WO2021250747A1 PCT/JP2020/022554 JP2020022554W WO2021250747A1 WO 2021250747 A1 WO2021250747 A1 WO 2021250747A1 JP 2020022554 W JP2020022554 W JP 2020022554W WO 2021250747 A1 WO2021250747 A1 WO 2021250747A1
Authority
WO
WIPO (PCT)
Prior art keywords
control
new
terminal
passenger conveyor
cable
Prior art date
Application number
PCT/JP2020/022554
Other languages
English (en)
French (fr)
Inventor
泰之 鳥居
Original Assignee
三菱電機ビルテクノサービス株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱電機ビルテクノサービス株式会社 filed Critical 三菱電機ビルテクノサービス株式会社
Priority to PCT/JP2020/022554 priority Critical patent/WO2021250747A1/ja
Priority to JP2022530372A priority patent/JP7136392B2/ja
Priority to CN202080101728.7A priority patent/CN115768711B/zh
Publication of WO2021250747A1 publication Critical patent/WO2021250747A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B23/00Component parts of escalators or moving walkways

Definitions

  • This disclosure relates to a passenger conveyor renewal tool and a passenger conveyor renewal method.
  • Patent Document 1 discloses an example of a method for renewing a passenger conveyor. The method includes a step of replacing the control panel and installing a plurality of safety switches, and a step of replacing the drive device.
  • Patent Document 1 the replacement of the control panel and the installation of a plurality of safety switches are performed by stopping the passenger conveyor in continuous time zones. Therefore, in order to secure the continuous stop time of the passenger conveyor, the degree of freedom in the renewal work process may be limited.
  • the present disclosure provides a renewal tool and a renewal method for a passenger conveyor that can increase the degree of freedom in the process.
  • the passenger conveyor renewal tool has a plurality of first device side terminals each connected to the corresponding first new control device among the plurality of first new control devices in the first region of the passenger conveyor. It has a temporary connector on the device side and a plurality of first control side terminals, each of which is detachably connected to the corresponding first device side terminal among the plurality of first device side terminals, in series to control an existing control panel.
  • a control-side temporary cable connected in series to the circuit and a plurality of first short-circuit terminals that are detachably connected to each of the plurality of first control-side terminals and short-circuit the connected first control-side terminals. Be prepared.
  • the method for renewing a passenger conveyor is a method having a plurality of first device side terminals each connected to a corresponding first new control device among a plurality of first new control devices in the first region of the passenger conveyor.
  • a plurality of control-side temporary cables having one device-side temporary connector and a plurality of first control-side terminals in series, each of which is detachably connected to the corresponding first device-side terminal among the plurality of first-device-side terminals.
  • An existing connection process including a connection procedure, a plurality of first device connection processes performed after the existing connection process corresponding to each of the plurality of first new control devices, and a procedure for replacing the existing control panel with a new control panel.
  • a new connection process performed after all or part of the plurality of first device connection processes, including a procedure for connecting a plurality of first device devices to the new control panel, and a plurality of first device connections.
  • the procedure for installing the corresponding first new control device among the plurality of first new control devices and the terminal on the first device side corresponding to the first new control device are set to the terminal on the first device side.
  • the procedure of connecting to the corresponding first control side terminal after removing the first short circuit terminal is included.
  • the continuous stop time of the passenger conveyor can be shortened.
  • FIG. 1 It is a block diagram of the passenger conveyor which concerns on Embodiment 1.
  • FIG. It is a block diagram of the renewal tool which concerns on Embodiment 1.
  • FIG. It is a block diagram of the renewal tool which concerns on Embodiment 1.
  • FIG. It is a block diagram of the renewal tool which concerns on Embodiment 1.
  • FIG. It is a figure which shows the example of the renewal method which concerns on Embodiment 1.
  • FIG. It is a figure which shows the example of the renewal method which concerns on Embodiment 1.
  • FIG. It is a figure which shows the example of the renewal method which concerns on Embodiment 1.
  • FIG. It is a figure which shows the example of the renewal method which concerns on Embodiment 1.
  • FIG. It is a figure which shows the example of the renewal method which concerns on Embodiment 1.
  • FIG. It is a figure which shows the example of the renewal method which
  • FIG. 1 is a configuration diagram of a passenger conveyor according to the first embodiment.
  • the passenger conveyor is, for example, an inclined escalator 1.
  • the escalator 1 is laid between the upper floor and the lower floor of the building.
  • the escalator 1 is a device for transporting passengers between the upper floor and the lower floor.
  • an upper machine room 2a is provided on the upper floor side.
  • the area on the upper floor side of the escalator 1 is an example of the first area.
  • a lower machine room 2b is provided on the lower floor side.
  • the area on the lower floor side of the escalator 1 is an example of the second area.
  • the escalator 1 includes a drive device 3, a plurality of steps 4, a pair of handrails 5, and a control panel 6.
  • the drive device 3 is a device that generates a drive force.
  • the drive device 3 is provided in, for example, the upper machine room 2a.
  • Each step 4 is a device that circulates and moves by the driving force generated by the driving device 3.
  • Each handrail 5 is a device that circulates and moves by a driving force generated by the driving device 3.
  • one handrail 5 is provided on the left side of the plurality of steps 4.
  • the other handrail 5 is provided on the right side of the plurality of steps 4.
  • the control panel 6 is a device that controls the operation of the escalator 1.
  • the control panel 6 is provided in, for example, the upper machine room 2a. In normal operation, the escalator 1 transports, for example, a passenger standing on one of the steps 4 while grasping one of the handrails 5 by a driving force generated by the driving device 3 under the control of the control
  • the escalator 1 includes two operation panels 7 and a plurality of safety switches 8.
  • Each operation panel 7 is a device that accepts operations such as starting and stopping the escalator 1.
  • One operation panel 7 is provided on the upper floor side of the escalator 1.
  • the other operation panel 7 is provided on the lower floor side of the escalator 1.
  • Each safety switch 8 is a control device that detects an event that has occurred in the escalator 1.
  • a part of the plurality of safety switches 8 is arranged on the right side on the upper floor side.
  • the other part of the plurality of safety switches 8 is arranged on the left side on the upper floor side.
  • the other part of the plurality of safety switches 8 is arranged on the right side on the lower floor side.
  • the other part of the plurality of safety switches 8 is arranged on the left side on the lower floor side.
  • the escalator 1 includes two connecting boxes 9 and a connecting cable 10.
  • Each connecting box 9 is a device used for connecting devices and devices provided in the escalator 1.
  • Each connecting box 9 houses terminals for connecting cables such as devices and devices provided in the escalator 1.
  • One connecting box 9 is arranged in the upper machine room 2a.
  • the other connecting box 9 is arranged in the lower machine room 2b.
  • the connecting box 9 of the upper machine room 2a has terminals of cables connected to each of the drive device 3, the control panel 6, the operation panel 7 on the upper floor side, the safety switch 8 arranged on the upper floor side, and the like.
  • the connecting box 9 of the lower machine room 2b houses each of the terminal of the cable connected to each of the operation panel 7 on the lower floor side and the safety switch 8 arranged on the lower floor side.
  • the connecting cable 10 is a cable provided between the connecting box 9 of the upper machine room 2a and the connecting box 9 of the lower machine room 2b.
  • the equipment and devices provided on the upper floor side and the equipment and devices provided on the lower floor side are connected by the communication cable 10.
  • the renewal of escalator 1 is, for example, control repair.
  • the renewal work is performed by stopping the operation of the escalator 1. Therefore, the renewal work is performed, for example, during a time when the escalator 1 is not used, so as to suppress a decrease in convenience for the user of the building in which the escalator 1 is provided.
  • the renewal tool is used so that the renewal work can be performed in a flexible process according to the time zone when the escalator 1 is not used.
  • FIGS. 2 to 4. are block diagrams of the renewal tool according to the first embodiment.
  • FIG. 2 shows an example of a wiring route in the escalator 1 being renewed.
  • the existing wiring is represented by a broken line.
  • the newly installed wiring is represented by a long-dotted line.
  • Temporary wiring is represented by a thick solid line.
  • the plurality of safety switches 8 include, for example, a DCS (Driving Chain Switch) that detects a break in the drive chain that transmits the driving force generated by the driving device 3. Further, the plurality of safety switches 8 include, for example, an HGS (Hand Gurad Switch) that detects the entanglement of the handrail 5 in the inlet boots. Further, the plurality of safety switches 8 include, for example, an SSS (Skirtguard Safety Switch) for detecting the pinching of the handrail 5 in the skirt guard of the balustrade. The plurality of safety switches 8 include, for example, a CRS (Curved Rail Switch) that detects the floating of step 4.
  • DCS Driving Chain Switch
  • the plurality of safety switches 8 include, for example, an HSS (Handrail Safety Switch) that detects deviation of the moving speed of the handrail 5 from the normal range.
  • the plurality of safety switches 8 include, for example, an SCS (Step Chain Switch) that detects a break in the step chain that moves the step 4.
  • the HGS, SSS, and CRS are located on both the upper and lower floors.
  • the DCS is located on the upper floor side.
  • the SCS is located on the lower floor side.
  • HGS, SSS, CRS, HSS, and SCS are arranged on both left and right sides.
  • the plurality of safety switches 8 may include safety switches not exemplified here, such as SRS (Step Roller Switch).
  • the plurality of safety switches 8 may not include some or all of the safety switches exemplified here.
  • the DCS, HGS, SSS, CRS, and SCS will be replaced with the new safety switch 8 from the existing safety switch 8.
  • the HSS will be installed as a new safety switch 8.
  • Each of the existing safety switches 8 arranged on the upper floor side is an example of the first existing control device.
  • Each of the existing safety switches 8 arranged on the lower floor side is an example of the second existing control device.
  • Each of the newly installed safety switches 8 arranged on the upper floor side is an example of the first newly installed control device.
  • Each of the newly installed safety switches 8 arranged on the lower floor side is an example of the second newly installed control device.
  • the drive device 3, the control panel 6, and the two operation panels 7 are replaced with new devices from the existing devices.
  • the existing drive device 3, control panel 6, and operation panel 7 arranged on the upper floor side are examples of the first existing device.
  • the existing operation panel 7 arranged on the lower floor side is an example of the second existing device.
  • the newly installed drive device 3, the control panel 6, and the operation panel 7 arranged on the upper floor side are examples of the first new device.
  • the newly installed operation panel 7 arranged on the lower floor side is an example of the second newly installed device.
  • the two connecting boxes 9 and the connecting cable 10 are replaced with new equipment from the existing equipment.
  • the existing connecting box 9 arranged on the upper floor side is the first existing connecting box.
  • the existing connecting box 9 arranged on the lower floor side is a second existing connecting box.
  • the new connecting box 9 arranged on the upper floor side is the first new connecting box.
  • the new connecting box 9 arranged on the lower floor side is the second new connecting box.
  • the first new connecting box and the second new connecting box are the main connecting boxes that are also used in the escalator 1 after the renewal work is completed.
  • the renewal tool 11 includes a first device-side temporary connector 12a, a control-side temporary cable 13, a second device-side temporary connector 12b, and a control-side temporary connector 14.
  • the temporary connector 12a on the first device side is housed in the first new connecting box.
  • the temporary connector 12a on the first device side is connected to each of the plurality of first new control devices via a cable.
  • the temporary connector 12a on the first device side may be separated into a plurality of portions.
  • the control side temporary cable 13 is connected to the existing control panel 6.
  • the control side temporary cable 13 has a plurality of first control side terminals 15a. Each of the first control side terminals 15a is housed in the first new connecting box.
  • the control side temporary cable 13 has a first communication terminal 16a. The first communication terminal 16a is connected to the newly installed communication cable 10.
  • the temporary connector 12b on the second device side is housed in the second new connecting box.
  • the temporary connector 12b on the second device side is connected to each of the plurality of second new control devices via a cable.
  • the temporary connector 12b on the second device side may be separated into a plurality of portions.
  • the control side temporary connector 14 is housed in the second new connecting box.
  • the control-side temporary connector 14 has a plurality of second control-side terminals 15b.
  • the control-side temporary connector 14 has a second communication terminal 16b.
  • the second contact terminal 16b is connected to the newly installed contact cable 10.
  • FIG. 3 shows a connection diagram of equipment and devices on the upper floor side.
  • a plurality of cables connected to a plurality of newly installed safety switches 8 are bundled as a wire harness 17.
  • the wire harness 17 has a plug terminal 18.
  • the wire harness 17 on the upper right side bundles the cables connected to the right HGS, SSS, and SRS, which are arranged on the upper floor side, and the DCS.
  • the upper left wire harness 17 bundles the cables connected to the left HGS, SSS, and SRS located on the upper floor side.
  • the existing control panel 6 has a control circuit 19.
  • the control circuit 19 is a safety circuit that stops the escalator 1 when, for example, a part of the circuit is opened.
  • the newly installed communication cable 10 has plug terminals 18 at both ends on the upper floor side and the lower floor side.
  • the plug terminal 18 on the upper floor side of the newly installed connecting cable 10 is detachably connected to the first connecting terminal 16a of the temporary control cable 13.
  • the first contact terminal 16a is the socket terminal 20.
  • the first new connection box houses the socket terminal 20 of the cable connected to the first new device.
  • the first new connecting box houses the plug terminal 18 of the wire harness 17 connected to the newly installed safety switch 8.
  • the first new connecting box houses the plug terminal 18 on the upper floor side of the newly installed connecting cable 10.
