KR101153018B1 - 계약상의 시작/종료 데이터의 사용자 입력에 기초하여프로젝트 관리 시스템 스케줄링 엔진을 재시작하기 위한방법 및 시스템 - Google Patents

계약상의 시작/종료 데이터의 사용자 입력에 기초하여프로젝트 관리 시스템 스케줄링 엔진을 재시작하기 위한방법 및 시스템 Download PDF

Info

Publication number
KR101153018B1
KR101153018B1 KR1020050051333A KR20050051333A KR101153018B1 KR 101153018 B1 KR101153018 B1 KR 101153018B1 KR 1020050051333 A KR1020050051333 A KR 1020050051333A KR 20050051333 A KR20050051333 A KR 20050051333A KR 101153018 B1 KR101153018 B1 KR 101153018B1
Authority
KR
South Korea
Prior art keywords
project
schedule
milestone
graphic
duration
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
KR1020050051333A
Other languages
English (en)
Korean (ko)
Other versions
KR20060046452A (ko
Inventor
에드워드 제리 슐츠
Original Assignee
마이크로소프트 코포레이션
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 마이크로소프트 코포레이션 filed Critical 마이크로소프트 코포레이션
Publication of KR20060046452A publication Critical patent/KR20060046452A/ko
Application granted granted Critical
Publication of KR101153018B1 publication Critical patent/KR101153018B1/ko
Assigned to 마이크로소프트 테크놀로지 라이센싱, 엘엘씨 reassignment 마이크로소프트 테크놀로지 라이센싱, 엘엘씨 권리의 전부이전등록 Assignors: 마이크로소프트 코포레이션
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • General Factory Administration (AREA)
KR1020050051333A 2004-06-15 2005-06-15 계약상의 시작/종료 데이터의 사용자 입력에 기초하여프로젝트 관리 시스템 스케줄링 엔진을 재시작하기 위한방법 및 시스템 Expired - Fee Related KR101153018B1 (ko)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US10/868,517 US20050278208A1 (en) 2004-06-15 2004-06-15 Method and system for restarting a project management system scheduling engine based on user input of contractual start/finish data
US10/868,517 2004-06-15

Publications (2)

Publication Number Publication Date
KR20060046452A KR20060046452A (ko) 2006-05-17
KR101153018B1 true KR101153018B1 (ko) 2012-06-04

Family

ID=34940113

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020050051333A Expired - Fee Related KR101153018B1 (ko) 2004-06-15 2005-06-15 계약상의 시작/종료 데이터의 사용자 입력에 기초하여프로젝트 관리 시스템 스케줄링 엔진을 재시작하기 위한방법 및 시스템

Country Status (12)

Country Link
US (1) US20050278208A1 (https=)
EP (1) EP1607895A3 (https=)
JP (1) JP2006004430A (https=)
KR (1) KR101153018B1 (https=)
CN (1) CN1728168A (https=)
AU (1) AU2005202445B2 (https=)
BR (1) BRPI0502196A (https=)
CA (1) CA2509784A1 (https=)
MX (1) MXPA05006430A (https=)
RU (1) RU2005118391A (https=)
TW (1) TWI390456B (https=)
ZA (1) ZA200504808B (https=)

