WO2011070857A1 - Punching manufacturing method for workpiece - Google Patents
Punching manufacturing method for workpiece Download PDFInfo
- Publication number
- WO2011070857A1 WO2011070857A1 PCT/JP2010/068375 JP2010068375W WO2011070857A1 WO 2011070857 A1 WO2011070857 A1 WO 2011070857A1 JP 2010068375 W JP2010068375 W JP 2010068375W WO 2011070857 A1 WO2011070857 A1 WO 2011070857A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- work
- processing
- pilot hole
- punching
- holes
- Prior art date
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D—WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D53/00—Making other particular articles
- B21D53/14—Making other particular articles belts, e.g. machine-gun belts
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D—WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D28/00—Shaping by press-cutting; Perforating
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D—WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D43/00—Feeding, positioning or storing devices combined with, or arranged in, or specially adapted for use in connection with, apparatus for working or processing sheet metal, metal tubes or metal profiles; Associations therewith of cutting devices
- B21D43/02—Advancing work in relation to the stroke of the die or tool
- B21D43/04—Advancing work in relation to the stroke of the die or tool by means in mechanical engagement with the work
- B21D43/05—Advancing work in relation to the stroke of the die or tool by means in mechanical engagement with the work specially adapted for multi-stage presses
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D—WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D43/00—Feeding, positioning or storing devices combined with, or arranged in, or specially adapted for use in connection with, apparatus for working or processing sheet metal, metal tubes or metal profiles; Associations therewith of cutting devices
- B21D43/02—Advancing work in relation to the stroke of the die or tool
- B21D43/04—Advancing work in relation to the stroke of the die or tool by means in mechanical engagement with the work
- B21D43/06—Advancing work in relation to the stroke of the die or tool by means in mechanical engagement with the work by positive or negative engaging parts co-operating with corresponding parts of the sheet or the like to be processed, e.g. carrier bolts or grooved section in the carriers
Definitions
- the present invention relates to a method for punching and producing a work using a long continuous metal plate as a material and manufacturing a work from the material.
- an element constituting a belt for a continuously variable transmission includes a body having a V surface in contact with a pulley of the continuously variable transmission, and a head continuously connected to an upper portion of the body via a neck.
- the head is provided on both sides with an ear that overhangs so as to face the upper edge of the body, and a recess is formed between the ear and the body located on both sides of the neck.
- the thin part which becomes thin gradually toward a lower edge is formed in the substantially lower half part of a body.
- the elements are annularly stacked in a plurality of sheets, and are bound in an annular shape by attaching a metal strip endless ring to the recess.
- the body is positioned on the inner circumferential side of the belt, and the head is positioned on the outer circumferential side of the belt.
- the element is formed by using a long continuous metal plate as a material, and the metal plate is punched out by a forming punch in a state of being placed on a die of a press. Then, several hundreds of the punched elements are annularly stacked, and an endless ring is attached to the recess, thereby being assembled as a continuously variable transmission belt.
- the processing station A the pilot holes 2 for feeding the strip 1 are formed, and in the processing station C, the punching process of the outer unnecessary portion 4 of the element 3 to be finally punched out is performed. Further, at the processing station D, coining processing is performed, while at the processing station E, shaving processing is performed. Finally, at the processing station H, the element 3 is separated from the strip 1 by a punch.
- the pilot holes 2 are formed in the strip 1 at the processing station A.
- the positioning conveyance pin which is not shown in figure is inserted in this pilot hole 2, and the strip material 1 is intermittently conveyed one by one in the arrow L direction.
- the strip material 1 is subjected to predetermined processing such as crushing processing such as coining processing.
- the present invention solves this type of problem, and provides a method of punching out a workpiece capable of easily and reliably manufacturing high quality workpieces from a long continuous metal plate material by a simple process.
- the purpose is to
- the present invention relates to a method of punching and manufacturing a work using a long continuous metal plate as a material and manufacturing a work from the material.
- the present invention relates to a method of punching out a work which is an element of a belt for a continuously variable transmission, while using a long continuous metal plate material as a material to manufacture a work from the material. .
- a long continuous metal plate material is used as a material to manufacture a work from the material, the work is an element of a continuously variable transmission belt, and the material is a certain plate
- the present invention relates to a method of punching out a work consisting only of a flat portion having a thickness.
