CN1728168A - 基于合同开始/结束数据的用户输入来重启项目管理系统调度引擎的方法和系统 - Google Patents

基于合同开始/结束数据的用户输入来重启项目管理系统调度引擎的方法和系统 Download PDF

Info

Publication number
CN1728168A
CN1728168A CNA2005100923864A CN200510092386A CN1728168A CN 1728168 A CN1728168 A CN 1728168A CN A2005100923864 A CNA2005100923864 A CN A2005100923864A CN 200510092386 A CN200510092386 A CN 200510092386A CN 1728168 A CN1728168 A CN 1728168A
Authority
CN
China
Prior art keywords
project
management program
project management
major event
contract
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2005100923864A
Other languages
English (en)
Chinese (zh)
Inventor
E·J·舒尔茨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Microsoft Technology Licensing LLC
Original Assignee
Microsoft Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Microsoft Corp filed Critical Microsoft Corp
Publication of CN1728168A publication Critical patent/CN1728168A/zh
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • General Factory Administration (AREA)
CNA2005100923864A 2004-06-15 2005-06-15 基于合同开始/结束数据的用户输入来重启项目管理系统调度引擎的方法和系统 Pending CN1728168A (zh)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US10/868,517 US20050278208A1 (en) 2004-06-15 2004-06-15 Method and system for restarting a project management system scheduling engine based on user input of contractual start/finish data
US10/868,517 2004-06-15

Publications (1)

Publication Number Publication Date
CN1728168A true CN1728168A (zh) 2006-02-01

Family

ID=34940113

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2005100923864A Pending CN1728168A (zh) 2004-06-15 2005-06-15 基于合同开始/结束数据的用户输入来重启项目管理系统调度引擎的方法和系统

Country Status (12)

Country Link
US (1) US20050278208A1 (https=)
EP (1) EP1607895A3 (https=)
JP (1) JP2006004430A (https=)
KR (1) KR101153018B1 (https=)
CN (1) CN1728168A (https=)
AU (1) AU2005202445B2 (https=)
BR (1) BRPI0502196A (https=)
CA (1) CA2509784A1 (https=)
MX (1) MXPA05006430A (https=)
RU (1) RU2005118391A (https=)
TW (1) TWI390456B (https=)
ZA (1) ZA200504808B (https=)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102592193A (zh) * 2011-12-29 2012-07-18 杭州新中大软件股份有限公司 一种通过资源驱控进度的方法
CN103337004A (zh) * 2013-05-27 2013-10-02 李庆吉 一种开放式工程实施动态监控系统和方法
CN104240027A (zh) * 2014-09-10 2014-12-24 南京跃豚智能科技有限公司 事务进度跟踪管理方法及装置
CN115759577A (zh) * 2022-11-01 2023-03-07 深圳市大数据研究院 任务动态调度方法和装置、电子设备、存储介质
TWI816110B (zh) * 2021-04-27 2023-09-21 捷拓科技股份有限公司 產品開發專案之多目標時程管理方法