Families Citing this family (37)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050228710A1 (en) * 2004-04-09 2005-10-13 Sam Richards Asset scheduling management in media production
US20100010856A1 (en) * 2006-02-08 2010-01-14 Kim Huat David Chua Method and system for constraint-based project scheduling
JP4144890B2 (ja) * 2006-06-08 2008-09-03 インターナショナル・ビジネス・マシーンズ・コーポレーション 開発プロジェクトの日程表作成を支援するシステムおよびその方法
US20080115077A1 (en) * 2006-11-09 2008-05-15 International Business Machines Corporation Persistent status indicator for calendar
US8249906B2 (en) * 2007-02-12 2012-08-21 Pma Technologies, Llc Interactive graphics-based planning systems
US8666794B1 (en) * 2007-03-26 2014-03-04 Sprint Communications Company L.P. Project management tool
US10255583B2 (en) 2007-05-01 2019-04-09 Oracle International Corporation Nested hierarchical rollups by level using a normalized table
US20080300945A1 (en) * 2007-05-31 2008-12-04 Michel Shane Simpson Techniques for sharing resources across multiple independent project lifecycles
US8082274B2 (en) 2007-06-28 2011-12-20 Microsoft Corporation Scheduling application allowing freeform data entry
US20090048894A1 (en) * 2007-08-14 2009-02-19 Michel Shane Simpson Techniques for propagating changes in projects
US20090234699A1 (en) * 2008-03-15 2009-09-17 Microsoft Corporation User Interface For Scheduling Resource Assignments
KR101020022B1 (ko) * 2008-06-30 2011-03-09 이주호 인터페이스 전환 방법 및 시스템과 이를 위한 기록매체
US8219435B2 (en) * 2009-01-21 2012-07-10 Microsoft Corporation Determining task status based upon identifying milestone indicators in project-related files
US8661447B1 (en) * 2009-03-23 2014-02-25 Symantec Corporation Method and apparatus for managing execution of a plurality of computer tasks based on availability of computer resources
US8160911B2 (en) * 2009-05-19 2012-04-17 Microsoft Corporation Project management applications utilizing summary tasks for top-down project planning
US10339479B2 (en) * 2009-12-15 2019-07-02 International Business Machines Corporation Dynamic aggregation of disparate enterprise data
US20110145913A1 (en) * 2009-12-15 2011-06-16 International Business Machines Corporation Project Management
CN102592193A (zh) * 2011-12-29 2012-07-18 杭州新中大软件股份有限公司 一种通过资源驱控进度的方法
US9734040B2 (en) 2013-05-21 2017-08-15 Microsoft Technology Licensing, Llc Animated highlights in a graph representing an application
US8990777B2 (en) 2013-05-21 2015-03-24 Concurix Corporation Interactive graph for navigating and monitoring execution of application code
CN103337004A (zh) * 2013-05-27 2013-10-02 李庆吉 一种开放式工程实施动态监控系统和方法
US9280841B2 (en) * 2013-07-24 2016-03-08 Microsoft Technology Licensing, Llc Event chain visualization of performance data
US9292415B2 (en) 2013-09-04 2016-03-22 Microsoft Technology Licensing, Llc Module specific tracing in a shared module environment
CN105765560B (zh) 2013-11-13 2019-11-05 微软技术许可有限责任公司 基于多次跟踪执行的软件组件推荐
WO2015089561A1 (en) * 2013-12-19 2015-06-25 South Australian Technology Group Pty Limited A method and system for monitoring behaviour
US20160026952A1 (en) * 2014-07-28 2016-01-28 Robin Systems, Inc. System and method performing job management
CN104240027A (zh) * 2014-09-10 2014-12-24 南京跃豚智能科技有限公司 事务进度跟踪管理方法及装置
US10437707B2 (en) 2015-03-19 2019-10-08 Teachers Insurance And Annuity Association Of America Evaluating and presenting software testing project status indicators
US10310849B2 (en) 2015-11-24 2019-06-04 Teachers Insurance And Annuity Association Of America Visual presentation of metrics reflecting lifecycle events of software artifacts
US10643158B2 (en) * 2016-04-01 2020-05-05 Snap-On Incorporated Technician timer
US11175914B2 (en) 2019-06-28 2021-11-16 Aras Corporation Calculation engine for performing calculations based on dependencies in a self-describing data system
WO2021102472A1 (en) * 2019-11-22 2021-05-27 Rev 1 Power Services, Inc. Automated system for tracking progress of operations deliverables
FR3106227B1 (fr) * 2020-01-15 2023-06-30 Freshcore Procédé et système de traitement de données pour la réalisation d’un travail d’impression
TWI816110B (zh) * 2021-04-27 2023-09-21 捷拓科技股份有限公司 產品開發專案之多目標時程管理方法
US12094014B2 (en) * 2022-04-27 2024-09-17 Procore Technologies, Inc. Computer systems and methods for dynamic pull planning
CN115759577B (zh) * 2022-11-01 2026-04-03 深圳市大数据研究院 任务动态调度方法和装置、电子设备、存储介质
US20240346411A1 (en) * 2023-04-12 2024-10-17 Dish Wireless L. L. C. Project scheduling systems and methods

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002236788A (ja) * 2001-02-09 2002-08-23 Kawasaki Steel Corp コンピュータ支援設計用プロジェクト進捗管理装置

