BRPI0502196A - Método e sistema para reiniciar um mecanismo de escalação do sistema de gerenciamento de projeto com base na entrada do usuário dos dados contratuais de inìcio/término - Google Patents
Método e sistema para reiniciar um mecanismo de escalação do sistema de gerenciamento de projeto com base na entrada do usuário dos dados contratuais de inìcio/términoInfo
- Publication number
- BRPI0502196A BRPI0502196A BR0502196-0A BRPI0502196A BRPI0502196A BR PI0502196 A BRPI0502196 A BR PI0502196A BR PI0502196 A BRPI0502196 A BR PI0502196A BR PI0502196 A BRPI0502196 A BR PI0502196A
- Authority
- BR
- Brazil
- Prior art keywords
- schedule
- escalation
- project management
- data
- project
- Prior art date
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- Operations Research (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Marketing (AREA)
- Educational Administration (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- General Factory Administration (AREA)
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US10/868,517 US20050278208A1 (en) | 2004-06-15 | 2004-06-15 | Method and system for restarting a project management system scheduling engine based on user input of contractual start/finish data |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| BRPI0502196A true BRPI0502196A (pt) | 2006-01-24 |
Family
ID=34940113
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| BR0502196-0A BRPI0502196A (pt) | 2004-06-15 | 2005-06-14 | Método e sistema para reiniciar um mecanismo de escalação do sistema de gerenciamento de projeto com base na entrada do usuário dos dados contratuais de inìcio/término |
Country Status (12)
| Country | Link |
|---|---|
| US (1) | US20050278208A1 (https=) |
| EP (1) | EP1607895A3 (https=) |
| JP (1) | JP2006004430A (https=) |
| KR (1) | KR101153018B1 (https=) |
| CN (1) | CN1728168A (https=) |
| AU (1) | AU2005202445B2 (https=) |
| BR (1) | BRPI0502196A (https=) |
| CA (1) | CA2509784A1 (https=) |
| MX (1) | MXPA05006430A (https=) |
| RU (1) | RU2005118391A (https=) |
| TW (1) | TWI390456B (https=) |
| ZA (1) | ZA200504808B (https=) |
Families Citing this family (37)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20050228710A1 (en) * | 2004-04-09 | 2005-10-13 | Sam Richards | Asset scheduling management in media production |
| US20100010856A1 (en) * | 2006-02-08 | 2010-01-14 | Kim Huat David Chua | Method and system for constraint-based project scheduling |
| JP4144890B2 (ja) * | 2006-06-08 | 2008-09-03 | インターナショナル・ビジネス・マシーンズ・コーポレーション | 開発プロジェクトの日程表作成を支援するシステムおよびその方法 |
| US20080115077A1 (en) * | 2006-11-09 | 2008-05-15 | International Business Machines Corporation | Persistent status indicator for calendar |
| US8249906B2 (en) * | 2007-02-12 | 2012-08-21 | Pma Technologies, Llc | Interactive graphics-based planning systems |
| US8666794B1 (en) * | 2007-03-26 | 2014-03-04 | Sprint Communications Company L.P. | Project management tool |
| US10255583B2 (en) | 2007-05-01 | 2019-04-09 | Oracle International Corporation | Nested hierarchical rollups by level using a normalized table |
| US20080300945A1 (en) * | 2007-05-31 | 2008-12-04 | Michel Shane Simpson | Techniques for sharing resources across multiple independent project lifecycles |
| US8082274B2 (en) | 2007-06-28 | 2011-12-20 | Microsoft Corporation | Scheduling application allowing freeform data entry |
