CN102472102B CN201080031123.1A CN201080031123A CN102472102B CN 102472102 B CN102472102 B CN 102472102B CN 201080031123 A CN201080031123 A CN 201080031123A CN 102472102 B CN102472102 B CN 102472102B
Authority
CN
China
Prior art keywords
base
engaged
top board
fished beam
top plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201080031123.1A
Other languages
English (en)
Other versions
CN102472102A (zh
Inventor
约翰·霍姆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Joy MM Delaware Inc
Original Assignee
Joy MM Delaware Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Joy MM Delaware Inc filed Critical Joy MM Delaware Inc
Priority to CN201510069298.6A priority Critical patent/CN104790995B/zh
Publication of CN102472102A publication Critical patent/CN102472102A/zh
Application granted granted Critical
Publication of CN102472102B publication Critical patent/CN102472102B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D23/00Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
    • E21D23/0004Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor along the working face
    • E21D23/0034Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor along the working face comprising a goaf shield articulated to a base member
    • E21D23/0043Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor along the working face comprising a goaf shield articulated to a base member and supported by two or more rows of struts parallel to the working face
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D23/00Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
    • E21D23/0004Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor along the working face
    • E21D23/0017Pile type supports
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D23/00Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
    • E21D23/03Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor having protective means, e.g. shields, for preventing or impeding entry of loose material into the working space or support
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D23/00Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
    • E21D23/08Advancing mechanisms
    • E21D23/081Advancing mechanisms forming parts of the roof supports
    • E21D23/082Advancing mechanisms forming parts of the roof supports acting solely on the elements of the supports

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Bridges Or Land Bridges (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)
  • Framework For Endless Conveyors (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Roof Covering Using Slabs Or Stiff Sheets (AREA)

Abstract

长壁开采系统包括具有纵向长度的至少一个工作面端头顶板支撑件、以及与该工作面端头顶板支撑件相邻的至少一个近端顶板支撑件。该近端顶板支撑件的纵向长度明显短于所述工作面端头顶板支撑件的纵向长度。还存在有与该近端顶板支撑件相邻的至少一个工作面顶板支撑件,并且该工作面顶板支撑件的纵向长度明显短于所述近端顶板支撑件的纵向长度。还存在有前部输送机和后部输送机,该前部输送机向前延伸并附接到工作面端头顶板支撑件、所述至少一个近端顶板支撑件和所述至少一个工作面顶板支撑件,该后部输送机向后延伸并附接到工作面端头顶板支撑件、所述至少一个近端顶板支撑件和所述至少一个工作面顶板支撑件。

