WO2021024368A1 - 乗客コンベアのリニューアル方法 - Google Patents

乗客コンベアのリニューアル方法 Download PDF

Info

Publication number
WO2021024368A1
WO2021024368A1 PCT/JP2019/030830 JP2019030830W WO2021024368A1 WO 2021024368 A1 WO2021024368 A1 WO 2021024368A1 JP 2019030830 W JP2019030830 W JP 2019030830W WO 2021024368 A1 WO2021024368 A1 WO 2021024368A1
Authority
WO
WIPO (PCT)
Prior art keywords
new
existing
passenger conveyor
control panel
safety device
Prior art date
Application number
PCT/JP2019/030830
Other languages
English (en)
French (fr)
Inventor
幸泰 長尾
Original Assignee
三菱電機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱電機株式会社 filed Critical 三菱電機株式会社
Priority to PCT/JP2019/030830 priority Critical patent/WO2021024368A1/ja
Priority to CN201980098689.7A priority patent/CN114144376B/zh
Priority to KR1020227000800A priority patent/KR102569287B1/ko
Priority to JP2021521325A priority patent/JP6947337B2/ja
Priority to DE112019007620.5T priority patent/DE112019007620T5/de
Priority to US17/606,458 priority patent/US11724918B2/en
Publication of WO2021024368A1 publication Critical patent/WO2021024368A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B25/00Control of escalators or moving walkways
    • B66B25/006Monitoring for maintenance or repair
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B23/00Component parts of escalators or moving walkways
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B29/00Safety devices of escalators or moving walkways

