WO2015001885A1 - 水処理方法及び水処理システム - Google Patents

水処理方法及び水処理システム Download PDF

Info

Publication number
WO2015001885A1
WO2015001885A1 PCT/JP2014/064514 JP2014064514W WO2015001885A1 WO 2015001885 A1 WO2015001885 A1 WO 2015001885A1 JP 2014064514 W JP2014064514 W JP 2014064514W WO 2015001885 A1 WO2015001885 A1 WO 2015001885A1
Authority
WO
WIPO (PCT)
Prior art keywords
water
treated
ions
unit
precipitation
Prior art date
Application number
PCT/JP2014/064514
Other languages
English (en)
French (fr)
Inventor
昌之 江田
進 沖野
隆士 吉山
櫻井 秀明
鵜飼 展行
英夫 鈴木
裕 中小路
茂 吉岡
Original Assignee
三菱重工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱重工業株式会社 filed Critical 三菱重工業株式会社
Priority to JP2015525099A priority Critical patent/JP6005283B2/ja
Priority to CN201480038059.8A priority patent/CN105377772B/zh
Priority to EP14820653.5A priority patent/EP3002260B1/en
Priority to CA2917155A priority patent/CA2917155C/en
Priority to AU2014285448A priority patent/AU2014285448B2/en
Publication of WO2015001885A1 publication Critical patent/WO2015001885A1/ja
Priority to US14/672,754 priority patent/US9914652B2/en
Priority to ZA2015/09359A priority patent/ZA201509359B/en

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/52Treatment of water, waste water, or sewage by flocculation or precipitation of suspended impurities
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F9/00Multistage treatment of water, waste water or sewage
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D19/00Degasification of liquids
    • B01D19/0005Degasification of liquids with one or more auxiliary substances
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D61/00Processes of separation using semi-permeable membranes, e.g. dialysis, osmosis or ultrafiltration; Apparatus, accessories or auxiliary operations specially adapted therefor
    • B01D61/02Reverse osmosis; Hyperfiltration ; Nanofiltration
    • B01D61/025Reverse osmosis; Hyperfiltration
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D61/00Processes of separation using semi-permeable membranes, e.g. dialysis, osmosis or ultrafiltration; Apparatus, accessories or auxiliary operations specially adapted therefor
    • B01D61/02Reverse osmosis; Hyperfiltration ; Nanofiltration
    • B01D61/04Feed pretreatment
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D65/00Accessories or auxiliary operations, in general, for separation processes or apparatus using semi-permeable membranes
    • B01D65/08Prevention of membrane fouling or of concentration polarisation
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D9/00Crystallisation
    • B01D9/0036Crystallisation on to a bed of product crystals; Seeding
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/52Treatment of water, waste water, or sewage by flocculation or precipitation of suspended impurities
    • C02F1/5281Installations for water purification using chemical agents
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D2311/00Details relating to membrane separation process operations and control
    • B01D2311/04Specific process operations in the feed stream; Feed pretreatment
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D2311/00Details relating to membrane separation process operations and control
    • B01D2311/12Addition of chemical agents
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D2311/00Details relating to membrane separation process operations and control
    • B01D2311/18Details relating to membrane separation process operations and control pH control
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D2311/00Details relating to membrane separation process operations and control
    • B01D2311/26Further operations combined with membrane separation processes
    • B01D2311/2642Aggregation, sedimentation, flocculation, precipitation or coagulation
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D2311/00Details relating to membrane separation process operations and control
    • B01D2311/26Further operations combined with membrane separation processes
    • B01D2311/2649Filtration
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D2311/00Details relating to membrane separation process operations and control
    • B01D2311/26Further operations combined with membrane separation processes
    • B01D2311/2653Degassing
    • B01D2311/2657Deaeration
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D61/00Processes of separation using semi-permeable membranes, e.g. dialysis, osmosis or ultrafiltration; Apparatus, accessories or auxiliary operations specially adapted therefor
    • B01D61/42Electrodialysis; Electro-osmosis ; Electro-ultrafiltration; Membrane capacitive deionization
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/02Treatment of water, waste water, or sewage by heating
    • C02F1/04Treatment of water, waste water, or sewage by heating by distillation or evaporation
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/20Treatment of water, waste water, or sewage by degassing, i.e. liberation of dissolved gases
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/42Treatment of water, waste water, or sewage by ion-exchange
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/44Treatment of water, waste water, or sewage by dialysis, osmosis or reverse osmosis
    • C02F1/441Treatment of water, waste water, or sewage by dialysis, osmosis or reverse osmosis by reverse osmosis
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/44Treatment of water, waste water, or sewage by dialysis, osmosis or reverse osmosis
    • C02F1/442Treatment of water, waste water, or sewage by dialysis, osmosis or reverse osmosis by nanofiltration
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/46Treatment of water, waste water, or sewage by electrochemical methods
    • C02F1/469Treatment of water, waste water, or sewage by electrochemical methods by electrochemical separation, e.g. by electro-osmosis, electrodialysis, electrophoresis
    • C02F1/4691Capacitive deionisation
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/46Treatment of water, waste water, or sewage by electrochemical methods
    • C02F1/469Treatment of water, waste water, or sewage by electrochemical methods by electrochemical separation, e.g. by electro-osmosis, electrodialysis, electrophoresis
    • C02F1/4693Treatment of water, waste water, or sewage by electrochemical methods by electrochemical separation, e.g. by electro-osmosis, electrodialysis, electrophoresis electrodialysis
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/66Treatment of water, waste water, or sewage by neutralisation; pH adjustment
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F2001/007Processes including a sedimentation step
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/52Treatment of water, waste water, or sewage by flocculation or precipitation of suspended impurities
    • C02F2001/5218Crystallization
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2101/00Nature of the contaminant
    • C02F2101/10Inorganic compounds
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2101/00Nature of the contaminant
    • C02F2101/10Inorganic compounds
    • C02F2101/101Sulfur compounds
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2103/00Nature of the water, waste water, sewage or sludge to be treated
    • C02F2103/02Non-contaminated water, e.g. for industrial water supply
    • C02F2103/023Water in cooling circuits
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2209/00Controlling or monitoring parameters in water treatment
    • C02F2209/06Controlling or monitoring parameters in water treatment pH
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F5/00Softening water; Preventing scale; Adding scale preventatives or scale removers to water, e.g. adding sequestering agents
    • C02F5/08Treatment of water with complexing chemicals or other solubilising agents for softening, scale prevention or scale removal, e.g. adding sequestering agents
    • C02F5/10Treatment of water with complexing chemicals or other solubilising agents for softening, scale prevention or scale removal, e.g. adding sequestering agents using organic substances
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/124Water desalination
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/124Water desalination
    • Y02A20/131Reverse-osmosis

