EP4092219A1 - Stützenkopf mit absenkbarer auflagerungshöhe für eine schalungsstütze - Google Patents

Stützenkopf mit absenkbarer auflagerungshöhe für eine schalungsstütze Download PDF

Info

Publication number
EP4092219A1
EP4092219A1 EP22181540.0A EP22181540A EP4092219A1 EP 4092219 A1 EP4092219 A1 EP 4092219A1 EP 22181540 A EP22181540 A EP 22181540A EP 4092219 A1 EP4092219 A1 EP 4092219A1
Authority
EP
European Patent Office
Prior art keywords
support
formwork
support section
slab
head
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
EP22181540.0A
Other languages
German (de)
English (en)
French (fr)
Inventor
Wilfried Haeberle
Stéphane GERELLI
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Peri SE
Original Assignee
Peri SE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Peri SE filed Critical Peri SE
Publication of EP4092219A1 publication Critical patent/EP4092219A1/de
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/48Supporting structures for shutterings or frames for floors or roofs
    • E04G11/486Dropheads supporting the concrete after removal of the shuttering; Connecting means on beams specially adapted for dropheads
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/38Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings for plane ceilings of concrete
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/48Supporting structures for shutterings or frames for floors or roofs
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G25/00Shores or struts; Chocks
    • E04G25/04Shores or struts; Chocks telescopic