Definitions

  • the present invention relates to a method for renewing a passenger conveyor.
  • Patent Document 1 discloses a method for renewing a passenger conveyor. According to the renewal method, the passenger conveyor can be renewed step by step.
  • An object of the present invention is to provide a method for renewing a passenger conveyor, which can suppress a long period of time when the passenger conveyor cannot be used when the passenger conveyor is renewed in stages.
  • the method for renewing a passenger conveyor is a safety device renewal step of updating an existing safety device to a new safety device in the passenger conveyor, and after the safety device renewal step, the existing drive of the passenger conveyor is newly installed.
  • the existing control panel of the passenger conveyor is updated to a new control panel, and a drive machine and a control panel update process are provided.
  • the process of renewing the passenger conveyor is divided into a process of updating the safety device and a process of updating the drive machine and the control panel. Therefore, when the passenger conveyor is renewed in stages, it is possible to prevent the passenger conveyor from being unavailable for a long period of time.
  • FIG. 5 is a connection diagram of a passenger conveyor to which the method of renewing the passenger conveyor according to the first embodiment is applied.
  • FIG. 5 is a connection diagram of a passenger conveyor to which the method of renewing the passenger conveyor according to the first embodiment is applied.
  • FIG. 5 is a connection diagram of a passenger conveyor to which the method of renewing the passenger conveyor according to the first embodiment is applied.
  • FIG. 5 is a connection diagram of a passenger conveyor to which the method of renewing the passenger conveyor according to the first embodiment is applied.
  • FIG. FIG. 5 is a connection diagram of a passenger conveyor to which the method of renewing the passenger conveyor according to the second embodiment is applied.
  • FIG. 1 is a configuration diagram of a passenger conveyor to which the passenger conveyor renewal method according to the first embodiment is applied.
  • the passenger conveyor in Fig. 1 is an escalator.
  • a passenger conveyor spans one adjacent floor to the other.
  • the lower entrance / exit 1 is provided at the lower part of the passenger conveyor.
  • the lower entrance 1 is provided on the lower floor of the adjacent floor.
  • the upper entrance / exit 2 is provided at the upper part of the passenger conveyor.
  • the upper entrance 2 is provided on the upper floor of the adjacent floor.
  • the plurality of steps 3 are provided between the lower entrance / exit 1 and the upper entrance / exit 2.
  • the plurality of steps 3 are provided in an endless manner.
  • One of the pair of skirt guards 4 is provided on the outside of one side of the plurality of steps 3.
  • the other side of the pair of skirt guards 4 is provided on the outside of the other side of the plurality of steps 3.
  • Each of the pair of skirt guards 4 is along the longitudinal direction of the passenger conveyor.
  • Each of the pair of balustrade panels 5 is provided on each of the pair of skirt guards 4. Each of the pair of balustrade panels 5 is along the longitudinal direction of the passenger conveyor.
  • Each of the pair of handrails 6 is provided on each of the pair of balustrade panels 5. Each of the pair of handrails 6 is provided endlessly.
  • a plurality of existing safety devices 7a are provided on the upper part of the passenger conveyor.
  • the plurality of existing safety devices 7a are provided so as to be able to detect a mechanical abnormality or the state of the user of the passenger conveyor.
  • the plurality of existing operation panels 8a are provided on the upper part of the passenger conveyor.
  • the plurality of existing operation panels 8a are provided so as to be able to stop the operation of the passenger conveyor when operated.
  • One of the plurality of existing connecting boxes 9 is provided on the upper part of the passenger conveyor.
  • a plurality of existing safety devices 7b are provided at the bottom of the passenger conveyor.
  • the plurality of existing safety devices 7b are provided so as to be able to detect a mechanical abnormality or the state of the user of the passenger conveyor.
  • the plurality of existing operation panels 8b are provided at the lower part of the passenger conveyor.
  • the plurality of existing operation panels 8b are provided so as to be able to stop the operation of the passenger conveyor when operated.
  • the other of the plurality of existing connecting boxes 9 is provided at the bottom of the passenger conveyor.
  • the existing drive 10 is provided on the upper part of the passenger conveyor.
  • the existing control panel 11 is provided on the upper part of the passenger conveyor.
  • the existing control panel 11 connects the operation of the passenger conveyor as a whole.
  • the existing control panel 11 controls the operation of the existing drive machine 10 based on signals from a plurality of existing safety devices 7a, a plurality of existing safety devices 7b, a plurality of existing operation panels 8a, and a plurality of existing operation panels 8b. To do.
  • each of the pair of handrails 6 circulates in accordance with the circulatory movements of the plurality of steps 3.
  • the upper entrance / exit 2 becomes an entrance.
  • the lower entrance / exit 1 is an exit.
  • the exposed step 3 moves horizontally from the upper entrance / exit 2. After that, the exposed step 3 moves diagonally downward. After that, the exposed step 3 moves horizontally toward the lower entrance / exit 1.
  • each of the pair of handrails 6 circulates in accordance with the circulatory movements of the plurality of steps 3.
  • FIGS. 2 to 6 are connection diagrams of the passenger conveyor to which the passenger conveyor renewal method according to the first embodiment is applied.
  • a plurality of devices on the passenger conveyor are electrically connected via a cable.
  • one and the other of the plurality of existing connecting boxes 9 are electrically connected via the existing relay cable 12.
  • FIG. 3 is a connection diagram after the relay box connection process has been performed.
  • the worker installs one of the plurality of new relay boxes 13 inside and above the frame of the passenger conveyor.
  • the worker installs the other of the plurality of new relay boxes 13 inside and below the frame of the passenger conveyor.
  • the worker lays one of the plurality of new cables 14 inside and above the passenger conveyor.
  • the worker electrically connects one of the plurality of new relay boxes 13 and one of the plurality of existing connecting boxes 9 via one of the plurality of new cables 14.
  • the worker lays the other of the plurality of new cables 14 inside and below the passenger conveyor.
  • the worker electrically connects the other of the plurality of new relay boxes 13 and the other of the plurality of existing connecting boxes 9 via the other of the plurality of new cables 14.
  • the worker releases the existing relay cable 12 (not shown in FIG. 3) from the electrical connection with the plurality of existing connecting boxes 9.
  • the worker electrically connects one of the plurality of existing connecting boxes 9 and the other via the new relay cable 15.
  • FIG. 4 is a connection diagram after the safety device update process is performed.
  • the worker releases the plurality of existing safety devices 7a (not shown in FIG. 4) from the electrical connection with one of the plurality of existing connecting boxes 9.
  • the worker electrically connects the plurality of new safety devices 16a to one of the plurality of new relay boxes 13.
  • the worker releases the plurality of existing safety devices 7b (not shown in FIG. 4) from the electrical connection of the plurality of existing connecting boxes 9 with the other.
  • the worker electrically connects the plurality of new safety devices 16b to the other of the plurality of new relay boxes 13.
  • FIG. 5 is a connection diagram after the drive unit and control panel update process is performed.
  • the worker releases the existing drive unit 10 (not shown in FIG. 5) from the electrical connection between one of the plurality of existing connecting boxes 9 and the existing control panel 11.
  • the worker releases the existing control panel 11 (not shown in FIG. 5) from the electrical connection with one of the plurality of existing connecting boxes 9.
  • the worker releases the plurality of existing operation panels 8a (not shown in FIG. 5) from the electrical connection with one of the plurality of existing connecting boxes 9 (not shown in FIG. 5).
  • the worker releases the plurality of existing operation panels 8b (not shown in FIG. 5) from the electrical connection with the other of the plurality of existing connecting boxes 9 (not shown in FIG. 5).
  • the worker electrically connects one of the plurality of new connecting boxes 19 to one of the plurality of new relay boxes 13.
  • the worker electrically connects the new drive unit 17 to one of the plurality of new connecting boxes 19.
  • the worker electrically connects the plurality of new operation panels 20a to one of the plurality of new connecting boxes 19.
  • the worker electrically connects the new control panel 21 to one of the new drive 17 and the plurality of new connecting boxes 19.
  • the worker electrically connects the other of the plurality of new connecting boxes 19 to the other of the plurality of new relay boxes 13.
  • the worker electrically connects a plurality of new operation panels 20b to the other of the plurality of new connecting boxes 19.
