JP2006004430A5 - - Google Patents

Download PDF

Info

Publication number
JP2006004430A5
JP2006004430A5 JP2005175168A JP2005175168A JP2006004430A5 JP 2006004430 A5 JP2006004430 A5 JP 2006004430A5 JP 2005175168 A JP2005175168 A JP 2005175168A JP 2005175168 A JP2005175168 A JP 2005175168A JP 2006004430 A5 JP2006004430 A5 JP 2006004430A5
Authority
JP
Japan
Prior art keywords
project
management schedule
end date
control point
project management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2005175168A
Other languages
English (en)
Japanese (ja)
Other versions
JP2006004430A (ja
Filing date
Publication date
Priority claimed from US10/868,517 external-priority patent/US20050278208A1/en
Application filed filed Critical
Publication of JP2006004430A publication Critical patent/JP2006004430A/ja
Publication of JP2006004430A5 publication Critical patent/JP2006004430A5/ja
Pending legal-status Critical Current

Links

JP2005175168A 2004-06-15 2005-06-15 契約上の開始/終了日のユーザー入力に基づいてプロジェクト管理システムスケジューリングエンジンを再始動するための方法とシステム Pending JP2006004430A (ja)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US10/868,517 US20050278208A1 (en) 2004-06-15 2004-06-15 Method and system for restarting a project management system scheduling engine based on user input of contractual start/finish data

Publications (2)

Publication Number Publication Date
JP2006004430A JP2006004430A (ja) 2006-01-05
JP2006004430A5 true JP2006004430A5 (https=) 2008-07-31

Family

ID=34940113

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2005175168A Pending JP2006004430A (ja) 2004-06-15 2005-06-15 契約上の開始/終了日のユーザー入力に基づいてプロジェクト管理システムスケジューリングエンジンを再始動するための方法とシステム

Country Status (12)

Country Link
US (1) US20050278208A1 (https=)
EP (1) EP1607895A3 (https=)
JP (1) JP2006004430A (https=)
KR (1) KR101153018B1 (https=)
CN (1) CN1728168A (https=)
AU (1) AU2005202445B2 (https=)
BR (1) BRPI0502196A (https=)
CA (1) CA2509784A1 (https=)
MX (1) MXPA05006430A (https=)
RU (1) RU2005118391A (https=)
TW (1) TWI390456B (https=)
ZA (1) ZA200504808B (https=)

