WO2008041266A1 - Elevator device - Google Patents

Elevator device Download PDF

Info

Publication number
WO2008041266A1
WO2008041266A1 PCT/JP2006/319406 JP2006319406W WO2008041266A1 WO 2008041266 A1 WO2008041266 A1 WO 2008041266A1 JP 2006319406 W JP2006319406 W JP 2006319406W WO 2008041266 A1 WO2008041266 A1 WO 2008041266A1
Authority
WO
WIPO (PCT)
Prior art keywords
rail
guide
guide rail
mounting
attached
Prior art date
Application number
PCT/JP2006/319406
Other languages
French (fr)
Japanese (ja)
Inventor
Kunio Kato
Original Assignee
Mitsubishi Electric Corporation
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corporation filed Critical Mitsubishi Electric Corporation
Priority to EP06810812.5A priority Critical patent/EP2067734B1/en
Priority to KR1020097002873A priority patent/KR101162240B1/en
Priority to CN2006800559565A priority patent/CN101511718B/en
Priority to PCT/JP2006/319406 priority patent/WO2008041266A1/en
Priority to JP2008537324A priority patent/JP5120260B2/en
Publication of WO2008041266A1 publication Critical patent/WO2008041266A1/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B7/00Other common features of elevators
    • B66B7/02Guideways; Guides
    • B66B7/023Mounting means therefor
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B11/00Main component parts of lifts in, or associated with, buildings or other structures
    • B66B11/04Driving gear ; Details thereof, e.g. seals
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B11/00Main component parts of lifts in, or associated with, buildings or other structures
    • B66B11/0035Arrangement of driving gear, e.g. location or support
    • B66B11/0045Arrangement of driving gear, e.g. location or support in the hoistway
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B19/00Mining-hoist operation
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B19/00Mining-hoist operation
    • B66B19/005Mining-hoist operation installing or exchanging the elevator drive
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B7/00Other common features of elevators
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B7/00Other common features of elevators
    • B66B7/02Guideways; Guides

