EP2383361B1 - Vorrichtung zur Beschichtung von Substraten mittels Hochgeschwindigkeitsflammspritzen - Google Patents
Vorrichtung zur Beschichtung von Substraten mittels Hochgeschwindigkeitsflammspritzen Download PDFInfo
- Publication number
- EP2383361B1 EP2383361B1 EP11405238.4A EP11405238A EP2383361B1 EP 2383361 B1 EP2383361 B1 EP 2383361B1 EP 11405238 A EP11405238 A EP 11405238A EP 2383361 B1 EP2383361 B1 EP 2383361B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- line
- fuel
- combustion chamber
- gas
- set forth
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Not-in-force
Links
- 239000011248 coating agent Substances 0.000 title claims description 10
- 238000000576 coating method Methods 0.000 title claims description 10
- 239000000758 substrate Substances 0.000 title claims description 7
- 238000010285 flame spraying Methods 0.000 title claims description 6
- 239000000446 fuel Substances 0.000 claims description 72
- 238000002485 combustion reaction Methods 0.000 claims description 52
- 239000007789 gas Substances 0.000 claims description 36
- 230000001590 oxidative effect Effects 0.000 claims description 13
- 239000000843 powder Substances 0.000 claims description 10
- 239000007788 liquid Substances 0.000 claims description 8
- 239000011261 inert gas Substances 0.000 claims description 4
- 239000012530 fluid Substances 0.000 claims 1
- QVGXLLKOCUKJST-UHFFFAOYSA-N atomic oxygen Chemical compound [O] QVGXLLKOCUKJST-UHFFFAOYSA-N 0.000 description 7
- 239000000463 material Substances 0.000 description 7
- 239000001301 oxygen Substances 0.000 description 7
- 229910052760 oxygen Inorganic materials 0.000 description 7
- IJGRMHOSHXDMSA-UHFFFAOYSA-N Atomic nitrogen Chemical compound N#N IJGRMHOSHXDMSA-UHFFFAOYSA-N 0.000 description 6
- 239000002737 fuel gas Substances 0.000 description 5
- 239000007921 spray Substances 0.000 description 5
- 239000000498 cooling water Substances 0.000 description 4
- 239000003350 kerosene Substances 0.000 description 4
- 239000000295 fuel oil Substances 0.000 description 3
- 238000002347 injection Methods 0.000 description 3
- 239000007924 injection Substances 0.000 description 3
- 239000000203 mixture Substances 0.000 description 3
- 229910052757 nitrogen Inorganic materials 0.000 description 3
- 239000003921 oil Substances 0.000 description 3
- ATUOYWHBWRKTHZ-UHFFFAOYSA-N Propane Chemical compound CCC ATUOYWHBWRKTHZ-UHFFFAOYSA-N 0.000 description 2
- 239000002283 diesel fuel Substances 0.000 description 2
- 238000001704 evaporation Methods 0.000 description 2
- 230000008020 evaporation Effects 0.000 description 2
- 239000001257 hydrogen Substances 0.000 description 2
- 229910052739 hydrogen Inorganic materials 0.000 description 2
- 125000004435 hydrogen atom Chemical class [H]* 0.000 description 2
- 230000008018 melting Effects 0.000 description 2
- 238000002844 melting Methods 0.000 description 2
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 description 2
- VGGSQFUCUMXWEO-UHFFFAOYSA-N Ethene Chemical compound C=C VGGSQFUCUMXWEO-UHFFFAOYSA-N 0.000 description 1
- 239000005977 Ethylene Substances 0.000 description 1
- 238000005299 abrasion Methods 0.000 description 1
- 230000002411 adverse Effects 0.000 description 1
- 238000003763 carbonization Methods 0.000 description 1
- 238000011109 contamination Methods 0.000 description 1
- 238000001816 cooling Methods 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- -1 for example Substances 0.000 description 1
- 239000003345 natural gas Substances 0.000 description 1
- 230000035515 penetration Effects 0.000 description 1
- 239000012254 powdered material Substances 0.000 description 1
- 239000001294 propane Substances 0.000 description 1
- QQONPFPTGQHPMA-UHFFFAOYSA-N propylene Natural products CC=C QQONPFPTGQHPMA-UHFFFAOYSA-N 0.000 description 1
- 125000004805 propylene group Chemical group [H]C([H])([H])C([H])([*:1])C([H])([H])[*:2] 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
- 238000009834 vaporization Methods 0.000 description 1
- 230000008016 vaporization Effects 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B05—SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05B—SPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
- B05B7/00—Spraying apparatus for discharge of liquids or other fluent materials from two or more sources, e.g. of liquid and air, of powder and gas
- B05B7/16—Spraying apparatus for discharge of liquids or other fluent materials from two or more sources, e.g. of liquid and air, of powder and gas incorporating means for heating or cooling the material to be sprayed
- B05B7/20—Spraying apparatus for discharge of liquids or other fluent materials from two or more sources, e.g. of liquid and air, of powder and gas incorporating means for heating or cooling the material to be sprayed by flame or combustion
- B05B7/208—Spraying apparatus for discharge of liquids or other fluent materials from two or more sources, e.g. of liquid and air, of powder and gas incorporating means for heating or cooling the material to be sprayed by flame or combustion the material to be sprayed being heated in a container
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B05—SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05B—SPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
- B05B7/00—Spraying apparatus for discharge of liquids or other fluent materials from two or more sources, e.g. of liquid and air, of powder and gas
- B05B7/16—Spraying apparatus for discharge of liquids or other fluent materials from two or more sources, e.g. of liquid and air, of powder and gas incorporating means for heating or cooling the material to be sprayed
- B05B7/20—Spraying apparatus for discharge of liquids or other fluent materials from two or more sources, e.g. of liquid and air, of powder and gas incorporating means for heating or cooling the material to be sprayed by flame or combustion
- B05B7/201—Spraying apparatus for discharge of liquids or other fluent materials from two or more sources, e.g. of liquid and air, of powder and gas incorporating means for heating or cooling the material to be sprayed by flame or combustion downstream of the nozzle
- B05B7/205—Spraying apparatus for discharge of liquids or other fluent materials from two or more sources, e.g. of liquid and air, of powder and gas incorporating means for heating or cooling the material to be sprayed by flame or combustion downstream of the nozzle the material to be sprayed being originally a particulate material
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B05—SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05B—SPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
- B05B7/00—Spraying apparatus for discharge of liquids or other fluent materials from two or more sources, e.g. of liquid and air, of powder and gas
- B05B7/16—Spraying apparatus for discharge of liquids or other fluent materials from two or more sources, e.g. of liquid and air, of powder and gas incorporating means for heating or cooling the material to be sprayed
- B05B7/20—Spraying apparatus for discharge of liquids or other fluent materials from two or more sources, e.g. of liquid and air, of powder and gas incorporating means for heating or cooling the material to be sprayed by flame or combustion
-
- C—CHEMISTRY; METALLURGY
- C23—COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
- C23C—COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
- C23C4/00—Coating by spraying the coating material in the molten state, e.g. by flame, plasma or electric discharge
- C23C4/12—Coating by spraying the coating material in the molten state, e.g. by flame, plasma or electric discharge characterised by the method of spraying
- C23C4/129—Flame spraying
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Combustion & Propulsion (AREA)
- Plasma & Fusion (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Materials Engineering (AREA)
- Mechanical Engineering (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Physics & Mathematics (AREA)
- Nozzles (AREA)
- Coating By Spraying Or Casting (AREA)
- Gas Burners (AREA)
Description
- Die Erfindung betrifft eine Vorrichtung zur Beschichtung von Substraten mittels Hochgeschwindigkeitsflammspritzen gemäss dem Oberbegriff des Anspruchs 1.
- Vorrichtungen der hier zur Rede stehenden Art sind in vielfältigsten Ausführungsformen bekannt und werden für verschiedenste Zwecke eingesetzt. Sie werden beispielsweise für das Aufbringen von temperaturbeständigen und/oder harten und/oder abriebfesten und/oder chemisch beständigen Schichten auf Oberflächen verschiedenster Substrate eingesetzt.
- Aus dem Stand der Technik sind Vorrichtungen bekannt, die mit einem gasförmigen Brennstoff betrieben werden. Bekannt sind auch Vorrichtungen, die mit flüssigem Brennstoff betrieben werden können. Gattungsgemässe Vorrichtungen besitzen üblicherweise zumindest einen Anschluss für den Brennstoff sowie einen weiteren für ein oxidatives Gas. Insbesondere bei Vorrichtungen, die mit einem flüssigen Brennstoff betrieben werden, kann noch ein zusätzlicher Anschluss für die Zufuhr von Druckluft vorgesehen werden. All diesen bekannten Vorrichtungen haftet jedoch der Nachteil an, dass deren Einsatzgebiet beschränkt ist.
- In der
DE 44 29 142 A1 ist ein Düsenspritzkopf zum Hochgeschwindigkeitsflammspritzen von pulverförmigen Materialien beschrieben. Der Düsenspritzkopf kann gleichzeitig mit zwei Brennstoffen (Diesel/Heizöl sowie einem Brenngas) betrieben werden, wobei als Hauptbrennstoff Diesel oder Heizöl mit einem Verkokungsgehalt über 0,5 Gew.-% eingesetzt werden kann. Um eine möglichst saubere Verbrennung des Hauptbrennstoffs zu erreichen, wird mittels des Brenngases eine Verdampfungsflamme erzeugt, welche eine Vorverdampfung des Heizöls und damit eine verkokungsfreie Verbrennung desselben ermöglicht. Die Verdampfungsflamme wird in Strömungsrichtung der Gase vor der eigentlichen Hauptflamme erzeugt. Um eine rückstandsfreie Verbrennung des Hauptbrennstoffs zu ermöglichen, müssen daher immer gleichzeitig beide Brennstoffe zugeführt werden. - Die
EP 0 458 018 A2 offenbart einen HVOF-Brenner, der mit einer Primärbrennkammer und einer Sekundärbrennkammer versehen ist. Beide Brennkammem werden mit separaten Brennstoffen betrieben. Die Primärbrennkammer dient dazu, das Spritzmaterial aufzuschmelzen, während das aufgeschmolzene Spritzmaterial in der nachfolgenden Sekundärbrennkammer auf Überschallgeschwindigkeit beschleunigt wird, so dass das aufgeschmolzene Spritzmaterial letztlich mit einer hohen kinetischen Energie aus dem Brenner austritt. Somit muss auch dieser Brenner immer gleichzeitig mit beiden Brenngasen betrieben werden. - Schliesslich geht aus der US 4'375'954 A ein Brenner hervor, der mit Gas und Öl in Kombination betrieben wird. Dieser Brenner besitzt eine ringförmige Vorheizkammer in der das Öl zuerst mittels eines Brenngases zuerst erhitzt wird. Danach wird das erhitzte Öl über eine zentrale Düse in die Brennkammer geleitet, wo es verbrannt wird. Allerdings handelt es sich bei diesem Brenner nicht um eine Beschichtungsvorrichtung zum Auftragen von Schichten auf Oberflächen von Substraten, sondern um einen konventionellen Brenner.
- Die Erfindung zielt darauf ab, eine Vorrichtung gemäss dem Oberbegriff des Anspruchs 1 derart weiterzubilden, dass diese universell einsetzbar ist, indem sie in verschiedenen Betriebsarten betreibbar ist.
- Hierzu wird nach der Erfindung eine Vorrichtung gemäss dem Anspruch 1 bereitgestellt.
- Bevorzugte Ausführungsformen der Vorrichtung sind in den abhängigen Ansprüchen 2 bis 15 umschrieben.
- Bei einer bevorzugten Weiterbildung wird vorgeschlagen, dass die Austrittsöffnungen der weiteren Brennstoffleitung auf einer Kreislinie angeordnet sind, wobei die genannten Austrittsöffnungen koaxial zu der zumindest einen zentral in die Brennkammer mündenden Austrittsöffnung angeordnet sind. Eine derartige Ausbildungsform ermöglicht in jedem Fall, d.h. sowohl im Betrieb mit dem einen oder dem anderen Brennstoff wie auch im Betrieb mit beiden Brennstoffen, dass eine homogene und zentrale Verbrennungsflamme erzeugt wird.
- Bei einer weiteren, bevorzugte Weiterbildung der Vorrichtung wird vorgeschlagen, dass die Austrittsöffnungen der zumindest einen Gasleitung auf einer Kreislinie angeordnet sind, welche koaxial zu der zentral in die Brennkammer mündenden Austrittsöffnung angeordnet sind. Diese Ausbildung begünstigt einerseits eine homogene Verbrennungsflamme und andererseits eine rückstandsfreie Verbrennung.