Families Citing this family (37)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050228710A1 (en) * 2004-04-09 2005-10-13 Sam Richards Asset scheduling management in media production
US20100010856A1 (en) * 2006-02-08 2010-01-14 Kim Huat David Chua Method and system for constraint-based project scheduling
JP4144890B2 (ja) * 2006-06-08 2008-09-03 インターナショナル・ビジネス・マシーンズ・コーポレーション 開発プロジェクトの日程表作成を支援するシステムおよびその方法
US20080115077A1 (en) * 2006-11-09 2008-05-15 International Business Machines Corporation Persistent status indicator for calendar
US8249906B2 (en) * 2007-02-12 2012-08-21 Pma Technologies, Llc Interactive graphics-based planning systems
US8666794B1 (en) * 2007-03-26 2014-03-04 Sprint Communications Company L.P. Project management tool
US10255583B2 (en) 2007-05-01 2019-04-09 Oracle International Corporation Nested hierarchical rollups by level using a normalized table
US20080300945A1 (en) * 2007-05-31 2008-12-04 Michel Shane Simpson Techniques for sharing resources across multiple independent project lifecycles
US8082274B2 (en) 2007-06-28 2011-12-20 Microsoft Corporation Scheduling application allowing freeform data entry
US20090048894A1 (en) * 2007-08-14 2009-02-19 Michel Shane Simpson Techniques for propagating changes in projects
US20090234699A1 (en) * 2008-03-15 2009-09-17 Microsoft Corporation User Interface For Scheduling Resource Assignments
KR101020022B1 (ko) * 2008-06-30 2011-03-09 이주호 인터페이스 전환 방법 및 시스템과 이를 위한 기록매체
US8219435B2 (en) * 2009-01-21 2012-07-10 Microsoft Corporation Determining task status based upon identifying milestone indicators in project-related files
US8661447B1 (en) * 2009-03-23 2014-02-25 Symantec Corporation Method and apparatus for managing execution of a plurality of computer tasks based on availability of computer resources
US8160911B2 (en) * 2009-05-19 2012-04-17 Microsoft Corporation Project management applications utilizing summary tasks for top-down project planning
US10339479B2 (en) * 2009-12-15 2019-07-02 International Business Machines Corporation Dynamic aggregation of disparate enterprise data
US20110145913A1 (en) * 2009-12-15 2011-06-16 International Business Machines Corporation Project Management
CN102592193A (zh) * 2011-12-29 2012-07-18 杭州新中大软件股份有限公司 一种通过资源驱控进度的方法
US9734040B2 (en) 2013-05-21 2017-08-15 Microsoft Technology Licensing, Llc Animated highlights in a graph representing an application
US8990777B2 (en) 2013-05-21 2015-03-24 Concurix Corporation Interactive graph for navigating and monitoring execution of application code
CN103337004A (zh) * 2013-05-27 2013-10-02 李庆吉 一种开放式工程实施动态监控系统和方法
US9280841B2 (en) * 2013-07-24 2016-03-08 Microsoft Technology Licensing, Llc Event chain visualization of performance data
US9292415B2 (en) 2013-09-04 2016-03-22 Microsoft Technology Licensing, Llc Module specific tracing in a shared module environment
CN105765560B (zh) 2013-11-13 2019-11-05 微软技术许可有限责任公司 基于多次跟踪执行的软件组件推荐
WO2015089561A1 (en) * 2013-12-19 2015-06-25 South Australian Technology Group Pty Limited A method and system for monitoring behaviour
US20160026952A1 (en) * 2014-07-28 2016-01-28 Robin Systems, Inc. System and method performing job management
CN104240027A (zh) * 2014-09-10 2014-12-24 南京跃豚智能科技有限公司 事务进度跟踪管理方法及装置
US10437707B2 (en) 2015-03-19 2019-10-08 Teachers Insurance And Annuity Association Of America Evaluating and presenting software testing project status indicators
US10310849B2 (en) 2015-11-24 2019-06-04 Teachers Insurance And Annuity Association Of America Visual presentation of metrics reflecting lifecycle events of software artifacts
US10643158B2 (en) * 2016-04-01 2020-05-05 Snap-On Incorporated Technician timer
US11175914B2 (en) 2019-06-28 2021-11-16 Aras Corporation Calculation engine for performing calculations based on dependencies in a self-describing data system
WO2021102472A1 (en) * 2019-11-22 2021-05-27 Rev 1 Power Services, Inc. Automated system for tracking progress of operations deliverables
FR3106227B1 (fr) * 2020-01-15 2023-06-30 Freshcore Procédé et système de traitement de données pour la réalisation d’un travail d’impression
TWI816110B (zh) * 2021-04-27 2023-09-21 捷拓科技股份有限公司 產品開發專案之多目標時程管理方法
US12094014B2 (en) * 2022-04-27 2024-09-17 Procore Technologies, Inc. Computer systems and methods for dynamic pull planning
CN115759577B (zh) * 2022-11-01 2026-04-03 深圳市大数据研究院 任务动态调度方法和装置、电子设备、存储介质
US20240346411A1 (en) * 2023-04-12 2024-10-17 Dish Wireless L. L. C. Project scheduling systems and methods