  • the order in which the existing drive unit 10, the existing control panel 11, the existing connecting box 9, the existing operation panel 8a, and the existing operation panel 8b are released does not matter.
  • the order of connecting the new drive unit 17, the new control panel 21, the new connecting box 19, the new operation panel 20a, and the new operation panel 20b does not matter.
  • FIG. 6 is a flowchart for explaining the procedure of the passenger conveyor renewal method according to the first embodiment.
  • step S1 the worker performs the relay box connection process. After that, the worker performs the step of step S2.
  • step S2 the worker performs the safety device updating process. After that, the worker performs the step of step S3.
  • step S3 the worker performs a drive machine and control panel updating step. After that, the renewal of the passenger conveyor is completed.
  • the process of renewing the passenger conveyor is divided into a safety device renewal process and a drive machine and control panel renewal process. Therefore, the work of renewing the passenger conveyor is subdivided. As a result, when the passenger conveyor is renewed in stages, it is possible to prevent the passenger conveyor from being unavailable for a long period of time.
  • the work content can be determined according to the workable time of each day of the renewal of the passenger conveyor. Therefore, it is possible to increase the degree of freedom in planning the work schedule for the renewal of the passenger conveyor.
  • the equipment of the existing drive control part is not changed. Therefore, when each operation is completed, the passenger conveyor can be normally operated under the control of the existing control panel 11.
  • one of the plurality of existing safety devices 7a is released from the electrical connection with one of the plurality of existing connecting boxes 9, and the plurality of new relay boxes are released.
  • One of the plurality of new safety devices 16a may be electrically connected to one of the thirteenth.
  • the passenger conveyor can be normally operated under the control of the existing control panel 11.
  • the work of renewing the passenger conveyor is performed at the upper and lower parts of the passenger conveyor. Therefore, the worker at the upper part of the passenger conveyor and the worker at the lower part of the passenger conveyor can perform the work at the same time. As a result, it is possible to more reliably suppress the lengthening of the time zone during which the passenger conveyor cannot be used.
  • the existing drive unit 10 and the existing control panel 11 are updated to the new drive unit 17 and the new control panel 21 in the same process.
  • a new installation necessary for controlling the new drive unit 17 by the existing control panel 11 is required as compared with the case where the drive unit is updated first. No interface panel required. Therefore, the work required for the renewal of the passenger conveyor can be reduced. Furthermore, the cost required for the renewal of the passenger conveyor can be reduced.
  • the existing drive unit 10 and the existing control panel 11 are updated to the new drive unit 17 and the new control panel 21 in the same process.
  • the existing drive unit 10 and the existing control panel 11 are updated to the new drive unit 17 and the new control panel 21 in the same process.
  • the control function of the existing drive 10 and the new drive 17 are added to the new control panel 21 as compared with the case where the control panel is updated first by the renewal method in which the steps of updating the drive and updating the control panel are separated. It is not necessary to have both of the control functions of. Therefore, the work required for the renewal of the passenger conveyor can be reduced. Furthermore, the cost required for the renewal of the passenger conveyor can be reduced.
  • FIG. 8 is a connection diagram of a passenger conveyor to which the passenger conveyor renewal method according to the second embodiment is applied.
  • the same or corresponding parts as those of the first embodiment are designated by the same reference numerals. The explanation of the relevant part is omitted.
  • the existing connecting box side connector 22 is provided in the existing connecting box 9.
  • the existing connector 22 is mechanically and electrically detachably connected to a plurality of connectors corresponding to a plurality of existing operation panels 8a (not shown in FIG. 8).
  • the existing connector 22 is mechanically and electrically detachably connected to a connector corresponding to the existing drive 10 (not shown in FIG. 8).
  • the existing connector 22 is mechanically and electrically detachably connected to a connector corresponding to the existing control panel 11 (not shown in FIG. 8).
  • the existing safety device side connector 23 is electrically connected to a plurality of cables corresponding to the plurality of new safety device 16a.
  • the new cable side connector 24 is electrically connected to one end of the new cable 14.
  • Each of the plurality of first new safety device side connectors 25a is electrically connected to the other end of the new cable 14.
  • Each of the plurality of second new safety device side connectors 25b is electrically connected to each of the plurality of cables corresponding to each of the plurality of new safety device 16a.
  • Each of the plurality of second new safety device side connectors 25b is mechanically and electrically detachably connected to each of the plurality of first new safety device side connectors 25a.
  • the new adapter 26 includes a first connection portion 26a, a second connection portion 26b, a third connection portion 26c, a plurality of first release connectors 26d, and a plurality of second release connectors 26e.
  • the first connection portion 26a is provided so as to be mechanically and electrically detachably connectable to the existing connector 22 on the connecting box side.
  • the second connection portion 26b is provided so as to be mechanically and electrically detachably connectable to the existing safety device side connector 23.
  • the third connecting portion 26c is electrically connected to the first connecting portion 26a.
  • the third connection portion 26c is provided so as to be mechanically and electrically detachably connectable to the new cable-side connector 24.
  • Each of the plurality of first release connectors 26d is provided corresponding to each of the plurality of existing safety devices 7a.
  • Each of the plurality of first release connectors 26d is electrically connected to the first connection portion 26a and the third connection portion 26c.
  • Each of the plurality of second release connectors 26e is electrically connected to the second connection portion 26b.
  • Each of the plurality of second release connectors 26e is provided so as to be mechanically and electrically detachably connectable to each of the plurality of first release connectors 26d.
  • the existing connecting box side connector 22 and the existing safety device side connector 23 are mechanically and electrically connected.
  • the plurality of existing safety devices 7a maintain a state in which they can operate.
  • the existing connecting box side connector 22 and the existing safety device side connector 23 are released from the mechanical and electrical connection.
  • the first connection portion 26a of the new adapter 26 is mechanically and electrically connected to the existing connector 22 on the connecting box side.
  • the second connection portion 26b of the new adapter 26 is mechanically and electrically connected to the existing safety device side connector 23.
  • Each of the plurality of first release connectors 26d and each of the plurality of second release connectors 26e are mechanically and electrically connected.
  • the plurality of existing safety devices 7a maintain a state in which they can operate.
  • the existing safety device side connector 23 and the second connection portion 26b of the new adapter 26 are released from the mechanical and electrical connection.
  • the third connection portion 26c of the new adapter 26 is mechanically and electrically connected to the new cable side connector 24.
  • the plurality of newly installed safety devices 16a maintain a state in which they can operate.
  • the existing connecting box 9 and the new cable 14 are mechanically and electrically connected via the new adapter 26. Therefore, the existing connecting box 9 and the new cable 14 can be easily connected.
  • each of the plurality of existing safety devices 7a may be independently released from the electrical connection with the new cable 14.
  • the mechanical and electrical connection between any one of the plurality of first release connectors 26d and any one of the plurality of second release connectors 26e is released, and the corresponding first new safety device side connector 25a is released.
  • the second new safety device side connector 25b may be mechanically and electrically connected.
  • any one of the plurality of existing safety devices 7a is updated to any one of the plurality of new safety devices 16a.
  • the passenger conveyor can be normally operated. As a result, the work of renewing the passenger conveyor can be performed more efficiently.
  • the same new adapter 26 may be applied to a plurality of existing safety devices 7b and a plurality of new safety devices 16b. Also in this case, the existing connecting box 9 and the new cable 14 can be easily connected.
  • the passenger conveyor renewal method of the first embodiment or the second embodiment may be applied to a moving walkway.
  • the moving walkway is renewed in stages, it is possible to prevent the moving walkway from being unavailable for a long period of time.
  • the passenger conveyor renewal method according to the present invention can be used for the passenger conveyor.

