WO2016017512A1 - クレーン - Google Patents

クレーン Download PDF

Info

Publication number
WO2016017512A1
WO2016017512A1 PCT/JP2015/070911 JP2015070911W WO2016017512A1 WO 2016017512 A1 WO2016017512 A1 WO 2016017512A1 JP 2015070911 W JP2015070911 W JP 2015070911W WO 2016017512 A1 WO2016017512 A1 WO 2016017512A1
Authority
WO
WIPO (PCT)
Prior art keywords
boom
mast
tip
crane
guy line
Prior art date
Application number
PCT/JP2015/070911
Other languages
English (en)
French (fr)
Inventor
宮崎 和之
慎吾 栗原
Original Assignee
コベルコクレーン株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by コベルコクレーン株式会社 filed Critical コベルコクレーン株式会社
Priority to EP15827964.6A priority Critical patent/EP3176124B1/en
Priority to CN201580040795.1A priority patent/CN106715316B/zh
Priority to EP18198793.4A priority patent/EP3453670B1/en
Priority to US15/325,452 priority patent/US10519010B2/en
Publication of WO2016017512A1 publication Critical patent/WO2016017512A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/60Derricks
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • B66C23/64Jibs
    • B66C23/66Outer or upper end constructions
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • B66C23/72Counterweights or supports for balancing lifting couples
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • B66C23/82Luffing gear

