CN100567703C - 长壁采煤法综采工艺 - Google Patents
长壁采煤法综采工艺 Download PDFInfo
- Publication number
- CN100567703C CN100567703C CNB2005100435625A CN200510043562A CN100567703C CN 100567703 C CN100567703 C CN 100567703C CN B2005100435625 A CNB2005100435625 A CN B2005100435625A CN 200510043562 A CN200510043562 A CN 200510043562A CN 100567703 C CN100567703 C CN 100567703C
- Authority
- CN
- China
- Prior art keywords
- mining
- mechanized mining
- fully mechanized
- coal
- work plane
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000005065 mining Methods 0.000 title claims abstract description 128
- 239000003245 coal Substances 0.000 title claims abstract description 55
- 238000000034 method Methods 0.000 title claims abstract description 41
- 238000005516 engineering process Methods 0.000 title abstract description 12
- 230000003245 working effect Effects 0.000 claims 1
- 238000004519 manufacturing process Methods 0.000 abstract description 9
- 238000011084 recovery Methods 0.000 abstract description 5
- 238000009412 basement excavation Methods 0.000 abstract description 3
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 238000007598 dipping method Methods 0.000 abstract 1
- 238000005086 pumping Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 244000208734 Pisonia aculeata Species 0.000 description 1
- 239000000839 emulsion Substances 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 235000012149 noodles Nutrition 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 230000005641 tunneling Effects 0.000 description 1
- 238000009423 ventilation Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
一种长壁采煤法综采工艺,涉及井工采煤,适于煤层稳定、顶板坚硬、无断层缓倾中厚煤层及厚煤层分层长壁法开采。在长壁综采工作面布置液压支架、刮板输送机、滚筒采煤机,在运输巷布置顺槽转载机、可伸缩带式输送机等。综采工作面采用超长布置,即面长按两个综采面长度布置。采煤机用两台,骑在同一部刮板输送机上,分别截割上半个面和下半个面的煤壁。也可在超长综采面中部布置中间巷作运输巷;在综采面的上半和下半工作面各布置一部刮板输送机相向运输,形成对拉综采工作面。本发明进一步挖掘长壁综采面生产潜力,提高产量和工效,使生产集中化;在实现高产高效的同时,降低巷道掘进率,减少煤柱损失,提高资源回收率;充分采动有利于地表下沉。
Description
所属技术领域
本发明涉及井工采煤领域,特别是一种适用于煤层稳定、顶板坚硬、无断层的缓倾斜中厚煤层以及厚煤层分层开采的长壁采煤法综采工艺。