Landscapes

  • Escalators And Moving Walkways (AREA)
  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

乗客コンベアのリニューアルが段階的に行われる際に、乗客コンベアが利用できない時間帯が長くなることを抑制できる乗客コンベアのリニューアル方法を提供する。乗客コンベアのリニューアル方法は、乗客コンベアにおいて、既設安全装置を新設安全装置に更新する安全装置更新工程と、前記安全装置更新工程の後、前記乗客コンベアの既設駆動機を新設駆動機に更新するとともに、前記乗客コンベアの既設制御盤を新設制御盤に更新する駆動機及び制御盤更新工程と、を備えた。

Description

乗客コンベアのリニューアル方法
 この発明は、乗客コンベアのリニューアル方法に関する。
 特許文献1は、乗客コンベアのリニューアル方法を開示する。当該リニューアル方法によれば、乗客コンベアのリニューアルを段階的に行うことができる。
日本特開2004-323153号公報
 しかしながら、特許文献1に記載の乗客コンベアのリニューアル方法の第2の工程においては、安全装置と制御盤とを更新する必要がある。このため、乗客コンベアが利用できない時間帯が長くなる。
 この発明は、上述の課題を解決するためになされた。この発明の目的は、乗客コンベアのリニューアルが段階的に行われる際に、乗客コンベアが利用できない時間帯が長くなることを抑制できる乗客コンベアのリニューアル方法を提供することである。
 この発明に係る乗客コンベアのリニューアル方法は、乗客コンベアにおいて、既設安全装置を新設安全装置に更新する安全装置更新工程と、前記安全装置更新工程の後、前記乗客コンベアの既設駆動機を新設駆動機に更新するとともに、前記乗客コンベアの既設制御盤を新設制御盤に更新する駆動機及び制御盤更新工程と、を備えた。
 この発明によれば、乗客コンベアのリニューアルの工程は、安全装置更新工程と駆動機及び制御盤更新工程とに分割される。このため、乗客コンベアのリニューアルが段階的に行われる際に、乗客コンベアが利用できない時間帯が長くなることを抑制できる。
実施の形態1における乗客コンベアのリニューアル方法が適用される乗客コンベアの構成図である。 実施の形態1における乗客コンベアのリニューアル方法が適用される乗客コンベアの接続図である。 実施の形態1における乗客コンベアのリニューアル方法が適用される乗客コンベアの接続図である。 実施の形態1における乗客コンベアのリニューアル方法が適用される乗客コンベアの接続図である。 実施の形態1における乗客コンベアのリニューアル方法が適用される乗客コンベアの接続図である。 実施の形態1における乗客コンベアのリニューアル方法の手順を説明するためのフローチャートである。 実施の形態2における乗客コンベアのリニューアル方法が適用される乗客コンベアの接続図である。
 この発明を実施するための形態について添付の図面に従って説明する。なお、各図中、同一または相当する部分には同一の符号が付される。当該部分の重複説明は適宜に簡略化ないし省略する。
実施の形態1.
 図1は実施の形態1における乗客コンベアのリニューアル方法が適用される乗客コンベアの構成図である。
 図1の乗客コンベアは、エスカレーターである。例えば、乗客コンベアは、隣接階の一方から他方にまたがる。
 下部乗降口1は、乗客コンベアの下部に設けられる。下部乗降口1は、隣接階の下方階に設けられる。上部乗降口2は、乗客コンベアの上部に設けられる。上部乗降口2は、隣接階の上方階に設けられる。
 複数のステップ3は、下部乗降口1と上部乗降口2との間に設けられる。複数のステップ3は、無端状に設けられる。
 一対のスカートガード4の一方は、複数のステップ3の一側の外側に設けられる。一対のスカートガード4の他方は、複数のステップ3の他側の外側に設けられる。一対のスカートガード4の各々は、乗客コンベアの長手方向に沿う。
 一対の欄干パネル5の各々は、一対のスカートガード4の各々に設けられる。一対の欄干パネル5の各々は、乗客コンベアの長手方向に沿う。
 一対の手摺6の各々は、一対の欄干パネル5の各々に設けられる。一対の手摺6の各々は、無端状に設けられる。
 複数の既設安全装置7aは、乗客コンベアの上部に設けられる。複数の既設安全装置7aは、機械的異常または乗客コンベアの利用者の状態を検出し得るように設けられる。複数の既設操作盤8aは、乗客コンベアの上部に設けられる。複数の既設操作盤8aは、操作された際に乗客コンベアの運転を停止させ得るように設けられる。複数の既設繋ぎ箱9の一方は、乗客コンベアの上部に設けられる。
 複数の既設安全装置7bは、乗客コンベアの下部に設けられる。複数の既設安全装置7bは、機械的異常または乗客コンベアの利用者の状態を検出し得るように設けられる。複数の既設操作盤8bは、乗客コンベアの下部に設けられる。複数の既設操作盤8bは、操作された際に乗客コンベアの運転を停止させ得るように設けられる。複数の既設繋ぎ箱9の他方は、乗客コンベアの下部に設けられる。
 既設駆動機10は、乗客コンベアの上部に設けられる。既設制御盤11は、乗客コンベアの上部に設けられる。
 既設制御盤11は、乗客コンベアの動作を全体的に接続する。例えば、既設制御盤11は、複数の既設安全装置7aと複数の既設安全装置7bと複数の既設操作盤8aと複数の既設操作盤8bとからの信号に基づいて既設駆動機10の動作を制御する。
 例えば、既設制御盤11の制御により乗客コンベアが上昇運転を行っている際、下部乗降口1は、乗り口となる。上部乗降口2は、降り口となる。露出したステップ3は、下部乗降口1から水平方向に移動する。その後、露出したステップ3は、斜め上方に移動する。その後、露出したステップ3は、上部乗降口2に向かって水平方向に移動する。この際、一対の手摺6の各々は、複数のステップ3の循環移動に合わせて循環移動する。
 例えば、既設制御盤11の制御により乗客コンベアが下降運転を行っている際、上部乗降口2は、乗り口となる。下部乗降口1は、降り口となる。露出したステップ3は、上部乗降口2から水平方向に移動する。その後、露出したステップ3は、斜め下方に移動する。その後、露出したステップ3は、下部乗降口1に向かって水平方向に移動する。この際、一対の手摺6の各々は、複数のステップ3の循環移動に合わせて循環移動する。
 次に、図2から図6を用いて、乗客コンベアのリニューアル方法の詳細を説明する。