- Bei einer weiteren, bevorzugten Weiterbildung weist die Vorrichtung einen an die Brennkammer angrenzenden Düsenkörper auf, der austauschbar in einen Anschlusskörper der Vorrichtung eingesetzt ist, wobei der Düsenkörper mit Austrittsöffnungen versehen ist und die beiden Brennstoffleitungen und die erste Gasleitung derart mit dem Düsenkörper verbunden sind, dass der Brennkammer die zum Betrieb der Vorrichtung notwendigen Medien über die genannten Austrittsöffnungen des Düsenkörpers zuführbar sind. Der Vorteil dieser Ausbildung besteht darin, dass der Düsenkörper austauschbar ist, wobei mit dem Austausch des Düsenkörpers gleichzeitig alle Austrittsöffnungen emeuert werden. Dies ist deshalb besonders wichtig, da der jeweilige Körper im Bereich der genannten Austrittsöffnungen sehr hohen Belastungen ausgesetzt ist, was mit einem Verschleiss einhergeht und zu unerwünschtem Materialabtrag und ggf. Materialauftrag im Bereich der Austrittsöffnungen führt. Es versteht sich, dass dies unerwünscht ist und zu einem nachteiligen Brennverhalten führt.
- Nachfolgend wird ein bevorzugtes Ausführungsbeispiel der Erfindung anhand von Zeichnungen näher erläutert. In diesen Zeichnungen zeigt:
- Fig.1
- Die Vorrichtung zur Beschichtung von Substraten mittels Hochgeschwindigkeitsflammspritzen in einer Ansicht von hinten;
- Fig. 2
- die Vorrichtung in einem Schnitt entlang der Linie A-A in
Fig. 1 ; - Fig. 3
- die Vorrichtung in einem Schnitt entlang der Linie B-B in
Fig. 1 ; - Fig. 4
- die Vorrichtung in einem Schnitt entlang der Linie C-C in
Fig. 1 ; - Fig. 5
- die Vorrichtung in einem Schnitt entlang der Linie D-D in
Fig. 1 ; - Fig. 6a
- einen Düsenkörper in einer Ansicht von vorne;
- Fig. 6b
- den Düsenkörper in einem Schnitt entlang der Linie A-A in
Fig. 6a , und - Fig. 6c
- den Düsenkörper in einem Schnitt entlang der Linie B-B in
Fig. 6a . - Die
Fig. 1 zeigt die Vorrichtung zur Beschichtung von Substraten mittels Hochgeschwindigkeitsflammspritzen in einer Ansicht von der Rückseite. Die Vorrichtung besteht im Wesentlichen aus dem eigentlichen Brenner, sowie Mitteln zur Zufuhr des aufzuschmelzenden und aufzutragenden Beschichtungsmaterials. Aus der Darstellung gemässFig. 1 ist ersichtlich, dass die Vorrichtung auf der Rückseite mit einer Vielzahl von Anschlüssen versehen ist, über welche einerseits die zum Betrieb des Brenners notwendigen Medien zugeführt werden können. Zusätzlich ist ein Anschluss für einen Drucksensor und ein weiterer für eine Zündeinheit vorgesehen. Es versteht sich, dass die Anzahl und Anordnung der Anschlüsse variieren kann. Im vorliegenden Beispiel sind die Anschlüsse A1 bis A9 für die Zufuhr folgender Medien vorgesehen: A1 flüssiger Brennstoff, A2 Sauerstoff, A3 Sauerstoff optional, A4 Stickstoff, A5 gasförmiger Brennstoff, A6 Kühlwasser ein, A7 Kühlwasser aus, A8 Pulver, A9 Pulver. Natürlich können anstelle der vorgängig genannten Medien über die Anschlüsse A1 bis A7 auch andere flüssige oder gasförmige Medien zugeführt werden können. Der Anschluss A10 ist für die Zündeinheit und der Anschluss A11 für den genannten Drucksensor vorgesehen. - Die
Fig. 2 zeigt in vereinfachter Darstellung die Vorrichtung in einem Längsschnitt entlang der Linie A-A inFig. 1 . Da der grundsätzliche Aufbau und die Wirkungsweise von gattungsgemässen Vorrichtungen bekannt ist, wird nachfolgend nicht auf sämtliche Elemente eingegangen. Derartige Vorrichtungen sind der Fachwelt insbesondere auch unter dem Namen HVOF (High Velocity Oxygen Fuel) Brenner bzw. Vorrichtung bekannt. - Die Vorrichtung umfasst einen Grundkörper 1, an dem rückseitig ein Anschlusskörper 2 angebracht ist. Innerhalb des Grundkörpers 1 ist ein Hohlkörper 3 angeordnet, welcher im Innem die eigentliche Brennkammer 4 bildet. Der rohrförmige Ausgang des Hohlkörpers 3 ist mit einer Rohrdüse 5 verbunden, die endseitig den Auslass 6 der Vorrichtung bildet. Auf der der Brennkammer 4 zugewandten Seite ist ein Düsenkörper 7 zentral in den Anschlusskörper 2 eingesetzt. Der Düsenkörper 7 ist austauschbar in dem Anschlusskörper 2 aufgenommen, wobei er in axialer Richtung mittels eines Ringkörpers 8 fixiert ist. Dazu ist der Ringkörper 8 mit einem ringförmigen Fortsatz 9 versehen, der in axialer Richtung an dem Düsenkörper 7 zur Anlage kommt. Der Ringkörper 8 seinerseits legt sich in axialer Richtung an einer Schulter des Hohlkörpers 3 an. Der Ringkörper 8 ist mit zwei axialen Durchgangsbohrungen 10, 11 versehen, welche mit je einer zugehörigen, in den Anschlusskörper eingelassenen Leitung L10, L11 fluchten.
- Um den Anschlusskörper 2 an dem Grundkörper 1 zu fixieren und weitere Elemente wie den Düsenkörper 7 und den Ringkörper 8 in axialer Richtung zu Positionieren und Fixieren ist an dem Grundkörper 1 eine Überwurfmutter 21 angeordnet, deren Innengewinde an einem Aussengewinde des Anschlusskörpers 2 anzugreifen bestimmt ist und beim Festziehen den Anschlusskörper 2 in axialer Richtung gegen den Grundkörper 1 zieht. Eine weitere Überwurfmutter 22 ist am vorderen Ende des Grundkörpers 1 angeordnet, mittels welcher die Rohrdüse 5 zusammen mit dem Hohlkörper 3 und dem Ringkörper 8 in Richtung des Anschlusskörpers 2 belastet wird. Jedenfalls kann die Vorrichtung durch das Vorsehen von zwei Überwurfmuttern 21, 22 in der gezeigten Art schnell und einfach zusammengebaut und auch wieder auseinandergenommen werden. Dies hat insbesondere den Vorteil, dass allfällige Verschleissteile wie beispielsweise der Hohlkörper 3, die Rohrdüse 5 oder der Düsenkörper 7 schnell und einfach ausgetauscht werden können. So kann nach dem Lösen der Überwurfmutter 21 der Anschlusskörper 2 von dem Grundkörper 1 abgenommen und der Düsenkörper 7 entnommen und ggf. ausgetauscht oder ersetzt werden.
- Wie ersichtlich, führt von jedem Anschluss eine Leitung ins Innere des Anschlusskörpers 2. Von dem Brennstoff-Anschluss A1 führt eine Brennstoff-Leitung L1 zentral durch den Anschlusskörper 2 zu dem Düsenkörper 7, welch letzterer dem gezielten Zuführen der zum Betrieb des Brenners notwendigen Medien in die Brennkammer 4 dient. Der Düsenkörper 7 wird anschliessend anhand der
Figuren 6a-6c noch näher erläutert. Damit die Zufuhr des Brennstoffs in der Brennstoff-Leitung L1 gesteuert werden kann, ist ein Durchflussregler 24 vorgesehen. Mit dem schematisch dargestellten Durchflussregler 24 soll einerseits die der Brennkammer 4 pro Zeiteinheit zugeführte Brennstoffmenge justiert werden können. Andererseits dient der Durchflussregler 24 auch dem Öffnen bzw. Verschliessen der zugehörigen Brennstoffleitung L1. - Auf die mit dem jeweiligen Kühlwasseranschluss A6, A7 verbundenen Leitungen L6, L7 wird nicht näher eingegangen, da solche dem Kühlen der thermisch hochbelasteten Teile dienenden Kühlwasserleitungen bekannt sind. Der Anschluss A10 ist über eine axiale Leitung L10 mit der Brennkammer verbunden. Der Anschluss A10 dient dem Anschliessen eines Drucksensors (nicht dargestellt), mittels welchem der in der Brennkammer 4 vorherrschende Druck gemessen werden kann. Von dem Anschluss A11 führt ebenfalls eine Leitung L11 axial durch den Anschlusskörper 2 hindurch in die Brennkammer 4. Diese Leitung L11 dient der Aufnahme einer Zündeinheit (nicht dargestellt), mit welcher das Brennstoffgemisch in der Brennkammer 4 gezündet werden kann. Von den beiden Pulveranschlüssen A8, A9 führt je eine Leitung L8, L9 schräg in die Vorrichtung hinein. Die beiden Pulverleitungen L8, L9 münden in Bezug auf die Längsachse der Vorrichtung im Wesentlichen radial in die Rohrdüse 5. Die Pulverleitungen L8, L9 dienen dem Zuführen von Beschichtungspulver, welches beim Eintreten in die Rohrdüse 5 von dem heissen Gasstrom mitgerissen und durch die vorherrschende Temperatur zumindest teilweise aufgeschmolzen wird. Anstelle des Zuführens des Beschichtungsmaterials in Pulverform könnte dieses beispielsweise auch in Drahtform zugeführt werden.
- Die
Fig. 3 zeigt die Vorrichtung in einem Längsschnitt entlang der Linie B-B inFig. 1 . Aus dieser Darstellung ist insbesondere ersichtlich, dass von dem Anschluss A5 eine Leitung L5 schräg durch den Anschlusskörper 2 hindurch zu einem ersten (vorderen) Ringkanal 14 des Düsenkörpers 7 führt. Von dem Anschluss A3 führt eine weitere Leitung L3 schräg durch den Anschlusskörper 2 hindurch zu dem ersten Ringkanal 14 des Düsenkörpers 7. Während die Leitung L3 der optionalen Zufuhr eines oxidativen Gases wie beispielsweise Sauerstoff dient, kann der Brennkammer 4 über die Leitung L5 ein zweiter Brennstoff, vorzugsweise ein Brenngas, zugeführt werden. Jedenfalls münden beide Brennstoffleitungen in die gemeinsame Brennkammer 4. - Damit die Zufuhr des Brennstoffs über die Brennstoff-Leitung L5 gesteuert werden kann, ist ein Durchflussregler 28 vorgesehen, welcher sowohl dem Öffnen bzw. Verschliessen der zugehörigen Brennstoffleitung L5 wie auch dem Justieren der pro Zeiteinheit zugeführten Brennstoffmenge dient. Um die Zufuhr des oxidativen Gases in der Leitung L3 steuern zu können, ist ein Regler 26 vorgesehen. Ggf. kann es genügen, wenn der Regler 26 für die Zufuhr des oxidativen Gases als Ein-Ausschalter konzipiert ist. Das Zuführen eines oxidativen Gases über die Leitung L3 erfolgt üblicherweise nur dann, wenn der Brenner mit einem Brennstoff betrieben wird, namentlich wenn ein erster Brennstoff, vorzugsweise Kerosin, zentral über die Leitung L1 zugeführt wird.
- Aus der
Fig. 4 , welche die Vorrichtung in einem Schnitt entlang der Linie C-C inFig. 1 zeigt, ist ersichtlich, dass von dem Anschluss A2 eine Leitung L2 zu einem zweiten (hinteren) Ringkanal 18 des Düsenkörpers 7 führt. Die Leitung L2 dient dem Zuführen eines oxidativen Gases, vorzugsweise Sauerstoff in die Brennkammer. Somit münden neben den beiden Brennstoffleitungen auch die Leitung L2 zum Zuführen eines oxidativen Gases in die gemeinsame Brennkammer 4. Um die GasZufuhr steuern zu können, ist ein Durchflussregler 25 vorgesehen. - Die
Fig. 5 zeigt die Vorrichtung in einem Längsschnitt entlang der Linie D-D inFig. 1 . Hieraus ist erkennbar, dass der Anschluss A4 über eine schräge Leitung mit dem vorderen Ringkanal 14 des Düsenkörpers 7 verbunden ist. Die Leitung L4 dient vorzugsweise dem Zuführen eines Inertgases, insbesondere Stickstoff. Um die Zufuhr des Inertgases steuern zu können, ist ein Durchflussregler 27 vorgesehen. - Zusammenfassend lässt sich somit festhalten, dass die Anschlüsse A3, A4 und A5 über die drei zugehörigen Leitungen L3, L4 und L5 mit dem ersten Ringkanal 14 des Düsenkörpers 7 verbunden sind, während der Anschluss A2 über die Leitung L2 zu dem zweiten Ringkanal 18 führt. Sofern über zumindest zwei der drei mit dem vorderen Ringkanal 14 verbundenen Leitungen L3, L4, L5 je ein Medium zugeführt wird, so vermischen sich diese Medien im Ringkanal 14.
