CN101310190A CNA2006800429241A CN200680042924A CN101310190A CN 101310190 A CN101310190 A CN 101310190A CN A2006800429241 A CNA2006800429241 A CN A2006800429241A CN 200680042924 A CN200680042924 A CN 200680042924A CN 101310190 A CN101310190 A CN 101310190A
Authority
CN
China
Prior art keywords
inspection
probe
substrate
bullport
insulation division
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2006800429241A
Other languages
Chinese (zh)
Other versions
CN101310190B (en
Inventor
加藤穰
藤野真
宫武忠数
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nidec Corp
Original Assignee
Nidec Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nidec Corp filed Critical Nidec Corp
Publication of CN101310190A publication Critical patent/CN101310190A/en
Application granted granted Critical
Publication of CN101310190B publication Critical patent/CN101310190B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R1/00Details of instruments or arrangements of the types included in groups G01R5/00 - G01R13/00 and G01R31/00
    • G01R1/02General constructional details
    • G01R1/06Measuring leads; Measuring probes
    • G01R1/067Measuring probes
    • G01R1/073Multiple probes
    • G01R1/07307Multiple probes with individual probe elements, e.g. needles, cantilever beams or bump contacts, fixed in relation to each other, e.g. bed of nails fixture or probe card
    • G01R1/07357Multiple probes with individual probe elements, e.g. needles, cantilever beams or bump contacts, fixed in relation to each other, e.g. bed of nails fixture or probe card with flexible bodies, e.g. buckling beams
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R1/00Details of instruments or arrangements of the types included in groups G01R5/00 - G01R13/00 and G01R31/00
    • G01R1/02General constructional details
    • G01R1/06Measuring leads; Measuring probes
    • G01R1/067Measuring probes
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R1/00Details of instruments or arrangements of the types included in groups G01R5/00 - G01R13/00 and G01R31/00
    • G01R1/02General constructional details
    • G01R1/06Measuring leads; Measuring probes
    • G01R1/067Measuring probes
    • G01R1/073Multiple probes

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Measuring Leads Or Probes (AREA)
  • Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)

Abstract

To provide a jig for inspecting substrates and an inspection probe to be used for inspecting electrical characteristics of substrates to be inspected. [MEANS FOR SOLVING PROBLEMS] A jig (1) for inspecting substrates is composed of an inspection probe (2) wherein a first end section (23) is electrically in contact with a prescribed inspecting position (101) of a substrate (100) to be inspected; a connecting electrode (4) having an electrode section (41) in electrically contact with a second end section (24) of the inspection probe (2); and a holding body (3) for holding the inspection probe (2). The holding body (3) is provided with a first guide section (31) having a first guide hole (311) for guiding the first end section (23) to the inspection position (101), and a second guide section (32) whereupon a second guide hole (321) is formed for guiding the second end section (24) to the electrode section (41). The inspection probe (2) is composed of a flexible linear conducting section (21) having the first end section (23) and the second end section (24), and an insulating section (22) applied for insulation on an outer circumference of the conducting section (21) excluding the first end section (23) and the second end section (24). The length of the second end section (24) is shorter than that of the second guide hole (321).