背景技术
随着综采技术的不断提高和综采设备的不断完善,中厚煤层一次采全高及厚煤层分层开采的综采工艺已相当成熟,安全、效益极好。
综采工艺即综合机械化采煤工艺。综采工作面的生产工艺过程,主要包括割煤、运煤、支护和处理采空区四个工序。割煤、运煤、支护工序分别是由滚筒采煤机、工作面可弯曲刮板输送机、液压支架完成。顺槽运煤是由桥式转载机转载到可伸缩带式输送机上,再经采区带式输送机运到采区煤仓。采空区处理,主要分全部陷落法与充填法,一般采用全部陷落法。在开采缓倾斜及倾斜厚煤层时,可按便于回采的高度,综采约2.5~3.5m,分层开采。
为了增加工作面的产量、降低巷道掘进率、减少煤柱损失,有的煤矿采用对拉面回采工艺,但仅限于产量较低的薄煤层炮采工作面或普采工作面,如:究州矿务局唐村煤矿4603炮采对拉工作面、汾西矿务局高阳矿单体液压支柱机采对拉面。而采用综合机械化采煤工艺进行对拉面回采,尚无先例。
发明内容
为了进一步挖掘现有长壁工作面综采工艺的生产潜力、克服采准巷道掘进率高及煤柱损失多的不足,本发明提供一种新的长壁采煤法综采工艺,该工艺能进一步提高综采工作面的产量和工效,实现集中化生产;在实现高产高效的同时,降低巷道掘进率,减少煤柱损失,提高资源回收率。
本发明解决其技术问题所采用的技术方案是:
本长壁采煤法综采工艺与通常综采工艺相同的是:在长壁综采工作面布置液压支架、工作面刮板输送机、滚筒采煤机,在综采工作面运输巷布置顺槽转载机、可伸缩带式输送机作顺槽运输。与通常综采工艺不同的是:长壁综采工作面的面长采用超长布置,即:工作面面长按两个综采工作面的长度布置。滚筒采煤机采用两台,骑行在同一部工作面刮板输送机的上半段和下半段,分别截割综采工作面的上半个工作面和下半个工作面的煤壁。或者,在超长布置的综采工作面的中部布置一条中间巷,作运输巷,安装顺槽转载机、可伸缩带式输送机,作顺槽运输。综采工作面上半工作面和下半工作面分别布置一部工作面刮板输送机,相向运输,将原煤运至中间巷的顺槽转载机,形成对拉综采工作面。
本发明解决其技术问题所采用的技术方案还可以是:
本综采工艺超长布置的综采面面长300~1000m,优选值360~610m。可用于中厚煤层走向长壁工作面或厚煤层倾斜分层下行垮落法走向长壁工作面开采。
本发明与现有技术相比具有如下优点:
①进一步挖掘长壁综采面的生产潜力,提高产量和工效,降低工作面的直接成本,减少工作面数量,减少和简化生产环节,实现矿井集中化生产。
②在实现高产高效的同时,减少煤柱损失,提高资源回收率,降低巷道掘进率,减少材料、动力、人力的消耗。
③采用超长综采工作面布置,提高工作面回采进度,实现充分采动,对地表下沉有利。
附图说明
图1是本发明综采工艺在超长走向长壁采煤工作面的设备布置示意图
图1中有三个剖视图:A-A、B-B、C-C剖视图
图2是本发明长壁采煤法综采工艺在对拉综采工作面的设备布置示意图
图2中有四个剖视图:D-D、E-E、F-F、G-G剖视图
图中:1-液压支架、2-上部滚筒采煤机、3-工作面刮板输送机、4-下部滚筒采煤机、5-桥式转载机、6-可伸缩带式输送机、7-泵站、8-上顺槽、9-下顺槽、10-采空区、11-综采工作面煤壁、12-中间巷、13-上半工作面、14-上部刮板输送机、15-下半工作面、16-下部刮板输送机、17-自移式端头支架
具体实施方式
以下结合附图对本发明的实施例作进一步详述。
实施例1:
本发明长壁采煤法综采工艺适合开采煤层稳定、顶板坚硬、地质构造简单、无断层或少断层、缓倾斜的中厚煤层;也可按便于回采的高度,约2.5m~3.5m,分层开采厚煤层。采用单一走向长壁工作面全部陷落法回采。
综采工作面采用超长布置,其面长按两个传统综采工作面的长度布置,即:超长综采工作面的长度可定为300m~1000m,其优选值为360m~610m。
在图1中示出本发明综采工艺,在走向长壁回采工作面的综采设备布置情况。在走向长壁综采工作面,沿工作面全长布置液压支架1,在工作面的煤壁11一侧、沿工作面全长布置工作面刮板输送机3。在工作面刮板输送机3上布置上部2和下部4两台双滚筒采煤机,两台滚筒采煤机2、4骑行在该工作面刮板输送机3的上半段和下半段,分别担负回采工作面上半个工作面和下半个工作面的割煤任务。
在综采工作面下顺槽9、即运输巷,布置顺槽桥式转载机5和可伸缩带式输送机6,担负顺槽原煤运输任务,同时,下顺槽作进风巷。综采工作面上顺槽8,作轨道运输或辅助运输巷,同时作回风巷,并设泵站7等。