| US20090048894A1 (en) * | 2007-08-14 | 2009-02-19 | Michel Shane Simpson | Techniques for propagating changes in projects |
| US20090234699A1 (en) * | 2008-03-15 | 2009-09-17 | Microsoft Corporation | User Interface For Scheduling Resource Assignments |
| KR101020022B1 (ko) * | 2008-06-30 | 2011-03-09 | 이주호 | 인터페이스 전환 방법 및 시스템과 이를 위한 기록매체 |
| US8219435B2 (en) * | 2009-01-21 | 2012-07-10 | Microsoft Corporation | Determining task status based upon identifying milestone indicators in project-related files |
| US8661447B1 (en) * | 2009-03-23 | 2014-02-25 | Symantec Corporation | Method and apparatus for managing execution of a plurality of computer tasks based on availability of computer resources |
| US8160911B2 (en) * | 2009-05-19 | 2012-04-17 | Microsoft Corporation | Project management applications utilizing summary tasks for top-down project planning |
| US10339479B2 (en) * | 2009-12-15 | 2019-07-02 | International Business Machines Corporation | Dynamic aggregation of disparate enterprise data |
| US20110145913A1 (en) * | 2009-12-15 | 2011-06-16 | International Business Machines Corporation | Project Management |
| CN102592193A (zh) * | 2011-12-29 | 2012-07-18 | 杭州新中大软件股份有限公司 | 一种通过资源驱控进度的方法 |
| US9734040B2 (en) | 2013-05-21 | 2017-08-15 | Microsoft Technology Licensing, Llc | Animated highlights in a graph representing an application |
| US8990777B2 (en) | 2013-05-21 | 2015-03-24 | Concurix Corporation | Interactive graph for navigating and monitoring execution of application code |
| CN103337004A (zh) * | 2013-05-27 | 2013-10-02 | 李庆吉 | 一种开放式工程实施动态监控系统和方法 |
| US9280841B2 (en) * | 2013-07-24 | 2016-03-08 | Microsoft Technology Licensing, Llc | Event chain visualization of performance data |
| US9292415B2 (en) | 2013-09-04 | 2016-03-22 | Microsoft Technology Licensing, Llc | Module specific tracing in a shared module environment |
| CN105765560B (zh) | 2013-11-13 | 2019-11-05 | 微软技术许可有限责任公司 | 基于多次跟踪执行的软件组件推荐 |
| WO2015089561A1 (en) * | 2013-12-19 | 2015-06-25 | South Australian Technology Group Pty Limited | A method and system for monitoring behaviour |
| US20160026952A1 (en) * | 2014-07-28 | 2016-01-28 | Robin Systems, Inc. | System and method performing job management |
| CN104240027A (zh) * | 2014-09-10 | 2014-12-24 | 南京跃豚智能科技有限公司 | 事务进度跟踪管理方法及装置 |
| US10437707B2 (en) | 2015-03-19 | 2019-10-08 | Teachers Insurance And Annuity Association Of America | Evaluating and presenting software testing project status indicators |
| US10310849B2 (en) | 2015-11-24 | 2019-06-04 | Teachers Insurance And Annuity Association Of America | Visual presentation of metrics reflecting lifecycle events of software artifacts |
| US10643158B2 (en) * | 2016-04-01 | 2020-05-05 | Snap-On Incorporated | Technician timer |
| US11175914B2 (en) | 2019-06-28 | 2021-11-16 | Aras Corporation | Calculation engine for performing calculations based on dependencies in a self-describing data system |
| WO2021102472A1 (en) * | 2019-11-22 | 2021-05-27 | Rev 1 Power Services, Inc. | Automated system for tracking progress of operations deliverables |
| FR3106227B1 (fr) * | 2020-01-15 | 2023-06-30 | Freshcore | Procédé et système de traitement de données pour la réalisation d’un travail d’impression |
| TWI816110B (zh) * | 2021-04-27 | 2023-09-21 | 捷拓科技股份有限公司 | 產品開發專案之多目標時程管理方法 |
