EP1817819A1 - Verfahren zum herstellen einer elektrischen verbindung zwischen einem aluminiumleiter und einem kontaktelement - Google Patents
Verfahren zum herstellen einer elektrischen verbindung zwischen einem aluminiumleiter und einem kontaktelementInfo
- Publication number
- EP1817819A1 EP1817819A1 EP04819620A EP04819620A EP1817819A1 EP 1817819 A1 EP1817819 A1 EP 1817819A1 EP 04819620 A EP04819620 A EP 04819620A EP 04819620 A EP04819620 A EP 04819620A EP 1817819 A1 EP1817819 A1 EP 1817819A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- contact element
- contacting
- aluminum conductor
- heated
- contact
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 title claims abstract description 68
- 229910052782 aluminium Inorganic materials 0.000 title claims abstract description 67
- 239000004020 conductor Substances 0.000 title claims abstract description 61
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 6
- 239000004411 aluminium Substances 0.000 title 1
- 238000002844 melting Methods 0.000 claims abstract description 9
- 230000008018 melting Effects 0.000 claims abstract description 9
- 239000000463 material Substances 0.000 claims abstract description 8
- 238000000034 method Methods 0.000 claims description 53
- ATJFFYVFTNAWJD-UHFFFAOYSA-N Tin Chemical compound [Sn] ATJFFYVFTNAWJD-UHFFFAOYSA-N 0.000 claims description 26
- 239000003795 chemical substances by application Substances 0.000 claims description 15
- 238000007493 shaping process Methods 0.000 claims description 15
- 238000010438 heat treatment Methods 0.000 claims description 14
- 229910001128 Sn alloy Inorganic materials 0.000 claims description 11
- 238000007654 immersion Methods 0.000 claims description 5
- 238000003825 pressing Methods 0.000 claims description 5
- 230000035939 shock Effects 0.000 claims description 4
- 230000001681 protective effect Effects 0.000 claims description 2
- 230000015572 biosynthetic process Effects 0.000 abstract description 9
- 238000007711 solidification Methods 0.000 abstract description 2
- 230000008023 solidification Effects 0.000 abstract description 2
- 230000008569 process Effects 0.000 description 15
- 238000002604 ultrasonography Methods 0.000 description 6
- 230000008901 benefit Effects 0.000 description 5
- 238000005520 cutting process Methods 0.000 description 5
- RYGMFSIKBFXOCR-UHFFFAOYSA-N Copper Chemical compound [Cu] RYGMFSIKBFXOCR-UHFFFAOYSA-N 0.000 description 4
- 229910052802 copper Inorganic materials 0.000 description 4
- 239000010949 copper Substances 0.000 description 4
- 230000000694 effects Effects 0.000 description 3
- 238000009413 insulation Methods 0.000 description 3
- 229910052751 metal Inorganic materials 0.000 description 3
- 239000002184 metal Substances 0.000 description 3
- 238000000926 separation method Methods 0.000 description 3
- 239000007787 solid Substances 0.000 description 3
- 230000002411 adverse Effects 0.000 description 2
- QVGXLLKOCUKJST-UHFFFAOYSA-N atomic oxygen Chemical compound [O] QVGXLLKOCUKJST-UHFFFAOYSA-N 0.000 description 2
- 230000005540 biological transmission Effects 0.000 description 2
- 238000001816 cooling Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 239000007788 liquid Substances 0.000 description 2
- 230000007774 longterm Effects 0.000 description 2
- 229910052760 oxygen Inorganic materials 0.000 description 2
- 239000001301 oxygen Substances 0.000 description 2
- 229910000679 solder Inorganic materials 0.000 description 2
- 229910000838 Al alloy Inorganic materials 0.000 description 1
- 229910000881 Cu alloy Inorganic materials 0.000 description 1
- HCHKCACWOHOZIP-UHFFFAOYSA-N Zinc Chemical compound [Zn] HCHKCACWOHOZIP-UHFFFAOYSA-N 0.000 description 1
- 230000001133 acceleration Effects 0.000 description 1
- 239000000853 adhesive Substances 0.000 description 1
- 230000001070 adhesive effect Effects 0.000 description 1
- AZDRQVAHHNSJOQ-UHFFFAOYSA-N alumane Chemical group [AlH3] AZDRQVAHHNSJOQ-UHFFFAOYSA-N 0.000 description 1
- 230000009172 bursting Effects 0.000 description 1
- 210000000078 claw Anatomy 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 238000005336 cracking Methods 0.000 description 1
- 230000004907 flux Effects 0.000 description 1
- 239000007789 gas Substances 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 230000001771 impaired effect Effects 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 239000000155 melt Substances 0.000 description 1
- 230000009972 noncorrosive effect Effects 0.000 description 1
- 230000003647 oxidation Effects 0.000 description 1
- 238000007254 oxidation reaction Methods 0.000 description 1
- 230000035515 penetration Effects 0.000 description 1
- 238000007747 plating Methods 0.000 description 1
- 230000009979 protective mechanism Effects 0.000 description 1
- 230000005855 radiation Effects 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 238000007788 roughening Methods 0.000 description 1
- 238000005476 soldering Methods 0.000 description 1
- 238000003892 spreading Methods 0.000 description 1
- 230000007480 spreading Effects 0.000 description 1
- 238000009210 therapy by ultrasound Methods 0.000 description 1
- 239000002966 varnish Substances 0.000 description 1
- 230000003313 weakening effect Effects 0.000 description 1
- 239000011701 zinc Substances 0.000 description 1
- 229910052725 zinc Inorganic materials 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01R—ELECTRICALLY-CONDUCTIVE CONNECTIONS; STRUCTURAL ASSOCIATIONS OF A PLURALITY OF MUTUALLY-INSULATED ELECTRICAL CONNECTING ELEMENTS; COUPLING DEVICES; CURRENT COLLECTORS