 図2から図6は実施の形態1における乗客コンベアのリニューアル方法が適用される乗客コンベアの接続図である。
 図2に示されるように、乗客コンベアの複数の機器は、ケーブルを介して電気的に接続される。例えば、複数の既設繋ぎ箱9の一方と他方とは、既設中継ケーブル12を介して電気的に接続される。
 図3は、中継箱接続工程が行われた後の接続図である。中継箱接続工程においては、作業員は、複数の新設中継箱13の一方を乗客コンベアのフレームの内部かつ上部に設置する。作業員は、複数の新設中継箱13の他方を乗客コンベアのフレームの内部かつ下部に設置する。
 作業員は、複数の新設ケーブル14の一方を乗客コンベアの内部かつ上部に敷設する。作業員は、複数の新設中継箱13の一方と複数の既設繋ぎ箱9の一方とを複数の新設ケーブル14の一方を介して電気的に接続する。作業員は、複数の新設ケーブル14の他方を乗客コンベアの内部かつ下部に敷設する。作業員は、複数の新設中継箱13の他方と複数の既設繋ぎ箱9の他方とを複数の新設ケーブル14の他方を介して電気的に接続する。
 作業員は、複数の既設繋ぎ箱9との電気的接続から図3においては図示されない既設中継ケーブル12を解放する。作業員は、複数の既設繋ぎ箱9の一方と他方とを新設中継ケーブル15を介して電気的に接続する。
 図4は、安全装置更新工程が行われた後の接続図である。安全装置更新工程においては、作業員は、複数の既設繋ぎ箱9の一方との電気的接続から図4においては図示されない複数の既設安全装置7aを解放する。作業員は、複数の新設中継箱13の一方に複数の新設安全装置16aを電気的に接続する。作業員は、複数の既設繋ぎ箱9の他方との電気的接続から図4においては図示されない複数の既設安全装置7bを解放する。作業員は、複数の新設中継箱13の他方に複数の新設安全装置16bを電気的に接続する。
 図5は、駆動機及び制御盤更新工程が行われた後の接続図である。駆動機及び制御盤更新工程においては、作業員は、複数の既設繋ぎ箱9の一方と既設制御盤11との電気的接続から図5においては図示されない既設駆動機10を解放する。
 作業員は、複数の既設繋ぎ箱9の一方との電気的接続から図5においては図示されない既設制御盤11を解放する。作業員は、図5においては図示されない複数の既設繋ぎ箱9の一方との電気的接続から図5においては図示されない複数の既設操作盤8aを解放する。作業員は、図5においては図示されない複数の既設繋ぎ箱9の他方との電気的接続から図5においては図示されない複数の既設操作盤8bを解放する。
 作業員は、複数の新設中継箱13の一方に複数の新設繋ぎ箱19の一方を電気的に接続する。作業員は、複数の新設繋ぎ箱19の一方に新設駆動機17を電気的に接続する。作業員は、複数の新設繋ぎ箱19の一方に複数の新設操作盤20aを電気的に接続する。作業員は、新設駆動機17と複数の新設繋ぎ箱19の一方とに新設制御盤21を電気的に接続する。
 作業員は、複数の新設中継箱13の他方に複数の新設繋ぎ箱19の他方を電気的に接続する。作業員は、複数の新設繋ぎ箱19の他方に複数の新設操作盤20bを電気的に接続する。なお、駆動機及び制御盤更新工程内であれば、既設駆動機10、既設制御盤11、既設繋ぎ箱9、既設操作盤8a及び既設操作盤8bを解放する順番は問わない。また、駆動機及び制御盤更新工程内であれば、新設駆動機17、新設制御盤21、新設繋ぎ箱19、新設操作盤20a及び新設操作盤20bを接続する順番は問わない。
 次に、図6を用いて、乗客コンベアのリニューアル方法の手順を説明する。
 図6は実施の形態1における乗客コンベアのリニューアル方法の手順を説明するためのフローチャートである。
 ステップS1では、作業員は、中継箱接続工程を行う。その後、作業員は、ステップS2の工程を行う。ステップS2では、作業員は、安全装置更新工程を行う。その後、作業員は、ステップS3の工程を行う。ステップS3では、作業員は、駆動機及び制御盤更新工程を行う。その後、乗客コンベアのリニューアルが完了する。
 以上で説明した実施の形態1によれば、乗客コンベアのリニューアルの工程は、安全装置更新工程と駆動機及び制御盤更新工程とに分割される。このため、乗客コンベアのリニューアルの作業が細分化される。その結果、乗客コンベアのリニューアルが段階的に行われる際に、乗客コンベアが利用できない時間帯が長くなることを抑制できる。
 この際、乗客コンベアのリニューアルの日ごとの作業可能時間に合わせて、作業内容を決定することができる。このため、乗客コンベアのリニューアルの作業日程の計画において、自由度を高めることができる。
 例えば、中継箱接続工程において、既設の駆動制御部分の機器は変更されない。このため、それぞれの作業が完了した時点で、既設制御盤11の制御により、乗客コンベアの通常運転を行い得る。
 例えば、複数の既設安全装置7aの一つのケーブルを切り離することで、複数の既設繋ぎ箱9の一方との電気的接続から複数の既設安全装置7aの一つを解放し、複数の新設中継箱13の一方に複数の新設安全装置16aの一つを電気的に接続してもよい。この場合も、既設制御盤11の制御により、乗客コンベアの通常運転を行い得る。
 また、乗客コンベアのリニューアルの作業は、乗客コンベアの上部と下部とで行われる。このため、乗客コンベアの上部にいる作業員と乗客コンベアの下部にいる作業員とが同時に作業を行い得る。その結果、乗客コンベアが利用できない時間帯が長くなることをより確実に抑制できる。
 また、駆動機及び制御盤更新工程では、既設駆動機10と既設制御盤11を同一の工程にて新設駆動機17と新設制御盤21に更新する。その結果、駆動機の更新と制御盤の更新の工程を分割したリニューアル方法で、駆動機を先に更新する場合と比べて、新設駆動機17を既設制御盤11で制御する際に必要な新設インターフェース盤が必要ない。したがって、乗客コンベアのリニューアルに必要な作業を軽減することができる。さらに、乗客コンベアのリニューアルに必要な費用を軽減することができる。
 また、駆動機及び制御盤更新工程では、既設駆動機10と既設制御盤11を同一の工程にて新設駆動機17と新設制御盤21に更新する。その結果、上述のような新設インターフェース盤の機能を備えた仮設制御盤を一時的に新設駆動機17に接続する必要がない。したがって、乗客コンベアのリニューアルに必要な作業を軽減することができる。さらに、乗客コンベアのリニューアルに必要な費用を軽減することができる。
