WO1992014598A1 - Method of monitoring injection pressure - Google Patents

Method of monitoring injection pressure Download PDF

Info

Publication number
WO1992014598A1
WO1992014598A1 PCT/JP1992/000206 JP9200206W WO9214598A1 WO 1992014598 A1 WO1992014598 A1 WO 1992014598A1 JP 9200206 W JP9200206 W JP 9200206W WO 9214598 A1 WO9214598 A1 WO 9214598A1
Authority
WO
WIPO (PCT)
Prior art keywords
screw
pressure
injection
screw position
displayed
Prior art date
Application number
PCT/JP1992/000206
Other languages
English (en)
French (fr)
Inventor
Masao Kamiguchi
Noriaki Neko
Original Assignee
Fanuc Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fanuc Ltd filed Critical Fanuc Ltd
Priority to DE69219034T priority Critical patent/DE69219034T2/de
Priority to EP92905298A priority patent/EP0529087B1/en
Priority to KR1019920702310A priority patent/KR970008244B1/ko
Publication of WO1992014598A1 publication Critical patent/WO1992014598A1/ja
Priority to US08/254,439 priority patent/US5549857A/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C45/17Component parts, details or accessories; Auxiliary operations
    • B29C45/76Measuring, controlling or regulating
    • B29C45/7693Measuring, controlling or regulating using rheological models of the material in the mould, e.g. finite elements method
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C37/00Component parts, details, accessories or auxiliary operations, not covered by group B29C33/00 or B29C35/00
    • B29C2037/90Measuring, controlling or regulating
    • B29C2037/906Measuring, controlling or regulating using visualisation means or linked accessories, e.g. screens, printers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C45/17Component parts, details or accessories; Auxiliary operations
    • B29C45/76Measuring, controlling or regulating
    • B29C2045/7606Controlling or regulating the display unit
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C45/17Component parts, details or accessories; Auxiliary operations
    • B29C45/76Measuring, controlling or regulating
    • B29C45/77Measuring, controlling or regulating of velocity or pressure of moulding material