Definitions

  • the present invention relates to a prop head for attachment to a formwork prop for forming a ceiling. Furthermore, the present invention relates to a ceiling formwork system which has such formwork supports, support heads and corresponding ceiling formwork elements. Furthermore, the present invention relates to a method for stripping a ceiling, which can be carried out using such a ceiling formwork system.
  • drop head supports are known from practice, which are used for the construction of a ceiling formwork. Slab formwork panels are placed on the drophead supports, or girders on which formwork panels are arranged. The use of a drop headrest enables so-called early stripping. Early stripping means that after unlocking the drophead, at least a part of the slab formwork panels or formwork panels is removed, whereby the drophead supports (formwork prop with drophead) remain erected in order to stabilize the slab until it has the required load-bearing capacity. However, it has been shown that the remaining drop head supports cause comparatively high costs for the provision of material, since the drop head supports are complex compared to simply constructed formwork supports without a drop head.
  • WO 2012/174597 A1 discloses a prop head for attachment to a formwork prop.
  • the prop head is designed for attachment to a formwork prop, for forming a ceiling with the aid of a large number of ceiling formwork elements, each of which has a formwork surface.
  • the prop head has a connection section for connecting the prop head to a shank section of the formwork prop.
  • the support head also has two support sections, which are suitable for supporting at least one pair of adjacent floor formwork elements of the plurality of floor formwork elements, so that one of the floor formwork elements of the adjacent pair can be supported on at least one support point on each of the support sections.
  • the support points have essentially the same shuttering support height.
  • the support head has an adjustment device for moving a first of the support sections into an arrangement in which the floor formwork element that can be supported on the first support section can be supported on at least one lower-lying support point, which has a lower support height than the formwork support height. With the lower support height, the support point of the second support section remains at the shuttering support height.
  • dismantling can be carried out in an efficient manner in such a way that no support-free zones arise, which are already too large to bear the load of the ceiling's own weight. Excessively large column-free zones could damage the concrete.
  • the prop head according to the invention therefore allows the prop head to be used again at an early stage in another ceiling formwork, such as in a subsequent floor. As a result, the number of prop heads required can be reduced and costs for maintaining the prop heads can be lowered.
  • drop head supports were developed which, in addition to the support surface for the formwork, also have a further support surface for the concrete of the ceiling.
  • the support surface for the formwork was designed in such a way that it can be lowered to remove the formwork.
  • drophead supports are constructed in such a way that the concrete comes into contact with the formwork on the one hand and with the contact surface of the drophead on the other hand either directly or via a cover strip. If the concrete comes into contact with different materials, this can lead to unwanted marks on the surface of the finished concrete pavement.
  • the prop head according to the invention allows the formwork prop to contact the ceiling only via the ceiling formwork elements, since it is no longer necessary for the formwork prop to remain with the prop head after early stripping in order to support the ceiling. This reduces the risk of creating unwanted marks or imprints on the surface of the concrete pavement.
  • the ceiling formwork elements can be designed as ceiling formwork panels.
  • Each of the ceiling formwork panels can have a formwork surface and one or more carrier elements.
  • the carrier elements of the ceiling formwork panel can be crossbeams and/or longitudinal beams.
  • the side walls of the ceiling formwork elements can be understood as transverse and longitudinal beams.
  • the adjacent pair of ceiling formwork elements can be essentially identical.
  • the pair of adjacent ceiling formwork elements can adjoin one another with their transverse sides or with their longitudinal sides.
  • the adjacent pair of ceiling formwork elements can be aligned with one another and therefore form a common central axis.
  • Two pairs of slab formwork elements can be placed on the first and the second support section, with two slab formwork elements being placeable on the first support section and two slab formwork elements on the second support section.
  • Each of the support sections can each have a bearing surface on which the ceiling formwork element can be placed adjacently.
  • a section of a cross member and/or a section of a longitudinal member of the ceiling formwork element can be placed on the support surface.
  • the bearing surfaces may each be at the formwork bedding height.
  • the formwork support height and the reduced support height can refer to a position of use of the prop head.
  • the support sections can each have one or more engagement elements, such as hanging hooks.
  • the suspension hooks can each be open at the top.
  • the suspension hooks can be brought into engagement with a transverse and/or longitudinal beam of the ceiling formwork element.
  • the movement of the first support section can cause a change in a position and/or orientation of the first support section.
  • the second support section can remain in an unchanged position and/or orientation.
  • the second support section can be rigidly connected to the connection section.
  • the adjustment device is designed in such a way that the movement of the first support section results in a lowering of at least part of the first support section.
  • the adjustment device has a guide for the movement of the first support section.
  • the guide enables a controlled movement of the first support section into the arrangement in which the slab formwork element can be supported on the lower-lying support point.
  • the guide can be designed, for example, as a sliding guide or as a rotary guide and sliding guide.
  • the displacement guide can be designed to form a straight or curved guideway.
  • the displacement guide is designed as a slotted guide or linear guide and slotted guide. At least part of the movement may have a directional component directed towards a floor formwork element, the floor formwork element being supported on the first support section. This can facilitate the release of the slab formwork element from engagement with the first support section.
  • the pivot guide defines an axis of rotation which is located lower than the casing support height.
  • the guide is designed as a linear guide and as a link guide.
  • the guide can be designed as a rotary sliding guide with a slot for lowering the first support section in the vertical direction.