Definitions

  • the present invention relates to a crane.
  • Patent Document 1 discloses an example of such a crane.
  • the base end portion of the boom is attached to the front portion of the machine body so as to be rotatable about an axis extending in the width direction of the machine body.
  • a live mast is provided at a position behind the boom in the airframe, and a high mast is provided at a position behind the boom.
  • the live mast and the high mast can be pivoted around their base end portions by being attached to the airframe so that their base end portions can be rotated around an axis extending in the width direction of the airframe. ing.
  • a top link is provided on the front side of the tip of the boom.
  • a hook for suspending a suspended load is suspended from a top sheave provided on the top link via a hook rope.
  • a pendant link is fixed on the rear side of the tip of the boom. The rear end of this pendant link and the tip of the live mast are connected via a pendant corresponding to a guy line.
  • the boom rope is wound around the sheave provided at the tip of the high mast and the sheave provided at the tip of the live mast, and the boom rope is wound and fed out by the winch provided on the fuselage. It has become.
  • the winch winds up the boom rope
  • the live mast rotates backward so that the tip of the live mast approaches the tip of the high mast.
  • the pendant is pulled backward, and the tip of the boom is pulled backward by the pendant, so that the boom stands up.
  • the pendant link that protrudes backward from the tip of the boom moves the pendant connection position away from the tip of the boom, thereby acting on the boom as the resultant force of the pendant tension and suspension load.
  • the position where the compressive force is applied is close to the boom axis. Thereby, the boom is able to withstand a large compressive force, and the lifting capacity of the crane is improved.
  • a boom having a structure whose length can be changed is generally used, and it is generally performed to change the boom length to an appropriate length according to the contents of the suspension work or the situation at the work site.
  • the suspension capacity is improved by providing the pendant link, there is a possibility that the suspension capacity is inevitably lowered when the length of the boom is reduced. Further, when the length of the boom is increased, another problem arises in that the tensile force required to cause the boom in a lying state increases.
  • An object of the present invention is to provide a crane that can achieve both an improvement in suspension capacity and a reduction in tensile force required to cause a boom.
  • a crane includes a fuselage, a boom attached to the fuselage so as to be rotatable, and having a structure capable of changing a length, and the boom is swung with respect to the fuselage.
  • a hoisting device to be operated the hoisting device is provided with a guy line, a connecting device provided at a tip of the boom and connecting one end of the guy line to the tip of the boom, and pulling the guy line backward
  • the connecting device is connected to one end of the guy line, and a support provided at the distal end portion.
  • FIG. 2 is a view corresponding to FIG. 2 showing a form of a guy line offset link adopted when a boom having a length larger than the boom length of the crane shown in FIG. 1 is used.
  • FIG. 4 is an enlarged view of the tip of the boom for explaining the difference between the compressive force acting on the boom in the crane of the first embodiment shown in FIG. 1 and the compressive force acting on the boom in the crane of the comparative example shown in FIG. It is.
  • the crane according to the first embodiment includes a lower traveling body 2 configured to be self-propelled and an upper revolving body that is mounted on the lower traveling body 2 so as to be pivotable about a vertical axis. 4 is provided.
  • the lower traveling body 2 is a crawler type, it is not necessarily limited to this, For example, a wheel type may be sufficient.
  • front and “rear” mean the front and rear of the upper swing body 4. That is, the right side in FIG. 1 corresponds to “front”, and the left side in FIG. 1 corresponds to “rear”.
  • the “width direction” corresponds to the width direction of the upper swing body 4 and is a direction that is horizontal and orthogonal to the front-rear direction. That is, the “width direction” corresponds to a direction perpendicular to the paper surface of FIG.
  • the crane according to the first embodiment includes a boom 10 attached to the upper swing body 4 of the machine body 6 so as to be rotatable around a rotation axis extending in the width direction, and the boom 10. And a hoisting device 11 for hoisting the upper swing body 4.
  • the boom 10 is a lattice boom having a lattice structure and extending in a certain direction.
  • the boom 10 is configured such that its axial length can be changed.
  • the boom 10 includes a boom body 12 and a boom head 13.
  • the boom body 12 constitutes most of the boom 10 and is formed by connecting a plurality of unit booms 14 having a lattice structure.
  • the base end portion which is one end portion in the longitudinal direction of the boom body 12, corresponds to the base end portion of the boom 10 and is attached to the front end portion of the upper swing body 4.
  • the base end portion of the boom body 12 is attached to the upper swing body 4 so as to be rotatable around a rotation axis extending in the width direction. Thereby, the boom 10 can be raised and lowered with the base end portion of the boom body 12 as a fulcrum.
  • Each unit boom 14 includes four main members 15 and a plurality of lattice members 16 that connect the main members 15 to each other.
  • Each main material 15 is disposed at each position corresponding to four vertices of a rectangle in a cross section orthogonal to the longitudinal direction of the boom 10.
  • the axis 10 a of the boom 10 passes through the middle between the four main members 15 in a cross section orthogonal to the longitudinal direction of the boom 10, and extends in the longitudinal direction of the boom 10.
  • the corresponding main members 15 of the adjacent unit booms 14 are connected so as to be separable.
  • the length of the boom 10 in the axial direction can be changed by changing the number of unit booms 14 to be connected or changing the unit boom 14 to be used to have a different length in the axial direction.
  • the boom head 13 is attached to the end opposite to the base end of the boom body 12 to form the tip of the boom 10.
  • the boom head 13 is an example of the tip of the boom in the present invention.
  • the boom head 13 has a back surface 21 facing rearward when the boom 10 is standing, a belly surface 22 facing frontward in this state, and a distal end surface 23 facing upward in that state.
  • the top sheave 25 is provided on the belly surface 22 side of the boom head 13 so as to be rotatable about a horizontal axis extending in the width direction.
  • the hook device 27 is suspended downward from the top sheave 25 via a suspension rope 26.
  • the hook device 27 includes an unillustrated hook sheave that is rotatable.
  • a hanging rope 26 drawn from a hoisting winch (not shown) mounted on the upper swing body 4 is hung around the hook sheave and the top sheave 25. When the hoisting winch winds / unwinds the suspension rope 26, the hook device 27 and the suspended load suspended thereon are wound up / down.
  • the hoisting device 11 (see FIG. 1) includes two guy lines 30, two connecting devices 32, and a guy line operating device 34.
  • the guy line 30 and the connecting device 32 connect the tip part 60b of the crane mast 60 and the boom head 13 which will be described later.
  • the two guy lines 30 are arranged separately in the width direction of the upper swing body 4. Since the two guy lines 30 overlap each other when viewed from the side of the upper swing body 4, only one guy line 30 is shown in each figure.
  • the two connecting devices 32 are provided on the boom head 13 and are arranged separately in the width direction. Since these two connecting devices 32 also overlap each other when viewed from the side of the upper swing body 4, only one connecting device 32 is shown in each figure.
  • One connecting device 32 connects one end of the corresponding one guy line 30 to the boom head 13.
  • the other connecting device 32 connects one end of the corresponding other guy line 30 to the boom head 13.
  • the other end of each guy line 30 is connected to a tip 60b of a crane mast 60 described later.
  • One connecting device 32 is provided at one end in the width direction of the boom head 13, and the other connecting device 32 is provided at the other end in the width direction of the boom head 13. Since the two connecting devices 32 are configured similarly, the structure of one connecting device 32 will be described below as a representative.
  • the coupling device 32 includes a coupling portion 36 and a support device 38.
  • the coupling part 36 is a part to which one end of the guy line 30 is coupled.
  • the coupling portion 36 includes a pin 55 and a connection member such as a shackle (not shown) attached to the pin 55.
  • the pin 55 connects a first link member 49 and a second link member 50 described later of the support device 38 to each other.
  • One end of the guy line 30 is coupled to the connecting member attached to the pin 55.
  • the support device 38 is provided on the boom head 13 and supports the coupling portion 36 so that the coupling portion 36 is located at a position away from the back surface 21 of the boom head 13 to the side opposite to the abdominal surface 22.
  • the support device 38 includes a mounting portion 42, a guy line offset link 44 (hereinafter simply referred to as a link 44), and pins 52 and 54.
  • the attachment part 42 is a part to which the link 44 is attached.
  • the attachment portion 42 is fixed to the back surface 21 so as to protrude from the back surface 21 of the boom head 13 to the side opposite to the abdominal surface 22, and supports the link 44.
  • the attachment portion 42 includes a first attachment member 46 and a second attachment member 47.
  • the first mounting member 46 is composed of two plates standing on the back surface 21 in the vicinity of the tip surface 23 of the boom head 13.
  • the two plate bodies of the first attachment member 46 are arranged such that their plate thickness directions coincide with the width direction.
  • the two plates are arranged with a slight gap between them in the width direction.
  • Each plate is formed with an attachment hole penetrating them in the thickness direction at the same position.
  • the second mounting member 47 is composed of a single plate standing on the back surface 21.
  • the second mounting member 47 is disposed so that the plate thickness direction thereof coincides with the width direction, and is disposed at a position corresponding to the middle of the two plate bodies of the first mounting member 46.
  • the second attachment member 47 is formed with an attachment hole penetrating the second attachment member 47 in the plate thickness direction. This mounting hole is disposed in the vicinity of the proximal end located on the opposite side (boom body 12 side) to the distal end surface 23 of the boom head 13.
  • the link 44 is attached to the attachment portion 42 and supports the coupling portion 36.
  • the link 44 can be attached to and detached from the attachment portion 42.
  • the link 44 includes a first link member 49 and a second link member 50.
  • the first link member 49 is an example of the holding member of the present invention.
  • the first link member 49 holds the pin 55 of the coupling portion 36.
  • the first link member 49 allows the position of the coupling portion 36 to be changed to a plurality of different positions in the A direction orthogonal to the axis 10 a of the boom 10 and the pivot axis of the boom 10.
  • the first link member 49 is formed of an elongated flat plate.
  • the first link member 49 is provided with a plurality of holes 49a penetrating the first link member 49 in the plate thickness direction.
  • the hole 49a is an example of a holding portion in the present invention.
  • the plurality of holes 49 a are arranged at intervals in the longitudinal direction of the first link member 49.
  • Each hole 49a holds the pin 52 in a detachable manner.
  • the first link member 49 has a base end portion 49b that is one end portion in the longitudinal direction and a distal end portion 49c that is the other end portion in the longitudinal direction.
  • the holes 49a are also arranged at the base end portion 49b and the tip end portion 49c of the first link member 49.
  • the base end portion 49 b of the first link member 49 is inserted between the two plates of the first mounting member 46.
  • the pin 52 By inserting the pin 52 into the hole 49a provided in the base end portion 49b of the first link member 49 and the attachment hole provided in the two plates of the first attachment member 46, the first link member 49 is inserted.
  • a base end portion 49 b of the link member 49 is attached to the first attachment member 46.
  • the pin 52 can be inserted into and removed from the hole 49 a of the base end portion 49 b and the mounting hole of the first mounting member 46.
  • the base end portion 49b can be separated from the first mounting member 46 by extracting the pins 52 from the holes. That is, the base end portion 49 b of the first link member 49 can be attached to and detached from the first attachment member 46.
  • the second link member 50 is an example of the support member of the present invention.
  • the second link member 50 extends in a direction intersecting the first link member 49 and the back surface 21 of the boom head 13, and is provided between the first link member 49 and the back surface 21 of the boom head 13.
  • the second link member 50 supports the first link member 49 at the position of the pin 55 via the pin 55 by being coupled to the pin 55 of the coupling portion 36 held by the first link member 49.
  • the second link member 50 is composed of two elongated flat plates.
  • the two flat plates are formed in the same shape.
  • Each flat plate of the second link member 50 has a base end portion 50a that is one end portion in the longitudinal direction and a distal end portion 50b that is the other end portion in the longitudinal direction.
  • the base end portion 50a of each flat plate is formed with a hole 51a penetrating the flat plate in the plate thickness direction.
  • a hole 51b that penetrates the flat plate in the thickness direction is formed at the tip 50b of each flat plate.
  • the base end portions 50 a of the two flat plates of the second link member 50 are connected to the second mounting member 47. Specifically, these base end portions 50a sandwich the second mounting member 47 from both sides in the plate thickness direction so that the hole 51a overlaps the mounting hole of the second mounting member 47, and in this state, the pin 54 is The base end portion 50 a is inserted into the hole 51 a and the mounting hole of the second mounting member 47. Thereby, the base end portion 50 a of the second link member 50 is attached to the second attachment member 47.
