WO2001067017A1 - Dispositif permettant de charger de la matiere dans un four de frittage - Google Patents

Dispositif permettant de charger de la matiere dans un four de frittage Download PDF

Info

Publication number
WO2001067017A1
WO2001067017A1 PCT/JP2001/001757 JP0101757W WO0167017A1 WO 2001067017 A1 WO2001067017 A1 WO 2001067017A1 JP 0101757 W JP0101757 W JP 0101757W WO 0167017 A1 WO0167017 A1 WO 0167017A1
Authority
WO
WIPO (PCT)
Prior art keywords
raw material
charging
sintering machine
sintering
feeder
Prior art date
Application number
PCT/JP2001/001757
Other languages
English (en)
French (fr)
Inventor
Hidetoshi Noda
Koichi Ichikawa
Shinichi Kurosawa
Hideaki Sato
Yoshinori Watanabe
Shoichi Rokugawa
Takashi Watanabe
Ken Hashimoto
Satoshi Machida
Original Assignee
Nkk Corporation
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nkk Corporation filed Critical Nkk Corporation
Priority to JP2001565944A priority Critical patent/JP4972758B2/ja
Publication of WO2001067017A1 publication Critical patent/WO2001067017A1/ja

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D3/00Charging; Discharging; Manipulation of charge
    • F27D3/0033Charging; Discharging; Manipulation of charge charging of particulate material
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27BFURNACES, KILNS, OVENS, OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
    • F27B21/00Open or uncovered sintering apparatus; Other heat-treatment apparatus of like construction
    • F27B21/06Endless-strand sintering machines

