WO2019077861A1 - 作業指示システムおよび方法 - Google Patents

作業指示システムおよび方法 Download PDF

Info

Publication number
WO2019077861A1
WO2019077861A1 PCT/JP2018/030682 JP2018030682W WO2019077861A1 WO 2019077861 A1 WO2019077861 A1 WO 2019077861A1 JP 2018030682 W JP2018030682 W JP 2018030682W WO 2019077861 A1 WO2019077861 A1 WO 2019077861A1
Authority
WO
WIPO (PCT)
Prior art keywords
work instruction
work
information
computer
displaying
Prior art date
Application number
PCT/JP2018/030682
Other languages
English (en)
French (fr)
Inventor
禎生 菅原
鯉渕 育雄
英憲 橋本
隆之 武澤
Original Assignee
株式会社日立製作所
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社日立製作所 filed Critical 株式会社日立製作所
Priority to CN201880062058.5A priority Critical patent/CN111133394A/zh
Publication of WO2019077861A1 publication Critical patent/WO2019077861A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/04Manufacturing
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Definitions

  • the present invention relates to work instruction systems and methods.
  • Products such as control panels, office equipment, automobiles, aircraft, industrial machines, construction machines, etc. are manufactured using a production method such as line method, cell method and dynamic cell method.
  • a production method such as line method, cell method and dynamic cell method.
  • One product is produced, for example, through a plurality of work processes such as preparation of parts and materials, sheet metal, painting, assembly of main parts, assembly of main parts to the main body, inspection and the like.
  • an assembly operation system is arranged that instructs an operator to perform an assembly operation (Patent Documents 1 and 2).
  • An assembly operation system presents the operator with parts to be assembled, an assembly method, and a jig used for assembly.
  • Patent Document 1 merely displays on a data display unit an image showing a component assembly landscape and a sentence related to a work procedure (Patent Document 1 paragraph 0022).
  • Patent Document 2 the type of parts, the order of incorporation, the jig number used for incorporation, and the precautions for incorporation are displayed in text, and the image is not displayed.
  • the present invention has been made in view of the above problems, and an object thereof is to provide a work instruction system and method capable of improving usability.
  • a work instruction system includes a computer generating a work instruction screen, and a display device connected to the computer to display the work instruction screen, and the work instruction screen is a tertiary object
  • the attribute information includes a first display region for displaying a three-dimensional model based on the original design data, a second display region for displaying at least a part of attribute information of the three-dimensional design data, and predetermined component information registered in advance. And a third display area for displaying related information associated with predetermined part information.
  • the operator can three-dimensionally grasp the work content through the work instruction screen, and the usability is improved.
  • 18 is an explanatory view according to the third embodiment, showing how an electronic mail is transmitted from a work instruction screen; It is a flowchart which shows the process which contacts the matter which noticed during work. It is a flowchart which shows the process which corrects a work instruction screen based on the work analysis result and / or the communication from a field.
  • the work instruction system 11 is included in a three-dimensional model based on three-dimensional design data of a part that is an object of assembly work, at least a part of attribute information of the three-dimensional design data, and attribute information.
  • the related information associated with the predetermined part information is provided to the worker as a work instruction screen.
  • FIG. 1 is an explanatory view showing the overall outline of the work improvement support system 1.
  • the work improvement support system 1 includes a work instruction system 11 and a work analysis system 12. Instead of this, the work improvement support system 1 can also be called an information processing system including the work instruction system 11.
  • the work improvement support system 1 provides the work instruction screen 300 to the worker who assembles at the work site 2 and collects and analyzes the work result of the worker. In another embodiment described later, the work improvement support system 1 can also correct the work instruction screen based on the work analysis result and / or the communication from the worker.
  • the work improvement support system 1 can be configured, for example, using at least one computer.
  • An example of a computer system for realizing the work improvement support system 1 will be described later with reference to FIG.
  • the work site 2 will be described first.
  • the work site 2 includes at least one cell 21.
  • the worker W produces the product 25 in accordance with the work procedure displayed on the work instruction terminal 23.
  • the cell production method is described as an example, but the present invention is not limited to this, and may be applied to a line method and a dynamic cell method.
  • the work site 2 of the present embodiment is suitable for so-called high-mix low-volume production, it is also applicable to low-mix high-volume production and low-mix low-volume production.
  • the cell 21 is provided with at least one camera 24 for monitoring the status of work by the worker.
  • the camera 24 may monitor not only the work situation but also the situation around the cell 21.
  • an RFID reader 22 that reads information from an RFID (Radio Frequency Identifier) tag 26 is provided.
  • the RFID tag 26 can be divided into, for example, a work tag 26-1 possessed by the worker W and a product tag 26-2 provided on the product 25.
  • the work tag 26-1 can be further divided into a worker tag for storing the identification information of the worker W and a work instruction slip tag indicating a cell (placement destination process) of the placement destination of the worker (both of them Not shown).
  • the RFID reader 22 reads out, from the work tag 26-1, identification information for identifying a worker and identification information for identifying a cell (process).
  • the work improvement support system 1 can grasp which worker 21 is disposed in which cell 21 based on the information read by the RFID reader 22. In addition, by acquiring information on the product 25 from the product tag 26-2, it is possible to grasp the current position of the product 25 and the manufacturing history.
  • the work instruction terminal 23 as an example of the “display device” displays a work instruction screen 300 for teaching the work procedure in the cell 21 to the worker.
  • the work instruction screen 300 includes a first pane 310 which is an example of a "first display area”, a second pane 320 which is an example of a "second display area”, and a third example which is an example of a "third display area”. And a pane 330.
  • the first pane 310 displays a three-dimensional model 311 of the assembly target product 25 and a three-dimensional model 312 of the assembly target part.
  • the three-dimensional model 312 of the part to be subjected to the work procedure can be highlighted so as to be distinguished from other parts. For highlighting, for example, methods such as changing colors with other parts, thickening lines, blinking, etc. can be adopted.
  • the second pane 320 At least a part of attribute information included in the three-dimensional design data of the product 25 (for example, a part of attribute information of a component to be assembled to the product 25) is displayed.
  • the third pane 330 displays related information associated with the component code.
  • the predetermined component code is an example of “predetermined component information”.
  • the related information includes, for example, work precautions, information on a predetermined tool necessary for assembling the target part to the target product, and information on the target product or other parts related to the target product. Can be included. As will be apparent from the later-described embodiment, it is conceivable that there is no related information, in which case the third pane 330 is not provided on the work instruction screen 300.
  • the operator When the operator completes one operation procedure, the operator operates a completion button indicating completion of the operation procedure or a next button (all not shown) requesting display of the next operation procedure on the operation instruction screen 300.
  • the work improvement support system 1 can grasp the progress of the work procedure in each cell 21 in real time by monitoring the operation on the work instruction terminal 23 (work instruction screen 300).
  • the worker can also have a worker terminal 27.
  • the worker terminal 27 is, for example, a mobile phone (including a so-called smart phone) or a portable information terminal provided by a company.
  • the configuration of the work improvement support system 1 will be described.
  • the work improvement support system 1 includes the work instruction system 11 and the work analysis system 12 as described above.
  • the work instruction system 11 will be described first.
  • the work instruction system 11 generates a work instruction screen 300 to be provided to the worker in each cell.
  • the work instruction system 11 includes, for example, a 3D CAD data storage unit 111, an assembly order storage unit 112, an assembly order registration unit 113, a work instruction generation unit 114, a work instruction display unit 115, and a work instruction management table 116. Prepare.
  • the 3D CAD data storage unit 111 stores 3D design data (3D CAD data) output from a 3D CAD system (not shown).
  • the assembly order storage unit 112 stores information on an assembly order generated automatically or manually from 3D CAD data.
  • the assembly order information is information indicating which parts are to be attached in what order and when the product 25 is manufactured.
  • the assembly order registration unit 113 registers assembly order information used for a work instruction for assembling the product 25 which is the object.
