WO2013137141A1 - バッテリの残存容量算出装置及びバッテリの残存容量算出方法 - Google Patents

バッテリの残存容量算出装置及びバッテリの残存容量算出方法 Download PDF

Info

Publication number
WO2013137141A1
WO2013137141A1 PCT/JP2013/056460 JP2013056460W WO2013137141A1 WO 2013137141 A1 WO2013137141 A1 WO 2013137141A1 JP 2013056460 W JP2013056460 W JP 2013056460W WO 2013137141 A1 WO2013137141 A1 WO 2013137141A1
Authority
WO
WIPO (PCT)
Prior art keywords
remaining capacity
battery
estimated value
value
soc
Prior art date
Application number
PCT/JP2013/056460
Other languages
English (en)
French (fr)
Inventor
力 曽我
敦史 ▲高▼野
Original Assignee
日産自動車株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 日産自動車株式会社 filed Critical 日産自動車株式会社
Priority to CN201380014092.2A priority Critical patent/CN104169733B/zh
Priority to EP13760801.4A priority patent/EP2827164B1/en
Priority to US14/384,438 priority patent/US10310025B2/en
Publication of WO2013137141A1 publication Critical patent/WO2013137141A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/36Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
    • G01R31/382Arrangements for monitoring battery or accumulator variables, e.g. SoC
    • G01R31/3842Arrangements for monitoring battery or accumulator variables, e.g. SoC combining voltage and current measurements
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L3/00Electric devices on electrically-propelled vehicles for safety purposes; Monitoring operating variables, e.g. speed, deceleration or energy consumption
    • B60L3/12Recording operating variables ; Monitoring of operating variables
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L58/00Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles
    • B60L58/10Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries
    • B60L58/12Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries responding to state of charge [SoC]
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/36Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
    • G01R31/3644Constructional arrangements
    • G01R31/3648Constructional arrangements comprising digital calculation means, e.g. for performing an algorithm
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/36Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
    • G01R31/367Software therefor, e.g. for battery testing using modelling or look-up tables
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/48Accumulators combined with arrangements for measuring, testing or indicating the condition of cells, e.g. the level or density of the electrolyte
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L2240/00Control parameters of input or output; Target parameters
    • B60L2240/40Drive Train control parameters
    • B60L2240/54Drive Train control parameters related to batteries
    • B60L2240/545Temperature
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L2240/00Control parameters of input or output; Target parameters
    • B60L2240/40Drive Train control parameters
    • B60L2240/54Drive Train control parameters related to batteries
    • B60L2240/547Voltage
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L2240/00Control parameters of input or output; Target parameters
    • B60L2240/40Drive Train control parameters
    • B60L2240/54Drive Train control parameters related to batteries
    • B60L2240/549Current
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L2260/00Operating Modes
    • B60L2260/40Control modes
    • B60L2260/44Control modes by parameter estimation
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/36Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
    • G01R31/382Arrangements for monitoring battery or accumulator variables, e.g. SoC
    • G01R31/3828Arrangements for monitoring battery or accumulator variables, e.g. SoC using current integration
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/10Energy storage using batteries
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/70Energy storage systems for electromobility, e.g. batteries