Definitions

  • the present invention relates to a water treatment method and a water treatment system for regenerating treated water containing Ca ions (Ca 2+ ), sulfate ions (SO 4 2 ⁇ ), carbonate ions and silica.
  • Factory wastewater, brine, and sewage are known to be rich in ions and silica. Further, in the cooling tower, heat exchange is performed between the high-temperature exhaust gas discharged from the boiler or the like and the cooling water. Since part of the cooling water becomes steam by this heat exchange, ions and silica in the cooling water are concentrated. Therefore, the cooling water (blowdown water) discharged from the cooling tower is in a state of high ion concentration and silica concentration.
  • ⁇ Water containing a large amount of ions is released into the environment after being desalted.
  • a reverse osmosis membrane device As a device for performing the desalting treatment, a reverse osmosis membrane device, a nanofiltration membrane device, an ion exchange device, and the like are known.
  • monovalent cations such as Na + , K + and NH 4 + and anions such as Cl ⁇ and NO 3 ⁇ are ions having high solubility in water.
  • divalent metal ions such as Ca 2+
  • anions such as SO 4 2 ⁇ and CO 3 2 ⁇
  • silica are components constituting the scale. Since the salt and silica constituting the scale have low solubility in water, they are likely to precipitate as scale.
  • the brine, industrial wastewater, and cooling tower blowdown water described above are rich in Ca 2+ , SO 4 2 ⁇ , carbonate ions (CO 3 2 ⁇ , HCO 3 ⁇ ), and silica.
  • the pH is 8, Na ion is 20 mg / L, K ion is 5 mg / L, Ca ion is 50 mg / L, Mg ion is 15 mg / L, HCO 3 ion is 200 mg / L, and Cl ion is 200 mg. / L, SO 4 ion is 120 mg / L, PO 4 ion is 5 mg / L, and SiO 2 ion is 35 mg / L.
  • Ca ion, Mg ion, SO 4 ion, and HCO 3 ion concentration are high, and scale (CaSO 4 , CaCO 3, etc.) is generated by reaction of these.
  • the silica component which exists in wastewater also becomes a scale component adhering to an apparatus etc. by a concentration rate.
  • the processing capacity is reduced. For this reason, it is calculated
  • a plant using a water-cooled cooling tower for example, power generation equipment (for power sales use, industrial power generation equipment using on-site power, power generation is thermal power, geothermal, etc.), power generation equipment And plants with cooling facilities.
  • the plant include a general chemical plant, steel plant, mining plant, oil field plant, gas field plant, and mechanical plant.
  • the lime soda method is known as a method for removing Ca ions.
  • sodium carbonate is added to the water to be treated, and Ca ions in the water to be treated are precipitated and precipitated as calcium carbonate to be removed from the water.
  • Patent Document 1 discloses a wastewater treatment apparatus in which a chemical softening apparatus, an ion exchange apparatus, a reverse osmosis membrane apparatus and the like using a lime soda method are combined.
  • the lime soda method has a high processing cost because it is necessary to add sodium carbonate for the processing.
  • the lime soda method when 1 mol of Ca ions is precipitated as calcium carbonate, 2 mol of Na + is generated.
  • SO 4 2- is contained in the water to be treated, it is not removed by the lime soda method. That is, in the lime soda method, the number of moles of ions contained in the treated water increases.
  • the system of patent document 1 performs the process which further removes an ion component by the reverse osmosis membrane apparatus after the water processed by the lime soda method and the ion exchange apparatus. For this reason, in the system of Patent Document 1, since the number of moles of ions is increased, there is a problem that the osmotic pressure in the reverse osmosis membrane device is increased and the processing load is increased. Further, in the apparatus of Patent Document 1, SO 4 2 ⁇ is not removed, and SO 4 2 ⁇ remains in the treated water, and it is difficult to obtain a high water recovery rate. Moreover, in the wastewater treatment apparatus of Patent Document 1, a large amount of chemicals is required to regenerate the ion exchange apparatus, and the treatment cost is high.
  • An object of the present invention is to provide a water treatment method and a water treatment system capable of regenerating salt-containing water with a high water recovery rate.
  • a first aspect of the present invention and Ca ions, SO 4 ion, water to be treated containing carbonate ion and silica, calcium scale inhibitor is a scale inhibitor to prevent the precipitation of scale including calcium
  • the water to be treated is the Ca ions
  • a second desalting step in which the SO 4 ion, the carbonate ion and the silica are concentrated into a second concentrated water and a treated water; and a gypsum seed crystal is supplied to the second concentrated water
  • a second crystallization step in which gypsum crystallizes from the second concentrated water, and a first scale inhibitor supply process in which the calcium scale inhibitor is supplied to the water to be treated after the second crystallization step.
  • the silica is adjusted to a pH at which the silica can be dissolved in the water to be treated.
  • a first desalting step in which treated water is separated into a first concentrated water and treated water in which the Ca ions, the SO 4 ions, the carbonate ions and the silica are concentrated, and gypsum in the first concentrated water.
  • a first crystallization step in which a seed crystal is supplied and gypsum crystallizes from the first concentrated water.
  • the second aspect of the present invention is the use of a calcium scale inhibitor and silica, which is a scale inhibitor that prevents precipitation of scales containing calcium in water to be treated containing Ca ions, SO 4 ions, carbonate ions and silica.
  • a second desalting unit that separates the SO 4 ion and the silica-concentrated second concentrated water and treated water; and a downstream side of the second desalting unit, and gypsum from the second concentrated water.
  • a second crystallization part having a second crystallization tank for crystallization, and a second seed crystal supply part for supplying a seed crystal of gypsum to the second crystallization tank, and the treatment of the second crystallization part
  • the treated water A first scale inhibitor supply unit that supplies the calcium scale inhibitor; and a pH adjuster is supplied to the treated water, and the pH of the treated water is adjusted to a value that allows the silica to be dissolved in the treated water.
  • the first pH adjusting unit to be adjusted, the first scale inhibitor supplying unit, and the first pH adjusting unit are installed on the downstream side, and the water to be treated is the Ca ions, the SO 4 ions, the carbonate ions, and the silica.
  • a first desalting part that separates the first concentrated water and the treated water in which water is concentrated, and a first crystallization that is provided downstream of the first desalting part and crystallizes gypsum from the first concentrated water.
  • a water treatment system comprising: a tank; and a first crystallization part having a first seed crystal supply part that supplies gypsum seed crystals to the first crystallization tank.
  • the second desalting unit and Scale generation in the second desalting step can be prevented.
  • the gypsum seed crystal to the second concentrated water in the second crystallization part and the second crystallization step, the gypsum is crystallized and separated from the water to be treated even if a scale inhibitor is present. be able to.
  • the water to be treated containing Ca ions, SO 4 ions and silica can be treated with a high water recovery rate, and the operating cost can be reduced. Furthermore, there is an effect that high-purity gypsum can be recovered.
  • the calcium scale inhibitor is added in the first scale inhibitor supplying step, the first scale inhibitor supplying unit, the first pH adjusting step, and the first pH adjusting unit. Since the water treatment is carried out by adjusting the pH so that silica can be dissolved, scale generation in the first desalting part and the first desalting step can be prevented. Further, by adding a gypsum seed crystal to the first concentrated water in the first crystallization part and the first crystallization step, the gypsum is crystallized and separated from the water to be treated even if a scale inhibitor is present. be able to.
  • the water to be treated containing Ca ions, SO 4 ions, carbonate ions and silica can be treated with a high water recovery rate while preventing the generation of scale.
  • the amount of chemicals required for processing and the power required for operation can be reduced, and maintenance can be facilitated, so that the operating cost can be reduced.
  • the downstream side separation is performed to separate the first concentrated water discharged from the first crystallization part into concentrated water and treated water on the downstream side of the first crystallization part at the most downstream side of the water to be treated.
  • Provide salt
  • the water recovery rate can be further improved by providing the downstream desalting step and the downstream desalting section. Further, in the invention, since the number of moles of ions in the water to be treated is greatly reduced, the amount of salts flowing into the downstream desalting unit can be reduced, so that the power of the downstream desalting unit is reduced. be able to.
  • the second concentrated water includes a second pH adjusting step in which the scale preventing function of the calcium scale inhibitor is reduced in the second crystallization step and the pH is adjusted to promote precipitation of the gypsum. It is preferable. In the above aspect, it is installed on the downstream side of the second desalting unit, and a pH adjuster is supplied to the second concentrated water so that the scale prevention function of the calcium scale inhibitor is reduced and the precipitation of the gypsum is promoted. It is preferable to include a second pH adjusting unit that adjusts the pH of the second concentrated water to a value to be set.
  • the second concentrated water after the pH is adjusted in the second pH adjustment step is adjusted to a pH at which the calcium scale inhibitor functions.
  • a pH adjuster is supplied to the second concentrated water after the pH is adjusted by the second pH adjuster on the downstream side of the second crystallization part, and the calcium scale inhibitor exerts its function. It is preferable to include a third pH adjusting unit that adjusts the pH of the second concentrated water.
  • the second concentrated water can include a second pH adjustment step in which the silica is soluble in the second crystallization step.
  • the silica is dissolved in the second concentrated water in the second crystallization portion by being installed downstream of the second desalting unit, supplying a pH adjuster to the second concentrated water. It is preferable to include a second pH adjusting unit that adjusts the pH of the second concentrated water to a certain value.
  • the second scale inhibitor supply step on the most upstream side of the water to be treated at least calcium carbonate is precipitated from the water to be treated, and the calcium carbonate in the water to be treated It is preferable to include a second upstream precipitation step in which the concentration is reduced. In this case, before the second upstream precipitation step or after the second upstream precipitation step and before the second scale inhibitor supply step, the second CO 2 is removed from the treated water. It is preferable to include 2 deaeration processes.
  • At least the calcium carbonate is precipitated from the said to-be-processed water in the upstream of the said 2nd scale inhibitor supply part located in the most upstream of the to-be-processed water,
  • the said calcium carbonate in the to-be-processed water It is preferable to provide the 2nd upstream sedimentation part which reduces the density
  • CO 2 from the treated water is upstream of the second upstream sedimentation section, or downstream of the second upstream sedimentation section and upstream of the second scale inhibitor supply section. It is preferable to provide the 2nd deaeration part to remove.
  • the water to be treated contains metal ions, and after the first crystallization step, at least one of calcium carbonate and a metal compound is precipitated, and the calcium carbonate and the metal ions are extracted from the first concentrated water. It is preferable that the 1st precipitation process by which the density
  • the first precipitation step at least one of the silica seed crystal and the silica precipitation agent is supplied to the first concentrated water.
  • the second precipitation step at least one of the silica seed crystal and the silica precipitation agent is supplied to the second concentrated water.
  • the water to be treated contains metal ions, and at least one of calcium carbonate and a metal compound is precipitated on the downstream side of the first crystallization part, so that the calcium carbonate and the metal in the first concentrated water are precipitated. It is preferable to provide the 1st precipitation part which reduces the density
  • at least one of the silica seed crystal and the silica precipitant is supplied to the first precipitation portion. At least one of the silica seed crystal and the silica precipitant is supplied to the second precipitation portion.
  • a high water recovery rate can be obtained by removing calcium carbonate and a metal compound from the water to be treated by the precipitation part and the precipitation process provided after the crystallization part and the crystallization process.
  • the silica removal rate can be increased by facilitating the precipitation of silica by adding a silica seed crystal in the precipitation part and the precipitation step. As a result, the water recovery rate can be further increased and the driving power can be further reduced.
  • the water to be treated contains Mg ions
  • the said to-be-processed water contains Mg ion
  • the water to be treated contains Mg ions
  • the 1st concentrated water of a said 1st precipitation process is adjusted to pH from which a magnesium compound precipitates, the density
  • the first concentrated water is preferably adjusted to a pH at which the magnesium compound can be dissolved.
  • the second concentrated water in the second precipitation step is adjusted to a pH at which a magnesium compound is precipitated to reduce the concentration of the Mg ions, and after the second precipitation step, the second concentrated water is converted into the magnesium compound. It is preferable that the pH is adjusted to be soluble.
  • the first concentrated water in the first precipitation part is adjusted to a pH at which a magnesium compound is precipitated to reduce the concentration of the Mg ions
  • the pH of the first concentrated water is adjusted to a value at which the magnesium compound can be dissolved on the downstream side of one precipitation part.
  • the second concentrated water in the second precipitation part is adjusted to a pH at which a magnesium compound precipitates to reduce the concentration of the Mg ions, and the second precipitation part
  • the pH of the second concentrated water is adjusted to a value at which the magnesium compound can be dissolved on the downstream side.
  • Mg ion When Mg ion is contained in the water to be treated, Mg ions in the concentrated water and silica react and precipitate in the precipitation step and the precipitation part.
  • the precipitant is supplied efficiently by adjusting the supply amount of the precipitant according to the balance between Mg ions in the concentrated water and silica.
  • the magnesium compound When the Mg ion concentration is higher than that of silica, the magnesium compound is precipitated in the precipitation step and the precipitation portion by adjusting the pH of the concentrated water. Thereafter, the concentrated water is adjusted to a pH at which the magnesium compound can be dissolved, thereby suppressing scale formation in the desalting part located downstream of the precipitation part.
  • the water to be treated in the second upstream precipitation step is adjusted to a pH at which a magnesium compound is precipitated to reduce the concentration of the Mg ions, It is preferable that after the second upstream precipitation step, the water to be treated is adjusted to a pH at which the magnesium compound can be dissolved.
  • the water to be treated in the second upstream precipitation part is adjusted to a pH at which a magnesium compound precipitates to reduce the concentration of the Mg ions, and on the downstream side of the second upstream precipitation part, It is preferable to adjust the pH of the water to be treated to a value at which the magnesium compound can be dissolved.
  • the said aspect WHEREIN It is preferable that a water
  • the said aspect WHEREIN It is preferable that a water
  • the volume of waste can be reduced when the solid matter generated during the water treatment is discharged out of the system as waste.
  • Ca 2+ and SO 4 2 ⁇ can be removed from the water to be treated as gypsum while preventing the generation of scales such as calcium carbonate and silica during the treatment.
  • the water recovery rate can be increased. Even when magnesium ions are contained in the water to be treated, if the water treatment system and the water treatment method of the present invention are used, they can be removed from the water to be treated while preventing the generation of scale containing magnesium during the treatment. .
  • the present invention also has an effect that high-purity gypsum can be crystallized and recovered.
  • the water to be treated (treated water) of the present invention contains Ca 2+ , SO 4 2 ⁇ , carbonate ions and silica.
  • water to be treated is brine, sewage, factory wastewater, cooling tower blowdown water, and the like.
  • the treated water may contain metal ions such as Mg ions.
  • FIG. 1 is a schematic view of a water treatment system according to a first reference embodiment of the present invention.
  • the water treatment system 1 of FIG. 1 has a configuration in which two water treatment units are connected in the flow direction of the water to be treated.
  • the number of water treatment units may be one or three or more water treatment units may be connected depending on the properties of the water to be treated.
  • Each water treatment unit includes a first desalting unit 10 (10a, 10b) and a first crystallization unit 20 (20a, 20b) in order from the upstream side of the water to be treated.
  • the concentration side of the first desalting units 10a and 10b and the first crystallization units 20a and 20b are connected.
  • a water treatment part is equipped with the 1st scale inhibitor supply part 30 (30a, 30b) and the 1st pH adjustment part 40 (40a, 40b) in the upstream flow path of each 1st desalination part 10 (10a, 10b). .
  • the first scale inhibitor supply unit 30 (30a, 30b) includes a tank 31 (31a, 31b), a valve V1 (V1a, V1b), and a control unit 32 (32a, 32b).
  • the control units 32a and 32b are connected to valves V1a and V1b, respectively.
  • a scale inhibitor is stored in the tanks 31a and 31b.
  • the scale inhibitor used in the present reference embodiment prevents the scale containing calcium from precipitating in the water to be treated.
  • calcium scale inhibitor suppresses the formation of gypsum or calcium carbonate crystal nuclei in the water to be treated, and the gypsum or calcium carbonate crystal nuclei contained in the water to be treated (small-scale scales deposited beyond the seed crystals and saturation concentration). Etc.) and has a function of suppressing crystal growth of gypsum or calcium carbonate.
  • some calcium scale inhibitors have a function of dispersing (preventing aggregation) particles in the water to be treated such as precipitated crystals.
  • Examples of calcium scale inhibitors include phosphonic acid scale inhibitors, polycarboxylic acid scale inhibitors, and mixtures thereof.
  • a specific example is FLOCON260 (trade name, manufactured by BWA).
  • magnesium scale inhibitor When Mg ion is contained in the water to be treated, a scale inhibitor that prevents the scale containing magnesium (for example, magnesium hydroxide) from being precipitated in the water to be treated can be used. Hereinafter, it is referred to as “magnesium scale inhibitor”.
  • magnesium scale inhibitors include polycarboxylic acid scale inhibitors. A specific example is FLOCON 295N (trade name, manufactured by BWA).
  • first scale inhibitor supply unit 30a, 30b is shown at each position.
  • first scale inhibitor supply units 30a, 30b are installed. It is preferable. In this case, the scale inhibitor is stored separately for each type in each tank.
  • the first pH adjusting unit 40 (40a, 40b) includes a tank 41 (41a, 41b), a valve V2 (V2a, V2b), a control unit 42 (42a, 42b), and a pH meter 43 (43a, 43b). ing.
  • alkali is stored as a pH adjuster.
  • the alkali is, for example, calcium hydroxide or sodium hydroxide.
  • calcium hydroxide is preferable because Ca ions are collected as gypsum in the crystallization step described later, and the amount of ions reaching the downstream desalting portion is reduced.
  • the controllers 42a and 42b are connected to valves V2a and V2b and pH meters 43a and 43b, respectively.
  • the first desalting units 10a and 10b are reverse osmosis membrane devices.
  • the first desalting units 10a and 10b include an electrodialyzer (ED), a polarity-changing electrodialyzer (EDR), an electroregenerative pure water device (EDI), an ion exchange device (IEx), an electrostatic device.
  • ED electrodialyzer
  • EDR polarity-changing electrodialyzer
  • EDI electroregenerative pure water device
  • IEx ion exchange device
  • electrostatic device an electrostatic device.
  • a desalting apparatus (CDI), a nano filter (NF), an evaporator, or the like can be employed.
  • NF nano filter
  • ED electrodialyzer
  • EDR polarity switching electrodialyzer
  • EDI electric regenerative pure water device
  • CDl electrostatic desalting device
  • the scale component (2 Valent ions such as Ca 2+ and Mg 2+ are selectively removed, and monovalent ions such as Na + and Cl ⁇ are permeated. If these desalting apparatuses are used, the concentration of ions, which are scale components in the concentrated water, is suppressed from being concentrated, so that it is possible to improve the water recovery rate and save energy (for example, reduce pump power).
  • the reclaimed water does not need to be pure water, and scale components (divalent ions, Ca 2+ , Mg 2+, etc.) need only be removed.
  • scale components divalent ions, Ca 2+ , Mg 2+, etc.
  • FIG. 1 shows only one first desalting unit 10a, 10b, but a plurality of desalting apparatuses may be connected in parallel or in series in the flow direction of the water to be treated.
  • the first crystallization unit 20 (20a, 20b) includes a first crystallization tank 21 (21a, 21b) and a first seed crystal supply unit 22 (22a, 22b).
  • the first seed crystal supply units 22a and 22b are connected to the first crystallization tanks 21a and 21b, respectively.
  • the first seed crystal supply units 22a and 22b include a seed crystal tank 23 (23a and 23b), a valve V3 (V3a and V3b), and a control unit 24 (24a and 24b).
  • the control units 24a and 24b are connected to valves V3a and V3b, respectively.
  • the seed crystal tanks 23a and 23b store gypsum particles as seed crystals.
  • the 1st precipitation part 50 (50a, 50b) may be installed in the downstream of each of the 1st crystallization part 20a, 20b.
  • Each of the first precipitation units 50a and 50b includes a first precipitation tank 51 (51a and 51b) and a first filtration device 52 (52a and 52b).
  • the water treatment system 1 includes a downstream desalting unit 60 on the downstream side of the water to be treated of the first crystallization unit 20b located on the most downstream side.
  • the downstream desalting unit 60 is a reverse osmosis membrane device.
  • the downstream desalting unit 60 includes an electrodialyzer (ED), a polarity-changing electrodialyzer (EDR), an electric regeneration pure water device (EDI), an ion exchange device, an electrostatic desalting device (CDI), and a nano filter. (NF), an evaporator or the like can be employed.
  • a precipitation tank 71 and a filtration device 72 are installed as a first upstream precipitation unit 70 upstream of the first scale inhibitor supply unit 30 a and the first pH adjustment unit 40 a located at the most upstream of the water to be treated. Is done.
  • the settling tank 71 and the filtration device 72 have the same configuration as the first settling tank 51 and the first filtration device 52 of the first settling unit 50.
  • the first upstream sedimentation section can adopt a configuration in which a plurality of sedimentation tanks 71 are connected in series in the flow direction of the water to be treated.
  • a first deaeration unit 73 may be provided on the upstream side of the first upstream sedimentation unit 70.
  • the 1st deaeration part 73 is a deaeration tower provided with the filler which removes a carbon dioxide, or a separation membrane.
  • a pH adjustment unit (not shown) that adjusts the water to be treated to a pH at which carbonate ions exist in the state of CO 2 may be installed on the upstream side of the water to be treated of the first degassing unit 73.
  • the 1st deaeration part 73 may be installed in the to-be-processed water downstream of the 1st upstream sedimentation part 70, and the upstream of the 1st scale inhibitor supply part 30a and the 1st pH adjustment part 40a.
  • the deaeration part having the same configuration as the first deaeration part 73 is a flow path between the first demineralization part 10 and the first crystallization part 20, and between the first crystallization part 20 and the first precipitation part 50. You may install in the flow path and the flow path between the 1st desalination part 10b or the downstream desalination part 60 in the downstream of the 1st sedimentation part 50.
  • FIG. 1st desalination part 10b or the downstream desalination part 60 in the downstream of the 1st sedimentation part 50.
  • an ion exchange device (not shown) is provided downstream of the filtration device 72 and upstream of the first scale inhibitor supply unit 30a and the first pH adjustment unit 40a located at the most upstream. May be installed.
  • the ion exchange device is, for example, an ion exchange resin tower or an ion exchange membrane device.
  • the gypsum in the for-treatment water flowing into the first desalting unit 10a is already supersaturated, the ions are further concentrated in the first desalting unit 10a, so that the gypsum concentration is further increased.
  • a large amount of calcium scale inhibitor needs to be added, and the gypsum concentration becomes higher than the calcium scale inhibitor exhibits its effect, and scale may be generated in the first desalting unit 10a. Therefore, when the gypsum in the raw water (treated water) is supersaturated, the above-described first crystallization tanks 21a and 21b are disposed upstream of the most upstream first scale inhibitor supply unit 30a and the first pH adjustment unit 40a.
  • An upstream crystallization part (not shown) having the same configuration as that described above may be provided, and the water to be treated may be supplied to the first desalting part 10a after reducing the gypsum concentration.
  • FIG. 2 is a simulation result of the pH dependence of the amount of gypsum deposited.
  • FIG. 3 is a simulation result of the pH dependency of the precipitated amount of calcium carbonate.
  • the horizontal axis represents pH
  • the vertical axis represents the amount of precipitation (mol) of gypsum or calcium carbonate, respectively.
  • the simulation was performed using simulation software manufactured by OLI under the condition that 0.1 mol / L of each solid component was mixed in water and H 2 SO 4 as an acid and Ca (OH) 2 as an alkali were added.
  • FIG. 4 is a graph showing the pH dependency of silica dissolution (source: FIG. 4 of US Pat. No. 7,815,804).
  • the horizontal axis represents pH
  • the vertical axis represents the amount of silica dissolved (mg / L).
  • ⁇ Pretreatment> When the water to be treated is industrial waste water or the like, before the water to be treated flows into the first upstream sedimentation section 70, a process of removing oil or suspended particles in the water to be treated, biological treatment or chemical oxidation treatment The step of removing organic substances is performed by the above.
  • Second degassing step> In the water treatment system 1 of FIG. 1, the water to be treated before flowing into the first degassing unit 73 is adjusted to a low pH. Carbonic acid in the water to be treated is in the following equilibrium state depending on the pH of the water to be treated. When the pH is as low as 6.5 or less, it exists mainly in the state of HCO 3 ⁇ and CO 2 in the treated water.
  • the water to be treated containing CO 2 flows into the first deaeration unit 73.
  • CO 2 is removed from the water to be treated in the first deaeration unit 73.
  • carbonate ions if it is adjusted water to be treated pH present as CO 2, can be efficiently removed carbon dioxide.
  • the treated water in which the carbonate ion concentration has been reduced by the first degassing step is fed to the first upstream sedimentation unit 70.
  • Second upstream precipitation step> In the 1st upstream sedimentation part 70, Ca ion and carbonate ion are partially removed from to-be-processed water beforehand as calcium carbonate.
  • the metal ions are roughly removed from the water to be treated in advance as a metal compound having low solubility in water in the first upstream precipitation unit 70.
  • This metal compound is mainly a metal hydroxide, but may also contain carbonates.
  • the settling tank 71 Ca (OH) 2 and an anionic polymer (Mitsubishi Heavy Industries Mechatronics Systems Co., Ltd., trade name: Hishiflock H305) are introduced into the water to be treated, and the pH in the settling tank 71 is 4 to 12, preferably Is controlled to be 8.5 or more and 12 or less.
  • Ca (OH) 2 and an anionic polymer Mitsubishi Heavy Industries Mechatronics Systems Co., Ltd., trade name: Hishiflock H305
  • the solubility of calcium carbonate is low in this pH region.
  • calcium carbonate becomes supersaturated calcium carbonate is deposited and settles at the bottom of the settling tank 71.
  • the solubility of the metal compound depends on the pH.
  • the solubility of metal ions in water increases with acidity. In the above pH range, the solubility of many metal compounds is low.
  • the metal compound having low solubility in water aggregates in the precipitation tank 71 and precipitates at the bottom of the precipitation tank 71. The precipitated calcium carbonate and metal compound are discharged from the bottom of the precipitation tank 71.
  • Mg ions form a salt that is hardly soluble in water, it is a component that tends to precipitate as scale. Mg (OH) 2 precipitates at pH 10 or higher.
  • the pH of the water to be treated in the precipitation tank 71 is adjusted to a pH at which a magnesium compound (mainly magnesium hydroxide) is precipitated.
  • the pH of the water to be treated is adjusted to 10 or more, preferably pH 10.5 or more, more preferably pH 11 or more. By doing so, the magnesium compound is precipitated from the water to be treated and is precipitated and removed at the bottom of the precipitation tank 71.
  • the water to be treated after being discharged from the first upstream sedimentation section 70 is preferably adjusted to a pH at which the magnesium compound can be dissolved. Specifically, the pH is adjusted to less than 10. By doing so, it is possible to prevent scale generation in the downstream apparatus and process, particularly in the first desalting unit 10a and the first desalting process.
  • Mg ions in the for-treatment water can be surely removed, and the Mg ion concentration in the for-treatment water fed downstream can be reduced.
  • the supernatant liquid in the settling tank 71 which is the water to be treated is discharged from the settling tank 71.
  • FeCl 3 is added to the discharged water to be treated, and solids such as calcium carbonate and metal compounds in the supernatant liquid aggregate with Fe (OH) 3 .
  • the treated water is supplied to the filtration device 72.
  • the solid content aggregated by Fe (OH) 3 is removed by the filtration device 72.
  • the pH of the water to be treated is adjusted to a pH at which carbonate ions can exist as CO 2 , specifically 6.5 or lower. .
  • the first degassing step and the first upstream precipitation step may be omitted depending on the properties of the water to be treated.
  • gypsum seed crystals are introduced into the water to be treated in the upstream crystallization section installed immediately after the filtration device 72, and the gypsum crystallizes to increase the gypsum concentration in the water to be treated.
  • Reduce Water to be treated with a reduced gypsum concentration is fed to the first desalting unit 10a.
  • the control unit 32a of the first scale inhibitor supply unit 30a opens the valve V1a and supplies a predetermined amount of calcium scale inhibitor from the tank 31a to the water to be treated.
  • the control unit 32a adjusts the opening of the valve V1a so that the concentration of the calcium scale inhibitor becomes a predetermined value set according to the properties of the water to be treated.
  • the magnesium scale inhibitor is supplied to the water to be treated by the same method as described above in the first scale inhibitor supply step.
  • the calcium scale inhibitor and the magnesium scale inhibitor are respectively stored in the tanks of the plurality of first scale inhibitor supply units, and each control unit adjusts the supply amounts of the calcium scale inhibitor and the magnesium scale inhibitor.
  • the control unit 42a of the first pH adjusting unit 40a manages the pH of the water to be treated at the inlet of the first desalting unit 10a to a value at which silica can be dissolved in the water to be treated. Specifically, the pH of the water to be treated fed to the first desalting unit 10a is adjusted to 10 or more, preferably 10.5 or more, more preferably 11 or more.
  • the pH meter 43a measures the pH of the water to be treated at the inlet of the first desalting unit 10a.
  • the controller 42a adjusts the opening of the valve V2a so that the measured value of the pH meter 43a becomes a predetermined pH control value, and causes alkali to be introduced from the tank 41a into the water to be treated.
  • the to-be-processed water in which pH was adjusted is processed.
  • the 1st desalination part 10a is a reverse osmosis membrane apparatus
  • the water which passed the reverse osmosis membrane is collect
  • other desalting apparatuses such as an electrostatic desalting apparatus are used, the water to be treated is separated into treated water and concentrated water (first concentrated water) having a high ion concentration.
  • silica is contained in the first concentrated water in a state of being dissolved in the water to be treated as shown in FIG. Even when the gypsum and calcium carbonate in the first concentrated water are concentrated to a saturation concentration or more, the scale generation is suppressed by the calcium scale inhibitor.
  • Mg ion is contained in the water to be treated, the concentration of Mg ions contained in the first concentrated water is increased by the first desalting step. However, the generation of scales containing magnesium is suppressed by the magnesium scale inhibitor.
  • the first concentrated water is fed toward the first crystallization part 20a.
  • the first concentrated water discharged from the first desalting unit 10a is stored in the first crystallization tank 21a of the first crystallization unit 20a.
  • the control unit 24a of the first seed crystal supply unit 22a opens the valve V3a and adds the gypsum seed crystal from the tank 23a to the first concentrated water in the first crystallization tank 21a.
  • the first concentrated water from the first desalting unit 10a has a pH of 10 or more. As described above, gypsum is in a dissolved state in water in a high pH region where a calcium scale inhibitor is present. However, if the seed crystal is sufficiently present, gypsum crystallizes with the seed crystal as a nucleus even if the scale inhibitor is present.
  • gypsum having a large diameter for example, a particle diameter of 10 ⁇ m or more, more preferably 20 ⁇ m or more
  • the precipitated gypsum is discharged from the bottom of the first crystallization tank 21a.
  • the silica exists in a dissolved state in the first concentrated water in the first crystallization tank 21a. Even when the silica concentration in the first concentrated water exceeds the saturation solubility, there is no silica seed crystal, so that it precipitates as a small floating substance such as a colloid and is not easily precipitated. According to FIG. 3, calcium carbonate tends to precipitate at pH 10 or higher. However, since the calcium scale inhibitor is added, the precipitation of calcium carbonate is suppressed in the first crystallization tank 21a. Moreover, when providing a 1st upstream sedimentation part and a 1st deaeration part, the density
  • FIG. 5 shows that when the scale inhibitor (FLOCON260) is added to simulated water (including Ca 2+ , SO 4 2 ⁇ , Na + , Cl ⁇ ) in which the gypsum is supersaturated, the pH of the simulated water is changed. It is the result of conducting a gypsum precipitation experiment.
  • the experimental conditions are as follows.
  • Simulated water gypsum supersaturation (25 ° C): 460%, Scale inhibitor addition amount: 2.1 mg / L, pH: 6.5 (condition 1), 5.5 (condition 2), 4.0 (condition 3), 3.0 (condition 4), Seed crystal addition amount: 0 g / L.
  • the Ca concentration in the simulated water treated under each condition was measured using an atomic absorption analyzer (manufactured by Shimadzu Corporation, AA-7000). As shown in FIG. In the figure, the vertical axis represents the degree of supersaturation (%).
  • the crystallization rate increases as the pH is lowered even under conditions where there is no seed crystal. From this, when seed crystals exist, gypsum crystallizes under condition 1 (pH 6.5), and the relationship between the crystallization speeds is that the lower the pH as shown in FIG. 5, the higher the crystallization speed. Understandable.
  • the first crystallization step when the first crystallization step is performed under a low pH condition, the high-purity gypsum crystallizes due to the low content of calcium carbonate and silica, and is recovered from the bottom of the first crystallization tank 21a. It will be.
  • an acid as a pH adjusting agent is added to the flow path between the first crystallization tank 21a or the first desalting unit 10a and the first crystallization tank 21a.
  • a third pH adjusting unit (not shown) to be supplied is installed.
  • the said pH adjustment part is the same structure as the 2nd pH adjustment part mentioned later.
  • FIG. 6 shows the results of a gypsum precipitation experiment in which the amount of seed crystals added was changed when a calcium scale inhibitor (FLOCON 260) was added to simulated water.
  • the experimental conditions in FIG. 5 were the same except that the pH was 4.0 and gypsum (CaSO 4 .2H 2 O) was added as a seed crystal in the following amounts.
  • Seed crystal addition amount 0 g / L (condition 3), 3 g / L (condition 5), 6 g / L (condition 6), 3 g / L (condition 7).
  • seed crystals and sulfuric acid for pH adjustment were added to the simulated water to which the scale inhibitor was added.
  • condition 7 seed crystals previously immersed in the scale inhibitor were added to the simulated water to which the scale inhibitor was added, and sulfuric acid was added for pH adjustment.
  • the Ca concentration in the simulated water treated under each condition was measured by the same method as in FIG. In FIG. 6, the vertical axis represents the degree of supersaturation (%).
  • the supersaturation degree was 215% in condition 3 where no seed crystal was added, but the supersaturation degree was 199% (condition 5) and 176% (condition 6) as the seed crystal concentration increased. It can be understood that the gypsum deposition rate increases. Even under high pH conditions, the gypsum deposition rate tends to increase as the seed crystal input amount increases.
  • Conditions 5 and 7 are the same test conditions except that a seed crystal not immersed in the scale inhibitor and a seed crystal immersed therein are used. The supersaturation degree was 199% even under condition 7 in which the scale inhibitor was previously attached to the seed crystal, and it was confirmed that gypsum of the same degree as that in condition 5 was precipitated. That is, from the results of Conditions 5 and 7, it was shown that the function of the scale inhibitor is reduced by lowering the pH to 4.0 regardless of the immersion time of the seed crystal in the calcium scale inhibitor.
  • FIG. 7 and 8 are micrographs of gypsum obtained by crystallization.
  • FIG. 7 shows the result of Condition 5 (with seed crystal addition)
  • FIG. 8 shows the result of Condition 3 (without seed crystal addition).
  • condition 5 gypsum larger than condition 3 was deposited.
  • the larger the precipitated gypsum the lower the water content. If the moisture content is low, the gypsum is highly pure.
  • the average particle size is 10 ⁇ m or more, preferably 20 ⁇ m or more, gypsum having a sufficiently reduced water content can be obtained.
  • the “average particle diameter” in the present invention is a particle diameter measured by a method (laser diffraction method) defined in JIS Z 8825.
  • First precipitation step The supernatant liquid (first concentrated water) of the first crystallization part 20a is fed to the first precipitation part 50a.
  • Ca (OH) 2 and an anionic polymer (Hishiflock H305) are charged into the first concentrated water after the crystallization step, and the pH in the first precipitation tank 51a is 4 or more and 12 or less, preferably It is managed from 8.5 to 12 inclusive.
  • the first precipitation tank 51a calcium carbonate and a metal compound are precipitated and removed from the first concentrated water. The precipitated calcium carbonate and the metal compound having low solubility in water are discharged from the bottom of the first precipitation tank 51a.
  • Water to be treated which is a supernatant liquid in the first sedimentation tank 51a is discharged from the first sedimentation tank 51a.
  • FeCl 3 is added to the discharged water to be treated, and solids such as calcium carbonate and metal compounds in the water to be treated aggregate with Fe (OH) 3 .
  • the treated water is fed to the first filtration device 52a.
  • the solid content aggregated by Fe (OH) 3 is removed by the first filtration device 52a.
  • Silica in the supernatant of the first crystallization part 20a may be removed from the first concentrated water in the first precipitation step, or may be fed downstream without being removed. Whether or not silica is removed in the first precipitation step is determined according to the properties of the water to be treated and the first concentrated water.
  • the first precipitation step is performed without supplying the silica seed crystal and the silica precipitant to the first precipitation tank 51a.
  • the silica is separated from the treated water in the desalting unit (the first desalting unit 10b or the downstream desalting unit 60) located on the downstream side.
  • a silica seed crystal and a silica precipitant is supplied from a supply unit (not shown) into the first concentrated water in the first precipitation unit 50a.
  • the silica seed crystal is, for example, silica gel
  • the silica precipitating agent is, for example, MgSO 4 .
  • the first concentrated water in the first sedimentation tank 51a is preferably adjusted to pH 8 or more and 10 or less.
  • silica seed crystal silica is crystallized using the seed crystal as a nucleus.
  • MgSO 4 or aluminate Na (Na [Al (OH) 4 ]) is used as a silica precipitant
  • magnesium silicate is precipitated. Crystallized silica and magnesium silicate are precipitated at the bottom of the first precipitation tank 51a and discharged from the bottom of the first precipitation tank 51a.
  • Mg ion When Mg ion is contained in the water to be treated, Mg ions and silica in the first concentrated water react and precipitate in the first precipitation step. Depending on the balance between the content of Mg ions in the first concentrated water in the first sedimentation tank 51a and the content of silica, the steps for removing silica and Mg ions are different.
  • the first concentrated water in the first precipitation step has a Mg ion concentration lower than the silica content
  • Mg ions are consumed for precipitation with silica.
  • a silica precipitating agent MgSO 4
  • the supply amount of the silica precipitating agent is supplied in accordance with the silica content and the Mg ion content in the first precipitation step as much as the excess silica is consumed.
  • the first concentrated water in the first precipitation step has a high Mg ion concentration relative to the silica content, Mg ions remain as a result of precipitation of Mg ions and silica.
  • the first concentrated water is discharged from the first sedimentation tank 51a in a state where the residual Mg ion concentration is high, in the case of the subsequent desalination part (in FIG. 1, the first desalination part 10b, the most downstream first precipitation part) May precipitate a scale containing Mg in the downstream desalting section 60). Therefore, the first concentrated water in the first precipitation tank 51a is adjusted to a value at which a magnesium compound (mainly magnesium hydroxide) can be precipitated.
  • a magnesium compound mainly magnesium hydroxide
  • a magnesium compound precipitates in the 1st sedimentation tank 51a, and Mg ion concentration of the 1st concentrated water in the 1st sedimentation tank 51a is reduced. Further, after the first precipitation step, the first concentrated water discharged from the first precipitation tank 51a is adjusted to a pH at which the magnesium compound can be dissolved. Specifically, the pH is less than 10. By carrying out like this, precipitation of the scale containing Mg in a desalting part can be suppressed.
  • the first concentrated water that has passed through the first filtration device 52a of the first water treatment section at the front stage flows into the water treatment section at the rear stage as treated water.