Definitions

  • the present invention relates to a raw material charging device for charging a raw material for sintering to a sintering machine for continuously producing sinter.
  • Sinter used as a raw material for blast furnaces is generally manufactured by the following method.
  • the granulated raw material for sintering is continuously supplied from a hopper onto a pallet of a sintering machine with a predetermined layer thickness, for example, a layer thickness of about 500 to 700 mm.
  • the carbon material in the surface layer is ignited by an ignition furnace, and the carbon material is burned while forcibly sucking air downward.
  • the sinter material is sintered and agglomerated by the combustion heat generated during combustion.
  • the sintered cake J 'thus crushed is crushed and cooled.
  • the granules are sized and 3 to 5 mm or more that satisfy the quality standards are charged to the blast furnace as “product sinter”. I do. Quality rejected products and crushed ore powder sinters of 3 to 5 mm or less generated in the sizing process are returned to ore and used again as raw materials for sintering.
  • the quality of the sinter used as a raw material for the blast furnace produced in this way has a great effect on the stability of the unloading state during operation of the blast furnace, ventilation and liquid permeability, reduction efficiency, high-temperature properties, and the like. Therefore, high quality is required for sinter ore, and strict quality control is performed. In addition, to reduce the production cost, it is required to improve the product yield of sinter.
  • the sintering method of loading the pallets into the sintering machine is the sintering method of loading the pallets into the sintering machine.
  • the purpose is to appropriately control both the particle size distribution in the layer and the component distribution of the binder raw material.
  • 500 To ensure the air permeability in the raw material layer having a height of about 700 mm to improve the combustion of the carbonaceous material, and to appropriately control the melting and sintering reaction of the sinter material by the combustion heat. Becomes possible. Therefore, conventionally, a number of raw material charging techniques for adjusting the particle size distribution and the component distribution in the layer of the sintering raw material charged on the pallet have been proposed.
  • Japanese Utility Model Publication No. 3-435999 proposes a raw material charging apparatus as shown in FIG.
  • the raw material 3 for sintering is sent out from the hopper 1 by the roll feeder 12 and falls.
  • the dropped sintering raw material 3 slides down a flat plate 4 that is inclined downward facing the roll feeder 12.
  • a plurality of openings or openings 5 are arranged at a predetermined pitch in the width direction of the sintering machine pallet 6 on a substantially extended line below the plate-shaped shout 4 to form a plurality of slit-shaped gaps 7.
  • the sintering raw material that slides down falls from the plurality of slit-shaped gaps 7 onto the sintering machine pallet 6 to form a raw material layer 8 having a predetermined thickness.
  • the slit gap 7 is narrow on the upper flat chute 4 side and wide on the lower sintering machine pallet 6 side.
  • Japanese Unexamined Patent Publication No. Hei 8-311568 proposes a raw material charging apparatus as shown in FIG.
  • the raw material for sintering 3 is sent out from the hopper 11 by a mouth feeder 12 and falls.
  • the dropped sintering raw material is received by a drum feeder 10 which is provided below the roll feeder 2 and rotates in the direction in which the sintering raw material falls.
  • a plurality of rods or ropes 5 are arranged at a predetermined pitch in the width direction of the sintering machine pallet 6 on a curved surface which is inclined downward from the front surface of the drum feeder 10 and is smoothly curved downward.
  • a plurality of slit-shaped gaps 7 are formed.
  • the sintering material whose falling speed has been reduced by the drum feeder 10 falls from the plurality of slit-shaped gaps 7 onto the sintering machine pallet 6 to form a material layer 8 having a predetermined thickness.
  • a plurality of the slits are arranged at a predetermined pitch.
  • the downward inclination direction of the grain size segregation charging mechanism 9, which is a structure formed with, is opposed to the moving direction of the sintering machine pallet 6 (the direction of the arrow X in FIG. 12).
  • the slit gap 7 is narrow on the upper drum feeder 10 side and wide on the lower sintering machine pallet 6 side.
  • the particle size distribution of the raw material for sintering in the raw material layer 8 charged on the pallet 6 can be adjusted so that coarse particles are deposited in the lower layer and fine particles are deposited in the upper layer (hereinafter, referred to as “sintering”).
  • sintering coarse particles are deposited in the lower layer and fine particles are deposited in the upper layer
  • the raw material charging technology for the sintering machine pallet 6 according to the prior art such as the prior art 1 and the prior art 2 described above is not used. It is not possible to control the distribution of constituent components, for example, carbon materials such as coke breeze, which is a solid fuel, and Ca ⁇ , which is a slag component, in the bed.
  • An object of the present invention is to improve the controllability of the component distribution in addition to the particle size distribution in the raw material layer of the sintering machine pallet, and to achieve high quality, high yield, and high productivity.
  • An object of the present invention is to provide an apparatus for charging raw materials into a machine.
  • the present invention provides a feeder for feeding a raw material for sintering, a roller provided below the feeder and a feeder provided below the roller feeder.
  • an apparatus for charging a raw material to a sintering machine which is provided and has a particle size segregation charging mechanism.
  • the roller feeder receives the raw material for sintering supplied by the feeder, and feeds the raw material for sintering downward.
  • the roller feeder is composed of a plurality of rollers having an axis, and the axis is arranged in a direction perpendicular to the moving direction of the sintering machine pallet.
  • the particle size segregation charging mechanism adjusts the charging distribution of the sintering raw material fed by the roller feeder into a sintering machine pallet.
  • the grain size segregation charging mechanism is composed of a plurality of linear rods or straight wires, and the axis of the linear rod or the linear wire is the grain segregation charging mechanism for the sintering raw material. It is preferable that the sintering machine is disposed in a direction perpendicular to the direction in which the sintering machine is moved, and in a direction perpendicular to the moving direction of the sintering machine pallet.
  • the linear rod or the linear wire is disposed in a curved shape curved toward the moving direction of the sintering machine pallet. Further, it is desirable that the interval between the adjacent rods or wires is widened from the upper part to the lower part.
  • the present invention provides a raw material supply mechanism for supplying a raw material for sintering to a pallet, wherein the upper end is located near the raw material supply mechanism, and the lower end is located above the pallet. Shut down in the direction opposite to the direction And a device for charging raw materials into a sintering machine.
  • the chute comprises a plurality of rods arranged in parallel in the width direction of the pallet from the upper end to the lower end thereof at a predetermined interval from each other, and has a concave shape from the upper end to the lower end. It has a curved shape.
  • the average value of the rate of change of the gradient connecting the adjacent rods in the range corresponding to the upper one-third of the horizontal length of the chute is the rate of change of the gradient in the range corresponding to the lower two-thirds. 1.5 to 10 times the average value of
  • the above invention is referred to as a second embodiment.
  • the shot according to the second embodiment can be used as the grain size segregation charging mechanism according to the first embodiment.
  • the material supply mechanism of the second embodiment the feeder and the roller feeder of the first embodiment can be used.
  • the present invention provides a raw material supply mechanism for supplying a raw material for sintering to a pallet, wherein the upper end is located near the raw material supply mechanism, and the lower end is located above the pallet.
  • the raw material charging g is provided to the sintering machine, which is composed of a shot inclined in a direction opposite to the moving direction of the raw material.
  • the chute is composed of a plurality of rods arranged in parallel in the width direction of the pallet from the upper end to the lower end thereof at predetermined intervals.
  • a vertical projection gap between the plurality of rods in an area where the falling raw material collides is substantially constant.
  • the above invention is referred to as a third embodiment.
  • the shot in the third embodiment can be used as the grain size segregation charging mechanism in the first embodiment.
  • the feeder and the mouth feeder according to the first embodiment can be used.
  • FIG. 1 is a schematic vertical sectional view of an apparatus for charging a raw material into a sintering machine according to the first embodiment.
  • FIG. 2 is an enlarged view of the roller feeder 1 of FIG.
  • FIG. 3 is a schematic front view of the grain size segregation charging mechanism in FIG.
  • FIG. 4 is a view taken along line AA of FIG.
  • FIG. 5 is a diagram showing the degree of particle size segregation in an example according to the first embodiment.
  • FIG. 6 is a diagram showing the degree of coke segregation in an example according to the first embodiment.
  • FIG. 7 is a diagram showing the degree of particle size segregation of the comparative example according to the first embodiment.
  • FIG. 8 is a diagram illustrating a coke segregation degree of a comparative example according to the first embodiment.
  • FIG. 9 is a diagram showing the production rates in the pot test of each of the example according to Embodiment 1 and the comparative example.
  • FIG. 10 is a diagram showing the yield in the pot test of each of the example according to the first embodiment and the comparative example.
  • FIG. 11 (a) is a schematic vertical sectional view showing an example of a conventional raw material charging apparatus for a sintering machine.
  • FIG. 11 (b) is a diagram schematically showing a slit-shaped gap in the segregation charging mechanism of the raw charging device of FIG. 11 (a).
  • FIG. 12 is a schematic vertical sectional view showing another example of a conventional raw material charging apparatus for a sintering machine.
  • FIG. 13 is a vertical sectional view showing an apparatus for charging a raw material into a sintering machine according to Embodiment 2-1.
  • FIG. 14 is a front view showing a chute in the raw material charging apparatus according to Embodiment 2-1.
  • FIG. 15 is a sectional view taken along line AA of FIG.
  • FIG. 16 is a vertical sectional view showing an apparatus for charging a raw material into a sintering machine according to Embodiment 2-2.
  • FIG. 17 is a vertical sectional view showing a raw material charging apparatus for a sintering machine according to Embodiment 2-3.
  • FIG. 18 is a vertical sectional view showing a raw material charging apparatus for a sintering machine according to Embodiments 2-4.
  • FIG. 19 is a graph showing the distance between adjacent doors in the shot used in the second embodiment.
  • FIG. 20 is a graph showing the shape curve of the chute of the example in the second embodiment.
  • FIG. 21 is a graph showing a shape curve of a shot of Comparative Example 1 in the second embodiment.
  • FIG. 22 is a graph showing a shape curve of a shot of Comparative Example 2 in the second embodiment.
  • FIG. 23A is a graph showing the ratio of CaO in the raw material layer in the example of the second embodiment.
  • FIG. 23 (b) is a graph showing the ratio of Ca ⁇ in the raw material layer in Comparative Example 1 of Embodiment 2.
  • FIG. 23 (c) is a graph showing the ratio of CaO in the raw material layer in Comparative Example 2 of Embodiment 2.
  • FIG. 24 (a) is a graph showing the average particle size and the ratio of the particles in the raw material layer in the example of the second embodiment.
  • FIG. 24 (b) is a graph showing the average particle size and the ratio of C in the raw material layer in Comparative Example 1 of Embodiment 2.
  • FIG. 24 (c) is a graph showing the average particle size and the ratio of C in the raw material layer in Comparative Example 2 of Embodiment 2.
  • FIG. 25 is a vertical sectional view showing the raw material charging apparatus according to Embodiment 3-1.
  • FIG. 26 is a front view showing a chute in the raw material charging apparatus according to Embodiment 3-1.
  • Fig. 27 is a new view of the A-A line in Fig. 26.
  • FIG. 28 is a vertical sectional view showing the raw material charging apparatus according to Embodiment 2-2.
  • FIG. 29 is a vertical sectional view showing the raw material supply device according to Embodiment 3-3.
  • FIG. 30 is a graph showing a vertical projection gap between adjacent rods in the chute according to the third embodiment.
  • FIG. 31 is a graph showing the distance between rod centers between adjacent rods in the chute according to the third embodiment.
  • FIG. 32 is a graph showing a shape curve of a chute according to the example in the third embodiment.
  • FIG. 33 is a graph showing a shape curve of a chute of the comparative example in the third embodiment.
  • FIG. 34 (a) is a graph comparing the average particle diameter and the ratio of C in the raw material layer in the third embodiment between the example and the comparative example.
  • FIG. 34 (b) is a graph comparing the ratio of C a 0 in the raw material layer in the third embodiment between the example and the comparative example.
  • the present inventors when focusing on each particle of the raw material for sintering, focus on the fact that there is a difference in specific gravity depending on the main component constituting the particle, and utilizing this difference in specific gravity, the raw material layer of the sintering machine pallet is used. It was found that the internal component distribution could be adjusted. To utilize this knowledge, conventionally, after a sintering raw material having a predetermined particle size composition and a component composition has been fed from a predetermined feeder, the sintering material is received, and the sintering raw material is sent downward.
  • the specific gravity difference is used before the particle size segregation charging using the particle size distribution of the raw material for sintering by the particle size segregation charging mechanism exemplified in Prior Art 1 or Prior Art 2.
  • the idea was to introduce a new mechanism to change the velocity of movement between particles with different components.
  • the present invention has been made based on the above findings and ideas, and the gist is as follows.
  • the raw material charging device for the sintering machine is provided with a feeder for sending out the raw material for sintering, which can be disposed close to the lower part of the feeder and receives the raw material for sintering supplied by the feeder.
  • a roller feeder is provided for feeding the sintering raw material downward while adjusting the downward movement of the sintering raw material, and is disposed adjacent to and below the mouth feeder.
  • the above-mentioned mouth feeder is composed of a plurality of rollers or rotating drums, and the axis of the mouth or rotating drum is supplied to the mouth feeder of the raw material for sintering.
  • the sintering machine pallet is arranged at right angles to the moving direction of the sintering machine pallet.
  • the raw material for sintering fed from the feeder provided above is received by a plurality of rollers or a roller feeder constituted by a rotating drum. Or reduce the diameter of the rotating drum appropriately and By adjusting the rotation speed of the sintering material, the lowering speed of the sintering material received and the layer thickness of the sintering material supported by a plurality of rollers or rotating drums can be appropriately adjusted. Depending on the conditions, the sintering material moves in the layer at a different descent speed according to the difference in specific gravity of the particles.
  • the rotation speed of the roller or the rotating drum is increased, the descending speed of the particles having a large specific gravity increases, and the gap between the rods or wires in the lower part of the particle size segregation charging device provided below is reduced. After dropping, it will be distributed more in the lower part of the raw material layer thickness of the sintering machine pallet.
  • the grain size segregation charging mechanism is composed of a plurality of linear rods or linear wires, and the axis of the linear rod or the linear wire is The sintering raw material is arranged in a direction perpendicular to the direction of receiving the particle size segregation charging mechanism and in a direction perpendicular to the direction of movement of the pallet of the sintering machine. Are arranged in the form of a screen in a descending form toward the moving direction of the sintering machine pallet.
  • a plurality of linear rods or linear wires arranged in a screen shape descending in the direction of movement of the sintering machine pallet form a gap s between adjacent rods or wires, from top to bottom. Preferably, it is wide.
  • FIG. 1 is a schematic vertical sectional view showing a preferred embodiment of the device of the present invention.
  • a sintering raw material 3 which is fed from the hopper 1 in a uniform amount in the width direction of the roll feeder 12 and falls, is provided below the roll feeder 12, and the sintering raw material is provided.
  • ⁇ Downward rai ⁇ ⁇ Saita's small isn— ⁇ — 11
  • the sintering raw material 3 placed on the mouth feeder 112 does not leak from the gap between the small diameter rollers 111. Also, since the small-diameter roller 11 is always rotating, the sintering raw material 3 is relatively hard to adhere to its surface, but it is close to the lower part of each small-diameter roller 11 to prevent the adhesion of the raw material. A raw material scraping member is provided.
  • the lowering speed of the sintering raw material 3 placed on the roller 1 feeder 12 can be easily changed. That is what you can do.
  • the difference in the lowering speed can be amplified according to the difference in specific gravity of the particles constituting the sintering raw material 3. For example, pseudo particles containing a large amount of iron ore in sintering raw material 3 have a higher specific gravity than pseudo particles containing a large amount of coke breeze.
  • the descent speed in the raw material for sintering 3 becomes faster than that of the pseudo particles containing a large amount of coke breeze, and the particle size segregation charge provided continuously below the roller 1 feeder 12 It reaches the lower part of mechanism 9, and as a result, the distribution of heavy pseudo-particles containing more iron ore in many feet in the lower part of sintering machine pallet 6 increases, and the amount of coke breeze increases. The distribution amount of light pseudo particles is reduced. In this way, the component distribution in the raw material layer 8 of the sintering machine pallet 6 can be adjusted.
  • a particle size segregation charging mechanism 9 is arranged close to and almost on the extension of the roller feeder 1.
  • the grain size segregation charging mechanism 9 has an upper end close to the lower end of the roller feeder 12 and a lower end close to the pallet 6 of the sintering machine.
  • a plurality of rods 14 are arranged on these surfaces at a predetermined pitch in the width direction of the sintering machine pallet 6 to form a plurality of slit-shaped gaps 7. I have. Note that the entire shape may be an inclined surface curved gently downwardly or may be an inclined plane.
  • Figure 3 shows a schematic diagram of the grain size segregation charging mechanism 9 in Figure 1.
  • FIG. 4 shows a front view
  • FIG. 4 is a view taken along the line AA in FIG.
  • the slit-like gap 7 is narrow on the upper roller feeder 12 side and wide on the lower sintering machine palette 6 side.
  • 1 5 has multiple rods 1 4 It is a connecting member for connecting a plurality of rods 14 with a predetermined gap 7 as described above and on a curved surface as described above.
  • Each of the ports 14 has a structure that can be slid in the length direction, and is slid as necessary to cut off the sintering raw material 3 adhered to the surface of the rod 14 with the connecting member 15, Gap 7 Eliminate clogging.
  • the grain size segregation charging mechanism 9 receives the discharged sintering raw material 3 whose descending speed has been adjusted by the mouth feeder 1-2.
  • the coarse-grained raw material in the raw material for sintering 3 falls from the lower region of the grain size segregation charging mechanism 9 having a wide slit-shaped gap 7 onto the sintering machine pallet 6, so that the lower part of the raw material layer 8
  • the fine-grained raw material falls on the sintering machine pallet 6 from the upper region of the grain size segregation charging mechanism 9 where the slit-shaped gap 7 is narrow, so that the upper layer of the raw material layer 8 Many will be distributed in the layer.
  • the adjustment of the particle size distribution in the raw material layer 8 of the sintering machine pallet 6 by the particle size segregation charging mechanism 9 is changed by adjusting the inclination angle and the degree of curvature of the entire shape of the particle size segregation charging mechanism 9.
  • the practical specifications of the apparatus of the present invention may vary depending on the scale and mode of the equipment, but generally the following ranges are appropriate. '' 1
  • Diameter of small diameter nozzle 100 to 200 mm
  • Length of small diameter roller 2-6 m
  • Roller-feeder tilt angle ( ⁇ ) 50-60 degrees
  • Mouth diameter 8 to 15 mm
  • Rod length 2-6 m (Equivalent to pallet effective width)
  • the sintering raw material 3 is supplied (charge layer thickness: 500 mm) to the sintering machine pallet 6 using the small simulation device (effective width: about 50 cm) of the embodiment according to the present invention shown in FIGS. Was. Further, the charged raw material was subjected to a pot test as it was.
  • the configuration of the roller feeder 112 of the embodiment device is as follows.
  • Number of rotations of the small diameter roller 4 levels of 2, 7, 10 and 15 rpm between 2 and 15 rpm
  • Curved part at the bottom of the overall shape an arc of radius 680 mm.
  • a sintering raw material 3 was supplied to a sintering machine pallet 6 by using a simulation apparatus which is an example of the conventional method shown in FIG. Then, the pot material was subjected to the pot test as in the example.
  • the configuration of the drum feeder 110 of the comparative example device is as follows. Roll diameter: 400 mm
  • the configuration of the grain size segregation charging mechanism 9 of the comparative example apparatus is the same as the configuration of the grain size segregation charging mechanism 9 of the example apparatus of (1) of Example II.
  • the sintering raw material was placed on a sintering machine pallet using the apparatus of the above-described embodiment, and 2.
  • the average particle size distribution of the raw material for sintering and the distribution of the C content in the raw material layer in the thickness direction of the raw material layer in the pallet when charged at 0 t / h ⁇ ⁇ 2 are shown.
  • the sintering raw material was placed on a sintering machine pallet using the apparatus of the comparative example described above.
  • the average particle size distribution of the raw material for sintering and the distribution of C content in the raw material layer in the thickness direction of the raw material layer in the pallet when charged at 0 t / h-m 2 are shown.
  • 9 to 10 show the sintering production rate and yield under each condition of the example and the comparative example.
  • the embodiment of the present invention has stronger grain size segregation and C concentration segregation than the comparative example, and improves the production rate and the yield.
  • the particle size distribution but also the component distribution in the raw material layer of the sintering machine pallet can be adjusted to a target distribution more accurately than the comparative example according to the prior art. it can.