Definitions

  • the present invention relates to an injection molding machine controlled by a processor, and more particularly to a method of monitoring an injection pressure in setting an injection condition.
  • injection speed control is performed to switch the injection speed in multiple stages according to the screw position.
  • the switching position of the injection speed and the setting of the speed of each stage correspond to the change in the flow resistance. It is desirable that For that purpose, it is necessary to be able to grasp the filling state of the resin in the mold cavity corresponding to the screw position in the injection process.
  • a short-shot method or the like has been used as a method for checking the filling state of the resin in the mold cavity.
  • a small amount of resin is injected, the mold is opened, the resin filling amount is checked, and then the injection amount is sequentially increased, and the screw position where the flow resistance changes is actually set in the mold.
  • the injection speed switching position is determined based on the position of the filled resin, and based on this position.
  • An object of the present invention is to provide an injection pressure monitoring method for graphically displaying a relationship between a screw position and an injection pressure.
  • an object of the present invention is to display the injection pressure on a display together with a picture of a screw and a picture of a mold cavity, so that the relationship between the injection pressure and one screw position, and the relation between the injection pressure and the resin in the cavity.
  • An object of the present invention is to provide an injection pressure monitoring method that facilitates setting of injection conditions by presenting a relationship with a filling state to a condition setter in the form of an image.
  • a screw position is detected by a screw position detecting unit, a pressure applied to a resin is detected by an injection pressure sensor, and based on the detected screw position and pressure.
  • the mold cavity data is stored, and the injection is performed at least once.
  • the mold cavity is divided into a plurality of regions, the volume from the cavity entrance to each of the divided regions is obtained and stored as the cavity data, and ejected from the input screw position.
  • the amount of resin is obtained, the amount of the injected resin is compared with the volume, and the area on the screen of the display device that satisfies the amount of the injected resin is identified and displayed.
  • the stored The volume is read out in order, a screw position for injecting the resin amount corresponding to the volume is determined, the screw position is displayed on the display device, and the cavity shape on the screen of the display device is read out. Identify product areas
  • the screw is advanced in the injection direction by the automatically set distance at every predetermined time.
  • each time the move command key is pressed it moves forward or backward by the set predetermined distance.
  • the cylinder shape is further drawn on the screen of the display device, and the screw shape is drawn in the drawing cylinder shape according to the input screw position.
  • a mark indicating the input screw position is displayed at a position corresponding to the input screw position in the pressure waveform of the pressure with respect to the screw position displayed on the display device.
  • a screw position is detected by a screw position detecting means, a pressure applied to the resin is detected by an injection pressure sensor, and a pressure waveform corresponding to the detected screw position is displayed on a screen.
  • the pressure waveform detected by the injection is drawn, the cylinder shape is drawn, and the drawing is performed according to the input of the screw position.
  • the screw shape that has advanced in the cylinder by the amount corresponding to the input value is displayed on the screen. And the pressure at that time can be grasped immediately.
  • FIG. 3 is an explanatory diagram of a table for storing cavity data
  • Fig. 4 is an explanatory diagram of the data stored when monitoring the injection pressure for the screw position.
  • FIG. 5 is an explanatory view of a display screen displayed in the implementation of the method of the present invention
  • FIG. 6 is a flowchart of a process in the first embodiment of the present invention
  • FIG. Flow chart of volume drawing process
  • FIG. 8 is a flowchart of the process according to the second embodiment of the present invention.
  • FIG. 9 is a flowchart of the process according to the third embodiment of the present invention.
  • FIG. 10 is a flowchart of the process according to the fourth embodiment of the present invention.
  • FIG. 11 is a flowchart of the process according to the fifth embodiment of the present invention.
  • FIG. 1 is a block diagram showing an electric injection molding machine employing one embodiment of the present invention and a main part of a control system of the injection molding machine, showing only an injection shaft, and other shafts, for example, a mold clamping shaft, Items related to the screw rotation shaft, ejector shaft, etc. are omitted.
  • an electric injection molding machine includes a numerical control device (hereinafter referred to as an NC device) 100 for controlling the injection molding machine, a screw 1, and an injection servomotor 2 for driving the screw 1 in the axial direction.
  • NC device numerical control device
  • a pulse coder 3 attached to the injection sub-motor 2 for detecting the current position of the screw 1; and a pulse coder 3 attached to a position for detecting the pressure applied to the screw 1 in the injection mechanism 5 for driving the screw 1 in the axial direction. And an element such as an injection pressure sensor 4 for detecting the resin pressure in the mold cavity acting as a reaction force in the screw axis direction.
  • the NC unit 100 is a microprocessor for NC (hereinafter, referred to as CPU).
  • the PMC CPU 114 has a CPU 114 for a 112 and a programmable machine controller (hereinafter referred to as PMC).
  • the PMC CPU 114 is connected to a ROM 117 storing a sequence program for controlling the sequence operation of the injection molding machine, a program for a modern processing of the present invention, which will be described later, and a RAMC 10 for PMC via a bus.
  • the NC CPU 112 has a ROM 115 that stores a management program that controls the entire injection molding machine, and drives and controls servomotors for each axis such as injection, clamp, screw rotation, and ejector.
  • Servo circuit is connected via the servo interface 111. In FIG.
  • the nonvolatile shared RAMI 05 which is composed of a bubble memory and a CMOS memory, stores a memory section that stores NC programs and the like that control each operation of the injection molding machine, and stores various setting values, parameters, and macro variables. And a setting memory unit for storing.
  • the bus arbiter controller (hereinafter referred to as BAC) 113 is connected to each bus of the CPU 112 for NC and the CPU 114 for PMC, the shared RAM 105, the input circuit 106, and the output circuit 107, and the bus used by the BAC 113 is controlled. Is to be done.
  • a manual data input device with a CRT display device (hereinafter referred to as CRTZMD I) 119 is connected to the BAC via an operator panel controller 116, and various types of operation keys such as soft keys and numeric keys are operated. Command and setting data can be input.
  • the RAMI 04 bus-connected to the NC CPU 112 is used for temporary storage of data and the like.
  • FIG. 1 only the one related to the injection axis, that is, the injection servomotor 2 for driving and injecting the screw 1 and attached to the injection servomotor 2, and detects the rotation of the servomotor. Only the pulse coder 3 that detects the screw position is shown, and other axes, such as those relating to the mold clamping axis, one screw rotation axis, and ejector glaze, are omitted. Also, only the servo circuit of the injection servomotor is shown in the NC device 100, and the servo circuits of the other axes are omitted. The servo circuit 103 is connected to the injection servomotor 2, and the output of the pulse coder 3 is input to the servo circuit 103. Also, a torque limit value for controlling the output torque of the injection servomotor 2 is output from the output circuit 107 to the servo circuit 103. Swelling.
  • an address generator 118 is connected to the output circuit 107, and the output of the address generator 118 is connected to the RAMI bus connected to the CPU 114 for PMC.
  • the output signal of the injection pressure sensor 4 is connected to the RAMI 08 via the A / D converter 101, and the RAMI 09 has a counter 102 for counting the signal from the pulse coder 3 and detecting the screw position.
  • the address generator 118 is generated at a predetermined sampling cycle in order from the predetermined address, and specifies the same address of the RAM 108, 109, and the AZD converter 101 And the output of the counter 102 are stored in a specified address.
  • the NC device 100 controls the sequence by the PMC CPU 114 based on the sequence program stored in the ROM 117, and controls the NC device 100 based on the NC program set and stored in the shared RAMI05.
  • the PU 112 distributes pulses to the servo circuits of the respective servo motors and drives the injection molding machine.
  • the resin pressure detected by the injection pressure sensor 4 is converted into a digital signal by the A / D converter 101, written into the RAMI 08 at predetermined intervals, and sequentially rewritten as the current resin pressure. Also, ? ! Do you need it?
  • the reference numeral 11114 reads the resin pressure written in the RAMI 08 every predetermined period, and sequentially writes the read resin pressure value to the shared RAMI 05 via the BAC.
  • the shared RAMI 05 of the NC device 100 has a longitudinal sectional shape representing the cavity shape of the mold used for injection molding and a tape described later.
  • Stores cavity data such as TB.
  • This cavity data is obtained when the above-mentioned mold is designed using a CAD system.
  • the cavity shape (cavity vertical section (contour) ) Can be drawn on a display, and the drawing area can be identified and displayed in a stepwise manner with respect to the volume of resin filled in the cavities. Therefore, the shared RAMI 05 stores the table TB data for storing the cavity data as shown in FIG.
  • the volume of the resin filled in the mold cavity (VI, V2, ..., Vn), which is required to be drawn to identify the filled volume as an area on the drawn cavity
  • a table TB that stores the number of lines (Ll, L2 ⁇ ⁇ ⁇ Ln), and the points on the drawn cavity contour lines (Pll, P12, ⁇ 21, ⁇ 22 ⁇ ⁇ ⁇ ⁇ ) that are the start and end points for displaying the above lines Is created when designing a mold using a CAD system, and is stored on a floppy disk or the like.
  • a disk controller is connected to the operator panel controller 116, and the above-mentioned cavities are stored in the shared RAM 105 from the floppy disk via the disk controller.
  • the cylinder and screw shapes to be drawn are also input to the shared RAMI05. Further, a cursor is displayed at the position of the screw and a vertical line is displayed at the position of the cursor. Referring to FIG. 2, the tip position of the resin that is injected and flows through the cavity is displayed stepwise on the contour line representing the mold cavity shape (cross-sectional shape) displayed on the display screen of CRTZMD I119. Multiple points are specified. In designating these points, first select locations where the flow resistance of the resin moving within the cavity changes significantly.
  • FIG. 3 shows.
  • the points P 51 and P 52 and the points P 53 and P 54 are connected by straight lines to the cavities on the screen shown in FIG.
  • the address generator 118 designates the addresses of the HI-order RAMIs 08 and 109 from address 0 at predetermined intervals from the start of the injection. Based on this address generation, the RAM 108 and 109 store the screw position and pressure for each cycle in the designated address.
  • Fig. 5 shows an example of the contents of the screen of the CRTZMD I 119 that displays the results of this monitor.
  • the coordinates A 1 (hereinafter referred to as pressure display coordinates) for a pressure waveform graph in which a horizontal glaze is placed at the screw position and the vertical axis is pressure, and a screen are shown below the display screen.
  • a cylinder-shaped and screw-shaped display area A2 and a mold cavity shape (longitudinal section shape) as shown in Fig. 2 are drawn.
  • a display area A3 is provided.
  • a force sol C is displayed corresponding to the screw position displayed in the above ⁇ A4.
  • the upper screw across the horizontal axis A vertical line L passing through one picture is displayed.
  • the position of the screw which is the horizontal axis of the pressure waveform coordinate
  • the vertical line L moves, and the skew position of the display ⁇ A4 is changed to a value corresponding thereto.
  • the screw position is displayed.
  • C This example displays the contents shown in FIG. 5 on the screen of the CRTZMD I 119, and presses the cursor C by operating the keys.
  • the vertical line L is moved, the screw position corresponding to the coordinate position of the cursor C is displayed on the display ⁇ A4, and at the same time, the screw on the screen moves through the cylinder as the vertical line L moves.
  • the movement of the screw and the filling of the resin into the cavity by the movement of the screw are displayed in the display area A3 of the cavity.
  • the processing for executing the first embodiment will be described with reference to the flowchart of FIG. 6. As described above, the injection speed, the holding pressure, etc.
  • the PMC CPU 114 firstly displays the cylinder shape on the CRT screen from the data stored in the shared RAMI 05, the screw shape at the screw back position (x m ) within this cylinder shape, In addition to drawing the mold cavity shape (vertical cross-sectional shape), the pressure value corresponding to the screw position stored in synchronization with RAMI 08, 109 is plotted on the pressure display coordinates. Then, a pressure waveform graph is displayed (step S101). Next, while looking at the waveform at the pressure coordinate A 1 on the screen, operate the cursor key to move the cursor C on the horizontal axis to the screw position to be examined (step S 102).
  • Cursor C moves, for example, according to the number of times the key is struck or pressed, and when the cursor key stops being pressed, it is assumed that the screw position (cursor position P) has been input. I have.
  • the position P on the horizontal axis of the cursor C thus moved is converted to the screw position (X) on the injection molding machine, and the value (X) is displayed on the screw position display A4 (step S103).
  • the screw position (X) on this injection molding machine is the value when the cylinder tip position is the origin (0) and the direction toward the screw back position ( xffla_ ) is a plus direction.
