Prior art keywords
feeder
power
standby period
turned
component
Prior art date
Application number
PCT/JP2012/056282
Other languages
English (en)
French (fr)
Inventor
吉識 永田
聡士 大崎
Original Assignee
富士機械製造株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 富士機械製造株式会社 filed Critical 富士機械製造株式会社
Priority to CN201280071352.5A priority Critical patent/CN104170542B/zh
Priority to EP12871124.9A priority patent/EP2827694B1/en
Priority to PCT/JP2012/056282 priority patent/WO2013136414A1/ja
Priority to JP2014504488A priority patent/JP5758540B2/ja
Publication of WO2013136414A1 publication Critical patent/WO2013136414A1/ja

Links

Images

Classifications

    • HELECTRICITY
    • H05ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
    • H05KPRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
    • H05K13/00Apparatus or processes specially adapted for manufacturing or adjusting assemblages of electric components
    • H05K13/04Mounting of components, e.g. of leadless components
    • H05K13/0417Feeding with belts or tapes
    • HELECTRICITY
    • H05ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
    • H05KPRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
    • H05K13/00Apparatus or processes specially adapted for manufacturing or adjusting assemblages of electric components
    • H05K13/04Mounting of components, e.g. of leadless components
    • H05K13/0417Feeding with belts or tapes
    • H05K13/0419Feeding with belts or tapes tape feeders
    • HELECTRICITY
    • H05ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
    • H05KPRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
    • H05K13/00Apparatus or processes specially adapted for manufacturing or adjusting assemblages of electric components
    • H05K13/08Monitoring manufacture of assemblages
    • H05K13/0885Power supply

