WO2002079067A1 - Methode de montage d'un treuil - Google Patents
Methode de montage d'un treuil Download PDFInfo
- Publication number
- WO2002079067A1 WO2002079067A1 PCT/JP2001/002667 JP0102667W WO02079067A1 WO 2002079067 A1 WO2002079067 A1 WO 2002079067A1 JP 0102667 W JP0102667 W JP 0102667W WO 02079067 A1 WO02079067 A1 WO 02079067A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- lifting
- guide rail
- hoist
- hoisting machine
- mounting member
- Prior art date
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B19/00—Mining-hoist operation
- B66B19/005—Mining-hoist operation installing or exchanging the elevator drive
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B11/00—Main component parts of lifts in, or associated with, buildings or other structures
- B66B11/0035—Arrangement of driving gear, e.g. location or support
- B66B11/0045—Arrangement of driving gear, e.g. location or support in the hoistway
Definitions
- the present invention relates to a method of installing a hoist for installing a hoist at a predetermined height from the bottom of a hoistway. Shisui technology
- the present invention has been made to solve the above problems, and an object of the present invention is to provide an installation method that can easily install a hoist at a predetermined height from the bottom of a hoistway.
- the method for installing a hoist according to the present invention includes: an erecting step of erecting a first guide rail and a second guide rail in a hoistway; Attaching a guide member to the attachment member for holding the attachment member slidably with respect to the first guide rail and the second guide rail; and attaching a hoist to the attachment member.
- the method for installing a hoist includes: an erecting step of erecting a first guide rail and a second guide rail in a hoistway; and after the erecting step, the hoisting machine is connected to the first guide rail.
- a lifting step of lifting the hoist while sliding in the longitudinal direction of the second guide rail, and after the lifting step, the first guide rail and the second guide rail includes a fixing step of fixing a support member for supporting a vertical load of the hoist, and an installation step of installing the hoist on the support member after the fixing step.
- the lifting step includes a step of attaching a lifting jig to the hoisting machine or the mounting member, and lifting the lifting jig as a lifting point.
- the lifting jig a protruding portion protruding beyond the first guide rail from the hoisting machine or the mounting member; and A lifting jig having a protruding portion protruding beyond the second guide rail; It is lifted as a point.
- the lifting step includes: a first lifting step of lifting the hoist or the mounting member as a hanging point; and after the first lifting step, the lifting machine or the mounting member.
- the lifting jig having a projecting portion projecting beyond the first guide rail from the first guide rail and a projecting portion projecting beyond the second guide rail from the hoisting machine or the mounting member from the hoisting machine or the hoisting machine.
- FIG. 1 is an overall configuration diagram of an elevator apparatus to which the present invention is applied.
- FIG. 2 is an enlarged view of the mounting mechanism 7 to which the present invention is applied.
- FIG. 3 is a drawing showing the structure of the guide member.
- (A) is a diagram showing the structure of the upper guide member 74a, and is a cross-sectional view in the direction A in FIG.
- (B) is a diagram showing the structure of the lower guide member 75a, and is a cross-sectional view in the B direction in FIG.
- Fig. 4 is a flow chart showing the procedure of the installation work of the hoisting machine 6.
- c Fig. 5 is an upper guide member 74a, 74b and a lower guide member 75a, 75b. It is a figure which shows the working state in the process of attaching.
- FIG. 6 is a diagram showing an operation state in a first step of hoisting the hoist 6.
- FIG. 7 is a view showing a working state in a second step of hoisting the hoist 6.
- FIG. 8 is a diagram showing a state in which the hoisting machine 6 is positioned at the top in the hoistway.
- Fig. 1 is a hoistway
- 2 is a car that moves up and down the hoistway
- 3a and 3b are provided on both sides of the car 2 and are guide rails for the car that guides the car 2 up and down. is there.
- Reference numeral 6 denotes a hoisting machine serving as a power source for raising and lowering the car 2 and the counterweight 4, and the hoisting machine 6 rotates a tractor 6 1 around which a main rope to be described later is wound and the traction 6 1 And a drive unit 62 including a motor to be driven.