Description

长壁开采顶板支撑件
技术领域
本发明涉及一种包括用于采掘出开采物料的机械、前部输送机和顶板支撑件的系统。更具体地,本发明涉及这样的还包括后部输送机的系统。
背景技术
已存在有用于从地下矿层中开采出煤炭和其它物料的各种不同的设备。地下开采操作中常用的一种设备包括在需要对矿层的延伸部分或长壁进行开采的情形中使用的采煤机。根据矿层的构造,所述长壁可以延伸达到1200-1500英尺的距离。在这种类型的开采操作中,标准做法是:挖掘多条平行平巷(parallel entries),使它们通到要开采的矿层中,并利用一个或多个主通道连接这些平巷。这种过程形成了要开采的长壁矿柱(longwall pillar)。接着,在对长壁矿柱的暴露“工作面”进行开采期间,通过可移动的顶板支撑件来支撑所述主通道的顶板。
常规的长壁开采技术采用了在业内被称为长壁采煤机的开采机械。在替代的布置结构中,使用刨煤机来代替长壁采煤机。
长壁采煤机通常具有细长的移动框架,该移动框架支撑在与开采工作面邻近且大致平行的安装在底板上的导轨上。带有从动齿的旋转式滚筒可操作地支撑在所述细长框架的每个端部处的臂上,用于当该框架在开采工作面前来回经过时采煤。所采得的物料落到工作面输送机上,该工作面输送机附接到所述安装在底板上的导轨并且与长壁工作面平行地延伸。该工作面输送机把物料卸到其它输送设备上,以输送来自矿层的物料。随着开采工作面的后退,所述输送机和导轨组件向前推进,以使采煤机能够继续开采。
图1示出了具有采煤机12(被承载在工作面输送机14上)形式的开采机械以及悬臂式顶板支撑件16的传统长壁系统10。随着该长壁系统10前进穿过采区18时,自动前进的顶板支撑件16以公知的方式朝着工作面20前进。
更具体而言,悬臂式顶板支撑件16是垛式顶板接合梁支撑单元(chock roof-engaging beam support unit),该垛式顶板接合梁支撑单元具有底板接合基座42和护盾24,该护盾24由与工作面输送机间隔开的两个可液压操作的支腿或油缸28(仅示出其中一个)支撑,以限定可进出的移动通路30。顶板接合梁32在34处可枢转地附接到护盾24,并且护盾24通过悬臂式连杆40连接到基座42。顶板接合梁32还在其前端处携载有包括接触板50的工作面斜撑组件48,该工作面斜撑组件48被示出为处于工作面支撑模式,其中,该接触板50通过液压缸54从其收起位置延伸至其抵靠在所述工作面的一部分上的位置。图1中以虚线示出了该工作面斜撑组件的完全延伸位置。
采煤机12具有细长移动框架60形式的开采机械支撑件,该移动框架60具有滑动型底托64,该滑动型底托64可移动地支撑在与长壁工作面大致平行的滚道68上。横向延伸的滚筒70具有附接到其上的多个开采钻头74,并且该滚筒70通过对应的悬臂构件78可枢转地附接到该细长移动框架60的每一端。在采矿领域中,采煤机12的操作是公知的,因此这里不再详细讨论。然而,技术人员将会知道,采煤机12在滚道68上来回移动,从而滚筒70上的开采钻头74能与开采工作面接合,以便从工作面中取下物料。随着工作面的后退,滚道68和采煤机12朝着该工作面推进,以便能够继续进行此开采过程。
在某些开采操作中,如图2所示,长壁操作包括位于顶板支撑件104前面的刮板输送机100以及位于顶板支撑件104后面的刮板输送机108。当顶板支撑件104前进时,位于顶板支撑件104后面的刮板输送机108收集从该顶板支撑件上方掉落的煤块。这种形式的开采被称为顶煤采放或放顶煤。在这种操作中使用的上顺槽顶板支撑件104包括底板接合基座112、用于支撑中部顶板接合梁118的一对支腿116、可枢转地连接到该中部顶板接合梁118的前部顶板接合梁120、以及由另一对支腿128支撑的两件式后部顶板接合梁124。在顶板支撑件104后面的两件式顶板接合梁124覆盖了顶板支撑件104后方的刮板输送机108。
在该长壁的巷道或下顺槽端部(main gate end)处,需要超宽超长的顶板支撑组件129,并且图3示出了该顶板支撑组件129。顶板支撑组件129包括两个间隔开的顶板支撑件130。每个下顺槽端顶板支撑件130均包括后部底板接合基座或浮筒(pontoon)134、前部底板接合基座或浮筒138,并且在每个浮筒134、138与相应的顶板接合梁146、150之间连接有间隔开的支腿142。后部浮筒134还包括可枢转地连接到顶板接合梁146的护盾152,并且连杆154将护盾152连接到后部浮筒134。前部浮筒138还包括可枢转地连接到顶板接合梁150的护盾158,并且连杆164将护盾158连接到前部浮筒138。换句话讲,下顺槽顶板支撑件130在一端处包括面向前方的顶板支撑件并在另一端处包括面向后方的顶板支撑件,这两个支撑件在中间的159处连结在一起。在连结点处,每个顶板支撑件均携载有油缸168和172,该油缸168和172延伸至各自顶板支撑件的顶板接合梁。
为了辅助支撑该顶板,两个顶板支撑件130中的每一个还包括间隔开的中间板176,该中间板176在两个相邻的顶板支撑件130之间延伸,从而形成重叠。该重叠的中间板176彼此不相连。使用两个相邻的顶板支撑件130是因为:每个顶板支撑件均具有其各自的浮筒,并且当顶板支撑件130前进时,矿井的底板是不规则的。每个顶板支撑件的浮筒需要能够与相邻浮筒独立地竖直移动。由于相邻的顶板支撑件彼此不相连,所以,当顶板支撑组件129前进时,难以维持相同的顶板支撑件相邻位置。
在上述典型的顶煤采放式长壁开采操作中,存在两个掘进平巷和横跨在这两个平巷之间的壁工作面,从而,然后沿着这些平巷向后开采。在图4A和4B所示的、被称为前进式长壁系统的另一不同形式的开采中,整个开采操作向前移动到采煤工作面中。在这种系统中仅使用了单个前部输送机。称为回采巷道端(gate road end)的用于支持该开采操作的巷道180需要被切断并与长壁工作面保持分开。该回采巷道端的构造增加了整个开采操作的复杂性。当回采巷道端180被切断时,必须搭建出壁184,以防止塌落的顶板进入该巷道。形成并支撑这种壁的难度是巨大的。为了减小施加到该人造壁184上的采空区压力的量,在回采巷道端180处设有完全顶板接合梁式的扶壁支撑件(fullyroof-engaging beamed buttress support)188以减小该人造壁184上的采空区压力。
发明内容
技术问题
本发明的一个目的是提供一种改进的、用于顶煤采放式长壁操作的顶板支撑件。
本发明的另一个目的是提供一种改进的顶煤采放系统,该顶煤采放系统在末端顺槽(end gates)上具有减小的采空区压力。
本发明的另一个目的是提供一种改进的顶煤采放设备。
本发明的另一个目的是提供一种具有更好的支护和操作的、改进的下顺槽顶板支撑件。
技术方案
因而,本发明提供了一种长壁开采系统,其包括具有纵向长度的至少一个工作面端头顶板支撑件以及与该工作面端头顶板支撑件相邻的至少一个近端顶板支撑件。该近端顶板支撑件的纵向长度明显短于工作面端头顶板支撑件的纵向长度。还存在有与该近端顶板支撑件相邻的至少一个工作面顶板支撑件,并且该工作面顶板支撑件的纵向长度明显短于所述近端顶板支撑件的纵向长度。还存在有前部输送机和后部输送机,该前部输送机向前延伸并附接到工作面端头顶板支撑件、至少一个近端顶板支撑件、以及至少一个工作面顶板支撑件,该后部输送机向后延伸并附接到工作面端头顶板支撑件、至少一个近端顶板支撑件和至少一个工作面顶板支撑件。
本发明还提供了一种顶板支撑件,该顶板支撑件包括第一底板接合基座、第一护盾、可枢转地附接到第一护盾的第一顶板接合梁、以及连接在第一底板接合基座和第一顶板接合梁之间的第一可液压操作的支腿。第一连杆将第一护盾可枢转地连接到第一基座。该顶板支撑件还包括与第一底板接合基座相邻但与第一底板接合基座间隔开的第二底板接合基座、第二护盾、可枢转地附接到第二护盾的第二顶板接合梁、以及连接在第二底板接合基座和第二顶板接合梁之间的第二可液压操作的支腿。第二连杆将第二护盾可枢转地连接到第二基座,并且,桥可枢转地连接到第一基座且可枢转地连接到第二基座。
附图说明
图1是常规的顶板支撑件的侧视图。
图2是上顺槽端顶板支撑件的侧视图。
图3是常规的下顺槽顶板支撑件的透视图。
图4A是称为前进式长壁的现有技术长壁开采法的示意性透视图。图4B是图4A所示的长壁前进开采法的顶部示意图。
图5是根据本发明的长壁开采系统的顶部示意图。
图6是图5所示的长壁开采系统的示意性透视图。
图7A是常规的顶煤采放工作面顶板支撑件的侧视图。图7B是根据本发明的近端顶板支撑件的侧视图。图7C是根据本发明的工作面端头顶板支撑件的侧视图。
图8是根据本发明的长壁下顺槽顶板支撑组件的侧视图。
图9A是图8所示的长壁下顺槽工作面支撑件的俯视图。图9B是图8所示的长壁下顺槽顶板支撑组件的端视图。
图10是图8所示的下顺槽顶板支撑组件的桥部的支腿的分解透视图。
图11是图8所示的下顺槽顶板支撑组件的示意性透视图,其不具有片帮板(sloughing plate)。
图12A是图11所示的下顺槽顶板组件的替代实施例。图12B是图12A所示的下顺槽顶板支撑组件的透视图,其中,所示的顶板支撑组件处于向梁腹推进(web-advanced)的位置。
