- DE3529998A1 DE3529998A1 DE19853529998 DE3529998A DE3529998A1 DE 3529998 A1 DE3529998 A1 DE 3529998A1 DE 19853529998 DE19853529998 DE 19853529998 DE 3529998 A DE3529998 A DE 3529998A DE 3529998 A1 DE3529998 A1 DE 3529998A1
- Authority
- DE
- Germany
- Prior art keywords
- concrete
- formwork
- tunnel
- lining
- circumferential direction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
- E21D11/102—Removable shuttering; Bearing or supporting devices therefor
Description
Die Erfindung betrifft ein dem Oberbegriff des Patentanspruches 1 ent
sprechendes Verfahren zum fortlaufenden Auskleiden eines Tunnels mit
Extrudierbeton und eine dem Oberbegriff des Patentanspruches 4 ent
sprechende Vorrichtung zur Durchführung eines solchen Verfahrens.
Bei der Herstellung einer Tunnelauskleidung nach dem Extrudierverfah
ren wird im Rahmen der bekannten gattungsgemäßen Maßnahmen (DE-
PS 34 06 980) hinter einer Vortriebsmaschine Beton durch eine einzige,
oben liegende Öffnung in einer vorwärts gleitenden Stirnschalung ge
pumpt. Um selbst im nichtkohäsiven Lockerboden das Gebirge hinter
der Vortriebsmaschine zuverlässig zu stützen, muß dabei sichergestellt
sein, daß der flüssige Beton hinter der Stirnschalung stets einen
Druck aufweist, der höher ist als der auf die Tunnelauskleidung wir
kende Erd- bzw. Gebirgsdruck und der eventuell wirkende Druck aus
der Auflast aus dem Grundwasser. Um diesen fortwährenden Druck zu
gewährleisten, müssen verschiedene Vorkehrungen bei der Stützung der
Stirnschalung und bei der Zuführung des Betons getroffen werden. Ob
gleich durch eine federnde Lagerung der Stirnschalung und ein ge
steuertes Vorbewegen der Stirnschalung einige Voraussetzungen für das
Extrudierverfahren geschaffen sind, gelingt es bisher nicht, eine wirk
lich einwandfreie Qualität des Extrudierbetons zu erzielen. Der durch
die Stirnschalung gepumpte Beton lagert sich nämlich nicht schichtwei
se parallel zu der vorwärts gleitenden Stirnschalung ab, sondern
fließt in nicht vorherbestimmbaren Fließkanälen innerhalb des hinein
gepumpten Betons, wodurch es immer wieder zu einer Schollenbildung
in der kontinuierlich hergestellten Tunnelauskleidung kommt. In den
Randzonen dieser Schollen ist der Beton nicht dicht, es zeigen sich
entmischte Zonen, sogenannte Nester und auch Löcher. Abgesehen da
von, daß die Festigkeit des Betons nicht den Normen entspricht, ist
die mangelnde Qualität des Betons im wasserführenden Lockerboden ei
ne Gefahrenquelle. Durch die Löcher in der Auskleidung dringt Wasser
vermischt mit Boden ins Tunnelinnere und gefährdet die Bettung und
die Standsicherheit der Tunnelschale.
Nach zur Erfindung gehörenden Untersuchungen ist das Fließen des Be
tons in dem ringförmigen Raum, der außen vom umgebenden Gebirge,
innen von der stählernen lnnenschalung und nach vorn von der vor
wärtsgleitenden Stirnschalung begrenzt wird, ein Vorgang, der vielen
Einflüssen unterliegt:
- Das Fließvermögen des Betons hängt insbesondere von sei nen spezifischen Materialeigenschaften ab und von der Zeit, da es sich um einen Stoff handelt, der sich in einem che mischen Reaktionsprozeß befindet.
- Auch das umgebende Gebirge beeinflußt das Fließen, und zwar sowohl durch die rauhe Oberfläche als auch durch die Möglichkeit, daß der Beton dort Filtrat-Wasser verliert. Durch den Verlust des Filtrat-Wassers wird das Fließvermö gen erheblich herabgesetzt.