Families Citing this family (32)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050228710A1 (en) * 2004-04-09 2005-10-13 Sam Richards Asset scheduling management in media production
US20100010856A1 (en) * 2006-02-08 2010-01-14 Kim Huat David Chua Method and system for constraint-based project scheduling
JP4144890B2 (ja) * 2006-06-08 2008-09-03 インターナショナル・ビジネス・マシーンズ・コーポレーション 開発プロジェクトの日程表作成を支援するシステムおよびその方法
US20080115077A1 (en) * 2006-11-09 2008-05-15 International Business Machines Corporation Persistent status indicator for calendar
US8249906B2 (en) * 2007-02-12 2012-08-21 Pma Technologies, Llc Interactive graphics-based planning systems
US8666794B1 (en) * 2007-03-26 2014-03-04 Sprint Communications Company L.P. Project management tool
US10255583B2 (en) 2007-05-01 2019-04-09 Oracle International Corporation Nested hierarchical rollups by level using a normalized table
US20080300945A1 (en) * 2007-05-31 2008-12-04 Michel Shane Simpson Techniques for sharing resources across multiple independent project lifecycles
US8082274B2 (en) 2007-06-28 2011-12-20 Microsoft Corporation Scheduling application allowing freeform data entry
US20090048894A1 (en) * 2007-08-14 2009-02-19 Michel Shane Simpson Techniques for propagating changes in projects
US20090234699A1 (en) * 2008-03-15 2009-09-17 Microsoft Corporation User Interface For Scheduling Resource Assignments
KR101020022B1 (ko) * 2008-06-30 2011-03-09 이주호 인터페이스 전환 방법 및 시스템과 이를 위한 기록매체
US8219435B2 (en) * 2009-01-21 2012-07-10 Microsoft Corporation Determining task status based upon identifying milestone indicators in project-related files
US8661447B1 (en) * 2009-03-23 2014-02-25 Symantec Corporation Method and apparatus for managing execution of a plurality of computer tasks based on availability of computer resources
US8160911B2 (en) * 2009-05-19 2012-04-17 Microsoft Corporation Project management applications utilizing summary tasks for top-down project planning
US10339479B2 (en) * 2009-12-15 2019-07-02 International Business Machines Corporation Dynamic aggregation of disparate enterprise data
US20110145913A1 (en) * 2009-12-15 2011-06-16 International Business Machines Corporation Project Management
US9734040B2 (en) 2013-05-21 2017-08-15 Microsoft Technology Licensing, Llc Animated highlights in a graph representing an application
US8990777B2 (en) 2013-05-21 2015-03-24 Concurix Corporation Interactive graph for navigating and monitoring execution of application code
US9280841B2 (en) * 2013-07-24 2016-03-08 Microsoft Technology Licensing, Llc Event chain visualization of performance data
US9292415B2 (en) 2013-09-04 2016-03-22 Microsoft Technology Licensing, Llc Module specific tracing in a shared module environment
CN105765560B (zh) 2013-11-13 2019-11-05 微软技术许可有限责任公司 基于多次跟踪执行的软件组件推荐
WO2015089561A1 (en) * 2013-12-19 2015-06-25 South Australian Technology Group Pty Limited A method and system for monitoring behaviour
US20160026952A1 (en) * 2014-07-28 2016-01-28 Robin Systems, Inc. System and method performing job management
US10437707B2 (en) 2015-03-19 2019-10-08 Teachers Insurance And Annuity Association Of America Evaluating and presenting software testing project status indicators
US10310849B2 (en) 2015-11-24 2019-06-04 Teachers Insurance And Annuity Association Of America Visual presentation of metrics reflecting lifecycle events of software artifacts
US10643158B2 (en) * 2016-04-01 2020-05-05 Snap-On Incorporated Technician timer
US11175914B2 (en) 2019-06-28 2021-11-16 Aras Corporation Calculation engine for performing calculations based on dependencies in a self-describing data system
WO2021102472A1 (en) * 2019-11-22 2021-05-27 Rev 1 Power Services, Inc. Automated system for tracking progress of operations deliverables
FR3106227B1 (fr) * 2020-01-15 2023-06-30 Freshcore Procédé et système de traitement de données pour la réalisation d’un travail d’impression
US12094014B2 (en) * 2022-04-27 2024-09-17 Procore Technologies, Inc. Computer systems and methods for dynamic pull planning
US20240346411A1 (en) * 2023-04-12 2024-10-17 Dish Wireless L. L. C. Project scheduling systems and methods

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001306718A (ja) * 2000-04-27 2001-11-02 Tic:Kk コンピュータ及び通信技術を使った情報関連事業を提供する事業システム
US20020073100A1 (en) * 2000-10-17 2002-06-13 Klaus Buchner Method for referencing time-related entries in different files in a planning program
US20020128895A1 (en) * 2001-01-11 2002-09-12 International Business Machines Corporation Project management method for optimizing information technology resources
JP2003223486A (ja) * 2002-01-30 2003-08-08 Fujitsu Ltd 工程管理システム
CN1438596A (zh) * 2002-02-10 2003-08-27 宫本保 进度表管理方法