Definitions

  • the present invention relates to the calculation of the remaining capacity of a battery.
  • a method of detecting a charge / discharge current (hereinafter simply referred to as a current) and calculating based on an integrated current value obtained by integrating the detected current, and a method of calculating based on an open circuit voltage
  • a current integrated value although a stable remaining capacity can be obtained even if there is a sudden change in load or the like, a detection error of the current tends to be accumulated.
  • the method based on the open circuit voltage can accurately obtain the remaining capacity, the calculated value largely fluctuates when there is a sudden fluctuation of load or the like.
  • the remaining capacity determined from the current integrated value and the remaining capacity determined based on the open circuit voltage estimated based on the internal resistance Weights are synthesized using weights set in accordance with the current change rate.
  • the calculation accuracy of the remaining capacity is enhanced by taking advantage of the calculation method based on the current integrated value and the calculation method based on the open circuit voltage.
  • the calculation method based on the current integrated value is based on the remaining capacity (SOC) estimated at the timing when the open voltage can be measured as at the start, and the remaining value obtained by dividing the current integrated value by the estimated full charge capacity.
  • the remaining capacity is calculated using the capacity change amount (SOC change amount). Therefore, for example, when the full charge capacity decreases due to a battery failure, calculation is performed using a full charge capacity estimated value larger than the true full charge capacity, and the remaining capacity change amount is a value smaller than the true change amount It will As a result, the remaining capacity larger than the true remaining capacity is calculated, and the error with respect to the true remaining capacity increases as charge and discharge continue.
  • An object of the present invention is, therefore, to suppress the estimation error of the remaining capacity, even if the full charge capacity is reduced due to a battery failure or the like.
  • a battery remaining capacity calculation device comprising current detection means for detecting charge and discharge current of a battery and voltage detection means for detecting a terminal voltage of the battery.
  • the remaining capacity calculation device for a battery calculates first remaining capacity calculation means for calculating a first remaining capacity based on an integrated value of charge and discharge current of the battery, and second calculates a second remaining capacity based on an open circuit voltage of the battery.
  • a remaining capacity calculation means is provided.
  • blending ratio setting means for determining the blending ratio of the second remaining capacity according to the deviation between the first remaining capacity and the second remaining capacity, and weighting combining the first remaining capacity and the second remaining capacity using the blending ratio And third remaining capacity calculation means. Then, the blending ratio setting means increases the blending ratio as the deviation between the first remaining capacity and the second remaining capacity increases.
  • FIG. 1 is a block diagram of a vehicle system according to an embodiment of the present invention.
  • FIG. 2 is a control block diagram showing an example of the SOC calculation algorithm.
  • FIG. 3 is an example of a map showing the relationship between the open circuit voltage OCV and the SOC.
  • FIG. 4 is a time chart in the case where the full charge capacity rapidly decreases during discharge.
  • FIG. 5 is a view showing an example of a blending rate map for use during discharge.
  • FIG. 6 is a view showing an example of a blending rate map for charging.
  • FIG. 7 is a flowchart of the SOC calculation algorithm.
  • FIG. 8 is a time chart when the battery is normal.
  • FIG. 9 is a time chart in the case where the full charge capacity suddenly decreases halfway.
  • FIG. 8 is a time chart when the battery is normal.
  • FIG. 9 is a time chart in the case where the full charge capacity suddenly decreases halfway.
  • FIG. 8 is a time chart when the battery is normal.
  • FIG. 10 is a diagram for explaining the limited range of the estimated value based on the current integrated value.
  • FIG. 11 is a block diagram showing an algorithm for estimating the full charge capacity.
  • FIG. 12 is a time chart in the case where a limitation range is provided for the estimated value based on the current integrated value.
  • FIG. 1 is a system configuration diagram when the present invention is applied to an electric vehicle.
  • the present system estimates the battery 1, the load 5 operated by the power supplied from the battery 1, and the remaining capacity of the battery 1 (the ratio of the remaining capacity to the full charge capacity, hereinafter referred to as SOC (State of Charge)) And a vehicle control controller (hereinafter referred to as a vehicle control ECU) 3 for controlling the load 5 based on the estimated value of the SOC.
  • the load 5 is, for example, a drive motor as a drive source of the vehicle.
  • the battery 1 is configured to include a plurality of unit cells, and is configured, for example, by connecting a plurality of unit cells in series and parallel (a plurality of parallel bodies in which a plurality of batteries are connected in parallel are connected in series).
  • the battery ECU 2 calculates an SOC estimated value based on detection signals of a voltage sensor 7 that detects a terminal voltage CCV of the battery 1 and a current sensor 8 that detects a charge / discharge current of the battery 1. The specific calculation content will be described later.
  • the battery ECU 2 is configured by a microcomputer including a central processing unit (CPU), a read only memory (ROM), a random access memory (RAM), and an input / output interface (I / O interface). It is also possible to configure the battery ECU 2 with a plurality of microcomputers. The same applies to a vehicle control ECU 3 described later.
  • CPU central processing unit
  • ROM read only memory
  • RAM random access memory
  • I / O interface input / output interface
  • the SOC estimated value calculated by the battery ECU 2 is transmitted to the vehicle control ECU 3 and the meter 4 by communication with the battery ECU 2 and CAN (Controller Area Network).
  • CAN Controller Area Network
  • the vehicle control ECU 3 determines whether or not the SOC is sufficient based on the estimated SOC value transmitted from the battery ECU 2. If the SOC is insufficient, for example, the power consumption of the load 5 is limited.
  • the meter 4 displays the SOC estimated value to the driver.
  • the battery ECU 2 sets the upper limit value of the power consumption set by the vehicle control ECU 3 in order to keep the terminal voltage of the battery 1 within the allowable range.
  • FIG. 2 is a control block diagram showing an example of an SOC calculation algorithm in the battery ECU 2.
  • This algorithm calculates SOC estimation value SOCv based on voltage and SOC estimation value SOCi based on current integration value, and uses SOC that is weighted and combined using blend ratio ⁇ [%] set based on the difference between the two. It is assumed to be the estimated value SOC_FIN.
  • the blending ratio ⁇ is a weight of the SOC estimated value SOCv based on a voltage in weighting and combining.
  • the blend ratio means the ratio (weight) of both when weighting and combining the SOC estimated value SOCv based on a voltage and the SOC estimated value SOCi based on a current integrated value.
  • the SOCi computing unit 100 computes the SOC estimated value SOCi based on the current integrated value in the following procedure.
  • the state where the current value is approximately 0 continues for a predetermined time, such as at start-up and after low current continuation (the state where the current and the voltage generated by the internal resistance are so small that they can be ignored, polarization is eliminated.
  • the open circuit voltage is measured by measuring the terminal voltage CCV at this timing as the timing at which the open circuit voltage can be measured after the time is continued and the terminal voltage CCV becomes approximately equal to the open circuit voltage. Calculate the SOC estimated value.
  • the full charge capacity is also calculated in advance. The full charge capacity uses, for example, the amount of change ⁇ Ah of the integrated current value [Ah] from the time when the open circuit voltage was measured last time to the time when the open circuit voltage was measured this time To calculate from equation (1).
  • the SOC estimated value SOCi based on the current integration I assume.
  • the method of calculating the SOC estimated value SOCi based on the current integration is not limited to the above.
  • the open circuit voltage is measured in the same manner as described above to calculate the SOC estimated value based on the open circuit voltage, and the SOC change amount corresponding to the current integrated value from the time of calculating the SOC estimated value to the present is subtracted to obtain SOCi. It may be calculated.
  • the SOC change amount corresponding to the current integrated value can be calculated, for example, from a map that represents the correlation between the current integrated value and the SOC change amount obtained in advance by experiment or the like.
  • the degree of deterioration of the battery is correlated with the internal resistance of the battery. Therefore, if the relationship between the current integrated value and the SOC change amount according to the internal resistance of the battery is stored in advance as a map, and the map stored in advance based on the current integrated value actually detected is referred to, The SOC change amount corresponding to the current integration value can be obtained. That is, it is not necessary to directly use the full charge capacity to calculate the SOC estimated value SOCi, but using the current integrated value and a parameter representing the full charge capacity (in the above example, internal resistance, that is, the degree of deterioration)
  • the estimated SOC value SOCi can be calculated according to the charge capacity. Note that the internal resistance of the battery can be easily calculated from the voltage change with respect to the current change during charge and discharge.
  • the base point is set, until the timing when the open voltage can be measured next time, the open circuit voltage is not measured, and the current integration value and the previously set full charge capacity (the base point is set).
  • the estimated value SOCi based on the full charge capacity is calculated, for example, the connection of a part of the batteries constituting the parallel body is canceled, and the full charge capacity of the battery 1 decreases during discharge. Even if there is, it will be calculated using the full charge capacity before the decrease.
  • the SOC change amount is calculated to be smaller than the true SOC change amount, and it becomes impossible to follow the true SOC decrease. Therefore, when the estimated value SOCi is displayed on the meter 4, a value larger than the true SOC will be displayed.
  • FIG. 4 is a time chart when the full charge capacity decreases at timing T1 while the battery 1 is discharging. Until timing T1, the estimated value SOCi can follow the true SOC, but after timing T1, the variation of the estimated value SOCi becomes smaller than the true SOC variation, and as the time passes, the estimated value SOCi Deviation from true SOC is increasing.
  • the SOC change amount is calculated to be smaller than the true SOC change amount also during charging, and when the estimated value SOCi is displayed on the meter 4, a value smaller than the true SOC is displayed.
  • SOCv computing unit 101 computes SOC estimated value SOCv based on the voltage according to the following procedure.
  • the terminal voltage CCV and the current I are read, and the internal resistance estimated value R is estimated from the terminal voltage CCV and the current I.
  • the open circuit voltage OCV is estimated using equation (2).
  • the value of the current I is such that the discharge direction is positive and the charge direction is negative.
  • the estimated open circuit voltage OCV is converted into an estimated value SOCv using a map showing the relationship between the open circuit voltage OCV and the SOC. Since the relationship between the open circuit voltage OCV and the SOC is determined by the characteristics of the battery, the relationship between the open circuit voltage OCV and the SOC is obtained in advance by experiment or the like, mapped, and stored in the SOCv computing unit 101.
  • FIG. 3 is an example of a map showing the relationship between the open circuit voltage OCV and the SOC.
  • the terminal voltage CCV is used for the calculation of the estimated value SOCv, and the terminal voltage CCV decreases accordingly as the true SOC decreases. Therefore, the estimated value SOCv accurately follows the true SOC change. However, the value fluctuates when noise is added to the measurement result of the terminal voltage CCV (it becomes oscillatory around the true value). For this reason, when the estimated value SOCv is displayed on the meter 4, for example, the SOC being displayed is temporarily increased due to the fluctuation due to noise despite the fact that the vehicle continues to travel (the battery 1 is discharged). This may cause the driver to feel uncomfortable.
  • the estimated value SOCi and the estimated value SOCv calculated as described above are read into the deviation calculation unit 102.
  • the deviation calculating unit 102 calculates a deviation (hereinafter referred to as an estimated value deviation) by subtracting the estimated value SOCv from the estimated value SOCi, and outputs the calculation result to the blend ratio ⁇ setting unit 103.
  • the blend ratio ⁇ setting unit 103 sets the blend ratio ⁇ of the estimated value SOCv using the blend ratio ⁇ setting maps of FIGS. 5 and 6 which are created and stored in advance.
  • FIG. 5 is a map used during discharging
  • FIG. 6 is a map used during charging.
  • the vertical axis is the blend ratio ⁇
  • the horizontal axis is the estimated value deviation.