  • the renewal tool 11 includes a plurality of first short-circuit terminals 21a. Each first short-circuit terminal 21a is detachably connected to one of the first control-side terminals 15a.
  • the first short-circuit terminal 21a is a terminal that short-circuits the connected first control side terminal 15a.
  • the temporary connector 12a on the first device side has a socket terminal 20 that is detachably connected to the plug terminal 18 of the wire harness 17.
  • the first device-side temporary connector 12a has a plurality of separated portions, a portion connected to the wire harness 17 on the upper right side and a portion connected to the wire harness 17 on the upper left side.
  • the socket terminal 20 of the temporary connector 12a on the first device side is provided in each of the separated portions.
  • the first device side temporary connector 12a has a plurality of first device side terminals 22a. Each first device side terminal 22a corresponds to any of a plurality of newly installed safety switches 8 arranged on the upper floor side. Each first device side terminal 22a is connected to the socket terminal 20 of the wire harness 17 connected to the corresponding newly installed safety switch 8. Each first device side terminal 22a is connected to the corresponding new safety switch 8 via the wire harness 17. Each first device-side terminal 22a is connected to the socket terminal 20 via a flexible cord 23 so that it can move independently of each other.
  • the control side temporary cable 13 is connected in series to the control circuit 19 of the existing control panel 6.
  • each of the plurality of first control side terminals 15a is connected in series with each other.
  • Each first control side terminal 15a is connected so as to be able to move independently of each other by a flexible cord 23.
  • Each first control side terminal 15a corresponds to any first device side terminal 22a.
  • Each first control side terminal 15a is detachably connected to the corresponding first device side terminal 22a.
  • the first communication terminal 16a is connected in series to each of the plurality of first control side terminals 15a.
  • FIG. 4 shows a connection diagram of equipment and devices on the lower floor side.
  • the wire harness 17 on the lower right side bundles the cables connected to the HGS, SCS, SSS, and CRS on the right side arranged on the lower floor side.
  • the lower left wire harness 17 bundles the cables connected to the left HGS, SCS, SSS, and CRS located on the lower floor side.
  • the plug terminal 18 on the lower floor side of the newly installed connecting cable 10 is detachably connected to the second connecting terminal 16b of the temporary control connector 14. At this time, the second contact terminal 16b is the socket terminal 20.
  • the second new connecting box houses the socket terminal 20 of the cable connected to the second new device.
  • the second new connecting box houses the plug terminal 18 of the wire harness 17 connected to the newly installed safety switch 8.
  • the second new connecting box houses the plug terminal 18 on the lower floor side of the newly installed connecting cable 10.
  • the socket terminal 20 to which the plug terminal 18 of the wire harness 17 is connected may be connected in series to the socket terminal 20 to which the plug terminal 18 of the newly installed connecting cable 10 is connected.
  • the renewal tool 11 includes a plurality of second short-circuit terminals 21b.
  • Each second short-circuit terminal 21b is detachably connected to one of the second control-side terminals 15b.
  • the second short-circuit terminal 21b is a terminal that short-circuits the connected second control side terminal 15b.
  • the temporary connector 12b on the second device side has a socket terminal 20 that is detachably connected to the plug terminal 18 of the wire harness 17.
  • the second device-side temporary connector 12b has a plurality of separated portions, a portion connected to the wire harness 17 on the lower right side and a portion connected to the wire harness 17 on the lower left side.
  • the socket terminal 20 of the temporary connector 12b on the second device side is provided in each of the separated portions.
  • the second device side temporary connector 12b has a plurality of second device side terminals 22b.
  • Each second device side terminal 22b corresponds to any of a plurality of newly installed safety switches 8 arranged on the lower floor side.
  • Each second device side terminal 22b is connected to the socket terminal 20 of the wire harness 17 connected to the corresponding new safety switch 8.
  • Each second device side terminal 22b is connected to the corresponding new safety switch 8 via a wire harness 17.
  • Each second device side terminal 22b is connected to the socket terminal 20 via a flexible cord 23 so that it can move independently of each other.
  • each of the plurality of second control side terminals 15b is connected in series with each other.
  • Each second control side terminal 15b is connected so as to be able to move independently of each other by a flexible cord 23.
  • Each second control side terminal 15b corresponds to any second device side terminal 22b.
  • Each second control side terminal 15b is detachably connected to the corresponding second device side terminal 22b.
  • the second communication terminal 16b is connected in series to each of the plurality of second control-side terminals 15b.
  • FIGS. 5 to 7 are diagrams showing an example of the renewal method according to the first embodiment.
  • 5 to 7 show an example of the renewal method on the upper floor side. Also on the lower floor side where the connection diagram is shown in FIG. 4, the work of the renewal method is performed in the same manner as on the upper floor side.
  • FIG. 5 shows a connection diagram of equipment and devices on the upper floor side.
  • the renewal method includes an existing connection process, a plurality of device connection processes, and a new connection process.
  • each device connection process corresponds to any new safety switch 8.
  • the worker performing the renewal work first stops the escalator 1 that is normally operating. After that, the worker performs the work of the existing connection process as follows, for example.
  • each of the first device-side temporary connector 12a and the plurality of first control-side terminals 15a of the control-side temporary cable 13 is housed in the first new connecting box.
  • Each of the plurality of first control side terminals 15a is short-circuited by the connection of the first short-circuit terminal 21a.
  • the second device-side temporary connector 12b and the control-side temporary connector 14 are housed in the second new connecting box.
  • Each of the plurality of second control side terminals 15b is short-circuited by the connection of the second short-circuit terminal 21b.
  • the worker arranges the new communication cable 10 between the upper floor side and the lower floor side.
  • the new connecting cable 10 is arranged between the first new connecting box and the second new connecting box.
  • the worker connects the plug terminal 18 on the upper floor side of the new communication cable 10 to the first communication terminal 16a inside the first new connection box.
  • the worker connects the plug terminal 18 on the lower floor side of the new communication cable 10 to the second communication terminal 16b inside the second new connection box.
  • the worker connects the control side temporary cable 13 in series with the control circuit 19 of the existing control panel 6.
  • the control circuit 19 is not opened. Since the existing control panel 6, the existing drive device 3, the existing two connecting boxes 9, the existing connecting cable 10, and the existing plurality of safety switches 8 are connected as they were before the existing connection process was started.
  • the escalator 1 is in a state where normal operation can be performed.
  • the worker conducts an operation test of the escalator 1.
  • the worker causes the escalator 1 to operate normally.
  • the escalator 1 is used to move the user in the building where the escalator 1 is installed.
  • the worker After that, after stopping the escalator 1 that is normally in operation, the worker performs the equipment connection process for any of the newly installed safety switches 8, for example, as follows.
  • the work of the equipment connection process for the right HGS arranged on the upper floor side will be described.
  • the device connection process for the safety switch 8 arranged on the upper floor side is an example of the first device connection process.
  • the worker installs a new safety switch 8 corresponding to the removed existing safety switch 8.
  • the new safety switch 8 corresponding to the existing safety switch 8 to be replaced detects, for example, a new safety switch 8 of the same type as the existing safety switch 8 or an event similar to the existing safety switch 8. It is a newly installed safety switch 8 and the like. That is, the worker installs the new HGS on the right side on the upper floor side. The worker connects the installed new HGS to the corresponding cable of the wire harness 17 on the upper right side. The worker removes the first short-circuit terminal 21a from the first control-side terminal 15a corresponding to the first device-side terminal 22a for the installed HGS. The worker removes the removed first short-circuit terminal 21a from the escalator 1.
  • the worker connects the first device side terminal 22a and the first control side terminal 15a.
  • the HGS which is the new safety switch 8
  • the existing control panel 6 can stop the escalator 1 by opening the new safety switch 8. Since the first control side terminal 15a corresponding to the first device side terminal 22a of the newly installed safety switch 8 that has not been installed is short-circuited, it depends only on the fact that the new safety switch 8 is not installed. Escalator 1 does not stop. In this way, the operation of opening the replaced new HGS is taken into the control circuit 19 of the existing control panel 6 via the renewal tool 11, so that the escalator 1 is in a state where normal operation can be performed.
  • the worker After the equipment connection process for the HGS on the right side located on the upper floor side, the worker conducts an operation test of the escalator 1. When the result of the operation test is normal, the worker causes the escalator 1 to operate normally. During normal operation, the escalator 1 is used to move the user in the building where the escalator 1 is installed.
  • the worker After that, after stopping the escalator 1 that is normally in operation, the worker also performs the work of the device connection process for the other newly installed safety switch 8.
  • the work of the equipment connection process for the SSS on the left side arranged on the lower floor side will be described.
  • the device connection process for the safety switch 8 arranged on the lower floor side is an example of the second device connection process.
  • the worker installs a new SSS on the lower floor side as a new safety switch 8 corresponding to the removed existing safety switch 8 on the left side.
  • the worker connects the installed new SSS to the corresponding cable of the wire harness 17 on the lower left side.
  • the worker removes the second short-circuit terminal 21b from the second control-side terminal 15b corresponding to the second device-side terminal 22b for the installed SSS.
  • the worker removes the removed second short-circuit terminal 21b from the escalator 1.
  • the worker connects the second device side terminal 22b and the second control side terminal 15b.
  • the SSS which is the new safety switch 8 is connected in series to the control circuit 19, so that the existing control panel 6 can stop the escalator 1 by opening the new safety switch 8.
  • the worker After the equipment connection process for the left SSS located on the lower floor side, the worker conducts an operation test of the escalator 1. When the result of the operation test is normal, the worker causes the escalator 1 to operate normally. During normal operation, the escalator 1 is used to move the user in the building where the escalator 1 is installed.
  • the worker After that, after stopping the escalator 1 that is normally in operation, the worker also sequentially performs the work of the device connection process for the other newly installed safety switch 8. At this time, the new safety switch 8 in which the worker performs the work of the equipment connection process is all or a part of the new safety switch 8 to be replaced or installed in the renewal.
  • the device connection process corresponding to the newly installed safety switch 8 without the corresponding existing safety switch 8 does not include the procedure for removing the existing safety switch 8.
  • the worker conducts an operation test of the escalator 1. When the result of the operation test is normal, the worker causes the escalator 1 to operate normally. During normal operation, the escalator 1 is used to move the user in the building where the escalator 1 is installed.
  • the renewal work may be performed without causing normal operation during the plurality of device connection processes.
  • the worker does not have to perform an operation test between a plurality of device connection processes.
  • the worker may continuously perform the work of the existing connection process and the work of the device connection process for any of the newly installed safety switches 8 without performing the operation test between the processes.
  • the worker may continuously perform the work of the equipment connection process for the plurality of newly installed safety switches 8 without performing the operation test during the process. Further, the worker may perform the work of a plurality of steps in parallel.
  • the worker may perform the work of a plurality of equipment connection processes for the plurality of newly installed safety switches 8 in parallel.
  • the worker performs the work of the plurality of equipment connection processes for the plurality of newly installed safety switches 8 on the upper floor side or the lower floor side, or on the right side or the left side where each safety switch 8 is provided. Regardless of whether or not there is, it may be performed in the order according to the situation.
  • FIG. 6 shows a connection diagram of equipment and devices on the upper floor side.
  • FIG. 6 shows a state in which the work of the device connection process for the other newly installed safety switch 8 of the DCS has been completed.
  • the worker After the equipment connection process for all or part of the plurality of newly installed safety switches 8, the worker performs the work of the new installation connection process as follows, for example. If there is a new safety switch 8 for which the equipment connection process has not been completed when the work of the new connection process is started, the worker will use the new safety switch 8 together with the work of the new connection process. You may perform the work of the equipment connection process of. In this example, the worker performs the work of the equipment connection process for the newly installed DCS together with the work of the new installation connection process. The work of the equipment connection process performed together with the work of the new installation connection process may be performed either during the work of the new installation connection process or after the work of the new installation connection process is completed.
  • the worker may continuously perform the work of the equipment connection process and the work of the new connection process for any of the newly installed safety switches 8 without performing the operation test and the normal operation during the process. ..
  • the worker replaces the two existing operation panels 7 with the two new operation panels 7.
  • the existing drive device 3 is replaced with a new drive device 3.
  • the worker replaces the existing control panel 6 with a new control panel 6. At this time, the worker may perform the work of the equipment connection process for the newly installed DCS.
  • FIG. 7 shows a connection diagram of equipment and devices on the upper floor side.