Family Cites Families (37)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5381332A (en) * 1991-12-09 1995-01-10 Motorola, Inc. Project management system with automated schedule and cost integration
JPH06348720A (ja) * 1993-06-14 1994-12-22 Toshiba Corp 生産開発管理表示装置
US5548506A (en) * 1994-03-17 1996-08-20 Srinivasan; Seshan R. Automated, electronic network based, project management server system, for managing multiple work-groups
US5974391A (en) * 1994-07-12 1999-10-26 Fujitsu Limited Device and method for project management
US5765140A (en) * 1995-11-17 1998-06-09 Mci Corporation Dynamic project management system
AUPN773496A0 (en) * 1996-01-25 1996-02-15 Task Solutions Pty Ltd Task management system
JPH10240804A (ja) * 1997-02-21 1998-09-11 Nec Corp プロジェクト管理システム
US6609100B2 (en) * 1997-03-07 2003-08-19 Lockhead Martin Corporation Program planning management system
JP4312846B2 (ja) * 1997-07-14 2009-08-12 株式会社日立製作所 取引進捗管理方法
JPH1196222A (ja) * 1997-09-17 1999-04-09 Hitachi Ltd 工程進捗管理方法および工程管理装置
JP2000001988A (ja) * 1998-06-17 2000-01-07 Daiken Trade & Ind Co Ltd 建築物施工に対する工程管理支援装置及び建築物施工に対する工程管理支援プログラムを記録したコンピュータ読み取り可能な記録媒体
US6351734B1 (en) * 1998-09-09 2002-02-26 Unisys Corporation System and method for resource allocation and planning
US6487469B1 (en) * 1998-11-13 2002-11-26 Texas Instruments Incorporated System and method for integrating schedule and design environments
US6501473B1 (en) * 1999-03-18 2002-12-31 Lucent Technologies Inc. Method and system for theory of constraints buffer graphing, tracking and management
US7139719B1 (en) * 1999-10-08 2006-11-21 I2 Technologies Us, Inc. System for scheduling product planning
US6581040B1 (en) * 2000-02-18 2003-06-17 Daniel B. Wright Project specific communications system and method
EP1128455A1 (en) * 2000-02-22 2001-08-29 Matsushita Electric Industrial Co., Ltd. Method of manufacturing electrode plates for batteries
JP2001306718A (ja) * 2000-04-27 2001-11-02 Tic:Kk コンピュータ及び通信技術を使った情報関連事業を提供する事業システム
US6714829B1 (en) * 2000-06-22 2004-03-30 Thomas K F Wong Dual path scheduling method
JP2002024495A (ja) * 2000-07-11 2002-01-25 Honda Motor Co Ltd スケジュール管理システム
DE10051456A1 (de) * 2000-10-17 2002-04-25 Siemens Ag Verfahren zum Referenzieren von zeitbezogenen Einträgen in verschiedenen Dateien eines Planungsprogramms
US20020128895A1 (en) * 2001-01-11 2002-09-12 International Business Machines Corporation Project management method for optimizing information technology resources
JP2002229634A (ja) * 2001-02-06 2002-08-16 Seisan Gijutsu Kenkyusho:Kk 進捗管理装置
US6963930B2 (en) * 2001-02-15 2005-11-08 Centric Software, Inc. Automatic transfer and expansion of application-specific data for display at a website
JP2002288406A (ja) * 2001-03-27 2002-10-04 Nec Fielding Ltd プロジェクト進捗状況監視システム及びプログラム
US7406432B1 (en) * 2001-06-13 2008-07-29 Ricoh Company, Ltd. Project management over a network with automated task schedule update
US7349863B1 (en) * 2001-06-14 2008-03-25 Massachusetts Institute Of Technology Dynamic planning method and system
US20030067492A1 (en) * 2001-09-17 2003-04-10 Cadwallader Charles W. Flashwarn (FW)
JP2003223486A (ja) * 2002-01-30 2003-08-08 Fujitsu Ltd 工程管理システム
CN1438596A (zh) * 2002-02-10 2003-08-27 宫本保 进度表管理方法
JP2003303268A (ja) * 2002-04-11 2003-10-24 Denso Corp 業務管理方法
US20030233268A1 (en) * 2002-06-17 2003-12-18 Ehsan Taqbeem Multi-dimensional interdependency based project management
US7644007B2 (en) * 2002-06-17 2010-01-05 King Fahd University Of Petroleum & Minerals Method and apparatus for finance-based scheduling of construction projects
US20040024629A1 (en) * 2002-08-02 2004-02-05 Kirby Jack Reese Methods and apparatus for project management
US6824694B2 (en) * 2002-11-04 2004-11-30 Chemco Systems L.P. Method for treating waste by application of energy waves
JP2004240486A (ja) * 2003-02-03 2004-08-26 Hitachi Ltd プロジェクトの変更管理方法および装置
US7734491B2 (en) * 2004-06-15 2010-06-08 Microsoft Corporation Hierarchical projects in a computer-enabled project management method and system

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002236788A (ja) * 2001-02-09 2002-08-23 Kawasaki Steel Corp コンピュータ支援設計用プロジェクト進捗管理装置

Also Published As

Publication number Publication date
JP2006004430A (ja) 2006-01-05
RU2005118391A (ru) 2006-12-20
AU2005202445B2 (en) 2010-12-16
TWI390456B (zh) 2013-03-21
ZA200504808B (en) 2007-03-28
EP1607895A2 (en) 2005-12-21
AU2005202445A1 (en) 2006-01-05
CN1728168A (zh) 2006-02-01
TW200602941A (en) 2006-01-16
EP1607895A3 (en) 2006-09-27
US20050278208A1 (en) 2005-12-15
BRPI0502196A (pt) 2006-01-24
CA2509784A1 (en) 2005-12-15
MXPA05006430A (es) 2006-01-31
KR20060046452A (ko) 2006-05-17