在详细说明本发明的一个实施例之前,应当理解,本发明在其应用方面不受以下描述中阐述或附图中示出的部件的构造和布置方式的细节所限。本发明能够具有其它实施例并且能够以各种方式来实施或实现。另外,应当理解,本文所用的短语和术语仅是出于描述的目的,不应视为限制性的。本文所用的“包含”和“包括”及其变型旨意味着涵盖其后列出的项目及其等同物,以及另外的项目。本文所用的“由…组成”及其变型意味着仅涵盖其后列出的项目及其等同物。此外,应当理解,诸如“前”、“后”、“左”、“右”、“上”和“下”等的用语仅是为了方便而使用的词语,不应理解为限制性用语。
具体实施方式
图5是构成根据本发明的长壁系统的各种顶板支撑件的示意图。长壁开采系统200包括至少一个悬臂式工作面端头顶板支撑件204、与该工作面端头顶板支撑件204相邻的悬臂式近端顶板支撑件208、以及与该近端顶板支撑件208相邻的至少一个常规的悬臂式工作面顶板支撑件212。更具体而言,在图示的实施例中,该长壁系统包括三个工作面端头顶板支撑件204、一个近端顶板支撑件208和至少一个顶板支撑件212。通常存在于该顶板支撑件212旁边的其他若干个顶板支撑件212未被示出,但应理解它们是存在的。还存在有下顺槽顶板支撑件216,它与该长壁系统的具有三个工作面端头支撑件204的末端相邻。
在图5所示的实施例中,工作面端头顶板支撑件204具有纵向长度205,并且近端顶板支撑件208具有纵向长度209,该纵向长度209明显短于所述工作面端头顶板支撑件的纵向长度205。工作面顶板支撑件212也具有纵向长度213,并且该纵向长度213明显短于所述近端顶板支撑件的纵向长度209。这形成了与采煤工作面成一定角度的有效采放线211,该采放线有助于减小工作面端头上的采空区压力,从而提高下顺槽顶板支撑件216的稳定性。
图6中示出了各个顶板支撑件的示意性透视图,图中显示了前部刮板输送机211和后部刮板输送机220。图7A、7B和7C示出了三种不同类型的、图4所示的工作面端头支撑件的侧视图。图7A中示出了常规的工作面支撑件212,该工作面支撑件212与结合图1描述的工作面支撑件基本相同,只是增加了覆盖所述后部刮板输送机220的尾端件218。图7B中的是根据本发明的近端顶板支撑件208,而图7C中的是根据本发明的工作面端头支撑件204。
图8是下顺槽顶板支撑件216的侧视图。该下顺槽支撑件类似于常规的下顺槽支撑件,但也有一些重要的区别。如常规的支撑件中那样,该下顺槽支撑件包括至少一对彼此分开但相邻的底板接合基座或浮筒230和232(参见图9A和9B)。每个浮筒230和232承载了支腿234和234′(参见图8),该支腿234和234′可枢转地附接到所述浮筒并可枢转地附接到顶板接合梁。与常规的下顺槽支撑件不同,两个相邻但彼此间隔开的浮筒230和232支撑着跨越这两个浮筒230和232的单个顶板接合梁系统240(参见图9B和图11)。为了允许浮筒230和232相对于彼此上下移动,但又使这些浮筒在前后移动方向上保持彼此相邻,可枢转地附接的桥244跨越浮筒230和232。
更具体而言,如图8和9A所示,桥244延伸横过这些浮筒的前部、这些浮筒的中部、以及这些浮筒的后部。每个桥244在接头250处附接到每个浮筒,如图10所示。更具体而言,桥244由刚性接头250可枢转地连接到每个浮筒(例如,浮筒230),并且该接头250使相邻浮筒维持并排关系,同时允许这些浮筒相对于彼此上下移动。再具体地,桥244的每一端均包括腿或凸构件254,该腿或凸构件254容纳在附接于浮筒的凹构件或袋状件270内。袋状件270包括两个间隔开的刚性板262和268以及两个间隔开的壁272和276,该壁272和276垂直于板262和268地延伸且位于板262和268之间。这些板和壁的组合形成了容纳桥腿254的袋状件270。开口280延伸穿过所述接头壁272和276,并且,当桥腿254容纳在袋状件270中时,桥腿254中的相应开口284与所述接头壁中的开口280对准。所提供的螺栓288延伸穿过开口280和284并将桥腿254固定在袋状件270内。在螺栓288的端部处设有开尾销290形式的用于将螺栓288固定在袋状件270内的装置,以将螺栓288固定在接头250中。当容纳在袋状件270中时,腿254与浮筒230间隔开,从而该腿254能够在袋状件270中围绕螺栓288旋转。
附接到下顺槽顶板支撑件216的外浮筒且远离另一个顶板支撑件的具有接头的片帮板294(参见图8)提供了进一步的增强。该片帮板在下顺槽顶板支撑件216的整个长度上延伸,并且为巷道提供了额外的保护。
现在转到图5至10所示的各种顶板支撑件的细节,工作面端头顶板支撑件204包括后部底板接合基座300、后护盾304、可枢转地附接到护盾304的后部顶板接合梁308、以及两个间隔开的可液压操作的后支腿312(仅示出一个),这两个间隔开的可液压操作的后支腿312连接在后部底板接合基座300和后部顶板接合梁308之间。该工作面端头顶板支撑件还包括:将后护盾304可枢转地连接到后部基座300的后连杆316、前部底板接合基座320、前护盾324、以及可枢转地连接到后部顶板接合梁308的前部顶板接合梁328。以前后成对(332和333)的方式间隔开的、四个彼此间隔开的可液压操作的前支腿连接在前部底板接合基座320和前部顶板接合梁328之间,并且,悬臂式连杆336将前护盾324可枢转地连接到前部基座320。
悬臂式近端顶板支撑件208包括底板接合基座340、护盾344、可枢转地附接到该护盾344的顶板接合梁348、以及连接在底板接合基座340和顶板接合梁348之间的四个间隔开的可液压操作的前支腿352。近端顶板支撑件208还包括将护盾344可枢转地连接到基座340的悬臂式连杆356、以及连接在底板接合基座340和顶板接合梁348之间的两个间隔开的可液压操作的后支腿353。后支腿353与两个间隔开的可液压操作的前支腿352间隔开。
近端顶板支撑件208还包括可枢转地连接到底板接合基座340的后部输送机驱动器370、可枢转地连接到后部输送机驱动器370的底板接合基座340、以及前部输送机驱动器374,底板接合基座340也可枢转地连接到前部输送机驱动器374。所述近端顶板支撑件还包括位于该单元后部的、短的枢转式顶板接合梁或尾端件380。
所述工作面支撑件包括底板接合基座384、护盾388、可枢转地附接到护盾388的顶板接合梁392、以及连接在底板接合基座384和顶板接合梁392之间的两个间隔开的可液压操作的支腿396(仅示出一个)。悬臂式连杆398将护盾388可枢转地连接到基座384。
下顺槽顶板支撑件216包括两个间隔开的侧面500和504(参见图9B),其中每个侧面均包括后部底板接合基座508、连接到后部底板接合基座508的可液压操作的后支腿234、以及后护盾516。悬臂式后连杆520将后护盾516可枢转地连接到后部基座508。中部底板接合基座524连接到后部底板接合基座508,并且,可液压操作的中部支腿528连接到中部底板接合基座524。前部底板接合基座530可枢转地连接到中部底板接合基座524,并且,可液压操作的前支腿234′连接到前部底板接合基座530。
下顺槽顶板支撑件216还包括可枢转地附接到后护盾516的后部顶板接合梁540,并且,所述侧面的上述间隔开的可液压操作的后支腿234连接在后部底板接合基座508和后部顶板接合梁540之间。中部顶板接合梁550可枢转地连接到后部顶板接合梁540,并且,所述侧面的上述间隔开的可液压操作的中部支腿528连接在中部底板接合基座524和中部顶板接合梁550之间。前部顶板接合梁560可枢转地附接到中部顶板接合梁550,并且,所述侧面的上述间隔开的可液压操作的前支腿234′连接在前部底板接合基座530和前部顶板接合梁560之间。每个侧面的前部底板接合基座、中部底板接合基座和后部底板接合基座组合形成了下顺槽支撑件216的每一个浮筒。
在可替代的下顺槽顶板支撑组件400中,如图12A和12B所示,第一悬臂式顶板支撑件404包括两个间隔开的侧面,每个侧面均具有第一底板接合基座408、第一护盾412、可枢转地附接到第一护盾412的第一顶板接合梁416、以及连接在第一底板接合基座408和第一顶板接合梁416之间的第一可液压操作的支腿420。第一悬臂式顶板支撑件404还包括将第一护盾412可枢转地连接到第一基座408的第一悬臂式连杆420。第一顶板支撑件404的对面是第二悬臂式顶板支撑件424,该第二悬臂式顶板支撑件424包括第二底板接合基座428、第二护盾432、以及可枢转地附接到第二护盾432的第二顶板接合梁436。第二顶板接合梁436与第一顶板接合梁416相邻且插在第一顶板接合梁416内。第二可液压操作的支腿440连接在第二底板接合基座428和第二顶板接合梁436之间,并且第二悬臂式连杆444将第二护盾432可枢转地连接到第二基座428。在图示的实施例中,另一个可液压操作的支腿也连接在第二底板接合基座428和第二顶板接合梁436之间。顶板支撑件404和424的每一侧的顶板接合梁和护盾是一体式的板,这些板跨越并连接到所述顶板支撑件的两个侧面。
更具体而言,第一顶板接合梁416包括两个间隔开的板450,而第二顶板接合梁436包括位于第一顶板接合梁的所述间隔开的板450之间的板454。凭借彼此分开的不连接的顶板支撑件404和424,下顺槽顶板支撑组件400能够推进一个顶板支撑件,然后推进另一个顶板支撑件,以辅助所述长壁开采过程。
在所附的权利要求中阐述了本发明的各种其它特征。