- H01R4/00—Electrically-conductive connections between two or more conductive members in direct contact, i.e. touching one another; Means for effecting or maintaining such contact; Electrically-conductive connections having two or more spaced connecting locations for conductors and using contact members penetrating insulation
- H01R4/58—Electrically-conductive connections between two or more conductive members in direct contact, i.e. touching one another; Means for effecting or maintaining such contact; Electrically-conductive connections having two or more spaced connecting locations for conductors and using contact members penetrating insulation characterised by the form or material of the contacting members
- H01R4/62—Connections between conductors of different materials; Connections between or with aluminium or steel-core aluminium conductors
- H01R4/625—Soldered or welded connections
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01R—ELECTRICALLY-CONDUCTIVE CONNECTIONS; STRUCTURAL ASSOCIATIONS OF A PLURALITY OF MUTUALLY-INSULATED ELECTRICAL CONNECTING ELEMENTS; COUPLING DEVICES; CURRENT COLLECTORS
- H01R4/00—Electrically-conductive connections between two or more conductive members in direct contact, i.e. touching one another; Means for effecting or maintaining such contact; Electrically-conductive connections having two or more spaced connecting locations for conductors and using contact members penetrating insulation
- H01R4/10—Electrically-conductive connections between two or more conductive members in direct contact, i.e. touching one another; Means for effecting or maintaining such contact; Electrically-conductive connections having two or more spaced connecting locations for conductors and using contact members penetrating insulation effected solely by twisting, wrapping, bending, crimping, or other permanent deformation
- H01R4/18—Electrically-conductive connections between two or more conductive members in direct contact, i.e. touching one another; Means for effecting or maintaining such contact; Electrically-conductive connections having two or more spaced connecting locations for conductors and using contact members penetrating insulation effected solely by twisting, wrapping, bending, crimping, or other permanent deformation by crimping
- H01R4/20—Electrically-conductive connections between two or more conductive members in direct contact, i.e. touching one another; Means for effecting or maintaining such contact; Electrically-conductive connections having two or more spaced connecting locations for conductors and using contact members penetrating insulation effected solely by twisting, wrapping, bending, crimping, or other permanent deformation by crimping using a crimping sleeve
- H01R4/203—Electrically-conductive connections between two or more conductive members in direct contact, i.e. touching one another; Means for effecting or maintaining such contact; Electrically-conductive connections having two or more spaced connecting locations for conductors and using contact members penetrating insulation effected solely by twisting, wrapping, bending, crimping, or other permanent deformation by crimping using a crimping sleeve having an uneven wire-receiving surface to improve the contact
Definitions
- the invention relates to a method for producing an electrical connection between an aluminum conductor and a contact element, in which an stripped end of the aluminum conductor is inserted into the contact element and electrically contacted with it, and in which a mechanical strain relief of the aluminum conductor is formed by reshaping the contact element in the latter is clamped.
- Such a method can be found in each case from DE 199 02 405 A1 and DE 33 16 563 A1. It is provided here that an aluminum conductor consisting of several tinned stranded wires is first mechanically clamped in a crimp sleeve. After the mechanical clamping, which is done by reshaping the crimp sleeve, the crimp sleeve is soldered or welded to the tinned aluminum conductor.
- Aluminum conductors instead of the otherwise usually provided copper conductors. Insofar as aluminum or copper conductors are referred to here, this means that the conductors largely consist of aluminum / copper or an aluminum / copper alloy. Due to the significantly lower specific weight of aluminum, weight savings can be achieved.
- the invention has for its object to allow easy to manufacture and safe and long-term contact between an aluminum conductor and a contact element with low contact resistance.
- the object is achieved according to the invention by the method according to claim 1. Then a stripped end piece of the aluminum conductor is inserted into the contact element and electrically contacted with it.
- a supply of a contacting means is provided to form the electrical contact, the contacting means being heated at least up to the range of its melting temperature, so that it is preferably in molten form.
- the contacting agent in particular tin or a tin alloy, a material connection is established between the aluminum conductor and the contact element.
- the aluminum conductor is therefore immersed, in particular, in a molten bath of the contacting agent accommodated in the contact element.
- the contacting agent is heated, for example, by irradiation of a high-frequency field, by irradiation of high-energy light (laser light) or directly by a flame or by another heating element.
- the contact element is mechanically deformed during or after the formation of the electrical contact, so that the aluminum conductor is clamped in the contact element in order to form a mechanical strain relief.
