ZA200504808B - Method and system for restarting a project management system scheduling engine based on user input of contractual start/finish data - Google Patents

Method and system for restarting a project management system scheduling engine based on user input of contractual start/finish data

Info

Publication number
ZA200504808B
ZA200504808B ZA200504808A ZA200504808A ZA200504808B ZA 200504808 B ZA200504808 B ZA 200504808B ZA 200504808 A ZA200504808 A ZA 200504808A ZA 200504808 A ZA200504808 A ZA 200504808A ZA 200504808 B ZA200504808 B ZA 200504808B
Authority
ZA
South Africa
Prior art keywords
restarting
user input
project management
engine based
management system
Prior art date
Application number
ZA200504808A
Other languages
English (en)
Inventor
Schultz Edward Jerry
Original Assignee
Microsoft Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Microsoft Corp filed Critical Microsoft Corp
Publication of ZA200504808B publication Critical patent/ZA200504808B/xx

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • General Factory Administration (AREA)
ZA200504808A 2004-06-15 2005-06-13 Method and system for restarting a project management system scheduling engine based on user input of contractual start/finish data ZA200504808B (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US10/868,517 US20050278208A1 (en) 2004-06-15 2004-06-15 Method and system for restarting a project management system scheduling engine based on user input of contractual start/finish data

Publications (1)

Publication Number Publication Date
ZA200504808B true ZA200504808B (en) 2007-03-28

Family

ID=34940113

Family Applications (1)

Application Number Title Priority Date Filing Date
ZA200504808A ZA200504808B (en) 2004-06-15 2005-06-13 Method and system for restarting a project management system scheduling engine based on user input of contractual start/finish data

Country Status (12)

Country Link
US (1) US20050278208A1 (xx)
EP (1) EP1607895A3 (xx)
JP (1) JP2006004430A (xx)
KR (1) KR101153018B1 (xx)
CN (1) CN1728168A (xx)
AU (1) AU2005202445B2 (xx)
BR (1) BRPI0502196A (xx)
CA (1) CA2509784A1 (xx)
MX (1) MXPA05006430A (xx)
RU (1) RU2005118391A (xx)
TW (1) TWI390456B (xx)
ZA (1) ZA200504808B (xx)

Families Citing this family (34)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050228710A1 (en) * 2004-04-09 2005-10-13 Sam Richards Asset scheduling management in media production
WO2007091979A1 (en) * 2006-02-08 2007-08-16 National University Of Singapore A method and system for constraint-based project scheduling
JP4144890B2 (ja) * 2006-06-08 2008-09-03 インターナショナル・ビジネス・マシーンズ・コーポレーション 開発プロジェクトの日程表作成を支援するシステムおよびその方法
US20080115077A1 (en) * 2006-11-09 2008-05-15 International Business Machines Corporation Persistent status indicator for calendar
US8249906B2 (en) * 2007-02-12 2012-08-21 Pma Technologies, Llc Interactive graphics-based planning systems
US8666794B1 (en) * 2007-03-26 2014-03-04 Sprint Communications Company L.P. Project management tool
US10255583B2 (en) 2007-05-01 2019-04-09 Oracle International Corporation Nested hierarchical rollups by level using a normalized table
US20080300945A1 (en) * 2007-05-31 2008-12-04 Michel Shane Simpson Techniques for sharing resources across multiple independent project lifecycles
US8082274B2 (en) * 2007-06-28 2011-12-20 Microsoft Corporation Scheduling application allowing freeform data entry
US20090048894A1 (en) * 2007-08-14 2009-02-19 Michel Shane Simpson Techniques for propagating changes in projects
US20090234699A1 (en) * 2008-03-15 2009-09-17 Microsoft Corporation User Interface For Scheduling Resource Assignments
KR101020022B1 (ko) * 2008-06-30 2011-03-09 이주호 인터페이스 전환 방법 및 시스템과 이를 위한 기록매체
US8219435B2 (en) * 2009-01-21 2012-07-10 Microsoft Corporation Determining task status based upon identifying milestone indicators in project-related files
US8661447B1 (en) * 2009-03-23 2014-02-25 Symantec Corporation Method and apparatus for managing execution of a plurality of computer tasks based on availability of computer resources
US8160911B2 (en) * 2009-05-19 2012-04-17 Microsoft Corporation Project management applications utilizing summary tasks for top-down project planning
US10339479B2 (en) * 2009-12-15 2019-07-02 International Business Machines Corporation Dynamic aggregation of disparate enterprise data
US20110145913A1 (en) * 2009-12-15 2011-06-16 International Business Machines Corporation Project Management
CN102592193A (zh) * 2011-12-29 2012-07-18 杭州新中大软件股份有限公司 一种通过资源驱控进度的方法
US8990777B2 (en) 2013-05-21 2015-03-24 Concurix Corporation Interactive graph for navigating and monitoring execution of application code
US9734040B2 (en) 2013-05-21 2017-08-15 Microsoft Technology Licensing, Llc Animated highlights in a graph representing an application
CN103337004A (zh) * 2013-05-27 2013-10-02 李庆吉 一种开放式工程实施动态监控系统和方法
US9280841B2 (en) * 2013-07-24 2016-03-08 Microsoft Technology Licensing, Llc Event chain visualization of performance data
US9292415B2 (en) 2013-09-04 2016-03-22 Microsoft Technology Licensing, Llc Module specific tracing in a shared module environment
US10346292B2 (en) 2013-11-13 2019-07-09 Microsoft Technology Licensing, Llc Software component recommendation based on multiple trace runs
US20160314696A1 (en) * 2013-12-19 2016-10-27 South Australian Technology Group Pty Limited A Method and System for Monitoring Behaviour
US20160026952A1 (en) * 2014-07-28 2016-01-28 Robin Systems, Inc. System and method performing job management
CN104240027A (zh) * 2014-09-10 2014-12-24 南京跃豚智能科技有限公司 事务进度跟踪管理方法及装置
US10437707B2 (en) 2015-03-19 2019-10-08 Teachers Insurance And Annuity Association Of America Evaluating and presenting software testing project status indicators
US10310849B2 (en) 2015-11-24 2019-06-04 Teachers Insurance And Annuity Association Of America Visual presentation of metrics reflecting lifecycle events of software artifacts
US11175914B2 (en) 2019-06-28 2021-11-16 Aras Corporation Calculation engine for performing calculations based on dependencies in a self-describing data system
WO2021102472A1 (en) * 2019-11-22 2021-05-27 Rev 1 Power Services, Inc. Automated system for tracking progress of operations deliverables
FR3106227B1 (fr) * 2020-01-15 2023-06-30 Freshcore Procédé et système de traitement de données pour la réalisation d’un travail d’impression
TWI816110B (zh) * 2021-04-27 2023-09-21 捷拓科技股份有限公司 產品開發專案之多目標時程管理方法
US20230351530A1 (en) * 2022-04-27 2023-11-02 Procore Technologies, Inc. Computer Systems and Methods for Dynamic Pull Planning