  • the worker removes the plug terminal 18 of the temporary connector 12a on the first device side from the plug terminal 18 of the wire harness 17 connected to the new safety switch 8 on the upper floor side. Inside the first new connecting box, the worker connects the plug terminal 18 of the wire harness 17 connected to the new safety switch 8 on the upper floor side to the socket terminal 20 of the cable connected to the first new device. do. As a result, each of the new safety switches 8 on the upper floor side is connected to the first new device including the new control panel 6. Inside the first new connecting box, the worker connects the plug terminal 18 on the upper floor side of the new connecting cable 10 to the socket terminal 20 of the cable connected to the first new device.
  • the worker removes the plug terminal 18 of the temporary connector 12b on the second device side from the plug terminal 18 of the wire harness 17 connected to the new safety switch 8 on the lower floor side.
  • the worker connects the plug terminal 18 of the wire harness 17 connected to the new safety switch 8 on the lower floor side to the socket terminal 20 of the cable connected to the second new device. do.
  • each of the newly installed safety switches 8 on the lower floor side is connected to the second newly installed device.
  • the worker connects the plug terminal 18 on the lower floor side of the new connecting cable 10 to the socket terminal 20 of the cable connected to the second new device.
  • each of the new safety switches 8 on the lower floor side is connected to the new control panel 6 via the new communication cable 10.
  • the worker removes the first device side temporary connector 12a, the control side temporary cable 13, the second device side temporary connector 12b, and the control side temporary connector 14 from the escalator 1.
  • the worker conducts an operation test of the escalator 1.
  • the worker can perform the device connection process and the device connection process for all the new safety switches 8.
  • the operation test of the escalator 1 is performed. When the result of the operation test is normal, the worker causes the escalator 1 to operate normally.
  • the renewal tool 11 includes a first device-side temporary connector 12a, a control-side temporary cable 13, and a plurality of first short-circuit terminals 21a.
  • the first device-side temporary connector 12a has a plurality of first-device-side terminals 22a. Each first device side terminal 22a is connected to the corresponding first new control device among the plurality of first new control devices. Each first new control device is located in the first area of the passenger conveyor.
  • the control side temporary cable 13 has a plurality of first control side terminals 15a in series. Each first control side terminal 15a is detachably connected to the corresponding first device side terminal 22a among the plurality of first device side terminals 22a.
  • the control side temporary cable 13 is connected in series to the control circuit 19 of the existing control panel 6.
  • Each first short-circuit terminal 21a is detachably connected to each of the first control-side terminals 15a.
  • Each first short-circuit terminal 21a short-circuits the connected first control-side terminal 15a.
  • the renewal method according to the first embodiment includes an existing connection step, a plurality of first device connection steps, and a new connection step.
  • the existing connection step is a procedure for arranging the first device-side temporary connector 12a and the control-side temporary cable 13 in the first region in a state where each first control-side terminal 15a is short-circuited by the connection of the first short-circuit terminal 21a. including.
  • the existing connection step includes a procedure for connecting the control side temporary cable 13 in series to the control circuit 19 of the existing control panel 6 after the procedure.
  • Each first device connection process corresponds to one of a plurality of first new control devices.
  • Each first device connection step is performed after the existing connection step.
  • Each first device connection process includes a procedure for installing a corresponding first new control device among a plurality of first new control devices.
  • the first device side terminal 22a corresponding to the first new control device is connected to the first control side terminal 15a corresponding to the first device side terminal 22a, and the first short circuit terminal 21a is connected to the first control side terminal 15a.
  • the new connection step is performed after all or part of the plurality of first device connection steps.
  • the new connection process includes a procedure for replacing the existing control panel 6 with the new control panel 6.
  • the new connection step includes a procedure for connecting a plurality of first new control devices to the new control panel 6.
  • the operation of opening the newly installed control device is incorporated into the control circuit 19 of the existing control panel 6.
  • the passenger conveyor is in a state where normal operation can be performed even in a state where new and existing control devices are mixed. Therefore, the replacement or installation of the plurality of newly installed control devices can be divided into a plurality of time zones in which the normal operation of the passenger conveyor is sandwiched between them. This increases the degree of freedom of the process in the renewal work.
  • the continuous stop time of the passenger conveyor can be shortened. Therefore, the deterioration of passenger convenience due to the renewal work can be suppressed.
  • the renewal work can be interrupted in smaller work units.
  • the manager or worker of the renewal work can flexibly change the amount of work according to the progress of the work. For example, when the progress of the work is delayed, the work can be interrupted and the passenger conveyor can be operated normally before the secured continuous stop time is exceeded. Further, for example, when the work is progressing, a part of the work scheduled for the next stop time can be performed in advance during the secured continuous stop time. Further, even when only a short continuous stop time can be secured, the process can be set according to the secured continuous stop time. In addition, even when other renewal works are carried out in parallel near the passenger conveyor, the work order should be changed according to the progress of the other works to avoid interference in the work area. Can be done.
  • the renewal work can be performed more efficiently by increasing the degree of freedom in the process. Further, when a plurality of passenger conveyors in the same building are renewed at the same time, the renewal work can be performed more efficiently by increasing the degree of freedom in the process.
  • the terminal of the cable connected to the first new installation device is housed in the first new installation connection box.
  • the first new device is a device arranged in the first area.
  • the temporary connector 12a on the first device side and the terminal 15a on the first control side are housed in the first new connecting box.
  • the first new device includes a new control panel 6.
  • the existing connection process includes a procedure for installing the first new connecting box.
  • the temporary connector 12a on the first device side and the terminal 15a on the first control side are arranged in a state of being housed in the first new connecting box.
  • the plurality of first new control devices are connected to the new control panel 6 via a cable whose terminals are housed in the first new connection box.
  • the renewal tool 11 is a tool for connecting terminals such as cables, it can be configured to have a size that can be stored in the first new connecting box of the main installation. Therefore, it is not necessary to install and remove the temporary connecting box. In addition, there is no need for large-scale modifications other than terminal processing for existing cables. Therefore, the renewal work can be performed more efficiently.
  • each of the plurality of first device side terminals 22a is provided so as to be able to move independently of each other by the flexible cord 23.
  • Each of the plurality of first control side terminals 15a is provided so as to be able to move independently of each other by the flexible cord 23.
  • the renewal tool 11 includes a second device-side temporary connector 12b, a control-side temporary connector 14, and a plurality of second short-circuit terminals 21b.
  • the second device-side temporary connector 12b has a plurality of second-device-side terminals 22b.
  • Each second device side terminal 22b is connected to the corresponding second new control device among the plurality of second new control devices.
  • Each second device side terminal 22b is arranged in the second area of the passenger conveyor.
  • the control-side temporary connector 14 has a plurality of second control-side terminals 15b in series. Each of the second control side terminals 15b is detachably connected to the corresponding second device side terminal 22b among the plurality of second device side terminals 22b.
  • the control-side temporary connector 14 has a second contact terminal 16b in series, and the second contact terminal 16b is detachably connected to the contact cable 10.
  • the communication cable 10 is provided between the first region and the second region.
  • Each second short-circuit terminal 21b is detachably connected to each of the second control-side terminals 15b.
  • Each second communication terminal 16b short-circuits the connected second control side terminal 15b.
  • the control side temporary cable 13 has a first communication terminal 16a in series.
  • the first contact terminal 16a is detachably connected to the contact cable 10.
  • the renewal method includes a plurality of second device connection steps.
  • the existing connection step is a procedure for arranging the second device-side temporary connector 12b and the control-side temporary connector 14 in the second region in a state where each of the second control-side terminals 15b is short-circuited by the connection of the second short-circuit terminal 21b. including.
  • the existing connection step includes a procedure for connecting the communication cable 10 to the first communication terminal 16a and the second communication terminal 16b after the procedure.
  • Each second device connection process corresponds to any of a plurality of second new control devices.
  • Each second device connection step is performed after the existing connection step.
  • Each second device connection process includes a procedure for installing a corresponding second new control device among a plurality of second new control devices.
  • the second device side terminal 22b corresponding to the second newly installed control device is connected to the second control side terminal 15b corresponding to the second device side terminal 22b, and the second short circuit terminal 21b is connected to the second control side terminal 15b.
  • the new connection step is performed after all or part of the plurality of second device connection steps.
  • the new connection step includes a procedure for connecting a plurality of second new control devices to the new control panel 6 via the communication cable 10.
  • the control equipment is separately arranged in a plurality of areas such as the upper floor side and the lower floor side, the worker can perform the work in any of the plurality of areas. As a result, the degree of freedom in the renewal work process is increased.
  • the terminal of the cable connected to the second new installation device is housed in the second new installation connection box.
  • the second new device is a device arranged in the second area.
  • the second device-side temporary connector 12b and the control-side temporary connector 14 are housed in the second new connecting box.
  • the existing connection process includes a procedure for installing a second new connecting box. In the existing connection process, the second device-side temporary connector 12b and the control-side temporary connector 14 are arranged in a state of being housed in the second new connecting box.
  • the renewal tool 11 is a tool for connecting terminals such as cables, it can be configured to have a size that can be stored in the second new connecting box of the main installation. Therefore, it is not necessary to install and remove the temporary connecting box. In addition, there is no need for large-scale modifications other than terminal processing for existing cables. Therefore, the renewal work is performed more efficiently.
  • each of the plurality of second device side terminals 22b is provided so as to be able to move independently of each other by the flexible cord 23.
  • Each of the plurality of second control side terminals 15b is provided so as to be able to move independently of each other by the flexible cord 23.
  • the new connection step includes a procedure for removing the temporary connector 12a on the first device side and the temporary cable 13 on the control side. Further, the new connection step includes a procedure for removing the second device-side temporary connector 12b and the control-side temporary connector 14.
  • the renewal method includes a process of performing an operation test.
  • the operation test is a test for determining whether or not the passenger conveyor can perform normal operation.
  • the step of performing the operation test is performed after at least one of a plurality of first device connection steps. Further, the step of performing the operation test is performed after at least one of the plurality of second device connection steps.
  • the passenger conveyor By the operation test after the multiple equipment connection process, the passenger conveyor can be operated properly and normally. As a result, the deterioration of convenience for passenger conveyor users due to the renewal work can be suppressed.
  • the worker may remove the existing connecting box 9.
  • the existing connecting box 9 may be left on the passenger conveyor. Further, in the new connection process, the worker may remove the existing communication cable 10.
  • the worker may operate the passenger conveyor normally after performing an operation test. For example, in the existing connection process, even if the worker normally operates the passenger conveyor after the procedure for arranging a part or all of the renewal tool 11 and before connecting the control side temporary cable 13 to the existing control panel 6. good.
  • the worker may operate the passenger conveyor normally before removing the existing communication cable 10 or the like after the procedure for replacing the control panel 6 and the drive device 3.
  • work such as replacement of devices such as a plurality of steps 4 and a pair of handrails 5 may be performed.
  • Part or all of the work may be performed during the existing connection process, each device connection process, and the new connection process.
  • a part or all of the work may be performed in parallel with the work of the existing connection step, each device connection step, and the new connection step.
  • control device may be a switch, a sensor, an operation button, or the like.
  • the first area may be on the lower floor side of the escalator 1.
  • the second area may be on the upper floor side of the escalator 1.
  • One or both of the first region and the second region may be an intermediate region of the escalator 1.
  • the safety switch 8 may be arranged in a third region such as an intermediate region.
  • the renewal tool 11 further includes a set of a second device-side temporary connector 12b, a control-side temporary connector 14, and a plurality of second short-circuit terminals 21b so as to correspond to the safety switch 8 in the third region. You may be.
  • the passenger conveyor may be a horizontal passenger conveyor.
  • the first region and the second region are, for example, the entrance side and the exit side of the passenger conveyor.
  • the renewal method according to this disclosure can be applied to passenger conveyors.
  • the renewal tool according to the present disclosure can be applied to the renewal method.