Family Cites Families (33)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5381332A (en) * 1991-12-09 1995-01-10 Motorola, Inc. Project management system with automated schedule and cost integration
JPH06348720A (ja) * 1993-06-14 1994-12-22 Toshiba Corp 生産開発管理表示装置
US5548506A (en) * 1994-03-17 1996-08-20 Srinivasan; Seshan R. Automated, electronic network based, project management server system, for managing multiple work-groups
US5974391A (en) * 1994-07-12 1999-10-26 Fujitsu Limited Device and method for project management
US5765140A (en) * 1995-11-17 1998-06-09 Mci Corporation Dynamic project management system
AUPN773496A0 (en) * 1996-01-25 1996-02-15 Task Solutions Pty Ltd Task management system
JPH10240804A (ja) * 1997-02-21 1998-09-11 Nec Corp プロジェクト管理システム
US6609100B2 (en) * 1997-03-07 2003-08-19 Lockhead Martin Corporation Program planning management system
JP4312846B2 (ja) * 1997-07-14 2009-08-12 株式会社日立製作所 取引進捗管理方法
JPH1196222A (ja) * 1997-09-17 1999-04-09 Hitachi Ltd 工程進捗管理方法および工程管理装置
JP2000001988A (ja) * 1998-06-17 2000-01-07 Daiken Trade & Ind Co Ltd 建築物施工に対する工程管理支援装置及び建築物施工に対する工程管理支援プログラムを記録したコンピュータ読み取り可能な記録媒体
US6351734B1 (en) * 1998-09-09 2002-02-26 Unisys Corporation System and method for resource allocation and planning
US6487469B1 (en) * 1998-11-13 2002-11-26 Texas Instruments Incorporated System and method for integrating schedule and design environments
US6501473B1 (en) * 1999-03-18 2002-12-31 Lucent Technologies Inc. Method and system for theory of constraints buffer graphing, tracking and management
US7139719B1 (en) * 1999-10-08 2006-11-21 I2 Technologies Us, Inc. System for scheduling product planning
US6581040B1 (en) * 2000-02-18 2003-06-17 Daniel B. Wright Project specific communications system and method
EP1128455A1 (en) * 2000-02-22 2001-08-29 Matsushita Electric Industrial Co., Ltd. Method of manufacturing electrode plates for batteries
US6714829B1 (en) * 2000-06-22 2004-03-30 Thomas K F Wong Dual path scheduling method
JP2002024495A (ja) * 2000-07-11 2002-01-25 Honda Motor Co Ltd スケジュール管理システム
JP2002229634A (ja) * 2001-02-06 2002-08-16 Seisan Gijutsu Kenkyusho:Kk 進捗管理装置
JP2002236788A (ja) * 2001-02-09 2002-08-23 Kawasaki Steel Corp コンピュータ支援設計用プロジェクト進捗管理装置
US6963930B2 (en) * 2001-02-15 2005-11-08 Centric Software, Inc. Automatic transfer and expansion of application-specific data for display at a website
JP2002288406A (ja) * 2001-03-27 2002-10-04 Nec Fielding Ltd プロジェクト進捗状況監視システム及びプログラム
US7406432B1 (en) * 2001-06-13 2008-07-29 Ricoh Company, Ltd. Project management over a network with automated task schedule update
US7349863B1 (en) * 2001-06-14 2008-03-25 Massachusetts Institute Of Technology Dynamic planning method and system
US20030067492A1 (en) * 2001-09-17 2003-04-10 Cadwallader Charles W. Flashwarn (FW)
JP2003303268A (ja) * 2002-04-11 2003-10-24 Denso Corp 業務管理方法
US20030233268A1 (en) * 2002-06-17 2003-12-18 Ehsan Taqbeem Multi-dimensional interdependency based project management
US7644007B2 (en) * 2002-06-17 2010-01-05 King Fahd University Of Petroleum & Minerals Method and apparatus for finance-based scheduling of construction projects
US20040024629A1 (en) * 2002-08-02 2004-02-05 Kirby Jack Reese Methods and apparatus for project management
US6824694B2 (en) * 2002-11-04 2004-11-30 Chemco Systems L.P. Method for treating waste by application of energy waves
JP2004240486A (ja) * 2003-02-03 2004-08-26 Hitachi Ltd プロジェクトの変更管理方法および装置
US7734491B2 (en) * 2004-06-15 2010-06-08 Microsoft Corporation Hierarchical projects in a computer-enabled project management method and system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001306718A (ja) * 2000-04-27 2001-11-02 Tic:Kk コンピュータ及び通信技術を使った情報関連事業を提供する事業システム
US20020073100A1 (en) * 2000-10-17 2002-06-13 Klaus Buchner Method for referencing time-related entries in different files in a planning program
US20020128895A1 (en) * 2001-01-11 2002-09-12 International Business Machines Corporation Project management method for optimizing information technology resources
JP2003223486A (ja) * 2002-01-30 2003-08-08 Fujitsu Ltd 工程管理システム
CN1438596A (zh) * 2002-02-10 2003-08-27 宫本保 进度表管理方法