- the provision of the liquefied contacting agent and the “immersion” of the usually tinned stranded wires of the aluminum conductor result in good electrical contact between the aluminum conductor and the contact element with low contact resistance.
- the contact element is usually also tinned on its inner surface
- the amount of contacting agent is advantageously the depth of penetration of the contacting agent between the individual stranded wires and thus the contact area to the stranded wires.
- Another decisive advantage is the simultaneous or subsequent reshaping of the contact element.
- the contact element is also heated due to the heated contacting agent, so that reliable forming without material damage and in particular without
- the contact element is formed in a forming zone which is spaced apart from a contacting zone in which the electrical contacting takes place.
- This measure in turn serves to separate the mechanical from the electrical function.
- this has the advantage that the contacting formed before the forming, in particular via tin or a tin alloy, is not impaired by the application of the pressure required for the forming.
- the contacting zone is not exposed to pressure, so that there is no risk of the contacting agent subsequently flowing, as a result of which the electrical contacting could deteriorate.
- the contact element is preferably additionally heated in the forming zone in order to enable a material-saving forming with improved flow behavior compared to a cold forming without crack formation.
- the contacting agent is expediently heated to a maximum of about 280 ° C. This measure prevents damage to the insulation of the aluminum conductor. In addition, the insulation can be protected by special clamps or other protective mechanisms.
- melting is guaranteed at a temperature of 280 ° C, since the melting temperature of tin is around 232 ° C and the melting temperature of a tin alloy with 10% zinc is 198 ° C.
- soldering paste can also be used as the contacting agent, which is in molten form at 280 ° C.
- the solder paste has halogen-free, non-corrosive flux in order to avoid subsequent corrosion of the solder connection.
- the portion to be tinned is shock-heated and then immersed in a tin bath.
- the section is preferably heated to about 400 ° C or more. It is advantageous here if the section is shock-heated in a time of ⁇ 1 second. This rapid heating can be done inductively by irradiation of a high-frequency field or by using a high-energy laser light. The shock heating leads to a different expansion behavior of the aluminum and the oxide layer.
- a protective gas atmosphere is preferably provided.
- the tinning of the section is carried out by ultrasonic tinning in a tin bath.
- ultrasonic tinning takes advantage of the fact that small cavities, so-called cavitations, are created by the irradiation of ultrasound in the tin bath, which collapse explosively. This creates considerable local compressive forces, which lead to damage and chipping of the oxide layer, so that the pure aluminum is in turn largely wetted by the tin.
- the aluminum conductor is immersed in a tin bath and part of the aluminum conductor is cut off or cut off in the tin bath.
- a "fresh" separating or cutting surface is formed by the separation in the tin bath, which is wetted with tin directly and without contact with atmospheric oxygen. This measure ensures that the cutting surface is tin-plated over the entire surface for the longitudinal spreading of the individual stranded wires, the separating surface corresponds to the cross-section, so that there is no reduction in the cross-sectional area in the contacting area with regard to the electrical contact surface is the cross-sectional area.
- the reshaping process takes place within a very short reshaping time, which in the ⁇ s range is in particular in the range up to about 10 ⁇ s.
- the decisive advantage with such rapid forming is that the individual stranded wires of the aluminum conductor behave less like a solid stranded wire than more like a liquid, so that the individual stranded wires bake or fuse together. This effect is comparable to a projectile that pierces a metal plate at high speed. The metal plate does not appear as a solid in the reference system of the projectile. Rather, the projectile penetrates the metal plate like a liquid.
- the inner surface of the contact element is roughened or structured.
- This roughening or structuring additionally deforms and penetrates the oxidation layer of the aluminum conductor during the forming and clamping, so that contact is made in the forming area between the contact element and the aluminum conductor.
- the inner surface of the contact element is provided, for example, with grooves or with threads that are preferably sharp-edged. When forming, these grooves or threads virtually cut into the individual stranded wires. By cutting, an additional mechanical strain relief is formed at the same time. This contacting can take place in addition to the contacting via the contacting means or as an independent contacting.
- the sudden reshaping and the simultaneous formation of the electrical and mechanical connection mean that an automated method, that is to say an automated striking of the contact element on the aluminum conductor, can be implemented at very high clock rates.
- the reshaping takes place by magnetocompression rapid magnetic reshaping.
- magnetocompression are to be reshaped
- Contact element generates very high magnetic fields, so that high currents are induced in the contact element, which in turn form a magnetic field, so that the contact element is repelled and thereby deformed due to the Lorenz force.
- the contact element is preformed, for example, in the manner of a sleeve or slotted sleeve into which the aluminum conductor is inserted.
- the external magnetic field leads to a radially inward deformation of the sleeve, so that the inserted aluminum conductor is clamped.
- the magnetocompression can achieve pressures in the range of, for example, 2000 bar. Since no mechanical forming elements are required, the contact element is not damaged despite these high pressures.
- the sudden reshaping takes place with the aid of a reshaping element by mechanical impact pressing.
- the shaping element expediently strikes the contact element at a speed> 5 m / sec, in particular> 10 m / sec.
- Conventional hydraulic presses do not reach these speeds and are therefore not suitable for sudden forming.