  • the pin 54 can be inserted into and removed from the hole 51 a of the base end portion 50 a and the mounting hole of the second mounting member 47.
  • the base end portion 50a can be separated from the second mounting member 47 by extracting the pins 54 from the holes. That is, the base end portion 50 a of the second link member 50 can be attached to and detached from the second attachment member 47.
  • the tip portions 50 b of the two flat plates of the second link member 50 are connected to the first link member 49. Specifically, these tip portions 50b are arranged so that the first link member 49 is seen from both sides in the plate thickness direction so that the hole 51b overlaps a certain hole 49a among the plurality of holes 49a provided in the first link member 49. In this state, the pin 55 is inserted into the hole 49a corresponding to the hole 51b. As a result, the distal end portion 50 b of the second link member 50 is attached to the first link member 49. The pin 55 can be inserted into and removed from the hole 51 b of the tip end portion 50 b and the hole 49 a of the first link member 49.
  • the first link member 49 and the distal end portion 50b of the second link member 50 can be separated from each other. That is, the front end portion 50 b of the second link member 50 is detachably connected to the first link member 49.
  • the second link member 50 supports a portion of the first link member 49 provided with a hole 49a into which the pin 55 is inserted through the pin 55.
  • the first link member 49 is attached to the first attachment member 46 and extends in a direction substantially along the A direction while being connected to the second link member 50 attached to the second attachment member 47. That is, the first link member 49 has a predetermined length in the A direction while being supported by the second link member 50 and the pin 55. Since the plurality of holes 49a are arranged in the longitudinal direction of the first link member 49, when the first link member 49 is supported by the second link member 50 and the pin 55, the plurality of holes 49a are formed in the A direction. Are arranged at a plurality of different positions.
  • the pin 55 is inserted into a certain hole 49a selected from the plurality of holes 49a and the hole 51b of the second link member 50, and the distal end portion 50b of the second link member 50 is placed at the position of the selected hole 49a.
  • the coupling portion 36 can be installed at a certain position in the A direction corresponding to the selected hole 49a.
  • the pin 55 is extracted from the hole 49a into which the pin 55 is inserted and the hole 51b of the second link member 50, the hole 51b of the second link member 50 is aligned with another hole 49a, and the pin is inserted into these holes 49a, 51b.
  • the position of the coupling portion 36 can be changed in the A direction.
  • a pin 55 is inserted into the hole 49a provided in the tip 49c of the first link member 49 and the hole 51b of the tip 50b of the second link member 50, and the first
  • the coupling portion 36 is separated from the rear surface 21 of the boom head 13 within the range of change of the position of the coupling portion 36 in the A direction. It is arranged at the most distant position.
  • the coupling portion 36 is In the A direction, it is arranged at a position closer to the back surface 21 of the boom head 13 than the position in the case of FIG.
  • the pin 55 is inserted into the hole 49a positioned closer to the base end portion 49b among the plurality of holes 49a provided in the first link member 49, and the distal end portion 50b of the second link member 50 is attached.
  • the coupling portion 36 can be disposed at a position closer to the back surface 21 of the boom head 13.
  • the pin 55 is inserted into the hole 49a located on the distal end portion 49c side among the plurality of holes 49a provided in the first link member 49 and the distal end portion 50b of the second link member 50 is connected.
  • the coupling portion 36 can be disposed at a position further away from the rear surface 21 of the boom head 13 to the side opposite to the abdominal surface 22.
  • the guy line operating device 34 (see FIG. 1) is a device that causes the boom 10 to stand by pulling the guy line 30 rearward and to fall the boom 10 by sending the guy line 30 forward.
  • the guy line operating device 34 includes a crane mast 60 and a mast rotating device 61.
  • the crane mast 60 has a base end portion 60 a attached to the upper swing body 4 at the rear of the position where the base end portion of the boom 10 is attached.
  • the base end portion 60a is attached to the upper swing body 4 so as to be rotatable around a horizontal axis extending in the width direction. Thereby, the crane mast 60 can be rotated around the horizontal axis around the base end portion 60a.
  • the other end which is the end opposite to one end of the guy line 30 connected to the coupling portion 36, is connected to the distal end 60b, which is the end opposite to the base end 60a of the crane mast 60.
  • the distal end portion 60 b of the crane mast 60 is disposed at a position considerably lower than the boom head 13.
  • the boom head 13 is disposed at a position lower than the distal end portion 60 b of the crane mast 60.
  • the mast rotating device 61 is a device that pulls the guy line 30 backward and sends it forward by rotating the crane mast 60. As shown in FIG. 1, the mast rotating device 61 includes an upper spreader 62, a lower spreader 64, a hoisting winch 66, and a hoisting rope 68.
  • the upper spreader 62 is attached to the tip 60b of the crane mast 60.
  • the upper spreader 62 has an upper sheave 62a that is rotatable about a horizontal axis extending in the width direction.
  • the lower spreader 64 is provided at the rear end of the upper swing body 4.
  • the lower spreader 64 has a lower sheave 64a that is rotatable about a horizontal axis extending in the width direction.
  • the undulating winch 66 is mounted on the upper swing body 4.
  • a hoisting rope 68 drawn out from the hoisting winch 66 is wound around the upper sheave 62a and the lower sheave 64a.
  • the hoisting winch 66 performs winding / unwinding of the hoisting rope 68.
  • the coupling portion 36 (see FIG. 2) coupled to one end of the guy line 30 is supported so as to be located at a position away from the rear surface 21 of the boom head 13 to the side opposite to the abdominal surface 22. Supported by device 38. For this reason, the action position of the compressive force acting on the standing boom 10 as a resultant force of the tension of the guy line 30 and the suspension load can be brought close to the axis 10 a of the boom 10. Thereby, the bending moment resulting from the compressive force which acts on the boom 10 becomes small.
  • the compression force P ⁇ b> 1 acting on the boom 10 in the first embodiment is perpendicular to the extension line of the guy line 30 coupled to the coupling portion 36 and the center of the rotation shaft of the top sheave 25.
  • the resultant force obtained by combining the tension T1 of the guy line 30 and the suspension load W is obtained.
  • the support device 38 is not provided, and the coupling portion 36 is provided on the second mounting member 47, and the coupling portion 36 is disposed at a position close to the back surface 21 of the boom head 13.
  • a crane is used as a comparative example.
  • the compressive force P2 (see FIG. 5) acting on the boom 10 is generated at the intersection N2 of the extension line of the guy line 30a and the straight line extending vertically upward from the center of the rotation axis of the top sheave 25. It is calculated
  • the distance L1 between the position of the compression force P1 of the boom 10 according to the first embodiment and the axis 10a in the plane perpendicular to the axis 10a of the boom 10 is in the same plane. It becomes smaller than the distance L2 between the action position of the compression force P2 of the boom 10 and the shaft center 10a according to the comparative example. That is, the operating position of the compression force P1 of the boom 10 according to the first embodiment is closer to the axis 10a of the boom 10 than the operating position of the compression force P2 of the boom 10 according to the comparative example.
  • the bending moment generated in the boom 10 when the compression force P1 acts on the boom 10 in the first embodiment is smaller than the bending moment generated when the compression force P2 acts on the boom 10 in the comparative example.
  • the bending of the boom 10 by a bending moment can be reduced, and it becomes possible to suspend a bigger suspension load. As a result, the suspension capacity can be improved.
  • the length of the boom 10 is changed by changing the number of joints of the unit booms 14 or changing the unit booms 14 to be used with different lengths. Change to an appropriate length according to the situation at the site.
  • the first link member 49 allows the position of the coupling portion 36 to be changed to a plurality of different positions in the A direction, the suspension force is improved and the tensile force required to cause the boom 10 is reduced. And both.
  • the coupling portion 36 when the length of the boom 10 is reduced, by inserting the pin 55 of the coupling portion 36 into the hole 49a near the distal end portion 49c of the first link member 49, the coupling portion 36 is in an upright state. It arrange
  • the coupling portion 36 is arranged at a position closer to the axial center 10a of the boom 10.
  • the coupling part 36 is arranged at the position shown in FIG.
  • the angle of the guy line 30 with respect to the axis 10a of the boom 10 in the fallen state which is reduced due to the increase in the length of the boom 10, can be increased.
  • the angle ⁇ shown in FIG. 6 can be enlarged.
  • the second link member 50 extending in the direction intersecting the first link member 49 is provided with a hole 49 a into which the pin 55 of the coupling portion 36 of the first link member 49 is inserted.
  • the part is supported through the pin 55.
  • the 2nd link member 50 can oppose the big tension
  • part in which the hole 49a in which the pin 55 of the 1st link member 49 was inserted is provided from the connection part 36.
  • FIG. As a result, deformation and breakage of the first link member 49 can be prevented.
  • (Second Embodiment) 7 and 8 show the configuration of the crane according to the second embodiment of the present invention.
  • the relative position of the coupling portion 36 with respect to the boom head 13 can be changed to a plurality of different positions in the B direction along the axial direction of the boom 10 in addition to the A direction.
  • the direction B is an example of the second direction in the present invention.
  • the crane according to the second embodiment can be changed between a normal specification and a heavy lift specification.
  • the normal specification and the heavy lift specification are properly used according to the magnitude of the suspended load. That is, when the magnitude of the suspended load is less than or equal to a preset set value, the normal specification is adopted as the crane specification, and when the magnitude of the suspended load is larger than the set value, the crane specification As a heavy lift specification is adopted.
  • bond part 36 is arrange
  • the normal specifications correspond to the crane specifications shown in FIG. That is, since the configuration of the crane with the normal specification corresponds to the configuration of the crane according to the first embodiment, the description thereof is omitted here.
  • the heavy lift specifications correspond to the crane specifications shown in FIG.
  • the guy line operating device 34 includes an HL mast 76 different from the crane mast 60 in addition to the crane mast 60 and the mast rotating device 61.
  • the crane mast 60 in this 2nd Embodiment is an example of the 1st mast by this invention.
  • the HL mast 76 is an example of a second mast according to the present invention.
  • the HL mast 76 is a mast having a lattice structure and extending in a certain direction.
  • the HL mast 76 includes a base end portion 76a that is one end portion in the axial direction of the HL mast 76 and a front end portion 76b that is an end portion on the opposite side to the base end portion 76a.
  • the base end portion 76a is detachably attached to the upper swing body 4.
  • the base end portion 76 a is attached to the upper swing body 4 so as to be rotatable around a common axis with the base end portion 60 a of the crane mast 60. Thereby, the HL mast 76 rotates between the boom 10 and the crane mast 60 around the base end portion 76a.
  • the guy line operating device 34 includes a connecting rope 78 that connects the tip 60b of the crane mast 60 and the tip 76b of the HL mast 76.
  • the connecting rope 78 is an example of a connecting member according to the present invention.
  • the ends of the two guy lines 30 opposite to the connecting device 32 are connected to the tip 76 b of the HL mast 76.
  • tip part 76b of the HL mast 76 and the boom head 13 are connected via the guy line 30 and the coupling device 32.
  • the distal end portion 76 b of the HL mast 76 is disposed at a position higher than the distal end portion 60 b of the crane mast 60.
  • the mast rotating device 61 rotates the HL mast 76 via the connecting rope 78 by rotating the crane mast 60, thereby pulling the guy line 30 backward and moving it forward. Send out.
  • the mounting portion 42 of the support device 38 supports the first link member 49 and changes the position of the first link member 49 to a plurality of different positions in the B direction. Allow.
  • the attachment portion 42 includes a first attachment member 46 and a second attachment member 47 configured in the same manner as the first attachment member 46 and the second attachment member 47 of the first embodiment, and another third An attachment member 48 and a fourth attachment member 56 are included.
  • the first mounting member 46 and the third mounting member 48 in the second embodiment are examples of the mounting member in the present invention.
  • the third mounting member 48 is composed of two plates that are erected from the distal end surface 23 at a position near the stomach surface 22 in the distal end surface 23 of the boom head 13. Accordingly, the third mounting member 48 is provided on the boom head 13 at a position different from the first mounting member 46 in the B direction, and is disposed on the more distal end side of the boom 10 than the first mounting member 46.
  • the two plate bodies of the third attachment member 48 are arranged such that their plate thickness directions coincide with the width direction.
  • the two plates are arranged with a slight gap between them in the width direction, and are arranged at positions that coincide with the two plates of the first mounting member 46 in the width direction.