Definitions

  • the present invention relates to a mounting structure for mounting a hoisting machine installed in a hoistway to a guide rail in an elevator apparatus that installs the hoisting machine in a hoistway.
  • a support base is attached to a guide rail that guides the lifting and lowering of the counterweight, and a mounting member on which the lifting machine is attached is attached via an elastic member on the support base.
  • the mounting member is provided with upper and lower members that hold the mounting member slidably in the longitudinal direction of the guide rail and prevent the mounting member from swinging in the horizontal direction.
  • the bracing member sandwiches the guide rail via an elastic member.
  • the hoisting machine has a driving sheave around which a main rope, which is a suspension means for suspending the force cage and the counterweight, is wound, and the car and the counterweight are moved up and down by driving the driving sheave.
  • a vertical force is applied to the lifting machine by the main rope, and a moment is applied to the mounting member via the lifting machine by this force.
  • This moment is supported on the guide rail by the anti-vibration members provided above and below the mounting member, and the vertical force acting on the lifting machine is supported by the support base. Then, the vibration of the lifting machine is suppressed from being transmitted to the guide rail by the elastic member provided on the support base and the elastic member provided on the anti-vibration member.
  • Patent Document 1 1 ⁇ ⁇ 0027079068 Publication (page 8-10, Fig. 2)
  • the present invention has been made in order to solve the problem of power and acts on the guide rail.
  • An object of the present invention is to obtain an elevator apparatus that can reduce the bending moment. Means for solving the problem
  • the hoisting machine is mounted, and the hoisting machine mounting part is disposed so as to include at least a part in the longitudinal direction of the guide rail as viewed from the horizontal direction.
  • the rail mounting part force that is attached to the lifting machine mounting part within the longitudinal range of the guide rail is attached to the guide rail across the mounting range of the lifting machine mounting part in the longitudinal direction of the guide rail. Is.
  • the present invention provides a guide rail that spans the mounting range of the hoisting machine mounting portion in the longitudinal direction of the guide rail, over the mounting range of the hoisting machine mounting portion in the longitudinal direction of the guide rail.
  • FIG. 1 shows an overall configuration diagram of an elevator apparatus according to a first embodiment.
  • FIG. 2 is a diagram showing a front view of the lifting machine mounting mechanism in the first embodiment.
  • FIG. 3 is a view showing a cross section AA of FIG.
  • FIG. 4 is a top view of FIG.
  • FIG. 5 is a view showing a cross section BB in FIG. 2.
  • FIG. 6 is a view showing the structure of the frame of the hoisting machine attachment mechanism in Embodiment 1, (a) is a front view, and (b) is a side view.
  • FIG. 7 is a view showing a lower guide portion of the lifting machine mounting mechanism in Embodiment 1, (a) is a front view, (b) is a bottom view, and (c) is a cross-section CC of (a). It is.
  • FIG. 8 is a view showing the upper guide part of the lifting machine mounting mechanism in Embodiment 1, (a) is a front view, (b) is a bottom view, and (c) is a cross section D— D.
  • FIG. 9 is a flowchart showing a procedure for installing the lifting machine mounting mechanism.
  • FIG. 10 is a diagram showing an installation work state of the lifting machine mounting mechanism.
  • FIG. 11 is a bottom view of FIG. 9.
  • FIG. 12 shows a front view of the lifting machine mounting mechanism in the second embodiment.
  • FIG. 13 is a view showing a cross section EE of FIG.
  • FIG. 14 is a front view of an enlarged view of the main part of the upper part of the hoisting machine attachment mechanism in the second embodiment.
  • FIG. 15 is a side view of an enlarged view of the main part of the upper part of the hoisting machine attachment mechanism in the second embodiment.
  • FIG. 16 is a view showing a cross section GG of FIG.
  • FIG. 17 shows an overall configuration diagram of an elevator apparatus according to a third embodiment.
  • FIG. 18 is a view showing a lifting machine mounting mechanism according to the third embodiment.
  • FIG. 1 shows an overall configuration diagram of an elevator apparatus according to Embodiment 1 for carrying out the present invention.
  • FIG. 1 in the hoistway 1, there are a force cage 2 that lifts and lowers passengers and a cage 2 that is provided on both sides of the force cage 2 and guides the elevator 2 to and from the cage 2.
  • a counterweight 4 that moves up and down in the direction opposite to the ascending / descending direction of the car 2
  • a counterweight 4 guide rails 5a and 5b provided on both sides of the counterweight 4 for guiding the lifting and lowering of the counterweight 4, respectively.
  • a lifting machine 6 serving as a power source for raising and lowering the car 2 and the counterweight 4 is provided above the counterweight 4 and above the hoistway 1.
  • the hoisting machine 6 includes a driving sheave 6a around which a suspension means 10 for suspending the force 2 and the counterweight 4 is wound, and a driving unit 6b that rotates the driving sheave 6a.
  • a lifting machine mounting mechanism 7 for mounting the lifting machine 6 between the guide rails 5a and 5b is provided at the upper part of the hoistway 1, and this embodiment is special to this lifting machine mounting mechanism 7. The details will be described later.
  • a counterweight suspension wheel 8 is attached to the upper portion of the counterweight 4, and a cage suspension wheel 9 is attached to the lower portion of the cage 2.
  • One end of the suspension means 10 is fixed to the suspension means attachment portion 11 at the upper end of the guide rail 3 a of the car 2, and the other end is fixed to the suspension means attachment portion 12 provided in the lifting machine attachment mechanism 7.
  • the suspension means 10 is wound around the counterweight suspension wheel 8, the driving sheave 6 a, and the force suspension wheel 9 to suspend the force 2 and the counterweight 4.
  • the car 2 and the balance 4 and the weight 4 are lifted and lowered via the suspension means 10 by rotating the driving sheave 6 a of the hoisting machine 6.
  • FIG. 2 is a front view showing the structure of the lifting machine mounting mechanism 7
  • FIG. 3 is a cross-sectional view taken along line AA in FIG. 2
  • FIG. 4 is a top view of FIG. 2
  • the guide rails 5a and 5b will be described.
  • the guide rails 5a and 5b are fixed to the hoistway wall via a plurality of rail brackets 53 in the longitudinal direction.
  • a group 53a and 53b of the plurality of rail brackets 53 are respectively arranged on the upper portions of the guide rails 5a and 5b.
  • Rail brackets 53c and 53d of other groups are rail brackets 53a and 53b Are arranged at a predetermined interval (H in FIG. 2).
  • the guide rail 5a has a rail bottom portion 5la and a rail guide portion 52a that stands on the rail bottom portion 5la and guides the lifting and lowering of the counterweight 4.
  • the other guide rail 5b is configured in the same manner as the force guide rail 5a, which will not be described.
  • the hoisting machine mounting mechanism 7 includes a hoisting machine mounting part 71 for mounting the hoisting machine 6 and a rail mounting part 72 that is mounted on the hoisting machine mounting part 71 and mounted on the guide rails 5a and 5b.
  • the rail attachment portion 72 has members 721a and 721b formed in an L-shaped plate shape.
  • the hoisting machine mounting portion 71 is mounted on the members 721a and 721b and mounted on the upper portions of the guide rails 5a and 5b, respectively.
  • the hoisting machine mounting portion 71 has a frame body 711 and is disposed within the range of the guide rails 5a and 5b in the longitudinal direction as viewed in the horizontal direction.
  • 6A and 6B are diagrams showing the structure of the frame body 711, where FIG. 6A is a front view and FIG. 6B is a side view.
  • the frame 711 is configured by fixing the horizontal members 712a and 712b above and below the vertical members 711a and 711b.
  • lower fixing bases 713a and 713b provided on one side surface of the vertical members 7 lla and 71 lb are attached.
  • upper fixing bases 714a and 714b provided on the left and right of one side surface of the lateral member 712b are attached to the upper portion of the frame body 711.
  • the lower part of the hoisting machine 6 is the lower fixing base 713a, 713b
  • the upper part of the hoisting machine 6 is the upper fixing base 714a, 714b. It is attached via the bodies 715a and 715b and the elastic bodies 716a and 716b.
  • the driving sheave 6a of the hoisting machine 6 is in contact with the frame 711 so that the suspension means 10 that hangs around the driving sheave 6a and does not come into contact with the frame 711. It is arranged at a position shifted.
  • a suspension means mounting portion 12 is provided on the lower lateral member 712a. The end of the suspension means 10 is attached to the suspension means attachment portion 12.
  • the lifting machine mounting portion 71 includes guide portions 81a, 81b, 82a, and 82b.
  • Guide portions 81 a and 81 b are provided on both sides of the lower portion of the frame body 711, and guide portions 82 a and 82 b are provided on both sides of the upper portion of the frame body 711.
  • FIG. 7 is a view showing the lower guide portions 81a and 81b, where (a) is a front view.
  • (B) is a top view and (c) is a DD cross-sectional view.
  • FIG. 8 is a view showing the upper guide portions 82a and 82b, in which (a) is a front view, (b) is a bottom view, and (c) is a CC cross-sectional view.
  • the guide portion 81a has a first attachment portion 811a attached to the lower surface of the lateral member 712a and a second attachment portion 812a attached to the member 721a of the rail attachment portion 72. .
  • the guide portion 81a has an engaging portion 813a engaged with the first mounting portion 81la so as to surround the rail guide portion 52a of the guide rail 5a, and is configured to be slidable on the guide rail 5a.
  • the guide portion 81a is provided with attachment means 814 on the first attachment portion 81la, which is detachably attached to the member 721a in the projection in which the upward force is also viewed.
  • the attaching means 814 includes, for example, an elongated hole 815 and a bolt 816, and the guide portion 81a is attached to the lateral member 712a by the bolt 816 through the elongated hole 815.
  • the description of the other guide portion 8 lb is omitted, but is similarly configured to be slidable on the guide rail 5b and is configured to be attached to the member 721b of the rail attachment portion 72.
  • the guide portion 82a has a first attachment portion 821a attached to the upper surface of the transverse member 712b and a second attachment portion 82 2a attached to the member 721a of the rail attachment portion 72. have.
  • the guide portion 82a has an engaging portion 823a that is engaged with the first mounting portion 821a so as to surround the rail guide portion 52a of the guide rail 5a, and is configured to be slidable on the guide rail 5a.
  • the guide portion 82a is provided with attachment means 824 on the first attachment portion 821a that is detachably attached to the member 721a in the projection in which the upward force is also viewed.
  • the attachment means 824 includes, for example, a long hole 825 and a bolt 826, and the guide portion 82a is attached to the lateral member 712b with the bolt 826 through the long hole 825.
  • the other guide portion 82b is configured to be slidable on the guide rail 5b in the same manner as the force that omits the description, and is configured to be attached to the member 721b of the rail attachment portion 72.
  • the rail mounting portion 72 has the slabs 721a and 721b.
  • Guide rods 81a and 82a and guide portions 81b and 82b are attached to the saddle members 721a and 721b, respectively, and the lifting machine attachment portion 71 is attached to the rail attachment portion 72 within the longitudinal range of the guide rails 5a and 5b. It is done.
  • the member 721a is attached to the guide rail 5a across the installation range of the lifting machine mounting portion in the longitudinal direction of the guide rail 5a, that is, the longitudinal range of the guide rail 5a including the guide portions 8la and 82a. It is attached.
  • the member 721a is attached to the guide rail 5a up to the vicinity of the lower rail bracket 53c. That is, the member 721a is attached to the guide rail 5a so as to extend over a range substantially including the mounting space of the hoistway wall of the guide rail 5a.
  • the guide rail 5a has a rail mounting surface 55a on the rail bottom 51a opposite to the rail guide 52a, and the member 721a is mounted on the rail mounting surface 55a. Yes.
  • the upper contact portion 722a of the member 721a is disposed so as to overlap the upper end of the guide rail 5a when viewed from above.
  • the guide rail 5b has a rail mounting surface 55b on the rail bottom 51b opposite to the rail guide 52b, and the member 721b is mounted on the rail mounting surface 55b. Yes. As shown in FIG. 2, the upper contact portion 722b of the member 721b is arranged so as to overlap the upper end of the guide rail 5b on the projection viewed from above.
  • the member 721a is attached to the guide rail 5a with a clip 54 sandwiching the rail bottom 51a at a predetermined interval with respect to the longitudinal direction of the guide rail 5a. It is.
  • the other member 721b is configured in the same manner as the force member 721a whose description is omitted.
  • the rail mounting portion 72 is attached to the lifting machine mounting portion 71 within the longitudinal direction of the guide rails 5a and 5b, and the lifting machine mounting portion in the longitudinal direction of the guide rails 5a and 5b. It is attached to the guide rails 5a and 5b over the attachment range of 71. Furthermore, the rail attachment portion 72 is attached to the guide rails 5a and 5b so as to substantially span the range including the attachment interval of the hoistway walls of the guide rails 5a and 5b.
  • the rail connecting portion 73 is attached to the contact portions 722a and 722b of the members 721a and 721b, and the guide rail 5a and the guide rail 5a are connected to the upper side of the guide rail 5b. Connect the guide rails 5b to each other!
  • FIG. 10 is a diagram showing a state of installation work
  • FIG. 11 is a diagram showing a bottom view of FIG.
  • guide rails 5a and 5b are set up in hoistway 1 via rail bracket 53 and clip 54. (SI in Fig. 9).
  • the members 721a and 721b of the rail attachment portion 72 are attached to the upper arm of the guide lanes 5a and 5b via the clip 54 (S2 in FIG. 9).
  • the guide rails 5a and 5b may be erected in a state where the saddle members 721a and 721b are attached to the guide rails 5a and 5b.
  • the hoisting machine 6 attached to the bottom of the hoistway 1 with the frame body 711 [14 'body 14 715a, 715b, 716a, 716b attached] S3).
  • the lifting machine 6 and the frame 711 are placed between the guide rails 5a and 5b.
  • the lifting machine 6 and the frame body 711 may be separately placed between the guide rails 5a and 5b, and then the lifting machine 6 may be attached to the frame body 711.
  • the guide rods 81a, 82a, 81b, and 82b are attached to the frame body 711 (S4 in FIG. 9).
  • the guide portion 8 la is engaged with the guide rail 5a.
  • the guide portion 8 la is attached to the member 721a so as to be separated from the member 721a on the projection viewed from above by using the elongated hole 815 and the bolt 816 of the attachment means 814.
  • the guide portion 81b is also attached to the frame body 711 in the same manner as the guide portion 81a.
  • the guide portions 82a and 82b are not shown, but are attached to the frame 711 in the same manner as the guide portion 81a.
  • the lifting machine 6 and the lifting machine mounting portion 71 are slidably held by the guide rails 5a and 5b.
  • the guide portions 81a, 81b, 82a, 82b may be attached when the frame body 711 is placed on the bottom of the hoistway 1.
  • the hoisting machine 6 and the hoisting machine mounting part 71 are lifted while sliding on the guide rails 5a and 5b (S5 in FIG. 9).
  • the guide portions 81a and 82a and the guide portions 81b and 82b are attached so as to be separated from the members 72 la and 721b, respectively, on the projection viewed from above, so that the members 72 la and 72 lb
  • the lifting machine mounting part 71 is lifted with a gap between the gap and the guide part 8 la, 82a and the guide part 8 lb, 82b.
  • the guide part 81a is attached to the member 721a, and the bolt 816 is tightened and attached to the lifting machine attachment part 71.
  • the other guide portions 82a, 81b, and 82b are attached in the same manner as the force guide portion 81a that is not described.
  • the lifting machine 6 and the lifting machine mounting part 71 are attached to the rail mounting part 72 (S6 in FIG. 9).
  • the rail connecting portion 73 is attached to the members 721a and 721b (S7 in FIG. 9). ) o
  • the Lenore connecting rod may be installed when the brazing materials 721a and 721b are attached to the guide Lenoles 5a and 5b.
  • the lifting machine 6 is installed in the hoistway 1.