| US12094014B2 (en) * | 2022-04-27 | 2024-09-17 | Procore Technologies, Inc. | Computer systems and methods for dynamic pull planning |
| CN115759577B (zh) * | 2022-11-01 | 2026-04-03 | 深圳市大数据研究院 | 任务动态调度方法和装置、电子设备、存储介质 |
| US20240346411A1 (en) * | 2023-04-12 | 2024-10-17 | Dish Wireless L. L. C. | Project scheduling systems and methods |
Family Cites Families (38)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US5381332A (en) * | 1991-12-09 | 1995-01-10 | Motorola, Inc. | Project management system with automated schedule and cost integration |
| JPH06348720A (ja) * | 1993-06-14 | 1994-12-22 | Toshiba Corp | 生産開発管理表示装置 |
| US5548506A (en) * | 1994-03-17 | 1996-08-20 | Srinivasan; Seshan R. | Automated, electronic network based, project management server system, for managing multiple work-groups |
| US5974391A (en) * | 1994-07-12 | 1999-10-26 | Fujitsu Limited | Device and method for project management |
| US5765140A (en) * | 1995-11-17 | 1998-06-09 | Mci Corporation | Dynamic project management system |
| AUPN773496A0 (en) * | 1996-01-25 | 1996-02-15 | Task Solutions Pty Ltd | Task management system |
| JPH10240804A (ja) * | 1997-02-21 | 1998-09-11 | Nec Corp | プロジェクト管理システム |
| US6609100B2 (en) * | 1997-03-07 | 2003-08-19 | Lockhead Martin Corporation | Program planning management system |
| JP4312846B2 (ja) * | 1997-07-14 | 2009-08-12 | 株式会社日立製作所 | 取引進捗管理方法 |
| JPH1196222A (ja) * | 1997-09-17 | 1999-04-09 | Hitachi Ltd | 工程進捗管理方法および工程管理装置 |
| JP2000001988A (ja) * | 1998-06-17 | 2000-01-07 | Daiken Trade & Ind Co Ltd | 建築物施工に対する工程管理支援装置及び建築物施工に対する工程管理支援プログラムを記録したコンピュータ読み取り可能な記録媒体 |
| US6351734B1 (en) * | 1998-09-09 | 2002-02-26 | Unisys Corporation | System and method for resource allocation and planning |
| US6487469B1 (en) * | 1998-11-13 | 2002-11-26 | Texas Instruments Incorporated | System and method for integrating schedule and design environments |
| US6501473B1 (en) * | 1999-03-18 | 2002-12-31 | Lucent Technologies Inc. | Method and system for theory of constraints buffer graphing, tracking and management |
| US7139719B1 (en) * | 1999-10-08 | 2006-11-21 | I2 Technologies Us, Inc. | System for scheduling product planning |
| US6581040B1 (en) * | 2000-02-18 | 2003-06-17 | Daniel B. Wright | Project specific communications system and method |
| EP1128455A1 (en) * | 2000-02-22 | 2001-08-29 | Matsushita Electric Industrial Co., Ltd. | Method of manufacturing electrode plates for batteries |
| JP2001306718A (ja) * | 2000-04-27 | 2001-11-02 | Tic:Kk | コンピュータ及び通信技術を使った情報関連事業を提供する事業システム |
| US6714829B1 (en) * | 2000-06-22 | 2004-03-30 | Thomas K F Wong | Dual path scheduling method |
| JP2002024495A (ja) * | 2000-07-11 | 2002-01-25 | Honda Motor Co Ltd | スケジュール管理システム |
| DE10051456A1 (de) * | 2000-10-17 | 2002-04-25 | Siemens Ag | Verfahren zum Referenzieren von zeitbezogenen Einträgen in verschiedenen Dateien eines Planungsprogramms |
| US20020128895A1 (en) * | 2001-01-11 | 2002-09-12 | International Business Machines Corporation | Project management method for optimizing information technology resources |
| JP2002229634A (ja) * | 2001-02-06 | 2002-08-16 | Seisan Gijutsu Kenkyusho:Kk | 進捗管理装置 |
| JP2002236788A (ja) * | 2001-02-09 | 2002-08-23 | Kawasaki Steel Corp | コンピュータ支援設計用プロジェクト進捗管理装置 |
| US6963930B2 (en) * | 2001-02-15 | 2005-11-08 | Centric Software, Inc. | Automatic transfer and expansion of application-specific data for display at a website |