  • Each plate body of the third attachment member 48 is formed with an attachment hole penetrating them in the thickness direction at the same position.
  • the fourth mounting member 56 is formed of a single plate that is erected from the tip surface 23 at a position near the back surface 21 of the tip surface 23 of the boom head 13.
  • the fourth attachment member 56 is arranged so that the thickness direction thereof coincides with the width direction.
  • the fourth attachment member 56 is disposed at a position corresponding to the middle of the two plates of the third attachment member 48 in the width direction.
  • the fourth mounting member 56 is formed with a mounting hole penetrating the fourth mounting member 56 in the thickness direction.
  • the first attachment state S1 in which the link 44 is attached to the first and second attachment members 46, 47 to the second attachment state S2 in which the link 44 is attached to the third and fourth attachment members 48, 56.
  • the first attachment state S1 is the same as the attachment state of the link 44 of the first embodiment shown in FIG.
  • the first link member 49 is attached to the first attachment member 46
  • the second link member 50 is attached to the second attachment member 47.
  • the position of the coupling portion 36 (pin 55) supported by the link 44 is closer to the boom main body 12 side (base end side of the boom 10) than the distal end surface 23 of the boom head 13. .
  • This first attachment state S1 is employed in the normal specification of the crane.
  • the base end portion 49b of the first link member 49 is attached to the third attachment member 48 and the base end portion 50a of the second link member 50 is attached. Is attached to the fourth attachment member 56.
  • the base end portion 49b of the first link member 49 is inserted between the two plates of the third mounting member 48, and the hole 49a provided in the base end portion 49b and the first end
  • the base end portion 49 b of the first link member 49 is attached to the third attachment member 48 by inserting the pin 52 into the attachment hole of each plate body of the third attachment member 48.
  • the pin 52 can be inserted into and removed from the hole 49 a of the base end portion 49 b and the mounting hole of the third mounting member 48.
  • the base end portion 49 b can be separated from the third mounting member 48 by extracting the pins 52 from those holes. That is, the base end portion 49 b of the first link member 49 can be attached to and detached from the third attachment member 48.
  • the base end portions 50a of the two flat plates of the second link member 50 have the plate thickness of the fourth attachment member 56 such that the hole 51a overlaps the attachment hole of the fourth attachment member 56.
  • the pin 54 is inserted into the hole 51a of each base end portion 50a and the mounting hole of the fourth mounting member 56.
  • the pin 54 can be inserted into and removed from the hole 51 a of the base end portion 50 a and the mounting hole of the fourth mounting member 56.
  • the base end portion 50 a can be separated from the fourth mounting member 56. That is, the base end portion 50 a of the second link member 50 can be attached to and detached from the fourth attachment member 56.
  • the link 44 projects from the tip end face 23 of the boom head 13 to the opposite side of the boom body 12 in the B direction. Accordingly, the coupling portion 36 supported by the link 44 is installed at a position spaced from the distal end surface 23 of the boom head 13 to the side opposite to the boom body 12 (the side opposite to the base end portion of the boom 10).
  • This second attachment state S2 is adopted in the heavy lift specification of the crane.
  • the distal end portion 60b of the crane mast 60 is disposed at a position considerably lower than the boom head 13 of the boom 10 in the standing state.
  • the angle with the shaft center 10a is reduced, and as a result, the tensile force component of the guy line 30 in the direction orthogonal to the shaft center 10a of the boom 10 is reduced.
  • the boom head 13 of the boom 10 in the standing state is positioned at a position higher than the distal end portion 60b of the crane mast 60.
  • the guy line 30 is connected to the front end portion 76b of the HL mast 76 arranged at a close height position. For this reason, the angle of the guy line 30 with respect to the axis 10a of the boom 10 is larger than that in the normal specification, and the tensile force component of the guy line 30 in the direction orthogonal to the axis 10a of the boom 10 can be increased. it can. As a result, in the heavy lift specification, it is possible to perform suspension work with a suspension load larger than the suspension load that can be suspended in the normal specification.
  • the link 44 When the crane is in the heavy lift specification, the link 44 is moved from the position of the first attachment state S1 in the normal specification to the position of the second attachment state S2, and the coupling portion 36 is disposed at a position on the more distal end side of the boom 10. To do. Thereby, the angle between the guy line 30 and the axis 10a of the boom 10 can be adjusted to a slightly smaller angle.
  • the coupling portion of the present invention is not necessarily limited to the configuration shown in the above embodiment.
  • the coupling portion may include a pin 55, a second link member 50, and a connection portion provided on the second link member 50.
  • the connecting portion is a portion to which the guy line 30 is connected, and is provided at, for example, an intermediate portion between the proximal end portion 50a and the distal end portion 50b of the second link member 50.
  • the hole 49a of the first link member 49 that connects the tip 50b of the second link member 50 via the pin 55 is changed to another hole 49a, so that the second link member 50 is pin 54. It is possible to change the relative position of the connecting portion (connecting portion) with respect to the boom head 13 to a plurality of different positions in the A direction.
  • the holding member of the present invention that holds the coupling portion and allows the position of the coupling portion to be changed to a plurality of different positions in the A direction is not necessarily limited to the first link member 49 described above. Instead of this, a configuration other than the first link member 49 can be used as the holding member of the present invention.
  • attachment portion of the present invention that allows the holding member to be attached and allows the position of the holding member to be changed to a plurality of different positions in the B direction is not necessarily limited to the attachment portion 42 described above.
  • a configuration other than the mounting portion 42 can also be adopted as the mounting portion of the present invention.
  • attachment form with respect to the boom head 13 of the 1st link member 49 and the 2nd link member 50 in 2nd attachment state S2 may be an attachment form like the modification shown in FIG.
  • the attachment portion 42 includes a first attachment member 46, a second attachment member 47, and a third attachment member 60.
  • the structure of the 1st attachment member 46 and the 2nd attachment member 47 is the same as that of the case of the said embodiment.
  • the third mounting member 60 is provided on the distal end surface 23 of the boom head 13 at the same position as the third mounting member 48 of the second embodiment.
  • the third attachment member 60 is composed of a single plate erected from the distal end surface 23.
  • the third attachment member 60 is arranged so that the thickness direction thereof coincides with the width direction.
  • the third mounting member 60 is disposed at a position that coincides with the position of the second mounting member 47 in the width direction. That is, the third mounting member 60 is disposed at a position corresponding to the middle of the two plates of the first mounting member 46 in the width direction.
  • the third attachment member 60 is formed with an attachment hole that penetrates the third attachment member 60 in the plate thickness direction.
  • the base end part 49b of the 1st link member 49 is attached to the 1st attachment member 46 similarly to 1st attachment state S1.
  • the first link member 49 is disposed so as to protrude from the distal end surface 23 of the boom head 13.
  • the base end portion 50a of the second link member 50 is attached to the third attachment member 60.
  • the attachment method of the base end portion 50 a to the third attachment member 60 is the same as the attachment method of the base end portion 50 a to the second attachment member 47. Therefore, the base end portion 50 a of the second link member 50 can be attached to and detached from the third attachment member 60.
  • the crane according to the embodiment includes a fuselage, a boom attached to the fuselage so as to be rotatable, and having a structure capable of changing the length, and a undulation that pivots the boom and undulates the fuselage.
  • the hoisting device includes a guy line, a connecting device that is provided at a tip of the boom and connects one end of the guy line to the tip of the boom, and pulls the guy line backward to pull the boom.
  • a guy line operating device for lowering the boom by sending the guy line forward while the tip of the boom is in a state where the boom is raised and a back face facing backward with the boom standing up
  • the connecting device is connected to one end of the guy line, and a support provided at the tip portion.
  • the support device holds the coupling part A holding member that allows the position of the coupling portion to be changed to a plurality of different positions in a first direction orthogonal to the axis of the boom and the pivot axis of the boom.
  • the holding member that holds the coupling portion allows the position of the coupling portion to be changed to a plurality of different positions in the first direction orthogonal to the axis of the boom and the pivot axis of the boom.
  • the connecting portion when the length of the boom is reduced, the connecting portion is disposed at a position further rearward from the axis of the boom in the standing state, and between the direction in which the guy line extends and the direction in which the suspension load is applied.
  • the angle By reducing the angle, it is possible to bring the operating position of the compressive force close to the boom axis from the boom center in the standing state due to the reduced boom length. .
  • the bending moment generated in the boom can be reduced, the bending of the boom can be reduced, and the suspension capacity can be improved.
  • the joint portion when the length of the boom is increased, the joint portion is disposed at a position closer to the axis of the boom, so that the guide line with respect to the axis of the boom that has been reduced due to the increase in the length of the boom.
  • the angle can be enlarged. As a result, it is possible to increase the vertical component of the tensile force of the guy line when the falling boom is caused, and as a result, it is possible to reduce the tensile force of the guy line required to cause the boom.
  • the holding member has a plurality of holding portions provided at different positions in the first direction, and each holding portion holds the coupling portion in a detachable manner.
  • the position of the coupling portion in the first direction can be changed by removing the coupling portion held by a certain holding portion and holding it by another holding portion. Therefore, it is possible to specifically configure a holding member that holds the coupling portion and allows the position of the coupling portion to be changed to a plurality of different positions in the first direction.
  • the support device includes a support member provided between the holding member and the back surface of the tip portion, and the support member is coupled to the coupling portion held by the holding member. Accordingly, it is preferable to support the holding member at the position of the coupling portion via the coupling portion.
  • the supporting member can counter the large tension of the guy line that is applied to the portion of the holding member that holds the coupling portion via the coupling portion, and can prevent deformation and breakage of the holding member.
  • the guy line operating device is rotatable between a first mast attached to the machine body so as to be rotatable at a position behind the boom, and between the boom and the first mast.
  • a second mast that is attached to the machine body and has a tip connected to an end opposite to the one end of the guy line; a tip of the first mast; and a tip of the second mast And a mast rotation that rotates the first mast to rotate the second mast via the connection member and pulls the guy line backward and forwards it.
  • the tip of the second mast is disposed at a position higher than the tip of the first mast, and the support device is provided at the tip of the boom and is held by the holding member.
  • the crane can be made into a heavy lift specification capable of carrying out a lifting work with a large lifting load, and the bending of the boom caused by the heavy lift specification can be reduced.
  • the guy line is connected to the tip of the first mast and the first mast is rotated to pull the guy line backward and forward to raise and lower the boom. I do.
  • the angle between the guy line connecting the tip of the first mast and the tip of the boom and the axis of the boom is reduced, and as a result, the tensile force of the guy line in the direction perpendicular to the axis of the boom.
  • the ingredients of can not be increased. For this reason, in the normal specification, it is difficult to suspend a large suspension load.
  • the mounting portion provided at the tip of the boom to which the holding member is attached can change the position of the holding member to a plurality of different positions in the second direction along the axis of the boom. Place the coupling part closer to the tip of the boom and adjust the angle between the guy line and the boom axis to a slightly smaller angle, thereby slightly reducing the component of tensile force in the direction perpendicular to the boom axis be able to. For this reason, the bending of the boom which arises when a crane is made into a heavy lift specification can be reduced.
  • the attachment portion has a plurality of attachment members that are provided at the tip end portion of the boom at a plurality of different positions in the second direction and are respectively detachable from the holding member.
  • the position of the holding member in the second direction can be changed by removing the holding member attached to a certain attachment member and attaching it to another attachment member. Therefore, it is possible to specifically configure an attachment portion to which the holding member is attached and which allows the position of the holding member to be changed to a plurality of different positions in the second direction.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Jib Cranes (AREA)