  • a force F is applied to the driving sheave 6 a of the hoist 6 by the suspension means 10. Since the driving sheave 6a is arranged at a position shifted from the frame 711, a moment acts on the lifting machine mounting portion 71 via the lifting machine 6 by this force F. This moment is applied to the installation position of the lifting machine mounting part 71 and the rail mounting part 72, that is, at the positions of the guide parts 81a and 82a and the guide parts 81b and 82b, respectively, and the guide rails 5a and 5b and the rail mounting part, respectively. A reaction force is applied to 72. As a result, a bending moment is generated in the longitudinal direction including the guide portions 81a and 82a and the guide portions 81b and 82b in the guide rails 5a and 5b and the rail mounting portion 72, respectively.
  • the guide rails 5a, 5b are attached to the hoistway wall, that is, the rails 53a and 53c and the rail brackets 53b and 53d are included in the range including the guide rail 5a, Bending moment acts on 5b.
  • the rail mounting portion 72 is attached to the guide rails 5a and 5b across the range including the mounting interval of the hoistway walls of the guide rails 5a and 5b. In this range, the rail mounting portion 72 is also bent. Moment acts.
  • the hoisting machine mounting mechanism 7 in the first embodiment includes the hoisting machine mounting part 71 for mounting the hoisting machine 6 and the rail for mounting the hoisting machine mounting part 71 to the guide rails 5a and 5b.
  • the rail mounting part 72 is attached to the lifting machine mounting part 71 within the longitudinal range of the guide rails 5a and 5b, and is installed in the longitudinal direction of the guide rails 5a and 5b. It is attached to the guide rails 5a and 5b across the attachment range of the portion 71.
  • the cross-sectional performance of the lifting machine mounting mechanism 7 in the mounting range of the lifting machine mounting portion 71 in the longitudinal direction of the guide rails 5a and 5b is improved as compared with the case where only the guide rails 5a and 5b are used. Therefore, it is possible to reduce the bending moment acting on the guide rails 5a and 5b equivalently.
  • the rail attachment portion 72 is attached to the guide rails 5a and 5b so as to substantially span the range including the attachment interval of the hoistway walls of the guide rails 5a and 5b.
  • the cross-sectional performance of the lifting machine mounting mechanism 7 in this range is only for the guide rails 5a and 5b. improves. Therefore, the bending moment acting on the guide rails 5a and 5b can be reduced equivalently.
  • the guide lenores 5a and 5b have rail mounting surfaces 55a and 55b opposite to the lenore guide rods 52a and 52b on the lenole bottom rods 51a and 51b, and the rail mounting portion 72 has the rail mounting surface 55a. Attached to 55b. Accordingly, since the rail guide portions 52a and 52b are not hindered in the mounting of the rail mounting portion 72 to the guide rails 5a and 5b, the rail mounting portion 72 can be configured with a simple structure and can be easily mounted.
  • the lifting machine mounting portion 71 is provided with guide parts 81a, 82a, 81b, 82b that are slidable on the guide rails 5a, 5b.
  • the 71 is installed at a predetermined height in the hoistway 1, it is guided by the guide rails 5a and 5b, so that the lifting weight can be stabilized and the installation work can be facilitated.
  • the guide parts 81a and 82a and the guide parts 81b and 82b are attached to the lifting machine mounting part 71 so as to be detachable from the members 721a and 721b on the projection viewed from the upward force. 814, 824. Accordingly, it is possible to lift the lifting machine mounting portion 71 in a state where a gap is generated between the member 721a and the member 721b and the gap between the guide portions 81a and 82a and the guide portions 81b and 82b. Therefore, the installation work can be facilitated without the force S being twisted with the saddle members 721a, 721b and the guide rods 81a, 82a, 81b, 82b.
  • the guide portions 81a, 82a, 81b, and 82b are configured to be attached to the rail attachment portion 72, the guide portions 81a, 82a, 81b, and 82b can be shared as a fixing member to reduce the number of parts. it can. Further, the guide portions 81a, 82a, 81b, 82b can be attached to the rail attachment portion 72 at an arbitrary position, and the attachment height of the lifting machine 6 can be freely selected.
  • the upper ends of the guide rails 5a, 5b are supported by the building beams at the top of the hoistway 1, so the upper ends of the guide rails 5a, 5b also need to be raised. is there .
  • the installation position of the lifting machine 6 is uniform from the upper ends of the guide rails 5a and 5b, the lifting machine 6 is also installed at a higher position in the hoistway 1, so installation workers and maintenance workers are required. You will work at a higher position.
  • the installation height of the lifting machine 6 can be freely selected, installation work, maintenance work and the like that do not require installation of the lifting machine 6 higher than necessary are facilitated.
  • the guide parts 81a, 81b, 82a, 82b are attached to the rail attaching part 72, and the lifting machine 6 is attached to the lifting machine attaching part 71 via the elastic bodies 7 15a, 715b, 716a, 716b.
  • the elastic bodies 715a, 715b, 716a, 716b attached to the lifting machine 6 that do not need to provide vibration isolation between the guide portions 81a, 82a, 81b, 82b and the guide rails 5a, 5b are required.
  • the vibration isolation effect can be obtained with a few configurations.
  • the vibration in the direction of arrow J in FIG. 3 due to the vibration of the hoisting machine 6 is supported by elastic bodies 715a, 715b, 716a, 716b arranged above and below the hoisting machine 6.
  • elastic bodies 715a, 715b, 716a, 716b arranged above and below the hoisting machine 6.
  • the invention is not limited to this, and a configuration in which one elastic body is provided at the upper center of the lifting machine and one elastic body is provided at the lower center. It is also possible to provide three or more elastic bodies on the top and bottom.
  • the hoisting machine mounting mechanism 7 has the rail connecting portion 73 that connects the guide rails 5a and 5b to each other on the upper side of the guide rails 5a and 5b. Opening can be prevented, and a highly reliable elevator apparatus can be obtained.
  • the rail connecting portion 73 may be attached directly to the upper portions of the guide rails 5a and 5b directly by the force attached to the members 721a and 721b.
  • the rail mounting portion 72 has contact portions 722a and 722b that overlap with the upper ends of the guide rails 5a and 5b in the projection in which the upward force is also viewed, and the rail mounting portion 72 includes the contact portions 722a, 722b is attached in contact with the upper ends of the guide rails 5a and 5b.
  • the force F applied to the lifting machine 6 is supported by the contact parts 722a and 722b. High elevator equipment can be obtained.
  • mounting holes are provided in the guide rails 5a and 5b, and bolts are passed through the mounting holes.
  • the force F applied to the lifting machine 6 is supported by the bolt engaging with the mounting hole even if the fastening slips.
  • the guide rails 5a and 5b are not only forced to cover the mounting holes, but the cross-sectional performance of the guide rails 5a and 5b in these mounting holes is reduced, and the strength of the guide rails 5a and 5b is reduced.
  • the force F applied to the lifting machine 6 is supported by the contact portions 722a and 722b, the strength that does not need to cover the mounting holes in the guide rails 5a and 5b is reduced.
  • the suspension means attachment portion 12 for attaching the suspension means 10 is provided in the lifting machine attachment portion 71, a separate member for attaching the suspension means is unnecessary, and the number of parts can be reduced. Also, if a beam is provided on the guide rails 5a and 5b and the lifting machine 6 is installed on the beam, the height direction of the ascending / descending path 1 is required. 6 and the lifting machine mounting portion 71 are installed within the longitudinal range of the guide rails 5a and 5b, so that the lifting machine 6 can be installed without increasing the height direction of the hoistway 1.
  • the lifting machine mounting portion 71 is arranged within the longitudinal range of the guide rails 5a and 5b in view of the horizontal force. May be placed out of the longitudinal range of 5b.
  • FIG. 12 is a front view
  • FIG. It is a cross section EE in FIG. 14 is a front view of an enlarged view of the main part of the upper part of the lifting machine mounting mechanism
  • FIG. 15 is a side view
  • FIG. 16 is a view showing a cross section GG of FIG.
  • the second embodiment is different from the first embodiment in that a partial contact portion 74, a restricting body 75, and an adjusting member 76 are provided on the upper portion of the rail mounting portion 72.
  • the other points are the same as in the first embodiment, and a description thereof will be omitted.
  • the same reference numerals as those in Embodiment 1 denote the corresponding parts.
  • FIG. 14 a partial contact portion 74 is provided between the contact portion 722a of the rail mounting portion 72 and the upper end of the guide rail 5a. Further, the partial contact portion 74 overlaps with a part of the center of the upper end of the guide rail 5a on the projection viewed from above. Has been placed. Further, the partial contact portion 74 is attached to the contact portion 722a.
  • the restricting body 75 is composed of a rod-like restricting body, for example, a pair of bolts 75a and 75b, and is provided on the upper portion of the rail mounting portion 72.
  • the bottom surfaces of the bolts 75a and 75b are located below the upper end of the guide rail 5a, and the bolts 75a and 75b are provided on both sides of the guide portion 52a of the guide rail 5a. Thereby, the restricting body 75 restricts the horizontal movement of the rail mounting portion 72.
  • Bonoleto 75a and 75b are hoofed together with a Lenore connecting rod at the abutment rod 722a!
  • the adjustment member 76 is disposed between the contact portion 722a and the upper end of the guide rail 5a, and is formed in a plate shape. Here, the adjustment member 76 is disposed between the partial contact portion 74 and the upper end of the guide rail 5a. Due to the assembly error of the guide rail 5a, an error may occur in the distance between the contact portion 722a and the upper end of the guide rail 5a. At this time, a number of adjusting members 76 corresponding to the error in the interval are arranged, and the interval between the contact portion 722a and the upper end of the guide rail 5a is adjusted. Further, a hole is formed in the adjusting member 76, and bolts 75a and 75b are passed through the hole. Note that the guide rail 5b side is configured in the same manner as the force guide rail 5a side whose description is omitted.
  • the hoisting machine mounting mechanism 13 in the second embodiment is provided between the upper contact portions 722a and 722b of the rail mounting portion 72 and the upper ends of the guide rails 5a and 5b. Further, the partial contact portion 74 is disposed so as to overlap with a central portion of the upper ends of the guide rails 5a and 5b on the projection viewed from the upward force. As a result, when the contact portions 722a and 722b support the force F exerted on the lifting machine 6, even if the shape accuracy of the upper end surfaces of the guide rails 5a and 5b is poor, the contact portions 722a and 722b are provided on the contact portions 722a and 722b.
  • the partial contact portion 74 Since the partial contact portion 74 is in contact with the central portion of the guide rails 5a and 5b, an offset load acts on the rail mounting portion 72. Usually, the height of the hoistway is caused by construction errors. Therefore, the upper ends of the guide rails 5a and 5b are cut at the installation site according to the height of the hoistway. In general, the shape accuracy of the cut surface is poor, but according to the second embodiment, even if this shape accuracy is poor, it can be handled with a simple configuration, so it is economical and easy to install. Is obtained.
  • the restricting body 75 is provided on the upper portion of the rail mounting portion 72, and bolts 75a and 75b as the limiting body 75 are arranged on both sides of the rail guide portions 52a and 52b, respectively. Movement is restricted. This should prevent the rail mounting part 72 and the guide rail 5 When the clip 54 that fastens a and 5b is released, the members 721a and 721b try to move in the direction perpendicular to the interval between the guide rails 5a and 5b.
  • Bolts 75a and 75b are the rail guides 52a and 52b. The movement of the members 721a and 721b is restricted by contacting the side surface of 52b.
  • the abutting portions 722a and 722b are not released in the vertical direction in the interval direction of the guide rails 5a and 5b, and the rail mounting portion 72 can reliably support the force F applied to the lifting machine 6 and has high reliability.
  • a lift device can be obtained.
  • the adjustment member 76 is disposed between the upper ends of the guide rails 5a and 5b and the contact portions 722a and 722b, and the interval between the upper ends of the guide rails 5a and 5b and the contact portions 722a and 722b is increased.
  • the rail mounting part 72 can be accurately mounted in the height direction and the contact parts 722a and 722b are supported by the guide rails 5a and 5b.
  • the force F applied to the lifting machine 6 can be reliably supported.
  • the adjusting member 76 is not limited to the force disposed between the partial contact portion 74 and the upper ends of the guide rails 5a and 5b.
  • the partial contact portion 74 may be in contact with the upper ends of the guide rails 5a and 5b, and the adjustment member 76 may be disposed between the contact portions 721a and 721b and the partial contact portion 74. Further, the adjusting member 76 may be disposed between the contact portions 722a and 722b and the upper ends of the guide rails 5a and 5b in a state where the partial contact portion 74 is not provided.
  • a hole is formed in the adjustment member 76, and bolts 75a and 75b as rod-shaped restricting bodies pass through the hole.
  • the bolts 75a and 75b as the restricting body 75 are provided on both sides of the guide portions 52a and 52b.
  • the bolts 75a and 75b may be provided on both sides of the rail bottom portions 51a and 51b.
  • FIGS. 17 and 18 illustrate an elevator apparatus according to Embodiment 3 of the present invention.
  • FIG. 15 is an overall configuration diagram of the elevator apparatus
  • FIG. 16 is an enlarged view of the lifting machine mounting mechanism.
  • the force of installing the lifting machine mounting mechanisms 7 and 13 on the guide rails 5a and 5b of the counterweight is not limited to this, and the guide rails 3a and 3b of the car 2 may be provided.
  • Embodiment 3 shows an example thereof. The other points are the same as in the first and second embodiments, and detailed description thereof is omitted. Note that the same reference numerals as those in Embodiments 1 and 2 indicate corresponding parts.
  • a car suspension wheel 14 is provided on the upper side of the force 2 and the suspension means 10 is fixed to a suspension means attaching portion 11 provided at one end of the guide rail 3a of the car, It is wound around a car 14 and wound around a lifting machine 15 installed at the top of the hoistway 1.
  • the hoisting machine 15 is a hoisting type hoisting machine, and the car 2 is raised and lowered by winding the suspension means 10.
  • a lifting machine mounting mechanism 16 for mounting the lifting machine 15 to the guide rail 3b of the car.
  • the hoisting machine mounting mechanism 16 includes a hoisting machine mounting part 91 for mounting the hoisting machine 15 and a rail mounting part 92 attached to the upper part of the hoisting machine mounting part 91 and attached to the upper part of the guide rail 3b. It is configured.
  • the hoisting machine mounting portion 91 includes a frame body 911 and is disposed within the longitudinal direction of the guide rail 3b as viewed in the horizontal direction.
  • the lifting machine 15 is attached to the frame body 911 via an elastic body (not shown).
  • the lifting machine mounting portion 91 is provided with guide portions 912 and 913 slidable on the guide rail 3b above and below the frame 911, respectively.
  • the guide parts 912 and 913 must be attached to the rail attachment part 92.
  • the lifting machine mounting portion 91 is attached to the rail mounting portion 92.
  • the lifting machine mounting portion 91 is configured to be slidable on the guide rail 3b and is mounted on the rail mounting portion 92.
  • the rail attachment portion 92 is attached to the hoisting machine attachment portion 71 in the longitudinal direction of the guide rail 3b.
  • the rail mounting portion 92 extends in the longitudinal direction of the guide rail 3b in the longitudinal direction of the guide rail 3b including the guide portions 912 and 913. Installed on rail 3b.
  • the rail mounting portion 92 has an abutting portion 921 at the upper portion, and the abutting portion 921 is disposed so as to overlap with the upper end of the guide rail 3b when viewed from above.
  • the guide rail 3b has a rail bottom portion 31 and a rail guide portion 32 that stands on the rail bottom portion 31 and guides the raising and lowering of the car 2.
  • the rail attachment portion 92 is attached to the surface of the rail bottom portion 31 opposite to the rail guide portion 32.
  • the lifting machine 15 is attached to the guide rail 3b, and the same effects as those in the first and second embodiments are obtained.
  • the present invention is applied to an elevator apparatus for attaching a lifting machine to a guide rail.