- the speeds for the forming element are in this case preferably generated solely by the weight, that is to say the forming element, for example designed as a mandrel or claw, strikes the contact element to be formed in the manner of a guillotine.
- connection between the aluminum conductor and the contact element is preferably insulated against moisture.
- a shrink tube is drawn on or the connection is coated with an insulating varnish or insulating adhesive.
- FIG. 1 shows a connection between a contact element and an aluminum conductor
- FIG. 2 shows a detail of the contact element with the aluminum conductor to illustrate the magnetocompression
- Fig. 3 is a partial representation of the contact element and the aluminum conductor to illustrate the forming by means of impact pressing and
- Fig. 1 an already finished connection between a contact element consisting in particular of copper and designed as a cable lug and an aluminum conductor 4 is shown.
- the contact element 2 is designed in the manner of a sleeve and has a receiving space into which an stripped end piece 6 of the aluminum conductor 4 is inserted. In the end piece 6, individual stranded wires of the aluminum conductor 4 are exposed. The stranded wires are tinned at least on their end portion.
- a supply or reservoir of a contacting means 8 is provided between the front end of the stranded wires and the rear wall or the base of the contact element 2.
- tin or a tin alloy is provided. The electrical contact is made between the aluminum conductor 4 and the contact element 2 via the tin alloy.
- the inner surface of the contact element 2 is preferably likewise pre-tinned.
- the tin alloy is introduced into the contact element 2 and melted. Subsequently or even before melting, the aluminum conductor 4 with the stripped end piece 6 is inserted into the contact element 2. In particular, the front ends of the stranded wires are immersed in the melted tin alloy 8. After cooling, there is therefore a material connection between the contact element 2 and the individual stranded wires of the aluminum conductor 4. A contacting zone 10 is formed in the region of the contacting means 8 and the front ends of the stranded wires.
- a forming zone 12 is provided spaced apart from the contacting zone 10, within which the contact element 2 is shaped. 1 already shows the deformed state in which a deformed section 14 of the Contact element 2 has penetrated into the stripped end piece 6.
- the aluminum conductor 4 is clamped in the contact element 2, whereby an effective mechanical strain relief is formed.
- the connection region in the exemplary embodiment is still surrounded by a shrink tube 16 as insulation against moisture.
- the contact element 2 is heated at least in the forming zone 12.
- a heating element 18 is provided, which is constructed in two parts in the exemplary embodiment and at the same time also serves to heat the contacting means 8 up to the region of its melting temperature.
- the heating element 18 is subdivided into two functional zones which are designed for the different requirements, namely the heating of the reservoir 8 and the heating of the contact element 2.
- only one heating element 18 can be provided for heating the contacting means 8.
- the contact element 2 is also necessarily heated.
- an ultrasound generator 20 is also provided.
- the contact element is in this case suitably mechanically fixed to an ultrasound sonodrote or acoustically coupled by a transmission medium for the transmission of the required ultrasound energies.
- the shaping process can be carried out in a conventional manner by mechanical or hydraulic pressing of shaping elements against the contact element 2.
- reshaping by means of magnetocompression is provided in the exemplary embodiment according to FIG. 2.
- a very strong magnetic field is generated by magnetic coils 22 in the immediate outer region of the contact element 2, so that currents are induced in the conductive contact element 2 and the Lorenz force is formed. This acts in the direction of the arrows shown in FIG. 2 on the contact element 2 and thereby causes the contact element 2 to be deformed.
- a so-called mechanical impact pressing is provided for reshaping according to the exemplary embodiment according to FIG. 3.
- a forming element 24 is struck against the contact element at a very high speed.
- the shaping element 24 is designed in the form of a spike.
- a counter element 26 is arranged, which in particular can also give shape to the forming process.
- the high speed of the shaping element 24 in the direction of the arrow direction shown in FIG. 3 is preferably achieved solely by acceleration due to gravity.
- a very rapid forming takes place with a duration in the ⁇ s range. Due to the sudden reshaping, the special effect is achieved that the individual stranded wires connect to one another in a materially integral manner.
- the sudden forming processes according to FIGS. 2 and 3 can therefore take place in addition to the mechanical connection for electrical contacting additionally or alternatively to the electrical contacting via the contacting means 8.
- the inner surface of the contacting element 2 is roughened or structured at least in the forming zone 12.
- a thread 28 is cut into the sleeve-like contact element 2. 2 and 3 show the situation before the forming process. After the shaping, the particularly sharp-edged threads of the thread 28 cut into the stranded wires and, in particular, penetrate the oxide layer.
- Process step "I: tinning of aluminum conductor 4" can alternatively be carried out by one of the following sub-processes:
- A conventional tinning or using an aluminum conductor with pre-tinned stranded wires
- Process step "III: Forming the strain relief” is carried out by one of the following sub-processes:
- i conventional forming
- ii Forming by magnetocompression
- iii Forming by impact press.
- the aluminum conductor 4 is first pre-tinned in the stripped section 6 by one of the sub-processes A, B, C or D.
- the sub-processes B, C and D are distinguished by a very good tinning result, so that these sub-processes can also be used as independent tinning processes independently of the electrical contact between the aluminum conductor 4 and the contact element 2.