Abstract

クレーンは、長さを変更可能な構造を有するブーム(10)と、前記ブーム(10)を回動させて機体に対して起伏させる起伏装置(11)とを備え、前記起伏装置(11)は、ガイライン(30)の一端を前記ブーム(10)の先端部に連結する連結装置(32)を含み、前記ブーム(10)の先端部(13)は、前記ブーム(10)が起立した状態で後方を向く背面(21)と、そのブームが起立した状態で前方を向く腹面(22)とを有し、前記連結装置(32)は、前記ガイライン(30)の一端と結合する結合部(36)と、前記先端部(13)に設けられた支持装置(38)であって前記結合部(36)が前記先端部(13)の前記背面(21)から前記腹面(22)と反対側へ離れた位置に位置するように当該結合部(36)を支持するものとを備え、前記支持装置(38)は、前記結合部(36)を保持する保持部材(49)を有し、当該保持部材(49)は、前記結合部の位置が前記ブームの軸心及び前記ブームの回動軸に対して直交する第1方向において複数の異なる位置に変更されることを許容する。

Description

クレーン
 本発明は、クレーンに関する。
 従来、起伏自在に設けられたブームと、そのブームを起伏させる起伏装置とを備えたクレーンが知られている。下記特許文献1には、このようなクレーンの一例が開示されている。
 下記特許文献1に開示されたクレーンでは、その機体の前部にブームの基端部が機体の幅方向に延びる軸回りに回動可能となるように取り付けられている。機体のうちブームの後方の位置にはライブマストが設けられ、さらにその後方の位置にはハイマストが設けられている。ライブマストとハイマストは、それらの基端部が機体の幅方向に延びる軸回りに回動可能となるように機体にそれぞれ取り付けられることにより、それらの基端部を中心としてそれぞれ回動可能となっている。
 ブームの先端部の前面側には、トップリンクが設けられている。そのトップリンクに設けられたトップシーブからフックロープを介して吊荷を吊るためのフックが吊り下げられる。ブームの先端部の後面側には、ペンダントリンクが固設されている。このペンダントリンクの後端とライブマストの先端部とは、ガイラインに相当するペンダントを介して接続されている。
 そして、ハイマストの先端部に設けられたシーブと、ライブマストの先端部に設けられたシーブとにブームロープが掛け回され、そのブームロープが機体に設けられたウインチにより巻き取り/繰り出しされるようになっている。ウインチがブームロープを巻き取ることにより、ライブマストの先端部がハイマストの先端部側へ近づくようにライブマストが後方へ回動する。それに伴って、ペンダントが後方へ引っ張られるとともに、そのペンダントによってブームの先端部が後方へ引っ張られて、ブームが起立する。
 このクレーンでは、ブームの先端部から後方へ突出するペンダントリンクにより、ペンダントの接続位置をブームの先端部から後方へ離れた位置とし、それによって、ペンダントの張力と吊荷重との合力としてブームに作用する圧縮力の作用位置をブームの軸心に近づけている。それにより、ブームが大きな圧縮力に耐え得るようにしてクレーンの吊能力を向上させている。
 クレーンでは、長さを変更可能な構造のブームが用いられて、吊作業の内容や作業現場の状況等に応じてブームの長さを適切な長さに変更することが一般的に行われる。上記特許文献1のクレーンでは、ペンダントリンクを設けることによって吊能力を向上させているものの、ブームの長さを小さくした場合には吊能力が低下せざるを得なくなる虞がある。また、ブームの長さを大きくした場合には、倒伏状態のブームの引き起こしに要する引張力が増大するという別の問題が生じる。
 具体的に、ブームの長さを小さくした場合には、ペンダントの延びる方向と吊荷重の作用方向との間の角度が大きくなるため、圧縮力の作用位置がブームの軸心から前方へ離れた位置となって曲げモーメントが大きくなり、その結果、ブームの撓みを抑制するために吊能力を低下せざるを得なくなる。一方、ブームの長さを大きくした場合には、ブームが略水平に倒伏した状態においてペンダントとブームの軸心との間の角度が小さくなるため、ペンダントの引張力の垂直成分が小さくなり、その結果、ブームを引き起こすためにより大きなペンダントの引張力が必要になる。
特開平11-43288号公報
 本発明の目的は、吊能力の向上とブームの引き起こしに要する引張力の低減とを両立可能なクレーンを提供することである。
 本発明の一局面によるクレーンは、機体と、回動自在となるように前記機体に取り付けられ、長さを変更可能な構造を有するブームと、前記ブームを回動させて前記機体に対して起伏させる起伏装置とを備え、前記起伏装置は、ガイラインと、前記ブームの先端部に設けられて前記ガイラインの一端を前記ブームの先端部に連結する連結装置と、前記ガイラインを後方へ引っ張ることにより前記ブームを起立させる一方、前記ガイラインを前方へ送り出すことにより前記ブームを倒伏させるガイライン操作装置とを含み、前記ブームの先端部は、前記ブームが起立した状態で後方を向く背面と、そのブームが起立した状態で前方を向く腹面とを有し、前記連結装置は、前記ガイラインの一端と結合する結合部と、前記先端部に設けられた支持装置であって前記結合部が前記先端部の前記背面から前記腹面と反対側へ離れた位置に位置するように当該結合部を支持するものとを備え、前記支持装置は、前記結合部を保持する保持部材を有し、当該保持部材は、前記結合部の位置が前記ブームの軸心及び前記ブームの回動軸に対して直交する第1方向において複数の異なる位置に変更されることを許容する。
本発明の第1実施形態によるクレーンの側面図であってブームが起立状態にある状態を示すものである。 図1に示したクレーンのブーム先端部の拡大図である。 図1に示したクレーンのブームの長さよりも大きい長さのブームが用いられる場合に採用されるガイラインオフセットリンクの形態を示す図2相当図である。 比較例によるクレーンの側面図である。 図1に示した第1実施形態のクレーンにおいてブームに作用する圧縮力と、図4に示した比較例のクレーンにおいてブームに作用する圧縮力との違いを説明するためのブーム先端部の拡大図である。 本発明の第1実施形態によるクレーンの側面図であってブームが倒伏状態にある状態を示すものである。 本発明の第2実施形態によるクレーンの側面図である。 図7に示したクレーンのブーム先端部の拡大図である。 本発明の変形例によるクレーンのブーム先端部の拡大図である。
 以下、本発明の実施形態について図面を参照して説明する。
 (第1実施形態)
 図1~図6を参照して、本発明の第1実施形態によるクレーンについて説明する。
 第1実施形態によるクレーンは、図1に示すように、自走可能に構成された下部走行体2と、下部走行体2上に縦軸回りに旋回可能となるように搭載された上部旋回体4とを有する機体6を備える。この第1実施形態では、下部走行体2は、クローラ式であるが、必ずしもこれに限定されるものではなく、例えばホイール式であってもよい。
 なお、以下の説明において、「前方」及び「後方」とは、上部旋回体4における前方及び後方を意味する。すなわち、図1における右方が「前方」に相当し、図1における左方が「後方」に相当する。また、以下の説明において、「幅方向」とは、上部旋回体4の幅方向に相当し、水平方向で且つ前後方向に直交する方向のことである。すなわち、「幅方向」は、図1の紙面に垂直な方向に相当する。
 この第1実施形態によるクレーンは、図1に示すように、幅方向に延びる回動軸回りに回動自在となるように機体6の上部旋回体4に取り付けられたブーム10と、そのブーム10を回動させて上部旋回体4に対して起伏させる起伏装置11とを備える。
 ブーム10は、ラチス構造を有し、ある方向に延びるラチスブームである。ブーム10は、その軸方向の長さが変更可能となるように構成されている。このブーム10は、ブーム本体12と、ブームヘッド13とを有する。
 ブーム本体12は、ブーム10の大半を構成するものであり、ラチス構造を有する複数の単位ブーム14が連結されることによって形成されている。このブーム本体12の長手方向の一端部である基端部は、ブーム10の基端部に相当し、上部旋回体4の前端部に取り付けられている。ブーム本体12の基端部は、幅方向に延びる回動軸回りに回動可能となるように上部旋回体4に取り付けられている。これにより、ブーム10は、ブーム本体12の基端部を支点として起伏可能となっている。
 各単位ブーム14は、4本の主材15と、それらの主材15同士を連結する複数のラチス材16とを有する。なお、各図はブーム10を側方から見た状態で示しているため、4本の主材15のうちの2本のみが各図には表されている。各主材15は、ブーム10の長手方向に直交する断面において矩形の4つの頂点に相当する各位置に配置されている。ブーム10の軸心10aは、このブーム10の長手方向に直交する断面における4本の主材15間の真中を通り、ブーム10の長手方向に延びる。隣り合う単位ブーム14の対応する主材15同士は、分離可能に連結されている。単位ブーム14を繋ぎ合わせる本数を変更したり、用いる単位ブーム14を軸方向の長さが異なるものに変更したりすることによって、ブーム10の軸方向の長さが変更可能となっている。
 ブームヘッド13は、ブーム本体12の基端部と反対側の端部に取り付けられてブーム10の先端部を形成している。ブームヘッド13は、本発明におけるブームの先端部の一例である。ブームヘッド13は、図1に示すようにブーム10が起立した状態で後方を向く背面21と、その状態で前方を向く腹面22と、その状態で上方を向く先端面23とを有する。
 ブームヘッド13の腹面22側の部分には、トップシーブ25が幅方向に延びる水平軸回りに回転可能となるように設けられている。図1に示すように、このトップシーブ25から下方へ吊ロープ26を介してフック装置27が吊り下げられる。フック装置27は、回転可能な図略のフックシーブを備えている。このフックシーブとトップシーブ25とに、上部旋回体4に搭載された図略の巻上ウインチから引き出された吊ロープ26が掛け回されている。巻上ウインチが吊ロープ26の巻き取り/繰り出しを行うことにより、フック装置27及びそれに吊られた吊荷が巻き上げ/巻き下げされるようになっている。
 起伏装置11(図1参照)は、2本のガイライン30と、2つの連結装置32と、ガイライン操作装置34とを備える。
 ガイライン30と連結装置32は、後述するクレーンマスト60の先端部60bとブームヘッド13とを繋ぐものである。
 2本のガイライン30は、上部旋回体4の幅方向に分かれて配置されている。2本のガイライン30は上部旋回体4の側方から見ると互いに重なるため、各図では一方のガイライン30のみが表されている。また、2つの連結装置32は、ブームヘッド13に設けられており、幅方向に分かれて配置されている。この2つの連結装置32も上部旋回体4の側方から見ると互いに重なるため、各図では一方の連結装置32のみが表されている。
 一方の連結装置32は、対応する一方のガイライン30の一端をブームヘッド13に連結する。他方の連結装置32は、対応する他方のガイライン30の一端をブームヘッド13に連結する。各ガイライン30の他端は、後述するクレーンマスト60の先端部60bに接続されている。一方の連結装置32は、ブームヘッド13の幅方向の一端部に設けられ、他方の連結装置32は、ブームヘッド13の幅方向の他端部に設けられている。2つの連結装置32は同様に構成されているため、以下、一方の連結装置32の構造について代表して説明する。
 連結装置32は、図2に示すように、結合部36と、支持装置38とを有する。
 結合部36は、ガイライン30の一端が結合される部分である。この結合部36は、ピン55と、そのピン55に取り付けられる図略のシャックル等の接続部材とからなる。ピン55は、支持装置38の後述する第1リンク部材49と第2リンク部材50とを互いに連結する。ガイライン30の一端は、このピン55に取り付けられた前記接続部材に結合される。
 支持装置38は、ブームヘッド13に設けられて、結合部36がブームヘッド13の背面21から腹面22と反対側へ離れた位置に位置するようにその結合部36を支持するものである。支持装置38は、図2に示すように、取付部42と、ガイラインオフセットリンク44(以下、単にリンク44と称する)と、ピン52,54とを有する。
 取付部42は、リンク44が取り付けられる部分である。取付部42は、ブームヘッド13の背面21から腹面22と反対側へ突出するように背面21に固設されていて、リンク44を支持する。取付部42は、図2に示すように、第1取付部材46と、第2取付部材47とを有する。
 第1取付部材46は、ブームヘッド13の先端面23近傍において背面21に立設された2枚の板体からなる。第1取付部材46の2枚の板体は、それらの板厚方向が幅方向に一致するように配置されている。この2枚の板体は、幅方向においてそれらの間に僅かな隙間をあけて配置されている。各板体には、それらを板厚方向に貫通する取付穴が同じ位置に形成されている。
 第2取付部材47は、背面21に立設された1枚の板体からなる。第2取付部材47は、その板厚方向が幅方向に一致するように配置されており、第1取付部材46の2枚の板体の中間に対応する位置に配置されている。第2取付部材47には、当該第2取付部材47を板厚方向に貫通する取付穴が形成されている。この取付穴は、ブームヘッド13の先端面23と反対側(ブーム本体12側)に位置する基端近傍に配置されている。
 リンク44は、取付部42に取り付けられて結合部36を支持するものである。リンク44は、取付部42に着脱可能となっている。リンク44は、図2に示すように、第1リンク部材49及び第2リンク部材50を有する。
 第1リンク部材49は、本発明の保持部材の一例である。第1リンク部材49は、結合部36のピン55を保持する。第1リンク部材49は、結合部36の位置がブーム10の軸心10a及びブーム10の回動軸に対して直交するA方向において複数の異なる位置に変更されることを許容する。
 具体的に、第1リンク部材49は、細長い平板からなる。第1リンク部材49には、当該第1リンク部材49を板厚方向に貫通する複数の穴49aが設けられている。この穴49aは、本発明における保持部の一例である。複数の穴49aは、第1リンク部材49の長手方向に間隔をあけて並んでいる。各穴49aは、ピン52をそれぞれ着脱可能に保持するものである。第1リンク部材49は、その長手方向の一端部である基端部49bと、その長手方向の他端部である先端部49cとを有する。穴49aは、第1リンク部材49の基端部49bと先端部49cにも配置されている。
 第1リンク部材49の基端部49bは、第1取付部材46の2枚の板体間に挿入されている。当該第1リンク部材49の基端部49bに設けられた穴49aと第1取付部材46の2枚の板体に設けられた取付穴とにピン52が挿嵌されることにより、当該第1リンク部材49の基端部49bが第1取付部材46に取り付けられている。ピン52は、基端部49bの穴49a及び第1取付部材46の取付穴に対して挿脱可能となっている。ピン52をそれらの穴から抜き出すことで、第1取付部材46から基端部49bを分離できるようになっている。すなわち、第1リンク部材49の基端部49bは、第1取付部材46に対して着脱可能となっている。
 第2リンク部材50は、本発明の支持部材の一例である。第2リンク部材50は、第1リンク部材49及びブームヘッド13の背面21に対して交差する方向に延び、第1リンク部材49とブームヘッド13の背面21との間に設けられている。第2リンク部材50は、第1リンク部材49に保持される結合部36のピン55と結合することによりそのピン55を介して当該ピン55の位置で第1リンク部材49を支える。
 具体的に、第2リンク部材50は、細長い2枚の平板からなる。この2枚の平板は、同形に形成されている。第2リンク部材50の各平板は、その長手方向の一端部である基端部50aと、その長手方向の他端部である先端部50bとを有する。各平板の基端部50aには、その平板を板厚方向に貫通する穴51aが形成されている。各平板の先端部50bには、その平板を板厚方向に貫通する穴51bが形成されている。