- Reference numeral 7 denotes a mounting mechanism for mounting the hoisting machine 6 between the guide rails 5a and 5b. In the present embodiment, details of the mounting mechanism 7 will be described later.
- Reference numeral 8 denotes a counterweight pulley attached to the upper part of the counterweight 4
- reference numeral 9 denotes an undercarriage pulley provided at the lower part of the car 2
- two undercarriage pulleys 9 are provided at the lower part of the car 2.
- main rope 10 is a main rope wound on a counterweight pulley 8 and a traction 6 Pulley 9 under the car cage.
- One end of the main rope 10 is fixed to the main rope attachment portion 11 at the upper end of the guide rail 3a, and the other end is fixed to the main rope attachment portion 12 provided between the guide rails 5a and 5b. .
- the counterweight pulley 8 is inclined with respect to the plane passing through the guide rails 5a and 5b. Can be fixed to part 1 and 2.
- the elevator device rotates the traction tube 61 of the hoist 6 to raise and lower the car 2 and the counterweight 4 via the main rope 10.
- FIG. 2 is an enlarged view showing the structure of the mounting mechanism 7, and parts other than the mounting mechanism 7 are omitted.
- the mounting mechanism 7 is composed of supporting stands 7 la and 7 lb, a beam 72, and a mounting frame 73 as a mounting member of the hoisting machine 6.
- the supports 7la and 71b are attached to the guide rails 5a and 5b, respectively, and the beam 72 has one end attached to the support 71a and the other end attached to the support 71b.
- a mounting frame 73 of the hoisting machine is installed on the beam 72.
- the hoisting machine 6 is mounted on the mounting frame 73, and upper guide members 74a and 74b and lower guide members 75a and 75b are mounted thereon.
- the upper guide member 74a and the lower guide member 75a sandwich a convex portion that is a sliding surface of the guide rail 5a via an elastic body.
- the upper guide member 74b and the lower guide member 75b have the same configuration. Therefore, the upper guide members 74a, 74b and the lower guide members 75a, 75b have a function of holding the mounting frame 73 slidably in the longitudinal direction of the guide rails 5a, 5b.
- the upper guide members 74a, 74b and the lower guide members 75a, 75b also have a function as a vibration-reducing member for reducing the lateral runout of the hoisting machine 6. I have.
- the vertical load of the hoisting machine 6 and the mounting frame 73 is supported by the guide rails 5a and 5b via the beam 72 and the support bases 71a and 71b.
- a method for installing the hoist on the premise of the above-described mounting mechanism 7 will be described.
- the flowchart in FIG. 4 and the working state diagrams in FIGS. 5 to 8 are used for the description.
- the guide rails 5a and 5b are erected in the hoistway 1 (S1 in FIG. 4).
- the hoisting machine 6 is mounted on the bottom of the hoistway 1 while being mounted on the mounting frame 73 (S2 in FIG. 4).
- the winding machine 6 and the mounting frame 73 are placed between the guide rails 5a and 5b.
- the hoist 6 may be mounted on the mounting frame 73.
- the upper guide members 74a, 74b and the lower guide members 75a, 75b are mounted on the mounting frame 73 (S3 in FIG. 4).
- the mounting frame 73 and the hoisting machine 6 are slidably held in the longitudinal direction of the guide rails 5a and 5b. Will be.
- the hoist 6 is lifted (S4 in FIG. 4).
- the hoisting machine 6 or the mounting frame 73 is used as a hanging point, and the electric hoist 13 lifts the hoist.
- the mounting frame 73 slides in the longitudinal direction of the guide rails 5a and 5b in a state where the hoisting machine 6 is mounted.
- the lifting jig 14 When the hoist 6 and the mounting frame 73 are lifted to a predetermined height, the lifting jig 14 is fixed below the hoist 6 or the mounting frame 73. Note that the lifting jig 14 may be fixed in advance.
- both ends of the lifting jig 14 are set as hanging points, and the hoist 6 is further lifted by the chain blocks 13a and 13b (S5 in FIG. 4). At this time, the chain blocks 13a and 13b are simultaneously operated. Since the lifting jig 14 is fixed below the hoisting machine 6 or the mounting frame 73, the lifting allowance required for installing the chain blocks 13a and 13b can be reduced.