  • the screw must be located either at the position where the cursor position P moved by the key input exceeds the cylinder tip (0), or at a position behind the screw back position (xitherill, a T ). If it represents (Step S104), it is determined that the input is not correct, and the process returns to Step S102, and waits for a correct input again.
  • step S105 the processing shown by the subroutine in FIG. 7 is performed.
  • the screw shape already drawn on the screen is erased, and the screw shape whose tip is located at this position P is newly displayed.
  • the tip of the screw shape on the screen, initially, the cursor C, the vertical line L are both, screw back position (x m. T
  • step S107 when the end key is pressed (step S107), this processing ends. However, if this key is not pressed and another screw position is input, the processing from step S102 is repeated again.
  • the script is displayed on the screen at the cursor position P where the input has been made (step S201).
  • the screw shape is displayed so that the tip of the screw is located directly above the cursor C on the seat-side glaze.
  • the volume of the resin filled into the cavity is calculated (step S 202). This calculation is based on the cylinder bore (D) and the screw stroke (x m — X)
  • Vx (TT D 2/4 ) (X - X)
  • step S 203 the index i corresponding to the address of the table TB of the shared RAMI 05 is set to 1 (step S 203), and the calculated filling amount VX is set to the volume V i (first time) corresponding to the index i stored in this table TB. Is determined to be less than or equal to VI) (step S204), and if not less than the volume V i, the value of the index i is incremented by 1 (step S205), and the value of the updated index i is If the volume of the cavity is not more than the divided number n (step S206), the process returns to step S204 again to determine whether the calculated filling amount Vx is less than or equal to the volume Vi corresponding to the updated index i. Judge whether or not. Thus, when V i equal to or larger than the charged amount VX is found in the process of repeating this operation, the process proceeds to step S207.
  • the input filling amount Vx is compared in order with VI, V2, V3,... Stored in the table TB.
  • step S207 another index j is initially set to 1 in step S207, and a point stored in the table TB of the shared RA Ml05 and 2j are connected by a straight line (step S208).
  • Initially j is 1, so we add P ⁇ and P f 2 .
  • the value is incremented (step S209), and it is determined whether or not the incremented value is less than or equal to the number L i of straight lines stored in the table TB corresponding to the volume Vi (see FIG. 7) (step S209).
  • step S 210) it is determined whether there is still a line connecting another point to the point outside one line connecting i and 2, and if there is, If the value of the index ⁇ is equal to or less than the number L i of straight lines, the process returns from step S210 to step S208, and similarly connects points 2j and 2j with straight lines.
  • L5, L6 the number of straight lines to be connected
  • the step S210 is executed only once from the step S210.
  • processing is performed to connect points P i and P i 2 j , that is, P j 3 and 4 , with a straight line.
  • step S 210 As a result of incrementing the value of the index j one by one as a result, if the value exceeds the number L i of straight lines to be connected (step S 210), the connection is made in the above steps S 208 to 210.
  • step S211 After performing identification processing such as painting the inside of the line (step S211), processing is performed to display on the screen the extent to which the resin has been filled in the cavity as an image. Upon completion of the process, the process returns to the step S107 in the flowchart of FIG.
  • the cursor C is positioned at an arbitrary position on the horizontal sleeve of the pressure display coordinate A 1 where the horizontal axis is the screw position and the vertical axis is the pressure ⁇ by key input.
  • the resin filling status due to the advance of the screw to the screw position (X) corresponding to the cursor position P is displayed as an image in the display area A3 on the same screen, so the screw position, pressure and filling in the cavity are displayed. You can understand at a glance the relationship between the three and the state.
  • the value of the pressure corresponding to the screw position on the injection molding machine can be immediately known from the vertical line L connected to the cursor C, and at the same time, to which region of the cavity the resin has been filled or the tip thereof. Can immediately understand from the screen whether or not they are moving to an area where the flow resistance changes significantly.
  • the PMC CPU 114 sets the index i corresponding to the address of the table TB (FIG. 3) to “1” (step S 302), and sets the screw position SC i to fill the volume Vi corresponding to the index i.
  • (Initially S C1) is determined from the relational expression between the screw position (X) and the filling amount (Vx) described above.
  • a screw shape is drawn at the determined screw position in the screw shape display area A2, and the position is numerically displayed in the screw position display ⁇ A4 (step S303).
  • step S304 another index i is set to 1 (step S304), and the point Pj 2j — i and the point P: 2j are connected by a straight line (step S305). Then, the value of the index j is incremented by 1 (step S306), and if the incremented value of the index j does not exceed the number L i of straight lines corresponding to the volume Vi (see FIG. 3) (step S307). ), Returning to step S 305, again at points P ⁇ 2j — j and Pi. Connect j with a line.
  • step S 308 After performing identification processing such as filling the resin inflow side of the closed area inside the formed cavity, the resin -1 1-Displays on the screen whether or not the area has been filled as an image. Note that among them, the processing from step S304 to step S308 is the same as the processing from step S203 to step S211 in FIG. 7 described above.
  • the timer T is started (step S309). After a certain period of time from the start of this timer T
  • Step S311 it is determined whether or not an end instruction has been issued (Step S311), and if it has been issued, this process ends. On the other hand, if the end command has not been issued, the value of the index i is incremented by 1 (step S312). If the incremented value of the index i does not exceed the cavity division number n, the process proceeds to step S303. Return, and thereafter, perform the same processing as before for the next address.
  • the process returns to step S 3 0 2
  • the timer T is Adoresu i the Sukuriyu 1 This is for setting the time to update only the time, so by changing the setting time of this timer T, the speed indicating the fluctuation of the filling state of the cavity on the screen can be increased, carried, or set arbitrarily. Can be adjusted.
  • the filling state of the cavity when the screw address is automatically increased by one at regular intervals is displayed on the screen at a fraction of the speed of actual operation (slow motion). Yes, and at the same time the pressure value at the screw position is displayed. Therefore, it is possible to check the fluctuation of the filling state of the cavity at a desired speed while monitoring the fluctuation of the pressure when the screw is gradually advanced, so that it is determined whether or not the injection speed is properly switched. You can easily judge from the movement of the image on the screen
  • step S401 The processing so far is the same as the processing in step S101 of the flowchart in FIG.
  • the screen position X is set to the screen back position ( ⁇ ⁇ ) (step S402).
  • step S 405 when the screw is advanced but not reached the injection completion position (x fflin ), the position X of the screw is displayed on the screen position display ⁇ A4 on the screen (step S 405), Then, the screw position X is converted into a coordinate value P (step S406). Then, at the position of the converted coordinate value P, the screw shape is drawn in the display area A2, and the cavity on the screen is filled in correspondence with the screw position X. That is, the subroutine processing of drawing the screw and the filling amount shown in FIG. 7 is performed (step S407).
  • step S409 If the end instruction is not issued after performing the subroutine processing of the screw and the filling amount drawing (step S408), then the timer T is started (step S409).
  • step S410 the time set by the timer T elapses without pressing the stop button (step S410) (step S411), the process returns to step S403, and the screw advances by a predetermined amount a. After that, the same processing as before will be performed. That is, the screw automatically advances by a fixed distance a every time the timer T is set. The set time of the timer T can be changed as appropriate.
  • step S410 The operator presses the stop key when he wants to stop the movement while moving the screen-shaped features on the screen one after another.
  • step S410 the stop key is pressed, this is sensed (step S410) and the timer T is stopped (step S412).
  • step S413 To release the stop, press the restart command key.
  • step S413 the process returns to step S411, and the same processing is performed.
  • the screw when the screw is advanced at a constant speed, the fluctuation of the filling state of the cavity can be known from the screen while monitoring the pressure, so that the screw speed can be determined in the same manner as in the second embodiment.
  • Basic data for setting injection conditions such as switching position and switching amount can be obtained.
  • the monitor command is input, and the PMC CPU 114 displays the pressure waveform, the cylinder shape, and the screw back position (x ma) [ ) within the cylinder shape on the screen. Then, the screed shape and the mold cavity shape are drawn (step S501). The processing so far is the same as the processing in step S101 of the flowchart in FIG.
  • step S505 When the forward command key is pressed, the screw position X is rewritten to the position (X-a) (step S505). That is, the screw is moved to a position where the screw is advanced by a predetermined amount a. If the moved position (new X) does not exceed the screw top position (x Bin ) (step S 506), the process moves to step S 511 to display the screw position X on the screen. ⁇ Display on A4.
  • step S512 the displayed screen position X is converted into a coordinate value P on the screen.
  • step S512 a screw is displayed at the coordinate value P, and a subroutine of drawing and filling amount drawing processing shown in FIG. 7 is performed in accordance with the screw position X (step S513).
  • step S5 After the above processing is completed, if an end command is issued (step S514), this processing ends. If this command has not been issued, step S 5 Return to 03 and wait for a reverse command (step S503) or a forward command (step S504).
  • step S506 If the screw position X exceeds the screw top position x min as a result of moving the screw forward (step S506), the screw is retracted by a predetermined amount a (step S507). The position is displayed on the screen as a screw position X (step S511), and the processing from step S512 is performed.
  • step S503 when the reverse command key is pressed (step S503), the screw at the current position X is moved backward by a predetermined amount a to reach the position x + a (step S508). If the moved position (new screw position X) does not exceed the screw back position (x m ID ⁇ , T ) (step S509)
  • step S512 the screen position is displayed on the screen (step S511), and the processing from step S512 is performed.
  • Step S509 the screw is advanced by a predetermined amount a (Step S510), and the position is displayed on the screen as a screw position X (Step S511).
  • Step S Perform the processing of 512 and below.
  • the screen position can be moved back and forth by a fixed distance, so that the pressure in the arbitrary position of the screen can be monitored and the cavity filling position can be monitored. It is easy to know the condition, and it is also possible to know the change in pressure and the change in the cavity filling state when the screw is moved from one position to another. Further, by changing the value of the predetermined amount a, the amount of movement of the screw by one key operation can be adjusted.
  • a description will be given of a fifth embodiment in which the filled state of cavities is drawn in real time while monitoring the actual pressure during continuous molding.
  • the PMC CPU 114 draws a cavity shape, a cylinder shape, and a screw shape on the display screen, and then executes the processing shown in FIG. 11 at predetermined intervals.
  • the process in the cycle ends. On the other hand, when it is determined that the injection has started, the flag F is set (step S603). In the injection process, the PMC CPU 114 sets the flag indicating “injection” to “1” in the shared RAM 104 during the injection process. Determine whether or not.
  • step S604 the current screw position SC and pressure PR output from the counter 102 and the pressure PR output from the AZD converter 101 are read (step S604), and the read current screw position SC and pressure PR are read.
  • the pressure is converted into ⁇ in the pressure display coordinates (step S605), and the pressure corresponding to the screw position is displayed on the coordinate A1 as a pressure waveform graph (step S605).
  • step S607 a vertical line is rewritten to the screw coordinate value (step S607), and furthermore, the drawing process of the screw and the filling amount shown in FIG. 7 is performed to rewrite the drawing position of the screw and the filling position in the cavity. After that (step S608), the processing of the cycle ends.
  • step S609 the flow shifts from step S601 to step S609 to judge whether or not the dwelling is completed. And proceed to the above-mentioned process, —Displays a graph of pressure against position, rewrites the drawing position, and rewrites the filling position in the cavity.
  • step S609 the process proceeds from step S609 to step S610 to set the flag F to "0" to end the cycle. Only the processing of 601, S602 is performed.
  • the injection (holding pressure) pressure, the screw position, and the resin filling position in the cavity in the actual injection process during continuous molding are displayed. According to the pressure, the actual speed, pressure, and normal state of cavity filling can be grasped.
  • the position of the screw in the cylinder and the filling state of the cavity are simultaneously displayed in correspondence with the pressure waveform, but the pressure waveform, the filling state of the cavity, and the screw position (numerical value) ) May be displayed without drawing the position of the screw in the cylinder. Further, only the pressure waveform and the position of the screw in the cylinder may be drawn.
  • the molding conditions are set, the injection speed, the holding pressure, etc. are set to tentative values, and the injection is performed once.
  • steps S101, S310, S410, S5 for example, steps S101, S310, S410, S5
  • the pressure waveform is not drawn when the value is 0 1).
  • only the position of the screw and the filling state in the cavity may be drawn. In this case, it may be used to determine the tentative injection speed and holding pressure, or to determine the injection speed and holding pressure from the beginning, and to determine the screw back position and the like.