Definitions

  • the present invention is an invention relating to a component mounter equipped with a plurality of feeders.
  • Patent Document 1 Japanese Patent No. 4777209
  • a circuit is provided by mounting many feeders on one component mounting machine and sucking the components supplied from each feeder by suction nozzles. It is designed to be mounted on the board. While the component mounter is in operation, power is continuously supplied to many feeders mounted on the component mounter, but the components are sucked into the suction nozzles in the order determined in advance by the production job. Therefore, many feeders mounted on the component mounting machine stop and wait for the component supply operation until the order of component suction comes.
  • Patent Document 1 In order to reduce the power consumption during the standby period of this feeder, in Patent Document 1, the power supply mode of the motor is switched to the power saving mode during the standby period by switching the energization mode of the motor that is the drive source of the feeder component supply operation. Is trying to reduce.
  • the problem to be solved by the present invention is to increase the power saving effect of the feeder mounted on the component mounting machine and to reduce the cost of countermeasures against static electricity.
  • the invention according to claim 1 is a component mounter equipped with a plurality of feeders, and a plurality of power switch means for turning on / off power supply to the plurality of feeders for each feeder, Feeder ID confirmation means for confirming identification information of each feeder (hereinafter referred to as “feeder ID”) by communicating with the control section of each feeder after each power switch means is turned on, and each power switch means being turned on Power supply control means for controlling off / off, and a period of waiting for the parts supplying operation of each feeder to be stopped during the execution of the production job based on the production job for mounting the parts supplied from the plurality of feeders on the circuit board (Hereinafter referred to as “feeder standby period”) for determining a feeder standby period, and the power supply control means includes the feeder among the plurality of feeders.
  • the feeder standby period starts.
  • the power switch means is sometimes turned off, and the power switch means is turned on at a timing that is at least advanced by the operation preparation time after the power is turned on again after the end of the feeder standby period.
  • the present invention turns off the power supply to the feeder at the start of the feeder standby period for a feeder whose feeder standby period exceeds at least the operation preparation time after the power is turned on again.
  • the power control means acquires the size of the component supplied from each feeder or information related to the size (for example, the tape width of the component supply tape, the tape feed pitch, etc.), For feeders that supply parts with a size of a predetermined value or less that is greatly affected by the deviation of the motor stop position during the feeder standby period, keep the power switch means on during the feeder standby period without turning it off. good. In this way, for a feeder that supplies a component having a size of a predetermined value or less that is greatly affected by the deviation of the motor stop position during the feeder standby period, power is supplied to the feeder even during the feeder standby period. This makes it possible to hold the motor stop position, and to prevent the displacement of the components during the feeder standby period, thereby preventing the occurrence of component adsorption mistakes.
  • FIG. 1 is a plan view of a component mounter according to an embodiment of the present invention.
  • FIG. 2 is a block diagram showing an electrical connection relationship between the component mounter and the feeder.
  • FIG. 3 is a time chart showing an example of feeder power on / off control.
  • FIG. 4 is a flowchart showing the processing flow of the feeder power on / off control program.
  • the component mounter 11 is provided with a conveyor 13 that conveys the circuit board 12 in the X direction, and a large number of feeders 14 are arranged on both sides of the conveyor 13.
  • An X slide 16 that moves in the conveyance direction (X direction) of the circuit board 12 is provided on an X slide base 15 provided in parallel with the conveyor 13, and this X slide 16 is connected to the X slide 16 via a Y slide (not shown).
  • a mounting head 18 is provided.
  • a suction nozzle (not shown) that sucks components supplied from the feeder 14 is held downward in the mounting head 18.
  • the X slide 16 is provided with an image capturing section 19 (camera optical system) that captures an image of a component sucked by the suction nozzle, and the image capturing section 19 moves integrally with the X slide 16 in the X direction. It is configured as follows.
  • Each feeder 14 is a tape feeder on which a tape reel around which a component supply tape is wound is mounted.
  • a motor that rotationally drives a sprocket (not shown) that sends the component supply tape to a component suction position.
  • a motor 22 that peels and winds the cover tape from the upper surface of the component supply tape
  • a control unit 23 that controls the start / stop of each of the motors 21 and 22, and the like.
  • Each of the motors 21 and 22 includes a stepping motor, a servo motor, and the like.
  • each feeder 14 When each feeder 14 is mounted on a feeder set base (not shown) of the component mounting machine 11, the connector 25 of each feeder 14 is connected to the connector 26 on the component mounting machine 11 side, and each feeder 14 and the component mounting machine 11 are connected. Are electrically connected by a power line 27 and a signal line 28 via connectors 25 and 26.
  • the component mounter 11 is provided with a control unit 30 for controlling the operation of each unit, and a plurality of power switches 31 (power switch means) for turning on / off the power supply to each feeder 14 for each feeder 14. Is provided. By mounting the feeder 14 on the feeder set base of the component mounting machine 11, the power switch 31 of the feeder 14 is mechanically turned on, and the power supply to the feeder 14 is started.
  • the control unit 30 of the component mounter 11 functions as power control means for controlling on / off of each power switch 31 and communicates with the control unit 23 of each feeder 14 after each power switch 31 is turned on. It also functions as feeder ID confirmation means for confirming the identification information of each feeder 14 (hereinafter referred to as “feeder ID”) and the status of each feeder 14.
  • control unit 30 of the component mounter 11 performs the component supply operation of each feeder 14 during the execution of the production job based on the production job (production program) for mounting the component supplied from each feeder 14 on the circuit board 12.
  • This function also serves as a feeder standby period determination means for determining a period for stopping and waiting (hereinafter referred to as “feeder standby period”), and among many feeders 14 mounted on the component mounter 11, the feeder standby period will be described later.
  • the power switch 31 is turned off at the start of the feeder standby period to turn off the power supply to the feeder 14, and thereafter , At the timing when the operation preparation time T (or a slightly longer time) after turning on the power again than before the end of the feeder standby period The power switch 31 is turned on so that power cycled to the feeder 14.