Description

Jig for inspecting substrate and inspection are with popping one's head in
Technical field
The present invention relates to be used to check as the jig for inspecting substrate of the electrical specification of the inspection substrate of checking object and check with probe.
In addition, the invention is not restricted to printed circuit board, for example can be applicable to the electrical wiring inspection on the various substrates such as the base plate for packaging of battery lead plate that flexible substrate, multi-layer wire substrate, LCD and plasma scope use and semiconductor-sealing-purpose and thin-film carrier, in this manual, above-mentioned various circuit boards are referred to as " substrate ".
Background technology
Whether be formed with the wiring figure that is made of many wirings on substrate, finish like that by design in order to check wiring figure, proposed various base board checking devices in the past, these devices have obtained practicality.
As this base board checking device, for example there is such device, that is: from a plurality of wirings that constitute wiring figure, select the inspection position in any 2 groups of wirings, check the electrical specification that these are checked between positions electric broken string whether or whether conduct electricity etc.
In this device, device with this spline structure is known, that is: utilize to keep the jig for inspecting substrate of a plurality of inspections with probe, and an end of checking with probe is contacted with the checkpoint of inspection substrate, the other end is contacted with electrode part, testing fixture and inspection object substrate are electrically connected.
Keep the jig for inspecting substrate employing such structure of this inspection with probe, that is: in order to solve the contact problems of checking with between the electrode part of probe and inspection substrate or jig for inspecting substrate, the spring that stretches with the direction of principal axis of popping one's head in checking is installed, perhaps make and check with probe self to have elasticity, make inspection with popping one's head in, check with the outside application of force axially of popping one's head in thereby make in its direction of principal axis deflection.
By adopting this structure, when contacting with contact site with probe, inspection produces contact pressure, solved this bad connection problem.
For example, as shown in Figure 6, jig for inspecting substrate J is held in deflection between inspection substrate 100 and electrode part E with flexible inspection with probe P, thereby produces the application of force outside the direction of principal axis of inspection with the P that pops one's head in, at the inspection position 101 and the electrode part E generation contact pressure of inspection substrate 100.Utilize this contact pressure, solved and checked with the contact problems (for example, with reference to patent documentation 1 or 2) between probe P and inspection substrate 100 or the electrode part E.
Yet, as patent documentation 1 or 2 disclosed, for jig for inspecting substrate J, check produce contact pressure with probe P and with situation that electrode part contact under, check with popping one's head in 2 to tilt agley, whenever bearing when loading with respect to electrode part E surface, check that the front end with probe slides on the electrode part surface, produce scratch in wiring, perhaps electrode part E and inspection are moved with the contact position between the probe P, thereby contact is unstable.
Patent documentation 1: No. 3690796 communique of Japan's special permission
Patent documentation 2: No. 3690801 communique of Japan's special permission
Summary of the invention
The present invention In view of the foregoing makes, the purpose of this invention is to provide such inspection with popping one's head in and jig for inspecting substrate, that is: under the situation that conduction that use to check the electrode part that realizes inspection substrate and jig for inspecting substrate with popping one's head in is connected, load and be under the situation with the electrically conducting manner contact condition checking to bear, stable contact condition can be provided with probe.
The described invention of claim 1 provides a kind of jig for inspecting substrate, and this jig for inspecting substrate is by constituting with the lower part, that is: check with probe, and its first end contacts with electrically conducting manner with regulation inspection position as the inspection substrate of checking object; The connection electrode body, it has with described inspection uses the second end of probe with electrically conducting manner electrodes in contact portion; And maintenance body, it is configured between described inspection substrate and the described connection electrode body and keeps described inspection with popping one's head in, this jig for inspecting substrate is characterised in that, described maintenance body has: first guide portion, and it is formed with first bullport that described inspection is directed to described inspection position with the first end of probe; And second guide portion, it is formed with second bullport that described inspection is directed to described electrode part with the second end of probe, described inspection with probe by constituting with the lower part, that is: the conductor portion of wire, it has described first end and described the second end and has flexible; And insulation division, it covers with insulation mode on the periphery of the described conductor portion except described first end and described the second end, and the length of described the second end forms shorter than the length of described second bullport.
The described invention of claim 2 provides claim 1 described jig for inspecting substrate, it is characterized in that, described electrode part forms the same one side of surface formation with described connection electrode body.
The described invention of claim 3 provides claim 1 or 2 described jig for inspecting substrate, it is characterized in that, described connection electrode body disposes in the tight mode that contacts with described second guide portion.
The described invention of claim 4 provides each the described jig for inspecting substrate in the claim 1 to 3, it is characterized in that, described inspection forms littler than the diameter of described second guide portion with the maximum gauge of probe.
The described invention of claim 5 provides each the described jig for inspecting substrate in the claim 1 to 4, it is characterized in that described electrode part is formed by columnar lead.
The described invention of claim 6 provides a kind of jig for inspecting substrate, and this jig for inspecting substrate is by constituting with the lower part, that is: check with probe, and its first end contacts with electrically conducting manner with regulation inspection position as the inspection substrate of checking object; The connection electrode body, it has with described inspection uses the second end of probe with electrically conducting manner electrodes in contact portion; And maintenance body, it is configured between described inspection substrate and the described connection electrode body and keeps described inspection with popping one's head in, this jig for inspecting substrate is characterised in that, described maintenance body has: first guide portion, and it is formed with first bullport that described inspection is directed to described inspection position with the first end of probe; And second guide portion, it is formed with second bullport that described inspection is directed to described electrode part with the second end of probe, and this second guide portion is configured in the mode at the predetermined distance of being separated by between itself and described first guide portion, described inspection is with popping one's head in by constituting with the lower part, that is: the conductor portion of wire, it has described first end and described the second end and has flexible; And insulation division, it covers on the periphery of the described conductor portion except described first end and described the second end with insulation mode, to make when described first end and inspection substrate butt and to check with probe when crooked, in order to make described the second end not have lateral excursion ground and described electrode part butt, described the second end and be positioned at second bullport with the part of the described insulation division of this second end adjacency, the part of this insulation division is to insert in this second bullport in the mode of the slight gap of being separated by between itself and this second bullport, and the length of the described insulation division that is inserted forms longer than the length of described the second end, and the length of the long axis direction of described the second end forms with described inspection roughly the same or shorter with the external diameter of the insulation division of probe than described inspection with the external diameter of the insulation division of probe.
The described invention of claim 7 provides a kind of jig for inspecting substrate, and this jig for inspecting substrate is by constituting with the lower part, that is: check with probe, and its first end contacts with electrically conducting manner with regulation inspection position as the inspection substrate of checking object; The connection electrode body, it has with described inspection uses the second end of probe with electrically conducting manner electrodes in contact portion; And maintenance body, it is configured between described inspection substrate and the described connection electrode body and keeps described inspection with popping one's head in, this jig for inspecting substrate is characterised in that, described maintenance body has: first guide portion, and it is formed with first bullport that described inspection is directed to described inspection position with the first end of probe; And second guide portion, it is formed with second bullport that described inspection is directed to described electrode part with the second end of probe, and this second guide portion is configured in the mode at the predetermined distance of being separated by between itself and described first guide portion, described inspection is with popping one's head in by constituting with the lower part, that is: the conductor portion of wire, it has described first end and described the second end and has flexible; And insulation division, it covers on the periphery of the described conductor portion except described first end and described the second end with insulation mode, to make when described first end and inspection substrate butt and to check with probe when crooked, in order to make described the second end not have lateral excursion ground and described electrode part butt, described the second end and be positioned at second bullport with the part of the described insulation division of this second end adjacency, the part of this insulation division is to insert in this second bullport in the mode of the slight gap of being separated by between itself and this second bullport, and the length of the described insulation division that is inserted forms longer than the length of described the second end, and the minimum diameter of described second bullport forms bigger with the external diameter of the insulation division of probe than described inspection.