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Mechanical Engineering (AREA)
  • Injection Moulding Of Plastics Or The Like (AREA)

Description

明 細 書
射出圧力モニタ方法
技 術 分 野
本発明は、 プロセッサで制御される射出成形機に関し、 特に、 射出条件 設定における射出圧力のモニタ方法に関する。
背 景 技 術
射出成形機の射出工程においては、 射出速度をスクリュー位置に応じて 多段に切換える射出速度制御が行われている。 ところで、 金型キヤビティ 内を移動する樹脂の流動抵抗は通過する領域によつて異なつてくるため、 射出速度の切り換え位置ならびに各段の速度の設定にあたっては、 その流 動抵抗の変化に対応したものであることが望ましい。 そのためには、 射出 工程におけるスクリュー位置に対応する金型キヤビティ内の樹脂の充填状 態を把握することができなければならない。
従来、 金型キヤビティ内の樹脂の充填状態を調べる方法として、 ショー トショッ ト法などが用いられていた。 この方法は、 樹脂を少量射出しては 金型を開いて樹脂の充填量を調べ、 そうして射出量を順次増大して行って、 流動抵抗が変化するスクリュー位置を金型内に実際に充填された樹脂位置 より求め、 この位置に基づいて射出速度切換え位置を求めていた。
このショートショ ッ ト法では、 上述したように、 少量づっ樹脂量を増大 させて射出を行い、 射出を行うごとに金型を開き金型に充填された樹脂先 端位置を調べる必要があり、 多大な時間と労働を必要とする。 またコネク タ等を成形する金型ではショートショッ ト法により条件出し中に過充填さ せてしまう場合があり、 問題がある。
発 明 の 開 示 本発明の目的は、 スクリュー位置と射出圧力の関係をグラフ表示する射 出圧力モニタ方法を提供することにある。
さらに、 本発明の目的は、 射出圧力をスクリユーの絵や金型キヤビティ の絵と一緒にディスプレイ上に表示するようにして、 射出圧力とスクリュ 一位置との関係、 および射出圧力とキヤビティ内の樹脂充填伏態との関係 をィメージの形で条件設定者に提示することによって、 射出条件の設定を 容易にした射出圧力モニタ方法を提供することにある。
上記目的を達成するため、 本発明の一態様は、 スク リュー位置検出手段 によってスクリュー位置を検出すると共に、 射出圧力センサによって樹脂 にかかる圧力を検出し、 該検出されたスクリュー位置と圧力に基づいてス クリュー位置に対する圧力の圧力波形を表示装置の画面上に表示して射出 圧力をモニタするにおいて、 金型のキヤビティデータを記憶しておき、 射 出を少なくとも一回行った後、 該射出で検出された圧力波形と共にキヤビ ティ形状を上記表示装置の画面上に描画し、 スクリューの位置を入力する ことにより、 該入力スクリュー位置を上記表示装置の画面に表示すると共 に、 該スクリュー入力位置に対応する射出樹脂置を求め、 上記描画された キヤビティ形伏に対し上記樹脂量に対応する充填樹脂状態を表示する。 好ましくは、 上記充填樹脂状態の表示において、 金型キヤビティを複数 の領域に分割し、 分割した各領域までのキヤビティ入口からの体積を求め 上記キヤビティデータとして記憶しておき、 入力スクリユー位置より射出 樹脂量を求め、 該射出樹脂量と上記体積を比較して、 上記表示装置の画面 上のキヤビティ形状に対して上記射出樹脂量を満たす領域までを識別表示 する。
さらに、 本発明の別の態様は、 設定された所定時間毎、 上記記憶された 体積を順に読みだし、 該体積に対応する樹脂量を射出するスクリユ ー位置 を求め、 該スク リ ュー位置を上記表示装置に表示すると共に、 上記表示装 置の画面上のキヤビティ形状に対して読み出した 積の領域を識別表示す る
さらに、 スクリユーの位置の入力の態様として、 設定された所定時間毎 自動的に設定された距離だけ射出方向に進めるようにする。 若しくは、 移 勖指令キーが押される度に設定所定距離前進又は後退させるようにする。 好ましくは、 表示装置の画面に、 さらにシリンダ形状を描画すると共に, 入力スクリュー位置に応じて上記描画シリンダ形状内にスクリュー形状を 描画する。 また、 表示装置に表示されたスクリュー位置に対する圧力の圧 力波形中の入力スクリュー位置に対応する位置に、 入力スクリュー位置を 示すマークを表示する。
さらに、 本発明の別の態様は、 連続成形中において射出開始後、 上記ス クリュ一位置検出手段、 射出圧力センサで所定周期毎スクリュ一位置、 圧 力を検出し、 上記画面に検出位置に対する検出圧力をグラフ表示すると共 に、 検出スクリユ ー位置に応じてキヤビティに充填される榭脂量を求めて、 上記描画キヤビティ内に樹脂充填状態を表示する。
さらに、 本発明の別の態様は、 スクリユ ー位置検出手段によってスクリ ユ ー位置を検出し、 射出圧力センサによって樹脂にかかる圧力を検出し、 該検出されたスクリ ュー位置に対する圧力波形を画面上に表示して射出圧 力をモニタするにおいて、 射出を少なく とも 1回行った後、 該射出で検出 された圧力波形を描画すると共に、 シリンダ形状を描画し、 スクリュー位 置の入力に応じて上記描画シリンダ形状内に入力スクリユ ー位置に対応し てスクリユ ー形状を描画する。 上述のように、 本発明の方法によれば、 スクリュ一位置を手動入力する と、 或いは設定した条件に基づき自動的に、 スクリューバック位置からこ の入力位置までの行程による射出で金型キヤビティのどの箇所まで樹脂が 充填されるかの情報が画面上にイメージで表示されることになる。 その結 果、 スクリユー位置、 圧力、 及びキヤビティ内の樹脂充填状態の三者の関 連が条件設定者にとつて明瞭になり、 射出速度制御の設定が正確且つ容易 に行えるようになる。
また、 スクリュー位置の手動入力に伴って、 その入力値に応じた量だけ シリンダ内を進んだ状態のスクリユー形状が画面上に表示されることによ り、 スクリユーがシリンダ内のどのような位置にいるか、 また、 その時の 圧力はどうか等のことが即座に把握できる。
図面の簡単な説明
第 1図は本発明の方法を実施する射出成形機の要部ブロック図、 第 2図は画面上の金型キヤビティを複数の領域に分割して表示するとき の処理を説明するための説明図、
第 3図はキヤビティデータを記憶するテーブルの説明図、
第 4図はスクリユー位置に対する射出圧力をモニタしたとき記憶される データの説明図、
第 5図は本発明の方法の実施において表示される表示画面の説明図、 第 6図は本発明の第 1の実施例における処理のフローチャート、 第 7図はスクリユー描画位置, キヤビティ内の樹脂充填量描画処理のフ ローチャート、
第 8図は本発明の第 2の実施例の処理のフローチヤ一ト、
第 9図は本発明の第 3の実施例の処理のフローチヤ一ト、 第 10図は本発明の第 4の実施例の処理のフローチヤ一ト、
第 11図は本発明の第 5の実施例の処理のフローチヤ一トである。
発明を実施するための最良の形態
以下、 本発明の一実施例を図面に基づいて説明する。
第 1図は本発明の一実施例を採用した電動式射出成形機及び該射出成形 機の制御系要部を示すブロック図で、 射出軸についてのみ図示し、 他の軸、 例えば型締め軸、 スクリュー回転軸、 ェジュクタ軸等に関するものは省略 している。 同図において、 電動式射出成形機は、 射出成形機を制御するた めの数値制御装置 (以下、 NC装置という) 100、 スクリユー 1、 該ス クリュー 1を軸方向に駆動する射出用サーボモータ 2、 該射出用サ一ボモ —タ 2に取り付けられスクリュー 1の現在位置を検出するパルスコーダ 3、 スクリュー 1を軸方向に駆動する射出機構 5内のスクリュー 1にかかる圧 力を検出する位置に取り付けられてスクリユー軸方向に反力として作用す る金型キヤビティ内樹脂圧力を検出する射出圧力センサ 4等の要素を含む。
NC装置 100は、 N C用のマイクロプロセッサ (以下、 CPUという)
112とプログラマブルマシンコントローラ (以下、 PMCという) 用の CPU 114を有している。 この PMC用の CPU 114には射出成形機 のシーケンス動作を制御するシーケンスプログラム, 後述する本発明のモ 二夕処理のプログラム等を記憶した ROM117及び PMC用 RAMI 1 0がバス接続されている。 一方、 NC用 CPU 112には射出成形機を全 体的に制御する管理プログラムを記憶した ROM115、 及び射出用, ク ランプ用, スクリュー回転用, ェジェクタ用等の各軸のサーボモータを駆 動制御するサーボ回路がサーボインタフヱイス 111を介して接続されて いる。 なお、 この第 1図では、 これらサーボ回路の内、 射出用サーボモ一 夕 2用のサーボ回路 103のみ図示している。 また、 バブルメモリや C MOSメモリで構成される不揮発性の共有 RAMI 05は、 射出成形機の 各動作を制御する NCプログラム等を記憶するメモリ部と各種設定値, パ ラメ一タ, マクロ変数を記憶する設定メモリ部とを有する。 バスアービタ コントローラ (以下、 B ACという) 113には NC用 C PU 112及び PMC用 CPU114, 共有 RAM105, 入力回路 106, 出力回路 1 07の各バスが接続され、 上記 B AC 113によって使用するバスが制御 されるるようになっている。
CRT表示装置付手動データ入力装置 (以下、 CRTZMD Iという) 119は、 オペレータパネルコントローラ 116を介して B ACに接続さ れていて、 ソフトキ一やテンキー等の各種操作キーを操作することにより 様々な指令及び設定データの入力ができるようになっている。 なお、 NC 用 CPU112にバス接続された RAMI 04は、 データの一時記憶等に 利用されるものである。
第 1図では、 射出軸に関するものだけ、 すなわち、 スク リュー 1を駆動 して射出させるための射出用サーボモータ 2、 及びその射出用サーボモ一 タ 2に取付けられ、 該サーボモータの回転を検出しスクリユー位置を検出 するパルスコーダ 3だけを示しており、 他の軸、 例えば型締軸, スクリュ 一回転軸, ェジェクタ釉などに関するものは省略している。 また、 NC装 置 100のサーボ回路も射出用サーボモータのものだけを示し、 他の軸の サーボ回路は省略している。 そしてこのサーボ回路 103は射出用サーボ モータ 2に接続され、 パルスコーダ 3の出力はサーボ回路 103に入力さ れている。 又、 出力回路 107からサーボ回路 103には、 射出用サーボ モー夕 2の出力トルクを制御するためのトルクリ ミ ヅ ト値が出力されるよ うになっている。
さらに、 出力回路 107にはァドレス発生器 118が接続され、 ァドレ ス発生器 118の出力は PMC用 C PU 114にバス接続された RAMI
08, 109に入力され、 RAMI 08, 109の同一アドレスを指定す るようになっている。 そして、 RAMI 08には射出圧力センサ 4の出力 信号が A/D変換器 101を介して接続され、 また RAMI 09にはパル スコーダ 3からの信号を計数してスクリユー位置を検出するカウンタ 10 2が接続されており、 出力回路 107から射出開始指令が出力されると、 ァドレス発生器 118が所定ァドレスより順に所定サンプリング周期で発 生し、 RAM108, 109の同一アドレスを指定し、 AZD変換器 10 1の出力, カウンタ 102の出力を指定ァドレスに格納するようになって いる。
以上の構成によって、 NC装置 100は PMC用 CPU 114によって、 ROM 117に記憶されたシーケンスプログラムに基づいてシーケンス制 御を行うと共に、 共有 RAMI 05に設定記憶されている NCプログラム に基づいて NC用 C PU 112が各サーボモータのサーボ回路にパルス分 配を行い射出成形機を駆動する。
射出圧力センサ 4で検出した樹脂圧力は、 A/D変換器 101でディ ジ タル信号に変換され、 RAMI 08に所定周期毎書き込まれ現在の樹脂圧 力として逐次書換えられている。 また、 ?! じ用じ?11114は、 所定周 期毎該 RAMI 08に書き込まれた樹脂圧力を読出し、 その読出した樹脂 圧力値を B ACを介して共有 RAMI 05に逐次書き込んでいる。
そして、 本実施例では、 N C装置 100の共有 RAMI 05に、 射出成 形に使用される金型のキヤビティ形状を表す縦断面形状及び後述するテー ブル TB等のキヤビティデータが格納される。 このキヤビティデータは上 記金型を CADシステムを用いて設計するときに得られるものであって、 このデータを用いることにより、 第 2図に示すようなキヤビティ形状 (キ ャビティの縦断面 (輪郭) を示す絵) をディスプレイ上に描き、 且つ、 こ の描画キヤビティに対して、 キヤビティに充填された樹脂体積に対する充 填領域を段階的に識別表示することができるようになつている。 そのため、 共有 RAMI 05には、 第 3図に示すようなキヤビティデータを記憶する テーブル TBデータが格納される。
第 3図に示すように、 金型キヤビティ内に充填される樹脂の体積 (VI , V2 , · · · Vn)、 上記充填体積を描画されたキヤビティに領域として識 別表示するために引く必要な線の本数 (Ll, L2 · · · Ln)、 上記線を表 示する始点と終点となる描画されたキヤビティ耪郭線上の点 (Pll、 P12、 Ρ21、 Ρ22 · · · ) を記憶したテーブル TBを CADシステムで金型を設 計するときに作成し、 フロッピ一ディスク等に記憶させておく。 そして、 オペレータパネルコントローラ 116にディスクコントロ一ラを接続して、 該ディスクコントローラを介して上記フロッピーディスクから共有 RAM 105にこれらキヤビティデータを格納する。 また、 描画すべきシリンダ とスクリューの形状も共有 RAMI 05に入力しておく。 さらに、 スクリ ュ一位置にカーソル及び該カ一ソル位置に縦線を表示するようにする。 第 2図を参照すると、 CRTZMD I 119の表示画面に表示された金 型キヤビティ形伏 (断面形状) を表す輪郭線上には、 射出されキヤビティ 内を流動する樹脂の先端位置を段階的に表示するための複数の点が指定さ れている。 これらの点の指定にあたっては、 まず、 キヤビティ内を移動す る撐脂の流動抵抗が大きく変化する箇所を選定する。 すなわち、 第 2図に 示す例では、 点 P31と点 P32を結んだ位置、 点 P41 (= P31) と点 P42を 結んだ位置、 点 P43 (= P32) と点 P44を結んだ位置、 点 P51と点 P52を を結んだ位置、 点 P53と点 P54を結んだ位置である。 次に、 上記の選定箇 所と選定箇所との間の領域を適当数に分割する点 (点 P 11と点 P 12、 点 P 21と P22など) をも選定する。 また、 こうして分割した領域の体積はそれ ぞれほぼ同じ大きさになることが望ましい。