  • the operation preparation time T after the power is turned back on is a time required for the start-up of the control unit 23 of the feeder 14 and the confirmation of the feeder ID after the power is turned back on, and the feeder 14 can start the component supply operation after the power is turned on again. This is the time required to reach a proper state.
  • the control unit 30 of the component mounting machine 11 preliminarily determines the size of the component supplied from each feeder 14 or information related to the size (for example, the tape width and tape feed pitch of the component supply tape). Etc.) by communication with the control unit 23 of each feeder 14 (or the component data corresponding to the feeder ID is acquired from the component database stored in the storage device of the control unit 30), and the motor during the feeder standby period
  • the feeder 14 that supplies parts having a size of a predetermined value or less that is greatly affected by the deviation of the stop position 21 is maintained in the on state without turning off the power switch 31 during the feeder standby period, and the motor 21 is energized. To continue.
  • feeder A is a feeder 14 that supplies parts having a size larger than a predetermined value, which is less affected by a shift in the stop position of the motor 21 during the feeder standby period
  • feeder B is a motor during the feeder standby period
  • 21 is a feeder 14 for supplying parts having a size equal to or smaller than a predetermined value, which is greatly influenced by the deviation of the stop position 21.
  • the feeder standby period exceeds the operation preparation time T (or slightly longer than that) after the power is turned on again before the next feeder standby period comes. And when it is determined that the feeder standby period exceeds the operation preparation time T after power-on (or a slightly longer time), at the start of the feeder standby period t1, the feeder A The power switch 31 is turned off to turn off the power supply to the feeder A. Thereafter, the power switch 31 of the feeder A is turned on at the timing t2 which is advanced by the operation preparation time T (or slightly longer than that) after the power is turned on again at the end of the feeder standby period t3. Reapply power to feeder A. Thus, by the time the feeder standby period ends, the feeder A returns to a state where the component supply operation can be started, and the component supply operation is started immediately after the feeder standby period ends.
  • the feeder standby period from t6 to t7 in FIG. 3 is determined not to exceed the operation preparation time T (or a little longer than that) after the power is turned on again, and the power switch of the feeder A is also used during the feeder standby period. 31 is not turned off, and power supply to the feeder A is continued.
  • the power on / off control of the feeder 14 is executed as follows according to the feeder power on / off control program of FIG.
  • the feeder power on / off control program in FIG. 4 is repeatedly executed at a predetermined cycle for each feeder 14 mounted on the component mounter 11, and serves as a power control means in the claims.
  • step 101 it is determined whether or not the size of the component supplied by the feeder 14 is larger than a predetermined value.
  • the power switch 31 of the feeder 14 is maintained in the ON state, and this program ends.
  • step 101 determines whether the size of the component supplied by the feeder 14 is larger than the predetermined value. If it is determined in step 101 that the size of the component supplied by the feeder 14 is larger than the predetermined value, the process proceeds to step 102, where the next feeder standby period is the operation preparation time T (or after the power is turned on again). And if it is determined that the feeder standby period is shorter than the operation preparation time T after power-on (or a slightly longer time), step 106 is performed. , The power switch 31 of the feeder 14 is maintained or switched to the on state, and the program is terminated.
  • step 102 If it is determined in step 102 that the next feeder standby period is longer than the operation preparation time T after power-on (or slightly longer), the process proceeds to step 103, where the current time is within the feeder standby period. If it is determined that it is not within the feeder standby period, the process proceeds to step 106, the power switch 31 of the feeder 14 is maintained or switched on, and this program is terminated.
  • step 104 the current time is slightly longer than the operation preparation time T (or slightly longer than that after the feeder standby period ends). It is determined whether or not the previous time. As a result, if it is determined that the current time is more than the operation preparation time T (or a slightly longer time) after the re-supply of power than the end of the feeder standby period, the process proceeds to step 105 and the power of the feeder 14 is The switch 31 is maintained or switched to the OFF state, and the program is terminated.
  • Step 104 the power switch 31 of the feeder 14 is maintained or switched to the on state, and the program is terminated.
  • the power supply to the feeder 14 is started at the start of the feeder standby period.
  • the supply is turned off, and then the feeder 14 is turned on again at the timing when the operation preparation time T (or a slightly longer time) is applied after turning on the power again than at the end of the feeder standby period. Therefore, the power supply to the feeder 14 can be turned off during the feeder standby period to increase the power saving effect, and the heat generated by the control unit 23 of the feeder 14 can be eliminated, and the drying of the air around the feeder 14 can be suppressed. It is possible to suppress the generation of static electricity and reduce the cost of countermeasures against static electricity.
  • the feeder 14 is turned on again at the timing of the operation preparation time T (or slightly longer than that) after turning on the power again than when the feeder waiting period ends, immediately after the feeder waiting period ends.
  • the parts supply operation can be started, and parts can be supplied, picked up, and mounted at the timing specified by the production job, so that productivity does not deteriorate.
  • the component mounting machine 11 of a present Example was set as the structure which arranged many feeders 14 on the both sides of the conveyor 13, respectively, it is good also as a structure which arranged many feeders 14 only on the one side of the conveyor 13.
  • FIG. 1 the component mounting machine 11 of a present Example was set as the structure which arranged many feeders 14 on the both sides of the conveyor 13, respectively, it is good also as a structure which arranged many feeders 14 only on the one side of the conveyor 13.
  • the plurality of feeders 14 mounted on the component mounter 11 are not limited to tape feeders, and some or all of the plurality of feeders 14 mounted on the component mounter 11 may be replaced with feeders other than tape feeders (for example, bulk feeders). , Stick feeder, tray feeder, etc.).
  • SYMBOLS 11 Component mounting machine, 12 ... Circuit board, 13 ... Conveyor, 14 ... Feeder, 18 ... Mounting head, 21 ... Sprocket drive motor, 22 ... Cover tape winding motor, 23 ... Feeder control part, 25, 26 ... Connector, 27 ... Power line, 28 ... Signal line, 30 ... Control part (power control means, feeder ID confirmation means) of component mounting machine, 31 ... Power switch (power switch means)