Landscapes

  • Escalators And Moving Walkways (AREA)

Abstract

工程の自由度を高められる乗客コンベアのリニューアル用具およびリニューアル方法を提供する。リニューアル方法に用いられるリニューアル用具(11)は、第1機器側仮設コネクタ(12a)と、制御側仮設ケーブル(13)と、複数の第1短絡端子(21a)と、を備える。第1機器側仮設コネクタ(12a)が有する複数の第1機器側端子(22a)の各々は、乗客コンベアの第1領域に配置される複数の第1新設制御機器のうち対応する第1新設制御機器に接続される。既設制御盤(6)の制御回路(19)に直列に接続される制御側仮設ケーブル(13)は、複数の第1機器側端子(22a)のうち対応する第1機器側端子(22a)に各々が着脱可能に接続される複数の第1制御側端子(15a)を直列に有する。第1制御側端子(15a)の各々に着脱可能に接続される複数の第1短絡端子(21a)の各々は、接続している第1制御側端子(15a)を短絡させる。

Description

乗客コンベアのリニューアル用具および乗客コンベアのリニューアル方法
 本開示は、乗客コンベアのリニューアル用具および乗客コンベアのリニューアル方法に関する。
 特許文献1は、乗客コンベアのリニューアル方法の例を開示する。当該方法は、制御盤の交換および複数の安全スイッチの設置を含む工程と、駆動装置を交換する工程を含む。
日本特開2004-323153号公報
 しかしながら、特許文献1において、制御盤の交換および複数の安全スイッチの設置は、連続した時間帯において乗客コンベアを停止させて行われる。このため、乗客コンベアの連続停止時間を確保するために、リニューアル作業の工程の自由度が限られることがある。
 本開示は、このような課題の解決に係るものである。本開示は、工程の自由度を高められる乗客コンベアのリニューアル用具およびリニューアル方法を提供する。
 本開示に係る乗客コンベアのリニューアル用具は、乗客コンベアの第1領域の複数の第1新設制御機器のうち対応する第1新設制御機器に各々が接続される複数の第1機器側端子を有する第1機器側仮設コネクタと、複数の第1機器側端子のうち対応する第1機器側端子に各々が着脱可能に接続される複数の第1制御側端子を直列に有し、既設制御盤の制御回路に直列に接続される制御側仮設ケーブルと、複数の第1制御側端子の各々に着脱可能に接続され、接続している第1制御側端子を短絡させる複数の第1短絡端子と、を備える。
 本開示に係る乗客コンベアのリニューアル方法は、乗客コンベアの第1領域の複数の第1新設制御機器のうち対応する第1新設制御機器に各々が接続される複数の第1機器側端子を有する第1機器側仮設コネクタ、および複数の第1機器側端子のうち対応する第1機器側端子に各々が着脱可能に接続される複数の第1制御側端子を直列に有する制御側仮設ケーブルを、複数の第1制御側端子の各々が第1短絡端子の接続によって短絡されている状態で第1領域に配置する手順、ならびに当該手順の後に、制御側仮設ケーブルを既設制御盤の制御回路に直列に接続する手順を含む既設接続工程と、複数の第1新設制御機器の各々に対応し、既設接続工程の後に行われる複数の第1機器接続工程と、既設制御盤を新設制御盤に交換する手順、および複数の第1新設制御機器を新設制御盤に接続する手順を含み、複数の第1機器接続工程の全部または一部の後に行われる新設接続工程と、を備え、複数の第1機器接続工程の各々は、複数の第1新設制御機器のうち対応する第1新設制御機器を設置する手順と、当該第1新設制御機器に対応する第1機器側端子を、当該第1機器側端子に対応する第1制御側端子に第1短絡端子を取り外した後に接続する手順と、を含む。
 本開示に係るリニューアル用具またはリニューアル方法であれば、乗客コンベアの連続停止時間を短縮できる。
実施の形態1に係る乗客コンベアの構成図である。 実施の形態1に係るリニューアル用具の構成図である。 実施の形態1に係るリニューアル用具の構成図である。 実施の形態1に係るリニューアル用具の構成図である。 実施の形態1に係るリニューアル方法の例を示す図である。 実施の形態1に係るリニューアル方法の例を示す図である。 実施の形態1に係るリニューアル方法の例を示す図である。
 本開示を実施するための形態について添付の図面を参照しながら説明する。各図において、同一または相当する部分には同一の符号を付して、重複する説明は適宜に簡略化または省略する。
 実施の形態1.
 図1は、実施の形態1に係る乗客コンベアの構成図である。
 乗客コンベアは、例えば傾斜式のエスカレーター1である。エスカレーター1は、建物の上階と下階との間において掛け渡される。エスカレーター1は、上階と下階との間で乗客を輸送する装置である。エスカレーター1において、上階側に上部機械室2aが設けられる。エスカレーター1の上階側の領域は、第1領域の例である。エスカレーター1において、下階側に下部機械室2bが設けられる。エスカレーター1の下階側の領域は、第2領域の例である。
 エスカレーター1は、駆動装置3と、複数のステップ4と、一対の手摺5と、制御盤6と、を備える。駆動装置3は、駆動力を発生させる装置である。駆動装置3は、例えば上部機械室2aに設けられる。各々のステップ4は、駆動装置3が発生させる駆動力によって循環移動する機器である。各々の手摺5は、駆動装置3が発生させる駆動力によって循環移動する機器である。ここで、一方の手摺5は、複数のステップ4の左側に設けられる。他方の手摺5は、複数のステップ4の右側に設けられる。制御盤6は、エスカレーター1の動作を制御する装置である。制御盤6は、例えば上部機械室2aに設けられる。通常運転において、エスカレーター1は、例えば一方の手摺5を掴みながらいずれかのステップ4の上に立ち止まっている乗客を、制御盤6の制御に基づいて駆動装置3が発生させる駆動力によって輸送する。
 エスカレーター1は、2つの操作盤7と、複数の安全スイッチ8と、を備える。各々の操作盤7は、エスカレーター1の起動および停止などの操作を受け付ける装置である。一方の操作盤7は、エスカレーター1の上階側に設けられる。他方の操作盤7は、エスカレーター1の下階側に設けられる。各々の安全スイッチ8は、エスカレーター1に発生した事象を検知する制御機器である。複数の安全スイッチ8の一部は、上階側の右側に配置される。複数の安全スイッチ8の他の一部は、上階側の左側に配置される。複数の安全スイッチ8の他の一部は、下階側の右側に配置される。複数の安全スイッチ8の他の一部は、下階側の左側に配置される。
 エスカレーター1は、2つの繋ぎ箱9と、連絡ケーブル10と、を備える。各々の繋ぎ箱9は、エスカレーター1において設けられる機器および装置などの接続に用いられる機器である。各々の繋ぎ箱9は、エスカレーター1において設けられる機器および装置などのケーブルを接続する端子を収納する。一方の繋ぎ箱9は、上部機械室2aに配置される。他方の繋ぎ箱9は、下部機械室2bに配置される。上部機械室2aの繋ぎ箱9は、駆動装置3、制御盤6、上階側の操作盤7、および上階側に配置される安全スイッチ8などの各々に接続されるケーブルの端子の各々を収納する。下部機械室2bの繋ぎ箱9は、下階側の操作盤7、および下階側に配置される安全スイッチ8などの各々に接続されるケーブルの端子の各々を収納する。この例において、連絡ケーブル10は、上部機械室2aの繋ぎ箱9と下部機械室2bの繋ぎ箱9との間にわたって設けられるケーブルである。上階側に設けられる機器および装置などと、下階側に設けられる機器および装置などとは、連絡ケーブル10によって接続される。
 エスカレーター1のリニューアルは、例えば制御改修である。エスカレーター1のリニューアルにおいて、例えば制御盤6、駆動装置3、2つの操作盤7、複数の安全スイッチ8、2つの繋ぎ箱9、および連絡ケーブル10などの交換、設置および撤去などが行われる。ここで、リニューアルの作業は、エスカレーター1の運転を停止して行われる。このため、エスカレーター1が設けられる建物の利用者の利便性の低下を抑えるように、リニューアルの作業は、例えばエスカレーター1が利用されない時間帯に行われる。この例において、エスカレーター1が利用されない時間帯に合わせた柔軟な工程でリニューアル作業を行いうるように、リニューアル用具が用いられる。
 続いて、図2から図4を用いて、リニューアル用具の構成を説明する。
 図2から図4は、実施の形態1に係るリニューアル用具の構成図である。
 図2において、リニューアルを行っているエスカレーター1における配線経路の例が示される。図2において、既設の配線が破線で表される。新設の配線が一点鎖線で表される。仮設の配線が太い実線で表される。
 エスカレーター1において、複数の安全スイッチ8は、例えば、駆動装置3が発生させた駆動力を伝達する駆動チェーンの切れなどを検知するDCS(Driving Chain Switch)を含む。また、複数の安全スイッチ8は、例えば、手摺5のインレットブーツへの巻き込みなどを検知するHGS(Hand Gurad Switch)を含む。また、複数の安全スイッチ8は、例えば、手摺5の欄干のスカートガードへの挟まりなどを検知するSSS(Skirtguard Safety Switch)を含む。複数の安全スイッチ8は、例えば、ステップ4の浮き上がりなどを検知するCRS(Curved Rail Switch)を含む。複数の安全スイッチ8は、例えば、手摺5の移動速度の正常範囲からの逸脱などを検知するHSS(Handrail Safety Switch)を含む。複数の安全スイッチ8は、例えば、ステップ4を移動させるステップチェーンの切れなどを検知するSCS(Step Chain Switch)などを含む。HGS、SSS、およびCRSは、上階側および下階側の両方に配置される。DCSは、上階側に配置される。SCSは、下階側に配置される。HGS、SSS、CRS、HSS、およびSCSは、左右の両側に配置される。なお、複数の安全スイッチ8は、例えばSRS(Step Roller Switch)などのここに例示されない安全スイッチを含んでもよい。複数の安全スイッチ8は、ここに例示された安全スイッチの一部または全部を含んでいなくてもよい。
 この例のリニューアルにおいて、DCS、HGS、SSS、CRS、およびSCSは、既設の安全スイッチ8から新設の安全スイッチ8に交換される。HSSは、新設の安全スイッチ8として設置される。上階側に配置される既設の安全スイッチ8の各々は、第1既設制御機器の例である。下階側に配置される既設の安全スイッチ8の各々は、第2既設制御機器の例である。上階側に配置される新設の安全スイッチ8の各々は、第1新設制御機器の例である。下階側に配置される新設の安全スイッチ8の各々は、第2新設制御機器の例である。
 この例のリニューアルにおいて、駆動装置3、制御盤6、および2つの操作盤7は、既設の装置から新設の装置に交換される。上階側に配置される既設の駆動装置3、制御盤6、および操作盤7は、第1既設装置の例である。下階側に配置される既設の操作盤7は、第2既設装置の例である。上階側に配置される新設の駆動装置3、制御盤6、および操作盤7は、第1新設装置の例である。下階側に配置される新設の操作盤7は、第2新設装置の例である。