- Anhand der
Fig. 6a, 6b und 6c wird der Aufbau des Düsenkörpers 7 näher erläutert. DieFig. 6a zeigt den Düsenkörper 7 in einer Ansicht von der Brennkammerseite her, während dieFig. 6b einen Längsschnitt durch den Düsenkörper 7 entlang der Linie A-A inFig. 6a zeigt. DieFig. 6c zeigt einen Längsschnitt durch den Düsenkörper 7 entlang der Linie B-B inFig. 6a . - In der
Fig. 6b ist erkennbar, dass von dem zweiten (hinteren) Ringkanal 18 axiale Bohrungen 19 zu der vorderen Stirnseite des Düsenkörpers 7 führen. Diese Bohrungen 19 bilden zur Brennkammerseite hin eine erste Gruppe von Austrittsöffnungen 19A, über welche der Brennkammer ein Medium oder mehrere Medien zugeführt werden kann/können. - In der
Fig. 6c ist erkennbar, dass von dem vorderen Ringkanal 14 weitere axiale Bohrungen 15 zu der vorderen Stirnseite des Düsenkörpers 7 führen. Die genannten Bohrungen 15 bilden zur Brennkammerseite hin eine zweite Gruppe von Austrittsöffnungen 15A. - In der
Fig. 6a ist erkennbar, dass die mit dem zweiten (hinteren) Ringkanal 18 verbundene Gruppe von Bohrungen 19 gleichmässig verteilt auf einer inneren Kreislinie 20 angeordnet ist, während die mit dem ersten (vorderen) Ringkanal 14 verbundenen weitere Gruppe von Bohrungen 15 gleichmässig verteilt auf einer äusseren Kreislinie 16 angeordnet ist. Beide Kreislinien 16, 20 sind koaxial zu einer zentralen Austrittsöffnung 13 des Düsenkörpers 7 angeordnet. Die zentrale Öffnung 13 des Düsenkörpers 7 dient der Aufnahme einer Einspritzdüse oder eines Einspritzventils (nicht dargestellt), welches dem Einspritzen des flüssigen Brennstoffs in die Brennkammer dient. Der Düsenkörper 7 ist dazu mit einem Innengewinde versehen, welches dem Befestigen einer solchen Einspritzdüse dient. Da solche Einspritzdüsen bekannt sind, wird hier nicht näher darauf eingegangen. - Die grundsätzlichen Vorteile einer derartigen Vorrichtung bestehen darin, dass diese universell einsetzbar ist. So kann der Brenner beispielsweise mit zwei Brennstoffen gleichzeitig betrieben werden, indem der Brennkammer 4 über den Düsenkörper 7 - Einspritzdüse- zentral ein erster Brennstoff, beispielsweise Kerosin, zugeführt wird, während der Brennkammer 4 gleichzeitig ein weiterer Brennstoff, beispielsweise Wasserstoff, zugeführt wird. Der zweite Brennstoff kann dabei über die Bohrungen 15, 19 des äusseren oder inneren Lochkreises des Düsenkörpers 7 zugeführt werden. Zudem können der Brennkammer den Anforderungen entsprechend über die beiden Anschlüsse A3, A4 beliebig weitere Medien zugeführt werden. So kann über den Anschluss A2 und/oder A3 ein oxidatives Gas wie beispielsweise Sauerstoff zugeführt werden. Sofern der Sauerstoff über den Anschluss A3 zugeführt wird, vermischt sich dieser im vorderen Ringkanal 14 mit dem über den Anschluss A4 und/oder A5 zugeführten Medium. Beispielsweise kann über den Anschluss A4 auch ein Inertgas wie beispielsweise Stickstoff zugeführt werden, was bewirkt, dass die Temperatur im Brennraum gesenkt wird. In der Fachsprache wird diesbezüglich von der Zufuhr eines "cold" Gases gesprochen. Die lochkreisförmige Anordnung der Bohrungen 15, 19 bzw. Austrittsöffnungen 15A, 19A hat den Vorteil, dass die verschiedenen Medien der Brennkammer gleichmässig und zentral zugeführt werden können. So eignet sich die Vorrichtung insbesondere auch zum Aufschmelzen von groben Pulvern und Auftragen von dicken Schichten und zum Erzeugen von rauhen Oberflächen, da beim Betrieb des Brenners mit zwei Brennstoffen pro Zeiteinheit sehr hohe Temperaturen und/oder hohe Aufschmelzraten des Beschichtungspulvers und/oder sehr hohe Gasgeschwindigkeiten erreicht werden können.
- Natürlich kann der Brenner auch nur mit einem Brennstoff betrieben werden. Da beide Brennstoffleitungen mit je einem Durchflussregler versehen sind, ist auch ein kontinuierlicher oder diskontinuierlicher Übergang vom einen auf den anderen Brennstoff möglich. Eine derartige Vorrichtung ermöglicht es beispielsweise, eine Grundschicht mit dem einen Brennstoff, vorzugsweise Kerosin, aufzutragen, um danach eine Deckschicht unter Zufuhr eines andern Brennstoffs oder beider Brennstoffe aufzutragen. Bis anhin mussten für einen solchen Vorgang zwei unterschiedliche Vorrichtungen eingesetzt werden.
- Je nach Betriebsart kann es vorteilhaft sein, über die Bohrungen 15, 19 des inneren und/oder äusseren Lochkreises des Düsenkörpers 7 ein gasförmiges Medium in die Brennkammer strömen zu lassen, damit eine Verschmutzung der Bohrungen und/oder ein Eindringen von Brennkammergasen in die genannten Bohrungen 15, 19 verhindert wird.
- Je nach gewünschter Betriebsart dient der Düsenkörper 7 dem Zuführen von einem oder zwei Brennstoffen bzw. Brennstoffgemischen sowie einem oder mehrerer oxidativer Gase sowie allfälliger weiterer Gase.
- Natürlich kann der Brenner auch nur mit einem Brennstoff betrieben werden, wobei grundsätzlich sowohl flüssige wie auch gasförmige Brennstoffe in Frage kommen. Während als flüssiger Brennstoff insbesondere Kerosin zum Einsatz kommt, können als gasförmige Brennstoffe beispielsweise Wasserstoff, Erdgas, Propylen, Propan oder Ethylen eingesetzt werden. Es versteht sich, dass die vorgängig erwähnten Betriebsarten keinesfalls als abschliessend zu betrachten sind, sondern dass mit der in den Ansprüchen definierten Vorrichtung eine grosse Zahl unterschiedlicher Betriebsarten möglich ist, wobei natürlich auch die Anzahl und Anordnung der beschriebenen Anschlüsse und Leitungen variieren kann.
- Ein weiterer Vorteil der erfindungsgemäss gestalteten Vorrichtung bzw. Brenners besteht darin, dass im Betrieb ohne Unterbruch von dem einen auf den anderen Brennstoff umgeschaltet werden kann.
- Aber auch die Ausgestaltung des eigentlichen Brenners kann natürlich variieren. So könnte der Düsenkörper 7 beispielsweise anstelle oder zusätzlich zu den lochkreisförmig angeordneten Bohrungen 15, 19 mit einem Ringkanal, oder ringkreisförmig ausgebildeten Abschnitten versehen werden, über welche ein Medium oder mehrere Medien der Brennkammer 4 zugeführt werden.
Claims (15)
- Vorrichtung zur Beschichtung von Substraten mittels Hochgeschwindigkeitsflammspritzen, mit einer Brennkammer (4), einer ersten Brennstoffleitung (L1) zum Zuführen eines ersten flüssigen oder gasförmigen Brennstoffs, einer ersten Gasleitung (L2) zum Zuführen eines oxidativen Gases und zumindest einer weiteren Brennstoffleitung (L5) zum Zuführen eines weiteren flüssigen oder gasförmigen Brennstoffs, dadurch gekennzeichnet, dass sowohl die erste Gasleitung (L2) wie auch die beiden Brennstoffleitungen (L1, L5) in eine gemeinsame Brennkammer (4) münden, und dass beide Brennstoffleitungen (L1, L5) mit je einem Durchflussregler (24, 28) versehen sind, um die Brennstoffzufuhr in den beiden Brennstoffleitungen (L1, L5), zur Beeinflussung der Betriebsart, unabhängig voneinander zu steuern.
- Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, dass die eine Brennstoffleitung (L1) zentral über zumindest eine Austrittsöffnung (13A) in die Brennkammer (4) mündet, und dass die weitere Brennstoffleitung (L5) über eine Vielzahl von weiteren Austrittsöffnungen (15A) in die Brennkammer (4) mündet.
- Vorrichtung nach Anspruch 1 oder 2, dadurch gekennzeichnet, dass die eine Brennstoffleitung (L1) zentral über zumindest eine Austrittsöffnung (13A) in die Brennkammer (4) mündet, und dass die erste Gasleitung (L2) über eine Vielzahl von zusätzlichen Austrittsöffnungen (19A) in die Brennkammer (4) mündet.
- Vorrichtung nach Anspruch 2 oder 3, dadurch gekennzeichnet, dass die Austrittsöffnungen (15A) der weiteren Brennstoffleitung (L5) auf einer Kreislinie (16) angeordnet sind, wobei die genannten Austrittsöffnungen (15A) koaxial zu der zumindest einen zentral in die Brennkammer (4) mündenden Austrittsöffnung (13A) angeordnet sind.
- Vorrichtung nach Anspruch 3, dadurch gekennzeichnet, dass die Austrittsöffnungen (19A) der ersten Gasleitung (L2) auf einer Kreislinie (20) angeordnet sind, welche koaxial zu der zentral in die Brennkammer (4) mündenden Austrittsöffnung (13A) angeordnet sind.
- Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, dass die Vorrichtung einen an die Brennkammer (4) angrenzenden Düsenkörper (7) aufweist, der austauschbar in einen Anschlusskörper (2) der Vorrichtung eingesetzt ist, wobei der Düsenkörper (7) mit einer Vielzahl von Austrittsöffnungen (13A, 15A, 19A) versehen ist und die beiden Brennstoffleitungen (L1, L5) und die erste Gasleitung (L2) derart mit dem Düsenkörper (7) verbunden sind, dass der Brennkammer (4) die zum Betrieb der Vorrichtung notwendigen Medien über die genannten Austrittsöffnungen (13A, 15A, 19A) des Düsenkörpers (7) zuführbar sind.
- Vorrichtung nach Anspruch 6, dadurch gekennzeichnet, dass der Düsenkörper (7) mit einer zentralen Austrittsöffnung (13A) oder Düse versehen ist und weitere Austrittsöffnungen (15A, 19A) kreisförmig verteilt um die zentrale Austrittsöffnung (13A) herum angeordnet sind, wobei die zentrale Austrittsöffnung (13A) oder Düse mit der ersten Brennstoffleitung (L1) verbunden ist, und wobei die genannten weiteren Austrittsöffnungen (15A, 19A) mit zumindest einer Leitung (L3, L4) zum Zuführen eines weiteren Brennstoffs und/oder eines weiteren Gases verbunden sind.
- Vorrichtung nach Anspruch 7, dadurch gekennzeichnet, dass die weiteren Austrittsöffnungen (15A, 19A) entlang von zwei mit unterschiedlichen Durchmessern versehenen Kreislinien (16, 20) angeordnet sind, wobei die entlang der äusseren Kreislinie (16) angeordneten Austrittsöffnungen (15A) mit einem ersten, in den Düsenkörper (7) eingelassenen Ringkanal (14) verbunden sind, und wobei die entlang der inneren Kreislinie (20) angeordneten Austrittsöffnungen (19A) mit einem zweiten, in den Düsenkörper (7) eingelassenen Ringkanal (18) verbunden sind.
- Vorrichtung nach Anspruch 8, dadurch gekennzeichnet, dass der erste Ringkanal (14) mit der weiteren Brennstoffleitung (L5) und/oder einer weiteren Gasleitung (L3, L4) verbunden ist.
- Vorrichtung nach Anspruch 8 oder 9, dadurch gekennzeichnet, dass der erste Ringkanal (14) mit einer weiteren Gasleitung (L4) zum Zuführen eines Inertgases verbunden ist.
- Vorrichtung nach einem der Ansprüche 8 bis 10, dadurch gekennzeichnet, dass der zweite Ringkanal (18) mit der ersten Gasleitung (L2) zum Zuführen eines oxidativen Gases verbunden ist.
- Vorrichtung nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass Mittel (25, 26, 27) vorgesehen sind, um zumindest in einzelnen Gasleitungen (L2, L3, L4) die Gaszufuhr zu steuern.
- Vorrichtung nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass die Vorrichtung einen die Brennkammer (4) begrenzenden Hohlkörper (3) aufweist, der austauschbar in einen Grundkörper (1) der Vorrichtung eingesetzt ist, dass in Strömungsrichtung der Gase gesehen hinter dem Hohlkörper (3) eine Rohrdüse (5) austauschbar in den Grundkörper (1) eingesetzt ist, und dass die Rohrdüse (5) mit im wesentlichen radial oder schräg zur Längsachse verlaufenden Pulverzufuhröffungen versehen ist.
- Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, dass die Vorrichtung einen an die Brennkammer (4) angrenzenden Düsenkörper (7) zum Zuführen der beiden Brennstoffe sowie des oxidativen Gases aufweist, wobei der Düsenkörper (7) austauschbar in einen Anschlusskörper (2) der Vorrichtung eingesetzt ist und mit einer zentralen Austrittsöffnung (13A) für den ersten Brennstoff sowie zwei Gruppen von weiteren Austrittsöffnungen (15A, 19A) für den weiteren Brennstoff sowie das oxidative Gas versehen ist, und wobei die eine Gruppe der genannten weiteren Austrittsöffnungen (15A) auf einer äusseren Kreislinie (16) angeordnet ist und die andere Gruppe der genannten weiteren Austrittsöffnungen (19A) auf einer inneren Kreislinie (20) angeordnet ist.
- Vorrichtung nach Anspruch 14, dadurch gekennzeichnet, dass die beiden Kreislinien (16,20) koaxial zu der zentralen Austrittsöffnung (13A) angeordnet sind und dass die zentrale Austrittsöffnung (13A) mit der ersten Brennstoffleitung (L1) verbunden ist und die eine Gruppe der genannten weiteren Austrittsöffnungen (19A) mit der ersten Gasleitung (L2) verbunden ist, und dass die andere Gruppe der weiteren Austrittsöffnungen (15A,) mit der weiteren Brennstoffleitung (L5) sowie zumindest einer weiteren Leitung (L3, L4) zum Zuführen eines weiteren Gases verbunden ist.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CH00643/10A CH702999A1 (de) | 2010-04-29 | 2010-04-29 | Vorrichtung zur Beschichtung von Substraten mittels Hochgeschwindigkeitsflammspritzen. |
Publications (2)
Publication Number | Publication Date |
---|---|
EP2383361A1 EP2383361A1 (de) | 2011-11-02 |
EP2383361B1 true EP2383361B1 (de) | 2015-10-28 |
Family
ID=44487111
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP11405238.4A Not-in-force EP2383361B1 (de) | 2010-04-29 | 2011-03-31 | Vorrichtung zur Beschichtung von Substraten mittels Hochgeschwindigkeitsflammspritzen |
Country Status (5)
Country | Link |
---|---|
US (1) | US9032903B2 (de) |
EP (1) | EP2383361B1 (de) |
JP (1) | JP5813989B2 (de) |
CN (1) | CN102233306B (de) |
CH (1) | CH702999A1 (de) |
Families Citing this family (311)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10378106B2 (en) | 2008-11-14 | 2019-08-13 | Asm Ip Holding B.V. | Method of forming insulation film by modified PEALD |
US9394608B2 (en) | 2009-04-06 | 2016-07-19 | Asm America, Inc. | Semiconductor processing reactor and components thereof |
US8802201B2 (en) | 2009-08-14 | 2014-08-12 | Asm America, Inc. | Systems and methods for thin-film deposition of metal oxides using excited nitrogen-oxygen species |
US9312155B2 (en) | 2011-06-06 | 2016-04-12 | Asm Japan K.K. | High-throughput semiconductor-processing apparatus equipped with multiple dual-chamber modules |
US10364496B2 (en) | 2011-06-27 | 2019-07-30 | Asm Ip Holding B.V. | Dual section module having shared and unshared mass flow controllers |
US10854498B2 (en) | 2011-07-15 | 2020-12-01 | Asm Ip Holding B.V. | Wafer-supporting device and method for producing same |
US20130023129A1 (en) | 2011-07-20 | 2013-01-24 | Asm America, Inc. | Pressure transmitter for a semiconductor processing environment |
US9017481B1 (en) | 2011-10-28 | 2015-04-28 | Asm America, Inc. | Process feed management for semiconductor substrate processing |
US8992656B2 (en) * | 2011-12-21 | 2015-03-31 | Praxair Technology, Inc. | Controllable solids injection |
US9558931B2 (en) | 2012-07-27 | 2017-01-31 | Asm Ip Holding B.V. | System and method for gas-phase sulfur passivation of a semiconductor surface |
US9659799B2 (en) | 2012-08-28 | 2017-05-23 | Asm Ip Holding B.V. | Systems and methods for dynamic semiconductor process scheduling |
US9021985B2 (en) | 2012-09-12 | 2015-05-05 | Asm Ip Holdings B.V. | Process gas management for an inductively-coupled plasma deposition reactor |
US10714315B2 (en) | 2012-10-12 | 2020-07-14 | Asm Ip Holdings B.V. | Semiconductor reaction chamber showerhead |
US20160376700A1 (en) | 2013-02-01 | 2016-12-29 | Asm Ip Holding B.V. | System for treatment of deposition reactor |
US9589770B2 (en) | 2013-03-08 | 2017-03-07 | Asm Ip Holding B.V. | Method and systems for in-situ formation of intermediate reactive species |
US9484191B2 (en) | 2013-03-08 | 2016-11-01 | Asm Ip Holding B.V. | Pulsed remote plasma method and system |
JP5780502B2 (ja) * | 2013-06-20 | 2015-09-16 | 芳▲高▼ 中川 | 溶射装置 |
US8993054B2 (en) | 2013-07-12 | 2015-03-31 | Asm Ip Holding B.V. | Method and system to reduce outgassing in a reaction chamber |
US9240412B2 (en) | 2013-09-27 | 2016-01-19 | Asm Ip Holding B.V. | Semiconductor structure and device and methods of forming same using selective epitaxial process |
EP2868388A1 (de) * | 2013-10-29 | 2015-05-06 | Alstom Technology Ltd | Vorrichtung für HVOF-Sprühverfahren |
ITBO20130619A1 (it) * | 2013-11-12 | 2015-05-13 | Ibix Srl | Metodo e apparecchiatura per la spruzzatura a fiamma di polveri termoplastiche |
US9605343B2 (en) | 2013-11-13 | 2017-03-28 | Asm Ip Holding B.V. | Method for forming conformal carbon films, structures conformal carbon film, and system of forming same |
US10683571B2 (en) * | 2014-02-25 | 2020-06-16 | Asm Ip Holding B.V. | Gas supply manifold and method of supplying gases to chamber using same |
US10167557B2 (en) | 2014-03-18 | 2019-01-01 | Asm Ip Holding B.V. | Gas distribution system, reactor including the system, and methods of using the same |
US11015245B2 (en) | 2014-03-19 | 2021-05-25 | Asm Ip Holding B.V. | Gas-phase reactor and system having exhaust plenum and components thereof |
US10858737B2 (en) | 2014-07-28 | 2020-12-08 | Asm Ip Holding B.V. | Showerhead assembly and components thereof |
US9890456B2 (en) | 2014-08-21 | 2018-02-13 | Asm Ip Holding B.V. | Method and system for in situ formation of gas-phase compounds |
US10941490B2 (en) | 2014-10-07 | 2021-03-09 | Asm Ip Holding B.V. | Multiple temperature range susceptor, assembly, reactor and system including the susceptor, and methods of using the same |
US9657845B2 (en) | 2014-10-07 | 2017-05-23 | Asm Ip Holding B.V. | Variable conductance gas distribution apparatus and method |
KR102300403B1 (ko) | 2014-11-19 | 2021-09-09 | 에이에스엠 아이피 홀딩 비.브이. | 박막 증착 방법 |
KR102263121B1 (ko) | 2014-12-22 | 2021-06-09 | 에이에스엠 아이피 홀딩 비.브이. | 반도체 소자 및 그 제조 방법 |
US10529542B2 (en) | 2015-03-11 | 2020-01-07 | Asm Ip Holdings B.V. | Cross-flow reactor and method |
US10276355B2 (en) | 2015-03-12 | 2019-04-30 | Asm Ip Holding B.V. | Multi-zone reactor, system including the reactor, and method of using the same |
US10458018B2 (en) | 2015-06-26 | 2019-10-29 | Asm Ip Holding B.V. | Structures including metal carbide material, devices including the structures, and methods of forming same |
US10600673B2 (en) | 2015-07-07 | 2020-03-24 | Asm Ip Holding B.V. | Magnetic susceptor to baseplate seal |
US10043661B2 (en) | 2015-07-13 | 2018-08-07 | Asm Ip Holding B.V. | Method for protecting layer by forming hydrocarbon-based extremely thin film |
US10083836B2 (en) | 2015-07-24 | 2018-09-25 | Asm Ip Holding B.V. | Formation of boron-doped titanium metal films with high work function |
US10087525B2 (en) | 2015-08-04 | 2018-10-02 | Asm Ip Holding B.V. | Variable gap hard stop design |
US9647114B2 (en) | 2015-08-14 | 2017-05-09 | Asm Ip Holding B.V. | Methods of forming highly p-type doped germanium tin films and structures and devices including the films |
US9960072B2 (en) | 2015-09-29 | 2018-05-01 | Asm Ip Holding B.V. | Variable adjustment for precise matching of multiple chamber cavity housings |
US10211308B2 (en) | 2015-10-21 | 2019-02-19 | Asm Ip Holding B.V. | NbMC layers |
US10322384B2 (en) | 2015-11-09 | 2019-06-18 | Asm Ip Holding B.V. | Counter flow mixer for process chamber |
US9627221B1 (en) | 2015-12-28 | 2017-04-18 | Asm Ip Holding B.V. | Continuous process incorporating atomic layer etching |
US11139308B2 (en) | 2015-12-29 | 2021-10-05 | Asm Ip Holding B.V. | Atomic layer deposition of III-V compounds to form V-NAND devices |
US10529554B2 (en) | 2016-02-19 | 2020-01-07 | Asm Ip Holding B.V. | Method for forming silicon nitride film selectively on sidewalls or flat surfaces of trenches |
US10468251B2 (en) | 2016-02-19 | 2019-11-05 | Asm Ip Holding B.V. | Method for forming spacers using silicon nitride film for spacer-defined multiple patterning |
US10501866B2 (en) | 2016-03-09 | 2019-12-10 | Asm Ip Holding B.V. | Gas distribution apparatus for improved film uniformity in an epitaxial system |
US10343920B2 (en) | 2016-03-18 | 2019-07-09 | Asm Ip Holding B.V. | Aligned carbon nanotubes |
US9892913B2 (en) | 2016-03-24 | 2018-02-13 | Asm Ip Holding B.V. | Radial and thickness control via biased multi-port injection settings |
US10087522B2 (en) | 2016-04-21 | 2018-10-02 | Asm Ip Holding B.V. | Deposition of metal borides |
US10865475B2 (en) | 2016-04-21 | 2020-12-15 | Asm Ip Holding B.V. | Deposition of metal borides and silicides |
US10190213B2 (en) | 2016-04-21 | 2019-01-29 | Asm Ip Holding B.V. | Deposition of metal borides |
US10032628B2 (en) | 2016-05-02 | 2018-07-24 | Asm Ip Holding B.V. | Source/drain performance through conformal solid state doping |
US10367080B2 (en) | 2016-05-02 | 2019-07-30 | Asm Ip Holding B.V. | Method of forming a germanium oxynitride film |
KR102592471B1 (ko) | 2016-05-17 | 2023-10-20 | 에이에스엠 아이피 홀딩 비.브이. | 금속 배선 형성 방법 및 이를 이용한 반도체 장치의 제조 방법 |
US11453943B2 (en) | 2016-05-25 | 2022-09-27 | Asm Ip Holding B.V. | Method for forming carbon-containing silicon/metal oxide or nitride film by ALD using silicon precursor and hydrocarbon precursor |
US10388509B2 (en) | 2016-06-28 | 2019-08-20 | Asm Ip Holding B.V. | Formation of epitaxial layers via dislocation filtering |
US10612137B2 (en) | 2016-07-08 | 2020-04-07 | Asm Ip Holdings B.V. | Organic reactants for atomic layer deposition |