 第2リンク部材50の2枚の平板の基端部50aは、第2取付部材47に連結されている。具体的に、これらの基端部50aは、穴51aが第2取付部材47の取付穴と重なるように第2取付部材47をその板厚方向の両側から挟み込み、その状態で、ピン54が、各基端部50aの穴51aと第2取付部材47の取付穴に挿嵌されている。これにより、第2リンク部材50の基端部50aが第2取付部材47に取り付けられている。ピン54は、基端部50aの穴51a及び第2取付部材47の取付穴に対して挿脱可能となっている。ピン54をそれらの穴から抜き出すことで、第2取付部材47から基端部50aを分離できるようになっている。すなわち、第2リンク部材50の基端部50aは、第2取付部材47に対して着脱可能となっている。
 また、第2リンク部材50の2枚の平板の先端部50bは、第1リンク部材49に連結される。具体的に、これらの先端部50bは、穴51bが第1リンク部材49に設けられた複数の穴49aのうちのある穴49aと重なるようにその第1リンク部材49を板厚方向の両側から挟み込み、その状態で、ピン55が、穴51bと対応する穴49aに挿嵌される。これにより、第2リンク部材50の先端部50bが第1リンク部材49に取り付けられている。ピン55は、先端部50bの穴51b及び第1リンク部材49の穴49aに対して挿脱可能となっている。ピン55を穴49a,51bから抜き出すことで、第1リンク部材49と第2リンク部材50の先端部50bとを互いに分離できるようになっている。すなわち、第2リンク部材50の先端部50bは、第1リンク部材49に対して分離可能に連結されている。第2リンク部材50は、ピン55を介して、第1リンク部材49のうちピン55が挿嵌された穴49aが設けられた部位を支える。
 第1リンク部材49は、第1取付部材46に取り付けられるとともに、第2取付部材47に取り付けられた第2リンク部材50と連結された状態で、前記A方向に概ね沿う方向に延びる。すなわち、第1リンク部材49は、第2リンク部材50及びピン55によって支えられた状態で前記A方向において所定の長さを有する。複数の穴49aは第1リンク部材49の長手方向に並んでいるため、第1リンク部材49が第2リンク部材50及びピン55によって支えられた状態では、当該複数の穴49aは、前記A方向において複数の異なる位置に配置される。このため、複数の穴49aから選択したある穴49aと第2リンク部材50の穴51bにピン55を挿嵌して第2リンク部材50の先端部50bをその選択した穴49aの位置で第1リンク部材49に連結することにより、結合部36を選択した穴49aに対応した前記A方向におけるある位置に設置できる。そして、ピン55が挿嵌された穴49aと第2リンク部材50の穴51bからピン55を抜き出し、別の穴49aに第2リンク部材50の穴51bを合わせてそれらの穴49a,51bにピン55を挿嵌し、第1リンク部材49に対する第2リンク部材50の先端部50bの連結位置を変更することにより、結合部36の位置を前記A方向において変更可能となっている。
 例えば図2に示されているように、第1リンク部材49の先端部49cに設けられた穴49aと第2リンク部材50の先端部50bの穴51bにピン55を挿嵌して、第1リンク部材49の先端部49cに第2リンク部材50の先端部50bを連結した場合には、結合部36は、前記A方向における当該結合部36の位置の変更範囲においてブームヘッド13の背面21から最も離れた位置に配置される。
 そして、例えば図3に示されているように、第1リンク部材49の先端部49cよりも基端部49b寄りの部位に設けられた穴49aと第2リンク部材50の先端部50bの穴51bにピン55を挿嵌して、そのピン55を挿嵌した穴49aが設けられた第1リンク部材49の部位に第2リンク部材50の先端部50bを連結した場合には、結合部36は、前記A方向において図2の場合の位置よりもブームヘッド13の背面21に近い位置に配置される。
 以上のように、第1リンク部材49に設けられた複数の穴49aの中でより基端部49b側に位置する穴49aにピン55を挿嵌して第2リンク部材50の先端部50bを連結すれば、結合部36をブームヘッド13の背面21により近い位置に配置できる。逆に、第1リンク部材49に設けられた複数の穴49aの中でより先端部49c側に位置する穴49aにピン55を挿嵌して第2リンク部材50の先端部50bを連結すれば、結合部36をブームヘッド13の背面21から腹面22と反対側へより離れた位置に配置できる。
 ガイライン操作装置34(図1参照)は、ガイライン30を後方へ引っ張ることによりブーム10を起立させる一方、ガイライン30を前方へ送り出すことによりブーム10を倒伏させる装置である。ガイライン操作装置34は、クレーンマスト60と、マスト回動装置61とを備える。
 クレーンマスト60は、図1に示すように、ブーム10の基端部が取り付けられた位置の後方において上部旋回体4に取り付けられた基端部60aを有する。基端部60aは、幅方向に延びる水平軸回りに回動可能となるように上部旋回体4に取り付けられている。これにより、クレーンマスト60は、その基端部60aを中心として水平軸回りに回動可能となっている。クレーンマスト60の基端部60aと反対側の端部である先端部60bには、結合部36に接続されたガイライン30の一端と反対側の端部である他端が接続されている。ブーム10が起立した状態(図1参照)では、クレーンマスト60の先端部60bは、ブームヘッド13よりもかなり低い位置に配置される。一方、ブーム10が上部旋回体4から前方へ略水平に延びるように倒伏した状態(図示せず)では、ブームヘッド13の方が、クレーンマスト60の先端部60bよりも低い位置に配置される。
 マスト回動装置61は、クレーンマスト60を回動させることによりガイライン30の後方への引っ張りと前方への送り出しとを行う装置である。このマスト回動装置61は、図1に示すように、上部スプレッダ62と、下部スプレッダ64と、起伏ウインチ66と、起伏ロープ68とを有する。
 上部スプレッダ62は、クレーンマスト60の先端部60bに取り付けられている。上部スプレッダ62は、幅方向に延びる水平軸回りに回転自在の上部シーブ62aを有する。
 下部スプレッダ64は、上部旋回体4の後端部に設けられている。下部スプレッダ64は、幅方向に延びる水平軸回りに回転自在の下部シーブ64aを有する。
 起伏ウインチ66は、上部旋回体4に搭載されている。起伏ウインチ66から引き出された起伏ロープ68が、上部シーブ62aと下部シーブ64aとに掛け回されている。起伏ウインチ66は、起伏ロープ68の巻き取り/繰り出しを行う。
 起伏ウインチ66が起伏ロープ68を巻き取ることにより、上部スプレッダ62が下部スプレッダ64側へ引き寄せられ、それに伴ってクレーンマスト60が後方へ回動し、その結果、ガイライン30がクレーンマスト60によって後方へ引っ張られる。これにより、ガイライン30及び連結装置32を介してブームヘッド13が後方へ引っ張られ、ブーム10が起立するようになっている。
 一方、起伏ウインチ66が起伏ロープ68を繰り出すことにより、上部スプレッダ62と下部スプレッダ64との間の間隔が拡大するとともに、クレーンマスト60がブーム10の荷重及び吊荷重をガイライン30を介して支えながら前方へ回動し、その結果、ガイライン30が前方へ送り出される。これにより、ブーム10が前方へ倒伏するようになっている。
 第1実施形態では、上述したように、ガイライン30の一端と結合する結合部36(図2参照)が、ブームヘッド13の背面21から腹面22と反対側へ離れた位置に位置するように支持装置38によって支持される。このため、起立状態のブーム10にガイライン30の張力と吊荷重との合力として作用する圧縮力の作用位置をブーム10の軸心10aに近づけることができる。これにより、ブーム10に作用する圧縮力に起因した曲げモーメントが小さくなる。
 具体的に、図5に示すように、当該第1実施形態においてブーム10に作用する圧縮力P1は、結合部36に結合したガイライン30の延長線とトップシーブ25の回転軸の中心から鉛直方向で上方へ延びる直線との交点N1において、ガイライン30の張力T1と吊荷重Wとを合成した合力として求められる。
 一方、図4に示すように支持装置38が設けられておらず、第2取付部材47に結合部36が設けられていてその結合部36がブームヘッド13の背面21に近接した位置に配置されているクレーンを比較例とする。この比較例においてブーム10に作用する圧縮力P2(図5参照)は、ガイライン30aの延長線とトップシーブ25の回転軸の中心から鉛直方向で上方へ延びる直線との交点N2において、ガイライン30aの張力T2と吊荷重Wとを合成した合力として求められる。
 図5に示すように、ブーム10の軸心10aに垂直な面内での第1実施形態によるブーム10の圧縮力P1の作用位置と軸心10aとの間の距離L1は、同面内での比較例によるブーム10の圧縮力P2の作用位置と軸心10aとの間の距離L2よりも小さくなる。すなわち、第1実施形態によるブーム10の圧縮力P1の作用位置は、比較例によるブーム10の圧縮力P2の作用位置に比べてブーム10の軸心10aに近づく。このため、当該第1実施形態において圧縮力P1がブーム10に作用することによりブーム10に生じる曲げモーメントは、比較例において圧縮力P2がブーム10に作用することにより生じる曲げモーメントよりも小さくなる。このため、第1実施形態では、曲げモーメントによるブーム10の撓みを軽減でき、より大きな吊荷重を吊ることが可能となる。その結果、吊能力を向上できる。
 この第1実施形態のクレーンでは、単位ブーム14の継ぎ数を変更したり、使用する単位ブーム14を長さの異なるものに変えたりすることによって、ブーム10の長さを吊作業の内容や作業現場の状況等に応じた適切な長さに変更する。この場合に、第1リンク部材49により、結合部36の位置を前記A方向において複数の異なる位置に変更することが許容されるため、吊能力の向上とブーム10の引き起こしに要する引張力の低減とを両立できる。
 具体的に、ブーム10の長さを小さくした場合には、結合部36のピン55を第1リンク部材49の先端部49c寄りの穴49aに挿嵌することにより、結合部36を起立状態のブーム10の軸心10aからより後方へ離れた位置に配置する。例えば、結合部36を図5に示した位置に配置する。この場合には、ブーム10の長さを小さくしたことに起因して起立状態のブーム10の軸心10aから前方へ離れた位置となった圧縮力の作用位置をブーム10の軸心10aに近づけることができる。このため、図5に基づいて説明した上記理由と同様の理由により、曲げモーメントによるブーム10の撓みを低減して吊能力を向上できる。
 一方、ブーム10の長さを大きくした場合には、結合部36のピン55を第1リンク部材49の先端部49cよりも基端部49b寄りに位置する穴49aに挿嵌して、結合部36をブーム10の軸心10aにより近い位置に配置する。例えば、結合部36を図3に示した位置に配置する。この場合には、ブーム10の長さを大きくしたことに起因して小さくなった倒伏状態のブーム10の軸心10aに対するガイライン30の角度を拡大することができる。具体的には、図6に示す角度θを拡大できる。これにより、倒伏状態のブーム10を引き起こす際、ガイライン30の引張力の鉛直方向の成分を大きくすることができる。その結果、ブーム10の引き起こしに要するガイライン30の引張力を低減できる。
 また、第1実施形態では、第1リンク部材49と交差する方向に延びる第2リンク部材50が、第1リンク部材49のうち結合部36のピン55が挿嵌された穴49aが設けられた部位をそのピン55を介して支える。このため、第2リンク部材50により、結合部36から第1リンク部材49のピン55が挿嵌された穴49aが設けられた部位に掛かるガイライン30の大きな張力に対抗することができる。その結果、第1リンク部材49の変形や破損を防ぐことができる。
 (第2実施形態)
 図7及び図8に、本発明の第2実施形態によるクレーンの構成が示されている。この第2実施形態によるクレーンでは、ブームヘッド13に対する結合部36の相対位置を、前記A方向に加えてブーム10の軸方向に沿うB方向においても複数の異なる位置に変更可能となっている。なお、B方向は、本発明における第2方向の一例である。
 また、この第2実施形態によるクレーンは、その仕様を通常仕様とヘビーリフト仕様とに変更可能となっている。通常仕様とヘビーリフト仕様は、吊荷重の大きさに応じて使い分けられる。すなわち、吊荷重の大きさが予め設定された設定値以下である場合には、クレーンの仕様として通常仕様が採用され、吊荷重の大きさがその設定値よりも大きい場合には、クレーンの仕様としてヘビーリフト仕様が採用される。そして、この第2実施形態では、クレーンをヘビーリフト仕様にする場合に、結合部36を前記B方向においてブーム10のより先端側へ配置するようになっている。以下、この第2実施形態によるクレーンの具体的な構成について説明する。
 通常仕様は、図1に示されたクレーンの仕様に相当する。すなわち、通常仕様のクレーンの構成は、上記第1実施形態のクレーンの構成に相当するため、ここではその説明を省略する。
 ヘビーリフト仕様は、図7に示されたクレーンの仕様に相当する。このヘビーリフト仕様では、ガイライン操作装置34が、クレーンマスト60とマスト回動装置61に加えて、クレーンマスト60とは別のHLマスト76を備える。なお、この第2実施形態におけるクレーンマスト60は、本発明による第1マストの一例である。また、HLマスト76は、本発明による第2マストの一例である。
 HLマスト76は、ラチス構造を有し、ある方向に延びるマストである。HLマスト76は、当該HLマスト76の軸方向の一端部である基端部76aと、当該基端部76aと反対側の端部である先端部76bとを有する。
 基端部76aは、上部旋回体4に分離可能に取り付けられる。この基端部76aは、クレーンマスト60の基端部60aと共通の軸回りに回動可能となるように上部旋回体4に取り付けられている。これにより、HLマスト76は、その基端部76aを中心としてブーム10とクレーンマスト60との間で回動するようになっている。
 また、この第2実施形態では、ガイライン操作装置34は、クレーンマスト60の先端部60bとHLマスト76の先端部76bとを繋ぐ連結ロープ78を備える。この連結ロープ78は、本発明による連結部材の一例である。また、2本のガイライン30の連結装置32と反対側の端部がHLマスト76の先端部76bに接続されている。これにより、HLマスト76の先端部76bとブームヘッド13とが、ガイライン30及び連結装置32を介して接続されている。HLマスト76の先端部76bは、クレーンマスト60の先端部60bよりも高い位置に配置される。
 この第2実施形態では、マスト回動装置61は、クレーンマスト60を回動させることにより連結ロープ78を介してHLマスト76を回動させ、それによってガイライン30の後方への引っ張りと前方への送り出しとを行う。
 また、この第2実施形態では、支持装置38の取付部42が、第1リンク部材49を支持するとともに、その第1リンク部材49の位置を前記B方向において複数の異なる位置に変更することを許容する。
 具体的に、取付部42は、上記第1実施形態の第1取付部材46及び第2取付部材47と同様に構成された第1取付部材46及び第2取付部材47と、さらに別の第3取付部材48及び第4取付部材56とを有する。この第2実施形態における第1取付部材46及び第3取付部材48は、本発明における取付部材の一例である。
 第3取付部材48は、ブームヘッド13の先端面23のうち腹面22寄りの位置においてその先端面23から立設された2枚の板体からなる。従って、第3取付部材48は、前記B方向において第1取付部材46と異なる位置でブームヘッド13に設けられており、第1取付部材46よりもブーム10のより先端側に配置されている。第3取付部材48の2枚の板体は、それらの板厚方向が幅方向に一致するように配置されている。この2枚の板体は、幅方向においてそれらの間に僅かな隙間をあけて配置されており、幅方向において第1取付部材46の2枚の板体と一致した位置に配置されている。第3取付部材48の各板体には、それらを板厚方向に貫通する取付穴が同じ位置に形成されている。
 第4取付部材56は、ブームヘッド13の先端面23のうち背面21近傍の位置においてその先端面23から立設された1枚の板体からなる。第4取付部材56は、その板厚方向が幅方向に一致するように配置されている。第4取付部材56は、幅方向において第3取付部材48の2枚の板体の中間に対応する位置に配置されている。第4取付部材56には、当該第4取付部材56を板厚方向に貫通する取付穴が形成されている。