- the electrical contacting as described for FIG. 1 takes place subsequently to the tinning.
- the individual stranded wires are immersed in a melted reservoir of tin or tin alloy, so that a solid bond between the individual stranded wires and the contact element 2 is formed via the tin after solidification.
- the shaping takes place, in particular according to one of the methods (ii, iii) described for FIGS. 2 or 3.
- process steps II and III can also take place simultaneously, that is to say that the forming does not necessarily have to take place after the melt has cooled.
- the only decisive factor is that the melting does not take place after the forming process.
- process steps I and II are combined with one another in a common work step, that is to say take place simultaneously. Specifically, it is provided that the tinning of the stranded wires takes place with the aid of ultrasonic tinning according to sub-method C, as was described for FIG. 1.
- the process sequence according to FIG. 6 is characterized overall by a one-step process in which process step I, namely tinning of the stranded wires, can be dispensed with.
- process step I namely tinning of the stranded wires
- the electrical contact (II) and the mechanical connection (III) take place within a single process step according to sub-procedure ii or iii.
- This one-stage method for producing the electrical and mechanical connection illustrated with reference to FIG. 6 is particularly suitable for automation with a high clock rate.
Landscapes
- Connections Effected By Soldering, Adhesion, Or Permanent Deformation (AREA)
- Conductive Materials (AREA)
- Coupling Device And Connection With Printed Circuit (AREA)
- Manufacturing Of Electrical Connectors (AREA)
Description
Claims
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE10357048A DE10357048A1 (de) | 2003-12-04 | 2003-12-04 | Verfahren zum Herstellen einer elektrischen Verbindung zwischen einem Aluminiumleiter und einem Kontaktelement |
PCT/EP2004/013366 WO2005055371A1 (de) | 2003-12-04 | 2004-11-25 | Verfahren zum herstellen einer elektrischen verbindung zwischen einem aluminiumleiter und einem kontaktelement |
Publications (2)
Publication Number | Publication Date |
---|---|
EP1817819A1 true EP1817819A1 (de) | 2007-08-15 |
EP1817819B1 EP1817819B1 (de) | 2009-01-21 |
Family
ID=34638430
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP04819620A Not-in-force EP1817819B1 (de) | 2003-12-04 | 2004-11-25 | Verfahren zum herstellen einer elektrischen verbindung zwischen einem aluminiumleiter und einem kontaktelement |
Country Status (10)
Country | Link |
---|---|
US (1) | US20060208838A1 (de) |
EP (1) | EP1817819B1 (de) |
JP (1) | JP2007513475A (de) |
CN (1) | CN100405663C (de) |
AT (1) | ATE421784T1 (de) |
BR (1) | BRPI0407953A (de) |
DE (2) | DE10357048A1 (de) |
ES (1) | ES2318369T3 (de) |
PT (1) | PT1817819E (de) |
WO (1) | WO2005055371A1 (de) |
Families Citing this family (33)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102006010622B3 (de) * | 2006-03-08 | 2007-08-02 | Schulte & Co. Gmbh | Verfahren zur Verbindung eines aus Kupfer oder einer Kupferlegierung bestehenden Anschlusselementes, insbesondere eines Kabelschuhs, mit einem elektrischen Kabel sowie nach diesem Verfahren hergestellter Kabelschuh |
DE102006021422B8 (de) * | 2006-05-05 | 2008-06-26 | Schunk Ultraschalltechnik Gmbh | Verfahren zur Herstellung eines Durchgangs- oder Endknotens sowie Durchgangs- oder Endknoten |
FR2910728A1 (fr) * | 2006-12-22 | 2008-06-27 | Thales Sa | Procede de raccordement de conducteurs electriques par magnetostriction et dispositif generateur de magnetostriction. |
FR2912000A1 (fr) * | 2007-01-31 | 2008-08-01 | Powerconn | Cable de raccordement de poles de batterie |
JP5196535B2 (ja) * | 2007-12-20 | 2013-05-15 | 矢崎総業株式会社 | アルミニウム電線に対する端子圧着方法 |
DE102008051323A1 (de) * | 2008-09-03 | 2010-03-04 | Adensis Gmbh | Verbindung eines Aluminiumteils mit einem Kupferteil |
DE102008061186B4 (de) * | 2008-12-09 | 2010-07-29 | Leoni Bordnetz-Systeme Gmbh | Elektronische Kontaktverbindung und Verfahren zur Herstellung einer elektrischen Kontaktverbindung |
JP2010251287A (ja) | 2009-03-23 | 2010-11-04 | Autonetworks Technologies Ltd | 端子金具付き電線の製造方法 |
JP5242475B2 (ja) * | 2009-03-25 | 2013-07-24 | 矢崎総業株式会社 | 金属接合方法及び金属接合装置 |
EP2339196B1 (de) * | 2009-12-22 | 2015-11-04 | Halla Visteon Climate Control Corporation | Feldspulenanordnung einer elektromagnetischen Kupplung für eine Leistungsübertragungsvorrichtung und Herstellungsverfahren dafür |
WO2011128225A2 (en) | 2010-04-12 | 2011-10-20 | Fci | Electrical contact terminal with improved connection portion |