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
  • Cage And Drive Apparatuses For Elevators (AREA)

Abstract

An elevator device in which bending moment on a guide rail is reduced. The elevator device has a hoist installation section on which a hoist is installed and placed so that, when viewed in the horizontal direction, at least a portion of the hoist installation section is included in a region in the longitudinal direction of the guide rail. A rail installation section is attached to the hoist installation section so as to be in the region in the longitudinal direction of the guide rail. The rail installation section is also attached to the guide rail so as to cover the installation range, in the longitudinal direction of the guide rail, of the hoist installation section.

Description

明 細 書  Specification
エレベータ装置  Elevator equipment
技術分野  Technical field
[0001] この発明は、卷上機を昇降路内に設置するエレベータ装置において、昇降路内に 設置される卷上機をガイドレールに取り付けるための取付構造に関するものである。 背景技術  [0001] The present invention relates to a mounting structure for mounting a hoisting machine installed in a hoistway to a guide rail in an elevator apparatus that installs the hoisting machine in a hoistway. Background art
[0002] 従来のエレベータ装置は、釣合い錘の昇降を案内するガイドレールに支持台を取り 付け、支持台の上に卷上機が取り付けられた取付部材が弾性部材を介して取付けら れている。取付部材には、ガイドレールの長手方向に摺動可能に取付部材を保持す るとともに、取付部材の水平方向の振れを防止する振止部材が取付部材の上下に設 けられている。振止部材は、弾性部材を介してガイドレールを挟み込んでいる。  [0002] In a conventional elevator apparatus, a support base is attached to a guide rail that guides the lifting and lowering of the counterweight, and a mounting member on which the lifting machine is attached is attached via an elastic member on the support base. . The mounting member is provided with upper and lower members that hold the mounting member slidably in the longitudinal direction of the guide rail and prevent the mounting member from swinging in the horizontal direction. The bracing member sandwiches the guide rail via an elastic member.
[0003] 卷上機は、力ご及び釣合い錘を懸架する懸架手段である主索が巻き掛けられる駆動 綱車を有し、駆動綱車を駆動することでかご及び釣合い錘を昇降させる。卷上機に は、主索によって垂直方向の力が作用し、この力によって卷上機を介して取付部材 にモーメントが作用する。このモーメントを取付部材の上下に設けられた振止部材で ガイドレールに支持され、支持台で卷上機に作用した垂直方向の力を支持する。そ して、支持台の上に設けられた弾性部材と振止部材に設けられた弾性部材で卷上 機の振動がガイドレールへ伝達されるのを抑えて 、る。(特許文献 1参照)  [0003] The hoisting machine has a driving sheave around which a main rope, which is a suspension means for suspending the force cage and the counterweight, is wound, and the car and the counterweight are moved up and down by driving the driving sheave. A vertical force is applied to the lifting machine by the main rope, and a moment is applied to the mounting member via the lifting machine by this force. This moment is supported on the guide rail by the anti-vibration members provided above and below the mounting member, and the vertical force acting on the lifting machine is supported by the support base. Then, the vibration of the lifting machine is suppressed from being transmitted to the guide rail by the elastic member provided on the support base and the elastic member provided on the anti-vibration member. (See Patent Document 1)
[0004] 特許文献1 :1\^0027079068公報(第8— 10頁、第 2図) [0004] Patent Document 1: 1 \ ^ 0027079068 Publication (page 8-10, Fig. 2)
発明の開示  Disclosure of the invention
発明が解決しょうとする課題  Problems to be solved by the invention
[0005] 以上のように、従来のエレベータ装置は、懸架手段である主索によって取付部材に 作用したモーメントを振止部材でガイドレールに支持されるので、ガイドレールには曲 げモーメントが作用する。このため、ガイドレールのサイズを大きくして、曲げモーメン トによるガイドレールの変形などを防止する必要があり、製造コストゃ据付コストが増 大するという問題があった。  [0005] As described above, in the conventional elevator apparatus, the moment acting on the mounting member by the main rope as the suspension means is supported on the guide rail by the retaining member, so that the bending moment acts on the guide rail. . For this reason, it is necessary to increase the size of the guide rail to prevent the guide rail from being deformed by a bending moment, resulting in an increase in manufacturing cost and installation cost.
[0006] この発明は、力かる問題点を解決するためになされたもので、ガイドレールに作用す る曲げモーメントを小さくすることができるエレベータ装置を得ることを目的とする。 課題を解決するための手段 [0006] The present invention has been made in order to solve the problem of power and acts on the guide rail. An object of the present invention is to obtain an elevator apparatus that can reduce the bending moment. Means for solving the problem
[0007] この発明に係るエレベータ装置にお!、ては、卷上機が取り付けられ、水平方向から 視てガイドレールの長手方向の範囲に少なくとも一部分を含むように配置された卷上 機取付部を有し、ガイドレールの長手方向の範囲内で卷上機取付部に取り付けられ たレール取付部力 ガイドレールの長手方向における卷上機取付部の取り付け範囲 に跨って、ガイドレールに取り付けられたものである。  [0007] In the elevator apparatus according to the present invention, the hoisting machine is mounted, and the hoisting machine mounting part is disposed so as to include at least a part in the longitudinal direction of the guide rail as viewed from the horizontal direction. The rail mounting part force that is attached to the lifting machine mounting part within the longitudinal range of the guide rail is attached to the guide rail across the mounting range of the lifting machine mounting part in the longitudinal direction of the guide rail. Is.
発明の効果  The invention's effect
[0008] この発明は、ガイドレールの長手方向の範囲内で卷上機取付部に取り付けられた レール取付部力 ガイドレールの長手方向における卷上機取付部の取り付け範囲に 跨って、ガイドレールに取り付けられることにより、卷上機に作用された力が卷上機取 付部を介してガイドレールに曲げモーメントが生じても、卷上機取付部の取り付け範 囲における断面性能が向上するため、ガイドレールに作用する曲げモーメントを小さ くすることがでさる。  [0008] The present invention provides a guide rail that spans the mounting range of the hoisting machine mounting portion in the longitudinal direction of the guide rail, over the mounting range of the hoisting machine mounting portion in the longitudinal direction of the guide rail. As a result, the cross-sectional performance in the mounting range of the lifting machine mounting portion is improved even if a bending moment is generated in the guide rail via the lifting machine mounting portion due to the force applied to the lifting machine. It is possible to reduce the bending moment acting on the guide rail.
図面の簡単な説明  Brief Description of Drawings
[0009] [図 1]実施の形態 1におけるエレベータ装置の全体構成図を示す図である。  FIG. 1 shows an overall configuration diagram of an elevator apparatus according to a first embodiment.
[図 2]実施の形態 1における卷上機取付機構の正面図を示す図である。  FIG. 2 is a diagram showing a front view of the lifting machine mounting mechanism in the first embodiment.
[図 3]図 2の断面 A— Aを示す図である。  FIG. 3 is a view showing a cross section AA of FIG.
[図 4]図 2の上面図である。  FIG. 4 is a top view of FIG.
[図 5]図 2の断面 B— Bを示す図である。  FIG. 5 is a view showing a cross section BB in FIG. 2.
[図 6]実施の形態 1における卷上機取付機構の枠体の構造を示す図であり、 (a)は正 面図、(b)は側面図である。  FIG. 6 is a view showing the structure of the frame of the hoisting machine attachment mechanism in Embodiment 1, (a) is a front view, and (b) is a side view.
[図 7]実施の形態 1における卷上機取付機構の下側のガイド部を示す図であり、 (a) は正面図、(b)は下面図、(c)は (a)の断面 C Cである。  FIG. 7 is a view showing a lower guide portion of the lifting machine mounting mechanism in Embodiment 1, (a) is a front view, (b) is a bottom view, and (c) is a cross-section CC of (a). It is.
[図 8]実施の形態 1における卷上機取付機構の上側のガイド部を示す図であり、 (a) は正面図、(b)は下面図、(c)は (a)の断面 D— Dである。  FIG. 8 is a view showing the upper guide part of the lifting machine mounting mechanism in Embodiment 1, (a) is a front view, (b) is a bottom view, and (c) is a cross section D— D.
[図 9]卷上機取付機構の据付作業の手順を示すフローチャートである。  FIG. 9 is a flowchart showing a procedure for installing the lifting machine mounting mechanism.
[図 10]卷上機取付機構の据付作業状態を示す図である。 [図 11]図 9の下面図である。 FIG. 10 is a diagram showing an installation work state of the lifting machine mounting mechanism. FIG. 11 is a bottom view of FIG. 9.
[図 12]実施の形態 2における卷上機取付機構の正面図を示す図である。  FIG. 12 shows a front view of the lifting machine mounting mechanism in the second embodiment.
[図 13]図 11の断面 E—Eを示す図である。 FIG. 13 is a view showing a cross section EE of FIG.
[図 14]実施の形態 2における卷上機取付機構の上部の要部拡大図の正面図である [図 15]実施の形態 2における卷上機取付機構の上部の要部拡大図の側面図である [図 16]図 14の断面 G— Gを示す図である。  FIG. 14 is a front view of an enlarged view of the main part of the upper part of the hoisting machine attachment mechanism in the second embodiment. FIG. 15 is a side view of an enlarged view of the main part of the upper part of the hoisting machine attachment mechanism in the second embodiment. FIG. 16 is a view showing a cross section GG of FIG.
[図 17]実施の形態 3におけるエレベータ装置の全体構成図を示す図である。  FIG. 17 shows an overall configuration diagram of an elevator apparatus according to a third embodiment.
[図 18]実施の形態 3における卷上機取付機構を示す図である。 FIG. 18 is a view showing a lifting machine mounting mechanism according to the third embodiment.
符号の説明 Explanation of symbols
1 昇降路、 2 かご、 3a, 3b かごのガイドレール 1 hoistway, 2 car, 3a, 3b car guide rail
4 釣合い錘、 5a, 5b 釣合い錘のガイドレール 4 counterweight, 5a, 5b counterweight guide rail
6 卷上機、 6a 駆動綱車、 6b 駆動部 6 Hoisting machine, 6a drive sheave, 6b drive unit
7 卷上機取付機構、 8 釣合い錘用吊り車 7 Lifting machine mounting mechanism, 8 Balance weight suspension
9 力ご用吊り車、 10 懸架手段、 12 懸架手段取付部 9 Suspension wheel, 10 suspension means, 12 suspension means mounting
13 卷上機取付機構、 14 カゝご用吊り車、 15 卷上機、 16 卷上機取付機構 31 , 51a, 51b レール底部、 32, 52a, 52b レール案内部 13 Hoisting machine mounting mechanism, 14 car suspension car, 15 Hoisting machine, 16 Hoisting machine mounting mechanism 31, 51a, 51b Rail bottom, 32, 52a, 52b Rail guide
53, 53a, 53b, 53c, 53d レールブラケット 53, 53a, 53b, 53c, 53d Rail bracket
55a, 55b レール取付面 55a, 55b Rail mounting surface
71 卷上機取付部、 72 レール取付部 71 Hoisting machine mounting part, 72 Rail mounting part
711 枠体、 715a, 715b, 715c, 715d 弾性体 711 frame, 715a, 715b, 715c, 715d elastic body
721a, 721b 部材、 722a, 722b 当接部 721a, 721b member, 722a, 722b contact part
73 レール連結部、 74 部分当接部、 75 制限体、 76 調整部材 73 Rail connection part, 74 Partial contact part, 75 Restriction body, 76 Adjustment member
81a, 81b, 82a, 82b ガイド部、 814, 824 取付手段 81a, 81b, 82a, 82b guide, 814, 824 mounting means
91 卷上機取付部、 92 レール取付部 91 Hoisting machine mounting part, 92 Rail mounting part
912, 913 ガイド部、 921 当接部 912, 913 Guide part, 921 Abutment part
発明を実施するための最良の形態 [0011] 以下、この発明の好適な実施の形態について図面を参照して説明する。 BEST MODE FOR CARRYING OUT THE INVENTION Hereinafter, preferred embodiments of the present invention will be described with reference to the drawings.
[0012] 実施の形態 1. [0012] Embodiment 1.
図 1は、この発明を実施するための実施の形態 1におけるエレベータ装置の全体構 成図を示す。  FIG. 1 shows an overall configuration diagram of an elevator apparatus according to Embodiment 1 for carrying out the present invention.
図 1において、昇降路 1内には、乗客を乗せて昇降する力ご 2と、力ご 2の両側にそ れぞれ設けられ、力ご 2の昇降を案内するかご 2のガイドレール 3a、 3bと、かご 2の昇 降方向と反対方向に昇降する釣合い錘 4と、釣合い錘 4の両側にそれぞれ設けられ 、釣合い錘 4の昇降を案内する釣合い錘 4のガイドレール 5a、 5bとを有している。釣 合い錘 4の上側で昇降路 1の上部に、かご 2及び釣合い錘 4の昇降の動力源となる卷 上機 6が設けられている。卷上機 6は、力ご 2及び釣合い錘 4を懸架する懸架手段 10 が巻き掛けられる駆動綱車 6aと、この駆動綱車 6aを回転させる駆動部 6bとを有して いる。また、昇降路 1の上部に卷上機 6をガイドレール 5a、 5bの間に取り付けるため の卷上機取付機構 7が設けられており、本実施の形態はこの卷上機取付機構 7に特 徴を有しており、その詳細は後述する。  In FIG. 1, in the hoistway 1, there are a force cage 2 that lifts and lowers passengers and a cage 2 that is provided on both sides of the force cage 2 and guides the elevator 2 to and from the cage 2. 3b, a counterweight 4 that moves up and down in the direction opposite to the ascending / descending direction of the car 2, and a counterweight 4 guide rails 5a and 5b provided on both sides of the counterweight 4 for guiding the lifting and lowering of the counterweight 4, respectively. is doing. A lifting machine 6 serving as a power source for raising and lowering the car 2 and the counterweight 4 is provided above the counterweight 4 and above the hoistway 1. The hoisting machine 6 includes a driving sheave 6a around which a suspension means 10 for suspending the force 2 and the counterweight 4 is wound, and a driving unit 6b that rotates the driving sheave 6a. In addition, a lifting machine mounting mechanism 7 for mounting the lifting machine 6 between the guide rails 5a and 5b is provided at the upper part of the hoistway 1, and this embodiment is special to this lifting machine mounting mechanism 7. The details will be described later.
[0013] 釣合い錘 4の上部には釣合い錘用吊り車 8が取り付けられており、かご 2の下部に はかご用吊り車 9が取り付けられている。懸架手段 10は、一端がかご 2のガイドレー ル 3aの上端の懸架手段取付部 11に固定され、他端が卷上機取付機構 7に設けられ た懸架手段取付部 12に固定される。そして、懸架手段 10は、釣合い錘用吊り車 8、 駆動綱車 6a、力ご用吊り車 9に巻き掛けられて、力ご 2及び釣合い錘 4を懸架する。こ のエレベータ装置は、卷上機 6の駆動綱車 6aを回転させることで、懸架手段 10を介 してかご 2及び釣合 、錘 4を昇降させる。  [0013] A counterweight suspension wheel 8 is attached to the upper portion of the counterweight 4, and a cage suspension wheel 9 is attached to the lower portion of the cage 2. One end of the suspension means 10 is fixed to the suspension means attachment portion 11 at the upper end of the guide rail 3 a of the car 2, and the other end is fixed to the suspension means attachment portion 12 provided in the lifting machine attachment mechanism 7. The suspension means 10 is wound around the counterweight suspension wheel 8, the driving sheave 6 a, and the force suspension wheel 9 to suspend the force 2 and the counterweight 4. In this elevator apparatus, the car 2 and the balance 4 and the weight 4 are lifted and lowered via the suspension means 10 by rotating the driving sheave 6 a of the hoisting machine 6.
[0014] 次に、卷上機取付機構 7について詳述する。  Next, the lifting machine mounting mechanism 7 will be described in detail.
図 2は卷上機取付機構 7の構造を示す正面図で、図 3は図 2の A— A断面図であり 、図 4は図 2の上面図、図 5は図 2の B— B断面図である。  2 is a front view showing the structure of the lifting machine mounting mechanism 7, FIG. 3 is a cross-sectional view taken along line AA in FIG. 2, FIG. 4 is a top view of FIG. 2, and FIG. FIG.
[0015] まず、ガイドレール 5a、 5bについて説明する。図 2及び図 4に示すように、ガイドレ ール 5a、 5bは、長手方向に複数のレールブラケット 53を介して昇降路壁に固定され る。複数のレールブラケット 53の一群 53a、 53bは、それぞれガイドレール 5a、 5bの 上部に配置される。他群のレールブラケット 53c、 53dはレールブラケット 53a、 53b に対して所定の間隔(図 2の H)をおいて配置される。また、図 5に示すように、ガイド レール 5aはレール底部 5 laと、このレール底部 5 laに立設して釣合い錘 4の昇降を 案内するレール案内部 52aとを有している。そして、クリップ 54をガイドレール 5aのレ 一ル底部 5 laとレールブラケット 53とを挟み込んで、ガイドレール 5aとレールブラケッ ト 53とが取り付けられる。他方のガイドレール 5bについては説明を省略する力 ガイ ドレール 5aと同様に構成されて!、る。 [0015] First, the guide rails 5a and 5b will be described. As shown in FIGS. 2 and 4, the guide rails 5a and 5b are fixed to the hoistway wall via a plurality of rail brackets 53 in the longitudinal direction. A group 53a and 53b of the plurality of rail brackets 53 are respectively arranged on the upper portions of the guide rails 5a and 5b. Rail brackets 53c and 53d of other groups are rail brackets 53a and 53b Are arranged at a predetermined interval (H in FIG. 2). Further, as shown in FIG. 5, the guide rail 5a has a rail bottom portion 5la and a rail guide portion 52a that stands on the rail bottom portion 5la and guides the lifting and lowering of the counterweight 4. Then, the guide rail 5a and the rail bracket 53 are attached with the clip 54 sandwiched between the rail bottom 5la of the guide rail 5a and the rail bracket 53. The other guide rail 5b is configured in the same manner as the force guide rail 5a, which will not be described.
[0016] 卷上機取付機構 7は、卷上機 6を取り付ける卷上機取付部 71と、卷上機取付部 71 に取り付けられるとともに、ガイドレール 5a、 5bに取り付けられるレール取付部 72から 構成されている。レール取付部 72は、 L字状の板状に形成された部材 721a, 721b を有している。この部材 721aと 721bに卷上機取付部 71が取り付けられ、それぞれ、 ガイドレール 5a、 5bの上部に取り付けられる。  [0016] The hoisting machine mounting mechanism 7 includes a hoisting machine mounting part 71 for mounting the hoisting machine 6 and a rail mounting part 72 that is mounted on the hoisting machine mounting part 71 and mounted on the guide rails 5a and 5b. Has been. The rail attachment portion 72 has members 721a and 721b formed in an L-shaped plate shape. The hoisting machine mounting portion 71 is mounted on the members 721a and 721b and mounted on the upper portions of the guide rails 5a and 5b, respectively.
