WO2020188876A1 - 物品搬送設備 - Google Patents

物品搬送設備 Download PDF

Info

Publication number
WO2020188876A1
WO2020188876A1 PCT/JP2019/043355 JP2019043355W WO2020188876A1 WO 2020188876 A1 WO2020188876 A1 WO 2020188876A1 JP 2019043355 W JP2019043355 W JP 2019043355W WO 2020188876 A1 WO2020188876 A1 WO 2020188876A1
Authority
WO
WIPO (PCT)
Prior art keywords
transport
carriages
article
tension
carriage
Prior art date
Application number
PCT/JP2019/043355
Other languages
English (en)
French (fr)
Inventor
上田 雄一
修 松井
小出 浩之
篤 石倉
Original Assignee
株式会社ダイフク
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社ダイフク filed Critical 株式会社ダイフク
Priority to EP19920161.7A priority Critical patent/EP3943358B1/en
Priority to US17/440,412 priority patent/US20220161832A1/en
Priority to KR1020217031635A priority patent/KR20210140735A/ko
Priority to CN201980093800.3A priority patent/CN113544036B/zh
Priority to ES19920161T priority patent/ES2945223T3/es
Publication of WO2020188876A1 publication Critical patent/WO2020188876A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G47/00Article or material-handling devices associated with conveyors; Methods employing such devices
    • B65G47/74Feeding, transfer, or discharging devices of particular kinds or types
    • B65G47/94Devices for flexing or tilting travelling structures; Throw-off carriages
    • B65G47/96Devices for tilting links or platform
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61BRAILWAY SYSTEMS; EQUIPMENT THEREFOR NOT OTHERWISE PROVIDED FOR
    • B61B13/00Other railway systems
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61DBODY DETAILS OR KINDS OF RAILWAY VEHICLES
    • B61D49/00Other details
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61GCOUPLINGS; DRAUGHT AND BUFFING APPLIANCES
    • B61G7/00Details or accessories
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G17/00Conveyors having an endless traction element, e.g. a chain, transmitting movement to a continuous or substantially-continuous load-carrying surface or to a series of individual load-carriers; Endless-chain conveyors in which the chains form the load-carrying surface
    • B65G17/30Details; Auxiliary devices
    • B65G17/32Individual load-carriers
    • B65G17/34Individual load-carriers having flat surfaces, e.g. platforms, grids, forks
    • B65G17/345Individual load-carriers having flat surfaces, e.g. platforms, grids, forks the surfaces being equipped with a conveyor
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G23/00Driving gear for endless conveyors; Belt- or chain-tensioning arrangements
    • B65G23/02Belt- or chain-engaging elements
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G35/00Mechanical conveyors not otherwise provided for
    • B65G35/06Mechanical conveyors not otherwise provided for comprising a load-carrier moving along a path, e.g. a closed path, and adapted to be engaged by any one of a series of traction elements spaced along the path
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G47/00Article or material-handling devices associated with conveyors; Methods employing such devices
    • B65G47/34Devices for discharging articles or materials from conveyor 
    • B65G47/46Devices for discharging articles or materials from conveyor  and distributing, e.g. automatically, to desired points
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01LMEASURING FORCE, STRESS, TORQUE, WORK, MECHANICAL POWER, MECHANICAL EFFICIENCY, OR FLUID PRESSURE
    • G01L5/00Apparatus for, or methods of, measuring force, work, mechanical power, or torque, specially adapted for specific purposes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G2203/00Indexing code relating to control or detection of the articles or the load carriers during conveying
    • B65G2203/02Control or detection
    • B65G2203/0266Control or detection relating to the load carrier(s)
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G2203/00Indexing code relating to control or detection of the articles or the load carriers during conveying
    • B65G2203/04Detection means
    • B65G2203/042Sensors