  • estimated value SOCi can not follow a change in true SOC due to a rapid decrease in full charge capacity, and estimated value SOCi Is more likely to indicate a value larger than the true SOC.
  • the estimated value SOCi is unlikely to indicate a large value with respect to the true SOC. Note that “the case where the estimated value deviation is small” also includes the case where the estimated value SOCi is smaller than the estimated value SOCv.
  • the blend rate ⁇ is zero [%], and as the estimated value deviation increases between D1 and D2, the blend rate ⁇ of the estimated value SOCv increases as shown in FIG.
  • the blend ratio ⁇ is set to 100% at D2 or more.
  • the blend ratio ⁇ increases and finally becomes 100 [%], so that the SOC after weighting and combining follows the true SOC It can be done.
  • weighting and combining are performed without increasing the blend ratio ⁇ , so that the driver feels uncomfortable with the display of the meter 4 There is no
  • the estimated value deviations D1 and D2 and D3 and D4 described later are set in advance in accordance with the battery 1 to be used.
  • the estimated value SOCi can not follow the change in the true SOC due to the rapid decrease of the full charge capacity. Thus, the possibility that the estimated value SOCi indicates a value smaller than the true SOC is increased.
  • the estimated value deviation is small, or when the estimated value SOCi is larger than the estimated value SOCv, the estimated value SOCi is less likely to indicate a smaller value than the true SOC.
  • the blend rate ⁇ is zero [%], and as the estimated value deviation increases in the negative direction between D3 and D4 as shown in FIG.
  • the rate ⁇ increases, and the blend rate ⁇ is set to 100 [%] below D4.
  • the blend ratio ⁇ calculated as described above is read into the blend calculation unit 104 together with the estimated value SOCi and the estimated value SOCv.
  • the blend operation unit 104 calculates the post-combination estimated value SOC_FIN according to the equation (3).
  • the blend ratio ⁇ setting map is set so that the blend ratio ⁇ is increased as the deviation between the estimated value SOCi based solely on the current integrated value and the estimated value SOCv based on the voltage value increases, regardless of whether it is charging or discharging. Calculation load can also be reduced. According to this, if the estimated value SOCi is lower than the true SOC during discharge, or if the estimated value SOCi is higher than the true SOC during charging, that is, the blend ratio ⁇ is increased. Even if there is no problem even if there is no such problem, the blend ratio ⁇ will be increased.
  • FIG. 7 is a flowchart of the SOC calculation algorithm described above.
  • the flowchart is repeatedly executed by the battery ECU 2 at short intervals of, for example, about 10 milliseconds.
  • step S10 battery ECU 2 calculates estimated value SOCv in SOCv calculation unit 101, and calculates estimated value SOCi in SOCi calculation unit 100 in step S20. Steps S10 and S20 are in random order.
  • step S30 the deviation calculating unit 102 calculates the estimated value deviation
  • step S40 the blending ratio ⁇ setting unit 103 calculates the blending rate ⁇ based on the estimated value deviation. Do.
  • FIG. 8 and 9 are time charts when the flowchart of FIG. 7 is executed during discharging, and FIG. 8 shows a case where the battery 1 is normal and FIG. 9 shows a case where the full charge capacity of the battery 1 drops sharply. ing.
  • the solid line in the drawing indicates the estimated value SOC_FIN after synthesis, the broken line indicates the estimated value SOCv, and the alternate long and short dashed line indicates the estimated value SOCi.
  • the estimated value deviation does not exceed D1 in FIG. 5, and in FIG. 9, the estimated value deviation is D1 at timing T1 and D2 at timing T2.
  • the estimated value SOCv decreases with a slope similar to that of the estimated value SOCi as a whole, while repeatedly increasing and decreasing due to the influence of noise and the like. Therefore, since the estimated value deviation does not exceed D1 in FIG. 5 and the blend ratio ⁇ remains zero [%], the post-synthesis estimated value SOC_FIN becomes equal to the estimated value SOCi. Therefore, the display of the meter 4 does not give a sense of discomfort to the driver.
  • the slope of estimated value SOCi becomes smaller than the slope of estimated value SOCv, so the estimated value deviation increases with the passage of time.
  • the blend ratio ⁇ gradually increases between timing T1 at which the estimated value deviation is D1 and timing T2 at which the estimated value deviation becomes D2, and reaches 100 [%] at timing T2.
  • the estimated combined value SOC_FIN is equal to the estimated value SOCi before timing T1, gradually approaches the estimated value SOCv between timing T1 and timing T2, and becomes equal to the estimated value SOCv at timing T2.
  • the blend ratio ⁇ setting map in FIGS. 5 and 6 includes a region in which the blend ratio ⁇ gradually changes, even if the blend ratio ⁇ changes stepwise with a predetermined estimated value deviation as a boundary. Good.
  • the post-combination estimated value SOC_FIN is the estimated value SOCi when the estimated value deviation is equal to or less than a predetermined value, and is switched to the estimated value SOCv when the estimated value deviation exceeds the predetermined value.
  • timing T1 and timing T2 there is a section in which the estimated value SOCv increases due to the influence of noise and the like, and in this section, the blend ratio ⁇ decreases, so the estimated value after synthesis SOC_FIN is strictly shown in FIG. It does not become straight like 9
  • the transition from the estimated value SOCi to the estimated value SOCv is represented by a straight line to facilitate understanding.
  • the present embodiment is different from the first embodiment only in the method of calculating the estimated value SOCi based on the current integrated value in the SOCi computing unit 100, so the difference will be described.
  • the temperature sensor detects the battery temperature.
  • the estimated value SOCi based on the current integrated value can be obtained by dividing the current integrated value ⁇ I by the full charge capacity FullAh based on the SOC at the start of charge and discharge (SOC 100% in FIG. 10). It is determined using the SOC change amount.
  • the full charge capacity FullAh may be a full charge capacity estimation value estimated using the above equation (1), but here it is estimated by the following method.
  • FIG. 11 is a block diagram showing an algorithm for estimating the full charge capacity FullAh.
  • the internal resistance calculation unit calculates the internal resistance ⁇ based on the detected values of current and voltage at the time of charge and discharge. Then, the reduction coefficient calculation unit reads the internal resistance ⁇ and the battery temperature, and using a map created and stored in advance, obtains the ratio of the internal resistance ⁇ at the new temperature and the current temperature concerned, and calculates this ratio It is converted into a reduction coefficient that represents the reduction rate (that is, deterioration rate) of the full charge capacity.
  • the map used here shows the characteristics of the internal resistance with respect to the battery temperature when new. Then, the reduction coefficient corresponding to the ratio of the internal resistance is set in advance, and the ratio is converted into the reduction coefficient based on this.
  • the description returns to the method of calculating the estimated value SOCi based on the current integration value. If the current estimated value SOCi is calculated using the SOC change amount ⁇ SOCAh based on the current integrated value ⁇ I from the previous time to the current time and the full charge capacity FullAh with respect to the previous value SOCi (n ⁇ 1) of the estimated value SOCi , SOCi '(n). Then, considering the error of the SOC change amount ⁇ SOCAh based on the error of the current integrated value ⁇ I due to the error of the current sensor 6 and the estimation error of the full charge capacity FullAh etc.
  • the shaded range hereinafter referred to as a change range).
  • the possible change in estimated value SOCi in one operation cycle from the previous time to the current can be the smallest value from the previous value SOCi (n-1) to the upper limit of the change range, and the largest previous value SOCi (n-1) To the lower limit of the change range.
  • the range (change range) in which the amount of change of the estimated value SOCi in one operation cycle can be determined in this manner is set with reference to the previous estimated value SOCi (n-1). Then, an estimated value limitation range having the same width as the change range can be set with the estimated value SOCi '(n) reduced from the previous estimated value SOCi (n-1) by the SOC change amount .DELTA.SOCAh as a center. Then, in this calculation method, the estimated value SOCv (n) obtained from the voltage is limited to a value within the estimated value restriction range which is the value that can be obtained by the current calculation, the estimated value SOCi based on the current integration value. An estimated value SOCi (n) which is a current value of the value SOCi is calculated.
  • an estimated value limitation range centered on the current estimated value SOCi '(n) calculated based on the current integration value with the previous estimated value SOCi (n-1) as a reference is set, and the estimated value SOCv Let n) be limited to the estimated value limit range to obtain the final estimated value SOCi (n) of this time.
  • the current final estimation using the estimated value SOCv (n) obtained from the open circuit voltage Determine the value SOCi (n).
  • t2 is the present estimation timing
  • t1 is the previous estimation timing
  • SOCi (n) the contents of the calculation of the estimated value SOCi (n) at the present estimation timing
  • the SOC change amount ⁇ SOCAh estimated based on the current integration value from the previous time (t1) to the current time (t2) is subtracted from the final estimated value SOCi (n) at the previous estimated timing (t1) (here, the discharge direction Since this is a change in capacity, the current estimated value SOCi '(n) is calculated by subtraction. Then, the estimated value limit range is set based on the calculated current estimated value SOCi '(n), and the estimated value SOCv (n) obtained from the open circuit voltage is limited within the estimated limit range to make the current final estimation. It is assumed that the value SOCi (n).
  • the estimated value SOCv (n) obtained from the open circuit voltage is a value larger than the estimated restricted range
  • the upper limit value of the estimated restricted range is taken as the final estimated value SOCi (n)
  • the estimated value obtained from the open circuit voltage If the value SOCv (n) is smaller than the estimated limit range, the lower limit value of the estimated limit range is taken as the final estimated value SOCi (n), and the estimated value SOCv (n) obtained from the open circuit voltage is the estimated limit range If the value is in the range, the estimated value SOCv (n) is taken as the final estimated value SOCi (n).
  • Estimated value SOCi '(n + 1) is calculated by adding change amount .DELTA.SOCAh (in this case, since it is a change in capacity in the charging direction, so as to calculate estimated value SOCi' (n + 1))
  • a range is set, and the estimated value SOCv (n + 1) obtained from the open circuit voltage is limited within the estimated limit range to obtain the next final estimated value SOCi (n + 1).
  • the above calculation is repeated at each estimation timing of the estimated value SOCi to obtain the estimated value SOCi.
  • estimated value SOCi calculated based on the current integrated value shifts so as to follow estimated value SOCv obtained from the voltage as compared with the first embodiment, and thus estimated value SOCi And the estimated value SOCv is less likely to deviate.
  • the present embodiment is different from the first and second embodiments only in the method of calculating the estimated value SOCv based on the voltage value in the SOCv computing unit 101, so the difference will be described.
  • the estimated value SOCv calculated by the same method as that of the first embodiment is subjected to filter processing to change the estimated post-synthesis value SOC_FIN displayed on the meter 4 when the blend ratio ⁇ is increased. Suppress.
  • a moving average, a weighted average, or a rate limiter with a limited change rate which will be described later, can be applied.
  • the estimated value SOCv is calculated in the same manner as in the first embodiment, and the previous value and the current value are respectively weighted and added to obtain the current estimated value SOCv.
  • the rate limiter places a limit on the amount of change from the previous estimated value SOCv, and if the amount of change from the previous value of the estimated value SOCv obtained in the current calculation exceeds the limit, It is a filter process which makes a value an estimated value SOCv of this time.
  • a blend ratio ⁇ setting unit 103 that determines the ratio ⁇ is provided. Then, blend calculation section 104 calculates weighted post-combination estimated value SOC_FIN using blend ratio ⁇ , and blend ratio ⁇ setting section 103 sets blend ratio ⁇ larger as the deviation between estimated value SOCi and estimated value SOCv increases. Do.
  • the capacity is calculated. As a result, it is possible to display the remaining capacity with high accuracy to the driver.
  • the blend ratio ⁇ setting unit sets a larger blend ratio ⁇ as the estimated value SOCi becomes larger than the estimated value SOCv during discharging, or as the estimated value SOCv becomes larger than the estimated value SOCi during charging.
  • the change range of the first remaining capacity in one operation cycle is calculate. Then, an estimated value limitation range in which a change range is set for the estimated value SOCv at the time of the previous calculation is set, and the estimated value SOCi is limited to the value of the estimated value limitation range.
  • the estimated value SOCi follows the estimated value SOCv, the opportunity for the blend ratio ⁇ to increase is reduced as compared with the case where no limitation is made.
  • the estimated value SOCv which fluctuates finely due to noise or the like, it is possible to reduce the chance of giving the driver a sense of discomfort.