  • the space between the roll feeder 2 and the grain size segregation charging mechanism 9 is narrow, so that even if it is impossible to install the drum feeder 10 with a large-diameter roller,
  • the roller feeder 112 comprising a plurality of small-diameter rollers 11 in the apparatus of the present invention can be installed, and the existing sintering equipment can be enhanced.
  • the inventors pay attention to the rate of change of the gradient of the straight line connecting the adjacent rods (conceptually, the second-order derivative of the shape curve of the shot), and set the rate of change of this gradient to a predetermined range. By doing so, it was found that the particles changed the traveling direction and the speed was appropriately reduced, and the particles could be uniformly dispersed over the entire length of the shot to drop the particles.
  • the apparatus for charging a raw material into a sintering machine includes a raw material supply mechanism for supplying a raw material for sintering to a pallet, an upper end of which is located near the raw material supply mechanism, and a lower end thereof. And a chute which is located above the pallet and which is inclined in a direction opposite to a moving direction of the pallet.
  • the chute comprises a plurality of rods arranged in parallel in the width direction of the pallet at predetermined intervals from the upper end to the lower end thereof, and is curved in a concave shape from the upper end to the lower end. It has a shape.
  • the average value of the rate of change of the gradient connecting the adjacent rods in the range corresponding to the upper one-third of the horizontal length of the chute is the gradient change in the range corresponding to the lower two-thirds. It is 1.5 to 10 times the average value of the dagger rate.
  • the raw material falls on the sheet by an appropriate amount, and the distribution of the amount of fall in the direction of the chute in the apparatus length direction (the moving direction of the raw material particles and the loading pallet) is dispersed. Therefore, a raw material layer with a large bias and a proper charge density can be obtained, and sintering yield and production rate can be improved.
  • FIG. 13 is a schematic vertical sectional view of the raw material charging apparatus.
  • This raw material charging apparatus includes a raw material supply mechanism for supplying the raw material 107 to the pallet 105, and a shunt 114.
  • the raw material supply mechanism is composed of a belt type feeder 103 that places the raw material 107 uniformly in the width direction and moves the raw material 107 in the direction of the arrow.
  • the upper end of the shroud 114 is located near the discharge end of the belt-type feeder 103, and the lower end thereof is located above the pallet 105, opposite to the moving direction of the pallet 105. It is inclined toward the direction.
  • Guide chute 1 1 7 is a belt type feeder 1 0 3 Is a plate-shaped chute located between the discharge end of the chute and the upper end of the chute 114. If material 7 enters chute 114 at an appropriate angle and speed, guidance shot 117 is not necessary.
  • FIG. 14 shows a front view of the chute
  • FIG. 15 shows a cross-sectional view taken along line AA of FIG.
  • the chute 1 14 is formed in a screen shape composed of a plurality of rods 1 15 arranged in parallel in the width direction of the pallet 105 from the upper end to the lower end thereof at a predetermined interval from each other. I have.
  • the rod also includes a linear member such as a wire.
  • This shutter 114 is formed in a gentle concave shape from the upper end to the lower end.
  • the average value of the change rate of the gradient connecting the adjacent rods 1 15 in the range L 1 corresponding to the upper end 1 Z 3 of the horizontal length L It is formed to be 1.5 to 10 times the average rate of change of the gradient in the range L2 corresponding to 3.
  • the connecting member 1 16 connects a plurality of rods 115 constituting the chute 114 with a predetermined interval therebetween.
  • the gap between rods 1 1 5 is-generally the upper end 1 1 4a of the chute 1 14 is smaller than the lower end 1 1 4b, but from top to bottom ⁇ ⁇ You don't have to.
  • the raw material 107 discharged from the discharge end of the belt-type feeder 103 through the guide chute 117 is used as the raw material 107 when sliding down on the concave-shaped shroud 114. Some particles of 7 collide with the rods 1 15 and are bent one after another to raise the traveling direction. At this time, the average value of the change rate of the gradient connecting the adjacent rods 1 15 in the range L 1 corresponding to the upper end 13 is the change rate of the gradient in the range L 2 corresponding to the lower end 2/3.
  • the rods 1 15 are arranged so as to be larger than the average value of the particles, specifically, 1.5 times to 10 times, the particles change the traveling direction and the speed is appropriately reduced, and the shoot 1
  • the particles can be uniformly dispersed over the entire length of 14 to drop the particles. That is, it is discharged through the guide chute 1 1 7 Of the raw material, some of the coarse particles glide down on a chute 1 14 composed of a plurality of rods 1 15, and the remaining portion of the coarse particles Drops from a wide gap between the rods 115 are fed onto a great bar 106 in a continuously moving pallet 105.
  • the fine-grained raw material falls from a narrow gap between the plurality of rods 115 constituting the upper part of the chute 114 and is supplied onto the great bar 106 in the pallet 105. Therefore, the amount of the raw material particles falling immediately below the chute 114 is dispersed in the apparatus length direction.
  • the coarse-grained raw material is supplied to the lower layer 107a in the palette 105, and the fine-grained raw material is supplied to the upper layer 107b. become. This results in the formation of a raw material layer with a biased grain size.
  • C and CaO in the raw material layer gradually increase from the lower layer to the upper layer, so that a high-quality sintered ore can be produced with a high yield.
  • the raw material 107 is dispersed and falls, the impact of falling on the pallet 105 is reduced, and a softly charged raw material layer with good air permeability can be obtained.
  • the rate of change of the gradient of the straight line connecting the centers of the rods is calculated by taking the second derivative of this function at the center of each mouth when the rod arrangement is on the curve defined by the function. Can be calculated. Even when the arrangement of the rod center position is not defined by the function, it can be easily calculated by the following Equation 1. Nu 3 2 y2-yl ⁇ /, ⁇ (y 3-y2) (x2-xl)-(y2-yl) (x3-xl)
  • Equation 1 calculate the gradient change rate from the center position of the three adjacent rods to determine the position of the pads. If so, the effects of the present invention can be obtained.
  • the gradient change rate is not calculated for the rods at both ends of the chute. That is, in a shot consisting of ⁇ rods, the average value of the gradient change rate at ⁇ -2 points is calculated in consideration of the horizontal range. Since the effectiveness of this rod arrangement is obtained by the flow of the raw material on the rod, the rod placed at a position where the raw material cannot physically flow should be within the range when considering the horizontal length of the chute. exclude.
  • the average value of the gradient change rate between the adjacent mouths in the range L 1 corresponding to the upper end 1/3 is the average of the gradient change rate in the range L 2 corresponding to the lower end 2 Z 3.
  • the deceleration of the particles becomes too large, and all the raw materials fall in the middle of shot 114.
  • the deceleration of the particles in the range L 1 of the uppermost one-third of the shot is small, and the particles travel at a large downhill speed in the range L2 of the lowermost two-thirds.
  • the average value of the gradient change rate in the range L2 is smaller than the average value of the gradient change rate in the range L1, a sufficient deceleration effect cannot be obtained, and The rate of falling from the gap decreases, and most of the particles jump out from the bottom of the chute.
  • FIG. 16 shows a raw material charging apparatus according to Embodiment 2-2.
  • a raw material supply mechanism includes a hopper 101 into which raw material 107 is charged and cut out at a lower portion of a side wall and having a gate 101a, and a lower end opening of hopper 101.
  • the second embodiment differs from the above-described embodiment 2-1 in that the second embodiment includes a roll feeder 102 provided in the second embodiment.
  • FIG. 17 shows a raw material charging apparatus according to Embodiment 2-3.
  • a raw material supply mechanism includes a hopper 101 into which raw material 107 is charged and cut out at a lower portion of a side wall and having a gate 101a, and a lower end opening of the hopper 101.
  • a roll feeder 118 provided diagonally below the roll feeder 102, unlike the embodiment 2-2.
  • the roll feeder 118 is provided diagonally below the cutout gate 101a.
  • FIG. 18 shows a raw material input device according to Embodiment 2-4.
  • the raw material supply mechanism is charged with the raw material 107 and cut out at the lower part of the side wall. It has a hopper 101 having a gate 101a, and a roll feeder 102 provided at the lower end opening of the hopper 101, and a plurality of rollers 119 linearly arranged below the hopper 101. The angle of entry of the raw material into the chute can be adjusted by the mouthpiece 119.
  • the raw material was supplied into the pallet by using the raw material charging apparatus according to the embodiment shown in FIGS.
  • the configuration of the chute in the device is as follows.
  • Rod spacing shown in Figure 19.
  • the horizontal axis represents the rod number
  • the vertical axis represents the distance between adjacent rods (wires).
  • the rods are numbered 1, 2, and 3-21 in order from the upper end to the lower end.
  • the interval between the rods is set to be smaller at the upper end than at the lower end, and is set to gradually increase from a point beyond the upper third of the upper end.
  • Figure 20 shows the shape curve of the chute.
  • the horizontal axis represents the horizontal distance (cm) from the top of the chute, and the horizontal axis represents the vertical distance (cm) from the top of the chute. From this figure, it can be seen that the chute is formed in a parabola.
  • FIG. 21 shows the shape curve of the chute of Comparative Example 1.
  • the horizontal axis represents the horizontal distance (cm) from the top of the chute, and the horizontal axis represents the vertical distance (cm) from the top of the chute. From this figure, it can be seen that the chute is formed in a parabola. '' Comparing the comparative example with the example, in the comparative example, the rate of change of the gradient in the range of 1/3 of the upper end of the shoot is smaller than the rate of change of the gradient in the lower 2Z3 of the shoot. You can see that
  • FIG. 22 shows the shape curve of the chute of Comparative Example 2.
  • the horizontal axis shows the horizontal distance (cm) from the top of the chute, and the horizontal axis shows the vertical distance (cm) from the top of the chute. From this figure, it can be seen that the shoot is formed into a cubic curve. Comparing the comparative example with the example, in the comparative example, the rate of change of the gradient in the upper third of the chute is extremely larger than the rate of change of the gradient in the lower second of the chute. You can see that it's done.
  • FIGS. 23 and 24 show the relationship between the height in the layer direction, the average particle size in the layer, and the ratios of C and CaO when the raw materials were supplied into the pallets using the apparatuses of the above-described Examples and Comparative Examples. It is a graph which shows a relationship.
  • the average particle size in the examples is from the upper layer to the lower layer. It gradually grows toward.
  • the average particle diameter increases at a substantially constant ratio from the upper layer to the lower layer, whereas in Comparative Examples 1 and 2, the average particle diameter increases in the upper layer. It changes between and the lower part of the layer.
  • the proportion of C in the example gradually increases from the lower layer to the upper layer.
  • the C ratio increases at a substantially constant ratio from the lower part of the layer to the upper part of the layer, whereas in Comparative Examples 1 and 2, the rate of change of the C percentage is higher than that of the upper part of the layer. It changes with the lower part.
  • FIG. 23 is a graph showing the relationship between the height in the layer direction and the ratio of CaO in the layer when the raw materials are supplied into the pallets using the apparatuses of the above-described examples and comparative examples.
  • the proportion of CaO in the example increases from the lower part of the layer to the upper part of the layer.
  • the present invention provides a raw material supply mechanism for supplying a raw material to a pallet, the upper end of which is located near the raw material supply mechanism, and the lower end of which is located above the pallet.
  • a raw material charging apparatus for a sintering machine comprising: a chute inclined in a direction opposite to a moving direction of the pallet; wherein the chutes are mutually predetermined from the upper end to the lower end in the width direction of the pallet.
  • the chute may be formed in a linear shape or a concave shape.
  • the rod also includes a linear member such as a wire.
  • the present invention is characterized in that the chute is curved concavely from its upper end toward its lower end.
  • the conventional raw material charging device in which the chute is formed in a straight line has the following problems.
  • the raw material slides down on a straight chute inclined at a predetermined angle and is supplied to a pallet. For this reason, the impact when the raw material falls onto the pallet and the angle of repose of the raw material increase, causing avalanche phenomena in the raw material layer and a fault in the raw material layer.
  • the particle size segregation in the layer direction of the raw material and the accompanying distribution of C and C a 0 in the raw material layer become uneven.
  • unevenness in ventilation occurs on the fault caused by the avalanche phenomenon, and the product yield decreases.
  • the downhill speed of the particles sliding down the chute It is too fast, and the classification effect on the shot is low.
  • the present invention by forming a chute composed of a plurality of openings into a gentle concave shape, it is possible to alleviate the impact of falling of the raw material at the time of falling and prevent the avalanche phenomenon.
  • the raw material can be further classified into coarse and fine particles, and accurate particle size segregation can be obtained in the pallet.
  • the vertical projection gap between the rods increases from the upper end to the lower end of the chute. .
  • This vertical projection gap between rods also increases when the center distance between rods is uniformly increased, unless the center distance between the rods is shortened on the way from the upper end to the lower end. If the vertical projection gap between the rods increases from the top to the bottom, coarse material will also pass through the gap in the area where most of the particles collide, and the classification effect for each particle size will be lost.
  • the projection gap in the vertical direction between the plurality of rods in the area where the falling raw material particles collide is kept constant. By doing so, it is possible to prevent coarse material having a certain particle size or more from falling through the gap between the rods.
  • the present invention is characterized in that at least a part of the rod interval (center-to-center distance between adjacent rods) in the section is smaller than a gap between lower ends of the section.
  • the rod interval is larger than the rod interval in the above-described area on the lower end side of the area where the projection interval in the vertical direction is arranged to be constant.
  • coarse material falls from the gap between the rods, so that particle size segregation can be increased.
  • the rod interval at the lower end side of the section is set to be larger as going downward, and the rod interval at the lower end of the chute is set to be larger than the rod interval of the section. It is characterized by being performed.
  • the vertical projection gap is constant.
  • the distance between the centers of the rods was increased at the lower end side of the area where the rods were arranged, and at the lower end of the shout, the rod interval was larger than the above area. Accordingly, particles having a large particle diameter can be dropped, and the classification effect can be further increased.
  • the projection gap in the vertical direction is set smaller than the diameter of the coarse particles of the raw material particles supplied to the sintering machine, the coarse particles can be prevented from falling. Since the diameter of the coarse particles is around 8 mm, the projection gap is set to 8 mm or less. Desirably, the projection gap is substantially set to 4 mm or less of the average particle diameter of the raw material particles in order to drop only the fine particles.
  • the depression angle at which the raw material enters is large, when projecting vertically, some of the adjacent rods in the above area may overlap, so that there is no gap between the rods in the projected image It is.
  • FIG. 25 is a schematic vertical sectional view of the raw material charging apparatus.
  • the raw material charging apparatus includes a raw material supply mechanism for supplying a raw material 207 to a pallet 205, and a shot 214.
  • the raw material supply mechanism includes a belt-type feeder 203 that places the raw material 207 uniformly in the width direction and moves the raw material 207 in the direction of the arrow.
  • the shutter 214 has its upper end located near the discharge end of the belt-type feeder 203 and its lower end located above the pallet 205, facing in the direction opposite to the direction of movement of the pallet 205. Inclined.
  • FIG. 26 shows a front view of the chute
  • FIG. 27 shows a cross-sectional view taken along line AA of FIG.
  • the chute 2.14 is formed in a screen shape comprising a plurality of rods 2 15 arranged in parallel with a predetermined interval from the upper end to the lower end in the width direction of the pallet 205. ing.
  • the shout 214 is formed in a gentle concave shape from the upper end to the lower end.
  • the rod 2 15 in the area where the raw material 2 07 supplied from the belt-type feeder 203 and entering the chute 2 14 directly collides with the shut 2 14
  • the projection gap in the direction is kept constant.
  • the vertical projection gap is defined as the rod 2 15 The gap between adjacent rods 2 15 when viewed.
  • the straight line S between the adjacent rods 215 (the rod interval) will move downward as it goes down.
  • the shortened rod interval in the zone is set smaller than the rod interval on the lower end side of the zone. Then, the rod interval at the lower end side of the section is made larger as it goes downward, and the rod interval at the lower end of the chute 214 is larger than the rod interval of the section.
  • the connecting member 2 16 connects a plurality of rods 2 15 constituting the chute 2 14 to each other at predetermined intervals. For example, four connecting members 2 16 are attached at predetermined intervals in the width direction of the rod 2 15.
  • the guide chute 2 17 shown in FIG. 25 is a plate-like chute located between the discharge end of the belt-type feeder 203 and the upper end of the shunt 214. If the raw material 207 enters the shouette 214 at an appropriate angle and speed, the guide stub 17 is not necessary. However, when the supply speed of the raw material 207 changes according to the change in the production rate, the direction of entry of the raw material particles changes even through the guide chute 217.
  • the raw material 207 discharged from the belt-type feeder 203 and further discharged through the guide chute 217 as needed collides with the upper part 216 a of the chute 216, and a part of the collides. The direction of travel is changed so that the player slides down the chute 2 14 formed in a screen shape.
  • the remaining part falls from the rod gap at the shot collision.
  • the rods in the area where the raw material collides are arranged so that the projection gap in the vertical direction is constant, so that the coarse-grained raw material does not fall out of the raw material particles, and the fine-grained raw material falls. .
  • the raw material particles Of the raw material particles, some of the coarse particles slide down on the chute 2 14 composed of a plurality of rods 2 15 and are discharged from the lower end of the chute 2 14. Further, the remaining part of the coarse particles falls from the wide gap between the rods constituting the lower part 214 b of the chute 214, and moves on the great bar 206 in the pallet 205 moving continuously. Supplied to On the other hand, the raw material of the fine particles may be in the narrow gap between the rods constituting the upper part of the chute 2 14 And is supplied onto a great bar 206 in a continuously moving pallet 205.
  • FIG. 28 shows a raw material charging apparatus according to Embodiment 3-2 of the present invention.
  • a raw material supply mechanism comprises: a hopper 201 having a cutout gate 201 a at a lower portion of a side wall opposite to the pallet 205 moving direction;
  • Embodiment 31 is different from Embodiment 3-1 described above in that it comprises a mouth feeder 202 provided at the lower end opening of the housing 101.
  • FIG. 29 shows a raw material charging apparatus according to Embodiment 3-3 of the present invention.
  • the raw material supply mechanism comprises: a hopper 201 into which the raw material 207 is charged; and a hopper 201 having a cut-out gate 201 a at a lower portion of a side wall opposite to the moving direction of the pallet 205; It has a mouth feeder 202 provided at the lower end opening of 201 and further differs from Embodiment 3-2.
  • the roll feeder 218 provided diagonally below the roll feeder is provided. Have. By rotating the roll feeder 218, the angle at which the raw material enters the chute can be adjusted to help reduce fluctuations.
  • FIG. 30 is a graph showing the relationship between the opening gap position and the vertical projection gap between the rods, comparing the example and the comparative example
  • FIG. 31 is a graph showing the relationship between the example and the comparative example. It is a graph showing the relationship between the rod gap position and the rod interval (center-to-center distance between rods).
  • the positions of the gaps are numbered 1, 2, 3, 4 and 21 from the top.
  • the center-to-center distance between the rods is set to gradually increase from the upper end to the lower end of the rod 215.
  • the vertical projection gap between the rods of this comparative example is compared with that of the example.
  • FIG. 32 is a graph showing the shape curve of the example, where the plotted points indicate the center position of the rod.
  • FIG. 33 is a graph showing the shape curve of the comparative example, and the plotted points indicate the center positions of the rods. Then, in the chutes of the example and the comparative example, the depression angle of the entrance angle of the raw material is set larger than the gradient of the upper end of the chute, and the entrance angle of the raw material particle crosses the inclination of the upper end of the shot by 13 degrees to advance the raw material particles. Let me enter.
  • Fig. 34 shows the relationship between the height in the layer direction, the average particle size in the layer, and the proportions of C and CaO when the raw materials were supplied into the pallets using the apparatuses of the above-described examples and comparative examples. It is a graph.
  • the average particle size will be described.
  • the average particle size of the examples gradually increases from the upper layer to the lower layer.
  • the proportion of C in the example gradually increases from the lower layer to the upper layer.
  • the ratio of C a 0 will be described.
  • the proportion of CaO in the example increases from the bottom of the layer to the top of the layer.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Manufacture And Refinement Of Metals (AREA)