Definitions

  • the present invention relates to an article transport facility in which a plurality of transport carts for transporting articles are connected and a plurality of connected transport carts are traveled along a transport route.
  • the article transport facility of Japanese Patent Application Laid-Open No. 2005-255331 includes a plurality of transport carts that move along rails, and the transport carts that are adjacent to each other in the moving direction are connected to each other by a connecting portion.
  • the transport trolley is moved along a loop-shaped rail, and when the transport trolley reaches a desired sorting position, the articles on the transport trolley are moved. Sort to the sorting position.
  • wheels are provided between the transport carriages, and the tension between the transport carriages is maintained at a predetermined tension so that the transport carriages are kept stable along the transport path. I'm running.
  • the lift of the wheel with respect to the traveling surface is determined by detecting the tension between the transporting carriages, but the tension between the transporting carriages cannot be detected when the transporting carriages are traveling. Therefore, there is a problem that it is not possible to determine the lifting of the wheels with respect to the traveling surface when the transport carriage is traveling, and it is not possible to prevent the wheels from being lifted with respect to the traveling surface.
  • an object of the present invention is to provide an article transporting facility capable of detecting the tension between the transporting carriages when the transporting carriages are traveling.
  • the article transport facility of the present invention is an article transport facility in which a plurality of transport carts for transporting articles are connected and the plurality of connected transport carts are traveled along a transport path, and the transport carriage is the traveling thereof.
  • a measuring unit that is connected to another transport carriage in the front-rear direction with respect to the direction by a connecting portion and is provided in the connecting portion to measure the force applied between the transport carriages and the transport carriage measured by the measuring unit.
  • the force applied to the wheels of the transport carriage is calculated based on the tension calculation unit that calculates the tension between the transport carriages based on the force applied to the carriage and the tension between the transport carriages calculated by the tension calculation unit. It is provided with a calculation unit. In the above configuration, the force applied to the wheels of the transport carriage is calculated based on the tension between the transport carriages.
  • the measuring section is provided at any two or more of the connecting sections provided for each of the transport carriages.
  • the tension between the transport carriages is calculated based on the force applied between the transport carriages measured by the measurement units provided in any two or more of the connection portions provided between the transport carriages. The force applied to the wheels of the transport trolley is calculated.
  • the measuring unit is composed of a load cell. In the above configuration, the force applied between the transport carriages is measured by the load cell.
  • the measuring unit is provided on the transport carriage, and the tension calculation unit and the calculation unit are provided on the ground side on which the transport carriage travels.
  • the force applied between the transport carriages is measured on the transport carriage side, and the tension between the transport carriages and the force applied to the wheels of the transport carriage are calculated on the ground side.
  • the tension between the transporting carriages is calculated by measuring the force applied between the transporting carriages by the measuring unit provided on the transporting carriages, so that the tension between the transporting carriages is calculated when the transporting carriages are running. It can be detected, and it is not necessary to stop the entire transport carriage every time the tension between the transport carriages is detected, so that the work efficiency is improved. Further, since the force applied to the wheels when the transport carriage is running is calculated, it is possible to predict in advance the lift of the wheels with respect to the running surface when the transport carriage is running, and it is possible to prevent the wheels from floating with respect to the running surface. ..
  • the article transport facility 10 includes a main conveyor device 20 that conveys the article 90 along the transfer path K, a plurality of induction conveyors 40 that are put into the article 90 on the transfer path K of the main conveyor device 20, and a main conveyor device 20. It is mainly composed of a plurality of chutes 50 that receive articles 90 to be discharged from the transport path K.
  • the article 90 is charged from the predetermined induction conveyor 40 onto the transport path K of the main conveyor device 20.
  • the article 90 loaded on the transport path K is received by the main conveyor device 20 at the article loading position P.
  • the article 90 is transported by a transport carriage 22 traveling on the transport path K.
  • the article 90 transported by the transport carriage 22 is paid out to the chute 50.
  • a store which is a sorting destination for the goods 90, is assigned to each chute 50.
  • the article 90 is sorted by the store assigned to each chute 50.
  • the induction conveyor 40 transports the article 90 diagonally from the upstream side to the downstream side of the traveling direction H of the transport carriage 22 on the side portion of the transport path K, and the transport posture of the article 90. Is put into the transport trolley 22 while holding the above.
  • a plurality of induction conveyors 40 (three in FIG. 1) are provided along the transport path K.
  • the induction conveyor 40 is provided corresponding to each of the article loading positions P (positions where the induction conveyor 40 loads the article 90 into the transport carriage 22) at a plurality of locations (three locations in FIG. 1) provided on the transport path K. ing.
  • the transport trolley 22 to which the article 90 should be loaded is searched in advance for each induction conveyor 40, and the transport trolley 22 to which the article 90 should be loaded is determined.
  • the induction conveyor 40 throws the article 90 into a predetermined conveyor 22 determined for each induction conveyor 40.
  • the chute 50 receives the article 90 paid out from the transport carriage 22 and transports the received article 90 to another downstream facility (for example, shipping facility) or a direct vehicle (for example, truck). Is.
  • a plurality of chutes 50 (three in FIG. 1) are provided along the transport path K.
  • the chute 50 receives a predetermined article 90 for each chute 50 from the transport carriage 22.
  • the chute 50 is configured by combining a plate-shaped member such as an iron plate, a roller conveyor, a belt conveyor, and the like.
  • the chute 50 inclines from above to below with respect to the main conveyor device 20.
  • the main conveyor device 20 is mainly composed of a rail 21 provided along the transport path K and a plurality of transport carts 22 traveling along the rail 21.
  • the article 90 is loaded from the induction conveyor 40 into the transport carriage 22.
  • the transport trolley 22 on which the article 90 loaded from the induction conveyor 40 is placed travels on the rail 21, so that the article 90 is conveyed along the transport path K.
  • the article 90 transported by the transport carriage 22 is paid out from the transport carriage 22 to the chute 50.
  • the transport carriage 22 receives the article 90 loaded from the predetermined induction conveyor 40 at the article loading position P.
  • the transport carriage 22 transports the received article 90 along the transport path K.
  • the transport carriage 22 pays out the article 90 to be transported along the transport path K to a predetermined chute 50.
  • the transport carriage 22 is mainly composed of a main body 23 running on the rail 21 and a belt conveyor 24 on which the article 90 is placed and supported.
  • the main body 23 mainly includes a wheel 23A for traveling on the rail 21, and a frame 23B for supporting the wheel 23A, the belt conveyor 24, and the like.
  • the belt conveyor 24 is provided on the upper part of the main body 23.
  • the belt conveyor 24 is configured to be capable of transporting the placed article 90 in a direction orthogonal to the traveling direction H of the transport carriage 22.
  • the belt conveyor 24 has a motor 26 for driving the belt.
  • the belt conveyor 24 drives the belt to discharge the article 90 in the direction in which the chute 50 is located.
  • the belt conveyor 24 drives the belt to position the article 90 at an appropriate position. Adjust to.
  • the transport trolley 22 is connected to another transport trolley 22 (another transport trolley 22 in the front-rear direction with respect to the traveling direction H of the transport trolley 22) adjacent to each other in the transport path K.
  • the transport carriage 22 travels on the rail 21 in a state of being connected to another adjacent transport carriage 22.
  • the transport carriage 22 is connected to another adjacent transport carriage 22 by a connecting portion 27.
  • the connecting portion 27 is mainly composed of a convex portion 27A provided at the front end portion of the frame 23B and a concave portion 27B provided at the rear end portion of the frame 23B.
  • the connecting portion 27 connects the protruding portion of the convex portion 27A provided at the front end portion of the front transport carriage 22 between the transport carriages 22 adjacent to the traveling direction of the transport carriage 22 in the front-rear direction to the rear transport carriage 22.
  • the adjacent transport carriages 22 are connected to each other so as to fit into the concave portion of the recess 27B provided at the rear end portion.
  • a cover 25 is provided so as to cover the connecting portion 27 in the gap between the adjacent transport carriages 22.
  • the cover 25 is composed of a plate-shaped member that closes the gap between the adjacent transport carriages 22.
  • the cover 25 is fixed to the rear end portion of the transport carriage 22 (the end portion on the rear side with respect to the traveling direction of the transport carriage 22).
  • Wheels 23A are pivotally supported by the connecting portion 27. That is, the wheels 23A are provided in the gap between the adjacent transport carriages 22. Specifically, the wheels 23A are provided in the recesses 27B at the rear end of the transport carriage 22, and are pivotally supported at both ends of the recesses 27B in the left-right direction (the direction horizontally orthogonal to the traveling direction H of the transport carriage 22). ing.
  • the force applied between the transport carriages 22 connected by the connecting portions 27 is measured at any two connecting portions 27 of the connecting portions 27 provided for each of the transport carriages 22.
  • a load cell 31 (an example of a “measurement unit”) is provided.
  • the load cell 31 is provided in two predetermined connecting portions 27 among the connecting portions 27 provided for each of the transport carriages 22.
  • the two predetermined connecting portions 27 are not particularly limited two (two places) connecting portions 27, but two connecting portions 27 that are close to each other but are separated from each other. It may be part 27.
  • the load cell 31 is a convex portion formed on the front end portion of two predetermined transport carriages 22 of the plurality of transport carriages 22 traveling along the rail 21. It is provided in the central part of 27A.
  • the load cell 31 provided in one of the two predetermined connecting portions 27 is used as a main (main), and the load cell 31 provided in the other connecting portion 27 is used as an auxiliary (sub).