  • the first precipitation step is performed from the first scale inhibitor supply step described above.
  • the concentrated water (first concentrated water) that has passed through the first precipitation unit 50 b located on the most downstream side of the water to be treated is supplied to the downstream desalting unit 60.
  • the water that has passed through the downstream desalting unit 60 is recovered as treated water.
  • the concentrated water in the downstream desalting unit 60 is discharged out of the system.
  • ions are concentrated in the first desalting unit 10, but gypsum, calcium carbonate, silica, and the like are removed in the first crystallization unit and the first precipitation unit. .
  • the number of moles of ions in the water flowing into the downstream desalting unit 60 is reduced as compared with that before the treatment.
  • the osmotic pressure in the 1st desalination part 10b located downstream and the downstream desalination part 60 becomes low, and required motive power is reduced.
  • An evaporator (not shown in FIG. 1) may be installed downstream of the downstream desalting unit 60 on the concentrated water side.
  • water is evaporated from the concentrated water, and ions contained in the concentrated water are precipitated as a solid and recovered as a solid. Since water is collected on the upstream side of the evaporator and the amount of concentrated water is significantly reduced, the evaporator can be made smaller and the energy required for evaporation can be reduced.
  • FIG. 9 is a schematic view of a water treatment system according to a second reference embodiment of the present invention.
  • the same components as those in the first reference embodiment are denoted by the same reference numerals.
  • the first separation unit 180 180a, 180b
  • the water treatment system 100 of FIG. 9 has a configuration in which two water treatment units are connected in the flow direction of the water to be treated.
  • the number of water treatment units may be one or three or more water treatment units may be connected according to the properties of the water to be treated.
  • FIG. 9 the same components as those in the first reference embodiment are denoted by the same reference numerals.
  • the first separation unit 180 180a, 180b
  • the water treatment system 100 of FIG. 9 has a configuration in which two water treatment units are connected in the flow direction of the water to be treated.
  • the number of water treatment units may be one or three or more water treatment units may be connected according to the properties of the water to be treated.
  • the first separation unit 180 (180a, 180b) includes a classifier 181 (181a, 181b) and a dehydrator 182 (182a, 182b).
  • the classifiers 181a and 181b are, for example, liquid cyclones.
  • the dehydrators 182a and 182b are, for example, belt filters.
  • only one classifier is installed in the first separation unit 180, but a plurality of classifiers may be connected in series in the flow direction of the water to be treated.
  • the water to be treated is treated in the same process as in the first reference embodiment, except that the first separation process is performed immediately after the first crystallization process.
  • the first concentrated water in the first crystallization tanks 21a and 21b is conveyed to the first separation units 180a and 180b.
  • the 1st concentrated water conveyed here is water containing the solid substance which precipitated in the 1st crystallization tank 21a, 21b.
  • the first concentrated water discharged from the first crystallization tanks 21a and 21b contains calcium carbonate and silica that have precipitated because the concentration exceeds the saturation concentration, in addition to gypsum having various particle sizes. Since calcium carbonate and silica are not precipitated in the presence of seed crystals, they are small-diameter or colloidal floating substances.
  • gypsum having a predetermined size for example, an average particle size of 10 ⁇ m or more settles at the bottom of the classifiers 181a and 181b, and gypsum, calcium carbonate and silica having a small particle size are It remains in the supernatant.
  • the gypsum settled on the bottoms of the classifiers 181a and 181b is further dehydrated and collected by the dehydrators 182a and 182b.
  • the supernatant liquid containing gypsum having a small particle diameter, calcium carbonate, and silica is fed to the first precipitation sections 50a and 50b.
  • gypsum having an average particle size of 10 ⁇ m or more is mainly precipitated, and the proportion of small-diameter gypsum is reduced.
  • gypsum having a low water content and no impurities that is, high purity
  • a part of the gypsum collected by the first separation units 180a and 180b may be circulated to the seed crystal tanks 23a and 23b as seed crystals.
  • FIG. 10 is a schematic view of a water treatment system according to a third reference embodiment of the present invention.
  • the water treatment system 200 in FIG. 10 has a configuration in which two water treatment units are connected in the flow direction of the water to be treated.
  • One water treatment part may be sufficient according to the property of to-be-processed water, and three or more water treatment parts may be connected.
  • One water treatment unit in the water treatment system 200 of the third reference embodiment is a second desalting unit 210 (210a, 210b) and a second crystallization unit 220 (220a, 220b) in order from the upstream side of the water to be treated. Is provided. The concentration side of the second desalting units 210a and 210b and the second crystallization units 220a and 220b are connected.
  • the water treatment unit includes a second scale inhibitor supply unit 230 (230a, 230b) in the upstream flow path of each second desalting unit 210 (210a, 210b).
  • the second scale inhibitor supply units 230a and 230b are composed of a tank 231 (231a and 231b), a valve V4 (V4a and V4b), and a control unit 232 (232a and 232b), respectively.
  • the control units 232a and 232b are connected to the valves V4a and V4b.
  • the scale inhibitor is stored in the tanks 231a and 231b of the second scale inhibitor supply units 230a and 230b.
  • the scale inhibitor used in the third reference embodiment includes the calcium scale inhibitor described in the first reference embodiment and the one that prevents silica from being precipitated as scale in the water to be treated (“silica scale inhibitor ").
  • silica scale inhibitors include phosphonic acid scale inhibitors, polycarboxylic acid scale inhibitors, and mixtures thereof.
  • FLOCON260 trade name, manufactured by BWA.
  • FIG. 10 shows two tanks 231a. For example, the calcium scale inhibitor is stored in one tank 231a, and the silica scale inhibitor is stored in the other tank 231a.
  • the 2nd desalination part 210 is a reverse osmosis membrane apparatus.
  • the second desalting unit 210 includes an electrodialyzer (ED), a polarity switching electrodialyzer (EDR), an electric regeneration pure water device (EDI), an ion exchange device, and an electrostatic desalting device (CDI). ), A nano filter (NF), an evaporator, or the like can be employed.
  • ED electrodialyzer
  • EDR polarity switching electrodialyzer
  • EDI electric regeneration pure water device
  • CDI electrostatic desalting device
  • NF nano filter
  • evaporator or the like can be employed.
  • FIG. 10 only one second desalting unit 210 is shown, but a plurality of desalting apparatuses may be connected in parallel or in series in the flow direction of the water to be treated.
  • the second crystallization unit 220 (220a, 220b) includes a second crystallization tank 221 (221a, 221b) and a second seed crystal supply unit 222 (222a, 222b).
  • the second seed crystal supply unit 222 is connected to the second crystallization tank 221.
  • the second seed crystal supply unit 222 includes a seed crystal tank 223 (223a, 223b), a valve V5 (V5a, V5b), and a control unit 224 (224a, 224b).
  • the control unit 224 is connected to the valve V5.
  • the seed crystal tank 223 stores gypsum particles as seed crystals.
  • the second pH adjusting unit 240 (240a, 240b) may be installed between the second desalting unit 210 and the second crystallization unit 220.
  • the second pH adjusting unit 240 includes a tank 241 (241a, 241b), a valve V6 (V6a, V6b), a pH meter 243 (243a, 243b), and a control unit 242 (242a, 242b).
  • An acid is stored in the tank 241 as a pH adjuster. Examples of the acid that can be used include hydrochloric acid, sulfuric acid, and nitric acid.
  • the control unit 242 is connected to the valve V6 and the pH meter 243.
  • the pH meter 243 may be installed in the flow path between the second desalting unit 210 and the second crystallization unit 220 as shown in FIG. 10, or may be installed in the second crystallization tank 221.
  • a sedimentation tank 271 and a filtration device 272 are installed as a second upstream sedimentation unit 270 on the upstream side of the second scale inhibitor supply unit 230a located in the uppermost stream of the water to be treated.
  • the second upstream sedimentation section 270 has the same configuration as the first upstream sedimentation section 70.
  • a plurality of stages of settling tanks 271 may be connected in series in the direction of water to be treated.
  • the water treatment system 200 may include a second deaeration unit 273 on the upstream side of the second upstream precipitation unit 270.
  • the 2nd deaeration part 273 is the same structure as the 1st deaeration part 73 of 1st reference embodiment.
  • the 2nd deaeration part 273 may be installed in the to-be-processed water downstream of the 2nd upstream sedimentation part 270, and the upstream of the 2nd scale inhibitor supply part 230a.
  • the deaeration part having the same configuration as the second deaeration part 273 is a flow path between the second demineralization part 210a and the second crystallization part 220a, and between the second crystallization part 220 and the second precipitation part 250. And the downstream side of the second sedimentation part 250 and between the second desalting part 210b or the downstream desalting part 60.
  • an ion exchange device may be installed downstream of the filtration device 272 and upstream of the second scale inhibitor supply unit 230a located at the uppermost stream. Further, even if an upstream crystallization part (not shown) having the same configuration as the second crystallization part is installed upstream of the most upstream second scale inhibitor supply part 230a according to the gypsum concentration in the water to be treated. good.
  • the second separation unit 280 (280a, 280b) may be installed on the downstream side of the second crystallization unit 220.
  • the second separation unit 280 has the same configuration as the first separation unit 180, and includes a classifier 281 (281a, 281b) and a dehydrator 282 (282a, 282b).
  • the second precipitation unit 250 (250a, 250b) may be installed on the downstream side of the second crystallization unit 220.
  • the 2nd sedimentation part 250 is the structure similar to the 1st sedimentation part 50, and is provided with the 2nd sedimentation tank 251 (251a, 251b) and the 2nd filtration apparatus 252 (252a, 252b).
  • the water treatment system 200 includes a downstream desalting unit 60 on the downstream side of the water to be treated of the first water treatment unit.
  • An evaporator (not shown in FIG. 10) may be installed downstream of the downstream desalting unit 60 on the concentrated water side.
  • Pretreatment The pretreatment described in the first reference embodiment is performed on the water to be treated.
  • ⁇ Second upstream precipitation step> In the second upstream sedimentation section 270, Ca ions and carbonate ions are roughly removed from the treated water in advance as calcium carbonate. When metal ions other than Ca ions are contained in the water to be treated, the metal compound having low solubility in water is roughly removed from the water to be treated in advance in the second upstream precipitation portion 270.
  • the second upstream precipitation step is performed in the same step as the first upstream precipitation step.
  • the water to be treated containing Mg ions is treated in the water treatment system 200 of the present embodiment, the water to be treated has a pH at which the magnesium compound is precipitated in the second upstream precipitation section 270, as in the first embodiment.
  • the pH is preferably adjusted to a pH at which the magnesium compound can be dissolved on the downstream side of the second upstream precipitation portion 270. Specifically, the pH is adjusted to less than 10. By doing so, it is possible to prevent scale generation in the downstream apparatus and process, particularly the second desalting unit 210 and the second desalting process.
  • the pH of the water to be treated is adjusted to a pH at which carbonate ions can exist as CO 2 , specifically 6.5 or lower. .
  • the second degassing step and the second upstream precipitation step can be omitted.
  • the controller 232a of the second scale inhibitor supply unit 230a opens the valve V4a and supplies a predetermined amount of calcium scale inhibitor from the tank 231a to the water to be treated.
  • the control unit 232b of the second scale inhibitor supply unit 230b opens the valve V4b and supplies a predetermined amount of silica scale inhibitor from the tank 231b to the water to be treated.
  • the control unit 232a and the control unit 232b adjust the opening degrees of the valve V4a and the valve V4b so that the concentrations of the calcium scale inhibitor and the silica scale inhibitor have predetermined values set according to the properties of the water to be treated. adjust.
  • the pH adjustment of the water to be treated immediately before flowing into the second desalting unit 210 is arbitrarily performed.
  • the pH of the water to be treated becomes about 5 to 6 by adding FeCl 3 and flows into the second desalting unit 210a.
  • calcium carbonate has high solubility in water.
  • carbonic acid exists mainly in the state of HCO 3 ⁇ and CO 2 in water.
  • the treated water flowing into the second desalting unit 210a has a low calcium carbonate concentration.
  • the pH adjustment part of the same structure as the 1st pH adjustment part of 1st reference embodiment is upstream in the 2nd desalination part 210a.
  • the treated water whose pH is adjusted may be installed and supplied to the second desalting unit 210a.
  • ⁇ Second desalting step> In the 2nd desalination part 210a, the to-be-processed water into which the scale inhibitor was thrown in is processed.
  • the 2nd desalination part 210a is a reverse osmosis membrane apparatus
  • the water which passed the reverse osmosis membrane is collect
  • Water containing ions and scale inhibitors is discharged as concentrated water (second concentrated water) from the non-permeating side of the reverse osmosis membrane.
  • the gypsum and silica in the second concentrated water are concentrated by the treatment in the second desalting unit 210a, but scale generation is suppressed by the calcium scale inhibitor and the silica scale inhibitor.
  • the water to be treated is separated into treated water and concentrated water (second concentrated water) having a high ion concentration.
  • the second concentrated water is fed toward the second crystallization part 220a.
  • the pH of the water to be treated may be adjusted by the second pH adjusting unit 240a between the second desalting unit 210a and the second crystallization unit 220a.
  • the second pH adjusting unit 240a manages the pH of the second concentrated water so that the function of the calcium scale inhibitor is reduced and the gypsum in the second concentrated water can be precipitated.
  • the pH meter 243a measures the pH of the second concentrated water.
  • the controller 242a adjusts the opening degree of the valve V6a so that the measured value of the pH meter 243a becomes a predetermined pH management value.
  • the second concentrated water is stored in the second crystallization tank 221 of the second crystallization unit 220a.
  • the control unit 224a of the second seed crystal supply unit 222a opens the valve V5 and adds the gypsum seed crystal from the seed crystal tank 223a to the second concentrated water in the second crystallization tank 221a.
  • a calcium scale inhibitor is contained in the second concentrated water, but when a seed crystal is introduced, gypsum crystallizes and grows.
  • the supersaturation degree is 460%, and even after 6 hours, there is no change from the initial supersaturation degree.
  • condition 1 the scale inhibitor exhibits a function and the precipitation of gypsum is suppressed.
  • conditions 2 to 4 the degree of supersaturation is reduced. That is, even when no seed crystal was added, it was confirmed that when the pH was reduced, the function of the scale inhibitor was reduced and the gypsum crystallized.
  • the result that the precipitation rate was so large that pH was low was obtained.
  • condition 7 (pH 4.0) adds seed crystals previously immersed in the calcium scale inhibitor to simulated water to which the calcium scale inhibitor has been added. Then, sulfuric acid was added for pH adjustment. The conditions other than the above were the same in conditions 5 and 7, and a gypsum precipitation experiment was performed. After 2 hours from pH adjustment, the Ca concentration in the simulated water was measured by the same method as in FIG. As a result, as shown in FIG. 6, in both conditions 5 and 7, the degree of supersaturation was 199% or less. From this, it can be said that the function of the calcium scale inhibitor is lowered when the pH is lowered to 4.0 regardless of the immersion time of the seed crystal in the calcium scale inhibitor.
  • the pH of the second concentrated water is adjusted to 6.0 or less, preferably 5.5 or less, more preferably 4.0 or less by the second pH adjustment step.
  • the function of the calcium scale inhibitor can be significantly reduced.
  • the pH range in the second pH adjustment step is appropriately set according to the type of scale inhibitor.
  • the silica when the pH is low, the silica may have a saturation solubility or higher.
  • the silica scale inhibitor is introduced in the second water treatment unit in the present embodiment, silica precipitation is suppressed even when the pH is low. Even if silica is precipitated in the second crystallization tank 221a, it is present as small-diameter particles or colloidal suspended matter.
  • calcium carbonate dissolves in water at pH 6.0 or lower. From the above, high-purity gypsum can be recovered in the second crystallization tank 221a of the second water treatment unit.
  • the second concentrated water in the second crystallization step may be adjusted to a pH at which silica can be dissolved in the second concentrated water by the second pH adjusting step. By doing so, silica precipitation from the second concentrated water is suppressed in the second crystallization tank 221a. As a result, when the second concentrated water discharged from the second crystallization tank 221a is classified by the second separation unit 280a, the purity of the recovered gypsum can be increased.
  • the classifier 281a of the second separation unit 280a includes gypsum having a predetermined size (for example, an average particle size of 10 ⁇ m or more) and a supernatant liquid containing small-diameter precipitates (gypsum and silica). Isolate.
  • the large-diameter gypsum is further dehydrated and collected by the dehydrator 282a. According to this reference embodiment, it is possible to collect high-purity gypsum. A part of the collected gypsum may be circulated to the seed crystal tank 223a as a seed crystal.
  • ⁇ Second precipitation step> The supernatant liquid (second concentrated water) or the supernatant liquid (second concentrated water) discharged from the second separation section 280a is fed to the second precipitation section 250a.
  • the calcium carbonate and the metal compound in the second concentrated water are removed by the second precipitation tank 251a and the second filtration device 252a in the same manner as the first precipitation step described in the first reference embodiment.
  • At least one of a silica seed crystal and a silica precipitation agent may be added to the second precipitation tank 251a in the same manner as in the first precipitation step, and the silica may be removed from the second concentrated water.
  • the second concentrated water that has passed through the second filtration device 252a of the second water treatment section at the front stage flows into the water treatment section at the rear stage as treated water.
  • the second precipitation step is performed from the second scale inhibitor supply step.
  • ⁇ Downstream desalting process> The second concentrated water that has passed through the second sedimentation section 250b located on the most downstream side of the water to be treated is treated by the downstream desalting section 60.
  • the water that has passed through the downstream desalting unit 60 is recovered as water to be treated.
  • the concentrated water in the downstream desalting unit 60 is discharged out of the system.
  • an evaporator (not shown) may be installed downstream of the concentrated water side of the downstream desalting unit 60.
  • the pH of the second concentrated water may be adjusted so that the calcium scale inhibitor can exert its function.
  • the pH is preferably 4.0 or higher, preferably 5.5 or higher, more preferably 6.0 or higher.
  • the third pH adjustment step is performed after the second crystallization step and before the second desalting step, or after the second crystallization step and before the downstream desalting step.
  • the water treatment system 200 of the present embodiment has a second crystallization part and a second desalting part immediately after that (in FIG. 10, the second crystallization part 220a and the second desalting part).
  • a third pH adjusting unit (not shown in FIG. 10) having the same configuration as the second pH adjusting unit is installed between the unit 210b and in particular between the second precipitation unit 250a and the second desalting unit 210b).
  • a third pH adjusting unit (not shown in FIG. 10) having the same configuration as the second pH adjusting unit is installed between the most downstream second precipitation unit 250b and the downstream desalting unit 60.
  • silica is concentrated by the treatment in the second water treatment unit. If the silica concentration in the second concentrated water is equal to or higher than the concentration at which the silica scale inhibitor works effectively, silica may be generated as scale from the second concentrated water. For example, when FLOCON260 is used as a silica scale inhibitor, the scale generation prevention effect is obtained up to a silica concentration of about 200 mg / L. Therefore, the number of stages of the second water treatment unit is set until the silica scale inhibitor is concentrated to a concentration at which the effect can be exerted.
  • water to be treated containing ions can be treated with a high water recovery rate.
  • gypsum is mainly precipitated in the second crystallization unit 220, so that the gypsum recovery rate in the second crystallization unit 220 is high, and the number of moles of ions fed downstream is further reduced.
  • the purity of the gypsum recovered by the second crystallization unit 220 can be increased.
  • FIG. 11 is a schematic view of a water treatment system according to a fourth reference embodiment of the present invention.
  • the water treatment system 300 of the fourth reference embodiment is provided with the water treatment unit described in the first reference embodiment.
  • the water treatment unit described in the third reference embodiment is installed on the downstream side of the water to be treated of the water treatment unit.
  • a first separation unit 180 is installed on the downstream side of the first crystallization unit 20.
  • a second separation unit 280 similar to the first separation unit 180 is installed on the downstream side of the second crystallization unit 220.
  • a downstream desalting unit 60 is installed on the downstream side of the water to be treated of the second crystallization unit 220 located on the most downstream side.
  • the water treatment system 300 of the fourth reference embodiment has the first scale described in the first reference embodiment on the upstream side of the first scale inhibitor supply unit 30 and the first pH adjustment unit 40 located in the uppermost stream of the water to be treated.
  • An upstream sedimentation section 70 is provided.
  • the water treatment system 300 of the fourth reference embodiment has a first deaeration unit 73 similar to that of the first reference embodiment on the upstream side of the first upstream sedimentation unit 70 as shown in FIG.
  • the first degassing unit 73 may be installed on the downstream side of the water to be treated of the first upstream sedimentation unit 70 and upstream of the first scale inhibitor supply unit 30 and the first pH adjustment unit 40.
  • the deaeration part of the same structure as the 1st deaeration part 73 is the flow path between the 1st demineralization part 10 and the 1st crystallization part 20, the 1st crystallization part 10 and the 1st precipitation part 50, Installed between the first crystallization unit 220 and the second precipitation unit 250, and between the first precipitation unit 50 and the second desalination unit 210. good.
  • an ion exchange device (not shown) and an upstream crystallization part (not shown) are provided upstream of the first scale inhibitor supply unit 30 and the first pH adjustment unit 40. May be.
  • the water treatment units from the first scale inhibitor supply unit 30 to the first precipitation unit 50 and the second scale inhibitor supply unit 230 to the second precipitation unit 250 are shown one by one.
  • a plurality of water treatment units may be connected to each other.
  • first, water to be treated is treated by the water treatment method described in the first reference embodiment and the second reference embodiment.
  • the first concentrated water after being treated by the method of the first reference embodiment and the second reference embodiment is treated water, and the second precipitation process from the second scale inhibitor supply process described in the third reference embodiment. Is processed.
  • the second concentrated water that has passed through the most downstream second precipitation section 250 is processed by the downstream desalting section 60.
  • the water that has passed through the downstream desalting unit 60 is recovered as treated water.
  • the concentrated water in the downstream desalting unit 60 is discharged out of the system.
  • an evaporator (not shown) may be installed downstream of the concentrated water side of the downstream desalting unit 60.
  • the third pH adjustment step described in the third reference embodiment is performed. May be.
  • FIG. 12 is a schematic diagram of the water treatment system according to the first embodiment of the present invention.
  • the water treatment system 400 of the first embodiment is provided with the water treatment unit described in the third reference embodiment.
  • the water treatment unit described in the first reference embodiment is installed on the downstream side of the water to be treated of the water treatment unit.
  • a first separation unit 180 and a second separation unit 280 are installed.
  • a downstream desalting unit 60 is installed on the downstream side of the water to be treated of the first crystallization unit 20 located on the most downstream side.
  • the water treatment system 400 of the first embodiment includes the second upstream sedimentation unit 270 described in the third reference embodiment on the upstream side of the second scale inhibitor supply unit 230 located at the most upstream of the water to be treated. . Furthermore, the water treatment system 400 of 1st Embodiment has the 2nd deaeration part 273 similar to 3rd reference embodiment in the upstream of the 2nd upstream sedimentation part 270, as shown in FIG. The second deaeration unit 273 may be installed on the downstream side of the water to be treated of the second upstream sedimentation unit 270 and upstream of the second scale inhibitor supply unit 230.
  • the deaeration part of the same structure as the 2nd deaeration part 273 is the flow path between the 2nd demineralization part 210 and the 2nd crystallization part 220, the 1st crystallization part 20, the 1st precipitation part 50, May be installed in the flow path between the second crystallization part 220 and the second precipitation part 250 and the flow path between the second precipitation part 250 and the first desalting part 10. good.
  • an ion exchange device (not shown) and an upstream crystallization part (not shown) may be provided upstream of the second scale inhibitor supply part 230.
  • the 1st separation part 180 and the 2nd separation part 280 may be installed in the downstream of the 1st crystallization tank 21 and the 2nd crystallization tank 221, respectively. .
  • the water treatment units from the second scale inhibitor supply unit 230 to the second precipitation unit 250 and the water treatment units from the first scale inhibitor supply unit 30 to the first precipitation unit 50 are shown one by one.
  • a plurality of water treatment units may be connected to each other.
  • the water to be treated is first treated by the water treatment method described in the third reference embodiment.
  • the second concentrated water after being treated by the method of the third reference embodiment is treated water, as the water to be treated, from the first scale inhibitor supply step described in the first reference embodiment and the second reference embodiment to the first precipitation step. Is processed.
  • the first concentrated water that has passed through the most downstream first sedimentation unit 50 is processed by the downstream desalting unit 60.
  • the water that has passed through the downstream desalting unit 60 is recovered as treated water.
  • the concentrated water in the downstream desalting unit 60 is discharged out of the system.
  • an evaporator (not shown) may be installed downstream of the downstream desalting unit 60 on the concentrated water side.
  • the third pH adjustment step described in the third reference embodiment is performed. May be.
  • the water treatment system 300 according to the fourth reference embodiment and the water treatment system 400 according to the first embodiment can also treat the water to be treated containing ions at a high water recovery rate.
  • the gypsum recovery rate in the second crystallization unit 220 is high, and the downstream is supplied to the downstream side. The number of moles of ions produced is further reduced. Furthermore, the purity of the gypsum recovered by the second crystallization unit 220 can be increased.
  • the amount of seed crystals of gypsum supplied to the first crystallization tank 21 and the second crystallization tank 221 is controlled in the first reference embodiment to the first embodiment.
  • a configuration in which the seed crystal supply amount to the first crystallization tank 21 is controlled will be described with reference to FIG. The same configuration is applied to the second crystallization tank 221.
  • a first pH measurement unit 543 that measures the pH of the first concentrated water in the first crystallization tank 21 is installed.
  • the first pH measurement unit 543 may be installed in a flow path connecting the first desalting unit 10 and the first crystallization tank 21, or may be installed directly in the first crystallization tank 21.
  • the first pH measurement unit 543 is connected to the control unit 24 of the seed crystal supply unit 22.
  • a pH adjusting unit 540 is installed as shown in FIG.
  • the pH adjustment unit 540 includes a tank 541, a control unit 542, and a valve V7.
  • the first pH measurement unit 543 is connected to the control unit 542 of the pH adjustment unit 540.
  • the pH adjustment unit 540 manages the pH of the first concentrated water in the first crystallization tank 21 to a predetermined value based on the measurement value of the first pH measurement unit 543.
  • the pH meter 243a described in the third reference embodiment corresponds to the second pH measuring unit
  • the control unit 242 corresponds to the control unit 542.
  • the seed crystal stored in the seed crystal tank 23 of the first seed crystal supply unit 22 may be a new chemical. However, when the first separation unit 180 is installed, the seed crystal is larger than the predetermined particle size separated by the classifier 181. Gypsum and gypsum after being dehydrated by the dehydrator 182 may be stored in the seed crystal tank 23.
  • the control of the seed crystal supply amount according to the fifth reference embodiment is performed in the following steps.
  • the first pH measuring unit 543 measures the pH of the first concentrated water in the first crystallization tank 21.
  • the measured pH value is transmitted to the control unit 24 of the seed crystal supply unit 22.
  • the control unit 24 stores a pH range in which the scale prevention function of the calcium scale inhibitor is reduced.
  • the pH range in which the scale prevention function of the calcium scale inhibitor is reduced is 6.0 or less, preferably 5.5 or less, more preferably 4.0. It is as follows.
  • the control unit 24 compares the measured value of the first pH measuring unit 543 with the pH range. When the measured value is in the above pH range, the control unit 24 reduces the amount of gypsum seed crystals supplied by reducing the opening of the valve V3. When the measured value is higher than the pH range, the control unit 24 increases the opening amount of the valve V3 to increase the supply amount of the gypsum seed crystal.
  • the seed crystal If the seed crystal is present, gypsum precipitates, but if the calcium scale inhibitor is functioning, the crystallization rate is slowed down. For this reason, the amount of seed crystals is increased to promote crystallization. On the other hand, when the function of the calcium scale inhibitor is reduced, a sufficient crystallization rate can be obtained even if there are few seed crystals. Thus, if the seed crystal supply amount is adjusted according to pH, it becomes possible to reduce the amount of seed crystal used.
  • the seed crystal can be intermittently supplied by measuring pH periodically during continuous operation.
  • a change with time of pH may be acquired during a test operation of the system, and the seed crystal supply amount may be increased or decreased based on the acquired change with time.
  • the sixth reference embodiment of the present invention is a water treatment system 600 that includes at least one of a first separation unit 180 and a second separation unit 280.
  • the water treatment system 600 is different from the fifth reference embodiment in that the gypsum separated in the separation unit is directly supplied to the first crystallization tank or the second crystallization tank as a seed crystal.
  • a first circulation line 601 is installed to convey a part of gypsum that has settled at the bottom of the classifier 181 of the first separation unit 180 so as to be directly supplied to the first crystallization tank 21.
  • a second circulation line 602 is provided that conveys part of the gypsum after being dehydrated by the dehydrator 182 so as to be directly supplied to the first crystallization tank 21.
  • a valve V8 is installed in the first circulation line 601 and a valve V9 is installed in the second circulation line 602.
  • the control unit 610 is connected to the first pH measurement unit 543, the valve V8, and the valve V9 that are the same as those in the fifth reference embodiment.
  • Control of the seed crystal supply amount according to the sixth reference embodiment is performed in the following steps.
  • the first pH measurement unit 543 measures the pH of the first concentrated water in the first crystallization tank 21.
  • the measured pH value is transmitted to the control unit 610.
  • the controller 610 stores a pH range in which the scale prevention function of the calcium scale inhibitor is reduced.
  • the control unit 610 compares the measured value of the first pH measuring unit 543 with the pH range in the same process as the fifth reference embodiment, and adjusts the opening degree of the valve V8 and the valve V9.
  • a seed crystal concentration measuring unit (not shown) that measures the gypsum seed crystal concentration in the first concentrated water in the first crystallization tank 21 is provided in the first crystallization tank 21. It may be installed.
  • the seed crystal concentration measurement unit measures the seed crystal concentration in the first crystallization tank 21.
  • the measured concentration value is transmitted to the control unit 24 or the control unit 610.
  • the control unit 24 or the control unit 610 stores a threshold value of the seed crystal concentration, and increases the seed crystal supply amount when the seed crystal concentration is equal to or lower than the threshold value.
  • a first concentration measurement unit (not shown) is installed downstream of the first crystallization tank 21 and upstream of the first precipitation unit 50.
  • the first concentration measurement unit is preferably installed on the downstream side of the first separation unit 180, but may be on the upstream side of the first separation unit 180.
  • the first concentration measurement unit is connected to the control unit 24 or the control unit 610.
  • a second concentration measurement unit is installed instead of the first concentration measurement unit.
  • the first concentration measuring unit measures at least one of the Ca ion concentration and the sulfate ion concentration in the first concentrated water discharged from the first crystallization tank 21.
  • the measured concentration is transmitted to the control unit 24 or the control unit 610.
  • the Ca ion concentration and the sulfate ion concentration measured by the first concentration measuring unit depend on the crystallization speed in the first crystallization tank 21. In the case of the same residence time, the lower the Ca ion concentration and the sulfate ion concentration, the faster the crystallization rate.
  • the control unit 24 and the control unit 610 store at least one threshold value of the Ca ion concentration and the sulfate ion concentration.
  • the control unit 24 increases the opening amount of the valve V3 to increase the supply amount of the seed crystal. .
  • the control unit 24 reduces the opening of the valve V3 to reduce the supply amount of the seed crystal. .
  • the control unit 610 increases the opening of the valve V8 and the valve V9 to supply the seed crystal supply amount. Increase.
  • the control unit 610 reduces the opening of the valve V8 and the valve V9 to supply the seed crystal supply amount. Reduce.
  • the supply amount of the seed crystal is controlled in the same process as described above. As described above, when the supply amount of the seed crystal is controlled by at least one of the Ca ion concentration and the sulfate ion concentration after the crystallization step, the seed crystal usage amount can be reduced.
  • FIG. 15 is a partial schematic view of a water treatment system according to a seventh reference embodiment of the present invention.
  • the water treatment system 700 of FIG. 15 collects gypsum separated from the first concentrated water in the first crystallization unit 20 in the water treatment system of the first embodiment, and the second crystallization tank of the second crystallization unit 220 is recovered. 221 is configured to be supplied. The same configuration can be adopted in the water treatment system of the fourth reference embodiment.
  • the pH of the concentrated water (first concentrated water) in the first crystallization tank 21 of the first crystallization unit 20 is not particularly limited. It is advantageous to perform the first crystallization step without changing the pH from the 1 desalting step. In this case, the first crystallization step is performed at a pH (10 or more) at which silica can be dissolved, but the solubility of calcium carbonate is low in this pH region.
  • the second crystallization unit 220 (second crystallization step) crystallizes gypsum in a lower pH region.
  • the pH range of the second crystallization step (6.0 or less, more preferably 4.0 or less)
  • calcium carbonate can be dissolved in water.
  • the gypsum containing calcium carbonate recovered in the first crystallization unit 20 is supplied to the second crystallization tank 221 of the second crystallization unit 220, the calcium carbonate which is an impurity dissolves in the second concentrated water and the gypsum. Is present in the second concentrated water as a solid.
  • the water treatment system 300 of the seventh reference embodiment it is possible to treat the water to be treated at a high water recovery rate and to collect high-purity gypsum.
  • FIG. 16 is a partial schematic view of a water treatment system according to an eighth reference embodiment of the present invention.
  • the same components as those of the second reference embodiment are denoted by the same reference numerals.
  • the eighth reference embodiment has been described using the water treatment method having the first separation step and the water treatment system having the first separation unit, but the second separation step and the second separation unit have the same configuration. Applicable.
  • the water treatment system 800 includes a plurality of classifiers (first classifiers) 181 in the flow direction of the water to be treated with respect to one first crystallization unit 20.
  • first classifiers first classifiers
  • two first classifiers 181a and 181b are installed.
  • the first classifier 181a located on the most upstream side and the first classifier 181b located on the downstream side differ in the size of the gypsum to be separated.
  • the size of the gypsum separated by the first classifier 181b is smaller than the gypsum separated by the first classifier 181a.
  • the first classifier 181a is a classifier that separates particles having an average particle diameter of 10 ⁇ m or more
  • the first classifier 181b is a classifier that separates particles having an average particle diameter of 5 ⁇ m or more.
  • the size of the gypsum separated by each first classifier 181 is designed so as to decrease in order from the upstream side toward the downstream side.
  • the number of first classifiers installed in the distribution direction to be processed and the particle size of solids that can be separated by each classifier are appropriately set in consideration of the water recovery rate, gypsum recovery rate, processing cost, and the like.
  • the following treatment is performed in the first separation step.
  • the first classifier 181a located at the uppermost stream gypsum having an average particle size of 10 ⁇ m or more is classified and settles to the bottom of the first classifier 181a.
  • the settled gypsum is discharged from the first classifier 181a and fed to the dehydrator 182.
  • the supernatant liquid of the first classifier 181a is fed to the first classifier 181b on the downstream side.
  • This supernatant liquid mainly contains particles (gypsum, calcium carbonate, silica, etc.) having a particle diameter of less than 10 ⁇ m.
  • gypsum having an average particle size of 5 ⁇ m or more is classified and settles to the bottom of the first classifier 181b.
  • the supernatant liquid of the first classifier 181b is fed to the first sedimentation unit 50.
  • the settled gypsum is discharged from the first classifier 181b.
  • the discharged gypsum is fed to the first crystallization tank 21 through the solids circulation line 801 and is supplied to the first concentrated water in the first crystallization tank 21.
  • the circulated gypsum functions as a seed crystal in the first crystallization tank 21, and the circulated gypsum grows by crystallization.
  • the circulating gypsum having an average particle size of 10 ⁇ m or more is fed together with the first concentrated water from the first crystallization tank 21 to the first classifier 181a, separated from the first concentrated water by the first classifier 181a, and dehydrated. To the machine 182.
  • the supernatant liquid of the first classifier 181b contains particles having a relatively small diameter of less than 5 ⁇ m, for example, a particle diameter of about 2 ⁇ m to 3 ⁇ m.
  • the gypsum is discharged from the first crystallization tank 21 before growing to a sufficient size in the first crystallization tank 21 and flows into the first precipitation tank 51.
  • the amount of gypsum increases.
  • the sediment in the first sedimentation tank 51 contains a large amount of gypsum.
  • a circulation line 802 that connects the bottom of the first precipitation tank 51 and the first crystallization tank 21 is provided, and a solid substance containing gypsum precipitated at the bottom of the first precipitation tank 51 is provided.
  • the first crystallization tank 21 may be circulated.
  • this reference embodiment it is possible to increase the amount of gypsum recovered in the first separation unit and to reduce the moisture content of the recovered gypsum.
  • Using the water treatment process and the water treatment system of the present embodiment leads to a reduction in the amount of gypsum particles with a relatively small diameter flowing out to the downstream side. The amount of waste generated can be reduced.
  • First desalting unit 20 First crystallization unit 21 First crystallization tank 22 First seed crystal supply unit 23,223 Seed crystal Tanks 24, 32, 42, 224, 232, 242, 542, 610 Control unit 30 First scale inhibitor supply unit 31, 41, 231, 241, 541 Tank 40 First pH adjustment unit 43, 243 pH meter 50 First precipitation Unit 51 first sedimentation tank 52 first filtration device 60 downstream demineralization unit 70 first upstream sedimentation unit 71 sedimentation tank 72 filtration device 73 first degassing unit 180 first separation unit 181, 181a, 181b, 281 classifier 182, 282 Dehydrator 210 Second desalting unit 220 Second crystallization unit 221 Second crystallization tank 222 Second seed crystal supply unit 230 Second scale inhibitor supply unit 240 Second pH adjustment unit 25 0 second sedimentation unit 251 second sedimentation tank 252 second filtration device 280 second separation unit 540 pH adjustment unit 543 first pH measurement unit 601 first circulation line 602 second circulation line 80