[0017] 卷上機取付部 71は、枠体 711を有し、水平方向力 視てガイドレール 5a、 5bの長 手方向の範囲内に配置している。図 6は枠体 711の構造を示す図であり、(a)は正面 図で、(b)は側面図である。図 6に示すように、枠体 711は、縦部材 711a、 711bの上 下に、横部材 712a、 712bを固定して構成されている。枠体 711の下部に、縦部材 7 l la、 71 lbの一側側面に設けられた下側固定台 713a、 713bが取り付けられている 。また、枠体 711の上部に、横部材 712bの一側側面の左右に設けられた上側固定 台 714a、 714bが取り付けられている。  [0017] The hoisting machine mounting portion 71 has a frame body 711 and is disposed within the range of the guide rails 5a and 5b in the longitudinal direction as viewed in the horizontal direction. 6A and 6B are diagrams showing the structure of the frame body 711, where FIG. 6A is a front view and FIG. 6B is a side view. As shown in FIG. 6, the frame 711 is configured by fixing the horizontal members 712a and 712b above and below the vertical members 711a and 711b. Under the frame body 711, lower fixing bases 713a and 713b provided on one side surface of the vertical members 7 lla and 71 lb are attached. Further, upper fixing bases 714a and 714b provided on the left and right of one side surface of the lateral member 712b are attached to the upper portion of the frame body 711.
[0018] 図 2に示すように、この枠体 711に、卷上機 6の下部が下側固定台 713a、 713bに、 卷上機 6の上部が上側固定台 714a、 714b〖こ、それぞれ弾性体 715a、 715bと弾性 体 716a、 716bを介して取り付けられている。このとき、図 3に示すように、駆動綱車 6 aに巻き掛けられて垂下する懸架手段 10が枠体 711と接触しないよう、卷上機 6の駆 動綱車 6aは枠体 711に対してずれた位置に配置される。また、下部の横部材 712a には、懸架手段取付部 12が設けられている。この懸架手段取付部 12に懸架手段 10 の端部が取り付けられる。  [0018] As shown in FIG. 2, in this frame body 711, the lower part of the hoisting machine 6 is the lower fixing base 713a, 713b, and the upper part of the hoisting machine 6 is the upper fixing base 714a, 714b. It is attached via the bodies 715a and 715b and the elastic bodies 716a and 716b. At this time, as shown in FIG. 3, the driving sheave 6a of the hoisting machine 6 is in contact with the frame 711 so that the suspension means 10 that hangs around the driving sheave 6a and does not come into contact with the frame 711. It is arranged at a position shifted. Further, a suspension means mounting portion 12 is provided on the lower lateral member 712a. The end of the suspension means 10 is attached to the suspension means attachment portion 12.
[0019] 卷上機取付部 71には、ガイド部 81a、 81b, 82a、 82bを有している。ガイド部 81a、 81bが枠体 711の下部の両側に設けられ、ガイド部 82a、 82bが枠体 711の上部の 両側に設けられている。図 7は下部のガイド部 81a、 81bを示す図であり、(a)は正面 図、(b)は上面図、(c)は D— D断面図である。また、図 8は上部のガイド部 82a、 82b を示す図であり、(a)は正面図、(b)は下面図、(c)は C C断面図である。 [0019] The lifting machine mounting portion 71 includes guide portions 81a, 81b, 82a, and 82b. Guide portions 81 a and 81 b are provided on both sides of the lower portion of the frame body 711, and guide portions 82 a and 82 b are provided on both sides of the upper portion of the frame body 711. FIG. 7 is a view showing the lower guide portions 81a and 81b, where (a) is a front view. (B) is a top view and (c) is a DD cross-sectional view. FIG. 8 is a view showing the upper guide portions 82a and 82b, in which (a) is a front view, (b) is a bottom view, and (c) is a CC cross-sectional view.
[0020] 図 7に示すようにガイド部 81aは、横部材 712aの下面に取り付けられる第 1の取付部 811aとレール取付部 72の部材 721aに取り付けられる第 2の取付部 812aを有して いる。また、ガイド部 81aは第 1の取付部 81 laにガイドレール 5aのレール案内部 52a を囲んで係合される係合部 813aを有し、ガイドレール 5aに摺動可能なように構成さ れている。また、ガイド部 81aには、上方向力も視た投影上で部材 721aに対して離 脱可能に取り付けられる取付手段 814を第 1の取付部 81 laに設けている。取付手段 814は例えば長穴 815とボルト 816で構成されており、ガイド部 81aは、長穴 815を 介してボルト 816により横部材 712aに取り付けられて 、る。他方のガイド部 8 lbにつ いては説明を省略するが、同様にガイドレール 5bに摺動可能なように構成され、レー ル取付部 72の部材 721bに取り付けられるように構成されている。  As shown in FIG. 7, the guide portion 81a has a first attachment portion 811a attached to the lower surface of the lateral member 712a and a second attachment portion 812a attached to the member 721a of the rail attachment portion 72. . The guide portion 81a has an engaging portion 813a engaged with the first mounting portion 81la so as to surround the rail guide portion 52a of the guide rail 5a, and is configured to be slidable on the guide rail 5a. ing. Further, the guide portion 81a is provided with attachment means 814 on the first attachment portion 81la, which is detachably attached to the member 721a in the projection in which the upward force is also viewed. The attaching means 814 includes, for example, an elongated hole 815 and a bolt 816, and the guide portion 81a is attached to the lateral member 712a by the bolt 816 through the elongated hole 815. The description of the other guide portion 8 lb is omitted, but is similarly configured to be slidable on the guide rail 5b and is configured to be attached to the member 721b of the rail attachment portion 72.
[0021] 同様に、ガイド部 82aは、図 8に示すように、横部材 712bの上面に取り付けられる 第 1の取付部 821aとレール取付部 72の部材 721aに取り付けられる第 2の取付部 82 2aを有している。また、ガイド部 82aは第 1の取付部 821aにガイドレール 5aのレール 案内部 52aを囲んで係合される係合部 823aを有し、ガイドレール 5aに摺動可能なよ うに構成されている。また、ガイド部 82aには、上方向力も視た投影上で部材 721aに 対して離脱可能に取り付けられる取付手段 824を第 1の取付部 821aに設けている。 取付手段 824は例えば長穴 825とボルト 826で構成されており、ガイド部 82aは、長 穴 825を介してボルト 826により横部材 712bに取り付けられている。他方のガイド部 82bについては説明を省略する力 同様にガイドレール 5bに摺動可能なように構成 され、レール取付部 72の部材 721bに取り付けられるように構成されている。  Similarly, as shown in FIG. 8, the guide portion 82a has a first attachment portion 821a attached to the upper surface of the transverse member 712b and a second attachment portion 82 2a attached to the member 721a of the rail attachment portion 72. have. The guide portion 82a has an engaging portion 823a that is engaged with the first mounting portion 821a so as to surround the rail guide portion 52a of the guide rail 5a, and is configured to be slidable on the guide rail 5a. . In addition, the guide portion 82a is provided with attachment means 824 on the first attachment portion 821a that is detachably attached to the member 721a in the projection in which the upward force is also viewed. The attachment means 824 includes, for example, a long hole 825 and a bolt 826, and the guide portion 82a is attached to the lateral member 712b with the bolt 826 through the long hole 825. The other guide portion 82b is configured to be slidable on the guide rail 5b in the same manner as the force that omits the description, and is configured to be attached to the member 721b of the rail attachment portion 72.
[0022] 次に、レール取付部 72の詳細について説明する。前述のように、レール取付部 72に ίま咅材 721a, 721bを有して!/ヽる。この咅材 721a、 721bに、それぞれガイド咅 81a、 82a及びガイド部 81b、 82bが取り付けられて、ガイドレール 5a、 5bの長手方向の範 囲内で卷上機取付部 71がレール取付部 72に取り付けられる。また、部材 721aは、 ガイドレール 5aの長手方向における卷上機取付部の取り付け範囲、即ち、ガイド部 8 la、 82aを含んだガイドレール 5aの長手方向の範囲に跨ってガイドレール 5aに取り 付けられている。 Next, the details of the rail mounting portion 72 will be described. As described above, the rail mounting portion 72 has the slabs 721a and 721b. Guide rods 81a and 82a and guide portions 81b and 82b are attached to the saddle members 721a and 721b, respectively, and the lifting machine attachment portion 71 is attached to the rail attachment portion 72 within the longitudinal range of the guide rails 5a and 5b. It is done. In addition, the member 721a is attached to the guide rail 5a across the installation range of the lifting machine mounting portion in the longitudinal direction of the guide rail 5a, that is, the longitudinal range of the guide rail 5a including the guide portions 8la and 82a. It is attached.
[0023] さらに、部材 721aは、下側のレールブラケット 53cの近傍までガイドレール 5aに取り 付けられている。即ち、部材 721aは、実質的にガイドレール 5aの昇降路壁の取り付 け間隔を含んだ範囲に跨ってガイドレール 5aに取り付けられている。また、図 7, 8に 示すように、ガイドレール 5aは、レール底部 51aにレール案内部 52aと反対側のレー ル取付面 55aを有し、部材 721aは、このレール取付面 55aに取り付けられている。そ して、図 2に示すように、部材 721aの上部の当接部 722aが、上方向から視た投影上 でガイドレール 5aの上端と重なるように配置されている。また、図 7, 8に示すように、 ガイドレール 5bは、レール底部 51bにレール案内部 52bと反対側のレール取付面 55 bを有し、部材 721bは、このレール取付面 55bに取り付けられている。そして、図 2に 示すように、部材 721bの上部の当接部 722bが、上方向から視た投影上でガイドレ ール 5bの上端と重なるように配置されて 、る。  [0023] Further, the member 721a is attached to the guide rail 5a up to the vicinity of the lower rail bracket 53c. That is, the member 721a is attached to the guide rail 5a so as to extend over a range substantially including the mounting space of the hoistway wall of the guide rail 5a. As shown in FIGS. 7 and 8, the guide rail 5a has a rail mounting surface 55a on the rail bottom 51a opposite to the rail guide 52a, and the member 721a is mounted on the rail mounting surface 55a. Yes. As shown in FIG. 2, the upper contact portion 722a of the member 721a is disposed so as to overlap the upper end of the guide rail 5a when viewed from above. As shown in FIGS. 7 and 8, the guide rail 5b has a rail mounting surface 55b on the rail bottom 51b opposite to the rail guide 52b, and the member 721b is mounted on the rail mounting surface 55b. Yes. As shown in FIG. 2, the upper contact portion 722b of the member 721b is arranged so as to overlap the upper end of the guide rail 5b on the projection viewed from above.
[0024] また、図 2, 7, 8に示すように、部材 721aは、ガイドレール 5aの長手方向に対して所 定の間隔に、クリップ 54でレール底部 51aを挟み込んでガイドレール 5aに取り付けら れる。他方の部材 721bについては説明を省略する力 部材 721aと同様に構成され ている。  In addition, as shown in FIGS. 2, 7, and 8, the member 721a is attached to the guide rail 5a with a clip 54 sandwiching the rail bottom 51a at a predetermined interval with respect to the longitudinal direction of the guide rail 5a. It is. The other member 721b is configured in the same manner as the force member 721a whose description is omitted.
[0025] 以上のように、レール取付部 72は、ガイドレール 5a、 5bの長手方向の範囲内で卷上 機取付部 71に取り付けられ、ガイドレール 5a、 5bの長手方向における卷上機取付 部 71の取り付け範囲に跨って、ガイドレール 5a、 5bに取り付けられている。さらに、レ 一ル取付部 72は、実質的にガイドレール 5a、 5bの昇降路壁の取り付け間隔を含ん だ範囲に跨って、ガイドレール 5a、 5bに取り付けられている。  [0025] As described above, the rail mounting portion 72 is attached to the lifting machine mounting portion 71 within the longitudinal direction of the guide rails 5a and 5b, and the lifting machine mounting portion in the longitudinal direction of the guide rails 5a and 5b. It is attached to the guide rails 5a and 5b over the attachment range of 71. Furthermore, the rail attachment portion 72 is attached to the guide rails 5a and 5b so as to substantially span the range including the attachment interval of the hoistway walls of the guide rails 5a and 5b.
[0026] また、卷上機取付機構 7には、レール連結部 73が部材 721a、 721bの当接部 722a 、 722bに取り付けられて、ガイドレール 5aとガイドレール 5bの上部側でガイドレール 5aとガイドレール 5bを互 、に連結して!/、る。  [0026] Further, in the hoisting machine mounting mechanism 7, the rail connecting portion 73 is attached to the contact portions 722a and 722b of the members 721a and 721b, and the guide rail 5a and the guide rail 5a are connected to the upper side of the guide rail 5b. Connect the guide rails 5b to each other!
[0027] 次に、卷上機取付機構 7の据付方法について図 9、 10, 11を用いて説明する。図 9 は据付作業の手順を示すフローチャートである。図 10は据付作業状態を示す図で、 図 11は図 10の下面図を示す図である。  Next, a method for installing the lifting machine mounting mechanism 7 will be described with reference to FIGS. Figure 9 is a flowchart showing the installation procedure. FIG. 10 is a diagram showing a state of installation work, and FIG. 11 is a diagram showing a bottom view of FIG.
まず、ガイドレール 5a、 5bをレールブラケット 53とクリップ 54を介して昇降路 1内に立 設する(図 9の SI)。次に、レール取付部 72の部材 721a、 721bをクリップ 54を介し てガイドレーノレ 5a、 5bの上咅に取り付ける(図 9の S2)。なお、咅材 721a、 721bをガ イドレール 5a、 5bに取り付けた状態でガイドレール 5a、 5bを立設してもよい。次に、 図 10【こ示すよう【こ、卷上機 6を枠体 711【こ弹 '14体 715a、 715b, 716a, 716bを介し て取り付けた状態で、昇降路 1の底部に置 図 9の S3)。このとき卷上機 6及び枠体 711はガイドレール 5a、 5bの間に置く。なお、卷上機 6、枠体 711をそれぞれ別個に ガイドレール 5a、 5bの間に置いた後、卷上機 6を枠体 711に取り付けるようにしてもよ い。 First, guide rails 5a and 5b are set up in hoistway 1 via rail bracket 53 and clip 54. (SI in Fig. 9). Next, the members 721a and 721b of the rail attachment portion 72 are attached to the upper arm of the guide lanes 5a and 5b via the clip 54 (S2 in FIG. 9). Note that the guide rails 5a and 5b may be erected in a state where the saddle members 721a and 721b are attached to the guide rails 5a and 5b. Next, as shown in Fig. 10, with the hoisting machine 6 attached to the bottom of the hoistway 1 with the frame body 711 [14 'body 14 715a, 715b, 716a, 716b attached] S3). At this time, the lifting machine 6 and the frame 711 are placed between the guide rails 5a and 5b. The lifting machine 6 and the frame body 711 may be separately placed between the guide rails 5a and 5b, and then the lifting machine 6 may be attached to the frame body 711.
[0028] 次に、ガイド咅 81a, 82a, 81b、 82bを枠体 711に取り付ける(図 9の S4)。このとき、 図 11に示すように、ガイド部 8 laをガイドレール 5aに係合させる。また、ガイド部 8 la は、取付手段 814の長穴 815とボルト 816を用いて、上方向から視た投影上で部材 7 21aに対して離脱するように取り付けられる。ガイド部 81bについても、ガイド部 81aと 同様に枠体 711に取り付けられる。ガイド部 82a、 82bについては図示しないが、ガイ ド部 81aと同様に枠体 711に取り付けられる。これにより、卷上機 6及び卷上機取付 部 71はガイドレール 5a、 5bに摺動可能に保持されたことになる。なお、ガイド部 81a 、 81b、 82a、 82bは枠体 711を昇降路 1の底部に置く時に取り付けてもよい。  Next, the guide rods 81a, 82a, 81b, and 82b are attached to the frame body 711 (S4 in FIG. 9). At this time, as shown in FIG. 11, the guide portion 8 la is engaged with the guide rail 5a. The guide portion 8 la is attached to the member 721a so as to be separated from the member 721a on the projection viewed from above by using the elongated hole 815 and the bolt 816 of the attachment means 814. The guide portion 81b is also attached to the frame body 711 in the same manner as the guide portion 81a. The guide portions 82a and 82b are not shown, but are attached to the frame 711 in the same manner as the guide portion 81a. As a result, the lifting machine 6 and the lifting machine mounting portion 71 are slidably held by the guide rails 5a and 5b. The guide portions 81a, 81b, 82a, 82b may be attached when the frame body 711 is placed on the bottom of the hoistway 1.
[0029] 次に、卷上機 6及び卷上機取付部 71を、ガイドレール 5a、 5bに摺動させながら揚重 する(図 9の S5)。このとき、ガイド部 81a、 82aとガイド部 81b、 82bを、上方向から視 た投影上でそれぞれ部材 72 la、 721bに対して離脱するように取り付けているので、 部材 72 laと部材 72 lbの間隔とガイド部 8 la、 82aとガイド部 8 lb、 82bの間隔に隙 間が生じた状態で、卷上機取付部 71を揚重される。卷上機 6及び卷上機取付部 71 が所定の高さまで揚重された後、ボルト 816を緩めて長穴 815に沿って、図 7のように ガイド部 8 laを部材 72 laに接触するようにずらす。そして、ガイド部 81aを部材 721a に取り付けるとともに、ボルト 816を締め付けて卷上機取付部 71に取り付ける。他の ガイド部 82a、 81b、 82bについては説明を省略する力 ガイド部 81aと同様に取り付 ける。これにより、卷上機 6及び卷上機取付部 71がレール取付部 72に取り付けられ たことになる(図 9の S6)。  Next, the hoisting machine 6 and the hoisting machine mounting part 71 are lifted while sliding on the guide rails 5a and 5b (S5 in FIG. 9). At this time, the guide portions 81a and 82a and the guide portions 81b and 82b are attached so as to be separated from the members 72 la and 721b, respectively, on the projection viewed from above, so that the members 72 la and 72 lb The lifting machine mounting part 71 is lifted with a gap between the gap and the guide part 8 la, 82a and the guide part 8 lb, 82b. After hoisting machine 6 and hoisting machine mounting part 71 are lifted to the prescribed height, loosen bolt 816 and follow guide hole 8 la to member 72 la as shown in Fig. 7 along long hole 815. Shift like so. Then, the guide part 81a is attached to the member 721a, and the bolt 816 is tightened and attached to the lifting machine attachment part 71. The other guide portions 82a, 81b, and 82b are attached in the same manner as the force guide portion 81a that is not described. As a result, the lifting machine 6 and the lifting machine mounting part 71 are attached to the rail mounting part 72 (S6 in FIG. 9).
[0030] 次に、図 2に示すようにレール連結部 73を部材 721a、 721bに取り付ける(図 9の S7 ) oなお、レーノレ連結咅 は、咅材 721a、 721bをガイドレーノレ 5a、 5bに取り付ける 時に設置してもよい。以上により、卷上機 6が昇降路 1内に設置される。 Next, as shown in FIG. 2, the rail connecting portion 73 is attached to the members 721a and 721b (S7 in FIG. 9). ) o The Lenore connecting rod may be installed when the brazing materials 721a and 721b are attached to the guide Lenoles 5a and 5b. As described above, the lifting machine 6 is installed in the hoistway 1.