DE102010053919A1 (de) | 2010-12-09 | 2012-06-14 | Bayerische Motoren Werke Aktiengesellschaft | Verfahren zur Kontaktierung eines isolierten Kabels und elektrische Kontaktverbindung |
DE102011077886B4 (de) * | 2011-06-21 | 2016-10-13 | Lisa Dräxlmaier GmbH | Verfahren zur Leitungskonfektionierung |
DE102011077888B4 (de) * | 2011-06-21 | 2016-10-13 | Lisa Dräxlmaier GmbH | Verfahren zur Konfektionierung einer Leitung |
JP5741502B2 (ja) | 2011-07-26 | 2015-07-01 | 株式会社オートネットワーク技術研究所 | 端子付き電線およびその製造方法 |
DE202011104677U1 (de) | 2011-08-22 | 2012-01-24 | Leoni Bordnetz-Systeme Gmbh | Kontaktierungsvorrichtung sowie Kontaktverbindung |
DE102011119699A1 (de) | 2011-11-29 | 2013-05-29 | Leoni Bordnetz-Systeme Gmbh | Kabel, insbesondere Aluminiumkabel |
DE102011089206B4 (de) | 2011-12-20 | 2023-10-05 | Lisa Dräxlmaier GmbH | Verfahren zum Kontaktieren einer Litzenleitung mit einem Kontakt |
DE102012215720A1 (de) * | 2012-09-05 | 2014-03-06 | Siemens Aktiengesellschaft | Erdungslasche |
EP2735397B1 (de) | 2012-11-23 | 2018-01-17 | Nexans | Verfahren zum elektrisch leitenden Verbinden eines Kontaktteils mit einem elektrischen Leiter |
US9937583B2 (en) | 2013-12-24 | 2018-04-10 | Innovative Weld Solutions Ltd. | Welding assembly and method |
US9649717B2 (en) | 2013-12-24 | 2017-05-16 | Innovative Weld Solutions, Ltd. | Welding assembly and method |
DE102014206283B3 (de) * | 2014-04-02 | 2015-07-02 | Leoni Bordnetz-Systeme Gmbh | Elektrische Kontaktverbindung sowie Verfahren zur Herstellung einer Kontaktverbindung |
DE102014108347A1 (de) | 2014-06-13 | 2015-12-17 | Leoni Bordnetz-Systeme Gmbh | Elektrischer Litzenleiter sowie Verfahren zur Herstellung eines elektrischen Litzenleiters |
AT516232B1 (de) * | 2014-09-10 | 2016-08-15 | Gebauer & Griller Kabelwerke Ges M B H | Verfahren zur Verbindung eines Kabelendes mit einem Verbindungselement |
WO2016054516A1 (en) | 2014-10-03 | 2016-04-07 | General Cable Technologies Corporation | Wire and methods for preparing a wire to receive a contact element |
EP3109944B1 (de) | 2015-06-23 | 2021-12-08 | Nexans | Verfahren zur herstellung einer elektrisch wirksamen kontaktstelle am ende eines elektrischen leiters |
EP3340397B1 (de) | 2016-12-22 | 2019-04-03 | Nexans | Verfahren zum befestigen eines kontaktelements am ende eines elektrischen leiters |
DE102017112947A1 (de) * | 2017-06-13 | 2018-12-13 | Te Connectivity Germany Gmbh | Elektrischer Hochstromverbinder sowie Verfahren zum Herstellen eines elektrischen Hochstromverbinders |
DE102017114994B3 (de) * | 2017-07-05 | 2018-05-09 | Lisa Dräxlmaier GmbH | Verfahren zum herstellen einer elektrischen leitungsanordnung |
CN109742640B (zh) * | 2019-01-02 | 2020-10-09 | 武汉船用机械有限责任公司 | 一种电缆和接线端子的连接方法 |
DE102019122591A1 (de) * | 2019-08-22 | 2021-02-25 | Auto-Kabel Management Gmbh | Verbindung eines Crimpkontakts mit einem Leiter sowie Verfahren zur Herstellung eines Crimpkontaktes |
EP4216371A1 (de) * | 2022-01-20 | 2023-07-26 | komax Holding AG | Verfahren zum verbinden eines elektrischen kabels mit einem kontaktstück |
Family Cites Families (22)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE720629C (de) * | 1938-05-28 | 1942-05-11 | Siemens Ag | Verfahren und Vorrichtung zum Verloeten von Gegenstaenden aus Aluminium untereinander oder mit Gegenstaenden aus anderen Metallen |
US2970068A (en) * | 1955-03-07 | 1961-01-31 | Union Carbide Corp | Method of making a composite stock |
DE1959958U (de) * | 1966-12-12 | 1967-05-11 | Ver Draht & Kabelwerke Ag | Presskabelschuh oder pressverbindungshuelse. |
US3842487A (en) * | 1971-10-18 | 1974-10-22 | Essex International Inc | Terminating of electrical conductors |
GB1329634A (en) * | 1972-03-21 | 1973-09-12 | Pirelli General Cable Works | Electrical connections |
US3852517A (en) * | 1972-06-12 | 1974-12-03 | Raychem Corp | Conductive insert for heat recoverable electrical connector |
FR2236254A1 (en) * | 1973-07-04 | 1975-01-31 | Kh Polt I Im V I Lenina | Removable magnetic concentrator - in 2 parts and having bore containing workpiece |
DD140601A1 (de) * | 1978-12-08 | 1980-03-12 | Petre Iancu | Verfahren zur herstellung elektrisch leitender verbindungen oder anschluesse |
DE3316563A1 (de) * | 1983-05-06 | 1984-12-06 | SWF Auto-Electric GmbH, 7120 Bietigheim-Bissingen | Elektrischer verbinder und verfahren zu seiner herstellung |
CN2079813U (zh) * | 1990-11-16 | 1991-06-26 | 武汉电缆附件厂 | 合金焊接法堵油式铜铝接线端子 |
GB9118841D0 (en) * | 1991-09-03 | 1991-10-16 | Raychem Sa Nv | Electrical connector |
DE9209482U1 (de) * | 1992-07-15 | 1992-09-17 | Geller, Carl F., 2120 Lüneburg | Schlagpreßbacke |
DE4426790A1 (de) * | 1994-07-28 | 1996-02-08 | Pfisterer Elektrotech Karl | Preßhülse |
CN2215771Y (zh) * | 1995-01-03 | 1995-12-20 | 杭州电力设备厂 | 一种铜铝连接线 |