- the hoisting machine 6 can be arranged close to the ceiling of the hoistway 1. After the hoisting machine 6 reaches the top of the hoistway 1 (Fig. 8), the supports 7 1a and 7 1b are attached to the guide rails 5a and 5b, respectively.
- the beam 72 is fixed to, 71b (S6 in Fig. 4).
- the mounting frame 73 is lowered onto the beam 72, and the mounting frame 73 is set on the beam 72 (S7 in FIG. 4).
- the hoisting machine 6 is installed at the top in the hoistway 1 as shown in FIG.
- the hoisting machine 6 is stable even during lifting.
- the position of the mounting frame 73 can be easily adjusted and the installation accuracy of the hoisting machine 6 can be easily ensured.
- the guide members are provided at the top, bottom, left and right, the mounting frame 73 is used for lifting. Can be stably lifted even when a rotational moment acts on the surface.
- the lifting process of the hoisting machine 6 is divided into two stages.
- the lifting jig 14 since the lifting jig 14 is fixed below the hoist 6 or the mounting frame 73, the space above the hoistway 1 required for lifting is reduced. be able to.
- the lifting jig 14 has a dimension longer than the distance between the guide rails 5a and 5b, and both ends protrude from the hoisting machine 6 or the mounting frame 73 beyond the guide rails 5a and 5b. I have. Since the projecting portion is suspended, the chain blocks 13a and 13b do not come into contact with the hoisting machine 6 and the mounting frame 73.
- the guide members 74a, 74b, 75a, 75b are mounted on the mounting frame 73, but the mounting frame 73 is not used and the hoisting machine 6 You may make it attach directly.
- a support member that supports the vertical load of the hoisting machine 6 and the mounting frame 73 is constituted by the supports 7 1 a, 7 lb and the beam 72, but is constituted by other members. It is also possible to configure.
- the support member may be fixed to the guide rails 5 a and 5 b and may be configured to support the vertical load of the hoisting machine 6 and the mounting frame 73.
- the hoisting machine 6 and the mounting frame 73 are finally installed on the beam 72.
- the hoisting machine 6 or the mounting frame 73 is connected to the beam 72 via another member such as an elastic member. You may make it install on top.
- the hoisting machine 6 is installed at the top of the hoistway 1 .
- the present invention is not limited to the top. Applicable. 'The effects of the installation method of the hoist of the present invention are as follows.
- the method of installing a hoist includes: an erecting step of erecting a first guide rail and a second guide rail in a hoistway; and, after the erecting step, attaching a mounting member to the first guide.
- the method for installing a hoist includes: an erecting step of erecting a first guide rail and a second guide rail in a hoistway; and after the erecting step, the hoisting machine is connected to the first guide rail.
- a lifting step of lifting the hoist while sliding in the longitudinal direction of the second guide rail; and after the lifting step, the first guide rail and the second guide rail are attached to the first guide rail and the second guide rail. Since the method includes a fixing step of fixing a support member that supports a vertical load of the hoist, and an installation step of installing the hoist on the support member after the fixing step, the hoist can be easily mounted. Can be installed.
- the lifting step includes a step of attaching a lifting jig to the hoist or the mounting member and lifting the lifting jig as a lifting point, the hoist can be easily installed.
- the lifting jig a protruding portion that protrudes beyond the first guide rail from the hoisting machine or the mounting member; and a protruding portion that protrudes from the hoisting machine or the mounting member.
- a lifting jig having a protruding portion that protrudes beyond the guide rail of No. 2 and lifting using the protruding portion as a hanging point a device required for lifting may come into contact with the hoist and the mounting member. Absent.
- the lifting step includes: a first lifting step of lifting the hoist or the mounting member as a hanging point; and after the first lifting step, the lifting machine or the mounting member.
- the lifting jig having a protruding portion projecting beyond the first guide rail from the first guide rail and a protruding portion projecting beyond the second guide rail from the hoisting machine or the mounting member from the hoisting machine or the hoisting machine.
- the present invention is applied to a machine room-less elevator apparatus in which a hoist is installed at a predetermined height from the bottom of a hoistway.