  • a slot allows both a pivoting of the first support section and a rectilinear lowering in the vertical direction.
  • the ceiling formwork element concerned continues to lie flat on the first support section. The lowered slab formwork element is still held securely in the prop head in this lowered position.
  • the elongated hole may be formed at an end of the first support portion. This allows the first support section to be pivoted with an elongate pivot arm.
  • a further embodiment of the support head is characterized in that a pawl is arranged in a pivot bearing of the support head.
  • the pawl rests in a first end position on the end of the first support section with the elongated hole when the first support section occupies a first storage position in which the support point of the first support section is at the shuttering support height.
  • the locking pawl falls automatically into a second end position, by means of which a second storage position of the first support section is fixed in place.
  • the pawl can slide into the second end position in a rotational movement at the end of the first support section with the elongated hole along the outer contour of the first support section.
  • the pawl prevents the first support section from being displaced upwards in the vertical direction.
  • the pivot bearing can have bulges and/or inwardly curved stops, not just a circular reach-through opening. Then the pawl can form a locking angle in relation to the vertical direction in the second end position. Below the locking angle of a canting of the pawl in the pivot bearing, the pawl can no longer be rotated back into its first end position by moving the first support section in the vertical direction and blocks displacement of the first support section in the vertical direction.
  • the pawl can have a reach-through opening.
  • the pawl can be unlocked manually via the reach-through opening. After unlocking, the first support section can be moved back up in the vertical direction.
  • the adjustment device has a releasable locking device.
  • the releasable locking device can releasably lock the movement of the first support portion.
  • the locking device can be designed in such a way that it can be actuated when the prop head is in a position of use and when all ceiling formwork elements that can be placed on the prop head are supported.
  • the locking device can have a wedge lock, for example.
  • other configurations of the locking device are also conceivable.
  • the slab formwork system has a large number of formwork supports.
  • the formwork props are each connected to a prop head according to one of the preceding embodiments.
  • the ceiling formwork system also has the multiplicity of ceiling formwork elements.
  • a ceiling formwork surface can be formed by resting the ceiling formwork elements on the first and second support sections of the prop heads, which covers the formwork props horizontally in a closed manner.
  • the support head has a moment support.
  • the moment support can be designed to engage with one of the ceiling formwork elements when this is supported on the second support section.
  • the moment support can be designed to support a torque which is exerted on the support head by a vertical load of the slab formwork element supported on the second support section.
  • the moment support can act on a surface profile, in particular on a crossbeam or longitudinal beam of the ceiling formwork element.
  • the torque support has a support section.
  • the support section can be designed for horizontal support of the second support section on a ceiling formwork element placed thereon.
  • the support section can act on an outside surface of the ceiling formwork element.
  • the support section can act on a cross member or longitudinal member.
  • the moment support has two support sections, which are each designed to horizontally support the second support section on a ceiling formwork element supported thereon.
  • the two support sections can be designed in such a way that they support the second support section on the slab formwork element resting on it at different heights and in two opposite horizontal directions.
  • the further support section can act on an inside surface of the ceiling formwork element, in particular on a cross member or longitudinal member.
  • the further support section can be designed as a suspension hook.
  • the hanging hook can be open at the top.
  • the formwork supports each have a height adjustment device.
  • the height adjustment device can be designed for simultaneous height adjustment of the first and of the second support section.
  • the method is configured for stripping a slab to be constructed using a solidifiable fill material, such as concrete.
  • a slab formwork for an underside of the manufactured slab has a multiplicity of slab formwork elements and a multiplicity of formwork supports.
  • At least one of the formwork props is connected to a prop head, which has two support sections, on which at least one pair of adjacent slab formwork elements of the plurality of slab formwork elements is supported, so that one of the slab formwork elements of the adjacent pair is supported on at least one support point on each of the support sections.
  • the support points have essentially the same shuttering support height.
  • the method includes moving a first of the support sections into an arrangement in which the slab form member supported on the first support section is supportable on at least one lower support point having a support height less than the formwork support height. With the lower support height, the support point of the second support section remains at the shuttering support height.
  • the method also includes stripping the slab formwork element resting on the first support section.
  • the slab formwork element resting on the first support section is supported by one or more additional supports.
  • Stripping can also include lowering and/or removing the at least one additional support.
  • the method may include releasing the slab formwork element supported on the first support section from engagement with the first support section.
  • stripping further comprises pivoting down the floor formwork element supported on the first support section with the aid of engagement elements of the first support section, which engage with the floor formwork element that has been swiveled down during the swing down.
  • the method includes supporting the ceiling relative to the floor in an exposed area of the ceiling.
  • the stripped-out area can correspond to a formwork surface of the slab formwork element resting on the first support section.
  • the Figure 1a shows a plan view of a ceiling formwork system 10.
  • the ceiling formwork system 10 is designed for casting a ceiling with concrete. In principle, the ceiling formwork system 10 is also suitable for other solidifiable filling materials.
  • the ceiling extends into the figure 1 in the plane of the paper and is in the in the Figure 1a Structure shown bounded laterally by a concrete wall 12.
  • the ceiling formwork system 10 has a large number of ceiling formwork elements 14a to 14u, which are each designed as ceiling formwork panels.