  • the work instruction generation unit 114 generates work instruction content to be displayed on the work instruction screen 300 from the assembly order information registered in the assembly order registration unit 113 and the attribute information and the related information stored in the work instruction management table 116. Do.
  • the work instruction display unit 115 causes the work instruction terminal 23 to display the work instruction screen 300 by generating data of the work instruction content generated by the work instruction generation unit 114 and transmitting the data to the work instruction terminal 23.
  • the 3D CAD data storage unit 111 and the assembly order storage unit 112 may be provided outside the system 1.
  • the work analysis system 12 monitors and analyzes the work result of each worker in each cell.
  • the work analysis system 12 includes, for example, a work status monitoring unit 121, a production record management unit 122, a production plan management unit 123, a worker management unit 124, and a work analysis unit 125.
  • the task analysis system 12 has a user interface device (not shown) for a user such as a task analyzer to exchange information with the task analysis system 12.
  • the work status monitoring unit 121, the production track record management unit 122, the production plan management unit 123, and the worker management unit 124 are provided outside the work improvement support system 1, and work only necessary information from the external functions 121 to 124 It may be transmitted to the analysis unit 125.
  • the work status monitoring unit 121 monitors the progress of the work in each cell 21 based on the identification information read from the RFID tag 26 by the RFID reader 22 of each process and the operation by the worker to the work instruction terminal 23. And sends it to the production results management unit 122.
  • the production result management unit 122 manages the production results for each cell (process) based on the data from the work status monitoring unit 121.
  • the production plan management unit 123 manages the production plan of the work site 2.
  • the production plan management unit 123 manages the production plan for the entire production site and the production plan for each cell.
  • the worker management unit 124 manages, for example, the worker number of each worker, the name, the type of work, the working hours, the history of the process in charge, and the presence or absence of the skills required in each cell. Information managed by the worker management unit 124 is written in the work tag 26-1.
  • the work analysis unit 125 analyzes the work situation in each cell based on the production result data of each cell managed by the production result management unit 122 and the cell-by-cell production plan managed by the production plan management unit 123. For example, the work analysis unit 125 can analyze, for example, whether a bottleneck work has occurred or not from the actual value (work time) of each work and the target value (target work time).
  • a user such as a production manager in charge of improvement of the work process can make a plan for improving work efficiency.
  • the prepared measures are adopted as work procedure instruction information after verification and are reflected on the work instruction screen 300.
  • FIG. 2 is an example of a computer system that implements the work improvement support system 1.
  • the computer system 1000 is configured, for example, by connecting a work instruction system server 1001, a work analysis system server 1002, a 3D CAD system 1003, a database server 1004, and a user management server 1005 via a communication network CN1. . Further, the work instruction system server 1001 and the work analysis system server 1002 are also connected to the work instruction terminal 23 of each cell via the communication network CN2.
  • the work instruction system server 1001 is a server that implements the work instruction system 11.
  • the work instruction system server 1001 has, for example, computer resources such as a microprocessor (abbreviated as CPU) 10011, a memory 10012, a storage device 10013, a user interface device 10014, and a communication unit 10015.
  • the microprocessor 10011 reads a computer program stored in the storage device 10013 into the memory 10012 and executes it to realize the function as the work instruction system 11.
  • the work analysis system server 1002 is a server that implements the work analysis system 12.
  • the work analysis system server 1002 also has computer resources (all not shown) such as a microprocessor and a memory.
  • a microprocessor (not shown) executes a computer program (not shown) to realize a function as the work analysis system 12.
  • FIG. 2 shows that the work instruction system server 1001 and the work analysis system server 1002 are configured as separate physical computers, in place of this, the servers 1001 and 1002 are configured as virtual computers and one of them is configured. It may be provided on a physical computer.
  • the 3D CAD system 1003 is a computer that generates and outputs three-dimensional design data of the product 25 and the parts that make up the product 25.
  • the database server 1004 stores data from the work site 2 and the like.
  • the user management server 1005 manages users (for example, a system administrator, a person in charge of analysis, a work instruction creator, a designer, etc.) who use the work improvement support system 1.
  • FIG. 3 shows an example of the work instruction management table 116.
  • the work instruction management table 116 manages the contents of the work instruction.
  • the work instruction management table 116 is prepared, for example, for each product.
  • the work instruction management table 116 includes, for example, a product name 1161, a serial number 1162, a work procedure number 1163, a part code 1164, attribute information 1165, and related information 1166.
  • the management table 116 may include items other than the items illustrated in FIG. 3, or may not include some of the items illustrated in FIG. 3.
  • the management table 116 does not have to be composed of one table, but can be composed of a plurality of tables.
  • the product name 1161 is a product name or model number.
  • the serial number 1162 is information for identifying a product.
  • the work procedure number 1163 is information that identifies a work procedure, such as a work name.
  • the part code 1164 is information for identifying a part to be assembled.
  • Attribute information 1165 is attribute information of 3D CAD data.
  • the attribute information includes, for example, the name of the part specified by the part code, information identifying the department that manufactured the part, the number of parts used for the assembly operation, and information identifying the CAD data of the part.
  • the part code is also one of the attribute information, but in FIG. 3 the part code and the attribute information are separately displayed for convenience.
  • the related information 1166 is predetermined information which is associated in advance with the predetermined component information when the attribute information includes information (component code) for specifying the predetermined component.
  • information component code
  • the other information 334 can include, for example, general notes on the product 25, general information applied to a plurality of parts constituting the product 25.
  • FIG. 4 is a flowchart of the work instruction generation process.
  • the work instruction system 11 executes the following steps S12 to S18 for each product (S11).
  • the work instruction system 11 acquires 3D CAD data of the target product 25 from the 3D CAD data storage unit 111 (S12). Further, the work instruction system 11 acquires assembly order information registered in the assembly order registration unit 113 among assembly order information obtained by analyzing 3D CAD data and the like (S13).
  • the work instruction system 11 executes steps S15 to S18 for each work procedure (S14). That is, the work instruction system 11 generates image data for drawing a 3D model (three-dimensional model) of the part to be worked based on the 3D CAD data acquired in step S12 (S15).
  • the work instruction system 11 acquires, from the work instruction management table 116, attribute information such as the part name, the required quantity, and the manufacturing department, based on the part code included in the 3D CAD data acquired in step S12 (S16).
  • the work instruction system 11 acquires related information from the work instruction management table 116 based on the part code included in the 3D CAD data (S17).
  • the work instruction system 11 displays the work instruction content to be displayed on the work instruction screen 300 based on the 3D image data generated in step S15, the attribute information acquired in step S16, and the related information acquired in step S17. Generate and save (S18).
  • FIG. 5 shows an example of the work instruction screen 300.
  • the work instruction screen 300 is displayed on the screen of the work instruction terminal 23.
  • the work instruction screen 300 includes a first pane 310 located at the center of the screen, a second pane 320 located below the first pane 310, and a third pane 330 located to the right of the first pane 310. .
  • the first pane 310 displays a three-dimensional model (3D model) 311 of the product 25 and a three-dimensional model 312 of the part to be subjected to the work procedure.
  • the three-dimensional model 312 of the part to be worked is highlighted so that its position and shape can be distinguished from other parts.
  • attribute information (part name, department name, quantity, remarks) of a part to be subjected to the work procedure is displayed in a tabular form.
  • information that can not be transmitted to the worker using the three-dimensional models 311 and 312 or the attribute information is displayed as related information.
  • Related information includes, for example, notes 331 such as manufacturing tips (know-how) and cautions, information 332 on other parts related to the target part, information 333 on tools used for assembling the target part, and others Information 334 may be included.