Landscapes
- Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Mechanical Engineering (AREA)
- Structural Engineering (AREA)
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
- Cage And Drive Apparatuses For Elevators (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Description
Claims
Priority Applications (5)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP01917630A EP1405812B1 (en) | 2001-03-29 | 2001-03-29 | Method for installing hoist |
CN01810122.4A CN1191984C (zh) | 2001-03-29 | 2001-03-29 | 卷扬机的安装方法 |
DE60132925T DE60132925T2 (de) | 2001-03-29 | 2001-03-29 | Verfahren zur installation einer fördervorrichtung |
PCT/JP2001/002667 WO2002079067A1 (fr) | 2001-03-29 | 2001-03-29 | Methode de montage d'un treuil |
JP2002545048A JP4828084B2 (ja) | 2001-03-29 | 2001-03-29 | 巻上機の据付方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/JP2001/002667 WO2002079067A1 (fr) | 2001-03-29 | 2001-03-29 | Methode de montage d'un treuil |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2002079067A1 true WO2002079067A1 (fr) | 2002-10-10 |
Family
ID=11737183
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2001/002667 WO2002079067A1 (fr) | 2001-03-29 | 2001-03-29 | Methode de montage d'un treuil |
Country Status (5)
Country | Link |
---|---|
EP (1) | EP1405812B1 (ja) |
JP (1) | JP4828084B2 (ja) |
CN (1) | CN1191984C (ja) |
DE (1) | DE60132925T2 (ja) |
WO (1) | WO2002079067A1 (ja) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1555236A1 (de) * | 2004-01-07 | 2005-07-20 | Inventio Ag | Antrieb für eine Aufzugsanlage und Verfahren zum Umbau eines Antriebes in einer Aufzugsanlage |
JP2006027749A (ja) * | 2004-07-12 | 2006-02-02 | Toshiba Elevator Co Ltd | 巻上機据付設備 |
WO2008041266A1 (en) * | 2006-09-29 | 2008-04-10 | Mitsubishi Electric Corporation | Elevator device |
US7624847B2 (en) | 2004-01-07 | 2009-12-01 | Inventio Ag | Drive for an elevator installation |
JP4869253B2 (ja) * | 2005-12-05 | 2012-02-08 | 東芝エレベータ株式会社 | エレベータの重量物仮置装置および重量物の据付方法 |
KR20180132821A (ko) | 2016-05-25 | 2018-12-12 | 미쓰비시덴키 가부시키가이샤 | 엘리베이터의 권상기 설치 방법 |
US20220259012A1 (en) * | 2019-12-19 | 2022-08-18 | Kone Corporation | Elevator arrangement and method |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4959986B2 (ja) * | 2006-02-09 | 2012-06-27 | 東芝エレベータ株式会社 | エレベータ用品の揚重装置及び揚重方法 |
CN100431942C (zh) * | 2006-05-12 | 2008-11-12 | 上海宝冶建设有限公司 | 一种采用旋转平衡法吊装特大型设备的工艺方法 |
KR101223860B1 (ko) * | 2007-10-05 | 2013-01-17 | 미쓰비시덴키 가부시키가이샤 | 엘리베이터의 양중장치 및 엘리베이터의 엘리베이터칸 프레임 및 엘리베이터의 양중방법 |
FI20105661A (fi) * | 2010-06-10 | 2011-12-11 | Kone Corp | Nostokoneiston kiinnitysjärjestely sekä hissikokoonpano |
JP5875789B2 (ja) * | 2011-06-28 | 2016-03-02 | 東芝エレベータ株式会社 | ロープ据付方法 |
JP6580528B2 (ja) * | 2016-07-15 | 2019-09-25 | 株式会社日立製作所 | 巻上機の据付方法、及びエレベーター |
CN118265668A (zh) * | 2021-11-15 | 2024-06-28 | 通力股份公司 | 升降机的构造布置和用于构造升降机的方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS51109563U (ja) * | 1975-02-28 | 1976-09-03 | ||
JPH03162384A (ja) * | 1989-11-21 | 1991-07-12 | Mitsubishi Electric Corp | 仮設エレベータの機械台支持装置 |