  • the ceiling formwork panels have a formwork wall, cross and longitudinal beams (in particular as longitudinal and transverse side walls).
  • each of the floor form members 14a through 14u is supported at each of its four corners by a form support.
  • the ceiling formwork system 10 has the formwork supports 16a to 161 and 18a to 181.
  • the formwork props 18a to 181 are connected to a prop head according to the invention, which is configured as a drop head. The structure of the prop head is described below with reference to the Figures 2a to 5 explained in more detail.
  • the formwork supports 18a to 181 allow a so-called early stripping of the ceiling formwork elements 14a to 14u, that is, removing the
  • Ceiling formwork elements 14a to 14u before the ceiling has the required load-bearing capacity.
  • the slab must therefore be further supported after early stripping.
  • drophead supports which allow at least part of the slab formwork to be dismantled, leaving the drophead supports to support the slab until it has the required stability.
  • the prop heads fastened to the formwork props 18a to 181 are designed such that the formwork props 18a to 181 can be efficiently removed together with the prop heads during early stripping and can be replaced with simply constructed tubular steel props. This will be explained in more detail below with reference to the Figures 1b to 1f explained.
  • the prop heads with the formwork props 18a to 181 are expensive compared to simply constructed tubular steel props, the number of prop heads used can be reduced and it is possible to lower the provision costs.
  • the prop heads with the formwork props 18a to 181 can namely be used early for the next formwork operation, for example on a subsequent floor.
  • the Figure 2a shows a schematic perspective view of the prop head 20 and the formwork prop 18e together with the slab formwork elements 14j and 14k, the arrangement of which in the slab formwork system 10 in FIG Figure 1a are shown schematically.
  • the ceiling formwork elements 14g and 14h which are also supported by the formwork support 18e, are shown in FIG Figure 2a not shown.
  • the figures 2b and 2c show schematic side views corresponding to the representation of FIG Figure 2a .
  • the figures 3a and 3b show schematic perspective views of the support head 20 without the ceiling formwork elements 14g, 14h, 14j and 14k.
  • the ceiling formwork elements 14j and 14k shown have a formwork surface 22, at least one first carrier 24 and at least one second carrier 26.
  • Each of the beams 24 and 26 can be longitudinal beams or transverse beams and in particular form a longitudinal wall or a transverse wall.
  • the support head 20 has a connection section 28 for connection to a shaft section 30 ( Figure 2a ) of the formwork prop 18e. Furthermore, the support head 20 has two support sections 32 and 34 .
  • the support sections 32 and 34 are suitable for supporting the adjacent pair of slab formwork elements 14j and 14k whose formwork surfaces 22 adjoin one another, so that the slab formwork elements 14j and 14k are aligned with one another and thus form a common central axis.
  • the first beam 24 extends parallel to the common central axis of the adjacent pair 14j and 14k.
  • the second carrier 26 extends perpendicularly to the common central axis.
  • the ceiling formwork element 14j is supported on the first support section 32 .
  • the first support section 32 has a bearing surface 36 ( Figure 3a ) on which rests a section of the first carrier 24 and/or a section of the second carrier 26 of the slab formwork element 14j.
  • the first support section 32 therefore has at least one support point Pi ( Figure 2b ) on which the ceiling formwork element 14j rests.
  • the ceiling formwork element 14k is supported on the second support section 34 .
  • the second support section 34 has a bearing surface 38 ( Figure 3b ) on which rests a section of the first carrier 24 and/or a section of the second carrier 26 of the slab formwork element 14k.
  • the second support section 34 therefore has at least one support point P2 ( Figure 2b ) on which the slab formwork element 14k rests.
  • ceiling formwork element 14g can be placed on top of it, for which purpose the first support section 32 has the bearing surface 40 .
  • second support portion 34 in the Figure 2a ceiling formwork element 14h can be placed on top, for which purpose the second support section 34 has the contact surface 42 .
  • Each of these ceiling formwork elements 14g and 14h can therefore be supported on at least one support point on the respective support section 32, 34.
  • the ceiling formwork elements 14g, 14h, 14j and 14k are designed in such a way that their formwork surfaces 22 together form a combined formwork surface which covers the prop head 20 and the formwork prop 18 in a closed manner.
  • the combined formwork surface is rectangular.
  • each of the ceiling formwork elements 14g, 14h, 14j and 14k has a projection on all four circumferential sides.
  • the formwork surface 22 protrudes beyond the first carrier 24 and the second carrier 26 as a result of the overhang.
  • the two support points P1 and P2 for the ceiling formwork elements 14j and 14k are arranged at the same formwork support height h1.
  • the same formwork support height h1 creates a smooth transition 43 between the formwork surfaces 22 of the ceiling formwork elements 14g, 14h, 14j and 14k, which are each in contact with the ceiling 44 to be produced.
  • ceiling 44 is therefore cast.
  • the prop head 20 has an adjustment device 46 for moving the first support section 32 into an arrangement in which the slab formwork element 14j rests on at least one point P3 of the first support section 32 ( Figure 2c ).
  • Figure 2c supported on at least one lower support point of the support section 32.
  • the deeper support points for the ceiling formwork elements 14g and 14j can be the same or different.
  • the lower support height can lead to a lowering of the supported section of the slab formwork elements 14g and 14j.
  • the floor formwork elements 14g and 14j are supported by further formwork supports, so that the movement of the first support section 32 does not automatically lead to a lowering of the floor formwork elements 14g and 14j.
  • the adjustment device 46 has a rotary guide 47 via which the first support section 32 is pivotably articulated on the second support section 34 .
  • the rotary guide 47 defines an axis of rotation A, which is arranged horizontally and perpendicularly to the common central axis of the ceiling formwork elements 14j and 14k.
  • the pivoting of the first support section 32 relative to the second support section 34 lowers the first support section 32 .
  • the axis of rotation A is arranged at a height h3, which is lower than the formwork support height hi.
  • at least part of the movement of each of the engaging elements 50 of the first support section 32 has a directional component which is directed towards the slab formwork element 14g or 14j.
  • the engagement elements 50 are designed as suspension hooks and engage with the second carrier 26 of the ceiling formwork elements 14g or 14j mounted on the first support section 32 .
  • the engagement elements 50 each have an end engagement section 52 (in particular a hook-like projection) for engagement with a substantially horizontal shoulder 54 of the second carrier 26.