Description

焼結機への原料装入装置 技術分野
この発明は、 焼結鉱を連続的に製造する焼結機に、 焼結用原料を装入するため の原料装入装置に関するものである。 背景技術
高炉用原料として使用される焼結鉱は、 一般に、 次の方法により製造される。 造粒された焼結用原料をホッパーより焼結機のパレット上に、 連続的に所定の 層厚、 例えば 5 0 0〜7 0 0 mm程度の高さの層厚にして供給する。 次いで点火 炉にて表層部中の炭材に点火し、 下方に向けて強制的に空気を吸引しながら炭材 を燃焼させる。 燃焼時に発生する燃焼熱によって焼結鉱原料を焼結し、 塊成化す る。 こうして焼成された 「焼結ケーキ J'を破碎し、 冷却する。 冷却後整粒して 3 〜 5 mm以上の粒子の内、 品質基準を満たすものを 「成品焼結鉱」 として高炉に 装入する。 品質不合格品及び破碎 ·整粒過程で発生した 3〜 5 mm以下の粉焼結 鉱は、 返鉱として再度焼結用原料として使用される。
こうして製造される高炉用原料として使用される焼結鉱の品質は、 高炉操業時 の荷下がり状態の安定性や通気 ·通液性、 還元効率及び高温性状等に対して大き な影響を及ぼす。 従って、 焼結鉱に対して高品質が要求され、 厳しい品質管理が 行なわれると共に、 またその製造コスト低減のために、 焼結鉱の成品歩留向上が 要請される。
上記焼結鉱に対する高品質の維持、 高成品歩留の維持、 及び製造コスト低減、 並びに、 生産性の向上を図るための極めて重要な条件の一つは、 焼結機パレット へ装入する焼結用原料の層内粒度分布と成分分布との両方を適切に調節すること である。 層内粒度分布と成分分布との両方を適切に調節することにより、 5 0 0 〜7 0 0 mm程度の高さを有する原料層内の通気性を確保して炭材の燃焼を向上 させると共に、 その燃焼熱による焼結鉱原料の溶融 ·焼結反応を適切に制御する ことが可能となる。 そこで、 従来、 パレットに装入された焼結用原料の層内粒度 分布及び成分分布を調節するための多数の原料装入技術が提案されている。
例えば、 実公平 3— 4 3 5 9 9号公報には、 図 1 1に示されるような原料装入 装置が提案されている。 焼結用原料 3はホッパー 1からロールフィーダ一 2で送 り出されて落下する。 落下した焼結用原料 3は、 ロールフィーダ一 2に対向して 下方に傾斜する平板状シュ一ト 4を滑り降下する。 その平板状シユート 4の下方 略延長線上に所定ピッチで複数本の口一プ又は口ッド 5が、 焼結機パレット 6の 幅方向に配設され、 複数のスリット状隙間 7が形成される。 滑り降下した焼結用 原料はその複数のスリット状隙間 7から焼結機パレツト 6上に落下し、 所定厚さ の原料層 8を形成する。 上記複数本の所定ピッチで配設され、 スリット状隙間 7 を形成した構造体である粒度偏析装入機構.9の下方傾斜方向は、 焼結機パレツト 6の移動方向 (図 1 1中の矢印 X方向) に対向している。 スリット状隙間 7は上 方の平板状シュート 4側で狭く、 下方の焼結機パレット 6側で広い。 かくして、 パレツト 6に装入された原料層 8内部の焼結用原料の粒度分布は、 下層部に粗粒、 上層部に細粒のものが堆積するように調節することができる (以下、 先行技術 1 という) 。
また他の例として、 特開平 8— 3 1 1 5 6 8号公報には、 図 1 2に示されるよ うな原料装入装置が提案されている。 焼結用原料 3はホッパ一 1から口一ルフ ィ一ダ一 2で送り出されて落下する。 落下した焼結用原料は、 上記ロールフィー ダー 2の下方に設けられ且つ焼結用原料の落下方向に対向して回転するドラムフ ィーダ一 1 0により受けられる。 このドラムフィーダ一 1 0の前面から下方に傾 斜し、 なだらかに下方に湾曲した曲面上に、 所定ピッチで複数本のロッド又は ロープ 5が、 焼結機パレツト 6の幅方向に配設され、 複数のスリット状隙間 7を 形成している。 上記ドラムフィーダ一 1 0により落下速度が減速された焼結用原 料は、 その複数のスリット状隙間 7から焼結機パレット 6上に落下し、 所定厚さ の原料層 8を形成する。 上記複数本の所定ピッチで配設され、 スリット状隙間 7 を形成した構造体である粒度偏析装入機構 9の下方傾斜方向は、 焼結機パレツト 6の移動方向 (図 1 2中の矢印 X方向) に対向している。 そして、 スリット状隙 間 7は上方のドラムフィーダ一 1 0側で狭く、 下方の焼結機パレット 6側で広い。 かくして、 パレット 6に装入された原料層 8内部の焼結用原料の粒度分布は、 下 層部に粗粒、 上層部に細粒のものが堆積するように調節することができる (以下、 先行技術 2という) 。
上述したように、 先行技術 1及び 2によればいずれも、 焼結機パレット 6に装 入された原料層 8内部の焼結用原料の粒度について、 下層部に粗粒、 上層部に細 粒のものが堆積する粒度分布に形成することができる。 しかし、 原料層 8内部の 層内成分分布の調節については、 上述した先行技術 1及び先行技術 2等の従来技 術による焼結機パレツト 6への原料装入技術では、 その焼結用原料の構成成分、 例えば、 固体燃料である粉コークス等炭材や、 スラグ成分である C a〇等の層内 分布を調節することはできない。
また、 特開平 8— 3 1 1 5 6 8号公報記載のシュートを連続的にカーブさせた 原料供給装置にあっては、 なだれ現象を防^:できるが、 粒子速度とロッド配置 カーブの曲率のバランスを取るのが困難で、 原料粒子の分級が不十分になるとい う問題とシュートの終端に到達する前に、 全ての粒子がロッド間より落下してし まうという問題を生じる。
発明の開示
この発明の目的は、 焼結機パレットの原料層内の粒度分布に加えて、 成分分布 の調節性向上を図り、 高品質、 高歩留、 高生産性が得られるようにするための焼 結機への原料装入装置を提供することにある。 上記の目的を達成するために、 本発明は、 焼結用原料を送り出すためのフィー ダ一と、 前記フィーダ一の下方に配設されたローラ一フィーダ一と、 前記ロー ラーフィーダ一の下方に配設され粒度偏析装入機構とを有する焼結機への原料装 入装置を提供する。
前記ローラーフィーダ一は、 当該フィーダ一により供給された前記焼結用原料 を受け、 当該焼結用原料を下方へ送給する。 前記ローラーフィーダ一は、 軸心線 を有する複数本のローラーで構成され、 当該軸心線は前記焼結機パレツトの移動 方向に対して直角方向に配設されている。
前記粒度偏析装入機構は、 当該ローラーフィーダ一により送給された前記焼結 用原料の焼結機パレツトへの装入分布块態を調節する。
前記粒度偏析装入機構は、 複数本の直線状ロッド又は直線状ワイヤで構成され、 そして当該直線状ロッド又は直線状ワイヤの軸心線が、 前記焼結用原料の当該粒 度偏析装入機構への受給方向に対して直角方向に、 且つ前記焼結機パレツトの移 動方向に対して直角方向に配設されているのが好ましい。
当該直線状ロッド又は直線状ワイヤは、 前記焼結機パレツ卜の移動方向に向か つて湾曲した曲面状に配設されているのが望ましい。 また、 当該隣接ロッド又は ワイヤの間隔は、 上部から下部に向かって広くなつているのが望ましい。
上記の発明は、 実施の形態 1として参照される。 さらに、 本発明は、 焼結用原料をパレットに供給するための原料供給機構と、 その上端が前記原料供給機構の近傍に位置し、 その下端が前記パレットの上方に 位置する、 前記パレットの移動方向とは反対の方向に向けて傾斜しているシュ一 トからなる焼結機への原料装入装置を提供する。
前記シュートは、 前記パレットの幅方向に、 その上端から下端に向けて互い に所定間隔を空けて平行に配設された複数本のロッドからなり、 その上端からそ の下端に向けて凹面状に湾曲した形状を有する。
前記シュートの水平方向の長さの上端側 1 / 3に対応する範囲における、 隣 接するロッド間を結ぶ勾配の変化率の平均値は、 下端側 2 / 3に対応する範囲に おける勾配の変化率の平均値に対して 1 . 5倍〜 1 0倍である。
上記の発明は、 実施の形態 2として参照される。 実施の形態 2におけるシュ一 卜が、 実施の形態 1の前記粒度偏析装入機構として使用することは可能である。 実施の形態 2の原料供給機構として、 実施の形態 1のフィーダ一とローラーフ ィーダ一が使用可能である。 さらにまた、 本発明は、 焼結用原料をパレットに供給するための原料供給機構 と、 その上端が前記原料供給機構の近傍に位置し、 その下端が前記パレットの上 方に位置する、 前記パレットの移動方向とは反対の方向に向けて傾斜しているシ ユートとからなる焼結機への原料装入 gを提供する。
前記シュートは、 前記パレットの幅方向に、 その上端から下端に向けて互い に所定間隔を空けて平行に配設された複数本のロッドからなる。 前記シュートの 上部において、 落下してくる原料が衝突する区域における、 前記複数本のロッド 間の垂直方向への投影間隙がほぼ一定である。
上記の発明は、 実施の形態 3として参照される。 実施の形態 3におけるシュ一 卜が、 実施の形態 1の前記粒度偏析装入機構として使用することは可能である。 実施の形態 3の原料供給機構として、 実施の形態 1のフィーダ一と口一ラーフ ィーダ一が使用可能である。 図面の簡単な説明
図 1は、 実施形態 1に係わる焼結機への原料装入装置の概略垂直断面図である。 図 2は、 図 1のローラーフィーダ一の拡大図である。
図 3は、 図 1中の粒度偏析装入機構の概略正面図である。
図 4は、 図 3の A— A線矢視図である。
図 5は、 実施形態 1に係わる実施例の粒度偏析度を示す図である。
図 6は、 実施形態 1に係わる実施例のコークス偏析度を示す図である。
図 7は、 実施形態 1に係わる比較例の粒度偏析度を示す図である。
図 8は、 実施形態 1に係わる比較例のコークス偏析度を示す図である。
図 9は、 実施形態 1に係わる実施例、 比較例各々の鍋試験における生産率を示 した図である。
図 1 0は、 実施形態 1に係わる実施例、 比較例各々の鍋試験における歩留を示 した図である。
図 1 1 ( a ) は、 従来の焼結機への原料装入装置の一例を示す概略垂直断面図 である。
図 1 1 ( b ) は、 図 1 1 ( a ) の原^装入装置の偏析装入機構におけるスリツ ト状隙間を模式的に示す図である。
図 1 2は、 従来の焼結.機への原料装入装置の他の例を示す概略垂直断面図であ る。
図 1 3は、 実施形態 2— 1に係わる焼結機への原料装入装置を示す垂直断面図 である。
図 1 4は、 実施形態 2— 1に係わる原料装入装置におけるシュートを示す正面 図である。
図 1 5は、 図 1 4の A— A線断面図である。
図 1 6は、 実施形態 2— 2に係わる焼結機への原料装入装置を示す垂直断面図 である。
図 1 7は、 実施形態 2— 3に係わる焼結機への原料装入装置を示す垂直断面図
'である。 図 18は、 実施形態 2— 4に係わる焼結機への原料装入装置を示す垂直断面図 である。
図 19は、 実施形態 2で使用されるシュ一トにおいて隣接する口ッド間の距離 を示すグラフである。
図 20は、 実施形態 2における実施例のシュートの形状曲線を示すグラフであ る。
図 21は、 実施形態 2における比較例 1のシュ一トの形状曲線を示すグラフで ある。
図 22は、 実施形態 2における比較例 2のシュ一トの形状曲線を示すグラフで める。
図 23 (a) は、 実施形態 2の実施例における原料層中の C aOの割合を示す グラフである。
• 図 23 (b) は、 実施形態 2の比較例 1における原料層中の Ca〇の割合を示 すグラフである。
図 23 (c) は、 実施形態 2の比較例 2における原料層中の CaOの割合を示 すグラフである。
図 24 (a) は、 実施形態 2の実施例における原料層中の平均粒径およびじの 割合を示すグラフである。
図 24 (b) は、 実施形態 2の比較例 1における原料層中の平均粒径および C の割合を示すグラフである。
図 24 ( c ) は、 実施形態 2の比較例 2における原料層中の平均粒径および C の割合を示すグラフである。
図 25は、 実施形態 3— 1における原料装入装置を示す垂直断面図である。 図 26は、 実施形態 3— 1における原料装入装置におけるシュートを示す正面 図である。
図 27は、 図 26の A— A線新面図である。
図 28は、 実施形態 3— 2における原料装入装置を示す垂直断面図である。 図 29は、 実施形態 3-3における原料供給装置を示す垂直断面図である。 図 3 0は、 実施形態 3におけるシュートにおいて、 隣接するロッド間の垂直投 影間隙を示すグラフである。
図 3 1は、 実施形態 3におけるシュートにおいて、 隣接するロッド間のロッド 中心間距離を示すグラフである。
図 3 2は、 実施形態 3における実施例のシュートの形状曲線を示すグラフであ る。
図 3 3は、 実施形態 3における比較例のシュートの形状曲線を示すグラフであ る。
図 3 4 ( a ) は、 実施形態 3における原料層中の平均粒径と Cの割合を、 実施 例と比較例で比較したグラフである。
図 3 4 ( b ) は、 実施形態 3における原料層中の C a 0の割合を、 実施例と比 較例で比較したグラフである。
発明を実施するための形態'
実施形態 1
本発明者等は、 焼結用原料の各粒子に注目すると、 その粒子を構成する主要成 分により比重に差があることに着眼し、 この比重差を利用して焼結機パレツトの 原料層内成分分布を調節し得ることを知見した。 この知見を活用するために、 従 来、 所定の粒度構成及び成分構成を有する焼結用原料を所定のフィーダ一で送給 された後、 これを受け止めて、 その焼結用原料に対して下方へ所定の運動状態を 与えた後に、 先行技術 1あるいは先行技術 2で例示した粒度偏析装入機構により 焼結用原料が有する粒度分布を利用した粒度偏析装入を行なう前に、 比重差を利 用して、 成分が異なる粒子間で運動速度を変化させる新しい機構を導入すること を着想した。