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Microelectronics & Electronic Packaging (AREA)
  • Operations Research (AREA)
  • Supply And Installment Of Electrical Components (AREA)

Abstract

 部品実装機11には、各フィーダ14への電源供給をフィーダ14毎にオン/オフする複数の電源スイッチ31が設けられている。部品実装機11の制御部30は、生産ジョブに基づいて該生産ジョブの実行中に各フィーダ14の部品供給動作を停止して待機するフィーダ待機期間を判定し、該フィーダ待機期間が電源再投入後動作準備時間(又はそれよりも若干長い時間)を越えるフィーダ14については、該フィーダ待機期間の開始時に電源スイッチ31をオフして該フィーダ14への電源供給をオフし、該フィーダ待機期間の終了時よりも電源再投入後動作準備時間(又はそれよりも若干長い時間)だけ前出ししたタイミングで該電源スイッチ31をオンして該フィーダ14に電源を再投入する。

Description

部品実装機
 本発明は、複数のフィーダを搭載した部品実装機に関する発明である。
 従来より、特許文献1(特許第4777209号公報)に記載されているように、1台の部品実装機に多くのフィーダを搭載し、各フィーダから供給される部品を吸着ノズルで吸着して回路基板に実装するようにしている。部品実装機の稼働中は、該部品実装機に搭載した多くのフィーダに電源を供給し続けるようになっているが、予め生産ジョブで決められた順番で吸着ノズルに部品を吸着して回路基板に実装するため、該部品実装機に搭載した多くのフィーダは、部品吸着の順番が来るまで部品供給動作を停止して待機することになる。
 このフィーダの待機期間中の消費電力を低減するために、特許文献1では、待機期間中にフィーダの部品供給動作の駆動源となるモータの通電モードを省電力モードに切り換えて、モータの消費電力を低減するようにしている。
特許第4777209号公報
 しかし、上記特許文献1のように、フィーダの待機期間中にモータの通電モードを省電力モードに切り換えるだけでは、部品実装機に搭載した多くのフィーダの制御部に電源を供給し続けることになるため、部品実装機全体としての節電効果が少ない。しかも、フィーダの待機期間中にフィーダの制御部に電源を供給し続けると、フィーダの制御部が発熱してフィーダ周辺の空気温度が上昇し、フィーダ周辺の空気が乾燥して静電気が発生しやすくなる。このため、微小な部品を供給するフィーダでは、部品供給テープの上面から剥離したカバーテープ(トップテープ)に静電気が帯電してカバーテープに部品が引っ付きやすくなり、吸着ノズルで部品吸着のミスが発生しやすくなる。この静電気対策として、部品実装機のフィーダ搭載部に冷却ファンを設けて、フィーダ周辺の温度上昇を抑えて空気の乾燥を抑えたり、イオナイザーを設けてフィーダ周辺の静電気を除去する必要があり、静電気対策にコストがかかるという問題があった。
 そこで、本発明が解決しようとする課題は、部品実装機に搭載したフィーダの節電効果を大きくし、且つ、静電気対策のコストを低減できるようにすることである。
 上記課題を解決するために、請求項1に係る発明は、複数のフィーダを搭載した部品実装機において、前記複数のフィーダへの電源供給をフィーダ毎にオン/オフする複数の電源スイッチ手段と、前記各電源スイッチ手段のオン後に前記各フィーダの制御部との間で通信して各フィーダの識別情報(以下「フィーダID」という)を確認するフィーダID確認手段と、前記各電源スイッチ手段のオン/オフを制御する電源制御手段と、前記複数のフィーダから供給される部品を回路基板に実装する生産ジョブに基づいて該生産ジョブの実行中に各フィーダの部品供給動作を停止して待機する期間(以下「フィーダ待機期間」という)を判定するフィーダ待機期間判定手段とを備え、前記電源制御手段は、前記複数のフィーダのうち、前記フィーダ待機期間が少なくとも電源再投入後のフィーダの制御
部の立上がり及び前記フィーダIDの確認に要する時間(以下「電源再投入後動作準備時間」という)を越えるフィーダについては、該フィーダ待機期間の開始時に前記電源スイッチ手段をオフし、該フィーダ待機期間の終了時よりも少なくとも前記電源再投入後動作準備時間だけ前出ししたタイミングで該電源スイッチ手段をオンするようにしたものである。
 この場合、フィーダへの電源供給をオフすると、電源再投入後に部品供給動作を開始できる状態になるまでには、少なくとも電源再投入後のフィーダの制御部の立上がり及びフィーダIDの確認に要する時間が「電源再投入後動作準備時間」として必要となる。この点を考慮して、本発明は、フィーダ待機期間が少なくとも電源再投入後動作準備時間を越えるフィーダについては、該フィーダ待機期間の開始時にフィーダへの電源供給をオフし、該フィーダ待機期間の終了時よりも少なくとも電源再投入後動作準備時間だけ前出ししたタイミングでフィーダに電源を再投入するようにしたものであり、これにより、フィーダ待機期間中にフィーダへの電源供給をオフして、節電効果を大きくできると共に、フィーダの制御部の発熱を無くすことができて、フィーダ周辺の空気の乾燥を抑えて静電気の発生を抑制することが可能となり、静電気対策のコストを低減できる。更に、フィーダ待機期間の終了時よりも少なくとも電源再投入後動作準備時間だけ前出ししたタイミングでフィーダに電源を再投入するため、フィーダ待機期間の終了後に直ちに部品供給動作を開始することが可能となり、生産ジョブで指定したタイミングで部品の供給・吸着・実装を実行でき、生産性を低下させずに済む。
 ところで、フィーダ待機期間中にフィーダへの電源供給をオフすると、部品供給動作の駆動源であるモータの停止位置が振動等でずれる可能性がある。吸着ノズルに比較的大きい部品を吸着する場合は、フィーダ待機期間中のモータの停止位置のずれによる部品供給テープのずれ(部品の位置ずれ)はほとんど問題にならないため、吸着ノズルに部品を安定して吸着できるが、微小な部品を吸着する場合は、フィーダ待機期間中のモータの停止位置のずれによる部品供給テープのずれの影響が大きくなり、部品吸着ミスが発生する可能性がある。