| JP2002288406A (ja) * | 2001-03-27 | 2002-10-04 | Nec Fielding Ltd | プロジェクト進捗状況監視システム及びプログラム |
| US7406432B1 (en) * | 2001-06-13 | 2008-07-29 | Ricoh Company, Ltd. | Project management over a network with automated task schedule update |
| US7349863B1 (en) * | 2001-06-14 | 2008-03-25 | Massachusetts Institute Of Technology | Dynamic planning method and system |
| US20030067492A1 (en) * | 2001-09-17 | 2003-04-10 | Cadwallader Charles W. | Flashwarn (FW) |
| JP2003223486A (ja) * | 2002-01-30 | 2003-08-08 | Fujitsu Ltd | 工程管理システム |
| CN1438596A (zh) * | 2002-02-10 | 2003-08-27 | 宫本保 | 进度表管理方法 |
| JP2003303268A (ja) * | 2002-04-11 | 2003-10-24 | Denso Corp | 業務管理方法 |
| US20030233268A1 (en) * | 2002-06-17 | 2003-12-18 | Ehsan Taqbeem | Multi-dimensional interdependency based project management |
| US7644007B2 (en) * | 2002-06-17 | 2010-01-05 | King Fahd University Of Petroleum & Minerals | Method and apparatus for finance-based scheduling of construction projects |
| US20040024629A1 (en) * | 2002-08-02 | 2004-02-05 | Kirby Jack Reese | Methods and apparatus for project management |
| US6824694B2 (en) * | 2002-11-04 | 2004-11-30 | Chemco Systems L.P. | Method for treating waste by application of energy waves |
| JP2004240486A (ja) * | 2003-02-03 | 2004-08-26 | Hitachi Ltd | プロジェクトの変更管理方法および装置 |
| US7734491B2 (en) * | 2004-06-15 | 2010-06-08 | Microsoft Corporation | Hierarchical projects in a computer-enabled project management method and system |
-
2004
- 2004-06-15 US US10/868,517 patent/US20050278208A1/en not_active Abandoned
-
2005
- 2005-06-06 AU AU2005202445A patent/AU2005202445B2/en not_active Ceased
- 2005-06-08 EP EP05104999A patent/EP1607895A3/en not_active Ceased
- 2005-06-13 ZA ZA200504808A patent/ZA200504808B/xx unknown
- 2005-06-13 CA CA002509784A patent/CA2509784A1/en not_active Abandoned
- 2005-06-14 BR BR0502196-0A patent/BRPI0502196A/pt not_active IP Right Cessation
- 2005-06-14 RU RU2005118391/09A patent/RU2005118391A/ru unknown
- 2005-06-14 TW TW094119680A patent/TWI390456B/zh not_active IP Right Cessation
- 2005-06-15 CN CNA2005100923864A patent/CN1728168A/zh active Pending
- 2005-06-15 MX MXPA05006430A patent/MXPA05006430A/es active IP Right Grant
- 2005-06-15 JP JP2005175168A patent/JP2006004430A/ja active Pending
- 2005-06-15 KR KR1020050051333A patent/KR101153018B1/ko not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JP2006004430A (ja) | 2006-01-05 |
| KR101153018B1 (ko) | 2012-06-04 |
| RU2005118391A (ru) | 2006-12-20 |
| AU2005202445B2 (en) | 2010-12-16 |
| TWI390456B (zh) | 2013-03-21 |
| ZA200504808B (en) | 2007-03-28 |
| EP1607895A2 (en) | 2005-12-21 |
| AU2005202445A1 (en) | 2006-01-05 |
| CN1728168A (zh) | 2006-02-01 |
| TW200602941A (en) | 2006-01-16 |
| EP1607895A3 (en) | 2006-09-27 |
| US20050278208A1 (en) | 2005-12-15 |
| CA2509784A1 (en) | 2005-12-15 |
| MXPA05006430A (es) | 2006-01-31 |
| KR20060046452A (ko) | 2006-05-17 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| BRPI0502196A (pt) | Método e sistema para reiniciar um mecanismo de escalação do sistema de gerenciamento de projeto com base na entrada do usuário dos dados contratuais de inìcio/término | |
| BRPI0713830A2 (pt) | "método, mémoria que pode ser lida por computador para controlar um computador incluindo um banco de dados de guia, memória que pode ser lida por computador para controlar um computador incluindo um banco de dados de treinamento de vídeo e sistema" | |