この発明は、 上記知見と着想に基づきなされたものであり、 その要旨は次の通 りである。
焼結機への原料装入装置は、 焼結用原料を送り出すためのフィーダ一を備え、 そのフィーダ一の下方に近接して配設きれ、 そのフィーダ一により供給された焼 結用原料を受けると共に、 その焼結用原料の下方への運動状態を調節しつつ焼結 用原料を下方へ送給するためのローラーフィーダ一を備え、 この口一ラーフィ一 ダ一の下方に近接して配設され、 そのローラ一フィーダ一により送給された上記 焼結用原料を焼結機パレツ卜へ装入するに当たり、 その装入分布状態を調節する ための粒度偏析装入機構を備えたものである。 上記口一ラーフィーダ一は、 複数 本のローラー又は回転ドラムで構成されており、 そしてその口一ラー又は回転ド ラムの軸心線が、 上記焼結用原料の口一ラーフィーダ一への受給方向に対して直 角方向に、 且つ上記焼結機パレツトの移動方向に対して直角方向に配設されてい る。
上記の通り、 上方に設けられたフィーダ一から送給された焼結用原料を、 複数 本のローラー又は回転ドラムで構成されたローラ一フィーダ一で受け止めるが、 その際、 複数本の口一ラー又は回転ドラムの直径を適切に小さくし、 またそれら の回転速度を調節することにより、 受け止めた焼結用原料の下降速度と複数本の ローラー又は回転ドラムで支持された焼結用原料の層厚を適切に調節することが でき、 しかも、 これらの条件に応じて、 この焼結用原料の層内を粒子の比重差に 応じて異なる降下速度で移動する。 例えば、 ローラー又は回転ドラムの回転速度 を速くすれば、 比重の大きい粒子の降下速度が大きくなり、 下方に配設されてい る粒度偏析装入装置のより下方部位のロッド又はワイヤ同士間の隙間から落下し て、 焼結機パレツトの原料層厚の下層部に多く分布することになる。 上記の焼結機への原料装入装置において、 粒度偏析装入機構が、 複数本の直線 状ロッド又は直線状ワイヤで構成され、 そしてその直線状ロッド又は直線状ワイ ャの軸心線が、 焼結用原料の上記粒度偏析装入機構への受給方向に対して直角方 向に、 且つ焼結機パレットの移動方向に対して直角方向に配設され、 しかもその 直線状ロッド又は直線状ワイヤの配列が、 上記焼結機パレツトの移動方向に向か つて下降形態のスクリーン状に配設されているものであること力 子ましい。
焼結機パレツトの 動方向に向かって下降形態のスクリーン状に配設された複 数本の直線状ロッド又は直線状ワイヤが、 隣接するロッド又はワイヤ同士の間隔 力 s、 上部から下部に向かって広くなつているものであるのが好ましい。
図 1は、 この発明の装置の望ましい実施態様を示す概略垂直断面図である。 同 図に示すように、 ホッパー 1からロールフィーダ一 2の幅方向に均一な量が送り されて落下する焼結用原料 3を、 ロールフィーダ一 2の下方に設けられ、 その 焼結用原 の兹下 向 向して rai^す^媳救太の小 isn— ^—1 1 、 ス
であることもあり、 口一ラーフィーダ一 1 2に載った焼結用原料 3は、 小径ロー ラ一 1 1間の隙間から洩れ落ちることはない。 また、 小径ローラー 1 1は常時回 転しているので、 焼結用原料 3は比較的その表面に付着しにくいが、 各小径口一 ラー 1 1の下部に近接して、 その原料付着防止用の原料削ぎ落とし用部材が設げ られている。
このローラ一フィーダ一 1 2の特徵的な機能ほ、 各小径ローラー 1 1の回転速 度を調節することにより、 ローラ一フィーダ一 1 2に載った焼結用原料 3の下降 速度を容易に変えることができることである。 このローラーフィーダ一 1 2上の 焼結用原料 3の下降速度の調節により、 焼結用原料 3を構成する粒子の比重差に 応じて下降速度の差を増幅させることができる。 例えば、 焼結用原料 3中の鉄鉱 石を多量に含んだ擬似粒子は、 粉コークスを多量に含んだ擬似粒子よりも比重が 大きいので、 ローラーフィーダ一 1 2を構成する小径ローラー 1 1の回転速度を 上げることにより、 焼結用原料 3中における降下速度が粉コークスを多量に含ん だ擬似粒子よりも速くなり、 ローラ一フィーダ一 1 2の下方に連続して設けられ ている粒度偏析装入機構 9のより下方部位まで到達し、 その結果、 焼結機パレツ ト 6の下層部により多くの鉄鉱石を多 ftに含んだ重い擬似粒子の分布量が多くな り、 粉コークスを多量に含んだ軽い擬似粒子の分布量が少なくなる。 このように して、 焼結機パレット 6の原料層 8内の成分分布を調節することができる。
ローラーフィーダ一 1 2の下方には、 これのほぼ延長上に、 粒度偏析装入機構 9が接近して配設されている。 粒度偏析装入機構 9は、 上端がローラ一フィ一 ダー 1 2の下端に近接し、 下端が焼結機パレット 6に近接しており、 全体形状は 上部は傾斜平面状で下部はなだらかに下に凸に湾曲した傾斜曲面状を呈し、 これ ら面上に所定ピッチで複数本のロッド 1 4を、 焼結機パレツト 6の幅方向に配設 して複数のスリット状隙間 7を形成している。 なお、 全体形状は全体がなだらか に下に凸に湾曲した傾 面でもよく、 あるいはまた全体が傾斜平面であつてもよ レ^ 図 3に、 図 1中の、 粒度偏析装入機構 9の概略正面図を示し 図 4に、 図 3 の AA線矢視図を示す。 スリット状隙間 7は上方のローラーフィーダー 1 2側で 狭く、 下方の焼結機パレツト 6側で広くしてある。 1 5は、 複数本のロッド 1 4 の連結部材であって、 複数本のロッド 1 4を上述したように所定の隙間 7を空け、 且つ上述したような湾曲した曲面上に連結するためのものである。 そして、 各口 ッド 1 4は長さ方向にスライド可能な構造を有し、 ロッド 1 4の表面に付着した 焼結用原料 3を連結部材 1 5で削ぎ落とすために適宜スライドさせて、 スリット 状隙間 7め詰まりをなくす。
粒度偏析装入機構 9は、 口一ラーフィーダ一 1 2により下降速度を調節され排 出された焼結用原料 3を受ける。 焼結用原料 3の内の粗粒原料は、 スリット状隙 間 7が広くなつている粒度偏析装入機構 9の下部領域から焼結機パレツト 6上に 落下するので、 その原料層 8の下部層に多く分布し、 一方、 細粒原料は、 スリツ ト状隙間 7が狭くなっている粒度偏析装入機構 9の上部領域から焼結機パレツト 6上に落下するので、 その原料層 8の上層層に多く分布することになる。 かかる 粒度偏析装入機構 9による焼結機パレツト 6の原料層 8内粒度分布の調節は、 粒 度偏析装入機構 9の全体形状の傾斜角度や湾曲度を調整することにより変える。 なお、 本発明装置の実用的な諸元としては設備規模,様態によっても変わり得る が、 概ね下記の範囲が適当である。 ' く□一ラ一フィ一夕1 ~~
小径口一ラーの直径: 1 0 0〜2 0 0 mm
小径ローラ一の長さ: 2〜6 m
小径ローラ一の本数: 3〜8本
小径ローラ一間の隙間 ( β ) : 5〜 1 5 mm
ローラ—フィーダ一の傾斜角 ( α) : 5 0〜6 0度
小径ローラーの回転数: 2〜1 5 r pm
<粒度偏析装入装置 >
口ッドの直径: 8 ~ 1 5 mm
ロッドの長さ: 2〜 6 m (パレット有効幅相当;)
全体形状上部の平面部の傾斜角: 5 0〜6 0
連結部材 (ブラケット) の本数: 2〜6個
連結部材間の間隔: 5 0 0〜 1 5 0 0 mm [実施例]
図 1〜4に示したこの発明に係る実施態様の小型シミュレーシヨン装置 (有効幅 約 50cm)を用いて、 焼結機パレツト 6へ焼結用原料 3を供給 (装入層厚: 500mm)し た。 さらにその装入原料をそのままの状態で鍋試験に供した。
①実施例装置のローラーフィーダ一 1 2の構成は下記の通りである。
小径ローラーの直径: 1 5 0 mm
小径口一ラーの本数: 5本
小径口一ラー間の隙間 ( i3 ) : 1 0 mm
ローラーフィーダ一の傾斜角 (ひ) : 5 5度
小径ローラ一の回転数: 2〜 1 5 r p mの間で 2 , 7 , 1 0 , 1 5 r p mの 4個の 水準実施 '
②実施例装置の粒度偏析装入機構 9の構成は下記の通りである。
ロッドの直径: 1 1 mm
ロッドの本数
- 上部の平面状部分: 1 2本 ·' ·
下部の湾曲状部分: 1 0本
スリット状隙間 (いずれも水平投影間隔)
上部の平面状部分: 1 7 . 3 mm
下部の湾曲状部分の上段部分: 2 2 · 5 mm
下部の湾曲状部分の下段部分: 3 6 . 0 mm
全体形状上部の平面部の傾斜角: 5 5度
全体形状下部の湾曲部分: 半径 6 8 0 mmの円弧 .
[比較例]
比較のために、 図 1 2に示した従来方法例である、 実施例と一見類似のシミュ レーシヨン装置を用いて、 焼結機パレット 6へ焼結用原料 3を供給した。 その後、 供給原料に対し、 実施例と同じく鍋試験を行った。
①比較例装置のドラムフィーダ一 1 0の構成は下記の通りである。 ロールの直径: 4 0 0 mm
ロールの回転数: 7, l O r p m
②比較例装置の粒度偏析装入機構 9の構成は、 [実施例〗 の②の実施例装置の 粒度偏析装入機構 9の構成と同じである。
図 5〜 6 (実施例での小径ローラーの回転数を変化させた水準数 = 5とした ) に、 上述した実施例の装置を用いて、 焼結機パレットに焼結用原料を、 2 . 0 t / h · πι2で装入した場合のパレット内原料層の層厚方向に対する、 焼結用原料 の平均粒径分布及び原料層中 C含有率の分布を示す。
図 7〜図 8 (比較例でのローラの回転数を変化させた水準数 = 2とした) に、 上述した比較例の装置を用いて、 焼結機パレットに焼結用原料を、 2 . 0 t /h - m2で装入した場合のパレツト内原料層の層厚方向に対する、 焼結用原料の平均 粒径分布及び原料層中 C含有率の分布を示す。 図 9〜 1 0は実施例、 比較例の各 条件での焼結生産率および歩留を示す。 '
上記図 5〜図 1 0に示したように、 本発明実施例の方が比較例に比べ粒度偏析、 C濃度偏祈が強化され、 生産率および歩留が向上することがわかる。
このように、 本発明の実施例によれば、 焼結機パレットの原料層内の粒度分布 のみならず成分分布も、 従来技術による比較例よりも目標とする分布に的確に調 節することができる。 更に、 従来の焼結機設備においては、 ロールフィ一ダー 2 と粒度偏析装入機構 9との間のスペースが狭くて、 .大径ローラのドラムフィー ダ一 1 0では設置不可能な場合でも、 本発明の装置における複数本の小径ロー ラ一 1 1からなるローラーフィーダ一 1 2であれば、 設置することが可能であり、 既存の焼結機設備に対する設備増強が可能である。 実施形態 2
本発明者等は、 隣接するロッド間を結ぶ直線の勾配の変化率 (概念的にはシ ユートの形状曲線を 2階微分した値) に着目し、 この勾配の変化率を所定の範囲 に設定することで、 粒子が進行方向を変えると共にその速度の低下が適切になり、 シユートの全長にわたり均一に分散して粒子を落下させることができることを知 見した。
実施形態 2の焼結機への原料装入装置は、 焼結用原料をパレットに供給するた めの原料供給機構と、 その上端が前記原料供給機構の近傍に位置し、 そして、 そ の下端が前記パレットの上方に位置する、 前記パレッ卜の移動方向とは反対の方 向に向けて傾斜しているシュートとからなる。 前記シュートは、 前記パレットの 幅方向に、 その上端から下端に向けて互いに所定間隔を空けて平行に配設された 複数本のロッドからなり、 その上端からその下端に向けて凹面状に湾曲した形状 を有する。 前記シュートの水平方向の長さの上端側 1 / 3に対応する範囲におけ る、 隣接するロッド間を結ぶ勾配の変化率の平均値は、 下端側 2 / 3に対応する 範囲における勾配の変ィ匕率の平均値に対して 1 . 5倍〜 1 0倍である。
この実施形態 2によれば、 原料がシ —卜で適正量落下し、 しかも、 シュート の装置長方向 (原料粒子および装入パレットの進行方向) での落下量の分布が分 散する。 したがって、 大きな偏祈と適当な装入密度の原料層が得られ、 焼結歩留 りと生産率を向上することができる。
以下、 添付図面に基づいて、 実施形態 2— 1における原料装入装置について説 明する。 図 1 3は原料装入装置の概略垂直断面図を示すものである。 この原料装 入装置は、 原料 1 0 7をパレツト 1 0 5に供給するための原料供給機構と、 シ ユート 1 1 4とを備える。
原料供給機構は、 幅方向に均一に原料 1 0 7を載せて、 原料 1 0 7を矢印の方 向に移動するベルト式フィーダ 1 0 3からなる。
シュ一ト 1 1 4は、 その上端がベルト式フィーダ 1 0 3の排出端近傍に位置し、 . その下端がパレツト 1 0 5の上方に位置し、 パレット 1 0 5の移動方向とは反対 の方向に向けて傾斜している。 案内シュート 1 1 7は、 ベルト式フィーダ 1 0 3 の排出端と、 シュート 1 1 4の上端との間に位置する板状のシュートである。 原 料 7が'シュート 1 1 4に適切な角度および速度で進入する場合には、 案内シュ一 ト 1 1 7は必ずしも必要でない。