 第1及び第2取付部材46,47にリンク44が取り付けられた第1取付状態S1(図8参照)から第3及び第4取付部材48,56にリンク44が取り付けられた第2取付状態S2(図8参照)へ取付部42に対するリンク44の取付状態を変更することで、第1リンク部材49の位置を前記B方向において複数の異なる位置に変更することが許容される。
 第1取付状態S1は、図2に示された上記第1実施形態のリンク44の取付状態と同様である。この第1取付状態S1では、第1リンク部材49が第1取付部材46に取り付けられるとともに、第2リンク部材50が第2取付部材47に取り付けられる。第1取付状態S1では、リンク44によって支持される結合部36(ピン55)の位置は、ブームヘッド13の先端面23よりもブーム本体12側(ブーム10の基端部側)の位置になる。この第1取付状態S1は、クレーンの通常仕様において採用される。
 一方、第2取付状態S2では、図8に示されているように、第1リンク部材49の基端部49bが第3取付部材48に取り付けられるとともに、第2リンク部材50の基端部50aが第4取付部材56に取り付けられる。
 この第2取付状態S2では、第1リンク部材49の基端部49bが第3取付部材48の2枚の板体間に挿入されるとともに、その基端部49bに設けられた穴49aと第3取付部材48の各板体の取付穴とにピン52が挿嵌されることにより、第1リンク部材49の基端部49bが第3取付部材48に取り付けられる。ピン52は、基端部49bの穴49a及び第3取付部材48の取付穴に対して挿脱可能となっている。ピン52をそれらの穴から抜き出すことで、第3取付部材48から基端部49bを分離できるようになっている。すなわち、第1リンク部材49の基端部49bは、第3取付部材48に対して着脱可能となっている。
 また、第2取付状態S2では、第2リンク部材50の2枚の平板の基端部50aは、穴51aが第4取付部材56の取付穴と重なるように第4取付部材56をその板厚方向の両側から挟み込み、その状態で、ピン54が、各基端部50aの穴51aと第4取付部材56の取付穴に挿嵌される。これにより、第2リンク部材50の基端部50aが第4取付部材56に取り付けられる。ピン54は、基端部50aの穴51a及び第4取付部材56の取付穴に対して挿脱可能となっている。ピン54をそれらの穴から抜き出すことで、第4取付部材56から基端部50aを分離できるようになっている。すなわち、第2リンク部材50の基端部50aは、第4取付部材56に対して着脱可能となっている。
 第2取付状態S2では、前記B方向においてリンク44がブームヘッド13の先端面23からブーム本体12と反対側へ突出する。これにより、リンク44によって支持される結合部36は、ブームヘッド13の先端面23からブーム本体12と反対側(ブーム10の基端部と反対側)へ離間した位置に設置される。この第2取付状態S2は、クレーンのヘビーリフト仕様において採用される。
 この第2実施形態によるクレーンの上記以外の構成は、上記第1実施形態によるクレーンの構成と同様である。
 この第2実施形態では、クレーンをヘビーリフト仕様にして大きな吊荷重の吊作業を実施できるようにしつつ、ヘビーリフト仕様で生じるブーム10の撓みを軽減できる。
 具体的に、クレーンの通常仕様(図1参照)では、クレーンマスト60の先端部60bが起立状態のブーム10のブームヘッド13よりもかなり低い位置に配置されることから、ガイライン30とブーム10の軸心10aとの間の角度が小さくなり、その結果、ブーム10の軸心10aに直交する方向のガイライン30の引張力の成分が小さくなる。このため、通常仕様では、大きな吊荷重の吊作業が困難になる。これに対し、HLマスト76を上部旋回体4に取り付けてクレーンをヘビーリフト仕様にすることにより、クレーンマスト60の先端部60bよりも高い位置で、且つ、起立状態のブーム10のブームヘッド13に近い高さ位置に配置されたHLマスト76の先端部76bにガイライン30が接続される。このため、ブーム10の軸心10aに対するガイライン30の角度が通常仕様の場合の角度に比べて拡大し、ブーム10の軸心10aに直交する方向のガイライン30の引張力の成分を大きくすることができる。その結果、ヘビーリフト仕様では、通常仕様で吊ることが可能な吊荷重よりも大きな吊荷重の吊作業が可能となる。
 そして、クレーンをヘビーリフト仕様にしたときには、リンク44を通常仕様での第1取付状態S1の位置から第2取付状態S2の位置へ移して結合部36をブーム10のより先端側の位置に配置する。これにより、ガイライン30とブーム10の軸心10aとの間の角度を少し小さい角度に調整できる。
 具体的には、図7及び図8に示されているように、リンク44を第2取付状態S2にして結合部36とHLマスト76の先端部76bとをガイライン30で繋いだ場合には、第1取付状態S1のままで結合部36とHLマスト76の先端部76bとをガイライン30で繋いだ場合に比べて、ガイライン30とブーム10の軸心10aとの間の角度が少し小さくなる。この場合には、リンク44が第1取付状態S1の位置にある場合に比べて、ガイライン30によるブームヘッド13の引張方向を少し下向きにすることができ、ブーム10に掛かる引張力のA方向の成分を少し弱めることができる。その結果、ヘビーリフト仕様においてブーム10に生じる撓みを軽減できる。
 また、HLマスト76を上部旋回体4から取り外してクレーンをヘビーリフト仕様から通常仕様に戻した場合には、リンク44をブームヘッド13の背面21から突出する第1取付状態S1の位置に戻すことが可能であり、上記第1実施形態と同様の効果を得ることができる。
 なお、今回開示された実施形態は、すべての点で例示であって制限的なものではないと考えられるべきである。本発明の範囲は、上記した実施形態の説明ではなく請求の範囲によって示され、また、請求の範囲と均等の意味及び範囲内でのすべての変更を含む。
 例えば、本発明の結合部は、必ずしも、上記実施形態で示した構成のものに限定されない。例えば、結合部は、ピン55と第2リンク部材50と第2リンク部材50に設けられた接続部とを含むものであってもよい。この場合、接続部は、ガイライン30が接続される部分であって、例えば、第2リンク部材50の基端部50aと先端部50bとの間の中間部に設けられる。そして、この場合には、第2リンク部材50の先端部50bをピン55を介して連結する第1リンク部材49の穴49aを別の穴49aにすることにより、第2リンク部材50をピン54を軸として回動させ、それによってブームヘッド13に対する結合部(接続部)の相対位置を前記A方向において複数の異なる位置に変更することが可能である。
 また、結合部を保持するとともに、その結合部の位置が前記A方向において複数の異なる位置に変更されることを許容する本発明の保持部材は、上述した第1リンク部材49に必ずしも限定されるものではなく、第1リンク部材49以外の構成のものも本発明の保持部材として採用可能である。
 また、保持部材が取り付けられるとともに、当該保持部材の位置を前記B方向において複数の異なる位置に変更することを許容する本発明の取付部は、上述した取付部42に必ずしも限定されるものではなく、その取付部42以外の構成のものも本発明の取付部として採用可能である。
 また、第2取付状態S2での第1リンク部材49と第2リンク部材50のブームヘッド13に対する取付形態は、図9に示す変形例のような取付形態であってもよい。
 具体的に、この変形例では、取付部42は、第1取付部材46と、第2取付部材47と、第3取付部材60とを有する。第1取付部材46及び第2取付部材47の構成は、上記実施形態の場合と同様である。
 第3取付部材60は、上記第2実施形態の第3取付部材48と同様の位置でブームヘッド13の先端面23に設けられている。ただし、この第3取付部材60は、先端面23から立設された1枚の板体からなる。第3取付部材60は、その板厚方向が幅方向に一致するように配置されている。また、第3取付部材60は、幅方向において第2取付部材47の位置と一致した位置に配置されている。すなわち、第3取付部材60は、幅方向において第1取付部材46の2枚の板体の中間に対応する位置に配置されている。第3取付部材60には、当該第3取付部材60を板厚方向に貫通する取付穴が形成されている。
 そして、この変形例の第2取付状態S2では、第1リンク部材49の基端部49bは、第1取付状態S1と同様、第1取付部材46に取り付けられる。ただし、この第2取付状態S2では、第1リンク部材49はブームヘッド13の先端面23から突出するように配置される。
 また、この変形例の第2取付状態S2では、第2リンク部材50の基端部50aが、第3取付部材60に取り付けられる。この第3取付部材60に対する基端部50aの取付方法は、第2取付部材47に対する基端部50aの取付方法と同様である。従って、第2リンク部材50の基端部50aは、第3取付部材60に対して着脱可能となっている。
 この変形例では、第1取付状態S1から第2取付状態S2へ変更するときには、第2リンク部材50の基端部50aを第2取付部材47に連結しているピン54を取り外して第2取付部材47から基端部50aを分離し、第1リンク部材49を第1取付状態S1での位置からピン52を軸として図9中の矢印D方向に回動させるとともに、第2リンク部材50を第1リンク部材49に対してピン55を軸として折り返すように回動させることにより、第1リンク部材49と第2リンク部材50を図9に示す第2取付状態S2の位置に配置する。そして、第2リンク部材50の基端部50aをピン54によって第3取付部材60に連結する。また、この変形例において、第2取付状態S2から第1取付状態S1へ変更するときには、第1取付状態S1から第2取付状態S2へ変更するときと逆の手順でその変更作業を行う。
 [実施の形態の概要]
 前記実施形態をまとめると、以下の通りである。
 前記実施形態によるクレーンは、機体と、回動自在となるように前記機体に取り付けられ、長さを変更可能な構造を有するブームと、前記ブームを回動させて前記機体に対して起伏させる起伏装置とを備え、前記起伏装置は、ガイラインと、前記ブームの先端部に設けられて前記ガイラインの一端を前記ブームの先端部に連結する連結装置と、前記ガイラインを後方へ引っ張ることにより前記ブームを起立させる一方、前記ガイラインを前方へ送り出すことにより前記ブームを倒伏させるガイライン操作装置とを含み、前記ブームの先端部は、前記ブームが起立した状態で後方を向く背面と、そのブームが起立した状態で前方を向く腹面とを有し、前記連結装置は、前記ガイラインの一端と結合する結合部と、前記先端部に設けられた支持装置であって前記結合部が前記先端部の前記背面から前記腹面と反対側へ離れた位置に位置するように当該結合部を支持するものとを備え、前記支持装置は、前記結合部を保持する保持部材を有し、当該保持部材は、前記結合部の位置が前記ブームの軸心及び前記ブームの回動軸に対して直交する第1方向において複数の異なる位置に変更されることを許容する。
 このクレーンでは、結合部を保持する保持部材が、結合部の位置がブームの軸心及びブームの回動軸に対して直交する第1方向において複数の異なる位置に変更されることを許容するため、吊能力の向上とブームの引き起こしに要する引張力の低減とを両立することができる。
 具体的に、ブームの長さを小さくした場合には、結合部を起立状態のブームの軸心からより後方へ離れた位置に配置してガイラインの延びる方向と吊荷重の作用方向との間の角度を小さくすることにより、ブームの長さを小さくしたことに起因して起立状態のブームの軸心から前方へ離れた位置となった圧縮力の作用位置をブームの軸心に近づけることができる。その結果、ブームに生じる曲げモーメントを低減してブームの撓みを低減することができ、吊能力を向上することができる。一方、ブームの長さを大きくした場合には、結合部をブームの軸心により近い位置に配置することにより、ブームの長さを大きくしたことに起因して小さくなったブームの軸心に対するガイラインの角度を拡大することができる。これにより、倒伏状態のブームを引き起こすときのガイラインの引張力の鉛直方向の成分を大きくすることができ、その結果、ブームの引き起こしに要するガイラインの引張力を低減することができる。
 上記クレーンにおいて、前記保持部材は、前記第1方向においてそれぞれ異なる位置に設けられた複数の保持部を有し、当該各保持部は、前記結合部をそれぞれ着脱可能に保持することが好ましい。
 この構成では、ある保持部に保持されていた結合部をその保持部から取り外して別の保持部に保持させることにより、前記第1方向において結合部の位置を変更することができる。従って、結合部を保持するとともに、その結合部の位置が前記第1方向において複数の異なる位置に変更されることを許容する保持部材を具体的に構成できる。
 上記クレーンにおいて、前記支持装置は、前記保持部材と前記先端部の前記背面との間に設けられた支持部材を有し、当該支持部材は、前記保持部材に保持される前記結合部と結合することによりその結合部を介して当該結合部の位置で前記保持部材を支えることが好ましい。
 この構成では、保持部材のうち結合部を保持する部位を支持部材によって支えることができる。このため、支持部材により、保持部材のうち結合部を保持する部位に当該結合部を介して掛かるガイラインの大きな張力に対抗することができ、保持部材の変形や破損を防ぐことができる。
 上記クレーンにおいて、前記ガイライン操作装置は、前記ブームの後方の位置で回動自在となるように前記機体に取り付けられた第1マストと、前記ブームと前記第1マストとの間で回動自在となるように前記機体に取り付けられていて、前記ガイラインの前記一端と反対側の端部が接続された先端部を有する第2マストと、前記第1マストの先端部と前記第2マストの先端部とを繋ぐ連結部材と、前記第1マストを回動させることにより前記連結部材を介して前記第2マストを回動させ、前記ガイラインの後方への引っ張りと前方への送り出しとを行うマスト回動装置とを有し、前記第2マストの先端部は、前記第1マストの先端部よりも高い位置に配置され、前記支持装置は、前記ブームの先端部に設けられていて前記保持部材が取り付けられる取付部を有し、当該取付部は、前記保持部材の位置を前記ブームの軸心に沿う第2方向において複数の異なる位置に変更することを許容することが好ましい。
 この構成によれば、クレーンを大きな吊荷重の吊作業が実施可能なヘビーリフト仕様にすることができるとともに、そのヘビーリフト仕様で生じるブームの撓みを軽減できる。具体的に、クレーンの通常仕様では、第1マストの先端部にガイラインを接続してその第1マストを回動させることにより、ブームを起伏させるためのガイラインの後方への引っ張りと前方への送り出しを行う。この場合には、第1マストの先端部とブームの先端部とを繋ぐガイラインとブームの軸心との間の角度が小さくなり、その結果、ブームの軸心に直交する方向のガイラインの引張力の成分を大きくできない。このため、通常仕様では、大きな吊荷重の吊作業が困難になる。これに対し、本構成では、第1マストの先端部よりも高い位置に配置された第2マストの先端部にガイラインが接続されるため、第1マストの先端部にガイラインを接続する通常仕様に比べて、ガイラインとブームの軸心との間の角度を拡大できる。このため、ブームの軸心に直交する方向のガイラインの引張力の成分を大きくすることができる。その結果、クレーンを大きな吊荷重の吊作業が可能となるヘビーリフト仕様にすることができる。また、本構成では、ブームの先端部に設けられて保持部材が取り付けられる取付部が保持部材の位置をブームの軸心に沿う第2方向において複数の異なる位置に変更することを許容するため、結合部をブームのより先端側に配置してガイラインとブームの軸心との間の角度を少し小さい角度に調整し、それによって、ブームの軸心に直交する方向の引張力の成分を少し弱めることができる。このため、クレーンをヘビーリフト仕様にしたときに生じるブームの撓みを軽減できる。
 この場合において、前記取付部は、前記第2方向において異なる複数の位置で前記ブームの先端部に設けられていて前記保持部材とそれぞれ着脱可能である複数の取付部材を有することが好ましい。
 この構成では、ある取付部材に取り付けられていた保持部材をその取付部材から取り外して別の取付部材に取り付けることにより、前記第2方向において保持部材の位置を変更することができる。従って、保持部材が取り付けられ、その保持部材の位置を前記第2方向において複数の異なる位置に変更することを許容する取付部を具体的に構成できる。
 以上説明したように、前記実施形態によれば、吊能力の向上と倒伏状態のブームの引き起こしに要する引張力の低減とを実現可能なクレーンを提供できる。

