины лифта |
JPS59232594A (ja) * | 1983-06-15 | 1984-12-27 | 富士車輌株式会社 | 衣類の搬送装置 |
JPS642986A (en) | 1987-06-25 | 1989-01-06 | Mitsubishi Electric Corp | Installation device for elevator |
US5020641A (en) * | 1990-06-20 | 1991-06-04 | Otis Elevator Company | Method and apparatus for erecting hydraulic elevator rails |
JPH0455276A (ja) * | 1990-06-21 | 1992-02-21 | Toshiba Corp | エレベータ塔内機器据付方法およびその装置 |
JP3034960B2 (ja) | 1990-12-28 | 2000-04-17 | 株式会社東芝 | 昇降路内機器据付装置 |
JPH05105362A (ja) | 1991-10-21 | 1993-04-27 | Toshiba Corp | 昇降路内作業装置 |
DE4200518A1 (de) | 1992-01-11 | 1993-07-15 | Bosch Gmbh Robert | Metallsuchdetektor |
JPH05228897A (ja) | 1992-02-13 | 1993-09-07 | Toshiba Corp | コンクリート穿鑿装置 |
RU2044681C1 (ru) | 1992-11-05 | 1995-09-27 | Акционерное общество "Западно-Сибирский металлургический комбинат" | Ленточный конвейер с нижней грузонесущей ветвью ленты |
JPH07151119A (ja) * | 1993-12-01 | 1995-06-13 | Toshiba Corp | アンカボルト取付装置及びアンカボルトの締付方法 |
JPH08245116A (ja) * | 1995-03-14 | 1996-09-24 | Toshiba Corp | エレベータの据付工法 |
JP3214801B2 (ja) | 1995-04-06 | 2001-10-02 | 東芝アイティー・コントロールシステム株式会社 | ガイドレール固定装置及び固定方法 |
JPH08290875A (ja) | 1995-04-21 | 1996-11-05 | Hitachi Building Syst Eng & Service Co Ltd | エレベータ据付用穴あけ装置 |
JPH09300114A (ja) | 1996-05-17 | 1997-11-25 | Press Kogyo Kk | ロボットによる穴明け装置 |
US5855721A (en) | 1997-03-11 | 1999-01-05 | The Regents Of The University Of California | Non-destructive method of determining the position and condition of reinforcing steel in concrete |
KR100288534B1 (ko) | 1998-06-25 | 2002-06-20 | 정명세 | 콘크리트내의철근의깊이와굵기를동시에측정할수있는다중코일탐촉자와이것을이용한측정방법 |
US6772091B1 (en) | 1998-12-08 | 2004-08-03 | Geophysical Survey Systems, Inc. | Determining the depth of reinforcing bars in a concrete structure using electromagnetic signals |
US6926473B2 (en) * | 2000-06-20 | 2005-08-09 | Actuant Corporation | Hand drill attachment |
ATE454248T1 (de) * | 2005-11-16 | 2010-01-15 | Metabowerke Gmbh | Motorisch angetriebener bohrhammer |
DE102007060636A1 (de) | 2007-12-17 | 2009-06-18 | Robert Bosch Gmbh | Elektrohandwerkzeug, insbesondere ein Bohr- und/oder Meißelhammer, mit einer Tilgereinheit |
AT507338B1 (de) | 2008-09-26 | 2010-07-15 | Ltw Intralogistics Gmbh | Fahrbarer bohrlochpositionierer, insbesondere selbstfahrender, automatischer bohrroboter |
ES2556593T3 (es) | 2008-12-05 | 2016-01-19 | Otis Elevator Company | Sistema de ascensor y método de instalación |
US8517642B2 (en) * | 2009-02-11 | 2013-08-27 | Phil Borunda | Tool mounted stud finder |
US9664808B2 (en) * | 2009-03-06 | 2017-05-30 | Milwaukee Electric Tool Corporation | Wall scanner |
FI20090389A (fi) * | 2009-10-23 | 2011-04-24 | Kone Corp | Menetelmä hissin valmistamisessa |
DE102012104993A1 (de) | 2012-06-11 | 2013-12-12 | Thyssenkrupp Elevator Ag | Verfahren und Montagesystem zur Montage von Aufzugskomponenten |
FI123925B (fi) * | 2012-08-17 | 2013-12-13 | Kone Corp | Menetelmä hissiin liittyvän tiedon hallinnoinnissa |
CN102926548B (zh) | 2012-10-11 | 2015-05-06 | 中冶天工上海十三冶建设有限公司 | 一种在钢筋混凝土表面后置式预埋钢板的钻洞定位方法 |
CN103123016B (zh) | 2013-02-28 | 2014-11-12 | 浙江国联设备工程有限公司 | 随桥敷设燃气管道施工工法 |
GB201419182D0 (en) | 2014-10-28 | 2014-12-10 | Nlink As | Mobile robotic drilling apparatus and method for drilling ceillings and walls |
CN104742116B (zh) | 2015-02-10 | 2017-01-04 | 浙江瑞鹏机器人科技有限公司 | 一种新型五自由度机器人机构 |
EP3085660B1 (de) * | 2015-04-23 | 2020-10-28 | Kone Corporation | Verfahren und anordnung zur installation von fahrstuhlführungsschienen |
CA3045313A1 (en) | 2016-12-19 | 2018-06-28 | Druggability Technologies Ip Holdco Limited | Pharmaceutical formulations of suvorexant |
-
2016
- 2016-06-30 SG SG11201800575SA patent/SG11201800575SA/en unknown
- 2016-06-30 CN CN201680042718.4A patent/CN107922166B/zh active Active
- 2016-06-30 MY MYPI2017705072A patent/MY189102A/en unknown
- 2016-06-30 CA CA2988505A patent/CA2988505C/en active Active
- 2016-06-30 KR KR1020187001887A patent/KR102585413B1/ko active IP Right Grant
- 2016-06-30 WO PCT/EP2016/065240 patent/WO2017016780A1/de active Application Filing
- 2016-06-30 MY MYPI2017705070A patent/MY187853A/en unknown
- 2016-06-30 SG SG11201800577WA patent/SG11201800577WA/en unknown