図 1 4は、 シュートの正面図を示し、 図 1 5は、 図 1 4の A— A線断面図を示 す。 シュート 1 1 4は、 パレット 1 0 5の幅方向に、 その上端から下端に向けて 互いに所定間隔を空けて平行に配設された複数本のロッド 1 1 5からなるスク リーン状に形成されている。 ロッドにはワイヤ等の線状部材も含まれる。 このシ ュ一卜 1 1 4は、 その上端から下端に向けてなだらかな凹面状に形成されている。 また、 シュート 1 1 4は、 水平方向の長さ Lの上端側 1 Z 3に対応する範囲 L 1 における、 隣接するロッド 1 1 5間を結ぶ勾配の変化率の平均値が、 下端側 2 / 3に対応する範囲 L 2における勾配の変化率平均値の 1 . 5倍〜 1 0倍になるよ うに形成される。 連結部材 1 1 6は、 シュート 1 1 4を構成する複数本のロッド 1 1 5を、 所定間隔を空けて、 相互に連結する。 この連結部材 1 1 6は、 ロッド 1 1 5の幅方向に所定間隔を空けて例えば 4個取り付けられる。 ロッド 1 1 5の 隙間は、- 全般的にはシュート 1 1 4の上端側 1 1 4 aのほうが、 下端側 1 1 4 b よりも小さいが、 上部から下部に向つ Τ·一様に拡大している必要はない。 例えば 上端と下端のロッドの途中で、 一部で隣接するロッド間隔で、 下部側が小さくな り、 さらにその下部では再び増大して、 上端側より大きなロッド間隔となる様に 配置することも可能である。
ベルト式フィーダ 1 0 3の排出端から、 案内シュート 1 1 7を介して排出され た原料 1 0 7は、 凹面状に形成されたシュ一卜 1 1 4上を滑降する際に、 原料 1 0 7の一部の粒子がロッド 1 1 5に衝突し、 次々に進行方向を上方に持ち上げる ように曲げられる。 このとき、 上端側 1 3に対応する範囲 L 1における、 隣接 するロッド 1 1 5間を結ぶ勾配の変化率の平均値が、 下端側 2 / 3に対応する範 囲 L 2における勾配の変化率の平均値よりも大きく、 具体的には 1 . 5倍から 1 0倍になるように、 ロッド 1 1 5を配置すると、 粒子が進行方向を変えると共に その速度の低下が適切になり、 シュート 1 1 4の全長にわたり均一に分散して粒 子を落下させることができる。 すなわち、 案内シュート 1 1 7を介して排出され た原料のうち、 粗粒の一部は、 複数本のロッド 1 1 5からなるシュート 1 1 4上 を滑降し、 また、 粗粒の残りの部分は、 シュート 1 1 4下部を構成する複数本の ロッド 1 1 5間の広い隙間から落下して、 連続的に移動するパレツト 1 0 5内の グレートバー 1 0 6上に供給される。 一方、 細粒の原料は、 シュート 1 1 4上部 を構成する複数本のロッド 1 1 5間の狭い隙間から落下して、 パレット 1 0 5内 のグレートバ一1 0 6上に供給される。 したがって、 シュート 1 1 4直下に落下 する原料粒子量が装置長方向に分散される。 かくして、 パレツト 1 0 5内の下層 1 0 7 aに粗粒原料が供給され、 上詹 1 0 7 bに細粒原料が供給され、 し力、も細 粒原料の層は、 上部ほど細粒になる。 このため、 粒度が偏祈した原料層が形成さ れる。 また、 偏析することで、 原料層中の Cおよび C a Oが下層から上層に向け て次第に多くなり、 品質の優れた焼結鉱を高歩留まりで製造することができる。 さらに、 原料 1 0 7が分散して落下するので、 パレット 1 0 5上への落下衝撃が 低下して、 ソフトに装入された通気性のよい原料層を得ることができる。
なお、 ロッド中心間を結ぶ直線の勾配の変化率は、 ロッド配置が関数で定義さ れた曲線上に乗っている場合は、 この関数の各口ッド中心位置での 2階微分値を もって算出できる。 ロッド中心位置の配置が関数で定義されない場合でも簡易的 に下記の数式 1により算出することができる。 ヌ 3 2 y2 - yl\ / , ^ (y 3 - y2)(x2 - xl) - (y2 - yl)(x3 - xl)
Χ ~ ΧΔ χζ - χΐ (χ2 - χϊ)(χ3一 χ2)(χ3 - χΐ) 上記数式 1から隣接する 3本のロッド中心位置から勾配の変化率を算出して口 ッドの配置を決定すれば、 本発明における効果を奏することができる。
なお、 この簡易算出法は 3点で定義されるものであるから、 シュートの両端の ロッドでは勾配の変化率は算出しない。 すなわち、 η本のロッドからなるシュ一 トでは η— 2点の勾配変化率につき、 水平方向の範囲を考慮して平均値を算出す る。 このロッドの配置の有効性はロッド上を原料が流れることにより得られるも のであるから、 物理的に原料が流れ得ない位置に配置したロッドは、 シュートの 水平長を考慮する際の範囲には含めない。 ここで、 上端側 1 / 3に対応する範囲 L 1における、 隣接する口ッド間を結ぶ 勾配変化率の平均値が、 下端側 2 Z 3に対応する範囲 L 2における勾配の変化率 の平均値に対して 1 0倍よりも大きいと、 粒子の減速が大きくなりすぎ、 'シユー ト 1 1 4の途中で全ての原料が落下してしまう。 また、 1 . 5倍よりも小さいと、 シュ一卜上端側 1 / 3の範囲 L 1での粒子の減速が小さく、 粒子が下端側 2 / 3 の範囲 L 2に大きな滑降速度で進むことになる。 範囲 L 2における勾配の変化率 の平均値は、 範囲 L 1における勾配の変化率の平均値よりも小さいため、 充分な 減速効果を得ることができず、 粒子が口ッド 1 1 5間の隙間から落下する割合が 低下して、 大部分の粒子がシュート 1 1 4下端から飛び出してしまう。
なお、 粒子の進行方向を変化し、 粒子を減速することな ロッド 1 1 5の隙 間から粒子を落下させる割合を制御し、 シュート 1 1 4の直下に均一に粒子を落 下させることは、 落下させたい部分のロッド 1 1 5の隙間を調整することで可能 であるが、 隙間を広げるとすべての粒子が隙間から落下することになり、 粒度が 偏祈した原料層を得ることができない。 , 図 1 6は、 実施形態 2— 2における原料装入装置を示すものである。 この原料 装入装置において、 原料供給機構は、 '原料 1 0 7が装入され、 側壁下部に切り出 しゲ一卜 1 0 1 aを有するホッパ 1 0 1と、 ホッパ 1 0 1の下端開口に設けられ たロールフィーダ 1 0 2からなつている点が、 上記実施形態 2— 1と異なる。
図 1 7は、 実施形態 2— 3における原料装入装置を示すものである。 この原 料装入装置において、 原料供給機構は、 原料 1 0 7が装入され、 側壁下部に切出 しゲ一ト 1 0 1 aを有するホッパ 1 0 1と、 ホッパ 1 0 1の下端開口に設けられ たロールフィーダ 1 0 2を有し、 さらに実施形態 2— 2と異なり、 ロールフィ一 ダ 1 0 2の斜め下に設けられたロールフィーダ 1 1 8を有する。 ロールフィーダ 1 1 8は、 切出しゲート 1 0 1 aの斜め下に設けられている。 ロールフィーダ 1 1 8の回転により、 原料のシュートへの進入角度、 補助的な速度調整が可能であ る。
図 1 8は、 実施形態 2— 4における原料^入装置を示すものである。 この原料 装入装置において、 原料供給機構は、 原料 1 0 7が装入され、 側壁下部に切出し ゲート 101 aを有するホッパ 101と、 ホッパ 101の下端開口に設けられた ロールフィーダ 102を有し、 その下に直線状に配置された複数個のローラー 1 19を有する。 口一ラー 119により、 原料のシュートへの進入角度が調整可能 である。 実施例
発明の実施例を比較例と対比しながら説明する。 図 13ないし図 15に示す一 実施形態の原料装入装置を使用して、 パレット内への原料の供給を行った。 同装 置におけるシュートの構成は以下の通りである。
① シュートの形状曲線:
y = - {7~ (0. 456 + 0. 12 x) } /0. 06 + 1 1. 26で、 x≥0 の部分を用いた。 ただし X, yは cm値
②ロッドの直径: 11. 5mm
③ロッド数: 22本
④ ロッド間隔:図 19に示す。 この図において、 横軸はロッドの番号、 縦軸は 隣接するロッド (ワイヤ) 間の間隔を'佘す。 ロッドには、 上端側から下端側に向 けて順番に 1 , 2 , 3-21と番号を附している。 ロッドの間隔は、 上端側のほ うが下端側よりも小さく設定され、 上端側 1 / 3の範囲をすぎた辺りから徐々に 広くなるように設定されている。
⑤ [水平方向の長さの上端側 1ノ 3に対応する範囲における、 隣接するロッド 間を結ぶ勾配の変化率の平均値] / [水平方向の長さの下端側 2./ 3に対応する 範囲 L 2における、 隣接するロッド間を結ぶ勾配の変化率の平均値] =Rとする と、
R=6. 5
シュートの形状曲線を図 20に示す。 図 20中、 横軸はシュート上端からの水 平方向距離 (cm) .を示し、 横軸はシュート上端からの垂直方向距離 (cm) を 示す。 この図からシュートは放物線に形成されていることがわかる。
次に比較例のシュートの構成について説明する。 まず、 比較例 1について説明 する。
① シュートの形状曲線:
y= 0. 012 X2- 1. 483 xで、 x≥ 0の部分の曲線を用いた。 ただし X, yは c m値
② ロッドの直径および口ッド数は実施例と同じ
③ R=l. 0
比較例 1のシュートの形状曲線を図 21に示す。 図 21中、 横軸はシュート上 端からの水平方向距離 (cm) を示し、 横軸はシュート上端からの垂直方向距離 (cm) を示す。 この図からシュートは放物線に形成されていることがわかる。' 比較例を実施例と比較すると、 比較例では、 シュートの上端側 1/3の範囲にお ける勾配の変化率が、 シュートの下端側 2 Z 3における勾配の変化率に比べ、 小 さくなつているのがわかる。
次に比較例 2について説明する。
① シュートの形状曲線:
y= 50000/ (x+ 12) 3- 28. 94で、 x≥ 0の部分の曲線を用いた。 たにし x, yは cm値
② ロッドの直径およびロッド数は実施例と同じ
③ R=88
比較例 2のシュートの形状曲線を図 22に示す。 図 22中、 横軸はシュート上 端からの水平方向距離 (cm) を示し、 横軸はシュート上端からの垂直方向距離 (cm) を示す。 この図からシュートは 3次曲線に形成されていることがわかる。 比較例を実施例と比較すると、 比較例では、 シュートの上端側 1/3の範囲にお ける勾配の変化率が、 シュートの下端側 2/3における勾配の変化率に比べ、 極 めて大きくなつていることがわかる。
図 23、 図 24は、 上述した実施例および比較例の装置を使用し、 パレット内 に原料を供給したときの、 層方向の高さと、 層中の平均粒径、 C、 CaOの割合 との関係を示すグラフである。
まず、 平均粒径について説明する。 実施例の平均粒径は、 層上部から層下部に 向けて次第に大きくなる。 層上部の粒径と層下 に粒径の差は、 4. 5 mm- 2 . 5mm=2mm程度である。 これに対し、 比較例 1の粒径の差は、 4. 2mm —2. 75mm= 1. 45 mmである。 また、 比較例 2の粒径の差は、 4. lm m- 2. 8mm= 1. 3mmである。 したがって、 実施例において、 分級効果の 大きい、 すなわち、 粒度偏祈の大きい原料層が得られるのがわかる。 また、 実施 例は、 層上部から層下部に向けて略一定の比率で、 平均粒径が大きくなつている のに対し、 比較例 1および比較例 2は、 平均粒径の増加比率が層上部と層下部と で変化してしまう。
次に、 Cの割合について説明する。 実施例の Cの割合は、 層下部から層上部に 向けて次第に大きくなる。 層下部の割合と層上部の割合との差は 3. 75wt . %- 3. 1 wt . = 0. 65wt. %程度になる。 これに対し、 比較例 1の 割合の差は、 3. 7w t . %- 3. 25w t . %= 0. 45w t. %。 また、 比 較例 2の割合の差は、 3. 7w t . %- 3. 35w t . %=0. 35w t . %で ある。 したがって、 実施例では、 C偏析の大きい原料層が得られるのがわかる。 また、 実施例では、 層下部から層上部に向けて略一定の比率で C割合が大きくな つているのに対し、 比較例 1および比較例 2でば、 C割合の変化率が層上部と層 下部とで変化してしまう。
最後に、 C a Oの割合について説明する。 図 23は、 上述した実施例および比 較例の装置を使用し、 パレット内に原料を供給したときの、 層方向の高さと、 層 中の C aOの割合との関係を示すグラフである。 実施例の CaOの割合は、 層下 部から層上部に向けて大きくなる。 層下部の割合と層上部の割合との差は 10. 1 w t . - 7. 9w t - %=2. 2w t . %程度になる。 これに対し、 比較例 1の割合の差は、 9. 6w t . %- 8. 2wt. = 1. 4wt. %。 また、 比 較例 2の割合の差は、 9. 6wt. %- 8. 5wt. %= 1. lwt. %である。 したがって、 実施例では、 C a〇偏折の大きい原料層が得られるのがわかる。 ま. た、 実施例では、 層下部から層上部に向けて略一定の比率で C a 0割合が大きく なっているのに対し、 比較例 1および比較例 2では、 CaO割合の変化率が層上 部と層下部とで変化してしまう。 実施の形態 3
