WO2012089697A1 - Verfahren zum herstellen einer festen fahrbahn - Google Patents

Verfahren zum herstellen einer festen fahrbahn Download PDF

Info

Publication number
WO2012089697A1
WO2012089697A1 PCT/EP2011/074024 EP2011074024W WO2012089697A1 WO 2012089697 A1 WO2012089697 A1 WO 2012089697A1 EP 2011074024 W EP2011074024 W EP 2011074024W WO 2012089697 A1 WO2012089697 A1 WO 2012089697A1
Authority
WO
WIPO (PCT)
Prior art keywords
hoods
substructure
escape route
formwork
sleepers
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/EP2011/074024
Other languages
German (de)
English (en)
French (fr)
Inventor
Peter Laborenz
Bruno Kiefer
Anabel Hengelmann
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SONNEVILLE AG
Original Assignee
SONNEVILLE AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SONNEVILLE AG filed Critical SONNEVILLE AG
Priority to NO11801759A priority Critical patent/NO2659068T3/no
Priority to SG2013049226A priority patent/SG191362A1/en
Priority to AU2011351482A priority patent/AU2011351482B2/en
Priority to EP11801759.9A priority patent/EP2659068B1/de
Priority to CA2822372A priority patent/CA2822372A1/en
Priority to RU2013134990/11A priority patent/RU2586101C2/ru
Priority to PL11801759T priority patent/PL2659068T3/pl
Priority to KR1020137020016A priority patent/KR102011811B1/ko
Priority to BR112013016308-9A priority patent/BR112013016308B1/pt
Priority to US13/976,221 priority patent/US9157192B2/en
Publication of WO2012089697A1 publication Critical patent/WO2012089697A1/de
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Classifications

    • E—FIXED CONSTRUCTIONS
    • E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B1/00—Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
    • E—FIXED CONSTRUCTIONS
    • E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B1/00—Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
    • E01B1/001—Track with ballast
    • E—FIXED CONSTRUCTIONS
    • E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B1/00—Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
    • E01B1/002—Ballastless track, e.g. concrete slab trackway, or with asphalt layers
    • E01B1/004—Ballastless track, e.g. concrete slab trackway, or with asphalt layers with prefabricated elements embedded in fresh concrete or asphalt
    • E—FIXED CONSTRUCTIONS
    • E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B1/00—Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
    • E01B1/008—Drainage of track
    • E—FIXED CONSTRUCTIONS
    • E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2/00—General structure of permanent way
    • E—FIXED CONSTRUCTIONS
    • E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B26/00—Tracks or track components not covered by any one of the preceding groups
    • E—FIXED CONSTRUCTIONS
    • E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00—Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E—FIXED CONSTRUCTIONS
    • E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00—Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/005—Making of concrete parts of the track in situ
    • E—FIXED CONSTRUCTIONS
    • E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C9/00—Special pavings; Pavings for special parts of roads or airfields
    • E—FIXED CONSTRUCTIONS
    • E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C9/00—Special pavings; Pavings for special parts of roads or airfields
    • E01C9/04—Pavings for railroad level-crossings
    • E—FIXED CONSTRUCTIONS
    • E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2204/00—Characteristics of the track and its foundations
    • E01B2204/06—Height or lateral adjustment means or positioning means for slabs, sleepers or rails