CN1073478C (zh) * | 1995-12-20 | 2001-10-24 | 普尔萨焊接有限公司 | 使至少两个金属制件的电磁连接或焊接的方法 |
DE19602951C2 (de) * | 1996-01-27 | 2000-12-07 | Steingroever Magnet Physik | Verfahren und Vorrichtung zum Aufweiten von Rohren oder rohrförmigen Teilen durch das Magnetfeld eines Strom-Impulses |
JPH10177867A (ja) * | 1996-12-18 | 1998-06-30 | Hitachi Cable Ltd | 配電機器用口出し線 |
DE19829761C2 (de) * | 1998-07-03 | 2000-10-26 | Sachsenwerk Gmbh | Verfahren und Leitungsverbinder zum Verbinden von warmfest lackisolierten Drähten |
FR2780986B1 (fr) * | 1998-07-10 | 2000-09-29 | Electrolyse L | Procede de transformation de structures chimiques dans un fluide sous pression et en temperature et dispositif pour sa mise en oeuvre |
DE19902405B4 (de) * | 1999-01-22 | 2005-10-27 | Feindrahtwerk Adolf Edelhoff Gmbh & Co | Verfahren zur Herstellung einer korrosionsresistenten, elektrischen Verbindung |
US6666732B1 (en) * | 2001-05-21 | 2003-12-23 | John E. Endacott | Terminal connector |
DE10223397B4 (de) * | 2003-10-04 | 2004-05-06 | Feindrahtwerk Adolf Edelhoff Gmbh & Co | Verfahren und Verbindung zur Kontaktierung eines Aluminiumkabels mit einer metallischen, verzinnten Kontaktklemme |
-
2003
- 2003-12-04 DE DE10357048A patent/DE10357048A1/de not_active Withdrawn
-
2004
- 2004-11-25 WO PCT/EP2004/013366 patent/WO2005055371A1/de active Application Filing
- 2004-11-25 ES ES04819620T patent/ES2318369T3/es active Active
- 2004-11-25 BR BRPI0407953-1A patent/BRPI0407953A/pt not_active IP Right Cessation
- 2004-11-25 JP JP2006541848A patent/JP2007513475A/ja active Pending
- 2004-11-25 CN CNB2004800038094A patent/CN100405663C/zh not_active Expired - Fee Related
- 2004-11-25 EP EP04819620A patent/EP1817819B1/de not_active Not-in-force
- 2004-11-25 AT AT04819620T patent/ATE421784T1/de not_active IP Right Cessation
- 2004-11-25 DE DE502004008930T patent/DE502004008930D1/de active Active
- 2004-11-25 PT PT04819620T patent/PT1817819E/pt unknown
-
2006
- 2006-05-04 US US11/417,687 patent/US20060208838A1/en not_active Abandoned
Non-Patent Citations (1)
Title |
---|
See references of WO2005055371A1 * |
Also Published As
Publication number | Publication date |
---|---|
DE10357048A1 (de) | 2005-07-21 |
BRPI0407953A (pt) | 2006-03-07 |
ATE421784T1 (de) | 2009-02-15 |
EP1817819B1 (de) | 2009-01-21 |
WO2005055371A1 (de) | 2005-06-16 |
PT1817819E (pt) | 2009-03-24 |
CN100405663C (zh) | 2008-07-23 |
ES2318369T3 (es) | 2009-05-01 |
US20060208838A1 (en) | 2006-09-21 |
CN1748343A (zh) | 2006-03-15 |
DE502004008930D1 (de) | 2009-03-12 |
JP2007513475A (ja) | 2007-05-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP1817819B1 (de) | Verfahren zum herstellen einer elektrischen verbindung zwischen einem aluminiumleiter und einem kontaktelement | |
EP2962369B1 (de) | Verfahren zum stoffschlüssigen fügen an einem kabelende sowie konfiguriertes kabel | |
EP1759439B1 (de) | Elektrische kontaktverbindung und verfahren zum ausbilden einer solchen kontaktverbindung | |
DE10358686B4 (de) | Crimpkontaktelement | |
EP3189561B1 (de) | Crimpkontakt | |
EP2141771A1 (de) | Kontaktierung von Leichtmetallleitungen | |
DE1057193B (de) | Elektrischer Presshuelsenverbinder | |
DE19902405B4 (de) | Verfahren zur Herstellung einer korrosionsresistenten, elektrischen Verbindung | |
EP2131448B1 (de) | Verfahren zum Verbinden eines elektrisch leitenden Bauteils mit einem flexiblen elektrischen Leiter | |
DE102014109604B4 (de) | Kontaktierung eines Litzenleiters | |
DE202007013957U1 (de) | Leiter mit Kontaktteil | |
DE19727314A1 (de) | Crimpverbindung | |
DE102010044241A1 (de) | Verbindung und Verfahren zum Verbinden eines Aluminiumkabels mit Anschlussteilen | |
DE102010027033A1 (de) | Leiter mit Kontaktteil | |
DE102011011409B4 (de) | Anschlussteil und Verbindung für elektrische Anlagen | |
DE3047684C2 (de) | Elektrischer Steckverbinder, Verfahren zu seinem Anschluß und Vorrichtung zur Durchführung des Verfahrens | |
EP3454420B1 (de) | Verfahren zum verbinden einer elektrischen aluminiumleitung mit einem aluminiumrohr | |
EP3771042B1 (de) | Herstellung einer flächigen verbindung zwischen einem elektrischen leiter und einem kontaktstück | |
DE102018100020B4 (de) | Verfahren und Vorrichtung zur Herstellung einer Verbindung zwischen einem Crimpkontakt und einem Litzenleiter | |
EP3451455B1 (de) | Verfahren zur herstellung einer elektrischen verbindung und eine elektrische leitung | |
DE102014004127B4 (de) | Verfahren zum Verbinden einer elektrischen Leitung mit einem metallischen Kontaktelement, Verbindungselement sowie Sonotrode | |
WO2018050392A1 (de) | Elektrischer rotor und verfahren zur bereitstellung eines elektrischen kontakts zwischen einer rotorwicklung und einer kontaktfahne | |