本発明者等は、 落下してくる原料粒子がシユートに衝突する区域における口ッ ド間隙の垂直方向への投影間隙が、 原料粒子の分級効果に影響を与えることを知 見し、 ロッド間隙の垂直方向への投影間隙を一定にすることにより、 原料粒子の うち、 一定粒径以上の粗粒原料がロッドを突き抜けてしまうのを防止した。 すな わち、 本発明は、 原料をパレットに供給するための原料供給機構と、 その上端が 前記原料供給機構の近傍に位置し、 そして、 その下端が前記パレットの上方に位 置する、 前記パレットの移動方向とは反対の方向に向けて傾斜しているシュート とを備える焼結機の原料装入装置において、 前記シュートは、 前記パレットの幅 方向に、 その上端から下端に向けて互いに所定間隔を空けて平行に配設された複 数本のロッドからなり、 前記シュートの上部において、 落下してくる原料粒子が 衝突する区域における前記複数本のロッド間の垂直方向への投影間隙が一定であ ることを特徴とする原料装入装置により、 上述した課題を解決した。
この発明によれば、 パレット上の原料層において、 シュートの上部から落下す る粒子を選択的に細粒に限定できるので、 大きな粒度偏析を得ることができ、 ひ いては焼結歩留、 生産率を向上することができる。 なお、 ここで、 シュートは直 線状に形成されてもよいし、 凹面状に形成されてもよい。 また、 ロッドにはワイ ャ等の線状部材も含まれる。 '
また、 本発明は、 前記シュートを、 その上端からその下端に向けて凹面状に湾 曲したことを特徴とする。
従来のシュートを直線状に形成した原料装入装置には、 以下のような問題があ つた。 原料は、 所定角度で傾斜した直線状のシュート上を滑降し、 パレット内に 供給される。 このため、 原料がパレットへ落下するときの衝撃、 および原料の安 息角が大になって、 原料層になだれ現象が生じ、 原料層に断層が生じる。 この結 果、 原料の層方向の粒度偏析、 およびそれに付随する原料層中の Cおよび C a 0 の分布が不均一になる。 しかも、 なだれ現象によって発生した断層に通気ムラが 生じて、 成品歩留りが低下する。 また、 シュート上を滑降する粒子の滑降速度が 速くなりすぎ、 シュートにおける分級効果が低い。 本発明によれば、 複数本の口 ッドからなるシュートをなだらかな凹面状に湾曲形成することで、 落下時の原料 の落下衝撃を緩和して、 なだれ現象を防止することができる。 しかも、 原料をよ り一層、 粗粒と細粒とに分級して、 パレット内に適確な粒度偏析を得ることがで きる。
また、 凹面のスクリーン状にロッドを配置する場合、 隣接するロッドの中心間 距離をシュート上端から下端に向けて一定にすると、 ロッド間の垂直投影間隙が シュート上端から下端に向けて増大してしまう。 このロッド間の垂直投影間隙は、 ロッドの中心間距離を上端から下端に向う途中で短くしない限り、 ロッドの中心 間距離を一様に増大したときも同様に増大してしまう。 ロッド間の垂直投影間隙 が上部から下部に向かって長くなると、 粒子の大部分が衝突する区域で粗粒原料 も間隙を通過してしまい、 粒径ごとの分級効果が失われる。 本発明によれば、 シ ユートを凹面状に湾曲して形成した場合であっても、 落下してくる原料粒子が衝 突する区域における複数本のロッド間の垂直方向への投影間隙を一定にすること で、 一定粒径以上の粗粒原料がロッド間隙を通過して落下するのを防止する。 また、 本発明は、 前記区域のロッド間隔 (隣接するロッドの中心間距離) の少 'なくとも一部を、 前記区域より下端側の口ッド間隔よりも小さぐしたことを特徴 とする。
この発明によれば、 垂直方向への投影間隔が一定になるように配置した区域よ り下端側では、 ロッド間隔が上記区域のロッド間隔より大きくなる。.シュートの 下部で、 粗粒原料がロッド間の隙間から落下するので、 粒度偏析を大きくするこ とができる。
さらに、 本発明は、 前記区域よりも下端側のロッド間隔は、 下方に進むに連れ て大きくなるように設定され、 前記シュートの下端のロッド間隔は、 前記区域の ロッド間隔より大きくなるように設定されることを特徴とする。
特に、 凹面状に湾曲してロッドを配置した場合、 ロッド間の垂直方向への投影 間隙が一定になるように配置した区域では、 ロッド間を結んだ直線距離が下に行 くに連れて短くなる。 し力、し、 本発明によれば、 垂直方向への投影間隙が一定に なるように配置した区域よりも下端側において、 下方に進むに連れ、 ロッドの中 心間距離を大きくし、 しかもシュ一ト下端では上記区域のロッド間隔よりも大き くしたので、 下方に進むに連れ、 粒径の大きい粒子を落下することができ、 分級 効果をより一層増大することができる。
ところで、 垂直方向への投影間隙を、 焼結機に投入される原料粒子の粗粒の径 よりも小さく設定すれば、 粗粒が落下するのを防止できる。 粗粒の径は 8 mm前 後だから、 投影間隙を 8 mm以下に設定する。 望ましくは、 細粒のみを落下させ るために、 投影間隙を実質的には原料粒子の平均粒子径の 4mm以下にする。 ま た、 原料の進入する俯角が大きい場合は、 垂直方向に投影した際、.上記区域にお ける隣接するロッドの一部が重なり合い、 投影像でロッド間の隙間が無くなるよ うにすることも可能である。
以下、 添付図面に基づいて、 本発明の実施形態 3—1における原料装入装置 について説明する。 図 2 5は原料装入装置の概略垂直断面図を示すものである。 この原料装入装置は、 原料 2 0 7をパレット 2 0 5に供給するための原料供給機 構と、 シユート 2 1 4とを備える。
原料供給機構は、 幅方向に均一に原料 2 0 7を載せて、 原料 2 0 7を矢印の方 向に移動するベルト式フィーダ 2 0 3からなる。
シユート 2 1 4は、 その上端がベルト式フィーダ 2 0 3の排出端近傍に位置し、 その下端がパレツト 2 0 5の上方に位置し、 パレット 2 0 5の移動方向とは反対 の方向に向けて傾斜している。
図 2 6は、 シュートの正面図を示し、 図 2 7は、 図 2 6の A— A線断面図を示 す。 シュート 2 .1 4は、 パレツト 2 0 5の幅方向に、 その上端から下端に向けて 互いに所定間隔を空けて平行に配設された複数本のロッド 2 1 5からなるスク リーン状に形成されている。 このシュ一ト 2 1 4は、 その上端から下端に向けて なだらかな凹面状に形成されている。 この複数のロッドのうち、 また、 ベルト式 フィーダ 2 0 3から供給され、 シュート 2 1 4に進入してきた原料 2 0 7が直接 シユー卜 2 1 4に衝突する区域のロッド 2 1 5は、 垂直方向への投影間隙を一定 にしている。 ここで、 垂直方向への投影間隙とは、 ロッド 2 1 5を垂直上方から 見た場合の隣接するロッド 2 1 5間の隙間をいう。 シユート 2 1 4を凹面状に湾 曲した場合、 垂直方向への投影間隙を一定にすると、 隣接するロッド 2 1 5間を 結んだ直線 S巨離 (以下ロッド間隔という) が下方に行くに連れて短くなる。 区域 内の短くなつたロッド間隔は、 区域より下端側のロッド間隔よりも小さく設定さ れる。 そして、 区域よりも下端側のロッド間隔は、 下方に進むに連れて大きくさ れ、 シュート 2 1 4下端のロッド間隔は、 前記区域のロッド間隔より大きくなつ ている。 なお、 ロッド間の垂直方向への投影間隙およびロッド間隔については、 後に実施例にて詳述する。
連結部材 2 1 6は、 シュート 2 1 4を構成する複数本のロッド 2 1 5を、 所定 間隔を空けて、 相互に連結する。 この連結部材 2 1 6は、 ロッド 2 1 5の幅方向 に所定間隔を空けて例えば 4個取り付けられる。
図 2 5に示す案内シュート 2 1 7は、 ベルト式フィーダ 2 0 3の排出端と、 シ ユート 2 1 4の上端との間に位置する板状のシュートである。 原料 2 0 7がシ ユート 2 1 4に適切な角度および速度で進入する場合には、 案内シュ一ト 2 1 7 は必ずしも必要でない。 ただし、 生産率の変化に応じて原料 2 0 7の供給スピー ドが変わると、 案内シュート 2 1 7を 由させても原料粒子の進入方向は変化す る。 ベルト式フィーダ 2 0 3から排出され、 さらに、 必要に応じて案内シュート 2 1 7を介して排出された原料 2 0 7は、 シュート 2 1 4の上部 2 1 4 aに衝突 し、 その一部がスクリーン状に形成されたシュート 2 1 4を滑降するように進行 方向を変える。 また残りの一部は、 シュ一ト衝突部分のロッド間隙から落下する。 この原料衝突する区域のロッドは、 垂直方向への投影間隙が一定になるように配 置されているので、 原料粒子中のうち粗粒原料が落下せずに、.細粒原料が落下す る。
原料粒子のうち、 粗粒の一部は、 複数本のロッド 2 1 5からなるシュート 2 1 4上を滑降し、 シュート 2 1 4下端から排出される。 また、 粗粒の残りの一部は、 シュート 2 1 4の下部 2 1 4 bを構成するロッド間の広い隙間から落下し、 連続 的に移動するパレツト 2 0 5内のグレートバー 2 0 6上に供給される。 一方、 細 粒の原料は、 上述のようにシュート 2 1 4上部を構成するロッド間の狭い隙間か ら落下して、 連続的に移動するパレツト 2 0 5内のグレートバ一2 0 6上に供給 される。 かくして、 シュート 2 1 4の上部 2 1 4 aの勾配よりも、 原料 2 0 7の 進入角度の俯角が大きい場合にも、 パレット 2 0 5内に下層としての粗粒原料と、 上部ほど細粒となる上層としての細粒原料とからなる、 その粒度が偏析した原料 層が形成される。
図 2 8は、 本発明の実施形態 3— 2における原料装入装置を示すものである。 この原料装入装置において、 原料供給機構は、 原料 2 0 7が装入され、 パレット 2 0 5移動方向と反対側の側壁下部に切り出しゲート 2 0 1 aを有するホッパ 2 0 1と、 ホッパ 2 0 1の下端開口に設けられた口一ルフィーダ 2 0 2からなつて いる点が、 上記の実施形態 3—1と異なる。
なお、 上記実施形態では、 シュートを凹面状に湾曲した場合について説明した が、 シュートは凹面状に限られることなく、 例えば直線状に形成してもよい。 図 2 9は、 本発明の実施形態 3— 3における原料装入装置を示すものである。 この原料装入装置において、 原料供給機構は、 原料 2 0 7が装入され、 パレット 2 0 5の移動方向と反対側の側壁下部に切出しゲート 2 0 1 aを有するホッパ 2 0 1と、 ホッパ 2 0 1の下端開口に設けられた口一ルフィーダ 2 0 2を有し、 さ らに実施形態 3— 2とは異なり.、 ロールフィーダの斜め下に設けられたロールフ ィ一ダ 2 1 8を有する。 ロールフィーダ 2 1 8の回転により、 原料のシュートへ の進入角度、 を裨助的に調整し、 変動を緩和することが可能である。
実施例
発明の実施例を比較例と対比しながら説明する。 実施例および比較例ともに、 シュートの形状曲線は、
y = - {7~ ( 0 . 4 5 6 + 0 . 1 2 x ) } / . 0 6 + 1 1 . 2 6で、 x≥0 の部分を用いた。 ただし X , yは c m値
図 3 0は、 実施例と比較例を対比して口ッド空隙位置とロッド間の垂直投影間 隙の関係を示したグラフであり、 図 3 1は、 実施例と比較例を対比してロッド空 隙位置とロッド間隔 (ロッド間の中心間距離) の関係を示したグラフである。 口 ッド空隙位置には、 上端から 1, 2 , 3 , 4— 2 1の番号を附している。 実施例 では、 図 30に示すように、 原料が当たる 1〜 6までのロッド間隙を 4 mmに設 定し、 それより下側のロッドについてはロッドの中心間距離が直線的に増大する ようにしている。 このため、 図 31に示すように、 ロッド間の中心間距離は一旦 小さくなつた後に、 徐々に大きくなる。 また、 比較例では、 図 31に示すように、 ロッド間の中心間距離をロッド 215の上端から下端に向かうに連れて徐々に大 きく設定している。 図 30では、 この比較例のロッド間の垂直投影間隙を実施例 と比較している。
図 32は、 実施例の形状曲線を示したグラフであり、 プロットされている点 がロッドの中心位置を示す。 図 33は、 比較例の形状曲線を示したグラフであり、 プロットされている点がロッドの中心位置を示す。 そして、 実施例および比較例 のシュートにおいて、 原料の進入角の俯角をシュート上端の勾配よりも大きくし、 シユート上端の勾配に対して原料粒子の進入角度を 1 3度交差して原料粒子を進 入させた。
図 34は、 上述した実施例および比較例の装置を使用し、 パレット内に原料を 供給したときの、 層方向の高さと、 層中の平均粒径、 C、 C aOの割合とめ関係 を示すグラフである。 まず、 平均粒径について説明する。 実施例の平均粒径は、 層上部から層下部に向けて次第に大きくなる。 層上部の粒径と層下部の粒径の差 は、 4. 6mm- 2. 7 mm= 1. 9 mm程度である。 これに対し、 比較例の粒 径の差は、 4. 25mm- 2. 9mm= 1. 35mmである。 したがって、 実施 例において、 分級効果の大きい、 すなわち、 粒度偏祈の大きい原料層が得られる のがわかる。
次に、 Cの割合について説明する。 実施例の Cの割合は、 層下部から層上部に 向けて次第に大きくなる。 層下部の割合と層上部の割合との差は 3. 6wt. % -2. 9wt. %=0. 7wt. %程度になる。 これに対し、 比較例の割合の差 は、 3. 55w t . %- 3. 2wt. %=0. 35wt. %である。 したがって、 実施例では、 C偏析の大きい原料層が得られるのがわかる。
最後に、 C a 0の割合について説明する。 実施例の C aOの割合は、,層下部か ら層上部に向けて大きくなる。 層下部の割合と層上部の割合との差は 9. 9wt • %-8wt. %=1. 9wt. %程度になる。 これに対し、 比較例の割合の差 は、 9. 5 w t . %-8wt. = 1. 5wt. %である。 したがって、 実施例 では、 C a〇偏析の大きい原料層が得られるのがわかる。