 また、駆動機及び制御盤更新工程では、既設駆動機10と既設制御盤11を同一の工程にて新設駆動機17と新設制御盤21に更新する。その結果、駆動機の更新と制御盤の更新の工程を分割したリニューアル方法で、制御盤を先に更新する場合と比べて、新設制御盤21に既設駆動機10の制御機能と新設駆動機17の制御機能の双方をもたせる必要がない。したがって、乗客コンベアのリニューアルに必要な作業を軽減することができる。さらに、乗客コンベアのリニューアルに必要な費用を軽減することができる。
実施の形態2.
 図8は実施の形態2における乗客コンベアのリニューアル方法が適用される乗客コンベアの接続図である。なお、実施の形態1の部分と同一又は相当部分には同一符号が付される。当該部分の説明は省略される。
 図8において、既設繋ぎ箱側コネクタ22は、既設繋ぎ箱9に設けられる。既設繋ぎ箱側コネクタ22は、図8においては図示されない複数の既設操作盤8aに対応した複数のコネクタに機械的かつ電気的に着脱自在に接続される。既設繋ぎ箱側コネクタ22は、図8においては図示されない既設駆動機10に対応したコネクタに機械的かつ電気的に着脱自在に接続される。既設繋ぎ箱側コネクタ22は、図8においては図示されない既設制御盤11に対応したコネクタに機械的かつ電気的に着脱自在に接続される。
 既設安全装置側コネクタ23は、複数の新設安全装置16aに対応した複数のケーブルに電気的に接続される。
 新設ケーブル側コネクタ24は、新設ケーブル14の一端部に電気的に接続される。
 複数の第1新設安全装置側コネクタ25aの各々は、新設ケーブル14の他端部に電気的に接続される。複数の第2新設安全装置側コネクタ25bの各々は、複数の新設安全装置16aの各々に対応した複数のケーブルの各々に電気的に接続される。複数の第2新設安全装置側コネクタ25bの各々は、複数の第1新設安全装置側コネクタ25aの各々に機械的かつ電気的に着脱自在に接続される。
 新設アダプタ26は、第1接続部26aと第2接続部26bと第3接続部26cと複数の第1解放用コネクタ26dと複数の第2解放用コネクタ26eとを備える。
 第1接続部26aは、既設繋ぎ箱側コネクタ22に機械的かつ電気的に着脱自在に接続し得るように設けられる。第2接続部26bは、既設安全装置側コネクタ23に機械的かつ電気的に着脱自在に接続し得るように設けられる。第3接続部26cは、第1接続部26aに電気的に接続される。第3接続部26cは、新設ケーブル側コネクタ24に機械的かつ電気的に着脱自在に接続し得るように設けられる。
 複数の第1解放用コネクタ26dの各々は、複数の既設安全装置7aの各々に対応して設けられる。複数の第1解放用コネクタ26dの各々は、第1接続部26aと第3接続部26cとに電気的に接続される。複数の第2解放用コネクタ26eの各々は、第2接続部26bに電気的に接続される。複数の第2解放用コネクタ26eの各々は、複数の第1解放用コネクタ26dの各々に機械的かつ電気的に着脱自在に接続し得るように設けられる。
 中継箱接続工程の前においては、既設繋ぎ箱側コネクタ22と既設安全装置側コネクタ23とが機械的かつ電気的に接続される。その結果、複数の既設安全装置7aは、動作し得る状態を維持する。
 中継箱接続工程においては、既設繋ぎ箱側コネクタ22と既設安全装置側コネクタ23とは、機械的かつ電気的な接続から解放される。その後、新設アダプタ26の第1接続部26aが既設繋ぎ箱側コネクタ22に機械的かつ電気的に接続される。新設アダプタ26の第2接続部26bが既設安全装置側コネクタ23に機械的かつ電気的に接続される。複数の第1解放用コネクタ26dの各々と複数の第2解放用コネクタ26eの各々とは、機械的かつ電気的に接続される。その結果、複数の既設安全装置7aは、動作し得る状態を維持する。
 その後、既設安全装置側コネクタ23と新設アダプタ26の第2接続部26bとは機械的かつ電気的な接続から解放される。その後、新設アダプタ26の第3接続部26cが新設ケーブル側コネクタ24に機械的かつ電気的に接続される。その結果、複数の新設安全装置16aは、動作し得る状態を維持する。
 以上で説明した実施の形態2によれば、既設繋ぎ箱9と新設ケーブル14とは、新設アダプタ26を介して機械的かつ電気的に接続される。このため、既設繋ぎ箱9と新設ケーブル14とを容易に接続することができる。
 なお、新設アダプタ26において、新設ケーブル14との電気的接続から複数の既設安全装置7aの各々を独立して解放してもよい。例えば、複数の第1解放用コネクタ26dのいずれか一つと複数の第2解放用コネクタ26eのいずれか一つとの機械的かつ電気的な接続を解放し、対応した第1新設安全装置側コネクタ25aと第2新設安全装置側コネクタ25bとだけを機械的かつ電気的に接続してもよい。この場合、複数の既設安全装置7aのいずれか1つが複数の新設安全装置16aのいずれか1つに更新される。この状態でも、乗客コンベアの通常運転を行い得る。その結果、乗客コンベアのリニューアルの作業をより効率的に行うことができる。
 また、複数の既設安全装置7bと複数の新設安全装置16bに対しても同様の新設アダプタ26を適用してもよい。この場合も、既設繋ぎ箱9と新設ケーブル14とを容易に接続することができる。
 なお、実施の形態1または実施の形態2の乗客コンベアのリニューアル方法を動く歩道に適用してもよい。この場合も、動く歩道のリニューアルが段階的に行われる際に、動く歩道が利用できない時間帯が長くなることを抑制できる。
 以上のように、この発明に係る乗客コンベアのリニューアル方法は、乗客コンベアに利用できる。
 1 下部乗降口、 2 上部乗降口、 3 ステップ、 4 スカートガード、 5 欄干パネル、 6 手摺、 7a 既設安全装置、 7b 既設安全装置、 8a 既設操作盤、 8b 既設操作盤、 9 既設繋ぎ箱、 10 既設駆動機、 11 既設制御盤、 12 既設中継ケーブル、 13 新設中継箱、 14 新設ケーブル、 15 新設中継ケーブル、 16a 新設安全装置、 16b 新設安全装置、 17 新設駆動機、 19 新設繋ぎ箱、 20a 新設操作盤、 20b 新設操作盤、 21 新設制御盤、 22 既設繋ぎ箱側コネクタ、 23 既設安全装置側コネクタ、 24 新設ケーブル側コネクタ、 25a 第1新設安全装置側コネクタ、 25b 第2新設安全装置側コネクタ、 26 新設アダプタ、26a 第1接続部、 26b 第2接続部、 26c 第3接続部、 26d 第1解放用コネクタ、 26e 第2解放用コネクタ