由于工作面刮板输送机的功率随工作面产量和工作面长度的增加而急剧增加。所以,综采工作面长度加倍、运输长度加倍后,工作面刮板输送机3易选用大运量、大运距、大功率的重型刮板输送机,并要求具有高强度、高可靠性、长寿命。为此,尽量选用目前最大功率的重型可弯曲刮板输送机,或设计新型的更大功率、运距、输送量的刮板输送机以满足要求,即:电机功率加倍、圆环链强度加倍、溜槽强度提高、溜槽断面加大,且采用整体铸焊封底式槽、可伸缩机尾等新技术。
考虑到提高综采面的产量、实现高产高效的需要,其它综采设备的配置也尽量选用大功率、高产、重型设备。由于顺槽运输量,与综放工作面顺槽运输相当,可按综放工作面的顺槽转载机和可伸缩带式输送机选型。
实施例2:
在图2中示出本发明综采工艺在走向长壁对拉回采工作面的综采设备的布置情况。在超长布置的综采工作面中部布置一条中间巷12,作运输巷,安装桥式转载机5、可伸缩带式输送机6、自移式端头支架17等。综采工作面被中间巷12分成的上半工作面13和下半工作面15,分别布置一部工作面刮板输送机14、16,相向运输,将原煤运至中间巷的顺槽桥式转载机5,如图2中的G-G剖视图所示,形成对拉的综采工作面。上、下顺槽8、9作轨道运输或辅助运输巷,同时作回风巷;中间巷12作进风巷,形成“W”型通风系统。
采用综采设备和工艺实现对拉的综采面回采,是以大功率高产重型综采设备为前提的,只有在综采设备不断完善的今天才可以成为现实。
由于两部工作面刮板输送机14、16呈对拉运输,无超长运输要求,可按普通综采工作面刮板输送机要求选型。其余设备同例1。
实施例3、4:
分别按实施例1、2的综采设备布置和实施方式,将本发明长壁采煤法综采工艺用于厚煤层倾斜分层下行垮落法开采的走向长壁综采工作面。
实施例5、6:
分别按实施例1、2的综采设备布置和实施方式,将本发明长壁采煤法综采工艺用于中厚或厚煤层倾斜长壁综采工作面,进行仰采或俯采。
综采设备的配置举例如下:
①液压支架:因液压支架的架型选择受围岩及矿压特性、煤层开采厚度、煤层倾角、瓦斯含量等诸多因素影响,应因地制宜地选择掩护式、支撑掩护式、支撑式支架,以及支架的工作阻力、支护强度、支架高度等。
本实施例优选电液控制两柱掩护式液压支架,如:德国DBT公司的产品。使用非电液控制的亦可,如:ZY560K-17/35型四柱支撑掩护式液压支架,在兖州矿区就比较适用,该液压支架的支架高度1.7~3.5m、工作阻力5600kN、支护强度898~934kN/m2。
②滚筒采煤机:
SL300型采煤机:采高1.4~3.5m、有效截深1800mm、装机总功率859kW,德国艾柯夫公司制造。国产电牵引采煤机:MGTY400/900-3.3D型,装机总功率900kW。国产AM-500型采煤机:功率750kW。
③工作面刮板输送机:
1)超长综采工作面用的单部工作面刮板输送机:
SGZ1200/1400型可弯曲中双链刮板输送机:设计长度305m、输送量2000t/h、中部槽尺寸1500×1200×355mm、刮板链链速1.28m/s、圆环链规格2-38×337mm紧凑链、电机功率2×600kW、电压3300V、牵引形式为销排式。
SGZ1000/1200型可弯曲中双链刮板输送机:设计长度305m、输送量2000t/h、中部槽尺寸1500×1000×337mm、刮板链链速1.28m/s、圆环链规格2-38×337mm、电机功率2×600kW、电压3300V、牵引形式为销排式。
2)对拉综采工作面用工作面刮板输送机:
SGZ960/750型可弯曲中双链刮板输送机:设计长度250m、输送量1800t/h、中部槽尺寸1500×960×315mm、刮板链链速1.2m/s、圆环链规格2-34×126、电机功率2×375kW、电压3300V、牵引形式为埋链式。
④顺槽桥式转载机:
SZZ1200/525型,输送能力3500t/h、电机功率525kW;PLM3800型轮式连续破碎机与SZZ1200/525型转载机配套使用,破碎能力3800t/h。
SZZ1000/375型,输送能力2200t/h、电机功率375kW、电压3300V;PCM200型垂式破碎机与SZZ1000/375型转载机配套使用,破碎能力2200t/h。
⑤可伸缩带式输送机:
SSJ1400/3×400型,输送能力3500t/h、电机功率400kW×3、胶带宽度1400mm。SSJ1200/3×200型,输送能力1600t/h、电机功率200kW×3、胶带宽度1200mm。
⑥乳化液泵站:
1)乳化液泵:GRB315/31.5型、两泵一箱;2)清水泵KPB315/31.5型、两泵一箱。
Claims (5)
1.一种长壁采煤法综采工艺,在长壁综采工作面布置液压支架、工作面刮板输送机、滚筒采煤机,在综采工作面运输巷布置顺槽转载机、可伸缩带式输送机,其特征在于:所说的长壁综采工作面采用超长布置,即,其面长按两个综采工作面的长度布置;