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Water Supply & Treatment (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Organic Chemistry (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Nanotechnology (AREA)
  • Crystallography & Structural Chemistry (AREA)
  • Health & Medical Sciences (AREA)
  • Urology & Nephrology (AREA)
  • General Chemical & Material Sciences (AREA)
  • Removal Of Specific Substances (AREA)
  • Separation Using Semi-Permeable Membranes (AREA)
  • Heat Treatment Of Water, Waste Water Or Sewage (AREA)
  • Physical Water Treatments (AREA)
  • Treatment Of Water By Ion Exchange (AREA)
  • Water Treatment By Electricity Or Magnetism (AREA)
  • Degasification And Air Bubble Elimination (AREA)
  • Separation Of Suspended Particles By Flocculating Agents (AREA)

Abstract

 高い水回収率で塩類を含む水を再生することができる水処理システム及び水処理方法を提供する。本発明の水処理システム(400)及び水処理方法において、Caイオン、SOイオン、炭酸イオン及びシリカを含む被処理水に対してスケール防止剤とシリカスケール防止剤とが供給された後、被処理水は、第2脱塩部(210)でCaイオン、SOイオン、炭酸イオン及びシリカが濃縮された第2濃縮水と処理水とに分離される。第2晶析部(220)において第2濃縮水に石膏の種結晶が供給され、石膏が晶析して第2濃縮水から除去される。