- Einen weiteren, wesentlichen Einfluß auf das Fließen haben die hydrostatischen Druckverhältnisse in dem Ringraum und damit in Zusammenhang stehend die Lage von Pumpöffnun gen in der Stirnschalung.
- Der Beton fließt entsprechend den Gesetzen der Strömungs lehre für zähe Flüssigkeiten. Durch im oberen Ringraum angeordnete Pumpöffnungen gepumpter Beton fließt, den nie deren Druck nutzend, in der Firste weit in den noch wei chen Beton, der noch eine geringe Scherfestigkeit besitzt, hinein. Erst nach mehreren Metern in Zonen, in denen der Abbindeprozeß schon weiter fortgeschritten ist und damit die Scherfestigkeit zunimmt, wird der Betonstrom nach un ten in Bereiche mit größerem hydrostatischen Druck abge lenkt. Durch untere Pumpöffnungen gepumpter Beton fließt dem Druckgradienten folgend sofort hinter der Stirnscha lung nach oben.
Die Schollen, das sind Zonen des extrudierten Betons, die als zusam
menhängende Flächen der vorwärts gleitenden Stirnschalung während
eines gewissen Zeitraumes hinterhereilen und dabei erhärten, entste
hen dadurch, daß in diesem Bereich das Fließvermögen des Betons ein
wenig geringer war oder die Druckpotentiallinien für längere Zeit kon
stant blieben. Sie werden insbesondere etwa im mittleren Abstand zwi
schen zwei Pumpöffnungen in der Stirnschalung beobachtet, wenn der
Abstand der Pumpöffnungen voneinander sehr groß ist. Die Schollen
werden deshalb zu einem Problem, weil sie zunächst auf der der Stirn
schalung abgewandten Seite von Beton höheren Drucks umströmt werden
und deshalb der Stirnschalung folgen. Irgendwann bricht der Fließka
nal hinter der Scholle zusammen oder die Reibung zum Gebirge wird
zu groß. Dann bleibt die Scholle hängen; in diesem Augenblick ent
steht auf der der Stirnschalung zugewandten Seite ein geringer Druck
oder gar eine Fehlstelle, wenn der Beton nicht sofort den entstehenden
Raum zwischen der weiter vorwärtseilenden Stirnschalung und der
hängenbleibenden Scholle ausfüllen kann.
Aufgabe der Erfindung ist es, die Schollenbildung zu verhindern.
Die erfindungsgemäße Lösung dieser Aufgabe ergibt sich in verfah
rensmäßiger Hinsicht aus dem Kennzeichen des Patentanspruches 1
und in vorrichtungsmäßiger Hinsicht aus dem Kennzeichen des Patent
anspruches 4.
Mit anderen Worten soll das Betonieren des Extrudierbetons durch
mehrere, über den Umfang der Stirnschalung in gleichen, nicht zu
großen Abständen angeordnete Pumpöffnungen nacheinander mit glei
chen Mengen in relativ schneller Folge durchgeführt werden. Durch
das Hereinpumpen des Betons in gleichen Mengen durch die gleich
weit entfernten Pumpöffnungen wird erreicht, daß der Beton den kürze
sten Fließweg hat. Schollenbildung tritt nicht mehr auf.
Vorteilhafte Ausgestaltungen der Erfindung ergeben sich aus den wei
teren Patentansprüchen.
Die Fortbewegung durch den Betonierdruck einer starren Stirnschalung,
die insgesamt zwar federnd gestützt ist, erzeugt auf dem Umfang der
Stirnschalung unterschiedliche Spannungsverhältnisse. Der Beton wird
gleichzeitig nur durch eine Pumpöffnung hinter die Stirnschalung ge
drückt, die in dem Einfüllbereich federnd ausweicht. Da sie jedoch
aus einer starren Stahlkonstruktion besteht, entstehen durch die Bewe
gung, etwa auf halber Höhe des Querschnittes, Zonen niedrigen Drucks.