Family Cites Families (38)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5381332A (en) * 1991-12-09 1995-01-10 Motorola, Inc. Project management system with automated schedule and cost integration
JPH06348720A (ja) * 1993-06-14 1994-12-22 Toshiba Corp 生産開発管理表示装置
US5548506A (en) * 1994-03-17 1996-08-20 Srinivasan; Seshan R. Automated, electronic network based, project management server system, for managing multiple work-groups
US5974391A (en) * 1994-07-12 1999-10-26 Fujitsu Limited Device and method for project management
US5765140A (en) * 1995-11-17 1998-06-09 Mci Corporation Dynamic project management system
AUPN773496A0 (en) * 1996-01-25 1996-02-15 Task Solutions Pty Ltd Task management system
JPH10240804A (ja) * 1997-02-21 1998-09-11 Nec Corp プロジェクト管理システム
US6609100B2 (en) * 1997-03-07 2003-08-19 Lockhead Martin Corporation Program planning management system
JP4312846B2 (ja) * 1997-07-14 2009-08-12 株式会社日立製作所 取引進捗管理方法
JPH1196222A (ja) * 1997-09-17 1999-04-09 Hitachi Ltd 工程進捗管理方法および工程管理装置
JP2000001988A (ja) * 1998-06-17 2000-01-07 Daiken Trade & Ind Co Ltd 建築物施工に対する工程管理支援装置及び建築物施工に対する工程管理支援プログラムを記録したコンピュータ読み取り可能な記録媒体
US6351734B1 (en) * 1998-09-09 2002-02-26 Unisys Corporation System and method for resource allocation and planning
US6487469B1 (en) * 1998-11-13 2002-11-26 Texas Instruments Incorporated System and method for integrating schedule and design environments
US6501473B1 (en) * 1999-03-18 2002-12-31 Lucent Technologies Inc. Method and system for theory of constraints buffer graphing, tracking and management
US7139719B1 (en) * 1999-10-08 2006-11-21 I2 Technologies Us, Inc. System for scheduling product planning
US6581040B1 (en) * 2000-02-18 2003-06-17 Daniel B. Wright Project specific communications system and method
EP1128455A1 (en) * 2000-02-22 2001-08-29 Matsushita Electric Industrial Co., Ltd. Method of manufacturing electrode plates for batteries
JP2001306718A (ja) * 2000-04-27 2001-11-02 Tic:Kk コンピュータ及び通信技術を使った情報関連事業を提供する事業システム
US6714829B1 (en) * 2000-06-22 2004-03-30 Thomas K F Wong Dual path scheduling method
JP2002024495A (ja) * 2000-07-11 2002-01-25 Honda Motor Co Ltd スケジュール管理システム
DE10051456A1 (de) * 2000-10-17 2002-04-25 Siemens Ag Verfahren zum Referenzieren von zeitbezogenen Einträgen in verschiedenen Dateien eines Planungsprogramms
US20020128895A1 (en) * 2001-01-11 2002-09-12 International Business Machines Corporation Project management method for optimizing information technology resources
JP2002229634A (ja) * 2001-02-06 2002-08-16 Seisan Gijutsu Kenkyusho:Kk 進捗管理装置
JP2002236788A (ja) * 2001-02-09 2002-08-23 Kawasaki Steel Corp コンピュータ支援設計用プロジェクト進捗管理装置
US6963930B2 (en) * 2001-02-15 2005-11-08 Centric Software, Inc. Automatic transfer and expansion of application-specific data for display at a website
JP2002288406A (ja) * 2001-03-27 2002-10-04 Nec Fielding Ltd プロジェクト進捗状況監視システム及びプログラム
US7406432B1 (en) * 2001-06-13 2008-07-29 Ricoh Company, Ltd. Project management over a network with automated task schedule update
US7349863B1 (en) * 2001-06-14 2008-03-25 Massachusetts Institute Of Technology Dynamic planning method and system
US20030067492A1 (en) * 2001-09-17 2003-04-10 Cadwallader Charles W. Flashwarn (FW)
JP2003223486A (ja) * 2002-01-30 2003-08-08 Fujitsu Ltd 工程管理システム
CN1438596A (zh) * 2002-02-10 2003-08-27 宫本保 进度表管理方法
JP2003303268A (ja) * 2002-04-11 2003-10-24 Denso Corp 業務管理方法
US20030233268A1 (en) * 2002-06-17 2003-12-18 Ehsan Taqbeem Multi-dimensional interdependency based project management
US7644007B2 (en) * 2002-06-17 2010-01-05 King Fahd University Of Petroleum & Minerals Method and apparatus for finance-based scheduling of construction projects
US20040024629A1 (en) * 2002-08-02 2004-02-05 Kirby Jack Reese Methods and apparatus for project management
US6824694B2 (en) * 2002-11-04 2004-11-30 Chemco Systems L.P. Method for treating waste by application of energy waves
JP2004240486A (ja) * 2003-02-03 2004-08-26 Hitachi Ltd プロジェクトの変更管理方法および装置
US7734491B2 (en) * 2004-06-15 2010-06-08 Microsoft Corporation Hierarchical projects in a computer-enabled project management method and system