The described invention of claim 8 provides claim 6 or 7 described jig for inspecting substrate, it is characterized in that, described second guide portion is laminated with a plurality of tabular components, these a plurality of tabular components are formed with the bullport of the described the second end of guiding respectively, described second bullport is configured the right angle orientation that forms with respect to the plate face by the bullport with described tabular component in the mode that respectively is offset ormal weight in same direction and tilts, and the border of described the second end and described insulation division is configured in the bullport of the described tabular component that is connected with described connection electrode body.
The described invention of claim 9 provides a kind of inspection with popping one's head in, this is checked with probe by checking that the maintenance body of substrate with anchor clamps keeps, and with inspection substrate and of the electrode part electrical connection of this inspection substrate with anchor clamps, wherein, the testing fixture that described maintenance body will become this inspection substrate of checking object and the electrical specification of checking this inspection substrate is electrically connected, this inspection is characterised in that with probe, described inspection is with popping one's head in by constituting with the lower part, that is: have the conductor portion of flexible wire, it has: at the first end that contacts with electrically conducting manner with the inspection position of described inspection substrate when keeping body to keep; With the second end that contacts with electrically conducting manner with the electrode part of anchor clamps with described inspection substrate; And insulation division, it covers with insulation mode on the periphery of the conductor portion except described first end and described the second end, and described inspection forms shorter than the length of described bullport with the length of the second end of probe.
The described invention of claim 10 provides a kind of inspection with popping one's head in, this is checked with probe by checking that the maintenance body of substrate with anchor clamps keeps, and inserted and to lead at first bullport of the checkpoint that is directed to inspection substrate that this maintenances body has and be directed in second bullport of electrode part of these inspection substrate usefulness anchor clamps, thereby this inspection substrate and this are checked that substrate is electrically connected with the electrode part of anchor clamps, wherein, the testing fixture that described maintenance body will become this inspection substrate of checking object and the electrical specification of checking this inspection substrate is electrically connected, this inspection is characterised in that with probe, described inspection is with popping one's head in by constituting with the lower part, that is: have the conductor portion of flexible wire, it has: contact with electrically conducting manner and the slotting first end that leads in described first bullport of quilt with the inspection position of described inspection substrate when keeping body to keep; With contact and inserted the second end that leads in described second bullport with electrically conducting manner with the electrode part of anchor clamps with described inspection substrate; And insulation division, it covers on the periphery of the conductor portion except described first end and described the second end with insulation mode, to make when described first end and inspection substrate butt and to check with probe when crooked, in order to make described the second end not have lateral excursion ground and described electrode part butt, described the second end and be positioned at second bullport with the part of the described insulation division of this second end adjacency, the part of this insulation division is in being inserted into this second bullport the time and this second bullport slight gap of being separated by, and the length of the described insulation division that is inserted forms longer than the length of described the second end, and the length of the long axis direction of described the second end forms with described inspection roughly the same or shorter with the external diameter of the insulation division of probe than described inspection with the external diameter of the insulation division of probe.
The described invention of claim 11 provides a kind of inspection with popping one's head in, this is checked with probe by checking that the maintenance body of substrate with anchor clamps keeps, and inserted and to lead at first bullport of the checkpoint that is directed to inspection substrate that this maintenances body has and be directed in second bullport of electrode part of these inspection substrate usefulness anchor clamps, this inspection substrate and this are checked that substrate is electrically connected with the electrode part of anchor clamps, wherein, the testing fixture that described maintenance body will become this inspection substrate of checking object and the electrical specification of checking this inspection substrate is electrically connected, this inspection is characterised in that with probe, described inspection is with popping one's head in by constituting with the lower part, that is: have the conductor portion of flexible wire, it has: contact with electrically conducting manner and the slotting first end that leads in described first bullport of quilt with the inspection position of described inspection substrate when keeping body to keep; With contact and inserted the second end that leads in described second bullport with electrically conducting manner with the electrode part of anchor clamps with described inspection substrate; And insulation division, it covers on the periphery of the conductor portion except described first end and described the second end with insulation mode, to make when described first end and inspection substrate butt and to check with probe when crooked, in order to make described the second end not have lateral excursion ground and described electrode part butt, described the second end and be positioned at second bullport with the part of the described insulation division of this second end adjacency, the part of this insulation division is in being inserted into this second bullport the time and this second bullport slight gap of being separated by, and the length of the described insulation division that is inserted forms longer than the length of described the second end, and described inspection forms littler than the minimum diameter of described second bullport with the external diameter of the insulation division of probe.
By these inventions are provided, solved above-mentioned problem.
Invention according to claim 1, such jig for inspecting substrate is provided, that is: flexible inspection with the first end of probe by first bullport guiding of first guide portion that keeps body and contact with the inspection position of inspection substrate, and check that the second end with probe is contacted with the electrode part of connection electrode body by second bullport guiding of second guide portion that keeps body, check that the length with the second end of popping one's head in forms shorter than the length of second bullport, thereby inspection is maintained between inspection substrate and the connection electrode body with probe, even under situation about checking with the probe deflection, the second end also becomes approximate right angle to contact with the surface of electrode part.
Therefore, this jig for inspecting substrate provides stable contact condition.And,, and prevent that the contact position of the second end and electrode part is offset because the second end becomes approximate right angle with the surface of electrode part, thereby prevents to produce the scratch that slides and cause owing on the electrode part surface.
Invention according to claim 2, because the electrode part of connection electrode body and connection electrode surface constitute with one side, thereby can utilize the electrode part that in manufacturing process, forms easily, and become approximate right angle electrodes in contact portion with the surface of electrode part owing to form the second end, thereby can prevent the slip of the second end, can make and check with probe and more stably contact with electrode part.
Invention according to claim 3, because the connection electrode body disposes in the tight mode that contacts with second guide portion, thereby the electrode part surface of contact of the second end can make inspection more stably contact with electrode part with probe roughly to contact with one side with the surface of second guide portion.
Invention according to claim 4 because it is littler than the diameter of second guide portion to check that maximum gauge with probe forms, thereby can be from the maintenance body of jig for inspecting substrate easily plug check with probe, can change easily and check with popping one's head in.
Invention according to claim 5, because electrode part is formed by the lead of drum, thereby, check that the part with probe embeds in the hole portion of this electrode part checking with under probe and the situation that electrode part contact, can make and check to use and pop one's head in and electrode part is stablized and contacted.