所说的滚筒采煤机采用两台(2、4),分别骑行在同一部工作面刮板输送机(3)的上半段和下半段、截割综采工作面(11)的上半个工作面和下半个工作面的煤壁;
或者,在超长布置的综采工作面中部布置一条中间巷(12),作运输巷,安装顺槽转载机(5)、可伸缩带式输送机(6),综采工作面的上半工作面(13)和下半工作面(15)分别布置一部工作面刮板输送机(14、16),相向运输,将原煤运至中间巷的顺槽转载机(5),形成对拉的综采工作面。
2.根据权利要求1所述的长壁采煤法综采工艺,其特征在于:所说的超长布置的综采工作面长度为300m~1000m。
3.根据权利要求2所述的长壁采煤法综采工艺,其特征在于:所说的综采工作面长度为360m~610m。
4.根据权利要求1所述的长壁采煤法综采工艺,其特征在于:所说的长壁综采工作面为中厚煤层走向长壁综采工作面。
5.根据权利要求1所述的长壁采煤法综采工艺,其特征在于:所说的长壁综采工作面为厚煤层倾斜分层下行垮落法开采的走向长壁综采工作面。
Priority Applications (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNB2005100435625A CN100567703C (zh) | 2005-05-19 | 2005-05-19 | 长壁采煤法综采工艺 |
| AU2005203458A AU2005203458A1 (en) | 2005-05-19 | 2005-08-04 | Fully mechanized mining technique of longwall mining method |
| ZA200506698A ZA200506698B (en) | 2005-05-19 | 2006-03-23 | Fully mechanized mining technique of longwall mining method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNB2005100435625A CN100567703C (zh) | 2005-05-19 | 2005-05-19 | 长壁采煤法综采工艺 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN1865657A CN1865657A (zh) | 2006-11-22 |
| CN100567703C true CN100567703C (zh) | 2009-12-09 |
Family
ID=37424782
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CNB2005100435625A Expired - Fee Related CN100567703C (zh) | 2005-05-19 | 2005-05-19 | 长壁采煤法综采工艺 |
Country Status (3)
| Country | Link |
|---|---|
| CN (1) | CN100567703C (zh) |
| AU (1) | AU2005203458A1 (zh) |
| ZA (1) | ZA200506698B (zh) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101952547A (zh) * | 2008-02-19 | 2011-01-19 | 拉格股份公司 | 在地下煤矿开采的长壁式开采作业中自动建立确定的工作面开口的方法 |
| WO2012155531A1 (zh) * | 2011-05-17 | 2012-11-22 | 山东新煤机械设备股份有限公司 | 煤与矸石分离并将矸石回填的技术设备 |
| AU2018208634B2 (en) * | 2017-12-08 | 2020-01-02 | China University Of Mining And Technology | Clean and efficient coal mining method |
Families Citing this family (42)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN100560937C (zh) * | 2007-03-23 | 2009-11-18 | 中国矿业大学 | 一种薄基岩浅埋煤层长壁工作面保水开采方法 |
