WO2017140405A1 - Gleisbaufahrzeug zur durchführung von gleisbauarbeiten - Google Patents
Gleisbaufahrzeug zur durchführung von gleisbauarbeiten Download PDFInfo
- Publication number
- WO2017140405A1 WO2017140405A1 PCT/EP2017/000051 EP2017000051W WO2017140405A1 WO 2017140405 A1 WO2017140405 A1 WO 2017140405A1 EP 2017000051 W EP2017000051 W EP 2017000051W WO 2017140405 A1 WO2017140405 A1 WO 2017140405A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- rail
- machine
- vehicle according
- longitudinal
- cross
- Prior art date
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/18—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
- B66C23/36—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes mounted on road or rail vehicles; Manually-movable jib-cranes for use in workshops; Floating cranes
- B66C23/50—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes mounted on road or rail vehicles; Manually-movable jib-cranes for use in workshops; Floating cranes mounted on railway vehicles, e.g. breakdown cranes
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B29/00—Laying, rebuilding, or taking-up tracks; Tools or machines therefor
- E01B29/16—Transporting, laying, removing, or replacing rails; Moving rails placed on sleepers in the track
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B29/00—Laying, rebuilding, or taking-up tracks; Tools or machines therefor
- E01B29/16—Transporting, laying, removing, or replacing rails; Moving rails placed on sleepers in the track
- E01B29/17—Lengths of rails assembled into strings, e.g. welded together
Definitions
- the invention relates to a track construction vehicle for carrying out track construction work, with a machine frame having rail slides spaced apart from one another in a machine longitudinal direction, which is delimited with respect to a machine transverse direction by two longitudinal members spaced apart from one another.
- Such tracked vehicles are widely known and are often equipped with a crane to perform various maintenance on the track. If necessary, the rails are renewed even in short track sections. For this it is of economic advantage to transport the new rails to the construction site with the track construction vehicle.
- the object of the present invention is now to provide a track construction vehicle of the type mentioned, with a simplified rail transport is possible.
- a track construction vehicle of the generic type in that at least one longitudinal beam on a - remote from the opposite side member - carrier outer side is connected to a provided rail for receiving rail transport device by a displacement drive in the cross-machine direction relative to the machine frame within a limited by a transport and a loading position displacement is displaceable.
- Such a trained rail transport device has the particular advantage that even with an on-demand transport of up to 20 meters long rails, the versatility of the track construction vehicle for other track construction work is impaired in any way.
- the loading of the rails can easily be done by the machine crane. Due to the lateral arrangement of the rail transport device on the longitudinal beam of the machine frame and a subsequent equipment of already in use machines is possible.
- FIG. 1 and 2 show a view of the rail transport device in a machine longitudinal direction; and FIG. 4 shows a view of the rail transport device in a cross machine direction.
- a track construction vehicle 1 for carrying out track construction work which is shown in FIG. 1 has a machine frame 2 with rail carriages 4 distanced from one another in a machine longitudinal direction 3 and can be moved on a track 5.
- NEN 6 In addition to end-mounted cabs NEN 6 is also a social space 7 for track construction workers and a rotary and height adjustable by drives crane 8 is provided.
- the machine frame 2 is delimited with respect to a machine transverse direction 9 by two longitudinal members 10 which are spaced apart from one another. This is in each case connected to a carrier outer side 11 facing away from the opposite longitudinal member 10 with a total of three rail transport devices 13 provided for receiving rails 12 and arranged one behind the other in the machine longitudinal direction 3 (see FIG. For simplicity, the arranged on the opposite side members 10 transport devices 13 are not shown in Fig. 2.
- the rail transport device 13 is designed as a carriage 16, which is displaceably mounted along carriage guides 14 in the cross machine direction 9 and has a rail support surface 15.
- the cross member formed as an I-beam longitudinal member 10 has at a top and bottom end 17, 18 depending on a horizontally extending support flange 19. A limited distance d by the rail support surface 15 and the upper support flange 19 is formed corresponding to a height of the rail 12 to be transported.
- the rail transport device 13 is - with respect to a vertical - between the upper and lower end 17, 18 of the longitudinal member 10 is arranged.
- the carriage 16 is moved by a displacement drive 20 in the ma- Transverse transverse direction 9 relative to the machine frame 2 within a by a transport and a loading position (see Fig. 2 and 3) limited displacement.