US9859151B1 (en) | 2016-07-08 | 2018-01-02 | Asm Ip Holding B.V. | Selective film deposition method to form air gaps |
US9793135B1 (en) | 2016-07-14 | 2017-10-17 | ASM IP Holding B.V | Method of cyclic dry etching using etchant film |
US10714385B2 (en) | 2016-07-19 | 2020-07-14 | Asm Ip Holding B.V. | Selective deposition of tungsten |
US10381226B2 (en) | 2016-07-27 | 2019-08-13 | Asm Ip Holding B.V. | Method of processing substrate |
US9812320B1 (en) | 2016-07-28 | 2017-11-07 | Asm Ip Holding B.V. | Method and apparatus for filling a gap |
KR102532607B1 (ko) | 2016-07-28 | 2023-05-15 | 에이에스엠 아이피 홀딩 비.브이. | 기판 가공 장치 및 그 동작 방법 |
US10395919B2 (en) | 2016-07-28 | 2019-08-27 | Asm Ip Holding B.V. | Method and apparatus for filling a gap |
US10177025B2 (en) | 2016-07-28 | 2019-01-08 | Asm Ip Holding B.V. | Method and apparatus for filling a gap |
US9887082B1 (en) | 2016-07-28 | 2018-02-06 | Asm Ip Holding B.V. | Method and apparatus for filling a gap |
US10090316B2 (en) | 2016-09-01 | 2018-10-02 | Asm Ip Holding B.V. | 3D stacked multilayer semiconductor memory using doped select transistor channel |
US10410943B2 (en) | 2016-10-13 | 2019-09-10 | Asm Ip Holding B.V. | Method for passivating a surface of a semiconductor and related systems |
US10643826B2 (en) | 2016-10-26 | 2020-05-05 | Asm Ip Holdings B.V. | Methods for thermally calibrating reaction chambers |
US11532757B2 (en) | 2016-10-27 | 2022-12-20 | Asm Ip Holding B.V. | Deposition of charge trapping layers |
US10643904B2 (en) | 2016-11-01 | 2020-05-05 | Asm Ip Holdings B.V. | Methods for forming a semiconductor device and related semiconductor device structures |
US10714350B2 (en) | 2016-11-01 | 2020-07-14 | ASM IP Holdings, B.V. | Methods for forming a transition metal niobium nitride film on a substrate by atomic layer deposition and related semiconductor device structures |
US10435790B2 (en) | 2016-11-01 | 2019-10-08 | Asm Ip Holding B.V. | Method of subatmospheric plasma-enhanced ALD using capacitively coupled electrodes with narrow gap |
US10229833B2 (en) | 2016-11-01 | 2019-03-12 | Asm Ip Holding B.V. | Methods for forming a transition metal nitride film on a substrate by atomic layer deposition and related semiconductor device structures |
US10134757B2 (en) | 2016-11-07 | 2018-11-20 | Asm Ip Holding B.V. | Method of processing a substrate and a device manufactured by using the method |
KR102546317B1 (ko) | 2016-11-15 | 2023-06-21 | 에이에스엠 아이피 홀딩 비.브이. | 기체 공급 유닛 및 이를 포함하는 기판 처리 장치 |
US10340135B2 (en) | 2016-11-28 | 2019-07-02 | Asm Ip Holding B.V. | Method of topologically restricted plasma-enhanced cyclic deposition of silicon or metal nitride |
KR20180068582A (ko) | 2016-12-14 | 2018-06-22 | 에이에스엠 아이피 홀딩 비.브이. | 기판 처리 장치 |
US9916980B1 (en) | 2016-12-15 | 2018-03-13 | Asm Ip Holding B.V. | Method of forming a structure on a substrate |
US11447861B2 (en) | 2016-12-15 | 2022-09-20 | Asm Ip Holding B.V. | Sequential infiltration synthesis apparatus and a method of forming a patterned structure |
US11581186B2 (en) | 2016-12-15 | 2023-02-14 | Asm Ip Holding B.V. | Sequential infiltration synthesis apparatus |
KR20180070971A (ko) | 2016-12-19 | 2018-06-27 | 에이에스엠 아이피 홀딩 비.브이. | 기판 처리 장치 |
US10269558B2 (en) | 2016-12-22 | 2019-04-23 | Asm Ip Holding B.V. | Method of forming a structure on a substrate |
US10867788B2 (en) | 2016-12-28 | 2020-12-15 | Asm Ip Holding B.V. | Method of forming a structure on a substrate |
US11390950B2 (en) | 2017-01-10 | 2022-07-19 | Asm Ip Holding B.V. | Reactor system and method to reduce residue buildup during a film deposition process |
US10655221B2 (en) | 2017-02-09 | 2020-05-19 | Asm Ip Holding B.V. | Method for depositing oxide film by thermal ALD and PEALD |
US10468261B2 (en) | 2017-02-15 | 2019-11-05 | Asm Ip Holding B.V. | Methods for forming a metallic film on a substrate by cyclical deposition and related semiconductor device structures |
US10283353B2 (en) | 2017-03-29 | 2019-05-07 | Asm Ip Holding B.V. | Method of reforming insulating film deposited on substrate with recess pattern |
US10529563B2 (en) | 2017-03-29 | 2020-01-07 | Asm Ip Holdings B.V. | Method for forming doped metal oxide films on a substrate by cyclical deposition and related semiconductor device structures |
US10103040B1 (en) | 2017-03-31 | 2018-10-16 | Asm Ip Holding B.V. | Apparatus and method for manufacturing a semiconductor device |
USD830981S1 (en) | 2017-04-07 | 2018-10-16 | Asm Ip Holding B.V. | Susceptor for semiconductor substrate processing apparatus |
KR102457289B1 (ko) | 2017-04-25 | 2022-10-21 | 에이에스엠 아이피 홀딩 비.브이. | 박막 증착 방법 및 반도체 장치의 제조 방법 |
US10892156B2 (en) | 2017-05-08 | 2021-01-12 | Asm Ip Holding B.V. | Methods for forming a silicon nitride film on a substrate and related semiconductor device structures |
US10446393B2 (en) | 2017-05-08 | 2019-10-15 | Asm Ip Holding B.V. | Methods for forming silicon-containing epitaxial layers and related semiconductor device structures |
US10770286B2 (en) | 2017-05-08 | 2020-09-08 | Asm Ip Holdings B.V. | Methods for selectively forming a silicon nitride film on a substrate and related semiconductor device structures |
US10504742B2 (en) | 2017-05-31 | 2019-12-10 | Asm Ip Holding B.V. | Method of atomic layer etching using hydrogen plasma |
US10886123B2 (en) | 2017-06-02 | 2021-01-05 | Asm Ip Holding B.V. | Methods for forming low temperature semiconductor layers and related semiconductor device structures |
US11306395B2 (en) | 2017-06-28 | 2022-04-19 | Asm Ip Holding B.V. | Methods for depositing a transition metal nitride film on a substrate by atomic layer deposition and related deposition apparatus |
US10685834B2 (en) | 2017-07-05 | 2020-06-16 | Asm Ip Holdings B.V. | Methods for forming a silicon germanium tin layer and related semiconductor device structures |
KR20190009245A (ko) | 2017-07-18 | 2019-01-28 | 에이에스엠 아이피 홀딩 비.브이. | 반도체 소자 구조물 형성 방법 및 관련된 반도체 소자 구조물 |
US10541333B2 (en) | 2017-07-19 | 2020-01-21 | Asm Ip Holding B.V. | Method for depositing a group IV semiconductor and related semiconductor device structures |
US11374112B2 (en) | 2017-07-19 | 2022-06-28 | Asm Ip Holding B.V. | Method for depositing a group IV semiconductor and related semiconductor device structures |
US11018002B2 (en) | 2017-07-19 | 2021-05-25 | Asm Ip Holding B.V. | Method for selectively depositing a Group IV semiconductor and related semiconductor device structures |
US10312055B2 (en) | 2017-07-26 | 2019-06-04 | Asm Ip Holding B.V. | Method of depositing film by PEALD using negative bias |
US10590535B2 (en) | 2017-07-26 | 2020-03-17 | Asm Ip Holdings B.V. | Chemical treatment, deposition and/or infiltration apparatus and method for using the same |
US10605530B2 (en) | 2017-07-26 | 2020-03-31 | Asm Ip Holding B.V. | Assembly of a liner and a flange for a vertical furnace as well as the liner and the vertical furnace |
US10770336B2 (en) | 2017-08-08 | 2020-09-08 | Asm Ip Holding B.V. | Substrate lift mechanism and reactor including same |
US10692741B2 (en) | 2017-08-08 | 2020-06-23 | Asm Ip Holdings B.V. | Radiation shield |
US11769682B2 (en) | 2017-08-09 | 2023-09-26 | Asm Ip Holding B.V. | Storage apparatus for storing cassettes for substrates and processing apparatus equipped therewith |
US11139191B2 (en) | 2017-08-09 | 2021-10-05 | Asm Ip Holding B.V. | Storage apparatus for storing cassettes for substrates and processing apparatus equipped therewith |
US10249524B2 (en) | 2017-08-09 | 2019-04-02 | Asm Ip Holding B.V. | Cassette holder assembly for a substrate cassette and holding member for use in such assembly |
US10236177B1 (en) | 2017-08-22 | 2019-03-19 | ASM IP Holding B.V.. | Methods for depositing a doped germanium tin semiconductor and related semiconductor device structures |
USD900036S1 (en) | 2017-08-24 | 2020-10-27 | Asm Ip Holding B.V. | Heater electrical connector and adapter |
US11830730B2 (en) | 2017-08-29 | 2023-11-28 | Asm Ip Holding B.V. | Layer forming method and apparatus |
US11295980B2 (en) | 2017-08-30 | 2022-04-05 | Asm Ip Holding B.V. | Methods for depositing a molybdenum metal film over a dielectric surface of a substrate by a cyclical deposition process and related semiconductor device structures |
KR102491945B1 (ko) | 2017-08-30 | 2023-01-26 | 에이에스엠 아이피 홀딩 비.브이. | 기판 처리 장치 |
US11056344B2 (en) | 2017-08-30 | 2021-07-06 | Asm Ip Holding B.V. | Layer forming method |
US10607895B2 (en) | 2017-09-18 | 2020-03-31 | Asm Ip Holdings B.V. | Method for forming a semiconductor device structure comprising a gate fill metal |
KR102630301B1 (ko) | 2017-09-21 | 2024-01-29 | 에이에스엠 아이피 홀딩 비.브이. | 침투성 재료의 순차 침투 합성 방법 처리 및 이를 이용하여 형성된 구조물 및 장치 |
US10844484B2 (en) | 2017-09-22 | 2020-11-24 | Asm Ip Holding B.V. | Apparatus for dispensing a vapor phase reactant to a reaction chamber and related methods |
US10658205B2 (en) | 2017-09-28 | 2020-05-19 | Asm Ip Holdings B.V. | Chemical dispensing apparatus and methods for dispensing a chemical to a reaction chamber |
US10403504B2 (en) | 2017-10-05 | 2019-09-03 | Asm Ip Holding B.V. | Method for selectively depositing a metallic film on a substrate |
US10319588B2 (en) | 2017-10-10 | 2019-06-11 | Asm Ip Holding B.V. | Method for depositing a metal chalcogenide on a substrate by cyclical deposition |
US10923344B2 (en) | 2017-10-30 | 2021-02-16 | Asm Ip Holding B.V. | Methods for forming a semiconductor structure and related semiconductor structures |
US10910262B2 (en) | 2017-11-16 | 2021-02-02 | Asm Ip Holding B.V. | Method of selectively depositing a capping layer structure on a semiconductor device structure |
KR102443047B1 (ko) | 2017-11-16 | 2022-09-14 | 에이에스엠 아이피 홀딩 비.브이. | 기판 처리 장치 방법 및 그에 의해 제조된 장치 |
US11022879B2 (en) | 2017-11-24 | 2021-06-01 | Asm Ip Holding B.V. | Method of forming an enhanced unexposed photoresist layer |
CN111344522B (zh) | 2017-11-27 | 2022-04-12 | 阿斯莫Ip控股公司 | 包括洁净迷你环境的装置 |