[0031] 次に、卷上機取付機構 7にかかる力について説明する。図 3に示すように、卷上機 6 の駆動綱車 6aには懸架手段 10によって力 Fがかかる。駆動綱車 6aは枠体 711に対 してずれた位置に配置しているため、この力 Fによって卷上機 6を介して卷上機取付 部 71にモーメントが作用する。このモーメントが、卷上機取付部 71とレール取付部 7 2との取り付け位置、即ち、ガイド部 81a、 82aとガイド部 81b、 82bの位置で、それぞ れガイドレール 5a、 5b及びレール取付部 72に対して反力を作用させる。これにより、 ガイドレール 5a、 5b及びレール取付部 72には、それぞれガイド部 81a、 82aとガイド 部 81b、 82bを含んだ長手方向の範囲に曲げモーメントが生じる。  Next, the force applied to the lifting machine mounting mechanism 7 will be described. As shown in FIG. 3, a force F is applied to the driving sheave 6 a of the hoist 6 by the suspension means 10. Since the driving sheave 6a is arranged at a position shifted from the frame 711, a moment acts on the lifting machine mounting portion 71 via the lifting machine 6 by this force F. This moment is applied to the installation position of the lifting machine mounting part 71 and the rail mounting part 72, that is, at the positions of the guide parts 81a and 82a and the guide parts 81b and 82b, respectively, and the guide rails 5a and 5b and the rail mounting part, respectively. A reaction force is applied to 72. As a result, a bending moment is generated in the longitudinal direction including the guide portions 81a and 82a and the guide portions 81b and 82b in the guide rails 5a and 5b and the rail mounting portion 72, respectively.
[0032] また、ガイドレール 5a、 5bの昇降路壁の取り付け間隔、即ち、レールブラケット 53aと 53cの取り付け間隔及びレールブラケット 53bと 53dの取り付け間隔を、含んだ範囲 においても、それぞれガイドレール 5a、 5bに曲げモーメントが作用する。レール取付 部 72は、実質的にガイドレール 5a、 5bの昇降路壁の取り付け間隔を含んだ範囲に 跨って、ガイドレール 5a、 5bに取り付けられており、この範囲においてレール取付部 72にも曲げモーメントが作用する。  [0032] Also, the guide rails 5a, 5b are attached to the hoistway wall, that is, the rails 53a and 53c and the rail brackets 53b and 53d are included in the range including the guide rail 5a, Bending moment acts on 5b. The rail mounting portion 72 is attached to the guide rails 5a and 5b across the range including the mounting interval of the hoistway walls of the guide rails 5a and 5b. In this range, the rail mounting portion 72 is also bent. Moment acts.
[0033] 以上のように、実施の形態 1における卷上機取付機構 7は、卷上機 6を取り付ける卷 上機取付部 71と、卷上機取付部 71をガイドレール 5a、 5bに取り付けるレール取付 部 72から構成されており、レール取付部 72は、ガイドレール 5a、 5bの長手方向の範 囲内で卷上機取付部 71に取り付けられ、ガイドレール 5a、 5bの長手方向における卷 上機取付部 71の取り付け範囲に跨って、ガイドレール 5a、 5bに取り付けられている。 これにより、ガイドレール 5a、 5bの長手方向における卷上機取付部 71の取り付け範 囲において、卷上機取付機構 7の断面性能がガイドレール 5a、 5bのみの場合に対し て向上する。従って、等価的にガイドレール 5a、 5bに作用する曲げモーメントを小さ くすることがでさる。  [0033] As described above, the hoisting machine mounting mechanism 7 in the first embodiment includes the hoisting machine mounting part 71 for mounting the hoisting machine 6 and the rail for mounting the hoisting machine mounting part 71 to the guide rails 5a and 5b. The rail mounting part 72 is attached to the lifting machine mounting part 71 within the longitudinal range of the guide rails 5a and 5b, and is installed in the longitudinal direction of the guide rails 5a and 5b. It is attached to the guide rails 5a and 5b across the attachment range of the portion 71. As a result, the cross-sectional performance of the lifting machine mounting mechanism 7 in the mounting range of the lifting machine mounting portion 71 in the longitudinal direction of the guide rails 5a and 5b is improved as compared with the case where only the guide rails 5a and 5b are used. Therefore, it is possible to reduce the bending moment acting on the guide rails 5a and 5b equivalently.
[0034] また、レール取付部 72は、実質的にガイドレール 5a、 5bの昇降路壁の取り付け間隔 を含んだ範囲に跨って、ガイドレール 5a、 5bに取付けられている。これにより、この範 囲における卷上機取付機構 7の断面性能がガイドレール 5a、 5bのみの場合に対して 向上する。従って、等価的にガイドレール 5a、 5bに作用する曲げモーメントを小さく することができる。 [0034] Further, the rail attachment portion 72 is attached to the guide rails 5a and 5b so as to substantially span the range including the attachment interval of the hoistway walls of the guide rails 5a and 5b. As a result, the cross-sectional performance of the lifting machine mounting mechanism 7 in this range is only for the guide rails 5a and 5b. improves. Therefore, the bending moment acting on the guide rails 5a and 5b can be reduced equivalently.
[0035] また、ガイドレーノレ 5a、 5bは、レーノレ底咅 51a、 51bにレーノレ案内咅 52a、 52bと反 対側のレール取付面 55a、 55bを有し、レール取付部 72は、このレール取付面 55a、 55bに取り付けられている。これにより、レール取付部 72のガイドレール 5a、 5bへの 取り付けにおいて、レール案内部 52a、 52bが阻害されないので、レール取付部 72 が簡素な構造で構成できるとともに、取り付けが容易にできる。  [0035] Further, the guide lenores 5a and 5b have rail mounting surfaces 55a and 55b opposite to the lenore guide rods 52a and 52b on the lenole bottom rods 51a and 51b, and the rail mounting portion 72 has the rail mounting surface 55a. Attached to 55b. Accordingly, since the rail guide portions 52a and 52b are not hindered in the mounting of the rail mounting portion 72 to the guide rails 5a and 5b, the rail mounting portion 72 can be configured with a simple structure and can be easily mounted.
[0036] また、卷上機取付部 71には、ガイドレール 5a、 5bに摺動可能なガイド部 81a、 82a 、 81b、 82bが取り付けられているので、卷上機 6及び卷上機取付部 71を昇降路 1内 の所定の高さに据え付ける際に、ガイドレール 5a、 5bに案内されるため、揚重が安 定にでき、据付作業が容易にできる。  [0036] Further, the lifting machine mounting portion 71 is provided with guide parts 81a, 82a, 81b, 82b that are slidable on the guide rails 5a, 5b. When the 71 is installed at a predetermined height in the hoistway 1, it is guided by the guide rails 5a and 5b, so that the lifting weight can be stabilized and the installation work can be facilitated.
また、ガイド部 81a、 82aとガイド部 81b、 82bは、上方向力ゝら視た投影上でそれぞ れ部材 721a、 721bに対して離脱可能に卷上機取付部 71に取り付けられる取付手 段 814、 824を有している。これにより、部材 721aと部材 721bの間隔と、ガイド部 81 a、 82aとガイド部 81b、 82bの間隔に隙間が生じた状態で、卷上機取付部 71を揚重 すること力 Sできる。そのため、咅材 721a、 721bとガイド咅 81a、 82a, 81b、 82bと力 S こじれることがなく、据付作業が容易にできる。  The guide parts 81a and 82a and the guide parts 81b and 82b are attached to the lifting machine mounting part 71 so as to be detachable from the members 721a and 721b on the projection viewed from the upward force. 814, 824. Accordingly, it is possible to lift the lifting machine mounting portion 71 in a state where a gap is generated between the member 721a and the member 721b and the gap between the guide portions 81a and 82a and the guide portions 81b and 82b. Therefore, the installation work can be facilitated without the force S being twisted with the saddle members 721a, 721b and the guide rods 81a, 82a, 81b, 82b.
[0037] また、ガイド部 81a、 82a、 81b、 82bをレール取付部 72に取り付けるように構成した ので、ガイド部 81a、 82a、 81b、 82bを固定部材として共用し部品点数を削減するこ とができる。さらに、ガイド部 81a、 82a、 81b、 82bをレール取付部 72に対して任意 の位置に取り付けることができ、卷上機 6の取り付け高さを自由に選択できる。  [0037] Further, since the guide portions 81a, 82a, 81b, and 82b are configured to be attached to the rail attachment portion 72, the guide portions 81a, 82a, 81b, and 82b can be shared as a fixing member to reduce the number of parts. it can. Further, the guide portions 81a, 82a, 81b, 82b can be attached to the rail attachment portion 72 at an arbitrary position, and the attachment height of the lifting machine 6 can be freely selected.
[0038] 例えば、昇降路 1の頂部が高い建物の場合、ガイドレール 5a、 5bの上端は昇降路 1 の頂部の建築梁に支持されるため、ガイドレール 5a、 5bの上端も高くする必要がある 。このとき、卷上機 6の取り付け位置がガイドレール 5a、 5bの上端から一律である場 合、卷上機 6も昇降路 1の高い位置に据付けられるため、据付作業者や保守作業者 は必要以上に高い位置で作業をすることになる。本実施の形態では、卷上機 6の取り 付け高さを自由に選択できるので、卷上機 6を必要以上に高く据付ける必要もなぐ 据付作業や保守作業などが容易となる。 [0039] ガイド部 81a、 81b、 82a、 82bをレール取付部 72に取り付け、卷上機 6を弾性体 7 15a、 715b, 716a, 716bを介して卷上機取付部 71に取り付けられているので、卷 上機 6に発生する振動がガイドレール 5a、 5bへ伝播することを抑制するという防振効 果が得られる。また、ガイド部 81a、 82a、 81b、 82bとガイドレール 5a、 5bとの間に弹 性体を設けて防振する必要がなぐ卷上機 6に取り付けられた弾性体 715a、 715b, 716a, 716bで防振することができ、数少ない構成で防振効果が得られる。 [0038] For example, in the case of a building where the top of the hoistway 1 is high, the upper ends of the guide rails 5a, 5b are supported by the building beams at the top of the hoistway 1, so the upper ends of the guide rails 5a, 5b also need to be raised. is there . At this time, if the installation position of the lifting machine 6 is uniform from the upper ends of the guide rails 5a and 5b, the lifting machine 6 is also installed at a higher position in the hoistway 1, so installation workers and maintenance workers are required. You will work at a higher position. In the present embodiment, since the installation height of the lifting machine 6 can be freely selected, installation work, maintenance work and the like that do not require installation of the lifting machine 6 higher than necessary are facilitated. [0039] Since the guide parts 81a, 81b, 82a, 82b are attached to the rail attaching part 72, and the lifting machine 6 is attached to the lifting machine attaching part 71 via the elastic bodies 7 15a, 715b, 716a, 716b. As a result, it is possible to obtain an anti-vibration effect of suppressing the vibration generated in the upper machine 6 from propagating to the guide rails 5a and 5b. In addition, the elastic bodies 715a, 715b, 716a, 716b attached to the lifting machine 6 that do not need to provide vibration isolation between the guide portions 81a, 82a, 81b, 82b and the guide rails 5a, 5b are required. The vibration isolation effect can be obtained with a few configurations.
[0040] また、卷上機 6の振動による図 3の矢印 J方向の振れを卷上機 6の上下に配置した 弾性体 715a、 715b, 716a, 716bで支持されるので、さらに防振効果が向上できる 。なお、卷上機 6の上下にそれぞれ 2個の弾性体を設けたが、これに制限されず、卷 上機の上部中央に 1個、下部中央に 1個の弾性体を設けた構成でもよぐ上下にそ れぞれ 3個以上の弾性体を設けてもょ ヽ。  [0040] Further, the vibration in the direction of arrow J in FIG. 3 due to the vibration of the hoisting machine 6 is supported by elastic bodies 715a, 715b, 716a, 716b arranged above and below the hoisting machine 6. Can be improved. Although two elastic bodies are provided on the upper and lower sides of the lifting machine 6, respectively, the invention is not limited to this, and a configuration in which one elastic body is provided at the upper center of the lifting machine and one elastic body is provided at the lower center. It is also possible to provide three or more elastic bodies on the top and bottom.
[0041] また、卷上機取付機構 7は、ガイドレール 5a、 5bの上部側でガイドレール 5a、 5bを 互いに連結するレール連結部 73を有しているので、ガイドレール 5a、 5bの間隔の開 きを防止することができ、信頼性の高いエレベータ装置を得ることができる。なお、レ ール連結部 73は、部材 721a、 721bに取り付けた力 直接、ガイドレール 5a、 5bの 上部に取り付けてもよい。  [0041] Further, the hoisting machine mounting mechanism 7 has the rail connecting portion 73 that connects the guide rails 5a and 5b to each other on the upper side of the guide rails 5a and 5b. Opening can be prevented, and a highly reliable elevator apparatus can be obtained. The rail connecting portion 73 may be attached directly to the upper portions of the guide rails 5a and 5b directly by the force attached to the members 721a and 721b.
[0042] また、レール取付部 72には、上方向力も視た投影上でガイドレール 5a、 5bの上端 と重なる当接部 722a、 722bを有し、レール取付部 72がこの当接部 722a, 722bを ガイドレール 5a, 5bの上端に接するように取付けられている。これにより、万一、レー ル取付部 72とガイドレール 5a、 5bの締結が緩んでも、卷上機 6にかかる力 Fを当接 部 722a、 722bで支持するので、簡素な構成で信頼性の高いエレベータ装置を得る ことができる。  [0042] Further, the rail mounting portion 72 has contact portions 722a and 722b that overlap with the upper ends of the guide rails 5a and 5b in the projection in which the upward force is also viewed, and the rail mounting portion 72 includes the contact portions 722a, 722b is attached in contact with the upper ends of the guide rails 5a and 5b. As a result, even if the rail mounting part 72 and the guide rails 5a and 5b are loosened, the force F applied to the lifting machine 6 is supported by the contact parts 722a and 722b. High elevator equipment can be obtained.
[0043] なお、当接部 722a, 722bがガイドレール 5a, 5bの上端に接していない状態で取り 付けられている場合でも、万一、レール取付部 72とガイドレール 5a, 5bとの締結が滑 つて、レール取付部 72が下方向へ移動することがあるが、当接部 722a, 722b力ガ イドレール 5a, 5bの上端に引っ掛力つて卷上機 6にかかる力 Fを支持するので、信頼 性の高 、エレベータ装置を得ることができる。  [0043] Even when the contact portions 722a and 722b are attached without being in contact with the upper ends of the guide rails 5a and 5b, the rail mounting portion 72 and the guide rails 5a and 5b are not fastened. As a result, the rail mounting part 72 may move downward, but the force F applied to the hoisting machine 6 is supported by the hooking force on the upper ends of the contact parts 722a, 722b force guide rails 5a, 5b. An elevator apparatus with high reliability can be obtained.
[0044] また、例えば、ガイドレール 5a、 5bに取付穴を設け、この取付穴にボルトを通してレ 一ル取付部 72と締結するようなボルト締結の場合、締結が滑ってもボルトが取付穴と 係合することで卷上機 6にかかる力 Fを支持する。この場合、ガイドレール 5a、 5bには 取付穴をカ卩ェすることはもちろんである力 この取付穴におけるガイドレール 5a、 5b の断面の断面性能が低下し、ガイドレール 5a、 5bの強度が低下する。しかしながら、 本実施の形態によれば、卷上機 6にかかる力 Fを当接部 722a、 722bで支持するの で、ガイドレール 5a、 5bに取付穴をカ卩ェする必要がなぐ強度が低下することもない [0044] Further, for example, mounting holes are provided in the guide rails 5a and 5b, and bolts are passed through the mounting holes. In the case of bolt fastening that is fastened to one mounting portion 72, the force F applied to the lifting machine 6 is supported by the bolt engaging with the mounting hole even if the fastening slips. In this case, the guide rails 5a and 5b are not only forced to cover the mounting holes, but the cross-sectional performance of the guide rails 5a and 5b in these mounting holes is reduced, and the strength of the guide rails 5a and 5b is reduced. To do. However, according to the present embodiment, since the force F applied to the lifting machine 6 is supported by the contact portions 722a and 722b, the strength that does not need to cover the mounting holes in the guide rails 5a and 5b is reduced. Never to
[0045] また、懸架手段 10を取り付ける懸架手段取付部 12が卷上機取付部 71に設けられ ているので、別途、懸架手段を取り付ける部材は不要で部品点数が削減できる。 また、ガイドレール 5a、 5bの上に梁を設けて、その梁の上に卷上機 6を設置すると昇 降路 1の高さ方向の寸法を要するが、本実施の形態は、卷上機 6及び卷上機取付部 71がガイドレール 5a、 5bの長手方向の範囲内に設置しているので、昇降路 1の高さ 方向を増大させることなぐ卷上機 6を設置できる。 [0045] In addition, since the suspension means attachment portion 12 for attaching the suspension means 10 is provided in the lifting machine attachment portion 71, a separate member for attaching the suspension means is unnecessary, and the number of parts can be reduced. Also, if a beam is provided on the guide rails 5a and 5b and the lifting machine 6 is installed on the beam, the height direction of the ascending / descending path 1 is required. 6 and the lifting machine mounting portion 71 are installed within the longitudinal range of the guide rails 5a and 5b, so that the lifting machine 6 can be installed without increasing the height direction of the hoistway 1.
なお、本実施の形態は、卷上機取付部 71が水平方向力も視てガイドレール 5a、 5b の長手方向の範囲内に配置している力 卷上機取付部 71の一部分がガイドレール 5 a、 5bの長手方向の範囲から出るように配置してもよ 、。  In the present embodiment, the lifting machine mounting portion 71 is arranged within the longitudinal range of the guide rails 5a and 5b in view of the horizontal force. May be placed out of the longitudinal range of 5b.
[0046] 実施の形態 2.  [0046] Embodiment 2.
図 12、図 13、図 14、図 15及び図 16は、この発明の実施の形態 2におけるエレべ ータ装置の卷上機取付機構を示すものであり、図 12は正面図、図 13は図 12の断面 E— Eである。図 14は卷上機取付機構の上部の要部拡大図の正面図であり、図 15 は側面図、図 16は図 14の断面 G— Gを示す図である。実施の形態 2は、実施の形態 1に対して、レール取付部 72の上部に、部分当接部 74と制限体 75及び調整部材 76 を設けたものである。その他の点は実施の形態 1と同様であり、説明は省略する。な お、実施の形態 1と同符号のものは相当部分を示す。  12, FIG. 13, FIG. 14, FIG. 15 and FIG. 16 show a lifting machine mounting mechanism for an elevator apparatus according to Embodiment 2 of the present invention. FIG. 12 is a front view, and FIG. It is a cross section EE in FIG. 14 is a front view of an enlarged view of the main part of the upper part of the lifting machine mounting mechanism, FIG. 15 is a side view, and FIG. 16 is a view showing a cross section GG of FIG. The second embodiment is different from the first embodiment in that a partial contact portion 74, a restricting body 75, and an adjusting member 76 are provided on the upper portion of the rail mounting portion 72. The other points are the same as in the first embodiment, and a description thereof will be omitted. Note that the same reference numerals as those in Embodiment 1 denote the corresponding parts.