 この例のリニューアルにおいて、2つの繋ぎ箱9および連絡ケーブル10は、既設の機器から新設の機器に交換される。上階側に配置される既設の繋ぎ箱9は、第1既設繋ぎ箱である。下階側に配置される既設の繋ぎ箱9は、第2既設繋ぎ箱である。上階側に配置される新設の繋ぎ箱9は、第1新設繋ぎ箱である。下階側に配置される新設の繋ぎ箱9は、第2新設繋ぎ箱である。第1新設繋ぎ箱および第2新設繋ぎ箱は、リニューアルの作業が完了した後のエスカレーター1においても利用される本設の繋ぎ箱である。
 リニューアル用具11は、第1機器側仮設コネクタ12aと、制御側仮設ケーブル13と、第2機器側仮設コネクタ12bと、制御側仮設コネクタ14と、を備える。
 第1機器側仮設コネクタ12aは、第1新設繋ぎ箱に収納される。第1機器側仮設コネクタ12aは、複数の第1新設制御機器の各々とケーブルを介して接続される。第1機器側仮設コネクタ12aは、複数の部分に分離されていてもよい。
 制御側仮設ケーブル13は、既設の制御盤6に接続される。制御側仮設ケーブル13は、複数の第1制御側端子15aを有する。各々の第1制御側端子15aは、第1新設繋ぎ箱に収納される。制御側仮設ケーブル13は、第1連絡端子16aを有する。第1連絡端子16aは、新設の連絡ケーブル10に接続される。
 第2機器側仮設コネクタ12bは、第2新設繋ぎ箱に収納される。第2機器側仮設コネクタ12bは、複数の第2新設制御機器の各々とケーブルを介して接続される。第2機器側仮設コネクタ12bは、複数の部分に分離されていてもよい。
 制御側仮設コネクタ14は、第2新設繋ぎ箱に収納される。制御側仮設コネクタ14は、複数の第2制御側端子15bを有する。制御側仮設コネクタ14は、第2連絡端子16bを有する。第2連絡端子16bは、新設の連絡ケーブル10に接続される。
 図3において、上階側における機器および装置の接続図が示される。
 エスカレーター1において、複数の新設の安全スイッチ8に接続される複数のケーブルは、ワイヤハーネス17として束ねられる。ワイヤハーネス17は、プラグ端子18を有する。上部右側のワイヤハーネス17は、上階側に配置される右側のHGS、SSS、およびSRS、ならびにDCSに接続されるケーブルを束ねる。上部左側のワイヤハーネス17は、上階側に配置される左側のHGS、SSS、およびSRSに接続されるケーブルを束ねる。
 既設の制御盤6は、制御回路19を有する。制御回路19は、例えば回路の一部が開放されるときにエスカレーター1を停止させる安全回路である。
 新設の連絡ケーブル10は、上階側および下階側の両端にプラグ端子18を有する。新設の連絡ケーブル10の上階側のプラグ端子18は、制御側仮設ケーブル13の第1連絡端子16aに着脱可能に接続される。このとき、第1連絡端子16aは、ソケット端子20である。
 第1新設繋ぎ箱は、第1新設装置に接続されるケーブルのソケット端子20を収納する。第1新設繋ぎ箱は、新設の安全スイッチ8に接続されるワイヤハーネス17のプラグ端子18を収納する。第1新設繋ぎ箱は、新設の連絡ケーブル10の上階側のプラグ端子18を収納する。
 リニューアル用具11は、複数の第1短絡端子21aを備える。各々の第1短絡端子21aは、いずれかの第1制御側端子15aに着脱可能に接続される。第1短絡端子21aは、接続している第1制御側端子15aを短絡させる端子である。
 第1機器側仮設コネクタ12aは、ワイヤハーネス17のプラグ端子18に着脱可能に接続されるソケット端子20を有する。この例において、第1機器側仮設コネクタ12aは、上部右側のワイヤハーネス17に接続される部分と、上部左側のワイヤハーネス17に接続される部分との、分離された複数の部分を有する。第1機器側仮設コネクタ12aのソケット端子20は、分離された部分の各々に設けられる。
 第1機器側仮設コネクタ12aは、複数の第1機器側端子22aを有する。各々の第1機器側端子22aは、上階側に配置される複数の新設の安全スイッチ8のいずれかに対応する。各々の第1機器側端子22aは、対応する新設の安全スイッチ8に接続されるワイヤハーネス17のソケット端子20に接続される。各々の第1機器側端子22aは、ワイヤハーネス17を介して、対応する新設の安全スイッチ8に接続される。各々の第1機器側端子22aは、互いに独立に動かしうるように、可撓性を有するコード23を介してソケット端子20に接続される。
 制御側仮設ケーブル13は、既設の制御盤6の制御回路19に直列に接続される。制御側仮設ケーブル13において、複数の第1制御側端子15aの各々は、互いに直列に接続されている。各々の第1制御側端子15aは、可撓性を有するコード23によって互いに独立に動かしうるように接続されている。各々の第1制御側端子15aは、いずれかの第1機器側端子22aに対応する。各々の第1制御側端子15aは、対応する第1機器側端子22aに着脱可能に接続される。制御側仮設ケーブル13において、第1連絡端子16aは、複数の第1制御側端子15aの各々に直列に接続されている。
 図4において、下階側における機器および装置の接続図が示される。
 エスカレーター1において、下部右側のワイヤハーネス17は、下階側に配置される右側のHGS、SCS、SSS、およびCRSに接続されるケーブルを束ねる。下部左側のワイヤハーネス17は、下階側に配置される左側のHGS、SCS、SSS、およびCRSに接続されるケーブルを束ねる。
 新設の連絡ケーブル10の下階側のプラグ端子18は、制御側仮設コネクタ14の第2連絡端子16bに着脱可能に接続される。このとき、第2連絡端子16bは、ソケット端子20である。
 第2新設繋ぎ箱は、第2新設装置に接続されるケーブルのソケット端子20を収納する。第2新設繋ぎ箱は、新設の安全スイッチ8に接続されるワイヤハーネス17のプラグ端子18を収納する。第2新設繋ぎ箱は、新設の連絡ケーブル10の下階側のプラグ端子18を収納する。第2新設繋ぎ箱において、ワイヤハーネス17のプラグ端子18が接続されるソケット端子20は、新設の連絡ケーブル10のプラグ端子18が接続されるソケット端子20に直列に接続されていてもよい。
 リニューアル用具11は、複数の第2短絡端子21bを備える。各々の第2短絡端子21bは、いずれかの第2制御側端子15bに着脱可能に接続される。第2短絡端子21bは、接続している第2制御側端子15bを短絡させる端子である。
 第2機器側仮設コネクタ12bは、ワイヤハーネス17のプラグ端子18に着脱可能に接続されるソケット端子20を有する。この例において、第2機器側仮設コネクタ12bは、下部右側のワイヤハーネス17に接続される部分と、下部左側のワイヤハーネス17に接続される部分との、分離された複数の部分を有する。第2機器側仮設コネクタ12bのソケット端子20は、分離された部分の各々に設けられる。
 第2機器側仮設コネクタ12bは、複数の第2機器側端子22bを有する。各々の第2機器側端子22bは、下階側に配置される複数の新設の安全スイッチ8のいずれかに対応する。各々の第2機器側端子22bは、対応する新設の安全スイッチ8に接続されるワイヤハーネス17のソケット端子20に接続される。各々の第2機器側端子22bは、ワイヤハーネス17を介して、対応する新設の安全スイッチ8に接続される。各々の第2機器側端子22bは、互いに独立に動かしうるように、可撓性を有するコード23を介してソケット端子20に接続される。
 制御側仮設コネクタ14において、複数の第2制御側端子15bの各々は、互いに直列に接続されている。各々の第2制御側端子15bは、可撓性を有するコード23によって互いに独立に動かしうるように接続されている。各々の第2制御側端子15bは、いずれかの第2機器側端子22bに対応する。各々の第2制御側端子15bは、対応する第2機器側端子22bに着脱可能に接続される。制御側仮設コネクタ14において、第2連絡端子16bは、複数の第2制御側端子15bの各々に直列に接続されている。
 続いて、図5から図7を主に用いて、リニューアル用具11を用いたリニューアル方法の例を説明する。
 図5から図7は、実施の形態1に係るリニューアル方法の例を示す図である。
 図5から図7において、上階側におけるリニューアル方法の例が示される。なお、接続図が図4に示される下階側においても、上階側と同様にしてリニューアル方法の作業が行われる。
 図5において、上階側における機器および装置の接続図が示される。
 リニューアル方法は、既設接続工程と、複数の機器接続工程と、新設接続工程と、を備える。この例において、各々の機器接続工程は、いずれかの新設の安全スイッチ8に対応する。
 リニューアルの作業を行う作業員は、まず、通常運転しているエスカレーター1を停止させる。その後に、作業員は、例えば次のように既設接続工程の作業を行う。
 作業員は、第1新設繋ぎ箱をエスカレーター1の上階側に設置する。ここで、第1機器側仮設コネクタ12a、および制御側仮設ケーブル13の複数の第1制御側端子15aの各々は、第1新設繋ぎ箱に収納されている。複数の第1制御側端子15aの各々は、第1短絡端子21aの接続によって短絡されている。
 作業員は、第2新設繋ぎ箱をエスカレーター1の下階側に設置する。ここで、第2機器側仮設コネクタ12b、および制御側仮設コネクタ14は、第2新設繋ぎ箱に収納されている。複数の第2制御側端子15bの各々は、第2短絡端子21bの接続によって短絡されている。
 作業員は、新設の連絡ケーブル10を上階側と下階側との間に配置する。新設の連絡ケーブル10は、第1新設繋ぎ箱と第2新設繋ぎ箱との間にわたって配置される。作業員は、新設の連絡ケーブル10の上階側のプラグ端子18を、第1新設繋ぎ箱の内部において第1連絡端子16aに接続する。作業員は、新設の連絡ケーブル10の下階側のプラグ端子18を、第2新設繋ぎ箱の内部において第2連絡端子16bに接続する。
 その後、作業員は、制御側仮設ケーブル13を既設の制御盤6の制御回路19に直列に接続する。このとき、各々の第1機器側端子22aおよび各々の第2機器側端子22bは短絡されているので、制御回路19は開放されていない。既設の制御盤6、既設の駆動装置3、既設の2つの繋ぎ箱9、既設の連絡ケーブル10、および既設の複数の安全スイッチ8は既設接続工程を開始する前のまま接続されているので、エスカレーター1は、通常運転を行いうる状態にある。
 既設接続工程の後に、作業員は、エスカレーター1の動作試験を行う。動作試験の結果が正常であった場合に、作業員は、エスカレーター1を通常運転させる。通常運転している間、エスカレーター1は、エスカレーター1が設けられる建物における利用者の移動に利用される。
 その後、通常運転しているエスカレーター1を停止させた後に、作業員は、例えば次のように、いずれかの新設の安全スイッチ8についての機器接続工程の作業を行う。この例において、上階側に配置される右側のHGSについての機器接続工程の作業を説明する。上階側に配置される安全スイッチ8についての機器接続工程は、第1機器接続工程の例である。
 作業員は、上階側に配置されている右側の既設のHGSを撤去する。作業員は、撤去された既設のHGSに接続されていたケーブルの端末を閉端接続によって短絡する。これにより、既設の安全スイッチ8であるHGSが撤去されていることのみによっては、エスカレーター1は停止しない。