Claims (5)

  1.  機体と、
     回動自在となるように前記機体に取り付けられ、長さを変更可能な構造を有するブームと、
     前記ブームを回動させて前記機体に対して起伏させる起伏装置とを備え、
     前記起伏装置は、ガイラインと、前記ブームの先端部に設けられて前記ガイラインの一端を前記ブームの先端部に連結する連結装置と、前記ガイラインを後方へ引っ張ることにより前記ブームを起立させる一方、前記ガイラインを前方へ送り出すことにより前記ブームを倒伏させるガイライン操作装置とを含み、
     前記ブームの先端部は、前記ブームが起立した状態で後方を向く背面と、そのブームが起立した状態で前方を向く腹面とを有し、
     前記連結装置は、前記ガイラインの一端と結合する結合部と、前記先端部に設けられた支持装置であって前記結合部が前記先端部の前記背面から前記腹面と反対側へ離れた位置に位置するように当該結合部を支持するものとを備え、
     前記支持装置は、前記結合部を保持する保持部材を有し、当該保持部材は、前記結合部の位置が前記ブームの軸心及び前記ブームの回動軸に対して直交する第1方向において複数の異なる位置に変更されることを許容する、クレーン。
  2.  請求項1に記載のクレーンにおいて、
     前記保持部材は、前記第1方向においてそれぞれ異なる位置に設けられた複数の保持部を有し、当該各保持部は、前記結合部をそれぞれ着脱可能に保持する、クレーン。
  3.  請求項1又は2に記載のクレーンにおいて、
     前記支持装置は、前記保持部材と前記先端部の前記背面との間に設けられた支持部材を有し、当該支持部材は、前記保持部材に保持される前記結合部と結合することによりその結合部を介して当該結合部の位置で前記保持部材を支える、クレーン。
  4.  請求項1又は2に記載のクレーンにおいて、
     前記ガイライン操作装置は、前記ブームの後方の位置で回動自在となるように前記機体に取り付けられた第1マストと、前記ブームと前記第1マストとの間で回動自在となるように前記機体に取り付けられていて、前記ガイラインの前記一端と反対側の端部が接続された先端部を有する第2マストと、前記第1マストの先端部と前記第2マストの先端部とを繋ぐ連結部材と、前記第1マストを回動させることにより前記連結部材を介して前記第2マストを回動させ、前記ガイラインの後方への引っ張りと前方への送り出しとを行うマスト回動装置とを有し、
     前記第2マストの先端部は、前記第1マストの先端部よりも高い位置に配置され、
     前記支持装置は、前記ブームの先端部に設けられていて前記保持部材が取り付けられる取付部を有し、当該取付部は、前記保持部材の位置を前記ブームの軸心に沿う第2方向において複数の異なる位置に変更することを許容する、クレーン。
  5.  請求項4に記載のクレーンにおいて、
     前記取付部は、前記第2方向において異なる複数の位置で前記ブームの先端部に設けられていて前記保持部材とそれぞれ着脱可能である複数の取付部材を有する、クレーン。
PCT/JP2015/070911 2014-07-29 2015-07-23 クレーン WO2016017512A1 (ja)

Priority Applications (4)

Application Number Priority Date Filing Date Title
EP15827964.6A EP3176124B1 (en) 2014-07-29 2015-07-23 Crane
CN201580040795.1A CN106715316B (zh) 2014-07-29 2015-07-23 起重机
EP18198793.4A EP3453670B1 (en) 2014-07-29 2015-07-23 Crane
US15/325,452 US10519010B2 (en) 2014-07-29 2015-07-23 Crane

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2014-153649 2014-07-29
JP2014153649A JP6318949B2 (ja) 2014-07-29 2014-07-29 クレーン

Publications (1)

Publication Number Publication Date
WO2016017512A1 true WO2016017512A1 (ja) 2016-02-04

Family

ID=55217413

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2015/070911 WO2016017512A1 (ja) 2014-07-29 2015-07-23 クレーン

Country Status (5)

Country Link
US (1) US10519010B2 (ja)
EP (2) EP3453670B1 (ja)
JP (1) JP6318949B2 (ja)
CN (1) CN106715316B (ja)
WO (1) WO2016017512A1 (ja)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102016104358B4 (de) * 2016-03-10 2019-11-07 Manitowoc Crane Group France Sas Verfahren zum Ermitteln der Tragfähigkeit eines Krans sowie Kran

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6033594U (ja) * 1983-08-12 1985-03-07 日立建機株式会社 クレ−ンブ−ムの支持装置
JPH0694348B2 (ja) * 1983-11-11 1994-11-24 マンネスマン・アクチエンゲゼルシヤフト ラチスマスト型クレーン
JPH09142785A (ja) * 1995-11-21 1997-06-03 Sumitomo Constr Mach Co Ltd クレーンのブーム起伏装置
JP2000143169A (ja) * 1998-11-13 2000-05-23 Sumitomo Constr Mach Co Ltd クレーンの巻き上げロープの過巻き防止装置

Family Cites Families (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5145075A (en) * 1990-10-15 1992-09-08 Bucyrus-Erie Boom point construction
JP2778880B2 (ja) 1992-09-11 1998-07-23 株式会社東芝 冷蔵庫
JPH1143288A (ja) 1997-07-24 1999-02-16 Sumitomo Constr Mach Co Ltd クレーンのブームトップセクション
US6669038B1 (en) * 2000-08-14 2003-12-30 David Zingerman Self-propelled crane
JP4281504B2 (ja) * 2003-10-17 2009-06-17 コベルコクレーン株式会社 クレーン
JP2006056695A (ja) 2004-08-23 2006-03-02 Kobelco Cranes Co Ltd クレーン
JP2006206233A (ja) * 2005-01-27 2006-08-10 Tadano Ltd 移動式クレーンの伸縮ブームの横撓み抑制装置
JP4229168B2 (ja) * 2006-10-23 2009-02-25 コベルコクレーン株式会社 建設機械のブームフットピン着脱装置
US8397924B2 (en) * 2008-09-19 2013-03-19 Manitowoc Crane Companies, Llc Drum frame system for cranes
CN102020208B (zh) 2010-11-26 2013-05-22 大连益利亚工程机械有限公司 新型履带起重机臂架系统
US8936167B2 (en) * 2010-12-17 2015-01-20 Kobelco Cranes Co., Ltd. Crane
JP5978859B2 (ja) * 2012-08-27 2016-08-24 株式会社神戸製鋼所 クレーンのラチスブーム
US9206021B2 (en) * 2012-09-26 2015-12-08 Kobelco Cranes Co., Ltd. Crane and crane assembling method
WO2017197302A1 (en) * 2016-05-12 2017-11-16 Wiethorn Jim Securement for crawler cranes and system and method for use of same

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6033594U (ja) * 1983-08-12 1985-03-07 日立建機株式会社 クレ−ンブ−ムの支持装置
JPH0694348B2 (ja) * 1983-11-11 1994-11-24 マンネスマン・アクチエンゲゼルシヤフト ラチスマスト型クレーン
JPH09142785A (ja) * 1995-11-21 1997-06-03 Sumitomo Constr Mach Co Ltd クレーンのブーム起伏装置
JP2000143169A (ja) * 1998-11-13 2000-05-23 Sumitomo Constr Mach Co Ltd クレーンの巻き上げロープの過巻き防止装置

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP3176124A4 *

Also Published As

Publication number Publication date
CN106715316A (zh) 2017-05-24
EP3176124A1 (en) 2017-06-07
EP3176124B1 (en) 2019-09-04
EP3453670B1 (en) 2020-04-08
JP2016030670A (ja) 2016-03-07
EP3453670A1 (en) 2019-03-13
CN106715316B (zh) 2018-06-19
US10519010B2 (en) 2019-12-31
US20170158470A1 (en) 2017-06-08
JP6318949B2 (ja) 2018-05-09
EP3176124A4 (en) 2018-03-28

Similar Documents

Publication Publication Date Title
CN101070135B (zh) 起重机及其起重臂俯仰装置
US10099905B2 (en) Crane
US20140083964A1 (en) Crane and crane assembling method
JP2012116607A (ja) 移動式クレーンおよび移動式クレーンの組立方法
US10640341B2 (en) Method for raising raisable and lowerable member, and crane
JP6645222B2 (ja) クレーンのジブ取付方法
JP6128163B2 (ja) 移動式クレーン及び移動式クレーンのブーム起立方法
JP2011190084A (ja) クレーンアタッチメントの組立方法
JP2004075294A (ja) タワークレーンのジブストラット自力組立方法
JP2010018355A (ja) ブーム起伏装置
JP6638434B2 (ja) クレーンのブーム取付方法
WO2016017512A1 (ja) クレーン
JP6493581B2 (ja) クレーン
CN104533303B (zh) 一种大扭矩旋挖钻机的桅杆折叠前趴式运输结构
JP6558399B2 (ja) クレーン
JP2018203487A (ja) 建設機械
CN204571852U (zh) 一种大扭矩旋挖钻机的桅杆折叠前趴式运输结构
JP6787223B2 (ja) ワイヤリング方法、およびクレーン
JP6962425B2 (ja) アダプタ
WO2024018913A1 (ja) クレーン、および、クレーンの組立方法
JP7447613B2 (ja) 作業機械
JP7187856B2 (ja) リンク機構
JP6579172B2 (ja) クレーンおよびクレーンのストラット引き起こし方法
JP2016222398A (ja) タワークレーン
JP2017137163A (ja) クレーン、およびクレーンの組立方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 15827964

Country of ref document: EP

Kind code of ref document: A1

REEP Request for entry into the european phase

Ref document number: 2015827964

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 15325452

Country of ref document: US

NENP Non-entry into the national phase

Ref country code: DE