こうして、 表示画面上の金型キヤビティ形状の輪郭線上にキヤビティ内 を流動する栴脂の先端位置を段階的に表示するための点の指定が終了する と、 その指定に基づいて第 3図に示すようなテーブル T Bが作成される。 すなわち、 ①キヤビティを所定体積の領域に分割するためのキヤビティ輪 郭線上の点 P j.1 , P i.2 , P j.3 , P j.4 · · · ·を特定すると共に、 上記分割領域を識別表示するために結ぶ直線の始点 ·終点の組み合わせ P j. 1-P j.2 、 P j.3-P j.4 、 · · · ·の設定、 ②結ぶべき直線の数 L j 、 ③上記直線でもって識別された分割領域の体積 Vj (j = l 〜! ι)、 等の諸項目 が含まれる。 なお、 上記③の分割体積 V j (j = l 〜! 1)の値及びその数(n) は、 キヤビティ輪郭線上の点 Pの指定によって自ずと定まる値であり、 キヤビ ティを分割する数を多くすればするほど (したがって、 指定する点 Pの数 が多くなるほど) 、 樹脂体積 Vi の数(n) が多くなって、 キヤビティへの 樹脂の充填状態をそれだけ細かく表現できることになる。
第 3図に示したテーブル T Bのキヤビテイデー夕によると、 例えば、 第 2図に示す画面のキヤビティに対して点 P 51と P 52、 点 P 53と P 54とを直 線で結び (結ぶ線の本数は L 2 = 2) 、 この直線とキヤビティ輪郭線とで 形成される閉領域を塗り潰すなどして区別すれば、 この領域は樹脂がキャ ビティ内に体積 V 5 だけ充填されたことを表現していることになる。 そこで、 前述したように、 共有 RAMI 05に上記キヤビティデータ (テーブル TB, キヤビティ縦断面形伏) を記憶させたうえで、 成形条件 を設定し、 射出を行うことによりモニタを実施する。 なお、 成形条件の内, 射出速度、 射出圧力、 保圧圧力については、 金型を破壊させない程度の仮 の植を設定することにする。 そして、 この様に設定された条件の下で、 射 出が開始されると、 ァドレス発生器 118は射出開始から所定周期毎) HI次 RAMI 08、 109のア ドレスを 0番地から指定する。 このア ドレス発 生に基づき、 その RAM 108、 109には各周期毎のスクリュー位置、 圧力が指定ァドレスにそれぞれ記憶されることになる。 この RAMI 08、 109に記憶される内容を表にして示すと、 第 4図のように、 アドレス i 番地にはァドレス発生時 (t = i r) にスクリュー位置データ S C i及び 圧力データ PR iが記億される。 なお、 この図の表において rはア ドレス 発生器 118がァドレスを発生する周期である。
このモニタの結果を表示する CRTZMD I 119の画面の内容の一例 を第 5図に示す。 第 5図を参照すると、 この表示画面の下方には横釉をス クリユー位置に縦轴を圧力にとった圧力波形グラフのための座標 A 1 (以 下、 圧力表示座標という) 、 及びスク リユー位置を数値で表示する欄 A 4 が設けられ、 また画面の上方にはシリンダ形状とスクリュー形状の表示領 域 A2、 及び第 2図に示したような金型キヤビティ形状 (縱断面形状) を 描画する表示領域 A 3が設けられる。
さらに、 圧力波形座標 A 1のスクリュー位置 (スクリユー先端の位置) を示す座標横軸上には、 上記の櫊 A 4に表示されたスクリュー位置に対応 して力一ソル Cが表示され、 また、 スクリュー位置を表示するマークとし て、 カーソル Cの表示位置において、 上記横軸を横切って上方のスクリュ 一の絵を通過する縦線 Lが表示される。 なお、 第 5図の画面において、 圧 力波形座標の横軸であるスクリユーの位置と描画されたシリンダの先端位 置とは対応させている。 そして、 後述するように、 カーソル Cを移動させ ると、 縦線 Lが移動し、 表示檷 A4のスクリユー位置もそれに対応した値 に変更されるようになっている。 又はその反対に、 スクリユー位置を表示 檷 A4に入力すると、 そのスクリュー位置に基づいてカーソル C及び縦線 Lが座標横軸及びシリンダ形状の絵に対して対応位置に移動するようにな つている。
そこで、 本発明の射出圧力モニタ方法にかかる第 1の実施例を説明する c この例は、 CRTZMD I 119の画面に第 5図に示したような内容の表 示をさせ、 キー操作によりカーソル Cを移動させ縦線 Lを移動させると、 表示檷 A4にはそのカーソル Cの座標位置に対応するスクリュー位置が表 示され、 同時に画面上のスクリューがシリンダの中を上記縱線 Lの移動に 伴い移動し、 且つそのスクリユーの移動によって樹脂がキヤビティ内に充 填される様子をキヤビティの表示領域 A 3に表示するというものである。 上記第 1実施例を実行するための処理を第 6図のフローチャートを用い て説明すると、 上述したように射出速度, 保圧等を仮設定しその成形条件 で射出を 1回行なった後、 モニタ指令を入力すると、 PMC用 CPU 11 4は、 まず、 共有 RAMI 05に記憶されているデータから CRT画面上 にシリ ンダ形状、 このシリンダ形状内でスクリューバック位置 (xm。 ) にあるスクリユー形状、 及び、 金型キヤビティ形状 (縦断面形状) をそれ ぞれ描画すると共に、 RAMI 08, 109に同期して記憶されているス クリユー位置に対応する圧力値を圧力表示座標上にプロッ 卜することによ つて圧力波形グラフを表示する (ステップ S 101) 。 次に、 画面の圧力座標 A 1における庄カ波形を見ながら、 カーソルキー を操作してカーソル Cをその横軸上に移動させて調べたいスクリュー位置 にもってくる (ステップ S 102) o なお、 このカーソル Cは、 例えば力 一ソルキーを叩く回数又は押し続ける時間に応じて移動するするものであ り、 カーソルキーの押圧が停止したとき、 スク リュー位置 (カーソル位置 P) の入力があったものとしている。 こうして移動したカーソル Cの横軸 上の位置 Pは、 射出成形機上のスクリュー位置 (X) に変換されてその値 (X) がスクリュー位置の表示檷 A 4に表示される (ステップ S 103) 。 なお、 この射出成形機上のスクリュー位置 (X) はシリンダ先端位置を原 点 (0) としスクリューバック位置 (xffla_ ) に向かう方向をプラスの方 向としたときの値としている。 そして、 キー入力により移動のあったカー ソル位置 Pがシリンダ先端 (0) を超えた位置か或いはスクリューバック 位置 (x„ ill, aT ) よりも後方の位置のいずれかにスクリユーが位置すること を表すものであれば (ステップ S 104) 、 正しい入力ではないとしてス テツプ S 102に戻り、 正しい値の再入力を待つ。
一方、 キー入力のあった力一ソル位置がシリンダ先端 (0) とスクリュ —バック位置 (χ„ Π13,τ ) との間にスクリューが位置することを表すもので あれば、 前に表示されていた縦線 Lを消去してこのカーソル位置 Pに新た に縦線 Lを描画する (ステップ S 105) 。 それから第 7図にサブルーチ ンで示した処理を行なう (ステップ S 106) 。
このサブルーチン処理では画面上に既に描画されているスクリユー形状 を消し、 この位置 Pに先端が位置するスクリュー形状を新たに表示する。 なお、 画面上のスクリュー形状の先端は、 当初は、 カーソル C、 縦線 Lと 共に、 スクリューバック位置 (xmT
HI ) に表示されている。 同時に、 この 画面上の金型キヤビティに対しそれまでに表示していた充填状態の識別表 示を消して、 新たなスク リュー位置 (X) に基づく樹脂充填状態を上記金 型キヤビティ形状に対して表示する。 なお、 このキヤビティ充填状態の表 示に関する具体的な処理については後述する。
そして終了キーが押されると (ステップ S 107) この処理は終了する が、 このキーが押されずに、 他のスクリユー位置の入力があると再びステ ップ S 102以下の処理を繰り返すことになる。
そこで、 上記ステップ S 106でのスクリユー位置及びそのスクリュー 位置に基づくキヤビティ充填状態の書換えについてのサブルーティ ン処理 の一例を第 7図のフローチヤ一トをもとに説明する。
まず、 入力のあったカーソル位置 Pにスクリユーを画面上に表示する (ステップ S 201) 。 すなわち、 座檩横釉上のカーソル Cの真上にスク リユーの先端が位置するようにスクリュー形状を表示する。 そしてカーソ ル Cの位置 Pに対応するスクリユー位置 (X) までスクリユーがスクリュ 一バック位置 (XJJ ) から進むことによって、 榭脂がどれだけキヤビテ ィ内に充填されるかその体積を計算する (ステップ S 202) 。 この計算 は、 シリンダ内径 (D) とスクリユーの行程 (xm — X)
ΙΠ αaT から、 次式の λ
演算を行なって体積すなわち、 充填量 Vxを求める。
Vx= (TT D2 /4) (X - X)
それから共有 RAMI 05のテーブル TBのァドレスに対応する指標 i を 1にして (ステップ S 203) 、 上記算出された充填量 V Xがこのテー ブル TBに記憶された指標 iに対応する体積 V i (最初は VI ) 以下か否 かを判断し (ステップ S 204) 、 体積 V i以下でなければ指標 iの値を 1インク リメ ン トし (ステップ S 205) 、 この更新された指標 iの値が キヤビティの容積を分割した数 n以下であると (ステップ S206) 、 再 びステップ S 204に戻って、 上記算出された充填量 Vxがこの更新され た指標 iに対応する体積 V i以下であるかどうかを判断する。 こうしてこ の作業を緣り返して行く過程で充填量 V Xに等しいかこれより大きい V i を見出だすと、 ステップ S 207に移行する。
すなわち、 上記ステップ S 204からステップ S206までの処理は、 入力のあった充填量 Vxをテーブル TBに記憶された VI、 V2、 V3、 • · · · と順に比較していって、 充填 SVxにもつとも近い (但しこれよ りも少なくはない) Vi (第 6図参照) を見付ける作業である。 例えば、 入力したスクリユー位置 Xに対応する充填量 Vxが共有 RAMI 05のテ 一ブル TBに記憶された体積 V6 と体積 V7 との間の値であれば、 指標 i =7で次のステップ S 207に移ることになる。
次にステップ S 207で別の指標 jを 1に初期設定してから、 共有 RA Ml 05のテーブル TBに記億された点 と 2jとを直線で結ぶ (ステップ S 208) 。 当初は jは 1であるから P{ { と Pf 2 とを桔ぶ。 なお、 上記例でのように指標 i =7でこのステップ S 207に移行したの なら、 まず、 点 P7 1 と P7 „ とが直線で結ばれることになる。 それから 指標 jの値を 1インク リメントし (ステップ S 209) 、 さらにそのィン クリメン卜した値が体積 V iに対応するテーブル TBに記憶された直線の 数 L i (第 7図参照) 以下か否かを判断する (ステップ S 210) 。 すな わち、 i と 2 とを結ぶ一つの線の外にまだ他の点と点とを結ぶベ き線が残っているかどうかを判断する。 もし、 残っていれば、 すなわち、 指標〗の値が直線の数 L i以下であれば、 ステップ S 210からステップ S 208に戻り、 同様に点 2j2jとを直線で結ぶ。 もし、 第 3 図のテーブル T Bにおける体積 V 5、 V 6 などのよう、 結ぶべき直線の数 ( L 5、 L 6 ) が 「2」 であるときは、 一回だけステップ S 2 1 0からス テツプ S 2 0 8に戻り、 点 P i と P i 2 j、 すなわち、 P j 34 とを直線で結ぶ処理をすることになる。
こうして指標 jの値を一つづつインクリメントしていった結果、 その値 が結ぶべき直線の数 L iを越えると (ステップ S 2 1 0 ) 、 上記ステップ S 2 0 8〜2 1 0で結んだ線の内側を塗り滇すなどの識別処理をして (ス テツブ S 2 1 1 ) 、 樹脂がキヤビティのどのあたりまで充填されたかを画 面上にイメージとして表示する処理を行う。 その処理が完了すると第 6図 のフローチャートのステップ S 1 0 7に戻る。
この第 1の実施例は、 第 5図に示すように、 横軸をスクリュー位置とし 縦軸を圧力值とした圧力表示座標 A 1の横袖上の任意位置にカーソル Cを キー入力により位置決めし、 そのカーソル位置 Pに対応するスクリュ一位 置 (X ) までスクリューが進んだことによる樹脂充填状態を同画面の表示 領域 A 3にイメージとして表示するので、 スクリュー位置と圧力及びキヤ ビティ内の充填状態との三者の関係が一目で理解できる。 すなわち、 射出 成形機上のスクリュー位置に対応する圧力の値はカーソル Cに連なる縦線 Lでもって直ちに知ることができると同時に、 そのとき樹脂はキヤビティ のどの領域まで充填されているのか或いはその先端が流動抵抗が大きく変 化することになる領域に移ろうとしているのかどうか等について、 画面に より直ちに理解できる。 '
次に、 樹脂のキヤビティ内での充填状態をスローモーションで画面表示 すると共にその時点での射出圧力を画面上に表示する第 2の実施例を第 8 図のフローチャートと共に説明する。 上述したように 1回射出をして、 第 4図に示すような、 所定周期ごとの スクリユー位置に対する圧力値データを得ておく。 その後モニタ指令を入 力すると、 PMC用 C P U 114は前述同様に画面上に圧力波形、 シリ ン ダ形状、 このシリンダ形状内でスクリューバック位置 (xfflai ) にあるス クリュー形状、 及び、 金型キヤビティをそれぞれ描画する (ステップ S 3 01) 。 ここまでの処理は第 6図のフローチヤ一トのステップ S 101で の処理と同じである。