  • the related part information 332 includes, for example, notes on parts related to the operation of the target part.
  • the other information 334 is information described according to the delivery destination of the product 25 or the like, and the item can be appropriately customized according to the delivery destination.
  • the operator confirms the content of the work instruction screen 300 displayed on the work instruction terminal 23 before starting the work. That is, the worker checks in advance what kind of point should be taken before starting work.
  • inexperienced workers are required to visually confirm all the information displayed on the panes 310 to 330, but if it is a skilled worker, it is necessary to visually confirm all the information. do not have to. Because experience often remembers work procedures. Therefore, in the present embodiment, it is possible to suppress the display of at least a part of the related information 331 to 334.
  • To suppress the display indicates, for example, a case where only the item name of the related information is displayed and the details are displayed when the worker operates the item name. That is, all relevant information is not displayed on the third pane 330 from the beginning, but is displayed according to the needs of the worker. Thereby, more information can be provided to the worker by effectively using the limited display size.
  • the first pane 310 displaying the product 25 and the three-dimensional model 311, 312 of the work target part, the second pane 320 displaying the attribute information of the part, and the predetermined part
  • the operator can be provided with a work instruction screen 300 including a third pane 330 displaying related information associated with a code.
  • the worker can three-dimensionally grasp the contents of the work procedure, and can confirm information that can not be easily transmitted by a three-dimensional model, such as notes.
  • the understanding of the work procedure can be promoted to improve the workability, and the variation of the manufacturing quality can be suppressed.
  • each pane can be controlled in accordance with the content of the work instruction content and the attribute of the worker.
  • FIG. 6 is a flowchart of the work instruction generation process according to the present embodiment. The process shown in FIG. 6 is different from the process described in FIG. 4 in that a new step S19 is provided.
  • the work instruction system 11 is, for example, the size or the position of all or part of the panes 310 to 330 based on the presence or absence of related information and the attribute of the worker (skill level, age, incidence of mistakes, etc.). Adjust one or both of them (S19).
  • FIG. 7 shows an example of the work instruction screen 300a when related information is not associated with the target part. If the related information does not exist, the size of the first pane 310 is set as large as possible. As a result, the worker can easily view the three-dimensional model of the target product and the target part, and the usability is improved.
  • FIG. 8 is an example in which the configuration of the work instruction screen 300b is changed according to the attribute of the worker. For example, in the case of a worker with low vision, only a three-dimensional model of a target product and a target part and related information may be displayed without displaying detailed attribute information. That is, the second pane 320 may be omitted.
  • the related information may be displayed to the less skilled worker without simplification while the related information may be simplified from the beginning to the highly skilled worker. That is, only the item name of the related information can be presented to the highly skilled worker, and detailed information in which the item of the related information is expanded can be presented from the beginning to the less skilled worker.
  • the present embodiment configured in this way also achieves the same effects as the first embodiment. Furthermore, in the present embodiment, in order to control the configuration of the work instruction screens 300a and 300b according to the attribute of the worker and the content of the work instruction content, the limited display size is effectively used to efficiently perform the necessary information. Can tell.
  • a third embodiment will be described with reference to FIGS. 9 to 11.
  • the work instruction screen 300 is improved.
  • FIG. 9 is an example of the work instruction screen 300c according to the present embodiment. Workers may notice improvements or defects while working as indicated in the work procedure. Below, the case where a defect is noticed is mentioned as an example and demonstrated.
  • the work instruction terminal 23 preferably includes a touch panel.
  • the present invention is not limited to the touch panel, and any device capable of specifying the portion in question on the three-dimensional model may be used.
  • the worker After marking the problem part, the worker generates an e-mail 400 by adding a text message or a voice message and sends it to a pre-registered destination.
  • the operator can write a text message from a virtual keyboard or a physical keyboard, and can record voice from a microphone (not shown) provided in the work instruction terminal 23.
  • the e-mail 400 configured in this manner includes, for example, an image of a problem part, a message, identification information of a worker, a work procedure number, and the like.
  • FIG. 10 is a flowchart showing a process of notifying the related person of the defect found at the work site 2 from the work instruction screen 300 as an E-mail.
  • the work instruction system 11 identifies the problem part based on the input operation from the worker (S21), and adds management information to the e-mail 400 (S22).
  • the management information is a bibliographic matter necessary for failure analysis, and is, for example, a worker ID, a work procedure number, a part code or the like. The operator can easily specify the occurrence point of the defect on the three-dimensional model, and the workability of the report is improved.
  • the work instruction system 11 adds the message input from the worker to the e-mail 400 (S23).
  • the work instruction system 11 detects that the worker instructs the transmission of the electronic mail (S24: YES)
  • the work instruction system 11 transmits the electronic mail 400 to a predetermined destination registered in advance (S25).
  • the predetermined destination for example, the person in charge of the work site 2, the designer of the product 25, and the creator of the work instruction content can be mentioned.
  • the defects found at each work site 2 are collected once to the site manager, and the e-mail 400 is forwarded to the designer or the like when the site manager determines that the problem is necessary.
  • the site manager determines whether the e-mail 400 should be transferred to the designer or the like.
  • the terminal 27 of the site manager transfers the e-mail 400 received in step S31 to a designer or the like (S33).
  • the e-mail 400 sent from the worker via the work instruction screen 300 is not sent directly to the designer, but is once collected to the on-site manager to prevent the useless e-mail 400 from being sent to the designer. It is because the defect which the worker discovered may be due to a worker's misunderstanding, immaturity, or the like.
  • the designer of the product 25 receives the electronic mail 400 transferred from the terminal 27 of the site manager at a terminal (not shown) such as a personal computer (S41) and confirms it. .
  • the received e-mail 400 is managed by, for example, the database server 1004.
  • FIG. 11 is a flowchart showing a process of correcting work instruction content. Here, the case where the designer terminal corrects the work instruction content will be described.
  • the designer terminal acquires the task analysis result from the task analysis system 12 (S51).
  • the designer terminal accesses the database server 1004 to confirm whether there is a defect report (S52). If there is a defect report (S52: YES), the designer terminal acquires an email 400 for reporting a defect from the database server 1004 (S53).
  • the designer terminal determines whether the content of the work instruction content should be corrected based on the work analysis result and the defect report (S54).
  • the bottleneck operation extracted from the operation analysis result matches the operation procedure in which the defect is reported, it can be determined that the work instruction content should be corrected to improve the operation procedure.
  • the bottleneck operation is, for example, an operation in which the time required to complete the operation is longer than the target value.
  • the increase in the working time depends on the skill level of the worker, but there may be an improvement in the way of transmitting the work instruction. In this case, for example, a new note on the relationship with parts that are easily overlooked, tools that are easily mistaken, and the like are created and included in the related information. On the other hand, if there is an improvement in the design of the product 25, the design data can be reviewed and corrected.
  • the present embodiment configured in this way also achieves the same effects as the first embodiment. Furthermore, according to the present embodiment, since the worker can report the points noticed during the work from the work instruction screen 300, the awareness at the work site 2 can be easily collected. Then, in the present embodiment, since the work instruction content can be corrected based on the work analysis result in the work analysis system 12 and the report from the work site 2, the work instruction screen 300 can be further understood to the worker Can be provided. Thereby, the workability of the assembly operation can be improved, and the occurrence of the bottleneck operation can be suppressed.
  • each component of the present invention can be arbitrarily selected, and an invention having a selected configuration is also included in the present invention.
  • the configurations described in the claims can be combined with combinations other than the combinations specified in the claims.