Claims (17)

1.一种工作面端头顶板支撑件,包括:
后部底板接合基座;
后护盾;
后部顶板接合梁,所述后部顶板接合梁可枢转地附接到所述后护盾;
两个间隔开的可液压操作的后支腿,所述两个间隔开的可液压操作的后支腿连接在所述后部底板接合基座和所述后部顶板接合梁之间;
后连杆,所述后连杆将所述后护盾可枢转地连接到所述后部底板接合基座;
前部底板接合基座;
前护盾;
前部顶板接合梁,所述前部顶板接合梁可枢转地连接到所述后部顶板接合梁;
两个间隔开的可液压操作的前支腿,所述两个间隔开的可液压操作的前支腿连接在所述前部底板接合基座和所述前部顶板接合梁之间;以及
前连杆,所述前连杆将所述前护盾可枢转地连接到所述前部底板接合基座。
2.根据权利要求1所述的工作面端头顶板支撑件,其中,所述工作面端头顶板支撑件还包括连接在所述前部底板接合基座和所述前部顶板接合梁之间的、第二对间隔开的可液压操作的前支腿,所述第二对间隔开的可液压操作的前支腿与前述两个间隔开的前支腿间隔开。
3.一种长壁开采系统,包括:
工作面端头顶板支撑件,所述工作面端头顶板支撑件包括:
后部底板接合基座;
后护盾;
后部顶板接合梁,所述后部顶板接合梁可枢转地附接到所述后护盾;
两个间隔开的可液压操作的后支腿,所述两个间隔开的可液压操作的后支腿连接在所述后部底板接合基座和所述后部顶板接合梁之间;
后连杆,所述后连杆将所述后护盾可枢转地连接到所述后部底板接合基座;
前部底板接合基座;
前护盾;
前部顶板接合梁,所述前部顶板接合梁可枢转地连接到所述后部顶板接合梁;
两个间隔开的可液压操作的前支腿,所述两个间隔开的可液压操作的前支腿连接在所述前部底板接合基座和所述前部顶板接合梁之间;和
前连杆,所述前连杆将所述前护盾可枢转地连接到所述前部底板接合基座;
后部输送机驱动器,所述后部输送机驱动器可枢转地连接到所述后部底板接合基座;以及
前部输送机驱动器,所述前部输送机驱动器可枢转地连接到所述前部底板接合基座。
4.根据权利要求3所述的长壁开采系统,其中,所述工作面端头顶板支撑件还包括连接在所述前部底板接合基座和所述前部顶板接合梁之间的、第二对间隔开的可液压操作的前支腿,所述第二对间隔开的可液压操作的前支腿与前述两个间隔开的前支腿间隔开。
5.根据权利要求4所述的长壁开采系统,其中,
所述工作面端头顶板支撑件具有纵向长度;
近端顶板支撑件与所述工作面端头顶板支撑件相邻,所述近端顶板支撑件的纵向长度短于所述工作面端头顶板支撑件的纵向长度;
工作面顶板支撑件与所述近端顶板支撑件相邻,所述工作面顶板支撑件的纵向长度短于所述近端顶板支撑件的纵向长度;
所述前部输送机驱动器向前延伸并附接到所述工作面端头顶板支撑件、所述近端顶板支撑件以及所述工作面顶板支撑件;并且
所述后部输送机驱动器向后延伸并附接到所述工作面端头顶板支撑件、所述近端顶板支撑件以及所述工作面顶板支撑件。
6.一种下顺槽顶板支撑件,所述下顺槽顶板支撑件包括两个间隔开的侧面,其中每个侧面包括:
后部底板接合基座;
可液压操作的后支腿,所述可液压操作的后支腿连接到所述后部底板接合基座;
后护盾;
后连杆,所述后连杆将所述后护盾可枢转地连接到所述后部底板接合基座;
中部底板接合基座,所述中部底板接合基座连接到所述后部底板接合基座;
可液压操作的中部支腿,所述可液压操作的中部支腿连接到所述中部底板接合基座;
前部底板接合基座,所述前部底板接合基座连接到所述中部底板接合基座;
可液压操作的前支腿,所述可液压操作的前支腿连接到所述前部底板接合基座;
后部顶板接合梁,所述后部顶板接合梁可枢转地附接到所述后护盾;
间隔开的所述可液压操作的后支腿连接在所述后部底板接合基座和所述后部顶板接合梁之间;
中部顶板接合梁,所述中部顶板接合梁可枢转地连接到所述后部顶板接合梁;
间隔开的所述可液压操作的中部支腿连接在所述中部底板接合基座和所述中部顶板接合梁之间;
前部顶板接合梁,所述前部顶板接合梁可枢转地附接到中部顶板接合梁,并且
间隔开的所述可液压操作的前支腿连接在所述前部底板接合基座和所述前部顶板接合梁之间。
7.根据权利要求6所述的下顺槽顶板支撑件,其中,后部桥可枢转地连接到所述后部底板接合基座中的每一个。
8.根据权利要求6所述的下顺槽顶板支撑件,其中,中部桥可枢转地连接到所述中部底板接合基座中的每一个。
9.根据权利要求6所述的下顺槽顶板支撑件,其中,前部桥可枢转地连接到所述前部底板接合基座中的每一个。
10.根据权利要求6所述的下顺槽顶板支撑件,其中,所述下顺槽顶板支撑件还包括可枢转地连接到每个底板接合基座的桥,所述桥包括桥腿,所述桥腿可枢转地连接在与所述底板接合基座附接的两个刚性板之间。
11.根据权利要求6所述的下顺槽顶板支撑件,其中,下顺槽顶板支撑件还包括片帮板,所述片帮板连接到所述下顺槽顶板支撑件的侧面。
12.一种下顺槽顶板支撑件,包括:
后部底板接合基座;
后护盾;
后部顶板接合梁,所述后部顶板接合梁可枢转地附接到所述后护盾;
两个间隔开的可液压操作的后支腿,所述两个间隔开的可液压操作的后支腿连接在所述后部底板接合基座和所述后部顶板接合梁之间;
后连杆,所述后连杆将所述后护盾可枢转地连接到所述后部底板接合基座;
前部底板接合基座,所述前部底板接合基座可枢转地连接到所述后部底板接合基座;
前部顶板接合梁,所述前部顶板接合梁可枢转地附接到后部顶板接合梁;
两个间隔开的可液压操作的前支腿,所述两个间隔开的可液压操作的前支腿连接在所述前部底板接合基座和所述前部顶板接合梁之间;
所述后部底板接合基座包括两个间隔开的后浮筒和可枢转地连接到每个所述后浮筒的后部桥,并且
所述前部底板接合基座包括两个间隔开的前浮筒和可枢转地连接到每个所述前浮筒的前部桥。
13.根据权利要求12所述的下顺槽顶板支撑件,其中,可枢转地连接到每个浮筒的所述桥包括桥腿,所述桥腿可枢转地连接在与其相应的浮筒附接的两个刚性板之间。
14.一种顶板支撑件,包括:
第一底板接合基座;
第一护盾;
第一顶板接合梁,所述第一顶板接合梁可枢转地附接到所述第一护盾;
第一可液压操作的支腿,所述第一可液压操作的支腿连接在所述第一底板接合基座和所述第一顶板接合梁之间;
第一连杆,所述第一连杆将所述第一护盾可枢转地连接到所述第一底板接合基座;
第二底板接合基座,所述第二底板接合基座与所述第一底板接合基座相邻、但与所述第一底板接合基座间隔开;
第二护盾;
第二顶板接合梁,所述第二顶板接合梁可枢转地附接到所述第二护盾;
第二可液压操作的支腿,所述第二可液压操作的支腿连接在所述第二底板接合基座和所述第二顶板接合梁之间;
第二连杆,所述第二连杆将所述第二护盾可枢转地连接到所述第二底板接合基座;以及
桥,所述桥可枢转地连接到所述第一底板接合基座,且可枢转地连接到所述第二底板接合基座。
15.根据权利要求14所述的顶板支撑件,其中,所述第一顶板接合梁和所述第二顶板接合梁被连接以形成单个顶板接合梁。
16.一种顶板支撑组件,包括:
第一顶板支撑件,所述第一顶板支撑件包括:
第一底板接合基座;
第一护盾;
第一顶板接合梁,所述第一顶板接合梁可枢转地附接到所述第一护盾;
第一可液压操作的支腿,所述第一可液压操作的支腿连接在所述第一底板接合基座和所述第一顶板接合梁之间;和
第一连杆,所述第一连杆将所述第一护盾可枢转地连接到所述第一底板接合基座;以及
第二顶板支撑件,所述第二顶板支撑件包括:
第二底板接合基座;
第二护盾;
第二顶板接合梁,所述第二顶板接合梁可枢转地附接到所述第二护盾,所述第二顶板接合梁与所述第一顶板接合梁相邻且穿插在所述第一顶板接合梁内;
第二可液压操作的支腿,所述第二可液压操作的支腿连接在所述第二底板接合基座和所述第二顶板接合梁之间;和
第二连杆,所述第二连杆将所述第二护盾可枢转地连接到所述第二底板接合基座,
其中所述第一底板接合基座和所述第一顶板接合梁从所述第二底板接合基座和所述第二顶板接合梁间隔开;
其中所述第一顶板支撑件和所述第二顶板支撑件能独立地移动。
17.根据权利要求16所述的顶板支撑组件,其中,所述第一顶板接合梁包括两个间隔开的板,而所述第二顶板接合梁包括位于所述第一顶板接合梁的间隔开的板之间的板。
CN201080031123.1A 2009-07-10 2010-07-09 长壁开采顶板支撑件 Expired - Fee Related CN102472102B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510069298.6A CN104790995B (zh) 2009-07-10 2010-07-09 长壁开采顶板支撑件