Invention according to claim 6, such jig for inspecting substrate is provided, that is: flexible inspection with the first end of probe by first bullport guiding of first guide portion that keeps body and contact with the inspection position of inspection substrate, and check that the second end with probe is contacted with the electrode part of connection electrode body by second bullport guiding of second guide portion that keeps body, to make when described first end and inspection substrate butt and to check with probe when crooked, in order to make described the second end not have lateral excursion ground and described electrode part butt, described the second end and be positioned at second bullport with the part of the described insulation division of this second end adjacency, the part of this insulation division is to insert in this second bullport in the mode of the slight gap of being separated by between itself and this second bullport, and the length of the described insulation division that is inserted forms longer than the length of the second end, the length of the long axis direction of the second end forms roughly the same or shorter than it with the external diameter of checking the insulation division of using probe, thereby inspection is maintained between inspection substrate and the connection electrode body with probe, even under situation about checking with the probe deflection, the second end also becomes approximate right angle to contact with the surface of electrode part.
Therefore, this jig for inspecting substrate provides stable contact condition.And,, and prevent that the contact position of the second end and electrode part is offset because the second end becomes approximate right angle with the surface of electrode part, thereby prevents to produce the scratch that slides and cause owing on the electrode part surface.
Invention according to claim 7, such jig for inspecting substrate is provided, that is: flexible inspection with the first end of probe by first bullport guiding of first guide portion that keeps body and contact with the inspection position of inspection substrate, and check that the second end with probe is contacted with the electrode part of connection electrode body by second bullport guiding of second guide portion that keeps body, to make when described first end and inspection substrate butt and to check with probe when crooked, in order to make described the second end not have lateral excursion ground and described electrode part butt, described the second end and be positioned at second bullport with the part of the described insulation division of this second end adjacency, the part of this insulation division is to insert in this second bullport in the mode of the slight gap of being separated by between itself and second bullport, and the length of the described insulation division that is inserted forms longer than the length of the second end, the minimum diameter of second bullport forms than checking that the external diameter with the insulation division of popping one's head in is big, thereby inspection is maintained between inspection substrate and the connection electrode body with probe, even under situation about checking with the probe deflection, the second end also becomes approximate right angle to contact with the surface of electrode part.
Therefore, this jig for inspecting substrate provides stable contact condition.And,, and prevent that the contact position of the second end and electrode part is offset because the second end becomes approximate right angle with the surface of electrode part, thereby prevents to produce the scratch that slides and cause owing on the electrode part surface.
Therefore, this jig for inspecting substrate provides stable contact condition.And,, and prevent that the contact position of the second end and electrode part is offset because the second end becomes approximate right angle with the surface of electrode part, thereby prevents to produce the scratch that slides and cause owing on the electrode part surface.
Invention according to claim 8, described second guide portion is laminated with a plurality of tabular components, these a plurality of tabular components are formed with the bullport of the described the second end of guiding respectively, described second bullport is configured in the mode that respectively is offset ormal weight in same direction by the bullport with described tabular component and tilts with respect to the right angle orientation of plate face, the border of described the second end and described insulation division is configured in the bullport of the described tabular component that is connected with described connection electrode body, thereby controlled being formed in makes inspection with popping one's head in roughly the same direction with roughly the same amount deflection under the situation about checking.
Invention according to claim 9, such inspection probe is provided, that is: flexible inspection with the first end of probe by first bullport guiding of first guide portion that keeps body and contact with the inspection position of inspection substrate, and check that the second end with probe is contacted with the electrode part of connection electrode body by second bullport guiding of second guide portion that keeps body, check that the length with the second end of popping one's head in forms shorter than the length of second bullport, thereby inspection is maintained between inspection substrate and the connection electrode body with probe, even under situation about checking with the probe deflection, the second end also becomes approximate right angle to contact with the surface of electrode part.
Therefore, this inspection provides stable contact condition with probe.And,, and prevent that the contact position of the second end and electrode part is offset because the second end becomes approximate right angle with the surface of electrode part, thereby prevents to produce the scratch that slides and cause owing on the electrode part surface.
Invention according to claim 10, such inspection probe is provided, this inspection uses the maintenance body of anchor clamps to keep with popping one's head in by the inspection substrate of the testing fixture electrical connection that will become the inspection substrate of checking object and the electrical specification of checking this inspection substrate, and inserted and to lead at first bullport of the checkpoint that is directed to this inspection substrate that this maintenances body has and be directed in second bullport of electrode part of these inspection substrate usefulness anchor clamps, this inspection substrate and this are checked that substrate is electrically connected with the electrode part of anchor clamps, this inspection is characterised in that with probe, described inspection is with popping one's head in by constituting with the lower part, that is: have the conductor portion of flexible wire, it has: contact with electrically conducting manner and the slotting first end that leads in described first bullport of quilt with the inspection position of described inspection substrate when keeping body to keep; With contact and inserted the second end that leads in described second bullport with electrically conducting manner with the electrode part of anchor clamps with described inspection substrate; And insulation division, it covers on the periphery of the conductor portion except described first end and described the second end with insulation mode, described inspection forms shorter than the length of described bullport with the length of the second end of probe, and, length at the described insulation division of the described second bullport inside forms longer than the length of described the second end, so that in use, make described the second end become approximate right angle with the surface of described electrode part, the length of the long axis direction of the second end forms roughly the same or shorter than it with the external diameter of checking the insulation division of using probe.
Therefore, this inspection provides stable contact condition with probe.And,, and prevent that the contact position of the second end and electrode part is offset because the second end becomes approximate right angle with the surface of electrode part, thereby prevents to produce the scratch that slides and cause owing on the electrode part surface.
Invention according to claim 11, such inspection probe is provided, this inspection uses the maintenance body of anchor clamps to keep with popping one's head in by the inspection substrate of the testing fixture electrical connection that will become the inspection substrate of checking object and the electrical specification of checking this inspection substrate, and inserted and to lead at first bullport of the checkpoint that is directed to this inspection substrate that this maintenances body has and be directed in second bullport of electrode part of these inspection substrate usefulness anchor clamps, this inspection substrate and this are checked that substrate is electrically connected with the electrode part of anchor clamps, this inspection is characterised in that with probe, described inspection is with popping one's head in by constituting with the lower part, that is: have the conductor portion of flexible wire, it has: contact with electrically conducting manner and the slotting first end that leads in described first bullport of quilt with the inspection position of described inspection substrate when keeping body to keep; With contact and inserted the second end that leads in described second bullport with electrically conducting manner with the electrode part of anchor clamps with described inspection substrate; And insulation division, it covers on the periphery of the conductor portion except described first end and described the second end with insulation mode, to make when described first end and inspection substrate butt and to check with probe when crooked, in order to make described the second end not have lateral excursion ground and described electrode part butt, described the second end and be positioned at second bullport with the part of the described insulation division of this second end adjacency, the part of this insulation division is in being inserted into this second bullport the time and this second bullport slight gap of being separated by, and the length of the described insulation division that is inserted forms longer than the length of described the second end, and described inspection forms littler than the minimum diameter of described second bullport with the external diameter of the insulation division of probe.
Therefore, this inspection provides stable contact condition with probe.And,, and prevent that the contact position of the second end and electrode part is offset because the second end becomes approximate right angle with the surface of electrode part, thereby prevents to produce the scratch that slides and cause owing on the electrode part surface.
Description of drawings
Fig. 1 illustrates the sectional view of the jig for inspecting substrate of embodiments of the invention, inspection (a) is shown bears the preceding state of load with probe, and the state that has born load with popping one's head in of checking (b) is shown.
Fig. 2 (a) illustrates the sectional view of maintenance body of the jig for inspecting substrate of embodiments of the invention, (b) amplifies to illustrate and checks with probe and be inserted into the state that keeps body interior.