Dieser Druckabbau kann, falls er eine bestimmte Größe übersteigt, da
zu führen, daß der Gesamtbetondruck an dieser Stelle geringer wird
als der von außen auf den Beton einwirkende Druck aus der Erd- und
der Wasserauflast. Die Folge wäre ein Verdrängen des Betons an die
ser Stelle durch den wassergesättigten Lockerboden. Dieser Gefahr
kann zunächst durch die Maßnahmen gemäß Patentanspruch 6 wirksam
begegnet werden; die Größe der Vorbewegung der starren Stirnschalung
sollte dabei pro Einfüllvorgang möglichst gering gehalten werden, und
zwar dadurch, daß nur verhältnismäßig kleine Mengen hineingepumpt
werden. Das dafür notwendige schnelle Wechseln von Pumpöffnung zu
Pumpöffnung kommt bei Lösung der steuerungstechnischen Probleme dem
Betoniervorgang zugute: Der Beton wird in den einzelnen Betonzufüh
rungen in kurzen Intervallen bewegt, die Gefahr des Erhärtens wird
vermindert. Als zweite Maßnahme, allein oder in Kombination mit der
vorstehend anzuwendenden Maßnahme, den Druckabbau etwa auf halber
Höhe des Querschnittes zu vermindern, empfiehlt sich die Lehre des
Patentanspruches 7; hierbei wäre die Oberfläche der Stirnschalung
elastisch zu gestalten, wobei zum Beispiel ein mit Wasser gefülltes
Gummiprofil sich den örtlichen Spannungsspitzen anpassen kann.
Im folgenden wird die Erfindung anhand einer Zeichnung erläutert.
Es zeigen in schematischer Darstellung
Fig. 1 einen Längsschnitt durch eine Vorrichtung zum fortlaufenden
Auskleiden eines Tunnels mit Extrudierbeton,
Fig. 2 eine Frontansicht einer Stirnschalung gemäß Fig. 1 und
Fig. 3 vergrößert das Detail A der Fig. 1.
Die in den Figuren dargestellte Vorrichtung besteht in ihrem grund
sätzlichen Aufbau aus einer Schalung 1, 2 mit Innenschalung 1 sowie
vorbewegbarer Stirnschalung 2 und an die Stirnschalung 2 angeschlos
sener Pumpenanordnung 3 für die Zuführung von Extrudierbeton. Die
Stirnschalung 2 ist zwischen einen, Schildschwanz 4 eines Vortriebs
schildes 5 und der Innenschalung 1 angeordnet (vgl. Fig. 1 und 3).
Wie aus Fig. 2 zu ersehen ist, ist die Stirnschalung 2 mit insgesamt
sechs Betonzuführöffnungen 6 versehen, die in Umfangsrichtung in
gleichmäßiger Verteilung angeordnet sind. Diese Betonzuführöffnungen
6 sind über jeweils eine Betonleitung 7 mit der Pumpenanordnung 3
verbunden, die für eine in Umgangsrichtung aufeinanderfolgende Bedie
nung der Betonzuführöffnungen 6 ausgelegt ist. Die aus einem starren
U-Profilring 8 bestehende Stirnschalung 2 liegt über elastische Dich
tungen 9, 10 einerseits am Schildschwanz 4, andererseits an der In
nenschalung 1 an und ist auf ihrer der Auskleidung abgewandten Vor
derseite 11 in Tunnellängsrichtung federnd abgestützt; das ist in Fig.
1 nur schematisch angedeutet. Aus Fig. 3 erkennt man, daß die Stirn
schalung 2 auf ihrer der Auskleidung zugewandten Rückseite 12 mit
einer elastisch nachgiebigen Oberfläche versehen ist. Diese elastische
Oberfläche ist von einem mit Wasser gefüllten Gummihohlprofil 13 ge
bildet, das in dem U-Profilring 8 angeordnet ist.
Der Extrudierbeton wird in verhältnismäßig kleinen, aber gleich gros
sen Mengenportionen in schneller Folge den Betonzuführöffnungen 6 zu
geführt, hinter denen sich die oben beschriebenen Segmentabschnitte
befinden.