Claims

請求の範囲
1 . 焼結機への原料装入装置は以下からなる:
焼結用原料を送り出すためのフィーダ一と、
前記フィ一ダ一の下方に配設され、 当該フィーダ一により供給された前記焼 結用原料を受け、 当該焼結用原料を下方へ送給するためのローラ一フィーダ一と、 前記ローラ一フィーダ一は軸心線を有する複数本のローラ一で構成され、 当 該軸心線は前記焼結機パレッ卜の移動方向に対して直角方向に配設されている、 前記ローラーフィーダ一の下方に配設され、 当該ローラ一フィーダ一により 送給された前記焼結用原料の焼結機パレットへの装入分布状態を調節するための 粒度偏析装入機構。
2 . 前記粒度偏析装入機構が、 複数本の直線状ロッド又は直線状ワイヤで構成さ れ、 そして当該直線状ロッド又は直線状ワイヤの軸心線が、 前記焼結用原料の当 該粒度偏析装入機構への受給方向に対して直角方向に、 且つ前記焼結機パレツト の移動方向に対して直角方向に配設されている請求の範囲 1記載の焼結機への原 料装入装置。
3 . 当該直線状ロッド又は直線状ワイヤが、 前記焼結機パレットの移動方向に向 かって湾曲した曲面状に配設されている請求の範囲 2記載の焼結機への原料装入
4. 前記複数本の直線状ロッド又は直線状ワイヤは、 当該隣接ロッド又はワイヤ の間隔が、 上部から下部に向かって広くなつている請求の範囲 2記載の焼結機へ の原料装入装置。
5 . 前記ローラーフィーダ一が、 1 0 0— 2 0 O mmの直径を有し、 2— 1 5 rpm の回転数を有するローラ一から構成される請求の範囲 1記載の焼結機への原料装 入装置。
6 . 前記ローラーフィーダ一が、 3— 8本の口一ラーから構成され、 5— 1 5 mm のローラー間の隙間を有する請求の範囲 1記載の焼結機への原料装入装置。
7 . 前記ローラ一フィーダ一が、 5 0— 6 0度の傾斜角を有する請求の範囲 1記 載の焼結機への原料装入装置。
8 . 焼結機への原料装入装置は以下からなる:
焼結用原料をパレットに供給するための原料供給機構と、
その上端が前記原料供給機構の近傍に位置し、 そして、 その下端が前記パレ ットの上方に位置する、 前記パレッ卜の移動方向とは反対の方向に向けて傾斜し ているシュートと、 · '·'
前記シュートは、 前記パレットの幅方向に、 その上端から下端に向けて互い に所定間隔を空けて平行に配設された複数本のロッドからなり、
前記シユートは、 その上端からその下端に向けて凹面状に湾曲した形状を有 し、
前記シュートの水平方向の長さの上端側 1ノ 3に対応する範囲における、 隣 接する口ッド間を結ぶ勾配の変化率の平均値は、 下端側 2 / 3に対応する範囲に おける勾配の変化率の平均値に対して 1 . 5倍〜 1 0倍である。
9 . 前記原料供給機構が、 ベルト式フィーダ一からなる請求の範囲 8記載の焼結 機への原料装入装置。
1 0 . 前記原料供給機構が、 原料が装入され、 下部に切り出しゲートを有するホ ッパと、 ホッパ下端に設けられたロールフィーダからなる請求の範囲 8記載の焼 結機への原料装入装置。
1 1 . 前記原料供給機構が、 原料が装入され、 下部に切出しゲートを有するホッ パと、 ホッパの下端に設けられたロールフィーダと、 前記ロールフィーダの下に 直線状に配置された複数個の口一ラーからなる請求の範囲 8記載の焼結機への原 料装入装置。
1 2 . '焼結機への原料装入装置は以下からなる:
焼結用原料をパレツ卜に供給するための原料供給機構と、
その上端が前記原料供給機構の近傍に位置し、 そして、 その下端が前記パレ ットの上方に位置する、 前記パレットの移動方向とは反対の方向に向けて傾斜し ているシュ一卜と、
前記シュートが、 前記パレットの'幅方向に、 その上端から下端に向けて互い に所定間隔を空けて平行に配設された複数本のロッドからなり、
前記シュートの上部において、 落下してくる原料が衝突する区域における、 前記複数本の口ッド間の垂直方向への投影間隙がほぼ一定である。
1 3 . 前記シュートが、 その上端からその下端に向けて湾曲した凹面を有する請 求の範囲 1 2記載の焼結機への原料装入装置。
1 4. 前記落下してくる原料が衝突する区域における、 ロッド間隔の少なくとも 一部が、 前記原料粒子が衝突する区域より下端側のロッド間隔よりも小さい請求 の範囲 1 2記載の焼結機への原料装入装置。
1 5 . 前記原料粒子が衝突する区域よりも下端側のロッド間隔を、 下方に進むに 連れて大きくし、
前記シュートの下端のロッド間隔を、 前記原料粒子が衝突する区域のロッド間 隔より大きくする請求の範囲 1 4記載の焼結機への原料装入装單。
1 6 . 前記投影間隙が 8 mm以下である請求の範囲 1 2記載の焼結機への原料装
1 7 . 前記原料供給機構が、 ベルト式フィーダ一からなる請求の範囲 1 2記載の 焼結機への原料装入装置。
1 8 . 前記原料供給機構が、 原料が装入され、 下部に切り出しゲートを有するホ ッノ と、 ホッパ下端に設けられたロールフィーダからなる請求の範囲 1 2記載の 焼結機への原料装入装置。
1 9 . 前記原料供給機構が.、 原料が装入され、 下部に切出しゲートを有するホッ パと、 ホッパの下端に設けられたロールフィーダと、 前記口一ルフィーダの下に 直線状に配置された複数個の口一ラーからなる請求の範囲 1 2記載の焼結機への 原料装入装置。
PCT/JP2001/001757 2000-03-09 2001-03-07 Dispositif permettant de charger de la matiere dans un four de frittage WO2001067017A1 (fr)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001565944A JP4972758B2 (ja) 2000-03-09 2001-03-07 焼結機への原料装入装置

Applications Claiming Priority (6)

Application Number Priority Date Filing Date Title
JP2000-064272 2000-03-09
JP2000064272 2000-03-09
JP2000291057 2000-09-25
JP2000-291058 2000-09-25
JP2000-291057 2000-09-25
JP2000291058 2000-09-25

Publications (1)

Publication Number Publication Date
WO2001067017A1 true WO2001067017A1 (fr) 2001-09-13

Family

ID=27342615

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2001/001757 WO2001067017A1 (fr) 2000-03-09 2001-03-07 Dispositif permettant de charger de la matiere dans un four de frittage

Country Status (3)

Country Link
JP (3) JP4972758B2 (ja)
CN (1) CN1416520A (ja)
WO (1) WO2001067017A1 (ja)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009197264A (ja) * 2008-02-20 2009-09-03 Jfe Steel Corp 焼結機への原料装入方法
WO2013183914A1 (ko) * 2012-06-05 2013-12-12 주식회사 포스코 원료의 장입장치 및 장입방법
KR20160050985A (ko) * 2014-10-31 2016-05-11 주식회사 포스코 원료 장입 장치
CN108931140A (zh) * 2017-05-23 2018-12-04 中冶长天国际工程有限责任公司 具有固定布料装置的塔式烧结矿冷却机及烧结矿冷却方法
CN108955276A (zh) * 2017-05-23 2018-12-07 中冶长天国际工程有限责任公司 具有旋转布料器的立式烧结矿冷却机及烧结矿冷却方法

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT413759B (de) * 2004-08-02 2006-05-15 Voest Alpine Ind Anlagen Aufgabevorrichtung für eine bandsintermaschine
DE102008045600B4 (de) * 2008-09-03 2014-08-07 Outotec Oyj Aufgabevorrichtung für Sintermaterial
WO2010073968A1 (ja) * 2008-12-24 2010-07-01 新日本製鐵株式会社 焼結機の原料装入方法及び装置
JP6056617B2 (ja) * 2013-04-03 2017-01-11 Jfeスチール株式会社 強磁性体の分離方法及び装置
KR101462549B1 (ko) * 2013-10-25 2014-11-18 주식회사 포스코 원료 장입 장치, 소결광 제조 설비 및 이를 이용한 소결광 제조 방법
CN104741318A (zh) * 2015-04-03 2015-07-01 甘肃酒钢集团宏兴钢铁股份有限公司 一种曲面粒度分级系统
CN106940138B (zh) * 2016-01-04 2019-01-25 中冶长天国际工程有限责任公司 一种料层厚度检测装置及方法
CN105783521B (zh) * 2016-05-04 2018-05-22 中冶华天南京工程技术有限公司 烧结用料层增厚装置
CN108955275B (zh) * 2017-05-23 2023-07-04 中冶长天国际工程有限责任公司 具有溜槽式布料器的立式烧结矿冷却机及烧结矿冷却方法
CN118318154A (zh) * 2022-01-11 2024-07-09 杰富意钢铁株式会社 信息处理方法、信息处理装置、信息处理系统、信息处理程序以及烧结矿制造方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08267009A (ja) * 1995-03-29 1996-10-15 Nippon Steel Corp 原料の篩分け方法
JPH11294961A (ja) * 1998-04-14 1999-10-29 Nkk Corp 焼結機の原料装入装置
JP2000063961A (ja) * 1998-06-08 2000-02-29 Kobe Steel Ltd 焼結機の原料装入方法および装置

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61195931A (ja) * 1985-02-27 1986-08-30 Sumitomo Metal Ind Ltd Dl型焼結機の原料装入方法および装置
JPH01104724A (ja) * 1987-10-14 1989-04-21 Nippon Steel Corp 燒結原料の装入方法
JP2714276B2 (ja) * 1991-06-25 1998-02-16 日本鋼管株式会社 焼結機の原料供給装置
JP2982690B2 (ja) * 1996-05-20 1999-11-29 日本鋼管株式会社 焼結機の原料供給装置
JPH109772A (ja) * 1996-06-24 1998-01-16 Sumitomo Metal Ind Ltd 焼結原料装入装置

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08267009A (ja) * 1995-03-29 1996-10-15 Nippon Steel Corp 原料の篩分け方法
JPH11294961A (ja) * 1998-04-14 1999-10-29 Nkk Corp 焼結機の原料装入装置
JP2000063961A (ja) * 1998-06-08 2000-02-29 Kobe Steel Ltd 焼結機の原料装入方法および装置

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009197264A (ja) * 2008-02-20 2009-09-03 Jfe Steel Corp 焼結機への原料装入方法
WO2013183914A1 (ko) * 2012-06-05 2013-12-12 주식회사 포스코 원료의 장입장치 및 장입방법
CN104350347A (zh) * 2012-06-05 2015-02-11 Posco公司 装载原料的装置和装载原料的方法
JP2015522786A (ja) * 2012-06-05 2015-08-06 ポスコ 原料の装入装置及び装入方法
KR20160050985A (ko) * 2014-10-31 2016-05-11 주식회사 포스코 원료 장입 장치
CN108931140A (zh) * 2017-05-23 2018-12-04 中冶长天国际工程有限责任公司 具有固定布料装置的塔式烧结矿冷却机及烧结矿冷却方法
CN108955276A (zh) * 2017-05-23 2018-12-07 中冶长天国际工程有限责任公司 具有旋转布料器的立式烧结矿冷却机及烧结矿冷却方法
CN108955276B (zh) * 2017-05-23 2023-07-04 中冶长天国际工程有限责任公司 具有旋转布料器的立式烧结矿冷却机及烧结矿冷却方法
CN108931140B (zh) * 2017-05-23 2023-07-04 中冶长天国际工程有限责任公司 塔式烧结矿冷却机及烧结矿冷却方法

Also Published As

Publication number Publication date
JP2011163756A (ja) 2011-08-25
JP4972758B2 (ja) 2012-07-11
JP5408179B2 (ja) 2014-02-05
CN1416520A (zh) 2003-05-07
JP5408180B2 (ja) 2014-02-05
JP2011163757A (ja) 2011-08-25

Similar Documents

Publication Publication Date Title
JP5408179B2 (ja) 焼結機への原料装入装置
JP4598882B2 (ja) 焼結機の原料装入方法及び装置
JP2714276B2 (ja) 焼結機の原料供給装置
EA017780B1 (ru) Погрузочное устройство для агломерационной шихты с упругим отклоняющим матом
JPH10265859A (ja) 焼結機の原料装入方法およびその装置
JP3950244B2 (ja) 焼結原料の装入制御方法
JP5493885B2 (ja) 高炉用ベルレス式炉頂装入装置の旋回シュート
JP2608425B2 (ja) 燒結原料の装入方法
JP3758386B2 (ja) 焼結パレットへの原料装入方法
JP3772377B2 (ja) 高炉用ベルレス式炉頂装入装置の旋回シュート
KR100406438B1 (ko) 소결원료 장입장치 및 이를 이용한 장입방법
JP7537473B2 (ja) ベルレス高炉の原料装入装置及び原料装入方法
JP2982690B2 (ja) 焼結機の原料供給装置
JPH11351756A (ja) 焼結原料の装入装置
JP2003105449A (ja) 焼結原料の装入方法および装入装置
JP2002363623A (ja) 高炉用ベルレス式炉頂装入装置の分配シュート構造
JPS5930776B2 (ja) 焼結機の原料装入方法及び装置
JP4317505B2 (ja) ベル式高炉の原料装入方法
JP4045897B2 (ja) ベルレス高炉の原料装入方法
JP7047263B2 (ja) 焼結原料粒の装入装置及び焼結原料粒の装入方法
JP2001227872A (ja) 焼結機の原料装入装置及びその使用方法
JP2005213579A (ja) 高炉の中心装入コークスの調製方法
JPH0424400Y2 (ja)
JPH03249137A (ja) 焼結原料の装入方法
CN116710577A (zh) 高炉的原料装入方法

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): CN JP

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LU MC NL PT SE TR

DFPE Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101)
121 Ep: the epo has been informed by wipo that ep was designated in this application
ENP Entry into the national phase

Ref country code: JP

Ref document number: 2001 565944

Kind code of ref document: A

Format of ref document f/p: F

WWE Wipo information: entry into national phase

Ref document number: 018062644

Country of ref document: CN

122 Ep: pct application non-entry in european phase