WO2014162648A1 - 充電スケジュールの変更方法、車両、充電制御装置、及び情報入出力装置 - Google Patents

充電スケジュールの変更方法、車両、充電制御装置、及び情報入出力装置 Download PDF

Info

Publication number
WO2014162648A1
WO2014162648A1 PCT/JP2014/000748 JP2014000748W WO2014162648A1 WO 2014162648 A1 WO2014162648 A1 WO 2014162648A1 JP 2014000748 W JP2014000748 W JP 2014000748W WO 2014162648 A1 WO2014162648 A1 WO 2014162648A1
Authority
WO
WIPO (PCT)
Prior art keywords
charging
schedule
charge
vehicle
change
Prior art date
Application number
PCT/JP2014/000748
Other languages
English (en)
French (fr)
Inventor
雄治 五十嵐
幸夫 後藤
松永 隆徳
和司 白澤
Original Assignee
三菱電機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱電機株式会社 filed Critical 三菱電機株式会社
Priority to US14/780,980 priority Critical patent/US9963042B2/en
Priority to JP2015509873A priority patent/JP6038290B2/ja
Priority to DE112014001783.3T priority patent/DE112014001783B4/de
Priority to CN201480019919.3A priority patent/CN105075059B/zh
Publication of WO2014162648A1 publication Critical patent/WO2014162648A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/60Monitoring or controlling charging stations
    • B60L53/66Data transfer between charging stations and vehicles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/10Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles characterised by the energy transfer between the charging station and the vehicle
    • B60L53/14Conductive energy transfer
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/30Constructional details of charging stations
    • B60L53/31Charging columns specially adapted for electric vehicles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/60Monitoring or controlling charging stations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/60Monitoring or controlling charging stations
    • B60L53/62Monitoring or controlling charging stations in response to charging parameters, e.g. current, voltage or electrical charge
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/60Monitoring or controlling charging stations
    • B60L53/64Optimising energy costs, e.g. responding to electricity rates
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/60Monitoring or controlling charging stations
    • B60L53/65Monitoring or controlling charging stations involving identification of vehicles or their battery types
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/60Monitoring or controlling charging stations
    • B60L53/68Off-site monitoring or control, e.g. remote control
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L58/00Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles
    • B60L58/10Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries
    • B60L58/12Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries responding to state of charge [SoC]
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/007Regulation of charging or discharging current or voltage
    • H02J7/0071Regulation of charging or discharging current or voltage with a programmable schedule
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/02Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries for charging batteries from ac mains by converters
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/02Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries for charging batteries from ac mains by converters
    • H02J7/04Regulation of charging current or voltage
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L2240/00Control parameters of input or output; Target parameters
    • B60L2240/70Interactions with external data bases, e.g. traffic centres
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L2240/00Control parameters of input or output; Target parameters
    • B60L2240/80Time limits
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L2250/00Driver interactions
    • B60L2250/14Driver interactions by input of vehicle departure time
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L2250/00Driver interactions
    • B60L2250/20Driver interactions by driver identification
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/44Methods for charging or discharging
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2310/00The network for supplying or distributing electric power characterised by its spatial reach or by the load
    • H02J2310/40The network being an on-board power network, i.e. within a vehicle
    • H02J2310/48The network being an on-board power network, i.e. within a vehicle for electric vehicles [EV] or hybrid vehicles [HEV]
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/00032Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries characterised by data exchange
    • H02J7/00036Charger exchanging data with battery
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/00047Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries with provisions for charging different types of batteries
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/10Energy storage using batteries
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/70Energy storage systems for electromobility, e.g. batteries
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/7072Electromobility specific charging systems or methods for batteries, ultracapacitors, supercapacitors or double-layer capacitors
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/72Electric energy management in electromobility
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/12Electric charging stations
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/14Plug-in electric vehicles
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/16Information or communication technologies improving the operation of electric vehicles
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/16Information or communication technologies improving the operation of electric vehicles
    • Y02T90/167Systems integrating technologies related to power network operation and communication or information technologies for supporting the interoperability of electric or hybrid vehicles, i.e. smartgrids as interface for battery charging of electric vehicles [EV] or hybrid vehicles [HEV]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S30/00Systems supporting specific end-user applications in the sector of transportation
    • Y04S30/10Systems supporting the interoperability of electric or hybrid vehicles
    • Y04S30/12Remote or cooperative charging
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S30/00Systems supporting specific end-user applications in the sector of transportation
    • Y04S30/10Systems supporting the interoperability of electric or hybrid vehicles
    • Y04S30/14Details associated with the interoperability, e.g. vehicle recognition, authentication, identification or billing