- the carriage guide 14 provided on both sides of the carriage 16 is in each case composed of a first guide rail 21 connected to the longitudinal member 10 and a second guide rail 23 connected thereto by a joint 22. This has a the displacement of the carriage 16 corresponding length.
- Each carriage 16 is connected to inside the guide rails 21, 23 mounted guide rollers 26.
- the rail bearing surface 15 has over this projecting, extending in the machine longitudinal direction 3 and in the cross-machine direction 9 for receiving rail feet 24 spaced from each other centering ribs 25.
- the second guide rails 23 are swung out and locked in an aligned with the first guide rails 21 insertion position. Subsequently, the carriage 16 are moved under the action of the displacement drives 20 in the apparent in Fig. 3 loading position.
- both rails 12 (if necessary, only one) are stored on the rail bearing surfaces 15 and connected by a transport lock 27 with the respective carriage 16.
- the displacement drives 20 are acted upon, the carriages 16, together with the two rails 12, are displaced into the transport position (see Fig. 2).
- a locking device 28 see Fig. 4) there is a transport lock the carriage 16.
- the second guide rails 23 are pivoted and fixed in an apparent in Fig. 2 and 4 transport position. After reaching the construction site and moving the carriage 16 in the loading position again takes place with the aid of the crane 8, the laying of the two rails 12 on the track. 5
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Machines For Laying And Maintaining Railways (AREA)
- Warehouses Or Storage Devices (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Description
Claims
Priority Applications (7)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US16/070,409 US11091884B2 (en) | 2016-02-15 | 2017-01-18 | Track-laying vehicle for performing track laying works |
CA3010023A CA3010023C (en) | 2016-02-15 | 2017-01-18 | Track-laying vehicle for performing track-laying works |
JP2018542706A JP6840160B2 (ja) | 2016-02-15 | 2017-01-18 | 軌道工事作業を行う軌道工事車両 |
ES17700594T ES2762100T3 (es) | 2016-02-15 | 2017-01-18 | Vehículo de asiento de vía para la realización de trabajos de asiento de vía |
EA201800350A EA034762B1 (ru) | 2016-02-15 | 2017-01-18 | Путевая машина для проведения строительных работ на рельсовых путях |
EP17700594.9A EP3417108B1 (de) | 2016-02-15 | 2017-01-18 | Gleisbaufahrzeug zur durchführung von gleisbauarbeiten |
CN201780009232.5A CN108603346B (zh) | 2016-02-15 | 2017-01-18 | 用于执行轨道构建操作的轨道构建车辆 |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
ATA73/2016A AT518062B1 (de) | 2016-02-15 | 2016-02-15 | Gleisbaufahrzeug zur Durchführung von Gleisbauarbeiten |
AT73/2016 | 2016-02-15 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2017140405A1 true WO2017140405A1 (de) | 2017-08-24 |
Family
ID=57838342
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/EP2017/000051 WO2017140405A1 (de) | 2016-02-15 | 2017-01-18 | Gleisbaufahrzeug zur durchführung von gleisbauarbeiten |
Country Status (7)
Country | Link |
---|---|
US (1) | US11091884B2 (de) |
JP (1) | JP6840160B2 (de) |
CN (1) | CN108603346B (de) |
AT (1) | AT518062B1 (de) |
CA (1) | CA3010023C (de) |
EA (1) | EA034762B1 (de) |
WO (1) | WO2017140405A1 (de) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AT518062B1 (de) | 2016-02-15 | 2017-07-15 | Plasser & Theurer Export Von Bahnbaumaschinen Gmbh | Gleisbaufahrzeug zur Durchführung von Gleisbauarbeiten |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR1013191A (fr) * | 1950-02-23 | 1952-07-23 | Dispositif de chargement et de déchargement des rails sur wagon | |
