WO2016113098A1 - Verfahren und vorrichtung zur sperrung und signalisierung eines mit achszählern ausgerüsteten gleisabschnittes - Google Patents
Verfahren und vorrichtung zur sperrung und signalisierung eines mit achszählern ausgerüsteten gleisabschnittes Download PDFInfo
- Publication number
- WO2016113098A1 WO2016113098A1 PCT/EP2015/081139 EP2015081139W WO2016113098A1 WO 2016113098 A1 WO2016113098 A1 WO 2016113098A1 EP 2015081139 W EP2015081139 W EP 2015081139W WO 2016113098 A1 WO2016113098 A1 WO 2016113098A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- track section
- axle
- blocking
- axle counter
- output signal
- Prior art date
Links
- 230000000903 blocking effect Effects 0.000 title claims abstract description 19
- 238000000034 method Methods 0.000 title claims abstract description 16
- 230000011664 signaling Effects 0.000 title claims abstract description 7
- 230000004913 activation Effects 0.000 claims description 2
- 230000005540 biological transmission Effects 0.000 claims 2
- JOCBASBOOFNAJA-UHFFFAOYSA-N N-tris(hydroxymethyl)methyl-2-aminoethanesulfonic acid Chemical compound OCC(CO)(CO)NCCS(O)(=O)=O JOCBASBOOFNAJA-UHFFFAOYSA-N 0.000 claims 1
- 230000004888 barrier function Effects 0.000 description 4
- 238000004891 communication Methods 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 238000006243 chemical reaction Methods 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000011156 evaluation Methods 0.000 description 1
- 230000000977 initiatory effect Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L1/00—Devices along the route controlled by interaction with the vehicle or train
- B61L1/16—Devices for counting axles; Devices for counting vehicles
- B61L1/167—Circuit details
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L1/00—Devices along the route controlled by interaction with the vehicle or train
- B61L1/16—Devices for counting axles; Devices for counting vehicles
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L23/00—Control, warning or like safety means along the route or between vehicles or trains
- B61L23/06—Control, warning or like safety means along the route or between vehicles or trains for warning men working on the route
Definitions
- the invention relates to a method for blocking and signaling a equipped with axle counter track section to work in the track section persons and a corresponding device.
- the invention has for its object to reduce the risk of occupants in a equipped with axle meters track section work-related people.
- safety-related operation is desirable with the least possible effort.
- the object is achieved in that the output signal of at least one of the track section limiting axle counter is set or configured such that the locking side of the track section is effected, the blocking is reported back to the track section and signaled.
- the object is achieved according to claim 8 also by a device in which the axle counter is connected to a device for generating a lock-specific output signal.
- axle counter secure busy messages, that is trafficability blocks generated, which, preferably permanently, visually and / or acoustically signaled to the persons located in the track section.
- the axle counters allow track work to be secured by an on-site measure. Lead times or a longer period of time than actually necessary omitted.
- Only the output signal of the axle counters must be adjustable or configurable in such a way that a lock-specific output signal is generated, which is always interpreted as a busy message on the standstill. This type of busy message may be distinguishable from the usual busy messages.
- the setting or configuration of the Achsterrorismer- output signal for example, based on a sufficiently long data telegram that is sent to the interlocking, or by means of cryptographic key to achieve the required signaling security.
- the blocking is confirmed by the control unit on the side of a device of the axle counter.
- the feedback can be displayed, for example, directly on the axle counter by an LED.
- the blocking according to claim 3 can also be confirmed by telephone from the interlocking to the persons in the track section.
- the drivability lock can also be reported back to the track section by the dispatcher. The presence of a radio system can be assumed, as in conventional methods a coordination between the persons in the track section and the dispatcher is absolutely necessary.
- the successful establishment of the drivability lock is transmitted to a mobile control unit of the staff in the track section and displayed.
- the absence of the desired drivability barrier for example, for safety reasons in the signal box, is transmitted, possibly indicating the cause, to the track section and signaled there.
- a further alternative or additional feedback of the blockage is carried out according to claim 4 by an activation of an automatic message on the track section.
- an SMS message may be automatically sent to the track section.
- axle counter output signal is modulated direction-dependent. This procedure is particularly suitable for axle counters in the form of double sensors.
- the Achskrafter output signal for transmitting a multiple Achstownabitese comprehensive track section is modulated to the interlocking.
- different-length traffic closures can be carried out in a simple manner and with a single data telegram from a single user
- Axle counter is sent to the signal box, be realized.
- a particularly advantageous development of the method according to claim 7 is that the Achsterrorismer- output signal for transmitting an axle counter identification number and / or time information to the interlocking is modulated.