次に PMC用 C PU 114は、 テーブル TB (第 3図) のァドレスに対 応する指標 iを 「1」 にし (ステップ S 302) 、 指標 iに対応する体積 V iを充填させるスクリュー位置 S C i (最初は S C1 ) を、 前述したス クリユー位置 (X) と充填量 (Vx) との関係式から求める。 そして、 ス クリユー形状の表示領域 A 2における求められたスクリュー位置にスクリ ユー形伏を描画し、 且つスクリユー位置の表示檷 A 4にその位置を数値で 表示する (ステップ S 303) 。
次に別の指標 iを 1にし (ステップ S 304) 、 点 Pj 2j— iと点 P: 2j とを直線で結ぶ (ステップ S 305) 。 そして指標 jの値を 1インクリメ ントし (ステップ S 306) 、 そのインクリメントした指標 jの値が体積 V iに対応する直線の数 L i (第 3図参照) を越えてなければ (ステップ S 307) 、 ステップ S 305に戻って、 同様に点 P{ 2j— jと Pi 。jとを 線で結ぶ。
こうして指標 jをインク リメ ントした結果、 その値が体積 V iを識別す るため結ぶべき直線の数 L iを越えると、 ステップ S 308に移行し、 ス テツプ S 305〜307で結んだ直線で形成されるキヤビティ内の閉領域 の樹脂流入側を塗り潰すなどの識別処理をして、 樹脂がキヤビティのどの - 1 1 - 領域まで充填されたかを画面上にイメージとして表示する。 なお、 この内, ステップ S 3 0 4からステップ S 3 0 8までの処理は、 前述の第図 7にお けるステップ S 2 0 3からステップ S 2 1 1までの処理と同一である。 そして上記の表示処理が終了すると、 タイマ一 Tをスタートさせる (ス テツプ S 3 0 9 ) 。 このタイマー Tのスター卜から一定時間経過すると
(ステップ S 3 1 0 ) 、 終了指示が出されたかどうかを判断し (ステップ S 3 1 1 ) 、 出されていればこの処理を終了する。 一方、 終了指令が出さ れてなければ指標 iの値を 1つインクリメントして (ステップ S 3 1 2 ) インクリメントした指標 iの値がキヤビティ分割数 nを越えてなければ、 ステップ S 3 0 3に戻って、 これ以降は次のアドレスについて前と同様な 処理を実行する。 なお、 指標 iの値が分割数 nを越えるとステップ S 3 0 2に戻り、 ァドレス i = 1に変更し、 前述した処理が繰り返し実行される c なお、 このタイマー Tはスクリユーをァドレス iを 1だけ更新させる時 間を設定するためのものであるから、 このタイマー Tの設定時間を変える ことにより、 画面上にキヤビティの充填状態の変動を表す速度を速めたり、 運く したり、 これを任意に調節することができる。
上述した例は一定時間ごとにスクリューのァドレスを自動的に 1つづつ 増加させたときのキヤビティの充填状態を実動作の何分の一かの速度 (ス ローモーション) で画面に表現するものであり、 同時にスクリユー位置で の圧力値を表示している。 したがって、 スクリューが徐々に前進したとき の圧力の変動をモニタしつつキヤビティの充填伏態の変動を所望の速度で 確認することができるので、 射出速度の切換えが適切に行われているか否 かが画面上での画像の動きから容易に判断できる
次に、 スクリューを一定速度で動かし、 スクリュー位置に対応して射出 圧力、 並びにキヤビティ充填状態の変動について画面に表示する第 3の実 施例を第 9図のフローチャートと共に説明する。
前述同様に 1回射出を行なつた後、 モニタ指令を入力することにより、 PMC用 CPU 114は画面上に圧力波形、 シリンダ形状、 このシリンダ 形状内でスクリユーバック位置 (xma∑ ) にあるスクリュー形状、 及び、 金型キヤビティ形状をそれぞれ描画する (ステップ S 401) 。 ここまで の処理は第 6図のフローチヤ一トのステップ S 101での処理と同じであ る。
次に、 スクリユー位置 Xをスクリユーバック位置 (χΠΜ ) に設定する (ステップ S 402) 。
それからスクリューの位置 (X) を現在位置 Xより所定量 aだけ前進させ る (ステップ S 403) 。 なお、 スクリューの位置 Xはシリンダ先端を原 点 (0 ) にしているため、 スクリューの前進方向とはマイナス方向になる。 また、 この所定量 a、 すなわち一回に進む距離は予め設定された値であつ て、 レジスタに格納されている。 そしてスクリューを前進させた結果、 そ れが射出完了位置 (xBin ) を越えてさらに前進させることになると、 ス テツプ S 402に戻って、 スクリユー位置 Xを再びスクリユーバック位置 (xfflai ) に設定する。
これに対して、 スクリューを前進させても射出完了位置 (xfflin ) に到 達してない伏態では、 そのスクリューの位置 Xを画面上のスクリユー位置 表示橱 A4に表示し (ステップ S 405) 、 それからこのスクリュ一位置 Xを座標値 Pに変換する (ステップ S 406) 。 そして、 この変換された 座標値 Pの位置にスクリュー形伏を表示領域 A 2に描画すると共に、 この スクリユー位置 Xに対応して画面上のキヤビティを塗りつぶす処理、 すな わち第 7図に示すスクリュー, 充填量描画のサブルーチン処理を行う (ス テツプ S 407 ) 。
スク リュー, 充填量描画のサブルーチン処理を行った後、 終了指示が出 てなければ (ステップ S 408) 、 次にタイマー Tをスタートさせる (ス テツプ S 409) 。 そして、 このタイマー Tによる設定時間が、 途中に停 止ボタンを押されることなく (ステップ S 410) 経過すると (ステップ S 411) 、 再びステップ S 403に移行し、 さらにスクリユーは所定量 aだけ前進することになつて、 それ以後は前と同様な処理を行うことにな る。 すなわち、 スクリューはタイマー Tの設定時間ごとに自動的に距離所 定量 aづっ進むことになる。 なお、 このタイマー Tの設定時間は適宜変更 することができる。
このように画面上のスクリユー形伏を次々と前進させている途中でその 動きを停止させたいときには、 オペレータは停止キーを押す。 停止キーが 押されるとこれを感知して (ステップ S 410) タイマ一 Tをストップす る (ステップ S 412) 。 また、 その停止を解除したいときは再開指令キ 一を押す。 再開指令が出されると (ステップ S 413) ステップ S 411 に戻り、 以下同様の処理を行う。
以上のように、 スクリユーを等速で前進させたときに圧力をモニタしつ つキヤビティの充填状態の変動を画面上から知ることができるので、 第二 実施例の場合と同様に、 スク リュー速度切換え位置、 切換え量などに射出 条件設定のための基礎的な資料を得ることができる。
次に、 スクリューをキー操作により一定量 (a) づっ前進或いは後退さ せ、 スク リユー位置に対応する射出圧力、 並びにキヤビティの充填状態の 変動を画面上に表現する第 4の実施例を第 10図のフローチャー トと共に 説明する。
前述同様に 1回射出を行なつた後、 モニタ指令を入力することにより、 PMC用 C PU 114は画面上に圧力波形、 シリンダ形状、 このシリンダ 形状内でスクリユーバック位置 (xma)[ ) にあるスクリユー形伏、 及び、 金型キヤビティ形状をそれぞれ描画する (ステップ S 501) 。 ここまで の処理は第 6図のフローチヤ一卜のステップ S 101での処理と同じであ る。
次に、 スクリュー位置 Xをスクリユーバック位置 (xm,T ) に設定し (ステップ S 502) 。 それから力一ソルキーの前進指令のキー (表示画 面が第 5図の通りとすると [ ] キ一) 、 或いは後退指令のキー (同様に、 [―] キー) が押されたかどうかを判断する (ステップ S 503、 504) o
前進指令のキーが押されると、 スクリユー位置 Xを (X— a) の位置に 書換える (ステップ S 505) 。 すなわち、 スクリューを所定量 aだけ前 進させた位置にする。 そしてこの移動させた位置 (新たな X) がスクリュ 一最先端位置 (xBin ) を越えてないと (ステップ S 506) 、 ステップ S 511に移って、 このスクリュ一位置 Xを画面のスクリユー位置表示檷 A 4に表示する。
そしてこの表示されたスクリユー位置 Xを画面上の座標値 Pに変換する (次のステップ S 512) 。 そうして、 この座標値 Pにスクリューを表示 すると共に、 このスクリュー位置 Xに対応して第 7図に示すスクリユー, 充填量描画処理のサブルーチンを行なう (ステップ S 513) 。
上記の処理が終了した後、 終了指令が出されれば (ステップ S 514) 、 この処理は終了する。 また、 この指令が出されてなければ、 ステップ S 5 03に戻り、 後退指令か (ステップ S 503) 、 前進指令 (ステップ S 5 04) を待つ。
なお、 スクリユーを前進させた結果、 スクリユー位置 Xがスクリユー最 先端位置 xmin を越えてしまったときは (ステップ S 506) 、 スクリュ 一を所定量 aだけ後退させたうえで (ステップ S 507) 、 その位置をス クリュー位置 Xとして画面に表示し (ステップ S 511) 、 ステップ S 5 12以下の処理を行う。
一方、 後退指令のキーが押されると (ステップ S 503) 、 現在の位置 Xにあるスクリューを所定量 aだけ後退させ、 x + aの位置にする (ステ ップ S 508) 。 そしてこの移動させた位置 (新たなスクリュー位置 X) が、 スクリューバック位置 (xm ID α,T ) を越えてないと (ステップ S 509)
、 そのスクリユー位置を画面に表示し (ステップ S 511) 、 ステップ S 512以下の処理を行う。
スクリユーを後退させた結果、 スクリユーが xmT を越えた位置にくる と (ステップ S 509) 、 スクリューを所定量 a前進させたうえで (ステ ップ S 510) その位置をスクリュー位置 Xとして画面に表示し (ステツ プ S 511) 、 以下ステップ S 512以下の処理を行う。
以上のように、 この第 4の実施例は、 カーソルキーを一回押す毎にスク リユー位置を一定畺だけ前後に移動することができるので、 スクリユーの 任意位置における圧力をモニタしつつキヤビティ充填伏態を容易に知るこ とができ、 また、 スクリューをある位置から他の位置に移動した時の圧力 の変動やキヤビティ充填状態の変動をも知ることができる。 さらには、 こ の所定量 aの値を変えることにより、 一回のキー操作によるスクリューの 移動量を調節することができる。 次に、 連続成形時に実際の圧力をモニタしながらキヤビティの充填状態 をリャルタイムに描画する第 5の実施例について説明する。 まず、 連続成 形中にモニタ指令を入力すると PMC用 CPU 114は表示画面上にキヤ ビティ形状、 シリンダ形状, スクリュー形状をそれぞれ描画し、 それから 第 11図に示す処理を所定周期毎実施する。
まず、 フラグ Fが立っている (F=l) か否かを判断し (ステップ S 6 01) 、 立っていなければ次に射出中であるかどうかを判断し (ステップ
5602) 、 射出中でなければ当該周期の処理を終了する。 一方、 射出が 開始されたことを判断するとフラグ Fを立てる (ステップ S 603) 。 な お、 射出中か否かは、 射出工程になると PMC用 CPU114が共有 RA Ml 04中に射出中を示すフラグを 「1」 にセッ 卜するため、 このフラグ の状態を検出して射出中か否かを判断する。
次に、 現在、 カウンタ 102から出力されているスクリユー位置 S Cと、 AZD変換器 101から出力されている圧力 PRとを読み取り (ステップ S 604) 、 さらにその読み取った現在のスクリユー位置 S C, 圧力 PR を圧力表示座標での值に変換して (ステップ S 605) 、 スクリュ—位置 に対応する圧力を圧力波形グラフとして座標 A 1に表示する (ステツプ S
606) 。 そして、 スクリュー座標値に縦線の書換えを行ない (ステップ S 607) 、 さらに、 第 7図に示すスクリュー, 充填量描画処理を行なつ てスクリューの描画位置と、 キヤビティ内の充填量位置の書換えを行なつ て (ステップ S 608) 、 当該周期の処理を終了する。
次の周期では、 フラグ Fが立っているから (F = 1) 、 ステップ S 60 1からステップ S 609に移行し、 保圧終了か否か判断し、 保圧終了でな ければ、 ステップ S 604に移行し前述した処理を行ない、 順次スクリュ —位置に対する圧力のグラフを表示すると共に、 スクリユ ー描画位置を書 換え、 かつ、 キヤビティ内の充填量位置の書換えを行なう。
こうして保圧工程が終了すると、 ステップ S 6 0 9からステップ S 6 1 0に移行しフラグ Fを 「0」 にして当該周期を終了し、 以後の周期からは 射出が開始されるまで、 ステップ S 6 0 1 , S 6 0 2の処理を行なうのみ となる。
以上のように、 上記第 5実施例では、 連続成形時の実際の射出工程にお ける射出 (保圧) 圧力とスクリュー位置, キヤビティ内の樹脂充填位置が 表示されるので、 設定射出速度や設定圧力に対応し、 実際の速度, 圧力, キヤビティ充填常態が関連して把握できることになる。
なお、 以上の各実施例は全て圧力波形に対応させてスクリューのシリン ダ内の位置, キヤビティの充填状態とを同時に表示するものであつたが、 圧力波形とキヤビティの充填状態及びスクリュー位置 (数値) のみ表示し、 スクリューのシリンダ内の位置の描画は行なわないでもよい。 また、 圧力 波形とシリンダー内のスクリューの位置のみ描画するようなものでもよい c さらには、 上記実施例では、 成形条件を設定し、 射出速度, 保圧等は仮 の値に設定し 1回射出を行なって圧力波形のデータを取って圧力波形を描 画するようにしたが、 圧力波形のデータを取らずに (例えば、 ステップ S 1 0 1 , S 3 0 1 , S 4 0 1 , S 5 0 1で、 圧力波形を描画しない) 、 ス クリユーの位置とキヤビティ内の充填状態のみを描画するようにしてもよ い。 この場合には、 仮の射出速度, 保圧を決めるとき、 もしくは、 始めか ら、 射出速度や保圧を決めるとき、 スクリューバック位置等を決めるとき などに利用すればよい。