Landscapes

  • Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Manufacturing & Machinery (AREA)
  • Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • General Health & Medical Sciences (AREA)
  • Marketing (AREA)
  • Quality & Reliability (AREA)
  • Health & Medical Sciences (AREA)
  • Economics (AREA)
  • General Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Automation & Control Theory (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • General Factory Administration (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

使い勝手を向上できるようにした作業指示システムを提供すること。 作業指示システム11は、作業指示画面300を生成する計算機1001と、計算機に接続され、作業指示画面を表示するディスプレイ装置23とを備え、作業指示画面は、対象物の三次元設計データに基づく立体モデル311,312を表示する第1表示領域310と、三次元設計データの属性情報の少なくとも一部を表示する第2表示領域320と、予め登録された所定の部品情報が属性情報に含まれている場合、所定の部品情報に対応づけられている関連情報を表示する第3表示領域330と、を含む。作業者は、作業指示画面を通じて作業内容を立体的に把握でき、使い勝手が向上する。

Description

作業指示システムおよび方法
 本発明は、作業指示システムおよび方法に関する。
 制御盤、事務機器、自動車、航空機、産業機械、建設機械等々といった各種工場では、ライン方式やセル方式、ダイナミックセル方式等の生産方式で製品を生産する。一つの製品は、例えば、部品や素材の準備、板金、塗装、主要部品の組立、主要部品の本体への組み付け、検査などの複数の作業工程を経て生産される。
 生産現場には、作業者に対して組立作業を指示する組立作業システムが配置される(特許文献1,2)。このような組立作業システムは、組み付けるべき部品、組み付け方法、組み付けに使用する治具を作業者に提示する。
特開2001-242928号公報 特開2012-118690号公報
 特許文献1は、部品組立風景を示す画像と作業手順に関する文章とをデータ表示部に表示させるものに過ぎない(特許文献1 段落0022)。特許文献2は、部品の型式、組み込み順序、組み込みに使用する治具番号、組み込むときの注意事項をテキスト表示するもので、画像は表示しない。
 このように従来技術では、対象物の三次元設計データに基づく立体モデルを作業者に提示しないため、作業者は、対象物の外形や取付位置、大きさなどを立体的に理解するのに手間取る可能性がある。
 本発明は、上記問題に鑑みてなされたもので、その目的は、使い勝手を向上できるようにした作業指示システムおよび方法を提供することにある。
 上記課題を解決すべく、本発明に従う作業指示システムは、作業指示画面を生成する計算機と、計算機に接続され、作業指示画面を表示するディスプレイ装置とを備え、作業指示画面は、対象物の三次元設計データに基づく立体モデルを表示する第1表示領域と、三次元設計データの属性情報の少なくとも一部を表示する第2表示領域と、予め登録された所定の部品情報が属性情報に含まれている場合、所定の部品情報に対応づけられている関連情報を表示する第3表示領域と、を含む。
 本発明によれば、作業者は作業指示画面を通じて作業内容を立体的に把握することができ、使い勝手が向上する。
本実施形態に係る作業指示システムを含む作業改善支援システムの全体概要を示す説明図である。 作業改善支援システムを実現するコンピュータシステムの例である。 作業指示を管理するテーブルの例である。 作業指示を生成する処理を示すフローチャートである。 作業指示画面の例である。 第2実施例に係り、作業指示の生成処理を示すフローチャートである。 作業指示画面の例である。 作業指示画面の他の例である。 第3実施例に係り、作業指示画面から電子メールを送信する様子を示す説明図である。 作業中に気づいた事項を連絡する処理を示すフローチャートである。 作業分析結果および/または現場からの連絡に基づいて作業指示画面を修正する処理を示すフローチャートである。
 以下、図面に基づいて、本発明の実施の形態を説明する。本実施形態に係る作業指示システム11は、組立作業の対象物である部品の三次元設計データに基づく立体モデルと、三次元設計データの属性情報の少なくとも一部と、属性情報に含まれている所定の部品情報に対応づけられている関連情報とを作業指示画面として、作業者へ提供する。
 図1~図5を用いて第1実施例を説明する。図1は、作業改善支援システム1の全体概要を示す説明図である。作業改善支援システム1は、作業指示システム11と作業分析システム12を備える。これに代えて、作業改善支援システム1は、作業指示システム11を含む情報処理システムと呼ぶこともできる。
 作業改善支援システム1は、作業現場2で組立作業する作業者に対して作業指示画面300を提供すると共に、作業者の作業結果を収集して分析する。後述する他の実施例では、作業改善支援システム1は、作業分析結果および/または作業者からの連絡に基づいて、作業指示画面を修正することもできる。
 作業改善支援システム1は、例えば、少なくとも一つの計算機を用いて構成することができる。作業改善支援システム1を実現するコンピュータシステムの一例は、図2で後述する。
 先に作業現場2について説明する。作業現場2は、少なくとも一つのセル21を含んでいる。セル21では、作業者Wが作業指示端末23に表示された作業手順にしたがって、製品25を生産する。
 ここでは、セル生産方式を例に挙げて説明するが、これに限らず、ライン方式、ダイナミックセル方式に適用してもよい。また、本実施形態の作業現場2は、いわゆる多品種少量生産に向いているが、少品種大量生産や少品種少量生産にも適用可能である。
 セル21には、作業者による作業の状況を監視するためのカメラ24が少なくとも一つ設置されている。カメラ24は、作業状況のみならず、セル21の周囲の状況を監視してもよい。
 セル21またはセル21の近傍には、RFID(Radio Frequency IDentifier)タグ26から情報を読み出すRFIDリーダ22が設けられている。ここで、RFIDタグ26は、例えば、作業者Wが持つ作業タグ26-1と、製品25に設けられる製品タグ26-2とに分けることができる。
 作業タグ26-1は、さらに、作業者Wの識別情報を格納する作業者タグと、作業者の配置先のセル(配置先工程)を示す作業指導票タグとに分けることができる(いずれも図示せず)。RFIDリーダ22は、作業タグ26-1から、作業者を特定する識別情報と、セル(工程)を特定する識別情報とを読み出す。作業改善支援システム1は、RFIDリーダ22の読み取った情報に基づいて、どのセル21にどの作業者が配置されているかを把握できる。また、製品タグ26-2から製品25に関する情報を取得することで、製品25の現在位置や製造履歴等を把握することもできる。