- the modulation of this axle counter ID is assigned to a specific axle counter and is stored in this, so that signal safety can be achieved.
- the figure shows a schematic representation of an embodiment for signaling a drivability barrier to work personnel 1, wherein the track side 2 axle counter 3 and 4 are provided.
- the output signals of the two axle counters 3 and 4 are transmitted via a Achsweakenedrechner 5 to a signal box 6.
- an ATP device (Automatic Train Protection) 7 is connected in parallel with the interlocking 6 and an ATS device (Automatic Train Supervision) 8 is connected downstream.
- a dispatcher 9 ensures by command release that the axle counting section 10 located between the axle counters 3 and 4 is "free or occupied” 11. For certain axle counting errors, there is also the status "disturbed" 12, which does not automatically result in a busy message must lead.
- a third state "locked" 13 is generated, which is set by means of a modulation device 14 acting on the axle counter 3.
- the output signal of the axle counter 3 is changed by the work personnel 1 in such a way that a signal is sent to the vehicle via the axle counting computer 5
- Signal box 6 is transmitted, which is interpreted as an interlocking command for the Achschargeabterrorism 10.
- This driveability lock is automatically returned to the labor staff 1 or by the dispatcher 9.
- the blocking is optically and / or acoustically signaled to the information of the labor staff 11 as long as the lock request is set to the modulation device 14.
- the modulation of the output signal of the axle counter 9 can also transmit additional information, for example with respect to the direction and the number of axle counting sections 10 to be locked or the axle counter ID or also time information, to the signal box 6 for the purpose of evaluation and, if appropriate, initiation of appropriate reactions become.
- additional information for example with respect to the direction and the number of axle counting sections 10 to be locked or the axle counter ID or also time information, to the signal box 6 for the purpose of evaluation and, if appropriate, initiation of appropriate reactions become.
- the achievable safety is thereby further improved, whereby existing components are only required by the modulation device 14 for setting the third state "locked" 13.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Automation & Control Theory (AREA)
- Train Traffic Observation, Control, And Security (AREA)
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP15831139.9A EP3221205B8 (de) | 2015-01-15 | 2015-12-23 | Verfahren und vorrichtung zur sperrung und signalisierung eines mit achszählern ausgerüsteten gleisabschnittes |
ES15831139T ES2702048T3 (es) | 2015-01-15 | 2015-12-23 | Procedimiento y dispositivo para bloquear y señalizar un tramo de vía equipado con contadores de ejes |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102015200552.6A DE102015200552A1 (de) | 2015-01-15 | 2015-01-15 | Verfahren und Vorrichtung zur Sperrung und Signalisierung eines mit Achszählern ausgerüsteten Gleisabschnittes |
DE102015200552.6 | 2015-01-15 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2016113098A1 true WO2016113098A1 (de) | 2016-07-21 |
Family
ID=55299419
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/EP2015/081139 WO2016113098A1 (de) | 2015-01-15 | 2015-12-23 | Verfahren und vorrichtung zur sperrung und signalisierung eines mit achszählern ausgerüsteten gleisabschnittes |
Country Status (4)
Country | Link |
---|---|
EP (1) | EP3221205B8 (es) |
DE (1) | DE102015200552A1 (es) |
ES (1) | ES2702048T3 (es) |
WO (1) | WO2016113098A1 (es) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3943363B1 (de) * | 2020-07-22 | 2023-04-05 | Siemens Mobility AG | Eisenbahnleitsystem mit bedienhemmung |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE10343765A1 (de) * | 2003-09-16 | 2005-05-04 | Siemens Ag | Vorrichtung zur Simulation der Funktion eines Achszählpunktes |
EP2206635A1 (en) * | 2009-01-09 | 2010-07-14 | Dual Inventive B.V. | Detection device for a short-circuit bridge |
EP2774826A2 (en) * | 2013-03-04 | 2014-09-10 | VolkerRail Nederland BV | Train traffic control with train simulation for taking track section out of service |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DD216207A1 (de) * | 1983-06-21 | 1984-12-05 | Senftenberg Braunkohle | Anordnung zur warnung vor sich naehernden schienenfahrzeugen |