GB2160919A (en) * | 1984-06-09 | 1986-01-02 | Northern Eng Ind | Rail handling equipment |
Family Cites Families (25)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US724577A (en) * | 1902-06-16 | 1903-04-07 | D F Holman Railway Track Layer Company | Track-laying machine. |
JPS5252211U (de) * | 1975-10-14 | 1977-04-14 | ||
JPS5844102A (ja) * | 1981-09-11 | 1983-03-15 | 株式会社日立製作所 | 横取り式軌框敷設装置 |
AT389541B (de) | 1987-07-23 | 1989-12-27 | Plasser Bahnbaumasch Franz | Schwellenauswechsel-maschine |
ATE83814T1 (de) * | 1988-08-18 | 1993-01-15 | Scheuchzer Sa | Zug zur erneuerung eines eisenbahngleises. |
AT402519B (de) * | 1990-02-06 | 1997-06-25 | Plasser Bahnbaumasch Franz | Kontinuierlich verfahrbare gleisbaumaschine zum verdichten der schotterbettung eines gleises |
DE4312964A1 (de) * | 1993-04-21 | 1994-10-27 | Robel Georg Gmbh & Co | Schienenverladezug zum Transport sowie zum Auf-und Abladen von Langschienen |
AT406970B (de) * | 1993-09-17 | 2000-11-27 | Plasser Bahnbaumasch Franz | Maschine zur vorbereitung von schweissarbeiten auf einem gleis |
DE4431074A1 (de) * | 1994-09-01 | 1996-04-04 | Robel Georg Gmbh & Co | Schienenverladewagen zum Auf- und Abladen von Langschienen |
DE19524285A1 (de) * | 1995-07-04 | 1997-01-09 | Robel Georg Gmbh & Co | Schienenladewagen |
JP4618528B2 (ja) * | 2001-05-28 | 2011-01-26 | ステンレスプラント株式会社 | リフト付運搬台車 |
AT6158U3 (de) * | 2003-01-29 | 2004-03-25 | Plasser Bahnbaumasch Franz | Maschine zur behandlung eines gleises |
AT500949B8 (de) * | 2004-10-01 | 2007-02-15 | Plasser Bahnbaumasch Franz | Maschine zur durchführung einer gleislagekorrektur |
AT501271B8 (de) | 2004-11-22 | 2007-02-15 | Plasser Bahnbaumasch Franz | Portalkran zum transportieren von gleisjochen |
US7707943B2 (en) * | 2006-12-19 | 2010-05-04 | Herzog Contracting Corp. | Self-propelled rail unloading machine |
DE202007009139U1 (de) * | 2007-06-29 | 2007-09-06 | Robel Bahnbaumaschinen Gmbh | Schienenkran zum Transport von Schienen |
JP5283870B2 (ja) * | 2007-08-20 | 2013-09-04 | ユニオン建設株式会社 | レール運搬用トロのレール積卸し装置 |
FR2942194B1 (fr) * | 2009-02-13 | 2011-04-01 | Pomagalski Sa | Installation de transport a vehicule passif accroche a des cables tracteurs lateraux |
CN101725095B (zh) * | 2009-11-23 | 2012-06-27 | 株洲新通铁路装备有限公司 | 铁路施工机械护轨起复装置及换轨车护轨起复装置 |
DE102010022679A1 (de) | 2010-06-04 | 2011-12-08 | Robel Bahnbaumaschinen Gmbh | Fahrzeugkombination zum Transport von Schienen |
CN103015278B (zh) | 2012-12-11 | 2016-04-06 | 中车沈阳机车车辆有限公司 | 拨钢轨装置及长钢轨运输车 |
CN203938942U (zh) | 2014-07-11 | 2014-11-12 | 山西平阳重工机械有限责任公司 | 一种轨道安装车 |
CN104553927A (zh) * | 2015-01-16 | 2015-04-29 | 中国重汽集团青岛重工有限公司 | 伸缩式移动平台 |
DE202016000509U1 (de) | 2016-01-27 | 2016-03-02 | Robel Bahnbaumaschinen Gmbh | Instandhaltungsfahrzeug |
AT518062B1 (de) | 2016-02-15 | 2017-07-15 | Plasser & Theurer Export Von Bahnbaumaschinen Gmbh | Gleisbaufahrzeug zur Durchführung von Gleisbauarbeiten |
-
2016
- 2016-02-15 AT ATA73/2016A patent/AT518062B1/de active
-
2017
- 2017-01-18 EA EA201800350A patent/EA034762B1/ru not_active IP Right Cessation
- 2017-01-18 WO PCT/EP2017/000051 patent/WO2017140405A1/de active Application Filing
- 2017-01-18 CA CA3010023A patent/CA3010023C/en active Active
- 2017-01-18 US US16/070,409 patent/US11091884B2/en active Active