Claims (7)

  1.  乗客コンベアにおいて、既設安全装置を新設安全装置に更新する安全装置更新工程と、
     前記安全装置更新工程の後、前記乗客コンベアの既設駆動機を新設駆動機に更新するとともに、前記乗客コンベアの既設制御盤を新設制御盤に更新する駆動機及び制御盤更新工程と、
    を備えた乗客コンベアのリニューアル方法。
  2.  前記乗客コンベアにおいて、新設中継箱と既設繋ぎ箱とを電気的に接続する中継箱接続工程、
    を備え、
     前記安全装置更新工程は、前記既設繋ぎ箱との電気的接続から前記既設安全装置を解放し、前記新設中継箱に前記新設安全装置を電気的に接続する工程を含み、
     前記駆動機及び制御盤更新工程は、前記安全装置更新工程の後、前記既設繋ぎ箱と前記既設制御盤との電気的接続から前記既設駆動機を解放し、前記既設繋ぎ箱との電気的接続から前記既設制御盤を解放し、前記新設中継箱に新設繋ぎ箱を電気的に接続し、前記新設繋ぎ箱に前記新設駆動機を電気的に接続し、前記新設駆動機と前記新設繋ぎ箱とに前記新設制御盤を電気的に接続する工程を含む請求項1に記載の乗客コンベアのリニューアル方法。
  3.  前記乗客コンベアにおいて、新設中継箱と既設繋ぎ箱とを電気的に接続する中継箱接続工程、
    を備え、
     前記安全装置更新工程は、前記既設繋ぎ箱との電気的接続から前記既設安全装置を解放し、前記新設中継箱に前記新設安全装置を電気的に接続する工程を含み、
     前記駆動機及び制御盤更新工程は、前記安全装置更新工程の後、前記既設繋ぎ箱と前記既設駆動機との電気的接続から前記既設制御盤を解放し、前記既設繋ぎ箱との電気的接続から前記既設駆動機を解放し、前記新設中継箱に新設繋ぎ箱を電気的に接続し、前記新設繋ぎ箱に前記新設制御盤を電気的に接続し、前記新設制御盤と前記新設繋ぎ箱とに前記新設駆動機を電気的に接続する工程を含む請求項1に記載の乗客コンベアのリニューアル方法。
  4.  前記安全装置更新工程は、前記既設繋ぎ箱との電気的接続から複数の既設安全装置の一つを解放し、前記新設中継箱に複数の新設安全装置の一つを電気的に接続することで、前記既設制御盤により前記乗客コンベアを運転し得る状態に維持する工程を含む請求項2または請求項3に記載の乗客コンベアのリニューアル方法。
  5.  前記中継箱接続工程は、前記乗客コンベアの上部において複数の新設中継箱の一方と複数の既設繋ぎ箱の一方とを複数の新設ケーブルの一方を介して電気的に接続し、前記乗客コンベアの下部において複数の新設中継箱の他方と複数の既設繋ぎ箱の他方とを前記複数の新設ケーブルの他方を介して電気的に接続する工程を含む請求項2から請求項4のいずれか一項に記載の乗客コンベアのリニューアル方法。
  6.  前記中継箱接続工程は、前記既設繋ぎ箱と前記既設安全装置に電気的に接続されたコネクタと新設アダプタとを電気的に接続し、前記新設アダプタと前記新設ケーブルとを電気的に接続する工程を含む請求項5に記載の乗客コンベアのリニューアル方法。
  7.  前記中継箱接続工程は、前記新設アダプタにおいて前記新設ケーブルとの電気的接続から複数の既設安全装置の各々を独立して解放する工程を含む請求項6に記載の乗客コンベアのリニューアル方法。
PCT/JP2019/030830 2019-08-06 2019-08-06 乗客コンベアのリニューアル方法 WO2021024368A1 (ja)

Priority Applications (6)

Application Number Priority Date Filing Date Title
PCT/JP2019/030830 WO2021024368A1 (ja) 2019-08-06 2019-08-06 乗客コンベアのリニューアル方法
CN201980098689.7A CN114144376B (zh) 2019-08-06 2019-08-06 乘客输送机的翻新方法
KR1020227000800A KR102569287B1 (ko) 2019-08-06 2019-08-06 승객 컨베이어의 리뉴얼 방법
JP2021521325A JP6947337B2 (ja) 2019-08-06 2019-08-06 乗客コンベアのリニューアル方法
DE112019007620.5T DE112019007620T5 (de) 2019-08-06 2019-08-06 Verfahren zur Erneuerung eines Personenbeförderers
US17/606,458 US11724918B2 (en) 2019-08-06 2019-08-06 Method of renewing passenger conveyor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2019/030830 WO2021024368A1 (ja) 2019-08-06 2019-08-06 乗客コンベアのリニューアル方法