- 2016-06-30 CA CA2987484A patent/CA2987484C/en active Active
- 2016-06-30 MX MX2018000986A patent/MX2018000986A/es unknown
- 2016-06-30 US US15/746,547 patent/US10850946B2/en active Active
- 2016-06-30 CA CA2988509A patent/CA2988509C/en active Active
- 2016-06-30 WO PCT/EP2016/065246 patent/WO2017016782A1/de active Application Filing
- 2016-06-30 PL PL16733547T patent/PL3325395T3/pl unknown
- 2016-06-30 RU RU2018106302A patent/RU2715066C2/ru active
- 2016-06-30 MX MX2018000988A patent/MX2018000988A/es active IP Right Grant
- 2016-06-30 MY MYPI2017705068A patent/MY187387A/en unknown
- 2016-06-30 CN CN201680042711.2A patent/CN107848768A/zh active Pending
- 2016-06-30 ES ES16733547T patent/ES2769749T3/es active Active
- 2016-06-30 US US15/746,090 patent/US10836610B2/en active Active
- 2016-06-30 BR BR112017026363-7A patent/BR112017026363B1/pt active IP Right Grant
- 2016-06-30 BR BR112017026263-0A patent/BR112017026263B1/pt active IP Right Grant
- 2016-06-30 AU AU2016299144A patent/AU2016299144B2/en active Active
- 2016-06-30 WO PCT/EP2016/065247 patent/WO2017016783A1/de active Application Filing
- 2016-06-30 US US15/746,161 patent/US10843902B2/en active Active
- 2016-06-30 EP EP16733547.0A patent/EP3325395B1/de active Active
- 2016-06-30 BR BR112017026754-3A patent/BR112017026754B1/pt active IP Right Grant
- 2016-06-30 RU RU2018106279A patent/RU2722774C2/ru active
- 2016-06-30 SG SG11201800099XA patent/SG11201800099XA/en unknown
- 2016-06-30 AU AU2016299143A patent/AU2016299143B2/en active Active
- 2016-06-30 KR KR1020187001826A patent/KR102585414B1/ko active IP Right Grant
- 2016-06-30 AU AU2016299141A patent/AU2016299141B2/en active Active
- 2016-06-30 CN CN201680042616.2A patent/CN107848767B/zh active Active
- 2016-06-30 MX MX2018000985A patent/MX2018000985A/es unknown
- 2016-06-30 NZ NZ737713A patent/NZ737713A/en unknown
- 2016-06-30 EP EP16733545.4A patent/EP3325394B1/de active Active
- 2016-06-30 PL PL16733548T patent/PL3325396T3/pl unknown
- 2016-06-30 EP EP16733548.8A patent/EP3325396B1/de active Active
- 2016-06-30 ES ES16733548T patent/ES2910664T3/es active Active
-
2017
- 2017-12-26 IL IL256596A patent/IL256596B/en active IP Right Grant
-
2018
- 2018-01-03 PH PH12018500001A patent/PH12018500001A1/en unknown
- 2018-02-20 ZA ZA2018/01168A patent/ZA201801168B/en unknown
- 2018-02-20 ZA ZA2018/01169A patent/ZA201801169B/en unknown
- 2018-05-23 HK HK18106652.6A patent/HK1247175A1/zh unknown
- 2018-05-23 HK HK18106653.5A patent/HK1247176A1/zh unknown
- 2018-06-08 HK HK18107476.8A patent/HK1248199A1/zh unknown
Also Published As
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3325394B1 (de) | Automatisierte montagevorrichtung zur durchführung von installationen in einem aufzugschacht einer aufzuganlage | |
EP3436390B1 (de) | Verfahren und montagevorrichtung zum durchführen eines installationsvorgangs in einem aufzugschacht einer aufzuganlage | |
EP3445697B1 (de) | Verfahren und montagevorrichtung zum durchführen eines installationsvorgangs in einem aufzugschacht einer aufzuganlage | |
EP3687933A1 (de) | Lokalisierungssystem und verfahren zur bestimmung einer aktuellen position in einem aufzugschacht einer aufzuganlage | |
NZ737797B2 (en) | Automated mounting device for performing assembly jobs in an elevator shaft of an elevator system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE |
|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
17P | Request for examination filed |
Effective date: 20171214 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
DAV | Request for validation of the european patent (deleted) | ||
DAX | Request for extension of the european patent (deleted) | ||
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
INTG | Intention to grant announced |