Claims

請 求 の 範 囲
1. スク リュー位置検出手段によってスク リュー位置を検出し、 射出圧力 センサによって樹脂にかかる圧力を検出し、 該検出されたスクリュー位 置と圧力に基づいてスクリユー位置に対する圧力の圧力波形を表示装置 の画面上に表示して射出圧力をモニタする射出圧力モニタ方法において、 金型のキヤビティデータを記億しておき、 射出を少なくとも一回行った 後、 該射出で検出された圧力波形と共にキヤビティ形伏を上記表示装置 の画面上に描画し、 スクリューの位置を入力することにより、 該入カス クリュー位置を上記表示装置の画面に表示すると共に、 該スクリュー入 力位置に対応する射出樹脂量を求め、 上記描画されたキヤビティ形状に 対し上記樹脂量に対応する充填捃脂伏態を表示する射出圧力モニタ方法。
2. 金型キヤビティを複数の領域に分割し、 分割した各領域までのキヤビ ティ入口からの体積を求め上記キヤビティデータとして記憶しておき、 入力スクリユー位置より射出樹脂量を求め、 該射出樹脂量と上記体積を 比较して、 上記表示装置の画面上のキヤビティ形状に対して上記射出樹 脂量を満たす領域までを識別表示する請求の範囲第 1項記載の射出圧力 モニタ方法。
3. 上記表示装置の画面にはシリンダ形状を描画すると共に、 入力スク リ ユー位置に応じて上記描画シリンダ形状内にスクリュー形状を描画する 請求の範囲第 1項または 2項記載の射出圧力モニタ方法。
4. 上記表示装置に表示されたスクリュー位置に対する圧力の圧力波形中 の入力スクリュー位置に対応する位置に、 入力スクリュー位置を示すマ 一クを表示する請求の範囲第 1項または 2項記載の射出圧力モニタ方法。
5 . 上記表示装置に表示されたスクリュー位置に対する圧力の圧力波形中 の入力スクリユー位置に対応する位置に、 入力スクリュ一位置を示すマ ークを表示する請求の範囲第 3項記載の射出圧力モニタ方法。
6 . スクリューの位置の入力を設定された所定時間毎自動的に設定された 距離だけ射出方向に進める、 請求の範囲第 1又は 2項記載の射出圧力モ 二夕方法。
7 . 上記表示装置の画面にはシリンダ形状を描画すると共に、 入力スクリ ユー位置に応じて上記描画シリンダ内にスクリユー形状を描画する請求 の範囲第 6項記載の射出圧力モニタ方法。
8 . 上記表示装置に表示されたスクリュー位置に対する圧力の圧力波形中 の入力スクリュー位置に対応する位置に、 入力スクリユー位置を示すマ 一クを表示する請求の範囲第 6項記載の射出圧力モニタ方法。
9 . 上記表示装置に表示されたスクリュー位置に対する圧力の圧力波形中 の入力スクリュー位置に対応する位置に、 入力スクリュー位置を示すマ 一クを表示する請求の範囲第 7項記載の射出圧力モ'ニタ方法。
1 0 . スク リューの位置の入力は移動指令キーが押される度に設定所定距 離前進又は後退させる、 請求の範囲第 1又は 2項記載の射出圧力モニタ 方法。
1 1 . 上記表示装置の画面にはシリンダ形状を描画すると共に、 入力スク リュー位置に応じて上記描画シリンダ形状内にスクリユー形伏を描画す る請求の範囲第 1 0項記載の射出圧力モニタ方法。
1 2 . 上記表示装置に表示されたスクリュー位置に対する圧力の圧力波形 中の入力スクリュー位置に対応する位置に、 入力スクリユー位置を示す マークを表示する請求の範囲第 1 0項記載の射出圧力モニタ方法。
1 3 . 上記表示装置に表示されたスクリユー位置に対する圧力の圧力波形 中の入力スクリユー位置に対応する位置に、 入力スクリユー位置を示す マークを表示する請求の範囲第 1 1項記載の射出圧力モニタ方法。
1 4. スクリユー位置検出手段によってスクリユー位置を検出し、 射出圧 力センサによって樹脂にかかる圧力を検出し、 該検出されたスクリュー 位置に対する圧力波形を画面上に表示して射出圧力をモニタする射出圧 力モニタ方法において、 射出を少なくとも 1回行った後、 該射出で検出 された圧力波形を描画すると共に、 シリンダ形伏を描画し、 スクリュー 位置の入力に応じて上記描画シリンダ形伏内に入力スクリュー位置に対 応してスクリュ一形状を描画する、 射出圧力モニタ方法。
1 5. 上記表示装置に表示されたスクリュー位置に対する圧力の圧力波形 中の入力スクリユー位置に対応する位置に、 入力スクリユー位置を示す マークを表示する請求の範囲第 1 4項記載の射出圧力モニタ方法。
1 6. スクリユー位置検出手段によってスクリュー位置を検出し、 射出圧 力センサによって樹脂にかかる圧力を検出し、 該検出されたスクリュー 位置と圧力に基づいてスクリユー位置に対する圧力の圧力波形を表示装 置の画面上に表示して射出圧力をモニタする射出圧力モニタ方法におい て、 金型キヤビティを複数の領域に分割し、 分割した各領域までのキヤ ビティ入口からの体積を求め、 キヤビティ形伏と共に上記各体積をキヤ ビティ入口から順に順次記憶しておき、 射出を少なくとも一回行った後、 該射出で検出された圧力波形と共にキヤビティ形状を上記表示装置の画 面上に描画し、 設定された所定時間毎、 上記記憶された体積を順に読み だし、 該体積に対応する樹脂量を射出するスクリユー位置を求め、 該ス クリユー位置を上記表示装置に表示すると共に、 上記表示装置の画面上 のキヤビティ形状に対して読み出した体積の領域を識別表示する射出圧 力モニタ方法。
1 7. 上記表示装置の画面にはシリンダを描画すると共に、 入カスクリュ 一位置に応じて上記描画シリンダ内にスクリュー形伏を描画する請求の 範囲第 1 6項記載の射出圧力モニタ方法。
1 8. 上記表示装置に表示されたスクリュー位置に対する圧力の圧力波形 中の入力スクリュー位置に対応する位置に、 入力スクリュー位置を示す マークを表示する請求の範囲第 1 6項または 1 7項記載の射出圧力モニ 夕方法。
1 9. スクリュー位置検出手段、 射出圧力センサを有し、 スクリュー位置 に対する圧力波形を画面上に表示して射出圧力をモニタする射出圧力モ ニタ方法において、 金型のキヤビティデータを記憶しておき、 該データ に基づいて上記表示画面にキヤビティを描画し、 射出開始後、 上記スク リュー位置検出手段、 射出圧力センサで所定周期毎スク リユー位置、 圧 力を検出し、 上記画面に検出位置に対する検出圧力をグラフ表示すると 共に、 検出スクリユ ー位置に応じてキヤビティに充填される樹脂量を求 めて、 上記描画キヤビティ内に榭脂充填状態を表示する、 射出圧力モニ タ方法。
0. 上記表示装置の画面にはシリンダを描画すると共に、 入カスクリュ —位置に応じて上記描画シリンダ内にスクリュー形伏を描画する請求の 範囲第 1 9項記載の射出圧力モニタ方法。
1 . 上記表示装置に表示されたスクリユ ー位置に対する圧力の圧力波形 中の入力スクリュー位置に対応する位置に、 入力スクリュー位置を示す マークを表示する請求の範囲第 1 9項または 2 0項記載の射出圧力モニ 夕方法。
PCT/JP1992/000206 1991-02-26 1992-02-25 Method of monitoring injection pressure WO1992014598A1 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
DE69219034T DE69219034T2 (de) 1991-02-26 1992-02-25 Verfahren zum überwachen des spritzdruckes
EP92905298A EP0529087B1 (en) 1991-02-26 1992-02-25 Method of monitoring injection pressure
KR1019920702310A KR970008244B1 (ko) 1991-02-26 1992-02-25 사출압력 모니터 방법
US08/254,439 US5549857A (en) 1991-02-26 1994-06-06 Injection pressure monitoring method