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102592193A (zh) * 2011-12-29 2012-07-18 杭州新中大软件股份有限公司 一种通过资源驱控进度的方法
CN103337004A (zh) * 2013-05-27 2013-10-02 李庆吉 一种开放式工程实施动态监控系统和方法
CN104240027A (zh) * 2014-09-10 2014-12-24 南京跃豚智能科技有限公司 事务进度跟踪管理方法及装置
TWI816110B (zh) * 2021-04-27 2023-09-21 捷拓科技股份有限公司 產品開發專案之多目標時程管理方法
CN115759577A (zh) * 2022-11-01 2023-03-07 深圳市大数据研究院 任务动态调度方法和装置、电子设备、存储介质
CN115759577B (zh) * 2022-11-01 2026-04-03 深圳市大数据研究院 任务动态调度方法和装置、电子设备、存储介质

Also Published As

Publication number Publication date
JP2006004430A (ja) 2006-01-05
KR101153018B1 (ko) 2012-06-04
RU2005118391A (ru) 2006-12-20
AU2005202445B2 (en) 2010-12-16
TWI390456B (zh) 2013-03-21
ZA200504808B (en) 2007-03-28
EP1607895A2 (en) 2005-12-21
AU2005202445A1 (en) 2006-01-05
TW200602941A (en) 2006-01-16
EP1607895A3 (en) 2006-09-27
US20050278208A1 (en) 2005-12-15
BRPI0502196A (pt) 2006-01-24
CA2509784A1 (en) 2005-12-15
MXPA05006430A (es) 2006-01-31
KR20060046452A (ko) 2006-05-17

Similar Documents

Publication Publication Date Title
CN1728168A (zh) 基于合同开始/结束数据的用户输入来重启项目管理系统调度引擎的方法和系统
US7752020B2 (en) System and method for modeling construction risk using location-based construction planning models
US8000946B2 (en) Discrete event simulation with constraint based scheduling analysis
CN1734483A (zh) 使用计算机项目管理中的分级项目方法和系统
US20130090971A1 (en) Method and system for allocation of resources in an agile environment
US20100257470A1 (en) Personal project management
US20080103871A1 (en) Company project management system
US20140032256A1 (en) Multi-project portfolio optimization
CN101630252A (zh) 一种基于过程仿真技术进行软件项目进度控制的方法
US8244569B2 (en) Non-destructive element splitting using location-based construction planning models
Austin et al. Application of the analytical design planning technique to construction project management
US6501473B1 (en) Method and system for theory of constraints buffer graphing, tracking and management
Salhab et al. Accounting for variability: identifying critical activities as a supplement to the critical path
Goyal et al. Integration of building information modeling (BIM) and prefabrication for lean construction
US20230351530A1 (en) Computer Systems and Methods for Dynamic Pull Planning
Wang et al. Modeling of design iterations through simulation
Połoński et al. Impact of baseline terms on the course of critical paths and time buffers in the modified Goldratt’s method
WO2007109030A2 (en) Location-based construction planning and scheduling system
Power et al. Takt complementing Last Planner System on residential construction projects
Marengo et al. Process management in construction: expansion of the Bolzano hospital
Boehm et al. Architecting: How much and when
TOMMELEIN Modeling the effect of rework timing: case study of a mechanical contractor
Li et al. Implementation of Agile Development Software Based on Project Management
CA2832806A1 (en) Method for optimizing schedule compression in projects using accelerating and overlapping of activities
Salama et al. INTEGRATED SCHEDULING OF MODULAR CONSTRUCTION USING “MOD-SCHEDULER”

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: MICROSOFT TECHNOLOGY LICENSING LLC

Free format text: FORMER OWNER: MICROSOFT CORP.

Effective date: 20150803

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20150803

Address after: Washington State

Applicant after: Micro soft technique license Co., Ltd

Address before: Washington State

Applicant before: Microsoft Corp.

C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20060201