 「ディスプレイ装置」の一例としての作業指示端末23は、そのセル21での作業手順を作業者へ教示する作業指示画面300を表示する。作業指示画面300は、「第1表示領域」の例である第1ペイン310と、「第2表示領域」の例である第2ペイン320と、「第3表示領域」の例である第3ペイン330とを含む。
 第1ペイン310には、組立対象製品25の立体モデル311と、組立対象部品の立体モデル312とが表示される。作業手順の対象となる部品の立体モデル312は、他の部品と区別がつくように強調表示することができる。強調表示のために、例えば、他の部品と色彩を変える、線を太くする、点滅させる等の手法を採用することができる。
 第2ペイン320には、製品25の三次元設計データに含まれる属性情報のうち少なくとも一部(例えば、製品25に組み付ける部品の属性情報の一部)が表示される。
 第3ペイン330には、属性情報に所定の部品コードが含まれている場合に、その部品コードに対応づけられている関連情報が表示される。所定の部品コードは「所定の部品情報」の例である。関連情報には、例えば、作業上の注意事項と、対象製品へ対象部品を組み付ける際に必要な所定の道具に関する情報と、対象製品または対象製品に関連する他の部品に関する情報とのいずれか一つを含むことができる。後述の実施例で明らかとなるように、関連情報が存在しない場合も考えられ、その場合は作業指示画面300に第3ペイン330は設けられない。
 作業者は、一つの作業手順を完了すると、作業指示画面300上において、その作業手順の完了を示す完了ボタンまたは次の作業手順の表示を要求する次ボタン(いずれも不図示)を操作する。作業改善支援システム1は、作業指示端末23(作業指示画面300)への操作を監視することにより、各セル21での作業手順の進捗状況をリアルタイムで把握することができる。
 作業者は、作業者端末27を持つこともできる。作業者端末27は、例えば、会社の支給する携帯電話(いわゆるスマートフォンを含む)や携帯情報端末である。
 作業改善支援システム1の構成を説明する。作業改善支援システム1は、上述の通り、作業指示システム11と、作業分析システム12とを含む。先に作業指示システム11について説明する。
 作業指示システム11は、各セルにおいて作業者へ提供する作業指示画面300を生成する。作業指示システム11は、例えば、3DCADデータ記憶部111と、組立順序記憶部112と、組立順序登録部113と、作業指示生成部114と、作業指示表示部115と、作業指示管理テーブル116とを備える。
 3DCADデータ記憶部111は、図外の三次元CADシステムの出力した三次元設計データ(3DCADデータ)を記憶する。
 組立順序記憶部112は、3DCADデータから自動的にまたは手動で生成される組立順序に関する情報を記憶する。組立順序情報とは、製品25を製造する際に、どの部品をどの順番でどこに取り付けるかを示す情報である。
 組立順序登録部113は、組立順序記憶部112に記憶された組立順序情報のうち、対象物である製品25の組立についての作業指示に用いる組立順序情報を登録する。
 作業指示生成部114は、組立順序登録部113に登録された組立順序情報と、作業指示管理テーブル116に記憶された属性情報および関連情報とから、作業指示画面300に表示する作業指示コンテンツを生成する。
 作業指示表示部115は、作業指示生成部114で生成された作業指示コンテンツのデータを生成して作業指示端末23へ送信することにより、作業指示端末23に作業指示画面300を表示させる。
 なお、上述の機能111~116の全てが作業改善支援システム1内に設けられている必要はない。例えば、3DCADデータ記憶部111と組立順序記憶部112は、システム1の外部に設けられてもよい。
 作業分析システム12について説明する。作業分析システム12は、各セルでの各作業者の作業結果を監視して分析する。作業分析システム12は、例えば、作業状況監視部121と、生産実績管理部122と、生産計画管理部123と、作業者管理部124と、作業分析部125とを備える。さらに、作業分析システム12は、作業解析者などのユーザが作業分析システム12との間で情報を交換するためのユーザインターフェース装置(不図示)を有する。
 なお、これら機能121~125の全ての実体が作業改善支援システム1内に設けられている必要はない。例えば、作業状況監視部121、生産実績管理部122、生産計画管理部123、作業者管理部124は、作業改善支援システム1の外部に設け、それら外部機能121~124から必要な情報のみを作業分析部125へ送信してもよい。
 作業状況監視部121は、各工程のRFIDリーダ22がRFIDタグ26から読み取った識別情報と、作業指示端末23への作業者による操作とに基づいて、各セル21での作業の進捗状況を監視し、生産実績管理部122へ送信する。
 生産実績管理部122は、作業状況監視部121からのデータに基づいて、セル(工程)毎の生産実績を管理する。
 生産計画管理部123は、作業現場2の生産計画を管理する。生産計画管理部123は、生産現場全体の生産計画と、セル別の生産計画とをそれぞれ管理する。
 作業者管理部124は、例えば、各作業者の作業員番号、氏名、勤務形態、勤務時間、担当した工程の履歴、各セルで必要とされるスキルの有無などを管理する。作業タグ26-1には、作業者管理部124で管理される情報が書き込まれる。
 作業分析部125は、生産実績管理部122で管理する各セルの生産実績データと生産計画管理部123で管理する各セル別生産計画とに基づいて、各セルでの作業状況を解析する。例えば、作業分析部125は、各作業の実績値(作業時間)と目標値(目標作業時間)とから、ボトルネック作業が発生しているか等を解析することができる。
 作業工程の改善を担当する生産管理責任者などのユーザは、作業分析部125の分析結果に基づいて、作業効率を改善するための策を立案することができる。立案された対策は、検証後に、作業手順指示情報として採用され、作業指示画面300に反映される。
 図2は、作業改善支援システム1を実現するコンピュータシステムの一例である。コンピュータシステム1000は、例えば、作業指示システムサーバ1001と、作業分析システムサーバ1002と、3DCADシステム1003と、データベースサーバ1004と、ユーザ管理サーバ1005とを通信ネットワークCN1を介して接続することにより構成される。さらに、作業指示システムサーバ1001および作業分析システムサーバ1002は、通信ネットワークCN2を介して、各セルの作業指示端末23にも接続されている。
 作業指示システムサーバ1001は、作業指示システム11を実現するサーバである。作業指示システムサーバ1001は、例えば、マイクロプロセッサ(CPUと略記)10011、メモリ10012、記憶装置10013、ユーザインターフェース装置10014、通信部10015といったコンピュータ資源を有する。マイクロプロセッサ10011が、記憶装置10013に格納されたコンピュータプログラムをメモリ10012に読み込んで実施することにより、作業指示システム11としての機能が実現する。
 作業分析システムサーバ1002は、作業分析システム12を実現するサーバである。作業分析システムサーバ1002も、マイクロプロセッサやメモリなどのコンピュータ資源(いずれも不図示)を有する。図示せぬマイクロプロセッサが図示せぬコンピュータプログラムを実行することにより、作業分析システム12としての機能が実現する。図2では、作業指示システムサーバ1001と作業分析システムサーバ1002とをそれぞれ別々の物理計算機として構成するかのように示すが、これに代えて、サーバ1001,1002を仮想計算機として構成し、一つの物理計算機上に設けてもよい。