 その後、作業員は、撤去した既設の安全スイッチ8に相当する新設の安全スイッチ8を設置する。ここで、交換される既設の安全スイッチ8に相当する新設の安全スイッチ8は、例えば当該既設の安全スイッチ8に同種の新設の安全スイッチ8、または当該既設の安全スイッチ8と同様の事象を検知する新設の安全スイッチ8などである。すなわち、作業員は、上階側において新設のHGSを右側に設置する。作業員は、設置した新設のHGSを、上部右側のワイヤハーネス17の対応するケーブルに接続する。作業員は、設置したHGSについての第1機器側端子22aに対応する第1制御側端子15aから、第1短絡端子21aを取り外す。作業員は、取り外した第1短絡端子21aをエスカレーター1から撤去する。作業員は、当該第1機器側端子22aと当該第1制御側端子15aとを接続する。これにより、新設の安全スイッチ8であるHGSが制御回路19に直列に接続されるので、既設の制御盤6は、新設の安全スイッチ8の開放によってエスカレーター1を停止できる。まだ設置されていない新設の安全スイッチ8についての第1機器側端子22aに対応する第1制御側端子15aは短絡されているので、当該新設の安全スイッチ8が設置されていないことのみによっては、エスカレーター1は停止しない。このように、交換された新設のHGSの開放の動作がリニューアル用具11を介して既設の制御盤6の制御回路19に取り込まれるので、エスカレーター1は、通常運転を行いうる状態にある。
 上階側に配置される右側のHGSについての機器接続工程の後に、作業員は、エスカレーター1の動作試験を行う。動作試験の結果が正常であった場合に、作業員は、エスカレーター1を通常運転させる。通常運転している間、エスカレーター1は、エスカレーター1が設けられる建物における利用者の移動に利用される。
 その後、通常運転しているエスカレーター1を停止させた後に、作業員は、同様に他の新設の安全スイッチ8についての機器接続工程の作業を行う。この例において、下階側に配置される左側のSSSについての機器接続工程の作業を説明する。下階側に配置される安全スイッチ8についての機器接続工程は、第2機器接続工程の例である。
 作業員は、下階側に配置されている左側の既設のSSSを撤去する。作業員は、撤去された既設のSSSに接続されていたケーブルの端末を閉端接続によって短絡する。これにより、既設の安全スイッチ8であるSSSが撤去されていることのみによるエスカレーター1の停止が防がれる。
 その後、作業員は、撤去した既設の安全スイッチ8に相当する新設の安全スイッチ8として、下階側において新設のSSSを左側に設置する。作業員は、設置した新設のSSSを、下部左側のワイヤハーネス17の対応するケーブルに接続する。作業員は、設置したSSSについての第2機器側端子22bに対応する第2制御側端子15bから、第2短絡端子21bを取り外す。作業員は、取り外した第2短絡端子21bをエスカレーター1から撤去する。作業員は、当該第2機器側端子22bと当該第2制御側端子15bとを接続する。これにより、新設の安全スイッチ8であるSSSが制御回路19に直列に接続されるので、既設の制御盤6は、新設の安全スイッチ8の開放によってエスカレーター1を停止できる。まだ設置されていない新設の安全スイッチ8についての第2機器側端子22bに対応する第2制御側端子15bは短絡されているので、当該新設の安全スイッチ8が設置されていないことのみによっては、エスカレーター1は停止しない。このように、交換された新設のSSSの開放の動作がリニューアル用具11を介して既設の制御盤6の制御回路19に取り込まれるので、エスカレーター1は、通常運転を行いうる状態にある。
 下階側に配置される左側のSSSについての機器接続工程の後に、作業員は、エスカレーター1の動作試験を行う。動作試験の結果が正常であった場合に、作業員は、エスカレーター1を通常運転させる。通常運転している間、エスカレーター1は、エスカレーター1が設けられる建物における利用者の移動に利用される。
 その後、通常運転しているエスカレーター1を停止させた後に、作業員は、同様に他の新設の安全スイッチ8についての機器接続工程の作業を順次行う。このときに作業員が機器接続工程の作業を行う新設の安全スイッチ8は、リニューアルにおいて交換または設置がされる新設の安全スイッチ8の全部または一部である。ここで、相当する既設の安全スイッチ8がない新設の安全スイッチ8に対応する機器接続工程は、既設の安全スイッチ8の撤去に係る手順を含まない。各々の新設の安全スイッチ8についての機器接続工程の前または後において、作業員は、エスカレーター1の動作試験を行う。動作試験の結果が正常であった場合に、作業員は、エスカレーター1を通常運転させる。通常運転している間、エスカレーター1は、エスカレーター1が設けられる建物における利用者の移動に利用される。
 なお、リニューアルの作業が可能な時間として確保された連続停止時間の間に完了できる作業量に応じて、複数の機器接続工程の間に通常運転をさせることなくリニューアル作業を行ってもよい。通常運転をさせない場合に、作業員は、複数の機器接続工程の間に動作試験を行わなくてもよい。例えば、作業員は、工程の間に動作試験を行わずに、既設接続工程の作業といずれかの新設の安全スイッチ8についての機器接続工程の作業とを連続して行ってもよい。作業員は、工程の間に動作試験を行わずに、複数の新設の安全スイッチ8についての機器接続工程の作業を連続して行ってもよい。また、作業員は、複数の工程の作業を並行して行ってもよい。例えば、作業員は、複数の新設の安全スイッチ8についての複数の機器接続工程の作業を並行して行ってもよい。また、作業員は、複数の新設の安全スイッチ8についての複数の機器接続工程の作業を、各々の安全スイッチ8の設けられる場所が上階側もしくは下階側であるか、または右側もしくは左側であるかなどに関わらず、状況に応じた順序で行ってもよい。
 図6において、上階側における機器および装置の接続図が示される。図6において、DCSの他の新設の安全スイッチ8についての機器接続工程の作業が終わった状態が示される。
 複数の新設の安全スイッチ8の全部または一部についての機器接続工程の後に、作業員は、例えば次のように新設接続工程の作業を行う。なお、新設接続工程の作業を開始するときにまだ機器接続工程が完了していない新設の安全スイッチ8がある場合に、作業員は、新設接続工程の作業と合わせて当該新設の安全スイッチ8についての機器接続工程の作業を行ってもよい。この例において、作業員は、新設接続工程の作業と合わせて新設のDCSについての機器接続工程の作業を行う。新設接続工程の作業と合わせて行われる機器接続工程の作業は、新設接続工程の作業途中または新設接続工程の作業終了後のいずれにおいて行われてもよい。
 まず、新設接続工程の作業の前にエスカレーター1が通常運転を行っている場合に、作業員は、エスカレーター1を停止させる。あるいは、作業員は、工程の間に動作試験および通常運転を行わずに、いずれかの新設の安全スイッチ8についての機器接続工程の作業と新設接続工程の作業とを連続して行ってもよい。
 作業員は、既設の2つの操作盤7を新設の2つの操作盤7に交換する。既設の駆動装置3を新設の駆動装置3に交換する。作業員は、既設の制御盤6を新設の制御盤6に交換する。このとき、作業員は、新設のDCSについての機器接続工程の作業を行ってもよい。
 図7において、上階側における機器および装置の接続図が示される。
 作業員は、第1機器側仮設コネクタ12aのプラグ端子18を、上階側の新設の安全スイッチ8に接続されるワイヤハーネス17のプラグ端子18から取り外す。作業員は、第1新設繋ぎ箱の内部において、上階側の新設の安全スイッチ8に接続されるワイヤハーネス17のプラグ端子18を、第1新設装置に接続されるケーブルのソケット端子20に接続する。これにより、上階側の新設の安全スイッチ8の各々は、新設の制御盤6を含む第1新設装置に接続される。作業員は、第1新設繋ぎ箱の内部において、新設の連絡ケーブル10の上階側のプラグ端子18を、第1新設装置に接続されるケーブルのソケット端子20に接続する。
 作業員は、第2機器側仮設コネクタ12bのプラグ端子18を、下階側の新設の安全スイッチ8に接続されるワイヤハーネス17のプラグ端子18から取り外す。作業員は、第2新設繋ぎ箱の内部において、下階側の新設の安全スイッチ8に接続されるワイヤハーネス17のプラグ端子18を、第2新設装置に接続されるケーブルのソケット端子20に接続する。これにより、下階側の新設の安全スイッチ8の各々は、第2新設装置に接続される。作業員は、第2新設繋ぎ箱の内部において、新設の連絡ケーブル10の下階側のプラグ端子18を、第2新設装置に接続されるケーブルのソケット端子20に接続する。これにより、下階側の新設の安全スイッチ8の各々は、新設の連絡ケーブル10を介して新設の制御盤6に接続される。
 その後、作業員は、第1機器側仮設コネクタ12a、制御側仮設ケーブル13、第2機器側仮設コネクタ12b、および制御側仮設コネクタ14をエスカレーター1から撤去する。
 新設接続工程の後に、作業員は、エスカレーター1の動作試験を行う。ここで、新設接続工程の作業を開始するときにまだ機器接続工程が完了していない新設の安全スイッチ8があった場合に、作業員は、全部の新設の安全スイッチ8についての機器接続工程および新設接続工程の後にエスカレーター1の動作試験を行う。動作試験の結果が正常であった場合に、作業員は、エスカレーター1を通常運転させる。
 以上に説明したように、実施の形態1に係るリニューアル用具11は、第1機器側仮設コネクタ12aと、制御側仮設ケーブル13と、複数の第1短絡端子21aと、を備える。第1機器側仮設コネクタ12aは、複数の第1機器側端子22aを有する。各々の第1機器側端子22aは、複数の第1新設制御機器のうち対応する第1新設制御機器に接続される。各々の第1新設制御機器は、乗客コンベアの第1領域に配置される。制御側仮設ケーブル13は、複数の第1制御側端子15aを直列に有する。各々の第1制御側端子15aは、複数の第1機器側端子22aのうち対応する第1機器側端子22aに着脱可能に接続される。制御側仮設ケーブル13は、既設制御盤6の制御回路19に直列に接続される。各々の第1短絡端子21aは、第1制御側端子15aの各々に着脱可能に接続される。各々の第1短絡端子21aは、接続している第1制御側端子15aを短絡させる。
 また、実施の形態1に係るリニューアル方法は、既設接続工程と、複数の第1機器接続工程と、新設接続工程と、を備える。既設接続工程は、第1機器側仮設コネクタ12aおよび制御側仮設ケーブル13を、各々の第1制御側端子15aが第1短絡端子21aの接続によって短絡されている状態で第1領域に配置する手順を含む。既設接続工程は、当該手順の後に、制御側仮設ケーブル13を既設制御盤6の制御回路19に直列に接続する手順を含む。各々の第1機器接続工程は、複数の第1新設制御機器のいずれかに対応する。各々の第1機器接続工程は、既設接続工程の後に行われる。各々の第1機器接続工程は、複数の第1新設制御機器のうち対応する第1新設制御機器を設置する手順を含む。各々の第1機器接続工程は、当該第1新設制御機器に対応する第1機器側端子22aを、当該第1機器側端子22aに対応する第1制御側端子15aに、第1短絡端子21aを取り外した後に接続する手順を含む。新設接続工程は、複数の第1機器接続工程の全部または一部の後に行われる。新設接続工程は、既設制御盤6を新設制御盤6に交換する手順を含む。新設接続工程は、複数の第1新設制御機器を新設制御盤6に接続する手順を含む。