Family Cites Families (38)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5381332A (en) * 1991-12-09 1995-01-10 Motorola, Inc. Project management system with automated schedule and cost integration
JPH06348720A (ja) * 1993-06-14 1994-12-22 Toshiba Corp 生産開発管理表示装置
US5548506A (en) * 1994-03-17 1996-08-20 Srinivasan; Seshan R. Automated, electronic network based, project management server system, for managing multiple work-groups
US5974391A (en) * 1994-07-12 1999-10-26 Fujitsu Limited Device and method for project management
US5765140A (en) * 1995-11-17 1998-06-09 Mci Corporation Dynamic project management system
AUPN773496A0 (en) * 1996-01-25 1996-02-15 Task Solutions Pty Ltd Task management system
JPH10240804A (ja) * 1997-02-21 1998-09-11 Nec Corp プロジェクト管理システム
US6609100B2 (en) * 1997-03-07 2003-08-19 Lockhead Martin Corporation Program planning management system
JP4312846B2 (ja) * 1997-07-14 2009-08-12 株式会社日立製作所 取引進捗管理方法
JPH1196222A (ja) * 1997-09-17 1999-04-09 Hitachi Ltd 工程進捗管理方法および工程管理装置
JP2000001988A (ja) * 1998-06-17 2000-01-07 Daiken Trade & Ind Co Ltd 建築物施工に対する工程管理支援装置及び建築物施工に対する工程管理支援プログラムを記録したコンピュータ読み取り可能な記録媒体
US6351734B1 (en) * 1998-09-09 2002-02-26 Unisys Corporation System and method for resource allocation and planning
US6487469B1 (en) * 1998-11-13 2002-11-26 Texas Instruments Incorporated System and method for integrating schedule and design environments
US6501473B1 (en) * 1999-03-18 2002-12-31 Lucent Technologies Inc. Method and system for theory of constraints buffer graphing, tracking and management
US7139719B1 (en) * 1999-10-08 2006-11-21 I2 Technologies Us, Inc. System for scheduling product planning
US6581040B1 (en) * 2000-02-18 2003-06-17 Daniel B. Wright Project specific communications system and method
EP1128455A1 (en) * 2000-02-22 2001-08-29 Matsushita Electric Industrial Co., Ltd. Method of manufacturing electrode plates for batteries
JP2001306718A (ja) * 2000-04-27 2001-11-02 Tic:Kk コンピュータ及び通信技術を使った情報関連事業を提供する事業システム
US6714829B1 (en) * 2000-06-22 2004-03-30 Thomas K F Wong Dual path scheduling method
JP2002024495A (ja) * 2000-07-11 2002-01-25 Honda Motor Co Ltd スケジュール管理システム
DE10051456A1 (de) * 2000-10-17 2002-04-25 Siemens Ag Verfahren zum Referenzieren von zeitbezogenen Einträgen in verschiedenen Dateien eines Planungsprogramms
US20020128895A1 (en) * 2001-01-11 2002-09-12 International Business Machines Corporation Project management method for optimizing information technology resources
JP2002229634A (ja) * 2001-02-06 2002-08-16 Seisan Gijutsu Kenkyusho:Kk 進捗管理装置
JP2002236788A (ja) * 2001-02-09 2002-08-23 Kawasaki Steel Corp コンピュータ支援設計用プロジェクト進捗管理装置
US6963930B2 (en) * 2001-02-15 2005-11-08 Centric Software, Inc. Automatic transfer and expansion of application-specific data for display at a website
JP2002288406A (ja) * 2001-03-27 2002-10-04 Nec Fielding Ltd プロジェクト進捗状況監視システム及びプログラム
US7406432B1 (en) * 2001-06-13 2008-07-29 Ricoh Company, Ltd. Project management over a network with automated task schedule update
US7349863B1 (en) * 2001-06-14 2008-03-25 Massachusetts Institute Of Technology Dynamic planning method and system
US20030067492A1 (en) * 2001-09-17 2003-04-10 Cadwallader Charles W. Flashwarn (FW)
JP2003223486A (ja) * 2002-01-30 2003-08-08 Fujitsu Ltd 工程管理システム
CN1438596A (zh) * 2002-02-10 2003-08-27 宫本保 进度表管理方法
JP2003303268A (ja) * 2002-04-11 2003-10-24 Denso Corp 業務管理方法
US20030233268A1 (en) * 2002-06-17 2003-12-18 Ehsan Taqbeem Multi-dimensional interdependency based project management
US7644007B2 (en) * 2002-06-17 2010-01-05 King Fahd University Of Petroleum & Minerals Method and apparatus for finance-based scheduling of construction projects
US20040024629A1 (en) * 2002-08-02 2004-02-05 Kirby Jack Reese Methods and apparatus for project management
US6824694B2 (en) * 2002-11-04 2004-11-30 Chemco Systems L.P. Method for treating waste by application of energy waves
JP2004240486A (ja) * 2003-02-03 2004-08-26 Hitachi Ltd プロジェクトの変更管理方法および装置
US7734491B2 (en) * 2004-06-15 2010-06-08 Microsoft Corporation Hierarchical projects in a computer-enabled project management method and system

Similar Documents

Publication Publication Date Title
JP2006004430A5 (https=)
JP2008234646A5 (https=)
RU2005118391A (ru) Способ и система для перезапуска машины планирования системы управления проектом на основании пользовательского ввода оговоренных данных начала/окончания
JP2006244088A5 (https=)
JP2012527693A (ja) トップダウンプロジェクト計画のためのサマリタスク
JP2013045308A (ja) 工事進捗管理支援システム及び方法
RU2013128537A (ru) Система и способ управления проектами
WO2011037987A3 (en) Process management system and method
Hebert et al. Combining contemporary and traditional project management tools to resolve a project scheduling problem
JP2001195483A (ja) プロジェクトリスク管理支援装置及びその方法並びにプログラムを記憶した記憶媒体
CN104616098A (zh) 一种任务管理方法及系统
JP2008059369A (ja) ワークフロー管理システム、ワークフロー管理方法、ワークフロー管理プログラムおよび記録媒体
GB2447178A (en) A method, system and software for talent management
JP2012164213A (ja) 作業指示書作成システム
US20140379407A1 (en) Automatic Scheduling of Future Appointments through Partially Constrained Calendar Rules
Połoński et al. Impact of baseline terms on the course of critical paths and time buffers in the modified Goldratt’s method
JP2015079445A (ja) プロジェクト管理装置、プロジェクト管理方法、およびプロジェクト管理プログラム
CN103401998A (zh) 移动设备上关联式闹钟的实现方法
Ebadi et al. Mathematical models for preemptive shop scheduling problems
JP2009276904A (ja) プロジェクト管理装置、プロジェクト管理方法、プロジェクト管理プログラム、及び記録媒体
WO2008030645A3 (en) Trace buffer with a processor
JP4906587B2 (ja) ジョブ稼動状況評価システム、ジョブ稼動状況評価方法及びジョブ稼動状況評価プログラム
JP2021039398A (ja) 工数自動算出システム
Kenley et al. Removing hidden waiting time in critical path schedules: a location-based approach to avoiding waste
CN117057550A (zh) 一种物料需求计划的计算方法、装置、网络设备及介质