Definitions

  • the present invention relates to a charging schedule changing method for supplying power to a vehicle-mounted battery using a charging cable (charging gun), a vehicle, a charging control device, and an information input / output device.
  • the charging facilities have different infrastructure conditions (for example, the current limit value that can be output by the switchboard or breaker and the amount of power that can be supplied by the power company or the solar power generator) depending on the region and its system configuration. For this reason, the electric vehicle and the hybrid vehicle require charging control according to the charging facility connected at the destination.
  • IEC61851 E-Mobility, and the like have been proposed as technologies for charging an electric vehicle connected to a charging infrastructure.
  • the charging infrastructure notifies the vehicle of real-time suppliable power, current, voltage, etc. during charging.
  • E-Mobility the charging infrastructure is: The vehicle is notified of a detailed charging schedule such as “can be supplied for 20 yen per unit.”)
  • the charging control device creates a charging schedule based on the charging amount required by the vehicle, and charges the battery based on this charging schedule. The method of doing is examined (patent document 1).
  • the present invention has been made in order to solve the above-described problems.
  • An object is to obtain an output device.
  • a charging schedule changing method is a method for changing a charging schedule of a power storage means mounted on a vehicle, wherein the charging schedule changing request is received, and the received charging schedule changing request is received.
  • the vehicle according to the present invention communicates with the power storage means, the control means for controlling the charging of the power storage means according to the charge schedule, and the charge control device according to the charge schedule change request, and changes the charge schedule.
  • Communication means for acquiring charging parameters applied in the case from the charging control device, and creating a changed charging schedule using the information regarding the charging state of the power storage means and the charging parameters acquired by the communication means .
  • the charging control apparatus further includes a communication unit that communicates with a vehicle equipped with the power storage unit, and a power supply control unit that controls power supply to the power storage unit according to the charging schedule.
  • a communication unit that communicates with a vehicle equipped with the power storage unit
  • a power supply control unit that controls power supply to the power storage unit according to the charging schedule.
  • the information input / output device is an information input / output device that communicates with a vehicle equipped with power storage means.
  • a change to the charge schedule of the power storage means is input, a request for changing the charge schedule is issued to the vehicle.
  • To obtain information on the charging state of the power storage means from the vehicle acquire charging parameters applied when changing the charging schedule from the charging control device that supplies power to the power storage means, and The changed charging schedule is created using the information and the charging parameters.
  • the charging schedule can be changed without reinserting the charging cable.
  • FIG. 1 is a configuration diagram of a charging system according to Embodiment 1.
  • FIG. It is a figure which shows the sequence of the charging system which concerns on Embodiment 1.
  • FIG. 3 is a flowchart showing an operation for starting charging of the vehicle according to the first embodiment.
  • 4 is a flowchart illustrating an operation of starting charging of the charging facility according to the first embodiment.
  • 3 is a flowchart showing an operation of changing a charging schedule of the information terminal according to the first embodiment.
  • 3 is a flowchart showing an operation for changing a charging schedule of the vehicle according to the first embodiment.
  • 6 is a flowchart showing another operation of changing the charging schedule of the vehicle according to the first embodiment.
  • 4 is a flowchart showing an operation of changing a charging schedule of the charging facility according to the first embodiment.
  • FIG. 6 is a flowchart showing an operation of changing a charging schedule of the charging facility according to the second embodiment. 6 is a flowchart showing an operation for changing a charging schedule of a vehicle according to a second embodiment. 6 is a flowchart illustrating an operation of changing a charging schedule of the information terminal according to the second embodiment.
  • FIG. 6 is a configuration diagram of a charging system according to Embodiment 3. It is a figure which shows the sequence of the charging system which concerns on Embodiment 3.
  • FIG. 10 is a flowchart showing an operation of changing a charging schedule of a supply and demand planning server according to a third embodiment.
  • 10 is a flowchart showing an operation of changing a charging schedule of the charging facility according to the third embodiment.
  • 10 is a flowchart showing an operation of changing a charging schedule of the information terminal according to the third embodiment. It is a figure which shows the sequence of the charging system which concerns on Embodiment 4.
  • FIG. It is a flowchart which shows the operation
  • Embodiment 1 FIG.
  • FIGS. 1-10 A charging system according to a first embodiment for carrying out the present invention will be described with reference to FIGS.
  • FIG. 1 is a diagram showing a configuration of a charging system according to the first embodiment.
  • the charging system 1 includes a vehicle 2, a charging facility (charging control means) 3, a charging cable (charging gun) 4, and an information terminal (information input / output device) 5.
  • the vehicle 2 with which the charging system 1 is provided is not limited to one, and may be a plurality of vehicles.
  • the charging facility 3 is, for example, a charging stand installed on a road shoulder, a meter installed in a house, and a power feeding system in which at least one of a power distribution company and a power company is connected to the charging stand.
  • the charging cable 4 is included in the configuration of the charging facility 3 as a part of the charging station.
  • the charging cable 4 may be a part of the configuration of the vehicle 2.
  • the end of the charging cable 4 is preferably a power plug that can be connected to an outlet.
  • the information terminal 5 is, for example, a mobile phone, a smartphone, or a car navigation device.
  • the information terminal 5 is used for input / output of information necessary for creating a charging schedule for the vehicle 2.
  • the information terminal 5 will be described as a device different from the vehicle 2, but the information terminal 5 may be incorporated as a part of the configuration of the vehicle 2.
  • the vehicle 2 is an electric vehicle (electric vehicle).
  • the vehicle 2 includes a battery (power storage means) 20, a control device (control means) 21, a communication device (communication means) 22, and a charging port 23.
  • the vehicle 2 is not limited to a motor driven by battery power alone, and includes, for example, a plug-in hybrid vehicle using a motor and a gasoline engine in combination.
  • the control device 21 is connected to the battery 20 and the charging port 23 via a power line, and is connected to the communication device 22 via a signal line.
  • the control device 21 follows the instruction (or notification) from the communication device 22, and in response to this instruction (or notification), the power supplied from the charging port 23 side (power supplied from the charging facility 3 via the charging cable 4). ) To charge the battery 20.
  • the communication device 22 is a device used when communicating with a communication device 31 (described later) on the charging facility side in a first communication method (described later) and a second communication method (described later).
  • the communication device 22 is connected to the control device 21, the charging port 23, and the information terminal 5 via signal lines.
  • the communication device 22 acquires information on whether or not the charging cable 4 is connected, a charging parameter of the battery 20, and the like through communication with a communication device 31 (described later) on the charging facility side. Further, if there is a matter to be confirmed by the owner of the vehicle 2, communication with the information terminal 5 is performed, and the information is acquired from the information terminal 5.
  • the charging facility 3 includes a power supply control device (power supply control means) 30, a communication device (communication means) 31, and an information input / output device (information input / output means) 32.
  • the power supply control device 30 is connected to the power network of the power distribution company or power company and the charging cable 4 via the power line, and is connected to the communication device 31 via the signal line.
  • the power supply control device 30 controls power supply to the charging cable 4 side (battery 20 of the vehicle 2) according to an instruction from the communication device 31.
  • the power supply control device 30 is connected to the power network of the distribution company or power company and the connection port of the charging cable 4 via the power line, and is connected to the communication device 31 via the signal line. . Also in this case, the power feeding control device 30 controls the power supply to the charging cable 4 side (the battery 20 of the vehicle 2) in accordance with an instruction from the communication device 31.
  • the power supply control device 30 is connected to the charging cable 4 and a power network such as a distribution company via a power line, It is connected to the device 31 via a signal line.
  • the power supply control device 30 exchanges information about the amount of power that can be supplied by the power network with the communication device 31.
  • the power supply control device 30 controls power supply to the charging cable 4 side (battery 20 of the vehicle 2) in accordance with an instruction from the communication device 31.
  • the communication device 31 is a device used when communicating with the communication device 22 on the vehicle side in a first communication method (described later) and a second communication method (described later).
  • the communication device 31 is connected to the power supply control device 30, the information input / output device 32, and the charging cable 4 via signal lines.
  • the information input / output device 32 is an interface provided on the surface of the charging stand, for example, for the user to input information for changing the charging schedule and for the facility manager to read the charging schedule.
  • Specific examples of the information input / output device 32 include a touch panel, a keyboard, a mouse, a microphone, and a speaker.
  • the configuration in which the charging facility 3 includes the information input / output device 32 will be described. However, when the charging schedule is changed from the information terminal 5 or the communication device 22 on the vehicle side, the information input / output device 32 is connected to the charging facility 3. Not a required configuration.
  • the first communication method is a PWM (Pulse Wide Modulation) type communication method.
  • communication is performed by changing and modulating the duty ratio of a pulse wave of a signal.
  • Communication performed in the first communication method is, for example, communication using a control pilot signal defined by IEC61851 (control pilot communication).
  • the control pilot communication uses a signal line inside the charging cable 4 and transmits information by controlling the level change of the voltage (signal line voltage) of the signal line.
  • control pilot communication when it is detected that the vehicle 2 and the charging equipment 3 are connected via the charging cable 4, the charging cable 4 is removed from the vehicle 2 or the charging equipment 3.
  • PLC communication power line communication
  • the battery 20 When detecting the mutual, when detecting leakage, when detecting the start / stop timing of power line communication (hereinafter referred to as PLC communication) (described later), the battery 20 is in a chargeable state.
  • the vehicle 2 notifies the charging facility 3 of the fact that the charging facility 3 notifies the vehicle 2 of the maximum value (maximum supply current value) that the charging facility 3 can supply.
  • the second communication method is a spread spectrum communication method such as OFDM (Orthogonal Frequency-Division Multiplexing). Communication performed in the second communication method is, for example, PLC communication.
  • OFDM Orthogonal Frequency-Division Multiplexing
  • PLC communication uses a signal line (existing signal line for control pilot communication) inside the charging cable 4 as in control pilot communication. Further, PLC communication uses a signal in a frequency band (eg, about 2 MHz to 30 MHz) that is not easily affected by interference from a signal in a frequency band (eg, about 1 KHz) used in control pilot communication.
  • a signal in a frequency band eg, about 2 MHz to 30 MHz
  • a frequency band eg, about 1 KHz
  • PLC communication when transmitting and receiving information related to charging (remaining power, charging start / stop command, current value specification during charging, etc.), discharge control from the vehicle 2 to the power provider
  • charging replenishing power
  • charging start / stop command current value specification during charging
  • current value specification during charging etc.
  • contract information or identification information used for charging processing is transmitted / received.
  • control pilot communication and the PLC communication will be described as using the same signal line as the communication path, but different signal lines may be used as the communication path. Moreover, it is good also considering both control pilot communication and PLC communication as wireless communication. However, when the control pilot communication and the PLC communication are wired communication, security can be ensured with a simpler communication network configuration.
  • the vehicle 2 and the charging facility 3 communicate using a communication protocol (for example, IPv6) of the network layer (layer 3) of the OSI (Open Systems Interconnection) reference model.
  • IPv6 the network layer
  • OSI Open Systems Interconnection
  • the physical layer (layer 1) uses PWM communication and OFDM communication.
  • the vehicle 2 acquires its own IP address and the IP address of the charging facility 3, and the vehicle 2 opens a session with the charging facility 3.
  • communication between the vehicle 2 and the charging facility 3 is performed using a transport layer (layer 4) protocol in order to maintain security.
  • the vehicle 2 and the charging facility 3 communicate using a communication application in the application layer (layer 7).
  • the physical layer (layer 1) performs PLC communication, or both PWM communication and OFDM communication.
  • the vehicle 2 transmits a notification message including its own (vehicle) charging parameter (for example, ID) to the charging facility 3.
  • the charging facility 3 Upon receiving the notification message, the charging facility 3 receives the charging parameters of the charging facility 3 (for example, information related to the power supply schedule, such as charging start time, scheduled charging end time, supplied power amount, power per unit time) A response message that includes a charge).
  • the charging parameter exchange sequence ends.
  • the charge start sequence corresponds to step S11 to step S13 and step S25 in FIG. (1)
  • the vehicle 2 creates a charging schedule based on the charging parameters of the charging facility 3 acquired in the charging parameter exchange sequence of the common session (step S11).
  • the vehicle 2 transmits a notification message including information on its own chargeability status and information on its own charge schedule generated based on the charge schedule (step S12).
  • the charging facility 3 When receiving the notification message, the charging facility 3 returns a response message including information on whether or not the charging schedule can be handled to the vehicle 2 (step S13). (4) When the vehicle 2 receives a response message including information indicating that the charging schedule can be handled, the vehicle 2 calculates the charging end time and the power charge required for charging from the charging schedule and the charging parameters of the charging facility 3, and calculates The result (charge end time and power charge) is notified to the information terminal 5 (step S25), and the charge start sequence is ended.
  • a charging schedule for charging a predetermined amount of power with priority given to low-charge per unit time between the start of charging and the elapse of a predetermined time are created and the charge end time is derived by creating this charge schedule.
  • the vehicle 2 after receiving a response message including information indicating that the charging facility 3 can respond to the charging schedule in step S13, the vehicle 2 notifies the information terminal 5 of the charging end time and the power charge necessary for charging.
  • the information terminal 5 stores charging reservation information indicating the charging end time and the power charge notified to a storage device such as a RAM, and is valid until the charging process of the vehicle 2 is completed and can be referred to at any time by the information terminal 5. desirable.
  • the information terminal 5 when the information terminal 5 is in a state where it can communicate with the server device via wireless communication such as 3G, LTE (Long Terminology Evolution), and Wi-Fi (Wireless Fidelity), the above-described charging reservation information is wirelessly communicated.
  • the charging reservation information may be stored in a storage device such as an HDD (for example, a control device 21 or a non-volatile memory in the communication device 22) mounted on the vehicle 2 or the like. It may be stored and the stored charge reservation information may be referred to.
  • step S11 when the vehicle 2 receives a response message including information indicating that the charging schedule is not available, the vehicle 2 returns to step S11 and generates the charging schedule again. Also, when the vehicle 2 does not receive a response message within a predetermined time, the vehicle 2 returns to step S11 and retransmits the notification message. By doing in this way, the reliability of a charge start sequence can be improved.
  • the communication device 22 notifies the acquired charging parameter to the control device 21 (step S101).
  • the control device 21 creates a charging schedule based on the charging parameters (step S102).
  • the control device 21 notifies the communication device 22 of the created charging schedule (step S103).
  • the communication device 22 generates a notification message including information on the charging schedule generated by the control device 21, and transmits the notification message to the charging facility 3 (step S104).
  • the communication device 22 determines whether a response message has been received from the charging facility 3 at a predetermined cycle or at an arbitrary timing (step S105).
  • the communication device 22 If the response message has been received, the communication device 22 reads a flag (or code) indicating whether or not the charging facility 3 is compatible with the notified charging schedule from the response message (step S106). On the other hand, when the response message has not been received, the communication device 22 returns to step S104 and retransmits the notification message to the charging facility 3. However, when the number of transmissions of the notification message exceeds a predetermined number of times, the communication device 22 considers that there is no charging facility 3 capable of supplying power on the charging system 1 and ends the process of the charging start sequence.
  • the communication device 22 When ending the processing of the charging start sequence, preferably, the communication device 22 notifies the information terminal 5 that charging cannot be started. Thereby, the user who uses the information terminal 5 can grasp that charging cannot be started.
  • the communication device 22 determines whether or not the charging facility 3 is compatible with the charging schedule notified by the read flag value (step S107). If the value of the flag indicates that the charging facility 3 is compatible, the communication device 22 notifies the control device 21 accordingly (step S108). The control device 21 calculates the above charging end time and the power charge necessary for charging, notifies the information terminal 5 of the calculation result via the communication device 22 (step S109), and then ends the charging start sequence. When the value of the flag indicates that the charging facility 3 is not compatible, the communication device 22 returns to step S102 and generates the charging schedule again.
  • the communication device 22 reads the flag value here, the communication device 22 may notify the control device 21 of the response message as it is. In this case, the control device 21 reads the value of the flag of the response message, and determines whether or not the charging facility 3 can cope with the charging schedule notified by the vehicle 2.
  • control device 21 If the value of the flag indicates that the charging facility 3 is compatible, the control device 21 notifies the communication device 22 to that effect and ends the charging start sequence. When the value of the flag indicates that the charging facility 3 is not compatible, the control device 21 notifies the communication device 22 of the fact. The communication device 22 returns to step S102 and generates the charging schedule again.
  • the communication device 22 may end the process of the charging start sequence as it is without retransmitting the notification message.
  • the charging facility 3 can start the charging process only by PWM communication (for example, when the duty ratio of PWM communication indicates a predetermined range such as 10 to 85%), the PWM communication is performed after the charging start sequence is completed. It is also possible to shift to a charging sequence using only the battery.
  • control device 21 and the communication device 22 have been described as individual devices. However, these may be programs. Furthermore, the program may be composed of one or a plurality of programs. In the case of a plurality of programs, these are driven by the same or separate computers.
  • the communication device 31 determines whether or not a notification message including information on the charging schedule generated by the vehicle 2 is received at a predetermined period or at an arbitrary timing (step S111). If the notification message has not been received, the communication device 31 returns to the state before step S111. On the other hand, when the notification message is received, the communication device 31 reads out information on the charging schedule of the vehicle 2 and notifies the power feeding control device 30 (step S112). The power supply control device 30 refers to its own power supply schedule, and determines whether or not the charging schedule of the vehicle 2 can be supported. The power supply control device 30 notifies the communication device 31 of the determined result (step S113).
  • the communication device 31 generates a response message to the notification message.
  • the communication device 31 includes the result notified from the power supply control device 30 (that the charging schedule can be supported) as a flag (or code) value in the response message (step S114). If the charging schedule cannot be handled, the communication device 31 includes a flag (or code) value in the response message indicating that the charging schedule cannot be handled (step S115).
  • the communication device 31 transmits the generated response message to the vehicle 2 (step S116), and ends the charging start sequence. Note that the communication device 31 can also include an error in the response message as a flag (or code) even if the notification message cannot be received correctly.
  • the power supply control device 30 and the communication device 31 have been described as individual devices. However, these may be programs. Furthermore, the program may be composed of one or a plurality of programs. In the case of a plurality of programs, these are driven by the same or separate computers.
  • the charging system 1 After the charging start sequence, the charging system 1 performs the charging sequence according to the charging schedule.
  • the charging sequence corresponds to step S14 in FIG.
  • the charging system 1 performs a charging sequence according to either AC charging or DC charging.
  • the charge request message includes, for example, the charge preparation state of the vehicle 2, a target current value, a target voltage value, a maximum allowable voltage, a maximum allowable current, a maximum allowable power, a vehicle SOC (State Of Charge). ), Information on whether or not the battery has been fully charged.
  • the response message includes information such as the state of the charging facility 3, the current output current value, the current voltage value, the allowable voltage limit value, the allowable current limit value, the allowable power limit value, and the like.
  • the charge change sequence corresponds to steps S15 to S20 in FIG. (1)
  • the information terminal 5 When a change in charging schedule is input from the user to the information terminal 5, the information terminal 5 generates and transmits a charging schedule change request message (step S15).
  • the information terminal 5 is input with at least one of the changed departure time, destination, and charging power amount from the user together with the change of the charging schedule. It is assumed that at least one of the departure time, destination information indicating the destination (latitude / longitude of the destination or the name and address of the facility), and the amount of charged power is included.
  • the charging power amount may be a value calculated by the information terminal 5 using the travel distance to the destination, and the charging schedule change request message is also transferred to the vehicle 2 and the charging facility 3 (S15). , S18), the vehicle 2 or the charging facility 3 may calculate in the same manner.
  • step S16 When receiving the change request message, the vehicle 2 generates and transmits a stop request message for requesting the charging facility 3 to stop charging (step S16). At this time, by setting the signal voltage of the above-described PWM communication line to a predetermined value (for example, 9 [V] indicating that the vehicle 2 is in a non-chargeable state), the vehicle 2 is changing the charging schedule. It is desirable to show.
  • a predetermined value for example, 9 [V] indicating that the vehicle 2 is in a non-chargeable state
  • the stop request message includes, for example, charge stop reason information indicating information such as “charge end” and “change of charge schedule”.
  • charge stop reason information indicates a change of the charge schedule.
  • the charging facility 3 When the charging facility 3 receives the first charge stop reason information, that is, the “change charge schedule” stop request message, the charging facility 3 supplies power to the vehicle 2 by, for example, opening the contactor of the power line to be supplied. Is stopped, and a charging schedule change request message is waiting to be received (step S17).
  • the first charge stop reason information that is, the “change charge schedule” stop request message
  • the charging facility 3 stores the pre-change charging schedule (old charging schedule) permitted for the vehicle 2 in the above-described charging start sequence so that the charging process can be continued according to the charging schedule before the power supply is stopped. It is preferable to store in a storage device such as.
  • the charging facility 3 does not receive the charging schedule change request message, or the processing of the charging schedule change request is not completed (a response including information indicating that the charging facility 3 can respond to the notification message in step S19 described later).
  • the charging process may be performed according to the old charging schedule.
  • the charging facility 3 when the charging facility 3 receives the second charging stop reason information, that is, the “charge end” stop request message, the charging facility 3 immediately stops power supply to the vehicle 2 and stores the old charging schedule in a storage device such as a memory. You don't have to.
  • the vehicle 2 transmits the first charge stop reason information, that is, the “change charge schedule” stop request message, and then transmits the charge schedule change request message to the charging facility 3 (step S18).
  • the charging facility 3 When the charging facility 3 receives the change request message, the charging parameters applied when the charging schedule is changed (for example, power charge per unit time, charging start time, scheduled charging end time, supplied power amount, etc.) ) Is generated.
  • the charging facility 3 transmits a response message including this charging parameter to the vehicle 2 (step S19).
  • the charging parameters included in the response message satisfy conditions (for example, a power charge per unit time, a charging start time, a scheduled charging end time, a supply power amount, etc.) before the charging schedule is changed.
  • conditions for example, a power charge per unit time, a charging start time, a scheduled charging end time, a supply power amount, etc.
  • the vehicle 2 receives this response message, and transfers the information to the information terminal 5 including information on the current charging state of the battery 20 (for example, SOC (State Of Charge) and a flag indicating that charging is being performed or stopped). To do.
  • the vehicle 2 may communicate with the information terminal 5 separately to notify the information terminal 5 of information related to the current charging state of the battery 20.
  • the above-mentioned SOC shall show the ratio of the electric energy currently charged to the battery with respect to the electrical storage electric energy at the time of the said battery full charge.
  • the information terminal 5 acquires information about the current charging state of the battery 20 and the charging parameters, and uses these to create a changed charging schedule.
  • the information terminal 5 generates a notification message including the newly created charging schedule after the change and transmits the notification message to the charging facility 3 (step S20).
  • the information terminal 5 shows the change contents indicating the difference (departure time or power charge difference) before and after the change of the above-described charging reservation information (departure time or power charge). Information is calculated, and this change content information is notified to the information terminal 5.
  • the change content information is the charge reservation information before the change (charge end time X1 and power charge Y1) and the charge reservation information 2 after the change (charge end time X2 and power charge Y2)
  • the time is expressed as UTC time (the number of seconds elapsed from midnight, January 1, 1970 00:00 (UNIX (registered trademark) Epoch)).
  • UTC time the number of seconds elapsed from midnight, January 1, 1970 00:00 (UNIX (registered trademark) Epoch)
  • seconds the departure time is delayed by
  • seconds the value is negative, charging is completed earlier by
  • the power charge difference ⁇ Y is a positive value
  • the power charge required for charging is increased by
  • the power charge is reduced by
  • the information terminal 5 converts the change content information into text information or voice information such as “Departure time is 10:30 (9:30 before change), but the price will be reduced by 300 yen”, etc. To receive approval input from the user. (8) When the charging facility 3 receives the notification message, the charging change sequence is terminated.
  • the information terminal 5 that has received the response message determines that the charge schedule cannot be changed (for example, when a desired charge schedule cannot be created from the changed charge parameters or when the user cannot obtain approval)
  • the information terminal 5 includes the information in the notification message and transmits it to the charging facility 3.
  • the information terminal 5 receives the response message, but the vehicle 2 may receive the response message.
  • the vehicle 2 creates a new charging schedule and transmits it to the charging facility 3.