EP3109944B1 (de) | Verfahren zur herstellung einer elektrisch wirksamen kontaktstelle am ende eines elektrischen leiters | |
DE102011089206B4 (de) | Verfahren zum Kontaktieren einer Litzenleitung mit einem Kontakt | |
EP2416457A1 (de) | Verfahren zur elektrischen Kontaktierung von Drähten |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20050728 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LU MC NL PL PT RO SE SI SK TR |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LU MC NL PL PT RO SE SI SK TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D Free format text: NOT ENGLISH |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D Free format text: LANGUAGE OF EP DOCUMENT: GERMAN |
|
REF | Corresponds to: |
Ref document number: 502004008930 Country of ref document: DE Date of ref document: 20090312 Kind code of ref document: P |
|
REG | Reference to a national code |
Ref country code: PT Ref legal event code: SC4A Free format text: AVAILABILITY OF NATIONAL TRANSLATION Effective date: 20090313 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2318369 Country of ref document: ES Kind code of ref document: T3 |
|
REG | Reference to a national code |
Ref country code: SE Ref legal event code: TRGR |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090121 |
|
NLV1 | Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act | ||
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090121 Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090121 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FD4D |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090121 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090521 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090121 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090121 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090121 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090121 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090121 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090121 |
|
26N | No opposition filed |
Effective date: 20091022 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090421 |
|
BERE | Be: lapsed |
Owner name: LEONI BORDNETZ-SYSTEME G.M.B.H. Effective date: 20091130 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20091130 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20091130 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20091130 Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20091130 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090422 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20091125 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20091125 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090722 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090121 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090121 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: ES Payment date: 20121122 Year of fee payment: 9 Ref country code: SE Payment date: 20121122 Year of fee payment: 9 Ref country code: IT Payment date: 20121128 Year of fee payment: 9 Ref country code: PT Payment date: 20120525 Year of fee payment: 9 |
|
REG | Reference to a national code |
Ref country code: PT Ref legal event code: MM4A Free format text: LAPSE DUE TO NON-PAYMENT OF FEES Effective date: 20140526 |
|
REG | Reference to a national code |
Ref country code: SE Ref legal event code: EUG |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20140526 Ref country code: SE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20131126 Ref country code: IT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20131125 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FD2A Effective date: 20150506 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20131126 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 12 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 13 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 14 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20211122 Year of fee payment: 18 Ref country code: FR Payment date: 20211119 Year of fee payment: 18 Ref country code: GB Payment date: 20211123 Year of fee payment: 18 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R081 Ref document number: 502004008930 Country of ref document: DE Owner name: LEONI BORDNETZ-SYSTEME GMBH, DE Free format text: FORMER OWNER: LEONI BORDNETZ-SYSTEME GMBH, 90402 NUERNBERG, DE |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 502004008930 Country of ref document: DE |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20221125 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20221125 Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230601 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20221130 |