Definitions

  • the invention relates to a method for producing a solid track for rail vehicles with an escape route for road vehicles, in which on a substructure a prefabricated track section with rails and
  • Escape route is that the dimensions and weight of the prefabricated panels can be designed so that the panels by conventional means
  • Threshold block distance and the slope of the concrete slab track plate must be adjusted. A gradient is necessary for the discharge of water. All these variable parameters make stock keeping of prefabricated panels uneconomic. Another disadvantage of this kind of
  • the present invention seeks to provide a method for producing a solid track for rail vehicles with an emergency route for road vehicles, the simple and
  • this object is achieved in that the part of the sleepers projecting from the roadway slab and the running rails are delimited by formwork means and an escape route is applied by pouring onto the carriage slab.
  • the rescue route fits exactly on the deck plate and rests on this stable. In addition eliminates the prefabrication and especially the storage of plates for the rescue route.
  • Chassis plate is completely cured.
  • the carrying and straightening device is removed before the escape route is poured. This has the advantage that in the rescue route no parts or traces of the carrying and straightening device
  • the invention also relates to a solid roadway produced by the method according to the invention.
  • a solid roadway produced by the method according to the invention.
  • the roadway is in the
  • Substructure arranged a drainage pipe, which is present through at intervals in the substructure
  • Substructure is connected. Such prepared substructure saves a subsequent attachment of a
  • connection holes communicating with the connection holes provided in the substructure.
  • Such connection openings are very easy to install in the deck slab, for example by inserting moldings before pouring the deck slab.
  • Another embodiment provides that the escape route is divided by extending substantially transversely to the rails joints. These joints compensate for stretching and shrinkage of the rescue route. In addition, in this way, the escape route easily according to the length the prefabricated track sections are produced step by step.
  • These drainage shafts are preferably arranged in the area of the joints and ensure the drainage of water from the rescue route.
  • drainage channels are arranged in the surface of the rescue route, drainage of the escape route is further improved.
  • the sleepers on at least one side of the running rail have an elevated shoulder whose surface is in line with the surface of the rail
  • the invention also relates to formwork agents for carrying out the method according to the invention.
  • these have the task of being able to set up and dismantle quickly and easily.
  • the formwork means consist of panels connecting areas of the sleepers to be set and adjacent hoods. These hoods and panels are quick to assemble and
  • Plates detachably connectable to the hoods. This measure also facilitates the assembly and disassembly of the formwork.
  • Another embodiment of the formwork means provides that the plates can be connected to the hoods in such a way that the distance between adjacent hoods can be changed. This avoids that correspondingly different
  • FIGS. 1 to 6 show in each case a view cut transversely to the direction of travel of six stages of an embodiment of the method according to the invention
  • Figure 7 is a perspective view of a
  • Figure 8 is a perspective view of a detail
  • Figure 9 is a perspective view of a detail
  • Threshold blocks 5 and mounted on rails 8 is, using a support and straightening device 4 on a substructure 1, for example, from reinforced concrete can be made, supported and aligned.
  • a drainage line 2 which is connected by spaced connection openings 3 with the top of the substructure 1. So that vibrations are damped later when driving on the tracks, 5 is at each threshold block from below
  • the threshold blocks 5 are each provided on both sides of the rail 8 with upstanding shoulders 24, the upper surface can later enter the finished lane or be driven by road vehicles.
  • the invention is not limited to a roadway with such threshold blocks 5.
  • Threshold block 5 a formwork hood 9 slipped up, whose task is later in the Glessen a
  • FIG. 3 shows the situation after the casting of the
  • Chassis plate 10 which may for example consist of unreinforced concrete. Basically, the touchdown of the
  • Track plate 10 done.
  • the previous placement offers the advantage that the carriageway panel 10 does not have to be entered for placing the shuttering hoods 9.
  • Disconnecting openings 11 for the drainage exist, which are aligned with the connection openings 3 mentioned in connection with Figure 1.
  • the connection openings 11 can be obtained in a known manner by inserting corresponding parts.
  • FIG. 4 differs from FIG. 3 only in that in the stage according to FIG. 4 the carrying and straightening device 4 has been removed.
  • an escape route 12 can now be cast, as shown in FIG. Unarmored concrete can also be used for the escape route 12.
  • FIG. 6 shows the condition of the roadway after removal of the formwork hoods.
  • the rescue route 10 is transverse to
  • Roadway is divided into blocks, wherein between each two escape route blocks a joint is arranged, as will become even clearer below in connection with the description of Figure 9.
  • a drainage shaft 23 is in each case arranged between two escape route blocks and is in alignment with the connection opening 11 present underneath. It is also clearly visible in FIG. 6 that the shoulders 24 of the threshold blocks 5 are flush with the surface 25 of the escape route 12.
  • FIG. 7 shows a perspective view of a pair of formwork hoods 9.
  • Each formwork hood 9 has two
  • Connection plate 19 ( Figure 8) are determined.
  • Formwork hoods 9 may be made of sheet metal, plastic, wood or other suitable material. So that the formwork hoods 9 can be removed after curing of the concrete of the escape route 12 by being pulled upwards, they are slightly conical. This means that the side walls 13, 15 and the rear wall 14 are inclined relative to the vertical by about 3 degrees, such that the formwork hood is narrower from top to bottom.
  • FIG. 8 shows a section of a running rail 8 with three sleeper blocks 5 covered by shuttering hoods 9.
  • connection plates 19 with each of which two formwork hoods 9 are interconnected.
  • openings 20 are present in the connection plates 19 into which the bolts 18 present on the connection parts 17 engage.
  • the connection plates 19 have the task of preventing the concrete of the escape route 12 from reaching the rail 8 when it is still able to flow.
  • connection plates 19 are different embodiments of
  • Formwork hoods 9 may be arranged, in which the
  • Connecting plates 19 can be inserted. Also, in each case two short connecting parts can form an elongated recess between them, which has the same function as a groove. Alternatively, one can also each
  • FIG. 9 shows in perspective a section of a roadway. From bottom to top are the substructure 1, the
  • Chassis plate 10 and the rescue route 12 visible. Also good to see is that the rescue route 12 to the
  • Threshold blocks 5 and the rails 8 leaves a gap.
  • the shoulders 24 of the threshold blocks 5 are practically flush with the surface of the escape route 12, so that no larger openings in the escape route exist in their place, which - especially for pedestrians - a
  • Sections of the escape route is in each case a gap 21 and in the middle between the rails 8 parallel to this a drainage channel 22nd
  • a vertical drainage shaft 23 is formed, in which the drainage channel 22 opens.
  • the drainage shaft 23 is connected to the drainage line 2 through the connection openings 3 and 11 (see, for example, FIG.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)
  • Road Paving Structures (AREA)
  • Railway Tracks (AREA)
PCT/EP2011/074024 2010-12-27 2011-12-23 Verfahren zum herstellen einer festen fahrbahn Ceased WO2012089697A1 (de)