  • the main and sub load cells 31 provided in the connecting portion 27 measure the force applied between the transport carriages 22 at the same time when the transport carriages 22 are traveling. Therefore, when the main load cell 31 cannot measure the force due to a failure or the like, the tension T is calculated from the force data measured by the sub load cell 31.
  • the tension monitoring system of the transport carriage 22 in the main conveyor device 20 will be described.
  • the force applied between the adjacent transport carriages 22 is measured, and the tension T between the transport carriages 22 is calculated based on the measured value.
  • the force F applied to the wheels 23A provided between the transport carriages 22 is calculated based on the calculated tension T between the transport carriages 22, and the lift of the wheels 23A with respect to the rail 21 is determined based on the calculated result. That is, the ground contact state of the wheel 23A with respect to the rail 21 is determined from the force F applied to the wheel 23A.
  • the force F applied to the wheel 23A becomes smaller than zero (becomes a negative value), it is determined that the wheel 23A is lifted from the rail 21.
  • the force F applied to the wheels 23A provided between the transport carriages 22 is the force applied between the weight Mg [N] of the transport carriage 22 and the transport carriage 22 measured by the load cell 31. It is calculated from the tension T [N] between the transport carriages 22 calculated based on the above and the inclination angle ⁇ of the rail 21. Specifically, the force F applied to the wheel 23A is calculated by the following equation (1).
  • F Mg + TSin ⁇ (1)
  • the inclination angle ⁇ of the rail 21 is a preset angle for each transport path K. As the inclination angle ⁇ of the rail 21, the angle measured at any time may be used in combination with the detection of the tension T between the transport carriages 22.
  • the value of the force F applied to the wheels 23A increases when the tension T between the transport carriages 22 is large, and decreases when the tension T between the transport carriages 22 is small. Then, when the force F applied to the wheels 23A is smaller than zero (becomes a negative value), that is, when the tension T between the transport carriages 22 is loosened and a compressive force is applied between the transport carriages 22, the wheels 23A It floats with respect to the rail 21. On the other hand, when the force F applied to the wheels 23A is large, that is, when the transport carriages 22 are pulled and a tensile force is applied between the transport carriages 22, the wheels 23A do not float with respect to the rail 21.
  • the main conveyor device 20 includes a load cell 31 (an example of a “measurement unit”) for measuring the force applied between the transport carriages 22 and a transmitter 32. , Equipped with.
  • the transmitter 32 transmits the measured value of the force applied between the transport carriages 22 measured by the load cell 31 to the receiver 36 described later.
  • the transmitter 32 is provided on the main body 23 (frame 23B) of the transport carriage 22 on which the load cell 31 is provided.
  • the transmitter 32 is connected to the load cell 31.
  • the transmitter 32 transmits the signal from the load cell 31 to the receiver 36.
  • the main conveyor device 20 includes a receiver 36 and a controller 37 (an example of a “tension calculation unit” and a “calculation unit”) on the ground side (position other than the transport carriage 22) on which the transport carriage 22 travels. ..
  • the receiver 36 receives a signal (measured value of the force applied between the transport carriages 22) transmitted from the transmitter 32.
  • the receiver 36 is provided so as to be able to wirelessly receive the signal from the transmitter 32 at a predetermined position on the side of the transport path K that does not interfere with the traveling of the transport carriage 22.
  • the receiver 36 receives a signal from the transmitter 32 when the transport carriage 22 provided with the transmitter 32 travels within the reception range of the receiver 36.
  • the measurement of the force applied between the transport trolleys 22, that is, the detection of the tension T between the transport trolleys 22, is performed every time the transport trolley 22 provided with the transmitter 32 makes one round of the transport path K (the transmitter 32 is provided). This is performed every time the transport carriage 22 travels within the reception range of the receiver 36).
  • the controller 37 controls the entire main conveyor device 20, and is connected to each part in the main conveyor device 20 including the receiver 36.
  • the controller 37 calculates the tension T between the transport carriages 22 based on the measured value of the force applied between the transport carriages 22 received by the receiver 36. That is, the controller 37 calculates the tension T between the transport carriages 22 based on the measured value of the force applied between the transport carriages 22 measured by the load cell 31. Further, the controller 37 calculates the force F applied to the wheels 23A provided between the transport carriages 22 based on the calculation result of the tension T between the transport carriages 22. Furthermore, the controller 37 determines whether or not the wheel 23A is floating with respect to the rail 21 based on the calculation result of the force F applied to the wheel 23A.
  • the controller 37 calculates the force F applied to the wheel 23A based on the above equation (1), and as a result of the calculation, if the force F applied to the wheel 23A is zero, the controller 37 is conveyed at that time.
  • the running of the trolley 22 is stopped. That is, the controller 37 controls the traveling of the transport carriage 22 based on the force F applied to the wheels 23A calculated based on the tension T between the transport carriages 22.
  • the controller 37 calculates that the force F applied to the wheels 23A is zero, the transport carriage 22 is stopped from running, and a warning light, a warning sound, or the like is used to notify the fact. It doesn't matter.
  • the controller 37 calculates the tension T between the transport carriages 22 based on the signal (measured value of the force applied between the transport carriages 22) transmitted from the transmitter 32 of the transport carriage 22 provided with the main load cell 31, and the wheels.
  • the force F applied to 23A is calculated.
  • the controller 37 is transmitted from the transmitter 32 of the transport carriage 22 provided with the sub load cell 31.
  • the tension T between the transport carriages 22 is calculated based on the signal (measured value of the force applied between the transport carriages 22), and the force F applied to the wheels 23A is calculated.
  • the force applied between the transport carriages 22 used for calculating the tension T between the transport carriages 22 is measured by the load cell 31 on the transport carriage 22 (on the transport carriage 22 side). ), The tension T between the transport carriages 22 and the force F applied to the wheels 23A are calculated on the ground side (position other than the transport carriage 22) on which the transport carriage 22 travels.
  • the load cell 31 provided on the transport carriage 22 measures the force applied between the transport carriages 22 to calculate the tension T between the transport carriages 22, so that the transport carriage 22 travels. Occasionally, the tension T between the transport carriages 22 can be detected, and it is not necessary to stop the entire transport carriage 22 every time the tension T between the transport carriages 22 is detected, so that the work efficiency is improved. Further, since the force F applied to the wheels 23A when the transport carriage 22 is traveling is calculated, it is possible to predict in advance the lift of the wheels 23A with respect to the rail 21 when the transport carriage 22 is traveling, and the lift of the wheels 23A with respect to the rail 21 can be predicted in advance. Can be prevented.
  • the load cell 31 is provided in any two connecting portions 27 of the connecting portions 27 provided for each of the transport carriages 22, the force applied between the transport carriages 22 is applied by a small number of parts. Can be measured. Further, even if the load cell 31 provided in one of the two connecting portions 27 cannot measure the force applied between the transport carriages 22 due to a failure or the like, the two connecting portions Since the force can be measured by the load cell 31 provided in the other connecting portion 27 of the 27, the tension T between the transport carriages 22 can be reliably detected.
  • a load cell 31 for measuring the force applied between the transport carriages 22 is mounted on the transport carriage 22, and the tension T between the transport carriages 22 and
  • the controller 37 that calculates the force F applied to the wheels 23A on the ground side other than the transport carriage 22, the force applied between the transport carriages 22 during the traveling of the transporting carriage 22 without stopping the traveling of the transporting carriage 22. Can be measured to calculate the tension T between the transport carriages 22 and the force F applied to the wheels 23A.
  • the article support in the main conveyor device 20 (conveyor carriage 22) is composed of a belt conveyor 24 (self-driven cross belt type), but the present invention is not limited to this. As long as the article 90 can be placed and supported, for example, a tray (a tilt tray type that is not driven by itself) may be used.
  • the load cell 31 is provided in any two connecting portions 27 of the connecting portions 27 provided for each of the transport carriages 22, but the present invention is not limited to this, and the transport carriage is not limited to this. If the configuration is such that the force applied between the 22 can be measured, the load cell 31 is provided in any one of the connecting portions 27 provided for each of the transport carriages 22 or in three or more connecting portions 27. It doesn't matter.
  • the load cell 31 is a measuring unit that measures the force applied between the transport carriages 22, but the present invention is not limited to this, and any means that can measure the force applied between the transport carriages 22 is available. I do not care.
  • the calculation of the tension T between the transport carriages 22 and the calculation of the force F applied to the wheels 23A of the transport carriage 22 are performed by the same controller 37, but the present invention is not limited to this. Instead, the calculation of the tension T between the transport carriages 22 and the calculation of the force F applied to the wheels 23A of the transport carriage 22 may be performed by different controllers. That is, the tension calculation unit and the calculation unit may be configured by separate controllers.
  • the tension T between the transport carriages 22 is calculated by the controller 37 provided on the ground side (position other than the transport carriage 22) on which the transport carriage 22 travels, but the present invention is limited to this. Instead, a controller for calculating the tension T between the transport carriages 22 may be provided on the transport carriage 22 and the tension T between the transport carriages 22 may be calculated on the transport carriage 22. That is, the tension T between the transport carriages 22 may be detected on the transport carriage 22.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Transportation (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Control Of Conveyors (AREA)
  • Discharge Of Articles From Conveyors (AREA)
  • Platform Screen Doors And Railroad Systems (AREA)
  • Warehouses Or Storage Devices (AREA)
  • Supplying Of Containers To The Packaging Station (AREA)
  • Control And Other Processes For Unpacking Of Materials (AREA)
  • Liquid Crystal Substances (AREA)
  • Specific Conveyance Elements (AREA)
  • Chain Conveyers (AREA)