Fig. 3 illustrates the outboard profile of the inspection of embodiments of the invention with probe.
Fig. 4 (a) illustrates the sectional view of connection electrode body of the jig for inspecting substrate of embodiments of the invention, and the stereographic map of the electrode part of another embodiment (b) is shown, and the situation that contacts with the electrode part of (b) with probe of checking (c) is shown.
Fig. 5 illustrates an embodiment of the jig for inspecting substrate of concrete example of the present invention.
Fig. 6 illustrates existing jig for inspecting substrate and checks with probe.
Label declaration
1: jig for inspecting substrate; 2: check with probe; 21: conductor portion; 22: insulation division; 23: first end; 24: the second end; 25: the border; 26: the border; 3: keep body; 31: the first guide portion; 311: the first bullports; 32: the second guide portion; 321: the second bullports; 4: the connection electrode body; 41: electrode part; 100: inspection substrate; 101: check the position.
Embodiment
Structure with reference to the jig for inspecting substrate 1 of description of drawings embodiments of the invention.
Fig. 1 illustrates the sectional view of the jig for inspecting substrate of embodiments of the invention, and Fig. 1 (a) illustrates inspection and bears the preceding state of load with probe, and Fig. 1 (b) illustrates the state that has born load with popping one's head in of checking.Fig. 2 (a) illustrates the sectional view of maintenance body of the jig for inspecting substrate of embodiments of the invention, and Fig. 2 (b) amplifies the state that is inserted into popping one's head in of checking that illustrates.Fig. 3 illustrates the outboard profile of the inspection of embodiments of the invention with probe.Fig. 4 (a) illustrates the sectional view of connection electrode body of the jig for inspecting substrate of embodiments of the invention, and Fig. 4 (b) illustrates the stereographic map of the electrode part of another embodiment, and Fig. 4 (c) illustrates the situation that contacts with the electrode part of (b) with probe of checking.
In addition, each structure of illustrated in this manual jig for inspecting substrate is that object describes with an inspection with probe, yet the inspection that can utilize the quantity corresponding with the checkpoint can be provided with several extremely inspections probes of about tens thousand of with probe in fact.
Jig for inspecting substrate 1 has to be checked with probe 2, maintenance body 3 and connection electrode body 4.
Check that the inspection position 101 with probe 2 and inspection substrate 100 contacts with electrically conducting manner, and contact with electrically conducting manner with the electrode part 41 of connection electrode body 4.Keep body 3 will check and 2 be directed to the inspection position 101 of regulation and electrode part 41 and its maintenance with popping one's head in.Connection electrode body 4 is delivered to testing fixture (not illustrating) with the signal that is detected.
Keep body 3 to be configured between inspection substrate 100 and the connection electrode body 4, keep checking with probe 2.This maintenance body 3 has: first guide portion 31, and it has first bullport 311, and the first end 23 with probe 2 is checked in these first bullport, 311 guiding, makes it check that with the regulation of inspection substrate 100 position 101 contacts; And second guide portion 32, it has second bullport 321, and these second bullport, 321 guiding are checked with the second end 24 of probe 2, and it is contacted with electrode part 41.
As shown in Figure 2, constitute by first guide portion 31, second guide portion 32 and pillar 33 at the maintenance body 3 shown in the embodiment of this instructions.This first guide portion 31 is formed by different members respectively with second guide portion 32, and these members are fixed into one by pillar 33.Quantity, shape and length that this pillar 33 is set decide as required.In addition, owing to the length of the thickness (length of longitudinal direction shown in Figure 2) that keeps body 3 according to this pillar 33 decides, thereby set according to the requirement in the design of gauging fixture.
As mentioned above, first guide portion 31 has and is used for checking first bullport 311 that is directed to inspection position 101 with the first end 23 of probe 2.It is little that the diameter 311W of this first bullport 311 forms the maximum gauge (checking the diameter 22W with probe 2) that has than the insulation division of checking with probe 2 22, prevents to check with popping one's head in 2 to give prominence to the figure direction that faces up.
First guide portion 31 shown in Figure 2 is formed by 3 tabular bodys, so that have 3 kinds of functions described later, yet is not limited to this piece number, can be formed by a tabular body, also can be formed by the tabular body more than 2.
This first guide portion 31 shown in Figure 2 has 3 tabular bodys 312,313,314, tabular body 312 is to be used for the tabular body that is directed to inspection position 101 with probe 2 (first end 23) with checking, tabular body 313 is the tabular bodys that are used to adjust the thickness of first guide portion 31, and tabular body 314 is formed with the threaded hole that is used for fixing pillar 33.
In addition, the thickness of this first guide portion 31 forms shorter than the length 23L of first end 23.
As mentioned above, second guide portion 32 has and is used for checking second bullport 321 that is directed to electrode part 41 with 2 the second end 24 of popping one's head in.The diameter 321W of this second bullport 321 forms bigger than checking with probe 2 maximum gauges that have, and can plug and check with probe 2.
Second guide portion 32 shown in Figure 2 is the same with first guide portion 31, is formed by 3 tabular bodys, so that have 3 kinds of functions described later, yet is not limited to this piece number, can be formed by a tabular body, also can be formed by the tabular body more than 2.
Second guide portion 32 shown in this Fig. 2 (a) has 3 tabular bodys 322,323,324, tabular body 322 is the tabular bodys that are used to form the threaded hole that is useful on anchor post 33, tabular body 323 is the tabular bodys that are used to adjust the thickness of second guide portion 32, and tabular body 324 is to be used for and will to check that (the second end 24) is directed to the tabular body of electrode part 41 with popping one's head in 2.
Fig. 2 (b) is the enlarged drawing at the dotted line position shown in Fig. 2 (a), illustrates to check with 2 states that are inserted in the maintenance body 3 of popping one's head in.
In the jig for inspecting substrate 1 of embodiments of the invention, owing in second bullport 321, have the border 26 of the second end 24 and insulation division 22, thereby can will check that the flexure effects with probe 2 is suppressed to Min..
And, because the length 24L (with reference to Fig. 3) of this second end 24 forms the thickness 32T weak point than second guide portion 32, even thereby checking that this border 26 also is present in second bullport, 321 inside under the situation of having born load with probe 2.
Like this because insulation division 22 is present in second guide portion, 321 inside, thereby and the diameter 321W of second guide portion 321 between gap S reduce, even under situation about checking with probe 2 deflections, because the second end 24 becomes approximate right angle to contact with the surface of electrode part 41, thereby also prevent to check the slip of using probe 2, perhaps suppress to swing.Therefore, this jig for inspecting substrate 1 can provide than existing gauging fixture more stable and electrode part between contact condition.
The diameter 321W of second bullport 321 forms bigger than checking with probe 2 maximum gauges that have (22W shown in Figure 3) as mentioned above.This diameter 321W forms than the big 1 μ m of the diameter 22W~50 μ m that check with probe 2, more preferably big 10 μ m~30 μ m.
For example, checking that the maximum gauge with probe 2 forms under the situation of 0.09mm, the diameter of second bullport 321 can form 0.12mm, is checking with probe 2 and is keeping having suitable confining force between the body 3.
Maintenance body 3 shown in Figure 2 is configured to make first bullport 311 consistent in the approximate vertical direction with second bullport 321, yet can be configured to make first guide portion 31 or second guide portion 32 at the parallel direction predetermined distance that staggers.In this case, because first bullport 311 and second bullport 321 are inconsistent on a straight line of vertical direction, thereby inserting inspection at 2 o'clock, checking with 2 deflections of popping one's head in popping one's head in, and by fastening, can prevent to fall with the sidepiece rubbing contact of first bullport 311 or second bullport 321.
Check with probe 2 and constitute (with reference to Fig. 3) by the conductor portion 21 of wire and insulation division 22 on the periphery that covers conductor portion 21.
This conductor portion 21 forms by having flexible material, and forms, and under the situation of having born from the axial load of conductor portion 21, conductor portion 21 is becoming the deflection of approximate right angle direction with direction of principal axis.Check to produce and be used for and contact force that the inspection position contacts with electrode part described later owing to this deflection makes with probe 2.
The material of this conductor portion 21 just can suitably utilize suitable material so long as have flexible material as mentioned above, for example can utilize beryllium copper (BeCu) and tungsten (W).
In addition, keep by maintenance body 3 as shown in Figure 1 owing to check direction of principal axis length (length of conductor portion 21), thereby be necessary that the thickness that forms at least than keeping body 3 is long, and need be used to satisfy the length of following condition with probe 2.
This inspection is to decide according to the size and the length that keep body 3 with the length (direction of principal axis length) of the conductor portion 21 of probe 2, can form about 10mm~100mm, can suitably set with the size of anchor clamps 1 according to the inspection substrate.
Check that the conductor portion 21 with probe 2 has: the first end 23 that contacts with the inspection position 101 of inspection substrate 100, with the second end 24 that contacts with the electrode part 41 of connection electrode body 4 described later.
As shown in Figure 3, first end 23 and the second end 24 are formed on the conductor portion of exposing from insulation division 22 21.