DE3445115A1 (de) * | 1984-12-11 | 1986-06-12 | Verkehrsbetriebe Peine-Salzgitter Gmbh, 3320 Salzgitter | Anordnung zur vereinfachung und verbesserung der zugfahrtsicherung |
ATE319601T1 (de) * | 2001-10-26 | 2006-03-15 | Cit Alcatel | Vorrichtung zur rottenwarnung |
-
2015
- 2015-01-15 DE DE102015200552.6A patent/DE102015200552A1/de not_active Withdrawn
- 2015-12-23 EP EP15831139.9A patent/EP3221205B8/de active Active
- 2015-12-23 WO PCT/EP2015/081139 patent/WO2016113098A1/de active Application Filing
- 2015-12-23 ES ES15831139T patent/ES2702048T3/es active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE10343765A1 (de) * | 2003-09-16 | 2005-05-04 | Siemens Ag | Vorrichtung zur Simulation der Funktion eines Achszählpunktes |
EP2206635A1 (en) * | 2009-01-09 | 2010-07-14 | Dual Inventive B.V. | Detection device for a short-circuit bridge |
EP2774826A2 (en) * | 2013-03-04 | 2014-09-10 | VolkerRail Nederland BV | Train traffic control with train simulation for taking track section out of service |
Also Published As
Publication number | Publication date |
---|---|
EP3221205B1 (de) | 2018-09-12 |
EP3221205B8 (de) | 2018-11-28 |
EP3221205A1 (de) | 2017-09-27 |
ES2702048T3 (es) | 2019-02-27 |
DE102015200552A1 (de) | 2016-07-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3445635B1 (de) | Verfahren zum betreiben einer ortungseinrichtung sowie ortungseinrichtung | |
WO2009109475A1 (de) | Verfahren zur signaltechnischen sicherung schienengebundener fahrzeuge und diesbezügliches sicherungssystem | |
EP2403744A1 (de) | Vorrichtung zur detektion des belegt- und freizustandes eines gleisabschnitts sowie verfahren zum betreiben einer solchen vorrichtung | |
EP2870047B1 (de) | Betrieb eines schienenfahrzeugs | |
DE102008045050A1 (de) | Verfahren und Vorrichtung zur Zugbeeinflussung | |
EP1308366B1 (de) | Vorrichtung zur Rottenwarnung | |
EP2819907B1 (de) | Verfahren zur hilfsbedienung eines fahrwegelements sowie betriebsleittechnisches system | |
WO2013117398A2 (de) | System zur steuerung, sicherung und/oder überwachung von fahrwegen spurgebundener fahrzeuge sowie verfahren zum betreiben eines solchen systems | |
EP3075625B1 (de) | Verfahren und system zur dynamischen fahrwegsicherung in einer mehrgleisigen gleisanlage | |
WO2008138761A1 (de) | Vorrichtung und verfahren zur zugbeeinflussung an einem bahnübergang | |
EP2088051B1 (de) | Verfahren und Vorrichtung zur sicheren Einstellung von einer Fahrstrasse für ein Schienenfahrzeug | |
EP3221205B1 (de) | Verfahren und vorrichtung zur sperrung und signalisierung eines mit achszählern ausgerüsteten gleisabschnittes | |
WO2012123474A1 (de) | Verfahren und einrichtung zum stellen einer elektrisch ortsgestellten weiche | |
EP2279107B1 (de) | Vorrichtung zur detektion des belegt- oder freizustandes eines gleisabschnittes | |
EP3013666B1 (de) | Verfahren zum betreiben eines zugbeeinflussungssystems und zugbeeinflussungssystem | |
DE102012217814A1 (de) | Langsamfahrstelle einer Bahnstrecke | |
WO2015132061A1 (de) | Verfahren zum steuern eines mit einem cbtc-system verbundenen schienenfahrzeugs und cbtc-system mit mindestens einem schienenfahrzeug | |
EP1396413B1 (de) | Verfahren zur Hilfsbedienung von Fahrwegelementen | |
EP2804798B1 (de) | Verfahren zum steuern, sichern und/oder überwachen des schienengebundenen verkehrs sowie betriebsleittechnisches system | |
WO2017045863A1 (de) | Kommunikationseinrichtung und verfahren zum automatisierten austausch von nachrichten in einer eisenbahntechnischen anlage | |
WO2018210475A1 (de) | Verfahren zum betreiben einer gleisanlage sowie stellwerk für eine gleisanlage | |
DE102014205862A1 (de) | Verfahren und Vorrichtung zur Signalisierung betrieblicher Abläufe und technischer Sicherungseinrichtungen an in dem betreffenden Gleisabschnitt arbeitsbedingt befindliche Personen | |
WO2016016003A2 (de) | Verfahren und vorrichtung zum betreiben einer eisenbahnsicherungsanlage | |
DE102019216770A1 (de) | Warnverfahren und Verarbeitungseinrichtung für eine Bahnübergangsanlage | |
EP1597129B1 (de) | Verfahren zur sicherung der zugfolge im zugleitbetrieb |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 15831139 Country of ref document: EP Kind code of ref document: A1 |
|
REEP | Request for entry into the european phase |
Ref document number: 2015831139 Country of ref document: EP |
|
NENP | Non-entry into the national phase |
Ref country code: DE |