  • the vehicle 2 creates the charging schedule and the charging reservation information and notifies the information terminal 5, and the information terminal 5 changes the content information indicating the difference between the changed charging reservation information (“departure time 10:30” (It will be 9:30 before the change), but the price will be reduced by 300 yen ").
  • These charging schedules and charging reservation information may be created by the information terminal 5, or the vehicle 2 may perform change content information.
  • the charging facility 3 when a stop request message is received, the charging facility 3 has been treated as having completed the charging schedule, so the charging schedule is exchanged again between the vehicle 2 and the charging facility 3, and the charging plug is used to start charging. It was necessary to plug in and out. In this way, by including the charge stop reason information indicating information such as “charge end” and “change of charge schedule” in the stop request message, the charge stop reason information is “change charge schedule” stop request message If the charging facility 3 receives the charging schedule, the charging schedule is not treated as if the charging schedule has been terminated as in the conventional case, but the charging schedule is changed without changing the charging plug. And charging can be resumed.
  • the information terminal 5 by enabling the information terminal 5 to acquire or calculate the difference between the pre-change and post-change charge reservation information (departure time, power charge), it is possible to provide information for the user to determine whether the charge schedule can be changed. Play.
  • the information terminal 5 determines whether or not there has been a charging schedule change input from the user at a predetermined period or at an arbitrary timing (step S121). If it is determined that there is no change in the charging schedule, the information terminal 5 returns to the state before step S121. On the other hand, when determining that the charging schedule change input has been received, the information terminal 5 generates a charging schedule change request message (step S122). The information terminal 5 transmits the generated change request message to the vehicle 2 (step S123).
  • the information terminal 5 determines whether or not a response message has been received at a predetermined period or at an arbitrary timing (step S124). When receiving the response message, the information terminal 5 reads a new charge parameter from the response message (step S125). On the other hand, when the response message has not been received, the information terminal 5 returns to step S123 and resends the change request message to the vehicle 2. Since the information terminal 5 resends the change request message when there is no response to the change request message, the reliability of the charge change sequence can be improved.
  • the information terminal 5 when the number of times of transmission of the notification message exceeds a predetermined number of times, the information terminal 5 considers that the charging facility 3 cannot cope with the change of the charging schedule, and ends the processing of the charging change sequence. In this case, preferably, the information terminal 5 notifies the user that it has been determined that the charging schedule cannot be changed. Thereby, the user can try re-changing a charging schedule as needed.
  • the information terminal 5 determines whether or not the read charging parameter includes a flag (or code) indicating that the charging schedule cannot be changed (step S126). If it is determined that there is a flag indicating that the charge schedule cannot be changed, the information terminal 5 considers that the charging facility 3 cannot cope with the change of the charge schedule, and ends the process of the charge change sequence. Also in this case, the information terminal 5 preferably notifies the user that it has been determined that the charging schedule cannot be changed.
  • the information terminal 5 determines whether or not the read charging parameter includes items that require user approval (step S127). If the information terminal 5 determines that the item that requires user approval is included, the information terminal 5 notifies the user of the item that requires approval (step S128). In this case, preferably, the information terminal 5 notifies the charging parameter information after converting it into at least one of a departure delay time and a power charge.
  • the information terminal 5 receives the input from the user and determines whether or not it has been approved (step S129). If user approval is obtained, the process proceeds to the next step S130 (described later). If the user's approval is not obtained within the predetermined time, the information terminal 5 determines that the charge schedule cannot be changed, and ends the process of the charge change sequence. In this case, preferably, the information terminal 5 notifies the user that it has been determined that the charging schedule cannot be changed. When the request for changing the charging schedule is input again from the user, the information terminal 5 repeats the operations after step S122.
  • step S127 When the information that the user needs to approve is not included in step S127 and when the user approval is obtained in step S129, the information terminal 5 uses the read charging parameter and the information on the current charging state of the battery 20. A charging schedule is created (step S130). The information terminal 5 generates a notification message including information on the newly created charging schedule after the change (step S131).
  • the information terminal 5 transmits a notification message to the charging facility 3 (step S132) and ends the process of the charge change sequence.
  • the information terminal 5 may transmit the notification message to the vehicle 2 as well.
  • the vehicle 2 can grasp the change of the charging schedule and can control the charging of the battery 20 according to the changed charging schedule.
  • step S141 movement of the vehicle 2 is demonstrated with the flowchart of FIG.
  • the communication device 22 determines whether or not a change request message has been received from the information terminal 5 at a predetermined cycle or at an arbitrary timing (step S141). If the change request message has not been received, the communication device 22 returns to the state before step S141.
  • the communication device 22 When the change request message is received, the communication device 22 generates a stop request message for requesting the stop of charging, and transmits it to the charging facility 3 (step S142). Thereafter, the communication device 22 transmits a change request message to the charging facility 3 (step S143).
  • the communication device 22 notifies the control device 21 that the change request message has been received (step S144).
  • the control device 21 notifies the communication device 22 of information such as the current charging state of the battery 20 (step S145).
  • the communication device 22 generates a response message including information such as the current state of charge of the battery 20 notified from the control device 21 (step S146).
  • the communication device 22 transmits the generated response message to the information terminal 5 (step S147), and ends the process of the charge change sequence.
  • the communication device 22 retransmits the response message when the notification message including the changed charging schedule is not received from the information terminal 5 within a predetermined time.
  • the communication device 22 can improve the reliability of the change request sequence.
  • the communication device 22 may include the information about the current charging state of the battery 20 in the response message received from the charging facility 3 and transmit the response message to the information terminal 5 instead of steps S146 and S147. .
  • the communication device 22 receives a message having the same content as the notification message transmitted from the information terminal 5 to the charging facility 3, and acquires the changed charging schedule. To do.
  • the changed charging schedule has been described as being created by the information terminal 5, but the vehicle 2 may create it.
  • the vehicle 2 creates a charge schedule after the change, thereby ensuring security.
  • the configuration of at least one of the vehicle 2 and the information terminal 5 can be simplified.
  • the communication device 22 determines whether or not a response message has been received from the charging facility 3 at a predetermined cycle or at an arbitrary timing after step S145 (step S148).
  • This response message includes charging parameters that are applied when changing the charging schedule.
  • the communication device 22 When the response message is received, the communication device 22 reads out the charging parameter applied after changing the charging schedule, and notifies the control device 21 (step S149). On the other hand, when the response message has not been received within the predetermined time, the communication device 22 returns to step S143 and retransmits the change request message to the charging facility 3.
  • the communication device 22 determines that the charging facility 3 is incapable of changing the charging schedule, and ends the processing of the charging change sequence. In this case, preferably, the communication device 22 notifies the information terminal 5 that it cannot respond to the change of the charging schedule. By doing in this way, the user can try the change of a charging schedule again as needed.
  • the control device 21 determines whether or not the charging schedule can be changed based on the charging parameters read in step S149 (step S150). If the control device 21 includes a flag (or code) indicating that the charge schedule cannot be changed, the control device 21 determines that the charging facility 3 cannot respond to the change of the charge schedule, and performs the process of the charge change sequence. Exit.
  • the communication device 22 or the control device 21 When ending the process of the charge change sequence, preferably, the communication device 22 or the control device 21 notifies the information terminal 5 that the charge change cannot be performed. Thereby, the user who uses information terminal 5 grasps that a charge schedule cannot be changed, and can request change of a charge schedule again as needed.
  • the control device 21 When determining that the charging schedule can be changed, the control device 21 creates a new charging schedule after the change using the charging parameters notified from the communication device 22 and the current charging state of the battery 20 (step). S151). The control device 21 notifies the communication device 22 of the created new charging schedule. The communication device 22 generates a notification message including new charging schedule information (step S152). The communication device 22 transmits this notification message to the charging facility 3 (step S153), and ends the process of the charge change sequence.
  • the communication device 22 when the communication device 22 does not receive the response message, the communication device 22 retransmits the change request message. However, even if the response message is not received, the communication device 22 may end the process of the charge change sequence without resending the change request message.
  • control device 21 and the communication device 22 have been described as separate devices. However, like the charge start sequence, these may be one or a plurality of programs. In the case of a plurality of programs, these are driven by the same or separate computers.
  • the communication device 31 determines whether or not a stop request message for requesting to stop charging is received at a predetermined cycle or at an arbitrary timing (step S161). When the stop request message is received, the communication device 31 notifies the power supply control device 30 to that effect, and the power supply control device 30 stops power supply to the vehicle 2 (step S162). If the stop request message has not been received, the communication device 31 returns to the state before step S161.
  • the communication device 31 receives the charge schedule change request message (step S163).
  • the communication device 31 reads information included in the change request message (for example, desired charging power, desired charging completion time, current charging state of the battery 20, and the like) and notifies the power feeding control device 30 (step S164).
  • the power supply control device 30 refers to its own power supply schedule and determines whether or not the charge schedule can be changed according to the information included in the change request message (step S165).
  • the power supply schedule is stored in, for example, a memory (not shown) owned by the charging facility 3.
  • the communication device 31 reads information from the change request message here, the power supply control device 30 may read information.
  • the power supply control device 30 When it is determined that the charging schedule cannot be changed, the power supply control device 30 notifies the information input / output device 32 and the information terminal 5 to that effect, and ends the processing of the charging change sequence. By doing in this way, the user can try changing the charging schedule again as necessary.
  • the power supply control device 30 determines the charging parameters applied when changing the charging schedule (for example, power charge per unit time, charging start time, scheduled charging end time, supplied power) The communication device 31 is notified.
  • This charging parameter is calculated or determined by the charging facility 3 based on the information of the change request message. For example, when its own power supply schedule is vacant, the charging facility 3 is required for the period required for the charging schedule change sequence from that time (until the charging facility 3 notifies the charging parameters and receives the changed charging schedule. After the (period) elapses, the charging start time is calculated. Further, the power charge per unit time is determined according to a charge table (for example, a table in which the relationship between the charge time and the power charge per unit time is described) that the charging facility 3 holds in the memory or the like.
  • a charge table for example, a table in which the relationship between the charge time and the power charge per unit time is described
  • the power charge is set lower than usual.
  • the power charge is set higher than usual.
  • the communication device 31 generates a response message including this charging parameter and transmits it to the information terminal 5 (step S166). Note that when the vehicle 2 creates a changed charging schedule, the communication device 31 also transmits a response message to the vehicle 2.
  • the communication device 31 receives a notification message including the new charge schedule after the change from the information terminal 5 or the vehicle 2 and acquires the charge schedule after the change (step S167). And the process of a charge change sequence is complete
  • the power supply control device 30 and the communication device 31 have been described as individual devices. However, like the charge start sequence, these may be one or a plurality of programs. In the case of a plurality of programs, these are driven by the same or separate computers.
  • the charging end sequence corresponds to step 21 and step S22 in FIG. (1)
  • the vehicle 2 transmits an end notification message (step S21).
  • the charging facility 3 Upon receiving the end notification message, the charging facility 3 returns a response message to the vehicle 2 and performs a charging session end process (step S22).
  • the charging end sequence is ended and the charging session is ended.
  • the vehicle 2 and the charging equipment 3 perform a maintenance management sequence for confirming the connection state and the abnormal state of the charging cable independently of each sequence during the charging session.
  • the charging system 1 includes the charging parameters of the charging facility 3 applied when changing the charging schedule in response to the request for changing the charging schedule, and the battery 20 corresponding to the charging schedule. Based on the information on the current state of charge, a changed charge schedule is generated. For this reason, the charging schedule can be changed without reinserting the charging cable.
  • the charging system 1 can request a change in the charging schedule, the charging system 1 starts during the charging (before the scheduled charging end time) or delays the starting time (delays the scheduled charging end time). For example, it is possible to flexibly cope with a different charging schedule than that notified when the charging cable is connected.
  • the information terminal 5 or the vehicle 2 notifies the user to that effect. For this reason, the user can select whether or not to request the change of the charging schedule again, and the convenience of the user is improved.
  • the charging facility 3 notifies the information terminal 5 or the vehicle 2 of the charging parameters applied after the change. For this reason, when surplus power or insufficient power is generated, it is possible to flexibly adjust the schedule with the user, and it is possible to effectively use power and secure efficient fee income.
  • the vehicle 2 or the information terminal 5 when the vehicle 2 or the information terminal 5 includes information that requires user approval in the charging parameter, the vehicle 2 or the information terminal 5 includes means for notifying the user of this. For this reason, information that requires security, such as information that requires user authentication, can be handled.
  • Embodiment 1 the case where the change of the charging schedule is requested from the information terminal 5 has been described.
  • the second embodiment a case where an event that requires a change in the charging schedule occurs on the charging facility 3 side will be described. Since the configuration other than the configuration of the charging system 1 and the operation other than the charging change sequence are the same as those in the first embodiment, the description thereof is omitted.
  • the charge change sequence according to the second embodiment will be described.
  • the charge change sequence corresponds to steps S30 to S35 in FIG. (1)
  • the charging facility 3 detects this and generates and transmits a change notification message for notifying the change in the charging schedule ( Step S30).
  • Events that require a change in the charging schedule include, for example, input of a change request from the user to the information input / output device 32, a request on the power distribution side, power shortage, a change in charge amount, fluctuations in CO2 emissions, charging facility 3
  • step S30 ′ When the vehicle 2 receives the change notification message, the vehicle 2 notifies the information terminal 5 that an event requiring a change in the charging schedule has occurred, if necessary (step S30 ′).
  • the charging facility 3 notifies the information terminal 5 of this, the vehicle 2 does not need to notify the information terminal 5.
  • the information terminal 5 can notify the user that an event requiring a change in the charging schedule has occurred.
  • the charging facility 3 stops power feeding to the vehicle 2 after transmitting the change notification message (step S31).
  • the information terminal 5 When a change in the charging schedule is input from the user to the information terminal 5, the information terminal 5 generates and transmits a charging schedule change request message (step S32).
  • the charging facility 3 Upon receiving the change request message, the charging facility 3 generates charging parameters (for example, a power charge, a scheduled charging completion time, etc.) applied when changing the charging schedule (step S33).
  • the charging parameter satisfies a condition before changing the charging schedule.
  • the charging facility 3 returns a response message including this charging parameter to the information terminal 5 (step S34).
  • the vehicle 2 notifies the information terminal 5 of the response message including information on the current charging state of the battery 20.
  • the vehicle 2 may notify the information terminal 5 of information related to the current state of charge of the battery 20 through communication separately performed between the information terminal 5 and the vehicle 2 (step S34 ′).
  • the information terminal 5 When the information terminal 5 receives the response message, the information terminal 5 acquires information about the charging parameters and the current state of the battery 20, and uses these to create a changed charging schedule. And the information terminal 5 produces
  • the information terminal 5 that has received the response message determines that the charge schedule cannot be changed (when a desired charge schedule cannot be created from the changed charge parameters, the user cannot obtain approval).
  • the information terminal 5 includes the information in the notification message and transmits it to the charging facility 3.
  • the information terminal 5 receives the response message, but the vehicle 2 may receive the response message.
  • the vehicle 2 transmits a response message to the information terminal 5 including information on the current state of charge of the battery 20. This eliminates the need for the information terminal 5 and the vehicle 2 to separately communicate in order to notify information related to the current state of charge of the battery 20. That is, the communication processing load of the information terminal 5 and the vehicle 2 can be reduced, and the power consumption can be reduced.
  • step S201 determinations whether an event that requires a change in the charging schedule has occurred at a predetermined period or at an arbitrary timing. If it is determined that an event that requires changing the charging schedule has not occurred, the charging facility 3 returns to the state before step S201.
  • the charging facility 3 detects (1) an input of a change request to the information input / output device 32, and (2) an event that the charging schedule has to be changed from a configuration (not shown) on the charging facility 3 side has occurred. If any of the detection is performed, the communication device 31 generates a change notification message including a flag to change the charging schedule, and transmits the change notification message to the vehicle 2 (step S202).
  • the communication device 31 also notifies the power supply control device 30 that an event requiring a change in the charging schedule has occurred (step S203).
  • the power supply control device 30 stops power supply to the vehicle 2 (step S204).
  • the communication device 31 receives a charge schedule change request message after step S204 (step S205).
  • the communication device 31 reads information included in the change request message (for example, desired charge power, desired charge completion time, etc.) and notifies the power supply control device 30 (step S206).
  • the power supply control device 30 refers to its own power supply schedule, and determines whether or not the charge schedule can be changed according to the information included in the change request message (step S207). When it is determined that the charge schedule cannot be changed, the power supply control device 30 ends the charge change sequence.
  • the power supply control device 30 notifies the information input / output device 32 or the information terminal 5 that the charging schedule cannot be changed. Thereby, the user can grasp that the charging schedule cannot be changed.
  • the communication device 31 reads information from the change request message here, the power supply control device 30 may read the information.
  • the power supply control device 30 determines the charging parameters applied when changing the charging schedule (for example, power charge per unit time, charging start time, scheduled charging end time, supplied power) The amount) is notified to the communication device 31 (step S208). In this case, for example, when there is surplus power in the charging facility 3, the power charge is set to be lower than normal. On the other hand, when the charging facility 3 takes over the power scheduled to be supplied to the other vehicle 2, the power charge is set higher than usual.
  • the communication device 31 generates a notification message including this charging parameter and transmits it to the information terminal 5 (step S209).
  • the notification message is, for example, information such as "Can you delay the departure time (scheduled end time of charging)" or "Can I discharge W from 0:00 to ⁇ ?" Can also be included.
  • the communication device 31 also transmits a notification message to the vehicle 2.
  • the communication device 31 receives the notification message from the information terminal 5 or the vehicle 2 and acquires the changed charging schedule (step S210), and ends the processing of the charging change sequence.
  • the power supply control device 30 and the communication device 31 have been described as individual devices. However, these may be one or a plurality of programs. In the case of a plurality of programs, these are driven by the same or separate computers.
  • the communication device 22 determines whether or not a change notification message (or notification that there has been a change notification of the charging schedule) has been received from the charging facility 3 or the information terminal 5 at a predetermined cycle or at an arbitrary timing (step) S211). When determining that there is no change notification, the communication device 22 returns to the state before step S211. On the other hand, when determining that there is a change notification, the communication device 22 notifies the control device 21 that an event requiring a change in the charging schedule has occurred (step S212).
  • the control device 21 notifies the communication device 22 of information related to the current state of charge of the battery 20 (step S213).
  • the communication device 22 generates a notification message including information notified from the control device 21. And the communication apparatus 22 transmits this notification message to the information terminal 5 (step S214), and complete
  • control device 21 and the communication device 22 have been described as individual devices. However, these may be programs. Furthermore, the program may be composed of one or a plurality of programs. In the case of a plurality of programs, these are driven by the same or separate computers.
  • the information terminal 5 determines whether or not a change notification message for notifying the change of the charging schedule is received at a predetermined cycle or at an arbitrary timing (step S221). If the change notification message has not been received, the process returns to the state before step S221. On the other hand, when determining that the change notification message has been received, the information terminal 5 generates a charge schedule change request message and transmits the change request message to the vehicle 2 (step S222).
  • the information terminal 5 determines whether or not a response message including a new charging parameter applied when changing the charging schedule is received from the charging facility 3 at a predetermined period or at an arbitrary timing (step S223).
  • the information terminal 5 reads a new charge parameter from the response message (step S224).
  • the information terminal 5 returns to step S222 and retransmits the change request message to the charging facility 3. Thereby, the reliability of a charge change sequence can be improved.
  • the information terminal 5 considers that the charging facility 3 cannot cope with the change of the charging schedule and ends the processing of the charging change sequence. In this case, preferably, the information terminal 5 notifies the user that it has been determined that the charging schedule cannot be changed.
  • the information terminal 5 determines whether or not the charging parameter read in step S224 includes matters that require user approval (step S225). If the information terminal 5 determines that the item that requires user approval is included, the information terminal 5 notifies the user of the item that requires approval (step S226).
  • the information terminal 5 receives an input from the user (step S227), and determines whether or not it has been approved (step S228). If user approval is obtained, the process proceeds to the next step S229. On the other hand, if the user's approval is not obtained within the predetermined time, the information terminal 5 determines that the charge schedule cannot be changed, and ends the charge change flow. In this case, preferably, the information terminal 5 notifies the user that it has been determined that the charging schedule cannot be changed.
  • the information terminal 5 creates a charge schedule after change based on the read charge parameters (step S229). ). The information terminal 5 generates a notification message including information on the created charging schedule and transmits it to the charging facility 3 (step S230). Preferably, the information terminal 5 also transmits this notification message to the vehicle 2.
  • the information terminal 5 In the middle of the charging change sequence, if another event that requires changing the charging schedule occurs, the information terminal 5 returns to step S221 and repeats the subsequent operations. When the charging schedule change request is input from the user, the information terminal 5 returns to step S227 and repeats the subsequent operations.
  • the charging facility 3 may create a changed charging schedule.
  • the information input / output device 32 notifies the power supply control device 30 of the charging parameter.
  • the communication device 31 acquires information on the current charging state of the battery 20 via the charging cable 4 and notifies the power supply control device 30 of the information.
  • the power supply control device 30 creates a changed charging schedule based on the charging parameter notified from the information input / output device 32 and information on the current charging state of the battery 20.
  • the power supply to the vehicle 2 may be stopped according to the content of the change request message from the information terminal 5. Specifically, when the change request message includes a flag (or code) for requesting the initial charging schedule, the charging facility 3 charges the vehicle 2 corresponding to the information terminal 5 with the initial charging schedule. Follow the charging schedule.
  • the charging facility 3 notifies the information terminal 5 that an event requiring a change in the charging schedule has occurred. For this reason, the charging system 1 changes the charging schedule in response to the request for changing the charging schedule being input to the charging facility 3 or the occurrence of an event that requires changing the charging schedule in the power network on the charging facility 3 side. it can.
  • the charging facility 3 includes the information input / output device 32 for the user to input / output information related to the charging schedule, so that the charging schedule can be performed without performing complicated communication between the information terminal 5 and the charging facility 3. Can be changed.
  • the charging facility 3 completes the charging of the vehicle 2 by the reserved time in order to determine whether to stop the power supply to the vehicle 2 according to the content of the change request message from the information terminal 5 can do. Thereby, the reliability of the charging system 1 improves.
  • Embodiments 1 and 2 have described the case where the charging facility 3 creates the charging parameters necessary for the charging schedule.
  • a supply and demand planning server different from the charging facility 3 creates charging parameters will be described.
  • FIG. 1 ⁇ / b> A includes the power supply device 6 and a supply and demand planning server (server) 7 in the charging system 1 described in the first embodiment.
  • Charging system 1A includes charging facility 3A instead of charging facility 3 described in the first embodiment.
  • the vehicle 2 with which the charging system 1 is provided is not limited to two, but may be one or three or more.
  • the configuration of the supply and demand planning server 7 and the charging facility 3A will be described.
  • the supply and demand plan server 7 is, for example, a computer installed in a power distribution company or a power company.
  • the supply and demand planning server 7 includes a charging facility communication device (communication means) 70, a power supply communication control device (first communication control means) 71, a power supply and demand plan creation device (power supply and demand plan creation means) 72, an information terminal communication control device ( Second communication control means) 73.
  • the charging facility communication device 70 is a device that is connected to the charging facility 3A via a wireless or wired communication path and communicates with the charging facility 3A.