Abstract

物品90を搬送する搬送台車22を複数連結し、連結した複数の搬送台車22を搬送経路Kに沿って走行させる物品搬送設備10である。搬送台車22は、その走行方向Hに対して前後方向の他の搬送台車22と連結部27により連結される。搬送台車22は、連結部27に設けられて搬送台車22間にかかる力を計測するロードセル31と、ロードセル31によって計測される搬送台車22間にかかる力により算出される搬送台車22間の張力Tに基づいて搬送台車22の車輪23Aにかかる力Fを算出するコントローラ37と、を備える。

Description

物品搬送設備
 本発明は、物品を搬送する搬送台車を複数連結し、連結した複数の搬送台車を搬送経路に沿って走行させる物品搬送設備に関するものである。
 従来、この種の物品搬送設備としては、例えば、日本国特開2005-255331号に示すような物品搬送設備がある。
 日本国特開2005-255331号の物品搬送設備は、レールに沿って移動する複数の搬送台車を備え、移動方向に隣り合う搬送台車同士が連結部によって互いに連結されるものである。日本国特開2005-255331号の物品搬送設備においては、前記搬送台車をループ状のレールに沿って移動させ、前記搬送台車が所望の仕分け位置に到達した時点で、前記搬送台車上の物品を前記仕分け位置に仕分ける。
 このような従来の物品搬送設備においては、各搬送台車間に車輪が設けられ、各搬送台車間の張力を所定の張力で保持することによって、各搬送台車を搬送経路に沿って安定した状態で走行させている。
 従来の物品搬送設備においては、搬送台車間の張力が緩むことによって搬送台車間に圧縮力がかかると、搬送台車間に設けられる車輪が走行面から浮き上がる。そのため、従来の物品搬送設備においては、搬送台車間の張力の検出を定期的に行う必要がある。しかしながら、従来の物品搬送設備においては、搬送台車間の張力の検出を搬送台車の停止時にのみ行うことができ、搬送台車間の張力の検出を行う毎に搬送台車全体を停止させる必要があり作業効率が悪いという問題があった。
 また、従来の物品搬送設備においては、搬送台車間の張力を検出することによって車輪の走行面に対する浮き上がりを判断しているが、搬送台車間の張力の検出を搬送台車の走行時に行うことができないため、搬送台車の走行時に車輪の走行面に対する浮き上がりを判断することできず、未然に、車輪の走行面に対する浮き上がりを防止することができないという問題があった。
 そこで、本発明は、搬送台車の走行時に搬送台車間の張力の検出が可能な物品搬送設備を提供することを目的とする。
 本発明の解決しようとする課題は以上であり、次にこの課題を解決するための手段を説明する。
 即ち、本発明の物品搬送設備は、物品を搬送する搬送台車を複数連結し、連結した複数の前記搬送台車を搬送経路に沿って走行させる物品搬送設備であって、前記搬送台車は、その走行方向に対して前後方向の他の搬送台車と連結部により連結され、前記連結部に設けられて前記搬送台車間にかかる力を計測する計測部と、前記計測部によって計測される前記搬送台車間にかかる力に基づいて、前記搬送台車間の張力を算出する張力算出部と、前記張力算出部によって算出される前記搬送台車間の張力に基づいて、前記搬送台車の車輪にかかる力を算出する算出部と、を備えるものである。
 上記構成では、搬送台車間の張力に基づいて搬送台車の車輪にかかる力を算出する。
 本発明の物品搬送設備は、前記計測部が、前記搬送台車間毎に設けられる前記連結部のうちのいずれか2つ以上の前記連結部に設けられるものである。
 上記構成では、搬送台車間毎に設けられる連結部のうちのいずれか2つ以上の連結部に設けられる計測部によって計測される搬送台車間にかかる力に基づいて搬送台車間の張力を算出して搬送台車の車輪にかかる力を算出する。
 本発明の物品搬送設備は、前記計測部が、ロードセルにより構成されるものである。
 上記構成では、搬送台車間にかかる力をロードセルにより計測する。
 本発明の物品搬送設備は、前記計測部が、前記搬送台車に設けられ、前記張力算出部及び前記算出部が、前記搬送台車が走行する地上側に設けられるものである。
 上記構成では、搬送台車側で搬送台車間にかかる力を計測し、地上側で搬送台車間の張力及び搬送台車の車輪にかかる力を算出する。
 本発明の物品搬送設備によれば、搬送台車に設けられる計測部によって搬送台車間にかかる力を計測して搬送台車間の張力を算出することから、搬送台車の走行時に搬送台車間の張力を検出することができ、搬送台車間の張力の検出を行う毎に搬送台車全体を停止させる必要がないため作業効率が向上する。
 また、搬送台車の走行時に車輪にかかる力を算出するため、搬送台車の走行時に、車輪の走行面に対する浮き上がりを予め予測することができ、未然に車輪の走行面に対する浮き上がりを防止することができる。
本発明に係る物品搬送設備の概略平面図である。 本発明に係る物品搬送設備の搬送台車の斜視図である。 本発明に係る物品搬送設備の搬送台車間の連結部の平面図である。 本発明に係る物品搬送設備の搬送台車が水平なレールを走行する場合の搬送台車の車輪にかかる力を示す概略図である。 本発明に係る物品搬送設備の搬送台車が傾斜のあるレールを走行する場合の搬送台車の車輪にかかる力を示す概略図である。 本発明に係る物品搬送設備の搬送台車の張力の監視システムの構成を示すブロック図である。
 本発明の実施の形態の物品搬送設備10について説明する。
 図1に示すように、物品搬送設備10には、ループ状の搬送経路Kが形成されている。物品搬送設備10は、搬送経路Kに沿って物品90を搬送する主コンベヤ装置20と、主コンベヤ装置20の搬送経路K上に物品90に投入する複数のインダクションコンベヤ40と、主コンベヤ装置20の搬送経路Kから払い出される物品90を受け入れる複数のシュート50と、から主に構成されている。物品搬送設備10では、物品90が所定のインダクションコンベヤ40から主コンベヤ装置20の搬送経路K上に投入される。搬送経路K上に投入された物品90は、物品投入位置Pにおいて、主コンベヤ装置20によって受け入れられる。物品90は、搬送経路K上を走行する搬送台車22によって搬送される。搬送台車22によって搬送される物品90は、シュート50に払い出される。各シュート50には、物品90の仕分け先である店舗が割り付けられている。物品90は、シュート50に払い出されることで、シュート50毎に割り付けられた店舗毎に仕分けられる。
 図1に示すように、インダクションコンベヤ40は、搬送経路Kの側部で搬送台車22の走行方向Hの上流側から下流側に沿った斜め方向に物品90を搬送し、その物品90の搬送姿勢を保持した状態で搬送台車22に投入する。インダクションコンベヤ40は、搬送経路Kに沿って複数本(図1では3本)設けられている。インダクションコンベヤ40は、搬送経路K上に設けられる複数箇所(図1では3箇所)の物品投入位置P(インダクションコンベヤ40が搬送台車22に物品90を投入する位置)のそれぞれに対応させて設けられている。インダクションコンベヤ40においては、それぞれのインダクションコンベヤ40毎に、予め物品90を投入すべき搬送台車22が検索されて、物品90を投入すべき搬送台車22が決定される。インダクションコンベヤ40は、インダクションコンベヤ40毎に決定された所定の搬送台車22に対して物品90を投入する。