 3DCADシステム1003は、製品25および製品25を構成する各部品の三次元設計データを生成して出力する計算機である。データベースサーバ1004は、作業現場2からのデータなどを格納する。ユーザ管理サーバ1005は、作業改善支援システム1を使用するユーザ(例えばシステム管理者、分析担当者、作業指示作成者、設計者など)を管理する。
 図3は、作業指示管理テーブル116の例を示す。作業指示管理テーブル116は、作業指示の内容を管理する。作業指示管理テーブル116は、例えば、製品毎に用意されている。
 すなわち、作業指示管理テーブル116は、例えば、製品名1161と、製造番号1162と、作業手順番号1163と、部品コード1164と、属性情報1165と、関連情報1166とを含む。管理テーブル116は、図3に示した項目以外の項目を含んでもよいし、図3に示した項目の一部を備えなくてもよい。管理テーブル116は、一つのテーブルから構成される必要はなく、複数のテーブルから構成することもできる。
 製品名1161は、製品の名称または型番である。製造番号1162は、製品を識別する情報である。作業手順番号1163は、例えば作業名のように、作業手順を識別する情報である。部品コード1164は、組立作業対象の部品を識別する情報である。
 属性情報1165は、3DCADデータの属性情報である。属性情報としては、例えば、部品コードで特定される部品の名称、その部品を製造した部署を識別する情報、その部品を組立作業に用いる数量、その部品のCADデータを特定する情報などがある。部品コードも属性情報の一つであるが、図3では便宜上、部品コードと属性情報とを分けて表示している。
 関連情報1166は、属性情報に所定の部品を特定する情報(部品コード)が含まれている場合に、その所定の部品情報に予め対応づけられている所定の情報である。関連情報としては、図5で後述するように、例えば、作業上の注意事項31と、作業対象の部品に関連する他の部品に関する情報332と、作業対象の部品の組立作業に使用する工具に関する情報333と、その他の情報334とがある。その他の情報334は、例えば、製品25についての一般的注意事項、製品25を構成する複数の部品に適用される一般的情報を含むことができる。
 図4は、作業指示生成処理のフローチャートである。作業指示システム11は、製品ごとに(S11)、以下の各ステップS12~S18を実行する。
 作業指示システム11は、対象の製品25の3DCADデータを3DCADデータ記憶部111から取得する(S12)。さらに、作業指示システム11は、3DCADデータ等を解析することにより得られた組立順序情報のうち、組立順序登録部113に登録された組立順序情報を取得する(S13)。
 作業指示システム11は、作業手順ごとに(S14)、ステップS15~S18を実行する。すなわち、作業指示システム11は、ステップS12で取得した3DCADデータに基づいて、作業対象の部品の3Dモデル(立体モデル)を描画する画像データを生成する(S15)。
 作業指示システム11は、ステップS12で取得した3DCADデータに含まれている部品コードに基づいて、部品名や必要数量、製造部署などの属性情報を作業指示管理テーブル116から取得する(S16)。
 作業指示システム11は、3DCADデータに含まれている部品コードに基づいて、作業指示管理テーブル116から関連情報を取得する(S17)。
 作業指示システム11は、ステップS15で生成した3D画像データと、ステップS16で取得した属性情報と、ステップS17で取得した関連情報を元にして、作業指示画面300に表示するための作業指示コンテンツを生成し、保存する(S18)。
 図5は、作業指示画面300の例を示す。上述の通り、作業指示画面300は、作業指示端末23の画面に表示される。作業指示画面300は、画面中央部に位置する第1ペイン310と、第1ペイン310の下側に位置する第2ペイン320と、第1ペイン310の右側に位置する第3ペイン330とを備える。
 第1ペイン310には、製品25の立体モデル(3Dモデル)311と、作業手順の対象とする部品の立体モデル312とが表示される。作業対象の部品の立体モデル312は、その位置や形状が他の部品と区別がつくように強調表示されている。
 第2ペイン320には、作業手順の対象とする部品の属性情報(部品名、部署名、数量、備考)が表形式で表示される。
 第3ペイン330には、立体モデル311,312や属性情報では作業者へ伝えることのできない情報が関連情報として表示される。関連情報は、例えば、製造上のこつ(ノウハウ)や注意点などの注意事項331、対象部品に関連する他の部品の情報332、対象部品の組付作業に使用する工具の情報333、その他の情報334を含めてもよい。
 関連部品情報332は、例えば、対象部品の作業に際して関連する部品に対する注意点などを含む。その他の情報334は、製品25の納入先などに応じて記載される情報であり、納入先に応じて項目を適宜カスタマイズすることができる。
 作業者は、作業に取りかかる前に、作業指示端末23に表示された作業指示画面300の内容を確認する。すなわち作業者は、どのような点に注意して作業すべきか等を事前に確認してから、作業に取りかかる。ここで、経験の浅い作業者は、各ペイン310~330に表示される全ての情報を目視して確認することが要求されるが、熟練の作業員であれば、必ずしも全ての情報を目視確認する必要はない。経験により作業手順を覚えていることが多いためである。そこで、本実施例では、関連情報331~334のうち、少なくとも一部の情報の表示を抑制できるようにしている。表示を抑制するとは、例えば、関連情報の項目名だけを表示し、作業者が項目名を操作した場合に詳細を表示させる場合を示している。つまり、関連情報の全てを最初から第3ペイン330に表示せずに、作業者の必要に応じて表示させる。これにより、限られた表示サイズを有効に利用して、より多くの情報を作業者へ提供することができる。
 このように構成される本実施例によれば、製品25および作業対象部品の立体モデル311,312を表示する第1ペイン310と、部品の属性情報を表示する第2ペイン320と、所定の部品コードに対応づけられた関連情報を表示する第3ペイン330を備える作業指示画面300を作業者へ提供することができる。これにより、作業者は、作業手順の内容を立体的に把握することができると共に、注意点などの立体モデルでは伝えにくい情報を確認することができる。この結果、本実施例によれば、作業手順の理解を促進して作業性を向上できるとともに、製造品質のばらつきをおさえることもできる。
 図6~図8を用いて第2実施例を説明する。本実施例を含む以下の各実施例は、第1実施例の変形例に相当するため、第1実施例との差異を中心に述べる。本実施例では、作業指示コンテンツの内容や作業者の属性に応じて、各ペインのサイズや位置を制御できるようにしている。
 図6は、本実施例による作業指示生成処理のフローチャートである。図6に示す処理は、図4で説明した処理に比べて、新規ステップS19を備える点で相違する。
 すなわち、作業指示システム11は、例えば、関連情報の有無や作業者の属性(熟練度、年齢、ミスの発生率など)に基づき、各ペイン310~330の全部または一部について、そのサイズまたは位置のいずれか一方または両方を調整する(S19)。
 図7は、対象部品に関連情報が対応づけられていない場合の作業指示画面300aの例を示す。関連情報が存在しない場合、第1ペイン310のサイズをできる限り大きく設定する。これにより、作業者は対象製品および対象部品の立体モデルを見やすくなり、使い勝手が向上する。