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
US22476209P 2009-07-10 2009-07-10
US61/224,762 2009-07-10
PCT/US2010/041482 WO2011006041A1 (en) 2009-07-10 2010-07-09 Longwall mining roof supports

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CN201510069298.6A Division CN104790995B (zh) 2009-07-10 2010-07-09 长壁开采顶板支撑件

Publications (2)

Publication Number Publication Date
CN102472102A CN102472102A (zh) 2012-05-23
CN102472102B true CN102472102B (zh) 2015-03-11

Family

ID=43426912

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201510069298.6A Expired - Fee Related CN104790995B (zh) 2009-07-10 2010-07-09 长壁开采顶板支撑件
CN201080031123.1A Expired - Fee Related CN102472102B (zh) 2009-07-10 2010-07-09 长壁开采顶板支撑件

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201510069298.6A Expired - Fee Related CN104790995B (zh) 2009-07-10 2010-07-09 长壁开采顶板支撑件

Country Status (7)

Country Link
US (2) US8590982B2 (zh)
EP (1) EP2452046A4 (zh)
CN (2) CN104790995B (zh)
AU (1) AU2010271330B2 (zh)
CO (1) CO6491093A2 (zh)
RU (2) RU2015102555A (zh)
WO (1) WO2011006041A1 (zh)

Families Citing this family (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU2012265588B2 (en) * 2011-07-15 2013-02-21 Yancoal Australia Ltd Coal caving cycle
DE102012210163A1 (de) 2012-06-15 2013-12-19 Fraunhofer-Gesellschaft zur Förderung der angewandten Forschung e.V. Verfahren zur Aktivierung einer Oberfläche für die Anbindung von Zielstrukturen
US8985699B2 (en) 2013-03-14 2015-03-24 Seneca Industries Inc. Mining methods and equipment
CN104131829B (zh) * 2014-06-25 2016-05-04 中国矿业大学 一种固体充填采煤液压支架撤架方法
AU2016280009A1 (en) * 2015-06-15 2017-12-21 Joy Global Underground Mining Llc Systems and methods for monitoring longwall mine roof stability
CN108222934B (zh) * 2015-06-24 2019-11-05 北京中矿创新联盟能源环境科学研究院 无巷道无煤柱自留巷开采工法的装备系统
CN105019925A (zh) * 2015-08-04 2015-11-04 山西晋城无烟煤矿业集团有限责任公司 采煤工作面过超高段支护工艺
CN106005295B (zh) * 2016-08-18 2017-10-24 杨木超 可伸缩式展开水上作业平台
WO2018129448A1 (en) * 2017-01-09 2018-07-12 Seneca Industries Inc. Mining underground formations
AU2019346421A1 (en) * 2018-09-24 2021-04-29 Joy Global Underground Mining Llc Roof support including extendable links
CN109356582B (zh) * 2018-11-15 2019-09-03 山东科技大学 一种用于综采放顶煤工作面的充填开采方法
US10890068B2 (en) 2018-12-15 2021-01-12 Jefferson David McKenzie Automated support of a gate entry for underground full extraction mining
CN109882219B (zh) * 2019-04-15 2024-02-27 辽宁鑫丰矿业(集团)有限公司 综采工作面回撤系统
CN111302090B (zh) * 2020-03-09 2021-06-29 大连大学 二维相似材料实验台底部放煤方法
CN111337643B (zh) * 2020-03-09 2022-05-13 大连大学 一种应用于矿用二维相似实验台的煤层采出装置
CN111706378B (zh) * 2020-06-28 2022-09-27 中煤科工开采研究院有限公司 一种薄煤层端头液压支架
CN114483122A (zh) * 2022-01-28 2022-05-13 北京天玛智控科技股份有限公司 一种液压支架系统及其控制方法