  • This engagement provides protection against lifting for the ceiling formwork elements 14g and 14j.
  • examples are also conceivable in which the first support section 32 has no anti-lift device, so that such a configuration of the movement is not necessary.
  • the movement of the first support section 32 to provide a lower support height h2 allows efficient early stripping, in which the formwork supports 18a to 181 (Figure la) together with the associated support heads 20 can be replaced by simple tubular steel supports, which are attached to the ceiling 44 without attack formwork.
  • the Figures 1c to 1e illustrate cross-sections according to the in the Figure 1a specified cutting line AA. To simplify the presentation are in the Figures 1c to 1e the formwork props 18e and 18f and the prop heads 20 attached thereto are not shown in section.
  • the slab formwork system 10 it is therefore not necessary for the slab 44 to be supported by the formwork props 18a to 181 with the prop heads 20 attached thereto after the slab formwork elements 14a to 14u have been removed.
  • the Figure 1c shows the state before the start of early stripping, as it is in the Figure 1a is shown in plan view.
  • the support portions 32 and 34 of the support heads are shown schematically as rounded squares with four dots.
  • the two support section cuts 32, 34 are arranged in such a way that they form the encasing support height h1 for the slab formwork elements 14a to 14u placed thereon.
  • Formwork support 16f shown is, like that in FIGS Figures 1a and 1b Formwork supports 16a to 16e and 16g to 161 shown each have a simply constructed jet pipe support without support head 20, as with reference to FIG Figures 2a to 6 is described.
  • a detachable locking device 56 ( figures 2a and 2 B ) solved, which is designed as a wedge lock in the examples shown.
  • other examples of the releasable locking device 56 are also conceivable.
  • the Figure 1d illustrates a condition which results from the release of the locking devices 56.
  • the first support portion 32 of the respective support head 20 moves in the Figure 2c Arrangement shown, in which the ceiling formwork element 14j is supported on the formwork supports 18e and 18g at the lower support height h2.
  • the slab formwork element 14k is further supported by the second support portions 34 of the formwork supports 18e and 18g further at the formwork support level ⁇ .
  • the ceiling 44 is therefore sufficiently stabilized in the area of the ceiling formwork element 14k and this prevents an excessively large support-free zone from occurring, through which the concrete of the ceiling 44 could be damaged.
  • the tubular steel supports 16f and 16g ( Figure la) can be lowered and removed and the slab formwork element 14j, as shown in FIG Figure 1e is shown to be switched off.
  • the engagement elements 50 ( Figure 2c ) are provided, which are designed as suspension hooks
  • the slab formwork element 14j can be swung down for stripping (illustrated by the arrow 58 in FIG. 1e).
  • the pivoting down can be done, for example, with the help of a formwork aid, not shown.
  • the ceiling formwork element 14j can then be released from engagement with the engagement elements 50 by the ceiling formwork system being unhooked from the suspension hooks.
  • the state after stripping the ceiling formwork element 14j is in the figures 1b and 1f shown.
  • the lowered first support sections 32 of the support heads 20 on the formwork supports 18e and 18g are in FIG Figure 1b marked by crosses.
  • the support points, which are located at the formwork support height h1, are marked by dots.
  • the slab formwork element 14k is supported by the second support sections 34 of the support heads 20 on the formwork supports 18e and 18g at the formwork support height h1. piled up. As a result, the slab is sufficiently supported in the area of the slab formwork element 14k.
  • the slab formwork elements 14g and 14m are supported at three corners on the formwork support height hl. This also provides sufficient support for the ceiling 44 in the area of these ceiling formwork elements.
  • Double supports are used, each of which supports two adjacent ceiling formwork elements, when the ceiling formwork element 14j is removed, there is no further support for the ceiling formwork elements 14g and 14m in accordance with those in FIG Figure 1b tubular steel supports 16e and 16h shown.
  • the slab formwork elements 14g and 14m are sufficiently stabilized by the concrete wall 12 so that it is not necessary to attach further supports in order to stabilize the slab formwork elements 14g and 14m. Should the Ceiling formwork elements 14g and 14m are not sufficiently stabilized by the concrete wall 12, so it is conceivable to temporarily attach tubular steel supports for stabilization.
  • the area of the slab 44 which was shuttered by the slab formwork element 14j is supported by tubular steel supports 60 and 62.
  • the other floor formwork elements (14a to 14i and 14k to 14u) and the formwork props (18a to 181) together with the prop heads 20 attached to them can be removed one after the other and replaced by tubular steel props.
  • the support head 20 allows this operation to be carried out efficiently without creating too large a support-free zone.
  • the formwork supports 18a to 181 they each have a height adjustment device for adjusting the height of the entire support head 20.
  • the height adjustment device can be designed, for example, for a telescopic height adjustment.
  • the prop head 20 has a moment support 64 ( Figures 2a to 2c , 3a and 3b ) on.
  • the moment support 64 is in engagement with the slab formwork elements supported on the second support section 34, ie in particular with the one in FIG Figure 1f slab formwork element 14k shown, and is rigidly connected to the second support section 34.
  • the moment support 64 has a support section 66 which is arranged in a gap 68 which is formed by all the ceiling formwork elements 14g, 14h, 14j, 14k which can be placed on the support head 20.
  • the first support section 66 is in engagement with an outside vertical surface 70 of those slab formwork elements 14h and 14k which are supported on the second support section 34 .
  • the outside vertical surface 70 is the surface of the second beam 26.
  • the second support portion 34 is supported horizontally on each of the slab form members 14h and 14k.
  • the torque is already effectively supported by the support section 66 .
  • An even better support of the torque is provided by a or several further support sections 72, through which the second support section 34 is also supported in the horizontal direction on the supported ceiling formwork elements 14h and 14k.
  • the further support sections 72 are each in engagement with a vertical surface 74 of the corresponding ceiling formwork element 14h and 14k, which faces towards the interior of the respective ceiling formwork element 14h and 14k.
  • the inward facing vertical surface 74 is a surface of the second beam 26 of the respective slab form members 14h and 14k.