 図1に示すように、シュート50は、搬送台車22から払い出される物品90を受け入れ、受け入れた物品90を下流の別設備(例えば、出荷設備)或いは直接車両(例えば、トラック)等に搬送するものである。シュート50は、搬送経路Kに沿って複数本(図1では3本)設けられている。シュート50は、それぞれのシュート50毎に予め決定された物品90を搬送台車22から受け入れる。シュート50は、鉄板等の板状部材、ローラコンベヤ、ベルトコンベヤ等を組み合わせて構成される。シュート50は、主コンベヤ装置20に対して上方から下方に向けて傾斜する。
 図1及び図2に示すように、主コンベヤ装置20は、搬送経路Kに沿って設けられるレール21と、レール21に沿って走行する複数の搬送台車22と、から主に構成されている。主コンベヤ装置20においては、インダクションコンベヤ40から搬送台車22に対して物品90が投入される。インダクションコンベヤ40から投入された物品90を載置した搬送台車22がレール21上を走行することで、物品90が搬送経路Kに沿って搬送される。搬送台車22によって搬送される物品90は、搬送台車22からシュート50に払い出される。
 搬送台車22は、所定のインダクションコンベヤ40から投入された物品90を物品投入位置Pにおいて受け入れる。搬送台車22は、受け入れた物品90を搬送経路Kに沿って搬送する。搬送台車22は、搬送経路Kに沿って搬送する物品90を所定のシュート50に対して払い出す。
 図2及び図3に示すように、搬送台車22は、レール21上を走行する本体23と、物品90を載置して支持するベルトコンベヤ24と、から主に構成されている。
 本体23は、レール21上を走行するための車輪23Aと、車輪23Aやベルトコンベヤ24等を支持するフレーム23Bと、を主に備える。
 ベルトコンベヤ24は、本体23の上部に設けられる。ベルトコンベヤ24は、載置した物品90を、搬送台車22の走行方向Hと直交する方向に搬送可能に構成されている。ベルトコンベヤ24は、ベルトを駆動するためのモータ26を有する。ベルトコンベヤ24は、搬送台車22が所定のシュート50に到達した際に、ベルトを駆動させることで物品90をシュート50が位置する方向に排出する。ベルトコンベヤ24は、搬送台車22による物品90の搬送中に、ベルトコンベヤ24上の物品90が適切な位置からズレた場合に、ベルトを駆動させることで、物品90の載置位置を適切な位置に調整する。
 搬送台車22は、搬送経路Kにおいて互いに隣接する他の搬送台車22(搬送台車22の走行方向Hに対して前後方向の他の搬送台車22)と連結される。搬送台車22は、隣接する他の搬送台車22と連なった状態でレール21上を走行する。搬送台車22は、隣接する他の搬送台車22と連結部27により連結されている。
 連結部27は、フレーム23Bの前端部に設けられる凸部27Aと、フレーム23Bの後端部に設けられる凹部27Bと、により主に構成される。連結部27は、搬送台車22の走行方向に対して前後方向に隣接する搬送台車22間において、前方の搬送台車22の前端部に設けられる凸部27Aの突起部分を、後方の搬送台車22の後端部に設けられる凹部27Bの凹状部分に嵌め合わせるように、当該隣接する搬送台車22同士を連結する。
 上記隣接する搬送台車22間の間隙には、連結部27を覆うようにカバー25が設けられている。カバー25は、上記隣接する搬送台車22間の間隙を塞ぐような板状の部材により構成される。カバー25は、搬送台車22の後側端部(搬送台車22の走行方向に対して後側の端部)に固定されている。
 連結部27には、車輪23Aが軸支されている。すなわち、車輪23Aは、隣接する搬送台車22間の間隙に設けられている。具体的には、車輪23Aは、搬送台車22の後端部の凹部27Bに設けられ、凹部27Bの左右方向(搬送台車22の走行方向Hに水平に直交する方向)の両端部に軸支されている。
 図1から図3に示すように、搬送台車22間毎に設けられる連結部27のうちのいずれか2つの連結部27には、連結部27によって連結される搬送台車22間にかかる力を計測するロードセル31(「計測部」の一例)が設けられている。ロードセル31は、搬送台車22間毎に設けられる連結部27のうちの予め設定された所定の2つの連結部27に設けられる。ここで、所定の2つの連結部27とは、特に限定された2つ(2か所)の連結部27ではなく、互いに近接する2つの連結部27であっても、互いに離れた2つの連結部27であっても構わない。具体的には、ロードセル31は、レール21に沿って走行する複数の搬送台車22のうちの所定の2台の搬送台車22において、その2台の搬送台車22の前端部に形成される凸部27Aの中央部に設けられる。上記所定の2つの連結部27のうちの一方の連結部27に設けられるロードセル31が主(メイン)として用いられ、他方の連結部27に設けられるロードセル31が補助的(サブ)に用いられる。連結部27に設けられるメイン及びサブのロードセル31は、搬送台車22の走行時に、それぞれ同時に搬送台車22間にかかる力を計測する。そのため、メインのロードセル31が故障等により当該力の計測が不可となった場合には、サブのロードセル31により計測される当該力のデータにより張力Tの算出を行う。
 次に、主コンベヤ装置20における搬送台車22の張力の監視システムについて説明する。
 主コンベヤ装置20においては、隣接する搬送台車22間にかかる力を計測し、その計測値に基づいて搬送台車22間の張力Tを算出する。さらに、算出される搬送台車22間の張力Tに基づいて搬送台車22間に設けられる車輪23Aにかかる力Fを算出し、算出した結果に基づいて車輪23Aのレール21に対する浮き上がりを判断する。つまり、車輪23Aにかかる力Fから、レール21に対する車輪23Aの接地状態を判断する。車輪23Aにかかる力Fがゼロより小さくなる(負の値になる)と、車輪23Aがレール21から浮き上がっていると判断する。
 図4A及び図4Bに示すように、搬送台車22間に設けられる車輪23Aにかかる力Fは、搬送台車22の重量Mg[N]と、ロードセル31により計測された搬送台車22間にかかる力に基づいて算出される搬送台車22間の張力T[N]と、レール21の傾斜角度θと、から算出される。具体的には、車輪23Aにかかる力Fは、以下の式(1)により算出される。
   F=Mg+TSinθ                  (1)
 ここで、レール21の傾斜角度θは、搬送経路K毎に予め設定された角度である。なお、レール21の傾斜角度θは、搬送台車22間の張力Tの検出と合わせて、随時測定した角度を用いても構わない。
 車輪23Aにかかる力Fは、搬送台車22間の張力Tが大きい場合にはその値が大きくなり、搬送台車22間の張力Tが小さい場合にはその値が小さくなる。そして、車輪23Aにかかる力Fがゼロより小さい(負の値となる)場合、すなわち、搬送台車22間の張力Tが緩んで、搬送台車22間に圧縮力がかかる場合には、車輪23Aはレール21に対して浮き上がる。一方、車輪23Aにかかる力Fが大きい場合、すなわち、搬送台車22間が引っ張られて、搬送台車22間に引張力がかかる場合には、車輪23Aはレール21に対して浮き上がらない。
 このように、搬送台車22間の張力Tから、搬送台車22間に設けられる車輪23Aにかかる力Fを算出することで、車輪23Aがレール21に対して浮き上がっているか否かを判断することができる。そのため、搬送台車22の走行時に、ロードセル31により計測される搬送台車22間の張力Tを定期的に監視しつつ、搬送台車22間の張力Tに基づいて算出された車輪23Aにかかる力Fがゼロになった時点で、搬送台車22の走行を停止させることで、未然に車輪23Aの浮き上がりを防止することができる。
 ここで、搬送台車22の張力の監視システムの構成について説明する。
 図1から図3及び図5に示すように、主コンベヤ装置20は、搬送台車22に、搬送台車22間にかかる力を計測するロードセル31(「計測部」の一例)と、送信機32と、を備える。