KR102597978B1 (ko) | 2017-11-27 | 2023-11-06 | 에이에스엠 아이피 홀딩 비.브이. | 배치 퍼니스와 함께 사용하기 위한 웨이퍼 카세트를 보관하기 위한 보관 장치 |
US10290508B1 (en) | 2017-12-05 | 2019-05-14 | Asm Ip Holding B.V. | Method for forming vertical spacers for spacer-defined patterning |
US10872771B2 (en) | 2018-01-16 | 2020-12-22 | Asm Ip Holding B. V. | Method for depositing a material film on a substrate within a reaction chamber by a cyclical deposition process and related device structures |
CN111630203A (zh) | 2018-01-19 | 2020-09-04 | Asm Ip私人控股有限公司 | 通过等离子体辅助沉积来沉积间隙填充层的方法 |
TW202325889A (zh) | 2018-01-19 | 2023-07-01 | 荷蘭商Asm 智慧財產控股公司 | 沈積方法 |
USD903477S1 (en) | 2018-01-24 | 2020-12-01 | Asm Ip Holdings B.V. | Metal clamp |
US11018047B2 (en) | 2018-01-25 | 2021-05-25 | Asm Ip Holding B.V. | Hybrid lift pin |
US10535516B2 (en) | 2018-02-01 | 2020-01-14 | Asm Ip Holdings B.V. | Method for depositing a semiconductor structure on a surface of a substrate and related semiconductor structures |
USD880437S1 (en) | 2018-02-01 | 2020-04-07 | Asm Ip Holding B.V. | Gas supply plate for semiconductor manufacturing apparatus |
US11081345B2 (en) | 2018-02-06 | 2021-08-03 | Asm Ip Holding B.V. | Method of post-deposition treatment for silicon oxide film |
EP3737779A1 (de) | 2018-02-14 | 2020-11-18 | ASM IP Holding B.V. | Verfahren zum abscheiden eines ruthenium-haltigen films auf einem substrat durch ein zyklisches abscheidungsverfahren |
US10896820B2 (en) | 2018-02-14 | 2021-01-19 | Asm Ip Holding B.V. | Method for depositing a ruthenium-containing film on a substrate by a cyclical deposition process |
US10731249B2 (en) | 2018-02-15 | 2020-08-04 | Asm Ip Holding B.V. | Method of forming a transition metal containing film on a substrate by a cyclical deposition process, a method for supplying a transition metal halide compound to a reaction chamber, and related vapor deposition apparatus |
KR102636427B1 (ko) | 2018-02-20 | 2024-02-13 | 에이에스엠 아이피 홀딩 비.브이. | 기판 처리 방법 및 장치 |
US10658181B2 (en) | 2018-02-20 | 2020-05-19 | Asm Ip Holding B.V. | Method of spacer-defined direct patterning in semiconductor fabrication |
US10975470B2 (en) | 2018-02-23 | 2021-04-13 | Asm Ip Holding B.V. | Apparatus for detecting or monitoring for a chemical precursor in a high temperature environment |
US11473195B2 (en) | 2018-03-01 | 2022-10-18 | Asm Ip Holding B.V. | Semiconductor processing apparatus and a method for processing a substrate |
US11629406B2 (en) | 2018-03-09 | 2023-04-18 | Asm Ip Holding B.V. | Semiconductor processing apparatus comprising one or more pyrometers for measuring a temperature of a substrate during transfer of the substrate |
US11114283B2 (en) | 2018-03-16 | 2021-09-07 | Asm Ip Holding B.V. | Reactor, system including the reactor, and methods of manufacturing and using same |
KR102646467B1 (ko) | 2018-03-27 | 2024-03-11 | 에이에스엠 아이피 홀딩 비.브이. | 기판 상에 전극을 형성하는 방법 및 전극을 포함하는 반도체 소자 구조 |
US11230766B2 (en) | 2018-03-29 | 2022-01-25 | Asm Ip Holding B.V. | Substrate processing apparatus and method |
US11088002B2 (en) | 2018-03-29 | 2021-08-10 | Asm Ip Holding B.V. | Substrate rack and a substrate processing system and method |
US10510536B2 (en) | 2018-03-29 | 2019-12-17 | Asm Ip Holding B.V. | Method of depositing a co-doped polysilicon film on a surface of a substrate within a reaction chamber |
KR102501472B1 (ko) | 2018-03-30 | 2023-02-20 | 에이에스엠 아이피 홀딩 비.브이. | 기판 처리 방법 |
TW202344708A (zh) | 2018-05-08 | 2023-11-16 | 荷蘭商Asm Ip私人控股有限公司 | 藉由循環沉積製程於基板上沉積氧化物膜之方法及相關裝置結構 |
TWI816783B (zh) | 2018-05-11 | 2023-10-01 | 荷蘭商Asm 智慧財產控股公司 | 用於基板上形成摻雜金屬碳化物薄膜之方法及相關半導體元件結構 |
KR102596988B1 (ko) | 2018-05-28 | 2023-10-31 | 에이에스엠 아이피 홀딩 비.브이. | 기판 처리 방법 및 그에 의해 제조된 장치 |
US11718913B2 (en) | 2018-06-04 | 2023-08-08 | Asm Ip Holding B.V. | Gas distribution system and reactor system including same |
US11270899B2 (en) | 2018-06-04 | 2022-03-08 | Asm Ip Holding B.V. | Wafer handling chamber with moisture reduction |
US11286562B2 (en) | 2018-06-08 | 2022-03-29 | Asm Ip Holding B.V. | Gas-phase chemical reactor and method of using same |
KR102568797B1 (ko) | 2018-06-21 | 2023-08-21 | 에이에스엠 아이피 홀딩 비.브이. | 기판 처리 시스템 |
US10797133B2 (en) | 2018-06-21 | 2020-10-06 | Asm Ip Holding B.V. | Method for depositing a phosphorus doped silicon arsenide film and related semiconductor device structures |
US11492703B2 (en) | 2018-06-27 | 2022-11-08 | Asm Ip Holding B.V. | Cyclic deposition methods for forming metal-containing material and films and structures including the metal-containing material |
WO2020003000A1 (en) | 2018-06-27 | 2020-01-02 | Asm Ip Holding B.V. | Cyclic deposition methods for forming metal-containing material and films and structures including the metal-containing material |
US10612136B2 (en) | 2018-06-29 | 2020-04-07 | ASM IP Holding, B.V. | Temperature-controlled flange and reactor system including same |
KR20200002519A (ko) | 2018-06-29 | 2020-01-08 | 에이에스엠 아이피 홀딩 비.브이. | 박막 증착 방법 및 반도체 장치의 제조 방법 |
US10388513B1 (en) | 2018-07-03 | 2019-08-20 | Asm Ip Holding B.V. | Method for depositing silicon-free carbon-containing film as gap-fill layer by pulse plasma-assisted deposition |
US10755922B2 (en) | 2018-07-03 | 2020-08-25 | Asm Ip Holding B.V. | Method for depositing silicon-free carbon-containing film as gap-fill layer by pulse plasma-assisted deposition |
US10767789B2 (en) | 2018-07-16 | 2020-09-08 | Asm Ip Holding B.V. | Diaphragm valves, valve components, and methods for forming valve components |
US10483099B1 (en) | 2018-07-26 | 2019-11-19 | Asm Ip Holding B.V. | Method for forming thermally stable organosilicon polymer film |
US11053591B2 (en) | 2018-08-06 | 2021-07-06 | Asm Ip Holding B.V. | Multi-port gas injection system and reactor system including same |
US10883175B2 (en) | 2018-08-09 | 2021-01-05 | Asm Ip Holding B.V. | Vertical furnace for processing substrates and a liner for use therein |
US10829852B2 (en) | 2018-08-16 | 2020-11-10 | Asm Ip Holding B.V. | Gas distribution device for a wafer processing apparatus |
US11430674B2 (en) | 2018-08-22 | 2022-08-30 | Asm Ip Holding B.V. | Sensor array, apparatus for dispensing a vapor phase reactant to a reaction chamber and related methods |
KR20200030162A (ko) | 2018-09-11 | 2020-03-20 | 에이에스엠 아이피 홀딩 비.브이. | 박막 증착 방법 |
US11024523B2 (en) | 2018-09-11 | 2021-06-01 | Asm Ip Holding B.V. | Substrate processing apparatus and method |
US11049751B2 (en) | 2018-09-14 | 2021-06-29 | Asm Ip Holding B.V. | Cassette supply system to store and handle cassettes and processing apparatus equipped therewith |
CN110970344A (zh) | 2018-10-01 | 2020-04-07 | Asm Ip控股有限公司 | 衬底保持设备、包含所述设备的系统及其使用方法 |
US11232963B2 (en) | 2018-10-03 | 2022-01-25 | Asm Ip Holding B.V. | Substrate processing apparatus and method |
KR102592699B1 (ko) | 2018-10-08 | 2023-10-23 | 에이에스엠 아이피 홀딩 비.브이. | 기판 지지 유닛 및 이를 포함하는 박막 증착 장치와 기판 처리 장치 |
US10847365B2 (en) | 2018-10-11 | 2020-11-24 | Asm Ip Holding B.V. | Method of forming conformal silicon carbide film by cyclic CVD |
US10811256B2 (en) | 2018-10-16 | 2020-10-20 | Asm Ip Holding B.V. | Method for etching a carbon-containing feature |
KR102605121B1 (ko) | 2018-10-19 | 2023-11-23 | 에이에스엠 아이피 홀딩 비.브이. | 기판 처리 장치 및 기판 처리 방법 |
KR102546322B1 (ko) | 2018-10-19 | 2023-06-21 | 에이에스엠 아이피 홀딩 비.브이. | 기판 처리 장치 및 기판 처리 방법 |
USD948463S1 (en) | 2018-10-24 | 2022-04-12 | Asm Ip Holding B.V. | Susceptor for semiconductor substrate supporting apparatus |
US10381219B1 (en) | 2018-10-25 | 2019-08-13 | Asm Ip Holding B.V. | Methods for forming a silicon nitride film |
US11087997B2 (en) | 2018-10-31 | 2021-08-10 | Asm Ip Holding B.V. | Substrate processing apparatus for processing substrates |
KR20200051105A (ko) | 2018-11-02 | 2020-05-13 | 에이에스엠 아이피 홀딩 비.브이. | 기판 지지 유닛 및 이를 포함하는 기판 처리 장치 |
US11572620B2 (en) | 2018-11-06 | 2023-02-07 | Asm Ip Holding B.V. | Methods for selectively depositing an amorphous silicon film on a substrate |
US11031242B2 (en) | 2018-11-07 | 2021-06-08 | Asm Ip Holding B.V. | Methods for depositing a boron doped silicon germanium film |
US10847366B2 (en) | 2018-11-16 | 2020-11-24 | Asm Ip Holding B.V. | Methods for depositing a transition metal chalcogenide film on a substrate by a cyclical deposition process |
US10818758B2 (en) | 2018-11-16 | 2020-10-27 | Asm Ip Holding B.V. | Methods for forming a metal silicate film on a substrate in a reaction chamber and related semiconductor device structures |
US10559458B1 (en) | 2018-11-26 | 2020-02-11 | Asm Ip Holding B.V. | Method of forming oxynitride film |
US11217444B2 (en) | 2018-11-30 | 2022-01-04 | Asm Ip Holding B.V. | Method for forming an ultraviolet radiation responsive metal oxide-containing film |
KR102636428B1 (ko) | 2018-12-04 | 2024-02-13 | 에이에스엠 아이피 홀딩 비.브이. | 기판 처리 장치를 세정하는 방법 |
US11158513B2 (en) | 2018-12-13 | 2021-10-26 | Asm Ip Holding B.V. | Methods for forming a rhenium-containing film on a substrate by a cyclical deposition process and related semiconductor device structures |
JP2020096183A (ja) | 2018-12-14 | 2020-06-18 | エーエスエム・アイピー・ホールディング・ベー・フェー | 窒化ガリウムの選択的堆積を用いてデバイス構造体を形成する方法及びそのためのシステム |
KR102610827B1 (ko) * | 2018-12-20 | 2023-12-07 | 어플라이드 머티어리얼스, 인코포레이티드 | 개선된 가스 유동을 처리 챔버의 처리 용적에 공급하기 위한 방법 및 장치 |
TWI819180B (zh) | 2019-01-17 | 2023-10-21 | 荷蘭商Asm 智慧財產控股公司 | 藉由循環沈積製程於基板上形成含過渡金屬膜之方法 |
KR20200091543A (ko) | 2019-01-22 | 2020-07-31 | 에이에스엠 아이피 홀딩 비.브이. | 기판 처리 장치 |
CN111524788B (zh) | 2019-02-01 | 2023-11-24 | Asm Ip私人控股有限公司 | 氧化硅的拓扑选择性膜形成的方法 |
TW202104632A (zh) | 2019-02-20 | 2021-02-01 | 荷蘭商Asm Ip私人控股有限公司 | 用來填充形成於基材表面內之凹部的循環沉積方法及設備 |
TW202044325A (zh) | 2019-02-20 | 2020-12-01 | 荷蘭商Asm Ip私人控股有限公司 | 填充一基板之一表面內所形成的一凹槽的方法、根據其所形成之半導體結構、及半導體處理設備 |
KR20200102357A (ko) | 2019-02-20 | 2020-08-31 | 에이에스엠 아이피 홀딩 비.브이. | 3-d nand 응용의 플러그 충진체 증착용 장치 및 방법 |
KR102626263B1 (ko) | 2019-02-20 | 2024-01-16 | 에이에스엠 아이피 홀딩 비.브이. | 처리 단계를 포함하는 주기적 증착 방법 및 이를 위한 장치 |