Effective date: 20190716 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D Free format text: NOT ENGLISH |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D Free format text: LANGUAGE OF EP DOCUMENT: GERMAN |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 502016007645 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 1203980 Country of ref document: AT Kind code of ref document: T Effective date: 20191215 |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20191120 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191120 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191120 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200220 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191120 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200220 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200221 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191120 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191120 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191120 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191120 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200320 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191120 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191120 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191120 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191120 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191120 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191120 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200412 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R026 Ref document number: 502016007645 Country of ref document: DE |
|
PLBI | Opposition filed |
Free format text: ORIGINAL CODE: 0009260 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191120 Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191120 |
|
PLAX | Notice of opposition and request to file observation + time limit sent |
Free format text: ORIGINAL CODE: EPIDOSNOBS2 |
|
26 | Opposition filed |
Opponent name: OTIS ELEVATOR COMPANY Effective date: 20200820 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191120 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191120 |
|
PLBB | Reply of patent proprietor to notice(s) of opposition received |
Free format text: ORIGINAL CODE: EPIDOSNOBS3 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191120 Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191120 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200630 |
|
REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20200630 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200630 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200630 |
|
PLCK | Communication despatched that opposition was rejected |
Free format text: ORIGINAL CODE: EPIDOSNREJ1 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191120 Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191120 Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191120 |
|
APBM | Appeal reference recorded |
Free format text: ORIGINAL CODE: EPIDOSNREFNO |
|
APBP | Date of receipt of notice of appeal recorded |
Free format text: ORIGINAL CODE: EPIDOSNNOA2O |
|
APAH | Appeal reference modified |
Free format text: ORIGINAL CODE: EPIDOSCREFNO |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191120 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R100 Ref document number: 502016007645 Country of ref document: DE |
|
APBU | Appeal procedure closed |
Free format text: ORIGINAL CODE: EPIDOSNNOA9O |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MM01 Ref document number: 1203980 Country of ref document: AT Kind code of ref document: T Effective date: 20210630 |
|
RAP4 | Party data changed (patent owner data changed or rights of a patent transferred) |
Owner name: INVENTIO AG |
|
PLBN | Opposition rejected |
Free format text: ORIGINAL CODE: 0009273 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: OPPOSITION REJECTED |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210630 |
|
27O | Opposition rejected |
Effective date: 20220714 |
|
P01 | Opt-out of the competence of the unified patent court (upc) registered |
Effective date: 20230521 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: CH Payment date: 20230702 Year of fee payment: 8 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20240618 Year of fee payment: 9 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20240627 Year of fee payment: 9 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20240625 Year of fee payment: 9 |