As shown in Figure 1, this first end 23 is configured to be projected into the outside (the last direction of drawing) from first bullport 311 of first guide portion 31.And the second end 24 described later is configured to be projected into the outside (the following direction of drawing) from second bullport 321 of second guide portion 32.Check with probe 2 and be configured to connect first and second bullports 311,321 that keep body 3.
And, first and second ends 23,24 are decided as required from the overhang separately that keeps body 3 (first guide portion 31 and second guide portion 32), yet when connection electrode body 4 contacts configuration with inspection substrate 100, check that with probe 2 deflections necessary is that connection electrode body 4 and inspection substrate 100 are fixed with keeping body 3 driving fits respectively.
The border 25 of this first end 23 and insulation division 22 is configured in the inboard of first guide portion 31.As long as the length 23L of this first end 23 satisfies above-mentioned condition, just the relation between energy basis and the maintenance body 3 is suitably set, and preferably forms 10mm~50mm, more preferably forms about 20mm~40mm.This is because by having the length of this scope, when checking with probe 2 deflections, can make and check that position 101 and first end 23 produce stable contact condition.
The second end 24 contacts with the electrode part 41 of connection electrode body 4.And the border 26 between the insulation division 22 of formation the second end 24 is configured in second bullport 321 of second guide portion 32 as shown in Figure 1.As mentioned above, this the second end 24 decides with 2 the degree of flexibility of popping one's head in from the overhang of the second guide portion 32 also inspection when checking, yet when connection electrode body 4 contacts with inspection substrate 100, check that connection electrode body 4 and inspection substrate 100 are fixed with keeping body 3 driving fits respectively with probe 2 deflections.
Because this border 26 is configured in second bullport, 321 inside, thereby check that the second end 24 with probe 2 can become approximate right angle to contact with the surface of electrode part 41.Therefore, can prevent from as in the past to check with probe under the situation of having born load with probe and under heeling condition, contact checking, can prevent to check with popping one's head on electrode part 41 slip or make electrode part 41 generation scratches with electrode part 41.
And the length 24L of this second end 24 forms shorter than the length of second bullport 321 (thickness).This is because by such formation, even born under the situation of load with probe 2 in inspection, border 26 also is configured in second bullport, 321 inside.
In addition, preferably, the front end of this first end 23 and the second end 24 is processed to have the chamfering as hemispherical, perhaps has most advanced and sophisticated more and more thinner cone-shaped.
Preferably, in order to make this second end 24 become approximate right angle in use with the surface of electrode part 41, the length of this second end 24 forms the length that makes at the insulation division 22 of second bullport, 32 inside and forms longlyer than the length of the second end 24, and it is roughly the same or lack than it with the external diameter of the insulation division of probe to make the length of the long axis direction of the second end 24 form and check.
This is because by such formation the second end 24, even be configured under the situation that makes 2 deflections of inspection usefulness probe on second guide portion 32 at the second end 24, also can become approximate right angle to stand with the surface of electrode part 41 and establish.
Owing to form to check with 2 the insulation division 22 of popping one's head in to cover as mentioned above on the conductor portion 21, so that first end 23 and the second end 24 expose, thereby the material that forms this insulation division 22 is insulating material, preferably the material of excellent processability.
When being material as described above, suitably select suitable material according to processability, for example can utilize polytetrafluoroethylene (PTFE) (so-called teflon (registered trademark)) and urethane resin.Particularly, by utilizing the good urethane resin of retrofit, border shown in Figure 3 25,26 can be formed and 21 one-tenth approximate right angle of conductor portion.
In addition, inspection illustrated in this instructions and drawing forms cylindrical shape with probe 2, the diameter of conductor portion 21 and insulation division 22 comes suitable decision according to the size of the inspection position 101 of inspection substrate 100, this diameter is can be by the diameter of second bullport 321, so that can check with probe 2 from jig for inspecting substrate 1 plug.
Connection electrode body 4 is made of electrode part 41, base portion 42 and fixed part 43.This connection electrode body 4 receives from checking the electric signal with probe 2 electric currents that obtain and voltage etc.
As shown in Figure 4, this electrode part 41 forms with the surface formation of connection electrode body 4 simultaneously same.By such formation, can make at the second end 24 of second bullport, 321 inside and stablize contact in electrode part 41.
As shown in Figure 4, this electrode part 41 is formed by lead, and an end of this lead is positioned on the surface of connection electrode body 4, and the other end of lead is connected with testing fixture.Base portion 24 is the base materials that keep electrode part 41.Fixed part 43 is the immobilization materials that are used for configured electrodes portion 41.
In addition, the method that forms this connection electrode body 4 for example is the hole portion that is formed for forming electrode part 41 on base portion 42 in advance at desired locations.Then, be configured as the lead of electrode part 41, fill the bonding agent that forms fixed part 43 in order to fix this lead.After having formed fixed part 43, remove the outstanding lead in surface (with checking) with probe 2 faces that contact from connection electrode body 4.Like this, form connection electrode body 4.
Shown in Fig. 4 (b), electrode part 41 also can be utilized columnar lead.By in electrode part 41, utilizing columnar lead, checking with under probe 2 and the situation that this electrode part 41 contacts, inspection is configured in electrode part 41 inside with the part of the front end of the second end 24 of probe 2, the periphery of the internal diameter 41W2 of electrode part 41 and the second end 24 butts provide stable contact condition (with reference to Fig. 4 (c)).
In order to have this contact condition, the internal diameter 41W2 of electrode part 41 forms littler than the diameter 21W of the second end 24 (conductor portion 21) at least.In addition, preferably, the length of the external diameter 41W1 of electrode part 41 is roughly the same with the diameter 21W that checks the conductor portion 21 of using probe 2.
Because this connection electrode body 4 disposes in intimate contact with second guide portion 32 that keeps body 3 in use, thereby keep body 3 and connection electrode body 4 to be in the state of butt seamlessly, can make the contact condition of the second end 24 and electrode part 41 more stable.
Below the inspection substrate of explanation embodiments of the invention is used a concrete example of probe 2 with anchor clamps 1 and inspection.Yet, the invention is not restricted to the size and dimension shown in this concrete example.In addition, Fig. 5 illustrates the summary of this concrete example.
Tungsten is processed, will be checked the cylindrical or cylindrical shape (wire) that forms the about 30mm of length, diameter 0.07mm with 2 the conductor portion 21 of popping one's head in.At this moment, two front ends of conductor portion 21 are processed into and have chamfering.
Use urethane resin to form insulation division 22, so that cover the periphery of this conductor portion 21.At this moment, first end 23 forms 3mm, and the second end 24 forms 0.05mm.The diameter 22W of insulation division 22 forms 0.09mm.
In addition, be easy to urethane resin formation because insulation division 22 uses to be processed to form, thereby the 21 one-tenth approximate right angle in border 25,26 and conductor portion can be carried out retrofit.
Forming on first guide portion 31 and second guide portion 32 that keeps body 3, as mentioned above, be formed with first bullport 311 and second bullport 321 respectively.In this embodiment, first guide portion 31 is formed by 2 tabular bodys 312,313.First bullport 311 is to form by 2 sidepieces with differential tabular body.This be because, forming under the situation of first bullport 311, form diameter with expectation by upper end and bottom with first bullport 311, can obtain having first bullport 311 of desired length.
Second guide portion 32 has differential tabular body 322,323,324 by 3 and forms.The same with the situation that forms first bullport 311, utilize these 3 tabular bodys to form second bullport 321.And in this embodiment, these 3 tabular bodys 322,323,324 are with the predetermined distance configuration of staggering.Such second bullport 321 forms the hole portion of vergence direction, checks with probe 2 to be configured to have certain deflection under with the situation in the anchor clamps 1 being inserted into the inspection substrate.Therefore, inserting in this jig for inspecting substrate 1 all checks with probe 2 in roughly the same direction with roughly the same amount deflection.
In addition, in this case, first bullport 311 forms about 0.08mm, and this value is bigger and littler than the diameter 22W of insulation division 22 than the diameter 21W that checks the conductor portion 21 of using probe 2, second bullport 321 is being made under the situation about checking with probe 2 as mentioned above, forms the diameter of about 0.12mm.
Form to check as mentioned above with probe 2 and keeping under the situation of body 3 that the electrode part 41 of connection electrode body 4 is used and the lead formation of checking with about 0.09mm of probe 2 roughly the same diameters.In addition, the diameter of the face side of the connection electrode body 4 of fixed part 43 forms about 0.10mm.
The jig for inspecting substrate 1 that is made in this case, even check when checking with popping one's head in and 2 bear load from direction of principal axis at every turn, the second end 24 also contacts with 41 one-tenth approximate right angle of electrode part, thereby can keep the excellent contact state.
Utilizability on the industry
The jig for inspecting substrate of embodiments of the invention and check with probe and move with the contact position of popping one's head in by repeatedly bearing the inspection that load causes by preventing can provide stable contact condition, obtains effective effect in inspecting substrate.