[0047] ガイドレール 5a側の部分当接部 74と制限体 75及び調整部材 76について、図 14、 図 15及び図 16を用いて説明する。図において、レール取付部 72の当接部 722aと ガイドレール 5aの上端との間に、部分当接部 74を設けている。また、部分当接部 74 は、上方向力 視た投影上でガイドレール 5aの上端の中央の一部分と重なるように 配置されている。また、部分当接部 74は当接部 722aに取付けられている。 [0047] The partial contact portion 74, the limiting body 75, and the adjustment member 76 on the guide rail 5a side will be described with reference to FIGS. 14, 15, and 16. FIG. In the figure, a partial contact portion 74 is provided between the contact portion 722a of the rail mounting portion 72 and the upper end of the guide rail 5a. Further, the partial contact portion 74 overlaps with a part of the center of the upper end of the guide rail 5a on the projection viewed from above. Has been placed. Further, the partial contact portion 74 is attached to the contact portion 722a.
[0048] 制限体 75は、棒状の制限体、例えば一対のボルト 75a、 75bから構成され、レール 取付部 72の上部に設けられている。ボルト 75a、 75bは下面がガイドレール 5aの上 端より下に位置し、且つ、各々がガイドレール 5aの案内部 52aの両側に設けられてい る。これにより、制限体 75はレール取付部 72の水平方向の移動を制限する。また、 ボノレト 75a、 75bは当接咅 722aにレーノレ連結咅 とともに蹄結されて!/、る。  The restricting body 75 is composed of a rod-like restricting body, for example, a pair of bolts 75a and 75b, and is provided on the upper portion of the rail mounting portion 72. The bottom surfaces of the bolts 75a and 75b are located below the upper end of the guide rail 5a, and the bolts 75a and 75b are provided on both sides of the guide portion 52a of the guide rail 5a. Thereby, the restricting body 75 restricts the horizontal movement of the rail mounting portion 72. Bonoleto 75a and 75b are hoofed together with a Lenore connecting rod at the abutment rod 722a!
[0049] 調整部材 76は当接部 722aとガイドレール 5aの上端との間に配置され、板状に形成 されている。なお、ここでは、調整部材 76は部分当接部 74とガイドレール 5aの上端と の間に配置されている。ガイドレール 5aの組付け誤差により、当接部 722aとガイドレ ール 5aの上端との間隔に誤差が生じる場合がある。このとき、その間隔の誤差に相 当する枚数の調整部材 76を配置して、当接部 722aとガイドレール 5aの上端との間 隔を調整する。また、調整部材 76には穴が形成され、この穴にボルト 75a、 75bが貫 通している。なお、ガイドレール 5b側については説明を省略する力 ガイドレール 5a 側と同様に構成されている。  [0049] The adjustment member 76 is disposed between the contact portion 722a and the upper end of the guide rail 5a, and is formed in a plate shape. Here, the adjustment member 76 is disposed between the partial contact portion 74 and the upper end of the guide rail 5a. Due to the assembly error of the guide rail 5a, an error may occur in the distance between the contact portion 722a and the upper end of the guide rail 5a. At this time, a number of adjusting members 76 corresponding to the error in the interval are arranged, and the interval between the contact portion 722a and the upper end of the guide rail 5a is adjusted. Further, a hole is formed in the adjusting member 76, and bolts 75a and 75b are passed through the hole. Note that the guide rail 5b side is configured in the same manner as the force guide rail 5a side whose description is omitted.
[0050] 以上のように、実施の形態 2における卷上機取付機構 13は、レール取付部 72の上 部の当接部 722a、 722bとガイドレール 5a、 5bの上端との間にそれぞれ設けられた 部分当接部 74が、上方向力 視た投影上でガイドレール 5a、 5bの上端の中央の一 部分と重なるように配置されている。これにより、当接部 722a、 722bが卷上機 6にか 力る力 Fを支持する際に、ガイドレール 5a、 5bの上端面の形状精度が悪くても、当接 部 722a、 722bに設けられてた部分当接部 74がガイドレール 5a、 5bの中央部に当 接するため、レール取付部 72に偏荷重が作用しに《なる。通常、昇降路の高さは 建築誤差などにより誤差が生じる。そのため、ガイドレール 5a、 5bは、据付現場にて 昇降路の高さに合わせて上端面を切断する。一般的に、その切断面の形状精度は 悪い状態であるが、実施の形態 2によれば、この形状精度が悪くても簡単な構成で対 応できるので、経済的で据付し易 、エレベータ装置が得られる。  As described above, the hoisting machine mounting mechanism 13 in the second embodiment is provided between the upper contact portions 722a and 722b of the rail mounting portion 72 and the upper ends of the guide rails 5a and 5b. Further, the partial contact portion 74 is disposed so as to overlap with a central portion of the upper ends of the guide rails 5a and 5b on the projection viewed from the upward force. As a result, when the contact portions 722a and 722b support the force F exerted on the lifting machine 6, even if the shape accuracy of the upper end surfaces of the guide rails 5a and 5b is poor, the contact portions 722a and 722b are provided on the contact portions 722a and 722b. Since the partial contact portion 74 is in contact with the central portion of the guide rails 5a and 5b, an offset load acts on the rail mounting portion 72. Usually, the height of the hoistway is caused by construction errors. Therefore, the upper ends of the guide rails 5a and 5b are cut at the installation site according to the height of the hoistway. In general, the shape accuracy of the cut surface is poor, but according to the second embodiment, even if this shape accuracy is poor, it can be handled with a simple configuration, so it is economical and easy to install. Is obtained.
[0051] また、制限体 75はレール取付部 72の上部に設けられ、制限体 75としてのボルト 75a 、 75b力 それぞれレール案内部 52a、 52bの両側に配置して、レール取付部 72の 水平方向の移動を制限している。これにより、万一、レール取付部 72とガイドレール 5 a、 5bとを締結しているクリップ 54が外れた場合、部材 721a、 721bがそれぞれガイド レール 5a、 5bの間隔方向の垂直方向に移動しょうとする力 ボルト 75a、 75bがレー ル案内部 52a、 52bの側面に接触して、部材 721a、 721bの移動を規制する。従つ て、当接部 722a、 722bはガイドレール 5a、 5bの間隔方向の垂直方向に外れること なぐレール取付部 72は確実に卷上機 6にかかる力 Fを支持でき、信頼性の高いェ レベータ装置を得ることができる。 [0051] Further, the restricting body 75 is provided on the upper portion of the rail mounting portion 72, and bolts 75a and 75b as the limiting body 75 are arranged on both sides of the rail guide portions 52a and 52b, respectively. Movement is restricted. This should prevent the rail mounting part 72 and the guide rail 5 When the clip 54 that fastens a and 5b is released, the members 721a and 721b try to move in the direction perpendicular to the interval between the guide rails 5a and 5b. Bolts 75a and 75b are the rail guides 52a and 52b. The movement of the members 721a and 721b is restricted by contacting the side surface of 52b. Therefore, the abutting portions 722a and 722b are not released in the vertical direction in the interval direction of the guide rails 5a and 5b, and the rail mounting portion 72 can reliably support the force F applied to the lifting machine 6 and has high reliability. A lift device can be obtained.
[0052] また、調整部材 76がガイドレール 5a、 5bの上端と当接部 722a、 722bとの間に配 置されて、ガイドレール 5a、 5bの上端と当接部 722a、 722bとの間隔を調整すること により、ガイドレール 5a、 5bの組付け誤差があっても、レール取付部 72は高さ方向に 精度良く取り付けできるとともに、当接部 722a、 722bがガイドレール 5a、 5bに支持さ れ、卷上機 6にかかる力 Fを確実に支持できる。なお、調整部材 76は部分当接部 74 とガイドレール 5a、 5bの上端との間に配置した力これに制限されない。部分当接部 7 4をガイドレール 5a、 5bの上端に当接し、調整部材 76を当接部 721a、 721bと部分 当接部 74との間に配置してもよい。また、部分当接部 74を設けない状態で、調整部 材 76を当接部 722a、 722bとガイドレール 5a、 5bの上端との間に配置してもよい。  [0052] Further, the adjustment member 76 is disposed between the upper ends of the guide rails 5a and 5b and the contact portions 722a and 722b, and the interval between the upper ends of the guide rails 5a and 5b and the contact portions 722a and 722b is increased. By adjusting, even if there is an assembly error of the guide rails 5a and 5b, the rail mounting part 72 can be accurately mounted in the height direction and the contact parts 722a and 722b are supported by the guide rails 5a and 5b. The force F applied to the lifting machine 6 can be reliably supported. The adjusting member 76 is not limited to the force disposed between the partial contact portion 74 and the upper ends of the guide rails 5a and 5b. The partial contact portion 74 may be in contact with the upper ends of the guide rails 5a and 5b, and the adjustment member 76 may be disposed between the contact portions 721a and 721b and the partial contact portion 74. Further, the adjusting member 76 may be disposed between the contact portions 722a and 722b and the upper ends of the guide rails 5a and 5b in a state where the partial contact portion 74 is not provided.
[0053] さらに、調整部材 76には穴が形成され、この穴に棒状の制限体としてのボルト 75a 、 75bが貫通している。これにより、万一、レール取付部 72とガイドレール 5a、 5bの締 結が緩んだ場合、調整部材 76は脱落しょうとする力 ボルト 75a、 75bに係合したま まとなり脱落を防止できる。従って、レール取付部 72は、卷上機 6の据付け高さを維 持した状態で確実に卷上機 6にかかる力 Fを支持でき、より信頼性の高いエレベータ 装置を得ることができる。  [0053] Further, a hole is formed in the adjustment member 76, and bolts 75a and 75b as rod-shaped restricting bodies pass through the hole. As a result, in the unlikely event that the rail mounting portion 72 and the guide rails 5a and 5b are loosened, the adjusting member 76 remains engaged with the force bolts 75a and 75b to be removed, and can be prevented from falling off. Therefore, the rail mounting portion 72 can reliably support the force F applied to the lifting machine 6 while maintaining the installation height of the lifting machine 6, and a more reliable elevator device can be obtained.
[0054] なお、本実施の形態では、制限体 75としてのボルト 75a、 75bを案内部 52a、 52b の両側に設けた力 これに制限されない。例えば、ボルト 75a、 75bをレール底部 51 a、 51bの両側に設ける構成にしてもよい。この場合でも、ボルト 75a、 75bがレール 底部 51a、 51bの側面に接触してレール取付部 72の移動を規制するので、当接部 7 22a, 722bはガイドレール 5a、 5bの間隔方向の垂直方向に外れることがない。  [0054] In the present embodiment, the bolts 75a and 75b as the restricting body 75 are provided on both sides of the guide portions 52a and 52b. For example, the bolts 75a and 75b may be provided on both sides of the rail bottom portions 51a and 51b. Even in this case, since the bolts 75a and 75b come into contact with the side surfaces of the rail bottom portions 51a and 51b to restrict the movement of the rail mounting portion 72, the contact portions 722a and 722b are perpendicular to the interval direction of the guide rails 5a and 5b. Never come off.
[0055] なお、制限体のボルト 75a、 75bをレール案内部 52a、 52bの両側に設けた構成に 加え、レール案内部 52a、 52bの頭部側にも制限体を設けた構成にしてもよい。この 場合、レール案内部 52a、 52bの両側に設けた制限体がレール取付部 72のガイドレ ール 5a、 5bの間隔方向と垂直方向の移動を制限する。そして、レール案内部 52a、 52bの頭部側に設けた制限体がレール取付部 72のガイドレール 5a、 5bの間隔方向 の移動を制限する。そのため、当接部 722a、 722bはガイドレール 5a、 5bの間隔方 向と垂直方向に外れることなぐレール取付部 72はより確実に卷上機 6にかかる力 F を支持できる。 [0055] In addition to the configuration in which the bolts 75a and 75b of the limiting body are provided on both sides of the rail guide portions 52a and 52b, a configuration in which the limiting body is also provided on the head side of the rail guide portions 52a and 52b may be adopted. . this In this case, the restriction bodies provided on both sides of the rail guide portions 52a and 52b restrict the movement of the rail mounting portion 72 in the direction perpendicular to the interval between the guide rails 5a and 5b. The restricting body provided on the head side of the rail guide portions 52a and 52b restricts the movement of the guide rails 5a and 5b of the rail mounting portion 72 in the interval direction. Therefore, the rail mounting portion 72 in which the contact portions 722a and 722b are not released in the direction perpendicular to the interval direction of the guide rails 5a and 5b can support the force F applied to the lifting machine 6 more reliably.
[0056] 実施の形態 3. [0056] Embodiment 3.
図 17、図 18は、この発明の実施の形態 3におけるエレベータ装置を示すものであり 、図 15はエレベータ装置の全体構成図、図 16はその卷上機取付機構の拡大図であ る。  FIGS. 17 and 18 illustrate an elevator apparatus according to Embodiment 3 of the present invention. FIG. 15 is an overall configuration diagram of the elevator apparatus, and FIG. 16 is an enlarged view of the lifting machine mounting mechanism.
実施の形態 1, 2は釣合い錘のガイドレール 5a、 5bに卷上機取付機構 7, 13を設け た力 これに限らず、かご 2のガイドレール 3a、 3bに設けてもよい。実施の形態 3はそ の一例を示したものである。その他の点は実施の形態 1, 2と同様であり、詳細な説明 は省略する。なお、実施の形態 1, 2と同符号のものは相当部分を示す。  In the first and second embodiments, the force of installing the lifting machine mounting mechanisms 7 and 13 on the guide rails 5a and 5b of the counterweight is not limited to this, and the guide rails 3a and 3b of the car 2 may be provided. Embodiment 3 shows an example thereof. The other points are the same as in the first and second embodiments, and detailed description thereof is omitted. Note that the same reference numerals as those in Embodiments 1 and 2 indicate corresponding parts.
図において、力ご 2の上部にかご用吊り車 14が設けられ、懸架手段 10が、一端がか ごのガイドレール 3aの上部に設けられた懸架手段取付部 11に固定され、力ご用吊り 車 14に巻き掛けられて、昇降路 1の上部に設置された卷上機 15に巻き掛けられる。 卷上機 15は卷胴式の卷上機であり、懸架手段 10を巻きつけることによりかご 2を昇 降させる。昇降路 1の上部には、卷上機 15をかごのガイドレール 3bに取り付けるため の卷上機取付機構 16が設けられている。  In the figure, a car suspension wheel 14 is provided on the upper side of the force 2 and the suspension means 10 is fixed to a suspension means attaching portion 11 provided at one end of the guide rail 3a of the car, It is wound around a car 14 and wound around a lifting machine 15 installed at the top of the hoistway 1. The hoisting machine 15 is a hoisting type hoisting machine, and the car 2 is raised and lowered by winding the suspension means 10. At the upper part of the hoistway 1, there is provided a lifting machine mounting mechanism 16 for mounting the lifting machine 15 to the guide rail 3b of the car.
[0057] 卷上機取付機構 16は、卷上機 15を取り付ける卷上機取付部 91と、卷上機取付部 9 1に取り付けられるとともに、ガイドレール 3bの上部に取り付けられるレール取付部 92 から構成されている。 The hoisting machine mounting mechanism 16 includes a hoisting machine mounting part 91 for mounting the hoisting machine 15 and a rail mounting part 92 attached to the upper part of the hoisting machine mounting part 91 and attached to the upper part of the guide rail 3b. It is configured.
図 18に示すように、卷上機取付部 91は、枠体 911を有し、水平方向力 視てガイド レール 3bの長手方向の範囲内に配置している。実施の形態 1または 2と同様に、卷 上機 15が図示しない弾性体を介して枠体 911に取り付けられる。また、卷上機取付 部 91は、枠体 911の上下にそれぞれガイドレール 3bに摺動可能なガイド部 912、 91 3が設けられている。このガイド部 912, 913がレール取付部 92に取り付けられること で、卷上機取付部 91がレール取付部 92に取り付けられる。これにより、実施の形態 1 または 2と同様に、卷上機取付部 91はガイドレール 3bに摺動可能に構成されて、レ 一ル取付部 92に取り付けられる。 As shown in FIG. 18, the hoisting machine mounting portion 91 includes a frame body 911 and is disposed within the longitudinal direction of the guide rail 3b as viewed in the horizontal direction. As in the first or second embodiment, the lifting machine 15 is attached to the frame body 911 via an elastic body (not shown). Further, the lifting machine mounting portion 91 is provided with guide portions 912 and 913 slidable on the guide rail 3b above and below the frame 911, respectively. The guide parts 912 and 913 must be attached to the rail attachment part 92. Thus, the lifting machine mounting portion 91 is attached to the rail mounting portion 92. As a result, as in the first or second embodiment, the lifting machine mounting portion 91 is configured to be slidable on the guide rail 3b and is mounted on the rail mounting portion 92.
[0058] また、レール取付部 92は、ガイドレール 3bの長手方向の範囲で卷上機取付部 71に 取り付けられている。そして、レール取付部 92は、ガイドレール 3bの長手方向におけ る卷上機取付部 91の取り付け範囲、即ち、ガイド部 912、 913を含んだガイドレール 3bの長手方向の範囲に跨って、ガイドレール 3bに取り付けられている。また、レール 取付部 92は、上部に当接部 921を有し、当接部 921が、上方向から視た投影上でガ イドレール 3bの上端と重なるように配置されている。ガイドレール 3bはレール底部 31 と、このレール底部 31に立設してかご 2の昇降を案内するレール案内部 32とを有し ている。そして、レール取付部 92は、レール底部 31のレール案内部 32と反対側の 面に取り付けられている。 [0058] Further, the rail attachment portion 92 is attached to the hoisting machine attachment portion 71 in the longitudinal direction of the guide rail 3b. The rail mounting portion 92 extends in the longitudinal direction of the guide rail 3b in the longitudinal direction of the guide rail 3b including the guide portions 912 and 913. Installed on rail 3b. Further, the rail mounting portion 92 has an abutting portion 921 at the upper portion, and the abutting portion 921 is disposed so as to overlap with the upper end of the guide rail 3b when viewed from above. The guide rail 3b has a rail bottom portion 31 and a rail guide portion 32 that stands on the rail bottom portion 31 and guides the raising and lowering of the car 2. The rail attachment portion 92 is attached to the surface of the rail bottom portion 31 opposite to the rail guide portion 32.
以上のように、実施の形態 3は、実施の形態 1または 2と同様に、卷上機 15がガイドレ ール 3bに取り付けられ、実施の形態 1, 2と同様な効果を奏する。  As described above, in the third embodiment, similarly to the first or second embodiment, the lifting machine 15 is attached to the guide rail 3b, and the same effects as those in the first and second embodiments are obtained.
産業上の利用可能性  Industrial applicability
[0059] 以上のように、この発明は、卷上機をガイドレールに取り付けるエレベータ装置に適 用される。 [0059] As described above, the present invention is applied to an elevator apparatus for attaching a lifting machine to a guide rail.