 リニューアル用具11を用いたリニューアル方法によれば、新設の制御機器の開放の動作が既設の制御盤6の制御回路19に取り込まれる。これにより、新設および既設の制御機器が混在している状態においても、乗客コンベアは、通常運転を行いうる状態にある。このため、複数の新設の制御機器の交換または設置を、乗客コンベアの通常運転を間に挟む複数の時間帯に分割して行うことができる。これにより、リニューアルの作業における工程の自由度が高くなる。また、乗客コンベアの連続停止時間を短縮しうる。このため、リニューアルの作業による乗客の利便性の低下が抑えられる。また、リニューアルの作業がより細かい作業の単位において中断できるようになる。このため、リニューアル作業の管理者または作業員などは、作業の進捗に応じて作業量を柔軟に変更できる。例えば作業の進捗が遅れている場合に、確保された連続停止時間を超える前に作業を中断して乗客コンベアを通常運転させることができる。また、例えば作業の進捗が進んでいる場合に、確保された連続停止時間の間に、次の停止時間に予定されていた作業の一部を先行して行うことができる。また、短い連続停止時間しか確保できない場合においても、確保された連続停止時間に合わせて工程を設定することができる。また、乗客コンベアの付近においてリニューアルの他の工事などが並行して行われる場合においても、当該他の工事の進捗に応じて作業の順序などを変更することで、作業領域の干渉などを避けることができる。また、第1制御側端子15aは、着脱可能な第1短絡端子21aの接続によって短絡されるので、作業現場における端末処理などの作業が容易になる。また、個々の制御機器ごとに交換または設置などが行われるので、作業においてミスが生じにくい。特に多数の制御機器が設けられる乗客コンベアにおいて、工程の自由度が高くなることによってリニューアル作業がより効率的に行われうる。また、同一の建物における複数の乗客コンベアのリニューアルが同時期に行われる場合などに、工程の自由度が高くなることによってリニューアル作業がより効率的に行われうる。
 また、第1新設装置に接続されるケーブルの端子は、第1新設繋ぎ箱に収納される。ここで、第1新設装置は、第1領域に配置される装置である。この場合に、第1機器側仮設コネクタ12aおよび各々の第1制御側端子15aは、第1新設繋ぎ箱に収納される。なお、第1新設装置は、新設制御盤6を含む。
 また、既設接続工程は、第1新設繋ぎ箱を設置する手順を含む。既設接続工程において、第1機器側仮設コネクタ12aおよび各々の第1制御側端子15aは、第1新設繋ぎ箱に収納された状態で配置される。新設接続工程において、複数の第1新設制御機器は、第1新設繋ぎ箱に端子が収納されているケーブルを介して新設制御盤6に接続される。
 リニューアル用具11は、ケーブルなどの端子を接続する用具であるので、本設の第1新設繋ぎ箱に収納できる大きさに構成しうる。このため、仮設の繋ぎ箱の設置および撤去が必要にならない。また、既設のケーブルなどに対して、端末処理などの他に大規模な改造を必要としない。このため、リニューアルの作業をより効率的に行うことができる。
 また、複数の第1機器側端子22aの各々は、可撓性を有するコード23によって互いに独立に動かしうるように設けられる。複数の第1制御側端子15aの各々は、可撓性を有するコード23によって互いに独立に動かしうるように設けられる。
 作業員は、各々の第1機器側端子22aおよび各々の第1装置側端子を独立に動かせるので、個々の第1機器側端子22aおよび第1装置側端子の組み合わせの接続の作業が容易になる。これにより、リニューアルの作業がより効率的になる。
 また、リニューアル用具11は、第2機器側仮設コネクタ12bと、制御側仮設コネクタ14と、複数の第2短絡端子21bと、を備える。第2機器側仮設コネクタ12bは、複数の第2機器側端子22bを有する。各々の第2機器側端子22bは、複数の第2新設制御機器のうち対応する第2新設制御機器に接続される。各々の第2機器側端子22bは、乗客コンベアの第2領域に配置される。制御側仮設コネクタ14は、複数の第2制御側端子15bを直列に有する。各々の第2制御側端子15bは、複数の第2機器側端子22bのうち対応する第2機器側端子22bに着脱可能に接続される。制御側仮設コネクタ14は、第2連絡端子16bを直列に有する、第2連絡端子16bは、連絡ケーブル10に着脱可能に接続される。連絡ケーブル10は、第1領域および第2領域の間にわたって設けられる。各々の第2短絡端子21bは、第2制御側端子15bの各々に着脱可能に接続される。各々の第2連絡端子16bは、接続している第2制御側端子15bを短絡させる。制御側仮設ケーブル13は、第1連絡端子16aを直列に有する。第1連絡端子16aは、連絡ケーブル10に着脱可能に接続される。
 また、リニューアル方法は、複数の第2機器接続工程を備える。既設接続工程は、第2機器側仮設コネクタ12bおよび制御側仮設コネクタ14を、各々の第2制御側端子15bが第2短絡端子21bの接続によって短絡されている状態で第2領域に配置する手順を含む。既設接続工程は、当該手順の後に、連絡ケーブル10を第1連絡端子16aおよび第2連絡端子16bに接続する手順を含む。各々の第2機器接続工程は、複数の第2新設制御機器のいずれかに対応する。各々の第2機器接続工程は、既設接続工程の後に行われる。各々の第2機器接続工程は、複数の第2新設制御機器のうち対応する第2新設制御機器を設置する手順を含む。各々の第2機器接続工程は、当該第2新設制御機器に対応する第2機器側端子22bを、当該第2機器側端子22bに対応する第2制御側端子15bに、第2短絡端子21bを取り外した後に接続する手順を含む。新設接続工程は、複数の第2機器接続工程の全部または一部の後に行われる。新設接続工程は、連絡ケーブル10を介して複数の第2新設制御機器を新設制御盤6に接続する手順を含む。
 乗客コンベアにおいて、上階側および下階側などの複数の領域に制御機器が分かれて配置されていても、作業員は、複数の領域のいずれにおける作業からでも行うことができる。これにより、リニューアル作業の工程の自由度がより高くなる。
 また、第2新設装置に接続されるケーブルの端子は、第2新設繋ぎ箱に収納される。ここで、第2新設装置は、第2領域に配置される装置である。この場合に、第2機器側仮設コネクタ12bおよび制御側仮設コネクタ14は、第2新設繋ぎ箱に収納される。
 また、既設接続工程は、第2新設繋ぎ箱を設置する手順を含む。既設接続工程において、第2機器側仮設コネクタ12bおよび制御側仮設コネクタ14は、第2新設繋ぎ箱に収納された状態で配置される。
 リニューアル用具11は、ケーブルなどの端子を接続する用具であるので、本設の第2新設繋ぎ箱に収納できる大きさに構成しうる。このため、仮設の繋ぎ箱の設置および撤去が必要にならない。また、既設のケーブルなどに対して、端末処理などの他に大規模な改造を必要としない。このため、リニューアルの作業がより効率的に行われる。
 また、複数の第2機器側端子22bの各々は、可撓性を有するコード23によって互いに独立に動かしうるように設けられる。複数の第2制御側端子15bの各々は、可撓性を有するコード23によって互いに独立に動かしうるように設けられる。
 作業員は、各々の第2機器側端子22bおよび各々の第2装置側端子を独立に動かせるので、個々の第2機器側端子22bおよび第2装置側端子の組み合わせの接続の作業が容易になる。これにより、リニューアルの作業がより効率的になる。
 また、新設接続工程は、第1機器側仮設コネクタ12aおよび制御側仮設ケーブル13を撤去する手順を含む。
 また、新設接続工程は、第2機器側仮設コネクタ12bおよび制御側仮設コネクタ14を撤去する手順を含む。
 リニューアル作業の新設接続工程において仮設のリニューアル用具11は撤去されるので、乗客コンベアにおいてスペースが占有されない。
 また、リニューアル方法は、動作試験を行う工程を含む。動作試験は、乗客コンベアが通常運転を行いうるか否かを判定する試験である。動作試験を行う工程は、複数の第1機器接続工程の少なくともいずれかの後に行われる。また、動作試験を行う工程は、複数の第2機器接続工程の少なくともいずれかの後に行われる。
 複数の機器接続工程の後の動作試験によって、乗客コンベアを適切に通常運転させられるようになる。これにより、リニューアル作業による乗客コンベアの利用者の利便性の低下が抑えられる。
 なお、新設接続工程において、作業員は、既設の繋ぎ箱9を撤去してもよい。あるいは、リニューアル作業の完了後において、既設の繋ぎ箱9は、乗客コンベアに残されていてもよい。また、新設接続工程において、作業員は、既設の連絡ケーブル10を撤去してもよい。
 また、既設接続工程、新設接続工程の途中においても、乗客コンベアが通常運転を行いうる状態にある場合に、作業員は、動作試験を行った上で乗客コンベアを通常運転させてもよい。例えば既設接続工程において、リニューアル用具11の一部または全部を配置する手順の後で制御側仮設ケーブル13を既設の制御盤6に接続する前に、作業員は、乗客コンベアを通常運転させてもよい。例えば新設接続工程において、制御盤6および駆動装置3を交換する手順の後で既設の連絡ケーブル10などを撤去する前に、作業員は、乗客コンベアを通常運転させてもよい。
 また、エスカレーター1のリニューアルにおいて、複数のステップ4および一対の手摺5などの機器の交換などの作業が行われてもよい。当該作業の一部または全部は、既設接続工程、各々の機器接続工程、および新設接続工程の間に行われてもよい。あるいは、当該作業の一部または全部は、既設接続工程、各々の機器接続工程、および新設接続工程の作業と並行して行われてもよい。
 また、制御機器は、スイッチ、センサーまたは操作ボタンなどであってもよい。
 また、第1領域は、エスカレーター1の下階側であってもよい。第2領域は、エスカレーター1の上階側であってもよい。第1領域および第2領域の一方または両方は、エスカレーター1の中間領域であってもよい。エスカレーター1において、例えば中間領域などの第3領域に安全スイッチ8が配置される場合がある。この場合に、第3領域の安全スイッチ8に対応しうるように、リニューアル用具11は、第2機器側仮設コネクタ12b、制御側仮設コネクタ14、および複数の第2短絡端子21bの組をさらに備えていてもよい。
 乗客コンベアは、水平式の乗客コンベアであってもよい。このとき、第1領域および第2領域は、例えば乗客コンベアの入り口側および出口側などである。
 本開示に係るリニューアル方法は、乗客コンベアに適用できる。本開示に係るリニューアル用具は、当該リニューアル方法に適用できる。
 1 エスカレーター、 2a 上部機械室、 2b 下部機械室、 3 駆動装置、 4 ステップ、 5 手摺、 6 制御盤、 7 操作盤、 8 安全スイッチ、 9 繋ぎ箱、 10 連絡ケーブル、 11 リニューアル用具、 12a 第1機器側仮設コネクタ、 12b 第2機器側仮設コネクタ、 13 制御側仮設ケーブル、 14 制御側仮設コネクタ、 15a 第1制御側端子、 15b 第2制御側端子、 16a 第1連絡端子、 16b 第2連絡端子、 17 ワイヤハーネス、 18 プラグ端子、 19 制御回路、 20 ソケット端子、 21a 第1短絡端子、 21b 第2短絡端子、 22a 第1機器側端子、 22b 第2機器側端子、 23 コード