- the manufacturing method forms a pilot hole in the material, and forms an opening around the pilot hole, and sequentially transfers and positions the material to the downstream station through the pilot hole. And processing the material transferred and positioned at the downstream station.
- the material has the pilot hole and the opening portion formed around the pilot hole.
- the opening includes, for example, an arc-like slit, a linear slit, or a hole.
- FIG. 1 shows an element 10 of a continuously variable transmission belt, which is an example of a workpiece manufactured by a punching manufacturing method according to an embodiment of the present invention.
- the left and right side edges 12 are in contact with the continuously variable transmission pulley (not shown) and are on the inner circumferential side
- a body 14 is provided, and a head 18 is provided continuously with a neck 16 on the upper edge side of the central portion of the body 14 via a plurality of rings and laminated in an annular shape.
- a thin portion 20 having a thinner plate thickness than the other portions is provided in a substantially lower half portion of the body 14.
- the thickness C of the left and right side end portions 24 located on the left and right sides of the upper region 22 adjacent to the neck 16 is the upper region 22 adjacent to the neck 16. It is set larger than the thickness D of (C> D).
- the thicknesses B and A of the neck 16 and the body 14 are set smaller than the thickness C of the left and right end portions 24 of the head 18.
- the thickness B is equal to or less than the thickness C.
- the thickness A of the left and right side end portions of the body 14 located on both sides of the lower region of the neck 16 is greater than the thickness B of the lower region of the neck 16 in substantially the upper half excluding the thin portion 20 of the body 14 It is set small (C ⁇ B> A).
- the manufacturing system 30 for carrying out the punching manufacturing method according to the present embodiment includes the first processing station 32, the second processing station 34, and the third processing along the arrow L direction which is the material conveyance direction.
- a station 36 and a fourth processing station 38 are arranged.
- a long continuous metal plate material is used as the material 40, the element 10 is manufactured from the material 40, and the material 40 is configured only by a flat portion having a certain thickness.
- the first processing station 32 forms a pilot hole 42, which is a piercing hole, in the material 40, and forms an opening, for example, four arcuate slits 44 around the pilot hole 42.
- the opening may be a plurality of linear slits, a plurality of holes, or the like instead of the arc-shaped slit 44.
- the punching process is performed by punching out the unnecessary portion 46 of the element 10 from the material 40.
- a mold apparatus 50 shown in FIG. 4 is used.
- the mold apparatus 50 has a die 52 and a punch 54, and the die 52 and the punch 54 are formed with holes 58 and 60 for inserting the positioning pin 56.
- the punch 54 is pressed toward the die 52 via an actuator (not shown), and the material 40 is subjected to a crushing process corresponding to the shape of the element 10 by the punch 54 and the molding surface 52 a of the die 52.
- the fourth processing station 38 is stamped to separate the element 10 from the blank 40.
- the material 40 is transported in the direction of arrow L via a transport device (not shown) and is first disposed at the first processing station 32.
- the material 40 is formed with a pilot hole 42 and a plurality of arc-shaped slits 44 that circulate around the pilot hole 42.
- the material 40 is conveyed in the direction of arrow L and placed at the second processing station 34.
- the transport of the material 40 is positioned and arranged at a desired position of the second processing station 34 under the movement of a positioning transport pin (not shown) inserted into the pilot hole 42.
- removal processing for removing the unnecessary portion 46 of the element 10 is performed.
- the material 40 is conveyed to the third processing station 36 through the pilot holes 42.
- the punch 54 constituting the mold apparatus 50 is pressed to the die 52 side.
- the material 40 is subjected to a crushing process corresponding to the shape of the element 10 through the molding surface 52 a of the die 52 and the punch 54.
- the material 40 is formed with a pilot hole 42 and a plurality of arc-shaped slits 44 around the pilot hole 42. For this reason, at the time of the crushing process by the mold apparatus 50, the material flow (see the arrow in FIG. 4) generated in the material 40 can be released (absorbed) by the plurality of slits 44. Therefore, it is possible to reliably prevent the pilot hole 42 from being deformed during the crushing process.
- the positioning accuracy of the material 40 can be favorably maintained through the pilot holes 42, and the product element 10 can be manufactured with high quality and efficiency.
- the positioning pin 56 is inserted into the pilot hole 42 at the time of the crushing process by the mold apparatus 50. Therefore, even if material flow occurs in the material 40 at the time of the crushing process by the mold apparatus 50, the deformation of the pilot hole 42 can be suppressed more reliably.
- the deviation of the transport pitch of the material 40 is detected.
- the deviation of the transport pitch is reduced to 50% or less compared to the conventional method.
- the continuously variable transmission belt when the continuously variable transmission belt is formed by being arranged in a plurality of rings, the bending deformation of the continuously variable transmission belt to the inner peripheral side is smoothed. To be done. For this reason, the lamination direction of each element 10 does not bend to the head 18 side, and a good lamination shape can be obtained.
- the relatively thick portions that is, the three portions of the left and right side end portions 24 of the head 18 and the lower region of the neck 16 in the body 14 are adjacent elements 10 Contact For this reason, it is possible to maintain an extremely stable laminated state, and when the continuously variable transmission belt is formed, it becomes possible to efficiently transmit power by preventing meandering and the like.
- the thickness A of the left and right end portions of the body 14 is set smaller than the thickness B of the lower region of the neck 16, while the thickness C of the left and right end portions 24 is set. Also in the lower region, the thickness B of the lower region is made equal or less.
- each element 10 is reliably prevented from bending so as to converge on the head 18 side, the element by unnecessary contact with the endless ring when it is hung on the continuously variable transmission pulley. It becomes possible to perform stable power transmission in the continuously variable transmission without 10 damage.
- the raw material 40 can use the raw material of various shapes besides what consists only of the flat part which has fixed plate
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Punching Or Piercing (AREA)
- Shaping Metal By Deep-Drawing, Or The Like (AREA)
Abstract
Description
Claims (9)
- 長尺な連続する金属製板材を素材(40)とし、前記素材(40)からワークを製造するワークの打ち抜き製造方法であって、
前記素材(40)に、パイロット孔(42)を形成するとともに、前記パイロット孔(42)を周回して開口部(44)を形成する工程と、
前記パイロット孔(42)を介して前記素材(40)を、順次、下流のステーションに移送及び位置決めする工程と、
前記下流のステーションに移送及び位置決めされた前記素材(40)に、加工処理を施す工程と、
を有することを特徴とするワークの打ち抜き製造方法。 A method of punching out a work, wherein a long continuous metal plate material is used as a material (40), and a work is manufactured from the material (40),
Forming a pilot hole (42) in the material (40) and forming an opening (44) around the pilot hole (42);
Transferring and positioning the material (40) sequentially to the downstream station via the pilot holes (42);
Processing the material (40) transferred and positioned at the downstream station;
A method of punching out a work comprising: - 請求項1記載の打ち抜き製造方法において、前記開口部(44)は複数のスリット又は複数の孔部であることを特徴とするワークの打ち抜き製造方法。 The method according to claim 1, wherein the opening (44) is a plurality of slits or a plurality of holes.
- 請求項1記載の打ち抜き製造方法において、前記素材(40)に前記加工処理としてつぶし加工処理を施す際、前記パイロット孔(42)には、位置決めピン(56)が挿入されることを特徴とするワークの打ち抜き製造方法。 The punching manufacturing method according to claim 1, characterized in that positioning pins (56) are inserted into the pilot holes (42) when the material (40) is subjected to crushing processing as the processing. Workpiece punching method.
- 長尺な連続する金属製板材を素材(40)とし、前記素材(40)からワークを製造するとともに、前記ワークは、無段変速機用ベルトのエレメント(10)であるワークの打ち抜き製造方法であって、
前記素材(40)に、パイロット孔(42)を形成するとともに、前記パイロット孔(42)を周回して開口部(44)を形成する工程と、
前記パイロット孔(42)を介して前記素材(40)を、順次、下流のステーションに移送及び位置決めする工程と、
前記下流のステーションに移送及び位置決めされた前記素材(40)に、加工処理を施す工程と、
を有することを特徴とするワークの打ち抜き製造方法。 A long continuous metal plate material is used as a material (40), and a work is manufactured from the material (40), and the work is a punching manufacturing method of a work which is an element (10) of a continuously variable transmission belt. There,
Forming a pilot hole (42) in the material (40) and forming an opening (44) around the pilot hole (42);
Transferring and positioning the material (40) sequentially to the downstream station via the pilot holes (42);
Processing the material (40) transferred and positioned at the downstream station;
A method of punching out a work comprising: - 請求項4記載の打ち抜き製造方法において、前記開口部(44)は複数のスリット又は複数の孔部であることを特徴とするワークの打ち抜き製造方法。 5. The method according to claim 4, wherein the opening (44) is a plurality of slits or a plurality of holes.
- 請求項4記載の打ち抜き製造方法において、前記素材(40)に前記加工処理としてつぶし加工処理を施す際、前記パイロット孔(42)には、位置決めピン(56)が挿入されることを特徴とするワークの打ち抜き製造方法。 5. The method according to claim 4, wherein when subjecting the material (40) to crushing as the processing, positioning pins (56) are inserted into the pilot holes (42). Workpiece punching method.
- 長尺な連続する金属製板材を素材(40)とし、前記素材(40)からワークを製造するとともに、前記ワークは、無段変速機用ベルトのエレメント(10)であり、且つ前記素材(40)は、一定の板厚を有する平面部のみからなるワークの打ち抜き製造方法であって、
前記素材(40)に、パイロット孔(42)を形成するとともに、前記パイロット孔(42)を周回して開口部(44)を形成する工程と、
前記パイロット孔(42)を介して前記素材(40)を、順次、下流のステーションに移送及び位置決めする工程と、
前記下流のステーションに移送及び位置決めされた前記素材(40)に、加工処理を施す工程と、
を有することを特徴とするワークの打ち抜き製造方法。 A long continuous metal plate is used as a material (40) to manufacture a work from the material (40), the work is an element (10) of a continuously variable transmission belt, and the material (40) ) Is a method of punching out a work consisting of only a flat portion having a constant thickness,
Forming a pilot hole (42) in the material (40) and forming an opening (44) around the pilot hole (42);
Transferring and positioning the material (40) sequentially to the downstream station via the pilot holes (42);
Processing the material (40) transferred and positioned at the downstream station;
A method of punching out a work comprising: - 請求項7記載の打ち抜き製造方法において、前記開口部(44)は複数のスリット又は複数の孔部であることを特徴とするワークの打ち抜き製造方法。 A method according to claim 7, wherein the opening (44) is a plurality of slits or a plurality of holes.
- 請求項7記載の打ち抜き製造方法において、前記素材(40)に前記加工処理としてつぶし加工処理を施す際、前記パイロット孔(42)には、位置決めピン(56)が挿入されることを特徴とするワークの打ち抜き製造方法。 The punching manufacturing method according to claim 7, characterized in that positioning pins (56) are inserted into said pilot holes (42) when said material (40) is subjected to crushing processing as said processing. Workpiece punching method.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201080055769.3A CN102655962B (en) | 2009-12-08 | 2010-10-19 | Punching manufacturing method for workpiece |
JP2011545141A JP5577353B2 (en) | 2009-12-08 | 2010-10-19 | Workpiece punching manufacturing method |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2009278226 | 2009-12-08 | ||
JP2009-278226 | 2009-12-08 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2011070857A1 true WO2011070857A1 (en) | 2011-06-16 |
Family
ID=44145410
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2010/068375 WO2011070857A1 (en) | 2009-12-08 | 2010-10-19 | Punching manufacturing method for workpiece |
Country Status (3)
Country | Link |
---|---|
JP (1) | JP5577353B2 (en) |
CN (1) | CN102655962B (en) |
WO (1) | WO2011070857A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102655959A (en) * | 2009-12-23 | 2012-09-05 | Sms西马格股份公司 | Method for hot-rolling a slab and hot-rolling mill |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
NL1042209B1 (en) * | 2016-12-30 | 2018-07-23 | Bosch Gmbh Robert | Method for manufacturing a transverse segment for a drive belt for a continuously variable transmission |
JP6957400B2 (en) | 2018-03-27 | 2021-11-02 | 本田技研工業株式会社 | Molding method of metal plate material |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5272543U (en) * | 1975-11-27 | 1977-05-31 | ||
JP2002213539A (en) * | 2001-01-18 | 2002-07-31 | Nissan Motor Co Ltd | Element for cvt belt and its manufacturing method |
JP2003263086A (en) * | 2002-03-08 | 2003-09-19 | Toyo Tire & Rubber Co Ltd | Method for manufacturing cleaning blade fixing metal |
JP2008011664A (en) * | 2006-06-30 | 2008-01-17 | Kuroda Precision Ind Ltd | Manufacturing method of laminated core, manufacturing device of laminated core, and laminated core |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07108417B2 (en) * | 1992-07-02 | 1995-11-22 | 株式会社精工舎 | Press-cutting method for U-shaped parts |
-
2010
- 2010-10-19 WO PCT/JP2010/068375 patent/WO2011070857A1/en active Application Filing
- 2010-10-19 CN CN201080055769.3A patent/CN102655962B/en not_active Expired - Fee Related
- 2010-10-19 JP JP2011545141A patent/JP5577353B2/en not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5272543U (en) * | 1975-11-27 | 1977-05-31 | ||
JP2002213539A (en) * | 2001-01-18 | 2002-07-31 | Nissan Motor Co Ltd | Element for cvt belt and its manufacturing method |
JP2003263086A (en) * | 2002-03-08 | 2003-09-19 | Toyo Tire & Rubber Co Ltd | Method for manufacturing cleaning blade fixing metal |
JP2008011664A (en) * | 2006-06-30 | 2008-01-17 | Kuroda Precision Ind Ltd | Manufacturing method of laminated core, manufacturing device of laminated core, and laminated core |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102655959A (en) * | 2009-12-23 | 2012-09-05 | Sms西马格股份公司 | Method for hot-rolling a slab and hot-rolling mill |
CN102655959B (en) * | 2009-12-23 | 2016-05-18 | Sms集团有限责任公司 | For method and the hot-rolling mill of hot rolling slab |
Also Published As
Publication number | Publication date |
---|---|
JPWO2011070857A1 (en) | 2013-04-22 |
CN102655962B (en) | 2015-06-03 |
JP5577353B2 (en) | 2014-08-20 |
CN102655962A (en) | 2012-09-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP3703678B2 (en) | Punching method for continuously variable transmission belt elements | |
TWI481453B (en) | Method for dividing end portion of metal plate or metal bar, and metal component produced by this method and jointing method therefor | |
EP2783771B1 (en) | Device and method for punching element | |
JP5551154B2 (en) | Method for manufacturing element for continuously variable transmission belt | |
WO2016067702A1 (en) | Progressive processing method | |
US6645104B2 (en) | Element for belt for continuously variable transmission | |
WO2011070857A1 (en) | Punching manufacturing method for workpiece | |
CN108778553A (en) | The manufacturing method and manufacturing device of laminated iron core | |
CN110303098B (en) | Method for forming metal plate | |
US9192974B2 (en) | Work-punching device, work-punching method, and method for producing element for continuously variable transmission | |
KR20030096034A (en) | Method for making elements of a continuously variable transmission belt | |
JP4315672B2 (en) | Method for manufacturing element of continuously variable transmission belt | |
JP2007135314A (en) | Manufacturing method for rotor laminated iron core | |
JP2004174585A (en) | Manufacturing method for element of continuously variable transmission belt | |
WO2020203613A1 (en) | Element manufacturing method and manufacturing device | |
JP2006043719A (en) | Element for continuously variable transmission and method for manufacturing the same | |
JP3701536B2 (en) | Punching method for continuously variable transmission belt elements | |
JP2724530B2 (en) | Iron core manufacturing method and iron core manufacturing apparatus | |
JP2011133015A (en) | Method for manufacturing element for continuously variable transmission | |
JP5929508B2 (en) | Method for manufacturing link for power transmission chain | |
WO2024024177A1 (en) | Can manufacturing method and manufacturing system | |
JP5585343B2 (en) | Stator core manufacturing method | |
JP2018038152A (en) | Method of manufacturing motor core and motor core | |
JP6577987B2 (en) | Element manufacturing method | |
JP2012086227A (en) | Method for manufacturing washer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
WWE | Wipo information: entry into national phase |
Ref document number: 201080055769.3 Country of ref document: CN |
|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 10835779 Country of ref document: EP Kind code of ref document: A1 |
|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 10835779 Country of ref document: EP Kind code of ref document: A1 |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2011545141 Country of ref document: JP |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 10835779 Country of ref document: EP Kind code of ref document: A1 |