 送信機32は、ロードセル31によって計測される搬送台車22間にかかる力の計測値を後述する受信機36に送信するものである。送信機32は、ロードセル31が設けられる搬送台車22の本体23(フレーム23B)に設けられる。送信機32は、ロードセル31と接続されている。送信機32は、ロードセル31からの信号を受信機36に送信する。
 また、主コンベヤ装置20は、搬送台車22が走行する地上側(搬送台車22以外の位置)に、受信機36と、コントローラ37(「張力算出部」「算出部」の一例)と、を備える。
 受信機36は、送信機32から送信される信号(搬送台車22間にかかる力の計測値)を受信するものである。受信機36は、搬送台車22の走行を妨げない搬送経路Kの側方の所定位置に、送信機32からの信号を無線で受信可能に設けられる。受信機36は、送信機32を備えた搬送台車22が受信機36の受信範囲内を走行する際に、送信機32からの信号を受信する。すなわち、搬送台車22間にかかる力の計測、つまり、搬送台車22間の張力Tの検出は、送信機32を備えた搬送台車22が搬送経路Kを1周する毎(送信機32を備えた搬送台車22が受信機36の受信範囲内を走行する毎)に行われる。
 コントローラ37は、主コンベヤ装置20全体を制御するものであり、受信機36をはじめとする主コンベヤ装置20内の各部と接続されている。コントローラ37は、受信機36によって受信される搬送台車22間にかかる力の計測値に基づいて、搬送台車22間の張力Tを算出する。すなわち、コントローラ37は、ロードセル31によって計測される搬送台車22間にかかる力の計測値に基づいて、搬送台車22間の張力Tを算出する。さらに、コントローラ37は、搬送台車22間の張力Tの算出結果に基づいて、搬送台車22間に設けられる車輪23Aにかかる力Fを算出する。さらにまた、コントローラ37は、車輪23Aにかかる力Fの算出結果に基づいて、車輪23Aがレール21に対して浮き上がっているか否かを判断する。具体的には、コントローラ37は、上記式(1)に基づいて車輪23Aにかかる力Fを算出し、算出した結果、車輪23Aにかかる力Fがゼロである場合には、その時点で、搬送台車22の走行を停止させる。すわなち、コントローラ37は、搬送台車22間の張力Tに基づいて算出される車輪23Aにかかる力Fに基づいて、搬送台車22の走行を制御する。なお、コントローラ37が、車輪23Aにかかる力Fがゼロであると算出した場合には、搬送台車22の走行を停止する他、その旨を警告灯、警告音等によって報知するように構成しても構わない。
 コントローラ37は、メインのロードセル31を備えた搬送台車22の送信機32から送信される信号(搬送台車22間にかかる力の計測値)に基づいて搬送台車22間の張力Tを算出して車輪23Aにかかる力Fを算出する。一方で、コントローラ37は、メインのロードセル31が故障等により搬送台車22間にかかる力の計測が不可となった場合には、サブのロードセル31を備えた搬送台車22の送信機32から送信される信号(搬送台車22間にかかる力の計測値)に基づいて搬送台車22間の張力Tを算出して車輪23Aにかかる力Fを算出する。
 このように、主コンベヤ装置20では、搬送台車22間の張力Tを算出するために用いる搬送台車22間にかかる力の計測を、搬送台車22上のロードセル31で行い(搬送台車22側で行い)、搬送台車22間の張力T及び車輪23Aにかかる力Fの算出を、搬送台車22が走行する地上側(搬送台車22以外の位置)において行う。
 以上のように、本実施の形態によると、搬送台車22に設けられるロードセル31によって搬送台車22間にかかる力を計測して搬送台車22間の張力Tを算出することから、搬送台車22の走行時に搬送台車22間の張力Tを検出することができ、搬送台車22間の張力Tの検出を行う毎に搬送台車22全体を停止させる必要がないため作業効率が向上する。
 また、搬送台車22の走行時に車輪23Aにかかる力Fを算出するため、搬送台車22の走行時に、車輪23Aのレール21に対する浮き上がりを予め予測することができ、未然に車輪23Aのレール21に対する浮き上がりを防止することができる。
 本実施の形態によると、ロードセル31が、搬送台車22間毎に設けられる連結部27のうちのいずれか2つの連結部27に設けられることから、少ない部品点数により搬送台車22間にかかる力を計測することができる。また、上記2つの連結部27のうちの一方の連結部27に設けられるロードセル31が故障等により搬送台車22間にかかる力の計測が不可となった場合であっても、上記2つの連結部27のうちの他方の連結部27に設けられるロードセル31によって当該力の計測が可能であるため、搬送台車22間の張力Tの検出を確実に行うことができる。
 本実施の形態によると、主コンベヤ装置20における搬送台車22の張力の監視システムでは、搬送台車22間にかかる力を計測するロードセル31を搬送台車22に搭載し、搬送台車22間の張力T及び車輪23Aにかかる力Fを算出するコントローラ37を搬送台車22以外の地上側に設置することで、搬送台車22の走行を停止させることなく、搬送台車22の走行中に搬送台車22間にかかる力を計測し、搬送台車22間の張力T及び車輪23Aにかかる力Fを算出することができる。
 なお、本実施の形態においては、主コンベヤ装置20(搬送台車22)における物品支持体をベルトコンベヤ24(自身駆動のクロスベルト式)により構成しているが、これに限定されるものではなく、物品90を載置して支持可能な構成であれば、例えば、トレー(自身非駆動のチルトトレー式)により構成しても構わない。
 本実施の形態においては、ロードセル31が、搬送台車22間毎に設けられる連結部27のうちのいずれか2つの連結部27に設けられているが、これに限定されるものではなく、搬送台車22間にかかる力を計測可能な構成であれば、ロードセル31を、搬送台車22間毎に設けられる連結部27のうちのいずれか1つの連結部27、又は3つ以上の連結部27に設けても構わない。
 本実施の形態においては、搬送台車22間にかかる力を計測する計測部をロードセル31としているが、これに限定されるものではなく、搬送台車22間にかかる力を計測可能な手段であれば構わない。
 本実施の形態においては、搬送台車22間の張力Tの算出と、搬送台車22の車輪23Aにかかる力Fの算出と、を同一のコントローラ37によって行っているが、これに限定されるものではなく、搬送台車22間の張力Tの算出と、搬送台車22の車輪23Aにかかる力Fの算出と、を異なるコントローラで行っても構わない。すなわち、張力算出部と算出部とを別々のコントローラによって構成しても構わない。
 本実施の形態においては、搬送台車22間の張力Tの算出を、搬送台車22が走行する地上側(搬送台車22以外の位置)に設けられるコントローラ37により行っているが、これに限定されるものではなく、搬送台車22間の張力Tの算出するコントローラを搬送台車22に設け、搬送台車22上で搬送台車22間の張力Tの算出を行っても構わない。すなわち、搬送台車22上で搬送台車22間の張力Tの検出を行う構成としても構わない。
 10         物品搬送設備
 22         搬送台車
 23A        車輪
 27         連結部
 31         ロードセル(計測部)
 37         コントローラ(張力算出部、算出部)
 90         物品
 F          車輪にかかる力
 K          搬送経路
 H          走行方向
 T          搬送台車間の張力
 