Landscapes

  • Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Sustainable Energy (AREA)
  • Transportation (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Sustainable Development (AREA)
  • Power Engineering (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • General Chemical & Material Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Secondary Cells (AREA)
  • Tests Of Electric Status Of Batteries (AREA)

Abstract

 バッテリの充放電電流を検出する電流検出手段と、バッテリの端子電圧を検出する電圧検出手段と、バッテリの充放電電流の積算値に基づいて第1残存容量を算出する第1残存容量演算手段と、バッテリの開放電圧に基づいて第2残存容量を算出する第2残存容量演算手段と、第1残存容量と第2残存容量の偏差に応じて第2残存容量のブレンド率を決定するブレンド率設定手段と、ブレンド率を用いて第1残存容量と第2残存容量を重み付け合成した合成後残存容量を算出する第3残存容量演算手段を備え、ブレンド率設定手段は、第1残存容量と第2残存容量の偏差が大きいほどブレンド率を大きくする。

Description

バッテリの残存容量算出装置及びバッテリの残存容量算出方法
 本発明は、バッテリの残存容量の演算に関する。
 バッテリの残存容量を求める方法として、充放電電流(以下、単に電流と言う)を検出して、検出した電流を積算した電流積算値に基づいて算出する方法と、開放電圧に基づいて算出する方法が知られている。電流積算値に基づく方法は、負荷の急激な変動等があっても安定した残存容量が得られる反面、電流の検出誤差が累積しやすい。一方、開放電圧に基づく方法は、正確な残存容量を求めることができる反面、負荷の急激な変動等があった場合に演算値が大きく変動してしまう。
 そこで、JP2006-38495Aの残存容量演算装置では、残存容量の推定精度を高めるために、電流積算値から求めた残存容量と、内部抵抗に基づいて推定した開放電圧に基づいて求めた残存容量とを、電流変化速度に応じて設定したウェイトを用いて重み付け合成している。
 これにより、電流積算値に基づく算出方法と開放電圧に基づく算出方法の利点を生かして、残存容量の演算精度を高めようとしている。
 ところで、電流積算値に基づく算出方法は、起動時のように開放電圧を計測できるタイミングで推定した残存容量(SOC)を基点とし、電流積算値を満充電容量推定値で除算して求めた残存容量変化量(SOC変化量)を用いて残存容量を算出する。したがって、例えば、電池の異常により満充電容量が低下すると、真の満充電容量より大きな満充電容量推定値を用いて演算することとなり、残存容量変化量は真の変化量より小さい値が算出されてしまう。その結果、真の残存容量よりも大きな残存容量を算出することとなり、充放電を続けるほど真の残存容量に対する誤差が大きくなる。
 しかしながら、JP2006-38495Aの残存容量演算装置では、電流変化速度に応じて設定したウェイト用いて重み付け合成しているため、電池の異常等による満充電容量の低下が有った場合、残存容量の推定誤差が大きくなってしまう。
 本発明の目的は、したがって、電池の異常等により満充電容量の低下があっても、残存容量の推定誤差を抑制することである。
 本発明のある態様によれば、バッテリの充放電電流を検出する電流検出手段と、バッテリの端子電圧を検出する電圧検出手段を備えるバッテリの残存容量算出装置が提供される。バッテリの残存容量算出装置は、バッテリの充放電電流の積算値に基づいて第1残存容量を算出する第1残存容量演算手段と、バッテリの開放電圧に基づいて第2残存容量を算出する第2残存容量演算手段を備える。さらに、第1残存容量と第2残存容量の偏差に応じて第2残存容量のブレンド率を決定するブレンド率設定手段と、ブレンド率を用いて第1残存容量と第2残存容量を重み付け合成する第3残存容量演算手段とを備える。そして、ブレンド率設定手段は、第1残存容量と第2残存容量の偏差が大きいほどブレンド率を大きくする。
 この発明の実施形態、本発明の利点については、添付された図面を参照しながら以下に詳細に説明する。
図1は本発明の実施形態による車両システムの構成図である。 図2は、SOC演算アルゴリズムの一例を示す制御ブロック図である。 図3は、開放電圧OCVとSOCの関係を示すマップの一例である。 図4は、放電中に満充電容量が急激に低下した場合のタイムチャートである。 図5は、放電中用のブレンド率マップの一例を示す図である。 図6は、充電中用のブレンド率マップの一例を示す図である。 図7は、SOC演算アルゴリズムのフローチャートである。 図8は、バッテリ正常時のタイムチャートである。 図9は、満充電容量が途中で急低下した場合のタイムチャートである。 図10は、電流積算値に基づく推定値の制限範囲について説明するための図である。 図11は、満充電容量を推定するアルゴリズムを示すブロック図である。 図12は、電流積算値に基づく推定値に制限範囲を設けた場合のタイムチャートである。
 図1は、本発明を電気自動車へ適用した場合のシステム構成図である。本システムは、バッテリ1と、バッテリ1から供給される電力で稼働する負荷5と、バッテリ1の残存容量(満充電容量に対する残存容量割合であり、以下、SOC(State of Charge)という)を推定するバッテリコントローラ(以下、バッテリECUという)2と、SOCの推定値に基づいて負荷5を制御する車両制御コントローラ(以下、車両制御ECUという)3を含む。負荷5は、例えば車両の駆動源としての駆動モータである。
 バッテリ1は、複数の単電池を含んで構成されており、例えば、複数の単電池を直並列に接続(複数の電池を並列接続した並列体を、複数直列接続)して構成されている。
 バッテリECU2は、バッテリ1の端子電圧CCVを検出する電圧センサ7と、バッテリ1の充放電電流を検出する電流センサ8の検出信号に基づいて、SOC推定値を演算する。具体的な演算内容については後述する。
 なお、バッテリECU2は、中央演算装置(CPU)、読み出し専用メモリ(ROM)、ランダムアクセスメモリ(RAM)及び入出力インタフェース(I/Oインタフェース)を備えたマイクロコンピュータで構成される。バッテリECU2を複数のマイクロコンピュータで構成することも可能である。後述する車両制御ECU3についても同様である。
 バッテリECU2で算出されたSOC推定値は、バッテリECU2とCAN(Controller Area Network)通信等により車両制御ECU3やメータ4へ送信される。
 車両制御ECU3は、バッテリECU2から送信されたSOC推定値に基づいてSOCが足りているか否かの判定を行ない、SOCが不足している場合には、例えば負荷5の消費電力を制限する。メータ4は、SOC推定値を運転者に対して表示するものである。
 また、バッテリECU2は、バッテリ1の端子電圧を許容範囲内に収めるために、車両制御ECU3が設定する消費電力の上限値を設定する。
 図2は、バッテリECU2内でのSOC演算アルゴリズムの一例を示す制御ブロック図である。本アルゴリズムは、電圧に基づくSOC推定値SOCvと、電流積算値に基づくSOC推定値SOCiとを演算し、両者の差に基づいて設定したブレンド率α[%]を用いて重み付け合成したものをSOC推定値SOC_FINとするものである。なお、ブレンド率αは、重み付け合成における、電圧に基づくSOC推定値SOCvの重みである。以下、本アルゴリズムの第1実施例について説明する。なお、本明細書中においてブレンド率とは、電圧に基づくSOC推定値SOCvと電流積算値に基づくSOC推定値SOCiとを重み付け合成する際の両者の比率(ウェイト)を意味する。
 SOCi演算部100では、以下の手順で電流積算値に基づくSOC推定値SOCiを演算する。
 まず、起動時や低電流継続後等といった、電流値が略0の状態が所定時間継続した(電流と内部抵抗によって発生する電圧が無視できるほど小さい値の状態が、分極が解消される程度の時間継続した)後であって端子電圧CCVが略開放電圧に等しくなるタイミングを、開放電圧を計測できるタイミングとして、該タイミングで端子電圧CCVを計測することで開放電圧を計測し、開放電圧に基づくSOC推定値を演算しておく。また、満充電容量も予め演算しておく。満充電容量は、例えば前回開放電圧を計測した時点から今回開放電圧を計測した時点までの電流積算値[Ah]の変化量△Ahと、開放電圧の変化から演算したSOC変化量△SOCを用いて、式(1)から演算する。
  満充電容量推定値=△Ah/△SOC   ・・・(1)
 そして、今回計測した開放電圧に基づいて推定したSOCを基点とし、電流積算値を満充電容量推定値で除算して得られるSOC変化量を用いて推定したSOCを電流積算に基づくSOC推定値SOCiとする。
 ここで、電流積算に基づくSOC推定値SOCiの算出方法は上記に限定されない。例えば、上記と同様に開放電圧を計測して開放電圧に基づくSOC推定値を演算し、SOC推定値を演算した時点から現在までの電流積算値に対応したSOC変化量を減算して、SOCiを算出しても良い。なお、電流積算値に対応したSOC変化量は例えば、予め実験等によって求めた電流積算値とSOC変化量との相関関係を表すマップから算出することができる。
 ここで、バッテリの劣化度(満充電容量の減少量)はバッテリの内部抵抗と相関が有ることが知られている。このため、バッテリの内部抵抗に応じた、電流積算値とSOC変化量との関係をマップとして予め記憶しておき、実際に検出された電流積算値に基づいて予め記憶したマップを参照すれば、電流積算値に対応したSOC変化量を求めることができる。すなわちSOC推定値SOCiの算出には、必ずしも直接的に満充電容量を用いる必要は無く、電流積算値と満充電容量を表すパラメータ(上記の例では内部抵抗、すなわち劣化度)を用いれば、満充電容量に応じたSOC推定値SOCiを算出することができる。なお、バッテリの内部抵抗は充放電時の電流変化に対する電圧変化から容易に算出することが可能である。
 この推定値SOCiの変化速度は、真のSOC変化速度との乖離が小さいので、メータ4に表示した場合に運転者に与える違和感が小さい。
 しかし、推定値SOCiの演算では、基点を設定した後に次回開放電圧が計測できるタイミングとなるまでは開放電圧を計測することなく、電流積算値と予め設定した満充電容量(基点を設定した際の満充電容量)に基づいた推定値SOCiを演算しているので、例えば並列体を構成する電池のうちの一部の電池の接続が解除された等、放電中にバッテリ1の満充電容量の低下があっても、低下前の満充電容量を用いて演算することになる。その結果、例えば放電中の電流積算値の変化をSOCの変化に換算する際に、SOC変化量を真のSOC変化量より小さく演算することになり、真のSOC低下に追従できなくなる。このため、推定値SOCiをメータ4に表示すると、真のSOCより大きい値を表示することになる。
 図4は、バッテリ1の放電中に、タイミングT1で満充電容量が低下した場合のタイムチャートである。タイミングT1までは、推定値SOCiは真のSOCに追従できているが、タイミングT1以降は、推定値SOCiの変化量が真のSOC変化量よりも小さくなり、時間が経過するほど推定値SOCiと真のSOCとの乖離が大きくなっている。
 また、充電中もSOC変化量を真のSOC変化量より小さく演算することになり、推定値SOCiをメータ4に表示すると、真のSOCより小さい値を表示することになる。
 一方、SOCv演算部101では、以下の手順で電圧に基づいたSOC推定値SOCvを演算する。
 まず、端子電圧CCV及び電流Iを読み込み、さらに端子電圧CCV及び電流Iから内部抵抗推定値Rを推定する。次に、式(2)を用いて開放電圧OCVを推定する。なお、本実施例において、電流Iの値は放電方向を正、充電方向を負としている。
  OCV=CCV+R×I   ・・・(2)
 推定した開放電圧OCVを、開放電圧OCVとSOCの関係を示すマップを用いて推定値SOCvに変換する。開放電圧OCVとSOCの関係は電池の特性により定まるので、予め実験等により求めてマップ化し、SOCv演算部101に記憶しておく。図3は開放電圧OCVとSOCの関係を示すマップの一例である。
 推定値SOCvの演算には端子電圧CCVを用いており、端子電圧CCVは、真のSOCが低下すれば、それに伴って低下する。したがって、推定値SOCvは真のSOC変化に精度良く追従する。ただし、端子電圧CCVの計測結果にノイズが乗った場合等に値が変動する(真値を中心に振動的になる)。このため、推定値SOCvをメータ4に表示すると、例えば、走行し続けている(バッテリ1が放電している)にもかかわらず、ノイズによる変動によって表示されているSOCが一時的に大きくなる場合が生じ、運転者に違和感を与えるおそれがある。
 上記のようにして算出された推定値SOCiと推定値SOCvは、偏差演算部102に読み込まれる。
 偏差演算部102では、推定値SOCiから推定値SOCvを減算することで偏差(以下、推定値偏差という)を演算し、演算結果をブレンド率α設定部103に出力する。
 ブレンド率α設定部103では、予め作成し記憶しておいた図5、図6のブレンド率α設定マップを用いて、推定値SOCvのブレンド率αを設定する。図5は放電中に用いるマップ、図6は充電中に用いるマップである。いずれも縦軸がブレンド率α、横軸が推定値偏差である。
 ここで、ブレンド率α設定マップについて説明する。
 放電中は、推定値SOCiが推定値SOCvに対して大きく、かつ推定値偏差が大きくなるほど、急激な満充電容量の低下により推定値SOCiが真のSOCの変化に追従できなくなって、推定値SOCiが真のSOCより大きい値を示している可能性が高まる。
 一方、推定値偏差が小さい場合は、推定値SOCiが真のSOCに対して大きい値を示している可能性は低い。なお、「推定値偏差が小さい場合」には推定値SOCiが推定値SOCvより小さい場合も含む。
 そこで、ブレンド率αを、図5に示すように推定値偏差がD1以下ではブレンド率αはゼロ[%]、D1からD2の間では推定値偏差が大きくなるほど推定値SOCvのブレンド率αも大きくなり、D2以上ではブレンド率αは100[%]と設定する。これにより、推定値SOCiが真のSOCから大きく乖離している可能性が高まるほどブレンド率αは高まり、最終的には100[%]となるので、重み付け合成後のSOCを真のSOCに追従させることができる。また、推定値SOCiが真のSOCより高い値となっている可能性が低い場合はブレンド率αを上げずに重み付け合成することになるので、運転者がメータ4の表示対して違和感を覚えることがない。
 なお、推定値偏差D1、D2及び後述するD3、D4については、使用するバッテリ1に応じて予め設定しておく。
 充電中には、推定値SOCiが推定値SOCvに対して小さく、かつ推定値偏差が負の方向に大きくなるほど、急激な満充電容量の低下により推定値SOCiが真のSOCの変化に追従できなくなって、推定値SOCiが真のSOCより小さい値を示している可能性が高まる。一方、推定値偏差が小さい場合、または推定値SOCiが推定値SOCvより大きい場合には、推定値SOCiが真のSOCに対して小さい値を示している可能性は低い。
 そこで、ブレンド率αを、図6に示すように推定値偏差がD3以上ではブレンド率αはゼロ[%]、D3からD4の間では推定値偏差が負の方向に大きくなるほど推定値SOCvのブレンド率αは高まり、D4以下ではブレンド率αは100[%]と設定する。これにより、放電中と同様に重み付け合成後のSOCを真のSOCに追従させることができる。
 上述したように算出されたブレンド率αは、推定値SOCi、推定値SOCvとともにブレンド演算部104に読み込まれる。
 ブレンド演算部104は、式(3)により合成後推定値SOC_FINを演算する。
  SOC_FIN=SOCv×α+SOCi×(1-α) ・・・(3)
 なお、充電中か放電中かによらず、単に電流積算値に基づく推定値SOCiと電圧値に基づく推定値SOCvの偏差が大きくなるほど、ブレンド率αを大きくするようにして、ブレンド率α設定マップを1つにして演算負荷を軽減することもできる。これによると、放電中に推定値SOCiが真のSOCより低い値となっている場合や、充電中に推定値SOCiが真のSOCより高い値となっている場合、つまりブレンド率αを増大させなくても支障が少ない場合にもブレンド率αを増大させることになる。しかしながら、充放電中に満充電容量が増大することは考え難く、上記のような状況は単にノイズ等によって一時的に推定値SOCiと推定値SOCvとに偏差が発生した状況であり、このような状況においては推定値SOCiと推定値SOCvとの偏差は比較的小さく、ブレンド率αを増大させても大きな問題は発生しない。
 図7は、上述したSOC演算アルゴリズムのフローチャートである。本フローチャートは、バッテリECU2により例えば10ミリ秒程度の短い間隔で繰り返し実行される。
 バッテリECU2は、ステップS10でSOCv演算部101において推定値SOCvを演算し、ステップS20でSOCi演算部100において推定値SOCiを演算する。なお、ステップS10とS20は順不同である。
 そして、ステップS30で偏差演算部102において推定値偏差を演算し、ステップS40でブレンド率α設定部103において推定値偏差に基づいてブレンド率αを演算し、ステップS50でブレンド演算部104において重み付け合成を行なう。
 図8、図9は放電中に図7のフローチャートを実行した場合のタイムチャートであり、図8はバッテリ1が正常な場合、図9はバッテリ1の満充電容量が急激に低下した場合を示している。図中の実線が合成後推定値SOC_FIN、破線が推定値SOCv、一点鎖線が推定値SOCiを示している。なお、図8では推定値偏差は図5のD1を超えないものとし、図9では推定値偏差はタイミングT1でD1、タイミングT2でD2になるものとする。
 バッテリ1が正常な場合は、図8に示すように、推定値SOCvはノイズ等の影響で増減を繰り返しつつも、全体として見ると推定値SOCiと同様の傾きで低下している。このため推定値偏差は図5のD1を超えず、ブレンド率αはゼロ[%]のままとなるので、合成後推定値SOC_FINは推定値SOCiに等しくなる。したがってメータ4の表示が運転者に違和感を与えることはない。
 一方、バッテリ1の異常により満充電容量が低下した場合は、図9に示すように、推定値SOCiの傾きが推定値SOCvの傾きより小さくなるので、時間の経過に伴って推定値偏差が増大する。推定値偏差はD1となるタイミングT1からD2となるタイミングT2の間は、ブレンド率αが徐々に大きくなり、タイミングT2で100[%]となる。その結果、合成後推定値SOC_FINは、タイミングT1以前は推定値SOCiと等しく、タイミングT1からタイミングT2の間で徐々に推定値SOCvに近づき、タイミングT2で推定値SOCvと等しくなる。これにより、合成後推定値SOC_FINを真のSOCに追従させることができる。
 なお、図5、図6のブレンド率α設定マップには、ブレンド率αが徐々に変化する領域があるが、所定の推定値偏差を境界としてブレンド率αがステップ的に変化するようにしてもよい。これによると、合成後推定値SOC_FINは、推定値偏差が所定値以下では推定値SOCiであり、推定値偏差が所定値を超えると推定値SOCvに切り替わる。
 また、タイミングT1からタイミングT2の間には、推定値SOCvがノイズの影響等により増加している区間があり、この区間ではブレンド率αが低下するので、合成後推定値SOC_FINは厳密には図9のように直線にはならない。しかし、推定値SOCvは振動的に増減を繰り返しつつ、全体としては低下しているので、ここでは推定値SOCiから推定値SOCvへの移行をわかり易くするため直線で表している。
 次に、SOC演算アルゴリズムの第2実施例について説明する。本実施例は、SOCi演算部100における電流積算値に基づく推定値SOCiの算出方法のみが第1実施例と相違するので、相違点について説明する。
 本実施例では、電流積算値に基づく推定値SOCiの取り得る値を制限することにより、満充電容量の急激な低下が有った場合でも、推定値SOCiと真のSOCとの乖離を小さくするものである。なお、本実施例では、温度センサによりバッテリ温度を検出する。
 図10に示すように、電流積算値に基づく推定値SOCiは、充放電開始時のSOC(図10においてはSOC100%)を基点とし、電流積算値∫Iを満充電容量FullAhで除算して求まるSOC変化量を用いて求めるものである。
 ここで、満充電容量FullAhの推定方法について説明する。なお、この満充電容量FullAhは、上記式(1)を用いて推定した満充電容量推定値であっても良いが、ここでは下記の方法で推定する。
 図11は満充電容量FullAhを推定するアルゴリズムを示すブロック図である。
 まず、内部抵抗演算部にて、充放電時の電流、電圧の検出値に基づいて内部抵抗Ωを算出する。そして、低下係数演算部にて、内部抵抗Ωとバッテリ温度を読み込み、予め作成し記憶しておいたマップを用いて、新品時と現在の当該温度における内部抵抗Ωの比を求め、この比を満充電容量の低下率(すなわち劣化率)を表す低下係数に変換する。ここで用いるマップは、新品時におけるバッテリ温度に対する内部抵抗の特性を示すものである。そして、内部抵抗の比に応じた低下係数を予め設定しておき、これに基づいて比を低下係数に変換する。
 このようにして算出した低下係数を、工場出荷時等に測定しておいた新品時の満充電容量に乗算することで、満充電容量FullAhを算出する。例えば、新品時の満充電容量が60[Ah]であり、内部抵抗Ω及びバッテリ温度に基づいて算出した低下係数が0.9であれば、現在の満充電容量FullAhは60×0.9=54[Ah]と推定される。
 電流積算値に基づく推定値SOCiの算出方法の説明に戻る。推定値SOCiの前回値SOCi(n-1)に対して、前回から今回までの電流積算値∫Iと満充電容量FullAhに基づくSOC変化量△SOCAhを用いて、今回の推定値SOCiを演算すると、SOCi’(n)となる。そして、電流センサ6の誤差による電流積算値∫Iの誤差や、満充電容量FullAhの推定誤差等に基づくSOC変化量△SOCAhの誤差を考慮すると、今回の推定値SOCiが取り得る範囲は図中網掛けした範囲(以下、変化範囲という)となる。つまり、前回から今回までの1演算周期における推定値SOCiの変化量がとり得る値は、最小で前回値SOCi(n-1)から変化範囲の上限まで、最大で前回値SOCi(n-1)から変化範囲の下限までとなる。
 このようにして定まる、1演算周期での推定値SOCiの変化量が取り得る範囲(変化範囲)を、前回推定値SOCi(n-1)を基準として設定する。そうすると、前回推定値SOCi(n-1)からSOC変化量△SOCAhだけ低下した推定値SOCi’(n)を中心として、変化範囲と同じ幅をもつ推定値制限範囲を設定することができる。そして、本演算方法では、電圧から求めた推定値SOCv(n)を、電流積算値に基づく推定値SOCiが今回の演算で取り得る値である推定値制限範囲内の値に制限して、推定値SOCiの今回値である推定値SOCi(n)を算出する。
 つまり、前回推定値SOCi(n-1)を基準として電流積算値に基づいて算出した今回推定値SOCi’(n)を中心とした推定値制限範囲を設定し、電圧から求めた推定値SOCv(n)を推定値制限範囲に制限して、今回の最終的な推定値SOCi(n)とする。言い換えれば、電流積算値に基づいて算出した今回推定値SOCi’(n)を中心とした推定値制限範囲内において、開放電圧から求めた推定値SOCv(n)を用いて今回の最終的な推定値SOCi(n)を決定する。すなわちこれは、電流積算値に基づいて推定した推定値SOCiを基準としたSOCの範囲(推定値制限範囲)を設定し、そのSOCの範囲内において、開放電圧から求めた推定値SOCv(n)を用いて今回の最終的な推定値SOCi(n)を設定するものであり、基本的には最終的な推定値SOCi(n)の値は電流積算値に基づいて制限された値であり、電流積算値に基づいて推定したSOCと言える。
 図10を用いて更に具体的に説明する。なお、図中t2が今回推定タイミング、t1が前回推定タイミングとし、今回推定タイミングにおける推定値SOCi(n)の演算内容に関して説明する。
 前回推定タイミング(t1)における最終的な推定値SOCi(n)に対し、前回(t1)から今回(t2)までの電流積算値に基づいて推定したSOC変化量△SOCAhを減算(ここでは放電方向の容量変化であるので減算)して今回の推定値SOCi’(n)を算出する。そして、算出した今回推定値SOCi’(n)に基づいて推定値制限範囲を設定し、開放電圧から求めた推定値SOCv(n)を上記推定制限範囲内に制限して今回の最終的な推定値SOCi(n)とする。ここで、開放電圧から求めた推定値SOCv(n)が推定制限範囲よりも大きい値である場合は推定制限範囲の上限値を最終的な推定値SOCi(n)とし、開放電圧から求めた推定値SOCv(n)が推定制限範囲よりも小さい値である場合は推定制限範囲の下限値を最終的な推定値SOCi(n)とし、開放電圧から求めた推定値SOCv(n)が推定制限範囲内の値である場合は推定値SOCv(n)を最終的な推定値SOCi(n)とする。
 同様に、次回推定タイミングt3においては、今回推定タイミングt2において算出された最終的な推定値SOCi(n)に対し、今回(t2)から次回(t3)までの電流積算値に基づいて推定したSOC変化量△SOCAhを加算(ここでは充電方向の容量変化であるので加算)して推定値SOCi’(n+1)を算出し、算出した推定値SOCi’(n+1)に基づいて推定制限範囲を設定し、開放電圧から求めた推定値SOCv(n+1)を推定制限範囲内に制限して次回の最終的な推定値SOCi(n+1)としている。
本実施例においては、推定値SOCiの推定タイミング毎に上記のような演算を繰り返して推定値SOCiを求めている
 これにより、図12に示すように、電流積算値に基づいて算出した推定値SOCiは第1実施例に比較して、電圧から求めた推定値SOCvに追従するように推移するので、推定値SOCiと推定値SOCvが乖離し難くなる。
 しかしながら、本演算方法でも、電池の異常等により真の満充電容量が急激に低下した場合には満充電容量FullAhが真の値から乖離するため、電流積算値に基づく推定値SOCiも真の値から乖離することになるが、上述したブレンド率αの制御によって、真の値に対して過剰に大きいSOCをメータ4に表示することを回避できる。
 次に、SOC演算アルゴリズムの第3実施例について説明する。本実施例は、SOCv演算部101における電圧値に基づく推定値SOCvの算出方法のみが第1実施例、第2実施例と相違するので、相違点について説明する。
 本実施例では、第1実施例と同様の方法で算出した推定値SOCvに対してフィルタ処理を施すことにより、ブレンド率αが増加した場合にメータ4に表示される合成後推定値SOC_FINの変動を抑制する。
 フィルタ処理は、後述する移動平均、加重平均、または変化速度を制限したレートリミッタ等を適用することができる。
 移動平均の場合は、第1実施例と同様に推定値SOCvを演算した後、例えば、今回演算値を含めた過去3回の演算値の平均を今回の推定値SOCvとする。加重平均の場合は、第1実施例と同様に推定値SOCvを演算した後、前回値と今回値にそれぞれ重み付けをして加算したものを今回の推定値SOCvとする。
 レートリミッタとは、前回の推定値SOCvからの変化量に制限を設け、今回の演算で得られた推定値SOCvの前回値からの変化量が制限を超えている場合には、制限範囲内の値を今回の推定値SOCvとするフィルタ処理である。
 これらのフィルタ処理により推定値SOCvの変動を抑制することで、SOCvのブレンド率αが増大した合成後推定値SOC_FINをメータ4に表示した際に運転者に与える違和感を抑制することができる。
 以上説明した実施形態の作用効果についてまとめると、次のようになる。
 電流積算値に基づく推定値SOCiを算出するSOCi演算部100と、電圧値に基づく推定値SOCvを算出するSOv演算部101と、推定値SOCiと推定値SOCvの偏差に応じて推定値SOCvのブレンド率αを決定するブレンド率α設定部103を備える。そして、ブレンド率αを用いて重み付け合成後推定値SOC_FINを算出するブレンド演算部104を備え、ブレンド率α設定部103は、推定値SOCiと推定値SOCvの偏差が大きいほど大きいブレンド率αを設定する。これにより、推定値SOCiの誤差が大きい場合には、真のSOCへの追従性に優れる推定値SOCvにより重みがつけられた重み付け合成後推定値SOC_FIN、つまり真のSOC変化との乖離が小さい残存容量が算出される。その結果、運転者に対して精度の高い残存容量を表示することができる。
 ブレンド率α設定部は、放電中に推定値SOCiが推定値SOCvに対して大きくなるほど、または充電中に推定値SOCvが推定値SOCiに対して大きくなるほど、大きいブレンド率αを設定する。これにより、運転者に対して精度の高いSOCを表示する必要性が高い場合に、確実に精度の高いSOCを表示することができる。
 電流センサ6の検出値と、電流センサ6の誤差見込み値と、満充電容量FullAhと、満充電容量FullAhの誤差見込み値とに基づいて、1演算周期での前記第1残存容量の変化範囲を算出する。そして、前回演算時の推定値SOCvに対して変化範囲を設定した推定値制限範囲を設定し、推定値SOCiを推定値制限範囲の値に制限する。これにより、推定値SOCiが推定値SOCvに追従するようになるので、制限をしない場合に比べてブレンド率αが増大する機会が減少する。その結果、ノイズ等に起因して細かく変動する推定値SOCvを表示することで運転者へ違和感を与える機会を減少させることができる。
 なお、複数の単電池を直並列接続した場合について説明したが、少なくとも2つの単電池が並列接続された構成であれば同様の効果が得られる。
 以上、本発明の実施形態について説明したが、上記実施形態は本発明の適用例の一部を示したに過ぎず、本発明の技術的範囲を上記実施形態の具体的構成に限定する趣旨ではない。
 本願は2012年3月13日に日本国特許庁に出願された特願2012-56385、及び2012年11月19日に日本国特許庁に出願された特願2012-253594に基づく優先権を主張し、この出願の全ての内容は参照により本明細書に組み込まれる。

Claims (4)

  1.  バッテリの充放電電流を検出する電流検出手段と、
     前記バッテリの端子電圧を検出する電圧検出手段と、
     前記バッテリの充放電電流の積算値に基づいて第1残存容量を算出する第1残存容量演算手段と、
     前記バッテリの開放電圧に基づいて第2残存容量を算出する第2残存容量演算手段と、
     前記第1残存容量と前記第2残存容量の偏差に応じて前記第2残存容量のブレンド率を決定するブレンド率設定手段と、
     前記ブレンド率を用いて前記第1残存容量と前記第2残存容量を重み付け合成した合成後残存容量を算出する第3残存容量演算手段と、
    を備えるバッテリの残存容量算出装置において、
     前記ブレンド率設定手段は、前記第1残存容量と前記第2残存容量の偏差が大きいほど前記ブレンド率を大きくするバッテリの残存容量算出装置。
  2.  請求項1に記載のバッテリの残存容量算出装置において、
     前記ブレンド率設定手段は、放電中に前記第1残存容量が前記第2残存容量に対して大きくなるほど、または充電中に前記第2残存容量が前記第1残存容量に対して大きくなるほど、前記ブレンド率を大きくするバッテリの残存容量算出装置。
  3.  請求項1または2に記載のバッテリの残存容量算出装置において、
     前記第1残存容量演算手段は、
     1演算周期での前記充放電電流の検出値の積算値と、予め求めた満充電容量と、前記電流検出手段の検出誤差もしくは前記満充電容量の誤差のいずれかを含む誤差見込み値とに基づいて、1演算周期での前記第1残存容量の変化範囲を算出し、
    前記第2残存容量を前記推定値制限範囲の値に制限した値を第1残存容量として算出するバッテリの残存容量算出装置。
  4.  バッテリの充放電電流を検出する電流検出手段と、
     前記バッテリの端子電圧を検出する電圧検出手段と、
    を備えるバッテリの残存容量演算方法において、
     前記バッテリの充放電電流の積算値に基づいて第1残存容量を算出する第1残存容量演算ステップと、
     前記バッテリの開放電圧に基づいて第2残存容量を算出する第2残存容量演算ステップと、
     前記第1残存容量と前記第2残存容量の偏差が大きいほど前記ブレンド率を大きく設定するステップと、
     前記ブレンド率を用いて前記第1残存容量と前記第2残存容量を重み付け合成した合成後残存容量を算出する第3残存容量演算ステップと、
    を備えるバッテリの残存容量算出方法。
PCT/JP2013/056460 2012-03-13 2013-03-08 バッテリの残存容量算出装置及びバッテリの残存容量算出方法 WO2013137141A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN201380014092.2A CN104169733B (zh) 2012-03-13 2013-03-08 电池的剩余容量计算装置以及电池的剩余容量计算方法
EP13760801.4A EP2827164B1 (en) 2012-03-13 2013-03-08 Battery residual capacitance calculation device and battery residual capacitance calculation method
US14/384,438 US10310025B2 (en) 2012-03-13 2013-03-08 Control device and control method for electric vehicle

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
JP2012056385 2012-03-13
JP2012-056385 2012-03-13
JP2012-253594 2012-11-19
JP2012253594A JP6040724B2 (ja) 2012-03-13 2012-11-19 バッテリの残存容量算出装置及びバッテリの残存容量算出方法

Publications (1)

Publication Number Publication Date
WO2013137141A1 true WO2013137141A1 (ja) 2013-09-19

Family

ID=49161051

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2013/056460 WO2013137141A1 (ja) 2012-03-13 2013-03-08 バッテリの残存容量算出装置及びバッテリの残存容量算出方法

Country Status (5)

Country Link
US (1) US10310025B2 (ja)
EP (1) EP2827164B1 (ja)
JP (1) JP6040724B2 (ja)
CN (1) CN104169733B (ja)
WO (1) WO2013137141A1 (ja)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016178308A1 (ja) * 2015-05-01 2016-11-10 カルソニックカンセイ株式会社 二次電池の充電率算出装置、及び蓄電池システム
US10712393B2 (en) 2016-01-15 2020-07-14 Gs Yuasa International Ltd. Energy storage device management apparatus, energy storage device module, vehicle, and energy storage device management method
JP2021012106A (ja) * 2019-07-05 2021-02-04 スズキ株式会社 Soc推定装置
CN116901783A (zh) * 2023-09-11 2023-10-20 临工重机股份有限公司 一种能量管理系统、方法及车辆

Families Citing this family (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SE540603C2 (en) 2015-11-05 2018-10-02 Ctek Sweden Ab A system and a method for determining the state of charge of a battery
JP6536687B2 (ja) 2015-11-20 2019-07-03 日産自動車株式会社 容量維持率推定装置又は容量維持率推定方法
US10300807B2 (en) * 2016-02-04 2019-05-28 Johnson Controls Technology Company Systems and methods for state of charge and capacity estimation of a rechargeable battery
KR102101912B1 (ko) 2017-02-17 2020-04-17 주식회사 엘지화학 에너지 저장장치 충전상태 추정방법
CN107643493A (zh) * 2017-09-15 2018-01-30 深圳市道通智能航空技术有限公司 一种电池电量预估方法和装置、无人机
KR102683336B1 (ko) * 2017-10-11 2024-07-09 주식회사 엘지에너지솔루션 배터리의 용량 추정 장치 및 방법, 이를 구비하는 배터리 관리 장치 및 방법
CN110068765B (zh) * 2018-01-19 2021-06-15 新盛力科技股份有限公司 电池容量的预估方法
EP3560751A1 (en) * 2018-04-27 2019-10-30 Panasonic Intellectual Property Corporation of America Control method, server, in-vehicle device, and program
JP2020016582A (ja) * 2018-07-26 2020-01-30 ラピスセミコンダクタ株式会社 半導体装置、およびバッテリの残量の検出方法
CN109085508A (zh) * 2018-08-30 2018-12-25 深圳市道通智能航空技术有限公司 确定电池的充电状态的方法、装置、芯片、电池及飞行器
JP7089049B2 (ja) * 2018-10-12 2022-06-21 ビークルエナジージャパン株式会社 電池制御装置
JP7131290B2 (ja) * 2018-10-19 2022-09-06 トヨタ自動車株式会社 表示装置およびそれを備える車両
CN109720206A (zh) * 2018-11-26 2019-05-07 铜陵市优车科技有限公司 电池续航测试方法和装置、系统、电子设备
JP2020187021A (ja) 2019-05-15 2020-11-19 本田技研工業株式会社 二次電池の残容量表示方法、表示装置、及び電動車両
CN111965544B (zh) * 2020-07-17 2023-03-24 江苏大学 基于电压及电流双约束的车用并联动力电池的最小包络线soc估计方法
CN111976542B (zh) * 2020-09-01 2022-06-14 广东高标电子科技有限公司 一种电动车的铅酸电池soc估算方法和装置
JP2022071900A (ja) * 2020-10-29 2022-05-17 シェアード・モビリティ・ネットワークス株式会社 推定システム、及び推定プログラム
FR3116768B1 (fr) * 2020-11-30 2023-02-10 Alstom Transp Tech Système d’alimentation électrique et procédé pour piloter un tel système d’alimentation électrique
US20220224135A1 (en) * 2021-01-08 2022-07-14 Intel Corporation Context-based battery charging apparatus and method
CN113514770A (zh) * 2021-05-14 2021-10-19 江苏欧力特能源科技有限公司 基于开路电压和电池温度驱动锂电池剩余容量soc预测算法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000150003A (ja) * 1998-11-10 2000-05-30 Nissan Motor Co Ltd ハイブリッド車の充電量演算方法および充電量演算装置
JP2005114646A (ja) * 2003-10-10 2005-04-28 Toyota Motor Corp 二次電池における残存容量の算出装置および算出方法
JP2006038495A (ja) 2004-07-22 2006-02-09 Fuji Heavy Ind Ltd 蓄電デバイスの残存容量演算装置

Family Cites Families (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5371682A (en) * 1993-02-04 1994-12-06 At&T Corp. Method and apparatus for predicting battery reserve time to a specified end-voltage
US5606242A (en) * 1994-10-04 1997-02-25 Duracell, Inc. Smart battery algorithm for reporting battery parameters to an external device
JP3864590B2 (ja) * 1998-11-25 2007-01-10 トヨタ自動車株式会社 バッテリ充電状態検出装置
JP2001176563A (ja) * 1999-10-08 2001-06-29 Yazaki Corp バッテリ容量演算装置
JP2002189066A (ja) * 2000-12-22 2002-07-05 Hitachi Ltd 二次電池残量推定法
JP2003035755A (ja) * 2001-07-25 2003-02-07 Hitachi Ltd 電池蓄電量検出方法
US6845332B2 (en) * 2001-11-16 2005-01-18 Toyota Jidosha Kabushiki Kaisha State of charge calculation device and state of charge calculation method
JP4509674B2 (ja) * 2004-07-05 2010-07-21 富士重工業株式会社 蓄電デバイスの残存容量演算装置
JP2006112786A (ja) * 2004-10-12 2006-04-27 Sanyo Electric Co Ltd 電池の残容量検出方法及び電源装置
KR100669470B1 (ko) * 2005-12-22 2007-01-16 삼성에스디아이 주식회사 배터리의 soo 보정 방법 및 이를 이용한 배터리 관리시스템
JP4967362B2 (ja) * 2006-02-09 2012-07-04 トヨタ自動車株式会社 二次電池の残存容量推定装置
KR100804698B1 (ko) * 2006-06-26 2008-02-18 삼성에스디아이 주식회사 배터리 soc 추정 방법 및 이를 이용하는 배터리 관리시스템 및 구동 방법
JP4890977B2 (ja) * 2006-07-04 2012-03-07 富士重工業株式会社 バッテリの劣化演算装置
CN101303397A (zh) * 2008-06-25 2008-11-12 河北工业大学 锂离子电池组剩余电能计算方法及装置
JP2010019595A (ja) * 2008-07-08 2010-01-28 Fuji Heavy Ind Ltd 蓄電デバイスの残存容量演算装置
KR100970841B1 (ko) * 2008-08-08 2010-07-16 주식회사 엘지화학 배터리 전압 거동을 이용한 배터리 용량 퇴화 추정 장치 및방법
US8004243B2 (en) * 2009-04-08 2011-08-23 Tesla Motors, Inc. Battery capacity estimating method and apparatus
CN102062841B (zh) * 2009-11-11 2012-12-12 北汽福田汽车股份有限公司 动力电池荷电状态的估测方法及系统
JP5771909B2 (ja) * 2010-06-08 2015-09-02 日産自動車株式会社 二次電池の充電容量推定装置
CN101975927B (zh) * 2010-08-27 2012-09-05 华南师范大学 一种估算锂离子动力电池组剩余可用容量的方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000150003A (ja) * 1998-11-10 2000-05-30 Nissan Motor Co Ltd ハイブリッド車の充電量演算方法および充電量演算装置
JP2005114646A (ja) * 2003-10-10 2005-04-28 Toyota Motor Corp 二次電池における残存容量の算出装置および算出方法
JP2006038495A (ja) 2004-07-22 2006-02-09 Fuji Heavy Ind Ltd 蓄電デバイスの残存容量演算装置

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP2827164A4

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016178308A1 (ja) * 2015-05-01 2016-11-10 カルソニックカンセイ株式会社 二次電池の充電率算出装置、及び蓄電池システム
US10712393B2 (en) 2016-01-15 2020-07-14 Gs Yuasa International Ltd. Energy storage device management apparatus, energy storage device module, vehicle, and energy storage device management method
JP2021012106A (ja) * 2019-07-05 2021-02-04 スズキ株式会社 Soc推定装置
JP7392305B2 (ja) 2019-07-05 2023-12-06 スズキ株式会社 Soc推定装置
CN116901783A (zh) * 2023-09-11 2023-10-20 临工重机股份有限公司 一种能量管理系统、方法及车辆
CN116901783B (zh) * 2023-09-11 2023-11-17 临工重机股份有限公司 一种能量管理系统、方法及车辆

Also Published As

Publication number Publication date
CN104169733B (zh) 2017-09-01
US20150134282A1 (en) 2015-05-14
EP2827164A1 (en) 2015-01-21
JP6040724B2 (ja) 2016-12-07
US10310025B2 (en) 2019-06-04
CN104169733A (zh) 2014-11-26
EP2827164A4 (en) 2015-04-01
JP2013217899A (ja) 2013-10-24
EP2827164B1 (en) 2018-09-19

Similar Documents

Publication Publication Date Title
WO2013137141A1 (ja) バッテリの残存容量算出装置及びバッテリの残存容量算出方法
US9709633B2 (en) Battery capacity display apparatus and battery capacity display method
JP5771909B2 (ja) 二次電池の充電容量推定装置
JP6317031B2 (ja) 電池制御装置、および、車両システム
JP5419832B2 (ja) 電池容量算出装置および電池容量算出方法
JP5242997B2 (ja) バッテリ状態管理方法及びバッテリ状態管理装置
US10048319B2 (en) Estimating of the state of charge of a battery
KR20150048439A (ko) 배터리관리시스템 및 그 운용방법
WO2014136547A1 (ja) 二次電池の状態検知方法及び状態検知装置
WO2019026142A1 (ja) 劣化状態演算方法及び劣化状態演算装置
JP2019070621A (ja) 二次電池システム
JPWO2012120620A1 (ja) 電池状態推定方法および電池管理システム
WO2019230033A1 (ja) パラメータ推定装置、パラメータ推定方法及びコンピュータプログラム
KR20120135075A (ko) 상태 판정 장치, 축전 장치, 상태 판정 방법
JP5163542B2 (ja) 二次電池の入出力可能電力推定装置
JP5482056B2 (ja) 組電池の容量調整装置
JP3453821B2 (ja) 電池残存容量計測装置
JP5463810B2 (ja) 組電池の容量調整装置
CN105489954A (zh) 补偿电池单元的充电状态的方法和执行该方法的电池系统
JP2009214604A (ja) バッテリ状態推定装置及びバッテリ状態推定方法
JPH1092475A (ja) 非水系二次電池の特性演算装置
JP6446880B2 (ja) バッテリ制御装置
US11338679B2 (en) Method of displaying residual capacity of secondary battery, display device, and motor-driven vehicle
CN104578241A (zh) 充电状态算出装置

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13760801

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 14384438

Country of ref document: US

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: 2013760801

Country of ref document: EP