 図8は、作業者の属性に応じて作業指示画面300bの構成を変更した例である。例えば、視力の低い作業者の場合には、細かな属性情報を表示せずに、対象製品および対象部品の立体モデルと関連情報のみを表示してもよい。すなわち第2ペイン320を省略してもよい。
 他の例として、熟練度の低い作業者には関連情報を簡略化せずに表示する一方、熟練度の高い作業者には関連情報を最初から簡略化して表示してもよい。つまり、熟練度の高い作業者には関連情報の項目名のみを提示し、熟練度の低い作業者には関連情報の項目を展開した詳細な情報を最初から提示することもできる。
 このように構成される本実施例も第1実施例と同様の作用効果を奏する。さらに本実施例では、作業者の属性や作業指示コンテンツの内容に応じて、作業指示画面300a,300bの構成を制御するため、限られた表示サイズを有効に利用して必要な情報を効率的に伝えることができる。
 図9~図11を用いて第3実施例を説明する。本実施例では、作業者が組立作業中に気づいた点を電子メール400で設計者等へフィードバックできるようにすることで、作業指示画面300の改善に役立てる。
 図9は、本実施例による作業指示画面300cの例である。作業者は、作業手順に示された通りに作業をしている間に、改善点または不具合点に気づくことがある。以下では、不具合点に気づいた場合を例に挙げて説明する。
 例えば、作業者は、対象部品の取り付けに際して、他の部品と干渉するおそれがあることに気づいたり、組み付けにくい等の問題に気づいたりした場合、立体モデル311,312上の問題箇所を指先などでマークする。したがって、本実施例では、作業指示端末23はタッチパネルを備えているのが好ましい。しかし、タッチパネルに限らず、問題の箇所を立体モデル上で特定可能な装置であればよい。
 作業者は、問題箇所をマークした後に、テキストメッセージまたは音声メッセージを付加することにより電子メール400を生成させ、予め登録された宛先に送信させる。作業者は、仮想キーボードや物理キーボードからテキストメッセージを書き込んだり、作業指示端末23に設けられたマイク(不図示)から音声を録音したりできる。このように構成される電子メール400は、例えば、問題箇所の画像と、メッセージと、作業者の識別情報と、作業手順番号等を含む。
 図10は、作業現場2で発見された不具合を作業指示画面300から電子メールとして関係者へ通知する処理を示すフローチャートである。
 上述の通り、不具合に気づいた作業者は、第1ペイン310に表示された立体モデル上で問題箇所をマークする。作業指示システム11は、作業者からの入力操作に基づいて、問題箇所を特定し(S21)、電子メール400に管理情報を付加する(S22)。管理情報とは、不具合解析に必要な書誌的事項であり、例えば、作業者ID、作業手順番号、部品コード等である。作業者は、不具合の発生箇所を立体モデル上で簡単に指定することができ、報告の作業性が向上する。
 さらに作業指示システム11は、作業者から入力されたメッセージを電子メール400に追加する(S23)。作業指示システム11は、作業者が電子メールの送信を指示したことを検出すると(S24:YES)、電子メール400を事前に登録された所定の宛先へ送信する(S25)。
 所定の宛先としては、例えば、作業現場2の責任者や、製品25の設計者、作業指示コンテンツの作成者を挙げることができる。本実施例では、各作業現場2で発見された不具合を現場責任者へいったん集め、現場責任者が必要と判断した場合に設計者などへ電子メール400を転送する。
 すなわち現場責任者は、自分の使用する端末27により電子メール400を受信すると(S31)、設計者などへ転送すべきであるか判断する。現場責任者の端末27は、転送指示が入力されたことを検知すると(S32:YES)、ステップS31で受信した電子メール400を設計者等へ転送する(S33)。
 作業者から作業指示画面300を介して送信された電子メール400を直接設計者へ送らずに、いったん現場責任者に集めることにより、無駄な電子メール400が設計者へ送られるのを抑制する。作業者の発見した不具合が、作業者の勘違いや未熟さ等に起因する場合もあるためである。
 製品25の設計者(および/または作業指示コンテンツの作成者)は、現場責任者の端末27から転送された電子メール400をパーソナルコンピュータ等の端末(不図示)で受信し(S41)、確認する。受信した電子メール400は、例えばデータベースサーバ1004で管理される。
 図11は、作業指示コンテンツを修正する処理を示すフローチャートである。ここでは、設計者端末が作業指示コンテンツを修正する場合を説明する。
 設計者端末は、作業分析システム12から作業分析結果を取得する(S51)。設計者端末は、データベースサーバ1004にアクセスすることにより、不具合報告があったか確認する(S52)。不具合報告がある場合(S52:YES)、設計者端末は不具合を報告する電子メール400をデータベースサーバ1004から取得する(S53)。
 設計者端末は、作業分析結果と不具合報告とから、作業指示コンテンツの内容を修正すべきか判断する(S54)。
 例えば、作業分析結果から抽出されるボトルネック作業と、不具合の報告された作業手順とが一致する場合、その作業手順の改善のために作業指示コンテンツを修正すべきであると判定することができる。ボトルネック作業とは、例えば、作業完了に要する時間が目標値よりも長い作業である。
 作業時間が長くなるのは、作業者の熟練度等によっても異なるが、作業指示の伝え方に改善点があるのかもしれない。この場合、例えば、見落としやすい周辺の部品との関係や、間違えやすい工具などについての注意事項を新規に作成し、関連情報に含める。これに対し、製品25の設計に改善点が存在する場合は、設計データを見直して修正することができる。
 このように構成される本実施例も第1実施例と同様の作用効果を奏する。さらに本実施例によれば、作業者は、作業中に気づいた点を作業指示画面300から報告することができるため、作業現場2での気づきを簡単に収集することができる。そして、本実施例では、作業分析システム12での作業分析結果と作業現場2からの報告とに基づいて、作業指示コンテンツを修正することができるため、より一層わかりやすい作業指示画面300を作業者へ提供することができる。これにより、組立作業の作業性を改善でき、ボトルネック作業の発生を抑制することができる。
 なお、本発明は、上述した実施形態に限定されない。当業者であれば、本発明の範囲内で、種々の追加や変更等を行うことができる。上述の実施形態において、添付図面に図示した構成例に限定されない。本発明の目的を達成する範囲内で、実施形態の構成や処理方法は適宜変更することが可能である。
 また、本発明の各構成要素は、任意に取捨選択することができ、取捨選択した構成を具備する発明も本発明に含まれる。さらに特許請求の範囲に記載された構成は、特許請求の範囲で明示している組合せ以外にも組み合わせることができる。
 1:作業改善支援システム、2:作業現場、11:作業指示システム、12:作業分析システム、21:セル、22:RFIDリーダ、23:作業指示端末、24:カメラ、25:製品、111:3DCADデータ記憶部、112:組立順序記憶部、113:組立順序登録部、114:作業指示生成部、115:作業指示表示部、116:作業指示管理テーブル、300:作業指示画面、310:第1ペイン、311,312:立体モデル、320:第2ペイン、330:第3ペイン