Description

水処理方法及び水処理システム
 本発明は、Caイオン(Ca2+)、硫酸イオン(SO 2-)、炭酸イオン及びシリカを含む被処理水を再生させる水処理方法及び水処理システムに関する。
 工場廃水、かん水、下水にはイオンやシリカが豊富に含まれていることが知られている。また、冷却塔においては、ボイラなどから排出された高温の排ガスと冷却水との間で熱交換が行われる。この熱交換により冷却水の一部が蒸気となるため、冷却水中のイオンやシリカが濃縮される。従って、冷却塔から排出された冷却水(ブローダウン水)は、イオン濃度やシリカ濃度が高い状態となっている。
 イオンを多量に含む水は、脱塩処理が施されてから環境中に放出される。脱塩処理を実施する装置としては、逆浸透膜装置、ナノろ過膜装置、イオン交換装置などが知られている。
 上述の水中に含まれるイオンの内、Na、K、NH などの1価の陽イオンやCl、NO 等の陰イオンは、水中への溶解度が高いイオンである。一方、Ca2+などの2価の金属イオン、SO 2-、CO 2-などの陰イオン、およびシリカは、スケールを構成する成分である。スケールを構成する成分の塩やシリカは水に対する溶解度が低いため、スケールとして析出しやすい。特に、上述のかん水、工業廃水、冷却塔のブローダウン水にはCa2+、SO 2-、炭酸イオン(CO 2-、HCO )、シリカが豊富に含まれている。性状の一例としては、pHが8、Naイオンが20mg/L、Kイオンが5mg/L、Caイオンが50mg/L、Mgイオンが15mg/L、HCO3イオンが200mg/L、Clイオンが200mg/L、SO4イオンが120mg/L、PO4イオンが5mg/L、SiO2イオンが35mg/Lである。これらの中でも、Caイオン、Mgイオン、SO4イオン、HCO3イオン濃度が高く、これらが反応することによりスケール(CaSO4、CaCO3等)が生成することとなる。また、廃水中に存在するシリカ成分も、濃縮率により機器等に付着するスケール成分となる。上記の脱塩処理を実施する装置内にスケールが発生すると処理能力が低減してしまう。このため、スケールを発生させることなく脱塩処理を実施することが求められる。
 ここで、水冷式の冷却塔を用いるプラントの例としては、例えば発電設備(売電用途の事業用、場内電力利用の産業用発電設備がある。発電は火力、地熱等である)、発電設備および冷却設備を有するプラント等がある。また、プラントとしては、一般の化学プラント、鉄鋼プラント、採鉱プラント、油田プラント、ガス田プラント、機械プラント等がある。
 Caイオンを除去する方法としてライムソーダ法が知られている。ライムソーダ法では、被処理水に炭酸ナトリウムが添加され、被処理水中のCaイオンが炭酸カルシウムとして析出・沈殿することにより水中から除去される。
 特許文献1には、ライムソーダ法を用いた化学軟化装置、イオン交換装置、逆浸透膜装置などが組み合わされた廃水処理装置が開示されている。
米国特許第7815804号明細書
 ライムソーダ法は処理のために炭酸ナトリウムを添加する必要があるために処理コストが高い。ライムソーダ法では1molのCaイオンを炭酸カルシウムとして沈殿させると2molのNaが発生する。一方、SO 2-が被処理水に含まれる場合、ライムソーダ法では除去されない。つまり、ライムソーダ法では処理後の水に含まれるイオンのモル数が増加することになる。
 イオン交換装置を用いてCaイオンを除去する場合も、1molのCaイオンを処理するために2molのNaが発生することになり、処理後の水に含まれるイオンのモル数が増加する。
 特許文献1のシステムは、ライムソーダ法及びイオン交換装置で処理された後の水を逆浸透膜装置により更にイオン分を除去する処理をする。このため、特許文献1のシステムでは、イオンのモル数が増加しているために逆浸透膜装置での浸透圧が高くなり処理負荷が大きくなるといった問題があった。また、特許文献1の装置ではSO 2-が除去されず、処理水にSO 2-が残留し、高い水回収率を得ることは困難であった。
 また、特許文献1の廃水処理装置ではイオン交換装置を再生するに当たり多量の薬品が必要となり、処理コストが高いことも問題となっていた。
 本発明は、高い水回収率で塩類を含む水を再生することができる水処理方法及び水処理システムを提供することを目的とする。
 本発明の第1の態様は、Caイオン、SOイオン、炭酸イオン及びシリカを含む被処理水に対して、カルシウムを含むスケールの析出を防止するスケール防止剤であるカルシウムスケール防止剤と、前記シリカの析出を防止するスケール防止剤であるシリカスケール防止剤とが供給される第2スケール防止剤供給工程と、前記第2スケール防止剤供給工程の後で、前記被処理水が前記Caイオン、前記SOイオン、前記炭酸イオン及び前記シリカが濃縮された第2濃縮水と処理水とに分離される第2脱塩工程と、前記第2濃縮水に石膏の種結晶が供給されて、前記第2濃縮水から石膏が晶析する第2晶析工程と、前記第2晶析工程の後に、前記被処理水に対して、前記カルシウムスケール防止剤が供給される第1スケール防止剤供給工程と、前記被処理水が、前記シリカが前記被処理水中に溶解可能なpHに調整される第1pH調整工程と、前記第1スケール防止剤供給工程及び前記第1pH調整工程の後で、前記被処理水が、前記Caイオン、前記SOイオン、前記炭酸イオン及び前記シリカが濃縮された第1濃縮水と処理水とに分離される第1脱塩工程と、前記第1濃縮水に石膏の種結晶が供給されて、前記第1濃縮水から石膏が晶析する第1晶析工程と、を含む水処理方法である。
 本発明の第2の態様は、Caイオン、SOイオン、炭酸イオン及びシリカを含む被処理水に対して、カルシウムを含むスケールの析出を防止するスケール防止剤であるカルシウムスケール防止剤とシリカの析出を防止するスケール防止剤であるシリカスケール防止剤とを供給する第2スケール防止剤供給部と、前記第2スケール防止剤供給部の下流側に設置され、前記被処理水を前記Caイオン、前記SOイオン及び前記シリカが濃縮された第2濃縮水と処理水とに分離する第2脱塩部と、前記第2脱塩部の下流側に設けられ、前記第2濃縮水から石膏を晶析させる第2晶析槽と、前記第2晶析槽に石膏の種結晶を供給する第2種結晶供給部とを有する第2晶析部と、前記第2晶析部の前記被処理水の下流側に、前記被処理水に対して、前記カルシウムスケール防止剤を供給する第1スケール防止剤供給部と、前記被処理水にpH調整剤を供給して、前記シリカが前記被処理水中に溶解可能な値に前記被処理水のpHを調整する第1pH調整部と、前記第1スケール防止剤供給部及び前記第1pH調整部の下流側に設置され、前記被処理水を、前記Caイオン、前記SOイオン、前記炭酸イオン及び前記シリカが濃縮された第1濃縮水と処理水とに分離する第1脱塩部と、前記第1脱塩部の下流側に設けられ、前記第1濃縮水から石膏を晶析させる第1晶析槽と、前記第1晶析槽に石膏の種結晶を供給する第1種結晶供給部とを有する第1晶析部と、を備える水処理システムである。
 第1の態様及び第2の態様では、第2スケール防止剤供給工程及び第2スケール防止剤供給部にて供給されるカルシウムスケール防止剤及びシリカスケール防止剤の効果により、第2脱塩部及び第2脱塩工程でのスケール発生を防止できる。また、第2晶析部及び第2晶析工程で石膏の種結晶を第2濃縮水に添加することにより、スケール防止剤が存在していても石膏を晶析させて被処理水から分離することができる。この結果、Caイオン、SOイオン及びシリカを含む被処理水を高い水回収率で処理することができ、運転コストを低減させることができる。更には、高純度の石膏を回収できるという効果も奏する。
 第1の態様及び第2の態様に依れば、第1スケール防止剤供給工程、第1スケール防止剤供給部、第1pH調整工程及び第1pH調整部にて、カルシウムスケール防止剤を添加するともにシリカが溶解可能なpHに調整して水処理を実施しているため、第1脱塩部及び第1脱塩工程でのスケール発生を防止できる。また、第1晶析部及び第1晶析工程で石膏の種結晶を第1濃縮水に添加することにより、スケール防止剤が存在していても石膏を晶析させて被処理水から分離することができる。この結果、スケール発生を防止しながら、Caイオン、SOイオン、炭酸イオン及びシリカを含む被処理水を高い水回収率で処理することができる。また、処理に要する薬品量や運転に要する動力を低減でき、メンテナンスも容易となるので、運転コストを低減させることができる。
 上記態様において、前記被処理水の最下流での前記第1晶析工程の後に、濃縮水と処理水とに分離されて、該分離された処理水が回収される下流側脱塩工程を含む。
 上記態様において、被処理水最下流の前記第1晶析部の下流側に、前記第1晶析部から排出された前記第1濃縮水を、濃縮水と処理水とに分離する下流側脱塩部を備える。
 下流側脱塩工程及び下流側脱塩部を設けることにより、水回収率を更に向上させることができる。また、発明では、被処理水中のイオンのモル数が大幅に低減されるため、下流側脱塩部への塩類の流入量を低減することができため、下流側脱塩部の動力を低減することができる。
 上記態様において、前記第2濃縮水が、前記第2晶析工程において前記カルシウムスケール防止剤のスケール防止機能が低減されて前記石膏の析出が促進されるpHに調整される第2pH調整工程を備えることが好ましい。
 上記態様において、前記第2脱塩部の下流側に設置され、前記第2濃縮水にpH調整剤を供給して、前記カルシウムスケール防止剤のスケール防止機能が低減されて前記石膏の析出が促進される値に、前記第2濃縮水のpHを調整する第2pH調整部を備えることが好ましい。
 この場合、前記第2晶析工程の後に、前記第2pH調整工程でpHが調整された後の前記第2濃縮水が、前記カルシウムスケール防止剤が機能を発揮するpHに調整されることが好ましい。
 また、前記第2晶析部の下流側に、前記第2pH調整部でpHが調整された後の前記第2濃縮水にpH調整剤を供給して、前記カルシウムスケール防止剤が機能を発揮する値に、前記第2濃縮水のpHを調整する第3pH調整部を備えることが好ましい。
 あるいは、上記態様において、前記第2濃縮水が、前記第2晶析工程において前記シリカが溶解可能であるpHに調整される第2pH調整工程を備えることができる。上記態様において、前記第2脱塩部の下流側に設置され、前記第2濃縮水にpH調整剤を供給して、前記第2晶析部内で前記シリカが前記第2濃縮水中に溶解可能である値に、前記第2濃縮水のpHを調整する第2pH調整部を備えることが好ましい。
 こうすることにより、下流側脱塩部内でのカルシウムを含むスケールの生成を抑制することが可能となる。
 第1の態様において、前記被処理水の最上流側での前記第2スケール防止剤供給工程の前に、前記被処理水から少なくとも炭酸カルシウムが沈殿されて、前記被処理水中の前記炭酸カルシウムの濃度が低減される第2上流側沈殿工程を含むことが好ましい。この場合、前記第2上流側沈殿工程の前、または、前記第2上流側沈殿工程の後であって前記第2スケール防止剤供給工程の前において、前記被処理水からCOを除去する第2脱気工程を含むことが好ましい。
 第2の態様において、前記被処理水の最上流に位置する前記第2スケール防止剤供給部の上流側に、前記被処理水から少なくとも炭酸カルシウムを沈殿させて、前記被処理水中の前記炭酸カルシウムの濃度を低下させる第2上流側沈殿部を備えることが好ましい。この場合、前記第2上流側沈殿部の上流側、または、前記第2上流側沈殿部の下流側であって前記第2スケール防止剤供給部の上流側に、前記被処理水からCOを除去する第2脱気部を備えることが好ましい。
 このように、脱塩部に流入する前の被処理水から炭酸カルシウムを予め除去することによって、水処理中に炭酸カルシウムがスケールとして析出することを防止できる。炭酸カルシウムを除去することによって、晶析工程及び晶析部で晶析する石膏の純度を高めることができる。
 上記態様において、前記被処理水が金属イオンを含み、前記第1晶析工程の後で、炭酸カルシウム及び金属化合物の少なくとも一方が沈殿されて、前記第1濃縮水から前記炭酸カルシウム及び前記金属イオンの少なくとも一方の濃度が低減される第1沈殿工程を含むことが好ましい。前記第2晶析工程の後で、炭酸カルシウム及び金属化合物の少なくとも一方が沈殿されて、前記第2濃縮水から前記炭酸カルシウム及び前記金属イオンの少なくとも一方の濃度が低減される第2沈殿工程を含むことが好ましい。
 この場合、前記第1沈殿工程において、前記第1濃縮水に対して前記シリカの種結晶及び前記シリカの沈殿剤の少なくとも一方が供給される。前記第2沈殿工程において、前記第2濃縮水に対して、前記シリカの種結晶及び前記シリカの沈殿剤の少なくとも一方が供給される。
 上記態様において、前記被処理水が金属イオンを含み、前記第1晶析部の下流側に、炭酸カルシウム及び金属化合物の少なくとも一方を沈殿させて、前記第1濃縮水中の前記炭酸カルシウム及び前記金属イオンの少なくとも一方の濃度を低減させる第1沈殿部を備えることが好ましい。前記第2晶析部の下流側に、炭酸カルシウム及び金属化合物の少なくとも一方を沈殿させて、前記第2濃縮水中の前記炭酸カルシウム及び前記金属イオンの少なくとも一方の濃度を低減させる第2沈殿部を備えることが好ましい。
 この場合、前記第1沈殿部に、前記シリカの種結晶及び前記シリカの沈殿剤の少なくとも一方が供給される。前記第2沈殿部に、前記シリカの種結晶及び前記シリカの沈殿剤の少なくとも一方が供給される。
 晶析部及び晶析工程の後に設けられる沈殿部及び沈殿工程により炭酸カルシウムや金属化合物を被処理水から除去することによって、高い水回収率を得ることができる。
 被処理水のpHによりシリカの溶解状態は変化するが、pHを変化させただけではシリカは析出しにくい傾向がある。そこで、沈殿部及び沈殿工程でシリカの種結晶を添加することによってシリカを析出させやすくすることにより、シリカの除去率を高めることができる。この結果、水回収率を更に高め、運転動力を更に低下させることができる。
 上記態様の水処理方法において、前記被処理水がMgイオンを含む場合に、前記Mgイオンの濃度に応じて前記シリカの沈殿剤の供給量を調整することが好ましい。
 上記態様において、前記被処理水がMgイオンを含む場合に、前記第1沈殿部において、前記Mgイオンの濃度に応じて前記シリカの沈殿剤の供給量を調整することが好ましい。前記被処理水がMgイオンを含む場合に、前記第2沈殿部において、前記Mgイオンの濃度に応じて前記シリカの沈殿剤の供給量を調整することが好ましい。
 上記態様において、前記被処理水がMgイオンを含む場合に、前記第1沈殿工程の第1濃縮水が、マグネシウム化合物が析出するpHに調整されて前記Mgイオンの濃度が低減され、前記第1沈殿工程の後で、前記第1濃縮水が、前記マグネシウム化合物が溶解可能なpHに調整されることが好ましい。前記第2沈殿工程の第2濃縮水が、マグネシウム化合物が析出するpHに調整されて前記Mgイオンの濃度が低減され、前記第2沈殿工程の後で、前記第2濃縮水が、前記マグネシウム化合物が溶解可能なpHに調整されることが好ましい。
 上記態様において、前記被処理水がMgイオンを含む場合に、前記第1沈殿部内の前記第1濃縮水を、マグネシウム化合物が析出するpHに調整して前記Mgイオンの濃度を低減し、前記第1沈殿部の下流側で、前記マグネシウム化合物が溶解可能な値に、前記第1濃縮水のpHを調整することが好ましい。前記被処理水がMgイオンを含む場合に、前記第2沈殿部内の前記第2濃縮水を、マグネシウム化合物が析出するpHに調整して前記Mgイオンの濃度を低減し、前記第2沈殿部の下流側で、前記マグネシウム化合物が溶解可能な値に、前記第2濃縮水のpHを調整することが好ましい。
 被処理水にMgイオンが含まれる場合は、沈殿工程及び沈殿部において濃縮水中のMgイオンとシリカとが反応して沈殿する。本発明では、濃縮水中のMgイオンとシリカとのバランスに応じて沈殿剤の供給量の調整を行うことにより、沈殿剤の供給を効率良く行う。シリカに対してMgイオン濃度が高い場合には、濃縮水のpHを調整して沈殿工程及び沈殿部でマグネシウム化合物を析出させる。その後、マグネシウム化合物が溶解可能なpHに濃縮水を調整して、沈殿部の下流側に位置する脱塩部でのスケール生成を抑制する。
 上記態様において、前記被処理水がMgイオンを含む場合に、前記第2上流側沈殿工程の前記被処理水が、マグネシウム化合物が析出するpHに調整されて前記Mgイオンの濃度が低減され、前記第2上流側沈殿工程の後で、前記被処理水が、前記マグネシウム化合物が溶解可能なpHに調整されることが好ましい。
 上記態様において、前記第2上流側沈殿部内の前記被処理水を、マグネシウム化合物が析出するpHに調整して前記Mgイオンの濃度を低減し、前記第2上流側沈殿部の下流側で、前記マグネシウム化合物が溶解可能な値に、前記被処理水のpHを調整することが好ましい。
 このように、被処理水にMgイオンが含まれる場合には、脱塩処理される前においてMgイオンを効率良く除去することにより、水処理工程中でのマグネシウムを含むスケールの生成を防止することができる。
 上記態様において、前記下流側脱塩工程の前記濃縮水から水分が蒸発されて、前記濃縮水中の固体が回収されることが好ましい。
 上記態様において、前記下流側脱塩工程の前記濃縮水から水分が蒸発されて、前記濃縮水中の固体が回収されることが好ましい。前記下流側脱塩部の前記濃縮水の下流側に、前記濃縮水から水分を蒸発させて前記濃縮水中の固体を回収する蒸発器を備えることが好ましい。
 上記構成の水処理方法及び水処理システムによれば、水処理の過程で生成する固形物を廃棄物として系外に排出するに当たり、廃棄物の容積を小さくすることができる。
 本発明の水処理システム及び水処理方法では、処理中での炭酸カルシウム、シリカ等のスケール発生を防止しながらCa2+及びSO 2-を石膏として被処理水から除去することができるため、更に水回収率を高めることができる。
 被処理水中にマグネシウムイオンが含まれる場合も、本発明の水処理システム及び水処理方法を用いれば、処理中のマグネシウムを含むスケールの発生を防止しながら被処理水中から除去することが可能である。
 本発明により処理された水は下流側でのイオンのモル数が大幅に低減されているため、下流に位置する脱塩部の動力を大幅に低減される。
 更に本発明は、高純度の石膏を晶析させ回収することができるという効果も奏する。
第1参考実施形態に係る水処理システムの概略図である。 石膏析出量のpH依存性のシミュレーション結果である。 炭酸カルシウム析出量のpH依存性のシミュレーション結果である。 シリカ溶解量のpH依存性を示すグラフである。 石膏が過飽和状態にある模擬水を用いて、模擬水のpHを変えて石膏析出実験を行った結果である。 石膏が過飽和状態にある模擬水を用いて、種結晶の濃度を変えて石膏析出実験を行った結果である。 条件5で晶析した石膏の顕微鏡写真である。 条件3で晶析した石膏の顕微鏡写真である。 第2参考実施形態に係る水処理システムの概略図である。 第3参考実施形態に係る水処理システムの概略図である。 第4参考実施形態に係る水処理システムの概略図である。 第1実施形態に係る水処理システムの概略図である。 第5参考実施形態に係る水処理システムを説明する概略図である。 第6参考実施形態に係る水処理システムを説明する概略図である。 第7参考実施形態に係る水処理システムを説明する概略図である。 第8参考実施形態に係る水処理システムを説明する概略図である。
 本発明の処理対象となる水(被処理水)はCa2+、SO 2-、炭酸イオン及びシリカを含む。具体的に、被処理水(原水)はかん水、下水、工場廃水、冷却塔のブローダウン水などである。また、被処理水は、Mgイオンなどの金属イオンを含む場合がある。
[第1参考実施形態]
 図1は、本発明の第1参考実施形態に係る水処理システムの概略図である。図1の水処理システム1は、被処理水の流通方向に2つの水処理部が連結された構成となっている。本参考実施形態の水処理システム1では、被処理水の性状に応じて水処理部が1つであっても良いし、3つ以上の水処理部が連結されても良い。
 一の水処理部はそれぞれ、被処理水の上流側から順に第1脱塩部10(10a,10b)及び第1晶析部20(20a,20b)を備える。第1脱塩部10a,10bの濃縮側と第1晶析部20a,20bとが接続されている。水処理部は、各第1脱塩部10(10a,10b)の上流側流路に、第1スケール防止剤供給部30(30a,30b)及び第1pH調整部40(40a,40b)を備える。
 第1スケール防止剤供給部30(30a,30b)は、タンク31(31a,31b)、バルブV1(V1a,V1b)、及び、制御部32(32a,32b)で構成されている。制御部32a,32bはそれぞれバルブV1a,V1bに接続する。タンク31a,31b内にはスケール防止剤が貯蔵されている。
 本参考実施形態で用いられるスケール防止剤は、被処理水中でカルシウムを含むスケールが析出することを防止するものである。以下では、「カルシウムスケール防止剤」と称する。
 カルシウムスケール防止剤は、被処理水中で石膏または炭酸カルシウムの結晶核生成を抑制するとともに、被処理水中に含まれる石膏または炭酸カルシウムの結晶核(種結晶や飽和濃度を超えて析出した小径のスケールなど)の表面に吸着して、石膏または炭酸カルシウムの結晶成長を抑制する機能を有するものである。あるいは、カルシウムスケール防止剤は、析出した結晶などの被処理水中の粒子を分散させる(凝集を防止する)機能を有するタイプのものもある。
 カルシウムスケール防止剤としては、ホスホン酸系のスケール防止剤、ポリカルボン酸系のスケール防止剤、及びこれらの混合物等がある。具体例としては、FLOCON260(商品名、BWA社製)が挙げられる。
 被処理水にMgイオンが含まれる場合、被処理水中でマグネシウムを含むスケール(例えば、水酸化マグネシウム)が析出することを防止するスケール防止剤を用いることができる。以下では、「マグネシウムスケール防止剤」と称する。
 マグネシウムスケール防止剤としては、ポリカルボン酸系のスケール防止剤等がある。具体例としては、FLOCON 295N(商品名,BWA社製)が挙げられる。
 図1では第1スケール防止剤供給部30a,30bは各位置で1つのみ図示されているが、複数種類のスケール防止剤を投入する場合は、複数の第1スケール防止剤供給部が設置されることが好ましい。この場合、それぞれのタンクにスケール防止剤が種類毎に分けて収納される。
 第1pH調整部40(40a,40b)は、タンク41(41a,41b)、バルブV2(V2a,V2b)、制御部42(42a,42b)、及び、pH計43(43a,43b)で構成されている。タンク41a,41b内にはpH調整剤としてアルカリが貯蔵されている。アルカリは、例えば水酸化カルシウム、水酸化ナトリウムである。特に水酸化カルシウムは、後述する晶析工程でCaイオンが石膏として回収されるため、下流側の脱塩部に到達するイオン量が低減されるので好ましい。制御部42a,42bはそれぞれ、バルブV2a、V2b及びpH計43a,43bに接続する。
 図1では、第1脱塩部10a,10bは逆浸透膜装置である。この他に、第1脱塩部10a,10bは、電気透析装置(ED)、極性転換式電気透析装置(EDR)、電気再生式純水装置(EDI)、イオン交換装置(IEx)、静電脱塩装置(CDI)、ナノフィルター(NF)、蒸発器などを採用することができる。
 ここで、ナノフィルター(NF)、電気透析装置(ED)、極性転換式電気透析装置(EDR)、電気再生式純水装置(EDI)、静電脱塩装置(CDl)では、スケール成分(2価イオン、Ca2+、Mg2+等)を選択的に除去し、Na及びCl等の1価イオンは透過する。これらの脱塩装置を使用すれば濃縮水中のスケール成分となるイオンのイオン濃度の濃縮を抑制するので、水回収率の向上、省エネルギー化(例えばポンプ動力の削減等)を図ることができる。
 また、被処理水が冷却塔ブローダウン水の場合では、再生水は純水である必要は無く、スケール成分(2価イオン、Ca2+、Mg2+等)が除去されていればよいので、ナノフィルター(NF)等を利用する利点がある。
 図1では、第1脱塩部10a,10bを1つのみ示しているが、複数の脱塩装置が被処理水の流通方向に並列または直列に連結される構成とされても良い。
 第1晶析部20(20a,20b)は、第1晶析槽21(21a,21b)及び第1種結晶供給部22(22a,22b)で構成される。第1種結晶供給部22a,22bがそれぞれ第1晶析槽21a,21bに接続される。第1種結晶供給部22a,22bは、種結晶タンク23(23a,23b)、バルブV3(V3a,V3b)、及び、制御部24(24a,24b)を有する。制御部24a,24bはそれぞれ、バルブV3a,V3bに接続する。種結晶タンク23a,23bは、種結晶として石膏粒子を貯蔵する。
 図1の水処理システム1では、第1晶析部20a,20bの各々の下流側に、第1沈殿部50(50a,50b)が設置されてもよい。第1沈殿部50a,50bはそれぞれ、第1沈殿槽51(51a,51b)及び第1ろ過装置52(52a,52b)を備える。
 水処理システム1は、最下流に位置する第1晶析部20bの被処理水下流側に下流側脱塩部60を備える。
 図1において下流側脱塩部60は逆浸透膜装置である。下流側脱塩部60は、電気透析装置(ED)、極性転換式電気透析装置(EDR)、電気再生式純水装置(EDI)、イオン交換装置、静電脱塩装置(CDI)、ナノフィルター(NF)、蒸発器などを採用することができる。
 水処理システム1において、被処理水の最上流に位置する第1スケール防止剤供給部30a及び第1pH調整部40aの上流に、第1上流側沈殿部70として沈殿槽71及びろ過装置72が設置される。沈殿槽71及びろ過装置72は、第1沈殿部50の第1沈殿槽51及び第1ろ過装置52と同じ構成である。
 特に被処理水にMgイオンが含まれる場合には、第1上流側沈殿部は複数の沈殿槽71が被処理水の流通方向に直列に接続される構成を採用することができる。
 図1に示す水処理システム1では、第1上流側沈殿部70の上流側に第1脱気部73が設けられていても良い。第1脱気部73は具体的に、二酸化炭素を除去する充填剤を備える脱気塔、または、分離膜である。第1脱気部73の被処理水上流側に、被処理水を炭酸イオンがCOの状態で存在するpHに調整するpH調整部(不図示)が設置されていても良い。
 第1脱気部73は、第1上流側沈殿部70の被処理水下流側であって、第1スケール防止剤供給部30a及び第1pH調整部40aの上流側に設置されていても良い。
 第1脱気部73と同じ構成の脱気部が、第1脱塩部10と第1晶析部20の間の流路、第1晶析部20と第1沈殿部50との間の流路、及び、第1沈殿部50の下流側であって第1脱塩部10bまたは下流側脱塩部60との間の流路に設置されても良い。
 被処理水中のCaイオン濃度が高い場合には、ろ過装置72の下流であって最上流に位置する第1スケール防止剤供給部30a及び第1pH調整部40aの上流にイオン交換装置(不図示)が設置されても良い。イオン交換装置は、例えばイオン交換樹脂塔、イオン交換膜装置である。
 第1脱塩部10aに流入する被処理水中の石膏が既に過飽和になっていると、第1脱塩部10aでイオンが更に濃縮されるので石膏濃度が更に高い状態となる。この場合、多量のカルシウムスケール防止剤投入が必要となる上、カルシウムスケール防止剤が効果を発揮する以上に石膏濃度が高くなり第1脱塩部10a内でスケールが発生する恐れがある。
 そこで、原水(被処理水)中の石膏が過飽和である場合には、最上流の第1スケール防止剤供給部30a及び第1pH調整部40aの上流に、上述の第1晶析槽21a,21bと同じ構成の上流側晶析部(不図示)を設け、石膏濃度を低減させてから被処理水を第1脱塩部10aに送給しても良い。
 第1参考実施形態の水処理システム1を用いて、被処理水を処理する方法を以下で説明する。
 まず、水中での石膏、シリカ、及び炭酸カルシウムの析出挙動を説明する。図2は、石膏析出量のpH依存性のシミュレーション結果である。図3は、炭酸カルシウム析出量のpH依存性のシミュレーション結果である。同図において、横軸はpH、縦軸はそれぞれ、石膏または炭酸カルシウムの析出量(mol)である。シミュレーションはOLI社製シミュレーションソフトを用い、水中に各固体成分が0.1mol/Lずつ混合され、酸としてHSO、アルカリとしてCa(OH)が添加される条件で行った。
 図4は、シリカ溶解量のpH依存性を示すグラフ(出典:米国特許第7815804号明細書の図4)である。同図において、横軸はpH、縦軸はシリカの溶解量(mg/L)である。
 図2より、石膏析出のpH依存性はなく、全pH領域で析出することが理解できる。しかし、カルシウムスケール防止剤が添加されると、高pH領域では石膏は水中に溶解した状態で存在する。図3より、炭酸カルシウムはpH5を超えると析出する。図4より、シリカはpH10以上となると水中に溶解する傾向がある。
<前処理>
 被処理水が工業廃水などである場合は、被処理水が第1上流側沈殿部70に流入する前に、被処理水中の油分や浮遊粒子等を除去する工程や、生物処理あるいは化学酸化処理により有機物を除去する工程が実施される。
<第1脱気工程>
 図1の水処理システム1では、第1脱気部73に流入する前の被処理水が、低pHに調整される。被処理水中の炭酸は、被処理水のpHに応じて以下の平衡状態となっている。
Figure JPOXMLDOC01-appb-C000001
 pHが6.5以下と低い場合には、被処理水中では主としてHCO 及びCOの状態で存在する。
 COを含んだ被処理水が第1脱気部73に流入する。COは、第1脱気部73において被処理水から除去される。予め、炭酸イオンがCOとして存在するpHに被処理水が調整されていれば、効率良く二酸化炭素を除去させることができる。
 第1脱気工程により炭酸イオン濃度が低減された被処理水が、第1上流側沈殿部70に送給される。
<第1上流側沈殿工程>
 第1上流側沈殿部70において、Caイオン及び炭酸イオンは炭酸カルシウムとして予め被処理水から一部除去される。
 被処理水にCaイオン以外の金属イオンが含まれる場合は、第1上流側沈殿部70において、金属イオンが水への溶解性が低い金属化合物として予め被処理水から粗除去される。この金属化合物は主として金属水酸化物であるが、炭酸塩も含まれる場合がある。
 沈殿槽71で被処理水にCa(OH)及びアニオン系ポリマー(三菱重工メカトロシステムズ(株)製、商品名:ヒシフロックH305)が投入され、沈殿槽71内のpHは4以上12以下、好ましくは8.5以上12以下に管理される。
 図3に示すように、このpH領域では炭酸カルシウムの溶解度は低い。炭酸カルシウムが過飽和となると、炭酸カルシウムが析出して沈殿槽71の底部に沈殿する。
 金属化合物の溶解度はpHに依存する。金属イオンの水への溶解度は酸性になるほど高くなる。上記のpH領域では多くの金属化合物の溶解度が低くなる。上記pH領域では水への溶解度が低い金属化合物は沈殿槽71内で凝集し、沈殿槽71の底部に沈殿する。
 沈殿した炭酸カルシウム及び金属化合物は沈殿槽71の底部から排出される。
 Mgイオンは水に対して難溶性の塩を形成するため、スケールとして析出しやすい成分である。Mg(OH)はpH10以上で析出する。
 本参考実施形態の水処理システム1でMgイオンを含む被処理水を処理する場合、沈殿槽71での被処理水のpHが、マグネシウム化合物(主として水酸化マグネシウム)が析出するpHに調整する。具体的には、被処理水のpHが10以上、好ましくはpH10.5以上、より好ましくはpH11以上に調整される。こうすることにより、マグネシウム化合物が被処理水から析出し、沈殿槽71の底部に沈殿して除去される。この結果、被処理水中のMgイオンが粗除去され、被処理水中のMgイオン濃度が低減する。
 上記の場合、第1上流側沈殿部70から排出された後の被処理水が、上記のマグネシウム化合物が溶解可能なpHに調整されることが好ましい。具体的に、pH10未満に調整される。こうすることにより、下流側の装置及び工程、特に第1脱塩部10a及び第1脱塩工程でのスケール生成を防止することが可能となる。
 沈殿槽71を複数段設ける場合は、被処理水中のMgイオンを確実に除去して、下流側に送給される被処理水中のMgイオン濃度を低減させることができる。
 被処理水である沈殿槽71内の上澄み液が沈殿槽71から排出される。排出された被処理水に対しFeClが添加され、上澄み液中の炭酸カルシウムや金属化合物等の固形分がFe(OH)と凝集する。
 被処理水はろ過装置72に送給される。ろ過装置72によりFe(OH)により凝集した固形分が除去される。
 第1上流側沈殿工程を実施した後に第1脱気工程を実施する場合は、被処理水のpHは炭酸イオンがCOとして存在可能であるpH、具体的に6.5以下に調整される。
 なお、被処理水の性状によっては、上記第1脱気工程及び第1上流側沈殿工程は省略しても良い。
 イオン交換装置を設置した場合は、イオン交換装置により被処理水中のCaイオンが除去される。被処理水にMgイオンが含まれる場合は、Mgイオンもイオン交換装置により除去される。
 原水中の石膏が過飽和である場合は、ろ過装置72直後に設置される上流側晶析部で被処理水に石膏の種結晶が投入され、石膏が晶析して被処理水中の石膏濃度を低減させる。石膏濃度が低減した被処理水が第1脱塩部10aに送給される。
<第1スケール防止剤供給工程>
 第1スケール防止剤供給部30aの制御部32aはバルブV1aを開放し、タンク31aから所定量のカルシウムスケール防止剤を被処理水に供給する。制御部32aは、カルシウムスケール防止剤の濃度が被処理水の性状に応じて設定された所定値となるようにバルブV1aの開度を調整する。
 被処理水にMgイオンが含まれる場合、第1スケール防止剤供給工程において上記と同様の方法にてマグネシウムスケール防止剤が被処理水に供給される。この場合、複数の第1スケール防止剤供給部のタンクにそれぞれカルシウムスケール防止剤及びマグネシウムスケール防止剤が収納され、各制御部がカルシウムスケール防止剤及びマグネシウムスケール防止剤の供給量を調整する。
<第1pH調整工程>
 第1pH調整部40aの制御部42aは、第1脱塩部10a入口での被処理水のpHを、シリカが被処理水中に溶解可能な値に管理する。具体的に、第1脱塩部10aに送給される被処理水のpHは10以上、好ましくは10.5以上、より好ましくは11以上に調整される。
 pH計43aは、第1脱塩部10a入口での被処理水のpHを計測する。制御部42aは、pH計43aでの計測値が所定のpH管理値になるようにバルブV2aの開度を調整し、タンク41aからアルカリを被処理水に投入させる。
<第1脱塩工程>
 第1脱塩部10aにおいて、pHが調整された被処理水が処理される。第1脱塩部10aが逆浸透膜装置である場合、逆浸透膜を通過した水は処理水として回収される。被処理水に含まれるイオン及びスケール防止剤は、逆浸透膜を透過することができない。従って、逆浸透膜の非透過側はイオン濃度が高い濃縮水となる。例えば静電脱塩装置など他の脱塩装置を用いた場合も、被処理水は処理水と、イオン濃度が高い濃縮水(第1濃縮水)とに分離される。
 第1脱塩工程により、図4に示すようにシリカは被処理水中に溶解した状態で、第1濃縮水中に含まれる。第1濃縮水中の石膏及び炭酸カルシウムは飽和濃度以上に濃縮されている場合でも、カルシウムスケール防止剤によりスケール発生が抑制されている。
 被処理水にMgイオンが含まれている場合、第1脱塩工程により第1濃縮水中に含まれるMgイオン濃度が増加する。しかし、マグネシウムスケール防止剤によりマグネシウムを含むスケールの発生が抑制されている。
 第1濃縮水は、第1晶析部20aに向かって送給される。
<第1晶析工程>
 第1脱塩部10aから排出された第1濃縮水が、第1晶析部20aの第1晶析槽21aに貯留される。第1種結晶供給部22aの制御部24aは、バルブV3aを開放し、タンク23aから石膏の種結晶を第1晶析槽21a内の第1濃縮水に添加する。
 第1脱塩部10aからの第1濃縮水はpH10以上である。前述したようにカルシウムスケール防止剤が存在する高pH領域の水中で石膏は溶解状態である。しかし、種結晶が十分に存在すると、スケール防止剤が存在していても種結晶を核として石膏が晶析する。図1の水処理システム1においては、結晶成長した大径(例えば粒径が10μm以上、より好ましくは20μm以上)の石膏が第1晶析槽21aの底部に沈殿する。沈殿した石膏は第1晶析槽21aの底部から排出される。
 一方、pH10以上であればシリカは第1晶析槽21a内で第1濃縮水中に溶解状態で存在する。第1濃縮水中のシリカ濃度が飽和溶解度を超えた場合でも、シリカの種結晶は存在しないので、コロイド状などの小さい浮遊物として析出し、沈殿しにくい。
 図3に依ればpH10以上で炭酸カルシウムは析出する傾向がある。しかし、カルシウムスケール防止剤が添加されているために、第1晶析槽21a内では炭酸カルシウムの析出は抑制されている。また、第1上流側沈殿部や第1脱気部を設ける場合は、予め炭酸カルシウムの濃度が低減されている。この結果、第1晶析槽21aでは炭酸カルシウムは石膏の種結晶を核として晶析しにくい。
 なお、石膏の種結晶が存在すればpHに依存することなく石膏は晶析するが、晶析速度はpHが低い程高くなる。
 図5は、石膏が過飽和状態にある模擬水(Ca2+,SO 2-,Na,Clを含む)に、スケール防止剤(FLOCON260)を添加した場合において、模擬水のpHを変えて石膏析出実験を行った結果である。実験条件は以下のとおりである。
  模擬水の石膏過飽和度(25℃):460%、
  スケール防止剤添加量:2.1mg/L、
  pH:6.5(条件1)、5.5(条件2)、4.0(条件3)、3.0(条件4)、
  種結晶添加量:0g/L。
 pH調整直後から2時間及び6時間経過後に、各条件で処理した模擬水中のCa濃度を原子吸光分析装置(島津製作所製、AA-7000)を用いて計測し、過飽和度を算出した結果を図5に示す。同図において、縦軸は過飽和度(%)である。
 図5によると、種結晶が無い条件でもpHを低くするほど晶析速度が大きくなる。このことから、種結晶が存在する場合では、条件1(pH6.5)でも石膏が晶析し、晶析速度の関係は図5のようにpHが低い方が晶析速度が高くなることが理解できる。
 被処理水中に炭酸イオンが含まれる場合は、pHが低い条件では化学式(1)のように炭酸イオンがCOとして被処理水から除去される。また、図3から理解できるように、pHが低い場合には炭酸カルシウムが溶解状態となる。
 以上の結果から、pHが低い条件で第1晶析工程を行うと、炭酸カルシウムやシリカの含有量が低いために純度の高い石膏が晶析し、第1晶析槽21a底部から回収されることになる。低いpHで第1晶析工程を行う場合には、第1晶析槽21a内または第1脱塩部10aと第1晶析槽21aとの間の流路に、pH調整剤としての酸を供給する第3pH調整部(不図示)が設置される。当該pH調整部は、後述する第2pH調整部と同じ構成である。
 一方で、水処理過程でpHを変動させるには多量の薬品(酸またはアルカリ)を供給する必要がある。酸及びアルカリを使用することは、第1晶析部20aの下流側に搬送されるイオン量が増大することに繋がり、下流側の脱塩部(図1では第1脱塩部10bや下流側脱塩部60)の動力が増大する原因となる。運転コストの観点からは、第1脱塩工程と第1晶析工程とでpHを変動させない方が有利である。
 石膏の晶析速度は種結晶の投入量に依存する。
 図6は、模擬水にカルシウムスケール防止剤(FLOCON260)を添加した場合において、種結晶の添加量を変えて石膏析出実験を行った結果である。pHを4.0として、種結晶として石膏(CaSO4・2HO)を以下の添加量とした以外は、図5の実験条件と同じとした。
  種結晶添加量:0g/L(条件3)、3g/L(条件5)、6g/L(条件6)、g/L(条件7)。
 条件5,6では、スケール防止剤が添加された模擬水に、種結晶とpH調整のための硫酸とを添加した。条件7では、スケール防止剤が添加された模擬水に予め上記スケール防止剤に浸漬した種結晶を添加し、pH調整のため硫酸を添加した。
 pH調整直後から2時間経過後に、各条件で処理した模擬水中のCa濃度を図5と同様の手法で計測した。図6において、縦軸は過飽和度(%)である。
 図6の結果より、種結晶を添加していない条件3では過飽和度が215%であったが、種結晶濃度が増大するに従って、過飽和度が199%(条件5)、176%(条件6)と低下しており、石膏析出速度が増大することが理解できる。pHが高い条件でも、同様に種結晶投入量が多い程石膏析出速度が増大する傾向がある。
条件5と条件7とは、スケール防止剤に浸漬していない種結晶と浸漬した種結晶を使用している以外は同じ試験条件である。予め種結晶にスケール防止剤を付着させた条件7でも過飽和度が199%となっており、条件5と同程度の石膏が析出することが確認できた。すなわち、条件5,7の結果から、種結晶のカルシウムスケール防止剤中の浸漬時間に依らず、pH4.0と低下させることによってスケール防止剤の機能が低減されることが示された。
 図7,8は、晶析で得られた石膏の顕微鏡写真である。図7は条件5(種結晶添加有り)、図8は条件3(種結晶添加なし)の結果である。条件5では、条件3よりも大きい石膏が析出した。一般に、析出した石膏が大きい程含水率が低くなる。含水率が低ければ、石膏は高純度となる。平均粒径が10μm以上、好ましくは20μm以上であれば、十分に含水率が低下した石膏が得られる。本発明における「平均粒径」とは、JIS Z 8825で規定される方法(レーザ回折法)により計測される粒径である。
<第1沈殿工程>
 第1晶析部20aの上澄み液(第1濃縮水)は、第1沈殿部50aに送給される。第1沈殿部50aにおいて、晶析工程後の第1濃縮水にCa(OH)及びアニオン系ポリマー(ヒシフロックH305)が投入され、第1沈殿槽51a内のpHが4以上12以下、好ましくは8.5以上12以下に管理される。第1沈殿槽51a内で、炭酸カルシウム及び金属化合物が沈殿し、第1濃縮水から除去される。沈殿した炭酸カルシウム及び水への溶解性が低い金属化合物は、第1沈殿槽51aの底部から排出される。
 第1沈殿槽51a内の上澄み液である被処理水が第1沈殿槽51aから排出される。排出された被処理水に対しFeClが添加され、被処理水中の炭酸カルシウムや金属化合物等の固形分がFe(OH)と凝集する。
 被処理水は第1ろ過装置52aに送給される。第1ろ過装置52aによりFe(OH)により凝集した固形分が除去される。
 第1晶析部20aの上澄み液中のシリカは、第1沈殿工程で第1濃縮水から除去されても良いし、除去されないで下流側に送給されても良い。
 第1沈殿工程でシリカを除去するか否かは、被処理水や第1濃縮水の性状に応じて決定される。
 シリカを除去しない場合は、第1沈殿槽51aにシリカの種結晶及びシリカの沈殿剤は供給しないで第1沈殿工程を実施する。この場合、シリカは下流側に位置する脱塩部(第1脱塩部10bや下流側脱塩部60)において、処理水と分離される。
 シリカを除去する場合は、不図示の供給部からシリカの種結晶及びシリカの沈殿剤の少なくとも一方が、第1沈殿部50a内の第1濃縮水中に供給される。シリカの種結晶は、例えばシリカゲルであり、シリカの沈殿剤は例えばMgSOである。シリカを除去する場合には、第1沈殿槽51a内の第1濃縮水はpH8以上10以下に調整されることが好ましい。シリカの種結晶を用いた場合は、種結晶を核としてシリカが晶析する。シリカの沈殿剤としてMgSOやアルミン酸Na(Na[Al(OH)])を用いた場合は、ケイ酸マグネシウムが析出する。晶析したシリカやケイ酸マグネシウムは第1沈殿槽51aの底部に沈殿し、第1沈殿槽51a底部から排出される。