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4065929A (en) * 1976-03-08 1978-01-03 Atlantic Richfield Company Mine roof support and method in longwall mining of thick mineral seams
DE2808487A1 (de) * 1978-02-28 1979-09-06 Gewerk Eisenhuette Westfalia Abbaueinrichtung fuer den abbau floezartiger lagerstaetten, insbesondere grosser maechtigkeit
US4217067A (en) * 1978-02-18 1980-08-12 Gewerkschaft Eisenhutte Westfalia Mine roof support assembly
US4372618A (en) * 1978-07-14 1983-02-08 Union Special G.M.B.H. Self-advancing mineral mining installation including tilting machine support
US4465406A (en) * 1980-09-19 1984-08-14 Gewerkschaft Eisenhutte Westfalia Mine roof support unit
CN2146569Y (zh) * 1992-10-31 1993-11-17 煤炭科学研究总院太原分院 带控制双连杆式液压支架
CN2154912Y (zh) * 1993-06-10 1994-02-02 沈阳矿务局 节式自移支架
CN2163232Y (zh) * 1993-07-02 1994-04-27 石炭井矿务局 高稳定性低位放顶煤液压支架
CN2811570Y (zh) * 2005-08-31 2006-08-30 郑州四维机电设备制造有限公司 液压支架用后伸缩梁