Claims (8)
1. Verfahren zum fortlaufenden Auskleiden eines Tunnels mit in Tun
nellängsrichtung zugeführtem Extrudierbeton, dadurch ge
kennzeichnet, daß der Extrudierbeton in einer gegenüber
seiner Erstarrungszeit kleinen Zeitspanne in gleichbleibenden Mengen
portionen in Umfangsrichtung aufeinanderfolgend pro Umfangslänge
mehrfach vorgesehenen, gleich großen Segmentabschnitten jeweils mit
tig zugeführt wird.
2. Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß der Ex
trudierbeton zumindest sechs Segmentabschnitten pro Umfangslänge zu
geführt wird.
3. Verfahren nach Anspruch 1 oder 2, dadurch gekennzeichnet, daß
die Mengenportionen derart bemessen werden, daß die Segmentabschnit
te in Tunnellängsrichtung jeweils eine Erstreckung aufweisen, die klei
ner als deren Länge in Umfangsrichtung ist.
4. Vorrichtung zur Durchführung des Verfahrens nach einem der An
sprüche 1 bis 3, bestehend aus einer Schalung mit Innenschalung so
wie vorbewegbarer Stirnschalung und an die Stirnschalung angeschlos
sener Pumpenanordnung für die Zuführung des Extrudierbetons,
dadurch gekennzeichnet, daß die Stirnschalung
(2) mit einer Mehrzahl von in Umfangsrichtung gleichmäßig verteilten,
mit der Pumpenanordnung (3) verbundenen Betonzuführöffnungen (6)
versehen ist und die Pumpenanordnung (3) für eine in Umfangsrich
tung aufeinanderfolgende Bedienung der Betonzuführöffnungen (6) aus
gelegt ist.
5. Vorrichtung nach Anspruch 4, dadurch gekennzeichnet, daß die
Stirnschalung (2) mit zumindest sechs Betonzuführöffnungen (6) verse
hen ist.
6. Vorrichtung nach Anspruch 4 oder 5, dadurch gekennzeichnet, daß
die Stirnschalung (2) auf ihrer der Auskleidung abgewandten Vorder
seite (11) in Tunnellängsrichtung federnd abgestützt ist.
7. Vorrichtung nach einem der Ansprüche 4 bis 6, dadurch gekenn
zeichnet, daß die Stirnschalung (2) auf ihrer der Auskleidung zuge
wandten Rückseite (12) mit einer elastisch nachgiebigen Oberfläche
versehen ist.
8. Vorrichtung nach Anspruch 7, dadurch gekennzeichnet, daß die ela
stisch nachgiebige Oberfläche von einem mit Wasser gefüllten Gummi-
oder Kunststoffhohlprofil (13) gebildet ist.
Priority Applications (10)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19853529998 DE3529998A1 (de) | 1985-08-22 | 1985-08-22 | Verfahren und vorrichtung zum fortlaufenden auskleiden eines tunnels mit extrudierbeton |
FR858516438A FR2586452B1 (fr) | 1985-08-22 | 1985-11-06 | Procede et dispositif pour apposer en continu un revetement dans un tunnel en utilisant du beton extrude |
BE2/60845A BE903654A (fr) | 1985-08-22 | 1985-11-18 | Procede et dispositif pour apposer en continu un revetement dans un tunnel en utilisant du beton extrude. |
NL8600541A NL191154C (nl) | 1985-08-22 | 1986-03-04 | Werkwijze voor het vervaardigen van een betonnen tunnelbekleding. |
JP61057177A JPH068597B2 (ja) | 1985-08-22 | 1986-03-17 | コンクリートトンネル内張りの形成方法 |
US06/882,274 US4820458A (en) | 1985-08-22 | 1986-07-07 | Process for continuously lining a tunnel with extruded concrete |
IT21176/86A IT1196522B (it) | 1985-08-22 | 1986-07-18 | Procedimento per rivestire continuamente un tunnel con calcestruzzo estruso alimentato lungo l'asse longitudinale del tunnel stesso |