 
 

Claims (4)

  1.  物品を搬送する搬送台車を複数連結し、連結した複数の前記搬送台車を搬送経路に沿って走行させる物品搬送設備であって、
     前記搬送台車は、その走行方向に対して前後方向の他の搬送台車と連結部により連結され、
     前記連結部に設けられて前記搬送台車間にかかる力を計測する計測部と、
     前記計測部によって計測される前記搬送台車間にかかる力に基づいて、前記搬送台車間の張力を算出する張力算出部と、
     前記張力算出部によって算出される前記搬送台車間の張力に基づいて、前記搬送台車の車輪にかかる力を算出する算出部と、
     を備えること
     を特徴とする物品搬送設備。
  2.  前記計測部は、前記搬送台車間毎に設けられる前記連結部のうちのいずれか2つ以上の前記連結部に設けられること
     を特徴とする請求項1に記載の物品搬送設備。
  3.  前記計測部は、ロードセルにより構成されること
     を特徴とする請求項2に記載の物品搬送設備。
  4.  前記計測部が、前記搬送台車に設けられ、
     前記張力算出部及び前記算出部が、前記搬送台車が走行する地上側に設けられること
     を特徴とする請求項1から請求項3のいずれか1項に記載の物品搬送設備。
     
PCT/JP2019/043355 2019-03-20 2019-11-06 物品搬送設備 WO2020188876A1 (ja)

Priority Applications (5)

Application Number Priority Date Filing Date Title
EP19920161.7A EP3943358B1 (en) 2019-03-20 2019-11-06 Article conveyance apparatus
US17/440,412 US20220161832A1 (en) 2019-03-20 2019-11-06 Article conveyance apparatus
KR1020217031635A KR20210140735A (ko) 2019-03-20 2019-11-06 물품 반송 설비
CN201980093800.3A CN113544036B (zh) 2019-03-20 2019-11-06 物品输送设备
ES19920161T ES2945223T3 (es) 2019-03-20 2019-11-06 Aparato de transporte de artículos