 この対策として、請求項2のように、電源制御手段は、各フィーダから供給される部品のサイズ又は該サイズに関連する情報(例えば部品供給テープのテープ幅やテープ送りピッチ等)を取得し、フィーダ待機期間中のモータの停止位置のずれの影響が大きい所定値以下のサイズの部品を供給するフィーダについては、フィーダ待機期間中に電源スイッチ手段をオフすることなくオン状態に維持するようにすると良い。このようにすれば、フィーダ待機期間中のモータの停止位置のずれの影響が大きい所定値以下のサイズの部品を供給するフィーダについては、フィーダ待機期間中も該フィーダに電源を供給して該フィーダのモータ停止位置を保持することが可能となり、フィーダ待機期間中の部品の位置ずれを防止できて、部品吸着ミスの発生を防止できる。
図1は本発明の一実施例における部品実装機の平面図である。 図2は部品実装機とフィーダとの電気的な接続関係を示すブロック図である。 図3はフィーダ電源オン/オフ制御の一例を示すタイムチャートである。 図4はフィーダ電源オン/オフ制御プログラムの処理の流れ示すフローチャートである。
 以下、本発明を実施するための形態を具体化した一実施例を説明する。
 まず、部品実装機全体の構成を図1及び図2を用いて説明する。
 図1に示すように、部品実装機11には、回路基板12をX方向に搬送するコンベア13が設けられ、このコンベア13の両側にそれぞれ多数のフィーダ14が配列されている。コンベア13と平行に設けられたXスライドベース15上に、回路基板12の搬送方向(X方向)に移動するXスライド16が設けられ、このXスライド16にYスライド(図示せず)を介して装着ヘッド18が設けられている。この装着ヘッド18には、フィーダ14から供給される部品を吸着する吸着ノズル(図示せず)が下向きに保持されている。また、Xスライド16には、吸着ノズルに吸着した部品の画像を取り込む画像取り込み部19(カメラの光学系)が設けられ、この画像取り込み部19がXスライド16と一体的にX方向に移動するように構成されている。
 各フィーダ14は、部品供給テープが巻回されたテープリールを装着したテープフィーダであり、図2に示すように、部品供給テープを部品吸着位置へ送るスプロケット(図示せず)を回転駆動するモータ21と、部品供給テープの上面からカバーテープを剥離して巻き取るモータ22と、各モータ21,22の起動/停止を制御する制御部23等が設けられている。各モータ21,22は、ステッピングモータ、サーボモータ等で構成されている。各フィーダ14を部品実装機11のフィーダセット台(図示せず)に搭載したときに、各フィーダ14のコネクタ25が部品実装機11側のコネクタ26と接続され、各フィーダ14と部品実装機11との間がコネクタ25,26を介して電源線27と信号線28で電気的に接続される。
 部品実装機11には、各部の動作を制御する制御部30が設けられていると共に、各フィーダ14への電源供給をフィーダ14毎にオン/オフする複数の電源スイッチ31(電源スイッチ手段)が設けられている。部品実装機11のフィーダセット台にフィーダ14を搭載することで、該フィーダ14の電源スイッチ31が機械的にオンされ、該フィーダ14への電源供給が開始されるように構成されている。
 部品実装機11の制御部30は、各電源スイッチ31のオン/オフを制御する電源制御手段として機能すると共に、各電源スイッチ31のオン後に各フィーダ14の制御部23との間で通信して各フィーダ14の識別情報(以下「フィーダID」という)や各フィーダ14の状態を確認するフィーダID確認手段としても機能する。
 また、部品実装機11の制御部30は、各フィーダ14から供給される部品を回路基板12に実装する生産ジョブ(生産プログラム)に基づいて該生産ジョブの実行中に各フィーダ14の部品供給動作を停止して待機する期間(以下「フィーダ待機期間」という)を判定するフィーダ待機期間判定手段としても機能し、該部品実装機11に搭載した多数のフィーダ14のうち、フィーダ待機期間が後述する電源再投入後動作準備時間T(又はそれよりも若干長い時間)を越えるフィーダ14については、該フィーダ待機期間の開始時に電源スイッチ31をオフして該フィーダ14への電源供給をオフし、その後、該フィーダ待機期間の終了時よりも電源再投入後動作準備時間T(又はそれよりも若干長い時間)だけ前出ししたタイミングで該電源スイッチ31をオンして該フィーダ14に電源を再投入するようにしている。この場合、電源再投入後動作準備時間Tは、電源再投入後のフィーダ14の制御部23の立上がり及びフィーダIDの確認に要する時間であり、電源再投入からフィーダ14が部品供給動作を開始可能な状態になるまでに要する時間である。
 ところで、フィーダ待機期間中にフィーダ14への電源供給をオフすると、部品供給動作の駆動源であるスプロケット駆動用のモータ21の停止位置が振動等でずれる可能性が
ある。吸着ノズルに比較的大きい部品を吸着する場合は、フィーダ待機期間中のモータ21の停止位置のずれによる部品供給テープのずれ(部品の位置ずれ)はほとんど問題にならないため、吸着ノズルに部品を安定して吸着できるが、微小な部品を吸着する場合は、フィーダ待機期間中のモータ21の停止位置のずれによる部品供給テープのずれの影響が大きくなり、部品吸着ミスが発生する可能性がある。
 この対策として、本実施例では、部品実装機11の制御部30は、予め、各フィーダ14から供給される部品のサイズ又は該サイズに関連する情報(例えば部品供給テープのテープ幅やテープ送りピッチ等)を各フィーダ14の制御部23との通信により取得し(又は該制御部30の記憶装置に格納された部品データベースからフィーダIDに対応する部品データを取得し)、フィーダ待機期間中のモータ21の停止位置のずれの影響が大きい所定値以下のサイズの部品を供給するフィーダ14については、フィーダ待機期間中に電源スイッチ31をオフすることなくオン状態に維持して該モータ21への通電を継続するようにしている。このようにすれば、フィーダ待機期間中のモータ21の停止位置のずれの影響が大きい所定値以下のサイズの部品を供給するフィーダ14については、フィーダ待機期間中も該フィーダ14に電源を供給して該フィーダ14のモータ21の停止位置を保持することが可能となり、フィーダ待機期間中の部品供給テープの位置ずれを防止できて、部品吸着ミスの発生を防止できる。
 以上説明した本実施例のフィーダ14の電源オン/オフ制御の一例を図3のタイムチャートを用いて説明する。図3において、フィーダAは、フィーダ待機期間中のモータ21の停止位置のずれの影響が小さい、所定値より大きいサイズの部品を供給するフィーダ14であり、フィーダBは、フィーダ待機期間中のモータ21の停止位置のずれの影響が大きい、所定値以下のサイズの部品を供給するフィーダ14である。
 所定値より大きいサイズの部品を供給するフィーダAについては、次のフィーダ待機期間が到来する前に、該フィーダ待機期間が電源再投入後動作準備時間T(又はそれよりも若干長い時間)を越えるか否かを判定し、該フィーダ待機期間が電源再投入後動作準備時間T(又はそれよりも若干長い時間)を越えると判定した場合は、該フィーダ待機期間の開始時t1 に、該フィーダAの電源スイッチ31をオフして該フィーダAへの電源供給をオフする。この後、該フィーダ待機期間の終了時t3 よりも電源再投入後動作準備時間T(又はそれよりも若干長い時間)だけ前出ししたタイミングt2 で、該フィーダAの電源スイッチ31をオンして該フィーダAに電源を再投入する。これにより、該フィーダ待機期間が終了するまでに、該フィーダAが部品供給動作を開始可能な状態に復帰して、該フィーダ待機期間の終了後に直ちに部品供給動作を開始する。
 一方、図3のt6 ~t7 のフィーダ待機期間については、電源再投入後動作準備時間T(又はそれよりも若干長い時間)を越えないと判定され、フィーダ待機期間中も該フィーダAの電源スイッチ31がオフされず、該フィーダAへの電源供給が継続される。
 一方、所定値以下のサイズの部品を供給するフィーダBについては、図3のt4 ~t5 のフィーダ待機期間が電源再投入後動作準備時間T(又はそれよりも若干長い時間)を越えても、該フィーダBの電源スイッチ31がオン状態に維持され、フィーダBへの電源供給が継続される。これにより、フィーダ待機期間中にスプロケット駆動用のモータ21が停止位置に保持され、部品供給テープの位置ずれが防止される。
 次に、フィーダ待機期間中にフィーダ14への電源供給をオフすることによる節電効果を説明する。
 例えば、フィーダ14の制御部23の消費電力を600[mW]、部品供給動作停止中の各モータ21,22の消費電力をそれぞれ600[mW]とすると、フィーダ14の1
台当たり、部品供給動作停止中でも合計1800[mW]の電力を消費する。部品実装機11に搭載した多数のフィーダ14のうち、N台のフィーダ14への電源供給をオフすれば、合計1800×N[mW]の電力消費を節約することができ、大きな節電効果を得ることができる。
 以上説明した本実施例のフィーダ14の電源オン/オフ制御は、部品実装機11の制御部30によって図4のフィーダ電源オン/オフ制御プログラムに従って次のようにして実行される。図4のフィーダ電源オン/オフ制御プログラムは、部品実装機11に搭載されたフィーダ14毎に、所定周期で繰り返し実行され、特許請求の範囲でいう電源制御手段としての役割を果たす。
 本プログラムが起動されると、まず、ステップ101で、フィーダ14が供給する部品のサイズが所定値よりも大きいか否かを判定し、所定値以下と判定されれば、ステップ106に進み、該フィーダ14の電源スイッチ31をオン状態に維持して本プログラムを終了する。
 これに対し、上記ステップ101で、フィーダ14が供給する部品のサイズが所定値よりも大きいと判定されれば、ステップ102に進み、次のフィーダ待機期間が電源再投入後動作準備時間T(又はそれよりも若干長い時間)よりも長いか否かを判定し、該フィーダ待機期間が電源再投入後動作準備時間T(又はそれよりも若干長い時間)よりも短いと判定されれば、ステップ106に進み、該フィーダ14の電源スイッチ31をオン状態に維持又は切り換えて、本プログラムを終了する。
 上記ステップ102で、次のフィーダ待機期間が電源再投入後動作準備時間T(又はそれよりも若干長い時間)よりも長いと判定されれば、ステップ103に進み、現時刻がフィーダ待機期間内であるか否かを判定し、フィーダ待機期間内でないと判定されれば、ステップ106に進み、該フィーダ14の電源スイッチ31をオン状態に維持又は切り換えて、本プログラムを終了する。
 上記ステップ103で、現時刻がフィーダ待機期間内であると判定されれば、ステップ104に進み、現時刻が該フィーダ待機期間終了時より電源再投入後動作準備時間T(又はそれよりも若干長い時間)以上前であるか否かを判定する。その結果、現時刻が該フィーダ待機期間終了時より電源再投入後動作準備時間T(又はそれよりも若干長い時間)以上前であると判定されれば、ステップ105に進み、該フィーダ14の電源スイッチ31をオフ状態に維持又は切り換えて、本プログラムを終了する。
 その後、現時刻が該フィーダ待機期間終了時より電源再投入後動作準備時間T(又はそれよりも若干長い時間)前のタイミングに到達した時点で、上記ステップ104で「No」と判定されて、ステップ106に進み、該フィーダ14の電源スイッチ31をオン状態に維持又は切り換えて、本プログラムを終了する。
 以上説明した本実施例によれば、フィーダ待機期間が電源再投入後動作準備時間T(又はそれよりも若干長い時間)を越えるフィーダ14については、該フィーダ待機期間の開始時にフィーダ14への電源供給をオフし、その後、該フィーダ待機期間の終了時よりも電源再投入後動作準備時間T(又はそれよりも若干長い時間)だけ前出ししたタイミングでフィーダ14に電源を再投入するようにしたので、フィーダ待機期間中にフィーダ14への電源供給をオフして、節電効果を大きくできると共に、フィーダ14の制御部23の発熱を無くすことができて、フィーダ14周辺の空気の乾燥を抑えて静電気の発生を抑制することが可能となり、静電気対策のコストを低減できる。更に、フィーダ待機期間の終了時よりも電源再投入後動作準備時間T(又はそれよりも若干長い時間)だけ前出しした
タイミングでフィーダ14に電源を再投入するため、フィーダ待機期間の終了後に直ちに部品供給動作を開始することが可能となり、生産ジョブで指定したタイミングで部品の供給・吸着・実装を実行でき、生産性を低下させずに済む。
 尚、本実施例の部品実装機11は、コンベア13の両側にそれぞれ多数のフィーダ14を配列した構成としたが、コンベア13の片側のみに多数のフィーダ14を配列した構成としても良い。
 また、部品実装機11に搭載する複数のフィーダ14は、テープフィーダのみに限定されず、部品実装機11に搭載する複数のフィーダ14の一部又は全部を、テープフィーダ以外のフィーダ(例えばバルクフィーダ、スティックフィーダ、トレイフィーダ等)に変更しても良い。
 その他、本発明は、部品実装機11の構成を適宜変更しても良い等、要旨を逸脱しない範囲内で種々変更して実施できることは言うまでもない。
 11…部品実装機、12…回路基板、13…コンベア、14…フィーダ、18…装着ヘッド、21…スプロケット駆動用モータ、22…カバーテープ巻取り用モータ、23…フィーダの制御部、25,26…コネクタ、27…電源線、28…信号線、30…部品実装機の制御部(電源制御手段,フィーダID確認手段)、31…電源スイッチ(電源スイッチ手段)