 被処理水にMgイオンが含まれる場合は、第1沈殿工程において第1濃縮水中のMgイオンとシリカとが反応して沈殿する。第1沈殿槽51a内の第1濃縮水中のMgイオンの含有量とシリカの含有量とのバランスに応じて、シリカ及びMgイオン除去の工程が異なる。
 第1沈殿工程での第1濃縮水が、シリカ含有量に対してMgイオン濃度が低い場合には、Mgイオンはシリカとの沈殿に消費される。Mgイオンとの沈殿に消費されない余剰のシリカを除去するために、シリカの沈殿剤(MgSO)が供給される。シリカの沈殿剤の供給量は、第1沈殿工程でのシリカの含有量及びMgイオンの含有量に応じて、上記余剰のシリカが消費される分だけ供給される。
 第1沈殿工程での第1濃縮水が、シリカ含有量に対してMgイオン濃度が高い場合には、Mgイオンとシリカとの沈殿の結果Mgイオンが残留する。残留するMgイオン濃度が高い状態で第1沈殿槽51aから第1濃縮水が排出されると、後段の脱塩部(図1では第1脱塩部10b、最下流の第1沈殿部の場合は下流側脱塩部60)でMgを含むスケールが析出する恐れがある。
 そこで、第1沈殿槽51a内の第1濃縮水が、マグネシウム化合物(主として水酸化マグネシウム)が析出可能な値に調整される。こうすることにより、第1沈殿槽51a内でマグネシウム化合物が沈殿し、第1沈殿槽51a内の第1濃縮水のMgイオン濃度を低減させる。更に、第1沈殿工程の後で、第1沈殿槽51aから排出された第1濃縮水が、マグネシウム化合物が溶解可能なpHに調整される。具体的に、pH10未満である。こうすることにより、脱塩部でのMgを含むスケールの析出を抑制することができる。
 多段で処理を実施する場合は、前段の第1水処理部の第1ろ過装置52aを通過した第1濃縮水が、被処理水として後段の水処理部に流入する。後段の水処理部において、上述した第1スケール防止剤供給工程から第1沈殿工程が実施される。
<下流側脱塩工程>
 被処理水最下流に位置する第1沈殿部50bを通過した濃縮水(第1濃縮水)は、下流側脱塩部60に送給される。下流側脱塩部60を通過した水は、処理水として回収される。下流側脱塩部60の濃縮水は系外に排出される。下流側脱塩部60が設置されると、水処理部で処理された後の水から更に処理水を回収することができるので、水回収率が向上する。
 本参考実施形態の水処理システム1では、第1脱塩部10でイオンが濃縮されているが、第1晶析部や第1沈殿部などで石膏、炭酸カルシウム、シリカ等が除去されている。このため、下流側脱塩部60に流入する水は処理前よりもイオンのモル数が低減されている。このため、下流に位置する第1脱塩部10bや下流側脱塩部60での浸透圧が低くなり、必要な動力が低減される。
 下流側脱塩部60の濃縮水側の下流に、蒸発器(図1では不図示)が設置されても良い。蒸発器において濃縮水から水が蒸発され、濃縮水に含まれていたイオンが固体として析出し、固体として回収される。蒸発器の上流側で水が回収され濃縮水量が著しく減量されるため、蒸発器を小さくすることが出来、蒸発に必要なエネルギーを小さくすることができる。
[第2参考実施形態]
 図9は、本発明の第2参考実施形態の水処理システムの概略図である。図9において第1参考実施形態と同じ構成には同一の符号を付す。第2参考実施形態の水処理システム100は、第1晶析部20a,20bの下流側に第1分離部180(180a,180b)が設置される。図9の水処理システム100は、被処理水の流通方向に2つの水処理部が連結された構成となっている。本参考実施形態の水処理システム100では、被処理水の性状に応じて水処理部が1つであっても良いし、3つ以上の水処理部が連結されても良い。
 図9では、第1分離部180(180a,180b)は分級機181(181a,181b)と脱水機182(182a,182b)とで構成される。分級機181a,181bは、例えば液体サイクロンとされる。脱水機182a,182bは例えばベルトフィルタとされる。
 図9では第1分離部180は分級機が1つのみ設置されているが、複数の分級機が被処理水の流通方向に直列に接続されていても良い。
 第2参考実施形態の水処理システム100では、第1晶析工程の直後に第1分離工程が行われる以外は、第1参考実施形態と同様の工程で被処理水が処理される。
<第1分離工程>
 第1晶析槽21a,21b内の第1濃縮水が第1分離部180a,180bに搬送される。ここで搬送される第1濃縮水は、第1晶析槽21a,21b内で析出した固形物を含む水である。
 第1晶析槽21a,21bから排出される第1濃縮水中には、種々の粒径を有する石膏の他、飽和濃度を超えたため析出した炭酸カルシウムやシリカが含まれる。炭酸カルシウムやシリカは種結晶の存在下で析出したものではないため、小径であったりコロイド状の浮遊物となっている。
 分級機181a,181bに第1濃縮水が流入すると、所定の大きさ、例えば平均粒径10μm以上の石膏は分級機181a,181bの底部に沈降し、小さい粒径の石膏、炭酸カルシウム及びシリカは上澄み液に残留する。分級機181a,181bの底部に沈降した石膏は、脱水機182a,182bで更に脱水されて回収される。小さい粒径の石膏、炭酸カルシウム及びシリカを含む上澄み液は、第1沈殿部50a,50bに送給される。
 本参考実施形態では種結晶を添加して晶析させているため、平均粒径10μm以上の石膏が主として析出し、小径の石膏の割合は少なくなる。第1分離工程により、含水率が低く不純物を含まない(すなわち高純度である)石膏を高い回収率で分離回収することができる。
 第1分離部180a,180bで回収された石膏の一部は、種結晶として種結晶タンク23a,23bに循環されても良い。
[第3参考実施形態]
 図10は、本発明の第3参考実施形態の水処理システムの概略図である。図10の水処理システム200は、被処理水の流通方向に2つの水処理部が連結された構成となっている。被処理水の性状に応じて、水処理部は1つであっても良いし、3つ以上の水処理部が連結されていても良い。
 第3参考実施形態の水処理システム200における一の水処理部はそれぞれ、被処理水の上流側から順に第2脱塩部210(210a,210b)及び第2晶析部220(220a,220b)を備える。第2脱塩部210a,210bの濃縮側と第2晶析部220a,220bとが接続されている。水処理部は、各第2脱塩部210(210a,210b)の上流側流路に、第2スケール防止剤供給部230(230a,230b)を備える。
 第2スケール防止剤供給部230a,230bはそれぞれ、タンク231(231a,231b)、バルブV4(V4a,V4b)、及び、制御部232(232a,232b)で構成されている。制御部232a,232bはバルブV4a,V4bに接続する。第2スケール防止剤供給部230a,230bのタンク231a,231b内にはスケール防止剤が貯蔵される。
 第3参考実施形態で用いられるスケール防止剤は、第1参考実施形態で説明されたカルシウムスケール防止剤、及び、被処理水中でシリカがスケールとして析出することを防止するもの(「シリカスケール防止剤」と称する)である。シリカスケール防止剤としては、ホスホン酸系のスケール防止剤、ポリカルボン酸系のスケール防止剤、及びこれらの混合物等がある。具体例としては、FLOCON260(商品名、BWA社製)が挙げられる。
 図10にはタンク231aが2つ示されているが、例えば一方のタンク231aにカルシウムスケール防止剤が収納され、他方のタンク231aにシリカスケール防止剤が収納される。
 図10では、第2脱塩部210は逆浸透膜装置である。この他に、第2脱塩部210は、電気透析装置(ED)、極性転換式電気透析装置(EDR)、電気再生式純水装置(EDI)、イオン交換装置、静電脱塩装置(CDI)、ナノフィルター(NF)、蒸発器などを採用することができる。
 図10では、第2脱塩部210を1つのみ示しているが、複数の脱塩装置が被処理水の流通方向に並列または直列に連結される構成とされても良い。
 第2晶析部220(220a,220b)は、第2晶析槽221(221a,221b)及び第2種結晶供給部222(222a,222b)で構成される。第2種結晶供給部222が第2晶析槽221に接続される。第2種結晶供給部222は、種結晶タンク223(223a,223b)、バルブV5(V5a,V5b)、及び、制御部224(224a,224b)を有する。制御部224はバルブV5に接続する。種結晶タンク223は、種結晶として石膏粒子を貯蔵する。
 第3参考実施形態の水処理システム200では、第2脱塩部210と第2晶析部220との間に第2pH調整部240(240a,240b)が設置されても良い。第2pH調整部240は、タンク241(241a,241b)、バルブV6(V6a,V6b)、pH計243(243a,243b)、及び、制御部242(242a,242b)で構成されている。タンク241内にはpH調整剤として酸が貯蔵されている。酸は、例えば塩酸、硫酸、硝酸等を使用できる。特に硫酸は、晶析工程でSO 2-が石膏として除去されて下流側の脱塩部に到達するイオン量が低減できるため好ましい。制御部242はバルブV6及びpH計243に接続する。pH計243は図10のように第2脱塩部210と第2晶析部220との間の流路に設置されても良いし、第2晶析槽221内に設置されても良い。
 水処理システム200において、被処理水の最上流に位置する第2スケール防止剤供給部230aの上流側に、第2上流側沈殿部270として沈殿槽271及びろ過装置272が設置される。第2上流側沈殿部270は第1上流側沈殿部70と同じ構成である。第1参考実施形態と同様に、複数段の沈殿槽271が被処理水の流通方向に直列に連結されていても良い。
 水処理システム200は、図10に示すように、第2上流側沈殿部270の上流側に第2脱気部273が設けられていても良い。第2脱気部273は第1参考実施形態の第1脱気部73と同じ構成である。
 第2脱気部273は、第2上流側沈殿部270の被処理水下流側であって第2スケール防止剤供給部230aの上流側に設置されていても良い。
 第2脱気部273と同じ構成の脱気部が、第2脱塩部210aと第2晶析部220aとの間の流路、第2晶析部220と第2沈殿部250との間の流路、及び、第2沈殿部250の下流側であって第2脱塩部210bまたは下流側脱塩部60との間の流路に設置されても良い。
 ろ過装置272の下流であって最上流に位置する第2スケール防止剤供給部230aの上流に、第1参考実施形態と同様にイオン交換装置(不図示)が設置されても良い。また、被処理水中の石膏濃度に応じて、最上流の第2スケール防止剤供給部230aの上流に、第2晶析部と同じ構成の上流側晶析部(不図示)が設置されても良い。
 本参考実施形態では、図10に示すように第2晶析部220の下流側に、第2分離部280(280a,280b)が設置されても良い。第2分離部280は第1分離部180と同様の構成であり、分級機281(281a,281b)と脱水機282(282a,282b)とを備える。
 図10の水処理システム200では、第2晶析部220の下流側に、第2沈殿部250(250a,250b)が設置されてもよい。第2沈殿部250は第1沈殿部50と同様の構成であり、第2沈殿槽251(251a,251b)及び第2ろ過装置252(252a,252b)を備える。
 水処理システム200は、第1水処理部の被処理水下流側に下流側脱塩部60を備える。下流側脱塩部60の濃縮水側の下流に、蒸発器(図10では不図示)が設置されても良い。
 第3参考実施形態の水処理システム200を用いて、被処理水を処理する方法を以下で説明する。
<前処理>
 被処理水に対し、第1参考実施形態で説明した前処理が実施される。
<第2脱気工程>
 第1参考実施形態で説明した第1脱気工程と同様にして、第2脱気部273で被処理水中のCOが除去されることにより、被処理水中の炭酸イオン濃度が低減される。
<第2上流側沈殿工程>
 第2上流側沈殿部270において、Caイオン及び炭酸イオンは炭酸カルシウムとして予め被処理水から粗除去される。被処理水にCaイオン以外の金属イオンが含まれる場合は、第2上流側沈殿部270において水への溶解性が低い金属化合物が予め被処理水から粗除去される。
 第2上流側沈殿工程は、第1上流側沈殿工程と同工程で実施される。
 本参考実施形態の水処理システム200でMgイオンを含む被処理水を処理する場合、第1参考実施形態と同様に、第2上流側沈殿部270において被処理水がマグネシウム化合物が析出するpHに調整され、被処理水中のMgイオンの粗除去が実施される。この後、第2上流側沈殿部270の下流側で、上記のマグネシウム化合物が溶解可能なpHに調整されることが好ましい。具体的に、pH10未満に調整される。こうすることにより、下流側の装置及び工程、特に第2脱塩部210及び第2脱塩工程でのスケール生成を防止することが可能となる。
 第2上流側沈殿工程を実施した後に第2脱気工程を実施する場合は、被処理水のpHは炭酸イオンがCOとして存在可能であるpH、具体的に6.5以下に調整される。
 被処理水の性状によっては、上記第2脱気工程及び第2上流側沈殿工程は省略することができる。
 第3参考実施形態の水処理システム200でイオン交換膜装置を設置した場合は、イオン交換膜装置により被処理水中のCaイオン及びMgイオンが除去される。
 上流側晶析部が設置された場合は、上流側晶析部において第1参考実施形態と同様の工程により被処理水中の石膏濃度が低減される。
<第2スケール防止剤供給工程>
 第2スケール防止剤供給部230aの制御部232aはバルブV4aを開放し、タンク231aから所定量のカルシウムスケール防止剤を被処理水に供給する。第2スケール防止剤供給部230bの制御部232bはバルブV4bを開放し、タンク231bから所定量のシリカスケール防止剤を被処理水に供給する。制御部232a及び制御部232bは、カルシウムスケール防止剤及びシリカスケール防止剤の濃度が被処理水の性状に応じて設定された所定値となるように、それぞれバルブV4a及びバルブV4bバルブの開度を調整する。
 第3参考実施形態の水処理システム200では、第2脱塩部210に流入する直前での被処理水のpH調整は任意に行われる。
 例えば図10の構成では、FeClが添加されることにより被処理水のpHが5から6程度となって第2脱塩部210aに流入することになる。図3に示すように、被処理水のpHが6.5以下では炭酸カルシウムは水中への溶解度が高い。また、式(1)のように、上記pH領域では水中で炭酸は主としてHCO 及びCOの状態で存在する。第2脱塩部210aに流入する被処理水は、炭酸カルシウム濃度が低くなっている。このような場合には、第2脱塩部210aの直前でpHを調整しなくても良い。
 なお、第2脱塩工程で処理される被処理水のpHを調整する場合には、第2脱塩部210aの上流において第1参考実施形態の第1pH調整部と同じ構成のpH調整部を設置し、pH調整された被処理水を第2脱塩部210aに送給しても良い。
<第2脱塩工程>
 第2脱塩部210aにおいて、スケール防止剤が投入された被処理水が処理される。第2脱塩部210aが逆浸透膜装置である場合、逆浸透膜を通過した水は処理水として回収される。イオン及びスケール防止剤を含む水は、逆浸透膜の非透過側から濃縮水(第2濃縮水)として排出される。
 第2脱塩部210aでの処理により、第2濃縮水中の石膏及びシリカは濃縮されているが、カルシウムスケール防止剤及びシリカスケール防止剤によりスケール発生が抑制されている。
 例えば静電脱塩装置など他の脱塩装置を用いた場合も、被処理水は処理水と、イオン濃度が高い濃縮水(第2濃縮水)とに分離される。第2濃縮水は、第2晶析部220aに向かって送給される。
<第2pH調整工程>
 本参考実施形態では、第2脱塩部210aと第2晶析部220aとの間で、第2pH調整部240aにより被処理水(第2濃縮水)のpHが調整されても良い。
 第2pH調整部240aは、第2濃縮水のpHを、カルシウムスケール防止剤の機能が低減されて第2濃縮水中の石膏が析出可能な値に管理する。pH計243aは、第2濃縮水のpHを計測する。制御部242aはpH計243aでの計測値が所定のpH管理値になるように、バルブV6aの開度を調整する。
<第2晶析工程>
 第2濃縮水が、第2晶析部220aの第2晶析槽221に貯留される。第2種結晶供給部222aの制御部224aは、バルブV5を開放し、種結晶タンク223aから石膏の種結晶を第2晶析槽221a内の第2濃縮水に添加する。第2濃縮水中にカルシウムスケール防止剤が含まれているが、種結晶が投入されると石膏が晶析し結晶成長する。
 図5に示されるように、条件1(pH6.5)では過飽和度が460%であり、6時間経過後でも初期の過飽和度からの変化がない。条件1では、スケール防止剤が機能を発現して石膏の析出が抑制されている。一方、条件2から条件4では過飽和度が低減している。
 すなわち、種結晶を投入していなくても、pHを低減させるとスケール防止剤の機能が低減されて石膏が晶析することが確認できた。また、図5の結果によると、pHが低い程析出速度が大きいとの結果が得られた。
 図6では、条件5(pH4.0)との比較として、条件7(pH4.0)は、カルシウムスケール防止剤が添加された模擬水に、予め上記カルシウムスケール防止剤に浸漬した種結晶を添加し、pH調整のため硫酸を添加した。上記以外の条件は、条件5と条件7とで同じとして、石膏析出実験を行った。pH調整から2時間経過後に、模擬水中のCa濃度を図3と同じ手法で計測した。
 この結果、図6に示すように、条件5と条件7は共に、過飽和度が199%以下であった。このことから、種結晶のカルシウムスケール防止剤中の浸漬時間に依らず、pHを4.0と低下させるとカルシウムスケール防止剤の機能が低下されると言える。
 カルシウムスケール防止剤の効果を考えて、第2pH調整工程により、第2濃縮水のpHは6.0以下、好ましくは5.5以下、より好ましくは4.0以下に調整される。特に、第2濃縮水をpH4.0以下に調整すると、カルシウムスケール防止剤の機能を著しく低下させることができる。カルシウムスケール防止剤のスケール防止機能が低減される値に第2濃縮水のpHを調整することによって、第2晶析部220aでの晶析が促進される。スケール防止剤の種類に応じて、第2pH調整工程でのpH領域が適切に設定される。
 図4によると、pHが低い場合にはシリカは飽和溶解度以上となる場合がある。しかし、本参考実施形態では第2水処理部においてシリカスケール防止剤が投入されているので、pHが低くてもシリカの析出が抑制されている。第2晶析槽221a内でシリカが析出したとしても、小径粒子やコロイド状浮遊物として存在する。
 また、図3によると、pH6.0以下では炭酸カルシウムは水中に溶解する。
 以上のことから、第2水処理部の第2晶析槽221aでは、高純度の石膏が回収できる。
 一方、第2pH調整工程により、第2晶析工程での第2濃縮水が、シリカが第2濃縮水に溶解可能であるpHに調整されても良い。こうすることにより、第2晶析槽221aにおいて第2濃縮水中からのシリカ析出が抑制される。この結果、第2分離部280aで第2晶析槽221aから排出された第2濃縮水を分級した場合に、回収される石膏の純度を高めることができる。
<第2分離工程>
 第2分離部280aが設置される場合、第2晶析槽221a内で析出した固形物を含む第2濃縮水が、第2分離部280aに搬送される。第2晶析槽221a内の第2濃縮水中には、晶析により析出した石膏が存在する。この他に、原水の水質変動や濃縮によりシリカスケール防止剤の機能が発揮する以上にシリカ濃度が高くなったために析出したシリカが含まれる可能性がある。シリカは小径粒子やコロイド状浮遊物として第2濃縮水中に存在する。
 第2参考実施形態と同様の工程で、第2分離部280aの分級機281aは、所定の大きさ(例えば平均粒径10μm以上)の石膏と小径析出物(石膏、シリカ)を含む上澄み液とを分離する。大径の石膏は脱水機282aで更に脱水されて回収される。本参考実施形態によれば、高純度の石膏を回収することが可能となる。回収された石膏の一部は、種結晶として種結晶タンク223aに循環されても良い。
 第2分離部280aを設置しない場合は、第2晶析部220aの第2晶析槽221aの底部に沈殿した石膏が第2晶析槽221aから排出される。第2晶析槽221aの上澄み液が第2沈殿部250aに送給される。
<第2沈殿工程>
 第2晶析部220aの上澄み液(第2濃縮水)または第2分離部280aから排出された上澄み液(第2濃縮水)は、第2沈殿部250aに送給される。
 第2沈殿工程では、第1参考実施形態で説明した第1沈殿工程と同様にして、第2沈殿槽251a及び第2ろ過装置252aにより第2濃縮水中の炭酸カルシウム及び金属化合物が除去される。
 第2沈殿工程において、第1沈殿工程と同様にして第2沈殿槽251aにシリカの種結晶及びシリカの沈殿剤の少なくとも一方が添加されて、シリカが第2濃縮水から除去されても良い。
 図10に示すように多段で処理を実施する場合は、前段の第2水処理部の第2ろ過装置252aを通過した第2濃縮水が、被処理水として後段の水処理部に流入する。後段の水処理部において、上述した第2スケール防止剤供給工程から第2沈殿工程が実施される。
<下流側脱塩工程>
 被処理水最下流に位置する第2沈殿部250bを通過した第2濃縮水は、下流側脱塩部60で処理される。下流側脱塩部60を通過した水は、被処理水として回収される。下流側脱塩部60の濃縮水は系外に排出される。
 本参考実施形態においても、下流側脱塩部60の濃縮水側の下流に、蒸発器(不図示)が設置されても良い。
 第3参考実施形態では、第2pH調整工程で第2濃縮水がカルシウムスケール防止剤の機能が低減されるpHに調整された場合は、第3pH調整工程として、第2晶析工程の後で、カルシウムスケール防止剤がその機能を発揮できるように第2濃縮水のpHが調整されても良い。具体的に、pHは4.0以上、好ましくは5.5以上、より好ましくは6.0以上にすることが好ましい。第3pH調整工程は、第2晶析工程の後であって第2脱塩工程の前、または、第2晶析工程の後であって下流側脱塩工程の前で実施される。
 本参考実施形態の水処理システム200は、第3pH調整工程を実施するために、第2晶析部とその直後の第2脱塩部(図10では第2晶析部220aと第2脱塩部210bとの間、特に、第2沈殿部250aと第2脱塩部210b)との間に第2pH調整部と同様の構成の第3pH調整部(図10では不図示)が設置される。また、最下流の第2沈殿部250bと下流側脱塩部60との間に、第2pH調整部と同様の構成の第3pH調整部(図10では不図示)が設置される。こうすることにより、下流側脱塩工程で第2濃縮水が処理されて濃縮水側のCaイオン濃度が高くなった場合でも、カルシウムスケール防止剤の機能によりスケール生成を抑制することができる。
 本実施形態の水処理システム200では、第2水処理部での処理によりシリカが濃縮される。第2濃縮水中のシリカ濃度がシリカスケール防止剤が有効に働く濃度以上になると、第2濃縮水中からシリカがスケールとして生成する可能性がある。例えば、シリカスケール防止剤としてFLOCON260を用いる場合、スケール発生防止効果が得られるのはシリカ濃度200mg/L程度までである。従って、シリカスケール防止剤が効果を発揮できる濃度に濃縮されるまで、第2水処理部の段数を設定する。
 第3参考実施形態の水処理システム200を用いることによって高い水回収率でイオンを含む被処理水を処理することができる。
 特に第3参考実施形態では第2晶析部220で主として石膏を析出させるので、第2晶析部220での石膏回収率が高く、下流側へ送給されるイオンのモル数がより低減される。また、第2晶析部220で回収される石膏の純度を高めることができる。
[第4参考実施形態]
 図11は、本発明の第4参考実施形態の水処理システムの概略図である。図11において第1参考実施形態乃至第3参考実施形態と同じ構成には同一の符号を付す。
 第4参考実施形態の水処理システム300は、第1参考実施形態で説明した水処理部が設置される。この水処理部の被処理水下流側に、第3参考実施形態で説明した水処理部が設置される。
 図11の水処理システム300では、第1晶析部20の下流側に第1分離部180が設置される。また、第2晶析部220の下流側に、第1分離部180と同様の第2分離部280が設置される。
 最下流に位置する第2晶析部220の被処理水下流側に、下流側脱塩部60が設置される。
 第4参考実施形態の水処理システム300は、被処理水の最上流に位置する第1スケール防止剤供給部30及び第1pH調整部40の上流側に、第1参考実施形態で説明した第1上流側沈殿部70を備える。
 更に、第4参考実施形態の水処理システム300は、図11に示すように第1上流側沈殿部70の上流側に、第1参考実施形態と同様の第1脱気部73を有する。第1脱気部73は、第1上流側沈殿部70の被処理水下流側であって、第1スケール防止剤供給部30及び第1pH調整部40の上流側に設置されていても良い。
 なお、第1脱気部73と同じ構成の脱気部が、第1脱塩部10と第1晶析部20との間の流路、第1晶析部10と第1沈殿部50との間の流路、第2晶析部220と第2沈殿部250との間の流路、及び、第1沈殿部50と第2脱塩部210との間の流路に設置されても良い。
 本参考実施形態の水処理システム300においても、第1スケール防止剤供給部30及び第1pH調整部40の上流にイオン交換装置(不図示)及び上流側晶析部(不図示)が設けられていても良い。
 図11では、第1スケール防止剤供給部30から第1沈殿部50、及び、第2スケール防止剤供給部230から第2沈殿部250までの水処理部が1段ずつ示されているが、それぞれ複数段の水処理部が連結されていても良い。
 第4参考実施形態の水処理システム300では、まず第1参考実施形態及び第2参考実施形態で説明した水処理方法で被処理水が処理される。第1参考実施形態及び第2参考実施形態の方法で処理された後の第1濃縮水が、被処理水として、第3参考実施形態で説明した第2スケール防止剤供給工程から第2沈殿工程の処理を施される。
 最下流の第2沈殿部250を通過した第2濃縮水は、下流側脱塩部60で処理される。下流側脱塩部60を通過した水は、処理水として回収される。下流側脱塩部60の濃縮水は系外に排出される。
 本参考実施形態においても、下流側脱塩部60の濃縮水側の下流に、蒸発器(不図示)が設置されても良い。
 第4参考実施形態において、第2pH調整工程で第2濃縮水がカルシウムスケール防止剤の機能が低減されるpHに調整された場合は、第3参考実施形態で説明された第3pH調整工程が実施されても良い。
[第1実施形態]
 図12は、本発明の第1実施形態の水処理システムの概略図である。図12において第1参考実施形態乃至第3参考実施形態と同じ構成には同一の符号を付す。
 第1実施形態の水処理システム400は、第3参考実施形態で説明した水処理部が設置される。この水処理部の被処理水下流側に、第1参考実施形態で説明した水処理部が設置される。
 図12の水処理システム400では、第1分離部180及び第2分離部280が設置される。
 最下流に位置する第1晶析部20の被処理水下流側に、下流側脱塩部60が設置される。
 第1実施形態の水処理システム400は、被処理水の最上流に位置する第2スケール防止剤供給部230の上流側に、第3参考実施形態で説明した第2上流側沈殿部270を備える。
 更に、第1実施形態の水処理システム400は、図12に示すように第2上流側沈殿部270の上流側に、第3参考実施形態と同様の第2脱気部273を有する。第2脱気部273は、第2上流側沈殿部270の被処理水下流側であって、第2スケール防止剤供給部230の上流側に設置されていても良い。
 なお、第2脱気部273と同じ構成の脱気部が、第2脱塩部210と第2晶析部220との間の流路、第1晶析部20と第1沈殿部50との間の流路、第2晶析部220と第2沈殿部250との間の流路、及び、第2沈殿部250と第1脱塩部10との間の流路に設置されても良い。
 本実施形態の水処理システム400においても、第2スケール防止剤供給部230の上流にイオン交換装置(不図示)及び上流側晶析部(不図示)が設けられていても良い。
 図12に示す本実施形態の水処理システム400では、第1晶析槽21及び第2晶析槽221の下流側に、それぞれ第1分離部180及び第2分離部280が設置されても良い。
 図12では、第2スケール防止剤供給部230から第2沈殿部250、及び、第1スケール防止剤供給部30から第1沈殿部50までの水処理部が1段ずつ示されているが、それぞれ複数段の水処理部が連結されていても良い。
 第1実施形態の水処理システム400では、まず第3参考実施形態で説明した水処理方法で被処理水が処理される。第3参考実施形態の方法で処理された後の第2濃縮水が、被処理水として、第1参考実施形態及び第2参考実施形態で説明した第1スケール防止剤供給工程から第1沈殿工程の処理が施される。
 最下流の第1沈殿部50を通過した第1濃縮水は、下流側脱塩部60で処理される。下流側脱塩部60を通過した水は、処理水として回収される。下流側脱塩部60の濃縮水は系外に排出される。
 本実施形態においても、下流側脱塩部60の濃縮水側の下流に、蒸発器(不図示)が設置されても良い。
 第1実施形態において、第2pH調整工程で第2濃縮水がカルシウムスケール防止剤の機能が低減されるpHに調整された場合は、第3参考実施形態で説明された第3pH調整工程が実施されても良い。
 第4参考実施形態の水処理システム300及び第1実施形態の水処理システム400によっても、高い水回収率でイオンを含む被処理水を処理することができる。
 特に第1実施形態の構成では、被処理水上流側の第2晶析部220で主として石膏を析出させているので、第2晶析部220での石膏回収率が高く、下流側へ送給されるイオンのモル数がより低減されている。更に、第2晶析部220で回収される石膏の純度を高めることができる。
[第5参考実施形態]
 本発明の第5参考実施形態は、第1参考実施形態から第1実施形態において、第1晶析槽21及び第2晶析槽221に供給される石膏の種結晶の量が制御される。図13を用いて、第1晶析槽21への種結晶供給量が制御される構成を説明する。第2晶析槽221についても同様の構成が適用される。
 第5参考実施形態では、第1晶析槽21内の第1濃縮水のpHを計測する第1pH計測部543が設置される。第1pH計測部543は、第1脱塩部10と第1晶析槽21とを連結する流路に設置されていても良いし、第1晶析槽21に直接設置されても良い。第1pH計測部543は、種結晶供給部22の制御部24に接続する。
 第5参考実施形態では、図13のようにpH調整部540が設置される。pH調整部540はタンク541、制御部542、及びバルブV7を備える。第1pH計測部543は、pH調整部540の制御部542に接続される。pH調整部540は、第1pH計測部543の計測値に基づいて、第1晶析槽21内の第1濃縮水のpHを所定値に管理する。
 なお、第2晶析槽221に供給される石膏の種結晶の量を制御する場合には、第3参考実施形態で説明したpH計243aが第2pH計測部に相当し、第2pH調整部の制御部242が制御部542に相当する。
 第1種結晶供給部22の種結晶タンク23に貯蔵される種結晶は、新品の薬品でも良いが、第1分離部180を設置する場合は、分級機181で分離された所定粒径以上の石膏や、脱水機182で脱水された後の石膏が、種結晶タンク23に貯蔵されても良い。
 第5参考実施形態に係る種結晶供給量の制御は、以下の工程で実施される。以下では、連続運転時に種結晶供給量を常時制御する場合を例に挙げて説明する。
 第1pH計測部543は第1晶析槽21内の第1濃縮水のpHを計測する。計測されたpHの値は、種結晶供給部22の制御部24に送信される。
 制御部24は、カルシウムスケール防止剤のスケール防止機能が低減されるpH範囲を格納している。具体的には、第2晶析工程で説明したように、カルシウムスケール防止剤のスケール防止機能が低減されるpH範囲は、6.0以下、好ましくは5.5以下、より好ましくは4.0以下である。
 制御部24は、第1pH計測部543の計測値と上記pH範囲とを比較する。制御部24は、計測値が上記pH範囲である場合には、バルブV3の開度を低減して石膏の種結晶の供給量を低減させる。制御部24は、計測値が上記pH範囲よりも高い場合に、バルブV3の開度を増大して石膏の種結晶の供給量を増大させる。
 種結晶が存在すれば石膏は析出するが、カルシウムスケール防止剤が機能を発揮している場合は、晶析速度が遅くなる。このため、種結晶量を増大させて晶析を促進させる。一方、カルシウムスケール防止剤の機能が低減されている場合は、種結晶が少なくても十分な晶析速度が得られる。
 このように、pHに応じて種結晶供給量を調整すれば、種結晶使用量を低減させることが可能となる。
 本実施形態では、連続運転時に定期的にpH計測することによって、間欠的に種結晶を供給することもできる。または、例えばシステムの試運転時にpHの経時変化を取得しておき、取得した経時変化に基づいて、種結晶供給量を増減させても良い。
[第6参考実施形態]
 本発明の第6参考実施形態は、第1分離部180及び第2分離部280の少なくとも一方を備える水処理システム600である。水処理システム600は、分離部で分離された石膏を種結晶として第1晶析槽または第2晶析槽に直接供給する点で第5参考実施形態と異なる。
 図14を用いて、本参考実施形態による第1晶析槽21への種結晶供給量が制御される構成を説明する。第2晶析槽221についても同様の構成が適用される。
 図14では、第1分離部180の分級機181の底部に沈降した石膏の一部が、第1晶析槽21に直接供給されるように搬送する第1循環ライン601が設置される。また、脱水機182で脱水された後の石膏の一部が、第1晶析槽21に直接供給されるように搬送する第2循環ライン602が設置される。第1循環ライン601にバルブV8が設置され、第2循環ライン602にバルブV9が設置される。なお、本参考実施形態では、第1循環ライン601及び第2循環ライン602のいずれか一方が設置される構成でも良い。
 制御部610が、第5参考実施形態と同様の第1pH計測部543、バルブV8、及び、バルブV9に接続する。
 第6参考実施形態に係る種結晶供給量の制御は、以下の工程で実施される。以下では、連続運転時に種結晶供給量を常時制御する場合を例に挙げて説明する。
 第1pH計測部543は、第1晶析槽21内の第1濃縮水のpHを計測する。計測されたpHの値は、制御部610に送信される。
 制御部610は、カルシウムスケール防止剤のスケール防止機能が低減されるpH範囲を格納している。制御部610は、第5参考実施形態と同様の工程にて、第1pH計測部543の計測値と上記pH範囲とを比較し、バルブV8及びバルブV9の開度を調整する。
 第5参考実施形態及び第6参考実施形態では、第1晶析槽21に第1晶析槽21内の第1濃縮水中の石膏種結晶濃度を計測する種結晶濃度計測部(不図示)が設置されても良い。種結晶濃度計測部は、第1晶析槽21内の種結晶濃度を計測する。計測された濃度の値は、制御部24または制御部610に送信される。制御部24または制御部610は種結晶濃度の閾値を格納しており、種結晶濃度が閾値以下となった場合に、種結晶供給量を増大させる。
 第5参考実施形態及び第6参考実施形態の変形例として、第1晶析槽21の下流側であって第1沈殿部50の上流側に、第1濃度計測部(不図示)が設置される。第1分離部180を設ける場合は、第1濃度計測部は、第1分離部180の下流側に設置されることが好ましいが、第1分離部180の上流側でも良い。第1濃度計測部は、制御部24または制御部610に接続される。
 第2晶析槽221の場合は、第1濃度計測部に代えて第2濃度計測部が設置される。
 第1濃度計測部は、第1晶析槽21から排出される第1濃縮水中のCaイオンの濃度及び硫酸イオンの濃度の少なくとも一方を計測する。計測された濃度は、制御部24または制御部610に送信される。
 第1濃度計測部で計測されるCaイオンの濃度及び硫酸イオンの濃度は、第1晶析槽21内での晶析速度に依存する。同じ滞留時間である場合には、Caイオンの濃度及び硫酸イオンの濃度が低い程、晶析速度が速くなる。
 制御部24及び制御部610は、Caイオンの濃度及び硫酸イオンの濃度の少なくとも一方の閾値を格納する。
 制御部24は、第1濃度計測部で計測されるCaイオンの濃度及び硫酸イオン濃度の少なくとも一方が閾値以上になる場合に、バルブV3の開度を増大して種結晶の供給量を増大させる。制御部24は、第1濃度計測部で計測されるCaイオンの濃度及び硫酸イオン濃度の少なくとも一方が閾値未満である場合に、バルブV3の開度を低減して種結晶の供給量を低減させる。
 制御部610は、第1濃度計測部で計測されるCaイオンの濃度及び硫酸イオン濃度の少なくとも一方が閾値以上になる場合に、バルブV8及びバルブV9の開度を増大して種結晶の供給量を増大させる。制御部610は、第1濃度計測部で計測されるCaイオンの濃度及び硫酸イオン濃度の少なくとも一方が閾値未満である場合に、バルブV8及びバルブV9の開度を低減して種結晶の供給量を低減させる。
 第2晶析槽221の場合も、上記と同様の工程で種結晶の供給量が制御される。
 このように晶析工程後のCaイオンの濃度及び硫酸イオンの濃度の少なくとも一方により種結晶の供給量を制御すると、種結晶使用量を低減させることが可能となる。
[第7参考実施形態]
 図15は、本発明の第7参考実施形態の水処理システムの部分概略図である。図15において第1参考実施形態乃至第3参考実施形態と同じ構成には同一の符号を付す。
 図15の水処理システム700は、第1実施形態の水処理システムにおいて第1晶析部20で第1濃縮水から分離された石膏が回収され、第2晶析部220の第2晶析槽221に供給される構成となっている。第4参考実施形態の水処理システムにおいても、同様の構成を採用することができる。
 第1参考実施形態で説明したように、第1晶析部20の第1晶析槽21内の濃縮水(第1濃縮水)のpHは特に限定されないが、運転コストの観点からは、第1脱塩工程からpHを変動させることなく第1晶析工程を行う方が有利である。この場合、第1晶析工程はシリカが溶解可能なpH(10以上)で行われることになるが、このpH領域では炭酸カルシウムの溶解度が低い。
 一方、第3参考実施形態で説明したように、第2晶析部220(第2晶析工程)は更に低いpH領域で石膏の晶析が行われる。第2晶析工程のpH領域(6.0以下、より好ましくは4.0以下)では、炭酸カルシウムは水に溶解可能である。第1晶析部20で回収された、炭酸カルシウムを含む石膏が第2晶析部220の第2晶析槽221に供給されると、不純物である炭酸カルシウムが第2濃縮水中に溶解し石膏が固体として第2濃縮水中に存在する。第7参考実施形態の水処理システム300を用いれば、高い水回収率で被処理水を処理できるとともに、高純度の石膏を回収することが可能となる。
[第8参考実施形態]
 図16は、本発明の第8参考実施形態の水処理システムの部分概略図である。図16において第2参考実施形態と同じ構成には同一の符号を付す。
 なお、以下では第8参考実施形態を第1分離工程を有する水処理方法及び第1分離部を有する水処理システムを用いて説明したが、第2分離工程及び第2分離部でも同様の構成を適用可能である。
 図16において、水処理システム800は、一つの第1晶析部20に対して、被処理水の流通方向に複数の分級機(第1分級機)181を備える。図16では2つの第1分級機181a,181bが設置されている。最上流に位置する第1分級機181aと、下流側に位置する第1分級機181bとは、分離する石膏の大きさが異なる。本参考実施形態では、第1分級機181bで分離される石膏の大きさは、第1分級機181aで分離される石膏よりも小さい。例えば、第1分級機181aは平均粒径10μm以上の粒子を分離する分級機とされ、第1分級機181bは平均粒径5μm以上の粒子を分離する分級機とされる。
 第1分級機181が3つ以上設置される場合は、各第1分級機181で分離される石膏の大きさが、上流側から下流側に向かって順に小さくなるように設計される。被処理する流通方向の第1分級機の設置数や、各分級機で分離できる固形物の粒径は、水回収率、石膏回収率、処理コスト等を考慮して適宜設定される。
 第8参考実施形態の水処理システム800では、第1分離工程において以下の処理が実施される。
 最上流に位置する第1分級機181aでは、平均粒径10μm以上の石膏が分級され、第1分級機181aの底部に沈降する。沈降した石膏は、第1分級機181aから排出され、脱水機182に送給される。第1分級機181aの上澄み液は、下流側の第1分級機181bに送給される。この上澄み液には、主として粒径10μm未満である粒子(石膏、炭酸カルシウム、シリカ等)が含まれている。
 下流側に位置する第1分級機181bでは、平均粒径5μm以上の石膏が分級され、第1分級機181bの底部に沈降する。第1分級機181bの上澄み液は、第1沈殿部50に送給される。
 沈降した石膏は、第1分級機181bから排出される。排出された石膏は、固形物循環ライン801を通じて第1晶析槽21に送給され、第1晶析槽21内の第1濃縮水中に供給される。
 循環された石膏は、第1晶析槽21内で種結晶として機能し、循環された石膏は晶析により結晶成長する。平均粒径10μm以上に結晶成長した循環石膏は、第1濃縮水とともに第1晶析槽21から第1分級機181aに送給され、第1分級機181aにより第1濃縮水から分離され、脱水機182に搬送される。
 第1分級機181bの上澄み液には、粒径5μm未満、例えば粒径2μmから3μm程度の比較的小径の粒子が含まれている。特に水処理システムの運転初期(立ち上がり直後等)では第1晶析槽21で石膏が十分な大きさまで成長する前に第1晶析槽21から排出されてしまい、第1沈殿槽51に流入する石膏量が多くなる。このような場合には、第1沈殿槽51での沈殿物に石膏が多量に含まれる。そこで、本参考実施形態においては、第1沈殿槽51の底部と第1晶析槽21をと連結する循環ライン802を設けて、第1沈殿部51の底部に沈殿した石膏を含む固形物を、第1晶析槽21に循環させても良い。
 本参考実施形態によれば、第1分離部で回収される石膏量を増大させるとともに、回収される石膏の含水率を低下させることができる。本参考実施形態の水処理工程及び水処理システムを用いれば、下流側に流出する比較的小径の石膏粒子量を低減させることに繋がるので、水回収率を高めることができるほか、水処理に伴って生成する廃棄物の量を削減することができる。
1,100,200,300,400,500,600,700,800 水処理システム
10 第1脱塩部
20 第1晶析部
21 第1晶析槽
22 第1種結晶供給部
23,223 種結晶タンク
24,32,42,224,232,242,542,610 制御部
30 第1スケール防止剤供給部
31,41,231,241,541 タンク
40 第1pH調整部
43,243 pH計
50 第1沈殿部
51 第1沈殿槽
52 第1ろ過装置
60 下流側脱塩部
70 第1上流側沈殿部
71 沈殿槽
72 ろ過装置
73 第1脱気部
180 第1分離部
181,181a,181b,281 分級機
182,282 脱水機
210 第2脱塩部
220 第2晶析部
221 第2晶析槽
222 第2種結晶供給部
230 第2スケール防止剤供給部
240 第2pH調整部
250 第2沈殿部
251 第2沈殿槽
252 第2ろ過装置
280 第2分離部
540 pH調整部
543 第1pH計測部
601 第1循環ライン
602 第2循環ライン
801,802 固形物循環ライン