Priority Applications (10)

Application Number Priority Date Filing Date Title
NO11801759A NO2659068T3 (enExample) 2010-12-27 2011-12-23
SG2013049226A SG191362A1 (en) 2010-12-27 2011-12-23 Method for producing a slab trackway
AU2011351482A AU2011351482B2 (en) 2010-12-27 2011-12-23 Method for producing a slab trackway
EP11801759.9A EP2659068B1 (de) 2010-12-27 2011-12-23 Verfahren zum herstellen einer festen fahrbahn
CA2822372A CA2822372A1 (en) 2010-12-27 2011-12-23 Method for producing a slab trackway
RU2013134990/11A RU2586101C2 (ru) 2010-12-27 2011-12-23 Способ изготовления безбалластного пути
PL11801759T PL2659068T3 (pl) 2010-12-27 2011-12-23 Sposób tworzenia torowiska bezpodsypkowego
KR1020137020016A KR102011811B1 (ko) 2010-12-27 2011-12-23 슬래브 트랙웨이 제조 방법
BR112013016308-9A BR112013016308B1 (pt) 2010-12-27 2011-12-23 método para produzir uma via férrea com laje
US13/976,221 US9157192B2 (en) 2010-12-27 2011-12-23 Method for producing a slab trackway

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
EP10197028A EP2468954A1 (de) 2010-12-27 2010-12-27 Verfahren zum Herstellen einer festen Fahrbahn für Schienenfahrzeuge mit einem Rettungsweg für Strassenfahrzeuge
EP10197028.3 2010-12-27

Publications (1)

Publication Number Publication Date
WO2012089697A1 true WO2012089697A1 (de) 2012-07-05

Family

ID=43844617

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/EP2011/074024 Ceased WO2012089697A1 (de) 2010-12-27 2011-12-23 Verfahren zum herstellen einer festen fahrbahn

Country Status (12)

Country Link
US (1) US9157192B2 (enExample)
EP (2) EP2468954A1 (enExample)
KR (1) KR102011811B1 (enExample)
AU (1) AU2011351482B2 (enExample)
BR (1) BR112013016308B1 (enExample)
CA (1) CA2822372A1 (enExample)
NO (1) NO2659068T3 (enExample)
PE (1) PE20141221A1 (enExample)
PL (1) PL2659068T3 (enExample)
RU (1) RU2586101C2 (enExample)
SG (1) SG191362A1 (enExample)
WO (1) WO2012089697A1 (enExample)

Families Citing this family (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2694735A4 (en) * 2011-04-05 2014-10-08 Newstyle Nominees Pty Ltd RAIL TRACK CARRIER THRESHOLD
EP2740842B1 (de) * 2012-12-07 2017-09-27 Sonneville AG Verfahren zum Umbau eines Schottergleises in eine feste Fahrbahn
EP2778284A1 (de) * 2013-03-11 2014-09-17 Sonneville AG Schwellenblockeinheit für Eisenbahnschienensysteme
CN103821049B (zh) * 2014-01-25 2016-08-24 中铁四局集团第四工程有限公司 一种crtsⅱ型板ca砂浆灌注钢管角钢组合封边压紧装置
EP3045588A1 (de) * 2015-01-14 2016-07-20 Sonneville AG Dichtungsanordnung zwischen schwellenblock und schwellenschuh eines eisenbahnschienensystems
JP6407796B2 (ja) * 2015-05-14 2018-10-17 公益財団法人鉄道総合技術研究所 型枠押さえ機能を有するまくらぎの施工方法
CN106049193B (zh) * 2016-05-17 2018-08-17 中国铁道科学研究院铁道建筑研究所 一种用于路基段高速铁路无砟轨道中线纠偏方法
CN106049204B (zh) * 2016-08-03 2018-02-06 中铁十七局集团第三工程有限公司 无砟轨道钢筋混凝土底座浇筑用凹槽模板
CN106245467B (zh) * 2016-08-23 2017-11-24 吴永芳 一种装配板式轨道结构的铺架方法
CN107460794A (zh) * 2017-04-24 2017-12-12 中铁四局集团有限公司 一种在严寒地区crtsⅲ型板式无砟轨道预制施工方法
CN107447606B (zh) * 2017-08-09 2023-06-30 中国铁建重工集团股份有限公司 一种磁悬浮轨排曲直两用组装设备
CN108642975B (zh) * 2018-03-08 2020-01-21 中国铁路设计集团有限公司 一种用于抬升沉降病害铁路路基的方法
EA036000B1 (ru) * 2018-06-29 2020-09-10 Открытое Акционерное Общество "Российские Железные Дороги" Устройство отвода поверхностных вод с верхнего строения двухпутного безбалластного железнодорожного пути
CN109778596B (zh) * 2018-08-16 2019-12-10 广州地铁设计研究院股份有限公司 带有辅助块的梯形预制板及其施工方法
CN108842529A (zh) * 2018-08-28 2018-11-20 上海市城市建设设计研究总院(集团)有限公司 有轨电车轨道基础快速化拼装结构及施工方法
CN109837811B (zh) * 2018-12-26 2021-03-19 中国铁道科学研究院集团有限公司铁道建筑研究所 一种用于路基段无砟轨道横向纠偏的反力结构及其制作方法
CN110130164A (zh) * 2019-04-22 2019-08-16 中铁五局集团有限公司 一种两组长枕埋入式渡线道岔道床浇筑方法
CN110180999B (zh) * 2019-06-25 2020-10-02 遵义航天新力精密铸锻有限公司 一种定位工装及其用于定位砂型铸造冷却板中管件的方法
DE202019003793U1 (de) * 2019-09-13 2019-11-08 Ed. Züblin Aktiengesellschaft Rahmen für eine Gleiseindeckung für eine Feste Fahrbahn und Anordnung umfassend eine Feste Fahrbahn und eine Gleiseindeckung
CN111676742B (zh) * 2020-01-13 2021-09-21 中国铁道科学研究院集团有限公司铁道建筑研究所 一种crtsⅲ型板式无砟轨道结构的纠偏方法
CN112127216B (zh) * 2020-09-30 2021-12-03 武汉理工大学 一种预制装配式沥青基板式无砟轨道及其施工方法
JP7255887B2 (ja) * 2020-11-20 2023-04-11 株式会社佐藤工業所 側面弾性材セット治具
CN112761034B (zh) * 2020-12-24 2022-08-09 成都市新筑路桥机械股份有限公司 一种流体材料浇筑小车
KR102811408B1 (ko) * 2022-09-27 2025-05-27 한국철도기술연구원 일반도로 병용 산악철도의 랙 궤도 구조 및 그 시공방법
US20260015802A1 (en) * 2024-07-09 2026-01-15 voestalpine Railway Systems Nortrak LLC Direct Fixation Block Assembly

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1745747A (en) * 1929-07-15 1930-02-04 William P Day Roadbed construction for railways
US4793545A (en) * 1987-07-14 1988-12-27 Construction Polymers Company Embedded track assembly
DE202009008366U1 (de) * 2008-07-08 2009-08-20 Heilit+Woerner Bau Gmbh Schienenfahrbahn, insbesondere für einen Tunnel- oder Brückenbereich
DE202008008157U1 (de) * 2008-06-18 2009-10-29 Heilit + Woerner Bau Gmbh Schienenfahrbahn, insbesondere für einen Tunnel- oder Brückenbereich

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4411889A1 (de) * 1994-04-07 1995-10-12 Hochtief Ag Hoch Tiefbauten Schotterloses Oberbausystem für zumindest ein Eisenbahngleis und Verfahren zur Herstellung
US5609294A (en) * 1995-07-21 1997-03-11 Lucas, Jr.; Joseph Railroad track assembly and method
FR2741090B1 (fr) * 1995-11-09 1998-01-30 Allevard Sa Chausson pour traverse de voie de chemin de fer sans ballast
DE202009008365U1 (de) * 2009-06-17 2010-10-28 Heilit+Woerner Bau Gmbh Schienenfahrbahn, insbesondere für einen Tunnel- oder Brückenbereich
DE102010030275A1 (de) * 2009-06-19 2011-03-10 Ed. Züblin Ag Vorrichtung zur Ermöglichung der Befahrbarkeit von Festen Fahrbahnen in Eisenbahntunneln mit gummibereiften Rettungsfahrzeugen

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1745747A (en) * 1929-07-15 1930-02-04 William P Day Roadbed construction for railways
US4793545A (en) * 1987-07-14 1988-12-27 Construction Polymers Company Embedded track assembly
DE202008008157U1 (de) * 2008-06-18 2009-10-29 Heilit + Woerner Bau Gmbh Schienenfahrbahn, insbesondere für einen Tunnel- oder Brückenbereich
DE202009008366U1 (de) * 2008-07-08 2009-08-20 Heilit+Woerner Bau Gmbh Schienenfahrbahn, insbesondere für einen Tunnel- oder Brückenbereich

Also Published As

Publication number Publication date
AU2011351482B2 (en) 2017-04-13
KR102011811B1 (ko) 2019-08-19
EP2659068B1 (de) 2018-01-31
PL2659068T3 (pl) 2018-07-31
EP2659068A1 (de) 2013-11-06
BR112013016308B1 (pt) 2020-07-07
CA2822372A1 (en) 2012-07-05
RU2013134990A (ru) 2015-02-10
EP2468954A1 (de) 2012-06-27
RU2586101C2 (ru) 2016-06-10
KR20140020858A (ko) 2014-02-19
PE20141221A1 (es) 2014-09-12
US20130277441A1 (en) 2013-10-24
NO2659068T3 (enExample) 2018-06-30
BR112013016308A2 (pt) 2018-06-26
US9157192B2 (en) 2015-10-13
AU2011351482A1 (en) 2013-07-11
SG191362A1 (en) 2013-08-30

Similar Documents

Publication Publication Date Title
EP2659068B1 (de) Verfahren zum herstellen einer festen fahrbahn
DE60311366T2 (de) Betonbodenplatte
EP3460125B1 (de) Gleiskonstruktion
DE1906690C3 (de) Schienengleicher Bahnübergang
EP2837738B1 (de) Gleiseindeckung von Festen Fahrbahnen und Verfahren zu ihrer Herstellung
DE102004019275B4 (de) Systemschalung für Querfugen bei festen Fahrbahnen
DE102007046249A1 (de) Gleiskörper mit geklebten Trögen
DE10004194C2 (de) Verfahren zur Fertigung einer festen Schienenfahrbahn auf einer Brücke
DE29705236U1 (de) Gleiseinrichtung
DE4135445C2 (de) Bahnsteigkante
EP1048783A1 (de) Feste Fahrbahn für Schienenfahrzeuge und Verfahren zu ihrer Herstellung
EP2806067B1 (de) Trogbrücke mit einer Fahrbahnplatte aus Grobblech und Verfahren zur Herstellung einer Trogbrücke
EP3792396B1 (de) Rahmen für eine gleiseindeckung für eine feste fahrbahn
DE102010030275A1 (de) Vorrichtung zur Ermöglichung der Befahrbarkeit von Festen Fahrbahnen in Eisenbahntunneln mit gummibereiften Rettungsfahrzeugen
DE202009008365U1 (de) Schienenfahrbahn, insbesondere für einen Tunnel- oder Brückenbereich
DE102008026661A1 (de) Verkehrsleitwand
WO2007147886A1 (de) Verfahren zur herstellung einer segmentfertigteilbrücke und segmentfertigteilbrücke
DE102007020075B3 (de) Kabelkanalsystem
DE19959236C1 (de) Bahnsteig
DE69916641T2 (de) Verbesserungen an oder in bezug auf bahnanlagen für schienenfahrzeuge
DE2905888A1 (de) Vorrichtung zum ueberbruecken von dehnungsfugen in bauwerken
EP0166719A2 (de) Profildichtung
WO2014040199A1 (de) Übergangsplatte für einen schienengleichen bahnübergang
DE850457C (de) UEberwegbefestigung aus bewehrten Betonplatten fuer Gleisanlagen
DE10032437A1 (de) Verfahren zum Herstellen einer Entgleisungsschutzeinrichtung sowie Entgleisungsschutzeinrichtung für ein Gleis

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 11801759

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2822372

Country of ref document: CA

WWE Wipo information: entry into national phase

Ref document number: 001465-2013

Country of ref document: PE

WWE Wipo information: entry into national phase

Ref document number: 13976221

Country of ref document: US

Ref document number: 2011801759

Country of ref document: EP

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2011351482

Country of ref document: AU

Date of ref document: 20111223

Kind code of ref document: A

ENP Entry into the national phase

Ref document number: 20137020016

Country of ref document: KR

Kind code of ref document: A

ENP Entry into the national phase

Ref document number: 2013134990

Country of ref document: RU

Kind code of ref document: A

REG Reference to national code

Ref country code: BR

Ref legal event code: B01A

Ref document number: 112013016308

Country of ref document: BR

ENP Entry into the national phase

Ref document number: 112013016308

Country of ref document: BR

Kind code of ref document: A2

Effective date: 20130625