| CN101070759B (zh) * | 2007-05-04 | 2010-05-19 | 中国矿业大学 | 一种薄基岩浅埋煤层保水开采适用条件分类方法 |
| CN100554642C (zh) * | 2007-09-19 | 2009-10-28 | 中国矿业大学 | 一种长壁综采回收房式开采煤柱的方法 |
| PL2247823T3 (pl) * | 2008-02-19 | 2015-01-30 | Rag Ag | Sposób sterowania wybieraniem ścianowym |
| CN101737049B (zh) * | 2008-11-25 | 2012-06-20 | 宝钢集团上海梅山有限公司 | 一种多作业面循环的采准掘进生产组织方法 |
| RU2544345C2 (ru) | 2009-07-10 | 2015-03-20 | Джой ММ Делавэр, Инк. | Кровельные опоры для сплошной выемки |
| CN101749018B (zh) * | 2010-01-31 | 2012-01-25 | 山西晋城无烟煤矿业集团有限责任公司 | 煤柱直接回收采煤法 |
| CN101915107B (zh) * | 2010-09-02 | 2012-01-04 | 中国神华能源股份有限公司 | 煤矿大采高工作面设备布置方法 |
| CN102061922B (zh) * | 2010-10-26 | 2012-10-24 | 中国矿业大学 | 一种分叉合并煤层综采连续推进开采的方法 |
| CN102080541B (zh) * | 2010-12-08 | 2012-09-19 | 中国神华能源股份有限公司 | 连续采煤机双向截割方法 |
| CN102080557A (zh) * | 2011-01-26 | 2011-06-01 | 郑州煤矿机械集团股份有限公司 | 适于煤炭综采大采高工作面过渡支架的分体侧护装置 |
| CN102080556A (zh) * | 2011-01-26 | 2011-06-01 | 郑州煤矿机械集团股份有限公司 | 用于煤炭综采大采高工作面的过渡支架 |
| CN102116155A (zh) * | 2011-01-26 | 2011-07-06 | 郑州煤矿机械集团股份有限公司 | 大采高工作面过渡段支护、采煤方法 |
| CN102108875A (zh) * | 2011-01-26 | 2011-06-29 | 郑州煤矿机械集团股份有限公司 | 适于煤炭综采大采高工作面过渡支架的单级侧护装置 |
| CN102080555A (zh) * | 2011-01-26 | 2011-06-01 | 郑州煤矿机械集团股份有限公司 | 适于煤炭综采大采高工作面过渡支架的双级侧护装置 |
| CN102418525B (zh) * | 2011-10-28 | 2014-07-09 | 山西晋城无烟煤矿业集团有限责任公司 | 软煤层长壁大采高综合机械化采煤末采方法 |
| CN102444401B (zh) * | 2011-11-28 | 2013-12-25 | 袁树来 | 薄煤层炮采工作面充填采煤方法及相关设备 |
| CN102536244A (zh) * | 2012-03-01 | 2012-07-04 | 山西中新唐山沟煤业有限责任公司 | 一种薄煤层滚筒采煤机自动化工作面采煤方法 |
| CN103104260B (zh) * | 2013-02-27 | 2015-09-16 | 湖南科技大学 | 复杂地质条件下综—机对拉面采煤方法 |
| CN103233757B (zh) * | 2013-05-03 | 2016-01-20 | 王建彪 | 一种利用薄煤层对拉工作面集中运输巷端头支架的采煤方法 |
| CN104047630B (zh) * | 2013-11-19 | 2017-03-15 | 辽宁鑫丰矿电设备制造有限公司 | 一种综采工作面机械化安装工艺方法 |
| CN105089668A (zh) * | 2014-05-19 | 2015-11-25 | 梁捷 | 一种长壁工作面无煤柱开采方法 |
| CN104234715B (zh) * | 2014-07-16 | 2017-03-15 | 天地科技股份有限公司 | 大采高双综采工作面回采工艺 |
| CN104196533A (zh) * | 2014-08-25 | 2014-12-10 | 安徽理工大学 | 原煤管状顺槽运输系统装备及运煤方法 |