JPH0710434A (ja) * | 1993-06-28 | 1995-01-13 | Kone Oy | トラクションシーブエレベータ |
JP2000169059A (ja) * | 1998-12-07 | 2000-06-20 | Mitsubishi Electric Corp | エレベーターの据付工法 |
JP2001106461A (ja) * | 1999-10-05 | 2001-04-17 | Matsushita Electric Works Ltd | エレベータ駆動装置の固定構造 |
JP2001171953A (ja) * | 1999-12-16 | 2001-06-26 | Fujitec Co Ltd | エレベータ用駆動装置の支持装置 |
JP2001171954A (ja) * | 1999-12-20 | 2001-06-26 | Mitsubishi Electric Corp | エレベータの巻上機支持装置 |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4005997A (en) * | 1975-02-24 | 1977-02-01 | The Dow Chemical Company | Gas dehydration with liquid desiccants and regeneration thereof |
JP2000034072A (ja) * | 1998-07-17 | 2000-02-02 | Hitachi Building Systems Co Ltd | エレベータ巻上機の据付装置 |
JP4157631B2 (ja) * | 1998-11-19 | 2008-10-01 | 日本エレベーター製造株式会社 | エレベ−タ装置 |
-
2001
- 2001-03-29 EP EP01917630A patent/EP1405812B1/en not_active Expired - Lifetime
- 2001-03-29 JP JP2002545048A patent/JP4828084B2/ja not_active Expired - Lifetime
- 2001-03-29 DE DE60132925T patent/DE60132925T2/de not_active Expired - Lifetime
- 2001-03-29 CN CN01810122.4A patent/CN1191984C/zh not_active Expired - Lifetime
- 2001-03-29 WO PCT/JP2001/002667 patent/WO2002079067A1/ja active IP Right Grant
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS51109563U (ja) * | 1975-02-28 | 1976-09-03 | ||
JPH03162384A (ja) * | 1989-11-21 | 1991-07-12 | Mitsubishi Electric Corp | 仮設エレベータの機械台支持装置 |
JPH0710434A (ja) * | 1993-06-28 | 1995-01-13 | Kone Oy | トラクションシーブエレベータ |
JP2000169059A (ja) * | 1998-12-07 | 2000-06-20 | Mitsubishi Electric Corp | エレベーターの据付工法 |
JP2001106461A (ja) * | 1999-10-05 | 2001-04-17 | Matsushita Electric Works Ltd | エレベータ駆動装置の固定構造 |
JP2001171953A (ja) * | 1999-12-16 | 2001-06-26 | Fujitec Co Ltd | エレベータ用駆動装置の支持装置 |
JP2001171954A (ja) * | 1999-12-20 | 2001-06-26 | Mitsubishi Electric Corp | エレベータの巻上機支持装置 |
Non-Patent Citations (1)
Title |
---|
See also references of EP1405812A4 * |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7624847B2 (en) | 2004-01-07 | 2009-12-01 | Inventio Ag | Drive for an elevator installation |
EP1555236A1 (de) * | 2004-01-07 | 2005-07-20 | Inventio Ag | Antrieb für eine Aufzugsanlage und Verfahren zum Umbau eines Antriebes in einer Aufzugsanlage |
US7775325B2 (en) | 2004-01-07 | 2010-08-17 | Inventio Ag | Drive for an elevator installation and method of converting a drive in an elevator installation |
JP4597595B2 (ja) * | 2004-07-12 | 2010-12-15 | 東芝エレベータ株式会社 | 巻上機据付設備 |
JP2006027749A (ja) * | 2004-07-12 | 2006-02-02 | Toshiba Elevator Co Ltd | 巻上機据付設備 |
JP4869253B2 (ja) * | 2005-12-05 | 2012-02-08 | 東芝エレベータ株式会社 | エレベータの重量物仮置装置および重量物の据付方法 |
JPWO2008041266A1 (ja) * | 2006-09-29 | 2010-01-28 | 三菱電機株式会社 | エレベータ装置 |
WO2008041266A1 (en) * | 2006-09-29 | 2008-04-10 | Mitsubishi Electric Corporation | Elevator device |
JP5120260B2 (ja) * | 2006-09-29 | 2013-01-16 | 三菱電機株式会社 | エレベータ装置 |
KR20180132821A (ko) | 2016-05-25 | 2018-12-12 | 미쓰비시덴키 가부시키가이샤 | 엘리베이터의 권상기 설치 방법 |