Claims (11)

1. jig for inspecting substrate, this jig for inspecting substrate that is: check with probe by constituting with the lower part, and its first end contacts with electrically conducting manner with regulation inspection position as the inspection substrate of checking object; The connection electrode body, it has with described inspection uses the second end of probe with electrically conducting manner electrodes in contact portion; And the maintenance body, it is configured between described inspection substrate and the described connection electrode body and keeps described inspection with probe, and this jig for inspecting substrate is characterised in that,
Described maintenance body has:
First guide portion, it is formed with first bullport that described inspection is directed to described inspection position with the first end of probe; And
Second guide portion, it is formed with described inspection is directed to second bullport of described electrode part with the second end of probe,
Described inspection is with popping one's head in by constituting with the lower part, that is:
The conductor portion of wire, it has described first end and described the second end and has flexible; And
Insulation division, it covers with insulation mode on the periphery of the described conductor portion except described first end and described the second end,
The length of described the second end forms shorter than the length of described second bullport.
2. jig for inspecting substrate according to claim 1 is characterized in that, described electrode part forms the same one side of surface formation with described connection electrode body.
3. jig for inspecting substrate according to claim 1 and 2 is characterized in that, described connection electrode body disposes in the tight mode that contacts with described second guide portion.
4. according to each the described jig for inspecting substrate in the claim 1 to 3, it is characterized in that described inspection forms littler than the diameter of described second guide portion with the maximum gauge of probe.
5. according to each the described jig for inspecting substrate in the claim 1 to 4, it is characterized in that described electrode part is formed by columnar lead.
6. jig for inspecting substrate, this jig for inspecting substrate that is: check with probe by constituting with the lower part, and its first end contacts with electrically conducting manner with regulation inspection position as the inspection substrate of checking object; The connection electrode body, it has with described inspection uses the second end of probe with electrically conducting manner electrodes in contact portion; And the maintenance body, it is configured between described inspection substrate and the described connection electrode body and keeps described inspection with probe, and this jig for inspecting substrate is characterised in that,
Described maintenance body has:
First guide portion, it is formed with first bullport that described inspection is directed to described inspection position with the first end of probe; And
Second guide portion, it is formed with described inspection is directed to second bullport of described electrode part with the second end of probe, and this second guide portion is configured in the mode at the predetermined distance of being separated by between itself and described first guide portion,
Described inspection is with popping one's head in by constituting with the lower part, that is:
The conductor portion of wire, it has described first end and described the second end and has flexible; And
Insulation division, it covers with insulation mode on the periphery of the described conductor portion except described first end and described the second end,
In the time of will making check probe crooked when described first end and inspection substrate butt; In order to make described the second end not have lateral shift ground and described electrode part butt; Described the second end and be positioned at second bullport with the part of the described insulation division of this second end adjacency; The part of this insulation division is to insert in this second bullport in the mode of the slight gap of being separated by between itself and this second bullport; And the length of the described insulation division that inserts forms longer than the length of described the second end
The length of the long axis direction of described the second end forms with described inspection roughly the same or shorter with the external diameter of the insulation division of probe than described inspection with the external diameter of the insulation division of probe.
7. jig for inspecting substrate, this jig for inspecting substrate that is: check with probe by constituting with the lower part, and its first end contacts with electrically conducting manner with regulation inspection position as the inspection substrate of checking object; The connection electrode body, it has with described inspection uses the second end of probe with electrically conducting manner electrodes in contact portion; And the maintenance body, it is configured between described inspection substrate and the described connection electrode body and keeps described inspection with probe, and this jig for inspecting substrate is characterised in that,
Described maintenance body has:
First guide portion, it is formed with first bullport that described inspection is directed to described inspection position with the first end of probe; And
Second guide portion, it is formed with described inspection is directed to second bullport of described electrode part with the second end of probe, and this second guide portion is configured in the mode at the predetermined distance of being separated by between itself and described first guide portion,
Described inspection is with popping one's head in by constituting with the lower part, that is:
The conductor portion of wire, it has described first end and described the second end and has flexible; And
Insulation division, it covers with insulation mode on the periphery of the described conductor portion except described first end and described the second end,
In the time of will making check probe crooked when described first end and inspection substrate butt; In order to make described the second end not have lateral shift ground and described electrode part butt; Described the second end and be positioned at second bullport with the part of the described insulation division of this second end adjacency; The part of this insulation division is to insert in this second bullport in the mode of the slight gap of being separated by between itself and this second bullport; And the length of the described insulation division that inserts forms longer than the length of described the second end
The minimum diameter of described second bullport forms bigger with the external diameter of the insulation division of probe than described inspection.
8. according to claim 6 or 7 described jig for inspecting substrate, it is characterized in that,
Described second guide portion is laminated with a plurality of tabular components, and these a plurality of tabular components are formed with the bullport of the described the second end of guiding respectively,
Described second bullport is configured the right angle orientation that forms with respect to the plate face by the bullport with described tabular component in the mode that respectively is offset ormal weight in same direction and tilts,
The border of described the second end and described insulation division is configured in the bullport of the described tabular component that is connected with described connection electrode body.
9. an inspection is with popping one's head in, this is checked with probe by checking that the maintenance body of substrate with anchor clamps keeps, and with inspection substrate and of the electrode part electrical connection of this inspection substrate with anchor clamps, wherein, the testing fixture that described maintenance body will become this inspection substrate of checking object and the electrical specification of checking this inspection substrate is electrically connected, this inspection is characterised in that with probe
Described inspection is with popping one's head in by constituting with the lower part, that is:
Have the conductor portion of flexible wire, it has: the first end that contacts with electrically conducting manner with the inspection position of described inspection substrate when being kept by the maintenance body; With the second end that contacts with electrically conducting manner with the electrode part of anchor clamps with described inspection substrate; And
Insulation division, it covers with insulation mode on the periphery of the conductor portion except described first end and described the second end,
Described inspection forms shorter than the length of described bullport with the length of the second end of probe.
10. check probe; This check probe is by checking that the holder of substrate with anchor clamps keeps; And be inserted through first bullport of the checkpoint that is directed to inspection substrate that this holder has and be directed in second bullport of electrode part of these inspections substrate usefulness anchor clamps; Thereby this inspection substrate and this are checked that substrate is electrically connected with the electrode part of anchor clamps; Wherein, The testing fixture that described holder will become this inspection substrate that checks object and the electrical characteristic that checks this inspection substrate is electrically connected; This check probe is characterised in that
Described inspection is with popping one's head in by constituting with the lower part, that is:
Have the conductor portion of flexible wire, it has: contact with electrically conducting manner and the slotting first end that leads in described first bullport of quilt with the inspection position of described inspection substrate when being kept by the maintenance body; With contact and inserted the second end that leads in described second bullport with electrically conducting manner with the electrode part of anchor clamps with described inspection substrate; And
Insulation division, it covers with insulation mode on the periphery of the conductor portion except described first end and described the second end,
To make when described first end and inspection substrate butt and to check with probe when crooked, in order to make described the second end not have lateral excursion ground and described electrode part butt, described the second end and be positioned at second bullport with the part of the described insulation division of this second end adjacency, the part of this insulation division is in being inserted into this second bullport the time and this second bullport slight gap of being separated by, and the length of the described insulation division that is inserted forms longer than the length of described the second end
The length of the long axis direction of described the second end forms with described inspection roughly the same or shorter with the external diameter of the insulation division of probe than described inspection with the external diameter of the insulation division of probe.
11. check probe; This check probe is by checking that the holder of substrate with anchor clamps keeps; And be inserted through first bullport of the checkpoint that is directed to inspection substrate that this holder has and be directed in second bullport of electrode part of these inspections substrate usefulness anchor clamps; Thereby this inspection substrate and this are checked that substrate is electrically connected with the electrode part of anchor clamps; Wherein, The testing fixture that described holder will become this inspection substrate that checks object and the electrical characteristic that checks this inspection substrate is electrically connected; This check probe is characterised in that
Described inspection is with popping one's head in by constituting with the lower part, that is:
Have the conductor portion of flexible wire, it has: contact with electrically conducting manner and the slotting first end that leads in described first bullport of quilt with the inspection position of described inspection substrate when being kept by the maintenance body; With contact and inserted the second end that leads in described second bullport with electrically conducting manner with the electrode part of anchor clamps with described inspection substrate; And
Insulation division, it covers with insulation mode on the periphery of the conductor portion except described first end and described the second end,
To make when described first end and inspection substrate butt and to check with probe when crooked, in order to make described the second end not have lateral excursion ground and described electrode part butt, described the second end and be positioned at second bullport with the part of the described insulation division of this second end adjacency, the part of this insulation division is in being inserted into this second bullport the time and this second bullport slight gap of being separated by, and the length of the described insulation division that is inserted forms longer than the length of described the second end
Described inspection forms littler than the minimum diameter of described second bullport with the external diameter of the insulation division of probe.
CN2006800429241A 2005-11-16 2006-10-14 Jig for inspecting substrate, and inspection probe Active CN101310190B (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2005332172A JP3849948B1 (en) 2005-11-16 2005-11-16 Substrate inspection jig and inspection probe
JP332172/2005 2005-11-16
PCT/JP2006/320514 WO2007058037A1 (en) 2005-11-16 2006-10-14 Jig for inspecting substrate, and inspection probe