- 2017-01-18 CN CN201780009232.5A patent/CN108603346B/zh active Active
- 2017-01-18 JP JP2018542706A patent/JP6840160B2/ja active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR1013191A (fr) * | 1950-02-23 | 1952-07-23 | Dispositif de chargement et de déchargement des rails sur wagon | |
GB2160919A (en) * | 1984-06-09 | 1986-01-02 | Northern Eng Ind | Rail handling equipment |
Also Published As
Publication number | Publication date |
---|---|
US20210054577A1 (en) | 2021-02-25 |
CN108603346B (zh) | 2020-10-30 |
JP6840160B2 (ja) | 2021-03-10 |
CN108603346A (zh) | 2018-09-28 |
AT518062A4 (de) | 2017-07-15 |
US11091884B2 (en) | 2021-08-17 |
JP2019504952A (ja) | 2019-02-21 |
CA3010023C (en) | 2024-03-19 |
EA034762B1 (ru) | 2020-03-18 |
CA3010023A1 (en) | 2017-08-24 |
EA201800350A1 (ru) | 2019-01-31 |
AT518062B1 (de) | 2017-07-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AT518023B1 (de) | Stopfmaschine sowie Verfahren zur Durchführung einer Lagekorrektur eines Gleises | |
WO2017129214A1 (de) | Instandhaltungsfahrzeug | |
WO2013064942A1 (de) | Messvorrichtung | |
EP1449962A2 (de) | Stopfaggregat zum Unterstopfen eines Gleises | |
AT518062B1 (de) | Gleisbaufahrzeug zur Durchführung von Gleisbauarbeiten | |
EP1834042B1 (de) | Maschine zur erneuerung eines gleises | |
EP3417108B1 (de) | Gleisbaufahrzeug zur durchführung von gleisbauarbeiten | |
EP2454414B1 (de) | Maschine zur erneuerung eines gleises | |
EP2122057A1 (de) | Stopfaggregat zum unterstopfen eines gleises | |
EP3554912B9 (de) | Transportsystem mit einem seilgezogenen fahrzeug | |
EP3082978B1 (de) | Absturzsicherung für eine gleisbaumaschine | |
DE202014010270U1 (de) | System zum Richten eines Gleises einer festen Schienenfahrbahn | |
EP2509844B1 (de) | Arbeitswagen mit einer arbeitsbühne | |
DE655748C (de) | Verlegbare Schiebebuehne fuer Foerderwagen im Grubenbetrieb | |
DE1658396A1 (de) | Vorrichtung zur Reinigung der aufgehaengten Laufschienen von Einschienenhaengebahnen des Untertagebergbaus | |
EP3363949B1 (de) | Verfahren und vorrichtung zur unterbrechung einer gleisabsperrung | |
WO2016177446A1 (de) | Verfahren zum unterstopfen einer weiche | |
WO2017076994A1 (de) | Verfahren und gleisbaumaschine zur erneuerung von schwellen eines aus schienen und den schwellen gebildeten gleises | |
DE3741553C2 (de) | ||
EP2318252B1 (de) | Fahrzeug mit einer arbeitsbühne | |
EP3063332A1 (de) | Gleisstopfmaschine mit verdrehbar gelagertem arbeitsrahmen | |
DE10329355B4 (de) | Vorrichtung zum Bewegen einer Baueinrichtung entlang von Gleisen | |
AT515698B1 (de) | Verfahren zur Transportsicherung von aufeinander gestapelten Gleisjochen beim Transport auf schienengebundenen Fahrzeugen | |
DE10329353B3 (de) | Vorrichtung zum Führen einer Baueinrichtung entlang von Gleisen | |
DE8528781U1 (de) | Fahrbares Hubgerüst |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 17700594 Country of ref document: EP Kind code of ref document: A1 |
|
ENP | Entry into the national phase |
Ref document number: 3010023 Country of ref document: CA |
|
WWE | Wipo information: entry into national phase |
Ref document number: 201800350 Country of ref document: EA |
|
ENP | Entry into the national phase |
Ref document number: 2018542706 Country of ref document: JP Kind code of ref document: A |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2017700594 Country of ref document: EP |
|
ENP | Entry into the national phase |
Ref document number: 2017700594 Country of ref document: EP Effective date: 20180917 |