DE112016006907T5 (de) | 2016-05-25 | 2019-02-14 | Mitsubishi Electric Corporation | Installationsverfahren für eine Hebemaschine eines Aufzugs |
US20220259012A1 (en) * | 2019-12-19 | 2022-08-18 | Kone Corporation | Elevator arrangement and method |
US11993484B2 (en) * | 2019-12-19 | 2024-05-28 | Kone Corporation | Elevator arrangement and method |
Also Published As
Publication number | Publication date |
---|---|
DE60132925D1 (de) | 2008-04-03 |
DE60132925T2 (de) | 2009-03-05 |
EP1405812B1 (en) | 2008-02-20 |
EP1405812A4 (en) | 2005-06-22 |
JPWO2002079067A1 (ja) | 2004-07-22 |
JP4828084B2 (ja) | 2011-11-30 |
CN1191984C (zh) | 2005-03-09 |
EP1405812A1 (en) | 2004-04-07 |
CN1430572A (zh) | 2003-07-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2002079067A1 (fr) | Methode de montage d'un treuil | |
CN109153539B (zh) | 电梯的曳引机安装方法 | |
JP2000034072A (ja) | エレベータ巻上機の据付装置 | |
JPWO2020035933A1 (ja) | エレベーターの揚程延長技術の適用方法 | |
KR20050051701A (ko) | 엘리베이터 장치 | |
JP3744764B2 (ja) | エレベータ装置及びその組立方法 | |
JP2612974B2 (ja) | 外壁pc部材の取付施工方法 | |
JP2013245033A (ja) | 巻上機据付方法 | |
JP2004168518A (ja) | エレベーター装置 | |
JP2018012562A (ja) | 揚重ブラケット、巻上機の設置方法及び巻上機 | |
KR100500861B1 (ko) | 권양기의 설치방법 | |
JP2000335847A (ja) | エレベータの据付装置 | |
JP2008063873A (ja) | 天井の搬送機構及び施工方法 | |
JP2000226169A (ja) | エレベータの据付方法 | |
JP2002115399A (ja) | 建築物の外壁用養生装置 | |
JP2003292268A (ja) | 荷重受けブラケット | |
JP2939064B2 (ja) | エレベータの据付用型板 | |
JP2002160876A (ja) | エレベーター装置 | |
JP2004196468A (ja) | エレベーター装置 | |
JPS63110365A (ja) | リフト用蓮台の昇降方法と装置 | |
JP2004189367A (ja) | エレベータの据付方法 | |
JPH11209027A (ja) | エレベータの据付方法 | |
JP3297345B2 (ja) | 工事用エレベータのガバナロープ繰出し方法 | |
JPH11292424A (ja) | 小型エレベータの据付方法 | |
JP2000226168A (ja) | エレベータの据付方法及び据付装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
ENP | Entry into the national phase |
Ref country code: JP Ref document number: 2002 545048 Kind code of ref document: A Format of ref document f/p: F |
|
AK | Designated states |
Kind code of ref document: A1 Designated state(s): CN JP KR |
|
AL | Designated countries for regional patents |
Kind code of ref document: A1 Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LU MC NL PT SE TR |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2001917630 Country of ref document: EP |
|
WWE | Wipo information: entry into national phase |
Ref document number: 1020027015544 Country of ref document: KR |
|
WWE | Wipo information: entry into national phase |
Ref document number: 018101224 Country of ref document: CN |
|
121 | Ep: the epo has been informed by wipo that ep was designated in this application | ||
WWP | Wipo information: published in national office |
Ref document number: 1020027015544 Country of ref document: KR |
|
WWP | Wipo information: published in national office |
Ref document number: 2001917630 Country of ref document: EP |
|
WWG | Wipo information: grant in national office |
Ref document number: 1020027015544 Country of ref document: KR |
|
WWG | Wipo information: grant in national office |
Ref document number: 2001917630 Country of ref document: EP |