Claims (8)

  1.  作業指示を表示する作業指示システムであって、
     作業指示画面を生成する計算機と、
     前記計算機に接続され、前記作業指示画面を表示するディスプレイ装置とを備え、
     前記作業指示画面は、
      対象物の三次元設計データに基づく立体モデルを表示する第1表示領域と、
      前記三次元設計データの属性情報の少なくとも一部を表示する第2表示領域と、
      予め登録された所定の部品情報が前記属性情報に含まれている場合、前記所定の部品情報に対応づけられている関連情報を表示する第3表示領域と、
    を含む
    作業指示システム。
  2.  前記関連情報には、作業上の注意事項と、前記対象物への操作に必要な所定の道具に関する情報と、前記対象物または前記対象物に関連する所定の物体に関する情報とのうち少なくともいずれか一つを含むことができる、
    請求項1に記載の作業指示システム。
  3.  前記第3表示領域では、前記関連情報のうち少なくとも一部の表示を抑制することができる、
    請求項2に記載の作業指示システム。
  4.  前記計算機は、作業指示を与える対象者の属性に応じて、前記各表示領域のうち少なくとも一つの表示領域の位置またはサイズの少なくともいずれかを制御する、
    請求項3に記載の作業指示システム。
  5.  前記計算機は、前記属性情報に前記関連情報が関連づけられていない場合、または、前記関連情報の全てについて表示が抑制された場合のいずれかの場合に、前記第3表示領域を含めないように前記作業指示画面を生成する、
    請求項4に記載の作業指示システム。
  6.  前記計算機は、前記作業指示画面への操作に応じてメッセージを生成し、前記生成したメッセージを予め登録された所定の宛先へ送信させる、
    請求項1に記載の作業指示システム。
  7.  前記計算機は、前記作業指示画面に基づいて実施された作業の分析結果を取得し、前記分析結果に基づいて前記作業指示画面を修正することができる、
    請求項1に記載の作業指示システム。
  8.  計算機からディスプレイ装置へ作業指示を表示させる作業指示方法であって、
     前記計算機は、
      対象物の立体モデルを表示する第1表示領域と、前記対象物の属性情報を表示する第2表示領域と、前記属性情報に対応づけられている関連情報であって、作業上の注意事項を少なくとも含む関連情報を表示する第3表示領域とを含む作業指示画面を生成し、
      前記生成した作業指示画面を前記ディスプレイ装置へ送信して表示させる、
    作業指示方法。
PCT/JP2018/030682 2017-10-16 2018-08-20 作業指示システムおよび方法 WO2019077861A1 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201880062058.5A CN111133394A (zh) 2017-10-16 2018-08-20 作业指示系统以及方法

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2017-200252 2017-10-16
JP2017200252A JP6882137B2 (ja) 2017-10-16 2017-10-16 作業指示システム

Publications (1)

Publication Number Publication Date
WO2019077861A1 true WO2019077861A1 (ja) 2019-04-25

Family

ID=66174430

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2018/030682 WO2019077861A1 (ja) 2017-10-16 2018-08-20 作業指示システムおよび方法

Country Status (3)

Country Link
JP (1) JP6882137B2 (ja)
CN (1) CN111133394A (ja)
WO (1) WO2019077861A1 (ja)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
PL3557351T3 (pl) * 2018-04-20 2021-06-14 Rittal Gmbh & Co. Kg System i sposób montażu wyposażenia modułowej szafy rozdzielczej
JP7348884B2 (ja) * 2020-08-11 2023-09-21 株式会社日立製作所 作業指示システム、及びプログラム

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09262745A (ja) * 1996-03-29 1997-10-07 Mitsubishi Electric Corp 作業指示システム
JP2001242928A (ja) * 2000-03-02 2001-09-07 Matsushita Electric Ind Co Ltd セル生産作業者支援システム
JP2008009834A (ja) * 2006-06-30 2008-01-17 Iwai Kikai Kogyo Co Ltd プラント作業支援システム
JP2011013986A (ja) * 2009-07-02 2011-01-20 Hitachi Ltd 作業指示図生成装置および作業指示図生成方法
JP2012043352A (ja) * 2010-08-23 2012-03-01 Hitachi Ltd 作業指図作成システム、その制御方法およびそのプログラム
JP2012118690A (ja) * 2010-11-30 2012-06-21 Hitachi Ltd 部品配膳・組み立てシステム
JP2012174158A (ja) * 2011-02-24 2012-09-10 Hitachi Ltd 作業指図管理方法および作業指図管理システム
JP2015060389A (ja) * 2013-09-18 2015-03-30 トヨタ自動車株式会社 生産指示システム、及び生産指示方法
JP2016144846A (ja) * 2015-02-09 2016-08-12 株式会社日立製作所 組立ナビゲーションシステム及び組立ナビゲーション方法

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011030081A (ja) * 2009-07-28 2011-02-10 Sony Corp 表示装置、表示システム、表示方法およびプログラム
JP2016146381A (ja) * 2015-02-06 2016-08-12 パナソニックIpマネジメント株式会社 段取り替え作業の指示方法

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09262745A (ja) * 1996-03-29 1997-10-07 Mitsubishi Electric Corp 作業指示システム
JP2001242928A (ja) * 2000-03-02 2001-09-07 Matsushita Electric Ind Co Ltd セル生産作業者支援システム
JP2008009834A (ja) * 2006-06-30 2008-01-17 Iwai Kikai Kogyo Co Ltd プラント作業支援システム
JP2011013986A (ja) * 2009-07-02 2011-01-20 Hitachi Ltd 作業指示図生成装置および作業指示図生成方法
JP2012043352A (ja) * 2010-08-23 2012-03-01 Hitachi Ltd 作業指図作成システム、その制御方法およびそのプログラム
JP2012118690A (ja) * 2010-11-30 2012-06-21 Hitachi Ltd 部品配膳・組み立てシステム
JP2012174158A (ja) * 2011-02-24 2012-09-10 Hitachi Ltd 作業指図管理方法および作業指図管理システム
JP2015060389A (ja) * 2013-09-18 2015-03-30 トヨタ自動車株式会社 生産指示システム、及び生産指示方法
JP2016144846A (ja) * 2015-02-09 2016-08-12 株式会社日立製作所 組立ナビゲーションシステム及び組立ナビゲーション方法

Also Published As

Publication number Publication date
JP6882137B2 (ja) 2021-06-02
JP2019074904A (ja) 2019-05-16
CN111133394A (zh) 2020-05-08

Similar Documents

Publication Publication Date Title
JP7377318B2 (ja) 作業指示システム
US20210335148A1 (en) Content presentation system
US20080249791A1 (en) System and Method to Document and Communicate On-Site Activity
JP6396561B1 (ja) 帳票自動化システム
KR20180092371A (ko) 시설물 유지관리 방법
Larek et al. Industry 4.0 in manual assembly processes–a concept for real time production steering and decision making
WO2019077861A1 (ja) 作業指示システムおよび方法
CN111192673A (zh) 设备维修高效管理方法、装置、计算机设备及存储介质
Zenker et al. Design and implementation of a collaborative smartwatch application supporting employees in industrial workflows
JP2002050555A (ja) 半導体製造システム
JP5608586B2 (ja) 作業指図管理方法および作業指図管理システム
JP2007094494A (ja) 生産計画支援システム、生産計画支援方法及びプログラム
Url et al. Practical insights on augmented reality support for shop-floor tasks
JP2021039776A (ja) 作業指示システムおよび方法
Tancredi et al. Analysis and testing of an online solution to monitor and solve safety issues for industrial systems
CN111860873A (zh) 设备检修方法、装置、系统及计算机可读储存介质
JP2006185098A (ja) デザインレビューのチェック進捗情報送信方法および装置
JP7373450B2 (ja) 建設現場用の帳票作成システム
JP2019049830A (ja) 組立順序生成装置、組立順序生成プログラムおよび組立順序生成方法
JP6438614B1 (ja) 評価装置、評価方法及びプログラム
JP5300641B2 (ja) 受注確度可視化装置および受注確度可視化プログラム
WO2024142412A1 (ja) 指摘内容出力システム、指摘内容出力方法及びプログラム
WO2024142413A1 (ja) 指摘内容出力システム、指摘内容出力方法及びプログラム
JP4205660B2 (ja) 作業支援システム及び作業支援方法
JP7055939B1 (ja) 工程管理装置および工程管理プログラム

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 18867848

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 18867848

Country of ref document: EP

Kind code of ref document: A1