  • the support section 66 and the further support sections 72 support the second support section 34 on the ceiling formwork elements 14h and 14k resting on it at different heights and in two opposite horizontal directions.
  • the support section 66 acts at a greater height than the other support sections 72.
  • the Figures 4a to 5 show alternative forms for the support head 20, in which the guide 78 of the adjustment device 46 is designed differently.
  • the figures 4a and 4b show an embodiment in which the guide 78 is designed as a sliding guide, specifically as a linear guide.
  • the linear guide has a guide arm 84 on which a guide sleeve 86 is arranged so that it can move longitudinally.
  • An axis B of the guide arm 84 extends parallel to a longitudinal axis C of the formwork prop (18a to 181) to which the prop head 20 is attached.
  • the Figure 4a shows the state in which the slab formwork elements are supported on both support sections 32 and 34 at the formwork support height h.
  • the Figure 4b shows the state in which the first support section 32 is lowered in order to support the slab formwork elements supported thereon at the lowered support level.
  • the figure 5 shows a first exemplary embodiment according to the invention for the support head 20, in which the displacement guide is designed as a link guide.
  • the link guide can be configured so that the guide path of the first support portion 32 is linear. Alternatively, it is also conceivable that the link guide is designed in such a way that the guideway of the first support section 32 runs in a curved manner.
  • the link guide has the links 88 which are arranged so as to be movable relative to the fixed sliding blocks 90 .
  • other configurations of the connecting link guide are also conceivable.
  • the exemplary embodiments shown thus provide a support head 20, a ceiling formwork system 10 and a method which enable efficient production of a ceiling 44 from solidifiable filling material, such as concrete.
  • In 6 1 is a longitudinal section through a second embodiment of a prop head 20(1) according to the present invention.
  • the guide 78 is designed as a rotary sliding guide.
  • the guide 78 has a slot 92 which is aligned in the vertical direction.
  • the elongated hole 92 is formed at one end 94 of the first support section 32 , the end 94 being arranged on the second support section 34 or interacting with the second support section 34 .
  • a sliding block 90 ( 1 ) formed on the second support section 34 is fixed in the slot 92 in a fixed position in the second support section 34 .
  • a pawl 98 is positioned in a pivot bearing 96 of the second support section 34 .
  • the pawl 98 is in a 6 illustrated first end position 100 at the end 94 of the first support portion 32 with the slot 92 at.
  • the first support section 32 occupies a first storage position 102, in which the support point Pi lies at the shuttering support height u.
  • the sliding block 90 (1) is located at the lower end 104 of the slot 92.
  • the first support section 32 is formed in one piece and is connected to the second support section 34 via the adjusting device 46 .
  • In 7 1 is a longitudinal section through the prop head 20(1) in the second embodiment after lowering the first support portion 32 compared to the second support portion 34 by pivoting the first support portion 32 after releasing the locking device 56.
  • the pawl 98 remains in the first end position 100.
  • the sliding block 90(1) is still located at the lower end 104 of the elongated hole 92.
  • the bearing surface 36 has an oblique orientation compared to the vertical direction.
  • In 8 1 is a longitudinal section through the strut head 20(1) in the second embodiment, with the first strut portion 32 assuming a second storage position 106.
  • FIG. The first support section 32 rests on the released locking device 56 .
  • the bearing surface 36 of the first support section 32 is aligned parallel to the bearing surface 38 of the second support section 34 .
  • the sliding block 90 (1) is located at the upper end 108 of the slot 92 of the guide 78.
  • the slot 92 in the vertical direction down along the sliding block 90 (1) for example, by the load resting on the support surface 36 Slab formwork element 14j (see Figure 2b ).
  • the pawl 98 is in a second end position 110 in which the pawl 98 fixes the first support section 32 in the second storage position 106 and prevents the first support section 32 from being displaced from the second storage position 106 .
  • the pawl 98 forms a locking angle 112 in this end position, with the pawl 98 tilting in the pivot bearing 96 in relation to the vertical direction. Below the locking angle 112, the locking pawl 98 can no longer be rotated back into its first end position by a movement of the first support section 32 in the vertical direction upwards and blocks a displacement of the first support section 32 in the vertical direction upwards.
  • the pawl 98 arranged in the pivot bearing 96 automatically falls out of its first end position 100 (see Fig. 6 ) and slides in a rotating movement at the end 94 of the first support section 32 with the elongated hole 92 along the outer contour of the first support section 32 into the second end position 110.
  • In 9 1 is a longitudinal section through the support head 20(1) in the second embodiment with a detailed view of the pivot bearing 96, with the first support section 32 assuming the second bearing position 106.
  • the pawl 98 bears against the first support section 32 .
  • the pivot bearing 96 has a bulge 120 at the upper end of which an inwardly curved stop 122 for the pawl 98 is formed.
  • the pawl 98 is no longer in its first end position 100 (see Fig. 6 ) can be turned back.
  • the pawl 98 thus blocks a displacement of the first support section 32 in the vertical direction upwards.
  • the pawl 98 can be released from its locking function manually and moved back to the first end position 100 .
  • the pawl 98 has a reach-through opening 114 . It is possible to reach through the reach-through opening 114, for example with a finger, in order to remove the pawl from the second end position 110 (see Fig. 8 ) to the first end position 100 (s. 6 ) to move back.
  • the pawl 98 also has two locking edges 116a, 116b which are attached to the first support section 32 (see Fig. 8 ) issue.
  • the pawl 98 can be pivoted in the rotary bearing 96 (see Fig. 6 ) are attached and guided.
  • a prop head (20, 20(1)) is therefore disclosed for fastening to a formwork prop (18a - 181), for forming a ceiling (44) with the aid of a large number of Ceiling formwork elements (14a - 14u), each having a formwork surface (22).
  • the prop head (20, 20(1)) has two support sections (32, 34) suitable for supporting at least one pair of adjacent slab formwork elements (14j, 14k) of the plurality of slab formwork elements (14a - 14u).
  • the prop head (20, 20(1)) has an adjustment device (46) for moving a first of the support sections (32) into an arrangement in which the slab formwork element (14j) that can be placed on the first support section (32) rests on at least one lower-lying Support point (P3) can be supported, which has a lower support height (h2) than a shuttering support height (h1).
  • the support point (P2) of the second support section (34) remains at the shuttering support height (h1).