TW202100794A (zh) | 2019-02-22 | 2021-01-01 | 荷蘭商Asm Ip私人控股有限公司 | 基材處理設備及處理基材之方法 |
KR20200108248A (ko) | 2019-03-08 | 2020-09-17 | 에이에스엠 아이피 홀딩 비.브이. | SiOCN 층을 포함한 구조체 및 이의 형성 방법 |
KR20200108242A (ko) | 2019-03-08 | 2020-09-17 | 에이에스엠 아이피 홀딩 비.브이. | 실리콘 질화물 층을 선택적으로 증착하는 방법, 및 선택적으로 증착된 실리콘 질화물 층을 포함하는 구조체 |
KR20200108243A (ko) | 2019-03-08 | 2020-09-17 | 에이에스엠 아이피 홀딩 비.브이. | SiOC 층을 포함한 구조체 및 이의 형성 방법 |
JP2020167398A (ja) | 2019-03-28 | 2020-10-08 | エーエスエム・アイピー・ホールディング・ベー・フェー | ドアオープナーおよびドアオープナーが提供される基材処理装置 |
KR20200116855A (ko) | 2019-04-01 | 2020-10-13 | 에이에스엠 아이피 홀딩 비.브이. | 반도체 소자를 제조하는 방법 |
KR20200123380A (ko) | 2019-04-19 | 2020-10-29 | 에이에스엠 아이피 홀딩 비.브이. | 층 형성 방법 및 장치 |
KR20200125453A (ko) | 2019-04-24 | 2020-11-04 | 에이에스엠 아이피 홀딩 비.브이. | 기상 반응기 시스템 및 이를 사용하는 방법 |
KR20200130121A (ko) | 2019-05-07 | 2020-11-18 | 에이에스엠 아이피 홀딩 비.브이. | 딥 튜브가 있는 화학물질 공급원 용기 |
KR20200130118A (ko) | 2019-05-07 | 2020-11-18 | 에이에스엠 아이피 홀딩 비.브이. | 비정질 탄소 중합체 막을 개질하는 방법 |
KR20200130652A (ko) | 2019-05-10 | 2020-11-19 | 에이에스엠 아이피 홀딩 비.브이. | 표면 상에 재료를 증착하는 방법 및 본 방법에 따라 형성된 구조 |
JP2020188255A (ja) | 2019-05-16 | 2020-11-19 | エーエスエム アイピー ホールディング ビー.ブイ. | ウェハボートハンドリング装置、縦型バッチ炉および方法 |
USD947913S1 (en) | 2019-05-17 | 2022-04-05 | Asm Ip Holding B.V. | Susceptor shaft |
USD975665S1 (en) | 2019-05-17 | 2023-01-17 | Asm Ip Holding B.V. | Susceptor shaft |
USD935572S1 (en) | 2019-05-24 | 2021-11-09 | Asm Ip Holding B.V. | Gas channel plate |
USD922229S1 (en) | 2019-06-05 | 2021-06-15 | Asm Ip Holding B.V. | Device for controlling a temperature of a gas supply unit |
KR20200141003A (ko) | 2019-06-06 | 2020-12-17 | 에이에스엠 아이피 홀딩 비.브이. | 가스 감지기를 포함하는 기상 반응기 시스템 |
KR20200143254A (ko) | 2019-06-11 | 2020-12-23 | 에이에스엠 아이피 홀딩 비.브이. | 개질 가스를 사용하여 전자 구조를 형성하는 방법, 상기 방법을 수행하기 위한 시스템, 및 상기 방법을 사용하여 형성되는 구조 |
USD944946S1 (en) | 2019-06-14 | 2022-03-01 | Asm Ip Holding B.V. | Shower plate |
USD931978S1 (en) | 2019-06-27 | 2021-09-28 | Asm Ip Holding B.V. | Showerhead vacuum transport |
KR20210005515A (ko) | 2019-07-03 | 2021-01-14 | 에이에스엠 아이피 홀딩 비.브이. | 기판 처리 장치용 온도 제어 조립체 및 이를 사용하는 방법 |
JP2021015791A (ja) | 2019-07-09 | 2021-02-12 | エーエスエム アイピー ホールディング ビー.ブイ. | 同軸導波管を用いたプラズマ装置、基板処理方法 |
CN112216646A (zh) | 2019-07-10 | 2021-01-12 | Asm Ip私人控股有限公司 | 基板支撑组件及包括其的基板处理装置 |
KR20210010307A (ko) | 2019-07-16 | 2021-01-27 | 에이에스엠 아이피 홀딩 비.브이. | 기판 처리 장치 |
KR20210010820A (ko) | 2019-07-17 | 2021-01-28 | 에이에스엠 아이피 홀딩 비.브이. | 실리콘 게르마늄 구조를 형성하는 방법 |
KR20210010816A (ko) | 2019-07-17 | 2021-01-28 | 에이에스엠 아이피 홀딩 비.브이. | 라디칼 보조 점화 플라즈마 시스템 및 방법 |
US11643724B2 (en) | 2019-07-18 | 2023-05-09 | Asm Ip Holding B.V. | Method of forming structures using a neutral beam |
CN112242296A (zh) | 2019-07-19 | 2021-01-19 | Asm Ip私人控股有限公司 | 形成拓扑受控的无定形碳聚合物膜的方法 |
CN112309843A (zh) | 2019-07-29 | 2021-02-02 | Asm Ip私人控股有限公司 | 实现高掺杂剂掺入的选择性沉积方法 |
CN112309900A (zh) | 2019-07-30 | 2021-02-02 | Asm Ip私人控股有限公司 | 基板处理设备 |
CN112309899A (zh) | 2019-07-30 | 2021-02-02 | Asm Ip私人控股有限公司 | 基板处理设备 |
US11587815B2 (en) | 2019-07-31 | 2023-02-21 | Asm Ip Holding B.V. | Vertical batch furnace assembly |
US11587814B2 (en) | 2019-07-31 | 2023-02-21 | Asm Ip Holding B.V. | Vertical batch furnace assembly |
US11227782B2 (en) | 2019-07-31 | 2022-01-18 | Asm Ip Holding B.V. | Vertical batch furnace assembly |
KR20210018759A (ko) | 2019-08-05 | 2021-02-18 | 에이에스엠 아이피 홀딩 비.브이. | 화학물질 공급원 용기를 위한 액체 레벨 센서 |
USD965524S1 (en) | 2019-08-19 | 2022-10-04 | Asm Ip Holding B.V. | Susceptor support |
USD965044S1 (en) | 2019-08-19 | 2022-09-27 | Asm Ip Holding B.V. | Susceptor shaft |
JP2021031769A (ja) | 2019-08-21 | 2021-03-01 | エーエスエム アイピー ホールディング ビー.ブイ. | 成膜原料混合ガス生成装置及び成膜装置 |
USD940837S1 (en) | 2019-08-22 | 2022-01-11 | Asm Ip Holding B.V. | Electrode |
USD930782S1 (en) | 2019-08-22 | 2021-09-14 | Asm Ip Holding B.V. | Gas distributor |
KR20210024423A (ko) | 2019-08-22 | 2021-03-05 | 에이에스엠 아이피 홀딩 비.브이. | 홀을 구비한 구조체를 형성하기 위한 방법 |
USD979506S1 (en) | 2019-08-22 | 2023-02-28 | Asm Ip Holding B.V. | Insulator |
USD949319S1 (en) | 2019-08-22 | 2022-04-19 | Asm Ip Holding B.V. | Exhaust duct |
US11286558B2 (en) | 2019-08-23 | 2022-03-29 | Asm Ip Holding B.V. | Methods for depositing a molybdenum nitride film on a surface of a substrate by a cyclical deposition process and related semiconductor device structures including a molybdenum nitride film |
KR20210024420A (ko) | 2019-08-23 | 2021-03-05 | 에이에스엠 아이피 홀딩 비.브이. | 비스(디에틸아미노)실란을 사용하여 peald에 의해 개선된 품질을 갖는 실리콘 산화물 막을 증착하기 위한 방법 |
KR20210029090A (ko) | 2019-09-04 | 2021-03-15 | 에이에스엠 아이피 홀딩 비.브이. | 희생 캡핑 층을 이용한 선택적 증착 방법 |
KR20210029663A (ko) | 2019-09-05 | 2021-03-16 | 에이에스엠 아이피 홀딩 비.브이. | 기판 처리 장치 |
US11562901B2 (en) | 2019-09-25 | 2023-01-24 | Asm Ip Holding B.V. | Substrate processing method |
CN112593212B (zh) | 2019-10-02 | 2023-12-22 | Asm Ip私人控股有限公司 | 通过循环等离子体增强沉积工艺形成拓扑选择性氧化硅膜的方法 |
TW202129060A (zh) | 2019-10-08 | 2021-08-01 | 荷蘭商Asm Ip控股公司 | 基板處理裝置、及基板處理方法 |
KR20210043460A (ko) | 2019-10-10 | 2021-04-21 | 에이에스엠 아이피 홀딩 비.브이. | 포토레지스트 하부층을 형성하기 위한 방법 및 이를 포함한 구조체 |
KR20210045930A (ko) | 2019-10-16 | 2021-04-27 | 에이에스엠 아이피 홀딩 비.브이. | 실리콘 산화물의 토폴로지-선택적 막의 형성 방법 |
US11637014B2 (en) | 2019-10-17 | 2023-04-25 | Asm Ip Holding B.V. | Methods for selective deposition of doped semiconductor material |
KR20210047808A (ko) | 2019-10-21 | 2021-04-30 | 에이에스엠 아이피 홀딩 비.브이. | 막을 선택적으로 에칭하기 위한 장치 및 방법 |
US11646205B2 (en) | 2019-10-29 | 2023-05-09 | Asm Ip Holding B.V. | Methods of selectively forming n-type doped material on a surface, systems for selectively forming n-type doped material, and structures formed using same |
KR20210054983A (ko) | 2019-11-05 | 2021-05-14 | 에이에스엠 아이피 홀딩 비.브이. | 도핑된 반도체 층을 갖는 구조체 및 이를 형성하기 위한 방법 및 시스템 |
US11501968B2 (en) | 2019-11-15 | 2022-11-15 | Asm Ip Holding B.V. | Method for providing a semiconductor device with silicon filled gaps |
KR20210062561A (ko) | 2019-11-20 | 2021-05-31 | 에이에스엠 아이피 홀딩 비.브이. | 기판의 표면 상에 탄소 함유 물질을 증착하는 방법, 상기 방법을 사용하여 형성된 구조물, 및 상기 구조물을 형성하기 위한 시스템 |
KR20210065848A (ko) | 2019-11-26 | 2021-06-04 | 에이에스엠 아이피 홀딩 비.브이. | 제1 유전체 표면과 제2 금속성 표면을 포함한 기판 상에 타겟 막을 선택적으로 형성하기 위한 방법 |
CN112951697A (zh) | 2019-11-26 | 2021-06-11 | Asm Ip私人控股有限公司 | 基板处理设备 |
CN112885693A (zh) | 2019-11-29 | 2021-06-01 | Asm Ip私人控股有限公司 | 基板处理设备 |
CN112885692A (zh) | 2019-11-29 | 2021-06-01 | Asm Ip私人控股有限公司 | 基板处理设备 |
JP2021090042A (ja) | 2019-12-02 | 2021-06-10 | エーエスエム アイピー ホールディング ビー.ブイ. | 基板処理装置、基板処理方法 |
KR20210070898A (ko) | 2019-12-04 | 2021-06-15 | 에이에스엠 아이피 홀딩 비.브이. | 기판 처리 장치 |
TW202125596A (zh) | 2019-12-17 | 2021-07-01 | 荷蘭商Asm Ip私人控股有限公司 | 形成氮化釩層之方法以及包括該氮化釩層之結構 |
KR20210080214A (ko) | 2019-12-19 | 2021-06-30 | 에이에스엠 아이피 홀딩 비.브이. | 기판 상의 갭 피처를 충진하는 방법 및 이와 관련된 반도체 소자 구조 |
JP2021109175A (ja) | 2020-01-06 | 2021-08-02 | エーエスエム・アイピー・ホールディング・ベー・フェー | ガス供給アセンブリ、その構成要素、およびこれを含む反応器システム |
KR20210095050A (ko) | 2020-01-20 | 2021-07-30 | 에이에스엠 아이피 홀딩 비.브이. | 박막 형성 방법 및 박막 표면 개질 방법 |
TW202130846A (zh) | 2020-02-03 | 2021-08-16 | 荷蘭商Asm Ip私人控股有限公司 | 形成包括釩或銦層的結構之方法 |
TW202146882A (zh) | 2020-02-04 | 2021-12-16 | 荷蘭商Asm Ip私人控股有限公司 | 驗證一物品之方法、用於驗證一物品之設備、及用於驗證一反應室之系統 |
US11776846B2 (en) | 2020-02-07 | 2023-10-03 | Asm Ip Holding B.V. | Methods for depositing gap filling fluids and related systems and devices |
US11781243B2 (en) | 2020-02-17 | 2023-10-10 | Asm Ip Holding B.V. | Method for depositing low temperature phosphorous-doped silicon |
KR20210116240A (ko) | 2020-03-11 | 2021-09-27 | 에이에스엠 아이피 홀딩 비.브이. | 조절성 접합부를 갖는 기판 핸들링 장치 |
US11876356B2 (en) | 2020-03-11 | 2024-01-16 | Asm Ip Holding B.V. | Lockout tagout assembly and system and method of using same |
KR20210117157A (ko) | 2020-03-12 | 2021-09-28 | 에이에스엠 아이피 홀딩 비.브이. | 타겟 토폴로지 프로파일을 갖는 층 구조를 제조하기 위한 방법 |
KR20210124042A (ko) | 2020-04-02 | 2021-10-14 | 에이에스엠 아이피 홀딩 비.브이. | 박막 형성 방법 |
TW202146689A (zh) | 2020-04-03 | 2021-12-16 | 荷蘭商Asm Ip控股公司 | 阻障層形成方法及半導體裝置的製造方法 |
TW202145344A (zh) | 2020-04-08 | 2021-12-01 | 荷蘭商Asm Ip私人控股有限公司 | 用於選擇性蝕刻氧化矽膜之設備及方法 |
US11821078B2 (en) | 2020-04-15 | 2023-11-21 | Asm Ip Holding B.V. | Method for forming precoat film and method for forming silicon-containing film |
KR20210132600A (ko) | 2020-04-24 | 2021-11-04 | 에이에스엠 아이피 홀딩 비.브이. | 바나듐, 질소 및 추가 원소를 포함한 층을 증착하기 위한 방법 및 시스템 |
KR20210132605A (ko) | 2020-04-24 | 2021-11-04 | 에이에스엠 아이피 홀딩 비.브이. | 냉각 가스 공급부를 포함한 수직형 배치 퍼니스 어셈블리 |
US11898243B2 (en) | 2020-04-24 | 2024-02-13 | Asm Ip Holding B.V. | Method of forming vanadium nitride-containing layer |
KR20210134226A (ko) | 2020-04-29 | 2021-11-09 | 에이에스엠 아이피 홀딩 비.브이. | 고체 소스 전구체 용기 |
KR20210134869A (ko) | 2020-05-01 | 2021-11-11 | 에이에스엠 아이피 홀딩 비.브이. | Foup 핸들러를 이용한 foup의 빠른 교환 |
KR20210141379A (ko) | 2020-05-13 | 2021-11-23 | 에이에스엠 아이피 홀딩 비.브이. | 반응기 시스템용 레이저 정렬 고정구 |
KR20210143653A (ko) | 2020-05-19 | 2021-11-29 | 에이에스엠 아이피 홀딩 비.브이. | 기판 처리 장치 |
KR20210145078A (ko) | 2020-05-21 | 2021-12-01 | 에이에스엠 아이피 홀딩 비.브이. | 다수의 탄소 층을 포함한 구조체 및 이를 형성하고 사용하는 방법 |
CN111549309B (zh) * | 2020-05-29 | 2022-04-12 | 中国人民解放军军事科学院国防科技创新研究院 | 一种低温高速火焰喷涂枪 |
TW202201602A (zh) | 2020-05-29 | 2022-01-01 | 荷蘭商Asm Ip私人控股有限公司 | 基板處理方法 |
TW202218133A (zh) | 2020-06-24 | 2022-05-01 | 荷蘭商Asm Ip私人控股有限公司 | 形成含矽層之方法 |
TW202217953A (zh) | 2020-06-30 | 2022-05-01 | 荷蘭商Asm Ip私人控股有限公司 | 基板處理方法 |
TW202219628A (zh) | 2020-07-17 | 2022-05-16 | 荷蘭商Asm Ip私人控股有限公司 | 用於光微影之結構與方法 |
TW202204662A (zh) | 2020-07-20 | 2022-02-01 | 荷蘭商Asm Ip私人控股有限公司 | 用於沉積鉬層之方法及系統 |
KR20220027026A (ko) | 2020-08-26 | 2022-03-07 | 에이에스엠 아이피 홀딩 비.브이. | 금속 실리콘 산화물 및 금속 실리콘 산질화물 층을 형성하기 위한 방법 및 시스템 |
USD990534S1 (en) | 2020-09-11 | 2023-06-27 | Asm Ip Holding B.V. | Weighted lift pin |
USD1012873S1 (en) | 2020-09-24 | 2024-01-30 | Asm Ip Holding B.V. | Electrode for semiconductor processing apparatus |
TW202229613A (zh) | 2020-10-14 | 2022-08-01 | 荷蘭商Asm Ip私人控股有限公司 | 於階梯式結構上沉積材料的方法 |