| CN104653182B (zh) * | 2014-11-07 | 2018-08-10 | 山东科技大学 | 一种含厚夹矸煤层煤矸分采的采煤方法 |
| CN105003269B (zh) * | 2015-08-11 | 2017-03-15 | 贵州理工学院 | 一种巨厚煤层长壁工作面的开采方法 |
| CN105527151A (zh) * | 2015-12-03 | 2016-04-27 | 中国矿业大学(北京) | 一种全方位研究地下采矿的岩石力学实验方法 |
| CN105840194B (zh) * | 2016-03-28 | 2018-02-02 | 中国矿业大学 | 一种确定综采面双采煤机同向过断层割煤范围的方法 |
| CN107882562B (zh) * | 2016-09-29 | 2020-06-05 | 河南理工大学 | 对拉工作面布置煤柱回收的实现方法 |
| CN108412528B (zh) * | 2018-04-23 | 2019-09-17 | 山东塔高矿业机械装备制造有限公司 | 基于延伸于巷道的液压支架装置和支护方法 |
| CN108729926A (zh) * | 2018-06-07 | 2018-11-02 | 天地科技股份有限公司 | 一种预掘中间巷道的400m以上超长工作面布置方式 |
| CN110410076B (zh) * | 2019-08-16 | 2021-06-08 | 山东科技大学 | 一种用于老房柱采空区遗留煤柱回收的充填开采方法 |
| CN111379561B (zh) * | 2020-04-07 | 2021-10-29 | 北京中矿创新联盟能源环境科学研究院 | 采煤系统及基于该采煤系统的无煤柱自成巷开采方法 |
| CN111456775B (zh) * | 2020-04-20 | 2021-07-20 | 北京中矿创新联盟能源环境科学研究院 | 薄煤层高档普采对拉工作面支架系统的移架方法 |
| CN111622762B (zh) * | 2020-06-08 | 2021-09-07 | 天地科技股份有限公司上海分公司 | 双滚筒采矿机开采工艺 |
| CN113586056A (zh) * | 2021-09-28 | 2021-11-02 | 中煤科工开采研究院有限公司 | 一种长壁式薄煤层和中厚煤层高效开采方法 |
| CN114684563B (zh) * | 2022-03-16 | 2024-06-14 | 江苏徐矿能源股份有限公司张双楼煤矿 | 一种回采工作面无皮带巷运煤系统 |
| CN115288788A (zh) * | 2022-07-28 | 2022-11-04 | 中煤能源研究院有限责任公司 | 一种冲击地压矿井超长工作面布置方法 |
| CN115478859A (zh) * | 2022-09-26 | 2022-12-16 | 天地上海采掘装备科技有限公司 | 地下铝土中厚矿层双采矿机中部斜切开采方法 |
| CN115478853B (zh) * | 2022-09-26 | 2026-02-24 | 天地上海采掘装备科技有限公司 | 地下铝土中厚矿层多机联合高效开采方法 |
| CN115492580B (zh) * | 2022-09-26 | 2026-02-06 | 天地上海采掘装备科技有限公司 | 高效矿料掏采方法 |
| CN115478855B (zh) * | 2022-09-26 | 2026-02-06 | 天地上海采掘装备科技有限公司 | 及时支护的矿料掏采方法 |
-
2005
- 2005-05-19 CN CNB2005100435625A patent/CN100567703C/zh not_active Expired - Fee Related
- 2005-08-04 AU AU2005203458A patent/AU2005203458A1/en not_active Abandoned
-
2006
- 2006-03-23 ZA ZA200506698A patent/ZA200506698B/en unknown
Non-Patent Citations (2)
| Title |
|---|
| 年产600万t超长综放面开采技术与设备配套. 来存良等.煤矿开采,第8卷第1期. 2003 * |
| 超长综放面设备配套与技术研究. 来存良等.矿山压力与顶板管理,第4期. 2001 * |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101952547A (zh) * | 2008-02-19 | 2011-01-19 | 拉格股份公司 | 在地下煤矿开采的长壁式开采作业中自动建立确定的工作面开口的方法 |