GB08618092A GB2179689B (en) | 1985-08-22 | 1986-07-24 | Continuous lining of tunnels with extrusion concrete |
CA000515854A CA1253706A (en) | 1985-08-22 | 1986-08-13 | Process and apparatus for continuously lining a tunnel with extruded concrete |
US07/061,864 US4768898A (en) | 1985-08-22 | 1987-06-11 | Process and apparatus for continuously lining a tunnel with extruded concrete |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19853529998 DE3529998A1 (de) | 1985-08-22 | 1985-08-22 | Verfahren und vorrichtung zum fortlaufenden auskleiden eines tunnels mit extrudierbeton |
Publications (2)
Publication Number | Publication Date |
---|---|
DE3529998A1 true DE3529998A1 (de) | 1987-02-26 |
DE3529998C2 DE3529998C2 (de) | 1989-11-23 |
Family
ID=6279085
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE19853529998 Granted DE3529998A1 (de) | 1985-08-22 | 1985-08-22 | Verfahren und vorrichtung zum fortlaufenden auskleiden eines tunnels mit extrudierbeton |
Country Status (9)
Country | Link |
---|---|
US (2) | US4820458A (de) |
JP (1) | JPH068597B2 (de) |
BE (1) | BE903654A (de) |
CA (1) | CA1253706A (de) |
DE (1) | DE3529998A1 (de) |
FR (1) | FR2586452B1 (de) |
GB (1) | GB2179689B (de) |
IT (1) | IT1196522B (de) |
NL (1) | NL191154C (de) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3826623A1 (de) * | 1988-08-05 | 1990-02-08 | Schlecht Karl | Verfahren und vorrichtung zur ueberwachung, steuerung und/oder regelung des fuelldrucks bei der tunnelbetonierung |
Families Citing this family (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3529998A1 (de) | 1985-08-22 | 1987-02-26 | Hochtief Ag Hoch Tiefbauten | Verfahren und vorrichtung zum fortlaufenden auskleiden eines tunnels mit extrudierbeton |
DE3723625A1 (de) * | 1987-07-17 | 1989-02-23 | Hochtief Ag Hoch Tiefbauten | Verfahren und vorrichtung zum auskleiden eines tunnels mit ortbeton |
DE3724769A1 (de) * | 1987-07-25 | 1989-02-02 | Hochtief Ag Hoch Tiefbauten | Schalung fuer eine tunnelauskleidung mit ortbeton |
JPH0784836B2 (ja) * | 1987-08-25 | 1995-09-13 | 東急建設株式会社 | シールドマシンのプレスジャッキ設置用台座リング |
JPH01127799A (ja) * | 1987-11-12 | 1989-05-19 | Toda Constr Co Ltd | Ecl工法のプレスリング構造 |
US5183356A (en) * | 1988-07-23 | 1993-02-02 | Putzmeister-Werk Maschinenfabrik Gmbh | Method and device for distributing pumpable thick matter into several delivery pipes |
CH681905A5 (de) * | 1990-09-14 | 1993-06-15 | Leo Corazza | |
US6983788B2 (en) * | 1998-11-09 | 2006-01-10 | Building Performance Equipment, Inc. | Ventilating system, heat exchanger and methods |
NO20004536D0 (no) * | 2000-09-12 | 2000-09-12 | Knut Fossum | Glidestøp, forskaling ved utstøping med sprøytebetong |
NL1018500C2 (nl) * | 2001-07-09 | 2003-01-14 | Ind Tunnelbouw Methode C V | Bekisting en werkwijze voor het bouwen van een beklede tunnel. |
ES2355613T3 (es) * | 2001-09-04 | 2011-03-29 | W.R. GRACE & CO. (A CONNECTICUT CORP.) | Composiciones en dos fases de polímero hidrofóbico superabsorbente. |
DE10220417A1 (de) * | 2002-05-08 | 2003-11-27 | Bystag Gmbh | Betonfördereinrichtung |
BR112023012723A2 (pt) * | 2020-12-23 | 2024-02-06 | Hinfra S R L | Método automatizado e carro de processamento para revestimento de túneis |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2706244A1 (de) * | 1977-02-15 | 1978-08-17 | Gewerk Eisenhuette Westfalia | Verfahren und einrichtung zum vortrieb von tunneln, stollen u.dgl. unter gleichzeitigem einbringen einer betonauskleidung |
DE3122891A1 (de) * | 1981-06-10 | 1982-12-30 | Gewerkschaft Eisenhütte Westfalia, 4670 Lünen | Stirnschalungsanordnung zur herstellung einer ortbetonauskleidung beim vortrieb unterirdischer bauwerke |
Family Cites Families (28)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1532555A (en) * | 1924-09-23 | 1925-04-07 | Joseph T Rice | Steel form for and method of applying cement linings to pipe lines, tunnels, etc. |
US2144013A (en) * | 1937-02-27 | 1939-01-17 | Mason & Hanger Co Inc | Method of and apparatus for constructing concrete tunnels |
US3561223A (en) * | 1968-07-09 | 1971-02-09 | John R Tabor | Tunneling machine with concrete wall forming mechanism |
US3723041A (en) * | 1968-11-06 | 1973-03-27 | Standard Concrete Pipe Co Inc | Tool for forming asbestos linings and the like |
AT300013B (de) * | 1970-02-25 | 1972-07-10 | Josef Jun Krismer | Einrichtung zur Durchführung der Schildbauweise für die Errichtung von Tunneln oder Stollen |
JPS4829241A (de) * | 1971-08-21 | 1973-04-18 | ||
US3966389A (en) * | 1972-12-27 | 1976-06-29 | Ameron, Inc. | Apparatus for troweling pipe lining material |
JPS5016086A (de) * | 1973-06-16 | 1975-02-20 | ||
AT329109B (de) * | 1973-11-08 | 1976-04-26 | Universale Hoch & Tiefbau | Vorrichtung zum auskleiden von tunneln oder stollen mit pumpbeton |
SU791976A1 (ru) * | 1974-09-13 | 1980-12-30 | Государственный Проектный Институт "Днепрогипрошахт" | Способ тампонажа горизонтальных горных выработок |
DE2460033C3 (de) * | 1974-12-19 | 1978-10-12 | Gewerkschaft Eisenhuette Westfalia, 4670 Luenen | Vorrichtung zum Entwässern von Beton am Druckring einer Schildvortriebsmaschine |
NL7601383A (nl) * | 1975-02-26 | 1976-08-30 | Martin & Pagenstecher Gmbh | Werkwijze en inrichting voor het maken van de vuurvaste bekleding van een buisvormig vat. |
SE407604B (sv) * | 1975-04-11 | 1979-04-02 | Cavallin Christer | Injekteringsanordning |
ES455871A1 (es) * | 1976-02-13 | 1978-05-16 | Gewerk Eisenhuette Westfalia | Un escudo para perforar tuneles u otras cavidades cuales- quiera. |
FR2380413A1 (fr) * | 1977-02-15 | 1978-09-08 | Gewerk Eisenhuette Westfalia | Procede et dispositif pour le creusement de tunnels, galeries et cavites analogues, avec pose simultanee d'un revetement en beton |
CH623887A5 (de) * | 1977-09-27 | 1981-06-30 | Locher & Cie Ag | |
DE2819647A1 (de) * | 1978-05-05 | 1979-11-08 | Helmut Dipl Ing Edeling | Aktives tunnelbausystem mit ortbetonauskleidung und vortriebsschild dazu |
JPS55168600U (de) * | 1979-05-16 | 1980-12-03 | ||
DE3043312C2 (de) * | 1980-11-17 | 1986-10-09 | Heinz-Theo Dipl.-Ing. 5300 Bonn Walbröhl | Gleitschalung zum Einbringen einer Ortbetonauskleidung sowie Verfahren zum Einbringen von Ortbeton im Stollen- und Tunnelbau |
DE3141273C2 (de) * | 1981-10-17 | 1986-04-10 | Maschinenfabrik Walter Scheele GmbH & Co KG, 4750 Unna-Massen | Tunnelbetoniereinrichtung mit schwenkbarem Endstück |