Family Cites Families (87)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1160390B (de) * 1961-04-28 1964-01-02 Rheinstahl Gmbh Wanheim Wanderndes Ausbauelement
GB1148916A (en) * 1965-08-03 1969-04-16 Coal Industry Patents Ltd Mine roof supports
US3606758A (en) * 1968-02-28 1971-09-21 Bergwerksverband Gmbh Hydraulic pit prop arrangements
US3656810A (en) * 1969-02-08 1972-04-18 Vladimir Alexandrovich Khodosh Tunneling shield
US3578809A (en) * 1969-05-09 1971-05-18 Vernon Cunningham Method and apparatus for forming subterranean structures
US3576110A (en) * 1969-05-14 1971-04-27 Gewerk Eisenhuette Westfalia Movable support assemblies for mineral mines
DE1960807C3 (de) * 1969-12-04 1979-02-01 Hippel Geb. Weiss, Sophie Von, 7771 Oberstenweiler Schildausbaugestell
DE7031383U (de) 1970-02-14 1973-10-31 Gullick Dobson Ltd Strebausbauelement fuer den strebausbau im bereich eines dem streo nachzufuehrenden bergedammes.
SU401804A1 (ru) * 1971-03-09 1973-10-12 Штрековая крепь
DE2128023B2 (de) * 1971-06-05 1974-04-18 Kloeckner-Werke Ag, 4100 Duisburg Wandernder Strebausbau mit nebeneinander angeordneten Ausbauschilden
GB1387311A (en) * 1972-03-24 1975-03-12 Gullick Dobson Ltd Mine roof supports
DE2224438C2 (de) * 1972-05-19 1975-06-05 Bochumer Eisenhuette Heintzmann & Co, 4630 Bochum Schildausbau für Abbaustreben im untertä'gigen Grubenbetrieb
DE2257828C2 (de) * 1972-11-25 1974-01-17 Bochumer Eisenhuette Heintzmann & Co, 4630 Bochum Vorrichtung zum schildartigen Ausbau von untertägigen Gewinnungsbetrieben
DE2365548A1 (de) * 1973-02-12 1975-10-30 Taiheiyo Coal Mining Co Ltd Selbstschreitendes ausbaugespann zum ausbau des streb-strecken-ueberganges
US3855805A (en) * 1973-02-12 1974-12-24 Taiheiyo Coal Mining Co Ltd Gate self-advancing support
ZA74424B (en) * 1973-02-27 1974-11-27 Becorit Grubenausbau Gmbh Improvements in or relating to a shield assembly in or for use in a mine roof support
DE2319910B2 (de) * 1973-04-19 1977-07-21 Gewerkschaft Eisenhütte Westfalia, 4670 Lünen Einrichtung zur niveausteuerung eines hobels o.dgl.
DE2325480C2 (de) * 1973-05-19 1974-12-05 Becorit Grubenausbau Gmbh, 4350 Recklinghausen Ausbaugestell für den Strebausbau im untertägigen Grubenbetrieb
US3890792A (en) * 1973-06-05 1975-06-24 Georges Alacchi Walking-props for mining galleries
US4010618A (en) * 1974-01-19 1977-03-08 Dowty Mining Equipment Limited Mine roof support
DE2416306C2 (de) * 1974-04-04 1979-12-06 Becorit Grubenausbau Gmbh, 4350 Recklinghausen Bruch- und Versatzabschirmung für einen Schildausbau für untertägige Grubenbetriebe
US3971225A (en) * 1974-04-08 1976-07-27 Becorit Grubenausbau Gmbh Mine support assemblies
DE2442177A1 (de) * 1974-09-03 1976-03-11 Roesler Draht Kg Verfahren und vorrichtung zum unterbinden des entstehens von staub, insbesondere gesteinsstaub, aus dem hangenden und dem bruch beim schild- oder schreitausbau, vornehmlich kohlebergbau
DE2451747C2 (de) * 1974-10-31 1977-09-15 Rheinstahl Ag Schildartiges ausbaugestell
DE2507319B2 (de) * 1975-01-11 1977-06-08 Thyssen Industrie Ag, 4300 Essen Schildausbaugestell
DE2522111B2 (de) * 1975-05-17 1978-10-12 Bochumer Eisenhuette Heintzmann Gmbh & Co, 4630 Bochum Schildausbaugespann mit Führungsvorrichtung
DE2522117A1 (de) * 1975-05-17 1976-12-02 Bochumer Eisen Heintzmann Liegendschwellenanordnung fuer ein schildausbaugestell
DE2525034C2 (de) * 1975-06-05 1981-01-08 Becorit Grubenausbau Gmbh, 4350 Recklinghausen Kappe für Strebausbauelemente
GB1494284A (en) * 1975-07-19 1977-12-07 Gullick Dobson Ltd Self-advancing mine roof supports
DE2540048C2 (de) * 1975-09-09 1984-01-26 Klöckner-Werke AG, 4100 Duisburg Vorrichtung mit einem Rückzylinder für ein mit einem Strebförderer wanderndes Schildausbaugestell und mit einem Schubkolbengetriebe zum Anheben des Kohlenstoßseitigen Endes der Liegendschwelle während des Rückens
DE2552817C3 (de) * 1975-11-25 1978-11-23 Walter Dipl.-Berging. Dr.- Ing. 4322 Sprockhoevel Wiebecke Vollmechanische Ausbau- und Gewinnungseinrichtung für Kohle der steilen Lagerung im Strebbau
US4026116A (en) * 1975-12-09 1977-05-31 Carnegie-Mellon University Mine roof supporting
DE2605068C3 (de) * 1976-02-10 1978-12-14 Thyssen Industrie Ag, 4300 Essen Kappen- und Bruchschildkonstruktion für ein Schildausbaugestell
US4030752A (en) * 1976-03-08 1977-06-21 Atlantic Richfield Company Longwall mining of thick underground mineral seams
DE2622888B2 (de) * 1976-05-21 1978-03-16 Bochumer Eisenhuette Heintzmann Gmbh & Co, 4630 Bochum Schildausbaugestell
GB1576317A (en) * 1976-08-20 1980-10-08 Dobson Park Ind Control of self-advancing mine roof supports
DE2646563C3 (de) * 1976-10-15 1979-08-09 Bochumer Eisenhuette Heintzmann Gmbh & Co, 4630 Bochum Ausbau für den Saumbereich eines Strebs
DE2646562B2 (de) * 1976-10-15 1978-11-02 Bochumer Eisenhuette Heintzmann Gmbh & Co, 4630 Bochum Hilfsausbau für den Übergang Streb-Strecke
DE2745429C2 (de) * 1977-10-08 1983-10-20 Bochumer Eisenhütte Heintzmann GmbH & Co, 4630 Bochum Wandernder Hilfsausbau für den Übergangsbereich Streb-Strecke
US4185940A (en) * 1977-11-08 1980-01-29 Klaus Spies Method and system for supporting a roof
AT350991B (de) * 1977-11-14 1979-06-25 Voest Ag Schildausbaugestell
DE2800619C2 (de) * 1978-01-07 1986-07-10 Gewerkschaft Eisenhütte Westfalia, 4670 Lünen Schreitausbau mit einer Anschlußvorrichtung für einen der Abspannung einer Förder- und/oder Gewinnungsanlage dienenden Abspannzylinder
US4199193A (en) * 1978-07-28 1980-04-22 Acme Machinery Company Underground mining machine having temporary roof support means and roof bolting means associated therewith
US4255071A (en) * 1979-08-27 1981-03-10 Bochumer Eisenhutte Heintzmann Gmbh & Co. Supporting of excavation roofs
GB2058895B (en) * 1979-09-18 1983-03-09 Coal Industry Patents Ltd Underground mine roof support system and supports for use in such a system
DE2942943C2 (de) * 1979-10-24 1981-11-26 Hermann Hemscheidt Maschinenfabrik Gmbh & Co, 5600 Wuppertal Vorrichtung zum Aufrechterhalten des vorgegebenen Mittenabstandes der Ausbauelemente eines Schreitausbaues für den Langfrontenabbau
HU179856B (en) * 1980-05-06 1982-12-28 Varpalotai Szenbanyak Apparatus for nining particularly expolating thick seams
GB2088458B (en) * 1980-11-28 1984-04-11 Dowty Mining Equipment Ltd Mine roof support
HU185039B (en) * 1981-04-13 1984-11-28 Koezponti Banyaszati Fejleszte Apparatus for provoding for support at the crossing of face entries
SU985313A1 (ru) * 1981-06-22 1982-12-30 Подмосковный Научно-Исследовательский И Проектно-Конструкторский Угольный Институт Секци механизированной крепи
US4480946A (en) * 1981-10-19 1984-11-06 Kelley Jay H Gob canopy for a mine roof support
DE3238256A1 (de) * 1982-10-15 1984-04-19 Gewerkschaft Eisenhütte Westfalia, 4670 Lünen Mobiles ausbaugespann, insbesondere fuer den einsatz beim pfeilerrueckbau
DE3244438C1 (de) * 1982-12-01 1984-05-03 Klöckner-Becorit GmbH, 4620 Castrop-Rauxel Schildausbaugestell
FR2540932B3 (fr) * 1983-02-16 1985-12-13 Bennes Marrel Pile de soutenement marchant, notamment pour les mines souterraines
SU1244336A1 (ru) * 1984-08-22 1986-07-15 Донецкий государственный проектно-конструкторский и экспериментальный институт комплексной механизации шахт Механизированна крепь выемочно-проходческого комплекса дл проведени спаренных выработок
SU1339255A1 (ru) * 1985-01-07 1987-09-23 Государственный проектно-конструкторский и технологический институт подъемно-транспортного машиностроения Механизированна крепь сопр жени фронтального агрегата
SU1314089A1 (ru) * 1985-12-17 1987-05-30 Подмосковный Научно-Исследовательский И Проектно-Конструкторский Угольный Институт Механизированна штрекова крепь
FR2600374B1 (fr) 1986-06-19 1988-09-23 Charbonnages De France Procede d'exploitation de mines ou carrieres souterraines par enlevures descendantes et foudroyage et installation pour sa mise en oeuvre
SU1384775A1 (ru) * 1986-06-30 1988-03-30 Л. М. Стро ковский Механизированна крепь сопр жени дл спаренных лав
DE3730711A1 (de) * 1987-09-12 1989-03-23 Bochumer Eisen Heintzmann Elektro-hydraulische programmfolgesteuerung
CN1261126A (zh) 1999-01-20 2000-07-26 兖州矿业(集团)有限责任公司东滩煤矿 采煤机机载高压荷电喷雾高效降尘系统
CN2396183Y (zh) 1999-10-19 2000-09-13 兖矿集团有限公司 综放液压支架高压水雾吸尘装置
CN1087807C (zh) 1999-11-10 2002-07-17 兖矿集团有限公司 一种低位放顶煤液压支架
CN1095540C (zh) 1999-12-28 2002-12-04 兖矿集团有限公司 煤巷煤炭自燃隐蔽火源点位置的红外探测法
CN1129703C (zh) 2000-02-20 2003-12-03 兖矿集团有限公司 一种综放工作面的采煤方法
CN2420422Y (zh) 2000-02-20 2001-02-21 兖矿集团有限公司 自动控制的放顶煤支架
CN100359132C (zh) 2003-03-05 2008-01-02 兖矿集团有限公司 低位放顶煤液压支架
RU2242616C1 (ru) * 2003-10-09 2004-12-20 Сибирский государственный индустриальный университет Секция механизированной крепи для выемки мощных пологих пластов с выпуском угля
RU2273733C1 (ru) 2004-10-08 2006-04-10 Институт угля и углехимии Сибирского отделения Российской Академии Наук (ИУУ СО РАН) Способ разработки пологого угольного пласта
US7331735B2 (en) * 2004-11-03 2008-02-19 Mckenzie Jefferson D Apparatus, system, and method for supporting a gate entry for underground full extraction mining
CN100371559C (zh) 2004-12-10 2008-02-27 兖州煤业股份有限公司 综放工作面端头液压支架
CN100593628C (zh) 2004-12-10 2010-03-10 兖州煤业股份有限公司 电液控制放顶煤方法及其液压支架
RU2284414C1 (ru) 2005-03-28 2006-09-27 Институт угля и углехимии Сибирского отделения Российской Академии Наук (ИУУ СО РАН) Способ разработки пологого угольного пласта
RU2283430C1 (ru) 2005-05-05 2006-09-10 Государственное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный институт им. Г.В. Плеханова (технический университет)" Способ разработки мощных крутых пластов полезных ископаемых
CN100567703C (zh) 2005-05-19 2009-12-09 兖矿集团有限公司 长壁采煤法综采工艺
CN1896460A (zh) 2005-07-15 2007-01-17 于海湧 高低位组合放顶煤液压支架
RU2303694C1 (ru) 2006-03-28 2007-07-27 Государственное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный институт имени Г.В. Плеханова (технический университет)" Способ разработки мощных угольных пластов
CN100494628C (zh) 2006-05-31 2009-06-03 段连权 综合性采煤方法
CN1888390A (zh) 2006-07-12 2007-01-03 山西潞安矿业(集团)有限责任公司 高瓦斯松软厚煤层准大采高综采低位放顶煤开采技术
CN1932240B (zh) 2006-09-21 2010-07-28 闫振东 一次全高、后退、分体移动、全跨落综合机械化采煤方法
CN101161990A (zh) 2006-10-12 2008-04-16 中国矿业大学(北京) 利用磨料水射流实现矿井放顶的方法
CN101201004B (zh) 2006-12-15 2010-04-21 中国神华能源股份有限公司 一种采煤方法
CN100999997A (zh) 2006-12-31 2007-07-18 阳泉煤业(集团)有限责任公司 综采放顶煤工作面抽放上邻近层瓦斯的方法
RU2325528C1 (ru) 2007-01-17 2008-05-27 Государственное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный институт имени Г.В. Плеханова (технический университет)" Способ управления труднообрушаемой кровлей
CN101050386B (zh) 2007-02-14 2011-04-13 兖矿集团有限公司 气化烧嘴在线投料方法
CN100462523C (zh) 2007-06-29 2009-02-18 淮南矿业(集团)有限责任公司 沿空留巷y型通风采空区顶板卸压瓦斯抽采的方法
CN100557194C (zh) 2007-08-24 2009-11-04 阳泉煤业(集团)有限责任公司 综放工作面高抽巷下返钻孔初采瓦斯抽放方法