Claims (33)

  1.  Caイオン、SOイオン、炭酸イオン及びシリカを含む被処理水に対して、カルシウムを含むスケールの析出を防止するスケール防止剤であるカルシウムスケール防止剤と、前記シリカの析出を防止するスケール防止剤であるシリカスケール防止剤とが供給される第2スケール防止剤供給工程と、
     前記第2スケール防止剤供給工程の後で、前記被処理水が前記Caイオン、前記SOイオン、前記炭酸イオン及び前記シリカが濃縮された第2濃縮水と処理水とに分離される第2脱塩工程と、
     前記第2濃縮水に石膏の種結晶が供給されて、前記第2濃縮水から石膏が晶析する第2晶析工程と、
     前記第2晶析工程の後に、
     前記被処理水に対して、前記カルシウムスケール防止剤が供給される第1スケール防止剤供給工程と、
     前記被処理水が、前記シリカが前記被処理水中に溶解可能なpHに調整される第1pH調整工程と、
     前記第1スケール防止剤供給工程及び前記第1pH調整工程の後で、前記被処理水が、前記Caイオン、前記SOイオン、前記炭酸イオン及び前記シリカが濃縮された第1濃縮水と処理水とに分離される第1脱塩工程と、
     前記第1濃縮水に石膏の種結晶が供給されて、前記第1濃縮水から石膏が晶析する第1晶析工程と、を含む水処理方法。
  2.  前記第2濃縮水が、前記第2晶析工程において前記カルシウムスケール防止剤のスケール防止機能が低減されて、前記石膏の析出が促進されるpHに調整される第2pH調整工程を備える請求項1に記載の水処理方法。
  3.  前記第2晶析工程の後に、前記第2pH調整工程でpHが調整された後の前記第2濃縮水が、前記カルシウムスケール防止剤が機能を発揮するpHに調整される請求項2に記載の水処理方法。
  4.  前記第2濃縮水が、前記第2晶析工程において前記シリカが溶解可能であるpHに調整される第2pH調整工程を備える請求項1に記載の水処理方法。
  5.  前記被処理水の最下流での前記第1晶析工程の後に、濃縮水と処理水とに分離されて、該分離された処理水が回収される下流側脱塩工程を含む請求項1に記載の水処理方法。
  6.  前記被処理水の最上流側での前記第2スケール防止剤供給工程の前に、前記被処理水から少なくとも炭酸カルシウムが沈殿されて、前記被処理水中の前記炭酸カルシウムの濃度が低減される第2上流側沈殿工程を含む請求項1乃至請求項5のいずれかに記載の水処理方法。
  7.  前記第2上流側沈殿工程の前、または、前記第2上流側沈殿工程の後であって前記第2スケール防止剤供給工程の前において、前記被処理水からCOを除去する第2脱気工程を含む請求項6に記載の水処理方法。
  8.  前記被処理水が金属イオンを含み、
     前記第2晶析工程の後で、炭酸カルシウム及び金属化合物の少なくとも一方が沈殿されて、前記第2濃縮水から前記炭酸カルシウム及び前記金属イオンの少なくとも一方の濃度が低減される第2沈殿工程を含む請求項1乃至請求項7のいずれかに記載の水処理方法。
  9.  前記第2沈殿工程において、前記第2濃縮水に対して、前記シリカの種結晶及び前記シリカの沈殿剤の少なくとも一方が供給される請求項8に記載の水処理方法。
  10.  前記被処理水が金属イオンを含み、
     前記第1晶析工程の後で、炭酸カルシウム及び金属化合物の少なくとも一方が沈殿されて、前記第1濃縮水から前記炭酸カルシウム及び前記金属イオンの少なくとも一方の濃度が低減される第1沈殿工程を含む請求項1に記載の水処理方法。
  11.  前記第1沈殿工程において、前記第1濃縮水に対して前記シリカの種結晶及び前記シリカの沈殿剤の少なくとも一方が供給される請求項10に記載の水処理方法。
  12.  前記被処理水がMgイオンを含む場合に、前記Mgイオンの濃度に応じて前記シリカの沈殿剤の供給量を調整する請求項9または請求項11に記載の水処理方法。
  13.  前記被処理水がMgイオンを含む場合に、前記第2沈殿工程の第2濃縮水が、マグネシウム化合物が析出するpHに調整されて前記Mgイオンの濃度が低減され、
     前記第2沈殿工程の後で、前記第2濃縮水が、前記マグネシウム化合物が溶解可能なpHに調整される請求項8に記載の水処理方法。
  14.  前記被処理水がMgイオンを含む場合に、前記第1沈殿工程の第1濃縮水が、マグネシウム化合物が析出するpHに調整されて前記Mgイオンの濃度が低減され、
     前記第1沈殿工程の後で、前記第1濃縮水が、前記マグネシウム化合物が溶解可能なpHに調整される請求項10に記載の水処理方法。
  15.  前記被処理水がMgイオンを含む場合に、前記第2上流側沈殿工程の前記被処理水が、マグネシウム化合物が析出するpHに調整されて前記Mgイオンの濃度が低減され、
     前記第2上流側沈殿工程の後で、前記被処理水が、前記マグネシウム化合物が溶解可能なpHに調整される請求項6に記載の水処理方法。
  16.  前記下流側脱塩工程の前記濃縮水から水分が蒸発されて、前記濃縮水中の固体が回収される請求項5に記載の水処理方法。
  17.  Caイオン、SOイオン、炭酸イオン及びシリカを含む被処理水に対して、カルシウムを含むスケールの析出を防止するスケール防止剤であるカルシウムスケール防止剤とシリカの析出を防止するスケール防止剤であるシリカスケール防止剤とを供給する第2スケール防止剤供給部と、
     前記第2スケール防止剤供給部の下流側に設置され、前記被処理水を前記Caイオン、前記SOイオン、前記炭酸イオン及び前記シリカが濃縮された第2濃縮水と処理水とに分離する第2脱塩部と、
     前記第2脱塩部の下流側に設けられ、前記第2濃縮水から石膏を晶析させる第2晶析槽と、前記第2晶析槽に石膏の種結晶を供給する第2種結晶供給部とを有する第2晶析部と、
     前記第2晶析部の前記被処理水の下流側に、
     前記被処理水に対して、前記カルシウムスケール防止剤を供給する第1スケール防止剤供給部と、
     前記被処理水にpH調整剤を供給して、前記シリカが前記被処理水中に溶解可能な値に前記被処理水のpHを調整する第1pH調整部と、
     前記第1スケール防止剤供給部及び前記第1pH調整部の下流側に設置され、前記被処理水を、前記Caイオン、前記SOイオン、前記炭酸イオン及び前記シリカが濃縮された第1濃縮水と処理水とに分離する第1脱塩部と、
     前記第1脱塩部の下流側に設けられ、前記第1濃縮水から石膏を晶析させる第1晶析槽と、前記第1晶析槽に石膏の種結晶を供給する第1種結晶供給部とを有する第1晶析部と、を備える水処理システム。
  18.  前記第2脱塩部の下流側に設置され、前記第2濃縮水にpH調整剤を供給して、前記カルシウムスケール防止剤のスケール防止機能が低減されて前記石膏の析出が促進される値に、前記第2濃縮水のpHを調整する第2pH調整部を備える請求項17に記載の水処理システム。
  19.  前記第2晶析部の下流側に、前記第2pH調整部でpHが調整された後の前記第2濃縮水にpH調整剤を供給して、前記カルシウムスケール防止剤が機能を発揮する値に、前記第2濃縮水のpHを調整する第3pH調整部を備える請求項18に記載の水処理システム。
  20.  前記第2脱塩部の下流側に設置され、前記第2濃縮水にpH調整剤を供給して、前記第2晶析部内で前記シリカが前記第2濃縮水中に溶解可能である値に、前記第2濃縮水のpHを調整する第2pH調整部を備える請求項17に記載の水処理システム。
  21.  被処理水最下流の前記第1晶析部の下流側に、前記第1晶析部から排出された前記第1濃縮水を、濃縮水と処理水とに分離する下流側脱塩部を備える請求項17に記載の水処理システム。
  22.  前記被処理水の最上流に位置する前記第2スケール防止剤供給部の上流側に、前記被処理水から少なくとも炭酸カルシウムを沈殿させて、前記被処理水中の前記炭酸カルシウムの濃度を低下させる第2上流側沈殿部を備える請求項17乃至請求項21のいずれかに記載の水処理システム。
  23.  前記第2上流側沈殿部の上流側、または、前記第2上流側沈殿部の下流側であって前記第2スケール防止剤供給部の上流側に、前記被処理水からCOを除去する第2脱気部を備える請求項22に記載の水処理システム。
  24.  前記被処理水が金属イオンを含み、
     前記第2晶析部の下流側に、炭酸カルシウム及び金属化合物の少なくとも一方を沈殿させる第2沈殿部を備える請求項17乃至請求項23のいずれかに記載の水処理システム。
  25.  前記第2沈殿部に前記シリカの種結晶及び前記シリカの沈殿剤の少なくとも一方が供給される請求項24に記載の水処理システム。
  26.  前記被処理水が金属イオンを含み、
     前記第1晶析部の下流側に、炭酸カルシウム及び金属化合物の少なくとも一方を沈殿させる第1沈殿部を備える請求項17に記載の水処理システム。
  27.  前記第1沈殿部に前記シリカの種結晶及び前記シリカの沈殿剤の少なくとも一方が供給される請求項26に記載の水処理システム。
  28.  前記被処理水がMgイオンを含む場合に、前記第2沈殿部において、前記Mgイオンの濃度に応じて前記シリカの沈殿剤の供給量を調整する請求項24に記載の水処理システム。
  29.  前記被処理水がMgイオンを含む場合に、前記第1沈殿部において、前記Mgイオンの濃度に応じて前記シリカの沈殿剤の供給量を調整する請求項26に記載の水処理システム。
  30.  前記被処理水がMgイオンを含む場合に、前記第2沈殿部内の前記第2濃縮水を、マグネシウム化合物が析出するpHに調整して前記Mgイオンの濃度を低減し、
     前記第2沈殿部の下流側で、前記マグネシウム化合物が溶解可能な値に、前記第2濃縮水のpHを調整する請求項24に記載の水処理システム。
  31.  前記被処理水がMgイオンを含む場合に、前記第1沈殿部内の前記第1濃縮水を、マグネシウム化合物が析出するpHに調整して前記Mgイオンの濃度を低減し、
     前記第1沈殿部の下流側で、前記マグネシウム化合物が溶解可能な値に、前記第1濃縮水のpHを調整する請求項26に記載の水処理システム。
  32.  前記被処理水がMgイオンを含む場合に、前記第2上流側沈殿部内の前記被処理水を、マグネシウム化合物が析出するpHに調整して前記Mgイオンの濃度を低減し、
     前記第2上流側沈殿部の下流側で、前記マグネシウム化合物が溶解可能な値に、前記被処理水のpHを調整する請求項22に記載の水処理システム。
  33.  前記下流側脱塩部の前記濃縮水の下流側に、前記濃縮水から水分を蒸発させて前記濃縮水中の固体を回収する蒸発器を備える請求項21に記載の水処理システム。
PCT/JP2014/064514 2013-07-05 2014-05-30 水処理方法及び水処理システム WO2015001885A1 (ja)