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP3/53766 1991-02-26
JP3053766A JP2649993B2 (ja) 1991-02-26 1991-02-26 射出圧力モニタ方法

Publications (1)

Publication Number Publication Date
WO1992014598A1 true WO1992014598A1 (en) 1992-09-03

Family

ID=12951939

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP1992/000206 WO1992014598A1 (en) 1991-02-26 1992-02-25 Method of monitoring injection pressure

Country Status (6)

Country Link
US (1) US5549857A (ja)
EP (1) EP0529087B1 (ja)
JP (1) JP2649993B2 (ja)
KR (1) KR970008244B1 (ja)
DE (1) DE69219034T2 (ja)
WO (1) WO1992014598A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0535243A1 (en) * 1991-04-09 1993-04-07 Fanuc Ltd. Method and apparatus for monitoring injection pressure

Families Citing this family (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3214197B2 (ja) * 1993-11-17 2001-10-02 トヨタ自動車株式会社 ガスケット製造方法およびガスケット製造装置
TW305798B (ja) * 1994-08-01 1997-05-21 Toray Industries
JP2805189B2 (ja) * 1994-11-10 1998-09-30 日精樹脂工業株式会社 射出成形機
JP2736757B2 (ja) * 1995-03-16 1998-04-02 日精樹脂工業株式会社 射出成形機の型締力制御方法
US5902525A (en) * 1995-06-19 1999-05-11 Hettinga; Siebolt Method of molding a plastic article including injecting based upon a pressure-dominated control algorithm after detecting an indicia of a decrease in the surface area of the melt front
US6161057A (en) * 1995-07-28 2000-12-12 Toray Industries, Inc. Apparatus for analyzing a process of fluid flow, and a production method of an injection molded product
US5858286A (en) * 1996-01-10 1999-01-12 Universal Ventures Balanced multi-cavity injection molding of ridged-wall plastic products
US6143215A (en) * 1996-09-18 2000-11-07 Vec Technology, Inc. Method and apparatus for molding composite articles
US6963824B1 (en) * 1999-02-19 2005-11-08 Davidson Joseph K Method and apparatus for geometric variations to integrate parametric computer aided design with tolerance analyses and optimization
US6816820B1 (en) * 1999-09-24 2004-11-09 Moldflow Ireland, Ltd. Method and apparatus for modeling injection of a fluid in a mold cavity
US6623672B2 (en) 2000-10-03 2003-09-23 Vec Technology Inc. Method and apparatus for molding composite articles
JP2002361702A (ja) * 2001-06-04 2002-12-18 Fujitsu Ltd 射出成形機、射出成形機制御装置、射出成形機制御方法および射出成形機制御プログラム
TW546195B (en) 2001-10-26 2003-08-11 Sumitomo Heavy Industries Display apparatus of an injection molding machine and an injection molding machine
JP3727596B2 (ja) * 2002-01-30 2005-12-14 日精樹脂工業株式会社 樹脂流れの観察方法
NL1022199C2 (nl) * 2002-12-18 2004-06-29 Oxycell Holding Bv Werkwijze voor het vervaardigen van een behuizing voor een luchtbehandelingsinrichting, alsmede met de werkwijze verkregen behuizing.
AU2004211184A1 (en) * 2003-02-05 2004-08-26 Moldflow Ireland Ltd. Apparatus and methods for performing process simulation using a hybrid model
JP2006523351A (ja) * 2003-03-03 2006-10-12 モルドフロウ アイルランド リミテッド 加工される材料の性質を予測する装置および方法
JP4340459B2 (ja) * 2003-03-14 2009-10-07 株式会社 日立ディスプレイズ 表示装置の製造方法
US7553435B2 (en) * 2004-01-23 2009-06-30 Vec Industries, L.L.C. Method and apparatus for molding composite articles
WO2008089334A2 (en) 2007-01-19 2008-07-24 Vec Industries, L.L.C. Method and apparatus for molding composite articles
US7736555B2 (en) * 2008-02-19 2010-06-15 Husky Injection Molding Systems Ltd. Method for controlling fill speed in a molding system
DE102015107025B4 (de) 2015-05-06 2021-01-21 Bt Bayern Treuhand Management & Technologie Gmbh Verfahren und Prozessparameterwert-Ermittlungseinrichtung zur Ermittlung und Anzeige von Prozessparameterwerten in einem Spritzgussprozess, Verfahren zur Steuerung und Steuereinrichtung für eine Spritzgießanlage sowie Spritzgießanlage
DE102015107024B3 (de) * 2015-05-06 2016-07-21 BT Bayern Treuhand Management & Technologie AG Ermitteln von Prozessparameterwerten in einem Spritzgussprozess

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61197214A (ja) * 1985-02-27 1986-09-01 Okuma Mach Works Ltd 射出成形機の動作モニタ方式
JPS639522A (ja) * 1986-07-01 1988-01-16 Ube Ind Ltd 成形条件のモニタ表示方法

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4311446A (en) * 1974-01-21 1982-01-19 Usm Corporation Injection molding machine controls
AU6339680A (en) * 1979-10-02 1981-04-28 Daihatsu Motor Co. Ltd. Method of controlling numerical controlled machine tool
JPS56146741A (en) * 1980-04-18 1981-11-14 Hitachi Ltd Setting of holding time and system therefor
JPS58222831A (ja) * 1982-06-22 1983-12-24 Fujitsu Ltd トランスフア成形装置
GB2204268B (en) * 1987-03-24 1990-05-23 Toshiba Machine Co Ltd Control systems for injection moulding machines
DE3830571A1 (de) * 1987-09-08 1989-04-06 Toshiba Machine Co Ltd Berechnungsverfahren fuer die stroemungsanalyse beim spritzgiessen
JPH01141021A (ja) * 1987-11-27 1989-06-02 Toshiba Mach Co Ltd 溶融材料の金型成形における流動解析結果の表示方法
US5031127A (en) * 1987-11-27 1991-07-09 Toshiba Machine Co., Ltd. Molten injection-molding method
JPH01234222A (ja) * 1988-03-15 1989-09-19 Komatsu Ltd 射出圧縮成形機の成形方法およびその成形装置
JPH03264327A (ja) * 1990-03-14 1991-11-25 Komatsu Ltd 射出成形機の射出速度制御方法
JPH0655383B2 (ja) * 1990-03-19 1994-07-27 住友電装株式会社 射出成形機における成形評価装置および成形評価方法
JP2649992B2 (ja) * 1991-01-14 1997-09-03 ファナック株式会社 キャビティ内樹脂位置モニタ方法
JP2649996B2 (ja) * 1991-04-09 1997-09-03 ファナック株式会社 射出圧力モニタ方法

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61197214A (ja) * 1985-02-27 1986-09-01 Okuma Mach Works Ltd 射出成形機の動作モニタ方式
JPS639522A (ja) * 1986-07-01 1988-01-16 Ube Ind Ltd 成形条件のモニタ表示方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP0529087A4 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0535243A1 (en) * 1991-04-09 1993-04-07 Fanuc Ltd. Method and apparatus for monitoring injection pressure
EP0535243A4 (en) * 1991-04-09 1993-07-14 Fanuc Ltd. Method and apparatus for monitoring injection pressure
US5296179A (en) * 1991-04-09 1994-03-22 Fanuc Ltd. Method and apparatus for monitoring injection pressure

Also Published As

Publication number Publication date
US5549857A (en) 1996-08-27
DE69219034T2 (de) 1997-07-24
JP2649993B2 (ja) 1997-09-03
JPH05185484A (ja) 1993-07-27
EP0529087B1 (en) 1997-04-16
EP0529087A4 (en) 1993-07-14
DE69219034D1 (de) 1997-05-22
KR970008244B1 (ko) 1997-05-22
EP0529087A1 (en) 1993-03-03

Similar Documents

Publication Publication Date Title
WO1992014598A1 (en) Method of monitoring injection pressure
JP2649996B2 (ja) 射出圧力モニタ方法
JP3830453B2 (ja) 射出成形機のモニタ装置
KR900001901B1 (ko) 사출 성형기의 모니터 장치
US7344664B2 (en) Pressure waveform setting method for injection pressure control and an injection molding machine
JP2001038775A (ja) 射出成形機のエジェクタ制御装置
JPH0475808B2 (ja)
KR970002297B1 (ko) 전동식 사출성형기의 배압제어방법 및 그의 장치
JP2649992B2 (ja) キャビティ内樹脂位置モニタ方法
KR0145194B1 (ko) 사출성형기의사출속도편집설정방법
JP2918210B2 (ja) 射出成形機の成形情報表示装置
JPH0617049B2 (ja) 射出成形機の動作状態表示方法およびその装置
JP2707109B2 (ja) 射出成形機の射出モニタ装置
JP2652893B2 (ja) 射出成形機における成形条件設定方法
JP3556236B2 (ja) 射出成形機のモニタ装置
JP2696238B2 (ja) 射出成形機のモニタ装置
JP2779081B2 (ja) 射出成形機の射出行程グラフィック表示方法
WO2024024084A1 (ja) 許容範囲設定装置、射出成形機及び許容範囲設定方法
JPH072369B2 (ja) 押出成形ラインのトレンド表示制御装置

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): KR US

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): AT BE CH DE DK ES FR GB GR IT LU MC NL SE

WWE Wipo information: entry into national phase

Ref document number: 1992905298

Country of ref document: EP

WWP Wipo information: published in national office

Ref document number: 1992905298

Country of ref document: EP

WWG Wipo information: grant in national office

Ref document number: 1992905298

Country of ref document: EP