Publications (1)

Publication Number Publication Date
WO2021024368A1 true WO2021024368A1 (ja) 2021-02-11

Family

ID=74504000

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2019/030830 WO2021024368A1 (ja) 2019-08-06 2019-08-06 乗客コンベアのリニューアル方法

Country Status (6)

Country Link
US (1) US11724918B2 (ja)
JP (1) JP6947337B2 (ja)
KR (1) KR102569287B1 (ja)
CN (1) CN114144376B (ja)
DE (1) DE112019007620T5 (ja)
WO (1) WO2021024368A1 (ja)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021250747A1 (ja) * 2020-06-08 2021-12-16 三菱電機ビルテクノサービス株式会社 乗客コンベアのリニューアル用具および乗客コンベアのリニューアル方法
DE202022100139U1 (de) 2022-01-12 2023-04-14 Norman Nieland Vorrichtung zur Steuerung von Fahrtreppen oder Fahrsteigen

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58193880A (ja) * 1982-04-30 1983-11-11 株式会社日立製作所 マンコンベアの改修方法
JP2004323153A (ja) * 2003-04-23 2004-11-18 Hitachi Building Systems Co Ltd 乗客コンベアのリニューアル方法
JP2015000809A (ja) * 2013-06-18 2015-01-05 フジテック株式会社 乗客コンベアのリニューアル工法及び該工法に用いる門型揚重装置
JP2018095328A (ja) * 2016-12-08 2018-06-21 株式会社日立製作所 乗客コンベア

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5936200A (en) * 1997-09-05 1999-08-10 Park; Mike K. Easy junction box
US6267219B1 (en) * 2000-08-11 2001-07-31 Otis Elevator Company Electronic safety system for escalators
JP2002104759A (ja) 2000-09-25 2002-04-10 Hitachi Building Systems Co Ltd 乗客コンベアのリニューアル方法
JP2003327382A (ja) * 2002-05-13 2003-11-19 Hitachi Building Systems Co Ltd 乗客コンベアの仮設操作スイッチ
JP2004010190A (ja) 2002-06-03 2004-01-15 Hitachi Building Systems Co Ltd 乗客コンベアの改造作業方法
JP2007119167A (ja) 2005-10-27 2007-05-17 Hitachi Building Systems Co Ltd 乗客コンベアの仮設操作装置
JP4836706B2 (ja) * 2006-08-10 2011-12-14 株式会社日立ビルシステム 乗客コンベアのリニューアル工法
WO2019224882A1 (ja) * 2018-05-21 2019-11-28 三菱電機株式会社 乗客コンベアのリニューアル方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58193880A (ja) * 1982-04-30 1983-11-11 株式会社日立製作所 マンコンベアの改修方法
JP2004323153A (ja) * 2003-04-23 2004-11-18 Hitachi Building Systems Co Ltd 乗客コンベアのリニューアル方法
JP2015000809A (ja) * 2013-06-18 2015-01-05 フジテック株式会社 乗客コンベアのリニューアル工法及び該工法に用いる門型揚重装置
JP2018095328A (ja) * 2016-12-08 2018-06-21 株式会社日立製作所 乗客コンベア

Also Published As

Publication number Publication date
US20220194745A1 (en) 2022-06-23
US11724918B2 (en) 2023-08-15
KR102569287B1 (ko) 2023-08-22
KR20220019039A (ko) 2022-02-15
DE112019007620T5 (de) 2022-04-21
JPWO2021024368A1 (ja) 2021-09-13
CN114144376B (zh) 2024-03-29
JP6947337B2 (ja) 2021-10-13
CN114144376A (zh) 2022-03-04

Similar Documents

Publication Publication Date Title
US9079750B2 (en) Elevator renovation method including a relay panel
JP6947337B2 (ja) 乗客コンベアのリニューアル方法
EP0523601A1 (en) Procedure for modernizing an elevator group
JP7020546B2 (ja) 乗客コンベアのリニューアル方法
KR20190077529A (ko) 엘리베이터의 리뉴얼 방법 및 엘리베이터 제어반
KR101352610B1 (ko) 엘리베이터 제어 시스템 장치
CN110997540A (zh) 电梯的更新方法以及电梯附属盘
KR20130142252A (ko) 엘리베이터 시스템
CN1155505A (zh) 具有分散的输入和输出装置的乘客运送机控制系统
WO2021250747A1 (ja) 乗客コンベアのリニューアル用具および乗客コンベアのリニューアル方法
KR102381875B1 (ko) 엘리베이터의 승강장 조작반
JP6900960B2 (ja) 乗客コンベア
JP2009046284A (ja) 群管理エレベータのリニューアル方法
JP2017218304A (ja) エレベーターのリニューアル方法
JP2010179998A (ja) エレベータのリニューアル工法
CN110194406B (zh) 电梯的改造辅助装置及电梯的改造方法
KR20050106469A (ko) 엘리베이터 제어 장치 및 이 엘리베이터 제어 장치를사용하는 엘리베이터 시스템
JPH08119546A (ja) エレベータの配線接続箱
JP2007119167A (ja) 乗客コンベアの仮設操作装置
JP6189801B2 (ja) エレベータ
JP2006008263A (ja) エレベーターの保守運転装置
JP2012201417A (ja) エレベータの制御盤の交換方法
JP2564413B2 (ja) 昇降機における乗かごの改造方法
JPH04280785A (ja) 昇降機の制御盤交換方法
JPH02106571A (ja) 仮設エレベータにおける仮設制御盤の結線装置

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 19940942

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2021521325

Country of ref document: JP

Kind code of ref document: A

ENP Entry into the national phase

Ref document number: 20227000800

Country of ref document: KR

Kind code of ref document: A

122 Ep: pct application non-entry in european phase

Ref document number: 19940942

Country of ref document: EP

Kind code of ref document: A1