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
EP22181540.0A 2017-06-19 2018-05-30 Stützenkopf mit absenkbarer auflagerungshöhe für eine schalungsstütze Pending EP4092219A1 (de)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
DE102017210195.4A DE102017210195A1 (de) 2017-06-19 2017-06-19 Stützenkopf mit absenkbarer Auflagerungshöhe für eine Schalungsstütze
EP18728359.3A EP3642428B1 (de) 2017-06-19 2018-05-30 Stützenkopf mit absenkbarer auflagerungshöhe für eine schalungsstütze
PCT/EP2018/064146 WO2018233993A1 (de) 2017-06-19 2018-05-30 Stützenkopf mit absenkbarer auflagerungshöhe für eine schalungsstütze

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
EP18728359.3A Division EP3642428B1 (de) 2017-06-19 2018-05-30 Stützenkopf mit absenkbarer auflagerungshöhe für eine schalungsstütze

Publications (1)

Publication Number Publication Date
EP4092219A1 true EP4092219A1 (de) 2022-11-23

Family

ID=62486577

Family Applications (2)

Application Number Title Priority Date Filing Date
EP22181540.0A Pending EP4092219A1 (de) 2017-06-19 2018-05-30 Stützenkopf mit absenkbarer auflagerungshöhe für eine schalungsstütze
EP18728359.3A Active EP3642428B1 (de) 2017-06-19 2018-05-30 Stützenkopf mit absenkbarer auflagerungshöhe für eine schalungsstütze

Family Applications After (1)

Application Number Title Priority Date Filing Date
EP18728359.3A Active EP3642428B1 (de) 2017-06-19 2018-05-30 Stützenkopf mit absenkbarer auflagerungshöhe für eine schalungsstütze

Country Status (10)

Country Link
US (2) US11603673B2 (zh)
EP (2) EP4092219A1 (zh)
KR (1) KR102574173B1 (zh)
CN (1) CN110998044B (zh)
AU (1) AU2018288296B2 (zh)
CA (1) CA3065809A1 (zh)
DE (2) DE102017210195A1 (zh)
ES (1) ES2925228T3 (zh)
PL (1) PL3642428T3 (zh)
WO (1) WO2018233993A1 (zh)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2929382T3 (es) * 2020-03-06 2022-11-28 Sist Tecnicos De Encofrados Sa Cabezal de anclaje para puntales de encofrado y puntal de encofrado para la ejecución de forjados inclinados
DE202020103396U1 (de) 2020-06-13 2020-06-23 Peri Gmbh Handschlagwerkzeug
DE102021106138A1 (de) 2021-03-12 2022-09-15 Peri Se Stützeinrichtung, Deckenstützen, Deckenschalungssystem und Verfahren zum Ausschalen eines Deckenschalungspaneels
US11987999B2 (en) 2021-07-14 2024-05-21 Brand Shared Services Llc Support head with quick release for formwork system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1250875A (zh) * 1967-11-07 1971-10-20
EP0092694A2 (de) * 1982-04-22 1983-11-02 Emil Steidle GmbH. & Co. Deckenschalungssystem
FR2742787A1 (fr) * 1995-12-26 1997-06-27 Viandon Maurice Coffrage de dalle modulaire sur etais a tetes multiples
WO2012174597A1 (en) 2011-06-22 2012-12-27 Form 700 Pty Ltd Formwork support improvements

Family Cites Families (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1907877A (en) * 1929-04-01 1933-05-09 Henry W Roos Apparatus for laying concrete floors
US1888738A (en) * 1930-03-13 1932-11-22 Henry W Roos Adjustable shore
GB520747A (en) * 1938-10-31 1940-05-02 Charles Bernard Mathews Improved scaffolding or supports for use in the formation or construction of ceilings and floors of buildings when formed of concrete
DE840435C (de) * 1948-10-02 1952-06-09 Carl Fels Hohler Stahltraeger, insbesondere fuer Schalungszwecke
DE801952C (de) * 1949-09-30 1951-01-29 Karlheinz Eickhoff Verlaengerbarer Schalungstraeger
FR1243767A (fr) * 1959-12-31 1960-10-14 Perfectionnement dans les poutrelles de support des hourdis, utilisées dans la construction de planchers en béton armé
AT340668B (de) * 1976-04-22 1977-12-27 Hunnebeck Ges M B H Austria Vorrichtung zur langenverstellung von gerusten, stutzen od.dgl.
DE3046284A1 (de) * 1980-12-09 1982-07-08 Hünnebeck GmbH, 4030 Ratingen Schalungssystem fuer deckenschalungen
DE8110483U1 (de) * 1981-04-07 1981-10-08 Schwechheimer, Jürgen, 4053 Jüchen Schalungstraeger
DE3316557C1 (de) * 1983-03-03 1984-10-11 NOE-Schaltechnik GmbH, 7334 Süssen Deckenschalungssystem
CH660049A5 (en) * 1986-10-02 1987-03-13 Tegoma Ag Handelsgesellschaft Displaceable shuttering support
NL8801475A (nl) * 1988-06-08 1990-01-02 Bbe Beleggingsmaatschappij Bou Steunconstructie voor de bekistingsplaten of -panelen van een te storten betonvloer.
JPH0232555U (zh) * 1988-08-23 1990-02-28
DE4211299C2 (de) * 1992-04-04 2000-01-20 Dingler Gerhard Profil - Hauptträger
DE29705696U1 (de) * 1997-02-11 1997-05-22 Meffert, Burkhard, 57641 Oberlahr Vorrichtung zur Vereinfachung der Ein- und Ausschalung von Deckenflächen im Hoch- und Tiefbau
DE19720885A1 (de) * 1997-05-17 1998-11-19 Thyssen Huennebeck Gmbh Ganz oder überwiegend aus Holz bestehender Deckenschalungs-Träger
DE19932707C1 (de) * 1999-07-16 2001-02-01 Hahn Baumaschinen Gmbh Fixiereinrichtung für Schalelemente in einem Deckenschalsystem und Verfahren zum Montieren einer Deckenschalung für Betondecken
KR100350687B1 (ko) * 1999-12-06 2002-08-30 현대건설주식회사 길이를 변경할 수 있는 경량형강을 이용한 슬래브거푸집
DE10035823A1 (de) * 2000-07-22 2002-02-07 Baumann Verwertungs Gmbh Schalungsträger
DE10135664B4 (de) * 2001-07-21 2008-06-26 Hünnebeck GmbH Stütze für Deckenschalungen od. dgl.
CA2416644C (en) * 2003-01-20 2010-07-20 Paul Gillespie Concrete slab form system
EP1526226A1 (de) * 2003-10-25 2005-04-27 ConmercoTec Vertriebs GmbH Schalungsträger für Betondecken
CN102835366A (zh) 2011-06-21 2012-12-26 科尼利厄斯·约翰尼斯·安嫩代尔 钓竿或杆的改进的孔环或线引导器元件
DE102015223773A1 (de) * 2015-11-30 2017-06-01 Peri Gmbh Stützenkopf, Deckenstütze und Deckenschalung mit einer solchen Deckenstütze
CN205894665U (zh) * 2016-08-15 2017-01-18 慧邦大成科技(北京)有限公司 屋顶及梁的浇注模板结构
CN106337558B (zh) * 2016-08-31 2018-07-03 赣州市嘉班钢模有限公司 一种双丝杆梁板控制器