Publications (2)

Publication Number Publication Date
CN101310190A true CN101310190A (en) 2008-11-19
CN101310190B CN101310190B (en) 2011-05-18

Family

ID=37544652

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2006800429241A Active CN101310190B (en) 2005-11-16 2006-10-14 Jig for inspecting substrate, and inspection probe

Country Status (5)

Country Link
JP (1) JP3849948B1 (en)
KR (1) KR100989300B1 (en)
CN (1) CN101310190B (en)
TW (1) TWI416114B (en)
WO (1) WO2007058037A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103348255A (en) * 2011-02-10 2013-10-09 日本电产理德株式会社 Test jig
CN109613307A (en) * 2018-08-01 2019-04-12 日本电产理德机器装置(浙江)有限公司 Gauging fixture
CN110346616A (en) * 2018-04-03 2019-10-18 中华精测科技股份有限公司 Probe card device and probe base

Families Citing this family (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4804542B2 (en) * 2006-12-28 2011-11-02 日本発條株式会社 Probe unit wiring fixing method and probe unit
JP5098339B2 (en) * 2007-01-11 2012-12-12 日本電産リード株式会社 Manufacturing method of substrate inspection jig
JP2009008516A (en) * 2007-06-28 2009-01-15 Nidec-Read Corp Tool and method for substrate inspection
JP2009036532A (en) * 2007-07-31 2009-02-19 Koyo Technos:Kk Inspection tool and inspection device
JP5504698B2 (en) * 2009-06-02 2014-05-28 日本電産リード株式会社 Inspection jig and contact for inspection
KR200468277Y1 (en) * 2009-12-04 2013-08-06 주식회사 오리온 tester for testing open of electrodes on the substrates
JP2013137281A (en) * 2011-12-28 2013-07-11 Seiko Epson Corp Probe device
KR101363367B1 (en) * 2012-09-04 2014-02-25 주식회사 에스피에스테크 Examination apparatus of printed circuit board
KR101363368B1 (en) * 2012-09-04 2014-02-25 주식회사 에스피에스테크 Examination apparatus of printed circuit board
KR101398550B1 (en) * 2013-04-22 2014-05-27 리노공업주식회사 A contact probe and method for producting the same
KR101662910B1 (en) * 2014-12-21 2016-10-06 김일 Contact Device for Test
JP6527042B2 (en) * 2015-07-13 2019-06-05 オルガン針株式会社 Wire probe holding structure
JP6855185B2 (en) * 2016-07-27 2021-04-07 株式会社日本マイクロニクス Electrical connection device
KR101828547B1 (en) * 2016-08-25 2018-02-12 한화테크윈 주식회사 Apparatus for testing electronic component
KR102463444B1 (en) 2016-12-12 2022-11-04 현대자동차주식회사 Method for Control Variable Snokle System and Vehicle thereby
CN110068711B (en) * 2018-01-24 2022-04-26 台湾中华精测科技股份有限公司 Probe card device and rectangular probe
KR102072452B1 (en) * 2018-07-27 2020-02-04 주식회사 에스디에이 Manufacturing method of probe card head block
KR102072451B1 (en) * 2018-07-27 2020-02-04 주식회사 에스디에이 Probe Card Head Block
TWI728665B (en) * 2020-01-21 2021-05-21 中華精測科技股份有限公司 Probe card device having directivity probe
KR102324248B1 (en) * 2020-06-19 2021-11-12 리노정밀(주) Inspection device

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09274054A (en) * 1996-04-08 1997-10-21 Furukawa Electric Co Ltd:The Prober
EP0915344B1 (en) * 1997-11-05 2004-02-25 Feinmetall GmbH Test head for microstructures with interface
JP2001116795A (en) * 1999-10-18 2001-04-27 Mitsubishi Electric Corp Test socket and connection sheet for use in test socket
JP3505495B2 (en) * 2000-09-13 2004-03-08 日本電産リード株式会社 Inspection jig for substrate inspection, substrate inspection device provided with the inspection jig, and method of assembling inspection jig for substrate inspection
KR100877243B1 (en) * 2001-02-19 2009-01-07 니혼 덴산 리드 가부시끼가이샤 A circuit board testing apparatus and method for testing a circuit board
JP2002311048A (en) * 2001-04-10 2002-10-23 Sekisui Chem Co Ltd Guide for probe card, probe card mounting the same, and method for testing electronic circuit device
JP3690796B2 (en) * 2002-01-31 2005-08-31 株式会社コーヨーテクノス Inspection jig, manufacturing method thereof, and circuit board manufacturing method
JP3905850B2 (en) * 2003-03-13 2007-04-18 日本電産リード株式会社 Substrate inspection probe and substrate inspection apparatus using the same
JP2005338065A (en) * 2004-04-26 2005-12-08 Koyo Technos:Kk Inspection jig and inspection equipment
JP2006258687A (en) * 2005-03-18 2006-09-28 Koyo Technos:Kk Inspection device
CN100535676C (en) * 2005-04-21 2009-09-02 株式会社光阳科技 Inspection jig and inspection equipment

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103348255A (en) * 2011-02-10 2013-10-09 日本电产理德株式会社 Test jig
CN103348255B (en) * 2011-02-10 2015-11-25 日本电产理德株式会社 Checking tool
CN110346616A (en) * 2018-04-03 2019-10-18 中华精测科技股份有限公司 Probe card device and probe base
CN110346616B (en) * 2018-04-03 2021-06-15 中华精测科技股份有限公司 Probe card device and probe base
CN109613307A (en) * 2018-08-01 2019-04-12 日本电产理德机器装置(浙江)有限公司 Gauging fixture
CN109613307B (en) * 2018-08-01 2019-10-11 日本电产理德机器装置(浙江)有限公司 Gauging fixture

Also Published As

Publication number Publication date
TW200720665A (en) 2007-06-01
TWI416114B (en) 2013-11-21
JP2007139524A (en) 2007-06-07
CN101310190B (en) 2011-05-18
WO2007058037A1 (en) 2007-05-24
JP3849948B1 (en) 2006-11-22
KR100989300B1 (en) 2010-10-22
KR20080063411A (en) 2008-07-03

Similar Documents

Publication Publication Date Title
CN101310190B (en) Jig for inspecting substrate, and inspection probe
TWI422829B (en) Inspection fixture, electrode structure and method for manufacturing electrode structure
US10914758B2 (en) Inspection jig provided with probe, substrate inspection device provided with same, and method for manufacturing inspection jig
CN101907642B (en) Inspection fixture and inspection probe
US10877085B2 (en) Inspection jig and inspection device
JP4041831B2 (en) Substrate inspection jig and electrode structure of connection electrode portion in this jig
TWI354108B (en)
WO2012108066A1 (en) Test jig
KR102232044B1 (en) Substrate inspecting apparatus, substrate inspecting method and jig for inspecting substrate
JP5070956B2 (en) Substrate inspection contact and substrate inspection jig
CN113287023A (en) Contact terminal, inspection jig, and inspection device
JP2017054773A (en) Connection jig, substrate inspection device, and manufacturing method for connection jig
JP6283929B2 (en) Inspection jig and method for manufacturing inspection jig
CN104011947A (en) Impedance adjustable connector
CN216523652U (en) Copper foil thickness measuring probe and probe head thereof
JP4937882B2 (en) Inspection socket
CN114252003A (en) Copper foil thickness measuring probe and probe head thereof
JP2010078432A (en) Substrate inspection jig and contactor
JP5245279B2 (en) Substrate inspection jig and electrode structure of connection electrode portion in this jig
JP4838658B2 (en) Substrate inspection jig and electrode structure of substrate inspection jig
JP6176466B1 (en) PCB inspection jig
JP5228610B2 (en) PCB inspection jig
JP2009250660A (en) Tool for substrate inspection and contact for inspection
JP2010091314A (en) Board inspection tool and inspection probe
JPWO2019187957A1 (en) Inspection jig and inspection equipment equipped with this

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant