WO2013042363A1 - 充電システム、サーバ装置、及び、サーバ装置のプログラム - Google Patents

充電システム、サーバ装置、及び、サーバ装置のプログラム Download PDF

Info

Publication number
WO2013042363A1
WO2013042363A1 PCT/JP2012/005975 JP2012005975W WO2013042363A1 WO 2013042363 A1 WO2013042363 A1 WO 2013042363A1 JP 2012005975 W JP2012005975 W JP 2012005975W WO 2013042363 A1 WO2013042363 A1 WO 2013042363A1
Authority
WO
WIPO (PCT)
Prior art keywords
charging
electric vehicle
power
demand
schedule
Prior art date
Application number
PCT/JP2012/005975
Other languages
English (en)
French (fr)
Inventor
泉 薄木
小川 剛
Original Assignee
パナソニック株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by パナソニック株式会社 filed Critical パナソニック株式会社
Priority to EP12833912.4A priority Critical patent/EP2759977A4/en
Priority to CN201280045532.6A priority patent/CN103814392B/zh
Publication of WO2013042363A1 publication Critical patent/WO2013042363A1/ja
Priority to US14/203,618 priority patent/US9387772B2/en

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/003Load forecast, e.g. methods or systems for forecasting future load demand
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/30Constructional details of charging stations
    • B60L53/305Communication interfaces
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/60Monitoring or controlling charging stations
    • B60L53/63Monitoring or controlling charging stations in response to network capacity
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/60Monitoring or controlling charging stations
    • B60L53/67Controlling two or more charging stations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/60Monitoring or controlling charging stations
    • B60L53/68Off-site monitoring or control, e.g. remote control
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/44Methods for charging or discharging
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/48Accumulators combined with arrangements for measuring, testing or indicating the condition of cells, e.g. the level or density of the electrolyte
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/0013Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries acting upon several batteries simultaneously or sequentially
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L2240/00Control parameters of input or output; Target parameters
    • B60L2240/60Navigation input
    • B60L2240/62Vehicle position
    • B60L2240/622Vehicle position by satellite navigation
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L2240/00Control parameters of input or output; Target parameters
    • B60L2240/70Interactions with external data bases, e.g. traffic centres
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L2240/00Control parameters of input or output; Target parameters
    • B60L2240/80Time limits
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L2250/00Driver interactions
    • B60L2250/10Driver interactions by alarm
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L2250/00Driver interactions
    • B60L2250/14Driver interactions by input of vehicle departure time
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L2260/00Operating Modes
    • B60L2260/40Control modes
    • B60L2260/46Control modes by self learning
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M2220/00Batteries for particular applications
    • H01M2220/20Batteries in motive systems, e.g. vehicle, ship, plane
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2310/00The network for supplying or distributing electric power characterised by its spatial reach or by the load
    • H02J2310/40The network being an on-board power network, i.e. within a vehicle
    • H02J2310/48The network being an on-board power network, i.e. within a vehicle for electric vehicles [EV] or hybrid vehicles [HEV]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/10Energy storage using batteries
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/70Energy storage systems for electromobility, e.g. batteries
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/7072Electromobility specific charging systems or methods for batteries, ultracapacitors, supercapacitors or double-layer capacitors
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/72Electric energy management in electromobility
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/12Electric charging stations
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/14Plug-in electric vehicles
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/16Information or communication technologies improving the operation of electric vehicles
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/12Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
    • Y04S10/126Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation the energy generation units being or involving electric vehicles [EV] or hybrid vehicles [HEV], i.e. power aggregation of EV or HEV, vehicle to grid arrangements [V2G]

Definitions

  • the present invention relates to a charging system, a server device, and a server device program for managing a charging operation performed on an electric vehicle.
  • Patent Document 1 is known as a charging system that efficiently charges an electric vehicle.
  • the electric power control apparatus in a house in Patent Document 1 receives information on charging of an in-vehicle battery transmitted from an electric vehicle before the electric vehicle arrives at a place where electric power is supplied to the electric vehicle.
  • the power control device determines a charging start time for the in-vehicle battery or the like based on the charging information so that charging to the in-vehicle battery or the like is completed by a predetermined time.
  • Patent Document 1 suppresses the power usage peak in the home. Therefore, the technique described in Patent Document 1 does not suppress power demand in units of areas managed by the power company.
  • this invention is proposed in view of the above-mentioned situation, and it aims at providing the charging system which can manage electric power per predetermined area, a server apparatus, and the program of a server apparatus. .
  • a charging system includes a server device capable of communicating with an electric vehicle driven by electric power stored in a rechargeable battery, and the server device capable of communicating with the charging device.
  • a charging system including a charging control device that controls charging of a battery, wherein the server device receives from the electric vehicle movement information of the electric vehicle and remaining information of a rechargeable battery in the electric vehicle.
  • a demand prediction unit that predicts demand power in a predetermined area based on the movement information and remaining amount information received by the communication unit, and the predetermined power based on the demand power in the predetermined area predicted by the demand prediction unit.
  • a schedule management unit for sending a charge schedule change request to a charge control device included in the area, wherein the charge control device sends a charge schedule sent from the server device. Depending on the module change request, and is characterized in that to change the schedule of the charging operation for the rechargeable battery provided in the electric vehicle.
  • the schedule management unit acquires the power consumption of the predetermined area, and the acquired power consumption and the demand The demand power in the predetermined area predicted by the prediction unit is compared to calculate the degree of coincidence, and the demand prediction unit moves the movement when the degree of coincidence calculated by the schedule management unit is lower than a predetermined value.
  • Demand power in a predetermined area is predicted again based on the information and remaining amount information, and the schedule management unit is charged in the predetermined area based on the demand power as a prediction result performed again by the demand prediction unit.
  • a charge schedule change request is sent to the control device.
  • the schedule management unit learns the generation process of the charging schedule change request in the predetermined area based on the degree of coincidence. It is characterized by doing.
  • a server device communicates between an electric vehicle driven by electric power stored in a rechargeable battery and a charge control device that controls charging of the rechargeable battery mounted on the electric vehicle. And a communication unit that receives the movement information of the electric vehicle and the remaining amount information of the rechargeable battery in the electric vehicle from the electric vehicle, and the movement information and the remaining amount information received by the communication unit. Based on the demand prediction unit that predicts the demand power in the predetermined area based on the demand, and based on the demand power in the predetermined area predicted by the demand prediction unit, a charge schedule change request is sent to the charge control device included in the predetermined area And a schedule management unit.
  • the program of the server apparatus which concerns on the 5th aspect of this invention is between the electric vehicle driven with the electric power accumulate
  • a communication unit that can communicate with the computer of the server device, the communication unit receiving movement information of the electric vehicle and remaining information of a rechargeable battery in the electric vehicle, the communication unit Based on the demand information of the predetermined area predicted by the demand prediction unit, the demand prediction unit predicting the demand power of the predetermined area including the destination included in the movement information based on the movement information and the remaining amount information received by
  • the charge control device included in the predetermined area is made to function as a schedule management unit that sends out a charge schedule change request.
  • FIG. 1 is a block diagram of a charging system shown as an embodiment of the present invention.
  • FIG. 2 is another block diagram of the charging system shown as the embodiment of the present invention.
  • FIG. 3 is a sequence diagram showing the operation of the charging system shown as the embodiment of the present invention.
  • the charging system shown as an embodiment of the present invention is configured, for example, as shown in FIG.
  • This charging system manages charging of electric power to an electric vehicle (electric vehicle).
  • the electric vehicle includes a rechargeable battery, a charging device that charges the rechargeable battery, a power conversion device that converts electric power stored in the rechargeable battery into power, and the like.
  • the electric vehicle travels by operating the drive mechanism with the power.
  • the charging system includes a plurality of in-vehicle devices 1a, 1b,..., A center server 2 as a server device, a power company server 3, and in-home systems 4a, 4b.
  • in-vehicle devices when in-vehicle devices are generically referred to, they are simply referred to as “in-vehicle device 1”.
  • home system 4 when referring to home systems in general, they are simply referred to as “home system 4”. For example, it is assumed that the user returns to the house using an electric vehicle such that the user of the in-vehicle device 1a and the home system 4a is Mr. A, and the user of the in-vehicle device 1b and the home system 4b is Mr. B. .
  • the home system 4 is provided for each house.
  • the in-home system 4 belongs to a predetermined power management area managed by the power company.
  • This predetermined power management area is a range in which the power company manages the power demand upper limit.
  • the in-home system 4 is requested to adjust the power consumption so as not to exceed the upper limit of the power management area to which the home system 4 belongs in accordance with the power demand of the power management area to which the home system 4 belongs.
  • the home system 4 can communicate with the center server 2.
  • the home system 4 can communicate with the in-vehicle device 1 via the center server 2.
  • the in-home system 4 performs an operation of monitoring the power usage status in the house and an operation of controlling the power usage status.
  • the home system 4 includes a broadband router 41, a controller 42, a control panel 43, and a charging stand 44 for an electric vehicle.
  • the broadband router 41 communicates with the center server 2.
  • the control panel 43 is composed of, for example, a touch panel.
  • the control panel 43 has a display interface for presenting various types of information to the user and an operation interface for accepting user operations.
  • the control panel 43 is also connected to a door phone or the like, and can perform various displays and operations.
  • control panel 43 displays a so-called “return notice” received from the center server 2 via the in-vehicle device 1.
  • This return notification includes the movement information and the remaining amount information transmitted from the electric vehicle on which the in-vehicle device 1 is mounted, and represents returning home on the electric vehicle at a later time.
  • control panel 43 displays the charge schedule change request for the charging station 44 transmitted from the center server 2.
  • the controller 42 controls the operation of the control panel 43 and the charging stand 44.
  • the controller 42 displays various information on the display interface of the control panel 43. Further, the controller 42 controls various electric devices in the house in accordance with operation instructions from the operation interface of the control panel 43.
  • the controller 42 causes the control panel 43 to display a charging schedule change request for the charging station 44 in response to a request from the center server 2. Thereafter, the controller 42 changes the charging schedule of the charging station 44 in response to an operation for accepting a request for changing the charging schedule of the charging station 44.
  • Such a controller 42 can communicate with the center server 2 as a server device via the broadband router 41 or the like.
  • the charging stand 44 functions as a charging control device that controls charging of the rechargeable battery mounted on the electric vehicle.
  • the charging stand 44 is connected to an electric vehicle on which the in-vehicle device 1 is mounted when charging a rechargeable battery provided in the electric vehicle.
  • the charging stand 44 starts charging the electric vehicle according to a preset charging schedule or according to a user operation.
  • the charging stand 44 charges the electric vehicle in response to a control signal supplied from the controller 42 and a user operation on an operation interface (not shown).
  • the charging station 44 is set with a charging schedule for the electric vehicle according to the control signal supplied from the controller 42.
  • a charging schedule for example, a charging start time, a total charging amount, a charging amount per unit time, a charging time, a charging end time, and the like are set.
  • the charging stand 44 automatically charges the electric vehicle according to the charging schedule.
  • the charging stand 44 changes the charging schedule according to the control signal supplied from the controller 42.
  • the charging stand 44 changes the charging schedule. Specifically, a request for changing the charging schedule that reduces the peak of power demand in a predetermined power management area is supplied. In response to this request, the charging station 44 changes the charging start time, the total charging amount, the charging amount per unit time, the charging time, the charging end time, and the like in response to the charging schedule change request.
  • the in-vehicle device 1 includes a GPS processing unit 11, a navigation function unit 12, and a communication unit 13, as shown in FIG.
  • the communication unit 13 includes a wireless communication circuit and the like, and communicates with the center server 2 via the Internet by wireless communication.
  • the communication unit 13 transmits a return notification including the movement information of the electric vehicle and the remaining amount information of the rechargeable battery in the electric vehicle to the center server 2.
  • the movement information of the electric vehicle includes a movement state and a movement destination indicating that the electric vehicle is moving or stopped.
  • the GPS processing unit 11 communicates with a GPS satellite and acquires its current position.
  • the navigation function unit 12 calculates a recommended route from the current position to the destination based on the current position acquired by the GPS processing unit 11, map data, and the set destination.
  • the navigation function unit 12 performs a display operation and an audio output operation for guiding the traveling direction of the electric vehicle according to the calculated recommended route and the current position.
  • the navigation function unit 12 receives the operation of the user of the electric vehicle and transmits a return notification. At this time, the navigation function part 12 produces
  • the method of transmitting movement information and remaining amount information from the electric vehicle to the center server 2 is not limited to the navigation function unit 12 and, of course, communication means such as a mobile phone or a personal computer may be used. It is.
  • the power company server 3 can communicate with the center server 2 via the Internet. The operation of the power company server 3 is controlled by a power company that supplies power to the home system 4.
  • the power company server 3 includes an area power management unit 31 and a communication unit 32.
  • the communication unit 32 communicates with the center server 2 via the Internet.
  • the area power management unit 31 acquires the upper limit power in a predetermined power management area. Moreover, the area power management part 31 may acquire the upper limit electric power which can be used for an electric vehicle among the usable electric power of a predetermined power management area.
  • the power company server 3 is connected to, for example, power transmission systems 5A,..., 5N that transmit power to each power management area.
  • the power transmission system 5A supplies power to a plurality of residential systems 4A included in the power management area A.
  • the power company server 3 acquires the supplied power supplied from each power transmission system 5 to the power management area.
  • the area power management unit 31 supplies the upper limit power of the power management area to the center server 2 communicating with the in-home system 4 included in the predetermined power management area.
  • the area power management unit 31 transmits the upper limit power of each power management area to the center server 2 every predetermined time, for example, every hour or every 30 minutes.
  • the center server 2 includes a demand prediction unit 21, a charging schedule management unit 22, and a communication unit 23.
  • the center server 2 is a computer including a storage unit, a communication I / F circuit, a CPU, and a program, and the CPU executes the program. Thereby, the program of the center server 2 executes a procedure for making a request for changing the charging schedule as will be described later.
  • the communication unit 23 communicates with the in-vehicle device 1, the power company server 3, and the home system 4.
  • the communication unit 23 receives the movement information as a return notification transmitted from the in-vehicle device 1.
  • the center server 2 acquires the movement information of the electric vehicle and the remaining amount information of the rechargeable battery in the electric vehicle.
  • the communication unit 23 acquires a power upper limit notification for each power management area from the power company server 3.
  • the demand prediction unit 21 predicts demand power in a predetermined power management area including a destination included in the movement information based on movement information including movement information of the electric vehicle and remaining battery charge information in the electric vehicle. To do.
  • the demand prediction unit 21 aggregates movement information for each power management area from the plurality of in-vehicle devices 1 and estimates a time zone in which the rechargeable battery of the electric vehicle is charged in the power management area.
  • the demand prediction unit 21 predicts demand power in the power management area at predetermined time intervals such as every hour.
  • the charging schedule management unit 22 sends out a charging schedule change request to the charging station 44 included in the power management area based on the demand power for each power management area predicted by the demand prediction unit 21.
  • the charging schedule management unit 22 compares the power upper limit notification transmitted from the power company server 3 for each power management area with the demand power predicted by the demand prediction unit 21.
  • the charging schedule management unit 22 generates a charging schedule change request based on a comparison result between the power upper limit notification and the predicted power demand. For example, if the predicted demand power reaches 80% of the upper limit power, a request for changing the charging schedule is generated to refrain from charging the electric vehicle during the time period.
  • the charge schedule management unit 22 transmits the charge schedule change request to the home system 4.
  • the charging station 44 changes the charging operation schedule for the rechargeable battery provided in the electric vehicle according to the request for changing the charging schedule.
  • the home system 4 causes the controller 42 to display a charge schedule change request on the control panel 43.
  • the controller 42 transmits a charge schedule change request to the charging stand 44 when detecting an operation for accepting a change request to the control panel 43.
  • the charging stand 44 changes, for example, the charging start time, the charging amount per unit time, the charging time, and the like.
  • the demand prediction and the charging schedule management are performed by the center server 2, but the processing may be performed by the power company server 3 or may be performed by another server.
  • a power upper limit notification S1 of a power management area to which a home system 4 with which the center server 2 can communicate is supplied from the power company server 3 to the center server 2.
  • the power upper limit notification S1 is transmitted to the center server 2 every predetermined time.
  • the in-vehicle device 1 When the in-vehicle device 1 is operated when the user returns home (step ST1), the in-vehicle device 1 transmits a return notification S2 to the center server 2.
  • the return notification S2 includes movement information, remaining battery charge information, and the like. Thereafter, the in-vehicle device 1 transmits the movement information S3 every time the electric vehicle moves or every predetermined time.
  • the center server 2 When the center server 2 receives the return notification S2, the center server 2 transmits the return notification S2 to the home system 4 corresponding to the electric vehicle. At this time, the center server 2 transmits a return notification S2 to the address of the home system 4 registered in advance corresponding to the ID information included in the return notification S2.
  • the home system 4 When the home system 4 receives the return notification S2, the home system 4 displays the position of the electric vehicle, the expected home time, and the like on the control panel 43.
  • the center server 2 creates a charging schedule for the charging station 44 in each in-home system 4 based on the return notification S2 and the movement information S3 transmitted after the return notification S2. At this time, the center server 2 creates a charging schedule for each in-home system 4 according to the charging start time based on the return home time of the electric vehicle and the charging amount based on the remaining amount information (step ST2). The charging schedule S4 created by the center server 2 is transmitted to each home system 4.
  • the home system 4 Upon receipt of the charging schedule S4, the home system 4 displays the charging schedule on the control panel 43 and sets the charging schedule in the charging stand 44. Thereby, the charging stand 44 is reserved to start charging from the charging start time specified in the charging schedule. After setting the charging schedule, the in-home system 4 acquires the charging performance of the charging station 44 and transmits a charging performance notification S5 to the center server 2 every predetermined time.
  • the center server 2 receives a power upper limit notification S1 from the power company server 3, a return notification S2 and movement information S3 from the in-vehicle device 1, and a charging performance notification S5 from the home system 4.
  • the center server 2 performs demand prediction of each power management area by the demand prediction unit 21 based on the return notification S2 and the movement information S3.
  • the center server 2 determines whether or not the power demand in each power management area obtained by the demand prediction needs to be changed in the charging schedule in view of the power upper limit of the power management area (step ST4).
  • the center server 2 acquires the power consumption of the power management area through the power company server 3 by the charging schedule management unit 22.
  • the center server 2 compares the acquired power consumption with the demand power in the power management area predicted by the demand prediction unit 21 and calculates the degree of coincidence.
  • the return time of the electric vehicle may fluctuate due to traffic jams or user convenience.
  • the power demand is predicted to be charged in the home system 4 based on the remaining amount information and the movement information included in the return notification S2.
  • the demand prediction unit 21 performs prediction of demand power in the power management area again based on the return notification S2 and the movement information S3. Then, the charging schedule management unit 22 sends out a charging schedule change request to the charging station 44 included in the power management area based on the demand power as a prediction result performed again by the demand prediction unit 21. This charge schedule change request is transmitted to the home system 4 as a charge schedule notification S6.
  • the home system 4 learns the charging schedule change request generation processing in the power management area based on the degree of coincidence by the charging schedule management unit 22. For example, in the case of a user who gets home late, the charging schedule is shifted late. In addition, when there is a large amount of traffic depending on the power management area and traffic congestion is likely to occur, the charging start time is delayed in the power management area. Therefore, the charging schedule management unit 22 can learn the charging pattern in the power management area and adjust the return time. Furthermore, it is desirable that the center server 2 registers an electric vehicle that goes out for power demand prediction in the power management area. By learning the charging schedule generation process, it is possible to plan a charging schedule with improved accuracy.
  • the charging schedule management unit 22 changes the charging start time, the charging amount per unit time, the charging time, etc. of each in-home system 4 so as to suppress or shift (move) the peak of power demand in each power management area. To do.
  • the home system 4 Upon receipt of the charging schedule notification S6, the home system 4 notifies the control panel 43 of an alarm by displaying or emitting sound. The home system 4 changes the charging schedule set in step ST3 (step ST6).
  • the home system 4 supplies a control signal S7 to the charging station 44.
  • the charging station 44 starts charging (step ST8).
  • the home system 4 supplies the charging result notification S ⁇ b> 8 to the center server 2.
  • the center server 2 When the center server 2 receives the charging result notification S8 from the home system 4, the center server 2 stores the charging result (step ST9).
  • the remaining charge of the rechargeable battery is included in the return notification transmitted from the in-vehicle device 1.
  • the center server 2 can predict the power demand required when the electric vehicle is charged in the home system 4 and can predict the power demand required for charging the electric vehicle for each power management area.
  • requirement of the charging schedule which suppresses the electric power demand of an electric power management area with respect to the electric power upper limit of the said electric power management area can be transmitted to the in-home system 4.
  • this charging system can avoid that an electric vehicle is charged all at once in the time-of-home time zone of an electric vehicle.
  • the power demand in the power management area can be re-predicted.
  • the charge schedule change request can be sent to the charging station 44 included in the power management area. Therefore, according to this charging system, when the demand prediction by the demand prediction unit 21 is not appropriate and the charging schedule needs to be changed, the home system 4 can be adjusted to update the charging schedule.
  • this charging system learning processing for generating a charging schedule change request in the power management area is learned based on the degree of coincidence of the power consumption in the actual power management area with the demand power predicted by the demand prediction unit 21. To do. Thereby, according to this charging system, the precision of a charging schedule can be improved.
  • the above-described charging system prevents the charging operation of the rechargeable battery of the electric vehicle even though the user returns home by transmitting a request to change the charging schedule from the center server 2 to the in-home system 4. . Therefore, this charging system can support a business form in which a benefit is provided to the home system 4 based on the charge performance notification by transmitting the charge performance notification from the home system 4 to the center server 2. .
  • the benefits for the home system 4 include, for example, information such as discounts on electricity charges.
  • the center server 2 determines that the charging operation by the home system 4 has been changed by the charge schedule change request based on the charging performance notification of the home system 4. In this case, the center server 2 supplies the information to that effect and the ID of the home system 4 to the power company server 3. Thereby, the electric power company server 3 can charge the electricity charge for the house corresponding to the ID of the home system 4 by discounting the electricity charge related to the ID of the home system 4.
  • the power demand in the predetermined area can be predicted by the server device, and the power can be managed in units of the predetermined area.
  • In-vehicle device 1 In-vehicle device 2 Center server (server device) 12 Navigation function part 21 Demand prediction part 22 Charge schedule management part (schedule management part) 31 Area Power Management Unit 42 Controller (Charge Control Device)

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Transportation (AREA)
  • Mechanical Engineering (AREA)
  • Business, Economics & Management (AREA)
  • Economics (AREA)
  • Manufacturing & Machinery (AREA)
  • General Chemical & Material Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Electrochemistry (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Chemical & Material Sciences (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Development Economics (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Electric Propulsion And Braking For Vehicles (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Secondary Cells (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

 電動車両との間で通信可能なセンタサーバ2、充電スタンド44とを有する充電システムであって、センタサーバ2は、電動車両の移動情報と充電池の残量情報とを電動車両から受信し、所定エリアの需要電力を予測し、当該所定エリアに含まれる充電制御装置に充電スケジュール変更要求を送出する。充電スタンド44は、充電スケジュール変更要求に応じて、電動車両に備えられた充電池に対する充電動作のスケジュールを変更する。

Description

充電システム、サーバ装置、及び、サーバ装置のプログラム
 本発明は、電動車両に対して行う充電動作を管理する充電システム、サーバ装置、及び、サーバ装置のプログラムに関する。
 電動車両への充電を効率よく行う充電システムとしては、下記の特許文献1などが知られている。
 この特許文献1における住宅内の電力制御装置は、電動車両に電力を供給する場所に電動車両が到着する前に、電動車両から送信された車載バッテリの充電に関する情報を受信する。この電力制御装置は、充電情報に基づいて、車載バッテリ等への充電が所定時刻までに完了するように車載バッテリ等への充電開始時刻を決定する。
 上述した特許文献1に記載された技術では、家庭内での電力使用ピークを抑制するものである。したがって、この特許文献1に記載された技術では、電力会社が管理しているエリア単位で電力需要を抑制するものではなかった。
 そこで、本発明は、上述した実情に鑑みて提案されたものであり、所定エリア単位で電力を管理することができる充電システム、サーバ装置、及び、サーバ装置のプログラムを提供することを目的とする。
国際公開第2011/007573号
 本発明の第1の態様に係る充電システムは、充電池に蓄積された電力によって駆動する電動車両との間で通信可能なサーバ装置と、前記サーバ装置との間で通信可能であって前記充電池に対する充電を制御する充電制御装置とを有する充電システムであって、前記サーバ装置は、前記電動車両の移動情報と当該電動車両における充電池の残量情報とを前記電動車両から受信する通信部と、前記通信部により受信された移動情報及び残量情報に基づいて所定エリアの需要電力を予測する需要予測部と、前記需要予測部により予測された所定エリアの需要電力に基づいて、当該所定エリアに含まれる充電制御装置に充電スケジュール変更要求を送出するスケジュール管理部とを有し、前記充電制御装置は、前記サーバ装置から送出された充電スケジュール変更要求に応じて、前記電動車両に備えられた充電池に対する充電動作のスケジュールを変更することを特徴とするものである。
 本発明の第2の態様に係る充電システムは、上記第1の態様の充電システムに対し、前記スケジュール管理部は、前記所定エリアの電力消費量を取得し、取得された電力消費量と前記需要予測部により予測された当該所定エリアにおける需要電力とを比較して一致度を算出し、前記需要予測部は、前記スケジュール管理部により算出された一致度が所定値よりも低い場合に、前記移動情報及び残量情報に基づく所定エリアにおける需要電力の予測を再度行い、前記スケジュール管理部は、前記需要予測部より再度行われた予測結果としての需要電力に基づいて、当該所定エリアに含まれる充電制御装置に充電スケジュール変更要求を送出することを特徴とする。
 本発明の第3の態様に係る充電システムは、上記第2の態様の充電システムに対し、前記スケジュール管理部は、前記一致度に基づいて、前記所定エリアにおける充電スケジュール変更要求の生成処理を学習することを特徴とする。
 本発明の第4の態様に係るサーバ装置は、充電池に蓄積された電力によって駆動する電動車両、及び、前記電動車両に搭載された充電池に対する充電を制御する充電制御装置との間で通信可能なサーバ装置であって、前記電動車両の移動情報と当該電動車両における充電池の残量情報とを前記電動車両から受信する通信部と、前記通信部により受信された移動情報及び残量情報に基づいて所定エリアの需要電力を予測する需要予測部と、前記需要予測部により予測された所定エリアの需要電力に基づいて、当該所定エリアに含まれる充電制御装置に充電スケジュール変更要求を送出するスケジュール管理部とを有することを特徴とする。
 本発明の第5の態様に係るサーバ装置のプログラムは、充電池に蓄積された電力によって駆動する電動車両、及び、前記電動車両に搭載された充電池に対する充電を制御する充電制御装置との間で通信可能なサーバ装置のプログラムであって、前記サーバ装置のコンピュータを、前記電動車両の移動情報と当該電動車両における充電池の残量情報とを前記電動車両から受信する通信部、前記通信部により受信された移動情報及び残量情報に基づいて当該移動情報に含まれる移動先を含む所定エリアの需要電力を予測する需要予測部、前記需要予測部により予測された所定エリアの需要電力に基づいて、当該所定エリアに含まれる充電制御装置に充電スケジュール変更要求を送出するスケジュール管理部として機能させることを特徴とする。
図1は、本発明の実施形態として示す充電システムのブロック図である。 図2は、本発明の実施形態として示す充電システムの他のブロック図である。 図3は、本発明の実施形態として示す充電システムの動作を示すシーケンス図である。
 以下、本発明の実施の形態について図面を参照して説明する。
 本発明の実施形態として示す充電システムは、例えば図1に示すように構成されている。この充電システムは、電動車両(電気自動車)に対する電力の充電を管理するものである。この充電システムにおいて、電動車両は、充電池、充電池に充電を行う充電装置、充電池に蓄積された電力を動力に変換する動力変換装置等を備える。この電動車両は、当該動力によって駆動機構を動作させて、走行する。
 充電システムは、複数の車載装置1a,1b・・・と、サーバ装置としてのセンタサーバ2と、電力会社サーバ3と、宅内システム4a,4b・・・とを含む。以下、車載装置を総称する場合には単に「車載装置1」と呼ぶ。また、宅内システムを総称する場合には単に「宅内システム4」と呼ぶ。例えば、車載装置1a及び宅内システム4aのユーザがAさんであり、車載装置1b及び宅内システム4bのユーザがBさんというように、ユーザが電動車両を利用して住宅に帰ることを想定している。
 この充電システムにおいて、宅内システム4は、住宅ごとに設けられる。宅内システム4は、電力会社が管理する所定の電力管理エリアに属する。この所定の電力管理エリアは、電力会社が電力需要上限を管理する範囲である。宅内システム4は、後述するように、自身が属する電力管理エリアの電力需要に応じて、自身が属する電力管理エリアの上限を超えないように消費電力を調整するよう要求される。
 宅内システム4は、センタサーバ2と通信可能となっている。また、宅内システム4は、センタサーバ2を介して車載装置1との間で通信が可能となっている。宅内システム4は、住宅内における電力の使用状況を監視する動作や、電力の使用状況を制御する動作を行う。
 宅内システム4は、ブロードバンドルータ41、コントローラ42、コントロールパネル43、及び、電気自動車用の充電スタンド44を有する。
 ブロードバンドルータ41は、センタサーバ2との間で通信を行う。
 コントロールパネル43は、例えばタッチパネル等からなる。コントロールパネル43は、ユーザに各種情報を提示する表示インタフェースや、ユーザの操作を受け付ける操作インタフェースを有している。このコントロールパネル43は、ドアホン等にも接続され、各種の表示、操作が可能である。
 特に、このコントロールパネル43は、車載装置1を介してセンタサーバ2から受信した所謂「帰る通知」を表示させる。この帰る通知は、車載装置1を搭載した電動車両から送信された移動情報及び残量情報を含み、以降の時間において電動車両に乗って帰宅することを表す。また、コントロールパネル43は、センタサーバ2から送信された充電スタンド44の充電スケジュール変更要求を表示させる。
 コントローラ42は、コントロールパネル43及び充電スタンド44の動作を制御する。コントローラ42は、コントロールパネル43の表示インタフェースに対して各種情報を表示させる。また、コントローラ42は、コントロールパネル43の操作インタフェースからの操作指示に応じて、宅内における各種電気機器を制御する。
 特に、コントローラ42は、センタサーバ2からの要求に応じて充電スタンド44の充電スケジュール変更要求をコントロールパネル43に表示させる。その後、コントローラ42は、充電スタンド44の充電スケジュール変更要求を受け付ける操作がされたことに応じて、充電スタンド44の充電スケジュールを変更する。
 このようなコントローラ42は、ブロードバンドルータ41等を介してサーバ装置としてのセンタサーバ2との間で通信可能である。充電スタンド44は、電動車両に搭載された充電池に対する充電を制御する充電制御装置として機能する。
 充電スタンド44は、電動車両に備えられた充電池の充電時に、車載装置1が搭載された電動車両が接続される。充電スタンド44は、予め設定された充電スケジュールに従って、又は、ユーザの操作に従って、電動車両に対する充電を開始する。充電スタンド44は、コントローラ42から供給された制御信号や、図示しない操作インタフェースに対するユーザの操作に応じて、電動車両に対する充電を行う。
 特に、充電スタンド44は、コントローラ42から供給された制御信号に応じて、電動車両に対する充電スケジュールが設定される。この充電スケジュールは、例えば、充電開始時刻、全充電量、単位時間当たりの充電量、充電時間、充電終了時刻等が設定される。充電スタンド44は、充電スケジュールが設定された場合、当該充電スケジュールに従って、自動的に電動車両に対する充電を行う。
 また、充電スタンド44は、コントローラ42から供給された制御信号に従って、充電スケジュールの変更を行う。充電スタンド44は、充電スケジュールを変更する。具体的には、所定の電力管理エリアにおける電力需要のピークを低減するような充電スケジュールの変更要求が供給される。この要求に応じ、充電スタンド44は、当該充電スケジュールの変更要求に応じて、充電開始時刻、全充電量、単位時間当たりの充電量、充電時間、充電終了時刻等を変更する。
 車載装置1は、図2に示すように、GPS処理部11、ナビゲーション機能部12、通信部13を有する。
 通信部13は、無線通信回路等を有し、無線通信によってインターネットを介してセンタサーバ2と通信を行う。通信部13は、電動車両の移動情報と当該電動車両における充電池の残量情報とを含む帰る通知をセンタサーバ2に送信する。電動車両の移動情報は、移動中や停止中であることを示す移動状態、移動先等を含む。
 GPS処理部11は、GPS衛星と通信を行って、自己の現在位置を取得する。
 ナビゲーション機能部12は、GPS処理部11により取得された現在位置、地図データ、及び、設定された目的地等に基づいて、現在位置から目的地までの推奨経路を演算する。ナビゲーション機能部12は、演算された推奨経路及び現在位置に従って、電動車両の進行方向を案内する表示動作及び音声出力動作を行う。
 ナビゲーション機能部12は、電動車両のユーザの操作を受け付けて、帰る通知を送信する。このとき、ナビゲーション機能部12は、電動車両の移動先としての自宅と、当該電動車両における充電池の残量情報とを含む移動情報を生成する。また、ナビゲーション機能部12は、帰る通知に、電動車両の現在位置、現在位置から自宅までの距離、自宅への到着予想時間を含めてもよい。
 なお、電動車両からセンタサーバ2に対して移動情報や残量情報を送信する手法としては、ナビゲーション機能部12に限らず、携帯電話やパーソナルコンピュータ等の通信手段を利用してもよいことは勿論である。
 電力会社サーバ3は、センタサーバ2との間でインターネットを介した通信が可能となっている。電力会社サーバ3は、宅内システム4に電力を供給する電力会社によって、その動作が制御される。電力会社サーバ3は、エリア電力管理部31と、通信部32とを有する。
 通信部32は、センタサーバ2との間でインターネットを介して通信を行う。
 エリア電力管理部31は、所定の電力管理エリアにおける上限電力を取得する。また、エリア電力管理部31は、所定の電力管理エリアの使用可能電力のうち、電動車両に使用可能な上限電力を取得してもよい。電力会社サーバ3は、例えば各電力管理エリアに対して送電を行う送電システム5A,・・・,5Nと接続されている。例えば送電システム5Aは、電力管理エリアAに含まれる複数の住宅の宅内システム4Aに対して電力供給を行っている。電力会社サーバ3は、各送電システム5から電力管理エリアに供給している供給電力を取得する。エリア電力管理部31は、所定の電力管理エリアに含まれる宅内システム4と通信するセンタサーバ2に対して、当該電力管理エリアの上限電力を供給する。エリア電力管理部31は、例えば1時間単位や30分単位といったように、所定時間毎に各電力管理エリアの上限電力をセンタサーバ2に送信する。
 センタサーバ2は、需要予測部21、充電スケジュール管理部22、通信部23を有する。センタサーバ2は、記憶部や通信I/F回路、CPU及びプログラムを含むコンピュータであり、CPUがプログラムを実行する。これにより、センタサーバ2のプログラムは、後述するように充電スケジュールの変更要求をする手順を実行させる。
 通信部23は、車載装置1、電力会社サーバ3及び宅内システム4との間で通信を行う。通信部23は、車載装置1から送信された帰る通知としての移動情報を受信する。これによりセンタサーバ2は、電動車両の移動情報と、電動車両における充電池の残量情報を取得する。通信部23は、電力会社サーバ3から各電力管理エリアの電力上限通知を取得する。
 需要予測部21は、電動車両の移動情報と当該電動車両における充電池の残量情報とを含む移動情報に基づいて当該移動情報に含まれる移動先を含む所定の電力管理エリアの需要電力を予測する。需要予測部21は、複数の車載装置1から移動情報を電力管理エリアごとに集計し、当該電力管理エリアにおいて電動車両の充電池が充電される時間帯を推定する。需要予測部21は、例えば1時間ごとといった所定の時間間隔ごとに電力管理エリアの需要電力を予測する。
 充電スケジュール管理部22は、需要予測部21により予測された電力管理エリアごとの需要電力に基づいて、当該電力管理エリアに含まれる充電スタンド44に充電スケジュール変更要求を送出する。このとき、充電スケジュール管理部22は、各電力管理エリアについて電力会社サーバ3から送信された電力上限通知と需要予測部21により予測された需要電力とを比較する。充電スケジュール管理部22は、電力上限通知と、予測された電力需要との比較結果に基づいて充電スケジュールの変更要求を生成する。例えば、予測された需要電力が上限電力の80%に達した場合、当該時間帯においては電動車両への充電動作を控える充電スケジュールの変更要求を生成する。充電スケジュール管理部22は、充電スケジュールの変更要求を生成した場合、当該充電スケジュールの変更要求を、宅内システム4に送信する。
 宅内システム4は、充電スケジュールの変更要求を受信すると、充電スタンド44によって、充電スケジュールの変更要求に応じて、電動車両に備えられた充電池に対する充電動作のスケジュールを変更する。このとき、宅内システム4は、コントローラ42によって充電スケジュール変更要求をコントロールパネル43に表示させる。コントローラ42は、コントロールパネル43に対する変更要求の受入操作を検出した場合に、充電スタンド44に充電スケジュール変更要求を送信する。この要求に応じて、充電スタンド44は、例えば、充電開始時刻、単位時間当たりの充電量、充電時間等を変更する。
 なお、本実施形態では、需要予測及び充電スケジュール管理をセンタサーバ2によって行ったが、当該処理を電力会社サーバ3によって行ってもよく、更に他のサーバによって行ってもよい。
 つぎに、上述したように構成された充電システムにおける動作について、図3を参照して説明する。
 この充電システムは、電力会社サーバ3からセンタサーバ2に対して、当該センタサーバ2が通信可能な宅内システム4が属する電力管理エリアの電力上限通知S1が供給される。この電力上限通知S1は、所定時間毎にセンタサーバ2に送信される。
 ユーザが自宅に帰るときに車載装置1が操作されると(ステップST1)、車載装置1は、帰る通知S2をセンタサーバ2に送信する。この帰る通知S2には、移動情報、充電池の残量情報等が含まれる。その後、車載装置1は、電動車両が移動するごと又は所定時間ごとに、移動情報S3を送信する。
 センタサーバ2は、帰る通知S2を受信すると、当該帰る通知S2を、電動車両に対応した宅内システム4に送信する。このとき、センタサーバ2は、帰る通知S2に含まれたID情報に対応して予め登録しておいた宅内システム4のアドレスに対して帰る通知S2を送信する。
 宅内システム4は、帰る通知S2を受信すると、コントロールパネル43に、電動車両の位置、帰宅予想時刻等を表示する。
 センタサーバ2は、帰る通知S2及び当該帰る通知S2後に送信された移動情報S3に基づいて、各宅内システム4における充電スタンド44の充電スケジュールを作成する。このとき、センタサーバ2は、電動車両の帰宅時刻に基づく充電開始時刻、残量情報に基づく充電量に従って、各宅内システム4の充電スケジュールを作成する(ステップST2)。センタサーバ2により作成された充電スケジュールS4は、各宅内システム4に送信される。
 宅内システム4は、充電スケジュールS4を受信すると、当該充電スケジュールをコントロールパネル43に表示させ、充電スタンド44に、当該充電スケジュールを設定する。これにより、充電スタンド44は、充電スケジュールで特定された充電開始時刻から充電を開始するよう予約される。充電スケジュールの設定以降、宅内システム4は、充電スタンド44の充電実績を取得し、所定時間毎に充電実績通知S5をセンタサーバ2に送信する。
 センタサーバ2は、電力会社サーバ3から電力上限通知S1、車載装置1からの帰る通知S2及び移動情報S3、及び、宅内システム4から充電実績通知S5を受信している。センタサーバ2は、需要予測部21によって、帰る通知S2及び移動情報S3に基づいて各電力管理エリアの需要予測を行っている。センタサーバ2は、需要予測によって得られた各電力管理エリアの電力需要が、当該電力管理エリアの電力上限からみて充電スケジュールの変更が必要かを判断する(ステップST4)。
 このとき、センタサーバ2は、充電スケジュール管理部22によって、電力管理エリアの電力消費量を、電力会社サーバ3を介して取得する。センタサーバ2は、取得された電力消費量と需要予測部21により予測された当該電力管理エリアにおける需要電力とを比較して一致度を算出する。例えば、電動車両の帰宅時刻が渋滞やユーザの都合によって変動する場合がある。この場合、帰る通知S2に含まれる残量情報及び移動情報に基づいて宅内システム4において充電されるという電力需要の予測がずれる。
 このため、需要予測部21は、充電スケジュール管理部22により評価された一致度が所定値よりも低い場合に、帰る通知S2及び移動情報S3に基づく電力管理エリアにおける需要電力の予測を再度行う。そして、充電スケジュール管理部22は、需要予測部21より再度行われた予測結果としての需要電力に基づいて、当該電力管理エリアに含まれる充電スタンド44に充電スケジュール変更要求を送出する。この充電スケジュール変更要求は、充電スケジュール通知S6として宅内システム4に送信される。
 また、宅内システム4は、充電スケジュール管理部22によって、一致度に基づいて、電力管理エリアにおける充電スケジュール変更要求の生成処理を学習することが望ましい。例えば、帰宅時間が遅くなるユーザの場合には、充電スケジュールを遅くシフトさせる。また、電力管理エリアによっては交通量が多く渋滞が発生しやすい場合、当該電力管理エリアでは、充電開始時刻が遅くなる。したがって、充電スケジュール管理部22は、電力管理エリアによって充電パターンを学習し、帰宅時間を調整できる。更に、センタサーバ2は、電力管理エリアにおける電力需要予測のために、遠出をする電動車両を登録しておくことが望ましい。この充電スケジュール生成処理の学習により、精度を高めた充電スケジュールを立案することができる。
 これにより、充電スケジュール管理部22は、各電力管理エリアの電力需要のピークを抑制又はシフト(移動)するよう、各宅内システム4の充電開始時刻、単位時間当たりの充電量、充電時間等を変更する。
 宅内システム4は、充電スケジュール通知S6を受信すると、コントロールパネル43に対して表示又は放音等をすることによって、アラーム通知する。また、宅内システム4は、ステップST3にて設定した充電スケジュールを変更する(ステップST6)。
 その後、宅内システム4は、充電開始時刻となったと判定した場合(ステップST7)、充電スタンド44に対して制御信号S7を供給する。この制御信号S7に応じて、充電スタンド44は、充電を開始する(ステップST8)。充電スタンド44が充電を開始したことに応じ、宅内システム4は、センタサーバ2に対して充電実績通知S8を供給する。
 センタサーバ2は、宅内システム4から充電実績通知S8を受信すると、当該充電実績を記憶する(ステップST9)。
 以上のように、この充電システムによれば、車載装置1から送信される帰る通知に充電池の残量を含める。これにより、センタサーバ2は、電動車両が宅内システム4にて充電を行うことによる電力需要を予測し、電力管理エリアごとに電動車両の充電に要する電力需要を予測できる。これにより、この充電システムによれば、当該電力管理エリアの電力上限に対して電力管理エリアの電力需要を抑制する充電スケジュールの変更要求を宅内システム4に送信できる。例えば、宅内システム4のユーザに、電動車両に対する充電を行う時間帯をずらす等の通知ができる。これにより、この充電システムは、電動車両の帰宅時間帯に一斉に電動車両が充電されることを回避できる。
 また、この充電システムによれば、実際の電力管理エリアにおける電力消費量が、需要予測部21により予測された需要電力と一致していない場合には、当該電力管理エリアの電力需要を再予測できる。そして、需要予測部21より再度行われた予測結果としての需要電力に基づいて、当該電力管理エリアに含まれる充電スタンド44に充電スケジュール変更要求を送出することができる。したがって、この充電システムによれば、需要予測部21による需要予測が妥当ではなく充電スケジュールの変更が必要な場合には、宅内システム4に対して充電スケジュールを更新するよう調整できる。
 更に、この充電システムによれば、実際の電力管理エリアにおける電力消費量が、需要予測部21により予測された需要電力と一致度に基づいて、電力管理エリアにおける充電スケジュール変更要求の生成処理を学習する。これにより、この充電システムによれば、充電スケジュールの精度を高めることができる。
 なお、上述の実施の形態は本発明の一例である。このため、本発明は、上述の実施形態に限定されることはなく、この実施の形態以外であっても、本発明に係る技術的思想を逸脱しない範囲であれば、設計等に応じて種々の変更が可能であることは勿論である。
 例えば、上述した充電システムは、センタサーバ2から宅内システム4に充電スケジュールの変更要求を送信することによって、ユーザが帰宅したにもかかわらず、電動車両の充電池への充電動作を妨げるものである。したがって、この充電システムは、宅内システム4からセンタサーバ2に充電実績通知を送信したことによって、当該充電実績通知に基づいて、宅内システム4に対して特典を提供するビジネス形態を支援することができる。この宅内システム4に対する特典とは、例えば、電気料金の割引等の情報が挙げられる。センタサーバ2は、宅内システム4の充電実績通知によって、宅内システム4よる充電動作が、充電スケジュールの変更要求によって変更されたことを判定する。この場合、センタサーバ2は、その旨の情報と宅内システム4のIDを電力会社サーバ3に供給する。これにより、電力会社サーバ3は、宅内システム4のIDに係る電気料金を割り引いて、宅内システム4のIDに対応した住宅に対する電気料金を請求できる。
 特願2011-204900号(出願日:2011年9月20日)の全内容は、ここに援用される。
 本発明の一態様によれば、電動車両から送信する情報に充電池の残量を含めるので、サーバ装置によって所定エリアにおける電力需要を予測でき、所定エリア単位で電力を管理することができる。
 1 車載装置
 2 センタサーバ(サーバ装置)
 12 ナビゲーション機能部
 21 需要予測部
 22 充電スケジュール管理部(スケジュール管理部)
 31 エリア電力管理部
 42 コントローラ(充電制御装置)