  • the power supply communication control device 71 is a device that is connected to the power supply device 6 via a wireless or wired communication path, communicates with the power supply device 6, and controls the power supply device 6.
  • the power supply / demand plan creation device 72 is a device that creates a power supply / demand plan based on information acquired from the charging facility 3 and the information terminal 5.
  • the information terminal communication control device 73 is a device that communicates with the information terminal 5 by being connected to the information terminal 5 via a wireless or wired communication path (for example, a public communication path such as the Internet network).
  • the charging facility 3 ⁇ / b> A includes the server communication device (communication means) 33 in the charging facility 3 described in the first embodiment.
  • the charging facility 3A is, for example, a charging stand installed on the road shoulder or a meter installed in the house.
  • charging cable 4 is included in the configuration of charging facility 3A as part of the charging stand. Further, when the charging facility 3 ⁇ / b> A is a meter, the charging cable 4 may be a part of the configuration of the vehicle 2. In this case, the end of the charging cable 4 is preferably a power plug that can be connected to an outlet.
  • the charge change sequence corresponds to step S40 to step S46 in FIG. (1)
  • the information terminal 5 When the change of the charging schedule is input from the user to the information terminal 5, the information terminal 5 generates a charging schedule change request message and transmits it to the vehicle 2 and the supply and demand planning server 7 (step S40).
  • This change request message may be transmitted from the information terminal 5 to the supply / demand planning server 7 or may be transmitted from the information terminal 5 to the supply / demand planning server 7 via the vehicle 2.
  • the supply / demand planning server 7 When the supply / demand planning server 7 receives the change request message, the supply / demand planning server 7 transmits a notification message (first notification message) to the charging facility 3A and the power supply device 6 so as to stop the power supply to the vehicle 2 (step S41). (3) Upon receiving the notification message from the supply and demand planning server 7, the charging facility 3A and the power supply device 6 stop supplying power to the vehicle 2 (step S42).
  • the supply and demand planning server 7 Upon receipt of the change request message, the supply and demand planning server 7 generates charging parameters (for example, a power charge, a scheduled charging completion time, etc.) applied when changing the charging schedule (step S43). Preferably, the charging parameter satisfies a condition before changing the charging schedule. Select whether or not to approve changes to the charging schedule if the charging parameters do not satisfy the conditions prior to changing the charging schedule (for example, power charges per unit time, charging start time, scheduled charging end time, power supply amount, etc.) Including a flag (or code). (5) The supply and demand planning server 7 generates a response message including the newly generated charging parameter and transmits it to the information terminal 5 (step S44). Further, the vehicle 2 separately notifies the information terminal 5 of information related to the current state of the battery 20 (step S44 ′).
  • charging parameters for example, a power charge, a scheduled charging completion time, etc.
  • the charging parameter satisfies a condition before changing the charging schedule.
  • the information terminal 5 When the information terminal 5 receives the response message from the vehicle 2 and the supply and demand planning server 7, the information terminal 5 creates a changed charging schedule by using information on the charging parameters and the current state of the battery 20 (step S45).
  • step S41, step S43, and step S44 ′ are not limited to this order, and may be interchanged in any order.
  • the information terminal 5 that has received the response message determines that the charge schedule cannot be changed (when a desired charge schedule cannot be created from the changed charge parameters, the user cannot obtain approval). Then, the information terminal 5 includes the information to that effect in the notification message and transmits it to the supply and demand planning server 7.
  • the information terminal 5 notifies the supply / demand planning server 7 of the changed charging schedule.
  • the information terminal 5 may notify the vehicle 2 or the charging facility 3A of the changed charging schedule, and the vehicle 2 or the charging facility 3A that has received this notification may notify the supply and demand planning server 7.
  • the communication path passes through the vehicle 2 and the charging facility 3A, the confidentiality of the changed charging schedule can be maintained even if notification is made using a simple communication protocol.
  • the changed charging schedule may be created by the vehicle 2 instead of the information terminal 5. For example, when the user's approval is unnecessary, it is not necessary for the vehicle 2 to transmit information regarding the current charging state of the battery 20 to the information terminal 5, and the communication load of the vehicle 2 and the information terminal 5 can be reduced.
  • the changed charging schedule is transmitted from the vehicle 2 to the charging facility 3A via the charging cable 4.
  • the charging facility 3A refers to its own power supply schedule, and if it is possible to supply power according to the changed charging schedule, notifies the supply / demand planning server 7 of the changed charging schedule. On the other hand, if the charging facility 3A determines that power supply is not possible in the changed charging schedule, the charging facility 3A notifies the user to that effect without transferring the changed charging schedule to the supply and demand planning server 7. By doing in this way, the communication load of 3 A of charging facilities and the demand-and-supply plan server 7 can be reduced.
  • the information terminal communication control device 73 determines whether or not a change request message is received at a predetermined cycle or at an arbitrary timing (step S301). If the change request message has not been received, the process returns to the state before step S301. When the change request message is received, the information terminal communication control device 73 reads information (for example, desired charge power, desired charge completion time, current charge state of the battery 20, etc.) included in the change request message, and the power supply / demand plan The creation device 72 is notified. (Step S302).
  • the power supply and demand plan creation device 72 refers to the power supply schedule of the charging facility 3A and determines whether or not the charge schedule can be changed according to the information included in the change request message (step S303).
  • the power supply schedule of the charging facility 3 ⁇ / b> A is stored in, for example, a memory (not shown) held by the supply and demand planning server 7.
  • the information terminal communication control device 73 reads information from the change request message, but the power supply and demand plan creation device 72 may read the information.
  • the power supply and demand plan creation device 72 stops supplying power to the vehicle 2 to the charging facility 3A via the charging facility communication device 70, to the power supply device 6 via the power communication control device 71.
  • a notification (or instruction) signal is transmitted to each of them (step S304).
  • the power supply and demand plan creation device 72 applies the charging parameters (for example, the power charge per unit time, the charging start time, and the charging end schedule) applied when changing the charging schedule.
  • the time, power supply amount, etc. are notified to the information terminal communication control device 73 (step S305).
  • This charging parameter is calculated or determined by the supply and demand planning server 7 based on the information of the change request message. For example, when the power supply schedule of the charging facility 3A (the charging facility corresponding to the user's vehicle 2 that has transmitted the change request message) is vacant, the demand-and-supply planning server 7 determines the period (supply / demand) required for the charging schedule change sequence from that time. The period after the plan server 7 notifies the charging parameters and receives the changed charging schedule is calculated as the charging start time.
  • the power charge per unit time is determined according to a charge table (for example, a table describing the relationship between the charging time and the power charge per unit time) held in the memory or the like by the supply and demand planning server 7.
  • the power charge is set lower than usual.
  • the charging facility 3 ⁇ / b> A takes over the power scheduled to be supplied to the other vehicle 2 or the like, the power charge is set to be higher than usual.
  • the information terminal communication control device 73 generates a response message including the charging parameter and transmits it to the information terminal 5 (step S306).
  • information terminal communication control device 73 includes a flag (or code) to change the charging schedule in the response message.
  • the power supply / demand plan creation device 72 determines that the charge schedule cannot be changed, the power supply / demand plan creation device 72 notifies the information terminal communication control device 73 (step S307).
  • the information terminal communication control device 73 generates a response message including a flag indicating that the charge schedule cannot be changed, and transmits the response message to the information terminal 5 (step S308).
  • the information terminal communication control device 73 receives a notification message including the changed charging schedule (step S309).
  • the information terminal communication control device 73 reads out the changed charging schedule and notifies the power supply and demand plan creation device 72 (step S310).
  • the power supply and demand plan creation device 72 notifies the charging facility communication device 70 of the changed charging schedule.
  • the charging equipment communication device 70 generates a notification message including the changed charging schedule and transmits it to the charging equipment 3A (step S311).
  • step S312 It is determined whether or not the charging facility communication device 70 has received a response message from the charging facility 3A (step S312). If the response message is not received within the predetermined time, the charging equipment communication device 70 returns to step S311 and retransmits the notification message. When the response message is received, the charging equipment communication device 70 ends the process of the charge change sequence.
  • communication between the supply and demand planning server 7 and the information terminal 5 may be performed via the charging facility 3 ⁇ / b> A and the vehicle 2.
  • the power supply and demand plan creation device 72 notifies the charging facility communication device 70 of the charging parameters instead of the information terminal communication control device 73, and the charging facility communication device 70 receives the changed charging schedule.
  • the charging facility communication apparatus 70 receives a notification message including a new charging schedule in step S310, the charging facility 3A acquires information on the changed charging schedule. For this reason, the power supply and demand plan creation device 72 ends the process of the charge change sequence without notifying the charging facility 3A of the changed charge schedule after step S309.
  • the power supply and demand plan creation device 72 notifies the power supply communication control device 71 of the changed charging schedule.
  • the power supply communication control device 71 transmits a control signal for controlling power supply to the power supply device 6 in response to the changed charging schedule.
  • the demand-and-supply plan server 7 is not limited to the information terminal communication control device 73, but can also change the charging schedule in response to a change request from the charging facility communication device 70.
  • the charging equipment communication device 70 determines whether or not a change request message is received from the charging equipment 3A at a predetermined cycle or at an arbitrary timing.
  • the charging facility communication device 70 reads information (for example, desired charge power, desired charge completion time, current charge state of the battery 20, etc.) included in the change request message, and creates a power supply and demand plan. Notify the device 72.
  • the power supply and demand plan creation device 72 refers to its own power supply schedule and determines whether or not the charge schedule can be changed according to the information included in the change request message. Subsequent operations are the same as those after step S304 in FIG. Here, the charging facility communication device 70 reads information from the change request message, but the power supply and demand plan creation device 72 may read the information.
  • the charging facility communication device 70, the power supply communication control device 71, the power supply and demand plan creation device 72, and the information terminal communication control device 73 have been described as individual devices. However, these may be programs. Furthermore, the program may be composed of one or a plurality of programs. In the case of a plurality of programs, these are driven by the same or separate computers.
  • the server communication device 33 determines whether or not a notification message for stopping power supply and a notification message for notification of charging parameters are received from the supply and demand planning server 7 at a predetermined cycle or at an arbitrary timing (step S321). If the notification message has not been received, the server communication device 33 returns to the state before step S321.
  • the server communication device 33 notifies the power supply control device 30 that the charging schedule is to be changed (step S322).
  • the power supply control device 30 stops power supply to the vehicle 2 (step S323).
  • the server communication device 33 determines whether or not a notification message including the changed charging schedule is received at a predetermined cycle or at an arbitrary timing (step S324). If this notification message has not been received, the process returns to the state before step S324.
  • step S325 When it is determined that the server communication device 33 (or the communication device 31) has received the notification message including the changed charging schedule, this is notified to the power supply control device 30 (step S325), and the processing of the charging change sequence is terminated.
  • the charge start sequence resumes.
  • the power feeding control device 30 feeds the electric power supplied from the power supply device 6 to the vehicle 2 based on the changed charging schedule.
  • control device 21 and the communication device 22 have been described as individual devices. However, these may be programs. Furthermore, the program may be composed of one or a plurality of programs. In the case of a plurality of programs, these are driven by the same or separate computers.
  • the second communication method is OFDM here, it may be replaced by wired communication such as CAN (Controller Area Network) or wireless communication such as Wi-Fi.
  • wired communication such as CAN (Controller Area Network) or wireless communication such as Wi-Fi.
  • the information terminal 5 determines whether or not the user inputs a change in the charging schedule at a predetermined cycle or at an arbitrary timing (step S331). If it is determined that there is no change input, the information terminal returns to the state before step S331. When the information terminal 5 determines that the charging schedule change input has been made, the information terminal 5 generates a charging schedule change request message (step S332). The information terminal 5 transmits the generated change request message to the supply and demand planning server 7 (step S333).
  • the information terminal 5 determines whether or not a response message has been received from the supply and demand planning server 7 at a predetermined cycle or at an arbitrary timing (step S334). If the information terminal 5 has not received the response message, the process returns to step S333.
  • the information terminal 5 when the number of transmissions of the change request message exceeds a predetermined number of times, the information terminal 5 considers that the charging facility 3 to which the vehicle 2 is connected cannot respond to the change of the charging schedule, and processes the charging change sequence. Exit. In this case, preferably, the information terminal 5 notifies the user that it has been determined that the charging schedule cannot be changed.
  • the information terminal 5 determines whether the response message includes a charging parameter or a response message notifying that the charging schedule cannot be changed (step S335). If the information terminal 5 determines that the notification message that the charge schedule cannot be changed is determined, the information terminal 5 considers that the charging facility 3 connected to the vehicle 2 cannot cope with the change of the charge schedule, and ends the process of the charge change sequence. Also in this case, preferably, the information terminal 5 notifies the user that it has been determined that the charging schedule cannot be changed.
  • the information terminal 5 When the information terminal 5 determines that the notification message includes the charging parameter, the information terminal 5 reads out the charging parameter and determines whether or not the information needs to be approved by the user (step S336). If the information terminal 5 determines that the item that requires user approval is included, the information terminal 5 notifies the user of the item that requires approval (step S337). In this case, preferably, the information terminal 5 converts the charging parameter information into the departure delay time and notifies it.
  • the information terminal 5 waits for a predetermined time and determines whether or not an approval input has been received from the user (step S338). If user approval is received, the process proceeds to the next step S339. On the other hand, if the user's approval is not received within the predetermined time, the information terminal 5 determines that the charge schedule cannot be changed, and ends the process of the charge change sequence. In this case, preferably, the information terminal 5 notifies the user that it has been determined that the charging schedule cannot be changed.
  • step S336 When the items that require user approval are not included in step S336, and when the user approval is obtained in step S338, the information terminal 5 uses the read charging parameters and information on the current state of the battery 20, A charge schedule after change is created (step S339). Note that the information terminal 5 separately acquires information on the current state of the battery 20 from the vehicle 2 by the method described in the first and second embodiments.
  • the information terminal 5 generates a notification message including information on the newly created charging schedule after the change (step S340).
  • the information terminal 5 transmits the changed charging schedule to the supply and demand planning server 7 (step S341), and ends the processing of the charging change sequence.
  • the information terminal 5 may transmit the changed charging schedule to the charging facility 3 ⁇ / b> A via the vehicle 2.
  • the power supply device 6 receives a control signal corresponding to the changed charging schedule from the supply and demand planning server 7 after the charging change sequence.
  • the power supply device 6 supplies power to the charging facility 3A based on this control signal.
  • the charging facility 3A can be configured simply. Moreover, since the supply and demand planning server 7 collectively manages the charging schedules of the plurality of charging facilities 3A, the installation cost and operation cost of the entire charging system can be reduced. Further, the information terminal 5 makes a change request to the supply and demand planning server 7 through a public communication path. For this reason, it can communicate safely using the existing communication protocol with which security was ensured.
  • Embodiment 3 the case where the information terminal 5 requests the supply and demand planning server 7 to change the charging schedule has been described.
  • the fourth embodiment a case will be described in which an event that requires a change in the charging schedule occurs on the supply and demand planning server 7 side.
  • the charge change sequence corresponds to steps S50 to S56 in FIG. (1) If an event requiring a change in the charging schedule occurs on the supply / demand planning server 7 side (at least one of the charging facility 3A, the power supply device 6 and the supply / demand planning server 7) during the charging process, the supply / demand planning server 7 Is detected and a change notification message for notifying the change of the charging schedule is generated and transmitted to the information terminal 5 (step S50). When the information terminal 5 receives this change notification message, the information terminal 5 notifies the user that an event requiring a change in the charging schedule has occurred.
  • the state of the power supply device 6 or the power network changes and the charging schedule must be changed.
  • Distribution request Power shortage, change in billing amount, CO2 emission fluctuation, request from other vehicle 2 connected to charging facility 3A or information terminal 5 controlling this
  • the supply and demand planning server 7 After transmitting the change notification message, the supply and demand planning server 7 notifies the charging facility 3A and the power supply device 6 to stop the power supply to the vehicle 2 (step S51). (3) Upon receiving the notification from the supply and demand planning server 7, the charging facility 3A and the power supply device 6 stop power feeding to the vehicle 2 (step S52).
  • the information terminal 5 When the change of the charging schedule is input from the user to the information terminal 5, the information terminal 5 generates a charging schedule change request message and transmits it to the supply and demand planning server 7 (step S53).
  • the supply and demand planning server 7 Upon receipt of the change request message, the supply and demand planning server 7 generates a charging parameter (for example, an electric charge, a scheduled charging completion time, etc.) applied when changing the charging schedule, and a response including this charging parameter.
  • a message is returned to the information terminal 5 (step S54).
  • the vehicle 2 communicates separately with the information terminal 5, and notifies the information terminal 5 of information related to the current state of the battery 20 (step S54 ').
  • the charging parameter included in the response message satisfies conditions before changing the charging schedule (for example, a power charge per unit time, a charging start time, a scheduled charging end time, a supplied power amount, etc.).
  • a flag (or code) for selecting whether to approve the changing of the charging schedule is included.
  • the information terminal 5 When the information terminal 5 receives the response message from the supply and demand planning server 7, the information terminal 5 creates a changed charging schedule by using information on the charging parameters and the current state of the battery 20 (step S55). In this case, if the user's approval is necessary, the information terminal 5 notifies the user of necessary approval items by screen display or voice and receives an approval input from the user. Preferably, the information terminal 5 converts the charging parameter information into a departure delay time and notifies it.
  • the information terminal 5 generates a notification message including the changed charging schedule and transmits it to the supply and demand planning server 7 (step S56).
  • the supply and demand planning server 7 receives the notification message, it ends the charge change sequence. Note that the above-described steps S50 and S51 may be performed in the reverse order.
  • the information terminal 5 that has received the response message determines that the charge schedule cannot be changed (when a desired charge schedule cannot be created from the changed charge parameters, the user cannot obtain approval).
  • the information terminal 5 transmits the notification message including the information to the supply and demand planning server 7.
  • the information terminal 5 receives the response message, but the vehicle 2 may receive the response message.
  • the vehicle 2 transmits a response message to the information terminal 5 including information on the current state of charge of the battery 20. This eliminates the need for the information terminal 5 and the vehicle 2 to separately communicate in order to notify information related to the current state of charge of the battery 20.
  • the information terminal 5 notifies the supply and demand planning server 7 of the changed charging schedule.
  • the information terminal 5 may notify the vehicle 2 or the charging facility 3A of the changed charging schedule, and the vehicle 2 or the charging facility 3A that has received this notification may notify the supply and demand planning server 7.
  • the confidentiality of the changed charging schedule can be maintained even if the communication protocol is simpler than when using a public communication path.
  • the supply and demand planning server 7 determines whether or not an event that requires a change in the charging schedule has occurred at a predetermined cycle or at an arbitrary timing (step S401).
  • the charging facility communication device 70 detects that a change request has been input to the charging facility 3A
  • the power communication control device 71 detects the charging schedule in the power supply device 6 or the power network connected thereto.
  • the power supply and demand plan creation device 72 is detected. Notice.
  • the power supply and demand plan creation device 72 notifies the information terminal communication control device 73 that an event requiring a change in the charging schedule has occurred.
  • the information terminal communication control device 73 generates a change notification message including a flag (or code) indicating that the charge schedule needs to be changed, and transmits the change notification message to the information terminal 5 (step S402).
  • the power supply / demand plan creation device 72 also notifies the charging facility communication device 70 and the power supply communication control device 71 that an event requiring a change in the charging schedule has occurred (step S403).
  • the charging facility communication device 70 and the power supply communication control device 71 stop supplying power to the vehicle 2 (step S404).
  • the information terminal communication control device 73 determines whether or not a charge schedule change request message has been received at a predetermined cycle or at an arbitrary timing after step S404 (step S405). If the change request message has not been received, the process returns to step S402. When the change request message is received, the information terminal communication control device 73 reads information (for example, desired charge power, desired charge completion time, etc.) included in the change request message and notifies the power supply and demand plan creation device 72 (step). S406).
  • information for example, desired charge power, desired charge completion time, etc.
  • the power supply and demand plan creation device 72 refers to the power supply schedule of the charging facility 3A, and determines whether or not the charge schedule can be changed according to the information included in the change request message (step S407). When it is determined that the charge schedule cannot be changed, the power supply and demand plan creation device 72 ends the charge change sequence.
  • the demand and supply plan server 7 When ending the charge change sequence, preferably, the demand and supply plan server 7 notifies the user that the charge schedule cannot be changed.
  • the information terminal communication control device 73 reads information from the change request message, but the power supply and demand plan creation device 72 may read the information.
  • the power supply and demand plan creation device 72 uses the charging parameters (for example, the power rate per unit time, the charging start time, the charging end scheduled time, The amount of power supplied) is notified to the information terminal communication control device 73 (step S408).
  • the charging parameters for example, the power rate per unit time, the charging start time, the charging end scheduled time, The amount of power supplied
  • the power charge is set to be lower than normal.
  • the charging facility 3 ⁇ / b> A takes over the power scheduled to be supplied to the other vehicle 2, the power charge is set to be higher than usual.
  • the information terminal communication control device 73 generates a notification message including this charging parameter and transmits it to the information terminal 5 (step S409).
  • the notification message is, for example, information such as "Can you delay the departure time (scheduled end time of charging)" or "Can I discharge W from 0:00 to ⁇ ?" Can also be included.
  • the information terminal communication control device 73 When the information terminal communication control device 73 receives the changed charging schedule from the information terminal 5, the information terminal communication control device 73 notifies the power supply and demand plan creation device 72 (step S410) and ends the processing of the charging change sequence.
  • communication between the supply and demand planning server 7 and the information terminal 5 may be performed via the charging facility 3 ⁇ / b> A and the vehicle 2.
  • the power supply and demand plan creation device 72 notifies the charging facility communication device 70 of the charging parameters instead of the information terminal communication control device 73, and the charging facility communication device 70 receives the changed charging schedule.
  • the charging facility communication device 70, the power supply communication control device 71, the power supply and demand plan creation device 72, and the information terminal communication control device 73 have been described as individual devices. However, these may be one or a plurality of programs. In the case of a plurality of programs, these are driven by the same or separate computers.
  • the power supply to the vehicle 2 may be stopped according to the content of the change request message from the information terminal 5. Specifically, when the change request message includes a flag (or code) for requesting the initial charging schedule, the demand-and-supply planning server 7 initially charges the vehicle 2 corresponding to the information terminal 5.
  • the charging schedule is a flag (or code) for requesting the initial charging schedule.
  • the supply and demand planning server 7 notifies the information terminal 5 that an event requiring a change in the charging schedule has occurred. For this reason, the charging system 1A can change the charging schedule in response to the occurrence of an event that requires changing the charging schedule on the supply and demand planning server side such as the charging facility 3A, the power supply device 6, and the supply and demand planning server 7.
  • the charging facility 3A can change the charging schedule from the charging facility 3A by providing the information input / output device 32 for the user to input and output information related to the charging schedule.
  • the supply and demand planning server 7 determines whether to stop power supply to the vehicle 2 according to the content of the change request message from the information terminal 5, so that the vehicle 2 is charged by the reserved time. Can be completed. Thereby, the reliability of the charging system 1A is improved.
  • Embodiment 2 The case where a change request is generated from the user side has been described as the first and third embodiments. Moreover, the case where the event which needs the change of a charging schedule generate
  • the notification method to the user is not limited to this, and may be another method such as blinking of a lamp.
  • the charging parameters and the like are notified by a message, but this message does not have to be one, and a plurality of messages may be combined to transmit one information group.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Transportation (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Sustainable Development (AREA)
  • Sustainable Energy (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Electric Propulsion And Braking For Vehicles (AREA)