DE3141272A1 (de) * | 1981-10-17 | 1983-05-05 | Maschinenfabrik Walter Scheele GmbH & Co KG, 4750 Unna-Massen | Tunnelbetoniereinrichtung mit schwenk- und ausrueckbarem endstueck |
JPS59106695A (ja) * | 1982-12-08 | 1984-06-20 | 三井建設株式会社 | 拡大シ−ルド掘削工法 |
JPS59179994A (ja) * | 1983-03-30 | 1984-10-12 | 三井建設株式会社 | 既設トンネルの途中に拡大トンネル部を築造する工法と装置 |
DE3404111A1 (de) * | 1984-02-07 | 1985-08-14 | Bergwerksverband Gmbh, 4300 Essen | Verfahren zur herstellung und zum ausbau von nicht begehbaren langgestreckten hohlraeumen in geschlossener bauweise |
DE3406980C1 (de) * | 1984-02-25 | 1985-04-04 | Hochtief Ag Vorm. Gebr. Helfmann, 4300 Essen | Verfahren und Vorrichtung zum fortlaufenden Auskleiden eines Tunnels mit Ortbeton |
DE3411857C1 (de) * | 1984-03-30 | 1985-04-18 | Hochtief Ag Vorm. Gebr. Helfmann, 4300 Essen | Zwischen einem Schildmantel einer Tunnelvortriebsmaschine sowie einer Tunnelinnenschalung laengsverstellbare Stirnschaltung |
DE3506463C1 (de) * | 1985-02-23 | 1986-07-17 | Maschinenfabrik Walter Scheele GmbH & Co KG, 4750 Unna-Massen | Einrichtung zur Betonverteilung in eine Mehrzahl von Fuellstutzen |
DE3529998A1 (de) | 1985-08-22 | 1987-02-26 | Hochtief Ag Hoch Tiefbauten | Verfahren und vorrichtung zum fortlaufenden auskleiden eines tunnels mit extrudierbeton |
-
1985
- 1985-08-22 DE DE19853529998 patent/DE3529998A1/de active Granted
- 1985-11-06 FR FR858516438A patent/FR2586452B1/fr not_active Expired - Fee Related
- 1985-11-18 BE BE2/60845A patent/BE903654A/fr not_active IP Right Cessation
-
1986
- 1986-03-04 NL NL8600541A patent/NL191154C/xx not_active IP Right Cessation
- 1986-03-17 JP JP61057177A patent/JPH068597B2/ja not_active Expired - Lifetime
- 1986-07-07 US US06/882,274 patent/US4820458A/en not_active Expired - Fee Related
- 1986-07-18 IT IT21176/86A patent/IT1196522B/it active
- 1986-07-24 GB GB08618092A patent/GB2179689B/en not_active Expired
- 1986-08-13 CA CA000515854A patent/CA1253706A/en not_active Expired
-
1987
- 1987-06-11 US US07/061,864 patent/US4768898A/en not_active Expired - Lifetime
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2706244A1 (de) * | 1977-02-15 | 1978-08-17 | Gewerk Eisenhuette Westfalia | Verfahren und einrichtung zum vortrieb von tunneln, stollen u.dgl. unter gleichzeitigem einbringen einer betonauskleidung |
DE3122891A1 (de) * | 1981-06-10 | 1982-12-30 | Gewerkschaft Eisenhütte Westfalia, 4670 Lünen | Stirnschalungsanordnung zur herstellung einer ortbetonauskleidung beim vortrieb unterirdischer bauwerke |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3826623A1 (de) * | 1988-08-05 | 1990-02-08 | Schlecht Karl | Verfahren und vorrichtung zur ueberwachung, steuerung und/oder regelung des fuelldrucks bei der tunnelbetonierung |
Also Published As
Publication number | Publication date |
---|---|
FR2586452B1 (fr) | 1992-04-10 |
JPS6245899A (ja) | 1987-02-27 |
DE3529998C2 (de) | 1989-11-23 |
JPH068597B2 (ja) | 1994-02-02 |
US4820458A (en) | 1989-04-11 |
BE903654A (fr) | 1986-03-14 |
NL8600541A (nl) | 1987-03-16 |
GB2179689A (en) | 1987-03-11 |
IT8621176A0 (it) | 1986-07-18 |
CA1253706A (en) | 1989-05-09 |
GB8618092D0 (en) | 1986-09-03 |
NL191154B (nl) | 1994-09-16 |
GB2179689B (en) | 1988-08-03 |
FR2586452A1 (fr) | 1987-02-27 |
US4768898A (en) | 1988-09-06 |