Claims (5)

  1.  充電池に蓄積された電力によって駆動する電動車両との間で通信可能なサーバ装置と、前記サーバ装置との間で通信可能であって前記充電池に対する充電を制御する充電制御装置とを有する充電システムであって、
     前記サーバ装置は、前記電動車両の移動情報と当該電動車両における充電池の残量情報とを前記電動車両から受信する通信部と、前記通信部により受信された移動情報及び残量情報に基づいて所定エリアの需要電力を予測する需要予測部と、前記需要予測部により予測された所定エリアの需要電力に基づいて、当該所定エリアに含まれる充電制御装置に充電スケジュール変更要求を送出するスケジュール管理部とを有し、
     前記充電制御装置は、前記サーバ装置から送出された充電スケジュール変更要求に応じて、前記電動車両に備えられた充電池に対する充電動作のスケジュールを変更すること
     を特徴とする充電システム。
  2.  前記スケジュール管理部は、前記所定エリアの電力消費量を取得し、取得された電力消費量と前記需要予測部により予測された当該所定エリアにおける需要電力とを比較して一致度を算出し、
     前記需要予測部は、前記スケジュール管理部により算出された一致度が所定値よりも低い場合に、前記移動情報及び残量情報に基づく所定エリアにおける需要電力の予測を再度行い、
     前記スケジュール管理部は、前記需要予測部より再度行われた予測結果としての需要電力に基づいて、当該所定エリアに含まれる充電制御装置に充電スケジュール変更要求を送出すること
     を特徴とする請求項1に記載の充電システム。
  3.  前記スケジュール管理部は、前記一致度に基づいて、前記所定エリアにおける充電スケジュール変更要求の生成処理を学習することを特徴とする請求項2に記載の充電システム。
  4.  充電池に蓄積された電力によって駆動する電動車両、及び、前記電動車両に搭載された充電池に対する充電を制御する充電制御装置との間で通信可能なサーバ装置であって、
     前記電動車両の移動情報と当該電動車両における充電池の残量情報とを前記電動車両から受信する通信部と、
     前記通信部により受信された移動情報及び残量情報に基づいて所定エリアの需要電力を予測する需要予測部と、
     前記需要予測部により予測された所定エリアの需要電力に基づいて、当該所定エリアに含まれる充電制御装置に充電スケジュール変更要求を送出するスケジュール管理部と
     を有することを特徴とするサーバ装置。
  5.  充電池に蓄積された電力によって駆動する電動車両、及び、前記電動車両に搭載された充電池に対する充電を制御する充電制御装置との間で通信可能なサーバ装置のプログラムであって、
     前記サーバ装置のコンピュータを、
     前記電動車両の移動情報と当該電動車両における充電池の残量情報とを前記電動車両から受信する通信部、
     前記通信部により受信された移動情報及び残量情報に基づいて当該移動情報に含まれる移動先を含む所定エリアの需要電力を予測する需要予測部、
     前記需要予測部により予測された所定エリアの需要電力に基づいて、当該所定エリアに含まれる充電制御装置に充電スケジュール変更要求を送出するスケジュール管理部
     として機能させることを特徴とするサーバ装置のプログラム。
PCT/JP2012/005975 2011-09-20 2012-09-20 充電システム、サーバ装置、及び、サーバ装置のプログラム WO2013042363A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
EP12833912.4A EP2759977A4 (en) 2011-09-20 2012-09-20 CHARGING SYSTEM, SERVER DEVICE AND SERVER DEVICE PROGRAM
CN201280045532.6A CN103814392B (zh) 2011-09-20 2012-09-20 充电系统、服务器装置以及服务器装置的程序
US14/203,618 US9387772B2 (en) 2011-09-20 2014-03-11 Charging system, server device, and program for server device

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2011-204900 2011-09-20
JP2011204900A JP5873986B2 (ja) 2011-09-20 2011-09-20 充電システム、サーバ装置、及び、サーバ装置のプログラム

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US14/203,618 Continuation US9387772B2 (en) 2011-09-20 2014-03-11 Charging system, server device, and program for server device

Publications (1)

Publication Number Publication Date
WO2013042363A1 true WO2013042363A1 (ja) 2013-03-28

Family

ID=47914151

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2012/005975 WO2013042363A1 (ja) 2011-09-20 2012-09-20 充電システム、サーバ装置、及び、サーバ装置のプログラム

Country Status (5)

Country Link
US (1) US9387772B2 (ja)
EP (1) EP2759977A4 (ja)
JP (1) JP5873986B2 (ja)
CN (1) CN103814392B (ja)
WO (1) WO2013042363A1 (ja)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014162648A1 (ja) * 2013-04-01 2014-10-09 三菱電機株式会社 充電スケジュールの変更方法、車両、充電制御装置、及び情報入出力装置
WO2015002092A1 (ja) * 2013-07-02 2015-01-08 株式会社 東芝 エネルギー管理サーバ、エネルギー管理方法およびプログラム
CN108808781A (zh) * 2018-06-22 2018-11-13 蔚来汽车有限公司 基于大数据的电动汽车预约充电方法和装置
JP2020119320A (ja) * 2019-01-24 2020-08-06 本田技研工業株式会社 充電管理装置、充電管理方法、および、プログラム
WO2023188357A1 (ja) * 2022-03-31 2023-10-05 日本電信電話株式会社 充電予約制御装置、充電予約制御方法、及びプログラム

Families Citing this family (30)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6081817B2 (ja) * 2013-02-26 2017-02-15 三菱重工業株式会社 車載器およびev管理システム
JP5623584B1 (ja) * 2013-04-19 2014-11-12 三菱電機株式会社 電動車両管理システム
JP2015022441A (ja) * 2013-07-17 2015-02-02 株式会社東芝 端末装置、車両管理情報生成方法および車両管理情報生成プログラム
CA2919318A1 (en) 2013-07-25 2015-01-29 Nissan Motor Co., Ltd. System for announcing predicted remaining amount of energy
WO2015016192A1 (ja) * 2013-07-31 2015-02-05 日本電気株式会社 電力需給調整システムおよび電力需給調整方法
EP2910404A1 (en) * 2014-02-25 2015-08-26 ABB Technology AG Self-managing charging poles
US20150294329A1 (en) * 2014-04-11 2015-10-15 Nissan North America, Inc. System and method of predicting usage of a charging station
KR101587581B1 (ko) * 2014-05-12 2016-01-26 한국전기연구원 수요반응형 전기자동차 교류 충전 방법 및 장치
US9789779B2 (en) 2014-08-25 2017-10-17 Toyota Jidosha Kabushiki Kaisha Regional charging control service
US10220719B2 (en) * 2014-11-17 2019-03-05 Siemens Industry, Inc. EVSE-based energy automation, management, and protection systems and methods
JP6495433B2 (ja) * 2015-02-25 2019-04-03 京セラ株式会社 電力制御システム、電力制御装置、及び電力制御方法
US11230204B2 (en) * 2016-03-29 2022-01-25 Kyocera Corporation Power management apparatus, power management system, and power management method
KR101916511B1 (ko) * 2016-05-16 2018-11-07 현대자동차주식회사 차량 시스템 및 차량 시스템의 배터리 충전 방법
CN108370167B (zh) * 2016-08-23 2021-11-05 柏思科技有限公司 用于将电力分配到多个负载的方法和系统
US9955428B1 (en) 2016-10-24 2018-04-24 International Business Machines Corporation Optimizing scheduled charging of battery enabled devices based on a predicted battery consumption factor for an area
US9955314B1 (en) * 2016-10-24 2018-04-24 International Business Machines Corporation Specifying a map of available locations for recharging battery enabled devices based on a schedule of predicted locations for a user
US9867017B1 (en) 2016-10-24 2018-01-09 International Business Machines Corporation Scheduling optimized charging of battery enabled devices based on battery usage impact factors and predicted usage received from multiple sources
US9955313B1 (en) 2016-10-24 2018-04-24 International Business Machines Corporation Scheduling optimized charging of battery enabled devices based on power usage impact data received from multiple sources
US10195956B2 (en) * 2017-06-02 2019-02-05 United Arab Emirates University Secure charging method for electric vehicles
JP6832254B2 (ja) * 2017-07-31 2021-02-24 Kddi株式会社 充電制御サーバ、充電制御システム及びプログラム
US10882411B2 (en) * 2018-01-18 2021-01-05 Ford Global Technologies, Llc Smart charging schedules for battery systems and associated methods for electrified vehicles
JP7040614B2 (ja) * 2018-06-18 2022-03-23 日産自動車株式会社 車両管理システム、車両管理コンピュータ、及び車両管理方法
CN108973739A (zh) * 2018-08-01 2018-12-11 芜湖雪影实业有限公司 一种充电控制站
US20200148073A1 (en) * 2018-11-13 2020-05-14 Ioan Sasu Battery quick-change process and system for electric vehicles
CN109552107A (zh) * 2018-12-03 2019-04-02 北京兴达智联科技有限公司 一种电动车智能换电系统及换电方法
US10937113B2 (en) * 2018-12-06 2021-03-02 GM Global Technology Operations LLC Energy resource pre-allocation and delivery based on demand
JP6892881B2 (ja) * 2019-01-17 2021-06-23 本田技研工業株式会社 制御装置及びプログラム
US11001161B2 (en) 2019-02-15 2021-05-11 Ford Global Technologies, Llc Electric vehicle charging scheduler
JP7413974B2 (ja) * 2020-10-22 2024-01-16 トヨタ自動車株式会社 充電管理装置、充電管理方法、及び移動体
JP7283459B2 (ja) * 2020-11-12 2023-05-30 トヨタ自動車株式会社 充電制御システム、充電制御装置および充電制御プログラム