KR20220053482A (ko) | 2020-10-22 | 2022-04-29 | 에이에스엠 아이피 홀딩 비.브이. | 바나듐 금속을 증착하는 방법, 구조체, 소자 및 증착 어셈블리 |
TW202223136A (zh) | 2020-10-28 | 2022-06-16 | 荷蘭商Asm Ip私人控股有限公司 | 用於在基板上形成層之方法、及半導體處理系統 |
TW202235675A (zh) | 2020-11-30 | 2022-09-16 | 荷蘭商Asm Ip私人控股有限公司 | 注入器、及基板處理設備 |
US11946137B2 (en) | 2020-12-16 | 2024-04-02 | Asm Ip Holding B.V. | Runout and wobble measurement fixtures |
TW202231903A (zh) | 2020-12-22 | 2022-08-16 | 荷蘭商Asm Ip私人控股有限公司 | 過渡金屬沉積方法、過渡金屬層、用於沉積過渡金屬於基板上的沉積總成 |
USD1023959S1 (en) | 2021-05-11 | 2024-04-23 | Asm Ip Holding B.V. | Electrode for substrate processing apparatus |
USD980813S1 (en) | 2021-05-11 | 2023-03-14 | Asm Ip Holding B.V. | Gas flow control plate for substrate processing apparatus |
USD980814S1 (en) | 2021-05-11 | 2023-03-14 | Asm Ip Holding B.V. | Gas distributor for substrate processing apparatus |
USD981973S1 (en) | 2021-05-11 | 2023-03-28 | Asm Ip Holding B.V. | Reactor wall for substrate processing apparatus |
USD990441S1 (en) | 2021-09-07 | 2023-06-27 | Asm Ip Holding B.V. | Gas flow control plate |
Family Cites Families (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1099985A (en) * | 1965-02-25 | 1968-01-17 | Metallisation Ltd | Improvements relating to metal spraying apparatus |
US4375954A (en) * | 1979-12-26 | 1983-03-08 | Roger Trudel | Oil and gas combination nozzle |
US4622007A (en) * | 1984-08-17 | 1986-11-11 | American Combustion, Inc. | Variable heat generating method and apparatus |
DE4016412A1 (de) * | 1990-05-22 | 1991-11-28 | Utp Schweissmaterial | Verfahren und vorrichtung zum hochgeschwindigkeitsflammspritzen von hochschmelzenden draht- und pulverfoermigen zusatzwerkstoffen zum beschichten von oberflaechen |
DE4239903C1 (de) * | 1992-11-27 | 1994-06-30 | Franz Kuenzli Ag Wangen | Injektor-Mundstück für Brenneraggregate |
DE4429142B4 (de) * | 1994-08-17 | 2004-11-18 | Matthäus Götz | Düsenspritzkopf zum Hochgeschwindigkeitsflammspritzen so wie Verfahren zur Verarbeitung von Beschichtungspulvern |
US5834066A (en) * | 1996-07-17 | 1998-11-10 | Huhne & Kunzli GmbH Oberflachentechnik | Spraying material feeding means for flame spraying burner |
DE19652649A1 (de) * | 1996-12-18 | 1998-06-25 | Castolin Sa | Flammspritzvorrichtung und Verfahren zum thermischen Spritzen |
EP1603684B1 (de) * | 2002-11-19 | 2009-03-11 | IBEDA Sicherheitsgeräte und Gastechnik GmbH & Co. KG | Niedertemperatur hochgeschwindigkeits-flammspritzsystem |
JP5319288B2 (ja) * | 2005-10-17 | 2013-10-16 | ナショナル・リサーチ・カウンシル・オブ・カナダ | 被膜および粉末の反応性噴射形成 |
-
2010
- 2010-04-29 CH CH00643/10A patent/CH702999A1/de not_active Application Discontinuation
-
2011
- 2011-03-31 EP EP11405238.4A patent/EP2383361B1/de not_active Not-in-force
- 2011-04-26 US US13/093,901 patent/US9032903B2/en not_active Expired - Fee Related
- 2011-04-28 JP JP2011101456A patent/JP5813989B2/ja not_active Expired - Fee Related
- 2011-04-28 CN CN201110108355.9A patent/CN102233306B/zh not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
EP2383361A1 (de) | 2011-11-02 |
CN102233306B (zh) | 2016-02-24 |
CH702999A1 (de) | 2011-10-31 |
US9032903B2 (en) | 2015-05-19 |
CN102233306A (zh) | 2011-11-09 |
US20110265715A1 (en) | 2011-11-03 |
JP5813989B2 (ja) | 2015-11-17 |
JP2011231405A (ja) | 2011-11-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2383361B1 (de) | Vorrichtung zur Beschichtung von Substraten mittels Hochgeschwindigkeitsflammspritzen | |
DE2261038C2 (de) | Doppelbrennstoff-Luftzerstäubungs-Brennstoffdüse | |
DE69923360T2 (de) | Thermische Lichtbogenspritzpistole und ihre Gaskappe | |
EP0902233B1 (de) | Kombinierte Druckzerstäuberdüse | |
DE825197C (de) | Spritzpistole zum Druckgasspritzen von schmelzbaren Materialien | |
DE2300217C3 (de) | Einspritzvorrichtung zur Einspritzung flüssigen Brennstoffs in Hochöfen | |
DE2060401A1 (de) | Brennstoffinjektor fuer ein Gasturbinenstrahltriebwerk | |
EP1999410B1 (de) | Brenner für den betrieb eines wärmeerzeugers | |
DE1646027A1 (de) | Duesen- und Gasmischanordnung fuer eine Pulverflammspritzpistole | |
DE102011000643A1 (de) | Brennstoffeinspritzdüse | |
DE1245813B (de) | Mundstueck fuer eine Pulver-Flammspritzpistole | |
EP0924460A1 (de) | Zweistufige Druckzerstäuberdüse | |
DE4239903C1 (de) | Injektor-Mundstück für Brenneraggregate | |
EP1943464A1 (de) | Brennstofflanze | |
DE1097327B (de) | Flammspritzpistole | |
DE3103824A1 (de) | "flammspritzpistole" | |
CH683323A5 (de) | Vorrichtung zum Flammspritzen von Werkstoffen. | |
DE10253794A1 (de) | Niedertemperatur Hochgeschwindigkeits-Flammspritzsystem | |
DE4429142B4 (de) | Düsenspritzkopf zum Hochgeschwindigkeitsflammspritzen so wie Verfahren zur Verarbeitung von Beschichtungspulvern | |
WO2016020376A1 (de) | Brenner-lanzen-einheit | |
DE829392C (de) | Metallspritzpistole | |
DE4016412A1 (de) | Verfahren und vorrichtung zum hochgeschwindigkeitsflammspritzen von hochschmelzenden draht- und pulverfoermigen zusatzwerkstoffen zum beschichten von oberflaechen | |
DE10037276B4 (de) | Zusatzeinrichtung für Pulver- und Draht-Flammspritzgeräte | |
DE4443811A1 (de) | Universell anwendbarer Hochgeschwindigkeits-Flammspritzbrenner zum Verspritzen von draht-, stab- und/oder pulverförmigen Spritzzusatz-Werkstoffen | |
DE102005063145A1 (de) | Brennerkopf für luftgekühltes Hochgeschwindigkeitsflammspritzgerät |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20111114 |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: C23C 4/12 20060101AFI20150527BHEP Ipc: B05B 7/20 20060101ALI20150527BHEP |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
INTG | Intention to grant announced |
Effective date: 20150714 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D Free format text: NOT ENGLISH |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: NV Representative=s name: ROTTMANN, ZIMMERMANN + PARTNER AG, CH Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 757985 Country of ref document: AT Kind code of ref document: T Effective date: 20151115 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D Free format text: LANGUAGE OF EP DOCUMENT: GERMAN |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 502011008218 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: FP |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 6 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151028 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151028 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151028 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160228 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160128 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151028 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151028 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151028 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160129 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160229 Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151028 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151028 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151028 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 502011008218 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151028 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151028 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151028 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151028 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151028 Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20160331 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed |
Effective date: 20160729 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160331 Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151028 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PCAR Free format text: NEW ADDRESS: GARTENSTRASSE 28 A, 5400 BADEN (CH) |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151028 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20160331 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 7 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20170322 Year of fee payment: 7 Ref country code: FR Payment date: 20170322 Year of fee payment: 7 Ref country code: CH Payment date: 20170322 Year of fee payment: 7 Ref country code: NL Payment date: 20170321 Year of fee payment: 7 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: AT Payment date: 20170322 Year of fee payment: 7 Ref country code: GB Payment date: 20170322 Year of fee payment: 7 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IT Payment date: 20170327 Year of fee payment: 7 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151028 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20110331 Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151028 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151028 Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151028 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151028 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 502011008218 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151028 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MM Effective date: 20180401 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MM01 Ref document number: 757985 Country of ref document: AT Kind code of ref document: T Effective date: 20180331 |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20180331 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180401 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20181002 Ref country code: AT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180331 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180331 Ref country code: IT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180331 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180331 Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180331 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180331 |