IT1196522B (it) | 1988-11-16 |
NL191154C (nl) | 1995-02-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE3529998A1 (de) | Verfahren und vorrichtung zum fortlaufenden auskleiden eines tunnels mit extrudierbeton | |
DE2124385C3 (de) | Verfahren zum Injizieren eines erhärtenden flüssigen Stoffes in den Baugrund und Vorrichtung zur Durchführung des Verfahrens | |
DE1243111B (de) | Arbeitsfahrzeug zur Herstellung einer Bewaesserungsanlage | |
EP0141899B1 (de) | Verfahren und Anordnung zum Auftragen von Medien in aufgeschäumtem bzw. Flüssigem Zustand auf ein bahnförmiges Material | |
DE2734717A1 (de) | Verfahren und vorrichtung zum ausbauen einer untertaegigen strecke oder eines tunnels | |
DE2504701C2 (de) | Verfahren und Vorrichtung zum beidseitigen Beschichten einer von unten nach oben bewegten Bahn | |
DE2351178A1 (de) | Beschichtungsvorrichtung | |
DE3129736C2 (de) | Verfahren zum Aufbringen einer Schicht aus Filterhilfs- oder Precoat-Mittel auf Filtertücher einer Plattenfilterpresse, sowie Plattenfilterpresse zur Durchführung des Verfahrens | |
DE2646334C2 (de) | Drahtverzugmatte für Strecken des Berg- und Tunnelbaus zur Herstellung eines Anschlusses des Ausbaus an das ihn umgebende Gebirge aus aushärtendem Hinterfüllmaterial | |
EP0345256A1 (de) | Verfahren zum herstellen eines brunnens. | |
DE2308928A1 (de) | Vorrichtung zum unter wasser vorsehen einer fliessfaehigen, wohl oder nicht haertbaren masse wie (betonmoertel), asphaltbitumen und dergleichen | |
DE2926581A1 (de) | Fugenband fuer aufgehende gebaeudewaende im hoch- und tiefbau, sowie verfahren zu seiner herstellung | |
EP0080189B1 (de) | Verfahren zum Einführen von Flüssigkeit gegen die aufsteigende Feuchtigkeit in Mauerwerk und Vorrichtung zur Durchführung des Verfahrens | |
DE3826623C2 (de) | ||
DE3224333A1 (de) | Verfahren und vorrichtung zum kontinuierlichen auftragen einer bewehrungsschicht auf eine poroese, mineralische bauplatte | |
DE3543059C2 (de) | ||
EP2666911A1 (de) | Verfahren zum Herstellen einer Bodenmörtelwand im Boden | |
AT519194A1 (de) | Maschine und Verfahren zur Reinigung von Schotter eines Gleises | |
DE2158653C3 (de) | Verfahren und Vorrichtung zur Herstellung von Bauplatten aus zementgebundenen Holzfasern o.dgl., z.B. Holzspänen oder Holzwolle | |
DE3627872C2 (de) | Mischvorrichtung zum Einbringen einer Dichtwandmasse in einen Dichtwandschlitz | |
DE4442475C2 (de) | Herstellung eines horizontalen Dichtschirms gegen drückendes Wasser | |
DE2352588C2 (de) | Vorrichtung zum Einmischen eines Bodenverfestigungsmaterials in fester oder flüssiger Form | |
DE4446028C2 (de) | Verfahren und Anlage zum Stabilisieren eines Bodens mit Hilfe von Injektionen | |
DE2109384B2 (de) | Verfahren und Vorrichtung zum Herstellen röhrenförmiger Tunnel, Stollen od. dgl. im Schildvortrieb mit einer Auskleidung aus Ortbeton | |
AT343340B (de) | Verfahren und vorrichtung zum vermorteln der wandung von schachten, insbesondere kaminschachten |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
8110 | Request for examination paragraph 44 | ||
D2 | Grant after examination | ||
8364 | No opposition during term of opposition | ||
8339 | Ceased/non-payment of the annual fee |