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2019-052030 2019-03-20
JP2019052030A JP7040487B2 (ja) 2019-03-20 2019-03-20 物品搬送設備

Publications (1)

Publication Number Publication Date
WO2020188876A1 true WO2020188876A1 (ja) 2020-09-24

Family

ID=72519264

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2019/043355 WO2020188876A1 (ja) 2019-03-20 2019-11-06 物品搬送設備

Country Status (8)

Country Link
US (1) US20220161832A1 (ja)
EP (1) EP3943358B1 (ja)
JP (1) JP7040487B2 (ja)
KR (1) KR20210140735A (ja)
CN (1) CN113544036B (ja)
ES (1) ES2945223T3 (ja)
TW (1) TWI820254B (ja)
WO (1) WO2020188876A1 (ja)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7497596B2 (ja) 2020-03-30 2024-06-11 イチカワ株式会社 耐熱フェルト材および耐熱フェルト材の製造方法
CN113799804B (zh) * 2021-10-29 2023-11-24 成都环境工程建设有限公司 一种客运地面缆车安全保护系统

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0741161A (ja) * 1993-07-29 1995-02-10 Toyota Motor Corp コンベヤにおける移動体搬送方向変換装置及び移動体連結確認装置
JP2005255331A (ja) 2004-03-11 2005-09-22 Okura Yusoki Co Ltd 物品仕分け装置
JP5862224B2 (ja) * 2011-11-21 2016-02-16 中西金属工業株式会社 コンベア装置
JP2018122986A (ja) * 2017-02-02 2018-08-09 三機工業株式会社 仕分けコンベヤ

Family Cites Families (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0764409B2 (ja) * 1989-11-14 1995-07-12 オークラ輸送機株式会社 コンベヤ装置
CA2156581C (en) * 1995-04-20 2000-11-07 Hisashi Kyotani Conveying system
TWI233913B (en) * 2002-06-06 2005-06-11 Murata Machinery Ltd Automated guided vehicle system
US7926427B1 (en) * 2005-07-22 2011-04-19 Liontech Trains Llc Force sensitive coupler for trains
JP5229535B2 (ja) * 2008-03-06 2013-07-03 株式会社安川電機 張力制御装置およびその制御方法、ならびに張力制御装置を備えた搬送装置
US8589003B2 (en) * 2009-10-22 2013-11-19 General Electric Company System and method for controlling operations of a vehicle consist based on location data
JP5517299B2 (ja) * 2010-07-30 2014-06-11 新明工業株式会社 リボン体の連結構造
US9096244B2 (en) * 2012-11-02 2015-08-04 General Electric Company System and method for controlling coupler nodes in a vehicle system
JP6094331B2 (ja) * 2013-03-29 2017-03-15 株式会社ダイフク 物品搬送設備
FR3017315B1 (fr) * 2014-02-11 2016-03-04 Cinetic Sorting S P A Procede et dispositif pour l'entrainement des trieurs de colis pour les installations ayant de forts changements de niveaux
JP6471651B2 (ja) * 2015-08-27 2019-02-20 株式会社ダイフク 物品搬送設備
DE102015115852A1 (de) * 2015-09-21 2017-03-23 Knorr-Bremse Systeme für Nutzfahrzeuge GmbH Verfahren zum Schätzen einer Achslastverteilung bei einem Lastzug
JP6848373B2 (ja) * 2016-11-14 2021-03-24 株式会社ダイフク 物品搬送設備
JP6885741B2 (ja) 2017-02-02 2021-06-16 三機工業株式会社 仕分けコンベヤ
JP2018131067A (ja) * 2017-02-15 2018-08-23 ナブテスコ株式会社 運搬台車
US10551257B2 (en) * 2017-06-15 2020-02-04 Amsted Rail Company, Inc. Railway freight car coupling force monitoring system
DE102017009125A1 (de) * 2017-06-30 2019-01-03 Knorr-Bremse Systeme für Schienenfahrzeuge GmbH Sensoranordnung und Verfahren zum Ermitteln einer Bremskraft

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0741161A (ja) * 1993-07-29 1995-02-10 Toyota Motor Corp コンベヤにおける移動体搬送方向変換装置及び移動体連結確認装置
JP2005255331A (ja) 2004-03-11 2005-09-22 Okura Yusoki Co Ltd 物品仕分け装置
JP5862224B2 (ja) * 2011-11-21 2016-02-16 中西金属工業株式会社 コンベア装置
JP2018122986A (ja) * 2017-02-02 2018-08-09 三機工業株式会社 仕分けコンベヤ

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP3943358A4

Also Published As

Publication number Publication date
JP2020152508A (ja) 2020-09-24
EP3943358B1 (en) 2023-03-15
EP3943358A4 (en) 2022-05-11
TWI820254B (zh) 2023-11-01
JP7040487B2 (ja) 2022-03-23
CN113544036B (zh) 2023-07-14
EP3943358A1 (en) 2022-01-26
TW202035254A (zh) 2020-10-01
KR20210140735A (ko) 2021-11-23
CN113544036A (zh) 2021-10-22
ES2945223T3 (es) 2023-06-29
US20220161832A1 (en) 2022-05-26

Similar Documents

Publication Publication Date Title
KR101664238B1 (ko) 반송 시스템 및 반송 시스템에서의 물품의 일시 보관 방법
JP2004189018A (ja) 天井搬送車システム
WO2020188876A1 (ja) 物品搬送設備
JP4926750B2 (ja) スキップ式搬送装置
CN116157342A (zh) 集装箱运输系统
WO2020152966A1 (ja) 物品搬送設備
JP2000079878A (ja) キャリア式搬送装置
JP2021109719A (ja) 仕分け設備
JP3541880B2 (ja) 荷物搬送台車装置とその荷物積込方法
JP3626939B2 (ja) 荷積み装置および荷積み方法
JP7268609B2 (ja) 物品搬送設備
TW202239632A (zh) 有軌道台車
JP5941647B2 (ja) 物品搬送装置
JP2750990B2 (ja) 荷物搬送装置
JP2660881B2 (ja) 荷搬送設備
JP2660882B2 (ja) 荷搬送設備
CN218560126U (zh) 一种纺织品卷材用载货车
JP5883604B2 (ja) 物品搬送装置
JP4381849B2 (ja) 物品仕分け装置
JPH06336326A (ja) 荷搬送装置
KR20220128269A (ko) 물품 반송 설비
JP2005187153A (ja) 物品仕分け装置
JP5912602B2 (ja) 物品搬送装置
JP4603470B2 (ja) 秤量装置,秤量システム及び秤量方法
JPH11263417A (ja) 空気浮上式ベルトコンベア

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 19920161

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 20217031635

Country of ref document: KR

Kind code of ref document: A

ENP Entry into the national phase

Ref document number: 2019920161

Country of ref document: EP

Effective date: 20211020