Abstract

 バッテリ20を搭載した車両2、充電設備3、及び情報端末5を備えた充電システム1において、バッテリ20の充電スケジュール作成後に、充電ケーブルを挿入し直すことなく変更する方法として、充電スケジュールの変更要求を受信するステップと、受信した充電スケジュールの変更要求に応じて、充電スケジュールを変更する場合に適用される充電パラメータを充電設備3から取得するステップと、充電設備3から取得した充電パラメータを用いて変更後の充電スケジュールを作成するステップと、を備える。

Description

充電スケジュールの変更方法、車両、充電制御装置、及び情報入出力装置
 この発明は、充電ケーブル(充電ガン)を用いて車載バッテリに電力供給を行う充電スケジュールの変更方法、車両、充電制御装置、及び情報入出力装置に関するものである。
 近年、バッテリを搭載し、電気を動力源とする電気自動車及びハイブリッド車が実用化されている。バッテリに給電するため、充電インフラである充電設備(充電制御装置)も各地に設置され始めている。
 しかし、電気自動車のバッテリをフル充電するには十数kWh(一般家庭の平均消費電力量に換算して2~3日分)という多大な電力用を必要とする。
 このため、電気自動車の電力供給設備(グリッド)では、負荷調整機能や配電制御機能などの充実化が課題とされ、電力の需要・供給の自動制御手段を組み込んだ「スマートグリッド」と呼ばれる次世代の電力網が注目を浴びている。
 一方、充電設備は、地域やそのシステム構成により、インフラの事情(例えば、配電盤又はブレーカーが出力可能な電流の制限値、電力会社又は太陽光発電機が供給可能な電力量)がそれぞれ異なる。このため、電気自動車及びハイブリッド車は、移動先で接続する充電設備に応じた充電制御を要する。
 上記の問題を解決するため、充電インフラに接続している電気自動車を充電する技術として、これまでに、IEC61851、E-Mobility等が提案されている。(IEC61851では、充電インフラが、充電時にリアルタイムの供給可能電力、電流、電圧などの値を車両に通知する。また、E-Mobilityでは、充電インフラが「AM10時からAM12時まで10Kwhの電力を1Kwhあたり20円で供給可能」などの詳細な充電スケジュールを車両に通知する。)また、車両が必要とする充電量等に基づき充電制御装置が充電スケジュールを作成し、この充電スケジュールに基づきバッテリを充電する方法が検討されている(特許文献1)。
特開2009-136109号公報
 しかし、このような方法は、充電スケジュールを作成する方法であるものの、充電制御装置が充電スケジュールを作成した後は、充電ケーブルを挿入し直さねばその充電スケジュールを変更することができない、という課題がある。
 この発明は、上記のような課題を解決するためになされたもので、充電ケーブルを挿入し直すこと無く充電スケジュールの変更を可能とする充電スケジュールの変更方法、車両、充電制御装置、及び情報入出力装置、を得ることを目的とする。
 この発明に係る充電スケジュールの変更方法は、車両に搭載される蓄電手段の充電スケジュールを変更する方法であって、充電スケジュールの変更要求を受信するステップと、受信した充電スケジュールの変更要求に応じて、充電スケジュールを変更する場合に適用される充電パラメータを、充電制御装置から取得するステップと、充電制御装置から取得した充電パラメータを用いて、変更後の充電スケジュールを作成するステップと、を備えたものである。
 また、この発明に係る車両は、蓄電手段と、蓄電手段への充電を充電スケジュールに応じて制御する制御手段と、充電スケジュールの変更要求に応じて充電制御装置と通信し、充電スケジュールを変更する場合に適用される充電パラメータを充電制御装置から取得する通信手段と、を備え、蓄電手段の充電状態に関する情報および通信手段が取得した充電パラメータを用いて変更後の充電スケジュールを作成するものである。
 また、この発明に係る充電制御装置は、蓄電手段を搭載した車両と通信する通信手段と、蓄電手段への給電を充電スケジュールに応じて制御する給電制御手段と、を備え、通信手段が充電スケジュールの変更要求を受信すると、充電スケジュールを変更する場合に適用される充電パラメータを車両へ通知するものである。
 また、この発明に係る情報入出力装置は、蓄電手段を搭載した車両と通信する情報入出力装置であって、蓄電手段の充電スケジュールへの変更が入力されると、充電スケジュールの変更要求を車両へ通知し、車両から蓄電手段の充電状態に関する情報を取得し、蓄電手段へ給電する充電制御装置から充電スケジュールを変更する場合に適用される充電パラメータを取得し、取得した蓄電手段の充電状態に関する情報および充電パラメータを用いて変更後の充電スケジュールを作成するものである。
 この発明によれば、上記の構成を備えたことにより、充電ケーブルを挿入し直すこと無く充電スケジュールを変更できる。
実施の形態1に係る充電システムの構成図である。 実施の形態1に係る充電システムのシーケンスを示す図である。 実施の形態1に係る車両の充電開始の動作を示すフローチャートである。 実施の形態1に係る充電設備の充電開始の動作を示すフローチャートである。 実施の形態1に係る情報端末の充電スケジュール変更の動作を示すフローチャートである。 実施の形態1に係る車両の充電スケジュール変更の動作を示すフローチャートである。 実施の形態1に係る車両の充電スケジュール変更の他の動作を示すフローチャートである。 実施の形態1に係る充電設備の充電スケジュール変更の動作を示すフローチャートである。 実施の形態2に係る充電システムのシーケンスを示す図である。 実施の形態2に係る充電設備の充電スケジュール変更の動作を示すフローチャートである。 実施の形態2に係る車両の充電スケジュール変更の動作を示すフローチャートである。 実施の形態2に係る情報端末の充電スケジュール変更の動作を示すフローチャートである。 実施の形態3に係る充電システムの構成図である。 実施の形態3に係る充電システムのシーケンスを示す図である。 実施の形態3に係る需給計画サーバの充電スケジュール変更の動作を示すフローチャートである。 実施の形態3に係る充電設備の充電スケジュール変更の動作を示すフローチャートである。 実施の形態3に係る情報端末の充電スケジュール変更の動作を示すフローチャートである。 実施の形態4に係る充電システムのシーケンスを示す図である。 実施の形態4に係る需給計画サーバの充電スケジュール変更の動作を示すフローチャートである。
実施の形態1.
 本発明を実施するための実施の形態1にかかる充電システムを、図1ないし図8を用いて説明する。
<充電システムの構成>
 図1は実施の形態1に係る充電システムの構成を示す図である。図1において、充電システム1は、車両2、充電設備(充電制御手段)3、充電ケーブル(充電ガン)4、情報端末(情報入出力装置)5、を備える。なお、充電システム1が備える車両2は一台に限らず、複数台であっても良い。
 充電設備3は、例えば、路肩に設置される充電スタンド、宅内に設置されるメーター、充電スタンドに配電会社及び電力会社の少なくとも一方が接続された給電システム、である。
 充電設備3が充電スタンドの場合、充電ケーブル4は充電スタンドの一部として充電設備3の構成に含まれる。また、充電設備3がメーターの場合、充電ケーブル4は車両2の構成の一部としても良い。この場合、好ましくは、充電ケーブル4の端部は、コンセントに接続可能な電源プラグである。
 情報端末5は、例えば、携帯電話、スマートフォン、カーナビゲーション装置、である。情報端末5は、車両2への充電スケジュールを作成するために必要な情報の入出力に用いる。ここでは、情報端末5は車両2とは異なる装置として説明するが、情報端末5は車両2の構成の一部として組込まれていても良い。
(車両の構成)
 車両2は電気自動車(電動車両)である。車両2は、バッテリ(蓄電手段)20、制御装置(制御手段)21、通信装置(通信手段)22、充電ポート23、を備える。
 なお、車両2はバッテリの電力で駆動されるモータのみを動力源とするものに限らず、例えば、モータとガソリンエンジンとを併用したプラグインハイブリッド車を含む。
 制御装置21は、バッテリ20及び充電ポート23に電力線を介して接続され、通信装置22に信号線を介して接続されている。制御装置21は通信装置22からの指示(又は通知)に従い、この指示(又は通知)に応じて、充電ポート23側から供給される電力(充電ケーブル4を介して充電設備3から供給される電力)をバッテリ20へ充電させる動作を制御する。
 通信装置22は、第1の通信方式(後述)及び第2の通信方式(後述)で充電設備側の通信装置31(後述)と通信する際に用いられる装置である。図1では、通信装置22は、制御装置21、充電ポート23、及び情報端末5に、信号線を介して接続されている。
 通信装置22は、充電ケーブル4の接続有無の情報、バッテリ20の充電パラメータ、などを、充電設備側の通信装置31(後述)との通信で取得する。また、車両2の所有者に確認すべき事項があれば、情報端末5と通信を行い、その情報を情報端末5から取得する。
(充電設備の構成)
 充電設備3は、給電制御装置(給電制御手段)30、通信装置(通信手段)31、情報入出力装置(情報入出力手段)32、を備える。
 例えば充電設備3が充電スタンドの場合、給電制御装置30は、配電会社又は電力会社の電力網及び充電ケーブル4と電力線を介して接続され、通信装置31と信号線を介して接続される。給電制御装置30は、通信装置31からの指示に従い、充電ケーブル4側(車両2のバッテリ20)への電力供給を制御する。
 また、充電設備3がメーターの場合、給電制御装置30は、配電会社又は電力会社の電力網及び充電ケーブル4の接続口と電力線を介して接続され、通信装置31と信号線を介して接続される。この場合も、給電制御装置30は、通信装置31からの指示に従い、充電ケーブル4側(車両2のバッテリ20)への電力供給を制御する。
 また、充電設備3が、充電スタンドに配電会社又は電力会社の電力網が接続された給電システムの場合、給電制御装置30は、充電ケーブル4及び配電会社等の電力網と電力線を介して接続され、通信装置31と信号線を介して接続される。この場合、給電制御装置30は、通信装置31との間で電力網が供給可能な電力量の情報等を相互に交換する。そして、給電制御装置30は、通信装置31からの指示に従い、充電ケーブル4側(車両2のバッテリ20)への電力供給を制御する。
 通信装置31は、第1の通信方式(後述)及び第2の通信方式(後述)で車両側の通信装置22と通信する際に用いられる装置である。図1では、通信装置31は、給電制御装置30、情報入出力装置32、及び充電ケーブル4に、信号線を介して接続されている。
 情報入出力装置32は、例えば、充電スタンドの表面に設けられた、ユーザーが充電スケジュールを変更するための情報を入力したり、設備管理人が充電スケジュールを読み出したりするインターフェースである。情報入出力装置32の具体例としては、タッチパネル、キーボード、マウス、マイク、スピーカ、等がある。
 なお、ここでは充電設備3が情報入出力装置32を備える構成を説明するが、充電スケジュールの変更を情報端末5又は車両側の通信装置22から行う場合、情報入出力装置32は充電設備3に必須の構成ではない。
<充電システムの通信方式>
 充電システム1で行われる通信の第1の通信方式及び第2の通信方式を説明する。
(第1の通信方式)
 第1の通信方式は、PWM(Pulse Wide Modulation)型の通信方式である。この通信方式では、信号のパルス波のデューティ比を変化させて変調することで通信を行う。第1の通信方式で行われる通信は、例えば、IEC61851で規定されるコントロールパイロット信号を用いた通信(コントロールパイロット通信)である。
 コントロールパイロット通信は、充電ケーブル4内部の信号線を用い、その信号線の電圧(信号線電圧)のレベル変化を制御して情報の伝達を行う。
 コントロールパイロット通信が用いられる場合には、例えば、車両2及び充電設備3が充電ケーブル4を介して接続されたことを相互に検出する場合、充電ケーブル4が車両2又は充電設備3から取り外されたことを相互に検出する場合、漏電を検出する場合、電力線通信(Power Line Communications;以下、PLC通信と称する)(後述)の開始/停止タイミングを検出する場合、バッテリ20が充電可能な状態となったことを車両2が充電設備3へ通知する場合、充電設備3が供給可能な電流の最大値(最大供給電流値)を充電設備3から車両2へ通知する場合等がある。
(第2の通信方式)
 第2の通信方式は、OFDM(Orthogonal Frequency-Division Multiplexing)などスペクトル拡散型の通信方式である。第2の通信方式で行われる通信は、例えば、PLC通信である。
 PLC通信は、コントロールパイロット通信と同じく、充電ケーブル4内部の信号線(コントロールパイロット通信用の既存の信号線)を用いる。また、PLC通信は、コントロールパイロット通信で使用する周波数帯域(例えば、1KHz程度)の信号から干渉の影響を受けにくい周波数帯域(例えば、2MHz~30MHz程度)の信号を使用する。
 PLC通信が用いられる場合には、例えば、充電に関する情報(電力残量、充電の開始/停止の命令、充電時の電流値の指定など)を送受信する場合、車両2から電力プロバイダへの放電制御を目的とした情報を送受信する場合、充電の課金処理に使用する契約情報や識別情報を送受信する場合等がある。
 なお、ここでは、コントロールパイロット通信とPLC通信とが同じ信号線を通信路として用いることとして説明するが、これらはそれぞれ異なる信号線を通信路として用いても良い。また、コントロールパイロット通信とPLC通信の双方又はいずれか一方を無線通信としても良い。但し、コントロールパイロット通信及びPLC通信を有線通信とした場合、より簡易な通信網の構成でセキュリティを確保することができる。
<充電システムの動作>
 ここで、充電システム1の動作を説明する。
 車両2のバッテリ20を充電する場合、車両2の充電ポート23には充電ケーブル4の充電コネクター(図示しない)が挿入される。そして、車両2及び充電設備3が充電ケーブル4を介して接続される。車両2及び充電設備3は、充電ケーブル4が車両2に挿入されたことを検出すると、充電に必要な情報を第1の通信方式及び第2の通信方式を用いて相互に送受信し、取得する。
 以下、車両2及び充電設備3の間で行われる通信(初期接続、共通セッション、充電セッション)を説明する。特に、充電セッションはこの発明に特有の動作であるため、詳細に説明する。
(初期接続)
 車両2及び充電設備3は、OSI(Open Systems Interconnection)参照モデルのネットワーク層(レイヤ3)の通信プロトコル(例えば、IPv6)を用いて通信を行う。このとき、物理層(レイヤ1)ではPWM通信及びOFDM通信を利用する。
 具体的には、車両2は、自身のIPアドレス及び充電設備3のIPアドレスを取得し、車両2は、充電設備3との間にセッションを開設する。好ましくは、車両2及び充電設備3の間の通信は、セキュリティを保つため、トランスポート層(レイヤ4)のプロトコルを用いて行う。
(共通セッション)
 セッション開設後、車両2及び充電設備3は、アプリケーション層(レイヤ7)の通信アプリケーションを用いて通信を行う。このとき、物理層(レイヤ1)ではPLC通信、又は、PWM通信及びOFDM通信の両方を行う。
 共通セッションでは、例えば、対応するサービスの確認、対応するサービスの情報交換、課金方法の選択、課金方法が選択された場合の認証、充電パラメータの交換、等を行う。ここで、充電パラメータの交換シーケンスを説明する。
・充電パラメータの交換シーケンス
(1)車両2は、自身(車両)の充電パラメータ(例えば、ID)を含む通知メッセージを充電設備3へ送信する。
(2)充電設備3は、通知メッセージを受信すると、充電設備3の充電パラメータ(例えば、電力供給スケジュールに関する情報であって、充電開始時刻、充電終了予定時刻、供給電力量、単位時間あたりの電力料金など)を含む応答メッセージを返信する。
(3)車両2が、この応答メッセージを受信すると、充電パラメータの交換シーケンスが終了する。
(充電セッション)
 共通セッションの後、車両2及び充電設備3は、図2に示すような充電セッションを行う。充電セッションでは、充電開始シーケンス及び充電シーケンスを行う。ここで、充電セッションの各シーケンスを、詳細に説明する。
・充電開始シーケンス
 充電開始シーケンスは、図2のステップS11ないしステップS13、及びステップS25に相当する。
(1)車両2は、共通セッションの充電パラメータの交換シーケンスで取得した充電設備3の充電パラメータに基づき、充電スケジュールを作成する(ステップS11)。
(2)車両2は、自身の充電可否状態に関する情報、及び、充電スケジュールに基づき生成した自身の充電スケジュールの情報を含む通知メッセージを送信する(ステップS12)。
(3)充電設備3は、通知メッセージを受信すると、充電スケジュールへの対応可否の情報を含む応答メッセージを車両2へ返信する(ステップS13)。
(4)車両2が充電スケジュールへ対応可の情報を含む応答メッセージを受信すると、車両2が充電スケジュールと充電設備3の充電パラメータから充電終了時刻と充電に必要な電力料金を計算し、計算した結果(充電終了時刻と電力料金)を情報端末5に通知し(ステップS25)、充電開始シーケンスを終了する。
 上述の充電スケジュールおよび充電終了時刻の作成方法としては、たとえば充電開始時点から所定時間経過時までの間で、単位時間あたりの料金が安い電力を優先して所定の電力量を充電する充電スケジュールを作成し、充電終了時刻は本充電スケジュールを作成することで導出されるものがある。
 また、車両2はステップS13で充電設備3から充電スケジュールへ対応可の情報を含む応答メッセージを受信後、情報端末5に充電終了時刻と充電に必要な電力料金を通知する。情報端末5はRAMなどの記憶装置などに通知された充電終了時刻と電力料金を示す充電予約情報を格納しておき、車両2の充電処理が完了するまで有効で情報端末5でいつでも参照できることが望ましい。
 また、情報端末5が3GやLTE(Long Term Evolution)、Wi-Fi(Wireless Fidelity)などの無線通信などを介してサーバ装置と通信可能な状態にある場合は、上述の充電予約情報を無線通信を介してサーバ装置などに保存しておいても良いし、また、車両2に搭載されたHDD(たとえば制御装置21、通信装置22内の不揮発性メモリ)などの記憶装置などに充電予約情報を蓄積しておき、蓄積した充電予約情報を参照しても良い。
 なお、車両2が充電スケジュールへ対応不可の情報を含む応答メッセージを受信した場合、車両2はステップS11に戻り、充電スケジュールを再度生成する。
 また、車両2が所定時間内に応答メッセージを受信しない場合も、車両2はステップS11に戻り、通知メッセージを再送する。
 このようにすることで、充電開始シーケンスの信頼性を向上できる。
[車両の充電開始の動作]
 ここで、車両2の動作を、図3のフローチャートで説明する。
 通信装置22は、取得済みの充電パラメータを制御装置21へ通知する(ステップS101)。制御装置21は、充電パラメータに基づき充電スケジュールを作成する(ステップS102)。制御装置21は、作成した充電スケジュールを通信装置22へ通知する(ステップS103)。通信装置22は、制御装置21が生成した充電スケジュールの情報を含む通知メッセージを生成し、充電設備3へ送信する(ステップS104)。
 通信装置22は、所定周期又は任意のタイミングで、充電設備3から応答メッセージを受信したか否かを判断する(ステップS105)。
 応答メッセージを受信している場合、通信装置22は、通知した充電スケジュールに充電設備3が対応可能か否かを示すフラグ(またはコード)を応答メッセージから読み出す(ステップS106)。一方、応答メッセージを受信していない場合、通信装置22はステップS104へ戻り、通知メッセージを充電設備3へ再送する。但し、通知メッセージの送信回数が予め定めた所定回数を超えた場合、通信装置22は、充電システム1上に給電可能な充電設備3が存在しないとみなし、充電開始シーケンスの処理を終了する。
 充電開始シーケンスの処理を終了する場合、好ましくは、通信装置22は、充電開始できない旨を情報端末5に通知する。これにより、情報端末5を使用するユーザーが、充電を開始できないことを把握できる。
 通信装置22は、読み出したフラグの値が通知した充電スケジュールに充電設備3が対応可能であることを示しているか否か、を判断する(ステップS107)。充電設備3が対応可能であることをフラグの値が示している場合、通信装置22は、その旨を制御装置21へ通知する(ステップS108)。制御装置21は上述の充電終了時刻と充電に必要な電力料金を計算し、計算結果を通信装置22を介して情報端末5に通知した後(ステップS109)、充電開始シーケンスを終了する。充電設備3が対応不可であることをフラグの値が示している場合、通信装置22は、ステップS102へ戻り、充電スケジュールを再度生成する。
 なお、ここでは、通信装置22がフラグの値を読み出すこととしたが、通信装置22が応答メッセージをそのまま制御装置21へ通知することとしても良い。この場合、制御装置21は、応答メッセージのフラグの値を読み出し、車両2が通知した充電スケジュールに充電設備3が対応可能か否かを判断する。
 充電設備3が対応可能であることをフラグの値が示している場合、制御装置21はその旨を通信装置22へ通知し、充電開始シーケンスを終了する。充電設備3が対応不可であることをフラグの値が示している場合、制御装置21は通信装置22へその旨を通知する。通信装置22は、ステップS102へ戻り、充電スケジュールを再度生成する。
 また、ここでは、スケジュール対応可の情報を含む応答メッセージを通信装置22が受信しなければ、通信装置22は通知メッセージを再送することとした。しかし、このような応答メッセージを受信しない場合、通信装置22は、通知メッセージを再送することなく、充電開始シーケンスの処理をそのまま終了しても良い。
 また、充電設備3がPWM通信のみで充電処理を開始可能な場合(たとえば、PWM通信のデューティ比が10~85%など所定の範囲を示す場合など)、充電開始シーケンスが終了した後、PWM通信のみを用いた充電シーケンスに移行しても良い。
 また、ここでは、制御装置21及び通信装置22を個別の装置として説明した。しかし、これらはプログラムであっても良い。さらに、プログラムは一つ又は複数のプログラムで構成されていても良い。複数のプログラムである場合、これらは同一又は個別のコンピュータで駆動される。
[充電設備の充電開始の動作]
 ここで、充電設備3の動作を、図4のフローチャートで説明する。
 通信装置31は、所定周期又は任意のタイミングで、車両2が生成した充電スケジュールの情報を含む通知メッセージを受信しているか否かを判断する(ステップS111)。通知メッセージを受信していない場合、通信装置31は、ステップS111の前の状態へ戻る。一方、通知メッセージを受信した場合、通信装置31は、車両2の充電スケジュールの情報を読み出し、給電制御装置30へ通知する(ステップS112)。給電制御装置30は、自身の給電スケジュールを参照し、車両2の充電スケジュールに対応可能か否かを判断する。給電制御装置30は、判断した結果を通信装置31へ通知する(ステップS113)。
 通信装置31は、通知メッセージに対する応答メッセージを生成する。充電スケジュールに対応可能な場合、通信装置31は、給電制御装置30から通知された結果(充電スケジュールに対応可能である旨)をフラグ(またはコード)の値として応答メッセージに含める(ステップS114)。充電スケジュールに対応不可の場合、通信装置31は、充電スケジュールに対応不可である旨をフラグ(またはコード)の値として応答メッセージに含める(ステップS115)。
 通信装置31は、生成した応答メッセージを車両2へ送信し(ステップS116)、充電開始シーケンスを終了する。
 なお、通信装置31は、通知メッセージを正しく受信できなかった場合も、エラーをフラグ(またはコード)として応答メッセージに含むことができる。
 ここでは、給電制御装置30及び通信装置31を個別の装置として説明した。しかし、これらはプログラムであっても良い。さらに、プログラムは一つ又は複数のプログラムで構成されていても良い。複数のプログラムである場合、これらは同一又は個別のコンピュータで駆動される。
・充電シーケンス
 充電開始シーケンスの後、充電システム1は、充電スケジュールに従い、充電シーケンスを行う。充電シーケンスは、図2のステップS14に相当する。
 車両2のバッテリ20を充電する方法には、AC充電とDC充電の2つの方法がある。充電システム1は、AC充電、DC充電のいずれかに応じて、充電シーケンスを行う。
 ここで、充電要求メッセージは、例えば、車両2の充電準備状態、目標電流値、目標電圧値、許容電圧の最大値、許容電流の最大値、許容電力の最大値、車両のSOC(State Of Charge)、バッテリのフルチャージが完了しているか否か、等の情報を含む。
 また、応答メッセージは、例えば、充電設備3の状態、現在の出力電流値、現在の電圧値、許容電圧の制限値、許容電流の制限値、許容電力の制限値、等の情報を含む。
・充電変更シーケンス
 充電変更シーケンスは、図2のステップS15ないしステップS20に相当する。
(1)情報端末5にユーザーから充電スケジュールの変更が入力されると、情報端末5は、充電スケジュールの変更要求メッセージを生成し、送信する(ステップS15)。この時、情報端末5にはユーザーから変更後の出発時刻、目的地、充電電力量の少なくとも1つの情報が充電スケジュールの変更とあわせて入力され、同様に充電スケジュールの変更要求メッセージには変更後の出発時刻、目的地を示す目的地情報(目的地の緯度・経度または施設の名称および住所)、充電電力量の少なくとも1つが含まれるものとする。
 なお、この充電電力量は情報端末5が目的地までの走行距離を用いて算出した値を用いても良いし、充電スケジュールの変更要求メッセージは車両2および充電設備3にも転送される(S15、S18)ため車両2または充電設備3で同様に計算しても良い。
(2)車両2は、変更要求メッセージを受信すると、充電設備3へ充電の停止を要求する停止要求メッセージを生成し、送信する(ステップS16)。この時、上述のPWM通信線の信号電圧を所定値(たとえば、車両2が充電不可状態にあることを示す9[V])にすることで、車両2が充電スケジュールの変更中であることを示すことが望ましい。
 この停止要求メッセージは、たとえば、「充電終了」、「充電スケジュールの変更」などの情報を示す充電停止理由情報が含まれ、上述のケースでは充電停止理由情報は充電スケジュールの変更を示す。
(3)充電設備3は、第1の充電停止理由情報、すなわち「充電スケジュールの変更」の停止要求メッセージを受信すると、給電する電力線のコンタクタをオープンの状態にするなどして車両2への給電を停止し、充電スケジュールの変更要求メッセージの受信待ちの状態になる(ステップS17)。
 この場合、充電設備3は給電停止前の充電スケジュールに従った充電処理が継続できるように、上述の充電開始シーケンスで車両2に対して許可した、変更前の充電スケジュール(旧充電スケジュール)をメモリなどの記憶装置に保存しておくが好ましい。
 また、充電設備3が充電スケジュールの変更要求メッセージを受信しない、または、充電スケジュールの変更要求の処理が完了しない状態(後述のステップS19で充電設備3からこの通知メッセージに対する対応可の情報を含む応答メッセージを受信しない状態)で、充電開始メッセージを車両2から受信した場合、旧充電スケジュールで充電処理を行っても良いものとする。
 また、充電設備3は、第2の充電停止理由情報、すなわち「充電終了」の停止要求メッセージを受信すると、すみやかに車両2への給電を停止し、旧充電スケジュールをメモリなどの記憶装置に保存しなくてもよい。
(4)車両2は、第1の充電停止理由情報、すなわち「充電スケジュールの変更」の停止要求メッセージを送信した後、充電スケジュールの変更要求メッセージを充電設備3へ送信する(ステップS18)。
(5)充電設備3は、変更要求メッセージを受信すると、充電スケジュールを変更する場合に適用される充電パラメータ(例えば、単位時間あたりの電力料金、充電開始時刻、充電終了予定時刻、供給電力量など)を生成する。充電設備3は、この充電パラメータを含む応答メッセージを車両2へ送信する(ステップS19)。
 好ましくは、応答メッセージに含まれる充電パラメータは、充電スケジュール変更前の条件(例えば、単位時間あたりの電力料金、充電開始時刻、充電終了予定時刻、供給電力量など)を満たす。
(6)車両2は、この応答メッセージを受信し、バッテリ20の現在の充電状態に関する情報(たとえば、SOC(State Of Charge)や充電実行または停止中を示すフラグ)を含めて情報端末5へ転送する。車両2は、情報端末5と別途通信を行い、バッテリ20の現在の充電状態に関する情報を情報端末5へ通知しても良い。
 なお、上述のSOCとは当該バッテリ満充電時の蓄電電力量に対するバッテリに充電されている電力量の割合を示すものとする。
 たとえば満充電時の蓄電電力量が10kwhのバッテリに対して5kwhの電力量が充電されている時のSOCは{5[KWh]÷10[KWh]}×100=50%となる。
(7)情報端末5は、応答メッセージを受信すると、バッテリ20の現在の充電状態に関する情報及び充電パラメータを取得し、これらを用いて変更後の充電スケジュールを作成する。情報端末5は、新たに作成した変更後の充電スケジュールを含む通知メッセージを生成し、充電設備3へ送信する(ステップS20)。
 なお、ユーザーの承認が必要であれば、たとえば、情報端末5が上述の充電予約情報(出発時刻、電力料金)の変更前と変更後の差(出発時刻または電力料金の差)を示す変更内容情報を計算し、この変更内容情報を情報端末5に通知する。
 変更内容情報は、たとえば、変更前の充電予約情報(充電終了時刻X1と電力料金Y1)、変更後の充電予約情報2(充電終了時刻X2と電力料金Y2)とした場合、その差(出発時刻の差ΔX=X2-X1、電力料金の差ΔY=Y2-Y1)として計算しても良い。
 たとえば時刻はUTC時刻(1970年1月1日午前0時0分0秒(UNIX(登録商標)エポック)からの経過秒数)で示し、電力料金は円単位とした場合、出発時刻の差ΔXが正値の場合出発時刻が|ΔX|秒分遅延し、負値の場合|ΔX|秒分早く充電が完了する。(|ΔX|はΔXの絶対値を示す。)
 また、同様に電力料金の差ΔYが正値の場合、充電に必要な電力料金が|ΔY|分高くなり、負値ならば電力料金が|ΔY|分安くなる。
 情報端末5は、変更内容情報を、たとえば「出発時間が10時半(変更前9時半)となりますが、料金は300円安くなります」等の文字情報や音声情報に変換して、ユーザーに通知し、ユーザーから承認入力を受ける。
(8)充電設備3が通知メッセージを受信すると、充電変更シーケンスを終了する。
 なお、応答メッセージを受信した情報端末5が充電スケジュールの変更は不可と判断した場合(変更後の充電パラメータから所望の充電スケジュールを作成できない場合、ユーザーから承認を得られない場合など)、情報端末5は通知メッセージにその情報を含めて充電設備3へ送信する。
 ここでは、情報端末5が応答メッセージを受信することとしたが、車両2が応答メッセージを受信しても良い。この場合、車両2が新たな充電スケジュールを作成し、充電設備3へ送信する。
 また、上述では車両2で充電スケジュールと充電予約情報の作成を行って情報端末5に通知し、情報端末5で変更後の充電予約情報の差を示す変更内容情報(「出発時間が10時半(変更前9時半)となりますが、料金は300円安くなります」など)を作成していた。これら充電スケジュール、充電予約情報の作成は情報端末5が全て行っても良いし、車両2が変更内容情報を行っても良いものとする。
 従来、停止要求メッセージを受信した場合は、充電設備3がその充電スケジュールが終了したものとして扱っていたため、再度充電スケジュールを車両2と充電設備3間でやりとりし、充電を開始するには充電プラグの抜き差しが必要となっていた。
 このように、停止要求メッセージに対して「充電終了」、「充電スケジュールの変更」などの情報を示す充電停止理由情報が含めることで、充電停止理由情報が「充電スケジュールの変更」の停止要求メッセージを充電設備3が受信した場合は、従来のようにその充電スケジュールが終了したものと扱わず、スケジュール変更中(すなわち一時停止)として扱うことで、充電プラグを抜き差しすることなく充電スケジュールの変更を行い、充電を再開することができる。
 また、情報端末5において変更前と変更後の充電予約情報(出発時刻、電力料金)の差を取得または計算可能とすることで、ユーザーに充電スケジュール変更の可否について判断するための情報提供する効果を奏する。
[情報端末の充電スケジュール変更の動作]
 ここで、情報端末5の動作を、図5のフローチャートで説明する。
 情報端末5は、所定周期又は任意のタイミングで、ユーザーからの充電スケジュールの変更入力があったか否かを判断する(ステップS121)。充電スケジュールの変更が無いと判断すると、情報端末5は、ステップS121の前の状態へ戻る。一方、充電スケジュールの変更入力があったと判断すると、情報端末5は充電スケジュールの変更要求メッセージを生成する(ステップS122)。情報端末5は、生成した変更要求メッセージを車両2へ送信する(ステップS123)。
 情報端末5は、所定周期又は任意のタイミングで、応答メッセージを受信したか否かを判断する(ステップS124)。応答メッセージを受信した場合、情報端末5は、新たな充電パラメータを応答メッセージから読み出す(ステップS125)。一方、応答メッセージを受信していない場合、情報端末5はステップS123へ戻り、変更要求メッセージを車両2へ再送する。
 情報端末5は、変更要求メッセージへの応答が無い場合に変更要求メッセージを再送するため、充電変更シーケンスの信頼性を向上できる。
 但し、通知メッセージの送信回数が予め定めた所定回数を超えた場合、情報端末5は、充電設備3が充電スケジュールの変更に対応できないとみなし、充電変更シーケンスの処理を終了する。この場合、好ましくは、情報端末5は、充電スケジュールを変更できないと判断した旨をユーザーに通知する。これにより、ユーザーは、必要に応じて充電スケジュールの再変更を試みることができる。
 情報端末5は、読み出した充電パラメータに、充電スケジュールの変更が不可であることを示すフラグ(またはコード)が有るか否かを判断する(ステップS126)。充電スケジュールの変更が不可のフラグが有ると判断した場合、情報端末5は、充電設備3が充電スケジュールの変更に対応できないとみなし、充電変更シーケンスの処理を終了する。この場合も、情報端末5は、好ましくは、充電スケジュールを変更できないと判断した旨をユーザーに通知する。
 情報端末5が充電スケジュールの変更が不可のフラグが無いと判断した場合、情報端末5は、読み出した充電パラメータにユーザーの承認が必要な事項を含むか否かを判断する(ステップS127)。ユーザーの承認が必要な事項を含むと判断した場合、情報端末5は、ユーザーに承認が必要な事項を通知する(ステップS128)。この場合、好ましくは、情報端末5は、充電パラメータの情報を、出発の遅延時間および電力料金の少なくとも一方に変換して通知する。
 情報端末5は、ユーザーからの入力を受け、承認されたか否かを判断する(ステップS129)。ユーザーの承認が得られた場合は次のステップS130(後述)へ進む。所定時間内にユーザーの承認が得られない場合、情報端末5は、充電スケジュールを変更できないと判断し、充電変更シーケンスの処理を終了する。この場合、好ましくは、情報端末5は、充電スケジュールを変更できないと判断した旨をユーザーに通知する。再度、ユーザーから充電スケジュールの変更要求が入力された場合、情報端末5はステップS122以降の動作を繰り返す。
 ステップS127でユーザーの承認が必要な事項を含まない場合、及びステップS129でユーザーの承認が得られた場合、情報端末5は、読み出した充電パラメータ及びバッテリ20の現在の充電状態の情報を用いて充電スケジュールを作成する(ステップS130)。情報端末5は、新たに作成した変更後の充電スケジュールの情報を含む通知メッセージを生成する(ステップS131)。
 情報端末5は通知メッセージを充電設備3へ送信し(ステップS132)、充電変更シーケンスの処理を終了する。
 なお、情報端末5は、通知メッセージを車両2へも送信することとしても良い。この場合、車両2が充電スケジュールの変更を把握し、変更後の充電スケジュールに応じてバッテリ20の充電を制御できる。
[車両の充電スケジュール変更の動作]
 ここで、車両2の動作を、図6のフローチャートで説明する。
 通信装置22は、所定周期又は任意のタイミングで、情報端末5から変更要求メッセージを受信したか否かを判断する(ステップS141)。変更要求メッセージを受信していない場合、通信装置22は、ステップS141の前の状態へ戻る。
 変更要求メッセージを受信した場合、通信装置22は、充電の停止を要求する停止要求メッセージを生成し、充電設備3へ送信する(ステップS142)。その後、通信装置22は、充電設備3へ変更要求メッセージを送信する(ステップS143)。
 通信装置22は、変更要求メッセージを受信した旨を制御装置21へ通知する(ステップS144)。制御装置21は、バッテリ20の現在の充電状態などの情報を通信装置22へ通知する(ステップS145)。
 通信装置22は、制御装置21から通知されたバッテリ20の現在の充電状態などの情報を含めて応答メッセージを生成する(ステップS146)。通信装置22は、生成した応答メッセージを情報端末5へ送信し(ステップS147)、充電変更シーケンスの処理を終了する。
 好ましくは、通信装置22は、情報端末5へ応答メッセージを送信した後、所定時間内に情報端末5から変更後の充電スケジュールを含む通知メッセージを受信しない場合、応答メッセージを再送する。
 通信装置22が、応答メッセージを再送することにより、変更要求シーケンスの信頼性を向上できる。
 また、好ましくは、通信装置22は、ステップS146及びステップS147の代わりに、充電設備3から受信した応答メッセージに、バッテリ20の現在の充電状態に関する情報を含め、情報端末5へ送信しても良い。
 また、好ましくは、通信装置22は、情報端末5から通知メッセージを受信する代わりに、情報端末5が充電設備3へ送信する通知メッセージと同じ内容のメッセージを受信し、変更後の充電スケジュールを取得する。
 ここまで、変更後の充電スケジュールは、情報端末5が作成するものとして説明したが、車両2が作成しても良い。例えば、ユーザーの承認を要する充電パラメータが無い場合、車両2が変更後の充電スケジュールを作成することにより、セキュリティ確保が容易になる。また、車両2及び情報端末5の少なくとも一方の構成を簡易にできる。
 この場合の車両2の動作を、図7のフローチャートで説明する。ステップS141ないしステップS145の動作は、図6と同じであるため、説明を省略する。
 通信装置22は、ステップS145の後、所定周期又は任意のタイミングで、充電設備3から応答メッセージを受信したか否かを判断する(ステップS148)。この応答メッセージは、充電スケジュールを変更する場合に適用される充電パラメータを含む。
 応答メッセージを受信した場合、通信装置22は、充電スケジュールを変更した後に適用される充電パラメータを読み出し、制御装置21へ通知する(ステップS149)。
 一方、所定時間内に応答メッセージを受信していない場合、通信装置22はステップS143へ戻り、変更要求メッセージを充電設備3へ再送する。
 但し、通知メッセージの送信回数が予め定めた所定回数を超えた場合、通信装置22は、充電設備3は充電スケジュールの変更に対応不可と判断し、充電変更シーケンスの処理を終了する。
 この場合、好ましくは、通信装置22は、充電スケジュールの変更に対応不可である旨を情報端末5へ通知する。このようにすることで、ユーザーは、必要に応じて充電スケジュールの再度の変更を試みることができる。
 制御装置21は、ステップS149で読み出した充電パラメータに基づき、充電スケジュールを変更できるか否かを判断する(ステップS150)。制御装置21は、充電スケジュールを変更できないことを示すフラグ(またはコード)が含まれている場合、制御装置21は、充電設備3は充電スケジュールの変更に対応不可と判断し、充電変更シーケンスの処理を終了する。
 充電変更シーケンスの処理を終了する場合、好ましくは、通信装置22又は制御装置21は、充電変更できない旨を情報端末5に通知する。これにより、情報端末5を使用するユーザーが、充電スケジュールを変更できないことを把握し、必要に応じて、再び充電スケジュールの変更を要求できる。
 制御装置21は、充電スケジュールの変更が可能であると判断すると、通信装置22から通知された充電パラメータ及びバッテリ20の現在の充電状態を用いて、新たに変更後の充電スケジュールを作成する(ステップS151)。制御装置21は、作成した新たな充電スケジュールを通信装置22へ通知する。通信装置22は、新たな充電スケジュールの情報を含む通知メッセージを生成する(ステップS152)。通信装置22は、この通知メッセージを充電設備3へ送信し(ステップS153)、充電変更シーケンスの処理を終了する。
 ここでは、通信装置22が応答メッセージを通信装置22が受信しない場合、変更要求メッセージを再送することとした。しかし、応答メッセージを受信しない場合であっても、通信装置22は、変更要求メッセージを再送することなく、充電変更シーケンスの処理をそのまま終了しても良い。
 また、ここでも、制御装置21及び通信装置22を個別の装置として説明した。しかし、充電開始シーケンスと同様に、これらは一つ又は複数のプログラムであっても良い。複数のプログラムである場合、これらは同一又は個別のコンピュータで駆動される。
[充電設備の充電スケジュール変更の動作]
 ここで、充電設備3の動作を、図8のフローチャートで説明する。
 通信装置31は、所定周期又は任意のタイミングで、充電の停止を要求する停止要求メッセージを受信しているか否かを判断する(ステップS161)。停止要求メッセージを受信した場合、通信装置31は、給電制御装置30へその旨を通知し、給電制御装置30は、車両2への給電を停止する(ステップS162)。停止要求メッセージを受信していない場合、通信装置31は、ステップS161の前の状態へ戻る。
 通信装置31は、充電スケジュールの変更要求メッセージを受信する(ステップS163)。通信装置31は、変更要求メッセージに含まれる情報(例えば、充電希望電力、充電完了希望時刻、バッテリ20の現在の充電状態など)を読み出し、給電制御装置30へ通知する(ステップS164)。
 給電制御装置30は、自身の給電スケジュールを参照し、変更要求メッセージに含まれる情報に応じた充電スケジュールの変更が可能か否かを判断する(ステップS165)。給電スケジュールは、例えば、充電設備3が保有するメモリ(図示しない)等に記憶されている。
 なお、ここでは、通信装置31が変更要求メッセージから情報を読み出すこととしたが、給電制御装置30が情報を読み出すこととしても良い。
 充電スケジュールの変更が不可と判断した場合、給電制御装置30は、その旨を情報入出力装置32及び情報端末5へ通知し、充電変更シーケンスの処理を終了する。このようにすることで、ユーザーが、必要に応じて充電スケジュールの再度の変更を試みることができる。
 充電スケジュールの変更が可能と判断した場合、給電制御装置30は、充電スケジュールを変更する場合に適用される充電パラメータ(例えば、単位時間あたりの電力料金、充電開始時刻、充電終了予定時刻、供給電力量など)を通信装置31へ通知する。
 この充電パラメータは、変更要求メッセージの情報に基づき、充電設備3が算出又は決定する。例えば、自身の給電スケジュールが空いている場合、充電設備3は、その時刻から充電スケジュールの変更シーケンスに要する期間(充電設備3が充電パラメータを通知し、変更後の充電スケジュールを受信するまでに要する期間)経過した後を、充電開始時刻として算出する。また、単位時間あたりの電力料金は、充電設備3がメモリ等に保有する料金表(例えば、充電時刻と単位時間あたりの電力料金の関係が記載された表)に従って決定する。
 なお、例えば充電設備3に余剰電力がある場合、電力料金は通常時よりも低額に設定される。これに対し、充電設備3が他の車両2へ供給を予定していた電力を譲り受ける場合、電力料金は通常時よりも高額に設定される。
 通信装置31は、この充電パラメータを含む応答メッセージを生成して情報端末5へ送信する(ステップS166)。なお、車両2が変更後の充電スケジュールを作成する場合、通信装置31は車両2へも応答メッセージを送信する。
 通信装置31は、変更後の新たな充電スケジュールを含む通知メッセージを、情報端末5又は車両2から受信し、変更後の充電スケジュールを取得する(ステップS167)。そして、充電変更シーケンスの処理を終了する。
 ここでは、給電制御装置30及び通信装置31を個別の装置として説明した。しかし、充電開始シーケンスと同様に、これらは一つ又は複数のプログラムであっても良い。複数のプログラムである場合、これらは同一又は個別のコンピュータで駆動される。
・充電終了シーケンス
 充電終了シーケンスは、図2のステップ21、ステップS22に相当する。
(1)車両2は、充電スケジュールが終了すると、終了通知メッセージを送信する(ステップS21)。
(2)充電設備3は、終了通知メッセージを受信すると、車両2へ応答メッセージを返信し、充電セッションの終了処理を行う(ステップS22)。
(3)車両2が応答メッセージを受信すると、充電終了シーケンスを終了し、充電セッションを終了する。
 なお、好ましくは、車両2及び充電設備3は、充電セッションの間に各シーケンスとは独立して、充電ケーブルの接続状態及び異常状態を確認する保守管理シーケンスを行う。
 この実施の形態1によれば、充電システム1は、充電スケジュールの変更要求に応じて、充電スケジュールを変更する場合に適用される充電設備3の充電パラメータと、この充電スケジュールに対応するバッテリ20の現在の充電状態に関する情報とに基づき、変更後の充電スケジュールを生成する。このため、充電ケーブルを挿入し直すこと無く充電スケジュールを変更できる。
 また、充電システム1は、充電スケジュールの変更を要求できるため、充電途中(予定してした充電終了時刻より前)に出発する、又は、出発時刻を遅らせる(予定してした充電終了時刻を遅らせる)など、充電ケーブル接続時に通知したのとは異なる充電スケジュールに柔軟に対応できる。
 また、充電スケジュールを変更できない場合、情報端末5又は車両2がその旨をユーザーに通知する。このため、ユーザーは、再び充電スケジュールの変更を要求するか否か選択でき、ユーザーの利便性が向上する。
 また、充電設備3は、変更後に適用される充電パラメータを情報端末5又は車両2へ通知する。このため、余剰電力や不足電力が発生した場合に、ユーザーとの間で柔軟にスケジュールを調整することができ、電力の有効活用及び効率的な料金収入の確保が可能となる。
 また、車両2又は情報端末5は、充電パラメータにユーザーの承認が必要な情報を含む場合、これをユーザーに通知する手段を備える。このため、ユーザー認証が必要な情報など、セキュリティ確保が必要な情報も取り扱うことができる。
実施の形態2
 実施の形態1では、情報端末5から充電スケジュールの変更を要求する場合を説明した。実施の形態2では、充電設備3側で充電スケジュールの変更が必要なイベントが発生した場合を説明する。
 充電システム1の構成、及び、充電変更シーケンス以外の動作は実施の形態1と同じであるため、説明を省略する。以下、実施の形態2に係る充電変更シーケンスを説明する。
・充電変更シーケンス
 充電変更シーケンスは、図9のステップS30ないしステップS35に相当する。
(1)充電処理の途中で充電設備3に充電スケジュールの変更を要するイベントが発生すると、充電設備3は、これを検出して充電スケジュールの変更を通知する変更通知メッセージを生成し、送信する(ステップS30)。
 充電スケジュールの変更を要するイベントには、例えば、ユーザーからの情報入出力装置32への変更要求の入力、配電側の要求、電力不足、課金額の変更、CO2排出量の変動、充電設備3に接続された他の車両2又はこれを制御する情報端末5からの要求、などがある。
(2)車両2は、変更通知メッセージを受信すると、必要に応じて、充電スケジュールの変更を要するイベントが発生したことを、情報端末5へ通知する(ステップS30')。なお、充電設備3が情報端末5へもこの旨を通知している場合、車両2は情報端末5へ通知しなくて良い。
 車両2又は充電設備3が情報端末5へ通知することにより、情報端末5はユーザーに充電スケジュールの変更を要するイベントが発生したことを通知できる。
(3)充電設備3は、変更通知メッセージを送信後、車両2への給電を停止する(ステップS31)。
(4)情報端末5にユーザーから充電スケジュールの変更が入力されると、情報端末5は、充電スケジュールの変更要求メッセージを生成し、送信する(ステップS32)。
(5)充電設備3は、変更要求メッセージを受信すると、充電スケジュールを変更する場合に適用される充電パラメータ(例えば、電力料金、充電完了予定時刻など)を生成する(ステップS33)。
 好ましくは、充電パラメータは、充電スケジュール変更前の条件を満たす。充電パラメータが充電スケジュール変更前の条件(例えば、単位時間あたりの電力料金、充電開始時刻、充電終了予定時刻、供給電力量など)を満たさない場合、充電スケジュールの変更を承認するか否かを選択させるためのフラグ(又はコード)を含む。
(6)充電設備3は、この充電パラメータを含む応答メッセージを情報端末5へ返信する(ステップS34)。好ましくは、車両2は、この応答メッセージにバッテリ20の現在の充電状態に関する情報を含めて情報端末5へ通知する。
 なお、車両2は、情報端末5及び車両2の間で別途行われる通信により、バッテリ20の現在の充電状態に関する情報を情報端末5へ通知しても良い(ステップS34')
(7)情報端末5は、応答メッセージを受信すると、充電パラメータ及びバッテリ20の現在の状態に関する情報を取得し、これらを用いて変更後の充電スケジュールを作成する。そして、情報端末5は、新たに作成した充電スケジュールを含む通知メッセージを生成し、充電設備3へ送信する(ステップS35)。
 この場合、ユーザーの承認が必要であれば、情報端末5は承認必要事項を画面表示または音声でユーザーに通知し、ユーザーから承認入力を受ける。情報端末5は、例えば、充電パラメータの情報から出発の遅延時間を算出し、「出発時間が30分遅れます。10時半に出発できます」等の文字情報に変換して画面表示する。
(8)充電設備3は、通知メッセージを受信すると、充電変更シーケンスを終了する。
 なお、好ましくは、応答メッセージを受信した情報端末5が充電スケジュールの変更は不可と判断した場合(変更後の充電パラメータから所望の充電スケジュールを作成できない場合、ユーザーから承認を得られない場合など)、情報端末5は通知メッセージにその情報を含めて充電設備3へ送信する。
 ここでは、情報端末5が応答メッセージを受信することとしたが、車両2が応答メッセージを受信しても良い。この場合、車両2はバッテリ20の現在の充電状態に関する情報を含め、応答メッセージを情報端末5へ送信する。これにより、情報端末5及び車両2は、バッテリ20の現在の充電状態に関する情報を通知するために別途通信する必要がなくなる。すなわち、情報端末5及び車両2の通信処理の負荷を軽減し、消費電力を低減できる。
[充電設備の充電スケジュール変更の動作]
 ここで、充電設備3の動作を、図10のフローチャートで説明する。
 充電設備3は、所定周期又は任意のタイミングで、充電スケジュールの変更が必要なイベントが発生したか否かを判断する(ステップS201)。充電スケジュールの変更が必要なイベントが発生していないと判断した場合、充電設備3はステップS201の前の状態へ戻る。
 一方、例えば、充電設備3が、(1)情報入出力装置32への変更要求の入力を検出、(2)充電設備3側の図示しない構成から充電スケジュールを変更すべきイベントが発生したことを検出、のいずれかをすると、通信装置31が、充電スケジュールを変更する旨のフラグを含む変更通知メッセージを生成し、車両2へ送信する(ステップS202)。
 通信装置31は、充電スケジュールの変更を要するイベントが発生した旨を給電制御装置30にも通知する(ステップS203)。給電制御装置30は、充電スケジュールの変更を要するイベントの発生を通知されると、車両2への給電を停止する(ステップS204)。
 通信装置31は、ステップS204の後、充電スケジュールの変更要求メッセージを受信する(ステップS205)。通信装置31は、変更要求メッセージに含まれる情報(例えば、充電希望電力、充電完了希望時刻など)を読み出し、給電制御装置30へ通知する(ステップS206)。
 給電制御装置30は、自身の給電スケジュールを参照し、変更要求メッセージに含まれる情報に応じた充電スケジュールの変更が可能か否かを判断する(ステップS207)。充電スケジュールの変更が不可と判断した場合、給電制御装置30は、充電変更シーケンスを終了する。
 この場合、好ましくは、給電制御装置30は、充電スケジュールの変更が不可である旨を情報入出力装置32又は情報端末5へ通知する。これにより、充電スケジュールは変更できないことを、ユーザーが把握できる。
 なお、ここでは、通信装置31が変更要求メッセージから情報を読み出すこととしたが、給電制御装置30が読み出すこととしても良い。
 充電スケジュールの変更が可能と判断した場合、給電制御装置30は、充電スケジュールを変更する場合に適用される充電パラメータ(例えば、単位時間あたりの電力料金、充電開始時刻、充電終了予定時刻、供給電力量など)を通信装置31へ通知する(ステップS208)。
 この場合、例えば充電設備3に余剰電力がある場合、電力料金は通常時よりも低額に設定される。これに対し、充電設備3が他の車両2へ供給を予定していた電力を譲り受ける場合、電力料金は通常時よりも高額に設定される。
 通信装置31は、この充電パラメータを含む通知メッセージを生成して情報端末5へ送信する(ステップS209)。通知メッセージは、例えば、充電スケジュールの更新伺いとして、「出発時刻(充電終了予定時刻)を遅らせて貰えませんか」、「○時から△時まで~W放電して貰えませんか」といった情報を含むこともできる。
 なお、好ましくは、通信装置31は車両2へも通知メッセージを送信する。
 通信装置31は、情報端末5又は車両2から通知メッセージを受信して変更後の充電スケジュールを取得し(ステップS210)、充電変更シーケンスの処理を終了する。
 ここでは、給電制御装置30及び通信装置31を個別の装置として説明した。しかし、これらは一つ又は複数のプログラムであっても良い。複数のプログラムである場合、これらは同一又は個別のコンピュータで駆動される。
[車両の充電スケジュール変更の動作]
 ここで、車両2の動作を、図11のフローチャートで説明する。
 通信装置22は、所定周期又は任意のタイミングで、充電設備3又は情報端末5から変更通知メッセージ(又は充電スケジュールの変更通知があった旨の通知)を受信しているか否かを判断する(ステップS211)。通信装置22は、変更通知が無いと判断すると、ステップS211の前の状態へ戻る。一方、通信装置22は、変更通知があったと判断すると、充電スケジュールの変更を要するイベントが発生した旨を制御装置21へ通知する(ステップS212)。
 制御装置21は、バッテリ20の現在の充電状態に関する情報を通信装置22へ通知する(ステップS213)。通信装置22は、制御装置21から通知された情報を含む通知メッセージを生成する。そして、通信装置22は、この通知メッセージを情報端末5へ送信し(ステップS214)、充電変更シーケンスの処理を終了する。
 ここでは、制御装置21及び通信装置22を個別の装置として説明した。しかし、これらはプログラムであっても良い。さらに、プログラムは一つ又は複数のプログラムで構成されていても良い。複数のプログラムである場合、これらは同一又は個別のコンピュータで駆動される。
[情報端末の充電スケジュール変更の動作]
 ここで、情報端末5の動作を、図12のフローチャートで説明する。
 情報端末5は、所定周期又は任意のタイミングで、充電スケジュールの変更を通知する変更通知メッセージを受信したか否かを判断する(ステップS221)。変更通知メッセージを受信していない場合、ステップS221の前の状態へ戻る。一方、変更通知メッセージを受信したと判断すると、情報端末5は充電スケジュールの変更要求メッセージを生成し、変更要求メッセージを車両2へ送信する(ステップS222)。
 情報端末5は、所定周期又は任意のタイミングで、充電スケジュールを変更する場合に適用される新たな充電パラメータを含む応答メッセージを充電設備3から受信しているか否かを判断する(ステップS223)。
 応答メッセージを受信した場合、情報端末5は、新たな充電パラメータを応答メッセージから読み出す(ステップS224)。
 応答メッセージを受信していない場合、好ましくは、情報端末5はステップS222へ戻り、変更要求メッセージを充電設備3へ再送する。これにより、充電変更シーケンスの信頼性を向上できる。
 但し、変更要求メッセージの送信回数が予め定めた所定回数を超えた場合、情報端末5は、充電設備3が充電スケジュールの変更に対応できないとみなし、充電変更シーケンスの処理を終了する。この場合、好ましくは、情報端末5は、充電スケジュールを変更できないと判断した旨をユーザーに通知する。
 情報端末5は、ステップS224で読み出した充電パラメータにユーザーの承認が必要な事項を含むか否かを判断する(ステップS225)。ユーザーの承認が必要な事項を含むと判断した場合、情報端末5は、ユーザーに承認が必要な事項を通知する(ステップS226)。
 情報端末5は、ユーザーからの入力を受け(ステップS227)、承認されたか否かを判断する(ステップS228)。ユーザーの承認が得られた場合は次のステップS229へ進む。一方、所定時間内にユーザーの承認が得られない場合、情報端末5は、充電スケジュールを変更できないと判断し、充電変更フローを終了する。この場合、好ましくは、情報端末5は、充電スケジュールを変更できないと判断した旨をユーザーに通知する。
 ステップS225でユーザーの承認が必要な事項を含まない場合、及びステップS228でユーザーの承認が得られた場合、情報端末5は、読み出した充電パラメータに基づき変更後の充電スケジュールを作成する(ステップS229)。情報端末5は、作成した充電スケジュールの情報を含む通知メッセージを生成し、充電設備3へ送信する(ステップS230)。好ましくは、情報端末5は、この通知メッセージを車両2へも送信する。
 なお、充電変更シーケンスの途中で、充電スケジュールの変更を要する別のイベントが発生した場合、情報端末5はステップS221へ戻り、以降の動作を繰り返す。また、ユーザーから充電スケジュールの変更要求が入力された場合、情報端末5はステップS227へ戻り、以降の動作を繰り返す。
 ここでは、情報端末5が充電スケジュールの変更要求メッセージを作成する場合を説明した。しかし、ユーザーが充電設備3の情報入出力装置32へ充電パラメータを入力する場合、充電設備3が変更後の充電スケジュールを作成することとしても良い。
 この場合、情報入出力装置32は充電パラメータを給電制御装置30へ通知する。また、通信装置31は、充電ケーブル4を介してバッテリ20の現在の充電状態に関する情報を取得し、給電制御装置30へ通知する。給電制御装置30は、情報入出力装置32から通知された充電パラメータ及びバッテリ20の現在の充電状態に関する情報に基づき、変更後の充電スケジュールを作成する。
 なお、ここでは、充電スケジュールの変更を要するイベントが発生した場合、直ちに車両2への給電を停止する場合を説明した。しかし、車両2への給電停止は、情報端末5からの変更要求メッセージの内容に応じて行なっても良い。具体的には、変更要求メッセージに、当初の充電スケジュールを要求するフラグ(またはコード)が含まれている場合、充電設備3は、この情報端末5に対応する車両2への充電を、当初の充電スケジュールどおりに行う。
 この実施の形態2によれば、実施の形態1の効果に加え、以下の効果を奏する。
 充電設備3が充電スケジュールの変更を要するイベントが発生した旨を情報端末5へ通知する。このため、充電設備3に充電スケジュールの変更要求が入力されたことや、充電設備3側の電力網で充電スケジュールの変更を要するイベントが発生したことに応じて、充電システム1は、充電スケジュールを変更できる。
 また、充電設備3は、ユーザーが充電スケジュールに関する情報を入出力するための情報入出力装置32を備えたことにより、情報端末5及び充電設備3の間で複雑な通信を行うこと無く、充電スケジュールを変更できる。
 また、充電設備3は、情報端末5からの変更要求メッセージの内容に応じて、車両2への給電を停止するか否かを判断するため、予約された時刻までに車両2への充電を完了することができる。これにより、充電システム1の信頼性が向上する。
実施の形態3
 実施の形態1、2では、充電設備3が、充電スケジュールに必要な充電パラメータを作成する場合を説明した。実施の形態3では、充電設備3とは異なる需給計画サーバが充電パラメータを作成する場合を説明する。
<充電システムの構成>
 実施の形態3における充電システム1Aを、図13に示す。充電システム1Aは、実施の形態1に記載の充電システム1に、電源装置6、需給計画サーバ(サーバ)7を備える。また、充電システム1Aは、実施の形態1に記載の充電設備3の代わりに、充電設備3Aを備える。なお、充電システム1が備える車両2は二台に限らず、一台であっても良いし、三台以上であっても良い。
 以下、需給計画サーバ7及び充電設備3Aの構成を説明する。
(需給計画サーバの構成)
 需給計画サーバ7は、例えば、配電会社又は電力会社に設置されるコンピュータである。
 需給計画サーバ7は、充電設備通信装置(通信手段)70、電源通信制御装置(第1の通信制御手段)71、電力需給計画作成装置(電力需給計画作成手段)72、情報端末通信制御装置(第2の通信制御手段)73、を備える。
 充電設備通信装置70は、充電設備3Aと無線又は有線の通信路を介して接続され、充電設備3Aと通信する装置である。電源通信制御装置71は、電源装置6と無線又は有線の通信路を介して接続され、電源装置6と通信し、電源装置6を制御する装置である。電力需給計画作成装置72は、充電設備3及び情報端末5から取得した情報に基づき、電力需給の計画を作成する装置である。情報端末通信制御装置73は、情報端末5と無線又は有線の通信路(例えば、インターネット網など公衆の通信路であっても良い)を介して接続され、情報端末5と通信する装置である。
(充電設備の構成)
 充電設備3Aは、実施の形態1に記載の充電設備3に、サーバ通信装置(通信手段)33を備える。
 充電設備3Aは、例えば、路肩に設置される充電スタンド、宅内に設置されるメーター、である。
 充電設備3Aが充電スタンドの場合、充電ケーブル4は充電スタンドの一部として充電設備3Aの構成に含まれる。
 また、充電設備3Aがメーターの場合、充電ケーブル4は車両2の構成の一部としても良い。この場合、好ましくは、充電ケーブル4の端部は、コンセントに接続可能な電源プラグである。
<充電システムの動作>
 ここで、充電システム1Aの動作を説明する。
 基本的な動作は、実施の形態1又は実施の形態2と同じであるため、説明を省略する。但し、充電設備3Aの一部の機能を需給計画サーバ7が行う点は相違する。例えば、初期接続、共通セッションなどの通信は、車両2及び需給計画サーバ7間で行う。
 ここでは、充電変更シーケンスを詳細に説明する。
・充電変更シーケンス
 充電変更シーケンスは、図14のステップS40ないしステップS46に相当する。
(1)情報端末5にユーザーから充電スケジュールの変更が入力されると、情報端末5は、充電スケジュールの変更要求メッセージを生成し、車両2及び需給計画サーバ7へ送信する(ステップS40)。この変更要求メッセージは、情報端末5から需給計画サーバ7宛に送信される場合もあるし、情報端末5から車両2経由で需給計画サーバ7へ送信される場合もある。
(2)需給計画サーバ7は、変更要求メッセージを受信すると、充電設備3A及び電源装置6に車両2への給電を停止するよう通知メッセージ(第1の通知メッセージ)を送信する(ステップS41)。
(3)充電設備3A及び電源装置6は、需給計画サーバ7から通知メッセージを受信すると、車両2への給電を停止する(ステップS42)。
(4)需給計画サーバ7は、変更要求メッセージを受信すると、充電スケジュールを変更する場合に適用される充電パラメータ(例えば、電力料金、充電完了予定時刻など)を生成する(ステップS43)。
 好ましくは、充電パラメータは、充電スケジュール変更前の条件を満たす。充電パラメータが充電スケジュール変更前の条件(例えば、単位時間あたりの電力料金、充電開始時刻、充電終了予定時刻、供給電力量など)を満たさない場合、充電スケジュールの変更を承認するか否かを選択させるためのフラグ(又はコード)を含む。
(5)需給計画サーバ7は、新たに生成した充電パラメータを含む応答メッセージを生成し、情報端末5へ送信する(ステップS44)。また、車両2は、バッテリ20の現在の状態に関する情報を、別途、情報端末5へ通知する(ステップS44')。
(6)情報端末5は、車両2及び需給計画サーバ7から応答メッセージを受信すると、充電パラメータ及びバッテリ20の現在の状態に関する情報を用いて、変更後の充電スケジュールを作成する(ステップS45)。
(7)情報端末5は、変更後の充電スケジュールを含む通知メッセージ(第2の通知メッセージ)を生成し、需給計画サーバ7へ送信する(ステップS46)。
(8)需給計画サーバ7は、情報端末5からの通知メッセージを受信すると、充電変更シーケンスを終了する。
 なお、上記のステップS41、ステップS43、ステップS44'は、この順序に限らず任意の順序で相互に入れ替えても良い。
 なお、好ましくは、応答メッセージを受信した情報端末5が充電スケジュールの変更は不可と判断した場合(変更後の充電パラメータから所望の充電スケジュールを作成できない場合、ユーザーから承認を得られない場合など)、情報端末5は通知メッセージにその旨の情報を含めて需給計画サーバ7へ送信する。
 また、ここでは、情報端末5が需給計画サーバ7へ、変更後の充電スケジュールを通知することとした。しかし、情報端末5は、車両2又は充電設備3Aへ変更後の充電スケジュールを通知し、この通知を受けた車両2又は充電設備3Aが需給計画サーバ7へ通知しても良い。
 通信路が車両2及び充電設備3Aを介することにより、簡易な通信プロトコルを用いて通知しても、変更後の充電スケジュールの秘匿性を保つことができる。
 また、実施の形態1で説明したように、変更後の充電スケジュールは、情報端末5の代わりに車両2が作成しても良い。例えば、ユーザーの承認が不要な場合、車両2がバッテリ20の現在の充電状態に関する情報を情報端末5に送信する必要がなく、車両2及び情報端末5の通信負荷を軽減できる。
 この場合、変更後の充電スケジュールは、車両2から充電ケーブル4を介して、充電設備3Aへ送信される。充電設備3Aは、自身の給電スケジュールを参照し、変更後の充電スケジュールで給電可能であれば、需給計画サーバ7に変更後の充電スケジュールを通知する。一方、充電設備3Aは、変更後の充電スケジュールで給電不可と判断すれば、需給計画サーバ7へ変更後の充電スケジュールを転送せず、ユーザーにその旨を通知する。このようにすることで、充電設備3A及び需給計画サーバ7の通信負荷を軽減できる。
[需給計画サーバの充電スケジュール変更の動作]
 ここで、需給計画サーバ7の動作を、図15のフローチャートで説明する。
 情報端末通信制御装置73は、所定周期又は任意のタイミングで、変更要求メッセージを受信しているか否かを判断する(ステップS301)。変更要求メッセージを受信していない場合、ステップS301の前の状態へ戻る。変更要求メッセージを受信した場合、情報端末通信制御装置73は、変更要求メッセージに含まれる情報(例えば、充電希望電力、充電完了希望時刻、バッテリ20の現在の充電状態など)を読み出し、電力需給計画作成装置72へ通知する。(ステップS302)。
 電力需給計画作成装置72は、充電設備3Aの給電スケジュールを参照し、変更要求メッセージに含まれる情報に応じた充電スケジュールの変更が可能か否かを判断する(ステップS303)。充電設備3Aの給電スケジュールは、例えば、需給計画サーバ7が保有するメモリ(図示しない)等に記憶されている。
 なお、ここでは、情報端末通信制御装置73が変更要求メッセージから情報を読み出すこととしたが、電力需給計画作成装置72が読み出すこととしても良い。
 充電スケジュールの変更が可能と判断した場合、電力需給計画作成装置72は、充電設備通信装置70経由で充電設備3Aへ、電源通信制御装置71経由で電源装置6へ、車両2への給電を停止するようそれぞれ通知(又は指示)信号を送信する(ステップS304)。
 また、充電スケジュールの変更が可能と判断した場合、電力需給計画作成装置72は、充電スケジュールを変更する場合に適用される充電パラメータ(例えば、単位時間あたりの電力料金、充電開始時刻、充電終了予定時刻、供給電力量など)を情報端末通信制御装置73へ通知する(ステップS305)。
 この充電パラメータは、変更要求メッセージの情報に基づき、需給計画サーバ7が算出又は決定する。例えば、充電設備3A(変更要求メッセージを送信したユーザーの車両2に対応する充電設備)の給電スケジュールが空いている場合、需給計画サーバ7は、その時刻から充電スケジュールの変更シーケンスに要する期間(需給計画サーバ7が充電パラメータを通知し、変更後の充電スケジュールを受信するまでに要する期間)経過した後を、充電開始時刻として算出する。また、単位時間あたりの電力料金は、需給計画サーバ7がメモリ等に保有する料金表(例えば、充電時刻と単位時間あたりの電力料金の関係が記載された表)に従って決定する。
 例えば充電設備3Aに余剰電力がある場合、電力料金は通常時よりも低額に設定される。これに対し、充電設備3Aが他の車両2等へ供給を予定していた電力を譲り受ける場合、電力料金は通常時よりも高額に設定される。
 情報端末通信制御装置73は、充電パラメータを含む応答メッセージを生成して情報端末5へ送信する(ステップS306)。好ましくは、情報端末通信制御装置73は、応答メッセージに充電スケジュールを変更する旨のフラグ(またはコード)を含む。
 一方、電力需給計画作成装置72が、充電スケジュールの変更は不可と判断した場合、電力需給計画作成装置72は、情報端末通信制御装置73へその旨を通知する(ステップS307)。情報端末通信制御装置73は、充電スケジュールの変更は不可である旨をフラグとして含む応答メッセージを生成し、情報端末5へ送信する(ステップS308)。
 ステップS306の後、情報端末通信制御装置73は、変更後の充電スケジュールを含む通知メッセージを受信する(ステップS309)。情報端末通信制御装置73は、変更後の充電スケジュールを読み出し、電力需給計画作成装置72へ通知する(ステップS310)。
 電力需給計画作成装置72は、変更後の充電スケジュールを充電設備通信装置70へ通知する。充電設備通信装置70は、変更後の充電スケジュールを含む通知メッセージを生成し、充電設備3Aへ送信する(ステップS311)。
 充電設備通信装置70が充電設備3Aから応答メッセージを受信したか否かを判断する(ステップS312)。所定時間内に応答メッセージを受信しない場合、充電設備通信装置70はステップS311へ戻り、通知メッセージを再送する。応答メッセージを受信した場合、充電設備通信装置70は、充電変更シーケンスの処理を終了する。
 なお、需給計画サーバ7及び情報端末5間の通信は、充電設備3A及び車両2経由で行なっても良い。この場合、電力需給計画作成装置72は、情報端末通信制御装置73の代わりに充電設備通信装置70へ充電パラメータを通知し、充電設備通信装置70が変更後の充電スケジュールを受信する。
 この場合、ステップS310で、充電設備通信装置70が新たな充電スケジュールを含む通知メッセージを受信すると、充電設備3Aは変更後の充電スケジュールの情報を取得することになる。このため、電力需給計画作成装置72は、ステップS309の後、充電設備3Aに変更後の充電スケジュールを通知すること無く、充電変更シーケンスの処理を終了する。
 なお、情報端末5及び需給計画サーバ7間の通信経路によらず、電力需給計画作成装置72は、電源通信制御装置71へも変更後の充電スケジュールを通知する。電源通信制御装置71は、変更後の充電スケジュールに応答して電源装置6に電力供給を制御する制御信号を送信する。
 ところで、需給計画サーバ7は、情報端末通信制御装置73に限らず、充電設備通信装置70からの変更要求に応答し、充電スケジュールの変更処理を行うこともできる。
 例えば、充電設備通信装置70は、所定周期又は任意のタイミングで、充電設備3Aから変更要求メッセージを受信しているか否かを判断する。変更要求メッセージを受信した場合、充電設備通信装置70は、変更要求メッセージに含まれる情報(例えば、充電希望電力、充電完了希望時刻、バッテリ20の現在の充電状態など)を読み出し、電力需給計画作成装置72へ通知する。
 電力需給計画作成装置72は、自身の給電スケジュールを参照し、変更要求メッセージに含まれる情報に応じた充電スケジュールの変更が可能か否かを判断する。以降の動作は、図15のステップS304以降と同じであるため、説明を省略する。
 なお、ここでは、充電設備通信装置70が変更要求メッセージから情報を読み出すこととしたが、電力需給計画作成装置72が読み出すこととしても良い。
 また、ここでは、充電設備通信装置70、電源通信制御装置71、電力需給計画作成装置72、及び情報端末通信制御装置73を個別の装置として説明した。しかし、これらはプログラムであっても良い。さらに、プログラムは一つ又は複数のプログラムで構成されていても良い。複数のプログラムである場合、これらは同一又は個別のコンピュータで駆動される。
[充電設備の充電スケジュール変更の動作]
 ここで、充電設備3Aの動作を、図16のフローチャートで説明する。
 サーバ通信装置33は、所定周期又は任意のタイミングで、需給計画サーバ7から給電を停止する通知メッセージ及び充電パラメータを通知する通知メッセージを受信しているか否かを判断する(ステップS321)。通知メッセージを受信していない場合、サーバ通信装置33は、ステップS321の前の状態へ戻る。
 通知メッセージを受信した場合、サーバ通信装置33は、充電スケジュールを変更する旨を給電制御装置30へ通知する(ステップS322)。給電制御装置30は、車両2への給電を停止する(ステップS323)。
 サーバ通信装置33(又は通信装置31)は、所定周期又は任意のタイミングで、変更後の充電スケジュールを含む通知メッセージを受信したか否かを判断する(ステップS324)。この通知メッセージを受信していない場合、ステップS324の前の状態へ戻る。
 サーバ通信装置33(又は通信装置31)が変更後の充電スケジュールを含む通知メッセージを受信したと判断すると、給電制御装置30へこれを通知し(ステップS325)、充電変更シーケンスの処理を終了する。
 なお、変更後の充電スケジュールを含む通知メッセージの通知経路が予め定まっている場合、サーバ通信装置33及び通信装置31のうち、この通知経路に対応する一方のみがステップS324、及びステップS325を行う。
 充電変更シーケンスの後、充電開始シーケンスが再開する。充電開始シーケンスでは、給電制御装置30は、変更後の充電スケジュールに基づき、電源装置6から供給される電力を車両2へ給電する。
 ここでは、制御装置21及び通信装置22を個別の装置として説明した。しかし、これらはプログラムであっても良い。さらに、プログラムは一つ又は複数のプログラムで構成されていても良い。複数のプログラムである場合、これらは同一又は個別のコンピュータで駆動される。
 また、ここでは第2の通信方式をOFDMとしていたが、たとえばCAN(Controller Area Network)などの有線通信でも、Wi-Fiなどの無線通信で代替しても良い。
[車両の充電スケジュール変更の動作]
 車両2の動作は、実施の形態2(図12)の動作の一部を省略したものであるため、説明を省略する。
[情報端末の充電スケジュール変更の動作]
 ここで、情報端末5の動作を、図17のフローチャートで説明する。
 情報端末5は、所定周期又は任意のタイミングで、ユーザーから充電スケジュールの変更入力があったか否かを判断する(ステップS331)。変更入力が無いと判断すると、情報端末はステップS331の前の状態へ戻る。情報端末5が充電スケジュールの変更入力があったと判断すると、情報端末5は、充電スケジュールの変更要求メッセージを生成する(ステップS332)。情報端末5は、生成した変更要求メッセージを需給計画サーバ7へ送信する(ステップS333)。
 情報端末5は、所定周期又は任意のタイミングで、需給計画サーバ7から応答メッセージを受信したか否かを判断する(ステップS334)。情報端末5が応答メッセージを受信していない場合、ステップS333へ戻る。
 但し、変更要求メッセージの送信回数が予め定めた所定回数を超えた場合、情報端末5は、車両2が接続している充電設備3が充電スケジュールの変更に対応できないとみなし、充電変更シーケンスの処理を終了する。この場合、好ましくは、情報端末5は、充電スケジュールを変更できないと判断した旨をユーザーに通知する。
 情報端末5は、応答メッセージを受信したと判断した場合、充電パラメータを含む応答メッセージか、充電スケジュールの変更は不可である旨を通知する応答メッセージか、を判断する(ステップS335)。情報端末5は、充電スケジュールの変更が不可の通知メッセージと判断した場合、車両2が接続している充電設備3が充電スケジュールの変更に対応できないとみなし、充電変更シーケンスの処理を終了する。この場合も、好ましくは、情報端末5は、充電スケジュールを変更できないと判断した旨をユーザーに通知する。
 情報端末5が充電パラメータを含む通知メッセージと判断した場合、情報端末5は、充電パラメータを読み出し、ユーザーの承認が必要な事項を含むか否かを判断する(ステップS336)。ユーザーの承認が必要な事項を含むと判断した場合、情報端末5は、ユーザーに承認が必要な事項を通知する(ステップS337)。この場合、好ましくは、情報端末5は、充電パラメータの情報を、出発の遅延時間に変換して通知する。
 情報端末5は、所定時間待って、ユーザーから承認の入力を受けたか否かを判断する(ステップS338)。ユーザーの承認を受けた場合は、次のステップS339へ進む。一方、所定時間内にユーザーの承認を受けていない場合、情報端末5は、充電スケジュールを変更できないと判断し、充電変更シーケンスの処理を終了する。この場合、好ましくは、情報端末5は、充電スケジュールを変更できないと判断した旨をユーザーに通知する。
 ステップS336でユーザーの承認が必要な事項を含まない場合、及びステップS338でユーザーの承認が得られた場合、情報端末5は、読み出した充電パラメータ及びバッテリ20の現在の状態に関する情報を用いて、変更後の充電スケジュールを作成する(ステップS339)。
 なお、情報端末5は、バッテリ20の現在の状態に関する情報を、実施の形態1、2で説明したような方法で、別途、車両2から取得する。
 情報端末5は、新たに作成した変更後の充電スケジュールの情報を含む通知メッセージを生成する(ステップS340)。情報端末5は、変更後の充電スケジュールを需給計画サーバ7へ送信し(ステップS341)、充電変更シーケンスの処理を終了する。
 なお、情報端末5は、変更後の充電スケジュールを車両2経由で充電設備3Aへ送信するとしても良い。
[電源装置の充電スケジュール変更の動作]
 ここで、電源装置6の動作を説明する。
 電源装置6は、充電変更シーケンスの後、変更後の充電スケジュールに対応する制御信号を需給計画サーバ7から受信する。電源装置6は、この制御信号に基づき、充電設備3Aへ電力を供給する。
 この実施の形態3によれば、実施の形態1の効果に加え、以下の効果を奏する。
 需給計画サーバ7を備えたことにより、充電設備3Aを簡易な構成にできる。
 また、需給計画サーバ7が複数の充電設備3Aの充電スケジュールを一括して管理するため、充電システム全体の設置コスト、運用コストも低減できる。
 また、情報端末5が需給計画サーバ7へ、公衆の通信路を介して変更要求を行う。このため、セキュリティが確保された既存の通信プロトコルを用いて、安全に通信することができる。
実施の形態4
 実施の形態3では、情報端末5から需給計画サーバ7へ充電スケジュールの変更を要求する場合を説明した。実施の形態4では、需給計画サーバ7側で充電スケジュールの変更を要するイベントが発生した場合を説明する。
 充電システム1Aの構成、及び、充電変更シーケンス以外の動作は実施の形態3と同じであるため、説明を省略する。以下、この実施の形態に係る充電変更シーケンスを説明する。
・充電変更シーケンス
 充電変更シーケンスは、図18のステップS50ないしステップS56に相当する。
(1)充電処理の途中で需給計画サーバ7側(充電設備3A、電源装置6、需給計画サーバ7の少なくとも一つ)に充電スケジュールの変更を要するイベントが発生すると、需給計画サーバ7は、これを検出して充電スケジュールの変更を通知する変更通知メッセージを生成し、情報端末5へ送信する(ステップS50)。情報端末5は、この変更通知メッセージを受信すると、ユーザーに充電スケジュールの変更を要するイベントが発生した旨を通知する。
 充電スケジュールの変更を要するイベントには、例えば、充電設備3Aの情報入出力装置32へユーザーからの変更要求が入力された場合、電源装置6又は電力網の状態が変動して充電スケジュールの変更が必要となった場合(配電側の要求、電力不足、課金額の変更、CO2排出量の変動、充電設備3Aに接続された他の車両2又はこれを制御する情報端末5からの要求など)がある。
(2)需給計画サーバ7は、変更通知メッセージを送信後、車両2への給電を停止するよう充電設備3A及び電源装置6へ通知する(ステップS51)。
(3)充電設備3A及び電源装置6は、需給計画サーバ7からの通知を受けると、車両2への給電を停止する(ステップS52)。
(4)情報端末5にユーザーから充電スケジュールの変更が入力されると、情報端末5は、充電スケジュールの変更要求メッセージを生成し、需給計画サーバ7へ送信する(ステップS53)。
(5)需給計画サーバ7は、変更要求メッセージを受信すると、充電スケジュールを変更する場合に適用される充電パラメータ(例えば、電力料金、充電完了予定時刻など)を生成し、この充電パラメータを含む応答メッセージを情報端末5へ返信する(ステップS54)。また、車両2は、情報端末5との間で別途通信を行い、バッテリ20の現在の状態に関する情報を情報端末5へ通知する(ステップS54'。)
 好ましくは、応答メッセージに含まれる充電パラメータは、充電スケジュール変更前の条件(例えば、単位時間あたりの電力料金、充電開始時刻、充電終了予定時刻、供給電力量など)を満たす。応答メッセージに含まれる充電パラメータが充電スケジュール変更前の条件を満たさない場合、充電スケジュールの変更を承認するか否かを選択させるためのフラグ(又はコード)を含む。
(6)情報端末5は、需給計画サーバ7から応答メッセージを受信すると、充電パラメータ及びバッテリ20の現在の状態に関する情報を用いて、変更後の充電スケジュールを作成する(ステップS55)。
 この場合、ユーザーの承認が必要であれば、情報端末5は承認必要事項を画面表示または音声でユーザーに通知し、ユーザーから承認入力を受ける。好ましくは、情報端末5は、充電パラメータの情報を、出発の遅延時間に変換して通知する。
(7)情報端末5は、変更後の充電スケジュールを含む通知メッセージを生成し、需給計画サーバ7へ送信する(ステップS56)。
(8)需給計画サーバ7は、通知メッセージを受信すると、充電変更シーケンスを終了する。
 なお、上記のステップS50及びステップS51は、逆の順序であっても良い。
 なお、好ましくは、応答メッセージを受信した情報端末5が充電スケジュールの変更は不可と判断した場合(変更後の充電パラメータから所望の充電スケジュールを作成できない場合、ユーザーから承認を得られない場合など)、情報端末5は通知メッセージにその情報を含めて需給計画サーバ7へ送信する。
 ここでは、情報端末5が応答メッセージを受信することとしたが、車両2が応答メッセージを受信しても良い。この場合、車両2はバッテリ20の現在の充電状態に関する情報を含め、応答メッセージを情報端末5へ送信する。これにより、情報端末5及び車両2は、バッテリ20の現在の充電状態に関する情報を通知するために別途通信する必要がなくなる。
 また、ここでは、情報端末5が需給計画サーバ7へ、変更後の充電スケジュールを通知することとした。しかし、情報端末5は、車両2又は充電設備3Aへ変更後の充電スケジュールを通知し、この通知を受けた車両2又は充電設備3Aが需給計画サーバ7へ通知しても良い。通信路が車両2及び充電設備3Aを介することにより、公衆の通信路を用いる場合より簡易な通信プロトコルであっても、変更後の充電スケジュールの秘匿性を保つことができる。
[需給計画サーバの充電スケジュール変更の動作]
 ここで、需給計画サーバ7の動作を、図19のフローチャートで説明する。
 需給計画サーバ7は、所定周期又は任意のタイミングで、充電スケジュールの変更が必要なイベントが発生したか否かを判断する(ステップS401)。
 例えば、(1)充電設備通信装置70が、充電設備3Aに変更要求が入力されたことを検出、(2)電源通信制御装置71が、電源装置6又はこれに接続された電力網で充電スケジュールの変更を要するイベントが発生したことを検出、(3)需給計画サーバ7の図示しない構成から充電スケジュールの変更を要するイベントが発生したことを検出、のいずれかをすると、電力需給計画作成装置72へ通知する。
 電力需給計画作成装置72は、情報端末通信制御装置73へ、充電スケジュールの変更を要するイベントが発生したことを通知する。情報端末通信制御装置73は、充電スケジュールの変更を要する旨のフラグ(またはコード)を含む変更通知メッセージを生成し、情報端末5へ送信する(ステップS402)。
 電力需給計画作成装置72は、充電スケジュールの変更を要するイベントが発生した旨を充電設備通信装置70及び電源通信制御装置71にも通知する(ステップS403)。充電設備通信装置70及び電源通信制御装置71は、充電スケジュールの変更を要するイベントの発生を通知されると、車両2への給電を停止する(ステップS404)。
 情報端末通信制御装置73は、ステップS404の後、所定周期又は任意のタイミングで、充電スケジュールの変更要求メッセージを受信したか否かを判断する(ステップS405)。変更要求メッセージを受信していない場合、ステップS402へ戻る。変更要求メッセージを受信した場合、情報端末通信制御装置73は、変更要求メッセージに含まれる情報(例えば、充電希望電力、充電完了希望時刻など)を読み出し、電力需給計画作成装置72へ通知する(ステップS406)。
 電力需給計画作成装置72は、充電設備3Aの給電スケジュールを参照し、変更要求メッセージに含まれる情報に応じた充電スケジュールの変更が可能か否かを判断する(ステップS407)。充電スケジュールの変更が不可と判断した場合、電力需給計画作成装置72は、充電変更シーケンスを終了する。
 充電変更シーケンスを終了する場合、好ましくは、需給計画サーバ7は、ユーザーに充電スケジュールの変更が不可である旨を通知する。
 なお、ここでは、情報端末通信制御装置73が変更要求メッセージから情報を読み出すこととしたが、電力需給計画作成装置72が読み出すこととしても良い。
 充電スケジュールの変更が可能と判断した場合、電力需給計画作成装置72は、充電スケジュールを変更する場合に適用される充電パラメータ(例えば、単位時間あたりの電力料金、充電開始時刻、充電終了予定時刻、供給電力量など)を情報端末通信制御装置73へ通知する(ステップS408)。
 この場合、例えば充電設備3Aに余剰電力がある場合、電力料金は通常時よりも低額に設定される。これに対し、充電設備3Aが他の車両2へ供給を予定していた電力を譲り受ける場合、電力料金は通常時よりも高額に設定される。
 情報端末通信制御装置73は、この充電パラメータを含む通知メッセージを生成して情報端末5へ送信する(ステップS409)。通知メッセージは、例えば、充電スケジュールの更新伺いとして、「出発時刻(充電終了予定時刻)を遅らせて貰えませんか」、「○時から△時まで~W放電して貰えませんか」といった情報を含むこともできる。
 情報端末通信制御装置73が、情報端末5から変更後の充電スケジュールを受信すると、電力需給計画作成装置72へ通知し(ステップS410)、充電変更シーケンスの処理を終了する。
 なお、需給計画サーバ7及び情報端末5間の通信は、充電設備3A及び車両2経由で行なっても良い。この場合、電力需給計画作成装置72は、情報端末通信制御装置73の代わりに充電設備通信装置70へ充電パラメータを通知し、充電設備通信装置70が変更後の充電スケジュールを受信する。
 また、ここでは、充電設備通信装置70、電源通信制御装置71、電力需給計画作成装置72、及び情報端末通信制御装置73を個別の装置として説明した。しかし、これらは一つ又は複数のプログラムであっても良い。複数のプログラムである場合、これらは同一又は個別のコンピュータで駆動される。
[車両の充電スケジュール変更の動作]
 車両2の動作は、実施の形態2(図11)と同じであるため、説明を省略する。
[情報端末の充電スケジュール変更の動作]
 情報端末5の動作も、実施の形態2(図12)と同じであるため、説明を省略する。
 なお、ここでは、充電スケジュールの変更を要するイベントが発生した場合、直ちに車両2への給電を停止する場合を説明した。しかし、車両2への給電停止は、情報端末5からの変更要求メッセージの内容に応じて行なっても良い。具体的には、変更要求メッセージに、当初の充電スケジュールを要求するフラグ(またはコード)が含まれている場合、需給計画サーバ7は、この情報端末5に対応する車両2への充電を、当初の充電スケジュールどおりに行う。
 この実施の形態4によれば、実施の形態3の効果に加え、以下の効果を奏する。
 需給計画サーバ7が充電スケジュールの変更を要するイベントが発生した旨を情報端末5へ通知する。このため、充電設備3A、電源装置6、需給計画サーバ7、等の需給計画サーバ側で充電スケジュールの変更が必要なイベントが発生したことに応じて、充電システム1Aは、充電スケジュールを変更できる。
 また、充電設備3Aは、ユーザーが充電スケジュールに関する情報を入出力するための情報入出力装置32を備えたことにより、充電設備3Aからも充電スケジュールを変更できる。
 また、需給計画サーバ7は、情報端末5からの変更要求メッセージの内容に応じて、車両2への給電を停止するか否かを判断するため、予約された時刻までに車両2への充電を完了することができる。これにより、充電システム1Aの信頼性が向上する。
 以上、ユーザー側から変更要求が発生した場合を、実施の形態1、3として説明した。また、充電設備側で充電スケジュールの変更が必要なイベントが発生した場合を、実施の形態2、4として説明した。この発明にかかる実施の形態は上記のものに限るものではない。これらの実施の形態1~4は、それぞれ独立していても良いし、任意に組合せても良い。
 また、充電スケジュールの変更が不可である場合、ユーザーに通知する方法の一例として、画面表示または音声で通知する場合を説明した。ユーザーへの通知方法はこれに限るものではなく、例えば、ランプの明滅等、他の方法であってもよい。
 また、充電パラメータ等はメッセージで通知することとしたが、このメッセージは一つである必要は無く、複数のメッセージを組合せて一つの情報群を伝達するものであっても良い。
1、1A 充電システム
2 車両
20 バッテリ
21 制御装置
22 通信装置
23 充電ポート
3、3A 充電設備
30 給電制御装置
31 通信装置
32 情報入出力装置
4 充電ケーブル
5 情報端末
6 電源装置
7 電力需給サーバ
70 充電設備通信装置
71 電源通信制御装置
72 電力需給計画作成装置
73 情報端末通信制御装置

Claims (10)

  1.  車両に搭載される蓄電手段の充電スケジュールを変更する方法であって、
     前記充電スケジュールの変更要求を受信するステップと、
     前記受信した充電スケジュールの変更要求に応じて、前記充電スケジュールを変更する場合に適用される充電パラメータを、充電制御装置から取得するステップと、
     前記充電制御装置から取得した充電パラメータを用いて変更後の充電スケジュールを作成するステップと、
    を備えた充電スケジュールの変更方法。
  2.  前記蓄電手段の充電状態に関する情報を取得するステップを備え、
    前記充電スケジュールを作成するステップは、
     前記充電制御装置から取得した充電パラメータ及び前記蓄電手段の充電状態に関する情報を用いて、変更後の充電スケジュールを作成すること、
    を特徴とする請求項1に記載の充電スケジュールの変更方法。
  3.  前記充電スケジュールの変更要求は、前記車両と通信する情報入出力装置から受信すること、
    を特徴とする請求項1又は請求項2に記載の充電スケジュールの変更方法。
  4.  前記充電スケジュールの変更要求を受信するステップの代わりに、前記充電スケジュールの変更を要するイベントが発生した旨の通知を前記充電制御装置から受信するステップ、
    を備えたことを特徴とする請求項1又は請求項2に記載の充電スケジュールの変更方法。
  5.  前記充電制御装置から取得した充電パラメータを適用して充電スケジュールを変更するか否かのユーザー承認を得るステップ、
    を備えたことを特徴とする請求項1又は請求項2に記載の充電スケジュールの変更方法。
  6.  前記充電パラメータは、充電スケジュール変更前の条件を満たすこと、
    を特徴とする請求項1又は請求項2に記載の充電スケジュールの変更方法。
  7.  前記充電パラメータは、充電スケジュール変更前の条件を満たさない場合、充電スケジュールの変更を承認するか否かを選択させるためのフラグを有すること、
    を特徴とする請求項1又は請求項2に記載の充電スケジュールの変更方法。
  8.  蓄電手段と、
     前記蓄電手段への充電を充電スケジュールに応じて制御する制御手段と、
     前記充電スケジュールの変更要求に応じて充電制御装置と通信し、充電スケジュールを変更する場合に適用される充電パラメータを前記充電制御装置から取得する通信手段と、
    を備え、
     前記蓄電手段の充電状態に関する情報および前記通信手段が取得した前記充電パラメータを用いて変更後の充電スケジュールを作成すること、
    を特徴とする車両。
  9.  蓄電手段を搭載した車両と通信する通信手段と、
     前記蓄電手段への給電を充電スケジュールに応じて制御する給電制御手段と、
    を備え、
     前記通信手段が前記充電スケジュールの変更要求を受信すると、前記充電スケジュールを変更する場合に適用される充電パラメータを前記車両へ通知すること、
    を特徴とする充電制御装置。
  10.  蓄電手段を搭載した車両と通信する情報入出力装置であって、
     前記蓄電手段の充電スケジュールへの変更が入力されると、充電スケジュールの変更要求を前記車両へ通知し、
     前記車両から前記蓄電手段の充電状態に関する情報を取得し、
     前記蓄電手段へ給電する充電制御装置から前記充電スケジュールを変更する場合に適用される充電パラメータを取得し、
     前記取得した前記蓄電手段の充電状態に関する情報および前記充電パラメータを用いて変更後の充電スケジュールを作成すること、
    を特徴とする情報入出力装置。
PCT/JP2014/000748 2013-04-01 2014-02-14 充電スケジュールの変更方法、車両、充電制御装置、及び情報入出力装置 WO2014162648A1 (ja)

Priority Applications (4)

Application Number Priority Date Filing Date Title
US14/780,980 US9963042B2 (en) 2013-04-01 2014-02-14 Apparatus, charging control apparatus, and information input/output apparatus
JP2015509873A JP6038290B2 (ja) 2013-04-01 2014-02-14 装置、充電制御装置、及び情報入出力装置
DE112014001783.3T DE112014001783B4 (de) 2013-04-01 2014-02-14 Vorrichtung zum Ändern eines Ladeplans, Ladesteuervorrichtung und Informationseingabe-/Informationsausgabevorrichtung
CN201480019919.3A CN105075059B (zh) 2013-04-01 2014-02-14 装置、充电控制装置以及信息输入输出装置

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2013-076224 2013-04-01
JP2013076224 2013-04-01

Publications (1)

Publication Number Publication Date
WO2014162648A1 true WO2014162648A1 (ja) 2014-10-09

Family

ID=51657964

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2014/000748 WO2014162648A1 (ja) 2013-04-01 2014-02-14 充電スケジュールの変更方法、車両、充電制御装置、及び情報入出力装置

Country Status (5)

Country Link
US (1) US9963042B2 (ja)
JP (1) JP6038290B2 (ja)
CN (1) CN105075059B (ja)
DE (1) DE112014001783B4 (ja)
WO (1) WO2014162648A1 (ja)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016121333A1 (ja) * 2015-01-28 2016-08-04 株式会社デンソー 車両用電池の充電情報報知システム、充電情報報知プログラム、及び充電情報報知方法
JP2017005917A (ja) * 2015-06-12 2017-01-05 パナソニックIpマネジメント株式会社 電力管理システム、制御装置、制御方法及び制御プログラム
EP3130504A1 (en) * 2015-08-14 2017-02-15 Siemens Industry, Inc. Automatically selecting charging routine for an electric vehicle by balancing utility and user considerations
JP2018157719A (ja) * 2017-03-21 2018-10-04 トヨタ自動車株式会社 サーバ及び充電システム
JP2018157718A (ja) * 2017-03-21 2018-10-04 トヨタ自動車株式会社 車両、車両の制御方法及び充電システム
JP2019092281A (ja) * 2017-11-14 2019-06-13 トヨタ自動車株式会社 情報提供システム
CN111674275A (zh) * 2020-06-18 2020-09-18 薛洛良 采用变压器输出1250伏电压的电动车直流充电系统
JP2022531335A (ja) * 2020-02-26 2022-07-06 エルジー エナジー ソリューション リミテッド バッテリー情報提供装置及び方法
WO2024038908A1 (ja) * 2022-08-18 2024-02-22 ユビ電株式会社 情報処理装置及びシステム
JP7480719B2 (ja) 2021-01-28 2024-05-10 トヨタ自動車株式会社 サーバ、電力管理システム、及びエネルギーマネジメント方法

Families Citing this family (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5782390B2 (ja) * 2012-02-08 2015-09-24 トヨタ自動車株式会社 情報通知装置
CA2981571C (en) * 2015-04-07 2019-01-15 Nissan Motor Co., Ltd. A locking/unlocking system for a vehicle
DE102016212135A1 (de) * 2016-07-04 2018-02-15 Bayerische Motoren Werke Aktiengesellschaft Verfahren zur Steuerung des elektrischen Ladens einer Gruppe von Fahrzeugen
DE102016217162B4 (de) * 2016-09-09 2023-10-19 Bayerische Motoren Werke Aktiengesellschaft Ladesystem und Verfahren zur Steuerung optimaler Ladevorgänge
DE102016219726A1 (de) * 2016-10-11 2018-04-12 Bayerische Motoren Werke Aktiengesellschaft Verfahren zur Steuerung des elektrischen Ladens einer Gruppe von Fahrzeugen
CN106696738B (zh) * 2016-12-28 2019-05-10 华为技术有限公司 一种电动汽车的无线充电方法、装置及系统
US10625614B2 (en) 2017-06-20 2020-04-21 GM Global Technology Operations LLC System and method for managing charging parameters between a vehicle and a charging station
JP7013826B2 (ja) * 2017-12-05 2022-02-01 トヨタ自動車株式会社 ハイブリッド自動車およびこれに搭載される制御装置
DE102018104577B4 (de) * 2018-02-28 2019-11-14 Bender Gmbh & Co. Kg Verfahren zur Laststeuerung einer Ladestation für ein Elektrofahrzeug
EP3664248B1 (en) * 2018-12-06 2021-03-03 GN Audio A/S Communication apparatus with charging reminder, and method
US11124082B2 (en) * 2018-12-07 2021-09-21 Hyundai Motor Company Apparatus for controlling isolation charging of vehicle, system having the same, and method thereof
DE102018131315A1 (de) * 2018-12-07 2020-06-10 Innogy Se Verfahren zum Betreiben eines Ladestationssystems
JP7172676B2 (ja) * 2019-02-05 2022-11-16 トヨタ自動車株式会社 車両の制御装置およびそれを備えた車両ならびに車両の制御方法
CN111688530A (zh) * 2020-05-12 2020-09-22 宁波吉利汽车研究开发有限公司 充电计划变更方法、装置及计算机可读取存储介质
KR20210143451A (ko) * 2020-05-20 2021-11-29 현대자동차주식회사 차량의 충전 관리 장치 및 방법
CN112512860B (zh) * 2020-07-30 2021-12-03 华为技术有限公司 充电控制方法、装置、服务器、系统及介质
JP2022103776A (ja) * 2020-12-28 2022-07-08 トヨタ自動車株式会社 充電制御装置
DE102021100388A1 (de) * 2021-01-12 2022-07-14 Volkswagen Aktiengesellschaft Aufladeverfahren für eine Batterie, Steuergerät und Batteriemanagementsystem

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010268585A (ja) * 2009-05-14 2010-11-25 Toyota Industries Corp 車両充電制御システム
JP2011155824A (ja) * 2009-12-28 2011-08-11 Kansai Electric Power Co Inc:The 蓄電池の充電方法及び充電システム
JP2011188731A (ja) * 2010-02-15 2011-09-22 Denso Corp プラグイン車両の充電制御装置
JP2013027190A (ja) * 2011-07-22 2013-02-04 Mitsubishi Electric Corp 充電装置及び充電システム及び充電方法
WO2013042363A1 (ja) * 2011-09-20 2013-03-28 パナソニック株式会社 充電システム、サーバ装置、及び、サーバ装置のプログラム

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4333798B2 (ja) 2007-11-30 2009-09-16 トヨタ自動車株式会社 充電制御装置および充電制御方法
JP5583124B2 (ja) 2008-07-08 2014-09-03 シーメンス アクチエンゲゼルシヤフト 車両にエネルギーチャージするためのアダプタ装置および方法
US8324859B2 (en) 2008-12-15 2012-12-04 Comverge, Inc. Method and system for co-operative charging of electric vehicles
US8384358B2 (en) 2009-05-28 2013-02-26 GM Global Technology Operations LLC Systems and methods for electric vehicle charging and for providing notification of variations from charging expectations
US8798830B2 (en) 2010-02-15 2014-08-05 Denso Corporation Charge controller and navigation device for plug-in vehicle
JP2011196826A (ja) * 2010-03-19 2011-10-06 Aisin Aw Co Ltd 車載バッテリ充電支援装置、車載バッテリ充電支援方法及びコンピュータプログラム
JP2012075282A (ja) * 2010-09-29 2012-04-12 Panasonic Corp 充電制御装置
US20130093393A1 (en) 2010-10-05 2013-04-18 Mitsubishi Electric Corporation Charging control apparatus
DE102011075872A1 (de) 2011-05-16 2012-11-22 Robert Bosch Gmbh Vorrichtung und Verfahren zum Bestimmen von Ladevorgängen
DE102011082623B3 (de) 2011-09-13 2013-02-07 Continental Automotive Gmbh Verfahren zum Laden eines in ein Elektrokraftfahrzeug eingebauten Akkumulators
JP5986749B2 (ja) * 2012-01-18 2016-09-06 クラリオン株式会社 予約システム、ナビゲーション装置、充電器およびサーバ

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010268585A (ja) * 2009-05-14 2010-11-25 Toyota Industries Corp 車両充電制御システム
JP2011155824A (ja) * 2009-12-28 2011-08-11 Kansai Electric Power Co Inc:The 蓄電池の充電方法及び充電システム
JP2011188731A (ja) * 2010-02-15 2011-09-22 Denso Corp プラグイン車両の充電制御装置
JP2013027190A (ja) * 2011-07-22 2013-02-04 Mitsubishi Electric Corp 充電装置及び充電システム及び充電方法
WO2013042363A1 (ja) * 2011-09-20 2013-03-28 パナソニック株式会社 充電システム、サーバ装置、及び、サーバ装置のプログラム

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016121333A1 (ja) * 2015-01-28 2016-08-04 株式会社デンソー 車両用電池の充電情報報知システム、充電情報報知プログラム、及び充電情報報知方法
JP2016140193A (ja) * 2015-01-28 2016-08-04 株式会社デンソー 車両用電池の充電情報報知システム及び充電情報報知プログラム
JP2017005917A (ja) * 2015-06-12 2017-01-05 パナソニックIpマネジメント株式会社 電力管理システム、制御装置、制御方法及び制御プログラム
EP3130504A1 (en) * 2015-08-14 2017-02-15 Siemens Industry, Inc. Automatically selecting charging routine for an electric vehicle by balancing utility and user considerations
US9840156B2 (en) 2015-08-14 2017-12-12 Siemens Industry, Inc. Automatically selecting charging routine for an electric vehicle by balancing utility and user considerations
JP2018157718A (ja) * 2017-03-21 2018-10-04 トヨタ自動車株式会社 車両、車両の制御方法及び充電システム
JP2018157719A (ja) * 2017-03-21 2018-10-04 トヨタ自動車株式会社 サーバ及び充電システム
JP2019092281A (ja) * 2017-11-14 2019-06-13 トヨタ自動車株式会社 情報提供システム
JP2022531335A (ja) * 2020-02-26 2022-07-06 エルジー エナジー ソリューション リミテッド バッテリー情報提供装置及び方法
JP7372344B2 (ja) 2020-02-26 2023-10-31 エルジー エナジー ソリューション リミテッド バッテリー情報提供装置及び方法
CN111674275A (zh) * 2020-06-18 2020-09-18 薛洛良 采用变压器输出1250伏电压的电动车直流充电系统
JP7480719B2 (ja) 2021-01-28 2024-05-10 トヨタ自動車株式会社 サーバ、電力管理システム、及びエネルギーマネジメント方法
WO2024038908A1 (ja) * 2022-08-18 2024-02-22 ユビ電株式会社 情報処理装置及びシステム

Also Published As

Publication number Publication date
DE112014001783T5 (de) 2015-12-10
DE112014001783B4 (de) 2023-07-06
CN105075059A (zh) 2015-11-18
US9963042B2 (en) 2018-05-08
JP6038290B2 (ja) 2016-12-07
JPWO2014162648A1 (ja) 2017-02-16
CN105075059B (zh) 2018-07-06
US20160039301A1 (en) 2016-02-11

Similar Documents

Publication Publication Date Title
JP6038290B2 (ja) 装置、充電制御装置、及び情報入出力装置
EP4166380A1 (en) Target power transmission amount changing method and power transmitting apparatus for implementing same
CN112937321B (zh) 服务器及电力管理系统
JP2021093802A (ja) 電力管理システム、及びサーバ
JP6194910B2 (ja) 電気機器の制御装置及びエネルギーマネジメントシステム
JP6715448B2 (ja) 出力制御装置、電力管理装置及び電力管理方法
JP2010512727A (ja) 分散型電気資源のための電力集約化システム
CN112744098B (zh) 报知控制装置、移动体、电力系统以及报知方法
CN113449950A (zh) 能量供给系统、能量供给方法
US20140288719A1 (en) Power electronics device, power connection inspection method and non-transitory computer readable medium
US20230147695A1 (en) Electric Vehicle Charging System
CN112671015A (zh) 供电系统
JP6705118B2 (ja) 充電制御装置、電力システム、端末装置、充電制御方法および充電制御プログラム
KR20150130568A (ko) 수요반응형 전기자동차 교류 충전 방법 및 장치
US10379563B2 (en) System, method, mobile terminal and computer software for providing electric energy to users
CN114665461A (zh) 服务器、电力管理方法
JP7401703B1 (ja) アダプタ、情報処理方法及び情報処理システム
US20230281731A1 (en) Power management system
US20240144310A1 (en) Battery Replacement Control Device and Battery Replacement Control System
Marcolin et al. Assessment of CIR/RO Aggregation Model for Domestic Charging: First Experimental Results
JP2017184596A (ja) 管理システム、管理方法、機器及び管理装置
Sorvisto Use cases for V2X implementation
JP2021065007A (ja) 報知システム
CN114665464A (zh) 服务器、电力管理方法
JP2021191196A (ja) 充電制御装置

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 201480019919.3

Country of ref document: CN

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 14778303

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2015509873

Country of ref document: JP

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 14780980

Country of ref document: US

WWE Wipo information: entry into national phase

Ref document number: 1120140017833

Country of ref document: DE

Ref document number: 112014001783

Country of ref document: DE

122 Ep: pct application non-entry in european phase

Ref document number: 14778303

Country of ref document: EP

Kind code of ref document: A1