Claims (14)

  1.  乗客コンベアの第1領域の複数の第1新設制御機器のうち対応する第1新設制御機器に各々が接続される複数の第1機器側端子を有する第1機器側仮設コネクタと、
     前記複数の第1機器側端子のうち対応する第1機器側端子に各々が着脱可能に接続される複数の第1制御側端子を直列に有し、既設制御盤の制御回路に直列に接続される制御側仮設ケーブルと、
     前記複数の第1制御側端子の各々に着脱可能に接続され、接続している第1制御側端子を短絡させる複数の第1短絡端子と、
     を備える乗客コンベアのリニューアル用具。
  2.  新設制御盤を含む前記第1領域の第1新設装置に接続されるケーブルの端子が第1新設繋ぎ箱に収納される場合に、前記第1機器側仮設コネクタおよび前記複数の第1制御側端子の各々は、前記第1新設繋ぎ箱に収納される
     請求項1に記載の乗客コンベアのリニューアル用具。
  3.  前記複数の第1機器側端子の各々は、可撓性を有するコードによって互いに独立に動かしうるように設けられ、
     前記複数の第1制御側端子の各々は、可撓性を有するコードによって互いに独立に動かしうるように設けられる
     請求項1または請求項2に記載の乗客コンベアのリニューアル用具。
  4.  乗客コンベアの第2領域の複数の第2新設制御機器のうち対応する第2新設制御機器に各々が接続される複数の第2機器側端子を有する第2機器側仮設コネクタと、
     前記複数の第2機器側端子のうち対応する第2機器側端子に各々が着脱可能に接続される複数の第2制御側端子を直列に有し、前記第1領域および前記第2領域の間にわたって設けられる連絡ケーブルに着脱可能に接続される第2連絡端子を直列に有する制御側仮設コネクタと、
     前記複数の第2制御側端子の各々に着脱可能に接続され、接続している第2制御側端子を短絡させる複数の第2短絡端子と、
     を備え、
     前記制御側仮設ケーブルは、前記連絡ケーブルに着脱可能に接続される第1連絡端子を直列に有する
     請求項1から請求項3のいずれか一項に記載の乗客コンベアのリニューアル用具。
  5.  前記第2領域の第2新設装置に接続されるケーブルの端子が第2新設繋ぎ箱に収納される場合に、前記第2機器側仮設コネクタおよび前記制御側仮設コネクタは、前記第2新設繋ぎ箱に収納される
     請求項4に記載の乗客コンベアのリニューアル用具。
  6.  前記複数の第2機器側端子の各々は、可撓性を有するコードによって互いに独立に動かしうるように設けられ、
     前記複数の第2制御側端子の各々は、可撓性を有するコードによって互いに独立に動かしうるように設けられる
     請求項4または請求項5に記載の乗客コンベアのリニューアル用具。
  7.  乗客コンベアの第1領域の複数の第1新設制御機器のうち対応する第1新設制御機器に各々が接続される複数の第1機器側端子を有する第1機器側仮設コネクタ、および前記複数の第1機器側端子のうち対応する第1機器側端子に各々が着脱可能に接続される複数の第1制御側端子を直列に有する制御側仮設ケーブルを、前記複数の第1制御側端子の各々が第1短絡端子の接続によって短絡されている状態で前記第1領域に配置する手順、ならびに
     当該手順の後に、前記制御側仮設ケーブルを既設制御盤の制御回路に直列に接続する手順
     を含む既設接続工程と、
     前記複数の第1新設制御機器の各々に対応し、前記既設接続工程の後に行われる複数の第1機器接続工程と、
     前記既設制御盤を新設制御盤に交換する手順、および
     前記複数の第1新設制御機器を前記新設制御盤に接続する手順
     を含み、前記複数の第1機器接続工程の全部または一部の後に行われる新設接続工程と、
     を備え、
     前記複数の第1機器接続工程の各々は、
     前記複数の第1新設制御機器のうち対応する第1新設制御機器を設置する手順と、
     当該第1新設制御機器に対応する第1機器側端子を、当該第1機器側端子に対応する第1制御側端子に前記第1短絡端子を取り外した後に接続する手順と、
     を含む
     乗客コンベアのリニューアル方法。
  8.  前記既設接続工程は、
     前記新設制御盤を含む前記第1領域の第1新設装置に接続されるケーブルの端子を収納する第1新設繋ぎ箱を設置する手順
     を含み、
     前記既設接続工程において、前記第1機器側仮設コネクタおよび前記複数の第1制御側端子の各々は、前記第1新設繋ぎ箱に収納された状態で配置され、
     前記新設接続工程において、前記複数の第1新設制御機器は、前記第1新設繋ぎ箱に端子が収納されているケーブルを介して前記新設制御盤に接続される
     請求項7に記載の乗客コンベアのリニューアル方法。
  9.  前記新設接続工程は、
     前記第1機器側仮設コネクタおよび前記制御側仮設ケーブルを撤去する手順
     を含む
     請求項7または請求項8に記載の乗客コンベアのリニューアル方法。
  10.  前記複数の第1機器接続工程の少なくともいずれかの後に、乗客コンベアが通常運転を行いうるか否かを判定する動作試験を行う工程
     を備える
     請求項7から請求項9のいずれか一項に記載の乗客コンベアのリニューアル方法。
  11.  乗客コンベアの第2領域の複数の第2新設制御機器の各々に対応し、前記既設接続工程の後に行われる複数の第2機器接続工程
     を備え、
     前記既設接続工程は、
     前記複数の第2新設制御機器のうち対応する第2新設制御機器に各々が接続される複数の第2機器側端子を有する第2機器側仮設コネクタ、および前記複数の第2機器側端子のうち対応する第2機器側端子に各々が着脱可能に接続される複数の第2制御側端子を直列に有し、前記第1領域および前記第2領域の間にわたって設けられる連絡ケーブルに着脱可能に接続される第2連絡端子を直列に有する制御側仮設コネクタを、前記複数の第2制御側端子の各々が第2短絡端子の接続によって短絡されている状態で前記第2領域に配置する手順、ならびに
     当該手順の後に、前記連絡ケーブルを前記第2連絡端子に接続し、前記連絡ケーブルを前記制御側仮設ケーブルが直列に有する第1連絡端子に接続する手順
     を含み、
     前記新設接続工程は、
     前記連絡ケーブルを介して前記複数の第2新設制御機器を前記新設制御盤に接続する手順
     を含み、前記複数の第2機器接続工程の全部または一部の後に行われ、
     前記複数の第2機器接続工程の各々は、
     前記複数の第2新設制御機器のうち対応する第2新設制御機器を設置する手順、および
     当該第2新設制御機器に対応する第2機器側端子を、当該第2機器側端子に対応する第2制御側端子に前記第2短絡端子を取り外した後に接続する手順
     を含む
     請求項7から請求項10のいずれか一項に記載の乗客コンベアのリニューアル方法。
  12.  前記既設接続工程は、
     前記第2領域の第2新設装置に接続されるケーブルの端子を収納する第2新設繋ぎ箱を設置する手順
     を含み、
     前記既設接続工程において、前記第2機器側仮設コネクタおよび前記制御側仮設コネクタは、前記第2新設繋ぎ箱に収納された状態で配置される
     請求項11に記載の乗客コンベアのリニューアル方法。
  13.  前記新設接続工程は、
     前記第2機器側仮設コネクタおよび前記制御側仮設コネクタを撤去する手順
     を含む
     請求項11または請求項12に記載の乗客コンベアのリニューアル方法。
  14.  前記複数の第2機器接続工程の少なくともいずれかの後に、乗客コンベアが通常運転を行いうるか否かを判定する動作試験を行う工程
     を備える
     請求項11から請求項13のいずれか一項に記載の乗客コンベアのリニューアル方法。
PCT/JP2020/022554 2020-06-08 2020-06-08 乗客コンベアのリニューアル用具および乗客コンベアのリニューアル方法 WO2021250747A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
PCT/JP2020/022554 WO2021250747A1 (ja) 2020-06-08 2020-06-08 乗客コンベアのリニューアル用具および乗客コンベアのリニューアル方法
JP2022530372A JP7136392B2 (ja) 2020-06-08 2020-06-08 乗客コンベアのリニューアル用具および乗客コンベアのリニューアル方法
CN202080101728.7A CN115768711B (zh) 2020-06-08 2020-06-08 乘客输送机的翻新用具以及乘客输送机的翻新方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2020/022554 WO2021250747A1 (ja) 2020-06-08 2020-06-08 乗客コンベアのリニューアル用具および乗客コンベアのリニューアル方法

Publications (1)

Publication Number Publication Date
WO2021250747A1 true WO2021250747A1 (ja) 2021-12-16

Family

ID=78845439

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2020/022554 WO2021250747A1 (ja) 2020-06-08 2020-06-08 乗客コンベアのリニューアル用具および乗客コンベアのリニューアル方法

Country Status (3)

Country Link
JP (1) JP7136392B2 (ja)
CN (1) CN115768711B (ja)
WO (1) WO2021250747A1 (ja)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5352857A (en) * 1991-07-16 1994-10-04 Seppo Ovaska Procedure for modernizing an elevator group
JP2004323153A (ja) * 2003-04-23 2004-11-18 Hitachi Building Systems Co Ltd 乗客コンベアのリニューアル方法
WO2019224882A1 (ja) * 2018-05-21 2019-11-28 三菱電機株式会社 乗客コンベアのリニューアル方法

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009012891A (ja) * 2007-07-02 2009-01-22 Toshiba Elevator Co Ltd 乗客コンベア監視装置及び遠隔監視システム
JP2017149497A (ja) * 2016-02-22 2017-08-31 東芝エレベータ株式会社 乗客コンベアの保守点検システム
WO2021024368A1 (ja) * 2019-08-06 2021-02-11 三菱電機株式会社 乗客コンベアのリニューアル方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5352857A (en) * 1991-07-16 1994-10-04 Seppo Ovaska Procedure for modernizing an elevator group
JP2004323153A (ja) * 2003-04-23 2004-11-18 Hitachi Building Systems Co Ltd 乗客コンベアのリニューアル方法
WO2019224882A1 (ja) * 2018-05-21 2019-11-28 三菱電機株式会社 乗客コンベアのリニューアル方法

Also Published As

Publication number Publication date
CN115768711A (zh) 2023-03-07
JPWO2021250747A1 (ja) 2021-12-16
JP7136392B2 (ja) 2022-09-13
CN115768711B (zh) 2023-06-13

Similar Documents

Publication Publication Date Title
US20120023722A1 (en) Elevator renovation method
JP6947337B2 (ja) 乗客コンベアのリニューアル方法
WO2021250747A1 (ja) 乗客コンベアのリニューアル用具および乗客コンベアのリニューアル方法
JP6554451B2 (ja) テールコードレスエレベーター
KR101352610B1 (ko) 엘리베이터 제어 시스템 장치
WO2019224882A1 (ja) 乗客コンベアのリニューアル方法
CN110775768A (zh) 多轿厢电梯以及轿厢移动控制方法
CN1847135A (zh) 乘客输送装置
JP6445652B1 (ja) 乗客コンベア
JP6900960B2 (ja) 乗客コンベア
WO2021210152A1 (ja) 乗客コンベアの駆動システム
JP6569749B2 (ja) エレベーターの改修支援装置およびエレベーターの改修方法
JP4355163B2 (ja) 乗客コンベアのリニューアル方法
JP2502765B2 (ja) エレベ―タ運転装置
JP2000281270A (ja) 乗客コンベア
JP5796992B2 (ja) エレベータの改修方法
JPH07252049A (ja) 複数台エレベータの停電時自動着床装置
JP3202422B2 (ja) 昇降機の改造方法
JP2000198638A (ja) エレベ―タの改造方法
JPH04280785A (ja) 昇降機の制御盤交換方法
JP2010254411A (ja) エレベータの制御装置
JP2007119167A (ja) 乗客コンベアの仮設操作装置
JPH10203741A (ja) 昇降機の制御盤交換方法及び仮設低速運転装置
JPH08259121A (ja) エレベータ工事用のかご運転装置
JPH06156936A (ja) エレベータ制御装置

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 20939557

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2022530372

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 20939557

Country of ref document: EP

Kind code of ref document: A1