| BRPI0500137A (pt) | Sistema e método para uma busca unificada e combinada | |
| BR112012016080A2 (pt) | registro temporário de dispositivo | |
| BR0317522A (pt) | Sistema para processar automaticamente componentes em um dispositivo | |
| AR039369A1 (es) | Disposicion para administrar controladores en un procesador operativo, metodo para interaccion de software con hardware en dicha disposicion y medio legible por ordenador conectado con dicha disposicion y aplicando dicho metodo para interaccion de software con hardware | |
| CL2007003725A1 (es) | Composicion herbicida que comprende un compuesto derivado de isoxazolina; y metodo para preparar la composicion herbicida. | |
| BRPI0607576A8 (pt) | Sistema e método para pesquisar uma rede ponto-a-ponto | |
| WO2008042810A3 (en) | Facilitating performance of tasks via distribution using third-party sites | |
| BRPI0720017A2 (pt) | método e sistema para controlar um ou mais elementos de emissão de luz operados por correntes diretas para gerar uma luz misturada. | |
| BR0313775A (pt) | aparelho e métodos de serviços da rede | |
| ITRM20040447A1 (it) | Sistema di fornitura di seminari interattivi, e relativo metodo. | |
| BRPI0406520A (pt) | Sistema e método para instalação e execução de aplicação de preferência | |
| BRPI0500134A (pt) | Arquitetura de sistema de distribuição atualizada e método para distribuição de software | |
| BRPI0512464A (pt) | método e dispositivo para a incorporação de alterações de configurações de dados de domìnios em tempo de execução | |
| NL1026172A1 (nl) | On line biedingsysteem. | |
| SG159393A1 (en) | System and method for building and execution of platform-neutral generic servicesæ client applications | |
| BRPI0406439A (pt) | Sistema e método para atualizar componentes de instalação em um ambiente em rede | |
| BR112012004910A2 (pt) | método, aparelho e sistema para atualização de informação sobre localização de um endereço de ip | |
| BRPI0516099A (pt) | método e sistema para fornecer acesso a serviços, método para fornecer credenciais de acesso | |
| BR112013028205A2 (pt) | dispositivo de iluminação; receptor; sistema de iluminação; método de modulação de códigos para dispositivos de iluminação | |
| BRPI0402462A (pt) | Uso combinado de uma linguagem de marcação em etapas e uma ferramenta de desenvolvimento orientada a objetos | |
| PE20050885A1 (es) | Metodo y sistema para realizar acciones en un dispositivo inalambrico usando listas de acciones y comparacion de versiones | |
| BRPI0607419A2 (pt) | terminal, siatema e método para programação de gerenciamento de dispositivo em tal terminal e sistema | |
| DE602006012656D1 (de) | Ransportstatusinformationen sowie deren verwendung |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| B03A | Publication of a patent application or of a certificate of addition of invention [chapter 3.1 patent gazette] | ||
| B08F | Application dismissed because of non-payment of annual fees [chapter 8.6 patent gazette] |
Free format text: REFERENTE 8A. ANUIDADE. |
|
| B08K | Patent lapsed as no evidence of payment of the annual fee has been furnished to inpi [chapter 8.11 patent gazette] |
Free format text: REFERENTE AO DESPACHO 8.6 PUBLICADO NA RPI 2204 DE 02/04/2013. |