Claims (2)

  1.  複数のフィーダを搭載した部品実装機において、
     前記複数のフィーダへの電源供給をフィーダ毎にオン/オフする複数の電源スイッチ手段と、
     前記各電源スイッチ手段のオン後に前記各フィーダの制御部との間で通信して各フィー
    ダの識別情報(以下「フィーダID」という)を確認するフィーダID確認手段と、
     前記各電源スイッチ手段のオン/オフを制御する電源制御手段と、
     前記複数のフィーダから供給される部品を回路基板に実装する生産ジョブに基づいて該生産ジョブの実行中に各フィーダの部品供給動作を停止して待機する期間(以下「フィーダ待機期間」という)を判定するフィーダ待機期間判定手段とを備え、
     前記電源制御手段は、前記複数のフィーダのうち、前記フィーダ待機期間が少なくとも電源再投入後のフィーダの制御部の立上がり及び前記フィーダIDの確認に要する時間(以下「電源再投入後動作準備時間」という)を越えるフィーダについては、該フィーダ待機期間の開始時に前記電源スイッチ手段をオフし、該フィーダ待機期間の終了時よりも少なくとも前記電源再投入後動作準備時間だけ前出ししたタイミングで該電源スイッチ手段をオンすることを特徴とする部品実装機。
  2.  前記電源制御手段は、前記各フィーダから供給される部品のサイズ又は該サイズに関連する情報を取得し、所定値以下のサイズの部品を供給するフィーダについては、前記フィーダ待機期間中に前記電源スイッチ手段をオフすることなくオン状態に維持することを特徴とする請求項1に記載の部品実装機。
PCT/JP2012/056282 2012-03-12 2012-03-12 部品実装機 WO2013136414A1 (ja)

Priority Applications (4)

Application Number Priority Date Filing Date Title
CN201280071352.5A CN104170542B (zh) 2012-03-12 2012-03-12 元件安装机
EP12871124.9A EP2827694B1 (en) 2012-03-12 2012-03-12 Component mounting device
PCT/JP2012/056282 WO2013136414A1 (ja) 2012-03-12 2012-03-12 部品実装機
JP2014504488A JP5758540B2 (ja) 2012-03-12 2012-03-12 部品実装機

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2012/056282 WO2013136414A1 (ja) 2012-03-12 2012-03-12 部品実装機

Publications (1)

Publication Number Publication Date
WO2013136414A1 true WO2013136414A1 (ja) 2013-09-19

Family

ID=49160385

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2012/056282 WO2013136414A1 (ja) 2012-03-12 2012-03-12 部品実装機

Country Status (4)

Country Link
EP (1) EP2827694B1 (ja)
JP (1) JP5758540B2 (ja)
CN (1) CN104170542B (ja)
WO (1) WO2013136414A1 (ja)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016006084A1 (ja) * 2014-07-10 2016-01-14 富士機械製造株式会社 部品実装機
WO2017094192A1 (ja) * 2015-12-04 2017-06-08 富士機械製造株式会社 フィーダ制御装置および制御方法ならびに部品供給装置
JP2018014364A (ja) * 2016-07-19 2018-01-25 Juki株式会社 電子部品供給装置、電子部品実装装置、及び電子部品供給装置の制御方法
WO2018225170A1 (ja) * 2017-06-07 2018-12-13 株式会社Fuji 部品装着機