Priority Applications (7)

Application Number Priority Date Filing Date Title
JP2015525099A JP6005283B2 (ja) 2013-07-05 2014-05-30 水処理方法及び水処理システム
CN201480038059.8A CN105377772B (zh) 2013-07-05 2014-05-30 水处理方法以及水处理系统
EP14820653.5A EP3002260B1 (en) 2013-07-05 2014-05-30 Water treatment method, and water treatment system
CA2917155A CA2917155C (en) 2013-07-05 2014-05-30 Water treatment process and water treatment system
AU2014285448A AU2014285448B2 (en) 2013-07-05 2014-05-30 Water treatment method, and water treatment system
US14/672,754 US9914652B2 (en) 2013-07-05 2015-03-30 Water treatment process and water treatment system
ZA2015/09359A ZA201509359B (en) 2013-07-05 2015-12-23 Water treatment method, and water treatment system

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2013-141932 2013-07-05
JP2013141932 2013-07-05

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US14/672,754 Continuation US9914652B2 (en) 2013-07-05 2015-03-30 Water treatment process and water treatment system

Publications (1)

Publication Number Publication Date
WO2015001885A1 true WO2015001885A1 (ja) 2015-01-08

Family

ID=52143474

Family Applications (6)

Application Number Title Priority Date Filing Date
PCT/JP2014/064517 WO2015001887A1 (ja) 2013-07-05 2014-05-30 水処理方法及び水処理システム
PCT/JP2014/064518 WO2015001888A1 (ja) 2013-07-05 2014-05-30 水処理方法及び水処理システム
PCT/JP2014/064515 WO2015001886A1 (ja) 2013-07-05 2014-05-30 水処理方法及び水処理システム
PCT/JP2014/064519 WO2015001889A1 (ja) 2013-07-05 2014-05-30 水処理方法及び水処理システム
PCT/JP2014/064514 WO2015001885A1 (ja) 2013-07-05 2014-05-30 水処理方法及び水処理システム
PCT/JP2014/064511 WO2015001884A1 (ja) 2013-07-05 2014-05-30 水処理方法及び水処理システム

Family Applications Before (4)

Application Number Title Priority Date Filing Date
PCT/JP2014/064517 WO2015001887A1 (ja) 2013-07-05 2014-05-30 水処理方法及び水処理システム
PCT/JP2014/064518 WO2015001888A1 (ja) 2013-07-05 2014-05-30 水処理方法及び水処理システム
PCT/JP2014/064515 WO2015001886A1 (ja) 2013-07-05 2014-05-30 水処理方法及び水処理システム
PCT/JP2014/064519 WO2015001889A1 (ja) 2013-07-05 2014-05-30 水処理方法及び水処理システム

Family Applications After (1)

Application Number Title Priority Date Filing Date
PCT/JP2014/064511 WO2015001884A1 (ja) 2013-07-05 2014-05-30 水処理方法及び水処理システム

Country Status (8)

Country Link
US (6) US10029929B2 (ja)
EP (7) EP3205628A1 (ja)
JP (6) JP6091031B2 (ja)
CN (6) CN105377772B (ja)
AU (6) AU2014285447B2 (ja)
CA (6) CA2917116A1 (ja)
WO (6) WO2015001887A1 (ja)
ZA (4) ZA201509364B (ja)

Families Citing this family (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10005686B2 (en) * 2013-11-01 2018-06-26 1934612 Ontario Inc. Fluid treatment system
JP6524752B2 (ja) * 2015-03-30 2019-06-05 栗田工業株式会社 カルシウムイオン及び無機炭素含有水の処理方法
WO2017022113A1 (ja) * 2015-08-05 2017-02-09 三菱重工業株式会社 水処理システム、発電プラント及び水処理システムの制御方法
US10589188B2 (en) 2016-06-27 2020-03-17 Enviro Water Minerals Company, Inc. System and method for removal of scale forming components
CN106276834A (zh) * 2016-08-05 2017-01-04 常熟市圆启晶体材料有限公司 磷酸二氢钾溶液冷却结晶的搅拌方法
CN108218014B (zh) * 2016-12-13 2020-11-20 鞍钢股份有限公司 一种含油石墨废水的深度处理方法
RU2739530C1 (ru) 2017-04-05 2020-12-25 Шунк Транзит Системз Гмбх Контактный блок для транспортного средства, работающего на электрической батарее
US10968126B2 (en) 2017-07-07 2021-04-06 Katz Water Tech, Llc Pretreatment of produced water to facilitate improved metal extraction
DE102018106047A1 (de) 2018-03-15 2019-09-19 Schunk Bahn- Und Industrietechnik Gmbh Kontakteinheit
CN108773964A (zh) * 2018-06-15 2018-11-09 烟台金正环保科技有限公司 一种高钙废水的零排放和资源化方法
CN108975578A (zh) * 2018-09-07 2018-12-11 澳兰斯健康产业有限公司 一种带富氢和uv杀菌功能的净水机
JP7122954B2 (ja) 2018-12-13 2022-08-22 オルガノ株式会社 シリカ含有水の膜分離方法及びシリカ含有水の膜分離システム
CN109592816A (zh) * 2018-12-16 2019-04-09 金科环境股份有限公司 消除反渗透浓水永久硬度和暂时硬度的装置及方法
CN109592815A (zh) * 2018-12-16 2019-04-09 金科环境股份有限公司 具有高永久性硬度的反渗透浓水的处理系统
JP7377000B2 (ja) * 2019-03-27 2023-11-09 川崎重工業株式会社 水処理システムおよび水処理方法
CN110294539A (zh) * 2019-06-27 2019-10-01 苏州思上环保科技有限公司 综合降低水结垢因子的复合剂及其制备方法
CN110563166A (zh) * 2019-09-23 2019-12-13 厦门嘉戎技术股份有限公司 一种脱硫废水软化除钙方法及装置
US20210179457A1 (en) * 2019-12-11 2021-06-17 Dynamic Water Technologies Global, LLC Systems and methods for the removal of minerals from conductive protonic fluids
JP7373426B2 (ja) * 2020-02-12 2023-11-02 日本特殊陶業株式会社 水質計測装置及び水質計測装置の保管方法
JP2024502540A (ja) 2020-11-30 2024-01-22 シュンク トランジット ジステムズ ゲーエムベーハー 急速充電システム及び車両を充電ステーションに電気的に接続する方法
CN112892874A (zh) * 2021-01-18 2021-06-04 贵溪鲍家矿业有限公司 一种铅锌银矿的矿坑水综合利用方法
CN112939155B (zh) * 2021-01-29 2023-05-16 华中科技大学 利用活性炭纤维电极电容活化过硫酸盐降解医药废水的方法
CN115072933B (zh) * 2022-06-17 2023-07-18 同济大学 一种同时去除污水中溴代污染物及硝酸盐的方法及系统
CN115138481B (zh) * 2022-07-06 2024-01-26 中南大学 一种将方铅矿、闪锌矿中的至少一种矿物与辉钼矿浮选分离的药剂和方法
CN116124939B (zh) * 2023-01-10 2024-03-26 华北电力科学研究院有限责任公司 一种脱硫浆液石膏过饱和度及石膏结垢风险评价方法和系统
CN116444106B (zh) * 2023-06-14 2023-09-12 华电电力科学研究院有限公司 一种高硬度高硫酸盐型煤矿矿井水处理方法及装置

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5916588A (ja) * 1982-07-20 1984-01-27 Agency Of Ind Science & Technol 熱水中のシリカの除去方法
JPS62294484A (ja) * 1986-06-13 1987-12-21 Shinko Fuaudoraa Kk 高濃度のシリカを含む水の逆浸透処理法
JPH1085742A (ja) * 1996-09-12 1998-04-07 Kawasaki Heavy Ind Ltd 脱硫排水の処理方法及び装置
JPH10113660A (ja) * 1996-10-14 1998-05-06 Shinko Pantec Co Ltd 水処理方法及び水処理装置
JPH10128052A (ja) * 1996-11-06 1998-05-19 Mitsubishi Heavy Ind Ltd 排煙脱硫システムにおける反応晶析装置および吸収剤の再生回収システム
JP2000015257A (ja) * 1998-07-06 2000-01-18 Kurita Water Ind Ltd 高純度水の製造装置および方法
JP2000511109A (ja) * 1996-08-12 2000-08-29 ムコパダイ、デバシッシ 高効率逆浸透処理の方法および装置
JP2000237748A (ja) * 1999-02-16 2000-09-05 Osaka City 液体分離装置および液体分離方法
JP2004141799A (ja) * 2002-10-25 2004-05-20 Mitsubishi Heavy Ind Ltd シリカを含有する排水の処理方法
US7815804B2 (en) 2006-12-12 2010-10-19 Otv Sa S.A. Method for treating wastewater or produced water
JP2011147899A (ja) * 2010-01-22 2011-08-04 Miura Co Ltd 水処理方法及び水処理システム
JP2011200788A (ja) * 2010-03-25 2011-10-13 Kobelco Eco-Solutions Co Ltd 水処理方法及び水処理装置
JP2013520315A (ja) * 2010-02-26 2013-06-06 ゼネラル・エレクトリック・カンパニイ 水処理装置及び方法

Family Cites Families (56)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4036749A (en) 1975-04-30 1977-07-19 Anderson Donald R Purification of saline water
JP2863820B2 (ja) * 1991-02-27 1999-03-03 オルガノ株式会社 硫酸イオン含有廃液の処理方法及び改良反応槽
US5120447A (en) * 1991-03-06 1992-06-09 Gte Products Corporation Method for removing heavy metals from wastewater
US5250185A (en) 1992-05-01 1993-10-05 Texaco Inc. Reducing aqueous boron concentrations with reverse osmosis membranes operating at a high pH
JPH0760262A (ja) * 1993-08-25 1995-03-07 Kurita Water Ind Ltd 金属含有廃水の処理方法
US5501798A (en) 1994-04-06 1996-03-26 Zenon Environmental, Inc. Microfiltration enhanced reverse osmosis for water treatment
US5532039A (en) 1994-04-25 1996-07-02 Gateway Technologies, Inc. Thermal barriers for buildings, appliances and textiles
US5925255A (en) * 1997-03-01 1999-07-20 Mukhopadhyay; Debasish Method and apparatus for high efficiency reverse osmosis operation
US20020153319A1 (en) 1997-08-12 2002-10-24 Debasish Mukhopadhyay Method and apparatus for high efficiency reverse osmosis operation
JPH10137757A (ja) * 1996-11-11 1998-05-26 Shinko Pantec Co Ltd 水処理方法及び水処理装置
JP3377941B2 (ja) * 1997-12-26 2003-02-17 神鋼パンテツク株式会社 浸出水の処理方法とその装置
US7077201B2 (en) * 1999-05-07 2006-07-18 Ge Ionics, Inc. Water treatment method for heavy oil production
JP3790383B2 (ja) * 1999-05-17 2006-06-28 三菱重工業株式会社 排煙脱硫排水の処理方法
EP1106237B1 (en) 1999-05-17 2004-10-13 Mitsubishi Heavy Industries, Ltd. Method of treating waste waters from a flue gas desulphuriser
JP3870712B2 (ja) * 2000-05-02 2007-01-24 栗田工業株式会社 循環冷却水の処理方法及び処理装置
JP2001314873A (ja) * 2000-05-09 2001-11-13 Mitsubishi Heavy Ind Ltd 硫酸含有排水処理方法とその装置
JP3640379B2 (ja) * 2000-06-29 2005-04-20 株式会社神鋼環境ソリューション 水処理方法
JP4052432B2 (ja) * 2001-12-28 2008-02-27 株式会社荏原製作所 晶析法による液中イオンの除去方法及び装置
JP2004016996A (ja) * 2002-06-19 2004-01-22 Kurita Water Ind Ltd 硫酸イオン及びカルシウムイオン含有水の処理方法及び処理装置
AU2003301447B2 (en) * 2002-10-18 2008-07-10 Aquatech International, Llc Method and apparatus for high efficiency evaporation operation
US7595001B2 (en) * 2002-11-05 2009-09-29 Geo-Processors Usa, Inc. Process for the treatment of saline water
WO2004103918A1 (en) * 2003-05-23 2004-12-02 Water Minerals Limited Desalination of aqueous feedstocks
EP1709363A2 (en) * 2003-11-26 2006-10-11 Aquatech International Corporation Method for production of high pressure steam from produced water
US7517493B2 (en) * 2004-01-09 2009-04-14 Water Conservation Technology International, Inc. Cooling water corrosion inhibition method
US6929749B2 (en) 2004-01-09 2005-08-16 Water & Enviro Tech Company, Inc. Cooling water scale and corrosion inhibition
US7179438B2 (en) * 2005-04-20 2007-02-20 Allegheny Energy, Inc. Methods and apparatus for recovering gypsum and magnesium hydroxide
CN100515957C (zh) * 2005-10-12 2009-07-22 王凌云 废液处理方法及系统
EP1887011A1 (en) 2006-08-09 2008-02-13 Thermphos Trading GmbH Alpha amino acid phosphonic acid compounds, method of preparation and use thereof
JP4590383B2 (ja) * 2006-09-04 2010-12-01 オルガノ株式会社 フッ素を含む排水の晶析処理方法
WO2008067246A2 (en) * 2006-11-27 2008-06-05 Ch2M Hill, Inc. Water treatment using de-supersaturation
US20080185294A1 (en) * 2007-02-01 2008-08-07 General Electric Company Liquid management method and system
US20080290033A1 (en) 2007-05-25 2008-11-27 Camp Dresser & Mckee, Inc. Method and apparatus for recovery of water containing silica
US20090101587A1 (en) 2007-10-22 2009-04-23 Peter Blokker Method of inhibiting scale formation and deposition in desalination systems
EP2268583A4 (en) * 2008-04-14 2012-05-16 Siemens Ag ELIMINATION OF SULFATES IN WATER SOURCES
US20110155665A1 (en) * 2008-06-11 2011-06-30 The Regents Of The University Of California Method and System for High Recovery Water Desalting
US8326069B2 (en) 2008-06-30 2012-12-04 Intel Corporation Computing higher resolution images from multiple lower resolution images
WO2010018249A1 (es) * 2008-07-30 2010-02-18 Desalacion Integral Systems, S.L. Planta desaladora-depuradora de aguas salobres y residuos industriales con descarga líquida cero perfeccionada
CN102216224A (zh) * 2008-09-17 2011-10-12 西门子私人有限公司 高回收率的硫酸盐除去方法
CN102307816A (zh) * 2009-02-13 2012-01-04 株式会社神钢环境舒立净 含氟和硅的废水的处理方法、氟化钙的制造方法和含氟废水处理设备
JP5330901B2 (ja) * 2009-05-28 2013-10-30 三菱重工業株式会社 塩及び淡水の併産装置及び方法
US20110024354A1 (en) * 2009-07-30 2011-02-03 General Electric Company Desalination system and method
CN101712521B (zh) * 2009-11-05 2012-04-25 天津市环境保护科学研究院 一种反渗透浓水余压喷雾脱盐方法
WO2011102848A1 (en) * 2010-02-17 2011-08-25 Katana Energy Llc Zero discharge water desalination plant with minerals extraction integrated with natural gas combined cycle power generation
US8647509B2 (en) 2010-06-15 2014-02-11 General Electric Company Seawater desalination plant and production of high purity salt
AU2011270911B2 (en) * 2010-06-23 2014-06-26 Veolia Water Solutions & Technologies Support A process for reducing the sulfate concentration in a wastewater stream
AU2010357340B9 (en) 2010-07-12 2014-11-06 Hitachi, Ltd. Concentration plant, plant for producing fresh water by concentration and for generating electric power, concentration method, and method for operating plant for producing fresh water by concentration and for generating electric power
CN103347823A (zh) 2011-02-11 2013-10-09 西门子私人有限公司 具有再循环的自废含水流中的硫酸盐去除
JP2012200657A (ja) * 2011-03-24 2012-10-22 Mitsubishi Heavy Ind Ltd 脱硫排液からの脱水濾液の噴霧乾燥装置、排ガス処理システム及び方法
CN102863055A (zh) 2011-07-08 2013-01-09 通用电气公司 脱盐系统和方法
WO2013091129A1 (en) * 2011-12-19 2013-06-27 General Electric Company Membrane filtration process for industrial process water treatment and recovery
JP5901288B2 (ja) 2011-12-28 2016-04-06 三菱重工メカトロシステムズ株式会社 排水処理装置
US20150068982A1 (en) 2013-04-25 2015-03-12 Mitsubishi Heavy Industries, Ltd. Water treatment process and water treatment system
ES2673001T3 (es) 2013-07-05 2018-06-19 Mitsubishi Heavy Industries, Ltd. Sistema y método de tratamiento de agua
JP6038318B2 (ja) 2013-07-05 2016-12-07 三菱重工業株式会社 水処理システム及び方法、冷却設備、発電設備
US10246357B2 (en) 2013-11-25 2019-04-02 Enviro Water Minerals Company, Inc. System and methods for removing minerals from a brine using electrodialysis
JP6189205B2 (ja) * 2013-12-18 2017-08-30 三菱重工業株式会社 濃縮装置のスケール検知装置及び方法、水の再生処理システム

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5916588A (ja) * 1982-07-20 1984-01-27 Agency Of Ind Science & Technol 熱水中のシリカの除去方法
JPS62294484A (ja) * 1986-06-13 1987-12-21 Shinko Fuaudoraa Kk 高濃度のシリカを含む水の逆浸透処理法
JP2000511109A (ja) * 1996-08-12 2000-08-29 ムコパダイ、デバシッシ 高効率逆浸透処理の方法および装置
JPH1085742A (ja) * 1996-09-12 1998-04-07 Kawasaki Heavy Ind Ltd 脱硫排水の処理方法及び装置
JPH10113660A (ja) * 1996-10-14 1998-05-06 Shinko Pantec Co Ltd 水処理方法及び水処理装置
JPH10128052A (ja) * 1996-11-06 1998-05-19 Mitsubishi Heavy Ind Ltd 排煙脱硫システムにおける反応晶析装置および吸収剤の再生回収システム
JP2000015257A (ja) * 1998-07-06 2000-01-18 Kurita Water Ind Ltd 高純度水の製造装置および方法
JP2000237748A (ja) * 1999-02-16 2000-09-05 Osaka City 液体分離装置および液体分離方法
JP2004141799A (ja) * 2002-10-25 2004-05-20 Mitsubishi Heavy Ind Ltd シリカを含有する排水の処理方法
US7815804B2 (en) 2006-12-12 2010-10-19 Otv Sa S.A. Method for treating wastewater or produced water
JP2011147899A (ja) * 2010-01-22 2011-08-04 Miura Co Ltd 水処理方法及び水処理システム
JP2013520315A (ja) * 2010-02-26 2013-06-06 ゼネラル・エレクトリック・カンパニイ 水処理装置及び方法
JP2011200788A (ja) * 2010-03-25 2011-10-13 Kobelco Eco-Solutions Co Ltd 水処理方法及び水処理装置

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP3002260A4

Also Published As

Publication number Publication date
CN105339313B (zh) 2017-12-22
WO2015001884A1 (ja) 2015-01-08
CN105377771A (zh) 2016-03-02
JP6091031B2 (ja) 2017-03-08
AU2014285451A1 (en) 2016-01-28
ZA201509363B (en) 2017-04-26
JPWO2015001886A1 (ja) 2017-02-23
EP3002258A4 (en) 2016-08-03
EP3002260B1 (en) 2019-03-13
CA2917123A1 (en) 2015-01-08
EP3002260A4 (en) 2016-08-10
JP6091033B2 (ja) 2017-03-08
AU2014285450A1 (en) 2016-01-28
AU2014285449B2 (en) 2016-11-24
ZA201509364B (en) 2017-04-26
JPWO2015001888A1 (ja) 2017-02-23
JPWO2015001885A1 (ja) 2017-02-23
US10029929B2 (en) 2018-07-24
US9969629B2 (en) 2018-05-15
US9914652B2 (en) 2018-03-13
EP3205628A1 (en) 2017-08-16
WO2015001886A1 (ja) 2015-01-08
EP3002260A1 (en) 2016-04-06
AU2014285448A1 (en) 2016-01-28
EP3002258A1 (en) 2016-04-06
EP3002259A1 (en) 2016-04-06
WO2015001889A1 (ja) 2015-01-08
US20150203384A1 (en) 2015-07-23
CA2917118A1 (en) 2015-01-08
JPWO2015001887A1 (ja) 2017-02-23
EP3002259A4 (en) 2016-08-03
JP6005282B2 (ja) 2016-10-12
AU2014285447A1 (en) 2016-01-21
CN105339313A (zh) 2016-02-17
CN105358491A (zh) 2016-02-24
CA2917155A1 (en) 2015-01-08
JPWO2015001889A1 (ja) 2017-02-23
AU2014285452A1 (en) 2016-01-28
US20150203381A1 (en) 2015-07-23
CN105377772A (zh) 2016-03-02
US20150203379A1 (en) 2015-07-23
AU2014285451B2 (en) 2017-04-13
EP3006409A4 (en) 2016-08-10
EP3002257B1 (en) 2019-07-03
US20150203380A1 (en) 2015-07-23
CA2917124A1 (en) 2015-01-08
CN105377771B (zh) 2017-08-18
EP3006409A1 (en) 2016-04-13
CN105358492A (zh) 2016-02-24
EP3002257A1 (en) 2016-04-06
EP3002257A4 (en) 2016-06-22
US9914653B2 (en) 2018-03-13
CA2917111A1 (en) 2015-01-08
JPWO2015001884A1 (ja) 2017-02-23
CA2917111C (en) 2017-04-11
CN105358490B (zh) 2017-09-01
AU2014285448B2 (en) 2016-11-24
AU2014285449A1 (en) 2016-01-28
US20150203383A1 (en) 2015-07-23
US10160671B2 (en) 2018-12-25
CA2917116A1 (en) 2015-01-08
CN105377772B (zh) 2018-08-24
EP3002256A4 (en) 2016-08-10
WO2015001888A1 (ja) 2015-01-08
AU2014285452B2 (en) 2017-04-13
JP6091032B2 (ja) 2017-03-08
JP6005284B2 (ja) 2016-10-12
EP3006409B1 (en) 2019-07-03
AU2014285450B2 (en) 2016-11-24
ZA201509359B (en) 2017-09-27
CN105358491B (zh) 2018-06-08
JP6005283B2 (ja) 2016-10-12
WO2015001887A1 (ja) 2015-01-08
US9950936B2 (en) 2018-04-24
EP3002256A1 (en) 2016-04-06
CA2917155C (en) 2017-05-16
AU2014285447B2 (en) 2017-04-13
CN105358490A (zh) 2016-02-24
ZA201509365B (en) 2017-04-26
CA2917123C (en) 2017-07-04
US20150203382A1 (en) 2015-07-23

Similar Documents

Publication Publication Date Title
JP6005283B2 (ja) 水処理方法及び水処理システム

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 14820653

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2015525099

Country of ref document: JP

Kind code of ref document: A

ENP Entry into the national phase

Ref document number: 2917155

Country of ref document: CA

WWE Wipo information: entry into national phase

Ref document number: 2014820653

Country of ref document: EP

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2014285448

Country of ref document: AU

Date of ref document: 20140530

Kind code of ref document: A