Claims

請求の範囲 The scope of the claims
[1] 昇降路内に設けられ、力ご又は釣合い錘の昇降を案内するガイドレールと、  [1] A guide rail provided in the hoistway for guiding the lifting of the force or counterweight,
前記かご又は釣合!、錘の昇降を駆動する卷上機と、  The cage or balance !, a lifting machine that drives the lifting and lowering of the weight;
前記卷上機が取付けられ、水平方向から視て前記ガイドレールの長手方向の範囲に 少なくとも一部分を含むように配置された卷上機取付部と、  The hoisting machine mounting portion to which the hoisting machine is mounted and disposed so as to include at least a part in a range in the longitudinal direction of the guide rail as viewed from the horizontal direction;
前記ガイドレールの長手方向の範囲内で前記卷上機取付部に取り付けられ、前記ガ イドレールの長手方向における前記卷上機取付部の取り付け範囲に跨って、前記ガ イドレールに取り付けられるレール取付部とを、を備えたことを特徴とするエレベータ 装置。  A rail mounting portion that is attached to the lifting machine mounting portion within the range of the guide rail in the longitudinal direction, and is attached to the guide rail across the mounting range of the lifting machine mounting portion in the longitudinal direction of the guide rail. An elevator apparatus comprising:
[2] 前記ガイドレールは長手方向に所定の取り付け間隔で前記昇降路の壁に取り付けら れ、前記レール取付部は実質的に前記取り付け間隔を含んだ範囲に跨って、前記 ガイドレールに取り付けられたことを特徴とする請求項 1に記載のエレベータ装置。  [2] The guide rail is attached to the hoistway wall at a predetermined attachment interval in the longitudinal direction, and the rail attachment portion is attached to the guide rail over a range substantially including the attachment interval. The elevator apparatus according to claim 1, wherein
[3] 前記ガイドレールは、レール底部と、該レール底部に立設し前記かご又は前記釣合 い錘を案内するレール案内部と、前記レール底部にレール案内部と反対側のレール 取付面とを有し、前記レール取付部は前記レール取付面に取り付けられたことを特 徴とする請求項 1または 2に記載のエレベータ装置。  [3] The guide rail includes a rail bottom portion, a rail guide portion standing on the rail bottom portion and guiding the cage or the counterweight, and a rail mounting surface on the rail bottom portion opposite to the rail guide portion. The elevator apparatus according to claim 1, wherein the rail attachment portion is attached to the rail attachment surface.
[4] 前記卷上機取付部は前記ガイドレールの長手方向に摺動可能なガイド部を有し、該 ガイド部は前記レール取付部に取り付けられたことを特徴とする請求項 1または 2に 記載のエレベータ装置。  [4] The hoisting machine mounting portion has a guide portion slidable in a longitudinal direction of the guide rail, and the guide portion is mounted on the rail mounting portion. The elevator apparatus as described.
[5] 前記ガイド部は、上方向から視た投影上で前記レール取付部に対して離脱可能に 前記卷上機取付部に取り付けられる取付手段を有することを特徴とする請求項 4に 記載のエレベータ装置。  5. The guide unit according to claim 4, wherein the guide unit includes an attaching unit that is detachably attached to the hoisting machine attachment unit in a projection viewed from above. Elevator device.
[6] 前記卷上機と前記卷上機取付部との間に設けられた弾性体を有することを特徴とす る請求項 1または 2に記載のエレベータ装置。  6. The elevator apparatus according to claim 1 or 2, further comprising an elastic body provided between the hoisting machine and the hoisting machine mounting portion.
[7] 前記弾性体は、前記卷上機の上部に少なくとも一個の弾性体と、前記卷上機の下部 に少なくとも一個の弾性体とを備えたことを特徴とする請求項 6に記載のエレベータ 装置。 7. The elevator according to claim 6, wherein the elastic body includes at least one elastic body at an upper part of the hoisting machine and at least one elastic body at a lower part of the hoisting machine. apparatus.
[8] 前記ガイドレールは第 1のガイドレールと第 2のガイドレールとを有し、該第 1のガイド レールと第 2のガイドレールの上部側で第 1のガイドレールと第 2のガイドレールを互 いに連結するレール連結部を備えたことを特徴とする請求項 1または 2に記載のエレ ベータ装置。 [8] The guide rail has a first guide rail and a second guide rail, and the first guide rail The elevator apparatus according to claim 1 or 2, further comprising a rail connecting portion that connects the first guide rail and the second guide rail to each other on the upper side of the rail and the second guide rail. .
[9] 前記レール取付部に、上方向から視た投影上で前記ガイドレールの上端と重なる当 接部を備えたことを特徴とする請求項 1または 2に記載のエレベータ装置。  [9] The elevator apparatus according to [1] or [2], wherein the rail mounting portion includes a contact portion that overlaps with an upper end of the guide rail when viewed from above.
[10] 前記ガイドレールの上端と前記当接部との間に、上方向から視た投影上で前記ガイ ドレールの上端中央の一部分と重なる部分当接部を備えたことを特徴とする請求項 9 に記載のエレベータ装置。  10. A partial contact portion that overlaps with a portion of the center of the upper end of the guide rail on a projection viewed from above, between the upper end of the guide rail and the contact portion. The elevator apparatus as described in 9.
[11] 前記ガイドレールに対して前記レール取付部の水平方向の移動を制限する制限体 を備えたことを特徴とする請求 9に記載のエレベータ装置。  11. The elevator apparatus according to claim 9, further comprising a restricting body that restricts horizontal movement of the rail mounting portion with respect to the guide rail.
[12] 前記当接部と前記ガイドレールの上端との間に配置され、前記当接部と前記ガイドレ ールの上端との間隔を調整する調整部材を備えたことを特徴とする請求 9に記載の エレベータ装置。  12. The apparatus according to claim 9, further comprising an adjustment member that is disposed between the contact portion and the upper end of the guide rail and adjusts a distance between the contact portion and the upper end of the guide rail. The elevator apparatus described.
[13] 前記ガイドレールに対して前記レール取付部の水平方向の移動を制限する棒状の 制限体と、該制限体が貫通される穴を有する前記調整部材とを備えたことを特徴とす る請求項 12に記載のエレベータ装置。 [13] The invention includes a rod-like restricting body that restricts horizontal movement of the rail mounting portion with respect to the guide rail, and the adjusting member having a hole through which the restricting body passes. The elevator apparatus according to claim 12.
[14] 前記卷上機取付部に、前記かご又は前記釣合い錘を懸架する懸架手段を取り付け る懸架手段取付部を備えたことを特徴とする請求項 1または 2に記載のエレベータ装 置。 14. The elevator apparatus according to claim 1 or 2, further comprising a suspension means attachment portion for attaching a suspension means for suspending the car or the counterweight to the lifting machine attachment portion.
[15] 請求項 4に記載のエレベータ装置の据付方法であって、  [15] The elevator apparatus installation method according to claim 4,
前記ガイドレールを前記昇降路内に立設するとともに、前記レール取付部を前記ガ イドレールに取り付ける立設工程と、  An erecting step of erecting the guide rail in the hoistway and attaching the rail mounting portion to the guide rail;
前記ガイド部を前記ガイドレールの長手方向に摺動可能に係合するとともに前記卷 上機取付部に取り付ける取付工程と、  An attachment step of slidably engaging the guide portion in the longitudinal direction of the guide rail and attaching the guide portion to the hoisting machine attachment portion;
前記卷上機取付部に前記卷上機を取り付けた状態で、前記取付工程の後、前記卷 上機取付部を前記ガイドレールの長手方向に摺動させながら揚重する揚重工程と、 前記揚重工程の後、前記レール取付部に前記ガイド部を取り付け、前記卷上機を設 置する設置工程とを有するエレベータ装置の据付方法。  In the state where the lifting machine is attached to the lifting machine mounting part, after the mounting process, the lifting process of lifting the lifting machine mounting part while sliding in the longitudinal direction of the guide rail, An elevator apparatus installation method comprising, after a lifting step, an installation step of attaching the guide portion to the rail attachment portion and installing the lifting machine.
PCT/JP2006/319406 2006-09-29 2006-09-29 Elevator device WO2008041266A1 (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
EP06810812.5A EP2067734B1 (en) 2006-09-29 2006-09-29 Elevator device
KR1020097002873A KR101162240B1 (en) 2006-09-29 2006-09-29 Elevator device
CN2006800559565A CN101511718B (en) 2006-09-29 2006-09-29 Elevator apparatus
PCT/JP2006/319406 WO2008041266A1 (en) 2006-09-29 2006-09-29 Elevator device
JP2008537324A JP5120260B2 (en) 2006-09-29 2006-09-29 Elevator equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2006/319406 WO2008041266A1 (en) 2006-09-29 2006-09-29 Elevator device

Publications (1)

Publication Number Publication Date
WO2008041266A1 true WO2008041266A1 (en) 2008-04-10

Family

ID=39268133

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2006/319406 WO2008041266A1 (en) 2006-09-29 2006-09-29 Elevator device

Country Status (5)

Country Link
EP (1) EP2067734B1 (en)
JP (1) JP5120260B2 (en)
KR (1) KR101162240B1 (en)
CN (1) CN101511718B (en)
WO (1) WO2008041266A1 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130081904A1 (en) * 2010-06-10 2013-04-04 Asmo Tenhunen Fixing arrangement for a hoisting machine, and elevator assembly
JP2013100171A (en) * 2011-11-09 2013-05-23 Mitsubishi Hitachi Home Elevator Corp Winding drum type elevator
KR20170039734A (en) 2014-08-25 2017-04-11 미쓰비시덴키 가부시키가이샤 Elevator hoist installing device
WO2017203633A1 (en) * 2016-05-25 2017-11-30 三菱電機株式会社 Method for installing elevator hoisting machine
US10384912B2 (en) 2014-08-13 2019-08-20 Mitsubishi Electric Corporation Machine base attachment device for elevator hoisting machine
DE112016007540T5 (en) 2016-12-22 2019-09-19 Mitsubishi Electric Corporation winder
WO2023175881A1 (en) * 2022-03-18 2023-09-21 株式会社日立ビルシステム Installation method for hoisting machine

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5875789B2 (en) * 2011-06-28 2016-03-02 東芝エレベータ株式会社 Rope installation method
WO2013165411A1 (en) * 2012-05-02 2013-11-07 Otis Elevator Company Method of installing a machine in an elevator system
FR3007008B1 (en) * 2013-06-13 2015-07-17 Thyssenkrupp Elevator Mfg F METHOD FOR INSTALLING A MOTOR OF AN ELEVATOR INSTALLATION
JP2015205736A (en) * 2014-04-17 2015-11-19 三菱電機株式会社 Elevator and suspension body support device of the same
CN104512792A (en) * 2014-12-11 2015-04-15 杭州新马电梯有限公司 Structure of traction system of elevator without machine room
WO2016166563A1 (en) 2015-04-17 2016-10-20 Otis Elevator Company Elevator system
CN106477426B (en) * 2015-09-02 2018-11-20 株式会社日立制作所 Lift appliance and its installation method
KR102082426B1 (en) * 2016-02-19 2020-02-27 미쓰비시덴키 가부시키가이샤 Elevator device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11139730A (en) * 1997-11-05 1999-05-25 Toshiba Corp Elevator
JP2001247279A (en) 2000-03-03 2001-09-11 Hitachi Ltd Elevator device
WO2002079067A1 (en) * 2001-03-29 2002-10-10 Mitsubishi Denki Kabushiki Kaisha Method for installing hoist
WO2002079068A1 (en) 2001-03-29 2002-10-10 Mitsubishi Denki Kabushiki Kaisha Mechanism for fixing hoist and elevator
EP1284232A1 (en) 2000-04-24 2003-02-19 Mitsubishi Denki Kabushiki Kaisha Elevator device

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3905613B2 (en) * 1997-10-22 2007-04-18 東芝エレベータ株式会社 elevator
JP4157631B2 (en) * 1998-11-19 2008-10-01 日本エレベーター製造株式会社 Elevator device
JP2001122563A (en) * 1999-10-22 2001-05-08 Hitachi Ltd Elevator car
JP3744764B2 (en) * 2000-02-29 2006-02-15 東芝エレベータ株式会社 Elevator apparatus and assembly method thereof
JP2001335255A (en) * 2000-05-24 2001-12-04 Toshiba Corp Elevator installation construction method, and elevator installation unit
JP3509727B2 (en) * 2000-09-19 2004-03-22 三菱電機株式会社 Elevator equipment
JP4107274B2 (en) * 2004-08-16 2008-06-25 株式会社日立製作所 Traction elevator

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11139730A (en) * 1997-11-05 1999-05-25 Toshiba Corp Elevator
JP2001247279A (en) 2000-03-03 2001-09-11 Hitachi Ltd Elevator device
EP1284232A1 (en) 2000-04-24 2003-02-19 Mitsubishi Denki Kabushiki Kaisha Elevator device
WO2002079067A1 (en) * 2001-03-29 2002-10-10 Mitsubishi Denki Kabushiki Kaisha Method for installing hoist
WO2002079068A1 (en) 2001-03-29 2002-10-10 Mitsubishi Denki Kabushiki Kaisha Mechanism for fixing hoist and elevator

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP2067734A4 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130081904A1 (en) * 2010-06-10 2013-04-04 Asmo Tenhunen Fixing arrangement for a hoisting machine, and elevator assembly
US9309092B2 (en) * 2010-06-10 2016-04-12 Kone Corporation Fixing arrangement for a hoisting machine, and elevator assembly
JP2013100171A (en) * 2011-11-09 2013-05-23 Mitsubishi Hitachi Home Elevator Corp Winding drum type elevator
US10384912B2 (en) 2014-08-13 2019-08-20 Mitsubishi Electric Corporation Machine base attachment device for elevator hoisting machine
DE112014006866B4 (en) * 2014-08-13 2021-06-17 Mitsubishi Electric Corporation Machine base attachment device for an elevator hoisting machine
KR20170039734A (en) 2014-08-25 2017-04-11 미쓰비시덴키 가부시키가이샤 Elevator hoist installing device
US10589962B2 (en) 2014-08-25 2020-03-17 Mitsubishi Electric Corporation Elevator hoisting machine mounting device
WO2017203633A1 (en) * 2016-05-25 2017-11-30 三菱電機株式会社 Method for installing elevator hoisting machine
DE112016007540T5 (en) 2016-12-22 2019-09-19 Mitsubishi Electric Corporation winder
WO2023175881A1 (en) * 2022-03-18 2023-09-21 株式会社日立ビルシステム Installation method for hoisting machine

Also Published As

Publication number Publication date
KR101162240B1 (en) 2012-07-04
KR20090038456A (en) 2009-04-20
EP2067734A4 (en) 2013-04-24
CN101511718B (en) 2012-08-29
EP2067734B1 (en) 2015-03-11
CN101511718A (en) 2009-08-19
JP5120260B2 (en) 2013-01-16
EP2067734A1 (en) 2009-06-10
JPWO2008041266A1 (en) 2010-01-28

Similar Documents

Publication Publication Date Title
WO2008041266A1 (en) Elevator device
EP2844600B1 (en) Method of installing a machine in an elevator system
JP2004142927A (en) Elevator device
JP5065766B2 (en) Elevator equipment
JP4261368B2 (en) Elevator main rope stretch compensation device
JP5329031B2 (en) Elevator equipment
CN103221624B (en) Elevator car
JP4091326B2 (en) Elevator equipment
CN114127002B (en) Method and auxiliary device for installing elevator
CN108698792B (en) Elevator device
JP4312590B2 (en) Lower assembly method for elevator upper equipment
WO2023175880A1 (en) Guide device for installation of hoisting machine, and hoisting machine installation method
WO2023175881A1 (en) Installation method for hoisting machine
KR101437800B1 (en) Elevator device
JP2002087732A (en) Elevator device
JP2877593B2 (en) Elevator installation method
JP2005162416A (en) Installation device of elevator
JP5681284B2 (en) elevator
JP2006151625A (en) Elevator device
JP2004067275A (en) Mobile scaffold and method for installing elevator
JPWO2003074408A1 (en) Elevator equipment
JP2004083205A (en) Buffer device for elevator
JP2002087728A (en) Assembling method for unit-type elevator
JP2005219921A (en) Machine base fixing device for elevator
JP2006225086A (en) Elevator device

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 200680055956.5

Country of ref document: CN

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 06810812

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2008537324

Country of ref document: JP

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 2006810812

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 1020097002873

Country of ref document: KR

Ref document number: KR

NENP Non-entry into the national phase

Ref country code: DE