Similar Documents

Publication Publication Date Title
KR101153018B1 (ko) 계약상의 시작/종료 데이터의 사용자 입력에 기초하여프로젝트 관리 시스템 스케줄링 엔진을 재시작하기 위한방법 및 시스템
KR101176647B1 (ko) 컴퓨터-사용가능 프로젝트 관리 방법 및 시스템에서의계층적인 프로젝트들
US11087281B2 (en) System and method of commitment management
US7496886B2 (en) Method and system for providing cross project commitments
US8751280B2 (en) Interactive graphics-based planning systems
US8160911B2 (en) Project management applications utilizing summary tasks for top-down project planning
US8296170B2 (en) Process management system and method
US8332251B1 (en) Method and system for allocation of resources in an Agile environment
US20060004618A1 (en) Explaining task scheduling for a project
US20080027776A1 (en) Project task drivers pane
KR20060092816A (ko) 협력 애플리케이션에서의 워크플로우 연관화
EP1716509A1 (en) A project management method and system
US20100023947A1 (en) System, method, and computer program product for resource collaboration optimization
HK1086905A (en) Method and system for restarting a project management system scheduling engine based on user input of contractual start/ finish data
Lowery et al. Managing projects with Microsoft Project 2000: for Windows

Legal Events

Date Code Title Description
PA0109 Patent application

St.27 status event code: A-0-1-A10-A12-nap-PA0109

PG1501 Laying open of application

St.27 status event code: A-1-1-Q10-Q12-nap-PG1501

P22-X000 Classification modified

St.27 status event code: A-2-2-P10-P22-nap-X000

A201 Request for examination
E13-X000 Pre-grant limitation requested

St.27 status event code: A-2-3-E10-E13-lim-X000

P11-X000 Amendment of application requested

St.27 status event code: A-2-2-P10-P11-nap-X000

P13-X000 Application amended

St.27 status event code: A-2-2-P10-P13-nap-X000

PA0201 Request for examination

St.27 status event code: A-1-2-D10-D11-exm-PA0201

D13-X000 Search requested

St.27 status event code: A-1-2-D10-D13-srh-X000

D14-X000 Search report completed

St.27 status event code: A-1-2-D10-D14-srh-X000

R17-X000 Change to representative recorded

St.27 status event code: A-3-3-R10-R17-oth-X000

E902 Notification of reason for refusal
PE0902 Notice of grounds for rejection

St.27 status event code: A-1-2-D10-D21-exm-PE0902

E13-X000 Pre-grant limitation requested

St.27 status event code: A-2-3-E10-E13-lim-X000

P11-X000 Amendment of application requested

St.27 status event code: A-2-2-P10-P11-nap-X000

P13-X000 Application amended

St.27 status event code: A-2-2-P10-P13-nap-X000

P22-X000 Classification modified

St.27 status event code: A-2-2-P10-P22-nap-X000

E701 Decision to grant or registration of patent right
PE0701 Decision of registration

St.27 status event code: A-1-2-D10-D22-exm-PE0701

GRNT Written decision to grant
PR0701 Registration of establishment

St.27 status event code: A-2-4-F10-F11-exm-PR0701

PR1002 Payment of registration fee

St.27 status event code: A-2-2-U10-U11-oth-PR1002

Fee payment year number: 1

PG1601 Publication of registration

St.27 status event code: A-4-4-Q10-Q13-nap-PG1601

P22-X000 Classification modified

St.27 status event code: A-4-4-P10-P22-nap-X000

PN2301 Change of applicant

St.27 status event code: A-5-5-R10-R13-asn-PN2301

St.27 status event code: A-5-5-R10-R11-asn-PN2301

LAPS Lapse due to unpaid annual fee
PC1903 Unpaid annual fee

St.27 status event code: A-4-4-U10-U13-oth-PC1903

Not in force date: 20150530

Payment event data comment text: Termination Category : DEFAULT_OF_REGISTRATION_FEE

PN2301 Change of applicant

St.27 status event code: A-5-5-R10-R11-asn-PN2301

PN2301 Change of applicant

St.27 status event code: A-5-5-R10-R14-asn-PN2301

PC1903 Unpaid annual fee

St.27 status event code: N-4-6-H10-H13-oth-PC1903

Ip right cessation event data comment text: Termination Category : DEFAULT_OF_REGISTRATION_FEE

Not in force date: 20150530

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000