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017072889A1 (ja) * 2015-10-28 2017-05-04 富士機械製造株式会社 フィーダのトレースログ保存システム
EP3410833B1 (en) * 2016-01-25 2020-12-16 Fuji Corporation Component mounting apparatus
JP7486141B2 (ja) * 2019-03-28 2024-05-17 パナソニックIpマネジメント株式会社 部品供給システムおよび部品供給装置

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004311688A (ja) * 2003-04-07 2004-11-04 Yamagata Casio Co Ltd 電子部品供給装置におけるテープ式部品供給装置及びその電気配線接続方法
JP2007073791A (ja) * 2005-09-08 2007-03-22 Yamaha Motor Co Ltd テープフィーダー及び表面実装機
JP4777209B2 (ja) 2006-10-11 2011-09-21 Juki株式会社 部品供給装置
JP2011205021A (ja) * 2010-03-26 2011-10-13 Juki Corp 部品実装装置

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3841585B2 (ja) * 1999-04-21 2006-11-01 松下電器産業株式会社 電子部品実装機、及び該電子部品実装機にて実行される電力供給制御方法
JP3960054B2 (ja) * 2002-01-21 2007-08-15 松下電器産業株式会社 電子部品実装装置および電子部品の実装ヘッドユニット
JP4887456B2 (ja) * 2010-03-29 2012-02-29 パナソニック株式会社 生産システムの電力供給制御方法、および生産システム

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004311688A (ja) * 2003-04-07 2004-11-04 Yamagata Casio Co Ltd 電子部品供給装置におけるテープ式部品供給装置及びその電気配線接続方法
JP2007073791A (ja) * 2005-09-08 2007-03-22 Yamaha Motor Co Ltd テープフィーダー及び表面実装機
JP4777209B2 (ja) 2006-10-11 2011-09-21 Juki株式会社 部品供給装置
JP2011205021A (ja) * 2010-03-26 2011-10-13 Juki Corp 部品実装装置

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016006084A1 (ja) * 2014-07-10 2016-01-14 富士機械製造株式会社 部品実装機
JPWO2016006084A1 (ja) * 2014-07-10 2017-06-01 富士機械製造株式会社 部品実装機
WO2017094192A1 (ja) * 2015-12-04 2017-06-08 富士機械製造株式会社 フィーダ制御装置および制御方法ならびに部品供給装置
JP2018014364A (ja) * 2016-07-19 2018-01-25 Juki株式会社 電子部品供給装置、電子部品実装装置、及び電子部品供給装置の制御方法
WO2018225170A1 (ja) * 2017-06-07 2018-12-13 株式会社Fuji 部品装着機
JPWO2018225170A1 (ja) * 2017-06-07 2020-05-21 株式会社Fuji 部品装着機

Also Published As

Publication number Publication date
JPWO2013136414A1 (ja) 2015-08-03
CN104170542B (zh) 2017-11-03
JP5758540B2 (ja) 2015-08-05
EP2827694A1 (en) 2015-01-21
EP2827694A4 (en) 2015-11-25
EP2827694B1 (en) 2019-04-24
CN104170542A (zh) 2014-11-26

Similar Documents

Publication Publication Date Title
JP5758540B2 (ja) 部品実装機
KR101489703B1 (ko) 전자 부품의 실장 방법, 및 표면 실장기
US10582651B2 (en) Component mounting machine
JP6067840B2 (ja) フィーダ電源制御装置及びその方法
JP6476196B2 (ja) メンテナンス案内システム及びメンテナンス案内方法
JP2010098016A (ja) 実装機およびヘッドユニットの駆動制御方法
JP6049741B2 (ja) フィーダ型部品供給装置
CN111886940B (zh) 对基板作业机的管理装置
JP4694516B2 (ja) 部品実装方法および表面実装機
JP2018029106A (ja) 段取ナビゲーション装置、部品実装システム、段取ナビゲーション方法、段取ナビゲーションプログラム
JP5102745B2 (ja) 部品実装方法および実装機
JP6353046B2 (ja) 給電装置
JP2008153292A (ja) 多連結モジュール型表面実装装置及び多連結型表面実装機システム
JP6204498B2 (ja) 電子部品装着機
JP6139948B2 (ja) 部品実装装置
US20220408623A1 (en) Component mounting machine
JP2004063940A (ja) 電子回路部品装着方法および電子回路部品装着システム
JP6793050B2 (ja) 表面実装機
JP2010097985A (ja) 表面実装装置の制御方法
JP2023184014A (ja) 部品実装機
JP6869734B2 (ja) 表面実装機、表面実装機のノズル交換プログラムおよび表面実装機のノズルの交換方法
JP6678057B2 (ja) 電子部品装着機
JP2012084631A (ja) 部品実装用装置および部品実装用装置における位置決め制御方法
JPWO2017130341A1 (ja) 生産ラインの電源管理システム
JP2006253616A (ja) 部品実装順序決定方法、部品実装方法及び部品実装機

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 12871124

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2014504488

Country of ref document: JP

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 2012871124

Country of ref document: EP

NENP Non-entry into the national phase

Ref country code: DE