| WO2012155531A1 (zh) * | 2011-05-17 | 2012-11-22 | 山东新煤机械设备股份有限公司 | 煤与矸石分离并将矸石回填的技术设备 |
| AU2012255582B2 (en) * | 2011-05-17 | 2015-08-13 | Shandong Xinmei Machinery Equipment Co., Ltd | Technology and equipment for separating coal and gangue and refilling gangue. |
| AU2018208634B2 (en) * | 2017-12-08 | 2020-01-02 | China University Of Mining And Technology | Clean and efficient coal mining method |
Also Published As
| Publication number | Publication date |
|---|---|
| ZA200506698B (en) | 2006-05-31 |
| CN1865657A (zh) | 2006-11-22 |
| AU2005203458A1 (en) | 2006-12-07 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN100567703C (zh) | 长壁采煤法综采工艺 | |
| CN111691885B (zh) | 一种特厚煤层高效充填开采方法 | |
| CN101105129B (zh) | 采矿环境再造连续采矿嗣后充填采矿法 | |
| CN103742148B (zh) | 一种急倾斜煤层柔掩支护下行矸石充填的采煤法 | |
| CN105065001B (zh) | 一种超长推进距离工作面的沿空掘巷开采方法 | |
| CN112922596B (zh) | 一种露天矿端帮薄煤层枝状倒退式硐采方法 | |
| CN113653492B (zh) | 一种充填开采防治冲击地压方法 | |
| CN103104259A (zh) | 倾斜破碎矿体分段顶板再造中深孔落矿充填采矿法 | |
| CN103939137B (zh) | 西部沙漠化矿区浅埋煤层的风积沙空场充填方法 | |
| CN103089266A (zh) | 露天转地下过渡期无底柱分段空场崩落采矿方法 | |
| CN114427463B (zh) | 深部矿床下向进路式盘区分区卸荷分层超前卸压回采方法 | |
| CN110410076A (zh) | 一种用于老房柱采空区遗留煤柱回收的充填开采方法 | |
| CN116163730A (zh) | 一种薄煤层钻机双向前进充填开采及二氧化碳封存的方法 | |
| CN109630112B (zh) | 一种切顶充填的n00采矿法 | |
| CN109458181A (zh) | 一种金属矿沿走向一次采全高的充填采矿方法 | |
| CN105134212B (zh) | 一种三软厚煤层巷道沿顶掘进综放开采保证回采率的方法 | |
| CN108756875A (zh) | 一种内排露天煤矿中厚煤层连续开采装置及方法 | |
| CN114412468B (zh) | 一种崩落转充填过渡分段及隔离矿柱联合开采方法 | |
| CN102031972B (zh) | 露井联采的l型开采方法 | |
| CN205277431U (zh) | 煤巷掘进设备 | |
| CN109973094B (zh) | 一种矿山资源同面全采局充开采方法 | |
| CN113294199B (zh) | 开采下保护层瓦斯治理巷道布置方法 | |
| CN210317355U (zh) | 综放工作面顺煤层回采过断层的支护结构 | |
| CN115030723B (zh) | 一种非爆机械破岩两步骤折返式进路充填采矿法 | |
| CN112610212B (zh) | 一种采区单向掘进无煤柱开采方法 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C17 | Cessation of patent right | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20091209 Termination date: 20130519 |