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4065929A (en) * 1976-03-08 1978-01-03 Atlantic Richfield Company Mine roof support and method in longwall mining of thick mineral seams
US4217067A (en) * 1978-02-18 1980-08-12 Gewerkschaft Eisenhutte Westfalia Mine roof support assembly
DE2808487A1 (de) * 1978-02-28 1979-09-06 Gewerk Eisenhuette Westfalia Abbaueinrichtung fuer den abbau floezartiger lagerstaetten, insbesondere grosser maechtigkeit
US4372618A (en) * 1978-07-14 1983-02-08 Union Special G.M.B.H. Self-advancing mineral mining installation including tilting machine support
US4465406A (en) * 1980-09-19 1984-08-14 Gewerkschaft Eisenhutte Westfalia Mine roof support unit
CN2146569Y (zh) * 1992-10-31 1993-11-17 煤炭科学研究总院太原分院 带控制双连杆式液压支架
CN2154912Y (zh) * 1993-06-10 1994-02-02 沈阳矿务局 节式自移支架
CN2163232Y (zh) * 1993-07-02 1994-04-27 石炭井矿务局 高稳定性低位放顶煤液压支架
CN2811570Y (zh) * 2005-08-31 2006-08-30 郑州四维机电设备制造有限公司 液压支架用后伸缩梁

Also Published As

Publication number Publication date
CO6491093A2 (es) 2012-07-31
EP2452046A1 (en) 2012-05-16
CN102472102A (zh) 2012-05-23
RU2015102555A3 (zh) 2018-08-27
US20110006586A1 (en) 2011-01-13
RU2012101713A (ru) 2013-08-20
US8590982B2 (en) 2013-11-26
RU2544345C2 (ru) 2015-03-20
WO2011006041A1 (en) 2011-01-13
US20140077580A1 (en) 2014-03-20
CN104790995B (zh) 2018-04-06
AU2010271330A1 (en) 2012-02-09
RU2015102555A (ru) 2015-06-20
CN104790995A (zh) 2015-07-22
AU2010271330B2 (en) 2014-09-11
US9670777B2 (en) 2017-06-06
EP2452046A4 (en) 2017-05-17

Similar Documents

Publication Publication Date Title
CN102472102B (zh) 长壁开采顶板支撑件
CN102606152B (zh) 新型矩形煤巷快速掘锚一体机
US4065929A (en) Mine roof support and method in longwall mining of thick mineral seams
CN205578020U (zh) 适用于硬岩巷道掘进的迈步式掘进支护装置
CN202611695U (zh) 新型矩形煤巷快速掘锚一体机
CN103277107B (zh) 护盾式巷道掘进机
CN205578001U (zh) 适用于软岩掘进的超前支护式联合机组
CN109026049A (zh) 一种迈步式掘支锚联合机组及其使用方法
CN110541705B (zh) 一种履带式掘支锚联合机组及其使用方法
CN109026050B (zh) 一种综采式掘支锚联合机组及其使用方法
CN109538224A (zh) 一种新型煤巷快速掘进机
CN111379561B (zh) 采煤系统及基于该采煤系统的无煤柱自成巷开采方法
CN108374660A (zh) 大倾角厚煤层开采方法
CN114320417A (zh) 一种锚固前移式快速掘进、支护装置及其工作方法
CN203008943U (zh) 切眼拓宽超前支护支架
US3856356A (en) Method of mining mineral
CN208777996U (zh) 一种综采式掘支锚联合机组
CN113374475B (zh) 一种探掘支运一体机
CS229614B2 (en) Edge support for the underground working
US3333426A (en) Self-advancing hydraulically extensible mine roof supports
CN111255496B (zh) 一种煤柱辅助式矿用超前临时支护装置及其使用方法
US4505517A (en) Self-advancing mine roof supports
CN208777997U (zh) 一种迈步式掘支锚联合机组
US4069676A (en) Mine packing equipment
US3851480A (en) Mine roof support assemblies

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150311

Termination date: 20180709

CF01 Termination of patent right due to non-payment of annual fee