Also Published As

Publication number Publication date
AU2005202445A1 (en) 2006-01-05
KR20060046452A (ko) 2006-05-17
CA2509784A1 (en) 2005-12-15
TWI390456B (zh) 2013-03-21
CN1728168A (zh) 2006-02-01
JP2006004430A (ja) 2006-01-05
MXPA05006430A (es) 2006-01-31
EP1607895A2 (en) 2005-12-21
EP1607895A3 (en) 2006-09-27
KR101153018B1 (ko) 2012-06-04
RU2005118391A (ru) 2006-12-20
BRPI0502196A (pt) 2006-01-24
AU2005202445B2 (en) 2010-12-16
TW200602941A (en) 2006-01-16
US20050278208A1 (en) 2005-12-15

Similar Documents

Publication Publication Date Title
ZA200504808B (en) Method and system for restarting a project management system scheduling engine based on user input of contractual start/finish data
HK1106357A1 (en) Device management system and device management command scheduling method thereof
GB2385963B (en) Method for determination of fuel usage for a vehicle in a vehicle navigation system
EP1834386A4 (en) SYSTEM AND METHOD FOR THE OPTICAL CONSUMPTION OF A REMOTE NETWORK COMPONENT
EP1735716A4 (en) SYSTEM AND METHOD FOR GENERATING TASKS ASSOCIATED WITH ELECTRONIC IMAGE FILES
GB2416600B (en) System and method for starting a vehicle
GB2414570B (en) Control system for gas-turbine engine
ZA200504811B (en) User interface for providing task management and calendar information
GB2433349B (en) A method and system for assessing a musical performance
EP1820091A4 (en) SYSTEM FOR MANAGING AND AUTOMATING BUSINESS KNOWLEDGE
GB0413624D0 (en) A queue management system and method
AU2003243627A8 (en) Microturbine engine system
GB2412752B (en) Control system for gas-turbine engine
WO2008060906A3 (en) Parameter-based appointment scheduling system and method
GB2410232B (en) An optical system and method of taking a number of photographs
HK1111541A1 (en) A method and system for user information management in instant communication system
DE50212015D1 (de) Ladesystem für eine Brennkraftmaschine sowie Verfahren zu dessen Regelung
SG123618A1 (en) A method and system for verifying the identity of a user
EP1759088A4 (en) METHOD, APPARATUS AND COMPUTER PROGRAM FOR PROGRAMMING RESOURCE EXTRACTION AND DETERMINING NET CURRENT VALUE OF EXTRACTION PROGRAMMING
ZA200704429B (en) Method and system for reducing fuel consumption in a diesel engine
TWI365370B (en) Methods and systems for a reference clock
DE60301830D1 (de) System, Verfahren und Computerprogramm zur Steuerung der Kraftstoffeinspritzung für einen Motor
EP1792264A4 (en) METHOD AND SYSTEM FOR ASSOCIATING CUSTOMER INFORMATION WITH A CUSTOMER IDENTIFICATION
GB2418988B (en) A soot management system for an engine
HK1111543A1 (en) A method and system for acquiring information on user state through search engine