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011007573A1 (ja) 2009-07-15 2011-01-20 パナソニック株式会社 電力制御システム、電力制御方法、電力制御装置及び電力制御プログラム

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20010051876A1 (en) * 2000-04-03 2001-12-13 Seigel Ronald E. System and method for personalizing, customizing and distributing geographically distinctive products and travel information over the internet
AU2003258018A1 (en) * 2002-08-02 2004-02-23 Limoq, Inc. Method, system and apparatus for providing transportation services
JP4786296B2 (ja) * 2005-10-27 2011-10-05 中国電力株式会社 電力負荷平準化システム
US7679336B2 (en) * 2007-02-27 2010-03-16 Ford Global Technologies, Llc Interactive battery charger for electric vehicle
US7693609B2 (en) * 2007-09-05 2010-04-06 Consolidated Edison Company Of New York, Inc. Hybrid vehicle recharging system and method of operation
JP2009171823A (ja) * 2007-12-21 2009-07-30 Nippon Telegr & Teleph Corp <Ntt> 電力供給制御システムとその制御方法
JP4713623B2 (ja) * 2008-09-25 2011-06-29 株式会社日立製作所 充放電管理装置
US20110016063A1 (en) * 2009-07-17 2011-01-20 Gridpoint, Inc. System and methods for smart charging techniques

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011007573A1 (ja) 2009-07-15 2011-01-20 パナソニック株式会社 電力制御システム、電力制御方法、電力制御装置及び電力制御プログラム

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP2759977A4

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014162648A1 (ja) * 2013-04-01 2014-10-09 三菱電機株式会社 充電スケジュールの変更方法、車両、充電制御装置、及び情報入出力装置
JP6038290B2 (ja) * 2013-04-01 2016-12-07 三菱電機株式会社 装置、充電制御装置、及び情報入出力装置
US9963042B2 (en) 2013-04-01 2018-05-08 Mitsubishi Electric Corporation Apparatus, charging control apparatus, and information input/output apparatus
WO2015002092A1 (ja) * 2013-07-02 2015-01-08 株式会社 東芝 エネルギー管理サーバ、エネルギー管理方法およびプログラム
JP2015012783A (ja) * 2013-07-02 2015-01-19 株式会社東芝 エネルギー管理サーバ、エネルギー管理方法およびプログラム
US9559549B2 (en) 2013-07-02 2017-01-31 Kabushiki Kaisha Toshiba Energy management server, energy management method, and program
CN108808781A (zh) * 2018-06-22 2018-11-13 蔚来汽车有限公司 基于大数据的电动汽车预约充电方法和装置
JP2020119320A (ja) * 2019-01-24 2020-08-06 本田技研工業株式会社 充電管理装置、充電管理方法、および、プログラム
WO2023188357A1 (ja) * 2022-03-31 2023-10-05 日本電信電話株式会社 充電予約制御装置、充電予約制御方法、及びプログラム

Also Published As

Publication number Publication date
US9387772B2 (en) 2016-07-12
US20140191722A1 (en) 2014-07-10
CN103814392B (zh) 2017-12-19
CN103814392A (zh) 2014-05-21
EP2759977A1 (en) 2014-07-30
JP2013065265A (ja) 2013-04-11
EP2759977A4 (en) 2015-01-28
JP5873986B2 (ja) 2016-03-01

Similar Documents

Publication Publication Date Title
WO2013042363A1 (ja) 充電システム、サーバ装置、及び、サーバ装置のプログラム
US10828996B2 (en) On-board unit and electric vehicle management system
US9744873B2 (en) Method and control device for charging a battery of a vehicle
JP4737307B2 (ja) プラグイン自動車の充電状況通知システム
JP5493510B2 (ja) 情報提供システム、情報センタ、車載装置及び情報提供方法
KR101768223B1 (ko) 전기차 충전 시스템 운영 방법, 서버 및 전기차의 단말
CN102916462B (zh) 电池充电系统和方法
US8390246B2 (en) Battery charge state transmission device and external charging system
JP5776017B2 (ja) 蓄電池充電計画支援システム
JP2019086842A (ja) 情報提供システム、サーバおよび情報提供方法
JPWO2012046269A1 (ja) 充電制御装置
JP2019101464A (ja) 移動体、配車システム、サーバ、及び移動体の配車方法
JP2014066713A (ja) 情報提供装置
WO2011121790A1 (ja) 検索装置、ナビゲーション装置、情報提供装置、検索方法、検索プログラムおよび記録媒体
WO2016020997A1 (ja) 情報提供システム、情報機器、および情報提供方法
KR101389353B1 (ko) 전기 자동차의 전력 관리 장치 및 방법
JP2019080369A (ja) 電力供給システム
JP6539903B2 (ja) Ev充電管理方法、ev充電管理システムおよび充電方法
JP2020134448A (ja) 充電施設案内システムおよび充電施設案内プログラム
JP2021189640A (ja) 情報処理装置、情報処理方法、およびプログラム
JP6278372B2 (ja) 電気自動車
JP2013038909A (ja) 電気機械を用いて駆動される自動車を動作させるための方法と装置
JP2020065396A (ja) 電気自動車を充電可能なホーム・エネルギー・マネジメント・システムにおけるドライビングデータ及びバッテリデータの送信方法
KR20210030135A (ko) 내비게이션 시스템 및 그의 서비스 센터 안내 방법
JP2020135614A (ja) 車両、情報処理装置、情報処理方法、及び、プログラム

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 12833912

Country of ref document: EP

Kind code of ref document: A1

REEP Request for entry into the european phase

Ref document number: 2012833912

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 2012833912

Country of ref document: EP

NENP Non-entry into the national phase

Ref country code: DE