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1250875A (zh) * 1967-11-07 1971-10-20
EP0092694A2 (de) * 1982-04-22 1983-11-02 Emil Steidle GmbH. & Co. Deckenschalungssystem
FR2742787A1 (fr) * 1995-12-26 1997-06-27 Viandon Maurice Coffrage de dalle modulaire sur etais a tetes multiples
WO2012174597A1 (en) 2011-06-22 2012-12-27 Form 700 Pty Ltd Formwork support improvements

Also Published As

Publication number Publication date
US11603673B2 (en) 2023-03-14
KR20200020709A (ko) 2020-02-26
EP3642428B1 (de) 2022-07-27
US20200217091A1 (en) 2020-07-09
WO2018233993A1 (de) 2018-12-27
US20230383556A1 (en) 2023-11-30
DE212018000070U1 (de) 2019-03-14
PL3642428T3 (pl) 2022-10-24
CN110998044B (zh) 2022-05-31
CA3065809A1 (en) 2018-12-27
AU2018288296B2 (en) 2024-02-22
ES2925228T3 (es) 2022-10-14
CN110998044A (zh) 2020-04-10
DE102017210195A1 (de) 2018-12-20
AU2018288296A1 (en) 2019-12-19
KR102574173B1 (ko) 2023-09-04
EP3642428A1 (de) 2020-04-29

Similar Documents

Publication Publication Date Title
EP3642428B1 (de) Stützenkopf mit absenkbarer auflagerungshöhe für eine schalungsstütze
EP3827146B1 (de) Hubantrieb für ein schienengeführtes klettersystem und verfahren zum klettern eines schienengeführten klettersystem
EP1899553B1 (de) Deckenschalungssystem
EP2243742A1 (de) Scherenhebebühne
WO2007141264A1 (de) Führungsschuh und klettersystem auf dem gebiet des bauwesens
DE2040328C3 (de) Fahrbare Rauminnenschalung für Beton und Stahlbetonbauten
WO2011138012A2 (de) Gittertragwerk
EP1096105A2 (de) Verfahren zum Verschalen von Wandungen eines Tunnels und Schalung zur Durchführung des Verfahrens
EP3439840A1 (de) Schalungseinrichtung
DE1928196C3 (de) Verfahrbare Raumschalung für Beton- und Stahlbetonbauten
EP3494259B1 (de) Brückenstützeinrichtung zum abstützen eines brückensegments und verfahren zum betrieb von brückenstützeinrichtungen
EP3702550A1 (de) Schalungsrahmen, schalungselement, deckenschalung und verfahren
DE3014708C2 (de) Schalung zur Fertigung von Stabelementen aus Beton
DE2935726A1 (de) Vorrichtung zum giessen von betonwaenden
EP4056785B1 (de) Stützeinrichtung, deckenstützen, deckenschalungssystem und verfahren zum ausschalen eines deckenschalungspaneels
EP4051472B1 (de) Schalungseinrichtung
EP3543197B1 (de) Vorrichtung zum anbringen eines leiterteils eines kranführeraufzugs an einem kranmasten
EP2570568B1 (de) Fallkopf für ein Deckenschalungssystem und Verfahren zum Entfernen von Deckenschalungselementen
DE2430009C2 (de) Verfahren und Vorrichtung zum Entschalen von Großtafeln aus Stahlbeton
DE1784065A1 (de) Verschalungsvorrichtung zur Herstellung von zu den Aussenwaenden senkrechten oder parallelen Mauern gleichzeitig mit den entsprechenden Decken
EP3832052A1 (de) Schalung zur herstellung einer tür/fensteraussparung in eine betonwand oder deckenelement
DE102022110726A1 (de) Kranaufbocksystem
DE102021120441A1 (de) System zur Schalung eines Wandelementes mit einem Verbund aus einer Schalung und einem Gerüstabschnitt
WO2023241941A1 (de) Schachtmodul zur bildung eines aus aufeinandergesetzten schachtmodulen zusammengesetzten aufzugschachts für eine aufzuganlage
DE2109075C3 (de) Raumschalung

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION HAS BEEN PUBLISHED

AC Divisional application: reference to earlier application

Ref document number: 3642428

Country of ref document: EP

Kind code of ref document: P

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20230515

RBV Designated contracting states (corrected)

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR