WO2005024144A1 - 施工目標指示装置 - Google Patents

施工目標指示装置 Download PDF

Info

Publication number
WO2005024144A1
WO2005024144A1 PCT/JP2004/012642 JP2004012642W WO2005024144A1 WO 2005024144 A1 WO2005024144 A1 WO 2005024144A1 JP 2004012642 W JP2004012642 W JP 2004012642W WO 2005024144 A1 WO2005024144 A1 WO 2005024144A1
Authority
WO
WIPO (PCT)
Prior art keywords
construction surface
virtual line
construction
display data
reference point
Prior art date
Application number
PCT/JP2004/012642
Other languages
English (en)
French (fr)
Inventor
Yuki Yokoyama
Masato Kageyama
Keisuke Miyata
Original Assignee
Komatsu Ltd.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Komatsu Ltd. filed Critical Komatsu Ltd.
Priority to JP2005513651A priority Critical patent/JP4311577B2/ja
Priority to GB0513429A priority patent/GB2413314B/en
Priority to US10/554,400 priority patent/US20070010925A1/en
Publication of WO2005024144A1 publication Critical patent/WO2005024144A1/ja

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/26Indicating devices
    • E02F9/261Surveying the work-site to be treated
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/26Indicating devices
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/28Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
    • E02F3/36Component parts
    • E02F3/42Drives for dippers, buckets, dipper-arms or bucket-arms
    • E02F3/43Control of dipper or bucket position; Control of sequence of drive operations
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01SRADIO DIRECTION-FINDING; RADIO NAVIGATION; DETERMINING DISTANCE OR VELOCITY BY USE OF RADIO WAVES; LOCATING OR PRESENCE-DETECTING BY USE OF THE REFLECTION OR RERADIATION OF RADIO WAVES; ANALOGOUS ARRANGEMENTS USING OTHER WAVES
    • G01S17/00Systems using the reflection or reradiation of electromagnetic waves other than radio waves, e.g. lidar systems
    • G01S17/88Lidar systems specially adapted for specific applications

Definitions

  • the present invention relates to a construction target indicating device that can be used for excavation work on a construction surface using a working machine such as a hydraulic shovel.
  • an external reference 60 is installed in a horizontal direction along the direction in which the target slope advances, and is provided in the cockpit.
  • the control unit calculates the vertical distance hfy and the horizontal distance hfx from the center O of the vehicle to the external reference by turning on the external reference setting switch with the front reference 61 provided at the end of the packet matched with the external reference.
  • Patent Document 1 Japanese Patent Application Laid-Open No. 5-295754
  • Patent Document 2 Republished Patent No. 98/036131
  • the work implement operating device described in Patent Document 1 enables linear control of the work implement.
  • a movable part of the work implement has a boom angle sensor, an arm angle sensor, Each packet angle sensor must be installed.
  • the external reference 60 is set accurately and horizontally. The operation becomes complicated, and the machine operator must visually match the packet reference 61 and the external reference 60 that are far away with high accuracy, and the operation cannot be performed easily.
  • An object of the present invention is to provide a device capable of automatically measuring the topography of a construction surface and the position of a reference mark with a simple configuration and presenting information to an operator to facilitate operation of a work machine. It is to provide.
  • a device for instructing an operator of a working machine is capable of determining a position of a construction surface to be currently worked and other objects existing near the construction surface while the working machine is working.
  • a measuring device for measuring a reference point detecting unit for detecting a reference point corresponding to a reference mark installed near the construction surface from the positions of the construction surface and other objects measured by the measurement device, and a reference inspection.
  • a virtual line calculation unit that calculates a virtual line corresponding to a target plane to be formed based on the reference point detected by the projection unit, and a position calculated by the measurement device and a virtual line calculated by the virtual line calculation unit.
  • a display data creation unit that creates display data for displaying an image indicating at least the construction surface and the position of the virtual line based on the line, and a display screen that receives the display data from the display data creation unit and displays the image.
  • the operator of the working machine can easily understand how much processing should be performed on the working surface by operating the working machine because the operator can understand the positional relationship between the displayed image power and the construction surface. I can judge.
  • the positions of other objects near the construction surface detected by the measurement device may be displayed together with the positions of the construction surface and the virtual lines.
  • Other objects to be detected typically include reference landmarks located near the construction surface and working components that directly affect the construction surface of the implement (eg, excavation packets in the case of hydraulic excavators). . Since the human pattern recognition ability is very high, the operator looks at the displayed image and easily identifies which of the displayed image is the action component, which is the construction surface, and which is the virtual line. Can easily determine how the implement should be moved.
  • the cross-sectional shape of the construction surface and other objects (such as reference marks and working components) detected by the measurement device is calculated, and a virtual line is also calculated.
  • An image showing the plane, the cross-sectional shape of the other object, and the virtual line is displayed on the display screen.
  • the measuring device may be installed to move or change direction with the work machine when the work machine moves or changes direction.
  • the current construction surface and the position of other objects near the construction surface are always measured, and the current construction surface and the virtual The position of the line is displayed on the display screen.
  • the measurement device may be configured to continuously detect the positions of the construction surface and other objects. As a result, while the work is being performed by the work machine, the positions of the construction surface and the virtual lines in the substantially real time are displayed on the display screen.
  • the reference point detection unit is configured to automatically detect, as a reference point, a position satisfying a predetermined geometric condition from among the positions of the construction surface and other objects measured by the measurement device.
  • the reference point detection unit may detect a position designated by the operator as a reference point from the positions of the construction surface and other objects measured by the measuring device.
  • a plurality of positions can be detected as reference points, and a virtual line can be calculated so as to pass through the plurality of reference points.
  • the pointing device of the present invention may further include a working component detection unit that detects the position of the above-described working component of the work implement. Based on the detected position of the operation component, the position of the operation component can be displayed on the display screen together with the position of the construction surface and the virtual line.
  • a position corresponding to the action component is detected from the positions of the construction surface and other objects measured by the measuring device, for example, by processing such as pattern matching or area determination. Can be adopted.
  • the displacement of a plurality of components of the working machine is measured by a displacement sensor attached to each component, and the position of the working component is obtained from the measured displacements of the plurality of components.
  • the detected position of the operation component is corrected using a predetermined offset amount, and the corrected position of the operation component is displayed together with the position of the construction surface and the virtual line. You can do it.
  • the position of the inner surface of the excavation packet which is a working component of the excavator, is measured by a measuring device, and the position of the inner surface is offset by an amount corresponding to the thickness of the excavation bucket.
  • the position of the inside surface of the corrected excavation packet is corrected to approximately correspond to the position of the side surface, and the position of the construction surface and the imaginary line are displayed. The operator can force S to grasp the position of the action component correctly.
  • the position deviation between the construction surface and the virtual line may be enlarged, that is, displayed in an emphasized manner. This makes it easier for the operator to operate the work machine more accurately.
  • a device for instructing an operator of a construction machine having a work machine includes: a device that moves together with the work machine when the construction machine moves or the work machine turns.
  • a measuring device that is attached to a construction machine so as to change direction and measures the position of the construction surface that is the current work target and the position of other objects near the construction surface while the work machine is working, and a measuring device.
  • a reference point detection unit that detects a reference point corresponding to a reference mark installed near the construction surface from among the positions of the construction surface and other objects measured by, and a reference point detected by the reference point detection unit.
  • a virtual line calculation unit that calculates a virtual line corresponding to a target plane to be formed based on the position measured by the measuring device and the virtual line calculated by the virtual line calculation unit.
  • Image showing the position of the virtual line A display data generating unit for generating display data for displaying an image; and a display device for receiving the display data from the display data generating unit and displaying the image on a display screen.
  • a method for instructing an operator of a work machine wherein the work machine includes a work surface to be worked on and a work surface near the work surface while the work machine is working. Measuring the position of another object, and detecting a reference point corresponding to a reference mark installed near the construction surface from the measured construction surface and other object positions. Calculating a virtual line corresponding to a target plane to be formed, based on the reference point, and indicating at least the positions of the construction plane and the virtual line based on the measured position and the calculated virtual line. Steps for creating an image and displaying it on a display screen;
  • FIG. 1 is a schematic configuration diagram of a working machine drive system in a conventional example.
  • FIG. 2 is a schematic view showing a working state in a conventional example.
  • FIG. 3 is a perspective view showing an example of a slope excavation state according to the hydraulic excavator.
  • FIG. 4 is a block diagram showing a configuration of a construction target indicating device according to an embodiment of the present invention mounted on a hydraulic excavator.
  • FIG. 5 is a block diagram showing a functional configuration of an arithmetic unit 32 of the construction target indicating device.
  • FIG. 6 is a diagram showing a method of detecting rectangular coordinates of a certain object point using a laser distance measuring device.
  • FIG. 7 is a diagram showing an example of a cross-sectional image of a construction surface displayed on a display screen.
  • FIG. 8 is a diagram showing a method of setting a first reference point.
  • FIG. 9 is a diagram showing a method of setting a second reference point.
  • FIG. 10 is a diagram showing a setting method of a virtual line.
  • FIG. 11 is a diagram showing a flow of processing for automatically detecting a reference point and setting a virtual line.
  • FIG. 12 is a diagram showing a flow of processing for automatically detecting a packet and correcting a packet shape.
  • FIG. 13 is a diagram showing a flow of pattern matching.
  • FIG. 14 is a diagram showing a display example of a terrain cross-sectional image.
  • FIG. 15 is a diagram illustrating an example in which a part of a terrain cross-sectional image is highlighted and displayed.
  • FIG. 16 is a diagram showing an algorithm for highlighting a terrain section.
  • FIG. 17 is a diagram illustrating an algorithm for highlighting a terrain section.
  • FIG. 18 is a diagram illustrating an algorithm for highlighting a terrain section.
  • FIG. 3 is a perspective view showing an example of a situation where a slope is excavated by a construction machine, for example, a hydraulic shovel on which an embodiment of a construction target indicating device according to the present invention is mounted.
  • a construction machine for example, a hydraulic shovel on which an embodiment of a construction target indicating device according to the present invention is mounted.
  • excavation by the excavator 1 has been completed, and the slope 28 has already been formed.
  • the construction surface 15 to be excavated In the area behind the construction site, below the packet 6, there is a construction surface 15 to be excavated.
  • reference marks such as a plurality of piles 16 and a pair of strings 17 stretched between the piles 16
  • These fiducials, especially the pair of strings 17, indicate that their passing surface indicates the target slope to be formed by excavation. That is, a pair of cords 17 are arranged on the extension of the target slope.
  • the excavator 1 includes a lower traveling body 7 for moving the excavator 1 and a lower traveling body. And an upper revolving superstructure 2 capable of turning (turning) in a horizontal direction on 7.
  • the upper swing body 2 includes a cab 3 and a working machine.
  • the work machine includes a boom 4, an arm 5 attached to a tip of the boom 4, and a bucket 6 attached to a tip of the arm 5.
  • Boom 4, arm 5, and packet 6 are each driven by a hydraulic cylinder. The operator can excavate the construction surface 15 correctly by moving the packet 6, which is a component directly acting on the construction surface 15 of the work machine, along the target direction indicated by the reference marks 16 and 17.
  • a distance measuring device 20 which is a part of the construction target indicating device according to the present invention, is attached to the upper part of the cab 3 of the excavator 1. Due to the turning operation of the upper turning body 2, the distance measuring device 20 turns together with the cab 3 and the working machine. When the excavator 1 moves, the distance measuring device 20 moves together with the excavator 1.
  • a laser distance measuring device is used as the distance measuring device 20, for example. This laser distance measuring device (distance measuring device 20) irradiates a laser beam in an angle direction corresponding to the front of the cab 3 at a horizontal rotation angle, and constantly changes the elevation angle of the laser beam at a predetermined cycle.
  • the fan-shaped scanning area 26 extending in front of the cab 3 is constantly scanned with a laser beam.
  • the construction surface 15 to be currently excavated.
  • This laser distance measuring device receives the laser beam reflected by the construction surface 15, the reference marks 16, 17 and the packet 6 in the scanning area 26, and determines the position of each part of the object. (Ie distance and elevation).
  • the position (distance and elevation angle) of each part of the construction surface 15 and other objects (reference marks 16, 17, bucket 6, etc.) in the scanning area 26 output from this laser distance measuring device (distance measuring device 20)
  • the indicated measurement data is processed by the construction target indicating device according to the present invention.
  • FIG. 4 shows a configuration of an embodiment of the construction target indicating device according to the present invention mounted on the hydraulic excavator 1.
  • the construction target indicating device 30 includes the above-described distance measuring device 20 (laser distance measuring device), an arithmetic device 32, a display device 34, and an input device 36.
  • the distance measurement device 20 (laser distance measurement device) measures the construction surface 15, the reference marks 16, 17 and the position information (distance and elevation angle) of each part of the packet 6 in the running area 26. Is Output to 32.
  • the arithmetic unit 32 can be realized by, for example, a computer having a storage device storing a program and a CPU executing the program.
  • the arithmetic unit 32 calculates the construction surface 15, the reference landmark 16, the reference landmark 16, 17 based on the position (distance and elevation angle) of each part of the packet 6 indicated by the measurement data from the distance measurement device 20 and the reference marks 16, 17 and the packet 6.
  • the arithmetic unit 32 displays the image of the cross-sectional shape of the construction surface 15, the reference marks 16 and 17 and the packet 6 from the calculated cross-sectional shape data of the construction surface 15, the reference marks 16 and 17 and the packet 6. Create data.
  • the arithmetic unit 32 outputs the display data to the display unit 34.
  • the display device 34 is, for example, a liquid crystal display panel installed in a place that is easy for the operator to see, such as in the cab 3.
  • the display device 34 displays an image of the construction surface 15, the reference marks 16, 17 and the cross-sectional shape of the packet 6 on the display screen.
  • the cross-sectional shape of the bucket 6 displayed on the display device 34 is usually not the outer surface but the inner surface of the bucket 6. The reason is that the inner side of the packet 6 is directed to the distance measuring device 20 on the cab 3 instead of the outer side. However, since the excavation work is performed not on the inner surface of the packet 6 but on the outer surface, it is desirable for the operator to display the sectional shape of the outer surface of the bucket 6 on the display screen instead of the inner surface. Therefore, the position of the inner surface of the bucket 6 is shifted outward by the offset amount corresponding to the thickness of the bucket 6 by the arithmetic unit 32, so that the outer surface of the bucket 6 exists on the display screen. Thus, a sectional shape image of the bucket 6 can be displayed.
  • the input device 36 is a pointing device for allowing an operator to designate a desired portion in the cross-sectional shape image of the construction surface 15, the reference marks 16, 17 and the packet 6 displayed on the display screen.
  • the input device 36 may be, for example, a touch panel incorporated in the display screen of the display device 34, a mouse for operating a cursor displayed on the display screen, and / or incorporated in the display device 34 or connected to the display device 34. Keyboard (various switches) or the like may be employed.
  • the distance measuring device 20 is not limited to the above-described laser distance measuring device. Automatically measure the cross-sectional shape or position of the work surface 15 and objects near it Various other devices can be employed as the distance measuring device 20. For example, a distance measuring device that detects a distance by emitting a sound wave or the like can be employed. Alternatively, a device that detects the cross-sectional shape of the construction surface by an optical method other than laser ranging can be employed. Alternatively, it is also possible to use a plurality of cameras or one camera to obtain a plurality of pieces of image information from different viewpoints of the construction surface, and to use those image information capabilities to detect the cross-sectional shape of the construction surface. .
  • the mounting position of the distance measuring device 20 is not limited to the upper part of the cab 3 as shown in FIG. It can be installed in the operator's cab 3 or at an appropriate place on the upper swing body 2. In any case, the distance measuring device 20 turns together with the upper turning body 2 and moves together with the hydraulic shovel 1.
  • the distance measuring device 20 constantly scans the inside of the scanning area 26 at a predetermined cycle, and detects a substantially real-time position of the construction surface 15 and the reference marks 16, 17 and the bucket 6 in the vicinity thereof. Therefore, a substantially real-time cross-sectional shape image of the construction surface 15, the reference marks 16, 17 and the packet 6 is displayed on the display screen.
  • the operator can confirm on the display screen whether the current position of the packet 6 is appropriate and whether the excavation work is being performed correctly. Can be easily checked.
  • FIG. 5 shows a functional configuration of the arithmetic unit 32 of the construction target indicating device shown in FIG.
  • the calculation device 32 includes a coordinate conversion unit 100, a reference point detection unit 102, a virtual line calculation unit 104, a packet detection unit 106, a packet shape correction unit 108, a display data creation unit 110, and an input It has a coordinate specifying unit 112.
  • These functional units 100 to 112 of the arithmetic unit 32 can be realized by executing a program by a CPU, or can be realized by a wired hardware circuit.
  • the coordinate conversion unit 100 converts the positions (distance and elevation angle) of each part of the construction surface 15, the reference marks 16, 17 and the packet 6 from the distance measuring device 20 (laser distance measuring device) in the rectangular coordinate system. Convert to coordinate value (X coordinate value and Y coordinate value).
  • the origin of the Cartesian coordinate system is a location at a predetermined relative position with respect to the excavator 1 (for example, a place where the distance measuring device 20 is mounted, a location of a driver's seat in the cab 3, or a center point of the excavator 1 or the like).
  • the reference point detection unit 102 corresponds to a reference mark (particularly, a pair of strings 17) from among the coordinate points of the construction surface 15, the reference marks 16 and 17 and the bucket 6 from the coordinate conversion unit 100. Detects coordinate values of multiple points (for example, two points) (hereinafter referred to as “reference points”). This detection may be performed automatically, or may be performed manually in accordance with the coordinate designation from the input device 36 by the operator.
  • the virtual line calculation unit 104 calculates a virtual line representing a cross-sectional shape line of a target slope to be formed by excavation, based on the plurality of reference points detected by the reference point detection unit 102.
  • the bucket detecting unit 106 automatically detects a group of coordinate values corresponding to the packet 6 from the coordinate values of each part of the construction surface 15, the reference marks 16, 17 and the bucket 6 from the coordinate converting unit 100. You. This detection may be performed based on the coordinate values from the coordinate conversion unit 100, for example, by a method such as pattern matching, or may be performed on a plurality of components (boom 4, arm 5, bucket 6) of the work machine. This is performed using a detection signal from a displacement sensor 38 (for example, a stroke sensor that detects a stroke of a hydraulic cylinder that moves each of the boom 4, the arm 5, and the bucket 6) that detects the displacement of each of the components provided. May be.
  • a displacement sensor 38 for example, a stroke sensor that detects a stroke of a hydraulic cylinder that moves each of the boom 4, the arm 5, and the bucket 6) that detects the displacement of each of the components provided. May be.
  • the packet shape correction unit 108 converts the coordinate value group of the bucket 6 (representing the inner cross-sectional shape of the packet 6) detected by the packet detection unit 106 in the outward direction by an offset amount corresponding to a predetermined thickness of the packet 6. By shifting the position, the correction is made so as to substantially correspond to the coordinate value of the outer surface of the bucket 6.
  • the display data creation unit 110 includes a coordinate value from the coordinate conversion unit 100, a reference point detected by the reference point detection unit 102, a virtual line calculated by the virtual line calculation unit 104, and a packet shape correction unit 108.
  • a coordinate value from the coordinate conversion unit 100
  • a reference point detected by the reference point detection unit 102 For displaying an image of the sectional shape of the construction surface 15, an image of the reference point, an image of the virtual line, and an image of the corrected sectional shape of the packet 6, based on the coordinate value group of the bucket 6 corrected by The data is created, and the display data is output to the display device 34.
  • the display device 34 displays an image representing the cross-sectional shape of the construction surface 15, the reference point, the virtual line, and the corrected cross-sectional shape of the packet 6.
  • This display image clearly shows the positional relationship among the construction surface 15, reference point, virtual line, and packet 6.
  • the display data creating unit 110 also enlarges the position deviation between the displayed virtual line and the construction surface 15 so as to make it easier for the operator to see. It is also possible to create display data of the image represented by the tone and output it to the display device 34.
  • the input coordinate specifying unit 112 specifies the coordinate value of a point specified on the display screen by the operator using the input device 36.
  • the coordinate value specified by the input coordinate specifying unit 112 is input to the reference point detecting unit 102 as the coordinate value of the reference point specified by the operator, for example, when the reference point is manually detected.
  • the coordinate value specified by the input coordinate specifying unit 112 specifies an area in the display image to be highlighted when, for example, the position deviation between the displayed virtual line and the construction surface 15 is emphasized and displayed.
  • FIG. 6 shows a method of converting the distance from the laser range finder 25 and the elevation angle into rectangular coordinate values in the coordinate conversion unit 100 shown in FIG.
  • FIG. 7 shows an example of an image displayed on the display screen.
  • the bucket In Figure 7, the bucket
  • the display of the cross-sectional shape image of 6 is omitted.
  • a curve 21 composed of a large number of continuous dots is a topographic line indicating the cross-sectional shape of the construction surface 15 (position data on the topographic surface).
  • Two dots 22a, 22b that are isolated from the topographic line 21 are images of a pair of strings 17 that are reference marks shown in FIG.
  • the direction indicated by the arrow in the figure is the scan direction of the laser range finder 25, but this scan direction is not limited to the direction of the arrow in the figure, and may be in the opposite direction to the arrow. It may be a reciprocating direction.
  • FIG. 7 the X axis and the Y axis are displayed such that the cross-sectional shape image is located in the second quadrant of the rectangular coordinate system.
  • a cross-sectional shape image viewed from the left viewpoint toward the construction surface 15 is displayed.
  • the viewpoint for viewing the cross section is reversed from the left side to the right side (that is, symmetric with respect to the image of FIG. 7 around the Y axis).
  • Image in the first quadrant illustrate a procedure in which the reference point is detected and the virtual line is set by the reference point detection unit 102 and the virtual line calculation unit 104 shown in FIG.
  • one dot 22a corresponding to a reference mark (string) is detected from the display image, and this is set as a first reference point. Further, as shown in FIG. 9, another dot 22b corresponding to another reference mark (string) is detected, and this is set as a second reference point.
  • Such detection of the reference point can be performed manually by the operator. That is, the operator uses the input device 36 (for example, a touch panel incorporated in the display screen, a mouse for operating a cursor displayed on the display screen, etc.) to select a reference mark (string) from the displayed image.
  • the input device 36 for example, a touch panel incorporated in the display screen, a mouse for operating a cursor displayed on the display screen, etc.
  • the coordinate value of the point is registered by the reference point detection unit 102 as the coordinates of the reference point.
  • the detection of the reference point can be automatically performed as described later.
  • the virtual line calculation unit 104 converts the coordinate values (XI, Yl) and ( ⁇ 2, ⁇ 2) of the reference points 22a and 22b as shown in FIG. On the basis of,
  • Y-Y1 (X-X1) (Y2-Y1) / (X2-X1)
  • a virtual line 23 is calculated from the relational expression. That is, the virtual line 23 is a straight line passing through the reference points 22a and 22b, and indicates the position of the target slope to be formed by excavation, that is, the sectional shape, as described above. Then, as shown in FIG. 10, images of the reference points 22a and 22b and the imaginary line 23 are displayed on the display screen together with the terrain line 21 having the sectional shape of the construction surface 15.
  • the reference points 22a and 22b, the imaginary line 23, and the terrain line 21 can be displayed in different colors, for example, so that they can be easily identified.
  • the method of calculating a virtual line is not limited to the method of calculating a straight line passing through the two reference points described above.
  • a virtual line can be calculated based on one reference point and a preset reference angle.
  • a guide message for instructing the input operation procedure may be output from the arithmetic unit 32 to the display screen. .
  • FIG. 11 shows the flow of this automatic processing.
  • the processing shown in FIG. 11 was measured by the distance measurement device 20.
  • the positions of the detected objects such as the construction surface 15 and the reference marks 16 and 17, those that satisfy the predetermined geometric conditions (for example, positions that are isolated from other position groups) are set as reference points. I'm trying to find out.
  • step S1 of FIG. 11 After the image of the cross-sectional shape of the detected object as shown in FIG. 7 is displayed on the display screen, in step S1 of FIG. 11, for example, the setting switch which is not shown in FIG. Turned ON by the operator.
  • step S2 one coordinate (Xi, Yi), which is the scanned order, is selected from the coordinate group transformed by the coordinate transformation unit 100, and the radius Rd around the selected coordinate (Xi, Yi) is selected.
  • the scanning order it is determined whether the coordinates of the preceding order (Xi-1, Yi-1) or the coordinates of the next order (Xi + 1, Yi + 1) exist. If neither the previous rank coordinate nor the next rank coordinate exists within the radius Rd centered on the selected coordinate (Xi, Yi), the selected coordinate (Xi, Yi) is separated from the construction surface 15 by a single string. It is determined that it corresponds to 17 (reference mark) (step S4). Thus, the coordinates (Xi, Yi) of one detected string are set as the first reference point.
  • step S8 When the second reference point is set in step S8, a straight line passing through the two reference points is calculated in step S9, and the straight line is displayed on the display screen as a virtual line 23 as shown in FIG. Displayed in
  • FIG. 12 shows a flow of a packet detection and shape correction process performed by the packet detection unit 106 and the packet shape correction unit 108 shown in FIG.
  • Steps S21 to S28 are performed.
  • step S21 when the bucket 6 is at an appropriate position, the first scan of the scanning area 26 by the distance measurement device 20 (laser distance measurement device 25) is performed.
  • step S22 the first scan is performed.
  • the coordinates of the construction surface 15, the reference landmarks 16, 17 and the packet 6 measured by the scan are taken into the bucket detecting unit 106 and stored.
  • step S23 the packet 6 is moved by a predetermined distance, and then in step 24, the first scan by the distance measuring device 20 (laser distance measuring device 25) is performed.
  • step S25 the coordinates of the construction surface 15, the reference marks 16, 17 and the bucket 6 measured in the second scan are taken into the packet detection unit 106 and stored.
  • step 26 the coordinates measured in the first and second scans are compared.
  • step S27 the coordinate group that is desired to change as a result of the comparison is recognized as corresponding to packet 6, and in step 28, the coordinate group force recognized as corresponding to packet 6 Packet pattern 120 representing the shape of packet 6 Is stored as This completes the packet pattern setting process.
  • the real-time sectional shape display processing of steps S31 to S36 in FIG. 12 is repeatedly executed at a predetermined high-speed cycle.
  • step S31 the scanning area 26 is scanned by the distance measuring device 20 (laser distance measuring device 25).
  • step 32 the construction surface 15, the reference marks 16, 17 and The coordinates of bucket 6 are captured and stored in bucket detector 106.
  • step S33 pattern matching is performed between the previously set bucket pattern 120 and the fetched coordinates. As a result, the coordinate group force S that matches the packet pattern 120 with a certain high degree of matching is extracted as corresponding to the packet 6.
  • This pattern matching can be performed, for example, by a procedure as shown in FIG. That is, in step S41 of FIG. 13, the degree of matching between each group of the fetched coordinates and the bucket pattern 120 is calculated.
  • step S42 a coordinate group having a match degree of 90% or more is searched. If no such coordinate group is found, a coordinate group with a match degree of 80% or more is searched for in step S43. If no such coordinate group is found, a coordinate group with a match degree of 70% or more is searched for in step S44. In this way, a match degree range of a certain degree or more (for example, 70%) or more
  • the process is divided into several stages, and a coordinate group having a corresponding degree of matching is searched in order from the higher stage.
  • the coordinate group with the highest matching degree is detected with higher priority.
  • the shape of the part of the packet 6 protruding from the ground can be detected by pattern matching. From the degree of matching, it is also possible to estimate whether or not the cutting edge of bucket 6 is in the soil from the degree of matching, and from the estimation result, it is also possible to estimate the position of the cutting edge that enters the soil of packet 6. .
  • step S34 the coordinates of the bucket 6 (representing the cross-sectional shape of the inner surface of the bucket 6) detected by the pattern matching are set in advance.
  • the offset amount for the thickness is added.
  • the coordinates of the inner surface of the bucket 6 are corrected to represent the approximate position of the outer surface of the packet 6.
  • step S35 based on the coordinates of the corrected bucket 6, the measured coordinates of the construction surface 15, the coordinates of the detected reference point, and the coordinates of the set virtual line, Display data for displaying the cross-sectional shape image is generated, and an image based on the display data is displayed in step S36.
  • This display image is as exemplified in FIG. 14, and displays the cross-sectional shape 21 of the construction surface 15, the reference points 22a and 22b, the virtual line 23, and the cross-sectional shape 24 of the bucket 6.
  • the method of detecting the equivalent of the neutral bucket 6 of the measured coordinate values is not limited to the above-described pattern matching, but may be replaced by or in combination with the pattern matching.
  • the following methods (1) to (3) can be adopted.
  • the measurement data existing in the predetermined area is regarded as corresponding to the packet 6. That is, in the measurement data from the distance measuring device 20 on the operator's cab 3, the bucket 6 is often present in an upper front area when viewed from the distance measuring device 20. Therefore, the group of coordinates existing in the upper front area is regarded as equivalent to packet 6.
  • the coordinates of the packet 6 are specified using the optical reflector attached to the work machine. That is, the optical reflector is pre-installed at a specific location of the working machine (for example, the arm 5 and the packet 6). The optical reflectors are detected based on the measurement data of the distance measuring device 20 (laser distance measuring device), and the coordinates of the packet 6 are specified based on the positional relationship between the optical reflectors.
  • the coordinates of the bucket 6 are specified using displacement sensors of a plurality of components of the work machine attached to the work machine. That is, data relating to the shape of the packet 6 and the structure of the working machine (for example, the boom 4, the arm 5, and the packet 6) are registered in the arithmetic unit 32 shown in FIG.
  • a displacement sensor for example, a sensor for detecting a stroke of a hydraulic cylinder
  • a displacement of each of the components for example, the boom 4, the arm 5, and the bucket 6
  • the coordinates of the bucket 6 are specified based on the displacement of each component of the work machine detected by the work machine displacement sensor, the structure of the work machine, and the shape of the packet 6.
  • the display data creation unit 110 shown in FIG. 5 has a function of enlarging or displaying the positional deviation between the virtual line 23 and the construction surface 15 in the area specified by the operator on the display screen.
  • FIG. 15 shows an example of an image displayed in such a manner that the deviation is emphasized.
  • the unevenness of the terrain cross-sectional shape 21, that is, the deviation from the virtual line 23 is displayed in an enlarged or emphasized manner.
  • FIG. 16 shows the algorithm of the highlighting process performed by the display data creation unit 110.
  • FIG. 17 and FIG. 18 are diagrams for explaining this anoregorism.
  • step S51 of FIG. 16 when the operator specifies a desired emphasized portion (Xt, Yt) on the display screen (FIG. 17) by using the input device 36, the display data creation unit 110 performs steps S52 to S58. Is executed.
  • step S54 When the terrain coordinates (Xi, Yi) are found in the enlarged display area 25, the terrain coordinates (Xi, Yi) are registered as enlargement target points (Xn, Yn) (step S54), and the enlargement point The enlargement calculation algorithm of step S55 is executed for (Xn, Yn).
  • step S55 In the enlargement calculation algorithm in step S55, as shown in FIG.
  • Enlarged coordinates (Xne, Yne) force The enlarged coordinates (Xne, Yne) are displayed only when located in the enlarged display area 25 (steps S56, S57, S58). The processing of steps S54 and S57 is repeated for all the terrain coordinates (Xi, Yi) found in the enlarged display area 25.
  • FIG. 17 an image in which a part of the terrain cross-sectional shape image is enlarged or emphasized as shown in FIG. 17 is displayed.
  • the operator can excavate the construction surface while looking at the emphasized image, so that a slope matching the virtual surface 23 with high accuracy can be formed.
  • the distance measuring device 20 is provided in a portion that can always maintain a constant relative positional relationship with the working machine in the turning direction, for example, in a cab. Scans are performed constantly to measure the actual real-time position of the construction surface, reference landmarks and packets. Therefore, even if the excavator 1 moves in a direction that is not parallel to the string 17, it is possible to always display the current construction surface and a virtual line representing the target slope on the display screen. The operator can easily perform high-precision excavation work.
  • the cross-sectional shape of the inner surface of the packet measured by the distance measuring device is corrected by a preset offset amount for the bucket thickness, and substantially corresponds to the cross-sectional system of the outer surface of the bucket.
  • the cross-sectional shape of the outer surface of the packet obtained by the correction is displayed together with the cross-sectional shape of the construction surface. The operator can accurately understand how the construction surface is excavated by the packet.
  • the positional deviation between the virtual line and the construction surface is displayed in an enlarged or emphasized manner. The operator can excavate more accurately.
  • the present invention can be applied to excavation work for purposes other than formation of a slope.
  • the present invention is not limited to excavation work, but may be applied to a machine for performing work using a positional relationship between a cross-sectional shape and a desired virtual line, such as a device for examining a projecting condition of a building or the like.
  • a target indicating device can be applied.
  • the construction target indicating device of the present invention may be incorporated into a work machine as a part of the work machine at the time of manufacture, or may be a product independent of the work machine and simply attached to the work machine. May be something. In any case, if the construction target indicating device of the present invention is applied, even if the work machine does not have a control device as disclosed in Patent Document 1 or Patent Document 2, accurate work can be performed. Can be done.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Component Parts Of Construction Machinery (AREA)
  • Operation Control Of Excavators (AREA)
  • Length Measuring Devices By Optical Means (AREA)

Abstract

 建設機械1の操作者に操作を容易にするための情報を呈示する施工目標指示装置30が提供される。施工目標指示装置30では、建設機械1の運転室に設置されたレーザ測距装置20が、施工面15と基準目印17とバケット6の実時間の位置を自動計測する。演算装置32が、施工面15とバケット6の断面形状を計算し、目標法面に相当する仮想線を計算し、そして、施工面15とバケット6の断面形状と仮想線を示した画像を作成する。表示装置34が、その画像を表示画面上に表示する。操作者は、表示画像上の仮想線に沿ってバケット6を動かすことで、正確な掘削作業を行うことができる。

Description

明 細 書
施工目標指示装置
技術分野
[0001] 本発明は、油圧ショベルなどの作業機械による施工面の掘削作業等に用レ、ること のできる施工目標指示装置に関する。
背景技術
[0002] 従来から、例えば、土木作業現場においては掘削する場所を、油圧ショベルなどの 作業機械に指示するため、「丁張り」又は「トンボ」と呼ばれる基準目印(基準の面や 線を表現した杭や杭間に張られた紐などの仮設物)を土木作業現場に設置している 。設置した基準目印に油圧ショベルのパケット底部やパケット刃先などを合わせて、 作業機械の操縦を行っている。しかし、従来から行われている施工方法では、バケツ トが基準目印から離れていくに従って、 目標が見えなくなり目標との間に位置ずれが 生じてしまレ、、施工精度が低下してしまうとレ、つた問題がある。
[0003] この問題を解決するため、通常のレバー操作を行うことで作業機に直線的な動きを させることができ、し力、もレバーの変位量にほぼ比例した速度による作業機操作と、 微操作との切換えが簡単に行えるようにした作業機操作装置 (特許文献 1参照)や、 水平な外部基準を設置して掘削施工を行う法面掘削制御装置 (特許文献 2参照)が 提案されている。
[0004] 図 1に示すように特許文献 1に記載された作業機操作装置では、制御装置 40内に 設けた切換え開閉器 41一 43に接続されたモード切換えスィッチ 44を操作すると、レ バー変位センサ 45、 46の出力信号が直線モード制御部 47に入力され、直線モード 制御部 47による制御指令信号がブーム駆動系 48、アーム駆動系 49、パケット駆動 系 50に出力される。これにより、パケット回動支点またはパケット刃先を直線的に動 かすことができる。
[0005] 特許文献 1に記載された作業機操作装置では、操作レバー 51、 52の操作方向並 びに操作量と、作業機を構成する各要素の揺動とが対応できる円弧モードの制御方 式と、操作レバー 51、 52の操作方向並びに操作量に基づいて、バケツトの回動支点 またはパケット刃先を上下方向または前後方向に直線的に作動させる直線モードの 制御方式とを行わせることができ、しかも、前記二つの制御方式をモード切換えスイツ チ 44の操作のみで切換えることができるようにしている。
[0006] このため、作業機における直線制御のために特別の追加操作系を必要とせず、従 来から使レ、慣れた通常のレバー操作によって直線制御を行わせることができる。また 、直線モードでは、通常の作業機操作で、パケット回動支点またはパケット刃先を上 下方向、または前後方向に動かすことができる。これによつて、レバー操作に違和感 がなぐ作業機速度もレバー操作量によって無段階に調節することができるので、直 線モードを使用する作業頻度の多い水平掘削や垂直掘りに対して、極めて簡単な操 作で容易に対応することができ、作業能率の向上が可能となる利点を有している。
[0007] また、図 2に示すように特許文献 2に記載された法面掘削制御装置では、 目標法面 の進展方向に沿って水平な方向に外部基準 60を設置し、操縦席に設けた操作器に より外部基準 60から目標法面上の基準点までの垂直距離 hry、水平距離 hrx、 目標 法面の角度 Θ rを設定する。パケット先端に設けたフロント基準 61を外部基準に一致 させた状態で外部基準設定スィッチを ONすることにより、制御ユニットは車体中心 O から外部基準までの垂直距離 hfy、水平距離 hfxを演算し、これらを補正値として車 体中心 Oに対する目標法面の基準点の垂直距離 hsy、水平距離 hsxを演算し、この 値と設定器で入力した角度により車体 62を基準とした目標法面を設定し、これで領 域制限掘削制御を行うものである。これにより、車体の横方向の移動により車体と既 設の斜面との位置関係が変化しても、段差無く法面を掘削形成できる。
特許文献 1:特開平 5 - 295754号公報
特許文献 2:再公表特許 98/036131号公報
発明の開示
発明が解決しょうとする課題
[0008] 特許文献 1に記載された作業機操作装置では、作業機における直線制御を可能と しているが、直線制御を行うためには作業機の可動部にブーム角度センサ、アーム 角度センサ、パケット角度センサをそれぞれ設置しなければならない。また、特許文 献 2に記載された法面掘削制御装置では、外部基準 60を正確に水平に設置する作 業が煩雑となり、機械操作者が目視で遠方にあるパケット基準 61と外部基準 60とを 高精度で一致させなければならず、操作を簡単に行うことができない。
[0009] 本願発明の目的は、簡単な構成で、施工面の地形と基準目印の位置を自動的に 計測して、作業機の操作を容易にする情報を操作者に呈示することのできる装置を 提供することにある。
課題を解決するための手段
[0010] 本発明に従う、作業機の操作者に指示するための装置は、作業機が作業している 間、現在の作業対象である施工面及び施工面の近傍に存在する他物体の位置を計 測する計測装置と、計測装置により計測された施工面及び他物体の位置の中から、 施工面の近傍に設置された基準目印に相当する基準点を検出する基準点検出部と 、基準点検出部により検出された基準点に基づいて、形成されるべき目標面に相当 する仮想線を演算する仮想線演算部と、計測装置により計測された位置と仮想線演 算部により演算された仮想線とに基づいて、少なくとも施工面と仮想線の位置を示す 画像を表示するための表示データを作成する表示データ作成部と、表示データ作成 部からの前記表示データを受けて前記画像を表示画面上に表示する表示装置とを 備える。よって、現在の作業対象である施工面の位置と、形成されるべき目標面に相 当する仮想線の位置を示す画像が表示画面上に表示される。作業機の操作者は、 表示された画像力 施工面と目標面との間の位置関係が判るので、作業機を操作し て施工面にどの程度の加工をカ卩えるべきかについて、容易に判断できる。
[0011] 計測装置によって検出される施工面の近傍の他物体の位置も、施工面と仮想線の 位置とともに表示されてよい。検出される他物体には、通常、施工面の近傍に設置さ れた基準目印や、作業機の施工面に直接作用する作用コンポーネント (例えば、油 圧ショベルの場合の掘削パケット)などが含まれる。人のパターン認識力は非常に高 いから、操作者は、表示画像を見て、表示画像内のどれが作用コンポーネントであり 、どれが施工面で、どれが仮想線であるか、容易に識別でき、作業機をどのように動 かすべきか、容易に判断できる。
[0012] 好適な実施形態では、計測装置により検出された施工面と他物体 (基準目印や作 用コンポーネントなど)の断面形状が演算され、また仮想線も演算され、そして、施工 面と他物体の断面形状と仮想線とを示した画像が、表示画面上に表示される。
[0013] 前記計測装置は、作業機が移動又は方向転換したとき作業機と一緒に移動又は 方向転換するように設置されること力できる。それにより、作業機が移動又は方向転 換することにより施工面が移動しても、常に現在の施工面及び施工面の近傍に存在 する他物体の位置が計測され、その現在の施工面と仮想線の位置が表示画面上に 表示される。
[0014] 計測装置は、施工面及び他物体の位置を継続的に検出するようになっていてよい 。それにより、作業機による作業が行われている間、施工面と仮想線の実質的に実時 間の位置が表示画面上に表示される。
[0015] 前記基準点検出部は、計測装置により計測された施工面及び他物体の位置の中 から、所定の幾何学的条件を満たす位置を基準点として自動的に検出するようにな つていてよい、或いは、基準点検出部は、計測装置により計測された施工面及び他 物体の位置の中から、操作者により指定された位置を基準点として検出するようにな つていてもよい。
[0016] 基準点として複数の位置を検出し、その複数の基準点を通るように仮想線を演算 するようにすることができる。
[0017] 本発明の指示装置は、作業機の上述した作用コンポーネントの位置を検出する作 用コンポーネント検出部を更に備えてもよい。検出された作用コンポーネントの位置 に基づいて、施工面と仮想線の位置とともに作用コンポーネントの位置も表示画面上 に表示されるようにすることができる。
[0018] 作用コンポーネントの位置を検出する方法として、計測装置により計測された施工 面及び他物体の位置の中から、例えばパターンマッチング或いは領域判定などの処 理により、作用コンポーネントに相当する位置を検出する方法が採用できる。或いは 、作業機がもつ複数のコンポーネントの変位を、それぞれのコンポーネントに取り付 けた変位センサで測定し、測定された複数のコンポーネントの変位から作用コンポ一 ネントの位置を求めてもょレ、。
[0019] さらに、検出された作用コンポーネントの位置を、所定のオフセット量を用いて補正 し、補正された作用コンポーネントの位置を、施工面及び仮想線の位置と共に表示 するようにしてもよレ、。好適な実施形態では、油圧ショベルの作用コンポーネントであ る掘削パケットの内側面の位置が計測装置によって計測され、その内側面の位置が 、掘削バケツトの厚さ分のオフセット量で、掘削バケツトの外側面の位置にほぼ相当 するように補正され、そして、補正された掘削パケットの内側面の位置が、施工面及 び仮想線の位置とともに、表示される。操作者は、作用コンポーネントの位置を正しく 巴握すること力 Sできる。
[0020] 操作者からの要求に応答して、施工面と仮想線の間の位置偏差を拡大してつまり 強調して表示するようにしてもよい。それにより、操作者は、一層正確に作業機を操 作することが容易になる。
[0021] 本発明の別の観点に従う、作業機を持つ建設機械の操作者に指示するための装 置は、建設機械が移動し又はその作業機が方向転換するとき作業機と一緒に移動 又は方向転換するように建設機械に取り付けられ、作業機が作業している間、現在 の作業対象である施工面及び前記施工面の近傍に存在する他物体の位置を計測 する計測装置と、計測装置により計測された施工面及び他物体の位置の中から、施 工面の近傍に設置された基準目印に相当する基準点を検出する基準点検出部と、 基準点検出部により検出された基準点に基づいて、形成されるべき目標面に相当す る仮想線を演算する仮想線演算部と、計測装置により計測された位置と仮想線演算 部により演算された仮想線とに基づいて、少なくとも施工面と仮想線の位置を示す画 像を表示するための表示データを作成する表示データ作成部と、表示データ作成部 からの表示データを受けて前記画像を表示画面に表示する表示装置とを備える。
[0022] 本発明のまた別の観点に従う、作業機の操作者に指示するための方法は、作業機 が作業している間、現在の作業対象である施工面及び前記施工面の近傍に存在す る他物体の位置を計測するステップと、計測された施工面及び他物体の位置の中か ら、施工面の近傍に設置された基準目印に相当する基準点を検出するステップと、 検出された基準点に基づいて、形成されるべき目標面に相当する仮想線を演算する ステップと、計測された位置と演算された仮想線とに基づいて、少なくとも施工面と仮 想線の位置を示す画像を作成して表示画面に表示するステップと
を有する。 図面の簡単な説明
[0023] [図 1]従来例における作業機駆動系の概略構成図である。
[図 2]従来例における作業状態を示す概略図である。
[図 3]油圧ショベルによると法面掘削状況の一例を示す斜視図である。
[図 4]油圧ショベルに搭載される本発明の一実施例に力、かる施工目標指示装置の構 成を示すブロック図である。
[図 5]施工目標指示装置の演算装置 32の機能的構成を示すブロック図である。
[図 6]レーザ測距装置を用いて或る物点の直交座標を検出する方法を示す図である
[図 7]表示画面に表示された施工面の断面画像の例を示す図である。
[図 8]第 1の基準点の設定方法を示す図である。
[図 9]第 2の基準点の設定方法を示す図である。
[図 10]仮想線の設定方法を示す図である。
[図 11]自動的に基準点を検出し仮想線を設定する処理の流れを示す図である。
[図 12]自動的にパケットを検出しパケット形状を補正する処理の流れを示す図である
[図 13]パターンマッチングの流れを示す図である。
[図 14]地形断面画像の表示例を示す図である。
[図 15]地形断面画像の一部を強調して表示した例を示す図である。
[図 16]地形断面の強調表示のアルゴリズムを示す図である。
[図 17]地形断面の強調表示のアルゴリズムを説明する図である。
[図 18]地形断面の強調表示のアルゴリズムを説明する図である。
符号の説明
[0024] 1 油圧ショベル
2 上部旋回体
3
5 アーム 7 下部走行体
15 施工面
16 丁張り
17 紐
20 距離計測装置
21 地形線 (施工面の断面形状)
22a, 22b 基準点(基準目印に相当するドット)
23 仮想線
25 レーザ測距装置
26
28 法面
30 施工目標指示装置
32
34
36 入力装置
発明を実施するための最良の形態
[0025] 本発明の好適な実施の形態について、添付図面に基づいて以下において具体的 に説明する。
[0026] 図 3は、本発明に従う施工目標指示装置の一実施形態が搭載された建設機械、例 えば油圧ショベル、により法面を掘削する状況例を示す斜視図である。図 3に示され た工事現場の手前側の領域では、油圧ショベル 1による掘削が終了して、法面 28が 既に形成されている。この工事現場の奥側の領域にて、パケット 6の下方に、現在の 掘削対象である施工面 15が存在する。施工面 15の上方近傍には、基準目印(複数 本の杭 16、及び杭 16間に張られた一対の紐 17など、所謂「丁張り」)が予め設置さ れている。これら基準目印、とりわけ一対の紐 17は、それら通過する面が、掘削により 形成されるべき目標の法面を指示している。すなわち、 目標の法面の延長面上に一 対の紐 17が配置されている。
[0027] 油圧ショベル 1は、油圧ショベル 1を移動させるための下部走行体 7と、下部走行体 7上で水平方向に方向転換 (旋回)可能な上部旋回体 2とを備える。上部旋回体 2は 、運転室 3と作業機を備える。作業機は、ブーム 4と、ブーム 4の先端に取り付けられ たアーム 5と、アーム 5の先端に取り付けられたバケツト 6を備える。ブーム 4、アーム 5 及びパケット 6はそれぞれ油圧シリンダにより駆動される。操作者は、作業機の施工 面 15に直接作用するコンポーネントであるパケット 6を、基準目印 16, 17により指示 される目標方面に沿って動かすことで、施工面 15を正しく掘削することができる。
[0028] 本発明に従う施工目標指示装置の一部である距離計測装置 20が、油圧ショベル 1 の運転室 3の上部に取り付けられる。上部旋回体 2の旋回動作により、距離計測装置 20は運転室 3及び作業機と一緒に旋回する。油圧ショベル 1が移動すれば、距離計 測装置 20は油圧ショベル 1と一緒に移動する。距離計測装置 20として、例えばレー ザ測距装置が使用される。このレーザ測距装置 (距離計測装置 20)は、水平回転角 度において運転室 3の正面前方に相当する角度方向にレーザビームを照射し、その レーザビームの仰角を所定の周期で常時変化させることで、運転室 3の正面前方に 広がる扇形の走査領域 26をレーザビームで常時スキャンする。走査領域 26内には、 現在の掘削対象である施工面 15が存在する。走査領域 26内には、また、施工面 15 の近傍の基準目印 16、 17、及びパケット 6も存在する。このレーザ測距装置(距離計 測装置 20)は、走査領域 26内の施工面 15、基準目印 16, 17及びパケット 6で反射 されたレーザビームを受信し、そして、それらの物体の各部の位置(すなわち、距離と 仰角度)を測定する。このレーザ測距装置 (距離計測装置 20)から出力される走査領 域 26内の施工面 15及びその他の物体(基準目印 16, 17、バケツト 6など)の各部の 位置 (距離と仰角度)を示す測定データは、本発明に従う施工目標指示装置により処 理される。
[0029] 図 4は、油圧ショベル 1に搭載された本発明に従う施工目標指示装置の一実施形 態の構成を示す。
[0030] 図 4に示すように、施工目標指示装置 30は、上述した距離計測装置 20 (レーザ測 距装置)と、演算装置 32と、表示装置 34と、入力装置 36とを有する。距離計測装置 20 (レーザ測距装置)は、上述したように、走查領域 26内の施工面 15、基準目印 16 , 17及びパケット 6の各部の位置情報 (距離と仰角度)を示す計測データを、演算装 置 32に出力する。
[0031] 演算装置 32は、例えばプログラムを記憶した記憶装置とそのプログラムを実行する CPUをもつコンピュータにより実現することができる。演算装置 32は、距離計測装置 2 0からの計測データが示す施工面 15、基準目印 16, 17及びパケット 6の各部の位置 (距離と仰角度)に基づいて、施工面 15、基準目印 16, 17及びパケット 6の鉛直面に 沿った断面形状 (輪郭形状)を演算する。そして、演算装置 32は、演算された施工面 15、基準目印 16, 17及びパケット 6の断面形状データから、施工面 15、基準目印 1 6, 17及びパケット 6の断面形状の画像を表した表示データを作成する。演算装置 3 2はその表示データを表示装置 34に出力する。表示装置 34は、運転室 3内のような 操作者が見やすい場所に設置された、例えば液晶ディスプレイパネルである。表示 装置 34は、表示データに応答して、施工面 15、基準目印 16, 17及びパケット 6の断 面形状の画像を表示画面に表示する。
[0032] 表示装置 34に表示されるバケツト 6の断面形状は、通常、バケツト 6の外側面では なく内側面の断面形状である。その理由は、パケット 6の外側面でなく内側面が運転 室 3上の距離計測装置 20に向けられているからである。しかし、掘削作業はパケット 6の内側面ではなく外側面で行われるから、操作者にとっては、バケツト 6の内側面で はなく外側面の断面形状が表示画面に表示されることが望ましい。そこで、演算装置 32にて、バケツト 6の内側面の位置を、バケツト 6の肉厚分のオフセット量だけ外側方 向へシフトすることにより、表示画面上でバケツト 6の外側面が存在する位置に、バケ ット 6の断面形状画像を表示することができる。
[0033] 入力装置 36は、操作者に、表示画面上に表示された施工面 15、基準目印 16, 17 及びパケット 6の断面形状画像中の所望の部分を指定させるためのポインティングデ バイスである。入力装置 36としては、例えば、表示装置 34の表示画面に組み込まれ たタツチパネル、表示画面上に表示されたカーソルを操作するためのマウス、及び/ 又は表示装置 34に組み込まれ或いは表示装置 34に接続されたキーボード(各種の スィッチ)などが採用され得る。
[0034] ところで、距離計測装置 20は、上述したレーザ測距装置だけに限定されない。施 工面 15及びその近傍の物体の断面形状又は位置を自動的に計測することができる 他の種々の装置が、距離計測装置 20として採用可能である。例えば、音波等を発射 して距離を検出する測距装置を採用することができる。或いは、レーザ測距以外の光 学的方法で施工面の断面形状を検出する装置を採用することもできる。或いは、複 数のカメラ又は 1つのカメラを用いて異なる視点から施工面を見た複数の画像情報を 得て、それらの画像情報力 施工面の断面形状を検出する装置を採用することもで きる。
[0035] 距離計測装置 20の取り付け位置は、図 3に示したような運転室 3の上部に限定され ない。運転室 3内に設置することも、上部旋回体 2上の適宜の場所に設置することが できる。いずれにしても、距離計測装置 20は、上部旋回体 2と一緒に旋回し、油圧シ ョベル 1と一緒に移動する。距離計測装置 20は、走査領域 26内を所定の周期で常 時スキャンして、施工面 15と、その近傍の基準目印 16, 17及びバケツト 6の実質的 に実時間の位置を検出する。よって、表示画面上に、施工面 15、基準目印 16, 17 及びパケット 6の実質的に実時間の断面形状画像が表示される。操作者は、掘削作 業開始時、掘削作業中及び掘削終了時の何時でも、現在のパケット 6の位置が適切 か否か、および掘削作業が正しく行われているか否かなどを、表示画面上で簡単に 確認できる。
[0036] 図 5は、図 4に示した施工目標指示装置の演算装置 32の機能的構成を示している
[0037] 図 5に示すように、演算装置 32は、座標変換部 100、基準点検出部 102、仮想線 演算部 104、パケット検出部 106、パケット形状補正部 108、表示データ作成部 110 及び入力座標特定部 112を有する。演算装置 32のこれらの機能部 100— 112は、 プログラムを CPUで実行することにより実現することもできるし、或いは、ワイヤードハ 一ドウエア回路により実現することもできる。
[0038] 座標変換部 100は、距離計測装置 20 (レーザ測距装置)からの施工面 15、基準目 印 16, 17及びパケット 6の各部の位置 (距離と仰角度)を、直交座標系の座標値 (X 座標値と Y座標値)に変換する。この直交座標系の原点は、油圧ショベル 1に対して 所定の相対位置にある場所 (例えば、距離計測装置 20の取付場所、運転室 3内の 運転席の場所、あるいは油圧ショベル 1の中心点など)に設定されている。 [0039] 基準点検出部 102は、座標変換部 100からの施工面 15、基準目印 16, 17及びバ ケット 6の各部の座標点の中から、基準目印(とりわけ一対の紐 17)に相当する複数 点(例えば 2点)の座標値(以下、「基準点」という)を検出する。この検出は、 自動的 に行われてもよいし、又は、入力装置 36による操作者からの座標指定に従って手動 的に行われてもよい。仮想線演算部 104は、基準点検出部 102により検出された複 数の基準点に基づいて、掘削により形成されるべき目標の法面の断面形状線を表す 仮想線を演算する。
[0040] バケツト検出部 106は、座標変換部 100からの施工面 15、基準目印 16, 17及びバ ケット 6の各部の座標値の中から、パケット 6に相当する座標値群を自動的に検出す る。この検出は、座標変換部 100からの座標値に専ら基づいて例えばパターンマツ チングなどの方法行われても良いし、或いは、作業機の複数のコンポーネント(ブー ム 4、アーム 5、バケツト 6)にそれぞれ設けられたそれぞれのコンポーネントの変位を 検出する変位センサ 38 (例えば、ブーム 4、アーム 5、バケツト 6のそれぞれを動かす 油圧シリンダのストロークを検出するストロークセンサ)からの検出信号を利用して行 われてもよい。パケット形状補正部 108は、パケット検出部 106により検出されたバケ ット 6の座標値群 (パケット 6の内側断面形状を表す)を、パケット 6の所定厚み分に相 当するオフセット量だけ外側方向へずらすことで、バケツト 6の外側面の座標値にほ ぼ相当するように補正する。
[0041] 表示データ作成部 110は、座標変換部 100からの座標値、基準点検出部 102によ り検出された基準点、仮想線演算部 104により演算された仮想線、パケット形状補正 部 108により補正されたバケツト 6の座標値群に基づいて、施工面 15の断面形状の 画像、基準点の画像、仮想線の画像、及びパケット 6の補正された断面形状の画像 を表示するための表示データを作成し、その表示データを表示装置 34に出力する。
[0042] 表示装置 34は、その表示データに応答して、施工面 15の断面形状、基準点、仮 想線、及びパケット 6の補正された断面形状を表した画像を表示する。この表示画像 は、施工面 15、基準点、仮想線及びパケット 6の位置関係を明確に示す。
[0043] 後に説明するように、表示データ作成部 110は、また、表示された仮想線と施工面 15との位置偏差を操作者にとって見やすくするために、その位置偏差を拡大して強 調して表した画像の表示データを作成して表示装置 34に出力することもできる。
[0044] 入力座標特定部 112は、操作者が入力装置 36を用いて表示画面上で指定した点 の座標値を特定する。入力座標特定部 112により特定された座標値は、例えば手動 的に基準点を検出する場合に、操作者によって指定された基準点の座標値として基 準点検出部 102に入力される。また、入力座標特定部 112により特定された座標値 は、例えば表示された仮想線と施工面 15との位置偏差を強調して表示する場合に、 強調表示を行うべき表示画像内の領域を指定する座標値として表示データ作成部 1 10に入力される。
[0045] 図 6は、図 5に示した座標変換部 100にて、レーザ測距装置 25からの距離と仰角度 を直交座標値に変換する方法を示してレ、る。
[0046] 図 6に示すように、レーザ測距装置 25により計測された物点 Pまでの距離 Riと仰角 度 Θ iから、
(Xi, Yi) = (Ri- cos Θ i, Ri- sin Θ i)
の計算式で、その物点 Pの直交座標 (Xi, Yi)を求めることができる。
[0047] 図 7は、表示画面に表示された画像の一例を示している。図 7においては、バケツト
6の断面形状画像の表示は省略されている。
[0048] 図 7に示された表示画像において、連続した多数のドットからなる曲線 21が、施工 面 15の断面形状(地形表面の位置データ)を示す地形線である。この地形線 21から 離れて孤立する 2つのドット 22a, 22b力 図 1に示された基準目印である一対の紐 1 7の画像である。また、因みに、図中の矢印で示す方向が、レーザ測距装置 25のス キャン方向であるが、このスキャン方向は図中の矢印方向に限定されるものではなく 、矢印とは逆方向でも、往復方向でもよい。
[0049] 図 7に示すように、直交座標系の第 2象限に断面形状画像が位置するように、 X軸と Y軸が表示される。これは、図 3に示した現場において、施工面 15に向かって左側の 視点から見た断面形状画像を表示してレ、ることを意味する。例えば表示装置 34に付 属する図示せぬ表示方向切換スィッチ等を操作することにより、断面を見る視点を左 側から右側へ反転させる(すなわち、図 7の画像に対して Y軸を中心に対称な画像を 第 1象限に表示する)こともできる。 [0050] 図 8から図 10は、図 5に示した基準点検出部 102及び仮想線演算部 104により基 準点の検出と仮想線の設定が行われる手順を説明している。
[0051] 図 8に示すように、表示画像の中から、基準目印(紐)に相当する一つのドット 22a が検出され、これが第 1の基準点として設定される。さらに、図 9に示すように、別の基 準目印(紐)に相当する別のドット 22bが検出され、これが第 2の基準点として設定さ れる。このような基準点の検出は、操作者の手動により行うことができる。すなわち、 操作者が、入力装置 36 (例えば、表示画面に組み込まれたタツチパネル、表示画面 上に表示されたカーソルを操作するマウスなど)を用いて、表示画像の中から基準目 印(紐)に相当する点を指定すると、その点の座標値が基準点検出部 102によって基 準点の座標として登録される。或いは、後述するように、基準点の検出を自動的に行 うことちできる。
[0052] 2つの基準点 22a、 22bが設定されると、仮想線演算部 104により、図 10に示すよう に、基準点 22a、 22bの座標値 (XI , Yl)、(Χ2, Υ2)に基づいて、
Y-Y1 = (X-X1) · (Y2-Y1) / (X2-X1)
の関係式から仮想線 23が演算される。すなわち、仮想線 23は、基準点 22a、 22bを 通る直線であり、これは、上述したように、掘削により形成されるべき目標法面の位置 つまり断面形状を示す。そして、図 10に示すように、基準点 22a、 22bと仮想線 23の 画像が、施工面 15の断面形状の地形線 21と共に、表示画面上に表示される。基準 点 22a、 22bと仮想線 23と地形線 21は、識別し易いように、例えば別の色で表示す ること力 Sできる。
[0053] ところで、仮想線の演算方法は、上述した 2つの基準点を通る直線を演算する方法 に限られなレ、。例えば、 1つの基準点と予め設定しておいた基準角度とに基づいて、 仮想線を演算することもできる。図 8から図 10を用いて説明した一連の作業のための 入力操作を容易に行えるようにするために、演算装置 32から表示画面に入力操作 手順を教えるガイドメッセージを出力するようにしてもよい。
[0054] 図 8から図 10に示した基準点検出と仮想線設定の処理は、操作者による手動の基 準点指定によらずに、全て自動的に行われるようにすることもできる。図 11は、この自 動的な処理の流れを示す。図 11に示す処理は、距離計測装置 20により計測された 施工面 15や基準目印 16, 17などの検出物体の位置の中から、所定の幾何学的条 件 (例えば、他の位置群から離れて孤立している位置)を満たすものを、基準点として 見つけ出すようになつている。
[0055] 図 7に示したような検出物体の断面形状の画像が表示画面に表示された後、図 11 のステップ S1で、例えば表示装置 34に付属する図示しなレ、 [設定]スィッチが操作 者によりターン ONされる。 [設定]スィッチがターン〇Nされると、図 5に示した基準点 検出部 102が起動し、初期的に i= lとして、ステップ S2から S8の基準点検出処理を 行う。ステップ S2では、座標変換部 100で変換された座標群中から、スキャンされた 順序力 番目である一つの座標(Xi, Yi)を選び、その選択座標 (Xi, Yi)を中心とした 半径 Rd内に、スキャンされた順序において前順位の座標 (Xi— 1、 Yi— 1)又は次順 位の座標 (Xi+1、 Yi+1)が存在するかの判断を行う。選択座標 (Xi, Yi)を中心とした 半径 Rd内に前順位の座標も次順位の座標も存在しないときには、その選択座標 (Xi , Yi)は、施工面 15から離れて孤立する一つの紐 17 (基準目印)に相当すると判断 する(ステップ S4)。こうして、検出された一つの紐の座標 (Xi, Yi)が第 1の基準点と して設定される。
[0056] ステップ S2で、選択座標 (Xi, Yi)を中心とした半径 Rd内に前順位の座標 (Xi— 1、 Yi— 1)又は次順位の座標 (Xi+1、 Yi+1)が存在したときは、その選択座標 (Xi, Yi) は施工面 15上の点に相当すると判断し、ステップ S3で i=i+lとして、次順位の座標( Xi, Yi)についてステップ S2の判断を続行する。
[0057] ステップ S4で第 1の基準点が設定された後、ステップ S5で i=i+ 1とし、ステップ S2 、 S3と同様のアルゴリズムが残りの座標について繰り返され(ステップ S6、 S7)、もう 一つの紐 17 (基準目印)に相当する第 2の基準点が検出される(ステップ S8)。
[0058] ステップ S8で第 2の基準点が設定されると、ステップ S9で、 2つの基準点を通る直 線が演算され、その直線が図 10に示したように仮想線 23として表示画面上に表示さ れる。
[0059] 図 12は、図 5に示したパケット検出部 106とパケット形状補正部 108が行うパケット の検出と形状補正の処理の流れを示す。
[0060] 図 12の掘削作業が開始される前に、パケット 6の形状パターンを設定するための処 理(ステップ S21から S28)が行われる。
[0061] ステップ S21では、バケツト 6が適当な位置にあるときに、距離計測装置 20 (レーザ 測距装置 25)による走査領域 26の 1回目のスキャンが行われ、ステップ S22で、 1回 目のスキャンで計測された施工面 15、基準目印 16, 17及びパケット 6の座標がバケ ット検出部 106に取り込まれ記憶される。その後、ステップ S23で、パケット 6を所定距 離だけ移動させた後、ステップ 24で、距離計測装置 20 (レーザ測距装置 25)による 1 回目のスキャンが行われ、
ステップ S25で、 2回目のスキャンで計測された施工面 15、基準目印 16, 17及びバ ケット 6の座標がパケット検出部 106に取り込まれ記憶される。
[0062] ステップ 26で、 1回目と 2回目のスキャンで計測された座標が比較される。ステップ S 27で、比較の結果変化の生じたい座標群が、パケット 6に相当するものと認識され、 ステップ 28で、パケット 6に相当すると認識された座標群力 パケット 6の形状を表す パケットパターン 120として記憶される。これで、パケットパターンの設定処理が完了 する。
[0063] 掘削作業が行われている間は、図 12のステップ S31から S36の実時間断面形状表 示処理が、所定の高速周期で繰り返し実行される。
[0064] ステップ S31で、距離計測装置 20 (レーザ測距装置 25)による走査領域 26のスキヤ ンが行われ、ステップ 32で、そのスキャンで計測されたる施工面 15、基準目印 16, 1 7及びバケツト 6の座標がバケツト検出部 106に取り込まれ記憶される。ステップ S33 で、予め設定されているバケツトパターン 120と取り込まれた座標との間でパターンマ ツチングが行われる。それにより、或る程度に高いマッチ度をもってパケットパターン 1 20にマッチする座標群力 S、パケット 6に相当するものとして抽出される。
[0065] このパターンマッチングは、例えば図 13に示すような手順で行うことができる。すな わち、図 13のステップ S41で、取り込まれた座標の各群とバケツトパターン 120とのマ ツチ度を計算する。ステップ S42で、マッチ度が 90%以上の座標群を探す。そのよう な座標群が見つからなければ、ステップ S43で、マッチ度が 80%以上の座標群を探 す。そのような座標群が見つからなければ、ステップ S44で、マッチ度が 70%以上の 座標群を探す。このようにして、或る程度以上 (例えば 70%)以上のマッチ度範囲を 数段階に分け、高い方の段階から順に、それ相当のマッチ度をもつ座標群を探す。 その結果、最もマッチ度の高い座標群が優先的に検出される。それだけでなぐバケ ット 6の刃先が土中に入っているときでも、パケット 6の地上に出ている部分の形状を 、パターンマッチングで検出することができる。し力、も、そのマッチ度から、バケツト 6の 刃先が土中に入っているか否力、も推測でき、その推測結果から、パケット 6の土中に 入ってレ、る刃先の位置も推定できる。
[0066] 再び図 12を参照して、ステップ S34では、パターンマッチングにより検出されたバ ケット 6の座標群(バケツト 6の内側面の断面形状を表す)に、予め設定されているバ ケット 6の厚み分のオフセット量が加算される。これにより、バケツト 6の内側面の座標 群力 パケット 6の外側面の大体の位置を表すように補正される。
[0067] ステップ S35では、補正されたバケツト 6の座標や、測定された施工面 15の座標値 や、検出された基準点の座標値や、設定された仮想線の座標値に基づいて、それら の断面形状画像を表示するための表示データが作成され、そして、ステップ S36で、 その表示データに基づいた画像が表示される。この表示画像は、図 14に例示するよ うなものであり、施工面 15の断面形状 21、基準点 22a, 22b、仮想線 23及びバケツト 6の断面形状 24を表示する。
[0068] ところで、測定された座標値の中力 バケツト 6に相当するものを検出する方法には 、上述したパターンマッチングに限られず、パターンマッチングに代えて又はこれと併 用して、他の方法、例えば以下の(1)から(3)の方法を採用することもできる。
[0069] (1) 所定の領域内に存在する計測データをパケット 6に相当するものとみなす。す なわち、運転室 3上にある距離測定装置 20からの測定データにおいて、バケツト 6は 距離測定装置 20から見て前方上方の領域に存在することが多い。そこで、その前方 上方の領域内に存在する座標群を、パケット 6に相当するものとみなす。
[0070] (2) 作業機に取り付けた光リフレクタを用いてパケット 6の座標を特定する。すなわ ち、作業機 (例えばアーム 5及びパケット 6)の特定箇所に光リフレクタが予め取り付け られる。距離測定装置 20 (レーザ測距装置)の計測データに基づいてそれら光リフレ クタを検出し、それら光リフレクタの位置関係に基づいてパケット 6の座標を特定する [0071] (3) 作業機に取り付けた作業機の複数コンポーネントの変位センサを用いてバケ ット 6の座標を特定する。すなわち、図 5に示した演算装置 32内に、パケット 6の形状 と作業機 (例えばブーム 4、アーム 5及びパケット 6)の構造に関するデータが登録さ れている。作業機の複数のコンポーネント(例えばブーム 4、アーム 5及びバケツト 6) には、それぞれの変位を検出する変位センサ(例えば、油圧シリンダのストロークを検 出するセンサ)が予め取り付けられている。作業機変位センサにより検出された作業 機各コンポーネントの変位と、作業機の構造と、パケット 6の形状とに基づいて、バケ ット 6の座標を特定する。
[0072] 操作者は、図 14に例示した表示画像を見ながら施工面 15の掘削作業を行うことが できる。操作者は、掘削作業中に、正確な掘削を行うために、仮想線 23と施工面 15 との位置偏差を拡大して見たいと思う場合がある。そこで、図 5に示した表示データ 作成部 110は、表示画面上で操作者が指定した領域における、仮想線 23と施工面 1 5との位置偏差を拡大つまり強調して表示する機能を有する。
[0073] 図 15は、そのように偏差を強調して表示した画像の例を示す。図 15中、拡大表示 領域 25において、地形断面形状 21の凹凸すなわち仮想線 23との偏差が、拡大つ まり強調されて表示されている。
[0074] 図 16は、表示データ作成部 110が行うこの強調表示の処理のアルゴリズムを示す 。図 17と図 18は、このァノレゴリズムを説明するための図である。
[0075] 図 16のステップ S51で、操作者が表示画面(図 17)上の所望の強調箇所 (Xt, Yt) を入力装置 36で指定すると、表示データ作成部 110によりステップ S52から S58の処 理が実行される。
[0076] ステップ S52で、 i= l (初期値)として、指定された強調箇所 (Xt, Yt)を中心とした 半径 Rt内に、施工面 15に相当する(つまり、バケツト 6にも基準点 22a, 22bにも相当 しない) i番目の地形座標 (Xi, Yi)が存在するか否かの判断が行われる。ここで、強 調箇所 (Xt, Yt)を中心とした半径 Rtとは、図 17に示した拡大表示領域 25に相当す る。この拡大表示領域 25内に地形座標 (Xi, Yi)が存在しないときには、ステップ S5 3で i = i+ lとして、拡大表示領域 25内で地形座標(Xi, Yi)が見つかるまで、ステツ プ S52及び S53の処理を繰り返す。 [0077] 拡大表示領域 25内で地形座標 (Xi, Yi)が見つかると、その地形座標 (Xi, Yi)は 拡大対象点 (Xn, Yn)として登録され (ステップ S 54)、その拡大対象点 (Xn, Yn)に ついてステップ S55の拡大計算アルゴリズムが実行される。
[0078] ステップ S55の拡大計算アルゴリズムでは、図 18に示すように、仮想線 23を Y=a
*X+bとして、仮想線 23に直交して拡大対象点 (Xn、 Yn)を通る直線と、仮想線 23 との交点 (Xc, Yc)が次式により求められる(下記式中の「 *」は乗算を意味する)。
[0079] Xc= (Xn + a*Yn_a*b)/(a*a+l)
Yc=(a*Xn + a*a*Yn+b)/(a*a+l)
そして、予め設定された拡大倍率 Eを用いて、拡大対象点 (Xn, Yn)の拡大された 座標(Xne, Yne)が、
Xne =(E* Xn- (E-l) * Xc
Yne = E*Yn-(E-l) *Yc
で計算される。
[0080] 拡大された座標 (Xne, Yne)力 拡大表示領域 25内に位置する場合にのみ、拡大 された座標(Xne, Yne)が表示される(ステップ S56、 S57、 S58)。拡大表示領域 2 5内で見つかった全ての地形座標(Xi, Yi)について、ステップ S54力 S57の処理 が繰り返される。
[0081] 以上の処理の結果として、図 17に示したような、地形断面形状画像の一部を拡大 つまり強調した画像が表示される。操作者は、この強調画像を見ながら施工面の掘 削作業を行うことで、仮想面 23に高い精度で一致した法面を形成することができる。
[0082] 以上説明した本発明の実施形態によれば、距離計測装置 20が、作業機に対して 旋回方向で常に一定の相対位置関係を保つことのできる部位、例えば、運転室に設 置されており、そして、スキャンを常時行って施工面、基準目印及びパケットの実質 的に実時間の位置を計測する。そのため、油圧ショベル 1が紐 17に対して平行でな い方向へ移動しても、常に現在の施工面と目標法面を表した仮想線とを表示画面に 表示することができる。操作者は、容易に精度の高い掘削作業を行うことができる。
[0083] 自動的に基準点を検出する場合、施工面から空間的に離れた位置にある物体が 基準点として検出される。そのため、工事現場において丁張りのような基準目印を施 工面から空間的に離れた位置に設置しておくことで、基準点を自動で検出して仮想 線を自動的に設定することができる。
[0084] 距離計測装置によって計測されるパケットの内側面の断面形状は、予め設定され たバケツト厚分のオフセット量で補正されて、バケツトの外側面の断面系にほぼ相当 するようになる。補正で得られたパケットの外側面の断面形状が、施工面の断面形状 とともに表示される。操作者は、パケットにより施工面がどのように掘削されるかを、正 確に把握できる。
[0085] また、必要に応じて、仮想線と施工面との位置偏差が拡大つまり強調して表示され る。操作者は、より正確に掘削を行うことができる。
[0086] 上述した実施形態では、法面を形成する掘削作業の場合を例にとって説明を行つ たが、本発明は法面形成以外の目的の掘削作業にも適用することができる。また、掘 削作業だけに限らず、断面形状と所望の仮想線との間の位置関係を用いて行う作業 を行う機械、例えば、建物等の出っ張り具合等を調べる装置等にも本発明の施工目 標指示装置を適用することができる。本発明の施工目標指示装置は、作業機の一部 として作業機に製造時に組み込まれるものであっても、或いは、作業機からは独立し た製品であって、作業機に単純に取り付けられるようなものであっても良い。いずれ にしても、本発明の施工目標指示装置を適用すれば、特許文献 1又は特許文献 2に 開示されているような制御装置をもたない作業機であっても、正確な作業を行うことが できる。
[0087] 以上、本発明の実施形態を説明したが、この実施形態は本発明の説明のための例 示にすぎず、本発明の範囲をこの実施形態にのみ限定する趣旨ではない。本発明 は、その要旨を逸脱することなぐその他の様々な態様でも実施することができる。

Claims

請求の範囲
[1] 作業機の操作者に指示するための装置 (30)におレ、て、
前記作業機が作業している間、現在の作業対象である施工面及び前記施工面の 近傍に存在する他物体の位置を計測する計測装置 (20)と、
前記計測装置により計測された前記施工面及び他物体の位置の中から、前記施工 面の近傍に設置された基準目印に相当する基準点を検出する基準点検出部(102) と、
前記基準点検出部により検出された前記基準点に基づいて、形成されるべき目標 面に相当する仮想線を演算する仮想線演算部( 104)と、
前記計測装置により計測された前記位置と前記仮想線演算部により演算された前 記仮想線とに基づレ、て、少なくとも前記施工面と前記仮想線の位置を示す画像を表 示するための表示データを作成する表示データ作成部(110)と、
前記表示データ作成部からの前記表示データを受けて前記画像を表示画面上に 表示する表示装置(34)と
を備えた装置。
[2] 前記表示データ作成部(110)が、前記施工面と前記仮想線の位置とともに前記他 物体の位置も示した画像が表示されるように、前記表示データを作成する請求項 1記
[3] 前記計測装置 (20)が、前記作業機が移動又は方向転換したとき前記作業機と一緒 に移動又は方向転換するように設置されており、それにより、前記作業機が移動又は 方向転換することにより前記施工面が移動しても、前記施工面及び前記施工面の近 傍に存在する他物体の位置を計測して、前記施工面と前記仮想線の位置を示す画 像を表示する請求項 1記載の装置。
[4] 前記計測装置(20)が、継続的に前記施工面及び他物体の位置を検出し、それによ り、前記施工面と前記仮想線の実質的に実時間の位置を示す画像を表示画面上に 表示する請求項 1記載の装置。
[5] 前記基準点検出部(102)が、前記計測装置により計測された前記施工面及び他物 体の位置の中から、所定の幾何学的条件を満たす位置を前記基準点として検出す る請求項 1記載の装置。
[6] 前記基準点検出部(102)が、前記計測装置により計測された前記施工面及び他物 体の位置の中から、前記操作者により指定された位置を前記基準点として検出する 請求項 1記載の装置。
[7] 前記基準点検出部(102)が、前記計測装置により計測された前記施工面及び他物 体の位置の中力 複数の位置を前記基準点として検出し、
前記仮想線演算手段(104)が、検出された前記複数の基準点を前記仮想線が通 るように前記仮想線を演算する請求項 1記載の装置。
[8] 前記作業機の前記施工面に作用する作用コンポーネント (6)の位置を検出する作用 コンポーネント検出部(106)を更に備え、
前記表示データ作成部(110)が、前記作用コンポーネント検出部により検出された 前記作用コンポーネントの位置に基づいて、前記施工面と前記仮想線の位置ととも に前記作用コンポーネントの位置も示した画像が表示されるように、前記表示データ を作成する請求項 1記載の装置。
[9] 前記作用コンポーネント検出部(106)力 前記計測装置により計測された前記施工 面及び他物体の位置の中から、前記作用コンポーネントの位置を検出する請求項 8 記載の施工目標指示装置。
[10] 前記作用コンポーネント検出部により検出された前記作用コンポーネントの位置を、 所定のオフセット量を用いて補正する作用コンポーネント位置補正部(108)を更に 備え、
前記表示データ作成部(110)が、前記作用コンポーネント位置補正部により補正 された前記作用コンポーネントの位置に基づレ、て、前記施工面と前記仮想線の位置 とともに前記作用コンポーネントの補正された位置を示した画像が表示されるように、 前記表示データを作成する請求項 9記載の装置。
[11] 前記作業機には前記作業機の複数のコンポーネントの変位を測定する変位センサ が設けられており、
前記作用コンポーネント検出部(106)力 前記変位センサにより測定された前記複 数のコンポーネントの変位に基づレ、て、前記作用コンポーネントの位置を検出する請 求項 1記載の装置。
[12] 前記表示データ作成部(110)が、前記操作者からの要求に応答して、前記施工面と 前記仮想線の間の位置偏差を拡大して示す強調画像を表示するための強調表示デ ータを作成し、
前記表示装置(34)が、前記表示データ作成部からの前記強調表示データを受け て前記強調画像を表示する請求項 1記載の装置。
[13] 作業機を持つ建設機械の操作者に指示するための装置 (30)において、
前記建設機械が移動し又は前記作業機が方向転換するとき前記作業機と一緒に 移動又は方向転換するように前記建設機械に取り付けられ、前記作業機が作業して いる間、現在の作業対象である施工面及び前記施工面の近傍に存在する他物体の 位置を計測する計測装置 (20)と、
前記計測装置により計測された前記施工面及び他物体の位置の中から、前記施工 面の近傍に設置された基準目印に相当する基準点を検出する基準点検出部(102) と、
前記基準点検出部により検出された前記基準点に基づいて、形成されるべき目標 面に相当する仮想線を演算する仮想線演算部( 104)と、
前記計測装置により計測された前記位置と前記仮想線演算部により演算された前 記仮想線とに基づレ、て、少なくとも前記施工面と前記仮想線の位置を示す画像を表 示するための表示データを作成する表示データ作成部(110)と、
前記表示データ作成部からの前記表示データを受けて前記画像を表示画面に表 示する表示装置 (34)と
を備えた装置。
[14] 作業機の操作者に指示するための方法において、
前記作業機が作業している間、現在の作業対象である施工面及び前記施工面の 近傍に存在する他物体の位置を計測するステップと、
計測された前記施工面及び他物体の位置の中から、前記施工面の近傍に設置さ れた基準目印に相当する基準点を検出するステップと、
検出された前記基準点に基づいて、形成されるべき目標面に相当する仮想線を演 計測された前記位置と演算された前記仮想線とに基づいて、少なくとも前記施工面 と前記仮想線の位置を示す画像を作成して表示画面に表示す
を有する方法。
PCT/JP2004/012642 2003-09-02 2004-09-01 施工目標指示装置 WO2005024144A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
JP2005513651A JP4311577B2 (ja) 2003-09-02 2004-09-01 施工目標指示装置
GB0513429A GB2413314B (en) 2003-09-02 2004-09-01 Construction target indicator device
US10/554,400 US20070010925A1 (en) 2003-09-02 2004-09-01 Construction target indicator device

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2003-309984 2003-09-02
JP2003309984 2003-09-02

Publications (1)

Publication Number Publication Date
WO2005024144A1 true WO2005024144A1 (ja) 2005-03-17

Family

ID=34269628

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2004/012642 WO2005024144A1 (ja) 2003-09-02 2004-09-01 施工目標指示装置

Country Status (6)

Country Link
US (1) US20070010925A1 (ja)
JP (1) JP4311577B2 (ja)
KR (1) KR20060064558A (ja)
CN (1) CN100545359C (ja)
GB (1) GB2413314B (ja)
WO (1) WO2005024144A1 (ja)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009042175A (ja) * 2007-08-10 2009-02-26 Koishi:Kk 施工位置測定システム及び丁張りレスシステム
JP2012507011A (ja) * 2008-10-28 2012-03-22 ザ・ボーイング・カンパニー 空間照会のための手持ち型位置決めインタフェース
JP2012172431A (ja) * 2011-02-22 2012-09-10 Komatsu Ltd 油圧ショベルの表示システム及びその制御方法
JP2014148893A (ja) * 2014-05-30 2014-08-21 Komatsu Ltd 油圧ショベルの表示システム
WO2015162710A1 (ja) * 2014-04-23 2015-10-29 株式会社日立製作所 掘削装置
KR101855988B1 (ko) * 2016-12-29 2018-05-09 주식회사 아이지오스캔 지형측정시스템 및 그것을 구비한 건설기계
WO2019031511A1 (ja) * 2017-08-09 2019-02-14 住友建機株式会社 ショベル、ショベルの表示装置及びショベルの表示方法
JP2019108775A (ja) * 2017-12-20 2019-07-04 コベルコ建機株式会社 建設機械
JP2019521403A (ja) * 2016-04-04 2019-07-25 トプコン ポジショニング システムズ, インク. 車輌ウィンドスクリーン上における拡張現実表示の方法及び装置
JP2019152098A (ja) * 2014-06-26 2019-09-12 住友建機株式会社 ショベル
WO2020203843A1 (ja) * 2019-03-29 2020-10-08 住友建機株式会社 ショベル
US11142883B2 (en) 2016-09-30 2021-10-12 Sumitomo (S.H.I.) Construction Machinery Co., Ltd. Shovel
JP2023011454A (ja) * 2021-07-12 2023-01-24 東亜道路工業株式会社 3d設計データ作成方法、建設工事方法、3d設計データ作成システムおよび3d設計データ作成プログラム
WO2023190843A1 (ja) * 2022-03-31 2023-10-05 住友重機械工業株式会社 支援装置、作業機械、プログラム

Families Citing this family (59)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006234494A (ja) * 2005-02-23 2006-09-07 Aisin Seiki Co Ltd 物体認識装置
JP5007059B2 (ja) * 2006-03-28 2012-08-22 クラリオン株式会社 立体視車載表示装置
US7772969B2 (en) * 2007-04-19 2010-08-10 Prohaska Dean P Vehicle with always forward system
CA2690239A1 (en) * 2009-02-10 2010-04-12 Certusview Technologies, Llc Methods, apparatus, and systems for exchanging information between excavators and other entities associated with underground facility locate and marking operations
US8902251B2 (en) 2009-02-10 2014-12-02 Certusview Technologies, Llc Methods, apparatus and systems for generating limited access files for searchable electronic records of underground facility locate and/or marking operations
US8572193B2 (en) 2009-02-10 2013-10-29 Certusview Technologies, Llc Methods, apparatus, and systems for providing an enhanced positive response in underground facility locate and marking operations
US8406963B2 (en) * 2009-08-18 2013-03-26 Caterpillar Inc. Implement control system for a machine
JP5261419B2 (ja) * 2010-03-05 2013-08-14 株式会社小松製作所 作業車両及び作業車両の制御方法
US8918898B2 (en) 2010-07-30 2014-12-23 Certusview Technologies, Llc Methods, apparatus and systems for onsite linking to location-specific electronic records of locate operations
JP5059954B2 (ja) * 2011-02-22 2012-10-31 株式会社小松製作所 掘削機械の表示システム及びその制御方法。
JP5054832B2 (ja) * 2011-02-22 2012-10-24 株式会社小松製作所 油圧ショベルの表示システム及びその制御方法
JP5054833B2 (ja) * 2011-02-22 2012-10-24 株式会社小松製作所 油圧ショベルの表示システム及びその制御方法
CL2012000933A1 (es) * 2011-04-14 2014-07-25 Harnischfeger Tech Inc Un metodo y una pala de cable para la generacion de un trayecto ideal, comprende: un motor de oscilacion, un motor de izaje, un motor de avance, un cucharon para excavar y vaciar materiales y, posicionar la pala por medio de la operacion del motor de izaje, el motor de avance y el motor de oscilacion y; un controlador que incluye un modulo generador de un trayecto ideal.
WO2013057758A1 (ja) * 2011-10-19 2013-04-25 住友重機械工業株式会社 旋回作業機械及び旋回作業機械の制御方法
US8843282B2 (en) * 2011-11-02 2014-09-23 Caterpillar Inc. Machine, control system and method for hovering an implement
WO2013082197A2 (en) * 2011-11-29 2013-06-06 Kent Kahle Managing information at a construction site
US10192178B2 (en) 2011-11-29 2019-01-29 Trimble Inc. Application information for power tools
US9898705B2 (en) 2011-11-29 2018-02-20 Trimble Inc. Automated handtool task verification
US9817839B2 (en) 2011-11-29 2017-11-14 Trimble Inc. Managing information at a construction site
US10460267B2 (en) 2011-11-29 2019-10-29 Trimble Inc. Integration of as built data of a project
US9031585B2 (en) 2011-11-29 2015-05-12 Trimble Navigation Limited Integrating position information into a handheld tool
US9666090B2 (en) 2011-11-29 2017-05-30 Trimble Inc. Reference based positioning of handheld tools
KR102102133B1 (ko) * 2011-12-26 2020-04-20 스미도모쥬기가이고교 가부시키가이샤 쇼벨의 화상표시장치
US9411325B2 (en) * 2012-10-19 2016-08-09 Komatsu Ltd. Excavation control system for hydraulic excavator
JP5476450B1 (ja) * 2012-11-19 2014-04-23 株式会社小松製作所 掘削機械の表示システム及び掘削機械
JP5789279B2 (ja) 2013-04-10 2015-10-07 株式会社小松製作所 掘削機械の施工管理装置、油圧ショベルの施工管理装置、掘削機械及び施工管理システム
JP5952244B2 (ja) * 2013-09-12 2016-07-13 日立建機株式会社 掘削領域制限制御の基礎情報の演算装置及び建設機械
US20150330054A1 (en) * 2014-05-16 2015-11-19 Topcon Positioning Systems, Inc. Optical Sensing a Distance from a Range Sensing Apparatus and Method
JP5848451B1 (ja) * 2014-06-02 2016-01-27 株式会社小松製作所 建設機械の制御システム、建設機械、及び建設機械の制御方法
JP6710493B2 (ja) * 2014-06-18 2020-06-17 住友建機株式会社 建設機械及びショベル
JP6314105B2 (ja) * 2015-03-05 2018-04-18 株式会社日立製作所 軌道生成装置および作業機械
EP3272947B1 (en) * 2015-03-19 2022-01-26 Sumitomo (S.H.I.) Construction Machinery Co., Ltd. Excavator
JP6316770B2 (ja) * 2015-04-15 2018-04-25 日立建機株式会社 建設機械
EP3086196B1 (en) * 2015-04-21 2017-04-05 Hexagon Technology Center GmbH Method and control system for surveying and mapping a terrain while operating a bulldozer
JP6480830B2 (ja) * 2015-08-24 2019-03-13 株式会社小松製作所 ホイールローダの制御システム、その制御方法およびホイールローダの制御方法
JP2017110472A (ja) * 2015-12-18 2017-06-22 住友建機株式会社 ショベル
CN105532157A (zh) * 2015-12-18 2016-05-04 重庆鑫源农机股份有限公司 一种设置有排水槽的挖掘机
CN105421506A (zh) * 2015-12-18 2016-03-23 重庆鑫源农机股份有限公司 一种距离提示挖掘机
EP3680400B1 (en) * 2015-12-28 2021-09-22 Sumitomo (S.H.I.) Construction Machinery Co., Ltd. Shovel
GB201603473D0 (en) * 2016-02-29 2016-04-13 South African Nuclear Energy Tagged excavation element
KR101839465B1 (ko) 2016-05-31 2018-03-16 가부시키가이샤 고마쓰 세이사쿠쇼 작업 기계의 제어 시스템, 작업 기계 및 작업 기계의 제어 방법
US10017913B2 (en) * 2016-05-31 2018-07-10 Komatsu Ltd. Construction machine control system, construction machine, and construction machine control method
JP6633464B2 (ja) * 2016-07-06 2020-01-22 日立建機株式会社 作業機械
JP2018021345A (ja) * 2016-08-02 2018-02-08 株式会社小松製作所 作業車両の制御システム、制御方法、及び作業車両
JP2018021346A (ja) * 2016-08-02 2018-02-08 株式会社小松製作所 作業車両の制御システム、制御方法、及び作業車両
KR101907938B1 (ko) 2016-11-29 2018-10-15 가부시키가이샤 고마쓰 세이사쿠쇼 건설 기계의 제어 장치 및 건설 기계의 제어 방법
KR102449834B1 (ko) * 2017-02-17 2022-09-29 스미도모쥬기가이고교 가부시키가이샤 작업기계용 주변감시 시스템
WO2019003191A1 (en) * 2017-06-28 2019-01-03 Gj Menard Inc. SYSTEM AND METHOD FOR INDICATING TO AN OPERATOR A DIRECTION FOR MOVING FORWARD A MACHINE
JP6878226B2 (ja) * 2017-09-19 2021-05-26 日立建機株式会社 作業機械
JP7117843B2 (ja) * 2017-12-26 2022-08-15 日立建機株式会社 作業機械
JP6854255B2 (ja) * 2018-03-15 2021-04-07 日立建機株式会社 建設機械
WO2019189030A1 (ja) * 2018-03-26 2019-10-03 住友建機株式会社 ショベル
EP3779067A4 (en) * 2018-03-27 2021-04-07 Sumitomo Heavy Industries, Ltd. EXCAVATOR
JP7154026B2 (ja) * 2018-03-30 2022-10-17 株式会社小松製作所 作業機械の制御装置、掘削機械の制御装置、及び作業機械の制御方法
JP7236826B2 (ja) 2018-07-31 2023-03-10 株式会社小松製作所 作業機械
JP7195903B2 (ja) * 2018-12-04 2022-12-26 住友建機株式会社 ショベル
JP7278095B2 (ja) * 2019-02-19 2023-05-19 株式会社小松製作所 作業機械の制御システム
JP2020197044A (ja) * 2019-05-31 2020-12-10 株式会社小松製作所 マップ生成システム及びマップ生成方法
KR102125664B1 (ko) * 2020-01-13 2020-06-22 이상룡 굴삭 레벨 검측 장치

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5826130A (ja) * 1981-08-10 1983-02-16 Meidensha Electric Mfg Co Ltd 土建作業方法
JPH09159448A (ja) * 1995-12-08 1997-06-20 Kumagai Gumi Co Ltd 測地システム
JPH1090392A (ja) * 1996-09-13 1998-04-10 Taisei Corp 法面仕上げ管理システム
WO1998036131A1 (fr) * 1997-02-13 1998-08-20 Hitachi Construction Machinery Co., Ltd. Controleur de creusement de pente de pelle hydraulique, dispositif d'etablissement de la pente cible et procede de formation d'un creusement en pente

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1278917B1 (en) * 2000-05-05 2009-11-11 Leica Geosystems GR, LLC Laser-guided construction equipment
US20040210370A1 (en) * 2000-12-16 2004-10-21 Gudat Adam J Method and apparatus for displaying an excavation to plan
JP4727068B2 (ja) * 2001-05-29 2011-07-20 株式会社トプコン 施工監視システム、施工管理方法
US6687613B2 (en) * 2001-05-31 2004-02-03 Alpine Electronics, Inc. Display method and apparatus of navigation system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5826130A (ja) * 1981-08-10 1983-02-16 Meidensha Electric Mfg Co Ltd 土建作業方法
JPH09159448A (ja) * 1995-12-08 1997-06-20 Kumagai Gumi Co Ltd 測地システム
JPH1090392A (ja) * 1996-09-13 1998-04-10 Taisei Corp 法面仕上げ管理システム
WO1998036131A1 (fr) * 1997-02-13 1998-08-20 Hitachi Construction Machinery Co., Ltd. Controleur de creusement de pente de pelle hydraulique, dispositif d'etablissement de la pente cible et procede de formation d'un creusement en pente

Cited By (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009042175A (ja) * 2007-08-10 2009-02-26 Koishi:Kk 施工位置測定システム及び丁張りレスシステム
JP2012507011A (ja) * 2008-10-28 2012-03-22 ザ・ボーイング・カンパニー 空間照会のための手持ち型位置決めインタフェース
JP2012172431A (ja) * 2011-02-22 2012-09-10 Komatsu Ltd 油圧ショベルの表示システム及びその制御方法
WO2015162710A1 (ja) * 2014-04-23 2015-10-29 株式会社日立製作所 掘削装置
JPWO2015162710A1 (ja) * 2014-04-23 2017-04-13 株式会社日立製作所 掘削装置
US10118553B2 (en) 2014-04-23 2018-11-06 Hitachi, Ltd. Excavation device using stereo camera and angle sensors to position bucket
JP2014148893A (ja) * 2014-05-30 2014-08-21 Komatsu Ltd 油圧ショベルの表示システム
JP2019152098A (ja) * 2014-06-26 2019-09-12 住友建機株式会社 ショベル
US10789744B2 (en) 2016-04-04 2020-09-29 Topcon Positioning Systems, Inc. Method and apparatus for augmented reality display on vehicle windscreen
JP2019521403A (ja) * 2016-04-04 2019-07-25 トプコン ポジショニング システムズ, インク. 車輌ウィンドスクリーン上における拡張現実表示の方法及び装置
US11142883B2 (en) 2016-09-30 2021-10-12 Sumitomo (S.H.I.) Construction Machinery Co., Ltd. Shovel
KR101855988B1 (ko) * 2016-12-29 2018-05-09 주식회사 아이지오스캔 지형측정시스템 및 그것을 구비한 건설기계
CN110446816A (zh) * 2017-08-09 2019-11-12 住友建机株式会社 挖土机、挖土机的显示装置及挖土机的显示方法
US11473272B2 (en) 2017-08-09 2022-10-18 Sumitomo Construction Machinery Co., Ltd. Shovel, display device for shovel, and display method for shovel
JPWO2019031511A1 (ja) * 2017-08-09 2020-08-20 住友建機株式会社 ショベル、ショベルの表示装置及びショベルの表示方法
KR102492415B1 (ko) 2017-08-09 2023-01-26 스미토모 겐키 가부시키가이샤 쇼벨, 쇼벨의 표시장치 및 쇼벨의 표시방법
CN110446816B (zh) * 2017-08-09 2023-01-20 住友建机株式会社 挖土机、挖土机的显示装置及挖土机的显示方法
WO2019031511A1 (ja) * 2017-08-09 2019-02-14 住友建機株式会社 ショベル、ショベルの表示装置及びショベルの表示方法
JP7044787B2 (ja) 2017-08-09 2022-03-30 住友建機株式会社 ショベル、ショベルの表示装置及びショベルの表示方法
KR20200039613A (ko) * 2017-08-09 2020-04-16 스미토모 겐키 가부시키가이샤 쇼벨, 쇼벨의 표시장치 및 쇼벨의 표시방법
US11447929B2 (en) 2017-12-20 2022-09-20 Kobelco Construction Machinery Co., Ltd. Construction machine
JP7155516B2 (ja) 2017-12-20 2022-10-19 コベルコ建機株式会社 建設機械
JP2019108775A (ja) * 2017-12-20 2019-07-04 コベルコ建機株式会社 建設機械
WO2020203843A1 (ja) * 2019-03-29 2020-10-08 住友建機株式会社 ショベル
JP2023011454A (ja) * 2021-07-12 2023-01-24 東亜道路工業株式会社 3d設計データ作成方法、建設工事方法、3d設計データ作成システムおよび3d設計データ作成プログラム
WO2023190843A1 (ja) * 2022-03-31 2023-10-05 住友重機械工業株式会社 支援装置、作業機械、プログラム

Also Published As

Publication number Publication date
GB0513429D0 (en) 2005-08-10
KR20060064558A (ko) 2006-06-13
CN1738947A (zh) 2006-02-22
CN100545359C (zh) 2009-09-30
GB2413314A (en) 2005-10-26
JP4311577B2 (ja) 2009-08-12
JPWO2005024144A1 (ja) 2006-11-02
GB2413314B (en) 2006-07-26
US20070010925A1 (en) 2007-01-11

Similar Documents

Publication Publication Date Title
WO2005024144A1 (ja) 施工目標指示装置
JP6526321B2 (ja) 作業機械
KR100353566B1 (ko) 유압셔블의경사면굴삭제어장치,목표경사면설정장치및경사면굴삭형성방법
JP6072993B1 (ja) 作業車両の制御システム、制御方法、及び作業車両
US6532409B1 (en) Target excavation surface setting device for excavation machine, recording medium therefor and display unit
US11230824B2 (en) Work machine
JP6633464B2 (ja) 作業機械
US11414841B2 (en) Construction machine
JP2009243073A (ja) 作業車両
JP3609164B2 (ja) 建設機械の領域制限掘削制御の掘削領域設定装置
JP5009269B2 (ja) 油圧ショベルの表示装置
JP2017186875A (ja) 作業車両の制御システム、制御方法、及び作業車両
KR102505529B1 (ko) 작업 기계
JP2021067174A (ja) ショベル、ショベルのシステム
JP2689250B2 (ja) トンネル用掘進機の姿勢制御装置
JP3522878B2 (ja) 建設機械の領域制限掘削制御の掘削領域設定装置
JP2017172207A (ja) ショベル
CN115387413B (zh) 挖掘机智能辅助施工基准修正方法、系统及挖掘机
JP2008106431A (ja) 掘削状況表示制御装置付き掘削機械
WO2023157707A1 (ja) 表示制御装置、及び遠隔操作装置
JPH08246493A (ja) 建設機械の領域制限掘削制御の掘削領域設定装置
JP2000204580A (ja) 建設機械の制御装置及び連続傾斜面の掘削形成方法
JPH09270945A (ja) 遠隔操縦機械のカメラ視野角制御装置
JPH07158104A (ja) 油圧ショベルの掘削制御装置
JPH11143715A (ja) ファジィ制御ルール修正方法およびファジィ制御ルール修正装置

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 2005513651

Country of ref document: JP

AK Designated states

Kind code of ref document: A1

Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BW BY BZ CA CH CN CO CR CU CZ DE DK DM DZ EC EE EG ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NA NI NO NZ OM PG PH PL PT RO RU SC SD SE SG SK SL SY TJ TM TN TR TT TZ UA UG US UZ VC VN YU ZA ZM ZW

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): BW GH GM KE LS MW MZ NA SD SL SZ TZ UG ZM ZW AM AZ BY KG KZ MD RU TJ TM AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LU MC NL PL PT RO SE SI SK TR BF BJ CF CG CI CM GA GN GQ GW ML MR NE SN TD TG

121 Ep: the epo has been informed by wipo that ep was designated in this application
ENP Entry into the national phase

Ref document number: 0513429

Country of ref document: GB

Kind code of ref document: A

Free format text: PCT FILING DATE = 20040901

WWE Wipo information: entry into national phase

Ref document number: 20048024848

Country of ref document: CN

WWE Wipo information: entry into national phase

Ref document number: 1020057013765

Country of ref document: KR

WWE Wipo information: entry into national phase

Ref document number: 2007010925

Country of ref document: US

Ref document number: 10554400

Country of ref document: US

122 Ep: pct application non-entry in european phase
WWP Wipo information: published in national office

Ref document number: 10554400

Country of ref document: US