WO2011070857A1 - ワークの打ち抜き製造方法 - Google Patents

ワークの打ち抜き製造方法 Download PDF

Info

Publication number
WO2011070857A1
WO2011070857A1 PCT/JP2010/068375 JP2010068375W WO2011070857A1 WO 2011070857 A1 WO2011070857 A1 WO 2011070857A1 JP 2010068375 W JP2010068375 W JP 2010068375W WO 2011070857 A1 WO2011070857 A1 WO 2011070857A1
Authority
WO
WIPO (PCT)
Prior art keywords
work
processing
pilot hole
punching
holes
Prior art date
Application number
PCT/JP2010/068375
Other languages
English (en)
French (fr)
Inventor
大久保成彦
三田和之
大西真輔
藤田将明
中村慎太郎
Original Assignee
本田技研工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 本田技研工業株式会社 filed Critical 本田技研工業株式会社
Priority to CN201080055769.3A priority Critical patent/CN102655962B/zh
Priority to JP2011545141A priority patent/JP5577353B2/ja
Publication of WO2011070857A1 publication Critical patent/WO2011070857A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D53/00Making other particular articles
    • B21D53/14Making other particular articles belts, e.g. machine-gun belts
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D28/00Shaping by press-cutting; Perforating
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D43/00Feeding, positioning or storing devices combined with, or arranged in, or specially adapted for use in connection with, apparatus for working or processing sheet metal, metal tubes or metal profiles; Associations therewith of cutting devices
    • B21D43/02Advancing work in relation to the stroke of the die or tool
    • B21D43/04Advancing work in relation to the stroke of the die or tool by means in mechanical engagement with the work
    • B21D43/05Advancing work in relation to the stroke of the die or tool by means in mechanical engagement with the work specially adapted for multi-stage presses
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D43/00Feeding, positioning or storing devices combined with, or arranged in, or specially adapted for use in connection with, apparatus for working or processing sheet metal, metal tubes or metal profiles; Associations therewith of cutting devices
    • B21D43/02Advancing work in relation to the stroke of the die or tool
    • B21D43/04Advancing work in relation to the stroke of the die or tool by means in mechanical engagement with the work
    • B21D43/06Advancing work in relation to the stroke of the die or tool by means in mechanical engagement with the work by positive or negative engaging parts co-operating with corresponding parts of the sheet or the like to be processed, e.g. carrier bolts or grooved section in the carriers

Definitions

  • the present invention relates to a method for punching and producing a work using a long continuous metal plate as a material and manufacturing a work from the material.
  • an element constituting a belt for a continuously variable transmission includes a body having a V surface in contact with a pulley of the continuously variable transmission, and a head continuously connected to an upper portion of the body via a neck.
  • the head is provided on both sides with an ear that overhangs so as to face the upper edge of the body, and a recess is formed between the ear and the body located on both sides of the neck.
  • the thin part which becomes thin gradually toward a lower edge is formed in the substantially lower half part of a body.
  • the elements are annularly stacked in a plurality of sheets, and are bound in an annular shape by attaching a metal strip endless ring to the recess.
  • the body is positioned on the inner circumferential side of the belt, and the head is positioned on the outer circumferential side of the belt.
  • the element is formed by using a long continuous metal plate as a material, and the metal plate is punched out by a forming punch in a state of being placed on a die of a press. Then, several hundreds of the punched elements are annularly stacked, and an endless ring is attached to the recess, thereby being assembled as a continuously variable transmission belt.
  • the processing station A the pilot holes 2 for feeding the strip 1 are formed, and in the processing station C, the punching process of the outer unnecessary portion 4 of the element 3 to be finally punched out is performed. Further, at the processing station D, coining processing is performed, while at the processing station E, shaving processing is performed. Finally, at the processing station H, the element 3 is separated from the strip 1 by a punch.
  • the pilot holes 2 are formed in the strip 1 at the processing station A.
  • the positioning conveyance pin which is not shown in figure is inserted in this pilot hole 2, and the strip material 1 is intermittently conveyed one by one in the arrow L direction.
  • the strip material 1 is subjected to predetermined processing such as crushing processing such as coining processing.
  • the present invention solves this type of problem, and provides a method of punching out a workpiece capable of easily and reliably manufacturing high quality workpieces from a long continuous metal plate material by a simple process.
  • the purpose is to
  • the present invention relates to a method of punching and manufacturing a work using a long continuous metal plate as a material and manufacturing a work from the material.
  • the present invention relates to a method of punching out a work which is an element of a belt for a continuously variable transmission, while using a long continuous metal plate material as a material to manufacture a work from the material. .
  • a long continuous metal plate material is used as a material to manufacture a work from the material, the work is an element of a continuously variable transmission belt, and the material is a certain plate
  • the present invention relates to a method of punching out a work consisting only of a flat portion having a thickness.
  • the manufacturing method forms a pilot hole in the material, and forms an opening around the pilot hole, and sequentially transfers and positions the material to the downstream station through the pilot hole. And processing the material transferred and positioned at the downstream station.
  • the material has the pilot hole and the opening portion formed around the pilot hole.
  • the opening includes, for example, an arc-like slit, a linear slit, or a hole.
  • FIG. 1 shows an element 10 of a continuously variable transmission belt, which is an example of a workpiece manufactured by a punching manufacturing method according to an embodiment of the present invention.
  • the left and right side edges 12 are in contact with the continuously variable transmission pulley (not shown) and are on the inner circumferential side
  • a body 14 is provided, and a head 18 is provided continuously with a neck 16 on the upper edge side of the central portion of the body 14 via a plurality of rings and laminated in an annular shape.
  • a thin portion 20 having a thinner plate thickness than the other portions is provided in a substantially lower half portion of the body 14.
  • the thickness C of the left and right side end portions 24 located on the left and right sides of the upper region 22 adjacent to the neck 16 is the upper region 22 adjacent to the neck 16. It is set larger than the thickness D of (C> D).
  • the thicknesses B and A of the neck 16 and the body 14 are set smaller than the thickness C of the left and right end portions 24 of the head 18.
  • the thickness B is equal to or less than the thickness C.
  • the thickness A of the left and right side end portions of the body 14 located on both sides of the lower region of the neck 16 is greater than the thickness B of the lower region of the neck 16 in substantially the upper half excluding the thin portion 20 of the body 14 It is set small (C ⁇ B> A).
  • the manufacturing system 30 for carrying out the punching manufacturing method according to the present embodiment includes the first processing station 32, the second processing station 34, and the third processing along the arrow L direction which is the material conveyance direction.
  • a station 36 and a fourth processing station 38 are arranged.
  • a long continuous metal plate material is used as the material 40, the element 10 is manufactured from the material 40, and the material 40 is configured only by a flat portion having a certain thickness.
  • the first processing station 32 forms a pilot hole 42, which is a piercing hole, in the material 40, and forms an opening, for example, four arcuate slits 44 around the pilot hole 42.
  • the opening may be a plurality of linear slits, a plurality of holes, or the like instead of the arc-shaped slit 44.
  • the punching process is performed by punching out the unnecessary portion 46 of the element 10 from the material 40.
  • a mold apparatus 50 shown in FIG. 4 is used.
  • the mold apparatus 50 has a die 52 and a punch 54, and the die 52 and the punch 54 are formed with holes 58 and 60 for inserting the positioning pin 56.
  • the punch 54 is pressed toward the die 52 via an actuator (not shown), and the material 40 is subjected to a crushing process corresponding to the shape of the element 10 by the punch 54 and the molding surface 52 a of the die 52.
  • the fourth processing station 38 is stamped to separate the element 10 from the blank 40.
  • the material 40 is transported in the direction of arrow L via a transport device (not shown) and is first disposed at the first processing station 32.
  • the material 40 is formed with a pilot hole 42 and a plurality of arc-shaped slits 44 that circulate around the pilot hole 42.
  • the material 40 is conveyed in the direction of arrow L and placed at the second processing station 34.
  • the transport of the material 40 is positioned and arranged at a desired position of the second processing station 34 under the movement of a positioning transport pin (not shown) inserted into the pilot hole 42.
  • removal processing for removing the unnecessary portion 46 of the element 10 is performed.
  • the material 40 is conveyed to the third processing station 36 through the pilot holes 42.
  • the punch 54 constituting the mold apparatus 50 is pressed to the die 52 side.
  • the material 40 is subjected to a crushing process corresponding to the shape of the element 10 through the molding surface 52 a of the die 52 and the punch 54.
  • the material 40 is formed with a pilot hole 42 and a plurality of arc-shaped slits 44 around the pilot hole 42. For this reason, at the time of the crushing process by the mold apparatus 50, the material flow (see the arrow in FIG. 4) generated in the material 40 can be released (absorbed) by the plurality of slits 44. Therefore, it is possible to reliably prevent the pilot hole 42 from being deformed during the crushing process.
  • the positioning accuracy of the material 40 can be favorably maintained through the pilot holes 42, and the product element 10 can be manufactured with high quality and efficiency.
  • the positioning pin 56 is inserted into the pilot hole 42 at the time of the crushing process by the mold apparatus 50. Therefore, even if material flow occurs in the material 40 at the time of the crushing process by the mold apparatus 50, the deformation of the pilot hole 42 can be suppressed more reliably.
  • the deviation of the transport pitch of the material 40 is detected.
  • the deviation of the transport pitch is reduced to 50% or less compared to the conventional method.
  • the continuously variable transmission belt when the continuously variable transmission belt is formed by being arranged in a plurality of rings, the bending deformation of the continuously variable transmission belt to the inner peripheral side is smoothed. To be done. For this reason, the lamination direction of each element 10 does not bend to the head 18 side, and a good lamination shape can be obtained.
  • the relatively thick portions that is, the three portions of the left and right side end portions 24 of the head 18 and the lower region of the neck 16 in the body 14 are adjacent elements 10 Contact For this reason, it is possible to maintain an extremely stable laminated state, and when the continuously variable transmission belt is formed, it becomes possible to efficiently transmit power by preventing meandering and the like.
  • the thickness A of the left and right end portions of the body 14 is set smaller than the thickness B of the lower region of the neck 16, while the thickness C of the left and right end portions 24 is set. Also in the lower region, the thickness B of the lower region is made equal or less.
  • each element 10 is reliably prevented from bending so as to converge on the head 18 side, the element by unnecessary contact with the endless ring when it is hung on the continuously variable transmission pulley. It becomes possible to perform stable power transmission in the continuously variable transmission without 10 damage.
  • the raw material 40 can use the raw material of various shapes besides what consists only of the flat part which has fixed plate

Abstract

 打ち抜き製造方法は、長尺な連続する金属製板材を素材(40)とし、前記素材(40)からエレメント(10)を製造するものであり、前記素材(40)に、パイロット孔(42)を形成するとともに、前記パイロット孔(42)を周回して複数のスリット(44)を形成する工程と、前記パイロット孔(42)を介して前記素材(40)を、順次、下流のステーションに移送及び位置決めする工程と、前記下流のステーションに移送及び位置決めされた前記素材(40)に、加工処理を施す工程とを有している。

Description

ワークの打ち抜き製造方法
 本発明は、長尺な連続する金属製板材を素材とし、前記素材からワークを製造するワークの打ち抜き製造方法に関する。
 例えば、無段変速機(CVT)用ベルトを構成するエレメントは、無段変速機のプーリに接するV面を有するボディと、前記ボディの上部にネックを介して連設されたヘッドとを備えている。ヘッドは、その両側にボディの上縁に対向するように張り出すイヤーを備えており、ネックの両側に位置する前記イヤーとボディとの間には、凹部が形成されている。また、ボディの略下半部には、板厚が下縁に向かって次第に薄くなる薄肉部が形成されている。
 通常、エレメントは、複数枚で環状に積層されるとともに、凹部に金属帯状の無端リングが装着されることにより、環状に結束されている。その際、ボディは、ベルトの内周側に、ヘッドは、ベルトの外周側に、それぞれ位置されている。
 エレメントは、長尺な連続する金属製板材を素材とし、前記金属製板材がプレス装置のダイの上に載置された状態で、成形パンチによって打ち抜かれることにより成形されている。そして、打ち抜かれたエレメントは、数百枚で環状に積層され、凹部に無端リングが装着されることにより、無段変速機用ベルトとして組み立てられている。
 この種の技術として、例えば、特開2004-141887号公報に開示されている無段変速機用ベルトのエレメントの製造方法が知られている。この製造方法では、図5に示すように、加工ステーションA~加工ステーションHが設けられており、帯状の条材1が矢印L方向に搬送されながら、前記加工ステーションA~前記加工ステーションHにより、所望の加工処理が施されている。
 例えば、加工ステーションAでは、条材1の送り用のパイロット孔2が形成されるとともに、加工ステーションCでは、最終的に打ち抜かれるエレメント3の外側不要部分4の打ち抜き加工が行われている。また、加工ステーションDでは、コイニング加工が行われる一方、加工ステーションEでは、シェービング加工が行われている。そして、最終的に、加工ステーションHでは、パンチによりエレメント3が条材1から切り離されている。
 上記の特開2004-141887号公報では、加工ステーションAにおいて、条材1にパイロット孔2が形成されている。このパイロット孔2には、図示しない位置決め搬送ピンが挿入されることにより、条材1は、矢印L方向に、順次、間欠搬送されている。そして、加工ステーションB~加工ステーションHにおいて、条材1には、所定の加工処理、例えば、コイニング加工等のつぶし処理が施されている。
 しかしながら、つぶし工程では、条材1に材料流動が発生し易い。このため、パイロット孔2が変形してしまい、前記パイロット孔2による位置決め精度が低下するおそれがある。これにより、製品であるエレメント3の加工品質のバラつきが大きくなる。
 本発明はこの種の問題を解決するものであり、簡単な工程で、長尺な連続する金属製板材から高品質なワークを容易且つ確実に製造することが可能なワークの打ち抜き製造方法を提供することを目的とする。
 本発明は、長尺な連続する金属製板材を素材とし、前記素材からワークを製造するワークの打ち抜き製造方法に関するものである。
 また、本発明は、長尺な連続する金属製板材を素材とし、前記素材からワークを製造するとともに、前記ワークは、無段変速機用ベルトのエレメントであるワークの打ち抜き製造方法に関するものである。
 さらに、本発明は、長尺な連続する金属製板材を素材とし、前記素材からワークを製造するとともに、前記ワークは、無段変速機用ベルトのエレメントであり、且つ前記素材は、一定の板厚を有する平面部のみからなるワークの打ち抜き製造方法に関するものである。
 この製造方法は、素材に、パイロット孔を形成するとともに、前記パイロット孔を周回して開口部を形成する工程と、前記パイロット孔を介して前記素材を、順次、下流のステーションに移送及び位置決めする工程と、前記下流のステーションに移送及び位置決めされた前記素材に、加工処理を施す工程とを有している。
 本発明によれば、素材には、パイロット孔と該パイロット孔を周回して開口部が形成されている。この開口部は、例えば、円弧状スリット、直線上スリット又は孔部等を含む。
 従って、素材につぶし加工処理が施される際、前記素材に材料流動が発生しても、開口部により前記材料流動を逃がす(吸収する)ことができる。このため、つぶし加工処理時にパイロット孔が変形することを、確実に阻止することが可能になる。これにより、パイロット位置決め精度を良好に維持することができ、製品であるワークを高品質且つ効率的に製造することが可能になる。
本発明の実施形態に係る打ち抜き製造方法により製造されるワークである無段変速機用ベルトのエレメントの説明図である。 前記エレメントの側面説明図である。 前記打ち抜き製造方法を実施する製造システムの概略説明図である。 前記製造システムを構成する金型装置の要部説明図である。 特開2004-141887号公報の無段変速機用ベルトのエレメントの製造方法の説明図である。
 図1には、本発明の実施形態に係る打ち抜き製造方法により製造されるワークの一例である無段変速機用ベルトのエレメント10が示されている。
 エレメント10は、厚み方向に環状に複数積層されて無段変速機用ベルトが形成された際に、左右側端縁12が無段変速機のプーリ(図示せず)に接して内周側に位置するボディ14と、前記ボディ14の中央部上縁側にネック16を介して連設され、環状に複数積層された際に外周側に位置するヘッド18とを備える。ボディ14の略下半部には、他部より板厚が薄く形成された薄肉部20が設けられる。
 図1及び図2に示すように、ヘッド18に関して言えば、ネック16に隣接上部領域22を挟んで左右両側に位置する左右側端部24の板厚Cが、前記ネック16に隣接上部領域22の厚さDより大きく設定される(C>D)。ネック16及びボディ14の板厚B、Aは、ヘッド18の左右側端部24の板厚Cより小さく設定される。板厚Bは、板厚Cに対して同等以下である。
 ボディ14の薄肉部20を除く略上半部においては、ネック16の下部領域の両側に位置する前記ボディ14の左右側端部の板厚Aが、前記ネック16の下部領域の板厚Bより小さく設定される(C≧B>A)。
 図3に示すように、本実施形態に係る打ち抜き製造方法を実施する製造システム30は、素材搬送方向である矢印L方向に沿って、第1加工ステーション32、第2加工ステーション34、第3加工ステーション36及び第4加工ステーション38が配置される。
 製造システム30では、長尺な連続する金属製板材を素材40とし、前記素材40からエレメント10を製造するとともに、前記素材40は、一定の板厚を有する平面部のみから構成される。
 第1加工ステーション32は、素材40に対し、ピアス孔であるパイロット孔42を形成するとともに、前記パイロット孔42を周回して開口部、例えば、円弧状の4つのスリット44を形成する。なお、開口部としては、円弧状のスリット44に代えて、複数の直線状のスリットや、複数の孔部等であってもよい。
 第2加工ステーション34では、素材40から、エレメント10の外形不要部46を打ち抜く抜き加工が行われる。第3加工ステーション36では、図4に示す金型装置50が用いられる。
 金型装置50は、ダイ52とパンチ54とを有し、前記ダイ52及び前記パンチ54には、位置決めピン56を挿通するための孔部58、60が形成される。パンチ54は、図示しないアクチュエータを介してダイ52側に押圧され、前記パンチ54と前記ダイ52の成形面52aとにより、素材40にエレメント10の形状に対応したつぶし加工処理を施す。第4加工ステーション38は、エレメント10を素材40から分離するための打ち抜き加工が行われる。
 次いで、製造システム30において、素材40からエレメント10を製造する打ち抜き製造方法について、以下に説明する。
 図3に示すように、素材40は、図示しない搬送装置を介して矢印L方向に搬送され、先ず、第1加工ステーション32に配置される。この第1加工ステーション32において、素材40には、パイロット孔42と前記パイロット孔42を周回する複数の円弧状のスリット44とが形成される。
 次いで、素材40は、矢印L方向に搬送されて第2加工ステーション34に配置される。その際、素材40の搬送は、パイロット孔42に挿入される図示しない位置決め搬送ピンの移動作用下に、第2加工ステーション34の所望の位置に位置決め配置される。第2加工ステーション34では、エレメント10の外形不要部46を除却する抜き処理が施される。
 さらに、素材40は、パイロット孔42を介して第3加工ステーション36に搬送される。第3加工ステーション36では、例えば、図4に示すように、金型装置50を構成するパンチ54が、ダイ52側に押圧される。これにより、ダイ52の成形面52aとパンチ54とを介して、素材40には、エレメント10の形状に対応してつぶし加工処理が施される。
 この場合、本実施形態では、素材40には、パイロット孔42とこのパイロット孔42を周回して複数の円弧状のスリット44とが形成されている。このため、金型装置50によるつぶし加工処理時に、素材40に発生する材料流動(図4中、矢印参照)を、複数のスリット44により逃がす(吸収する)ことができる。従って、つぶし加工処理時に、パイロット孔42が変形することを確実に阻止することが可能になる。
 これにより、パイロット孔42を介して素材40の位置決め精度を良好に維持することができ、製品であるエレメント10を高品質且つ効率的に製造することが可能になる。
 しかも、本実施形態では、金型装置50によるつぶし加工処理時に、位置決めピン56がパイロット孔42に挿入されている。従って、金型装置50によるつぶし加工処理時に素材40に材料流動が発生しても、パイロット孔42の変形を一層確実に抑制することができる。
 実際上、パイロット孔42のみを設けた従来方法と、前記パイロット孔42を周回して複数のスリット44を形成した本実施形態とで、素材40の搬送ピッチのずれを検出した。その結果、本実施形態では、搬送ピッチのずれが、従来方法に比べて50%以下にまで低減された。
 また、本実施形態で製造されたエレメント10では、複数環状に並べられて無段変速機用ベルトが形成された際に、この無段変速機用ベルトの内周側への湾曲変形が円滑に行われる。このため、各エレメント10の積層方向は、ヘッド18側に曲がることがなく、良好な積層形状を得ることができる。
 そして、無段変速機用ベルトを形成して、無段変速機のプーリに掛けわたされた際には、前記無段変速機用ベルトの外周方向への振れを防止することが可能になる。従って、無端リングやエレメント10の損傷も回避され、無段変速機における安定した動力の伝達を行うことが可能になる。
 しかも、複数のエレメント10を環状に積層した際には、比較的肉厚の部分、すなわち、ヘッド18の左右側端部24及びボディ14におけるネック16の下部領域の三箇所は、隣り合うエレメント10に接触する。このため、極めて安定した積層状態を維持することができ、無段変速機用ベルトを形成した際に、蛇行等を防止して効率よく動力の伝達を行うことが可能になる。
 さらにまた、図2に示すように、ネック16の下部領域の板厚Bよりも、ボディ14の左右側端部の板厚Aが小さく設定される一方、左右側端部24の板厚Cよりも下部領域の板厚Bが同等以下とされている。これにより、複数のエレメント10を環状に積層して無段変速機用ベルトを形成した際、左右側端部24と下部領域との接触により、安定した積層状態とすることができる。
 その上、各エレメント10は、ヘッド18側に収束するように湾曲することを確実に阻止されるため、無段変速機のプーリに掛けわたされた際に、無端リングとの不要な接触によるエレメント10の損傷もなく、無段変速機における安定した動力の伝達を行うことが可能になる。
 なお、本実施形態では、ワークとして、無段変速機用ベルトのエレメント10を製造する場合について説明したが、これに限定されるものではない。例えば、素材40は、一定の板厚を有する平面部のみからなるものの他、種々の形状の素材を用いることができる。さらに、金属製板材を素材としてワークを製造するものであればよく、エレメント10以外の種々のワークに適用することが可能である。

Claims (9)

  1.  長尺な連続する金属製板材を素材(40)とし、前記素材(40)からワークを製造するワークの打ち抜き製造方法であって、
     前記素材(40)に、パイロット孔(42)を形成するとともに、前記パイロット孔(42)を周回して開口部(44)を形成する工程と、
     前記パイロット孔(42)を介して前記素材(40)を、順次、下流のステーションに移送及び位置決めする工程と、
     前記下流のステーションに移送及び位置決めされた前記素材(40)に、加工処理を施す工程と、
     を有することを特徴とするワークの打ち抜き製造方法。
  2.  請求項1記載の打ち抜き製造方法において、前記開口部(44)は複数のスリット又は複数の孔部であることを特徴とするワークの打ち抜き製造方法。
  3.  請求項1記載の打ち抜き製造方法において、前記素材(40)に前記加工処理としてつぶし加工処理を施す際、前記パイロット孔(42)には、位置決めピン(56)が挿入されることを特徴とするワークの打ち抜き製造方法。
  4.  長尺な連続する金属製板材を素材(40)とし、前記素材(40)からワークを製造するとともに、前記ワークは、無段変速機用ベルトのエレメント(10)であるワークの打ち抜き製造方法であって、
     前記素材(40)に、パイロット孔(42)を形成するとともに、前記パイロット孔(42)を周回して開口部(44)を形成する工程と、
     前記パイロット孔(42)を介して前記素材(40)を、順次、下流のステーションに移送及び位置決めする工程と、
     前記下流のステーションに移送及び位置決めされた前記素材(40)に、加工処理を施す工程と、
     を有することを特徴とするワークの打ち抜き製造方法。
  5.  請求項4記載の打ち抜き製造方法において、前記開口部(44)は複数のスリット又は複数の孔部であることを特徴とするワークの打ち抜き製造方法。
  6.  請求項4記載の打ち抜き製造方法において、前記素材(40)に前記加工処理としてつぶし加工処理を施す際、前記パイロット孔(42)には、位置決めピン(56)が挿入されることを特徴とするワークの打ち抜き製造方法。
  7.  長尺な連続する金属製板材を素材(40)とし、前記素材(40)からワークを製造するとともに、前記ワークは、無段変速機用ベルトのエレメント(10)であり、且つ前記素材(40)は、一定の板厚を有する平面部のみからなるワークの打ち抜き製造方法であって、
     前記素材(40)に、パイロット孔(42)を形成するとともに、前記パイロット孔(42)を周回して開口部(44)を形成する工程と、
     前記パイロット孔(42)を介して前記素材(40)を、順次、下流のステーションに移送及び位置決めする工程と、
     前記下流のステーションに移送及び位置決めされた前記素材(40)に、加工処理を施す工程と、
     を有することを特徴とするワークの打ち抜き製造方法。
  8.  請求項7記載の打ち抜き製造方法において、前記開口部(44)は複数のスリット又は複数の孔部であることを特徴とするワークの打ち抜き製造方法。
  9.  請求項7記載の打ち抜き製造方法において、前記素材(40)に前記加工処理としてつぶし加工処理を施す際、前記パイロット孔(42)には、位置決めピン(56)が挿入されることを特徴とするワークの打ち抜き製造方法。
PCT/JP2010/068375 2009-12-08 2010-10-19 ワークの打ち抜き製造方法 WO2011070857A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201080055769.3A CN102655962B (zh) 2009-12-08 2010-10-19 用于工件的冲压制造方法
JP2011545141A JP5577353B2 (ja) 2009-12-08 2010-10-19 ワークの打ち抜き製造方法

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2009278226 2009-12-08
JP2009-278226 2009-12-08

Publications (1)

Publication Number Publication Date
WO2011070857A1 true WO2011070857A1 (ja) 2011-06-16

Family

ID=44145410

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2010/068375 WO2011070857A1 (ja) 2009-12-08 2010-10-19 ワークの打ち抜き製造方法

Country Status (3)

Country Link
JP (1) JP5577353B2 (ja)
CN (1) CN102655962B (ja)
WO (1) WO2011070857A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102655959A (zh) * 2009-12-23 2012-09-05 Sms西马格股份公司 用于热轧制板坯的方法以及热轧机

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL1042209B1 (en) * 2016-12-30 2018-07-23 Bosch Gmbh Robert Method for manufacturing a transverse segment for a drive belt for a continuously variable transmission
JP6957400B2 (ja) * 2018-03-27 2021-11-02 本田技研工業株式会社 金属板材の成形方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5272543U (ja) * 1975-11-27 1977-05-31
JP2002213539A (ja) * 2001-01-18 2002-07-31 Nissan Motor Co Ltd Cvtベルト用エレメントとその製造方法
JP2003263086A (ja) * 2002-03-08 2003-09-19 Toyo Tire & Rubber Co Ltd クリーニングブレード取付金具の製造方法
JP2008011664A (ja) * 2006-06-30 2008-01-17 Kuroda Precision Ind Ltd 積層鉄心製造方法、積層鉄心製造装置および積層鉄心

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07108417B2 (ja) * 1992-07-02 1995-11-22 株式会社精工舎 コ字状部品のプレス抜き方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5272543U (ja) * 1975-11-27 1977-05-31
JP2002213539A (ja) * 2001-01-18 2002-07-31 Nissan Motor Co Ltd Cvtベルト用エレメントとその製造方法
JP2003263086A (ja) * 2002-03-08 2003-09-19 Toyo Tire & Rubber Co Ltd クリーニングブレード取付金具の製造方法
JP2008011664A (ja) * 2006-06-30 2008-01-17 Kuroda Precision Ind Ltd 積層鉄心製造方法、積層鉄心製造装置および積層鉄心

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102655959A (zh) * 2009-12-23 2012-09-05 Sms西马格股份公司 用于热轧制板坯的方法以及热轧机
CN102655959B (zh) * 2009-12-23 2016-05-18 Sms集团有限责任公司 用于热轧制板坯的方法以及热轧机

Also Published As

Publication number Publication date
CN102655962A (zh) 2012-09-05
CN102655962B (zh) 2015-06-03
JP5577353B2 (ja) 2014-08-20
JPWO2011070857A1 (ja) 2013-04-22

Similar Documents

Publication Publication Date Title
JP3703678B2 (ja) 無段変速機用ベルトのエレメントの打抜き加工方法
TWI481453B (zh) 金屬板或金屬棒之端部分割方法、使用該端部分割方法製造之金屬零件及其接合方法
EP2783771B1 (en) Device and method for punching element
JP5551154B2 (ja) 無段変速機ベルト用エレメントの製造方法
CN105081057B (zh) 制造层叠铁芯的方法和装置
WO2016067702A1 (ja) 順送加工方法
EP1158203A1 (en) Element for belt for continuously variable transmission and method of blanking such element
WO2011070857A1 (ja) ワークの打ち抜き製造方法
JP2007190570A (ja) プレス送り込み方法及びその設備
JP3777986B2 (ja) Cvtベルト用エレメントとその製造方法
CN108778553A (zh) 层叠铁芯的制造方法及制造装置
CN110303098B (zh) 金属板材的成型方法
US9192974B2 (en) Work-punching device, work-punching method, and method for producing element for continuously variable transmission
KR20030096034A (ko) 연속 가변형 트렌스밋션 벨트의 부품 제조 방법
JP4315672B2 (ja) 無段変速機用ベルトのエレメントの製造方法
JP2007135314A (ja) 回転子積層鉄心の製造方法
JP2004174585A (ja) 無段変速機用ベルトのエレメントの製造方法
WO2020203613A1 (ja) エレメントの製造方法および製造装置
JP2006043719A (ja) 無段変速機用エレメントおよびその製造方法
JP2724530B2 (ja) 鉄心の製造方法およびその製造装置
JP2001232424A (ja) 無段変速機用ベルトのエレメントの打抜き加工方法
JP5929508B2 (ja) 動力伝達チェーン用リンクの製造方法
WO2024024177A1 (ja) 缶の製造方法及び製造システム
JP5585343B2 (ja) ステータコア製造方法
JP2004141887A (ja) 無段変速機用ベルトのエレメントの製造方法

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 201080055769.3

Country of ref document: CN

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 10835779

Country of ref document: EP

Kind code of ref document: A1

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 10835779

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 2011545141

Country of ref document: JP

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 10835779

Country of ref document: EP

Kind code of ref document: A1